Questions and Replies

Filter by year

14 October 2015 - NW3210

Profile picture: Esau, Mr S

Esau, Mr S to ask the Minister of Defence and Military Veterans

Why is the SA Airforce recruiting pilots from the (a) SA Flight Training Academy and (b) Vukani Aviation project when the Department of Higher Education and Training has suspended all flights by student pilots it is funding due to safety reasons?

Reply:

The SAAF does not target any specific institution but people who have an interest in aviation.

14 October 2015 - NW3385

Profile picture: Malatsi, Mr MS

Malatsi, Mr MS to ask the Minister of Sport and Recreation

With regard to the return of boxing broadcasting to the SA Broadcasting Corporation (a) who allocates the dates for broadcasting the fights and (b) on what bases are these dates allocated; (2) Do promoters of boxing apply for the allocation of certain broadcasting dates; if so ( a) to who do they apply and (b) what are the relevant details of this application process; (3) (a) What was the total cost of the broadcasting rights fees for the boxing matches broadcast from (i) Gauteng on 26 June 2015 and (ii) the Eastern Cape on 24 July 2015 and (b) in respect of each specified case what amount was (i) generated for hosting the specified fights (ii) paid to each of the fighters (iii) paid to the referees and (iv) paid to the match officials?

Reply:

  1. (a) Provincial departments and the National department of Sport and Recreation in instances where the province that is supposed to host does not have the necessary funds.

(b) They use the Supply Chain Management processes.

2.(a) Yes.

(b) BIDs are invited from promoters based in a specific province for that province as per SCM procedures.

14 October 2015 - NW3665

Profile picture: Esau, Mr S

Esau, Mr S to ask the Minister of Defence and Military Veterans

(1) (a) What are the relevant details of the training and development programmes envisaged bu her department over the current Medium-Term Expenditure Framework period, (b) how many of the specified programmes have been (i) implemented and (ii) accredited, (c) how many (i) veterans and (ii) dependants have benefited from the specified programmes, (d) which educational institutions are involved in each programme and (e) what are the related costs for each learner and institution in each case: (2) (a) what skills audit has been conducted to date to determine which programmes are needed, (b) who conducted the audit and (c) what wre the costs; (3) (a) how many were the military veterans selected in respect of each programme and (b) waht wre the criteria for selection for each specified programme?

Reply:

1 (a) Co-operatives Training Programme and Skills Development Training Programme determined by the needs of individual military veteran.

(b) Co-operatives Training Programme - Both accredited by the Small Enterprise Development Agency (SEDA) provided by accredited training providers from the Agency.

(c) Co-operatives Training Programme - Three hundred and sixty eight (368)

Skills development - 698

(d) None at the moment for Co-operatives Training Programme

Skills Development - Public and private institution and the maximum cost permitted to pay per student is R40 000.00

2. An audit was conducted on the type of businesses that military veterans own, what they would like to start and the support required to start and grow their businesses.

In terms of Skills Development no audit has been conducted because of the following reason; each military veteran advice the department on their areas which they need intervention on.

3. (a) and (b)

During the DMV roadshows, Military Veterans who attended the sessions in all Provinces were captured on attendance registers, questionnaires were distributed according to Military Veteran’s interest and a survey was conducted. The Military Veterans who showed interest in forming co-operatives were invited for this programme. The second group of Military Veterans was the ones who completed the “Aspiring” questionnaire and indicated interest in starting any form of business. The third group that was approached were the Military Veterans with informal businesses (Informal traders) and the last group was the ones with registered businesses but have not started operating and did not know how to get their businesses off the ground. A phoning exercise was embarked upon to establish whether the above-mentioned groups would like to form co-operatives. All these groups were then combined together to benefit in the Co-operatives Training Programme.

Not applicable to Skills Development.

14 October 2015 - NW2888

Profile picture: Mhlongo, Mr P

Mhlongo, Mr P to ask the Minister of Defence and Military Veterans

(1)Whether the chief financial officer (CFO) of her department is still on suspension; if not, what is the position in this regard; (2) whether the specified CFO was on suspension with full pay; if so, (a) what amount did he get paid while on suspension and (b) for how many months did he get paid while on suspension; (3) what were the reasons for the suspension?

Reply:

This disciplinary case has been finalized and the employee has been dismissed following the outcome of the disciplinary hearing.

14 October 2015 - NW3666

Profile picture: Esau, Mr S

Esau, Mr S to ask the Minister of Defence and Military Veterans

What is the present status of the Department of Military Veterans’ Appeal Board, (b) what support does the specific department render to the Appeal Board, (c) what are the financial implications of each form of support rendered and (d) who are the members of the specified board?

Reply:

Members of the Appeals Board have been appointed on a part-time basis, as of 1 June 2015, for a period of five years.

Members of the Appeal Board not in the full-time service of the State shall receive remuneration in accordance with the scales provided for in Category B1of the Service Benefit Packages for Office-bearers of certain statutory and other institutions.

The Appeal Board is composed of five members and they are Mr. M. Msimang, who is the chairperson; Adv. C.O. Morolo; Mr. F. Hartzenberg; Adv. Fhedzisani and Ms Mkwanazi.

14 October 2015 - NW3112

Profile picture: Dreyer, Ms AM

Dreyer, Ms AM to ask the Minister of Health

With regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and in view of the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 (details furnished), (a) when was the decision to demolish the hospital taken and (b) who took the decision?

Reply:

(a) This department did not make a decision to demolish the Sizwe Tropical Disease Hospital, The land was part of the land awarded for development through the Department of Local Government and Housing. This Department is not in a position to confirm when this decision was taken.

(b) The decision was taken by the Department of Local Government and Housing.

END.

13 October 2015 - NW3575

Profile picture: Bagraim, Mr M

Bagraim, Mr M to ask the Minister of Labour

Whether, with regard to minimum wage levels set for job categories falling under various bargaining councils and for various wage determinations, the Government is considering a minimum wage set below the current lowest wage determination?

Reply:

The discussions around a national minimum wage are currently taking place at NEDLAC where social partners are negotiating the modalities of the national minimum wage. In addition, a number of research projects are currently underway to inform this debate. It would therefore be premature to speculate on the level or modalities of this proposed national minimum wage.

END

13 October 2015 - NW3576

Profile picture: Bagraim, Mr M

Bagraim, Mr M to ask the Minister of Labour

Beside the Unemployment Insurance Fund, is her department considering an insurance scheme for persons who leave their jobs that is similar to the insurance offered by the private to persons who are retrenched?

Reply:

There is no new insurance scheme to be introduced at the moment.

13 October 2015 - NW3534

Profile picture: Bozzoli, Prof B

Bozzoli, Prof B to ask the Minister of Higher Education and Training

Is a certain person (name and details furnished) still receiving a salary from the EastCape Midlands Technical and Vocational Education and Training College; if so, (a) why and (b) what amount is the specified person receiving; (2) does the specified college own a farm outside Uitenhage; if so, (a) how was it purchased, (b) is any money owed on the specified property and (c) what is the farm intended for; (3) is the specified farm being used for the purpose for which it was intended; if not, why not; (4) are cattle belonging to the specified person kept at the specified farm; if so, (a) why and (b) when will they be removed?

Reply:

  1. Mr Mbana was transferred as the Principal of Eastcape Midlands Technical and Vocational Education and Training College (EMC) to the Department of Higher Education and Training on 1 April 2013. All Principals are appointed as Directors at salary level 13.

(2), (3) and (4) The Department will bring this matter to the attention of the College Council requesting that it forms part of the forensic investigation in terms of Section 46 of the Continuing Education and Training Act of 2006, as amended. The Terms of Reference for the forensic investigation will be addressed in consultation with the College Council.

Compiler/Contact persons:

Ext:

DIRECTOR – GENERAL

STATUS:

DATE:

REPLY TO QUESTION 3534 APPROVED/NOT APPROVED/AMENDED

Dr B NZIMANDE, MP

MINISTER OF HIGHER EDUCATION AND TRAINING

STATUS:

DATE:

13 October 2015 - NW3632

Profile picture: Bergman, Mr D

Bergman, Mr D to ask the Minister of Home Affairs

(1)(a) What is the total number of South African citizens who hold more than one passport who are currently residing in the country, (b) how was the specified numbers arrived at and (c) how up to date is that information; (2) does his department have a breakdown in terms of exactly which countries the numerous second passports have been issued from; if so, which countries have issued the highest numbers of second passports to South African citizens?

Reply:

(1-2) The department is unable to provide the information as its obligation extends only to keeping record of the number of documents it issues to its citizens and not that of the foreign countries.

13 October 2015 - NW3686

Profile picture: Mkhaliphi, Ms HO

Mkhaliphi, Ms HO to ask the Minister of Home Affairs

With reference to his reply to question 3272 on 18 September 2015, why (a) did his department not supply the requested information as other departments have done and (b) transactions are not recorded according to the Standard Chart of Accounts format as prescribed by the National Treasury Regulations?

Reply:

a) The Department uses LOGIS system for travel which does not provide field for recording purpose of trip as it is a procurement system.

b) Transactions are fully recorded on LOGIS as required by Standard Chart of Accounts as prescribed by National Treasury. There is no field that caters for the purpose of the trip.

12 October 2015 - NW2729

Profile picture: Maimane, Mr MA

Maimane, Mr MA to ask the Deputy President

(1)How many government functions has he held at the (a) Oliver Tambo residence in Pretoria, (b) Highstead residence in Cape Town and (c) Dr John L Dube residence in Durban since his inauguration in May 2014; 2) how many visits by official (a) foreign and/or (b) local delegations has he hosted at each of the specified residences?

Reply:

The Deputy President holds several meetings at the two official residences in Pretoria and Cape Town as and when required. To date, over a dozen official meetings have been held at these residences, in addition to meetings held at the Offices.

2776. Adv H C Schmidt (DA) to ask the Deputy President:

Whether (a) he and (b) any officials in his Office travelled to China in the 2014-15 financial year; if so, what was the (i) purpose of each specified visit and (ii)(aa) total cost and (bb) breakdown of such costs of each specified visit? NW3210E

REPLY

Neither the Deputy President nor any officials in his Office travelled to China in the 2014-15 financial year.

12 October 2015 - NW3152

Profile picture: Maimane, Mr MA

Maimane, Mr MA to ask the Deputy President

With reference to his responsibilities as the patron of the Moral Regeneration Movement, what tangible interventions is his office implementing in terms of (a) eradicating corruption and (b) ending corrupt practices within (i) the Executive, (ii) his office and (iii) the greater public service?

Reply:

It should be noted the Moral Regeneration Movement (MRM) is a Section 21 company that operates independently from the Office of the Deputy President and government.

As patron of the MRM, the Deputy President supports the work of the MRM in government and in society more broadly.

Recently the Moral Regeneration Movement developed the Ethical and Values-driven Leadership initiative. It is envisaged that this will eventually form part of government’s induction programme for officials and those in leadership positions. The programme is also targeted at business, religious and traditional leaders and at civil society organisations.

The MRM is engaging with Corruption Watch and Ethics SA to develop a programme that will assist leaders to develop a Code of Ethics in their institutions, departments and community organisations.

The year from July 2015 to July 2016 has been designated by the MRM as the year of moral regeneration under the theme “My Ideal SA: Ethics and Values”. As part of the activities to rally communities around this theme, the MRM will be going out to engage communities in various provinces, district and local municipalities on the role community members can play in building ideal communities based on agreed ethics and values.

Already, two such dialogues have been conducted, in Sedibeng District Municipality on the 3 July 2015 and in KwaZulu-Natal on 31 July 2015.

The proposals from communities during these interactions will be consolidated into a report that will assist in the development of a framework for the Ethical and Values-driven Programme led by the MRM.

The Moral Regeneration Movement is currently engaging the South African Local Government Association and the Department of Cooperative Governance to explore the possible inclusion of the MRM in local government structures and in the Integrated Development Plan (IDPs) to promote the Ethical and Values-driven Leadership Programme.

The Honourable Member should note that these initiatives are building on the successful implementation of the Charter of Positive Values developed by MRM and adopted in schools.

We hope that these and many other initiatives by various social partners across the country will contribute to deepening corporate citizenship and in sustaining a national conversation on the importance of balancing citizens’ rights and responsibilities.

Working with our social partners we will continue to strive to build a united nation with the aim of creating a more just, corruption-free and inclusive society.

12 October 2015 - NW3310

Profile picture: Lekota, Mr M

Lekota, Mr M to ask the President of the Republic

Mr MGP Lekota (Cope) to ask the President of the Republic 1. How many inter-ministerial teams has he appointed since he took office; 2. Whether any of the specified teams (a) concluded their task and were disbanded and (b) were still in existence; if not, why not, in each case; if so, (i) what was the purpose for establishing each team and (ii) to what extent did each team fulfill the objectives it was set up for; 3. Whether he will make a statement on the functioning and efficacy of inter-ministerial teams; particularly in relation to better governance? THE PRESIDENCY: REPUBLIC OF SOUTH AFRICA Private Bag X1000, Pretoria, 0001 NATIONAL ASSEMBLY QUESTION FOR WRITTEN REPLY Question No : 3310 Date Published: 28 August 2015 Mr MGP Lekota (Cope) to ask the President of the Republic How many inter-ministerial teams has he appointed since he took office; Whether any of the specified teams (a) concluded their task and were disbanded and (b) were still in existence; if not, why not, in each case; if so, (i) what was the purpose for establishing each team and (ii) to what extent did each team fulfill the objectives it was set up for; Whether he will make a statement on the functioning and efficacy of inter-ministerial teams; particularly in relation to better governance?                                                                                                                NW3923E DRAFT REPLY There are several Inter-Ministerial Committees (IMCs) that have been established since 2009. The purpose of the IMCs is to get a group of relevant Ministers to address a specific matter within a relatively short period of time. As a result most IMCs have a short life span. Some of the IMCs were established to achieve a short term goal include the following; IMC to oversee preparations for the 2014 inauguration IMC to oversee the 20 Year Review of Freedom and Democracy IMC to prepare for COP17 in Durban IMC to oversee South Africa’s bid for the Square Kilometre Array IMC on the impact of immigration regulations IMC on the New Growth Path IMC on Section 100 intervention in Limpopo IMC on Development Finance Institutions IMC on Ebola Preparedness and Response Other IMCs are appointed to address matters that are ongoing. These include the following: The South African National AIDS Council (SANAC) IMC on Anti-Poverty and Short-term Job Creation IMC on the prevention and combating of corruption IMC on State Funerals IMC on the revitalisation of distressed mining communities Various IMCs on Operation Phakisa IMC on Natural Disasters and Flooding in South Africa IMC on Service Delivery IMC on Acid Mine Drainage IMC on BRICS IMC on the Bucket Eradication Programme IMC on Combating Alcohol and Substance Abuse The IMCs that were established to do short-term work have concluded their work and no longer active. For instance, the IMC that was established to oversee preparations for the inauguration did its work and no longer exists. Other IMCs still exist and are actively doing the work for which they were established. These include SANAC, the IMC on State Funerals. As stated in (a) above, the IMCs are a useful instrument to bring together relevant Ministers to achieve a specific goal that concerns all of them. They are a very effective tool of organisation the work of government and ensuring that government’s objectives are achieved.

Reply:

(a) There are several Inter-Ministerial Committees (IMCs) that have been established since 2009. The purpose of the IMCs is to get a group of relevant Ministers to address a specific matter within a relatively short period of time. As a result most IMCs have a short life span.

Some of the IMCs were established to achieve a short term goal include the following;

  • IMC to oversee preparations for the 2014 inauguration
  • IMC to oversee the 20 Year Review of Freedom and Democracy
  • IMC to prepare for COP17 in Durban
  • IMC to oversee South Africa’s bid for the Square Kilometre Array
  • IMC on the impact of immigration regulations
  • IMC on the New Growth Path
  • IMC on Section 100 intervention in Limpopo
  • IMC on Development Finance Institutions
  • IMC on Ebola Preparedness and Response

Other IMCs are appointed to address matters that are ongoing. These include the following:

  • The South African National AIDS Council (SANAC)
  • IMC on Anti-Poverty and Short-term Job Creation
  • IMC on the prevention and combating of corruption
  • IMC on State Funerals
  • IMC on the revitalisation of distressed mining communities
  • Various IMCs on Operation Phakisa
  • IMC on Natural Disasters and Flooding in South Africa
  • IMC on Service Delivery
  • IMC on Acid Mine Drainage
  • IMC on BRICS
  • IMC on the Bucket Eradication Programme
  • IMC on Combating Alcohol and Substance Abuse

(b) The IMCs that were established to do short-term work have concluded their work and no longer active. For instance, the IMC that was established to oversee preparations for the inauguration did its work and no longer exists. Other IMCs still exist and are actively doing the work for which they were established. These include SANAC, the IMC on State Funerals.

(c) As stated in (a) above, the IMCs are a useful instrument to bring together relevant Ministers to achieve a specific goal that concerns all of them. They are a very effective tool of organisation the work of government and ensuring that government’s objectives are achieved.

12 October 2015 - NW3582

Profile picture: Majola, Mr F

Majola, Mr F to ask the Minister of Transport

What is the reason for the delay in assigning to the City of Cape Town Metropolitan Municipality the function of acting as a contracting authority, in terms of section 7(2)b)(i) of the National Land Transport Act, Act 5 of 2009, (b) when will she make a decision in this regard and (c) why has correspondence from the Executive Mayor of the specified municipality to her not been answered and acknowledged? NW4249E

Reply:

a) The request for assignment is still being considered;

b) The decision will be made after due consideration of all the factors;

c) The expectation from the city is a response on the request made, which is still under consideration. The department and the city are working together on the matter.

12 October 2015 - NW3578

3578Mr M S F de Freitas to ask the Minister of Transport

(a) When was the Midterm Road Safety Country Report (i) published and (ii) made public, (b) what are the key elements that come out of the specified report, (c) what (i) solutions and (ii) recommendations were made in the specified report, (d) what is her department doing to implement the specified recommendations and (e) what are the time frames?

Reply:

The Minister of Transport

(a) (i) The Midterm Road Safety Country Report has not been published, as it is in the process of

review and consultations are being finalised.

(ii) The Midterm Road Safety Country Report will be available after it has been finalised.

(b) The key elements are included in the Midterm Road Safety Country report, which is currently being finalised.

(c) The Midterm Road Safety Country Report, when finalised, will contain the:

     (i) solutions and

     (ii) recommendations

(d) Details regarding the implementation of the specified recommendations of the Midterm Road Safety Country report will be available once the report has been finalised.

(e) The timeframes for the implementation of the specified recommendations of the Midterm Road Safety Country report will form part of the report.

ADDITIONAL INFORMATION FOR THE MINISTER

PARLIAMENTARY QUESTION …… BY MR M S DE FREITAS (DA) FOR WRITTEN REPLY

MIDTERM ROAD SAFETY COUNTRY REPORT

The Midterm Road Safety Country Report has not yet been published or made public. At this stage, the report is still under review by the Department’s leadership.

The key elements contained in the UN Global Plan are the Pillars which have fixed Activities as supplied by the UN, which all countries must speak to. They are as follows:

Pillar 1: Road Safety Management

Activities:

   (a) Lead Agency,

   (b) National Road Safety Strategy,

   (c) Setting of Targets,

   (d) Funding, and

  (e) Data Management.

Pillar 2: Safer Roads and Mobility

Activities:

a) Road Safety ownership and accountability among key authorities, road engineers and urban planners,

b) Sustainable Urban Planning, Transport Demand and Land Use Management,

c) Infrastructure Management,

d) New Infrastructure Development,

e) Capacity Building, and

f) Research and Development

Pillar 3: Safer Vehicles

Activities:

a) Vehicle Safety Regulations,

b) Vehicle Requirements and Standards,

c) New Car Safety Assessment Programme,

d) Encourage Universal deployment of Crash Avoidance Technologies, and

e) Fiscal and other Incentives for Motor Vehicles.

Pillar 4: Safer Road Users

Activities:

a) Prevention Interventions,

b) Road Safety Educational Awareness Programs and Campaigns,

c) Road Safety Education Programmes,

d) Set and Seek compliance with speed limits,

e) Set and seek compliance with child restraint and seatbelts,

f) Set and seek compliance with standards and rules for motorcycle helmets,

g) Set and seek compliance with Transport, Occupational Health and safety laws, and

h) Establishment of Graduated Driver licensing.

Pillar 5: Post Crash Response

Activities:

a) Pre-Hospital Care,

b) Hospital Trauma Care Systems,

c) Rehabilitation Programmes,

d) Introduction of Road User Insurance Scheme,

e) Crash Investigation Management and Claim Settlement,

f) Employment of People with Disabilities,

g) Research and Development, and

h) Incident Response

Solutions are as follows:

Pillar 1: Road Safety Management

a) Lead Agency:

The National Department Transport as a coordinating body through its entities established the Road Traffic Management Corporation in terms of the RTMC Act (Act 20 of 1999) as a lead agency on traffic and road safety matters. The RTMC together with provinces, local authorities and transport entities have established coordination and facilitation structures that identify key strategic delivery programmes for road safety and law enforcement, coordinate the implementation of the programmes and monitors and evaluate progress against the key strategic delivery areas across all the three spheres of government.

b) National Road Safety Strategy:

The National Road Safety Strategy 2006 Onwards was developed and approved. The latter document remains the official government document to date. The document was developed on the premise of the 4 Es’. There is work currently under way to review the national road safety strategy. The road policy is nearing its conclusion from the 1996 White Paper on Transport. This is where the road safety policy was alluded to.

c) Setting of Targets:

Taking into perspective the percentage variance of the number of motorized vehicles on our roads back in 2012 compared to current, there is a remarkable increase. Zooming closer to the recent years, as recent as 2012, there is a notable distinct rise from 7 714 924 to 10 249 504 in 2014. That alone tells a story, that the road infrastructure developed back in the day cannot keep up with the increase of vehicles hence firstly, infrastructural development remains a priority in the country and secondly, when looking at targets, cognisance should be paid to the fact that targets that are set annually of decreasing road carnage should take into account that there would have been more cars on the road each year.

South Africa’s targets have been set, and measures are in place to achieve the targets. The targets are outlined in the consolidated National Department of Transport Strategic Plan (Year to Year) and Annual Performance Plan (Financial year) which captures the key delivery areas for all transport departments and entities.

d) Funding

The National Treasury allocates budget to the Department of Transport and Entities. The budget allocation focuses on the key delivery areas of Transport namely roads infrastructure (dealt with under Pillar 2), road safety and law enforcement programmes (dealt with under Pillar 4) and Road Accident funding (dealt with under Pillar 5). Currently road safety is under-resourced. However, discussions at Cabinet level will address this challenge.

e) Data Management

South Africa uses a multi-pronged method of collecting statistics with the South African Police Services (SAPS) being the first to arrive at the scene of the crash. The Department of Health with its paramedics serves as another source for the country’s statistics supported by other State organs such as the Metro Traffic, Provincial Traffic Authorities and some of the transport entities.

Pillar 2: Safer Roads and Mobility

a) Road Safety ownership and accountability among key authorities, road engineers and urban planners

The proper planning and design of infrastructure development is critical to road safety. A strong need has been established for road authorities to identify and understand road safety risk on a road network level. A network level road assessment tool, called Netsafe© has been developed. This tool identifies high risk portions of roads, similar to iRAP, and uses video analytics of road features plus road operational components such as operating speeds to calculate a Road Safety Risk Index for uniform sections for the primary road network. This network assessment tool has been applied to approximately 20 000 km of hazardous locations in South Africa's primary road network. A series of workshops are being conducted throughout the country to further implement appropriate remedial measures at high priority locations identified through Netsafe©.

b) Sustainable Urban Planning, Transport Demand and Land Use Management

The country has got a plan to reduce congestion in urban areas by introducing facilities that are accommodating a number of people in a mode of transport. This is where transport systems interface hence reducing congestion and confusion in the urban areas.

c) Integrated Public Transport Network: Investment in public transport is paramount, in creating safer mobility for all road users. The country has put in place a plan to reduce congestion in urban areas by introducing facilities that are accommodating the number of people in a single transport and provide an alternative mode of transport such as ‘bus rapid transit’ system; e.g. Rea vaya, My Citi as well as a mode such as Gautrain. The country has also created dedicated lanes dealing with mass movers to reduce congestion and promote road safety. In the metros in particular, pedestrian lanes and cyclists lanes have been developed to separate vehicle traffic and pedestrians from vehicle traffic thus creating safety on the urban areas.

d) Infrastructure Maintenance

South Africa has 750 000km of roads and they have different levels. There are some exceptionally good roads in the country and poor roads too. They are graded from good, fair, poor and very poor. There is an on-going maintenance of roads taking place across the year in different parts of the country to improve the state of our roads. There are also many active community development programmes throughout the country which provide for the delivery of footpaths, sidewalk and pedestrian bridges. And these come at a high cost to the country. We also note the maintenance backlog of about 37% which will be cleared at a cost of approximately R197 billion.

e) New Infrastructure Development

In relation to road safety the fact is that the road connectivity within the country is still a challenge, linking the communities particularly the previously disadvantageous communities is a challenge. People walk on average more than 10km to reach a public transport facility. It is always an expensive exercise to build a new network to link the communities. This country is one of the mountainous countries with deep valleys and rivers to be crossed. These rivers need to be crossed through bridges that are very expensive to build. These previously disadvantaged communities need to be linked through thousands of kilometres which are expensive to build. We continue as a country to build well-engineered safe roads addressing the backlog that we have as a country which is to link communities and make trade easier for the country.

f) Capacity Building

In line with the National Development Plan (NDP) under chapter 4 there is commitment by government to strengthen institutional capacity for road traffic.

Furthermore, there is a review and publication of the South African Road Safety Audit Manual (SARSAM) which is a significant step towards inculcating the culture of road safety ownership and accountability amongst road authorities, by ensuring that a standard guideline is available for consistent undertaking of Road Safety Audits. Road Safety Audits and the associated training of the Audit Engineers not only addresses the need to conduct Road Safety Impacts of new infrastructure projects, but also trains Engineers to incorporate road safety in all aspects of infrastructure maintenance and provision. This is seen as a significant road safety capacity development. The Department through its entity SANRAL has developed and implemented accredited 5 day Road Safety Audit Courses across the country, and have trained approximately 200 Road Safety Auditors to date. Efforts are underway to make it mandatory for road authorities to report on an annual basis on the status of road safety of their respective road networks, and this must be done in accordance with the Road Safety Audit Manual.

Various Road Authorities have hazardous location programmes for example has a pedestrian hazardous location programme which has a minimum target of identifying, investigating and implementing remedial measures.

The National Department of Transport is collaborating with Non-Governmental Organisations (NGOs) in implementing safer roads particularly around schools and build-up areas and private sectors.

g) Research and Development

There are various research programmes underway to better understand specific road safety issues facing South African. The country works close with some of the research bodies such as CSIR, Department of Health, Department of Basic Education and SABS. Together with the Department of Basic Education we have introduced a new generation of drivers through the use of a Learner Licence. Regular regional and national road safety workshops, seminars and conferences are convened to share best practice case studies with other road authorities and road safety practitioners. It is important to continue to elevate the role that infrastructure can play reducing the risk of a serious injury or death when a crash does occur.

Pillar 3: Safer Vehicles

a) Vehicle Safety Regulations

SADC Standards have been developed in line with South African Standards. Member states are encouraged to streamline and develop national legislative frameworks that should allow for the incorporation of harmonised motor vehicle Standards into their national legislation. South Africa is a contracting party to WP29 and has been requested by the UN, as a role player in the SADC region, to encourage SADC counterparts to attend WP29 as individual states or as a regional body. SABS has published a large number of standards in conjunction with the UN ECE, many of which are called up in our legislation.

b) Vehicle Requirements and Standards

It is a requirement that new vehicles entering the SA market comply with seatbelts and anchorage requirements as well as specific crash test requirements, including other safety related aspects. The development of the relevant standards takes place in conjunction with NAAMSA and the NRCS. South Africa is noting the progress of the UN regulations on intelligent transport systems that enhance vehicle safety.

c) New Car Safety Assessment Programme

New vehicles entering SA must comply with the South African compulsory specification for motor vehicles. These specifications are based on UN regulations and are revised as and when necessary. New vehicles entering the SA market are inherently safe, further advancement in safety could be mandated through internal policies and procedures.

d) Encourage universal deployment of crash avoidance technologies

The South African compulsory motor vehicle specifications are in the process of being revised to include various advanced safety requirements which will be implemented in 2016. South Africa leads the world in the fitment of retro-reflective contour marking for vehicles.

e) Fiscal and other incentives for motor vehicle

South Africa in consideration of safety features, has barred the importation of used vehicles with the view to maintain UN safety standards.

Pillar 4: Safer Road Users

i) Prevention Interventions

Over the years South Africa has implemented several programmes that support or focus on the reduction of road safety risk factors, namely but not limited to:

a) The Railway Level Crossing Unit: The aim of the programme is to ensure safety at railway level crossings. The implementation resulted in the establishment of such level crossing units in high incident zones across 3 provinces, in collaboration with Transnet.

b) Enhancement of compliance: The introduction of the AARTO Act that promotes road traffic quality by providing for a scheme to discourage road traffic contraventions and to facilitate the adjudication of road traffic infringements.

c) Strategic Law Enforcement: The National Rolling Enforcement Plan is a consolidated programme by the Traffic Authorities throughout the country and offers a centralised reporting and monitoring framework.

d) Fighting Fraud and Corruption: The establishment of the National Traffic Anti-Fraud and Corruption Unit within the RTMC to combat acts of fraud and corruption by collaborating with other law enforcement agencies has resulted in several prosecutions for unlawful acts across the traffic environment.

e) Law Enforcement in SADC: The Cross Border Road Transport Agency is mandated to facilitate unimpeded movement of passengers and goods within the SADC region. Since 2013 the Agency has hosted several member states as part of its exchange programmes trail some of which are Zimbabwe, Zambia, Namibia, Botswana, Swaziland and Mozambique. In all these activities the Agency sponsored solid support in both regional and national road safety programmes.

ii) Road Safety Educational Awareness Programs and Campaigns

The achievements of road safety awareness campaigns is informed by an integrated and intensified approach to road safety awareness activities targeting cyclists, pedestrians, passengers and drivers through the pooling of traffic management resources across the various levels of Government through the implementation of the 365 day road safety programme. The following awareness campaigns were undertaken:

a) Child Restraint Campaign: It aims at educating communities on the child restrain regulation and child car seats are being distributed in strategic areas.

b) The “Get there. No Regrets” Campaign: it was a multi-pronged media campaign targeting different road users.

c) Cheki-iCoast: An imaginative campaign to promote roads safety among younger audiences on campuses and schools

ii) Road Safety Educational Programmes

a) Junior Traffic Training Centres/Mats Programme: aims to teach and instil safer road conduct to children in a safer, miniature simulated road environment.

b) Scholar Patrol: The programme is one of the longest existing road safety projects and it ensures the safe crossing of learners to and from school by learners under adult supervision. The number of scholar patrols operational nationwide are 1480.

c) Safe Kids Walk this Way: Project creates a safe environment for kids to operate in thereby contributing to the reduction in pedestrian fatalities and injuries. This project has been rolled out in all Provinces.

d) Road Safety Schools Debates: The programme is directed at secondary / high school learners in grades 10 and 11 and is conducted in line with the World Schools Style of Debating adapted for the purposes of imparting road safety knowledge amongst peers.

e) Participatory Educational Techniques (P.E.T) Programme: The program is aimed at encouraging high school learners to identify road safety challenges in their communities and being part of developing and implementing sustainable solutions that will positively contribute to safer road users and roads.

f) Professional Drivers’ Awareness: The programme assesses the road safety competencies (skills and knowledge) of heavy vehicle drivers. South Africa is a member of the Union Internationale des Chauffeurs Routiers (UICR) a world body which coordinates the interest of professional drivers worldwide.

g) Road Safety Education in Curriculum: The back to basics approach of government to inculcate a culture of road safety at a young age has resulted in the mandatory implementation of road safety at primary schools as part of life skills.

h) Scholar Transport: The programme aims at addressing the problem of scholar transport safety, the implementation of the Shova Kalula programme is part of a low cost mobility solution to improve rural accessibility and urban mobility “by cycling” to basic services including educational centres. It is directed to learners who walk more than 3 up to 5km to schools, youth and farm labourers.

i) Cross-Alive Road Safety Programme: The aim of the programme is to address challenges such as:

• Safety of scholar transport

• Cycling and helmets

• Child restraint and safety belts

• Distracted walking

iv) Set and seek compliance with speed limits

The deployment of Average Speed over Distance (ASOD) on approximately 700 km of National and Provincial Routes, namely N3, N1, N2, R27 and R61.

v) Set and seek compliance with drink-driving

Review of standardisation in relation to equipment used in the ascertaining and prosecution of alcohol contents in the driver blood specimen.

vi) Set and Seek compliance with child restraint and seatbelts

Regulations were amended to require a driver of a motor vehicle operated on a public road to ensure that an infant traveling in such a motor vehicle is seated on an appropriate child restraint.

vii) Set and Seek compliance with standards and rules for motorcycle helmets

The country has a legislation that prescribes minimum standards for wearing helmets on motorcycles and bicycles.

viii) Set and Seek compliance with Transport, occupational health and safety laws

Requirements were set that require that public transport be fitted with speed governors, to ensure that the set speed is not exceeded.

ix) Establishment of Graduated Driver Licensing

A learner license programme has been implemented targeting Grade 12 and Final year tertiary students. This programme provides learners and youth with theoretical and practical knowledge, based on the rules of the road. It is a computer- based programme that also uses simulators for practical driving lessons.

Pillar 5: Post-Crash Care

a) Pre Hospital Care

The country’s post-crash care programme including the pre-hospital care systems place an emphasis on pre-empting and prevention of road fatalities and disabilities. The entity of the Department, the Road Accident Fund is mandated to provide cover to all road users within the borders of South Africa. A single medical tariff under the Road Accident Fund (RAF) ensures equitable access to emergency medical treatment as per set tariff to all victims of crashes. The Department is working through RAF to secure a single emergency hotline, in partnership with the South African Private Ambulance Emergency Services Association (SAPAESA).

i) Foster partnerships with public and private healthcare sector – ongoing

  1. The Department of Health has engaged with the Department of Communication into the single nationwide telephone number – redirected to the Department of Telecommunications
  2. ii) Hospital Trauma Care Systems

Through the RAF Act, government’s crash care system starts from providing emergency care cover from the scene of the crash, transportation to hospital, the cost for hospital treatment, as well as victim reintegration and rehabilitation as part of the post recovery treatment interventions. South Africa’s public and private healthcare services provides for a hospital trauma care through the hospital emergency centres. Following a crash and the related trauma, the Department with its entity RAF, through the healthcare sector provides post-crash response as follows:

i) Immediate phase: Emergency medical care

ii) Therapeutic phase: Medical care to treat and stabilize

iii) Rehabilitation phase: Medical and non-medical assistance and support

RAF in collaboration with civil society identifies hospitals with poor trauma care units and systems with the objective of providing funding to improve conditions of care in the SA trauma units.

c) Rehabilitation Programme

The Department through RAF provides a compulsory cover to all road crash victims for medical, loss of support, loss of income, general damages and funeral costs. This helps provide a social and economic safety net for road crash victims and their families who are in need of rehabilitation, trauma care, and psychological counselling. The Department through RAF further provides for social reintegration of road crash victims through dedicated case management, home-based care, counselling as well as provide for past, current, and future medical undertaking expenses.

d) Introduction of Road User Insurance Schemes

South Africa as a country doesn’t have a compulsory third party insurance cover for road users. The South African Insurance Association is currently in pursuit of government approval towards legislating a compulsory third party cover for road users.

e) Crash Investigation Management and Claims Settlement

The RAF is mandated to identify the wrongdoer through a fault-based road accident compensation system aimed at compensating road crash deaths and injuries. The country currently uses a fault-based system to compensate for road crash victims. The RAF uphold an objective determination of the claim through courts and provision of medical cover and legal experts In terms of the RSA constitution everyone has the right to a lawyer and a free and fair hearing through the Legal Aid Board and SA court system. The country is investing in capacity building within the traffic environment by training on crash investigation and management of dangerous goods. All major crashes as per the set out criteria are investigated to determine cause and prevention of these crashes as well as the monitoring of the implementation of the recommendations.

f) Employment of People with disabilities

South Africa through the National Department of Labour, champions various legislations pertaining to the employment of people with disabilities. These legislations include the Employment Equity Act, which in turn, falls within the domain of the Labour Relations Act and the Basic Conditions of Employment Act (BCEA). Chapter 2 of the RSA Constitution provides that there should be no discrimination of the basis of disability, gender, race and age.

g) Research and Development

Investment in research remains a focal point to ensure effective and efficient utilisation of the resources of existing institutes and research bodies. The establishment of relationships with research bodies and the academia to has resulted in the formation of various relationships with medical and specialist organisations focusing on rehabilitating victims of road trauma. The 2014/15 financial year saw government, through the Road Accident Fund, partnering with the South African Spinal Injury Association with the aim of encouraging and contributing to resourcing research and development aimed at improving the treatment of spinal injuries.

h) Incident Response

The entire national road network has incident management systems in place to ensure the optimal coordinated response to incidents. Initiatives are under way to legislate and roll out incident management systems on all major routes in South Africa, including an expanded network. The Intelligent Transport Systems (ITS) is being used to manage freeway operations. Freeway Management Systems (FMS) have already been deployed in Gauteng, KwaZulu-Natal and Western Cape and are being expanded and enhanced to ensure an even more efficient and coordinated response to incidents.

The recommendations as notified by the Department and all the key stakeholders who participated in the drafting of the UN Mid-Term Country report are as follow:

South Africa is aware that there is still a lot of work to be done to reduce not only the crash and fatality rates in terms of road traffic deaths per population, or deaths per the number of registered vehicles or the distance travelled, but also in terms of real straight figures.

Road crashes are amongst the main causes of death in South Africa. They have serious ramifications to the economy; the emergency and health cost along with lost economic output is significant. The estimated cost of road crashes is estimated at billions of rands per annum.

Our continued commitment to the reduction of road fatalities by 50% as outlined in the Decade of Action for road safety will see a drastic shift in the implementation of various provisions and models for the acceleration and implementation of sustainable road safety programmes.

Key to these is an increase in educational road safety programmes to ensure our road users know how to stay safe, and keep others around them safe mainly the changed behaviour and attitudes of our road users and that will be supported by intensified law enforcement to deal with those who put other road user lives in danger. Eventually, we want to see a culture of voluntary compliance in South Africa and we will get there.

As a recommendation going forward post 2015, the multidisciplinary approach will be undertaken in order to create a safer road environment by fostering partnerships and increasing the participation of all strata of society to enable the drastic reduction in the number of road fatalities. Road safety is in every citizen’s interest and given that safety starts with an individual road user itself, whether motorist, passenger or pedestrian, the involvement of the entire civil society on an on-going basis can never be overstated. The fight against road crashes is yet to be won, and we envision a future where our people feel safe and secure on our roads.

The Department with its Roads entities developed the 365 Days Road Safety Programme which is in line with the Decade of Action for Road Safety 2011-2020. The 365 Days Road Safety Programme consists of 5 Pillars and it also focuses on the 4E’s (Education, Enforcement, Engineering and Evaluation). The 365 Days Road Safety Programme ensure that road safety takes place at all times through the whole year and not only during the pick seasons, such as the Easter and Festive season.

The 365 Days Road Safety Programme is guided by the Decade of Action for Road Safety 2011-2020.

12 October 2015 - NW3425

Profile picture: Lotriet, Prof  A

Lotriet, Prof A to ask the Minister of Science and Technology

Whether the discontinuation of the student programme at the SA Astronomical Observatory (SAAO) will have any impact on the future need for scientists in the field of Astronomy; if so, what is her department doing to remedy the situation at the SAAO?ˮ

Reply:

Yes, the discontinuation of these programmes could have a negative impact on SAAO science operations and hence training of scientists, if not addressed. Telescopes and astronomy instruments that are used by astronomers are maintained and developed by optical, mechanical and electronic engineers/technicians. SAAO is the ideal ground to develop and sustain the skills of local engineers and technicians who are developing instrumentation at the cutting edge of astronomy. These skills are needed to operate and develop the telescopes located at Sutherland, and discontinuation of the student programme will lead to fewer young astronomers, engineers, and technicians available to service the needs of the SAAO and the country for the development of instrumentation in the medium to long term. SAAO has motivated for an increase in its core grant and the Astronomy sub-Agency, within the NRF, will be including this request in an Implementation Plan for Multi-wavelength Astronomy, which is currently being drafted by the NRF and will submitted to the DST at the end of September 2015. The Department will then assess the feasibility of increasing allocations to the SAAO for this purpose.

12 October 2015 - NW3121

Profile picture: Maimane, Mr MA

Maimane, Mr MA to ask the President of the Republic

With reference to his reply to question 2728 on 14 August 2015, how many government functions has he hosted at his private residence in Nkandla for (a) heads of state, (b) Cabinet Ministers, (c) Deputy Ministers, (d) traditional leaders, € Premiers, (f) Mayors, (g) religious leaders and (h) ordinary members of the public since 1 January 2014? THE PRESIDENCY: REPUBLIC OF SOUTH AFRICA Private Bag X1000, Pretoria, 0001 NATIONAL ASSEMBLY QUESTION FOR WRITTEN REPLY Question No : 3121 Date Published: 21 AUGUST 2015 The Leader of the Opposition (DA) to ask the President of the Republic With reference to his reply to question 2728 on 14 August 2015, how many government functions has he hosted at his private residence in Nkandla for (a) heads of state, (b) Cabinet Ministers, (c) Deputy Ministers, (d) traditional leaders, € Premiers, (f) Mayors, (g) religious leaders and (h) ordinary members of the public since 1 January 2014? NW3662E DRAFT REPLY: The Presidency does not keep a record of the number of meetings and functions held at the private residence of the President.

Reply:

The Presidency does not keep a record of the number of meetings and functions held at the private residence of the President.

12 October 2015 - NW3303

Profile picture: Mulaudzi, Adv TE

Mulaudzi, Adv TE to ask the Minister of Transport

(1)(a)(i) What total amount did her department spend on her travel costs between Gauteng and Cape Town in the 2014-15 financial year and (ii) how many trips did she undertake between Gauteng and Cape Town in the specified financial year and (b) what total amount did her department spend on (i) hotel and (ii) residential or other accommodation for her in (aa) Cape Town and (bb) Pretoria in the 2014-15 financial year; (2) (a)(i) what total amount did her department spend on the Deputy Minister’s travel costs between Gauteng and Cape Town in the 2014-15 financial year and (ii) how many trips did the Deputy Minister undertake between Gauteng and Cape Town in the specified financial year and (b) what total amount did her department spend on (i) hotel and (ii) residential or other accommodation for the Deputy Minister in (aa) Cape Town and (bb) Pretoria in the 2014-15 financial year?

Reply:

The information is based on the transactions recorded for trips to Cape Town from Gauteng irrespective of the routing and purpose

(1)(a)(i) The total amount spent on the Ministers travel between Gauteng and Cape Town for the financial year 2014-15 irrespective of the routing is R268,395-05

(1)(a)(ii) The number of trips undertaken by the Minister between Gauteng and Cape Town based on the record of transactions is 64.

(1)(b)(i) The total amount spent on hotel accommodation in Cape Town for the Minister is R980-00

(1)(b)(ii) Travel Services does not keep a record of this information.

Please note that this information is based on travel procured via Wings from March 2015. The Office of the Deputy Minister contacted their previous travel agent to supply the information.

(2)(a)(i) The total amount spent on the Deputy Minister’s travel between Gauteng and Cape Town for the financial year 2014-15 irrespective of the routing is R56,762-46

(2)(a)(ii) The number of trips undertaken by the Deputy Minister between Gauteng and Cape Town based on the record of transactions is 20

(2)(b)(i) The Deputy Minister did not have any hotel accommodation in Cape Town.

(2)(b)(ii) Travel Services does not keep a record of this information.

12 October 2015 - NW3624

Profile picture: Kohler-Barnard, Ms D

Kohler-Barnard, Ms D to ask the Minister of Police

(1)How many operational SA Police Service members who were killed in each province had their firearm(s) taken from them (a) in the (i) 2010-11, (ii) 2011-12, (iii) 2012-13, (iv) 2013-14 and (v) 2014-15 financial years and (b) from 1 April 2015 up to the latest specified date for which information is available; (2) whether each specified firearm(s) was subsequently (a) found to have been utilised in the commission of another crime and (b) recovered; (3) whether the officer in question had the requisite firearm competency certificates in each specified case?

Reply:

(1) (a) & (b) (i) – (v)

The table below provides a breakdown of the number of members per province killed on and off duty who had their firearms taken from them, from 2010/11 to 17 September 2015:

PROVINCE

2010/2011

2011/2012

2012/2013

2013/2014

2014/2015

2015/2016

 

ON

OFF

ON

OFF

ON

OFF

ON

OFF

ON

OFF

ON

OFF

Eastern Cape

3

0

1

0

1

1

0

0

0

1

0

0

Free State

0

0

1

1

0

2

0

1

1

0

0

0

Gauteng

3

1

5

0

5

2

1

0

2

1

4

1

KwaZulu-Natal

2

3

0

0

2

3

2

2

2

0

0

1

Limpopo

0

0

1

0

0

1

0

0

1

0

0

0

Mpumalanga

2

0

0

2

0

1

0

1

0

1

0

0

North West

0

0

0

1

2

0

1

0

0

0

0

0

Northern Cape

0

0

0

0

0

0

0

1

0

0

0

0

Western Cape

0

0

2

0

0

3

2

2

4

0

0

0

Head Office

0

0

0

0

0

0

0

0

0

1

0

1

SUB TOTAL

10

4

10

4

10

13

6

7

10

4

4

3

TOTAL

14

14

23

13

14

7

(2)(a) A total of 3 firearms which were taken were used in the commission of another crime.

(2)(b) A total of 31 firearms were recovered.

It must be noted that in several instances serial numbers of firearms are removed and it is therefore not possible to determine if the specific firearm has been recovered.

(3) The status of the number of members in possession of the requisite firearm competency certificates is as follows:

 

FIREARM COMPETENCY

FINANCIAL YEAR

COMPETENT

NOT YET COMPETENT

2010/2011

7

7

2011/2012

8

6

2012/2013

20

3

2013/2014

13

0

2014/2015

14

0

TOTAL

62

16

12 October 2015 - NW2776

Profile picture: Schmidt, Adv H

Schmidt, Adv H to ask the Deputy President

Whether (a) he and (b) any officials in his Office travelled to China in the 2014-15 financial year; if so, what was the (i) purpose of each specified visit and (ii)(aa) total cost and (bb) breakdown of such costs of each specified visit?

Reply:

Neither the Deputy President nor any officials in his Office travelled to China in the 2014-15 financial year.

12 October 2015 - NW3581

Profile picture: Majola, Mr F

Majola, Mr F to ask the Minister of Transport

How many Mi-8 helicopters have been granted type acceptance by the SA Civil Aviation Authority, (b) when was type acceptance granted in each case, (c) what number of type acceptance applications have been rejected and (d) what are the reasons for the rejection in each case?

Reply:

South African Civil Aviation Authority (SACAA)

a) No (0) Mi-8 helicopters have been granted type acceptance by the SA Civil Aviation Authority,

(b) N/A

(b) One (1) type acceptance application was declined in February 2014.

(c) (d) The application was rejected because the aircraft design does not comply with any prevailing airworthiness design standards. Russia as the State of Manufacture requires that there be a working agreement between the CAA’s namely South African Civil Aviation Authority (SACAA) and Russia CAA, the Interstate Aviation Committee Aviation Register (IAR AR). There was no agreement in place at the time.

12 October 2015 - NW3365

Profile picture: Terblanche, Ms JF

Terblanche, Ms JF to ask the Minister of Science and Technology

What progress has been made by ASSAf to promote and inspire all fields of scholarly inquiry and evidence-based solutions that are aligned with goals of the department and the challenges reflected in the National Development Plan? (2) How does the mandate of ASSAf assist with (a) unprecedented employment rates, (b) poverty and (c) inequality?”

Reply:

  1. The broad objectives aimed at addressing the triple challenges of the NDP through a set of priority interventions are unpacked below:

       (a) Develop an economy that will create more jobs

  • The State of Green Technologies in South Africa. (Consensus study - completed)
  • South Africa’s technical readiness to support the shale gas industry. (Consensus study - ongoing)
  • “Our Nuclear Future: Delay or Demise”. (Workshop - completed)
  • Standing Committee on the Science for the Reduction of Poverty and Inequality. (Ongoing)
  • “Measuring Deprivation to order to promote Human Development”. (Workshop -completed)

      (b) Improve national infrastructure

  • The State of Energy Research in South Africa. (Completed – follow up study to be initiated)
  • A symposium on “Our Nuclear Future: Delay or Demise”. (Completed)
  • Standing Committee on the Science for the Reduction of Poverty and Inequality. (Ongoing)

     (c) Transition to a low-carbon economy

  • The State of Green Technologies in South Africa. (Consensus study - completed)
  • South Africa’s technical readiness to support the shale gas industry. (Consensus study - ongoing)
  • “Our Nuclear Future: Delay or Demise”. (Workshop - completed)
  • Hosting the official release and media workshop on the Fifth Assessment Report, Working Group II of the Intergovernmental Panel for Climate Change (IPCC). (Completed)

     (d) Create an inclusive and integrated economy

  • Standing Committee on the Science for the Reduction of Poverty and Inequality. (Ongoing)
  • “Measuring Deprivation to order to promote Human Development”. (Workshop -completed)

     (e) Reverse the spatial effects of apartheid

  • Standing Committee on the Science for the Reduction of Poverty and Inequality. (Ongoing)
  • “Measuring Deprivation to order to promote Human Development”. (Workshop - completed)

     (f) Improve the quality of education, training and innovation

  • Reconceptualising Education and Training of an Appropriate Health Workforce for the Improved Health of the Nation. (Consensus study - ongoing)
  • Revitalising Agricultural Education and Training (AET) in South Africa. (Consensus study - ongoing)
  • Inquiry-based science education (IBSE) pilot project. (Ongoing)

    (g) Provide quality health care for all

  • Standing Committee on the Science for the Reduction of Poverty and Inequality. (Ongoing)
  • Diversity in Human Sexuality. (Consensus study - completed)
  • Biosafety and Biosecurity Standing Committee. (Ongoing)
  • The State of Biosafety and Biosecurity in South Africa. (Consensus study - completed)
  • Standing Committee on Health. (Ongoing)
  • Improved Nutritional Assessment of Micronutrients. (Consensus study - completed)
  • Reconceptualising Education and Training of an Appropriate Health Workforce for the Improved Health of the Nation. (Consensus study - ongoing)
  • Preventing a Tobacco Use Epidemic in Africa. (Consensus study - completed)
  • Provider Core Competencies for Mental, Neurological and Substance Use (MNS) Disorders. (Consensus study - ongoing)

     (h) Provide social protection

  • Standing Committee on the Science for the Reduction of Poverty and Inequality. (Ongoing)
  • Diversity in Human Sexuality. (Consensus study - Completed)
  • Standing Committee on Health. (Ongoing)

   (i) Build safer communities

  • Standing Committee on the Science for the Reduction of Poverty and Inequality. (Ongoing)
  • Workshop on “Measuring Deprivation to order to promote Human Development”. An initiative of the Standing Committee for the Science for the Reduction of Poverty and Inequality. (Completed)
  • Diversity in Human Sexuality. (Consensus study - Completed)
  • Standing Committee on Health. (Ongoing)

(2) Through the promotion of excellence and scholarly endeavour, ASSAf contributes to the knowledge base on these topics. The second component of ASSAf’s mandate relates to the provision of science advice to government. ASSAf is able to mount in-depth studies and convene workshops on relevant topics with a view to providing advice on matters of science to support policy development and also to provide a platform for scholarly debate. A good example of the latter would be a recent workshop on “Measuring Deprivation in order to promote Human Development in South Africa”.

12 October 2015 - NW3580

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Transport

With reference to the Integrated Public Transport System in the Nelson Mandela Bay Metropolitan Municipality and its operations agreement with a certain company (name furnished), (a) what are the reasons for paying compensation to taxi operators, (b) when did such payment commence and (c) what amount has been paid in each month from the date of inception up to 14 September 2015?

Reply:

With reference to the Integrated Public Transport System in the Nelson Mandela Bay Metropolitan Municipality and its operations agreement with a certain company (name furnished):

(a) what are the reasons for paying compensation to taxi operators

On 06 December 2012 the Municipality and Transbay (Pty) Ltd concluded an operator agreement with the taxi industry and bus industry to operate the pilot phase of the IPTS. As part of the pilot phase, the Municipality further concluded a compensation agreement with Kyoscan (Pty) Ltd, representing the taxi industry. In this agreement, 60 mini-bus taxi operators operating on affected routes within the pilot phase agreed to deliver their 60 vehicles and operating licenses to Kyoscan for safe storage in the facilities provided by the Municipality.

The purpose of the compensation agreement was to structure the removal of mini-bus taxis from the IPTS routes in order to create demand and eliminate competition between the operators and the IPTS buses. The operators were in turn fully compensated at a rate of R6 500.00 per month for their loss of revenue. The pilot phase commenced on 21 January 2013 and terminated on 20 January 2014.

b) when did such payment commence

The payments commenced at the start of the NMBM pilot operations in January 2013.

(c) what amount has been paid in each month from the date of inception up to 14 September 2015?

An amount of R6 500 per month has been paid from January 2013 to January 2014 to each of the mini-bus taxi operator who had surrendered their mini-bus taxi and Operating Licence. Lump sum payments were made for the period February 2014 to June 2014 and also for the period July 2014 to December 2014.

Amounts that have been paid to the mini-bus taxi industry to date are outlined further as follows:

 

Beneficiary

Amount

Year

Reason

Laphumilanga Taxi Services Secondary Co-op (LTSSC)

2 812 500

July 2010

2010 Transport operations

Laphumilanga Taxi Services Secondary Co-op (LTSSC)

2 050 000

Oct 2010

Start-up funding for the secondary Co-op

Laphumilanga Taxi Services Secondary Co-op

1 227 038

May 2011

Start-up funding for the secondary Co-op (To pay LTSSC creditors)

Laphumilanga Taxi Services Secondary Co-op

8 599 531

July 2012

Start-up funding for the secondary Co-op

Laphumilanga Taxi Services Secondary Co-op

18 946 516

2014

Start-up funding for the secondary Co-op including LTSSC director’s back pay.

Transbay

32 129 189

2012/13 & 2013/14

Pilot Transport operations

120 IPTS Ambassadors

10 784 838

2013 & 2014

Salaries for the taxi drivers and conductors displaced due to the withdrawal of 60 taxis from Summerstrand route

Compensation for 60 Mini-bus taxi

9 360 000

2013 & 2014

Compensation for taxis removed from Summerstrand route.

12 October 2015 - NW3398

Profile picture: Lekota, Mr M

Lekota, Mr M to ask the President of the Republic

Whether the Government and/or any government departments held secret talks with Russia or any other country or with any companies anywhere in the world regarding the development of nuclear power stations in South Africa and proceeded to take any decisions on the specified matter without a transparent public consultation process regarding affordability, desirability, viability and practicability; if not, 2. Whether any nuclear deal by the Government will be done with the express consent of the nation’s representatives in Parliament; if so, what are the relevant details?

Reply:

1. No. It must be noted Government has interacted and signed Inter-Governmental Agreements (IGAs) with several nuclear vendor countries in preparation for procurement of Nuclear New Build Programme.   To date IGAs have been signed with China, Russia, South Korea, USA and France.  Negotiations are at advance stage with Canada and Japan also to conclude the IGAs. In addition the vendor parade workshops have been held with these vendor countries to demonstrate their technological capability. It should further be noted that the procurement process has not started. South Africa will follow an open, transparent, and cost competitive procurement process to select Strategic Partner or Partners in line with legislation. The rollout of Nuclear New Build Programme is guided by Government Nuclear Energy Policy of 2008 and Integrated Resource Plan 2010-2030. These government policies have undergone stakeholder consultations and stakeholder input taken into account process. In addition a Joint Technical Task Team has been established between Department of Energy and National Treasury to address the funding model for the Nuclear New Build Programme.

2. The Nuclear New Build Programme will be implemented in line with Government approve Nuclear Energy Policy and Integrated Resources Plan 2010-2030. It should also be noted that the Department of Energy report its performance in Parliament to the Portfolio Committee on Energy to provide oversight on the government programmes.

NW4057E

12 October 2015 - NW3444

Profile picture: Kruger, Mr HC

Kruger, Mr HC to ask the Minister of Small Business Development

Whether the Deputy Minister of Small Business Development had undertaken any official international travel since 1 January 2015; if so, in each case, (a) why did she undertake the specified trip, (b) who travelled with her, (c) to which destinations did she travel and (d) what was the total cost of each specified trip?

Reply:

The Deputy Minister of Small Business Development has undertaken official international trips since January 2015.

The Deputy Minister of Small Business Development travelled to Sao Paulo, Brazil from 12 – 18 May 2015 to lead a delegation of women to participate at the 25th Global Summit of Women. The theme of the Summit, Creative Women – Creative Economies, underscored the innovation that women bring to the world’s economies. The Summit’s focus was on innovative and creative solutions by government, business and civil society to advance women’s economic status globally. Travelling with the Deputy Minister were her Official Companion, Head of Office and Assistant Administrator, and the total cost of the trip was R348 366.26.

The Deputy Minister travelled to the United States of America to lead two (2) delegations of SMMEs to the Atlanta Lifestyle Hub Show Atlanta, July Show, and the Santa Fe Folk art market in New Mexico from 07 – 10 July 2015 and 10 – 13 July 2015, respectively. In January 2014, the Department of Trade and Industry (the dti) launched the South African permanent showroom at the Atlanta Lifestyle Hub for South African high-end products. The main purpose of the permanent showroom is to expose products, including arts and crafts, of SMMEs and Cooperatives to the international markets. The Deputy Minister then proceeded to the Santa Fe International Folk art Market (SFIFM) which features master folk artists from 60 countries, and is proclaimed as the largest consumer market providing opportunities to traditional artisans to showcase handmade goods. The SFIFM provides a platform for traditional art manufacturers to sell their products to a niche market consisting of art galleries, museum, art collectors and antique curators. The Deputy Minister travelled with her Official Companion, Head of Office and Private Secretary at a total cost of R738 218.99

The Deputy Minister accompanied the Progressive Business Forum (PBF) SMME Trade Delegation to Instanbul and Ankara, Turkey from 26 – 31 July 2015. The primary objective of the PBF is to create of a platform of dialogue between the business community and Government. To this end, the PBF has hosted a number of international trade delegations which included countries such as the Democratic Republic of Congo, India, Vietnam, Mauritius, Tanzania, Cuba, Kenya, Sri Lanka, Brazil, China and more. In each case a Deputy Minister accompanied the delegation, and in this case an invitation was extended to the Deputy Minister of Small Business Development. The Deputy Minister travelled with her Private Secretary at a cost of R83 713.34. The Forum covered the Deputy Minister’s costs.

The Deputy Minister travelled to Maputo, Mozambique to attend the 51st Edition of Maputo International Trade from 29 August – 03 September 2015. Traveling with the Deputy Minister was a Media Liaison Officer, Official Companion, Head of Office and a Private Secretary, and the total cost of the trip was R238 730.45

12 October 2015 - NW3278

Profile picture: Mulaudzi, Adv TE

Mulaudzi, Adv TE to ask the Minister of Transport

(1)What (a) total amount did her department spend on air travel between Gauteng and Cape Town for employees attending Parliament business in the 2014-15 financial year and (b) is the total number of trips that were undertaken; (2) what is the total amount that her department spent on (a) accommodation and (b) car rental in Cape Town for employees attending Parliament business in the specified financial year?

Reply:

The information is based on the transactions recorded for trips to Cape Town from Gauteng irrespective of the routing and purpose

  1. (a) Total amount spent by the Department on Air Travel between Gauteng and Cape Town irrespective of routing for the 2014-15 financial year is R7,577,182-43

(b) Total number of trips recorded per transaction undertaken to Cape Town for the same period is 1918

2.(a) Total amount spent by the Department on accommodation is R2,082,552-20

(b) Total amount spent by the Department on car rental in Cape Town is R1,120,983-85

09 October 2015 - NW3444

Profile picture: Kruger, Mr HC

Kruger, Mr HC to ask the Minister of Small Business Development

Whether the Deputy Minister of Small Business Development had undertaken any official international travel since 1 January 2015; if so, in each case, (a) why did she undertake the specified trip, (b) who travelled with her, (c) to which destinations did she travel and (d) what was the total cost of each specified trip?

Reply:

The Deputy Minister of Small Business Development has undertaken official international trips since January 2015.

The Deputy Minister of Small Business Development travelled to Sao Paulo, Brazil from 12 – 18 May 2015 to lead a delegation of women to participate at the 25th Global Summit of Women. The theme of the Summit, Creative Women – Creative Economies, underscored the innovation that women bring to the world’s economies. The Summit’s focus was on innovative and creative solutions by government, business and civil society to advance women’s economic status globally. Travelling with the Deputy Minister were her Official Companion, Head of Office and Assistant Administrator, and the total cost of the trip was R348 366.26.

The Deputy Minister travelled to the United States of America to lead two (2) delegations of SMMEs to the Atlanta Lifestyle Hub Show Atlanta, July Show, and the Santa Fe Folk art market in New Mexico from 07 – 10 July 2015 and 10 – 13 July 2015, respectively. In January 2014, the Department of Trade and Industry (the dti) launched the South African permanent showroom at the Atlanta Lifestyle Hub for South African high-end products. The main purpose of the permanent showroom is to expose products, including arts and crafts, of SMMEs and Cooperatives to the international markets. The Deputy Minister then proceeded to the Santa Fe International Folk art Market (SFIFM) which features master folk artists from 60 countries, and is proclaimed as the largest consumer market providing opportunities to traditional artisans to showcase handmade goods. The SFIFM provides a platform for traditional art manufacturers to sell their products to a niche market consisting of art galleries, museum, art collectors and antique curators. The Deputy Minister travelled with her Official Companion, Head of Office and Private Secretary at a total cost of R738 218.99

The Deputy Minister accompanied the Progressive Business Forum (PBF) SMME Trade Delegation to Instanbul and Ankara, Turkey from 26 – 31 July 2015. The primary objective of the PBF is to create of a platform of dialogue between the business community and Government. To this end, the PBF has hosted a number of international trade delegations which included countries such as the Democratic Republic of Congo, India, Vietnam, Mauritius, Tanzania, Cuba, Kenya, Sri Lanka, Brazil, China and more. In each case a Deputy Minister accompanied the delegation, and in this case an invitation was extended to the Deputy Minister of Small Business Development. The Deputy Minister travelled with her Private Secretary at a cost of R83 713.34. The Forum covered the Deputy Minister’s costs.

The Deputy Minister travelled to Maputo, Mozambique to attend the 51st Edition of Maputo International Trade from 29 August – 03 September 2015. Traveling with the Deputy Minister was a Media Liaison Officer, Official Companion, Head of Office and a Private Secretary, and the total cost of the trip was R238 730.45

09 October 2015 - NW3566

Profile picture: Lees, Mr RA

Lees, Mr RA to ask the Minister of Public Enterprises

Whether any state-owned enterprise engaged the services of Foresight Advisory Services (Pty) Ltd in the (a) 2013-14, (b) 2014-15 and (c) 2015-16 financial years; if not, why not in each specified case; if so, in each specified case (i) what is the name of the state-owned enterprise, (ii) why were the specified services engaged, (iii) when did the specified services (aa) begin and (bb) end and (iv) what was the (aa) total amount and (bb) breakdown of the specified amount spent by each specified state-owned enterprise?          NW4233

Reply:

ALEXKOR SOC LTD:

Alexkor did not engage the services of Foresight Advisory Services (Pty) Ltd in the (a) 2013-14, (b) 2014-15 and (c) 2015-16 financial years. 

DENEL SOC LTD:

 

Denel did not engage the services of Foresight Advisory Services (Pty) Ltd in the (a) 2013-14, (b) 2014-15 and (c) 2015-16 financial years. 

SAFCOL SOC LTD:

SAFCOL did not engage the services of Foresight Advisory Services (Pty) Ltd in the in the (a) 2013-14, (b) 2014-15 and (c) 2015-16 financial years. 

 

SOUTH AFRICAN EXPRESS SOC LTD:

SA Express did not engage the services of Foresight Advisory Services (Pty) Ltd in the in the (a) 2013-14, (b) 2014-15 and (c) 2015-16 financial years.

TRANSNET SOC LTD:

Transnet did not engage the services of Foresight Advisory Services (Pty) Ltd in the in the (a) 2013-14 and (b) 2014-15

(c) 2015-2016 R1 400 000.00.

ESKOM SOC LTD:

 

Eskom did not engage the services of Foresight Advisory Services (Pty) Ltd in the in
the (a) 2013-14, (b) 2014-15 and (c) 2015-16 financial years.

 

 

 

 

09 October 2015 - NW3242

Profile picture: Lotriet, Prof  A

Lotriet, Prof A to ask the Minister of Science and Technology

(1)What is the current level of collaboration between the Human Sciences Research Council (HSRC) and the SA National Space Agency (SANSA); (2) Is the HSRC currently benefiting from prefential pricing from any of SANSA’s products and services with regard to (a) spatial development and migration, (b) HIV/AIDS and sexually transmitted diseases and (c) Tuberculosis; if not, why not in each case; if so, what are the relevant details of the specified benefits in each case?.”

Reply:

(1) There is currently no collaboration between the HSRC and SANSA.

(2) None.

 

UPDATE:

Until recently there was little contact between HSRC and SANSA. Since the question was posed to the Minister of DST the two organisations have made some initial contact and are planning a meeting to explore some possible collaborations especially on spatial development and migration. It is also hoped that the meeting will also discuss other areas of potential collaboration including, if possible, HIV/AIDS, STIs and TB. However, the relevance of HIV/AIDS, STIs and TB specifically to SANSA’s work is not a matter we are able to address in this reply.

09 October 2015 - NW3462

Profile picture: Walters, Mr TC

Walters, Mr TC to ask the Minister of Rural Development and Land Reform

(1)With regard to a certain law firm (name furnished) that deals with eviction issues on behalf of his department, (a) what criteria did his department set down to apply to the panel of law firms that get appointed by the specified law firm to assist with eviction matters, (b) how is the quality of legal services that are provided by the specified law firm measured and/or controlled by his department, (c) what measures are set down by his department to determine the merits of cases before they are taken on by the panel of law firms, (d) what total number of cases, where other law firms were appointed by his department, were postponed on the hearing date because of poor preparation by the appointed law firm, (e) how many cases were settled in and/or at court on the first day that they were set down for hearing and (f) how many cases were settled out of court and/or without any litigation being initiated by landowners; (2) with reference to the total number of cases in respect of which (a) his department, (b) the specified law firm and/or (c) members of its panel of law firms offered to pay legal costs of landowners, what is the number of cases where the specified landowners were successful in (i) obtaining an eviction order and/or (ii) defending a land claim; (3) with reference to cases that have come before the Land Claims Court since the appointment of the specified law firm, what is the (a) total number and (b) total cost of cost orders that were made against land occupiers?

Reply:

(1)(a) Relevant legal experience and expertise, knowledge of the regulatory framework governing land reform, representivity (race, gender, and disability), administrative infrastructure and support capacity, national spread, attendance of training, language skills, BEE status of the law firm, community involvement, professional conduct and registration with relevant Law Society and Fidelity Fund.

(b) Panellists submit monthly progress reports; bi-monthly meetings are held between the managing law firm and the Department; provincial reviews held with panellists; managing firm and Departmental officials; LRMF management information system (monitoring and evaluation of each matter) is in place; review of panellist invoices in line with the LRMF fee tariff and monthly review of panellist.

(c) Interviews using questionnaires and farm visits.

(d) None.

(e), (f) Unknown. The Information Management System does not provide for details of this nature and would require scrutiny of each file. The system provides for significant milestones such as: Pending, Closed and, Finalised.

(2)(a),(b),(c) Apart from cost orders made by the Court, no offers were made to pay legal costs of landowners.

 

(i),(ii) Falls away.

(3)(a) 5

(b) R293 077.89

09 October 2015 - NW3605

Profile picture: Van Der Walt, Ms D

Van Der Walt, Ms D to ask the Minister of Women in the Presidency

Has her department, together with the Departments of (a) Social Development and (b) Basic Education, undertaken any (i) studies and/or (ii) interventions to address female learners’ inadequate access to (aa) sanitary towels and (bb) proper sanitation facilities in schools, including sanitary bins in bathrooms; if not, why not; if so, what are the relevant details?

Reply:

The Department of Women has not undertaken studies or interventions on the issue of sanitary towels and/or sanitation facilities in schools.

However, the Departments of Social Development and Basic Education are engaged in this matter.

In addition, there are a number of initiatives on this matter, emanating from the private sector and the non-profit sector.

________________________

Approved by the Minister on

Date………………………..

09 October 2015 - NW3630

Profile picture: Steenkamp, Ms J

Steenkamp, Ms J to ask the Minister of Rural Development and Land Reform

How many farms have been transferred to local communities in and around Alldays, Limpopo, for purposes of land reform; (2) what support is his department providing to the specified communities to ensure their success; (3) has his department been made aware of the practice of driven hunting taking place on some of these farms; if so, what are the relevant details; (4) is it his department’s position to allow the practice of driven hunting to take place on these farms; if not, what steps is his department taking to end this practice; (5) (a) what steps is his department taking to mentor and guide the specified communities with regard to successful game farm ranching and (b) how many of the specified farms (i) were and (ii) are operated as game farms

Reply:

 

  1. 35: 10 farms in terms of the Redistribution Programme and 25 farms in terms of the Restitution Programme.
  2. The Department of Rural Development and Land Reform provides a range of support to emerging farmers through its Recapitalization and Development Programme (RADP); support includes infrastructure development, production inputs, machinery and equipment.
  3. No.
  4. No. Hunting does not fall within the scope of the Department’s portfolio. Information regarding such practices should however be directed to the relevant province or authority.
  5. (a) Training and mentoring of communities with regard to game farm ranching is referred to the Limpopo Economic Development, Environment and Tourism Department ( LEDET ) since it is their area of specialty.

           (b) (i) 28 farms : 25 Restitution and 3 Redistribution.

          (ii) 25 farms restored in terms of the Restitution Programme were purchased as game farms and are still used as game farms. The remaining 10      farms are currently operated as livestock farms.

08 October 2015 - NW3563

Profile picture: Figg, Mr MJ

Figg, Mr MJ to ask the Minister of State Security

(1)Whether with reference to his reply to question 739 on 23 March 2015, with regard to the investigation that was instituted into the leaking of the so-called spy cables has been completed; if not, why not; if so, when was the investigation completed; (2) whether a final report of the investigation was compiled; if not, why not; if so (a) what is the title of the report, (b) on what date was the report (i) completed and (ii) submitted to him and (c) what are the main (i) findings and (ii) recommendations of the report; (3) whether he will make a statement on the matter?

Reply:

  1. No
  2. No, however a full investigation has been launched into the purported leakage, its veracity and verification will be handled in terms of the protocols governing the management of classified information.
  3. The findings of the investigation will be made available to the Joint Standing Committee on Intelligence.

08 October 2015 - NW3354

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister in the Presidency

With regard to the call for nomination of individuals to serve on the National Planning Commission for a new five-year term which closed on 10 April 2015, (a) how many nominations were received, (b) why has no announcement been forthcoming about the appointment of Commissioners and (c) who has been advising the Government on how best to implement the National Development Plan in the absence of a constituted National Planning Commission?

Reply:

A total of 127 nominations were received. On 17 September 2015 President Jacob Zuma announced the appointment of 25 new members of the National Planning Commission in the Department of Planning, Monitoring and Evaluation, for a period of five years.

In regard to the last part of the enquiry, the Honourable Member will recall that Government developed the Medium Term Strategic Framework (MTSF 2014-15) which is the first five year building block to implement the NDP. Government has been implementing, monitoring and reporting on the progress being made on the implementation of the NDP imperative under the guidance of Cabinet and Minister in the Presidency. There was therefore no vacuum in the absence of the National Planning Commission.

08 October 2015 - NW3527

Profile picture: Gcume, Ms NP

Gcume, Ms NP to ask the Minister in the Presidency

(1)With reference to his reply to oral question 341 on 26 August 2015, (a) who are the members of the task team appointed by the Deputy Minister in The Presidency, (b) on what basis was the task team appointed and (c) what amount are the members of the specified task team remunerated; (2) will the Deputy Minister in The Presidency make the draft National Expansion and Co-ordination Framework on National Youth Service Programme available; if not, why not; if so, what are the relevant details; (3) will the final report of the specified task team be made public; if not, why not; if so, (a) on what date will the specified report be made public and (b) what are the further relevant details?

Reply:

The members of the Task Team appointed by the Minister in The Presidency are:

1.  Dept of Arts and Culture

2.  Dept of Basic Education

3.  City Year South Africa

4.  Department of Communications (GCIS)

5.  COSATU

6.  Dept of Defence

7.  Dept of Cooperative Governance and Traditional Affairs

8.  Dept of Human Settlements

9.  Dept of Labour

10. Dept of Public Works

11.  Dept. of Rural Development and Land Reform 

12.  Dept of Social Development

13.  Dept of Higher Education and Training

14.  Lovelife

15.  National Youth Development Agency (NYDA)

16.  Banking Association of SA

17.  Communication Specialist - Ms Jabulile Buthelezi

18.  Construction SETA

19.  National Treasury

20.  Dept of Public Service and Administration

21.  South African Graduates Development Association (SAGDA)

22.  South African Local Government Association (SALGA)

23.  South African Youth Council (SAYC)

24.  Youth in Action

25.  Department of Planning, Monitoring and Evaluation

The Task Team was appointed on the basis of including key government departments that have experience in implementing National Youth Service (NYS) programmes, including government departments that may have a strong role to play in the expansion of the NYS.  The Task Team also includes civil society organisations and the private sector so that the views and experiences of these sectors in relation to NYS are incorporated. The work of the Task Team is voluntary and no members are remunerated.

Once the Task Team has concluded on the draft NYS Expansion and Coordination Framework, the Deputy Minister in The Presidency will release the draft framework for public comment and will accordingly engage with relevant stakeholders.

The draft framework will be made public together with a planned stakeholder engagement process.  The inputs gathered will further strengthen the draft framework.   

The final NYS Expansion and Coordination Framework will be submitted to Cabinet for approval and will subsequently be made public.

 

 

 

MINISTER IN THE PRESIDENCY: REPUBLIC OF SOUTH AFRICA

Private Bag X1000, Pretoria, 0001, Union Buildings, Government Avenue, PRETORIA

Tel: (012) 300 5200, Website: www.thepresidency.gov.za

NATIONAL ASSEMBLY

QUESTION FOR WRITTEN REPLY

QUESTION NUMBER: 3527

3527. Ms P T van Damme (DA) to ask the Minister in The Presidency:

(1) With reference to his reply to oral question 341 on 26 August 2015, (a) who are the members of the task team appointed by the Deputy Minister in The Presidency, (b) on what basis was the task team appointed and (c) what amount are the members of the specified task team remunerated;

(2) will the Deputy Minister in The Presidency make the draft National Expansion and Co-ordination Framework on National Youth Service Programme available; if not, why not; if so, what are the relevant details;

(3) will the final report of the specified task team be made public; if not, why not; if so, (a) on what date will the specified report be made public and (b) what are the further relevant details? NW4192E

The members of the Task Team appointed by the Minister in The Presidency are:

1. Dept of Arts and Culture

2.  Dept of Basic Education

3.  City Year South Africa

4.  Department of Communications (GCIS)

5.  COSATU

6.  Dept of Defence

7.  Dept of Cooperative Governance and Traditional Affairs

8.  Dept of Human Settlements

9.  Dept of Labour

10. Dept of Public Works

11.  Dept. of Rural Development and Land Reform 

12.  Dept of Social Development

13.  Dept of Higher Education and Training

14.  Lovelife

15.  National Youth Development Agency (NYDA)

16.  Banking Association of SA

17.  Communication Specialist - Ms Jabulile Buthelezi

18.  Construction SETA

19.  National Treasury

20.  Dept of Public Service and Administration

21.  South African Graduates Development Association (SAGDA)

22.  South African Local Government Association (SALGA)

23.  South African Youth Council (SAYC)

24.  Youth in Action

25.  Department of Planning, Monitoring and Evaluation

The Task Team was appointed on the basis of including key government departments that have experience in implementing National Youth Service (NYS) programmes, including government departments that may have a strong role to play in the expansion of the NYS. The Task Team also includes civil society organisations and the private sector so that the views and experiences of these sectors in relation to NYS are incorporated. The work of the Task Team is voluntary and no members are remunerated.

 

Once the Task Team has concluded on the draft NYS Expansion and Coordination Framework, the Deputy Minister in The Presidency will release the draft framework for public comment and will accordingly engage with relevant stakeholders.

The draft framework will be made public together with a planned stakeholder engagement process. The inputs gathered will further strengthen the draft framework.

The final NYS Expansion and Coordination Framework will be submitted to Cabinet for approval and will subsequently be made public.

08 October 2015 - NW3637

Profile picture: Mente-Nkuna, Ms NV

Mente-Nkuna, Ms NV to ask the Minister in the Presidency

With reference to his reply to question 3309 on 11 September 2015, on what page of the 2014-15 Annual Report of his department that was tabled in the National Assembly are the specified costs indicated?

Reply:

On page 96 of the Annual Report 2014/15 ‘Travel and Substance’ are listed under Appropriation per Economic Classification under ‘Goods and Services’. Also listed, amongst others, is the Final Appropriation and audited Actual Expenditure in regard to travel and subsistence. But more specifically, the figures obtained from the travel agent show that Minister and Deputy Minister travelled between Cape Town and Johannesburg 35 times at a total cost of R202 488 and 33 times at a total cost of R222 693, respectively during the financial year in question.

07 October 2015 - NW3551

Profile picture: Grootboom, Mr GA

Grootboom, Mr GA to ask the Minister of Higher Education and Training

With reference to the board members of the Culture, Arts, Tourism, Hospitality and Sports Sector Education and Training Authority having reportedly spent public funds on their families, (a) what amount of public funds was spent on family members of each specified board member, (b) have any of the funds been recouped and (c) what (i) actions have been taken against the specified board members who misappropriated funds and (ii) measures have been put in place to prevent such actions in the future?

Reply:

a) The investigation commissioned by the Administrator of the Culture, Arts, Tourism, Hospitality and Sports Sector Education and Training Authority (CATHSSETA) found no wrongdoing by Board members, but instead made certain findings against some senior staff members of CATHSSETA.

b) Not applicable.

c) (i) Staff members implicated by the findings were formally charged and have since left the organisation.

(ii) To prevent the occurrence of similar fraudulent activities in the future, the Administrator developed new policies and amended existing policies, such as:

  • Risk Management

A Risk Management Framework was developed to address identified shortcomings in the risk register, fraud prevention policy and procedures, and risk management policy.

  • Discretionary Grant Allocations

A Discretionary Grant Policy and Procedures was developed to guide the allocation of discretionary funding.

  • Financial Management and Procurement Procedures

These procedures were amended to improve financial management.

 

 

 

Compiler/Contact persons:

Ext:

DIRECTOR – GENERAL

STATUS:

DATE:

REPLY TO QUESTION 3551 APPROVED/NOT APPROVED/AMENDED

Dr BE NZIMANDE, MP

MINISTER OF HIGHER EDUCATION AND TRAINING

STATUS:

DATE:

07 October 2015 - NW3371

Profile picture: Basson, Mr LJ

Basson, Mr LJ to ask the Minister of Water and Sanitation

(1)What is the status of the Wentzel Dam’s capacity to deliver water to Schweizer-Reneke in the North West; (2) whether, given the fact that five of the 16 boreholes in Schweizer-Reneke are currently dry, she has taken any measures to prevent a water crisis in the event

Reply:

  1. The Wentzel Dam’s water level has dropped to 22% effective from end August 2015. The volume of water supplied from the Schweizer-Reneke Water Treatment Plant has also dropped from 4 Ml to 2.8 Ml per day. This has resulted in water supply shortages in Schweizer-Reneke Town and Ipelegeng Township.

The most affected are high-lying areas of Ipelegeng which are getting water intermittently during the night. To address this challenge, my Department in collaboration with water services authority, the Dr. Ruth Segomotsi Mompati DM, implemented the following short term interventions:

  • The Fire and Disaster Unit from the Dr Ruth Segomotsi Mompati DM is on standby to supply water to the clinics and schools.
  • Two water tanker trucks are currently supplying water to the most affected areas of Ipelegeng Extension 4, 6, 8 and portion of Extension 5.
  • A total of 9X10 000 liters Jojo tanks are placed at Ipelegeng (including clinics, schools, police station) and are being filled from 06H00 until 20H00 on daily basis.

2.  My Department has allocated R5,1 million to Dr Ruth Segomotsi Mompati DM under the Municipal Water Infrastructure Grant (MWIG) for intervention in addressing the short term water supply issues. Already eight non-functional boreholes have been tested and the results have confirmed dewatering on the aquifers. The scope of work for this funding entails:

  • rehabilitation and refurbishment of existing boreholes;
  • sitting and drilling of new boreholes;
  • equipping of boreholes; and
  • connecting mains.

Furthermore, my Department allocated R1, 589 million to Dr. Ruth Segomotsi Mompati DM under Accelerated Community Programme (ACIP) to address Water Conservation Demand Management issues in Mamusa Local Municipality. The Dr. Ruth Segomotsi Mompati DM is in the process of getting Bid approval and the work is anticipated to commence in October 2015.

---00O00---

07 October 2015 - NW3352

Profile picture: Lees, Mr RA

Lees, Mr RA to ask the Minister of Water and Sanitation

(1)What are the reasons for the non-supply of piped water to the Divaal area situated in Ward 2 of the Indaka Local Municipality and within the uThukela District Municipality in KwaZulu-Natal, which has been without piped water for six months; (2) whether her department has made alternative arrangements to supply water to the community; if not, why not; (3) whether her department (a) has taken or (b) will take action in order to reinstate piped water supplies to the specified area; if not, why not; if so, (i) what action has been taken and (ii) when will the supply of piped water be restored to the specified area?

Reply:

  1. The Uthukela District Municipality (DM) is the Water Services Authority responsible for providing water services in the Indaka Local Municipality (LM). The area is supplied through the Ekukeveni Water Scheme and the Oliphantskop Dam is the raw water source.

The Divaal area has not been without piped water supply for any extended period. The entire Indaka area has an interrupted water supply i.e. the water supply is not available on a continuous basis due to a shortage of water. The water demand exceeds the available water supply because the Ekuvukeni Water Scheme was designed for a particular area and water demand, however more areas were brought onto and supplied from this water scheme, exceeding the scheme’s design capacity.

The different areas of Indaka LM receive piped water on a rotational basis with each area receiving water supply on different days of the week. Some areas, receive water more than once a week depending on location in the area. This is influenced by the proximity to the water treatment works and the layout of the water scheme. The Divaal area is at the end of the water scheme and receives water once a week on Thursdays.

(2) When an area is not receiving water through the water scheme, the Uthukela DM provides water tankers to fill static water tanks and individual containers so residents have access to water.

(3)(a) The Uthukela DM has identified and is implementing a range of measures to ensure continuous piped water supply in the area.

(3)(b)(i)As part of the drought intervention programme, which is managed by my Department, the UThukela DM is allocated R3 million to implement a borehole programme to improve water availability in the district. Contractors are currently on site conducting investigation of sites to start drilling boreholes. The Uthukela DM has made a further application for R3.5 million under the Municipal Water Infrastructure Grant to extend the borehole programme in this area.

(3)(b)(ii)The long term sustainable solution depends on the rollout of the Driefontein Complex Regional Bulk Scheme, a Regional Bulk Infrastructure Grant funded project with various phases to ultimately supply water to the region from the Spioenkop Dam.

---00O00---

07 October 2015 - NW3360

Profile picture: McLoughlin, Mr AR

McLoughlin, Mr AR to ask the Minister of Water and Sanitation

In light of the fact that her department is mandated to discharge the Constitutional obligation of providing access to water to every citizen in the country, (a) what (i) joint discussion process has been established with the Department of Human Settlements and the Department of Cooperative Governance and Traditional Affairs, to ensure that no duplication or overlap of functionality in the carrying out of her department’s stated mandate occurs between these departments, (ii) separate actions are being taken by her department in carrying out its stated mandate, (iii) monitoring procedure is in place, to establish whether or not there is a duplicity of actions between departments, (iv) resolution mechanism exists in instances where two or more departments are found to be carrying out the same actions to ensure that optimal use is made of the available funds and (v) good reason exists for the continuation of this right that is shared by the specified departments and (b) why should the right of water provision not be located within one dedicated department?

Reply:

(a)(i) A joint discussion has already taken place between the Department of Water and Sanitation together with COGTA, the Municipal Infrastructure Support Agent (MISA), the office of the Presidency’s M&E unit and National Treasury, and a Project Management Office (PMO) has been established to co-ordinate and integrate all water services activities related to sustainable Water Services delivery in the 27 Priority DMs. The Department of Human Settlements is part of this initiative. The PMO will ensure that there is no duplication with regards to the water and sanitation service delivery and will ensure that funding alignment between different Departments and funding sources takes place.

(a)(ii) No separate actions are being undertaken by the Department. As stated above all water services actions are being coordinated through the PMO.

(a)(iii) A monitoring programme is being established to ensure that, once a pipeline of projects has been determined, they are implemented and run effectively. My Department has identified eleven key intervention activities that will be monitored to ensure the implementation of sustainable water and sanitation service delivery. They are:

  1. Demographics;
  2. Service Levels;
  3. Socio-Economics;
  4. Water Services Infrastructure;
  5. Operational and Maintenance;
  6. Associated Services;
  7. Water Resources;
  8. Conservation & Demand Management;
  9. Financial;
  10. Institutional Arrangements; and
  11. Social & Customer Service Requirements.

A 5-year implementation plan will be developed and implementation thereof will be monitored at community and project level. The plan will be developed through a consultancy process at municipal level with relevant role-players and funding initiatives. The plan will be signed off by Council to ensure that no duplication takes place.

(a)(iv) Requesting Honourable member to note that, there are no two Departments which execute identical actions. Each Department finds its mandate in the Constitution, followed by the legislation administered by the respective Department, therefore the need for such a resolution mechanism has not arisen. My Department's mandate is highlighted in Section 3 of the National Water Act, 1998 (Act No. 36 of 1998):

Public trusteeship of nation's water resources

3. (1) As the public trustee of the nation's water resources the National Government, acting through the Minister, must ensure that water is protected, used, developed, conserved, managed and controlled in a sustainable and equitable manner, for the benefit of all persons and in accordance with its constitutional mandate. (2) Without limiting subsection (1), the Minister is ultimately responsible to ensure that water is allocated equitably and used beneficially in the public interest, while promoting environmental values. (3) The National Government, acting through the Minister, has the power to regulate the use, flow and control of all water in the Republic.”

(a)(v) Falls away.

(b) Falls away.

---00O00---

07 October 2015 - NW2660

Profile picture: Horn, Mr W

Horn, Mr W to ask the Minister of Water and Sanitation

(1)How many households in the jurisdictional area of the Mangaung Metropolitan Municipality made use of (a) bucket system serviced toilets (b) VIP toilets and (c) pit latrines from (i)(aa) 31 May 2011 and (bb) each calendar year till 31 May 2015 and (ii) 1 June 2015 up to the latest date for which information is available; (2) how many households in the specified municipality are expected to still be using the (a) bucket system serviced toilets (b) VIP toilets and (c) pit latrines by 31 May 2016?

Reply:

(1)(b) The official figure for bucket toilets in the Metro area is 1 585 but a recent survey has indicated that 1 347 buckets are being removed in Mangaung and 757 in Botshabelo giving a total of 2 104. It must however be noted that the majority of these buckets are on informal sites and that all bucket toilets have been eradicated in Thaba Nchu.

(1)(b) The Mangaung Metro has a total of 33 382 VIP toilets.

(1)(c) The spread sheet depicts the number of pit latrines as per a financial year as requested:

HHs with Sanitation Services in MMM

Month Year

Pit Latrines

(aa) May-11

33 745

(bb) May-12

32 998

(bb) May-13

31 255

(bb) May-14

30 825

(bb)May-15

29 823

(ii)(bb) May-16

28 437

(2) Mangaung Metro Municipality has committed itself to eradicate the sanitation backlog which includes all bucket and VIP toilets by 2018. With the current bucket and VIP eradication program, the Metro is expected to have the following backlog which will be addressed annually until the above mentioned eradication date:

HHs with Sanitation Services in MMM

Month Year

(2)(a) Buckets Toilets

(2)(b) Pit Latrines

(2)(c) VIPs

May-16

1 223

28 437

31 468

---00O00---

07 October 2015 - NW3695

Profile picture: Mbatha, Mr MS

Mbatha, Mr MS to ask the Minister of Higher Education and Training

How many students (a) were registered by the (i) Further Education and Training colleges and (ii) universities across the country in 2015 and (b) will be registered by the specified institutions in 2016?

Reply:

a) (i) Public Technical and Vocational Education and Training (TVET) colleges have a number of enrolment intakes within an academic year. Headcount enrolments in public TVET colleges across the nine provinces as at 21 August 2015 are tabulated below. This excludes headcount enrolments for Engineering Trimester 3 N1 – N6 programmes, which will only be available on 30 October 2015.

Total Headcount Actual students enrolled as at 21 August 2015

Province

NC(V)
Engineering

NC(V)
Business and General Studies

Engineering

Intro N4 - N6
Business Studies

Other Programmes

TOTAL
Headcount Actual students Enrolled

     

N1 - N3

N4 - N6

     

Eastern Cape

5 600

15 066

10 294

4 959

29 880

2 646

68 445

Free State

1 721

5 273

10 380

4 760

24 744

1 851

48 729

Gauteng

8 426

18 303

38 059

18 122

52 234

4 983

140 127

KwaZulu-Natal

9 800

21 365

20 880

10 259

43 898

10 255

116 457

Limpopo

9 839

16 538

19 622

7 450

32 181

1 044

86 674

Mpumalanga

4 590

6 912

9 133

3 299

9 270

119

33 323

North-West

3 405

6 628

9 886

3 293

14 554

1 017

38 783

Northern Cape

731

1 537

3 686

269

6 814

756

13 793

Western Cape

3 887

10 920

11 403

3 057

25 391

13 369

68 027

National

47 999

102 542

133 343

55 468

238 966

36 040

614 358

Data source: Weekly Enrolment Monitoring as at 21 August 2015.

(ii) Universities have a number of enrolment intakes within an academic year and will be submitting their 2015 enrolment data to the Department on 30 November 2015. The university headcount enrolment target for the 2015 academic year is 1 020 000.

b) The preliminary headcount enrolment targets for the 2016 academic year are as follows:

   (i) Public TVET colleges: 829 000

   (ii) Universities: 1 035 000

 

 

 

Compiler/Contact persons:

Ext:

DIRECTOR – GENERAL

STATUS:

DATE:

REPLY TO QUESTION 3695 APPROVED/NOT APPROVED/AMENDED

Dr B NZIMANDE, MP

MINISTER OF HIGHER EDUCATION AND TRAINING

STATUS:

DATE:

07 October 2015 - NW3369

Profile picture: Basson, Mr LJ

Basson, Mr LJ to ask the Minister of Water and Sanitation

(1)(a) When will the new water purification plant in Bloemhof in the North West be completed and (b) what will the capacity of the plant be; (2) (a) what is the total cost of the specified plant and (b) how will it be funded; (3) whether any outstanding funding is required to complete the project; if so, (a) what amount and (b) how will it be financed; (4) who will be running the specified plant; (5) which areas will receive water from the specified plant?

Reply:

(1)(a) The new water purification plant in Bloemhof in the North West will be completed in January 2017.

(1)(b) The capacity of the plant is from 10 Mℓ/d to 25 Mℓ/d.

(2)(a) The total cost of the plant is R403 million.

(2)(b) It will be funded by my Department through Regional Bulk Infrastructure Grant (RBIG).

(3) No outstanding funding is required.

(3)(a) Falls away.

(3)(b) Falls away.

(4) The plant will be operated by Sedibeng Water Board on behalf of Dr Ruth Segomotsi Mompati District Municipality.

(5) The following areas will receive water from the plant.

  • ScheizerReneke Town;
  • Ipelegeng Township;
  • Bloemhof Town; and
  • Boitumelong Township.

---00O00---

07 October 2015 - NW3419

Profile picture: More, Ms E

More, Ms E to ask the Minister of Water and Sanitation

Whether her department meets the Government’s 2% employment equity target for the employment of persons with disabilities that was set in 2005; if not, why not; if so, what are the relevant details?

Reply:

Currently, my Department is not meeting the set targets of 2% for the employment of people with disabilities.

However my Department has in 2012, established an Employment Equity (EE) Forum which developed and an approved EE Plan to address issues of gender and disability.

Since the inception of the forum in 2012 there has been a slow but significant movement in the appointment of people with disabilties from 0.28% in April 2011 to 0.76% as at April 2014. Currently, the percentatge of people with disabilities as at July 2015 is 0.78%. (see below movement of appointment PWDs)

My Department plans to target vacant funded posts when advertising for people with disabilities in the future to reach the target of 2% or more, and also work closely with the Directorate Gender and Mainstreaming to address isues of gender and disabilities.

---00O00---

07 October 2015 - NW3256

Profile picture: Khawula, Ms MS

Khawula, Ms MS to ask the Minister of Water and Sanitation

(1)What (a) total amount did her department spend on air travel between Gauteng and Cape Town for employees attending Parliament business in the 2014-15 financial year and (b) is the total number of trips that were undertaken; (2) what is the total amount that her department spent on (a) accommodation and (b) car rental in Cape Town for employees attending Parliament business in the specified financial year?

Reply:

  1. The total amount spent on air travel and the total number of trips that were undertaken between Gauteng and Cape Town for employees attending Parliamentary business for the financial year 2014/2015 was as follows:

(1)(a) The total amount spent on air travel is R 8 436 100.63

(1)(b) The total number of air travel undertaken is 1852 between Gauteng and Cape Town for employees attending Parliamentary business for the financial year 2014/2015

2. The total amount spent on accommodation and car rental costs in Cape Town for employees attending Parliamentary business for the financial year 2014/2015 was as follows:

(2)(a) The total amount that the department has spent on accommodation is R 4 624 218.12

(2)(b) The total amount that her department spent on car rental costs R 371 270.55

---00O00---

07 October 2015 - NW3410

Profile picture: Alberts, Mr ADW

Alberts, Mr ADW to ask the Minister of Public Enterprises

Whether, since her reply to question 483 on 4 May 2015 and question 3010 on 1 September 2015, in the light of the poverty of the pensioners of the Transport Pension Fund and the Transnet Second Defined Benefit Fund, she will consider to expeditiously finalise the adjustment of the 2% rule for the specified pensioners and to urgently investigate the financial status of the specified pension funds in order to give these pensioners an inflation-linked increase at the beginning of 2016 that will be higher than the maximum increase of 2%; if not, why not; if so, what are the relevant details; (2) whether she will consider submitting an application for National Treasury to make a direct payment to these pensioners in order to bring financial relief; if not, why not; if so, what are the relevant details; (3) whether, in the light of the financial situation of the pensioners, she will consider implementing on an annual basis the parliamentary finding on 1 November 2010 (details furnished) and recommendation regarding a financial injection, further bonuses and inflation-linked increases; if not, why not; if so, what are the relevant details??

Reply:

  1. As per the response provided to PQ 483, along with the Minister of Finance, I am currently considering the proposal to adjust the pension fund rules to amend the 2% rule and will provide a response in due course.
  2. The rules of the fund stipulate that only when the fund is unable to meet its financial obligations, will there be a requirement for Transnet to inject money into the fund. Should Transnet not be in a position to inject the required funds in order for the Pension fund to meet its financial obligations, then the state will be required to inject funds directly into the fund. At this stage, the fund is able to meet its financial obligations and accordingly there is no legal obligation in terms of the Legal Succession to the South African Transport Services Act of 1989, for either Transnet and/or the State to make a direct payment to the Pension Funds.
  3. Transnet has complied with the recommendations of the Portfolio Committee in as far as the payment of bonuses to the pensioners are concerned. Since 2010, Transnet has to date paid over R2.2 billion in ad hoc bonuses to the pensioners belonging to the TPF and TSDBF. With regard to the recommendation relating to financial injection and inflation-linked increases, please refer to paragraphs 1 and 2 of this response.

 

07 October 2015 - NW3286

Profile picture: Malatsi, Mr MS

Malatsi, Mr MS to ask the Minister of Sport and Recreation

(1)​(a) On what date was a fighting licence issued to the late Phindile Mwelase for her fight on 12 October 2014 with Liz Butler, (b) by which official at Boxing South Africa was the licence issued and (c) what was the position of the official who issued the licence at the time; (2)(a) who are the members of the team appointed to investigate the specified person’s death and (b) from which (i) company or (ii) department were the specified team members appointed; (3)what amount (a) has been budgeted for the investigation of the specified person’s death and (b) has been paid to the investigative team as at 25 August 2015; (4)has the investigative team submitted its (a) preliminary report and (b) final report; if not, (i) why not and (ii) when are the respective deadlines for submission of the specified reports; if so, when did the specified team submit the specified reports?NW4043E

Reply:

The Department is currently sourcing the information required from Boxing South Africa and will reply to the question when all information is available.

07 October 2015 - NW3375

Profile picture: Balindlela, Ms ZB

Balindlela, Ms ZB to ask the Minister of Water and Sanitation

With reference to her media statement on 24 February 2015 on security of water supply (details furnished), (a) at what stage of development is the master plan for water resource infrastructure and (b) what is the estimated date of its completion?

Reply:

(a) The development of a Master Plan for water resource infrastructure is currently in the information gathering stage entailing aspects such as condition assessment of existing infrastructure and updating of the asset management plan.

It should be noted that the Second Edition of the National Water Resource Strategy that was published in 2013 already indicates key information on new water resource infrastructure projects that are currently under development and this shall form part of the master plan.

(b) The development of the Master Plan is estimated to be completed at the end of August 2016.

---00O00---

07 October 2015 - NW3485

Profile picture: Baker, Ms TE

Baker, Ms TE to ask the Minister of Water and Sanitation

(1)Which municipalities in each province have been identified as (a) high-risk and (b) in crisis, with regard to their waste water treatment capacity; (2) whether any remedial action is currently being taken to address the situation in each of the specified high-risk municipalities; if not, why not; if so, what are the relevant details for each of the municipalities?

Reply:

(1) Please refer to Annexure A below for the list of prioritised plants.

(2) My Department together with all the Provincial Operations Offices has prioritised these Waste Water Treatment Works (WWTW) and are all under regular surveillance. This entails that municipalities will develop Corrective Action Plans for those plants, which will be monitored regularly by the Provincial Operations Offices. Site inspections are conducted and progress reports developed and submitted on a quarterly basis. Over and above, these WWTW are prioritised from the support side and allocation of funds is availed to mitigate against the risk associated with operation of each of the works.

---00O00---

ANNEXURE A

Region

Municipality

Name of WWTW

Actions Taken by Regulation

Associated Cost

Gauteng

None

     

Kwazulu-Natal

Ilembe DM

Amatikulu

  • Conducted a site inspection and a meeting with the WSA
  • The plant is no longer in operation, it will be decommissioned and deregistered from Green Drop System (GDS)
 
 

Umzinyathi DM

Tugela Ferry

  • Conducted a site inspection
  • Presented inspection findings to the WSA
  • Assisted the WSA to develop an action plan,

and to complete water use registration forms

 
 

uMkhanyakude DM

St Lucia, Bethesda-Ubombo, Hluhluwe, Jozini, Ingwavuma-Mosvold, Manguzi Hospital, Hlabisa Hospital, Mkhuze

  • Conducted site inspections
  • Presented inspection findings to the WSA
  • Assisted WSA to develop an action plan,

and to complete water use registration forms

(all these documents were received by DWS).

 
 

uThukela DM

Ladysmith, Winterton, Escourt, Wembezi, Ezakheni, Bergville,Colenso, Ekuvukeni

  • Conducted site inspections
  • Assisted the WSA to develop an action plan, and

to complete water use registration forms

  • (an action plan was received by DWS, a service

Provider has been appointed to improve the

Operations).

 
 

uThungulu DM

Gingindlovu, Mpushini, Ekhombe Hospital, Ekuphumuleni Hospital, Kwabadala, Mbongolwane Hospital, Owen Sithole College, Umlazi-Mtunzini, Nkandla, Catherine Booth

  • Conducted site inspections
  • Presented inspection findings to the WSA
  • Assisted the WSA to develop an action plan, and to

complete water use registration forms

  • The Region is waiting for the action plan
 
 

Zululand DM

Vryheid-Klipfontein, Emondlo, Coronation, Hlobane

  • Conducted site inspections
  • Presented inspection findings to the WSA
  • Assisted WSA to develop an action plan, and to

complete water use registration forms

  • The Region is waiting for the action plan
 
 

uMzinyathi DM

Tugela Ferry

  • Desludged settling tank; Refurbished aerator motor; Refurbished aerator gearbox; Provision of self-powered chlorinator; Refurbished wasted sludge return mechanism

R810 000

(ACIP)

 

uMkhanyakude DM

St Lucia

  • Refurbished Inlet Works Screens; Replaced Inlet Works ultrasonic flow sensor; Refurbished primary and maturation ponds; Removed sludge and weeds/reeds from primary and maturation ponds; Replaced flow controls/sluices from primary and maturation ponds

R2 686 184 (ACIP)

 

uMkhanyakude DM

Mkhuze

  • Desludged all six ponds; repaired three damaged ponds; Installed new lining in ponds

R1 697 805(ACIP)

 

uMkhanyakude DM

Bethesda-Ubombo,

  • Municipality refurbished plant using own funds
 
 

uMkhanyakude DM

Hluhluwe

  • Earmarked for refurbishment in the 2015/2016 national financial year

R5 million (budget) (ACIP)

 

uMkhanyakude DM

Jozini

  • Installation of chlorination system; Structural repairs to all ponds and desludging and disposal; Fencing and Security Gates

R2 022 000 (WSOS)

 

uMkhanyakude DM

Ingwavuma-Mosvold

  • Municipality refurbished plant using own funds
 
 

uMkhanyakude DM

Hlabisa Hospital

  • Municipality refurbished plant using own funds
 
 

uThukela DM

Escourt

  • Refurbish Ultrasonic Flow Sensor; Bridge Corrosion protection; Refurbish bridge drive motor and gearbox;
  • Refurbish central bearing assembly; Refurbish desludge valves and pipework; Degrit and clean; Refurbish circulation pumps; Refurbish external pipework; Bridge Corrosion protection;
  • Refurbish bridge drive motor and gearbox; Refurbish central bearing assembly;
  • Refurbish desludge valves and pipework

R4 260 000 (ACIP)

 

uThukela DM

Winterton

  • Refurbish inlet screens; Bridge Corrosion protection;
  • Refurbish bridge drive motor and gearbox; Refurbish desludge valves and pipework; Refurbish sludge pumps and motors and pipework/valves

R1 200 000 (ACIP)

 

uThukela DM

Wembezi

  • Replace submersible pump.
  • To refurbish grit openchsnnel flume,weed control,flow control/sluit,sludge removal.

R960 000 (ACIP)

 

uThukela DM

Ezakheni

  • Refurbish 2 No. 30kW pumps; Refurbish ultrasonic flow sensor; Refurbish aerator motors (2 No.) and gearbox (1 No.); Refurbish Mixer
  • General corrosion protection
  • Replace access railings; Bridge corrosion protection and replace bridge drive motor
  • Refurbish bridge drive gearbox; Refurbish central bearing assembly
  • Refurbish desludge valves, pipework

R3 340 000 (ACIP)

 

uThukela DM

Colenso

  • Replaced pump motors and gearboxes; Replaced open channel flume; Refurbish Aerator Motors in both basins
  • Replace aerator gearboxes in both basins; Refurbish mixers in both basins; Replace Access Rails on each basin; Refurbish flow control sluices
  • Weed control - rehabilitate

R3 390 000 (ACIP)

 

uThukela DM

Ekuvukeni

  • Refurbish inlet screens
  • Refurbish grit removal system
  • Refurbish ultrasonic flow sensor; R efurbish flow control valves; Refurbish aerator motor and gearbox;
  • General corrosion protection
  • Replace handrailing; Refurbish mixer; Refurbish bridge drive gearbox;
  • Refurbish bridge drive motor;
  • Refurbish central bearing assembly; Refurbish desludge valves, pipework; Bridge corrosion protection

R1 350 000 (ACIP)

 

uThukela DM

Ladysmith

  • Earmarked for refurbishment in the 2015/2016 national financial year

R3 890 000 (ACIP)

 

uThungulu DM

Kwabadala

  • To replace inlet screens, ultrasonic flow sensor, flow controles/sluicecabling and recorders.
  • To refurbish ponds remove weeds/reeds,reinstate ponds.

R960 000

(ACIP)

 

uThungulu DM

Owen Sithole College

  • Refurbish screens; Replace ultrasonic flow sensor and flume; Replace cabling and recorder; Replace aerator motor and gearbox; Replace mixer; Corrosion protection of plant/handrrailing; Replace bridge corrosion protection;
  • Refurbish bridge drive motor and gearbox; Replace desludge valves and pipework

R1 120 000

(ACIP)

 

uThungulu DM

Catherine Booth

  • Replace inlet screen, ultrasonic flow sensor and flume.; To refurbish ponds, ponds, chlorinator, general buiking upgrade. To replace flow controls/sluice,general building upgrade

R490 000

(ACIP)

 

uThungulu DM

Ekuphumuleni Hospital

  • Refurbish screens,bridge drive motor and gearbox. Replace ultrasonic flow sensor and flume. Replace bridge corrosion protection, desludge valves and pipework.

R490 000

(ACIP)

 

uThungulu DM

Mbongolwane Hospital

  • To refurbish grit removal,inlet screen,ultrasoni flow sensor. To replace motors and gearboxes,mixer,switchgear and cabling. To refurbish chlorinator and scales.

R560 000

(ACIP)

 

Zululand DM

Emondlo

  • To refurbish access rails,pipework and valves,switchgear. Ro refurbish pumps and motor, chlorinator,desludge valves,deslidge valves. To refurbish central bearing,bridge corrosion and replace mixer.

R820 000

(ACIP)

 

Coronation

Zululand DM

  • Refurbish Inlet Screens;
  • Replace ultrasonic sensor and cabling and recorder;
  • Refurbish bridge drive motor and gearbox; Refurbish desludge valves and pipework; Bridge corrosion protection; Refurbish aerator motor and gear box; Replace mixer; Refurbish cabling and switchgear; Replace access rails/hand rails; Replace chlorinator; Replace gas leak detection; Replace scales;
  • Corrosion protection

R1 640 000

(ACIP)

Limpopo

Mookgopong LM

Thusang Ponds

   
 

Sekhukhune DM

Groblersdal, Dennilton, Motetema Ponds, Monsterlus-Hlogotlou, Elandkraal, Leeufontein-Mokganyaka, Marble Hall, Jane Furse-Glen Cowie, Phokwane Ponds, Nebo Ponds, Meckleberg-Moroke Ponds

  • RRU Support funding only assisted the following Waste water treatment works in drafting the Risk abatement plan: Lephalale Local Municipality (4 x systems, Zongesien, Witpoort, Paarl, and Monyeke), Vhembe District Municipality (2 x systems Thohoyandou and Makhado), Sekhukhune District Municipality (1 x system, Motetema) and Polokwane Local Municipality
    (1 x system, Mankweng).
  • A workshop was conducted with 4 WSAs that scored below 30% to further clarify the improvement plans required as stipulated in the Assessment report. WSAs were requested to submit an action plan to improve its performance in the underperforming areas as indicated above. Only two (2) WSAs complied, Mopani & Thabazimbi and the region to further assist the three remaining WSA’s to submit their action plans.
  • Through Water Services Operating Grant (WSOG) the department is assisting three WSAs in refurbishment of their WWTW: Polokwane LM ( Seshego, Mankweng WWTW ), Sekhukhune DM (Dennilton, Motetema, Practiseer, Penge and Mapodile Ponds) and Capricorn DM( Lebowakgomo Ponds)

RRU Support:

Lephalale LM: R135 501.

Vhembe DD: R107 140.

Sekhukhune DM:R40 000.

Polokwane LM: R58 717

Sub-total: R341 358.

WSOG:

Polokwane:R14,5Million

Sekhukhune: R14,66million

Capricorn: R4 Million

Sub-total: R33,160 Million

Grand Total: R33,5Million

 

Mopani DM

Giyani , Ga-Kgapane, Modjadjl-Duiwelskloof, Senwamokgope Ponds, Phalaborwa, Lulekani, Lenyenye, Nkowankowa, Namakgale

   
 

Thabazimbi LM

Rooiberg, Northam

   
 

Vhembe DM

Louis Trichardt-Makhado, Makhado-Dzanani Ponds, Waterval-Makhado, Mutale Ponds, Malamulele, Thokoyandou, Tsifulanani Ponds, Mhinga, Nancefield

   
 

Capricorn LM

Sewabarwana Oxidation ponds

 

R4 m (ACIP)

 

Lephalale LM

 

Re-engineering of sewer network in Lephalale town

R6 m (ACIP)

 

Sekhukhune DM

 

Upgrade of WWTW at Greater Tubaste LM

R5 m (ACIP)

     

To dedicated to WWTW flaged high risk by 2013 Green drop report

R5.2 m (ACIP)

Mpumalanga

Mbombela LM

Kabokweni

   
 

DR JS Moroka LM

Vaalbank Oxidation Pond

No support due to the fact that the Oxidation Pond only services Vaalbank SAPS (Police) Station.

N/A

 

Albert Luthuli LM

Mpuluzi-Mayflower, Elukwatini-Eerstehoek, Carolina

Carolina

  • Upgrading of pumps
  • Refurbishment of the chlorination system
  • Refurbishment of aerators
  • Building renovations
  • Cleaning of dams
  • Repairs to the inlet works

Follow up Inspection

Holding of monthly project progress meetings until to the end of the project

R2.098million

(ACIP)

 

Nkomazi LM

Mhlatikop, Komatipoort, Hector Spruit

Mhlatikop

  • Installation of palisade fencing
  • Construction of mini lab
  • Installation of blowers
  • Upgrading of the inlet works
  • Replacement of pumps
  • Installation of a new chlorine system and shower
  • Installation of flow meters
  • Renovation of buildings

Komatipoort

  • Cleaning of the ponds
  • Installation of a new chlorination system
  • Construction of a pump house and upgrading of pumps at Spar pump station
  • Construction of a pump house and upgrading of pumps at Orlando Spar pump station
  • Construction of a pump house and upgrading of pumps at Crocodile pump station
  • Construction of the Guard house
  • Related pipe works
  • Renovations to buildings

Follow up Inspection

Holding of monthly project progress meetings until to the end of the project

R5.68million (ACIP)

R11.53million (ACIP)

 

Thembisile Hani LM)

KwaMhlanga Ponds (East) , KwaMhlanga (West

  • Installation of flow meters
  • Upgrade of the outlet works.
  • Installation of disinfection system.
  • Process audit and optimization of the works
  • Construction of fencing and a guardhouse with
  • office and ablution unit
  • Sludge removal

Follow up Inspection

Holding of monthly project progress meetings until to the end of the project

R3.3million (WSOSG)

 

PixleykaSeme LM

Amersfoort, Perdekop, Volksrust, Vukuzakhe, Wakkerstroom

   
 

Emalahleni LM All 7 plants

Ga-Nala,Rietspruit,Phola, Riverview,Klipspruit,Naawpoort,Ferrobank

RIVERVIEW WWTW:

Inlet WWTW;

  • Installation of new mechanical screen replacing the non functional one
  • Installation of safety grid over open channel.
  • Supply new screen bin.

Primary Settling Tank (PST);

  • Repair Scrum scraper blade.
  • Replace scum removal rubbers.

2 X Small Digesters;

  • Clean digesters.
  • Replace 5 gate valves with new ones.
  • Replace all existing steel pipe work from sludge pump station to digesters.
  • Replace sludge feed and draw off work.
  • Replace hand rails.

1 x Larger Digester;

  • Clean out the digester

Sludge Pump Station;

  • Extension of sludge feed pipe line to both sumps;
  • Replacement of existing KSB sludge pump with motor pump set.
  • Supply and install safety covers over couplings of two pumps.

Aeration Pond;

  • Clean out aeration basin.
  • Supply and install new electric motors for the floating aerators.
  • Supply and install of holding ropes.
  • Replace corroded mild steel pipe sections with stainless steel pipes.
  • Supply and install of two blank flanges fitted with jetting nozzles

Drying Beds;

  • Replace of 32 hand stops on 8 drying beds of 1st section.
  • Replace of 24 hand stops on 12 drying beds of 2nd section

2 X Bio-Filters;

  • Replace centre column and filter arm pipes of bio filter 1.
  • Clean arms and level arms of bio filter 2.

Screw Pump;

  • Replacement of bottom bearing.
  • Replacement of electric motor with 1410 rpm unit.

Final Settling Tank;

  • Repair scum draw off valve mechanism.

Submersible Pumps;

  • Supply and install new 2 submersible pumps.

Humus Pump Station;

  • Replace obsolete pump motor set with suitable equipment.
  • Replace existing pump set.

Inlet Work – electrical Equipment;

  • Moving of inlet flow meter to new (suitable) position.

Stand-By Generator;

  • Supply and install 94 kV diesel powered generator.
  • Supply change over panel from mains to generator

Palisade Walling;

  • Supply and install the new palisade walling around entire plant
  • Supply and installation of the manual sliding gate

Follow up Inspection

Holding of monthly project progress meetings until to the end of the project

R5.54 million (ACIP)

     

FERROBANK WWTW:

  • Refurbishment of drying beds covering the area of 4920 m2.
  • Refurbishment of mechanical screen
  • Calibration of outlet flow and sludge pump ultrasonic flow meter.
  • Cleaning and unblocking humus tanks.

Primary Treatment;

  • Refurbishment of three Primary. Settling Tanks (3 x PSTs); i.e. cleaning and unblocking of PST #5, #6, and #7.

Secondary Treatment;

  • Mechanical refurbishments of four Bio Filters, i.e. bio filter #1, #2, #3 and #4.

Follow up Inspection

Holding of monthly project progress meetings until to the end of the project

R5million (ACIP)

 

Bushbuckridge LM

Acornhoek, Dwarsloop, Hoxane, Maviljan, Tintswalo, Mkhuhlu, Thulamahashe

   
 

Msukaligwa LM

BreytenPonds,Breyten ASP,Chrissiesmeer,Davel, Ermelo,Lothair

Breyten

  • Refurbishment of the RAS pumps
  • Refurbishment of inlet pumps
  • Refurbishment of the Aerators shaft and blades
  • Calibratiojn of ultrasonic flow meters
  • Cleaning of the chlorine contact tank
  • Installation of the emergency shower
  • Refurbishment of Aerator gearbox
  • Refurbishment of Aerator motors
  • Refurbishment of drive wheel bearing on SST

Follow up Inspection

Holding of monthly project progress meetings until to the end of the project

R2.2million (ACIP)

 

Lekwa LM

Morgenzon, Standerton

Standerton

  • Refurbishment of inlet works
  • Refurbishment of 15KW GR pumps
  • Installation of one 15KW GR pump
  • Refurbish MCC (install soft starter,
    motor control unit)
  • Refurbishment of the PST
  • Flushing of biofilters

Follow up Inspection

Holding of monthly project progress meetings until to the end of the project

R1.7million (ACIP)

 

Dipaleseng LM

Balfour,Grootvlei Eskom,Greylingstad,Grootvlei Mine

Balfour

  • Installation of Aerator no 4 motor and gearbox
  • Installation of vertical spindle mixer no2
  • Installation of two RAS pumps 2.5 and 4.5KW both immersible pumps
  • Refurbishment of the SST
  • Refurbishment of aerator no3

Greylingstad

  • Calibration of inlet flow meters
  • Service and repair bearings on brush aerator
  • New submersible WAS/recycle pump (estimated 5.5kW)
  • New submersible mixer (estimated 2.5 kW)
  • Rebuild effluent flow meter weir
  • Install doors to office building bathroom
  • Install geyser and hot water plumbing to shower

Follow up Inspection

Holding of monthly project progress meetings until to the end of the project

R1.15million (ACIP)

R0.591million (ACIP)

 
  • Thaba Chwue LM
  • Lydenburg WWTW
  • Refurbishment of Lydenburg WWTW
  • R 6. 971 m (ACIP)
 
  • Emakhazeni LM
  • Machadodrop WWTW
  • Refurbishment of Machadodrop WWTW
  • R 4. 603 m (ACIP)
 
  • Lekwa LM
  • Morgenzon WWTW
  • Refurbishment of Morgenzon WWTW
  • R 3. 415 m (ACIP)
 
  • Dr Pixley ka Seme
  • Wakkerstroom WWTW
  • Refurbishment of Wakkerstroom WWTW
  • R 1. 424 m (ACIP)
         
 
  • Dipaleseng
 
  • Balfour Wastewater Treatment Works
  • All these plants are prioritized under RBIG for the implementation in the third quarter of 2015/16 financial year
 
  • Victor Khanye
 
  • Upgrade of Delmas Waste Water
 
 
  • Victor Khanye
 
  • Upgrade of Botleng Waste Water
 
         

Free State

  • Tswelopele LM
  • Hoopstad, Builtfontein
  • B/G Drop task team established
 
 

Mantsopa LM

Tweespruit, Thaba Patchoa

Tweespruit: site inspection conducted on 12 March 2015. Non compliance letter dated 30 March 2015 issued. No pre-directive or directive issued

B/G Drop task team established

 
 

Matjhabeng LM

Welkom

Refurbishment of Mamahabane Waste Water Treatment Works: Project to start in 2015/16 financial year. Completion expected in March 2016

Upgrading of sewer network in Kutlwanong Stadium area: Project to start in 2015/16 financial year. Completion expected in March 2016

B/G Drop task team established

R3,000,000.00

R3,352,000.00

 

Mafube LM

Namahadi

Upgrading of Namahadi WWTW. The project has been divided into two phases. Phase 1 is more bulk sewer lines and pump stations. Phase 2 is more on upgrading of WWTW. Currently we are on Phase1 which is 35%

B/G Drop task team established

R120,000,000.00

 

Mohokare LM

Rouxville, Smithfield

B/G Drop task team established

 
 

Metsimaholo LM

Deneysville

Deneysville WWTW: Construction of outfall sewer line. The project is at 75%

B/G Drop task team established

R8,000,000.00

 

Dihlabeng LM

Bethlehem

Refurbishment of Bethlehem WWTW: Project completed December 2012

B/G Drop task team established

R2,441,000.00

 

Moqhaka LM

Mashaeng, Mautse

Refurbishment of Kroonstad WWTW. Plant not operational. Project has started, but, not much progress to date. Completion is expected in March 2016

Upgrading of Kroonstad sewer line. Project to be completed in March 2016.

B/G Drop task team established

R36,000,000.00

 

Phumelela LM

Warden, Memel, Vrede

Refurbishment of Warden WWTW. Project completed December 2014 and the plant was operational after intervention

Refurbishment of Vrede WWTW. Project completed December 2014 and the plant was operational after intervention

B/G Drop task team established

R6,560,000.00

R2,700,000.00

 

Tokologo LM

Boshof, Hertzogville, Dealesville

B/G Drop task team established

 
 

Nketoana LM

Arlington, Lindley / Ntha, Petrus Steyn, Reitz

Refurbishments of Petrus Steyn Transfer sewer pump station. Project completed March 2015 and pump station operational

Refurbishment of Lindley and Reitz sewer pump stations. Contractor appointed and implementation to start May 2015

B/G Drop task team established

R1, 800,000.00

R4, 275,000.00

 

Letsemeng LM

Koffiefontein, Jacobsdal, Petrusburg, Luckhoff

Refurbishment of Koffiefontein WWTW: Project under implementation and progress is at 95% and completion planned for end August 2015

B/G Drop task team established

R3,100,000.00

 

Ngwathe LM

Parys, Vredefort, Koppies, Heilbron

Parys: last site inspection conducted in May 2014. The contractor that was busy with the refurbishment was no longer on site and completed his job according to the scope of work. No pre-directive or directive issued

Vredefort: last site inspection conducted in May 2014. On the day of the inspection the contractor was on site at the WWTWs and he indicated that he was finishing up on the work that he did at the plant as well as the pump station. No pre-directive or directive issued

Koppies: Last inspection conducted in September 2013. Major part of the plant was operational with a few infrastructures not operational. Major concern was that there was no chlorination taking place. No pre-directive or directive issued

Heilbron: last site inspection conducted in May 2014. Part of the upgraded plant was completed and operational during the inspection. The process controller mentioned that it was about two months since they have been using the upgraded plant. No pre-directive or directive issued

Refurbishment of Vredefort WWTW: Drying beds have been completed and panel installed, pump stations are refurbished, project expected for completion May 2015.

Refurbishment of Parys sewer: project was completed March 2014 through MIG

B/G Drop task team established

R16,400,000.00

 

Masilonyana LM

Brandfort, Masilo, Verkeerdevlei, Winburg

Brandfort: Last site inspection was conducted in January 2015 and Bloemwater was on site busy with the refurbishment at the plant. No pre-directive or directive issued

  • Refurbishment Theunissen sewer outfall and pump station: Upgrading of the pipe line has been completed
  • Refurbishment Brandfort sewer outfall and pump station: Project is at 95% completion and the sewer spillage has been dealt with.
  • Refurbishment of Winburg sewer transfer pump station and Verkeerdevlei sewer outfall pipe line: refurbishment of the pump station has been completed and upgrading of Verkeerdevlei outfall sewer line is at 85%
  • Upgrading of Winburg WWTW was completed through MIG

B/G Drop task team established

R1,000,000.00

R3,290,000.00

R1,520,000.00

 

Nala LM

Bothaville, Wesselsbron

Construction of a WWTW in Wesselsbron/Monyakeng: Project under implementation and is at 40% and planned to be completed December 2015

B/G Drop task team established

R46,000,000.00

 

Naledi LM

Dewetsdorp, Van Stadensrus, Wepener

  • Refurbishment of Wepener WWTW. The project was completed March 2014.
  • Upgrading of Wepener sewer outfall and refurbishment of two sewer pump stations: This is a new project for the 2015/16 financial year and implementation is expected to start June 2015

B/G Drop task team established

R2,250,000.00

R3,600,000.00

 

Setsoto LM

Ficksburg, Clocolan, Marquard, Senekal

  • Refurbishment of Clocolan WWTW : The refurbishment of the WWTW and three sewer pump station was completed in July 2014
  • Upgrading of Ficksburg Sewer: The project entailed the upgrading of the main sewers and connection of toilets to the sewer system. The project divided into phases due to funding limitations and the last phase which is phase 3 was completed in June 2014 and there are more sewers that still need to be attended to in future. Project completed July 2014

B/G Drop task team established

R5,800,000.00

R16,900,000.00

         
 

Kopanong

 

Phillipolis retrofitting

R 308 (ACIP)

 

Ngwethe LM

 

Refurbishment of Koppies WWTW

R 2. 500 m (ACIP)

         
 

Moqhaka LM

 

Moqhaka Bulk Sewer

All these plants are prioritized under RBIG for the implementation in the third quarter of 2015/16 financial year

 

Ngwathe LM

 

Ngwathe Bulk Sewer

 
 

Tokologo LM

 

Hertzogville Sewer

 
 

Tokologo LM

 

Dealsville Waste Water Package Plant

 
 

Naledi LM

 

Dewetsdorp Sewer

 
 

Mafube LM

 

Frankfort Bulk Sewer

 
 

Mafube LM

 

Tweeling Sewer Pumpstation

 
 

Ngwathe LM

 

Heilbron Sewer and Pumpstation

 
 

Mohokare LM

 

Rouxville Outfall Sewer

 
 

Phumelela LM

 

Memel Refurbishment WWTW and Sewer

 
 

Phumelela LM

 

Memel Refurbishment WWTW

 
 

Masilonyana LM

 

Winburg Upgrading WWTW

 
 

Nketoana LM

 

Petrus Steyn Refurbishment WWTW

 
 

Nketoana LM

 

Petrus Steyn Upgrading WWTP

 
 

Nketoana LM

 

Arlington Refurbishment WWTW

 
 

Nketoana LM

 

Reitz Upgrading WWTP

 
 

Mafube LM

 

Frankfort Bulk Sewer

 
 

Metsimaholo LM

 

Upgrading of Deneysville WWTW

 
 

Mathjabeng LM

 

Mathjabeng Bulk sewer

 

Northern Cape

Kamiesberg LM

Garies;Kamieskroon

RBIG

Vanderkloof: New WWTW under construction.

Petrusville: Identified as part of the RBIG priority list.

Fraserburg: Identified as part of the RBIG priority list.

Colesberg: upgrade complete March 2014.

Keimoes: Identified as part of the RBIG priority list.

(ACIP)

Petrusville: Refurbishment of WWTW.(March 2014)

Port Nolloth: refurbishment of sewer Pump station. (March 2014)

Douglas: Refurbishment of oxidation ponds and pump stations.(March 2015)

Groblershoop:

Poffadder: Refurbishment of pump stations and sewage truck.(March 2014)

Nababeep: refurbishment Pump station (March 2013)

Olifantshoop: refurbishment Pump station (March 2013)

DWS EXP:

 

R 4 816 000 (budget: R 23 231 000) (Vanderkloof)

R18 604 000 (Colesberg) (DWS)

 

R 1 525 913.

(Petrusville ACIP)

R 2 810 000.

(Port Nolloth ACIP

R11 566 000 (Douglas ACIP)

R3 792 000. (Poffadder ACIP)

 

R1 700 000. (Nababeep ACIP)

R1 980 000. (Olifantshoop ACIP)

 

Renosterberg LM

Vanderkloof,Petrusville,Philipstown

   
 

Mier LM

Rietfontein,Askham,Loubos

   
 

Karoo Hoogland LM

Williston,Fraserburg,Sutherland

   
 

Richersveld LM

Port Nolloth

   
 

Umsobomvu LM

Colesburg, Noupoort

   
 

Siyancuma LM

Douglas,Griekwastad,Schmidtsdrift

   
 

Kareeberg LM

Carnavon, Vosburg

   
 

Ubuntu LM

Richmond

   
 

!Kheis LM

Groblershoop,Brandboom,Wegdraai, Topline, Grootdrink

   
 

Khai-Ma LM

Pofadder

   
 

!Kai !Garib LM

Keimoes

   
 

NamaKhoi LM

Nababeep

   
 

Siyathemba LM

Prieska

   
 

Joe Morolong LM

Van Zylrust

   
 

Umsobomvu LM

Colesburg, Noupoort (repeat)

   
 

Hantam LM

Middelpos

   
 

Joe Morolong LM

Hotazel

   
 

Ubuntu LM

Richmond

   
 

Gamagara LM

Dibeng, Olifantshoek

   
 

Siyancuma LM

 

Refurbishment of waste water pumpstation

R 4. 000 m (ACIP)

 

Dikgatlong Lm

 

Refurbishment of Delportshoop WWTW

R 3. 222 m (ACIP)

 

Kamiesberg LM

 

Refurbishment of Kheis evapouration ponds

R 662 (ACIP)

     

Refurbishment of Klipfontein evapouration ponds

R 604 (ACIP)

North West

Moretele LM

Swartdam

Follow up inspection conducted on 24/03/2014

 
 

Kgetleng River LM

Swartruggens, Koster

Department provided funding for refurbishment of the Koster Oxidations Ponds, desludging and cleaning of the lagoons, the upgrading of the inlet works and the refurbishment of the recirculation pumps. The upgrading of a new Koster WWTW is at design stage. Follow up inspection for Koster WWTW was conducted on 30/08/2014

FY2014: R6 000 000

FY2015: R7 850 000

 

Dr Ruth Mompati DM

Vryburg, SchweizerReneke, Bloemhof

Department provided funding to refurbish the Bloemhof WWTW, Work included the repair of the biological filter arms for filter no. 1 and 2. Cleaning of the anaerobic ponds and restoring of sludge drainage equipment, repair of electrical works at inlet works and old works pump controls, repairs to inlet works mechanical equipment including mechanical raking system and de-gritting system, and servicing of pumps in main pump station.

FY2015: R2 954 533

     

The Vryburg WWTW refurbishment business plan was developed and evaluated for the 2015/16 financial year ACIP allocation.

 
     

Follow up inspections for Schweizer Reneke and Bloemhof WWTWs were conducted on 06/06/2014.

 
 

Ngaka Modiri Molema DM

Coligny, Lichtenburg, Itsoseng, Mafikeng, Mmabatho, Zeerust, Delareyville, Sannieshof, Ottosdal, Atamelang

The Business plan has been developed and submitted for funding consideration under ACIP for the refurbishment of Mafikeng WWTW.

 
     

Follow up inspections for Coligny, Lichtenburg, Itsoseng, Mafikeng, Mmabatho, Zeerust, Delareyville, Sannieshof, Ottosdal and Atamelang WWTWs were conducted on 10-11/02/2015

 
 

Moses Kotane LM

Mogwase, Madikwe

Follow up inspection for Mogwase WWTW was conducted on 31/03/2014

 
 

Maquassi Hills LM

Leeudoringstad, Wolmaranstad, Agisanang

Department provided funding for the upgrade of Maquassi WWTW from 4Ml/d to 9 Ml/d .The project is under construction.

R 130 million

     

Follow up inspection for Wolmaranstad WWTW was conducted on 19/02/2014

 
 

Dr RSM DM

 

Bray sewer pump upgrade

R 1. 462 m (ACIP)

 

Dr RSM DM

 

Bloemhof Phase 2

R 3. 500 m (ACIP)

 

Dr RSM DM

 

Refurbishment of sludge drying beds at Vryburg (Naledi)

R 2. 050 m (ACIP)

 

Dr RSM DM

 

Upgrading of booster sewage pumping station in vryburg

R 1. 672 m (ACIP)

 

Ngaka MM DM

 

Refurbishment of Mafikeng and Mmabatho WWTW and sewage pumping stations

R 5. 000 m (ACIP)

Western Cape

Beaufort West LM

Murraysburg

Beaufort West:

(b) Introduction and background:

Although Murraysburg WWTW falls under

Beaufort West Municipality in Western Cape Province, it also falls under Mzimvubu- Tsitsikama CMA which is controlled from the Eastern Cape Provincial Operations. Therefore their authorization is supposed to be handled by Eastern Cape Provincial Operations. Murraysburg WWTW was recently inherited by Beaufort Municipality from Central Karoo District Municipality.

Initial site inspection:

Initial site inspection was done on 20 May 2014, a feedback letter was written to the municipality with recommendations on how they can improve their shortfalls. An email was also sent with the recommendations (see attached), and a feedback meeting was also done to discuss the recommendations and progress with implementation of the recommendations (see attached). A file note was also written and filed (see attached).

(c) Follow up site inspection:

A follow up site inspection was done on 19 January 2015 (see attached 2nd file note). This was done to find out if any of the initial recommendations have been addressed and the progress to date.

Cost incurred include accommodation and transport for the official

 

Matzikama LM

Bitterfontein, Nuwerus

Matsikama:

(b) Site inspection was conducted for Matzikama LM which included inspections of Bitterfontein and Nuwerus in 2014 and recommendations were made in the form a feedback letter. The noted non compliances included registration of systems and operational issues like the frequency of cleaning of screens. All units were in working order.

(c)Follow – up was done in terms of registration of the systems and the current status which reflects that the two works has been authorized under GA.

 
 

Theewaterskloof LM

Greyton

Theewaterskloof

(b) Site inspection was conducted for all the WWTWs in Theewaterskloof including Greyton Oxidation pond System. Feedback letter was send to the Municipality with the recommendations to improve poor maintenance status and improve data submissions of Greyton WWTW.

(c) Follow up was in a form of monitoring of data on GDS and Improvement for data compliance on the green dropd system (GDS) was acknowledged after recommendations send to the municipality. With regards to authorization the works is not yet authorized but they have applied through Breede-Gouritz Catchment Management

 
 

Bergrivier LM

Eendekuil

Bergrivier:

Eendekuil a site inspection was done in 2014. The finding included non compliance with the regulation 2834 regarding number of Process controllers the works is required to have and qualifications. Then section 141 of National Water Act 1998 with regards to data submission on to the GDS and section 19 of NWA 1998 with regards to pollution prevention poor maintenance of the ponds resulting to the accumulation of sludge in the primary pond. The feedback letter was written with the recommendations.

The follow up site inspections has not taken place. But through the monitoring of the GDS and the data is no being loaded into the system ever since.

 
 

Cederberg LM

Graffwater, Elands Bay, Wupperthal, Algeria

Cederberg:

On the 20 November 2014 the municipality was assisted with GDS training which was upon request by the municipality. Site inspections were conducted on all four systems Graffwater, Elands Bay, Wupperthal, Algeria. The feedback letter was written and sent to the municipality and the action plan was received by the department for all their works.

Follow up site inspection has not yet taken place

 
 

Bergrivier LM

Porteville WWTW

Refurbishment and upgarde of Porteville WWTW

R 2.843 m (ACIP funding)

 

Hesseque LM

Albertina WWTW

Refurbishment of Albertina WWTW

R 3. 000 m (ACIP funding)

Eastern Cape

- ---· ·- - -

Chris Hani DM

Molteno, Cradock, Lady Frere, Middelburg,

Tsomo

• Non compliance letters sent to WSA,

• Compliance

Assessment have

been conducted to check progress,

• Training provided for

Green Drop system,

• Advisory support has been given,

• Action Plan not submitted by the WSA's.

Engcobo wwtw =

R1,948m (ACIP-14/15) + R1,2 m-

(ACIP 13/14)

       

Molten - pump station = R3,5m- (ACIP14/15)

Sterkstroom wwtw R3m- (ACIP 13/14),

Tsomo wwtw priority for RRU (total RRU funds for wwtw is R 3.5m for whole Province),

 

Baviaans LM

Rietbron

• Engagement was

done with the WSA

but no progress.

Willowmore wwtw R4,147m (ACIP-12/13),

• Rietbron wwtw priority for RRU.

 

Alfred Nzo DM

Cedarville, Bizana, Ntabankulu

• Compliance

Inspection have been

done,

• Continued engagements are

happening.

• Training on green drop system.

• Action Plan has been provided by the WSA.

Ntabankulu wwtw

targeted for RRU.

 

Sundays River

Valley LM

Enon-Bethesda

• Compliance inspection

have been conducted,

• Non compliance letter issued,

• Re-Training provided

on the green drop

system.

Nil for wwtw

 

KouKamma LM -

Coldstream_!.Misgl.Jnd, St()rms River We !,

Clarkson, Kareedouw-

  • Compliance Inspection has been done.

• Non compliance

letters have been

issued

• IE has been engaged to deal with

Authorizations.

• No action plans submitted by WSA.

R2,930m - Refurbishment of Louterwater (ACIP-15/16)

 

Blue Crane LM

Cookhouse, Pearston, Somerset East

• Compliance Inspections have been done

• Non compliance letters have been

issued.

• No action plans submitted by WSA.

Somerset East wwtw R10 OOO m= (ACIP-13/14) & outfall sewer

R6,243,156m- (ACIP-12/13)

 

ORTambo OM

Flastaff, Lusikisiki,Mqanduli,Mthatha,Ngqeleni,PortSt Johns,Qumbu, Tsolo

• Compliance

Inspections have been

conducted.

• Non compliance letters have been

issued,

• Training has been provided for Green drop

• No action plan submitted.

Port St Johns wwtw

prioritized for RRU.

 

Ndlambe LM

Alexandria/Kwanonkqu, Nolukhanyo, Bushmans Marselle, Port Alfred,

/Ekuphumleni

  • Non compliance letter have been issued

• Training for green drop undertaken.

• No action plan submitted by the WSA

Port Alfred pump stations R4,5m-(ACIP 14/15),

Kenton-on-sea pump stations R1,75m- (ACIP 13/14),

Alexandria prioritized for RRU,

 

Kouga LM

 

Refurbishment of 3 sewer pump station in Jeffrey's Bay

R 4. 535 m (ACIP funding)

 

Ikwezi LM

 

Refurbishment of Sewer pumpstation at Janseville & Klipplaat

R 3.350 m (ACIP funding)

 

Amathole DM

 

Refurbishment of Fort Beaufort Sewage Pump station and optimisation WWTW - Phase 1

R 3. 5 m (ACIP)

Gauteng

Randfonttein LM

Randfontein WWTW

refurbushment of Randfontein WWTW

R 5.000 m (ACIP)