Questions and Replies
02 September 2019 - NW212
Buthelezi, Ms P to ask the Minister of Public Enterprises
What is the total (a) number of employees in his department who are being paid whilst they are on undue and/or extended periods of sick leave and (b) cost to the Government in each case?
Reply:
(a) None
(b) None
02 September 2019 - NW216
Buthelezi, Ms P to ask the Minister of Public Enterprises
(a) What is the total number of vacancies in (i) his department and (ii) each of the provincial departments reporting to him and (b) by what date will the vacancies be filled in each case?
Reply:
(a) What is the total number of vacancies in
(i) his department
32 vacancies
(ii) each provincial departments reporting to him; and
None
(b) by what date will the vacancies be filled in each case.
The post of Director General was advertised during July 2019. Critical posts been prioritised to be filled.
02 September 2019 - NW257
Mbabama, Ms TM to ask the Minister of Agriculture, Land Reform and Rural Development
Whether her department reserved a percentage of the department’s budget for the current financial year for disaster management; if not, why not, considering the risky nature of the agricultural sector; if so, what informed the percentage?
Reply:
The former Department of Rural Development and Land Reform established at national level, has sub-programme called Rural Disaster Mitigation Services which is aimed at coordinating departmental disaster management related functions in compliance with the Disaster Management Framework of 2005. As a result, the Department allocates within its budget, funds for capacity building and disaster risk reduction that are implemented annually. The sub-programme is allocated a total amount of R15.4 million.
During unforeseen disaster events, the Department, upon declaration of a disaster reprioritization or funding within existing budget for relief efforts in consultation with relevant stakeholders is made to cater for the disaster.
02 September 2019 - NW283
Roos, Mr AC to ask the Minister of Public Enterprises
What (a) Total amount budgeted for his private office for the 2019/20 financial year and (b) was the (i) total remuneration, (ii) salary level, (iii) job title, (iv) qualification and (v) job description of each employee appointed in his private office since May 2019?
Reply:
(a) |
R20 717 000.00 |
|
(b) |
(i) |
R16 595 000.00 |
(ii) |
(iii) |
(iv) |
|
Salary Level |
Job Title |
Qualification |
|
13 |
Private Secretary |
|
|
9 |
Assistant Private Secretary |
|
|
13 |
Senior Parliamentary and Cabinet Services |
|
|
13 |
Head: Administration |
|
|
13 |
Media Liaison Officer |
|
|
12 |
Parliamentary and Cabinet Support Officer |
|
|
9 |
Administrative Secretary |
|
|
8 |
Registry Clerk |
|
|
7 |
Receptionist |
|
|
6 |
Driver/Messenger |
|
|
6 |
Driver/Messenger |
|
|
5 |
Food Service Aid |
|
|
(v) |
Job Description of each employee appointed in his private office since May 2019. As per the DPSA benchmark job descriptions for Ministerial Support Staff. |
30 August 2019 - NW490
Marais, Mr S to ask the Minister of Defence and Military Veterans
(1)With reference to the name changes of the Reserve Force Units, (a)(i) what was the costs related to the name change process to date and (ii) from which budget allocation was the process funded and (b)(i) what will the financial costs be related to the (aa) changing of names, (bb) new insignia including beret/cap badges and (cc) flashes as well as colours and (ii) from which budget allocation will this be funded; (2) is this a higher priority expense as compared to the expense to increase troops and resources deployed to our land borders and the replacement of essential SA National Defence Force equipment; if not, why is this expenses still prioritised over the essentially required expenses?
Reply:
1. a (i) No additional costs were incurred since the start of the name review process because information briefs and guidelines provided for the process, were issued during the normal scheduled meetings with SA Army Formations and Units. Furthermore, detailed instructions and guidelines were also issued as part of the normal processes in the SA Army.
(ii) The process was funded from the normal command and control budget without any additional costs allocated for the name review process.
b. It is estimated that the total cost to implement the approved Name Review Process will be Rm8. This includes new insignia beret/cap badges, colours as well as other requirements for example signage etc. This objective is currently one of the many lower priority unfunded objectives of the SA Army. The implementation of the Name Review Process will be phased in over a three-year period, as and when funds become available.
2. This is not a higher priority expense compared to the expense of increased troops and resources deployed to our land borders and the replacement of essential SANDF equipment. That is why this objective is currently indicated as unfunded. It will be phased in over a three-year period as and when funds become available.
This objective must be seen as a transformational imperative that is long outstanding. Although it cannot be phased in immediately due to budget constraints, just the mere fact that these new names have been approved in principle will contribute to unit cohesion and ensure that the rich and diverse military history of South Africa is now reflected in a balanced way. It was the aim of the name review process to address this omission in a sensible and innovative manner, without any additional costs, where in stakeholders were consulted over the past 5 years.
30 August 2019 - NW24
Mileham, Mr K to ask the Minister of Mineral Resources and Energy
What (a) number of (i) prospecting, (ii) mining, (iii) exploration and (iv) production rights currently issued by his department to various rights holders are (aa) operational, (bb) dormant and (cc) closed down and (b) are the details of each right that is (i) dormant and •(ii) closed down? NW981E
Reply:
(a)(i) Prospecting issued 4372
(ii) Mining rights issued 1316
(iii) Exploration rights Onshore 18 Offshore 17
(iv) Production rights Onshore 01 Offshore 06
(aa) Operational 1174
(bb) Dormant 65
(cc) Closed Down 135
(b)(i) The rights are placed under care and maintenance due to amongst others the prevailing economic conditions, current low demand of commodities and inability to attract investments.
(ii) The right holder will apply for closure in most instances when the resource has been depleted. The right holder must apply for mine closure in terms of the legislation, and upon granting closure certificate, the right cease to exist and the mine is considered effectively closed.
DDG: Mineral Regulations
Date: 18 July 2019
Recommended
Advocate T Mokoena
Director General; Department of Mineral Resources
23 July 2019
Approved
Mr SG Mantashe
Minister of Mineral Resources
Date submitted; 29/08/2019
30 August 2019 - NW123
Mileham, Mr K to ask the Minister of Mineral Resources and Energy
1) Whether the Government made any investments in energy resources such as coal, oil, gas or other mineral resources and/or any beneficiation process for energy resources or the direct supply of energy outside the borders of the Republic (a) in the (i) 2017-18 and (ii) 2018-19 financial years and (b) since 1 April 2019; if not, what is the position in this regard; if so, what are the full relevant details of each specified investment, including the (aa) cost, (bb) expected benefits and (cc) details of the process followed in each case; and 2) Whether any feasibility studies were conducted before making each investment; if not, in each case, why not; if so, (a) what were the (i) findings and (ii) recommendations in each case and (b) who conducted each feasibility study? NW1084E
Reply:
1) (a) (i) The Government has not made any investment in the energy resources for 2017/18 financial year (ii) Only SFF, CEF Group subsidiary had invested in South Sudan during 2018/19 financial year.
(b) The Nile-Orange Energy Project (NOEP) is an ambitious strategic project spread in full Hydrocarbon value chain and currently ongoing in South Sudan between South African Government (Represented by Strategic Fuel Fund) and South Sudanese Government (Represented by NILEPET which is a National Oil Company of South Sudan). The cooperation is aimed at assessing and determination of technical, commercial and economic viability of the Nile Orange Energy Project spread in its entire component.
(b)(aa) To date Strategic Fuel Fund has spent R18.5 million towards developing the initiation note, this expense is made up of internal salary costs of experts, travelling, lodging and miscellaneous associated activities, deemed absolutely essential for execution of project.
(b)(bb) The partnership with South Sudan holds significant promise as it addresses in part South Africa security of feedstock supply challenges and provides a mechanism that acts as a natural hedge and reduces South Africa's exposure to oil price fluctuations.
(b)(cc) The National Treasury Framework for Infrastructure Delivery and Procurement Management gated framework is being followed and adhered to. All Project stage gates will be followed during the execution of project in future.
2) Process to depute experts and companies to conduct Pre-feasibility and feasibility studies is underway and findings /recommendations will be known at the end of feasibility studies only.
30 August 2019 - NW222
Mileham, Mr K to ask the Minister of Mineral Resources and Energy
(1) What are the relevant details of {a) the treaties, {b) the memoranda of understanding and {c) any other written agreement that the Republic has committed to regarding its involvement in the Grand Inga Hydroelectric Project (2) whether each written agreement was tabled in the National Assembly; if not, {a) which agreements have not been tabled and (b) why not, in each case; if so, (3) what amounts have been paid to {a) the Democratic Republic of Congo and (b) any other party for the hydroelectric project; (4) by what date does lie envisage will the Republic begin to receive electricity from the Grand Inga Hydroelectric Project? NW1181 E
Reply:
(1) The Republic of South Africa has entered into three instruments with the Democratic Republic of the Congo in the energy sector, namely:
(a) Treaty on the Grand Inga Hydropower Project between the between the Government of the Republic of South Africa and the Government of the Democratic Republic of Congo {29th October 2013)
(b) (i) Agreement between the Government of the Republic of South Africa and the Government of the Democratic Republic of the Congo regarding the Cooperation in the Field of Energy Resources {09lh September 2014); and (ii) Memorandum of Understanding between the Government of the Republic of South Africa and the Government of the Democratic Republic of the Congo with respect to the Grand Inga Hydropower Project in the Democratic Republic of the Congo ( 12th November 2011)
(2) All the instruments mentioned in (1) were tabled in the National Assembly.
(3) None.
(4) The project time line at this stage is by 2030.
30 August 2019 - NW320
Mileham, Mr K to ask the Minister of Mineral Resources and Energy
(1) With reference to his reply to question 26 on 8 July 2019, by what date will he table the forensic report in the National Assembly; (2) whether any disciplinary action will be taken against anyone found to be implicated; if not, in each case, why not; if so, (a) what is the name of each person found to be implicated and (b) by what date will disciplinary action be taken in each case; (3) whether any (a) criminal and/or (h) civil action is envisaged as a result of the conclusion of the investigation; if not, why not; if so, what is the (i) name of each person in this regard and (ii) current status of the criminal and/or civil action; (4) Whether the costs incurred as a result of (a) the sale of the strategic fuel reserves under investigation, (b) the resulting investigation and (c) all criminal and civil action taken and planned will be recovered from those persons found guilty; if not, in each case, why not; if so, what are the relevant details in each case? NW1287
Reply:
(1) The forensic report will be tabled in Parliament once all the necessary internal governance processes are completed.
(2) Appropriate action and sanction will be taken against those found to be implicated in due course.
(a) Given that the civil litigation and parallel criminal investigation processes are at a sensitive and critical stage and we would not want to jeopardise the case it is thus that further details in relation to name of the implicated parties will be disclosed at an appropriate time.
(b) The timing of the disciplinary action will also be based on the outcomes of the parallel civil litigation and criminal investigation process currently under way.
(3) (a)(b) It is the intent of the organisation to fully pursue appropriate civil and criminal action without any fear or favour with the intentions of ensuring restoring good governance and curbing any harmful acts of dishonesty and associated activities in our State Owned Entities.
(i)(ii) Details pertaining to this process will be disclosed in due course given that the civil litigation and parallel criminal investigation is at sensitive stage.
(4) In line with legislation and best practice the entity intents to fully ensure that all costs incurred by the state in relation to this matter are recovered from those that are found to be implicated in the sale of the strategic reserves. This is to• end a very strong message that such behaviours cannot be tolerated and will be dealt with harshly
30 August 2019 - NW201
Boshoff, Ms SH to ask the Minister of Mineral Resources and Energy
(a) What is the combined generation capacity of rooftop solar installations in the Republic according to his department's estimate and (b) what number of hours of load-shedding was prevented by such installations? NW1157E
Reply:
a) There are no official rooftop solar 1nstaiied capacity numbers as most of these installations were considered "generation for own use" in line with the old Schedule 2 of the Electricity Regulation Act (ERA) which exempted !hem from the requirement to be licensed or registered. Realising the impact these installations are likely to have on capacity planning, power systems operations and personal safety, in year 2017 the Department amended Schedule 2 of ERA therefore compelling these facilities to be registered or licensed with National Energy Regulator of South Africa (NERSA). NERSA is in the process of finalising the registration processes and rules, which will enable formal collection and analysis of information and data or. distributed generation.
The South African Photovoltaic Association (SAPV!A) estimate installed rooftop solar capacity in the country to be about 280MW.
b) There are no official number of hours as the installed capacity of rooftop solar is not known.
30 August 2019 - NW124
Mileham, Mr K to ask the Minister of Mineral Resources and Energy:
Whether certain persons and certain companies (names and details furnished) played any role in the (a) negotiation, (b) facilitation and/or (c) finalisation of the South Sudan oil deal; if not, what is the position in this regard; if so, what (i) was the role of each specified person and company in the deal, (ii) outcome was achieved by the involvement of each person and company and (iii) amount did each person and company receive in remuneration for services rendered? NW1085E
Reply:
(a) Njock Ajuk Eyong is the CEO of Centurion Law Goup.
(b) The "Joint working committee" from SFF and Nilepet thus constituted for the "Nile-Orange Energy Project" appointed Centurion Law Firm, South Africa:-
(a)(b) to perform the function of Legal Services Advisory in order to assist with the completion and submission of Exploration Production Sharing Agreement (EPSA) after following due process.
(c) Centurion Law Firm was the only company contracted to SFF.
(i) Centurion Law Firm rendered Legal Advisory Services. The key factors considered for appointment of any law firm were knowledge and proven expertise in completing an Exploration Production Sharing Agreement in South Sudan post cessation from Sudan; Knowledge and proven expertise regarding South Sudan Upstream Legislation; Presence and local content in South Sudan and knowledge of South African laws; Easily approachable and quick turnaround time.
(ii) The Centurion Law firm appointed, delivered the set objectives, resulting in signing of Exploration production sharing agreement (EPSA) being signed on Q6th May 2019 at Juba.
(iii) Centurion Law Firm was the only company in this regard that was contracted to SFF and were paid according to the agreed contracted rates.
(c) Eric Prince did not play any role
(d) Blackwater America did not play any role
(e) Frontier Resource Group did not play any role
(f) Thiangrial Petroleum did not play any role
30 August 2019 - NW221
Mileham, Mr K to ask the Minister of Mineral Resources and Energy
What (a) is the incidence level as a percentage of mineworkers of (i) pneumoconiosis and (ii) silicosis in South African mines, (b) steps is his department taking to reduce the incidence levels of these occupation related diseases and (c) is the trend of the specified diseases in the mining sector over the past 10 years?
Reply:
(a)(i) The incidence level as a percentage of mineworkers with pneumoconiosis is 0.01 % reported from the 2017 annual medical reports and 0,00% in 2018.
(a)(ii) silicosis is 0.13% in 2017 and 0.09% in 2018.
(b)The department has carried focused audits and inspections on airborne pollutants in all the regions. The department has reviewed the Guideline on Airborne Pollutants in 2017/2018 financial year which was popularised industry-wide during 2018/2019 financial year. The department is monitoring airborne pollutants overexposures through occupational hygiene statutory returns on a quarterly basis. During the 2014 OHS Summit the South African Mining Industry, (State, Employers and Organised Labour) committed to reduce the Occupational Exposure Levels (OEL) of airborne pollutants by 2024 to reduce occupational lung diseases. The mining sector is engaged at annual Occupational Health Dialogues and quarterly regional tripartite forums to deliberate on programmes initiatives to reduce the incidence of occupational lung diseases (OLD) at mines.
Find here: (c)Trends of specified occupational diseases in the mining sector over the past 10 years: (i) Coal worker's pneumoconiosis (CWP) cases reported from the annual medical reports
30 August 2019 - NW492
Marais, Mr S to ask the Minister of Defence and Military Veterans
(1)Whether refunds from the United Nations are based on actual strength in the form of soldiers and equipment instead of the serviceability of deployed equipment as was reported to the Portfolio Committee on Defence and Military Veterans (details furnished); (2) whether she has found that the United Nations Organisation Stabilisation Mission in the Democratic Republic of the Congo secured and/or ring-fenced a refund for her department or the SA National Defence Force; if so, what are the costs and comparable revenue amounts for the past five financial years?
Reply:
1. The United Nations reimbursement is based on actual strength of personnel on the ground and the serviceability of equipment deployed. If a vehicle is not serviceable during Contingent Own Equipment (COE) inspection, a penalty is levelled against the vehicle and the would be drivers and supporting staff of the vehicle also. (For example serviceability of the vehicle can be questioned as a result of a missing mirror or fire extinguisher).
2. To date claims made to the United Nations amount to RM840 that includes flying hours, manpower and amunitionThe following depicts the comparable re venue amounts for the past five financial years:
Ser No |
Year |
Paid |
Refund |
a |
b |
c |
d |
01. |
2014 |
1 155 767 612 |
356 088 658 |
02. |
2015 |
1 035 291 166 |
451 096 017 |
03. |
2016 |
985 927 629 |
887 227 546 |
04. |
2017 |
886 945 063 |
509 547 709 |
05. |
2018 |
820 494 657 |
320 612 050 |
30 August 2019 - NW488
Mileham, Mr K to ask the Minister of Mineral Resources and Energy
(1) What is the status of the Thyspunt site, in the Kouga Local Municipality, which was intended to be the site of the nuclear build programme; (2) why are public participation processes around the specified site continuing; (3) what is the status of the nuclear build programme? NW1481E
Reply:
1. Thyspunt remains one of Eskom's suitable sites to host a nuclear power plant. It has undergone extensive environmental studies in the form of environmental impact assessment and nuclear site safety review by independent consultants. Eskom has submitted nuclear site installation license (N ISL) applications for Thyspunt in order to get the site ready for any South African future nuclear power plans.
2. Site approvals for nuclear power plants, the Environmental Impact Assessment (EIA) by the Department of Environmental Affairs (DEA) and Nuclear Installation Site License (N ISL) from National Nuclear Regulator (NNR) are long-lead items. Consequently, the NNR is continuing with Eskom's application for NISL. The public hearings are an integral part of this NISL process.
Since receipt and acceptance of the Nuclear Installation Site Licence applications, the National Nuclear Regulator (NNR) has been seized with its internal technical review process of the Thyspunt site application, which is a lengthy and thorough process focusing on technical, scientific and onsite assessments amongst others.
The reason for holding NNR public hearings around the Thyspunt during this time is that NNR has completed its internal review process of the Thyspunt site application and is now embarking on an external consultation process to listen to health, safety and environmental concerns related to the application from interested and affected parties. The NNR embarks on this process to ensure that its regulatory decision making is independent, robust and transparent.
3. In terms of the Nuclear Energy Policy for 2008, the new nuclear build programme is still part of the energy mix. The Nuclear Energy Policy provides the government vision for developing extensive nuclear energy programme and to become self-sufficient in all aspects of the nuclear value chain for peaceful use of nuclear energy.
The nuclear build programme is informed by the Integrated Resources Plan (IRP). NEDLAC is in the process of finalizing IRP. In September 2019, the Integrated Resource Plan will be tabled in Cabinet for approval. The Integrated Resource Plan considers a diversified energy mix that include cleaner coal, nuclear, gas, hydro, renewables and battery storage. The outcomes of the revised IRP, will determine how the nuclear new build programme becomes phased in future. Government policy position is that South Africa will acquire nuclear at the price, pace and scale that the country can afford.
30 August 2019 - NW375
Gondwe, Dr M to ask the Minister of Tourism
What (a) number of official international trips is (i) she and (ii) her deputy planning to undertake in the 2019-22 medium term expenditure framework, (b) will the (i) destination, (ii) date, (iii) purpose and (iv) number of persons who will travel with the delegation be and (c) is the detailed breakdown of the expected cost of (i) flights, (ii) accommodation and (iii) any other expenses in each case?
Reply:
(a) Number of international trips planning to undertake in 2019-22
Government is currently in the process of concluding MTSF and MTEF 2020 -2025, once this is concluded the department will conclude its plans and budget.
- N/A
- N/A
(b) N/A
(c) N/A
30 August 2019 - NW153
Nxumalo, Mr MN to ask the Minister of Mineral Resources and Energy
Whether he has a plan in place to ensure the safety of mine workers. Particularly when trade union members and workers decide to embark on a strike while they are underground; if not. why not: if so. what are the relevant details?
Reply:
The legislation compels all underground mines to ensure that all employees are brought to surface as soon as possible at the end of their shift, as per regulation 4.1.1 in force in terms of Schedule 4 of the Mine Health and Safety Act No 29 of 1996, as amended. The primary objective of this regulation is to prevent mine employees from being exposed to a dangerous environment for long periods of time unnecessarily. In this regard, the Department will encourage the mine employers to ensure compliance with the respective legal provisions.
Also, any dispute between the labour and employer must be resolved by using the established negotiation processes. The Commission of Conciliation Mediation and Arbitration (CCMA) can also be called to assist when there is an impasse between the two parties. Again, I want to stress that labour must refrain from underground sit-in and rather apply for a protected strike as enshrined in the Labour Relations Act
Chief Inspector Mine
Date: 09/07/2019
Recommended
Advocate T Mokoena
Director General: Department of Mineral Resources
10/07/2019
Approved/Not approved
Mr S.G Mantashe
Minister of Mineral Resource and Energy
…………./2019
30 August 2019 - NW290
Mpambo-Sibhukwana, Ms T to ask the Minister of Tourism
What (a) total amount is budgeted for her private office for the 2019-20 financial year and (b) was the (i) total remuneration, (ii) salary level, (iii) job title, (iv) qualification and (v) job description of each employee appointed in her private office since 1 May 2019?
Reply:
(a) The total amount that is budgeted for the Ministry is per Annual Performance plan approved by Parliament
(b) The proposed staff establishment of the Office of a Members Administrative staff is informed by the Guide for Members of the Executive as approved by the President with effect from 8 June 2019.
(b)The (i) total remuneration, (ii) salary level, (iii) job title, (iv) qualification and (v) job description of each employee appointed in her private office since 1 May 2019?
(i) Remuneration is in accordance to the level of the employee in public service
(b) |
(ii) salary level |
(iii) job title, |
(iv) Qualification |
(v)Job description |
1 |
IV |
Special Advisor |
DPhil, Engineering |
Dispensation for the appointment and Remuneration of persons (Special Advisers) appointed to executive Authorities on ground of policy Considerations in terms of section 12A (1) of the Public Service Act, 1994): Provides that Special Advisers may be appointed-
|
2 |
IV |
Special Advisor |
D Phil, Economics |
Dispensation for the appointment and Remuneration of persons (Special Advisers) appointed to executive Authorities on ground of policy Considerations in terms of section 12A (1) of the Public Service Act, 1994): Provides that Special Advisers may be appointed-
|
3 |
14 |
Chief of Staff |
Advance Certificate in Municipal Governance and Management Current study: Advanced Diploma in Public Management |
|
4 |
13 |
Administrative Secretary |
Bachelor of Administration Honours Current study: Masters Degree in Public Administration |
|
5 |
13 |
Media Liaison Officer |
Baccalaureus Technologiae: Journalism |
|
6 |
13 |
Private Secretary |
Advanced Diploma: Public Management Current study: Honours in Public Administration |
|
7 |
13 |
Parliamentary and Cabinet Support |
Baccalaureus Legum LLB (Postgraduate) |
|
8 |
11 |
Cabinet and Parliamentary Officer |
Diploma: Journalism |
|
9 |
11 |
Community Outreach Officer |
Matric |
|
10 |
9 |
Assistant Appointment Secretary |
Matric |
|
11 |
7 |
Registry Clerk
|
Baccalaureus Artium Cum Honoribus |
|
12 |
7 |
Secretary / Receptionist |
National Diploma: Internal Auditing |
|
13 |
5 |
Messenger/Driver |
Advanced Diploma: Small Business Management |
|
29 August 2019 - NW299
Steyn, Ms A to ask the Minister of Agriculture, Land Reform and Rural Development
Is the Oviston area in the Walter Sisulu Local Municipality surveyed; if so, (a) what number of erven are registered, (b) what number of the registered erven are registered as (i) private and (ii) in the name of the State and (c) under which state department are they registered? NW1265E
Reply:
Yes, the Oviston area in the Walter Sisulu Local Municipality is surveyed. Oviston is a township that was approved as a Deduction Plan (No. 10062) in 1978 by the Surveyor General: Cape Town (KaapStad), with SG No. 5642/1978.
According to the records of the King William's Town Deeds Office -
(a) There are 319 properties registered.
(b) (i) 296 privately owned
(ii) 23 state owned
(c) 5 - Provincial Government of the Eastern Cape
2 - National Government of the Republic of South Africa
16 - Walter Sisulu Local Municipality
29 August 2019 - NW440
Breedt, Ms T to ask the Minister of Agriculture, Land Reform and Rural Development
(1) What (a) progress has been made with conducting the State land audit and (b) are the timelines for completing the specified audit; (2) what (a) methodology is being applied in compiling the audit and (b) sources are being consulted for conducting the land audit; (3) whether she will make a statement on the matter?
Reply:
1. (a) The final report of the audit of state land conducted by the department was published in 2013.
(b) The audit was carried out between 2010 and 2012.
(2) (a) The audit involved desktop analysis and field physical verification.
(b) Deeds ownership data and Cadastral Data.
(3) No.
29 August 2019 - NW301
Steyn, Ms A to ask the Minister of Agriculture, Land Reform and Rural Development
What (a) number of hectares is currently sitting in the Agricultural Land Holding account and (b) is the annual income for the account?
Reply:
a) There are 85 325 total hectares currently sitting in the Agricultural Land Holding account for the financial year 2018/2019 and
b) The amount of R 15,038,040.58 is the annual income for the account in 2018/2019 financial year.
NB:
The hectares sitting in the Agricultural holding account refers to the total number of hectares acquired in the financial year 2018/2019 which is not related to the amount of annual income since not all farms/hectares acquired qualify for rental billing/collection
28 August 2019 - NW371
De Villiers, Mr MJ to ask the Minister of Small Business Development
What (a) number of official international trips is (i) she and (ii) her deputy planning to undertake in the 2019-22 medium term expenditure framework, (b) will the (i) destination, (ii) date, (iii) purpose and (iv) number of persons who will travel with the delegation be and (c) is the detailed breakdown of the expected cost of (i) flights, (ii) accommodation and (iii) any other expenses in each case?”
Reply:
(a) The international trips for the Minister are based on the requests for support from the Presidency and other key stakeholders such as the Department of International Relations and Cooperation (DIRCO), for essential issues of national interest related to SME and Co-operatives development. However; the Departmental requests for international trips are based on the requirements of the Department of Small Business Development (DSBD) Annual Performance Plan as well as fulfilling prior commitments in multilateral engagements such as the Brazil, Russia, India, China and South Africa (BRICS) and the Indian Ocean Rim Association (IORA) that have strong SME and Co-operatives development element.
(b) The size of the delegation to any Departmental international trip is governed by the DSBD Travel Policy and approved by the Director-General. The Delegation for Ministry is determined in line with the Public Finance Management Act (PFMA) and in line with the Ministerial Handbook.
(c) The (i) flights; (ii) accommodation costs and (iii) other expenses are as per National Treasury Guidelines for the applicable job levels.
28 August 2019 - NW286
Nodada, Mr BB to ask the Minister of Small Business Development
What (a) total amount is budgeted for her private office for the 2019-20 financial year and (b) was the (i) total remuneration, (ii) salary level, (iii) job title, (iv) qualification and (v) job description of each employee appointed in her private office since 1 May 2019?”
Reply:
The Guide for Members of the Executive give guidance on the appointment of the staff in the Private Office. It equally provides the recommended salary levels of each post. The salary levels are adjusted on an annual basis as prescribed in the Public Service Regulations.
The Office of the Minister has a staff complement as defined in the Guide for Members of the Executive. In line with the Protection of Personal Information Act (PoPi) and the Basic Conditions of Employment Act, I am unable to provide the members with such confidential information in the manner it is requested.
I however draw the honourable members to the Department’s Annual Report wherein the organogram of the Department provides the information required. Should it be insufficient, the Department will make the personal files of the officials available for further scrutiny by the Auditor General as prescribed by the Act.
a) Total amount budgeted for the private office for both the Minister and the Deputy Minister is
R 15, 844,624.00
b) (i) (ii) (iii) Ministry- the Minister’s office staff
- One employee at salary level 14
- Three employees at salary level 13
- Two employees at salary level 11
- One employees at salary level 7
- Two employees at salary level 3
- One employee at salary level 5
c) Deputy Minister’s office staff
• One employee at salary level 13
• One employee at salary level 12
• One employee at salary level 11
• One employees at salary level 11
One employee at salary level 3
_______________________________________________________________________________
28 August 2019 - NW385
Steyn, Ms A to ask the Minister of Agriculture, Land Reform and Rural DevelopmentQUESTION
(1) What (a) number of investigations undertaken by her department are currently underway and (b) are the reasons for each specified investigation; (2) whether she will make the reports of each investigation public; if not, why not; if so, by what date? NW1357E
Reply:
AGRICULTURE
1(a) Cabinet invoked Section 100 (1) of the Constitution of South Africa on the Provincial Administration of the North West Province in May 2019. President Ramaphosa then established an Inter-Ministerial Task Team (IMTT), chaired by Minister Nkosazana Dlamini-Zuma, to address matters relating to the administration in North West. The IMTT was supported by the Technical Task Team (TTT) comprising of Directors-General (DGs). The TTT recommended that a forensic audit and investigation be conducted into the appointment and operations of Agridelight, which was an implementing agent for North West Department of Rural, Environment and Agricultural Development (READ) projects.
The Department of Agriculture, Forestry and Fisheries (DAFF) engaged the National Treasury (NT) in September 2018 to conduct a forensic audit on the indicators of possible fraud, financial irregularity, financial mismanagement and corruption relating to the appointment of Agridelight. This audit and investigation had to delve into subsequent operations and activities of projects funded through Comprehensive Agricultural Support Programme (CASP) in READ. The National Treasury began with the forensic audit and investigation in November 2018.
To date, satisfactory progress has been made on this forensic audit and investigation. The DAFF Audit Committee was briefed on the progress made relating to the process. The National Treasury will conclude its work in due course.
(b) This is the only forensic audit and investigation that is currently being conducted by the DAFF and the reason are outlined above.
2. All matters related to this forensic audit and investigation will be dealt with in terms of decisions by Cabinet which invoked Section 100 (1) of the Constitution of South Africa relating to Provincial administration of the North West Province.
RURAL DEVELOPMENT AND LAND REFORM
(1) (a) There are 43 allegations scheduled for investigation on the rolling annual case management register. In addition, the Special Investigating Unit (SIU) was authorised to conduct investigations in terms of the following Presidential Proclamations:
Proclamation No. R. 53 of 2012 for Restitution matters;
Proclamation No. R. 7 of 2014 for State Information Technology Agency;
Proclamation No. R. 599 of 2015, and amendment to Proclamation No. R. 7 of 2014, to include Deeds matters; and
Proclamation No. R.24 of 27 for land reform matters.
(b) The Department has a duty to investigate allegations of irregularities, including fraud, corruption, financial mismanagement, financial irregularities and mismanagement, amongst others. The allegations investigated were received from the Anti-Corruption Hotline managed by the Office of the Public Service Commission, management, whistle-blowers, officials of the department and members of the public. Alleged offences based on these reports include amongst others fraud, corruption, financial mismanagement and maladministration. The investigations conducted by the SIU are carried out in terms of Proclamations by the President as provided in the Special Investigating Units and Special Tribunals Act No 74 of 1996.
2. The investigation reports of the Department are confidential and are generally not shared with the public; however requests for access to the reports may be made in terms of the applicable law, namely the Promotion of Access to Information Act 2 of 2000.
28 August 2019 - NW330
Lotriet, Prof A to ask the Minister of Police
What number of licenced firearms are there in the Republic for every 100 persons?
Reply:
The total number of licensed firearms, on 31 July 2019, was 2 582 656.
The population estimate, published by Statistics South Africa (Stats SA), for June 2019. Is. 58 775022. ·
There is a total of 4,39 licensed firearms, per 100 population, In the Republic of South Africa.
Reply for question 330 recommended
GENERAL NATIONAL COMMISSIONER: SOUTH AFRICAN POLICE
KJ SITOLE (SOEG)
Date: 2019/08/23
Reply for question 330 approved
GENERAL BH CELE
MINISTER OF POLICE
Date: 26/08/2019
28 August 2019 - NW377
Gumbi, Mr HS to ask the Minister of Transport
What (a) number of official international trips is (i) he and (ii) his deputy planning to undertake in the 2019-22 medium term expenditure framework, (b) will the (i) destination, (ii) date, (iii) purpose and (iv) number of persons who will travel with the delegation be and (c) is the detailed breakdown of the expected cost of (i) flights, (ii) accommodation and (iii) any other expenses in each case?
Reply:
Financial Year: July 2019 / March 2020
|
b) i) Destination |
ii) Date |
iii) Purpose |
iv) No. of Delegates |
c) i) Flights |
ii) Accommodation |
iii) Allowances |
Minister |
Colombia, Cartegena |
15 -17 Sept |
IMO World Maritime Day Parallel Event |
5 – Minister, Ministerial officials, IR and line function |
Approximately R400 000, Three business class and two economy |
Rates provided by the Mission * |
USD 85 x 5persons x 5 days = USD 2125 = R32 445.80 |
Canada, Montreal |
24 Sept - 4 October |
ICAO Assembly |
5 – Minister, Ministerial officials, IR and line function |
R 832 489.65 Five business class |
Rates provided by the Mission * |
C$174 x 5 persons x 5 days =C$ 4350 = R 50032.90 |
|
Tanzania |
16-20 September |
SADC Ministers Meeting |
5 – Minister, Ministerial officials, IR and line function |
Approximately R90 000. 00 Three business class and two economy |
Rates provided by the Mission * |
USD 117 x 5 persons x 5 days = USD 2925= R44 660.70 |
|
USA, New York |
September |
UN Climate Summit |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 600 000.00 Five business class |
Rates provided by the mission * |
USD 153 x 5 persons x 5 days = USD 3825 =R 58 402.40 |
|
UAE, Abu Dhabi |
6-10 October |
26th World Road Congress |
5 – Minister, Ministerial officials, IR and line function |
R 274 689.65 Three business class and two economy |
Rates provided by the Mission * |
UAE Dir 635 x 5 persons x 5 days = UAE Dir 5875.20 = R 24 416.80 |
|
Singapore, Singapore |
21-10 October |
26th Intelligent Transport Systems World Congress |
5 – Minister, Ministerial officials, IR and line function |
Approximately R400 000, Three business class and two economy |
Rates provided by the Mission * |
Singapore $ 211 x 5 persons x 5 days = Singapore $ 5275 = R 58 043.90 |
|
Spain, Torremolinos |
21-23 October |
Ministerial Conference on Fishing Vessel Safety and Illegal, Unreported and Unregulated Fishing |
5 – Minister, Ministerial officials, IR and line function |
Approximately R450 000, Three business class and two economy |
Rates provided by the Mission * |
Euro 102 x 5 persons x 5 days = Euro 2550 = R 43 164.10 |
|
Canada, Montreal |
18-29 Nov |
ICAO Council – Council Phase |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 998 987.58 Five business class |
Rates provided by the Mission * |
C$ 174 x 5 persons x 5 days = C$ 4350 = R 50 032.90 |
|
United Kingdom, London |
21-22 Nov |
IMO Council- Extraordinary Session |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 506 913.00 Four business class and one economy |
Rates provided by the Mission * |
GBP 104 x 5 persons x5 days = GBP 2600 = R 47 880.90 |
|
United Kingdom, London |
25 Nov - 6 December |
IMO Assembly |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 608296.3 Four business class and one economy |
Rates provided by the Mission * |
GBP 104 x 5 persons x5 days = GBP 2600 = R 47 880.90 |
|
Switzerland |
December |
Geneva Convention and Conference on Road Traffic |
5 – Minister, Ministerial officials, IR and line function |
Approximately R500 000 Three business class and two economy |
Rates provided by the Mission * |
Swiss Francs183 x 5 persons x 5 days = Swiss Francs 4575 = R 71 710.70 |
|
Sweden, Stockholm |
19-20 February |
3rd Global Ministerial Conference on Road Safety |
5 – Minister, Ministerial officials, IR and line function |
R 479 503.65 Three business class and two economy |
Rates provided by the Mission * |
Swedish Krona 1309 x 5 persons x 5 days = Swedish Krona 32725 = R 52 094.60 |
Financial Year: April 2020 – March 2021
a) |
b) i) Destination |
ii) Date |
iii) Purpose |
iv) No. of Delegates |
c) i) Flights |
ii)Accommodation |
iii) Allowances |
Minister |
Canada, Montreal |
April-May |
ICAO Council Phase |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 900 000.00 Five business class |
Rates provided by the Mission * |
C$ 174 x 5 persons x 5 days = C$ 4350 = R 50 032.90 |
United Kingdom, London |
July |
IMO Council |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 875 946.00 Four business class and one economy |
Rates provided by the Mission * |
GBP 104 x 5 persons x5 days = GBP 2600 = R 47 880.90 |
|
Canada, Montreal |
September |
ICAO Assembly |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 900 000.00 Five business class |
Rates provided by the Mission * |
C$ 174 x 5 persons x 5 days = C$ 4350 = R 50 032.90 |
|
United Kingdom, London |
November |
IMO Council |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 875 946.00 Four business class and one economy |
Rates provided by the Mission * |
GBP 104 x 5 persons x5 days = GBP 2600 = R 47 880.90 |
|
United Kingdom, London |
December |
IMO Assembly |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 875 946.00 Four business class and one economy |
Rates provided by the Mission * |
GBP 104 x 5 persons x5 days = GBP 2600 = R 47 880.90 |
Financial Year: April 2021 – March 2022
a) |
b) i) Destination |
ii) Date |
iii) Purpose |
iv) No. of delegates |
c) i) Flights |
ii)Accommodation |
iii) Allowances |
Minister |
Canada, Montreal |
April-May |
ICAO Council Phase |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 900 000.00 Five business class |
Rates provided by the Mission * |
C$ 174 x 5 persons x 5 days = C$ 4350 = R 50 032.90 |
United Kingdom, London |
July |
IMO Council |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 729 955.00 Four business class and one economy |
Rates provided by the Mission * |
GBP 104 x 5 persons x5 days = GBP 2600 = R 47 880.90 |
|
Iran, Bandar Abbas |
September |
World Maritime Day Parallel Event |
5 – Minister, Ministerial officials, IR and line function |
Approximately R500 000 Four business class and one economy |
Rates provided by the Mission * |
USD 109 x 5 persons x 5 days = USD 2725 = R 41 607.00 |
|
Canada, Montreal |
September |
ICAO Assembly |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 900 000.00 Five business class |
Rates provided by the Mission * |
C$ 174 x 5 persons x 5 days = C$ 4350 = R 50032.90 |
|
United Kingdom, London |
November |
IMO Council |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 875 946.00 Four business class and one economy |
Rates provided by the Mission * |
GBP 104 x 5 persons x5 days = GBP 2600 = R 47880.90 |
|
United Kingdom, London |
December |
IMO Assembly |
5 – Minister, Ministerial officials, IR and line function |
Approximately R 875 946.00 Four business class and one economy |
Rates provided by the Mission * |
GBP 104 x 5 persons x5 days = GBP 2600 = R 47880.90 |
*The budget for foreign accommodation for the 2019/2020 financial year isR5million
ADDITIONAL NOTES:
- Minister may be invited by the President to participate in Binational Commissions (BNCs), State Visits, High-Level meetings, conferences etc.
- Minister receives, from time to time, invitations from international organisations concerned with the transport sector (maritime, aviation, road and rail).
- DIRCO will most often advise of confirmed meetings closer to the date, making it difficult to plan well in advance for such meetings.
- Almost all of the invitations are directed to the Minister, who may delegate some of these engagements to the Deputy Minister. Currently there is no indication of which international meetings the Deputy Minister will attend.
- Daily Allowance will be amended as per the Financial Manual.
- Flight prices fluctuate on a daily basis, thus it is difficult to forecast accurately. The amounts provided are an estimation and are subject to change
27 August 2019 - NW380
Roos, Mr AC to ask the Minister of Home Affairs
What (a) number of asylum seekers have currently been awaiting an interview with a refugee status determination officer (RSDO) for more than (i) 30 days and (ii) 90 days and (b) is the average waiting time, in number of days, between the time that an application for an appointment with an RSDO is lodged until the interview takes place for all current asylum seeker applications?
Reply:
a) (i) The total number of asylum seekers registered on the Departmental system with an active section 22 permit waiting an interview with the RSDO for more than 30 days but less than 90 days is 516.
(ii) The total number of asylum seekers with an active section 22 permit awaiting an interview with the RSDO for more than 90 days is 2503.
b) The average waiting time for current asylum seeker applications is 30 days or less for an interview. It must be noted the Department can only provide accurate information on the average waiting period for cases registered on the National Immigration Information System (NISS) as from 1 January 2018 due to the enhancements done on the NIIS at that time.
END
26 August 2019 - NW321
De Freitas, Mr MS to ask the Minister of Tourism
(1)(a) What are the monthly statistics with reference to domestic tourism (i) in the past three years and (ii) since 1 January 2019, (b) where did the tourists travel to in each month, (c) what targets were set in this regard and (d) how did the set targets measure up to actual number of arrivals at domestic travel destinations in each month; (2) (a) what is being done to ensure that tourism targets set are met and (b) how are these targets measured; (3) (a) how is South African tourism marketed (i) in countries abroad and (ii) locally and (b) what budgets have been allocated in this regard for the next three years?
Reply:
(1)(a) (i) and (ii)
Total domestic trips see th link below:
http://pmg-assets.s3-website-eu-west-1.amazonaws.com/RNW321Total_domestic_trip.pdf
Note: Data reported in millions
Source: South African Tourism domestic surveys
Domestic holiday trips see th link below:
http://pmg-assets.s3-website-eu-west-1.amazonaws.com/RNW321Holiday_domestic_trip.pdf
Note: Data reported in millions
Source: South African Tourism domestic surveys
1. (b) Where did the tourist travel each month?
Provincial distribution cannot reliably be reported on at a monthly level. Data is provided at an annual level.
(c) What targets were set in this regard?
Targets on the number of total domestic trips per destination are set on an annual basis not on a Monthly basis
(d) How did the targets set, measure up to actual number of arrivals at domestic travel destinations each month?
Not Applicable. Refer to response (c)
(2) (a) what is being done to ensure the targets that were set are met?
Refer to response 1(c)
(b) How are these targets measured?
Refer to response 1(c)
(3)(a) How is SA tourism marketed
Marketing the South Africa a tourist destination is the responsibility of the Department of Tourism and this responsibility is shared between the department and its implementation entity South African Tourism. The latter devices programmes aimed at marketing the country with the support of the department. In addition, SAT has established stations in almost all the major regions of the world to implement marketing programmes tailored to suit each region and in some instances to suit countries within a region. South African Tourism’s marketing approach is two-pronged focussing on building a unified brand and marketing communications plan and leveraging synergistic partnerships
(i) Countries abroad
South African Tourism has a defined selection of prioritised markets that have been shortlisted for dedicated in-market marketing investments, based on their tourism potential and SA Tourism’s ability to win in these markets.
South African Tourism’s strategy is to market a unified brand in order to improve brand awareness and positivity by building brand appeal among first-time and repeat tourists, through the provision of information that shows South Africa as a value-for-money, safe and secure destination that offers unique and varied experiences.
This is achieved in the following ways:
- Marketing South Africa in its different markets and segments using different channels that provide user-friendly and fit for purpose content to consumers as well as trade and partners that sell South Africa as a tourism destination;
- Implementing an enhanced 360-degree global communications plan that conveys appealing messages to consumers, trade and media; and
- Supporting Brand SA’s reputation management strategy.
Marketing campaigns in countries are localised based on the global brand campaign and target the following segments:
- Wanderluster Segment who are older wealthier and experienced international travellers between the ages of 40 and 60
- Next Stop South Africa (NSSAs) Segment who are younger singles or couples between the ages of 25 and 50 with considerable travel experience.
- Niche Market Segments such as Millenials, LGBTQ+, African Americans and others.
Key Business drivers for international tourism marketing are:
- Hostings
- In-Country Roadshows
- Domestic and International Trade Platforms
- Trade Training and
- Strategic Partnerships
(ii) Locally
The Domestic Tourism Marketing Strategy focusses on inspiring the targeted segments of travellers to take more trips by showcasing a variety of affordable, desired experiences in a clear and accessible manner using the Domestic Sho’t Left Campaign. The Campaign is executed through a mix of various channels such as social media, radio and television, out of home marketing as well as a number of various consumer and trade activations and partnerships.
For domestic tourism, target travel groups are identified based on the degree of holiday-taking culture, which can be differentially targeted according to the behaviour that underpins the segment. The focus segments targeted through domestic tourism marketing initiatives are:
- The Build Segment has the appropriate socio-economic background and is not travelling and thus there is a need to build a culture of travel within this grouping.
- The Convert Segment are people who travel for a number of reasons, but not necessarily and need to be converted to travel for a holiday.
- The Defend Segment is mature in terms of holiday travel and there is therefore a need to defend this market and up-sell where possible.
SA Tourism also partners with and educates the distribution channel (traditional and non-traditional) to package and promote relevant deals supporting affordable, consumer-desired holiday and business events experiences, to encourage our prioritized segments to book and travel.
(b) What budgets have been allocated in this regard for the next three years
Name of the Programme |
2020/21 |
2021/22 |
2022/23 |
|
|
|
|
||
|
Budget |
Budget |
Budget |
|
(R’000) |
(R’000) |
(R’000) |
||
1 |
Corporate Support |
135 033 |
140 926 |
146 483 |
2 |
Business Enablement |
90 743 |
94 704 |
98 438 |
3 |
Leisure Tourism Marketing |
1 083 397 |
1 130 676 |
1 175 257 |
4 |
Business Events |
135 029 |
140 922 |
146 479 |
5 |
Visitor Experience |
69 494 |
72 526 |
75 386 |
Total |
1 513 696 |
1 579 755 |
1 642 043 |
26 August 2019 - NW247
Van Dyk, Ms V to ask the Minister of Communications
(1)Do the producers have to deliver all signed artist contracts to the SA Broadcasting Corporation (SABC) at least 14 days prior to the first production payment by SABC and not later than 60 days after signing of the production contract; (2) whether the producers have to provide the SABC with a list of the principal performers and their remunerations for the purpose of repeat fees; if so, what clause of the SABC Freelance Contract for Performers reflects this; (3) whether the SABC has the records of fully signed contracts with producers and contracts of all actors in all productions in the SABC archives; if so, why does a certain person (name furnished) insist on fully signed contracts from contractors when the specified person could retrieve the contracts from the records kept by the SABC; (4) why (a) does the fact that the contract lacks the signature of the producer make the contract invalid and (b) can the SABC not sign as producer, as the SABC is the ultimate commissioning producer? NW1206E
Reply:
I have been advised by the Department as follows:
1. Yes.
2. Yes. Producers have to provide a list of the principle performers. There is no clause in the SABC Freelance Contract for Performers that reflects this.
3. No, the SABC has records of contracts captured on its CRM system dating back to 2009 only. If actors for older programmes are claiming fees, the SABC will ask for a copy of the contract and if they don’t have a copy, an affidavit will be required. The SABC Content Drama department will watch the programmes and check the onscreen credits to establish the actors that were principled.
4. (a) A contract is only valid when all parties sign.
(b) No, the SABC cannot sign the contract as it is not the Producer of the
programme. The SABC commissions the content but does not produce it.
MS. STELLA NDABENI-ABRAHAMS, MP
MINISTER
26 August 2019 - NW280
Sarupen, Mr AN to ask the Minister of Justice and Correctional Services
What (a) total amount is budgeted for his private office for the 2019-20 financial year and (b) was the (i) total remuneration, (ii) salary level, (iii) job title, (iv) qualification and (v) job description of each employee appointed in his private office since 1 May 2019?
Reply:
a) The budget information for Minister’s private office is contained in the Annual Performance Plan.
b) Salary of staff range between level 5 and level 14, and staff component is tabulated below:
JOB TITLE |
LEVEL |
REMUNERATION |
QUALIFICATION/S |
JOB DESCRIPTION |
Chief of Staff |
14 |
R1 251 183.00 |
Snr Certificate, B Com Accounting and Postgraduate Diploma in Business Management. |
|
Administrative Secretary |
13 |
R1 057 326.00 |
Snr Certificate, Public Management |
|
Parliamentary and Cabinet Support |
13 |
R1 057 326.00 |
Snr Certificate, National Diploma Public Management |
|
Media Liaison Officer/Spokesperson |
13 |
R1 057 326.00 |
Snr Certificate, B. Law |
|
Parliamentary Officer |
11 |
R733 257.00 |
Snr Certificate, National Diploma, B-Tech Public Management |
|
Appointments/Private Secretary |
12 |
R869 007.00 |
N2 Business Studies, N4 Human Resource Management |
|
Assistant Appointments and Administrative Secretary |
10 |
R758 537.50 |
Snr Certificate, B. Accounting |
|
Driver/Messenger |
5 |
R237 973.10 |
Grade 10– |
|
Registry |
7 |
R368 909.50 |
Snr Certificate, B-Tech Public Management |
|
Department of Correctional Services
01 May 2019
No. |
Job Title |
Salary level |
Remuneration |
Qualification |
1. |
Special Projects and Stakeholder Relations |
13 |
R1 183 932 |
|
2. |
National Council on Correctional Services (NCCS) |
13 |
R 1 017 972.00 |
|
3. |
Parliamentary Officer |
11 |
R733 257 |
|
4. |
Personal Assistance |
10 |
R470 040 |
|
5. |
Registry Clerk |
07 |
R257 508 |
|
6. |
Driver |
05 |
R173 703 |
|
Office of the Deputy Minister
No. |
Job Title |
Salary level |
Remuneration |
Qualification |
1. |
Head of Office |
13 |
R1 183 932 |
|
2. |
Technical Specialist |
13 |
R1 183 932 |
|
3. |
Private Secretary |
12 |
R869 007 |
|
4. |
Parliamentary Cabinet Liaison |
12 |
R869 007 |
|
5. |
Community Outreach Officer |
11 |
R733 257 |
|
6. |
Secretary/ Receptionist |
07 |
R303 339 |
|
7. |
Registry Clerk |
07 |
R257 508 |
|
8. |
Messenger Driver |
05 |
R173 703 |
|
9. |
2X Domestic Workers |
03 |
R122 595 |
|
26 August 2019 - NW341
Van Dyk, Ms V to ask the Minister of Communications
In light of the SA Revenue Service (Sars) Vat News No. 20, dated September 2002, which announced that tax invoices may be issued electronically instead of the paper format, why does the SABC (a) repeat claims department still insists on originally signed tax invoices and (b) not allow invoices via email in PDF format which are in accordance with SARS instructions?
Reply:
I have been advised by the Department as follows:
a) The SABC Standard Operating Procedure (SOP) for Repeat Fees still requires the original tax certificates. The SOP will, however, be updated.
b) The SABC accepts invoices via email in PDF format in accordance with SARS instructions.
MS. STELLA NDABENI-ABRAHAMS, MP
MINISTER
26 August 2019 - NW345
Matiase, Mr NS to ask the Minister of Justice and Correctional Services
Whether, with reference to the reply to question 1606 on 12 July 2017 regarding the Constitutional Court ruling in 2011 that the practice of repossessing homes without having the claims tested by a judge is illegal, Legal Aid South Africa and Lungelo Letho Human Rights Foundation have been successful in ensuring that the illegal repossession of the house of Mr Ernest Mashaba does not take place; if not, why not; if so, what are the relevant details?
Reply:
In July 2017, the Impact Litigation Unit of Legal Aid South Africa made contact with Lungelo Lethu Human Rights Foundations (LLHRF) who were assisting Mr Mashaba in order to start the process to apply for legal aid. We were informed that legal counsel, Advocate Douglas Shaw was already instructed to act on behalf of Mr Mashaba and 243 other persons in the same position as Mr Mashaba. Further, that counsel is considering a Class Action against 4 major banks and that Advocate Alexandra Benjamin is acting as amicus.
We further reiterated that should they require legal assistance herein they can contact Legal Aid South Africa. We have not received any further requests for assistance from Mr Mashaba or Lungelo Lethu Human Rights Foundations (LLHRF).
Legal Aid SA has in the past been involved in the litigation to protect the rights of the poor people who are set to lose their home due to foreclosure of the bond.
In the following two (2) cases Legal Aid SA was admitted as an amicus.
1. ABSA vs Mokebe
Firstly, Absa Bank Limited v Mokebe and Other Related Cases 2018 (6) SA 492 (GJ) is a landmark ruling in the protection of the Constitutional right to housing set out in section 26 of the Constitution. Legal Aid South Africa made a submission which was accepted by the full court that the monetary judgment, special execution order and the setting of a reserve price should be heard and adjudicated upon simultaneously to reduce litigation costs which may be incurred by the indigent and poor if those applications were to be heard separately in 2 or 3 separate applications. [para 26]. This court for the first time made a ruling that courts have a discretion when considering the monetary judgment and special execution order to set a reserve price in terms of the Rules of Court. This means that the risk of selling the repossessed house on auction for trifling amounts and at far less than the market value has been reduced tremendously as a result of this judgment. Any reduction in the reserve price would have to be motivated to the Court that set the original reserve price. This procedure has been documented in the Practice Directives of this Court.
2. Std. Bank vs Hendricks
Secondly, the matter of Standard Bank of South Africa v Hendricks and another and related matters 2019 (2) SA 620 (WCC). The matter dealt with seven Foreclosure matters where the Standard Bank and Absa Bank sought an order of execution against immovable property which was the primary resident of the judgement debtor. Legal Aid South Africa made important submissions where the proposed practice directive of Western Cape was developed to align with the Practice Directive in Gauteng to include the necessary factors for consideration in Foreclosure applications which was in line with Mokebe’s decision. The Full Court followed the Mokebe’s decision on the question of whether or not a reserve price should be set. The court further held setting a reserve price outweighs any prejudice that may arise and that only in exceptional circumstances that the court should exercise its discretion to not make such an order.
26 August 2019 - NW349
van der Merwe, Ms LL to ask the Minister of Home Affairs
What were the main reasons cited in the applications of a certain number of individuals (details furnished) from (a) Bangladesh, (b) Pakistan, (c) India, (d) Malawi, (e) Ghana, (f) Kenya, (g) Mozambique, (h) Tanzania, (i) Zambia and (j) Thailand that led to them being granted asylum in the Republic?
Reply:
The table below indicates the main reasons for cases granted asylum from the mentioned countries as recorded on the National Immigration Information System (NIIS): -
Country |
Reasons for granting |
A) Bangladesh |
|
b) Pakistan |
|
|
|
c) India |
|
d) Malawi |
|
e) Ghana |
|
f) Kenya |
|
g) Mozambique |
|
h) Tanzania |
|
i) Zambia |
|
|
|
j) Thailand |
|
Note: According to the NIIS only a total of 1 322 cases were granted asylum (Refugee Status) from the countries indicated above.
END
26 August 2019 - NW322
De Freitas, Mr MS to ask the Minister of Tourism
(1)(a) What relationship does her department have with other government departments in order to meet its objectives, (b) what is the nature of the relationship in each instance and (c) how are these relationships monitored and measured in each instance; (2) (a) what relationship does her department have with the provinces in each instance in order to meet the objectives of her department, (b) what is the nature of the relationship in each instance and (c) how are these relationships monitored and measured in each instance?
Reply:
1. (a) The department’s relationship with other government departments:
(i). We work with other departments on a whole of government approach through the cluster systems as part of both the Economic Sector, Investment, Employment and Infrastructure Development Cluster (ESIEID) and International Cooperation, Trade and Security Cluster (ICTS). We also engage with individual departments on a case by case basis.
(b). What is the nature of the relationship in each instance?
(i). The relationship that exist is that of an intergovernmental relationship where government departments work with its counterpart on intergovernmental matters.
(c). How are these relationships monitored and measured in each instance?
(i). Through Cluster systems
2. (a). The department’s relationship with provinces
(i). The department works closely with provinces and SALGA through the Tourism MINMEC. We also engage with individual municipalities and provinces on a case by case basis.
(b). What is the nature of the relationship in each instance?
(i). The relationship that exist is that of an Intergovernmental relationship where the Department of Tourism meets with provincial departments and with municipalities through SALGA to discuss intergovernmental matters and solutions to tourism challenges at provincial, local and district level.
(c). How are these relationships monitored and measured in each instance?
(i). Through intergovernmental forums e.g. MINMEC
26 August 2019 - NW325
Krumbock, Mr GR to ask the Minister of Tourism
With reference to the Republic’s missions abroad, (a) what measures are put in place to use the missions in order to increase tourism, (b) what targets have been set for each mission, (c) what targets were achieved by each mission in the past three years, (d) how do the targets set compare to each mission, (e) how is the achievement of targets being monitored and (f) who is monitoring the achievement of targets?
Reply:
(a) Measures to use the Republic’s missions to increase tourism
Tourism development and promotion has become an important area of economic diplomacy and the Department of Tourism and South African Tourism (SA Tourism) work closely with the Department of International Relations and Cooperation (DIRCO) in this regard. SA Tourism supports missions abroad to promote South Africa as the entity responsible for this function.
In order to leverage on the network of South African Embassies in various countries, SA Tourism currently provides support to the Missions in the following ways:
- Providing DIRCO staff with Tourism Training at all levels, including Heads of Missions
- Provide SA Embassies with toolkits to promote tourism in various countries
- Support Missions in country with understanding their consumer, tourism trade and media landscapes, and to identify opportunities to engage them.
(b) What targets have been set for each mission
We don’t set targets for Missions
(c ) – (f) Not Applicable
23 August 2019 - NW267
Weber, Ms AMM to ask the MS A M M WEBER
What (a) total amount is budgeted for her private office for the 2019-20 financial year and (b) was the (i) total remuneration, (ii) salary level, (iii) job title, (iv) qualification and (v) job description of each employee appointed in her private office since 1 May 2019? NW1233E
Reply:
a) R26,369,000
b) (i) Total Remuneration (ii) salary level and (iii) job title
Component |
Subcomponent |
Post Description |
Post Salary Level |
Post Costing |
Office of the Chief of Staff |
Private Office |
Private Secretary |
13 |
1 005 063 |
Office of the Chief of Staff |
Private Office |
Community Outreach Officer |
11 |
733 257 |
Office of the Chief of Staff |
Private Office |
Assistant Appointment Secretary |
9 |
376 596 |
Office of the Chief of Staff |
Private Office |
Secretary/Receptionist |
7 |
257 508 |
Office of the Chief of Staff |
Private Office |
Domestic Worker |
3 |
122 595 |
Office of the Chief of Staff |
Private Office |
Domestic Worker |
3 |
122 595 |
TOTAL |
2 617 614 |
(b) (iv) highest qualification and (v) job description
Post Description |
Post Status |
Highest Qualification |
Job description |
Private Secretary |
Filled |
B.Com (HRM) |
Provide a direct secretarial support service to the Executive Authority. |
Community Outreach Officer |
Vacant |
To facilitate Member’s interface with Citizens on matters falling within portfolio |
|
Assistant Appointment Secretary |
Vacant |
Assist the appointments/private and administrative secretaries to provide a direct support service to the executive authority. |
|
Secretary/Receptionist |
Filled |
BA Art (Hons) Psychology |
To render a secretarial and receptionist service to the office of the Executive Authority |
Domestic Worker |
Vacant |
The main purpose of this position is” To provide household service aid |
|
Domestic Worker |
Vacant |
The main purpose of this position is” To provide household service aid |
23 August 2019 - NW378
Gumbi, Mr HS to ask the Minister in The Presidency
What (a) number of official international trips is (i) he and (ii) his deputy planning to undertake in the 2019-22 medium term expenditure framework, (b) will the (i) destination, (ii) date, (iii) purpose and (iv) number of persons who will travel with the delegation be and (c) is the detailed breakdown of the expected cost of (i) flights, (ii) accommodation and (iii) any other expenses in each case? NW1350E
Reply:
Minister Jackson Mthembu, MP
Below is a few known and planned international trips and there could be additional as per invitations and mandated by the President.
Month |
Destination |
Trip Purpose |
Number of Persons |
Estimated Costs |
2020/2022 (yearly programme) |
Addis Ababa, Ethiopia |
Ordinary Session of the Assembly of Heads of State and Government of the |
Estimated 5 persons |
Not known |
Find here: table
23 August 2019 - NW305
Hunsinger, Dr CH to ask the Minister of Transport
(1)What has he found were the reasons for not reporting on the 2018-19 Fourth Quarter expenditure; (2) whether the Railway Safety Bill has been submitted to Cabinet in the past five years; if so, (a) on what date was it submitted and (b) what was the outcome or decision in this regard; (3) whether any legislation on railway safety is currently being developed; if so, (a) on what date did work on the specified legislation start, (b) at what stage of development is the legislation in each case and (c)(i) which of the legislation have been assigned to external contractors and (ii) at what cost in each case?
Reply:
1. During the Fourth Quarter of the 2018-19 financial year there were no expenditure incurred on the development of the Rail Safety Bill and therefore there was no reporting.
2. The Railway Safety Bill was submitted to Cabinet (a) on 7 February 2018 and (b) approved for public consultation.
3. (a) Work on the development of the Railway Safety Bill commenced on 15 September 2015 and was concluded on 31 March 2019.
(b) The Railway Safety Bill has been developed.
(c) (i) The specialist drafting of the Bill was assigned to external contractors
(ii) R2,421,796-62
23 August 2019 - NW418
Schreiber, Dr LA to ask the Minister in the Presidency
(1) Whether, with reference to the reply by the former Minister in The Presidency to question 3866 on 7 January 2019, he will furnish Dr LA Schreiber with a copy of the Policy on the Benefits of Executive Office; if not, why not; (2) what is the (a) name and (b) designation of each person who currently qualifies for benefits contained in the specified policy?
Reply:
(1) We are unfortunately, unable to avail the Policy on the Benefits of the Executive Office as it contains sensitive information about security and private residences of former principals;
(2) The benefits in the policy apply to the following former principals and their respective spouses, as indicated below: -
a. Former President De Klerk and spouse;
b. Former President Mbeki and spouse;
c. Former President Motlanthe and spouse;
d. Former President Zuma and spouse/s;
e. Former Deputy President Mlambo Ngcuka and spouse; and
f. Former Deputy President Mbete and spouse.
DRAFTER OF THE REPLY
Name: Ms Linese Pillay
Designation: Administrative Manager: Former Principals Unit
Contacts: (012) 300 5581
Recommended
Director-General and Secretary to the Cabinet
Date: 22/08/2019
Recommended
Hon. Thembi Siweya, MP
Deputy Minister in The Presidency
Date:
Approved
Hon. Jackson Mthembu, MP
Minister in The Presidency
Date: 22/08/2019
21 August 2019 - NW402
Abrahams, Ms ALA to ask the Minister of Basic Education
(1)(a) What period is covered by the National Education Infrastructure Management System report dated January 2018 and (b) on what date will the report for the next period be tabled; (2) whether any measures are in place to confirm the accuracy of the reports; if not, why not; if so, what are the relevant details?
Reply:
1. The National Education Infrastructure Management System Report dated January 2018, is information of NEIMS condition Assessment done in the years 2013 to 2014, also information of completed projects which the Provincial Education Department submit every quarter.
2. Yes, DBE have engaged with Provincial Education Department requesting them to make budget allocations for the financial year 2019/20 to ensure that NEIMS condition assessments are done for the updating of the system.
21 August 2019 - NW353
Weber, Ms AMM to ask the Minister of Basic Education
What (a) number of official international trips is (i) she and (ii) her deputy planning to undertake in the 2019-22 medium term expenditure framework, (b) will the (i) destination, (ii) date, (iii) purpose and (iv) number of persons who will travel with the delegation be and (c) is the detailed breakdown of the expected cost of (i) flights, (ii) accommodation and (iii) any other expenses in each case?
Reply:
(a)(i)(ii)The official international trips that the Minister and her deputy might undertake in 2019-22 depends on, as and when the Department of Basic Education receive an invite, the invitation is then assessed and accepted subject to the president’s approval, or declined if it’s of little value to the department for consideration.
(b)(i)(ii)(iii) Dependant on (a) above, therefore currently not available.
(c)(i)(ii)(iii) Dependant on (a) above, therefore currently not available.
21 August 2019 - NW265
Boshoff, Dr WJ to ask the Minister of Basic Education
Whether she will clarify the (a) policy of her department regarding the promotion of learners in the Foundation Phase and (b) educational basis for the specified policy; (2) whether she will make a statement on the matter?
Reply:
1. a) The Foundation Phase policy on promotion requirements is stipulated in the National Policy Pertaining to the Programme and Promotion Requirements of the National Curriculum Statement (NCS) and the National Protocol on Assessment (NPA), which state that a learner may only be retained once in the Foundation Phase in order to prevent the learner being retained in this phase for longer than four years.
- In the Basic Education Budget Vote Speech for the 2018/19 Financial Year, it was announced that the progression and promotion policies, especially in the lower Grades needed to be reviewed, a policy proposal that is currently under consideration.
b) The international literature on this topic demonstrates very little evidence for repetition policies actually benefitting children. At best, these policies appear to have no effect on learner achievement and dropout, despite the immense financial stress they place on the schooling system. However, in many cases they have a negative effect on child outcomes.
Two early meta-analyses (Holmes, 1989; Jimerson 2001) showed strong negative effects of retention policies on academic achievement and socio-emotional adjustment. A recent and more rigorous meta-analysis (Allen 2009), indicated that on average repetition either had a negative effect or a null effect on academic achievement.
As such, support for automatic progression within the South African context is being considered as a possible policy position, given that repetition is regarded as being associated with learner dropout and poor academic performance (Branson, Hofmeyr and Lam, 2013; Hartley, 2006).
Indeed, many scholars (Jimerson et al., 1997) hold the view that the negative effects of repetition far outweigh automatic promotion.
Within this debate, we must also consider issues of efficiency and human rights aspects of over-sized classes, as well as the unaffordability of bringing the learner/educator ratio down substantially via hiring of additional teachers.
Many school systems in both developed and developing countries have adopted automatic promotion policies which stipulate that all learners who complete a given school year be promoted to the next grade, regardless of their levels of achievement.
2. The Minister will not make a statement. The Department of Basic Education (DBE) is putting plans in place to make the necessary policy amendments which could give effect to automatic progression in the Foundation Phase:
- Every learner will be supported to achieve the expected levels of performance for the grade. There will be adequate support for learners at risk throughout the phase.
- For the breadth of foundational skills across the phase, there will be an identified set of skills per grade to focus on, thus making it possible to give more opportunities to demonstrate competence in the next grade on the same skills if there is a need.
- Learners who experience barriers to learning will be given the opportunities to demonstrate their competence in ways that suit their needs. This has the following implications:
- Some learners may need concrete apparatus for a longer time than their peers.
- Assessment activities, especially written activities, may have to be broken up into smaller sections for learners who cannot concentrate or work for a long time, or they may be given short breaks during the tasks.
- A variety of assessment instruments should be used, as a learner may find that a particular assessment instrument does not allow her to demonstrate her true competence.
- In the Foundation Phase the inability to read should not prevent learners from demonstrating their mathematical competence, because this produces misleading results that are of no use to the learner, the teacher who has to plan the learner’s learning sequence, and the education authorities who have to identify problems in the education system.
- The usage of Mathematical terms should not be confined to the Language of Learning and Teaching (LoLT), the knowledge of Mathematical concepts in other languages should be accepted as correct.
- Reporting will be comprehensive, giving the teacher in the next grade and the parents a clear indication of strengths and skills that need further development.
21 August 2019 - NW362
Chetty, Mr M to ask the Minister of Home Affairs
What (a) number of official international trips is (i) he and (ii) his deputy planning to undertake in the 2019-22 medium term expenditure framework, (b) will the (i) destination, (ii) date, (iii) purpose and (iv) number of persons who will travel with the delegation be and (c) is the detailed breakdown of the expected cost of (i) flights, (ii) accommodation and (iii) any other expenses in each case?
Reply:
(a) (i) the annual multilateral engagements that may be attended at Ministerial or Deputy Ministerial level are:
- African Union (AU) Summit
- Migration Dialogue for Southern Africa (MIDSA) Ministerial Conference
- SADC Ministerial Committee of the Organ (MCO) meeting on Politics, Defence and Security Cooperation
- Executive Committee meeting of the United Nations High Commissioner of Refugees’ (UNHCR) Programme
(ii) annual or biannual bilateral meetings with the neighbouring counterparts
(iii) bilateral meetings with other international counterparts and other multilateral meetings are attended if relevant to the mandate of Home Affairs
(iv) international workshops, seminars, conferences, etc will be attended if relevant to the mandate of Home Affairs
AU Summit
(b) (i) Ethiopia
(ii) Dates to be announced by the AU
(iii) Migration related
(iv) Support staff, and experts on issues tabled for discussion
MIDSA Ministerial Conference
(i) SADC member state – rotational basis
(ii) Dates to be announced by the IOM and hosting country
(iii) Migration related
(iv) Support staff, and experts on issues tabled for discussion
SADC MCO
(i) SADC member state – rotational basis
(ii) Dates to be announced by SADC Secretariat and hosting country
(iii) Migration and civics related
(iv) Support staff, and experts on issues tabled for discussion
UNHCR EXCOM
(i) Switzerland
(ii) Dates to be announced by the UNHCR
(iii) Asylum seeker and refugee related
(iv) Support staff, and experts on issues tabled for discussion
All other engagements as listed above
(i) Bilaterals take place in host’s country and for remaining engagements, the host will announce.
(ii) To be announced by hosts
(iii) Migration and / or civics related
(iv) Support staff, and experts on issues tabled for discussion
(c) Costs cannot be pre – determined as dependent on duration of engagement, available flights, accommodation and ground transport, size of delegation, etc.
END
21 August 2019 - NW65
Sindane, Mr P to ask the Minister of Agriculture, Land Reform and Rural Development
What are the names of the ten largest commercial land owners in each province?
Reply:
The Branch Deeds Registration does not have a record of the use of land. However the table below reflects the land owners of the top 10 largest farms, according to its extent per province. Various municipalities are the custodian of the land use.
Province |
Property/ Land Owner |
Eastern Cape |
1. Geyer Hermanus 2. Mun Ikwezi 3. South African National Roads Agency S O C Ltd 4. National Government Of The Republic Of South Africa 5. Moravian Church In South Africa 6. South African National Roads Agency Ltd 7. Watt Handrie Van Der 8. Roelofse George Frederik 9. National Government Of The Republic Of South Africa 10. National Government Of The Republic Of South Africa |
Free State |
1. Macholo Moramang Simon 2. Plessis Jacoba Johanna Du 3. Die Suid-Afrikaanse Nasionale Padagentskap Ltd 4. South African National Roads Agency Soc Ltd Mangaung Local Municipality
|
Gauteng |
|
Kwazulu Natal |
|
Mpumalanga |
|
North West |
|
Limpopo |
|
Northern Cape |
|
Western Cape |
|
21 August 2019 - NW268
Weber, Ms AMM to ask the Minister of Basic Education
What (a) total amount is budgeted for her private office for the 2019-20 financial year and (b) was the (i) total remuneration, (ii) salary level, (iii) job title, (iv) qualification and (v) Job Description of each employee appointed in her private office since 1 May 2019?
Reply:
(a) The total amount Budgeted for her private office is R 9 342 585.00
Incumbents from 31 May 2019 to date |
(b)(i) Total Remuneration |
(b)(ii) Salary Level |
(b)(iii) Job Title |
(b)(iv) Qualification |
(b)(v) Job Description |
PRIVATE OFFICE |
|||||
P Sehlabelo |
1,308,345.00 |
14 |
1 X Chief of Staff |
Baccalaureus Artium (BA), University Education Diploma, |
Chief of Staff |
S Mabua |
978,924.00 |
12 |
1 X Private Secretary |
Diploma Office Administration, Diploma Secretarial Skills & Computer Software |
Private Secretary |
W Mncube |
1,089,294.00 |
13 |
1 X Media Liaison Officer |
Bachelors Degree In Technology Journalism, National Diploma Journalism |
Media Liaison Officer |
MJ Letsoha-Mathae |
1,023,645.00 |
12 |
1 X Community Outreach Officer |
Diploma: Project Management |
Community Outreach Officer |
EN Mbatha |
553,677.00 |
10 |
1 X Assistant Appointment Secretary |
National Diploma: Hospitality Studies |
Assistant Appointment Secretary |
JN Skwatsha |
303,339.00 |
7 |
1X Principal Ministerial Typist |
Grade 12 & Certificate In Introduction |
Principal Ministerial Typist |
PM Mphigalale |
234,960.00 |
6 |
1X Secretary/ Receptionist |
Bachelor of Social Science |
Secretary/ Receptionist |
DR Kunene |
122,595.00 |
3 |
2 X Domestic Worker |
Grade 12 Matric |
Domestic Worker |
PT Mashaba |
122,595.00 |
3 |
Grade 12 Matric |
Domestic Worker |
|
ADMINISTRATIVE STAFF |
|||||
MB Masuku |
1,245,495.00 |
13 |
1 X Administrative Secretary |
Bachelors Degree in Paedagogia, Masters of Law |
Administrative Secretary |
NM Ramahuma |
908,694.00 |
12 |
1 X Parliamentary and Cabinet Support |
Primary Teachers Diploma, Further Diploma In Education, Baccalaureus Educationis Honoribus, Master Artium (MA) |
Parliamentary and Cabinet Support |
T Mohlala |
869,007.00 |
12 |
1 X Cabinet and Parliamentary Officer |
N4 Certificate: Business Studies, UNISA - Executive Leadership Municipal Development Programme |
Cabinet and Parliamentary Officer |
A Segakweng |
261,372.00 |
7 |
1 X Registry Clerk |
Grade 12 Matric |
Registry Clerk |
MA Mashaba |
218,109.00 |
6 |
1 X Driver/Messenger |
Grade 12 Matric |
Driver/Messenger |
SM Hlatshwayo |
102,534.00 |
2 |
1 X Food Aide Services |
Grade 11 |
Food Aide Services |
21 August 2019 - NW428
Tarabella - Marchesi, Ms NI to ask the Minister of Basic Education
What (a) is the name of each provider of learner transport that has not received payment for services rendered within the prescribed 30 days in each province since 1 January 2019, (b) is the reason for not abiding by the policy of payment within 30 days for services rendered in each case and (c) number of days were exceeded in each case?
Reply:
Procurement of learner transport service providers and payment of these service providers take place at a provincial level, as such, the information on these payments, or lack thereof is located in provinces. Information has been requested from all the Provincial Departments responsible for the provision of Learner Transport Programme and will be provided as soon as it is received. The Honourable member must also note that the Learner Transport Programme is provided by both the Department of Basic Education and the Department of Transport and that in some provinces the function resides with the education sector whilst in others resides with the transport sector.
21 August 2019 - NW249
Steyn, Ms A to ask the Minister of Agriculture, Land Reform and Rural Development
(a) What total number of land claims are currently in court, (b) how long has each of the cases been going on in court, (c) what number of judges are currently serving in land claims courts and (d) how many are needed in order to speed up the processes?
Reply:
a) 349
b) Currently the earliest (long serving) case dates back to 1998. It becomes difficult to state how long a case can stay at the Land Claims Court solely because a litigant sues the department or Commission based on a decision taken by a Commissioner. Once that decision is reviewed/ set aside or corrected, for example, in acceptance/ gazetting of a claim, such a litigant will then compel referral of the claim to the Land Claims Court under the same case number as the initial case, then there might be other interlocutory applications on the same case requiring a number of various actions or directives to be issued by the judge or bring certain things to be done e.g Research / Mapping or valuation of lease rights.
c) The total number of the Land Claims Court Judges known to the Commission is (Four) being:
- Acting Judge President Justice Meer
- Acting Judge Molefe
- Acting Judge Ngcukaitobi
- Acting Judge Canca
d) The Department of Justice via the Land Claims Court can be the relevant institution to respond to this question as the Commission does not know the time period a judge requires to fast-tract the finalisation of the cases.
END
20 August 2019 - NW119
Steyn, Ms A to ask the Minister of Agriculture, Land Reform and Rural Development
(1) What number of incomplete sale purchase agreements for land claims are currently on the books of the State; (2) in what number of land claims did sellers agree to sell land to the State, which the State did not offer to purchase (a) in each of the past five financial years and (b) since 1 April 2019; (3) what is the average turnaround time for the State within which to purchase land from willing sellers?
Reply:
(1) 42
(2) (a) 85 (This figure refers to only 2018/19 financial year as the Commission had previously not categorised the capturing of offers according to land purchases and financial compensation.
(b) 32 from April 2019 to date.
(3) There is no average turn-around time since the process involves valuation (by OVG), and purchase price negotiations with land owners.
20 August 2019 - NW250
Steyn, Ms A to ask the Minister of Agriculture, Land Reform and Rural Development
(1) What is the current status of each of the AgriParks; (2) (a) what amount has been (i) budgeted for each park and (ii) spent on it to date and (b) which parks have been completed; (3) whether any outstanding payments is owed to contractors; if so, (a) what amount and (b) to which projects?
Reply:
(1) Of the proposed 44 Agri-Parks, none have been fully completed. Please refer to Annexure A for a list of projects under implementation and planning status.
The following 4 Agri-Hubs are partially operational:
- Nchora: EC;
- Springbokpan: NW;
- Witzenberg : WC; and
- Mkhulu Agri-Hub: MP.
The following 23 Farmer Production Support Units (FPSUs) are partially operational:
- Qamata-Bilatye - FPSU (EC);
- Emalahleni – FPSU (EC);
- Makholokoeng – FPSU (FS);
- Sediba FPSU (Mangaung, FS);
- Tarlton – FPSU (GP);
- Bakkerdals - (Westrand: GP);
- Ndumo FPSU (KZN);
- Makhatini FPSU (KZN);
- Nsuze FPSU (KZN);
- St Paul FPSU (KZN);
- Mapela FPSU (LP);
- Nwanedi FPSU (LP);
- Tshiombo (LP);
- Huntington FPSU (MP);
- Dundonald FPSU (MP);
- Sybrandskraal FPSU (MP);
- Heuningsvlei FPSU (NC);
- Eksteenskuil FPSU (NC);
- Taung FPSU NW);
- Ebenaeser FPSU (WC);
- Napier FPSU (WC);
- Suurbraak PFSU (WC); and
- Haarlem FPSU (WC)
(2) (a),(i),(ii) Please refer to Annexure B.
(b) There is no fully completed Agri-Park to date.
(3) (a) Invoices are paid as per job completed/ satisfied.
(b) Please refer to Annexure A for projects still under implementation or retention and still to be paid.
20 August 2019 - NW364
Sharif, Ms NK to ask the Minister of International Relations and Cooperation
What (a) number of official international trips is (i) she and (ii) her deputies planning to undertake in the 2019 – 22 medium term expenditure framework, (b) will the (i) destination, (ii) date, (iii) purpose and (iv) number of persons who will travel with the delegation be and (c) is the detailed breakdown of the expected cost of (i) flights, (ii) accommodation and (iii) any other expenses in each case? NW 1336E
Reply:
(a) The major responsibilities of the Ministry of International Relations and Cooperation is managing South Africa’s relations with the International World. This includes bilateral relations with countries across the globe, also engaging in the various multi-lateral institutions that deal with issues ranging from Peace and Security, Human Rights, Environmental Protection, Nuclear Non -Proliferation and Trade and Development. This means that over the course of MTEF, the
(i) Ministry inclusive of the Minister and
(ii) two Deputy Ministers would need to undertake various trips, to deal with Issues emanating from the bilateral and multi-lateral environments.
Some of the trips are standard, for an example we know that on annual basis, the South African President supported by the Minister of International Relations would be expected to travel to the United Nations, for the United Nations General Assembly (UNGA).So of course these kinds of trips we can pencil in and plan for well in advance. However, many of the trips arise from specific required interventions in the arena. Therefore it is not possible to provide a detailed schedule of trips on the MTEF as required by this question.
What I can undertake is to ensure that there are no trips that are undertaken when they are not necessary or relevant. I can also undertake that we would ensure that delegation sizes are not larger than what is needed to conclude diplomatic engagements successfully. I can undertake to ensure to keep the Ministry’s and the Department’s travel within the budget outlined in the MTEF. This may be difficult as South Africa has been asked as to serve as the Chair of the African Union during the year 2020. This will require additional funds which are not provided for on the MTEF. The Department will engage with National Treasury on this matter urgently.
19 August 2019 - NW432
Mazzone, Ms NW to ask the Minister of Public Enterprises
(1) Whether a bailout and/or additional guarantees are under consideration for Denel; if not, what is the position in this regard; if so, what (a) are the reasons for the bailout and/or additional guarantees and (b) is the amount under consideration; (2) Whether Denel intends to expand its operations beyond weaponry; if so, (a) what are the reasons for the expansion in its operations and (b into which industry will it expand its operations; (3) Whether the expansion of its operations will require any additional financial support from the State; if not, what is the position in this regard; if so, what are the relevant details? CW46E
Reply:
The answers for the SOEs in my portfolio are as follows:
1. An application for funding to be allocated to Denel from the contingency reserve announced by the Minister of Finance during the 2019 Budget Speech has been made, with additional funding requested over the Medium Term Expenditure Framework (MTEF).
(a) Denel requires recapitalisation because of the liquidity challenges it faces.
(b) The amount of the total recapitalisation is still being considered by Government.
(2)(a) & (b) As per the South African Defence Review (2015), Denel is a national security asset, with the primary purpose of designing, developing, manufacturing and supporting defence matériel. In addition, Denel is charged with:
-
- The custodianship of assigned sovereign or strategic defence capabilities, technologies and abilities, inclusive of those that may be at risk, the loss of which would threaten South Africa’s required defence capability.
- The design, development, manufacture and support of important capabilities.
Denel is busy with the implementation of a turnaround plan. The strategy was approved by the Board of Directors in February 2019 and is aligned with the expectations of the shareholder. The immediate focus will be on disposing of non-core assets on an urgent basis and establishing strategic equity partnerships across the various divisions of the company.
Nevertheless, Denel is constantly exploring economically viable new revenue streams as part of its profitable growth strategy as well as new technologies to grow its business and technology base. These include both technologies adjacent to its current product portfolio technologies and new “green fields” technologies. Denel continues to and intends to further grow its collaboration with local and international Universities and research institutes. Some of the technology and expansion areas being explored include security and cyber technology solutions, system of system level integration capabilities, advanced software solutions and an enhanced offering to the South African Police Service.
Denel is one of the few, if not the only, level 5 System integration capability for Military solutions in South Africa. Denel intends to play an active role in 4th Industrial revolution solutions in South Africa.
(3) Denel’s expansion into new technology areas will be funded through a combination of self-funding projects and R&D investments. No specific additional State funding is foreseen for this technology expansion.