Questions and Replies

Filter by year

24 May 2016 - NW1300

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Economic Development

What (a) political and (b) commercial considerations led the Industrial Development Corporation (IDC) to strike a restructuring deal with a certain company at a reduced interest rate of prime plus 2% given that the specified company defaulted on its first R250 billion loan to the IDC?

Reply:

I have been furnished with a statement by the CEO of the Industrial Development Corporation, Mr Geoffrey Qhena, on the matters covered by the question.

The statement by the IDC follows:

“(A) There were no political considerations associated with the restructure;

(B) The restructuring was done purely on commercial terms as set out below;

(C) Point of correction – the amount is R250 million and not R250 billion.

The original R250 million loan is expected to be fully repaid, as R137,5 million has already being received to date and R112,5 million is outstanding as at 30 April 2016. The next instalment of R37,5 million is payable by end of June 2016, with intention of the full capital being repaid by 31 March 2018.

The interest of R257 million being from 14 April 2010 to 31 May 2014 (the date on which the amount converted was determined) was converted into shares when the entity was listed (at a 10% discount to the listing price).

The additional interest (after conversion) of prime plus 2% will be repaid as a lump sum on 31 March 2018.

The risk profile of the company at the time of our initial investment compared to the risk profile of the company at the time of restructuring differed materially. At the time of the acquisition, the mine was under care and maintenance and the company was not generating any revenue which needed to be brought back into production.  The turnaround strategy of the company was based on an improvement in operational efficiencies and productivity. The IDC initially viewed the asset as a pure uranium play (the gold potential was not considered at the time due to level of accuracy of the information) compared to the time of restructuring, there was a demonstrable open cast gold reserve with a proven operational record. At the time of the acquisition, the “perceived” risks were higher, hence the equity type return of 10% Real After Tax Internal Rate of Return (RATIRR).

Our pricing mechanism always takes into account both the level of risk and developmental impact and the repayment profile mirrors the anticipated cash flow generation of the asset/project.

At the time of the restructuring, IDC demanded that the company part settle R100 million of the original facility before the restructuring of the facility. In addition the main shareholder had injected an additional R293 million and the company was generating positive cash flows from the gold production concomitant with now a demonstrable operational track record from the gold production. Moreover, the IDC facility was reduced by R100 million and the balance of the original capital continued to be secured by the assets of the company, giving the IDC a security cover of more than one times – hence the prime plus two percent post the restructuring. It is not the first time that the IDC has done a restructuring of this nature where a debt facility is converted into equity. Ordinarily both the interest and capital is converted into equity. The difference in this instance is that only the interest portion was converted retaining the capital for it to still be repaid thus putting us in a better position.”

MG Qhena, 23 May 2016

-END-

24 May 2016 - NW850

Profile picture: Mashabela, Ms N

Mashabela, Ms N to ask the Minister of Basic Education

Whether she has taken any steps to address the challenge in the Amathole region in the Eastern Cape Province, since being notified that teachers at Seymour High School are not teaching learners since schools open in January 2016; if not, why not; if so; which steps has she taken?

Reply:

The National Department of Basic Education contacted the Eastern Cape Education Department to seek clarity on the matter as we could not find a Seymour High School in the Amathole region on the national database. The Eastern Cape Department indicated that there is no Seymour High School in the Amathole but Seymour Primary School, located in the Fort Beaufort district. The province and the district were not aware of any disruptions at Seymour Primary School – a school that had been visited by district officials at the beginning of the year to assess readiness for the 2016 academic year. The principal of Seymour Primary School has also sent in a written response indicating that the school has operated normally since the opening of schools on 11 January 2016, and no disruptions have been experienced at the school. The response from Seymour Primary School attached (Annexure A)

24 May 2016 - NW1280

Profile picture: Marais, Mr S

Marais, Mr S to ask the Minister of Defence and Military Veterans

With reference to the Armaments Corporation of South Africa’s tender ETEL/2016/12 published on 22 April 2016, for the lease of a VIP-configured inter-continental aircraft for the SA Air Force, (a) what (i) are the specifications to be met by the specified aircraft, (ii) amount has been budgeted for the leasing of the specified aircraft and (iii) is the timeline for the delivery of the specified aircraft and (b) how long will the specified aircraft be leased for?

Reply:

(a) (i) See the attached specifications.

(ii) There is a budget allocated for the 2016/17 financial year.

(iii)The initial date was end of May 2016 but the tender adjudication process is underway and can alter the delivery date.

(b) It has recently been determined that the Aircraft will be leased for a period of 12 Months.

SPECIFICATIONS ATTACHED UNDER SEPARATE COVER

24 May 2016 - NW373

Profile picture: Groenewald, Mr HB

Groenewald, Mr HB to ask the Minister of Labour

(a) With reference to President Jacob G Zuma’s undertaking in his State of the Nation Address delivered on 12 February 2015, that the Government will set aside 30% of appropriate categories of state procurement for purchasing from Small, Medium and Micro-sized Enterprises (SMMEs), co-operatives, as well as township and rural enterprises, what percentage of the total procurement of (a) her department and (b) every entity reporting to her went to (i) SMMEs and (ii) co-operatives from 1 April 2015 up to the latest specified date for which information is available?

Reply:

1. The Department of Labour’s spent on SMMEs for 2015/16 accounted for 59.2% of the total procurement spent.

2. When taking all its entities into account, 29.6% accounted for SMMEs procurement.

3. Cooperatives accounted for negligible share and the Labour Activation Programme is focusing on Enterprise Development Programme with a special focus on Cooperatives.

24 May 2016 - NW1238

Profile picture: Whitfield, Mr AG

Whitfield, Mr AG to ask the Minister of Environmental Affairs

(1)Whether the Marselle Waste Transfer Site in the Ndlambe Local Municipality in the Eastern Cape complies with every relevant provision of the National Environmental Management Act, Act 107 of 1998, as amended; if not, (a) why has the specified site not been closed down and (b) what waste management plans has her Department put in place to ensure compliance with the specified Act; and, what are the relevant details; and (2) whether the Green Scorpions have been asked to investigate the specified site; if not, why not; if so, what are the relevant details?

Reply:

1. (a) First of all we need to remind the Honourable member that the mandate of managing landfill sites belongs to municipalities. This response relates only to our support work that we do. The Marselle waste disposal facility was identified to be licensed for closure because it is nearing its capacity. After rehabilitation one of the options for its alternative use was that the site be used as a transfer station. The site was licensed for closure on 16 March 2015. The license holder is required to commence the closure and rehabilitation activities under the supervision of a registered engineer and an Environmental Control Officer (ECO) within a period of three years from the date of issue.

(b) The site was inspected for compliance with the licence conditions on 10 June 2015, which is a routine monitoring function of the Provincial Department, and concerns were raised with the licence holder. Thereafter, concerns from local residents’ associations were received by the Department, and a meeting between the Ndlambe Local Municipality and the Chairpersons from Kenton-on-Sea Ratepayers Association (KOSRA) and Natures Landing Homeowners Association was convened on 14 September 2015 to try and address non-compliance issues associated with the site. It transpired that the Municipality has put aside a budget to appoint a service provider that will commence with the closure activities, but is overwhelmed with the quantities of waste still going to the site to enable the closure. The Department committed to assist the municipality to source funds for a project that will help with diverting waste away from going to landfill, and the project was approved and allocated a budget of R2, 026 million for the 2016/17 financial year. The project will employ a total of 46 people to assist with access control and security services at the landfill site, cleaning illegal dumps, door-to-door awareness campaigns in hotspot communities, promoting a culture of separation at source and recovery of materials.

2. The Department received this complaint in an e-mail sent to the office of the Chief Director: Regulatory Services on 08 February 2012. An inspection was conducted on 17 February 2012 at Marselle/Boesmansriviermond disposal site, and a meeting was held between the officials from the Department of Environmental Affairs, Department of Economic Development, Environmental Affairs and Tourism (DEDEAT) and Ndlambe Municipality. On 23 February 2012, Ndlambe Municipality submitted a letter to the Department where they clearly indicated that there is currently no budget to render a 24-hour access control/security; however, staff members had been instructed not to start fires on site. Measures were also put in place as from
20 February 2012 to extend the working hours of the municipal employees to monitor the situation and ensure that fires were not lit.

It was also highlighted to the Department that, due to limited space for waste disposal, the Kenton-on-Sea garden waste site was closed, and more pressure was placed on Marselle disposal site as the garden waste was then brought to this site. The interim plan for the Municipality was to negotiate with the Kenton-on-Sea Ratepayers Association as they were keen to make available a chipper and ask garden services to drop off their garden refuse at a point where it could be chipped. This was to open up space for domestic refuse in the area that was to be used for garden refuse.

Since the matter focused on general waste management activities which fall within the mandate of the provincial sphere of government, the matter was then referred to the provincial DEDEAT on 29t February 2012.

Subsequently, the site was inspected for compliance with its licence conditions on 10 June 2015 by the DEDEAT as part of their routine monitoring function as indicated in question 1(b) above. Accordingly, the events following this inspection are outlined above.

---ooOoo---

24 May 2016 - NW1485

Profile picture: Maimane, Mr MA

Maimane, Mr MA to ask the Minister of Defence and Military Veterans

(a) How many flights have been made in military helicopters between the President’s private residence in Nkandla and Durban in KwaZulu-Natal, between 1 February 2015 and 17 May 2016 and (b) what was the total cost of each specified flight?

Reply:

The information required relates to the movement of the President and for security reasons, the response to this question can only be presented to closed session of the Joint Standing Committee on Defence.

24 May 2016 - NW1435

Profile picture: Krumbock, Mr GR

Krumbock, Mr GR to ask the Minister of Labour

(1) (a) on what date did her department conducted an inspection of the Chloorkop Primary School in Kempton Park, Gauteng, through the inspection and enforcement services in line with the Occupational Health and Safety Act, Act 85 of 1993, as amended, (b) what were the findings of the specified inspections and (c) how often is her department compelled by law to inspect work environments in line with (i) the specified Act and (ii) any other legislation; (2) (a) when will her department conduct such an inspection at the specified school, given the structural damage to the school’s buildings (details furnished) and (b) when will such a report be made public?

Reply:

1 (a) No inspection conducted at Chloorkop Primary School in Kempton Park, Gauteng.

   (b) Due to the fact that there was no inspection conducted, there are no findings.

   (c) There is no stipulation in the Occupational Heath and Safety Act regarding the frequency of inspections for any workplace and there is no other legislation.

(2) (a) Inspection will be conducted at end of May 2016.

(b) inspection reports are not made public in terms of Section 36 of the Occupational Health and Safety Act as amended.

24 May 2016 - NW1049

Profile picture: McLoughlin, Mr AR

McLoughlin, Mr AR to ask the Minister of Communications

(1) What are the reasons for pulling the SA Broadcasting Corporation Channel 404 programme, On the Record with Vuyo Mvoko, off the air on the evening of Thursday, 17 March 2016; (2) whether any complaints were received about the content of the specified programme; if so, what are the relevant details; (3) whether disciplinary proceedings have been instituted against a certain person (name furnished); if so, (a) on what basis and (b) what are the further relevant details?

Reply:

(1) The SABC is reviewing a number of Current Affairs shows as it prepares for the election programmes. Mvoko is one of the SABC’s experienced anchors that the Corporation would like to use for programmes that will look into election stories, i.e, political debates. The SABC is yet to decide on the relevant time slots for various shows.

(2) No, the SABC has not received a complaint about the content of the specified programme.

(3) No. Mvoko was not disciplined for his work as an Anchor for On the Record programme. (He did, however, get a formal corrective measure notice for communicating internal communication on social media without permission).

 

MR NN MUNZHELELE

DIRECTOR GENERAL [ACTING]

DEPARTMENT OF COMMUNICATIONS

DATE:

MS AF MUTHAMBI (MP)

MINISTER OF COMMUNICATIONS

DATE:

24 May 2016 - NW804

Profile picture: Van Damme, Ms PT

Van Damme, Ms PT to ask the Minister of Communications

(a) What was the purpose of her attendance at the International Development Corporation meeting on Gender and Media in Geneva, Switzerland from 7 to 10 December 2015, (b) what are the (i) names and (ii) positions of the persons who accompanied her and (c) what was the (i) total cost and (ii) breakdown of the costs of the specified trip?

Reply:

(a) The Honourable Member will remember that the main aim of the framework on Gender and Media International Cooperation is to support the implementation of the “Women and the Media follow-up” for section J of the Beijing Declaration and Platform for Action, Women and the Media. Now, the Minister was invited by UNESCO to share ideas and experience with the world on how the South African government is making strides in terms of promoting and championing gender equality in all forms of the media; how we as government we are encouraging women to take advantage of the revolution in communications technology in order to make their voice to be heard across the country.

The Minister was invited to make opening and closing statements at this global forum as well as chairing two sessions, however, Mr Johannes Rantete attended the global assembly on behalf of Minister Faith Muthambi. The South African delegation led by Mr Rantete used the platform to urge the international community to put gender equality and women’s empowerment in the media at the heart of all discussions and agreements. Again, the Geneva Framework on Gender and Media International Development Cooperation resonates with the contemporary agenda:

  • Sustainable Development Goal (SDG) 5: Achieving gender equality and empowering women and girls,
  • SDG 16, target 10: Concerning measures to promote public access to information and protect fundamental freedoms,
  • SDG 17: Strengthen the means of implementation and revitalize the global partnership for sustainable development.

A series of stories about this event were published on the government online news agency: SAnews.gov.za as well as on social networks.

(b) (i) Mr Johannes Rantete (attended in place of Minister);

Mr Mishack Molakeng; and

Mr Nthambeleni Gabara.

(ii) Acting Director-General: GCIS;

Media Liaison Officer: Ministry of Communications

Assistant Director: SA News

(c) (i) The total amount is still in the process of being audited and will subsequently be made available.

(ii) The breakdown is also not available as it still needs to be audited.

 

 

MR NN MUNZHELELE

DIRECTOR GENERAL [ACTING]

DEPARTMENT OF COMMUNICATIONS

DATE:

MS AF MUTHAMBI (MP)

MINISTER OF COMMUNICATIONS

DATE:

24 May 2016 - NW802

Profile picture: Van Damme, Ms PT

Van Damme, Ms PT to ask the Minister of Communications

(1)  Whether the Acting Director-General of her department signed a performance contract with her; if not, why not; if so (a) when and (b) what are the key deliverables listed in the specified performance contract; (2) whether all senior managers in her department signed performance contracts with the Acting Director-General, if not, (a) which senior managers did not sign, (b) for what reasons and (c) when will they sign them; if so, on what date did each senior manager sign a performance contract?

Reply:

1. No, the Acting Director General did not sign a Performance Agreement for the 2015/16 financial year.

2. Not all Senior Managers submitted Performance Agreements.

    (a) Ms R Fisher, Ms P Pillay, Mr MJ Rantete and Mr F Nieman.

    (b) These SMS members occupied their posts during the course of the year.

   (c) The officials have signed 2016/17 Performance Agreements in line with the 15 April 2016 deadline.

 

MR NN MUNZHELELE

DIRECTOR GENERAL [ACTING]

DEPARTMENT OF COMMUNICATIONS

DATE:

MS AF MUTHAMBI (MP)

MINISTER OF COMMUNICATIONS

DATE

24 May 2016 - NW1301

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Economic Development

With regard to the proposed merger of the soft-drink bottling operations of certain companies, did he share documents supplied to him by the Competition Commission with his expert witness, before the specified expert witness had signed confidentiality agreements; if not, what is the position in this regards; if so , why?

Reply:

I am advised that the government expert witness signed the requisite confidentiality agreement supplied to him by government lawyers prior to gaining access to confidential information.

-END-

24 May 2016 - NW1192

Profile picture: Mileham, Mr K

Mileham, Mr K to ask the Minister of Cooperative Governance and Traditional Affairs

Whether the Executive Mayor of the Nelson Mandela Bay Metropolitan Municipality, Mr Danny Jordaan, (a) instructed or (b) gave cause for an instruction to be issued that a certain billboards (details furnished) be removed; if not, from whom did this instruction originate; if so, on what legal provision did this instruction rely;

Reply:

According to Nelson Mandela Bay Metro, the institution has not yet established who gave the instruction for the billboards to be removed and it is still investigating the matter.

24 May 2016 - NW1233

Profile picture: McLoughlin, Mr AR

McLoughlin, Mr AR to ask the Minister of Water and Sanitation

(1)With reference to her department’s advertisement that it will train 15 000 youths as plumbers, (a) what (i) are the relevant details of the training programme that will be provided by her department and (ii) qualification will the successful trainees receive upon completion, (b) who will be eligible for the specified training programme, (c) where will the specified training programme be presented, (d) what is the duration of the specified training programme and (e) when (i) will and/or (ii) did the specified training programme commence; (2)(a) what is the cost per trainee with regard to the specified training programme, (b)(i) which funds of (ii) which Budget Vote will be utilised for the specified training programme and (c)(i) where and (ii) for what duration will each trainee be deployed once qualified?

Reply:

(1)(a)(i) With reference to my Department’s advertisement to train 15 000 youths as plumbers, the following are in place. My Department has appointed Rand Water and Energy and Water Sector Education and Training Authority (EWSETA) as implementing agents responsible for project/programme management and training, respectively. The training takes place in three phases, namely:

  • Phase 1 commenced last year 2015 and 3000 learners were recruited.
  • Phase 2 to start in July 2016 and 7000 prospective learners are being recruited country wide.
  • Phase 3 to start in 2017 and remaining 5000 learners to be recruited as part of Phase 3.

Since the objective of the programme is to fix water leaks in municipalities, the learners are recruited from priority municipalities across the country that experience high water loses. The learners will be placed in these municipalities as part of experiential training.

(1)(a)(ii) Qualifications that successful trainees will receive upon completion of the programme are as follows:

  • Water Agents;
  • Artisans; and
  • Plumbers.

(1)(b) Eligibility for the specified training programme. Since the programme requires technical expertise in water environment, the following entry requirements are defined:

  • Grade 10 – 12 for Water Agents; and
  • Grade 12 / N3 with Maths and Science for Artisans and Plumbers.

(1)(c) Training of the programme takes place at TVETS and private technical colleges across the country. The practical part of the training programme takes place at the municipalities and technical facilities provided by TVETS and private technical colleges.

(1)(d) All learners are recruited for a 36 month period, which includes the theory and workplace/experiential part of the programme.

(1)(e) The programme was launched on 28 August 2015 by the Honourable President, Mr Jacob Zuma.

  1. Phase 1 started in September 2015;
  2. Phase 2 to start in July 2016; and
  3. Phase 3 planned to comments April 2017.

(2)(a) Cost per candidate within the respective disciplines, which includes stipend paid for the duration of 36 months.

     (i) Artisans – R175 489;

     (ii) Plumbers – R177 345; and

     (iii) Water Agents – R69 494.

(2)(b) The funds for the programme will be from the Water Trading Entity.

(2)(c)(i) The learners will be placed in priority municipalities across the county, which have high water loses.

(2)(c)(ii) The learners will be at these municipalities for the contract period of the programme.

---00O00---

24 May 2016 - NW1189

Profile picture: Bhanga, Mr BM

Bhanga, Mr BM to ask the Minister of Cooperative Governance and Traditional Affairs

(a) What is the total number of water leakages that were (i) reported and (ii) fixed in each metropolitan municipality since 1 July 2015, (b) how many litres of water were lost due to the specified leakages in each case and (c) what was each metropolitan municipality’s average response time to fix the specified water leakages?

Reply:

According to the information received from the Metropolitan Municipalities,

(a) The total number of leakages that were (i) reported and (ii) fixed since 1 July 2015 are indicated below:

Buffalo City: leakages reported 1 928 and fixed 1 928;

City of Cape Town: leakages reported 27 500 and fixed 27 500;

City of Johannesburg: leakages reported 22 431 and fixed 22 408;

City of Tshwane: leakages reported 61 000 and fixed 56 000;

Ekurhuleni: leakages reported 31 857 and fixed 31 850;

eThekwini: leakages reported 104 960 and fixed 103 176;

Manguang: leakages reported 16 976 and fixed 13 442;

Nelson Mandela Bay: leakages reported 8 014 and fixed 8 014.

(b) The litres of water that were lost due to leakages since 1 July 2015:

Buffalo City: not measured;

City of Cape Town: 2 978 Million Litres;

City of Johannesburg: 11 531 Million Litres;

City of Tshwane: 64 000 Million Litres;

Ekurhuleni: 41 880 Million Litres;

eThekwini: 279 Million Litres per Day; (approximately 2,511 million)

Manguang: 3,658 Million Litres per Day; (approximately 32,922 million)

Nelson Mandela Bay: 34 000 Million Litres.

(c) The average response time to fix the leakages are:

Buffalo City: 3 hours;

City of Cape Town: less than 24 hours;

City of Johannesburg: 32 hours;

City of Tshwane: 48 hours;

Ekurhuleni: 47 hours;

eThekwini: 1 to 2 working days;

Manguang: 3 working days;

Nelson Mandela Bay: 4 hours.

24 May 2016 - NW1279

Profile picture: Marais, Mr S

Marais, Mr S to ask the Minister of Defence and Military Veterans

(1) Whether, with reference to her reply to question 4116 on 8 December 2015, she has finalised the appointment of Regular Force Military Judges yet; if not, (a) when will the vetting process for the specified judges be finalised and (b) by when will the specified judges be appointed; if so, what are the relevant details;

Reply:

  1. Vetting has been completed. Judges will be appointed before the end of May 2016.
  2. The Military Discipline Bill has recently received pre-certification from the State Law Advisers and this marks the way for the introduction of the Bill into Parliament. The Bill once passed will go a long way towards strengthening the military justice system.

24 May 2016 - NW1366

Profile picture: McLoughlin, Mr AR

McLoughlin, Mr AR to ask the Minister of Water and Sanitation

Whether her department acquired any (a) hardware and/or (b) software information technology equipment in the (i) 2014-15 and (ii) 2015-16 financial years; if not, why not; if so, what are the full details in each case in terms of (aa) what were the tender requirements, (bb) where were the relevant tender advertisements placed, (cc) who were the members of each bid adjudication committee, (dd)(aaa) where and (bbb) when did each of the specified bid adjudication committees sit, (ee)(aaa) how many tender applications were received for each advertised tender and (bbb) from whom, (ff) who was the successful bidder in each case and (gg) on what basis was each tender awarded to the specified successful bidder?

Reply:

Refer to the table below for the summary of the acquired hardware and software for the periods in question:

 

(i) 2014-15 financial years

(ii) 2015-16 financial year

(a) Hardware

My Department awarded three (3) tenders for the acquisition of hardware

My Department awarded three (3) tenders for the acquisition of hardware

(b) Software

No tenders were awarded for acquisition of software

My Department awarded four (4) tenders for the acquisition of software

The specific details for the tenders awarded for the acquisition of hardware and software during the period in question is detailed in Annexure A.

---00O00---

24 May 2016 - NW1367

Profile picture: McLoughlin, Mr AR

McLoughlin, Mr AR to ask the Minister of Water and Sanitation

(1)Whether her department incurred any irregular, fruitless and wasteful expenditure as determined by the Auditor-General in the (a) 2014-15 and (b) 2015-16 financial years; if not, what is the position in this regard; if so, in each case, (i) why was the specified expenditure incurred, (ii) who was the recipient and (iii) what tender processes were followed; (2) Whether her department has attempted to recover any of the specified expenditures in any of the specified financial years; if not, (a) why not and (b) what steps will be taken to recover the specified expenditures; if so, what are the relevant details in each case?

Reply:

(1)(a) Yes, my Department has incurred irregular, fruitless and wasteful expenditures as determined by the Auditor-General in the 2014-15 financial year.

(1)(b) The findings have not yet been determined by Auditor-General since the audit for the financial year 2015/16 has not been finalised.

(1)(b)(i) The irregular expenditure was incurred for various reasons as disclosed on the financial report for the year end 2014/15 which was made public and is available on my departmental website.

(1)(b)(ii) Recipients are various service providers who provided service to my Department. In terms of the National Treasury instruction on the treatment of irregular expenditure, my Department is bound to pay for the service when the obligation has been made by my Department officials on behalf of the Department. After the payment has been made the Department has to investigate how the transgression was done and take appropriate disciplinary actions as directed by the PFMA.

(1)(b)(iii) Refer to the list below for the tender processes followed that led to the transgressions committed:

  • Procurement of IT services not following the SITA Act;
  • Procurement of goods and services deliberately split into parts or items of smaller value merely to avoid complying with the requirements of the SCM policy and legislation;
  • The final decision on the acceptance of quotations not done by a properly delegated official or committee;
  • Goods or services of a transaction value of more than R2 000 procured without inviting at least three written price quotations from prospective suppliers and the deviation not approved by delegated person;
  • Deviations from competitive bidding and not test the market by procuring goods and services from none approved sole supplier;
  • Correct Supply Chain Management (SCM) processes and procedures not adhered to.
  • Payment may only be made in terms of a valid contract to a duly authorised payee.
  • Incorrect authorisation of transactions (delegations not complied with);
  • Expenditure exceeding original excess of the approved contract or quoted amount or no contract in place;
  • Lowest quotation not selected and no motivation provided;
  • Contracts awarded without original tax clearance certificates or tax clearance certificates expired;
  • The method of procurement is inconsistent with those prescribed in terms of PN 8 of 2007/2008. Goods or services of a transaction value of R10 000 to R500 000 were procured without inviting at least three written price quotations from prospective suppliers and the deviation was not approved by delegated person; and
  • Goods and services were rendered by the supplier and paid for without a valid written signed contract.

(2)(a) My Department is investigating the matter to determine whether the transgressions were in the interest of the State or not.

(2)(b) The appropriate actions will be taken upon completion of the investigation.

---00O00---

24 May 2016 - NW683

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Communications

(1)(a) Which set-top box providers have been involved in the production of set top boxes (STBs) to the (i) Northern Cape and (ii) Free State up until 29 February 2016, (b) how many STBs has each company provided in each case? and (c) what amount has each company been paid up until the specified date for services rendered; (2) whether all of the STBs produced by the specified companies are Direct-to-Home STBs; if not, how many of the STBs produced are Digital Terrestrial Television STBs?

Reply:

(1) (a) Universal Service and Aceess Agency of South Africa (USAASA), has informed me that it has appointed three companies (BUA Africa, CZ Electronics and Leratadima) to produce and supply set-top boxes to the South African Post Offices accross the country, including the Northern Cape and the Free State.

(b) USAASA informed me that the companies provided STBs as follows:

(i) Northern Cape: BUA Africa provided 3,506 STBs; CZ Electronics provided 27,000 STBs; and Leratadima provided 150 STBs.

(ii) Free State: BUA Africa provided 1,400 STBs; CZ Electronics provided 16,000 STBs; and Leratadima provided 00 STBs.

(c) USAASA further informed me that BUA Africa did not receive any payments as their invoices came in late. Leratadima and CZ Electronics were paid R680,934.34 and R35,841,674.00 respectively.

(2)  According to the Agency, not all produced STBs are Digital Terrestrial Television: 3,506 are DTH STBs and 27,150 are DTT STBs.

                                                                         

MR NN MUNZHELELE

DIRECTOR GENERAL [ACTING]

DEPARTMENT OF COMMUNICATIONS

DATE:

MS AF MUTHAMBI (MP)

MINISTER OF COMMUNICATIONS

DATE

24 May 2016 - NW1422

Profile picture: Figg, Mr MJ

Figg, Mr MJ to ask the Minister of Water and Sanitation

What (a) progress has been made to date on the Nooitgedacht Low Level Scheme in the Nelson Mandela Bay Metropolitan Municipality in the Eastern Cape, (b) amount has been spent to date and (c) is the expected date of completion of the specified scheme?

Reply:

(a) Phase 1 for the installation of the ±45 km pipe work and associated works was completed at a cost of R570 million. Phase 2 commenced in December 2014.

(b) Phase 2 expenditure for the 2014/15 Municipal financial year was R59.6 million. It is anticipated that the expenditure for 2015/16 (30 June 2016) will be R82 million. A further R40 million has been budgeted for the completion of Phase 2 during the 2016/17 financial year.

(c) Phase 2 is scheduled for completion by March 2017 with Phase 3 in December 2018.

---00O00---

24 May 2016 - NW1101

Profile picture: Van Der Walt, Ms D

Van Der Walt, Ms D to ask the Minister of Basic Eduction

(1)How many learners fell pregnant in respect of each (a) province and (b) district in (i) primary and (ii) secondary schools in the 2015 school year; (2) (a) at which schools where the specified learners registered, (b) in what grades were the specified learners when they fell pregnant and (c) how many of the specified learners returned to complete their school year after their pregnancies?

Reply:

(1)(a)(b)(i)(ii) The 2015 data on learner pregnancy is not ready for use as yet.

(2)(a)(b)(c) The 2015 data on learner pregnancy is not ready for use as yet.

24 May 2016 - NW1399

Profile picture: Stander, Ms T

Stander, Ms T to ask the Minister of Labour

Whether (a) her department and (b) all entities reporting to her are running developmental programmes for (i) small businesses and Yes (ii) co-operatives; Yes if not, why not, if so, in each case (aa) what are the relevant details, (bb) what amount has been budgeted and (cc) how many jobs will be created through the specified development programmes in the 2016-17 financial year?

Reply:

(a)(i)(ii) Yes, Productivity South Africa does run developmental programmes for Small, Medium and Micro Enterprises (SMMEs), and Cooperatives.

(aa) The entity has developed action learning solutions to assist SMMEs and Cooperatives aimed at equipping them with the right skills, knowledge and attitudes to implement systems and procedures to improve productivity, profitability, growth and employment creation within these sectors.

The details of the program are as follows:

  1. PHASE 1: Business Start-up Workshop (BSUW)

The objective of this phase is to cultivate productive behaviour and distribute productivity competencies among emerging entrepreneurs, including SMMEs and co-operatives. They are enabled to achieve the following learning outcomes:

  • Demonstrate an understanding of productivity and its measurement.
  • Define entrepreneurship and the characteristics of a successful entrepreneur.
  • Demonstrate an understanding of business compliance.
  • Identify sources of start-up capital.
  • Demonstrate an understanding of the business plan guide/ template as a tool during implementation of action plans to establish a business.

    2. PHASE 2: Business Performance Improvement Workshop (BPIW)

The objective of this phase is to apply an action learning solution to assist SMMEs and co-operatives to implement systems and procedures that will result in:

  • Wastage elimination
  • Increased sales
  • Reduced operational costs through speed and quality improvement
  • Maximised profits
  • An early warning system (EWS) to proactively detect distress.
  1. PHASE 3: After-care and Coaching

The third phase of the programme assist delegates with practical assignments relevant to their own businesses in the form of coaching aftercare services. The practical implementation of the programme content facilitates the achievement of the following objectives:

  • The assumption of entrepreneurial behaviour
  • The ability to calculate basic productivity measurements
  • The ability to establish and maintain critical business practices, such as cash-flow management, budgeting and inventory control
  • Practical measurement of current productivity levels and setting of achievable improvement targets
  • The ability to undertake practical productivity improvement projects based on set targets
  • The ability to realise tangible financial savings from productivity improvement projects and improving profitability and growth.

The coaching component is applied throughout the programme as practical improvement projects are presented. Productivity advisors align activities according to the requirements of the group/cluster. The programme is concluded with a comprehensive stakeholder close-out report and entrepreneurs who complete their portfolio of evidence receive certification.

(bb) An amount of R6 277 116.00 has been budgeted for the 2016/17 financial year for this program.

(cc) A total 1 200 SMMEs and 4 300 Cooperatives will be assisted.

 

24 May 2016 - NW685

Profile picture: America, Mr D

America, Mr D to ask the Minister of Communications

(a) How many set-top boxes (STBs) were installed countrywide by 29 February 2016, (b) which service providers were contracted to install the specified STBs, and (c) what amount has each service provider been paid to date for the installation of STBs in each case?

Reply:

(a) The Universal Service and Access Agency for South Africa, which is the entity charged with the responsibility of managing the production and installation of set top boxes, informed me that 823 STBs were installed country wide as at 29 February 2016.

(b) The companies USAASA contracted to install the specified STBs are: Amigen Investments, Duramics Trading & Projects, Ketelelo Trading, Krosworx, KST Consortium, Lamec, Maziya Construction, Silverwell Business Enterprise and Ellies Industries.

(c) USAASA further informed me that Amigen Investments was paid R15,400.00; Duramics Trading & Projects was paid R 3,850.00; Ketelelo Trading was paid R15,950.00; Krosworx was paid R14,300.00; KST Consortium was paid R2,750.00; Lamec was paid R18,150.00; Maziya Construction was paid R12,650.00; Silverwell Business Enterprise was paid R24,200.00; and Ellies Industries has not redeemed any vouchers at SAPO.

 

MR NN MUNZHELELE

DIRECTOR GENERAL [ACTING]

DEPARTMENT OF COMMUNICATIONS

DATE:

MS AF MUTHAMBI (MP)

MINISTER OF COMMUNICATIONS

DATE:

24 May 2016 - NW1456

Profile picture: Mulder, Dr PW

Mulder, Dr PW to ask the MINISTER OF ARTS AND CULTURE

(1) Why he and his department are making use of a certain private firm of attorneys (name furnished) in a certain court case (details furnished) instead of the services of the State Attorney; (2) What have the legal costs of the (a) attorneys and (b) advocates in the specified court case amounted to for him and his department to date? (NW1607E)

Reply:

1. The Department appointed Cheadle; Thompson & Haysom attorneys since they previously dealt with similar language related cases initiated by the said Lourens and were therefore familiar and more knowledgeable regarding the issues at hand. Furthermore, the said attorneys had assisted the Department in drafting the Use of Official Languages Act in 2012 and their appointment was thus necessary to ensure continuity and effectiveness in addressing the language related issues.

2. The legal costs of the (a) attorneys amount to R726 186.70 and (b) R694 925.69 for advocates to date.

24 May 2016 - NW1355

Profile picture: Mbhele, Mr ZN

Mbhele, Mr ZN to ask the Minister of Police

How many SA Police Service officers have been trained in basic first aid in the (a) 2011-12, (b) 2012-13, (c) 2013-14, (d) 2014-15 and (e) 2015-16 financial years?

Reply:

QUESTION

FINANCIAL YEAR

MEMBERS TRAINED

a)

2011/2012

1093

b)

2012/2013

997

c)

2013/2014

1697

d)

2014/2015

1055

e)

2015/2016

1578

 

24 May 2016 - NW1151

Profile picture: Mncwango, Mr MA

Mncwango, Mr MA to ask the Minister of Defence and Military Veterans

With regard to the soldiers deployed in KwaZulu-Natal game parks (details furnished), what amount has been spent by her department in the past 10 years for the protection of rhinos in all the game parks, including uniforms, food, training, housing, transport, health, vehicles and weaponry?

Reply:

Soldiers of the SANDF are not deployed in in the KZN game parks per se but are responsible for border safeguarding operations. Amongst other, along the KZN-Mozambican borders therefore there is no financial implications related to the above mentioned question, only OP CORONA budget is spent for border safeguarding.

24 May 2016 - NW1411

Profile picture: Motau, Mr SC

Motau, Mr SC to ask the Minister of State Security

Whether (a) his department and (b) all entities reporting to him are running development programmes for (i) small businesses and (ii) co-operatives; if not, why not; if so, in each case, (aa) what are the relevant details, (bb) what amount has been budgeted and (cc) how many jobs will be created through the specified development programmes in the 2016-17 financial year?

Reply:

The State Security Agency (SSA) does not have development programmes for SMME’s or Cooperatives.

24 May 2016 - NW684

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Communications

(a) Which companies have been providing the antennae for the set-top box roll-out in the (i) Northern Cape and (ii) Free State up until 29 February 2016 (b) how many antennae has each specified company provided to date? and (c) what amount has each specified company been paid to date?

Reply:

(a) The Universal Service and Access Agency of South Africa (USAASA), which is the entity charged with the responsibility of managing the procurement of set-top boxes, informed me that Ellies Industries, Temic Manufacturing and QEC Pty Ltd are the three companies appointed to provide DTT antennas in the Northern Cape and Free State as at 29 February 2016.

(b) The entity has informed me that Ellies Industries provided 15,680 DTH Antennas, Temic Manufacturing provided 9,640 DTT Antennas, and QEC Pty Ltd provided 3,100 DTT antennas.

(c) USAASA informed me that an amount of R8,834,200.00 was paid to Ellies Industries. QEC and Temic Manufacturing were paid R17,770.32 and R27,018.00 respectively.

 

MR NN MUNZHELELE

DIRECTOR GENERAL [ACTING]

DEPARTMENT OF COMMUNICATIONS

DATE:

MS AF MUTHAMBI (MP)

MINISTER OF COMMUNICATIONS

DATE

24 May 2016 - NW1339

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Environmental Affairs

What is the detailed breakdown of the costs that will be incurred by her Department to host the 17th Conference of Parties (17th CoP) to the Convention on International Trade in Endangered Species of Wild Flora and Fauna in Johannesburg, Gauteng from 24 September 2016 to 05 October 2016?

Reply:

Costs relating to the hosting of the 17th Conference of Parties to the Convention on International Trade in Endangered Species of Wild Flora and Fauna (CITES) in Johannesburg, Gauteng from 24 September 2016 to 05 October 2016 include:

  • Host Country Agreement with the CITES Secretariat (translation, interpretation, documentation, report writing, travel of CITES Staff) = USD647 234 .
  • Costs associated with logistical arrangements associated with the CoP, including venue, professional conference organiser, technical requirements (voting system, microphone and audiovisual systems) opening and closing ceremonies = R34 280 547.
  • Costs associated with communication, community empowerment and participation and legacy programme = R31 188 808.

---ooOoo---

24 May 2016 - NW1096

Profile picture: Boshoff, Ms SH

Boshoff, Ms SH to ask the Minister of Basic Education

How many online registrations by educators were received by the SA Council for Educators in each (a) province and (b) district in the (i) 2012-13, (ii) 2013-14 and (iii) 2014-15 financial years?

Reply:

According to the South African Council for Educators (SACE) Annual Performance Plan, educators were registered as follows, both on-and off-line:

2013/14: 25 315

2014/15: 26 000

2015/16: 20 000 educators were targeted for registration.

The online system is being piloted from April to June 2016. Data will then be available.

 

24 May 2016 - NW1072

Profile picture: Davis, Mr GR

Davis, Mr GR to ask the Minister of Basic Education

(1)How many progressed learners (a) were in Grade 12 in each province as at 15 March 2015 and (b) are in Grade 12 in each province as at 15 March 2016; (2) how many of the progressed learners in Grade 12 as at 15 March 2015 (a) wrote and (b) passed the 2015 National Senior Certificate examinations in each province; (3) what support is being offered to the progressed learners in Grade 12 in each province as at 15 March 2016?

Reply:

Province

Question 1

Question 2

Question 3: Curriculum support for progressed learners as at 15 March 2016

Eastern Cape

 (a) Number of Progressed learners as at 15 March 2015:

13927

(b) Number of progressed learners as at 15 March 2016:

18255

(a)  Number of Progressed learners as at 15 March 2015 who wrote:

11705

(b) Number of progressed learners who passed the 2015 NSC:

2625

(a) Extra lessons are conducted by schools over the weekends.

(b) Morning and afternoon classes are conducted by schools.

(c) Common tests which were set by districts were written by all learners in term 1.

(d) Use of Telematic Centres for 7 Key subjects in 77 centres in the province.

Free State

(a) Number of Progressed learners as at 15 March 2015:

8187

(b) Number of progressed learners as at 15 March 2016:

7362

(a) Number of Progressed learners as at 15 March 2015 who wrote the 2015 NSC:

5105

(b) Number of progressed learners who passed the 2015 NSC:

2600

(a) Curriculum support in the form of morning, afternoon and weekend classes.

(b) Vacation classes for extra curriculum support in the form of:

  • Autumn,
  • Winter,
  • Spring, and
  • Special Camps for progressed.

(c) Support material to supplement textbooks, e.g. Study guides, DBE’s Mind the Gap and the DBE Siyavula workbooks.

(d) CDs containing past exam papers and memoranda.

(e) IBP broadcast lessons and copies of DVDs and CDs

(f) Special Maths program.

(g) Performance of the learners is regularly tracked via the Provincial Standardised exam and/or tests.

Gauteng

(a) Number of Progressed learners as at 15 March 2015:

4 798

(b) Number of progressed learners as at 15 March 2016:

The Department is not able to provide the requested information, as registration is still being captured.

(a) Number of Progressed learners as at 15 March 2015 who wrote:

4568

(b) Number of progressed learners who passed the 2015 NSC:

2149

(a) All progressed learners are participating in the Gauteng Department of Education (GDE)’s Secondary School Improvement Programme (SSIP) which provides supplementary tuition in 10 subjects every week.

b) In addition to this, a winter school residential camp programme especially for progressed learners will be run during the June school holiday. There will be similar support offered in September.
c) Progressed learners’ attendance and progress in the SSIP are being separately monitored and reported on weekly so that school principals can take action where needed.

KZN

(a) Number of Progressed learners as at 15 March 2015:

10 720

(b) Number of progressed learners as at 15 March 2016:

24549

(a) Number of Progressed learners as at 15 March 2015 who wrote:

10 070

(b) Number of progressed learners who passed the 2015 NSC:

4765

(a) Progressed learners in grade 12 are provided with subject glossaries like other learners.

(b) Special camps are arranged for progressed learners.

(c) A special Maths program is rolled-out for progressed learners in grade 12 in partnership with HeyMath and HeyScience.

(d) Progressed learners in grade 12 are provided with copies of English FAL resources.

(e) Copies of past exam papers with memoranda.

(f) Learners who achieve levels 1& 2 are provided with the DBE copies of Mind the Gap Study Guides.  These study guides assisted progressed learners in the past to move from level 1&2 to level 3 and above. 

(g) Exposed to regular writing and assessment to improve their reading speedy, retention memory and analytical skills. 

(h) They are provided with copies of abridged work schedules so as to focus on the essential and examinable content.

(i) Special sessions are arranged for the progressed learners that offer Mathematics.

(j) Exposed to live Memo Discussions and Marking to understand how to overcome typical mistakes made by learners during the exams.

(k) As part of ‘the last push’ strategy, camps are arranged for progressed learners to consolidate their learning.

(l) Provided with past papers and memoranda, revision packs and copies of the exam timetable timely.

(m) Provided with psycho-social support and motivations.

Limpopo

(a) Number of Progressed learners as at 15 March 2015:

13022

(b) Number of progressed learners as at 15 March 2016:

27523

(a) Number of Progressed learners as at 15 March 2015 who wrote:

13022

(b) Number of progressed learners who passed the 2015 NSC:

3492

(a) Instructed school to provide internal and specialized support to all progressed learners.

(b) Directed curriculum at the Districts to provide specialized programmes that are aimed to support progressed learners.

(c) Province has planned to acquire and provide learner support materials in the form of study guides in selected subjects.

(d) Plans are in an advanced stage to provide radio lessons to all grade 12 learners including progressed learners using all community radio stations located in all the Five Districts of the Province.

(e) Saturday lessons in selected circuits where there is a high concentration of progressed learners have been planned.

(f) Encouraged schools to run Winter Enrichment classes, focusing on identified topics as outlined from the Diagnostic reports.

Mpumalanga

(a) Number of Progressed learners as at 15 March 2015:

5230

(b) Number of progressed learners as at 15 March 2016:

11 160

(a) Number of Progressed learners as at 15 March 2015 who wrote:

5091

(b) Number of progressed learners who passed the 2015 NSC:

2290

(a) The District Based Support Teams (DBSTs) work with School Based Support Teams (SBSTs) in ensuring that progressed learners are supported.

(b) Extra lessons are provided to progressed learners on challenging content.

(c) Winter and Spring Vacation Classes will accomodate progressed learners.

(d) Remedial support programs are implemented by schools in support of progressed learners.

Northern Cape

(a) Number of Progressed learners as at 15 March 2015:

2631

(b) Number of progressed learners as at 15 March 2016:

2280

(a) Number of Progressed learners as at 15 March 2015 who wrote:

1963

(b) Number of progressed learners who passed the 2015 NSC:

613

(a) Learners get tuition at their respective schools

(b) Some attend classes at Dinaledi schools

(c) The Department provides material to learners where they cannot attend classes due to distance and transport. These comprise course materials which are used during interventions such as the Winter and Spring schools throughout the year. The material are compiled from the Mind the Gap study series. The materials, including previous examinations question papers, are used throughout the year.

(d) The Dinaledi schools’ is a NYDA & ETDP SETA project where matriculants get Face to Face tuition. There are 2 such schools in the Northern Cape and the Department joined forces with them so that these modulate (progressed learners) also attend face to face classes.

(e)Some progressed learners attend classes at their previous schools.

North West

(a) Number of Progressed learners as at 15 March 2015:

3767

(b) Number of progressed learners as at 15 March 2016:6654

(a) Number of Progressed learners as at 15 March 2015 who wrote:

3543

(b) Number of progressed learners who passed the 2015 NSC: 2122

(a) Designated camps for progressed candidates are held during Autumn school holidays.

(b) Progressed learners attend the winter and spring camps for underperforming schools

(c) Progressed learners are part of LAIP (Learner Attainment Improvement Plan, known at DBE as NSLA – National Strategy for Learner Attainment.

Western Cape

(a) Number of Progressed learners as at 15 March 2015:

2280

(b) Number of progressed learners as at 15 March 2016:

3058

(a) Number of Progressed learners as at 15 March 2015 who wrote:

3589

(b) Number of progressed learners who passed the 2015 NSC:

1404

(a) Graded, consolidated exercises for learners at risk provided as downloadable resources.

(b) Subject specific tutoring conducted after school and on Saturdays.

(c) Provision of LTSM support.

(d) Provision of Tips for Success booklet.

(e) Provision of NCS 2015 and March 2016 question papers & Memos.

(f) Each learner will receive Revision Countdown (2 exam papers & memos in 7 subjects).

(g) Standardized SBA tasks.

(h) Provision of Mind the Gap books.

(i) Provision of Siyavula Mathematics and Physical Sciences textbooks.

24 May 2016 - NW426

Profile picture: Boshoff, Ms SH

Boshoff, Ms SH to ask the Minister of Basic Education

(1)How many sign language teachers are currently appropriately trained to teach sign language in the (a) foundation, (b) intermediate, (c) senior and (d) Further Education and Training phases of the education system; (2) (a) what are the names of schools that cater for learners with hearing impairments and (b) how many of the appropriately trained teachers are deployed to teach at the specified schools in each province; (3) (a) how many full service schools are catering for learners with hearing impairments, (b) what are the names of the schools and (c) how many appropriately trained teachers are deployed at each of the specified schools in each province; (4) what steps are being taken to bridge the gap caused by shortages for appropriately trained sign language teachers?

Reply:

1. (a), (b), (c) and (d). The table below shows the number of appropriately trained sign language teachers at Foundation, Intermediate, Senior and Further Education and Training Phases in each province.

Province

  1. Foundation Phase
  1. Intermediate Phase

(c)Senior Phase

(d)Further Education and Training Phase

Total

Eastern Cape

35

22

26

16

99

Free State

16

2

3

3

24

Gauteng

11

10

11

1

33

KwaZulu-Natal

       

31

Limpopo

26

20

22

17

85

Mpumalanga

13

9

No school catering for FET

22

North West

12

11

2

0

25

Northern Cape

4

3(7)

3(6)

2(5)

12(18)

Western Cape

7

5

5

5

22

Source: Provincial reporting

2. (a) and (b). The table below shows the names of schools that cater for learners with hearing impairments; and the number of appropriately trained teachers in specified schools in each province.

Province

(a) School

(b) Number of Teachers

Eastern Cape

Efata

35

 

St Thomas

28

 

Reubin Birin

21

 

Sive

15

Totals

4

99

Free State

Bartimea Special School

13

 

Thiboloha Special School

11 (2 specialist teachers teaching sign language as a subject.

TOTAL

2

24

Gauteng

Dominican

9 (7)

 

Filadelfia

2(4)

 

Katlehong School for the Deaf

6(7)

 

MC Kharbai

4(4)

 

Sizwile

5(3)

 

St Vincent

4(3)

 

Transoranje

3(3)

Totals

7

33(31)

KwaZulu-Natal

Fulton School for the Deaf

2 (4) assistants in brackets.

 

KwaThintwa School for the Deaf

2(6)

 

VN Naik School for the Deaf

3(4)

 

Durban School for the Deaf

3(4)

 

KwaVulindlebe School for the Deaf

0(5)

 

Indaleni School for the Deaf

1(7)

 

Vuleka School for the Deaf

7(5)

 

St Martin de Porres

8(2)

 

Bumbisizwe Special School

1(2)

 

Inkanyezi Special School

2(1)

 

Inkanyiso Special School

0(1)

TOTAL

11

29(43)

Limpopo

Setotolwane

34

 

Yingisani

17

 

Bosele

15

 

Tshilidzini

15

 

Sedibeng

4

TOTAL

5

85

Mpumalanga

Kamagugu

6

 

Silindokuhle

12

 

Bukhosibetfu

4

 

Marietjie

2

 

Wolvenkop

3

TOTAL

5

27

Northern Cape

Retlamelang

12

TOTAL

1

12

Western Cape

   
 

De la Bat

80% 0f teachers in the schools completed SASL linguistic training university level

 

Nuwe Hoop

 
 

Dominican Wittebome

 
 

Mary Kihn

 
 

Noluthando School

 
     

Source: Provincial reporting

(3) (a)(b)(c). The table below shows the number and names full service schools catering for learners with hearing impairments; and the number of appropriately trained teachers deployed at each school. Only the Free State and Mpumalanga have Full Service Schools that cater for learners with hearing impairments.

  1. Number of Schools; And (b) Names of schools
  1. Number of appropriately trained teachers

Free State

Botle ba Thuto P/S

  • No teachers appropriately trained
  • Teachers and parents of learners who are identified with hearing impairments were provided with strategies on how to support these learners

Jagersfontein I/S

 

Mofulatshepe P/S

 

Oranjekrag I/S

 

Zama P/S

 

Christiaan de Wet I/S (Ordinary School)

 

Gelukwaarts IF/S

 

Hermana P/S

 

Jim Fouche P/S

 

Mabela P/S

 

Maboloka P/S

 

Pontsheng P/S

 

Dieketseng P/S

 

Hlaboloha P/S

 

Kegomoditswe

 

Winburg C/S

 

Kweetsa P/S

 

Letsibolo P/s

 

Malebaleba P/S

 

Ntuthuzelo P/S

 

Refihletse P/S

 

Reseamohetse P/S

 

Thoriso P/S

 

Chris van Niekerk I/S

 

JJ Kubheka P/S

 

Ntshwephepa P/S

 

Poelamo P/S

 

Sentrale Volkskool P/S

 

Theha Setjhaba P/S

 

Lesoana P/S

 

Letlotlo P/S

 

Mafube P/S

 

Leifo Iziko I/S

 

Mphatlalatsane P/S

 

Masaleng P/S

 

Pulamadiboho P/S

 

Qhubeka P/S

 

Sekgothadi P/S

 

Theboho P/s

 

TOTAL= 41 SCHOOLS

 

MPUMALANGA

Bukihosibetfu Full Service School

4

TOTAL= 1 SCHOOL

 

Source: Provincial reporting

(4) The following are the steps taken to bridge the gap caused by shortages for appropriately trained sign language teachers in each province.

Eastern Cape

The Eastern Cape Department of Education has entered into a partnership with the Education and Training Sector Education and Training Authority (ETDP SETA) to train all educators in four Schools for the Deaf. The EDTP SETA has in turn, contracted University of Witwatersrand (WITS) to train educators in two workshops of five days per year in 2014 and 2015. The partnership with Sector Education and Training Authority (SETA) continues in the 2016/17 until all educators in these schools are qualified to teach Sign Language.

Free State

Teachers at Bartimea and Thiboloha Special Schools for the Deaf and Hard of Hearing were trained on the South African Sign Language (SASL) Curriculum and Assessment Policy Statements (CAPS) at Home Language level. Teachers were also trained on sign language as a means of communication.

Gauteng

  • Continuous SASL competency training takes place.
  • Currently all teachers teaching SASL as a subject have NQF Level 5.
  • All SASL teachers have deaf class assistants to compliment the language skill and to adopt the team teaching approach;
  • Collaboration with Wits Centre for Deaf Studies to assist with Curriculum and Assessment Policy Statements (CAPS) for SASL, focusing on prose and poetry.

KwaZulu-Natal

The Inclusive Education Directorate has arranged with ETDP SETA to fund SASL training and the up-skilling of teachers from the above-mentioned schools. ETDP SETA has secured the services of the Wits Language School to undertake the training, assessment and certification of teachers. In the current training cohort, there are six (6) District officials and fifty seven (57) teachers receiving training in SASL. The training programme which extends over 15 days commenced in December 2015 and will continue in March-April 2016.

Mpumalanga

  • There is ongoing orientation of stakeholders on the approved SASL CAPS which includes, Curriculum Implementers (CIs), School Management Teams (SMTs), Deaf Teacher Assistants and educators;
  • The Education department of Mpumalanga is providing training of teachers, Language Subject Advisors and Deaf teacher assistants on SASL;
  • 45 teachers have to date been trained on NQF Level 4 and 5;
  • 60 Foundation Phase Language Subject Advisors and Inclusive Education officials have been trained on the basics of SASL; and
  • For the financial year 2015/16, 60 teachers will be trained on NQF Level 4 and 5 by the University of Free State. The training will take place from 25 February to 12 March 2016.

Limpopo

All teachers teaching learners with hearing impairments have been trained on basic SASL and further advanced training at the University (Advanced Diploma) level is planned for the future.

Western Cape

18 educators are being trained on SASL through the ETDPSETA by the University of Witwatersrand. Of the number given eight (8) are doing the advance level. In 2014 to 2015; thirty four (34) educators and officials were trained on SASL. The training on SASL will continue annually for all the educators.

24 May 2016 - NW1455

Profile picture: Mulder, Dr PW

Mulder, Dr PW to ask the Minister of Arts and Culture

(1)(a).How many translators are currently in service to his department, (b) in which languages do the specified translators perform translation work and (c) what is the average annual remuneration of (i) a translator and (ii) the sum total of all the translators in his department; (2) whether he has taken any steps or plans to take steps with regard to building capacity of translation services in his department; if not, why not; if so, what are the relevant details?

Reply:

  1. (a). There is currently a total of fifteen (15) translators in service to the department,
  2. (b) these in house translators perform translation work in all the official languages including French and Portuguese,
  3. (c) (i) the annual remuneration of translators are according to their levels which are level eight (8) with notches ranging from 91,404 to 107,670 and level nine (9) with notches ranging from 311, 784 – 376, 626 per annum, (ii) the sum total of all the translators in the department is fifteen (15).

(2). Yes, steps have been taken in the department with regards to building of capacity of translation services. Translators attended on-going development training in areas such as basic copy editing, proof reading and advancement in foreign languages. In addition, there are a number of translators who have registered with various institutions of higher learning through the DAC bursary scheme for the long term formal programs such as studies in applied linguistics.

24 May 2016 - NW1048

Profile picture: McLoughlin, Mr AR

McLoughlin, Mr AR to ask the Minister of Communications

(1) How many (a) performance, (b) retention, (c) share-bound or (d) any other bonuses were paid out by each of the entities reporting to her to (i) board members and (ii) members of the Executive of the SABC board (aa) in the (aaa) 2014-15 and (bbb) 2015-16 financial years and (bb) since 1 April 2016; (2)  what was the total remuneration package, including bonuses, paid out by each of the entities reporting to her to each (a) board member and (b) member of the Executive of the SABC board respectively in the specified financial years and period?

Reply:

Brand South Africa

(1) N/A

(2) N/A

ICASA

(1) N/A

(2) ICASA has in the specified financial years, paid council members a total of R9,680,828.00

 

Film and Publications Board

(1) N/A

(2)(a) FPB Board members do not receive an annual remuneration package, they are remunerated at an hourly rate for time worked as per time claimed.

Therefore, FPB paid a total of R1,077,768.68 in 2014/15, and a total of R1,176,685.64 in 2015/16.

MDDA

(1) N/A

(2)(a) Due to the absence of senior executives at the MDDA, the Board Chair and Board Members played a critical role in supporting management. The failure of previous management to build internal human development programmes and succession plans put pressure on the current Board to drive the rebuilding, reconfiguration and re-engineering of the organisation.

Therefore, MDDA paid a total of R510,000.00 in 2015/16 and a total of R233,000.00 in 2014/15

SABC

(1)

(a),(b)&(c) N/A

(d)(ii) (aaa) R638 000 excluding tax (3 Executive Board members)

(bbb) The 2015/16 financials are currently being audit and the information is therefore not yet available.

(2) (a) 2014/15: R3,74m excluding tax (12 non-executive Board members).

2015/16: The 2015/16 financials are currently being audit and the information is therefore not yet available.

(b) 2014/15: R11,6m total cost to company. (4 executive Board members, some were in acting capacity).

2015/16: The 2015/16 financials are currently being audit and the information is therefore not yet available.

MR NN MUNZHELELE

DIRECTOR GENERAL [ACTING]

DEPARTMENT OF COMMUNICATIONS

DATE:

MS AF MUTHAMBI (MP)

MINISTER OF COMMUNICATIONS

DATE:

24 May 2016 - NW1289

Profile picture: Bergman, Mr D

Bergman, Mr D to ask the Minister of Communications

What is the status of the legal action taken by etv against the Broadcast Digital Migration policy adopted by Cabinet in March 2015? NW1437E

Reply:

In the matter between Etv v Minister of Communications the North Gauteng High Court found in favour of the Minister. Etv appealed to the Supreme Court of Appeal (SCA) and the matter was heard on 09 May 2016. The SCA reserved judgement. We will hear from the SCA for a day allocated to note judgment.

 

MR NN MUNZHELELE

DIRECTOR GENERAL [ACTING]

DEPARTMENT OF COMMUNICATIONS

DATE:

MS AF MUTHAMBI (MP)

MINISTER OF COMMUNICATIONS

DATE:

24 May 2016 - NW1457

Profile picture: Mulder, Dr PW

Mulder, Dr PW to ask the Minister of Arts and Culture

(1) Whether his department has a database of all available translators in each of the national departments, national bodies and national entities; if not why not; if so, (2) how many translators are able to perform translation work in each national department, national body and national entity respectively? (3) Whether he has taken steps or is planning to take steps with regard to the building of capacity in respect of translation services in national departments, national bodies and national entities; if not, why not; if so, what are the relevant details?

Reply:

In relation to the question of translators in other departments, I am unable to provide answers since these departments are not accountable to me. The honourable Member must feel free to ask each of the departments of government and their respective entities.

24 May 2016 - NW1237

Profile picture: Grootboom, Mr GA

Grootboom, Mr GA to ask the MINISTER OF ARTS AND CULTURE

(1) Whether the National Film and Video Foundation (NFVF) has regional offices in each province; if not, why not; if so, what are the relevant details; (2) Whether the NFVF has any relationships and/or liaisons with international film companies currently filming in South Africa; if not, why not; if so, what are the relevant details; (3) Whether there are any policies governing the specified liaisons between the NFVF and international film companies; if not, why not; if so, will he furnish (a) Dr G A Grootboom and/or (b) the Portfolio Committee on Arts and Culture with copies of the specified policies?

Reply:

1. The NFVF currently does not have any regional offices. The main reason is budgetary – the NFVF Act allows for a 25% cap on administration expenditure and the setting up of regional offices would cause NFVF to vastly exceed this cap and reduce funds available to offer as grants.

2. The NFVF does not enter into agreements with individual international companies. However, the NFVF has agreements with official international state entities. South Africa has signed 8 international co-production treaties with the governments of Canada, United Kingdom, Ireland, Italy, Germany, France, Australia and New Zealand. We are currently in negotiation with Brazil, Algeria, Kenya and Netherlands to sign treaties with these countries.

Co-production treaties are signed in order for government entities (such as NFVF) in both countries to facilitate and encourage production and cultural exchange between the respective countries. These co-production treaties are administered by the NFVF.

3. The co-production treaties that has been signed with the 8 above-mentioned countries govern the relationship between South Africa and the respective countries. Please find attached copies of the 8 treaties signed between the government of South Africa and the government of the respective countries.

24 May 2016 - NW1278

Profile picture: Marais, Mr S

Marais, Mr S to ask the Minister of Defence and Military Veterans

With reference to her reply to question 395 on 15 March 2016, (a) how many burglaries from the Military Police Service facilities were reported at either (i) the Military Police Service station and/or (ii) the SA Police Service in the (aa) 2012-13, (bb) 2013-14 and (cc) 2014-15 financial years and (b) what was the (i) nature of the stolen goods in each case and (ii) monetary worth of such losses as determined by the SA National Defence Force?

Reply:

(a) Burglary cases reported

   (i) Military Police Service Stations – Three cases of burglary were reported.

(aa) 2012-13: One case of burglary at haba Tshwane Military Police Area Office (MPAO) and one burglary at Daquar MPAO.

(bb) 2013-14: No burglary was reported.

(cc) 2014- 15: One case of burglary at Bloemfontein MPAO

(b) Nature of stolen goods is TV, two edge cutters.

TV (Thaba Tshwane) R6,000.00

2x edge cutters (Daquar) R5,000.00

Forced entry (Bloemfontein – nothing stolen)

There were no cases reported to the South African Police Service

24 May 2016 - NW1044

Profile picture: Marais, Mr EJ

Marais, Mr EJ to ask the Minister of Communications

Whether (a) she and (b) her department and/or any entities reporting to her (i) entered into any agreements with and (ii) received any sponsorships and/or services from (aa) Sahara Holdings, (bb) Oakbay Investments, (cc) The New Age Media, (dd) Vusizwe Media, (ee) Mabengela, (ff) Islandsite Investments 255, (gg) Afripalm Horizons Stakes, (hh) Dunrose Investments and/or (ii) JIC Mining Services since 1 May 2014; if so, what are the (aaa) relevant details and (bbb) costs involved in each specified case?

Reply:

Department of Communications:

(a) The Minister and (b) the Department have not (i) entered into any agreements with and (ii) received any sponsorships and/or services from (aa) Sahara Holdings, (bb) Oakbay Investments, (cc) The New Age Media, (dd) Vusizwe Media, (ee) Mabengela, (ff) Islandsite Investments 255, (gg) Afripalm Horizons Stakes, (hh) Dunrose Investments and/or (ii) JIC Mining Services since 1 May 2014.

Government Communication and Information System (GCIS):

(b)(i) GCIS has not entered into any agreements with (aa) Sahara Holdings, (bb) Oakbay Investments, (dd) Vusizwe Media, (ee) Mabengela, (ff) Islandsite Investments 255, (gg) Afripalm Horizons Stakes, (hh) Dunrose Investments and/or (ii) JIC Mining Services since 1 May 2014.

The the Department has however transacted with (cc) The New Age Media to procure advertising. (aaa) Payments made from the budget appropriated to Government Communication and information System (GCIS) to The New Age Media are detailed in the table (bbb) below:

 

2014/2015

 

Government Communication and Information System (GCIS)

Database registration

R 14 945.40

 

Profiling Campaign

R 720 990.72

 

Recruitment

R 301 195.75

 

Recruitment Phase 3

R 57 078.43

 

SONA 2014

R 100 137.60

 

SONA 2015

R 101 888.64

Total Government Communication and Information System (GCIS)

 

R 1 296 236.54

 

2015/2016

 

Government Communication and Information System (GCIS)

SONA 2016

R 145 555.20

 

Voter Education

R 81 874.80

Total Government Communication and Information System (GCIS)

 

R227 430.00

South African Broadcasting Corporation (SABC):

(b) (i) Yes

(ii) Yes

(cc) Yes

(aaa) 1. New Age newspaper subscription.

2. The SABC and The New Age (TNA) have an agreement that the SABC will cover live all the TNA Business Breakfasts. This agreement is for a period of three years. The agreement stipulates that the TNA will arrange and organise the Business Breakfasts by providing the venue (as well as catering) and secure the participants. The SABC in turn broadcasts the event. The advantage for the SABC is the acquisition of content.

(bbb) 1. R 733,930.

2. Nil

Independent Communications Authority of South Africa (ICASA):

The Authority has not (i) entered into any agreements with and did not (ii) receive any sponsorships and/or services from (aa) Sahara Holdings, (bb) Oakbay Investments, (cc) The New Age Media, (dd) Vusizwe Media, (ee) Mabengela, (ff) Islandsite Investments 255, (gg) Afripalm Horizons Stakes, (hh) Dunrose Investments and/or (ii) JIC Mining Services since 1 May 2014.

Film and Publications Board (FPB):

The Film and Publication Board bought a table for The New Age business breakfast in the 2014/15 financial year for an amount of R 14 261.40.

Brand South Africa (BSA):

Brand South Africa has not (i) entered into any agreements with and did not (ii) receive any sponsorships and/or services from (aa) Sahara Holdings, (bb) Oakbay Investments, (cc) The New Age Media, (dd) Vusizwe Media, (ee) Mabengela, (ff) Islandsite Investments 255, (gg) Afripalm Horizons Stakes, (hh) Dunrose Investments and/or (ii) JIC Mining Services since 1 May 2014.

Media Diversity and Development Agency (MDDA):

MDDA has not (i) entered into any agreements with and did not (ii) receive any sponsorships and/or services from (aa) Sahara Holdings, (bb) Oakbay Investments, (cc) The New Age Media, (dd) Vusizwe Media, (ee) Mabengela, (ff) Islandsite Investments 255, (gg) Afripalm Horizons Stakes, (hh) Dunrose Investments and/or (ii) JIC Mining Services since 1 May 2014.

MR NN MUNZHELELE

DIRECTOR GENERAL [ACTING]

DEPARTMENT OF COMMUNICATIONS

DATE:

MR D LIPHOKO

DIRECTOR GENERAL [ACTING]

GOVERNMENT COMMUNICATION AND INFORMATION SYSTEM

DATE:

MS AF MUTHAMBI (MP)

MINISTER OF COMMUNICATIONS

DATE:

24 May 2016 - NW1256

Profile picture: Bagraim, Mr M

Bagraim, Mr M to ask the Minister of Arts and Culture,

Whether he has undertaken any international trips on government business to (a) the French Republic and/or the (b) the Republic of Senegal in the 2015-16 financial year; if so, (i) where did he go in each case and (ii) what was the reason for each specified trip? NW1404E

Reply:

I did not undertake an international trip on government business to either the French Republic and/ or the Republic of Senegal in the 2015 -16 financial years.

24 May 2016 - NW1299

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Economic Development

Whether any member of the Industrial Development Corporation’s executive team has ever (a) met with any (i) member, (ii) employee and/or (iii) close associate of the Gupta family and/or (b) attended any meeting with the specified family (i) at the Gupta’s Saxonwold estate or (ii) anywhere else since taking office; if not, what is the position in this regard; if so, in each specified case, (aa) what are the names of the persons who were present at each meeting, (bb)(aaa) when and (bbb) where did each specified meeting take place and (cc) what was the purpose of each specified meeting?

Reply:

I have been furnished with a statement by the CEO of the Industrial Development Corporation, Mr Geoffrey Qhena, on the matters covered by the question.

The statement follows:

“It is common knowledge that the IDC has provided financial assistance to Oakbay Resources & Energy Limited. In the period leading up to the finalisation of negotiations regarding the transaction and in the normal course of business, Mr Ufikile Khumalo (who was at the time the Divisional Executive responsible for Mining and Beneficiation) and Mr Abel Malinga (the current Divisional Executive responsible for Mining & Metals Industries) held several meetings with officials, executives and shareholders of Oakbay Resources & Energy including Mr Atul Gupta and Mr Jagdish Parekh. All meetings with officials, executives and shareholders of Oakbay Resources took place at the offices of the IDC. None of these meetings took place at the Gupta’s Saxonwold Estate.

In addition to the meetings referred to above and during the course of the last year, the current Divisional Executive for Mining and Metals Industries, Mr Abel Malinga met twice with the Chief Operating Officer (COO) of Oakbay Resources, Ms Ronica Ragavan, to finalise the terms for restructuring Oakbay Resources’ existing facilities with the IDC. The second meeting discussed a possible early redemption of IDC facilities by Oakbay Resources. The meeting to discuss the restructuring of Oakbay Resources facilities took place at the IDC whilst the discussion on possible early redemption of IDC facilities by Oakbay Resources took place at the client’s offices at 144 Katherine Street, Sandton.”

MG Qhena, 11 May 2016

-end-

24 May 2016 - NW1236

Profile picture: Grootboom, Mr GA

Grootboom, Mr GA to ask the Minister of Arts and Culture

HOW MANY TRIPS DID OFFICIALS FROM HIS DEPARTMENT UNDERTAKE TO INTERNATION FILM FESTIVALS IN THE (i) 2011-12, (ii) 2012-13, (iii) 2013-14, (iv) 2014-15 and (v) 2015-16 FINANCIAL YEARS, (b) HOW MUCH DID EACH SPECIFIED TRIP COST, (c) HOW MANY ARTISTS ACCOMPANIED HIS DEPARTMENT’S OFFICIALS ON THE SPECIFIED TRIPS AND (d) HOW DID FILM PRODUCERS BENEFIT FROM THE SPECIFIED TRIPS?

Reply:

Year & Festival

(a) Number of trips by officials of the department

(c) Number of artists accompanying officials on the specific trips

(b) Estimated costs – actual costs are being collected from financial records and will be supplied as soon as available

(d) How did film producers benefit from the specific trips

2011/12

FISAHARA Film Festival in Tindouf in Algeria

  • 1 trip
  • 3 artists
  • Estimated costs R600 000 -

Actual costs being obtained

The work of SA film producers was showcased

2012/13

FISAHARA Film Festival in Tindouf in Algeria

  • 1 trip
  • 4 artists
  • Estimated costs R650 000

Actual costs being obtained

  • The work of SA film producers was showcased

2013/14:

FISAHARA Film Festival in Tindouf in Algeria

Cannes Film Festival in France

  • 1 trip
  • 1 trip
  • 11 artists

None

  • Estimated costs R800 000
  • Actual costs being obtained
  • Estimated costs was R814 180.00.

Actual costs being obtained

  • The work of SA film producers was showcased
  • The work of SA film producers was showcased.

Signing film coproduction treaties allow SA film producers to access partnerships, access co-financing, to coproduce, and access distribution, exhibition and marketing opportunities.

2014/15

FISAHARA Film Festival in Tindouf in Algeria

  • 1 trip
  • 2 artist
  • Estimated costs R400 000 -

Actual costs being obtained

  • The work of SA film producers was showcased

2 FISAHARA Film Festival in Tindouf in Algeria 015/16

  • 1 trip
  • 1 artist
  • Estimated costs R400 000 -

Actual costs being obtained

  • The work of SA film producers was showcased

24 May 2016 - NW1234

Profile picture: McLoughlin, Mr AR

McLoughlin, Mr AR to ask the Minister of Water and Sanitation

(1)Whether, with reference to particular key commitments undertaken by her as a consequence of the assessment of her department by the Auditor-General in the 2014-15 financial year, the focus risk assessment has been discussed by her department’s top management; if not, why not; if so, (a)(i) when and (ii) where did such discussions take place, (b) who was present during the specified discussions and (c) what was the outcome of the discussions; (2) whetherher department’s audit committee produce a report on its monitoring of the risk assessment; if not, (a) why not and (b) when will this take place; (3) whether, with reference to the specified commitments, a structure incorporating the sanitation function has been established; if not, why not; if so, what (a) is the name of the specified structure, (b) are the full relevant details of the terms of reference of the specified structure, (c) sanitation-related work has the specified structure undertaken to date and (d) were the outcomes in each case; (4) whether, with reference to the specified commitments, a joint team comprising her department, the Auditor-General of South Africa and the National Treasury has met to commence its work towards addressing issues of concern; if not, why not; if so, what are the relevant details?

Reply:

(1)(a)(i) My Department's Top Management discussed the Auditor-General (AG)’s report on the following dates, refer below:

  • 13 October 2014;
  • 23 February 2015; and
  • 23 March 2015.

Furthermore the Risk Management Committee also discussed the AG's report on 13 October 2014.

(1)(a)(ii) The meeting took place in Pretoria.

(1)(b) The meeting was attended by members of Top Management and Risk Management.

(1)(c) The outcomes of the discussions was to mitigate risks as identified by the AG and to continue to improve the internal control environment.

(2) My Department’s audit committee report has been included in the annual report for 2014/15 financial year.

(3) No, the structure of the sanitation function remains as transferred from the Department of Human Settlements. The organisational structure of my Department is currently being reviewed in its entirety.

(4) A Steering Committee functions within my Department and is attended by Top Management, Internal Control, AG and National Treasury, which worked in tandem to resolve the issues raised during the AG Audit.

---00O00---

23 May 2016 - NW1199

Profile picture: Redelinghuys, Mr MH

Redelinghuys, Mr MH to ask the Minister of Police

(a) Which SA Police Service stations currently serve Ward 24 in the City of Tshwane, (b) what are the boundaries of the area of operation of each of the specified police stations and (c)(i) how many (aa) police officers, (bb) officials who are employed in terms of the Public Service Act, Act 103 of 1994, and (cc) operational vehicles are at each of the specified stations and (ii) what is the breakdown in terms of the (aa) rank of each specified officer and official and (bb) division each specified officer and official belongs to?

Reply:

  1. Loate and Dube police stations.

(b) A map indicating the boundaries is attached as per Annexure A.

(c)(i)

 

(c)(i)(aa) Police Act Employees

(c)(i)(bb) Public Service Act Employees

Dube

41

9

Loate

118

26

(c)(ii)(aa) and (bb) Breakdown per function and salary level is attached as per Annexure B.

(c)(i)(cc) Operational vehicles at Dube police station:

Operational vehicles at Dube police station

Sectors

6

Detective Service

5

Client Service Centre

6

Crime Prevention

2

Total operational vehicles

19

Operational vehicles at Loate police station

Detective Service

16

Client Service Centre

5

Crime Prevention

15

Total operational vehicles

36

23 May 2016 - NW1283

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Telecommunications and Postal Services

(a) How much funding has been allocated for the Virtual Cyber Security Hub hosted by the Council for Scientific and Industrial Research for the 2016-17 financial year and (b) what are the specific deliverables that the specified hub must deliver against these funds; (2) (a) how much funding has been allocated for the specified hub for the (i) 2017-18 and (ii) 2018-19 financial years and (b) what items and programmes will the funding be spent on in each of the specified years; (3) whether his department is the sole funder of the specified hub; if not, (a) what is the name of any other funder, (b) what is the financial contribution of each other funder and (c) what are the specific items and programmes to be delivered against these funds in each case, respectively; if so, what is the position in this regard; (4) (a) How much did his department spend in each year that it contributed to the specified hub and (b) what items and programmes were these funds spent on in each specified year?

Reply:

I have been advised by the Department as follows:-

(1)(a) The amount allocated to the Cybersecurity Hub for the 2016/2017 financial year is R 16, 418, 000.00

(b) Specific deliverables include

  • Formalise engagements with stakeholder, which supports the sharing and technical integration of cybersecurity incident information
  • Operationalisation of the Proactive and Reactive services
  • Increased functionality of Hub’s tools
  • Assist in the enablement and establishment of sector CERTs
  • Dissemination of incident and thereat information to stakeholders
  • Undertaking of a cybersecurity awareness programs which includes upgrade of the Hub’s website functionality

(2)(a)(i) In the 2017/2018 financial year R 15, 325, 000.00 has been allocated

(ii) In the 2018/2019 financial year R 12, 297, 000.00has been allocated

It should be noted that the allocated budget for these two financial years are subject to change as the MTSF is yet to be finalised.

(b) The monies will be used as follows:

  • Obtaining international certification for the Hub
  • Establishment of both private and public sector industry specific CERTs
  • Integration of incident information
  • Development and deployment of cybersecurity audit and readiness tools
  • Ongoing awareness programs

(3)(a) The Department is the sole funder of the Hub

(b) N/A

(c) N/A

(4)(a) In the 2014/2015 financial year R 18 533 013 was allocated

In the 2015/2016 financial year R 15 156 157 was allocated

(b) In the 2014/2015 financial year the monies were used for:

  • Establishment of the Hub
  • Development of Operational Processes
  • Development of Policies and Procedures

In the 2015/2016 financial year the monies were used for:

  • Research
  • Technical and operational support
  • System integration
  • Facilities, facilities maintenance
  • Infrastructure costs
  • Stakeholder engagement

23 May 2016 - NW1285

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Telecommunications and Postal Services

(1)Has the Universal Service Access Agency of South Africa (USAASA) played any role in the planning of SA Connect; if not, (a) why not and (b) what role will USAASA play in the future planning and rollout of the programme; (2) (a) what is the estimated cost of (i) planning and (ii) rolling out (aa) Phase 1 and (bb) Phase 2 of SA Connect, (b) what is the detailed breakdown of how this funding will be spent in the (i) 2016-17, (ii) 2017-18 and (iii) 2018-19 financial years and (c) which budget allocation will the specified funds come from in each of the specified financial years?

Reply:

I have been advised by the Department as follows:-

1. No.

(a) The Department has engaged with USAASA to ensure alignment of the Broadband initiatives being funded through the USAF and SA Connect Phase 1 hence USAASA’s current and future plans are aligned with the SA Connect Phase 1 District Municipalities.

(b) The Department and USAASA will continue to engage to outline the agency roles on SA Connect implementation taking into consideration developments in the sector

2. (aa) (i)-(ii) The estimated cost for Phase1 of SA Connect is R6.56billion

(bb) (i) – (ii) The estimated cost for Phase2 of SA Connect is R67.4 billion

(b) (i)-(iii) Phase 1 detailed breakdown

Phase 1 Budget Allocation (Million)

2016/17

2017/18

2018/19

Total

R 516.34

R 719. 52

R 720. 37

R6.56 Billion

(i)- (iii) Phase 2 detailed breakdown

Phase 2 Budget Allocation (Million)

2016/17

2017/18

2018/19

Total

R 823, 9

R 1, 557

R 2, 213

67.42 Billion

(c) The funding for Phase 1 will come from Budget allocation MTEF 2016/-2018/19. No allocation for Phase 2

23 May 2016 - NW1287

Profile picture: Basson, Mr LJ

Basson, Mr LJ to ask the Minister of Telecommunications and Postal Services

(1)What meetings of (a) the National ICT Forum and (b) each of its four forums have taken place since 1 October 2015, in each case indicating (i) dates, (ii) venues of these meetings, as well as (iii) agendas and (iv) records of decisions made at each meeting; (2) Which (a) reports and/or (b) initiatives have been instigated by any of the specified forums, in each case providing the relevant details including (i) plans of action and (ii) deadlines where applicable?

Reply:

I have been advised by the Department as follows:-

1. (a) Since 1 October 2015, the National ICT Forum has held a number of meetings through its various structures, which comprises of the Chairpersons Forum, Chamber meetings and Working Committees.

(b) (i) Meeting Dates:

      • Chairpersons Forum – 30 November 2015, 11 March 2016 and 06 May 2016
      • Economic Chamber – 3 March 2016
      • Social Chamber – 27 November 2015 and 19 February 2016
      • Governance and Security Chamber – 7 December 2015
      • ICTs and Disability Chamber – 2 December 2015 and 17 March 2016

(ii) Venues:

  • Chairpersons Forum – Director General’s Boardroom (Department)
  • Economic Chamber – Blue Crane Boardroom (Department)
  • Social Chamber – Blue Crane boardroom (Department)
    • Governance and Security Chamber – Blue Crane Boardroom (Department)
  • ICTs and Disability Chamber – Burgherspark Hotel (Pretoria)

 

(iii) Agendas:

Chairpersons Forum – Stakeholder Mobilization and Participation, Resource Mobilization, Draft Work Programmes of Chambers, National Workshop

Economic Chamber – ICT Skills, ICT SMMEs support, Electronic Manufacturing, Postal Sector and ICTs

  • Social Chamber – e-Health, e-Education, e-Justice and e-Agriculture
  • Governance and Security Chamber – e-Commerce, Internet Governance, Policy Mapping and Cyber Security.
  • ICTs and Disability Chamber – ICT Assistive Devices, Access to Government websites, Access to Banking Services

(iv) Records of decisions:

  • Chambers have developed their Terms of Reference and firmed up their structures
  • Chambers have now resolved and are prepared draft Work Programmes which still need to
  • be approved by the department
  • The Chairpersons Forum agreed to convene a National Workshop to discuss and endorse
  • the draft Work Programmes

(2)(a) Reports and (b) Initiatives

Initiatives that are coming out of the draft work programmes of the chambers include the following:

  • Conduct a National ICT Skills Audit with relevant stakeholders
  • Develop and implement a basic National e-Literacy Programme
  • Facilitate creation of Creative Hubs for SMMEs in townships with relevant support
  • Support development of ICT applications that will enable SMMEs to expand business opportunities
  • Develop and implement a Cybersecurity Awareness programme
  • To develop a National set of Principles/framework for Internet Governance in South Africa
  • Establish/ or revive an Intergovernmental Forum on Internet Governance
  • Create a cybersecurity Body of Knowledge for general access by South Africans
  • Explore Youth Job Creation Programme focusing on cybersecurity awareness
  • Facilitate engagements with relevant to improve access to banking services, government websites, employment, education and broadcasting for people with disabilities.

A National Workshop will be convened before the end of June 2016 to discuss and endorse the draft programmes of each Chamber. The workshop will also discuss resource mobilization for implementation of the work programme and timelines.

23 May 2016 - NW869

Profile picture: Groenewald, Dr PJ

Groenewald, Dr PJ to ask the Minister of Finance

(1)Whether the SA Airways still allows firearms handed in by passengers to be flown to their destination; if not, (a) when was the practice discontinued and (b) what is the reason for this; (2) whether he will make a statement about the matter?

Reply:

1. South African Airways has indicated that on all destinations they have stopped transporting fire-arms for passengers. Additional information is available on SAA’s webiste at http://www.flysaa.com/za/en/flyingSAA/baggage/firearms.html

2. The Minister does not intend to make an announcement on this matter.

23 May 2016 - NW1286

Profile picture: Basson, Mr LJ

Basson, Mr LJ to ask the Minister of Telecommunications and Postal Services

(a) What steps have been taken to replace the three councillors who resigned from the National Broadband Advisory Council in 2015, (b) who is the current chair of the specified council and (c) what meetings has he had with the specified chairperson since taking office, in each case indicating (i) dates, (ii) venue and (iii) agenda of any specified meetings?

Reply:

(a) There have not been attempts to replace the Councillors. Minister met with the previous Chairperson and expressed the intention to change the structure of the Council to derive maximum value for all stakeholders.

(b) There is currently no designated Chairperson of the council.

(c) There has not been any meetings with the Chairperson.

23 May 2016 - NW1284

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Telecommunications and Postal Services

(a) what amount of the R1.2 billion allocated to broadband in his department’s Medium Term Expenditure Framework 2016-17 to 2018-19 financial years is allocated to SA Connect and (b) what is the detailed breakdown of items the specified allocation will be spent on in each of the specified financial years; 2) (a) what steps in line with the Public Finance Management Act, Act 1 of 1999, are being taken to select a lead agency for SA Connect, (b) what skills are required of the lead agency and (c) what documents, such as requests for proposals, have been published in this regard to invite private sector participation in the (i) planning, (ii) project management and (iii) execution of the programmes under SA Connect up to the latest specified date for which information is available; 3) Whether any funds allocated for SA Connect have been spent in the (a) 2015-16 financial year and/or (b) since 1 April 2016 to the latest specified date; if not, why not; if so, what are the relevant details; 4) What amount of funding allocated for SA Connect in the 2015-16 financial year rolled over to the 2016-17 financial year?

Reply:

1. (a) R1.54 million is allocated for the implementation of SA Connect Phase 1.

(b) The allocated amount will be spent to procure broadband connectivity services for the Phase 1 sites. Detailed Breakdown:

Budget Allocation (Million)

2016/17

2017/18

2018/19

Total

336 600

422 300

711 900

1 450 800

2. (a) The Department is engaging with SITA to explore options of the appointment of the service provider that will be in line with the existing procurement legislations and regulations.

(b) The lead agency should be an organisation with the following capabilities:

   (i) To coordinate between public & private sector players,

   (ii) To raise funding to expand fibre infrastructure,

   (iii) To rollout simultaneously in all the phase 1 districts as per the Broadband Implementation Plan,

   (iv) To leverage on existing infrastructure to minimise duplication.

(c) The Department is engaging stakeholders to finalise the appointment process and no requests for proposals have been published yet.

    (i) - (iii) See (c) above

3) (a) In the 2015/2016 financial year R200 million was allocated for this project of which R100 million was transferred to Sentech for dual illumination and R50, 240 million to SAPO for the National Address System.

(b) No funds were spent since 1 April 2016. Because the department was engaging with the relevant stakeholders to finalise the appointment process.

4) In the 2015/2016 financial year R200 million was allocated for the project. An amount of R49, 760 million was rolled over.

23 May 2016 - NW1222

Profile picture: Filtane, Mr ML

Filtane, Mr ML to ask the Minister of Police

Whether he is aware of the alleged irregularities (details furnished) at the Madeira Police Station in Mthatha, Eastern Cape; if not, will he institute an investigation into the alleged irregularities for the purposes of bringing a solution; if so, (a) what steps, if any, have been taken to resolve the specified irregularities, (b) what is the (i) progress and (ii) time frame of the specified steps and (c) what are the further relevant details?

Reply:

The Provincial Commissioner of the Eastern Cape was not aware of the alleged irregularities as contained in the attached statements to this Question in Parliament, which are viewed in a very serious light.

 (a) Two (2) Senior Officers have been appointed to conduct an in-depth investigation into the alleged irregularities at Madeira Police Station with a view to take appropriate action against whoever might be implicated in such irregularities.

 (b) The investigation will commence immediately and is envisaged to be finalized within twenty one (21) days.

 (c) Progress will be reported in due course.