02 July 2018 - NW2142

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Energy

With reference to his statement on 1 June 2018 in which he stated that the two coal Independent Power Producers (IPPs) would give rise to at least 5 000 jobs during construction (details furnished), (a) where did he obtain this figure and (b) can he verify it, as the figures provided by the coal IPPs are different?

Reply:

In terms of the Request for Proposals (RFP) for coal IPPs, the preferred bidders bid the following in terms of job creation:

 

Project 1

Project 2

Total

Jobs during Construction (person years)*

7 943

2 377

10 320

Jobs during Operations (person years)

10 678

4 626

15 304

Total jobs in person years

18 621

7 003

25 624

*(Person years: 1 job = 12 person-months and 1 person-month = 160 working hours)

The quantification of job creation is calculated in terms of the above formula stipulated in the RFP. If one were to assume the Construction period to be 4 years with the Operations period being 30 years, the total direct jobs during Construction would be equivalent to having approximately 2 580 people working for 4 years during Construction and approximately 510 people working for 30 years during Operations. However, since jobs are provided in job years as per the RFP, the figures are likely to be understated given workers who are employed for less than one year, especially during the construction phase.

Furthermore, these job numbers directly associated with the coal IPP plants do not include the indirect jobs created as a result of the new mine which one of the Projects will be dependent on as well as the jobs created in relation to the discard coal supply which the other Project will be utilising. The job numbers further exclude indirect job creation in respect of factors such as manufacturing and limestone supply.

Approved / Not Approved

Mr J T Radebe, MP

Minister of Energy

Date:

02 July 2018 - NW1589

Profile picture: Masango, Ms B

Masango, Ms B to ask the Minister of Social Development

Whether her department prescribes minimum standards with regard to (a) the number of social workers employed in every area serviced by her department, (b) the number of cases that each social worker is permitted to handle, (c) office space per employee, (d) vehicles per office, (e) office equipment, (f) playrooms for children, (g) interviewing and/or statement rooms and (h) any other specified minimum standards; if not, what is the position in this regard; if so, what are the relevant details in each case?

Reply:

There is no one comprehensive document that addresses all the elements mentioned in this question. However, almost all of them are addressed in the following documents: National Norms and Standards for Social Infrastructure Delivery; Blue Print on Office Accommodation for Social Workers; Gazetted Public Works Space Norms; Integrated Social Services Delivery Model; Social Work Indaba Action Plan 2017 etc.

________________________

Approved by the Minister on

Date…………………………….

02 July 2018 - NW2167

Profile picture: Mashabela, Ms N

Mashabela, Ms N to ask the Minister of Energy

Did certain persons (names furnished) declare that they were directors in certain companies (details furnished), all of which had their bids accepted as part of the most recently signed Renewable Energy Independent Power Producer Programme agreements; if so, on what basis was this approved?

Reply:

Projects are not evaluated on the directorship of participating companies but rather on the shareholding of each project company to ensure that the bid criteria in respect of South African Entity and Black ownership participation are met. Thus the persons (names furnished) were not required to declare directorship.

All bidders are bound by rules against collusion which may result in disqualification. The commonality in directorship in the specified project companies refer to a group of companies with the same shareholding structure. Thus, collusion with another bidding group or developer is not relevant. The individual bids by the named project companies competed with multiple other bids in respect of the unique offering of each underlying project, in terms of a combination of factors that inform their pricing, for example location, size of plant and technology.

Approved / Not Approved

Mr J T Radebe, MP

Minister of Energy

Date:

.

02 July 2018 - NW2056

Profile picture: Alberts, Mr ADW

Alberts, Mr ADW to ask the Minister of Energy

1. Whether all members of the Senior Management Services (SMS) in his department had declared their financial interests for the past year as required by the Public Service Regulations; if not, (a) why not, (b) what number of the specified members did not declare their interest and (c) what are the (i) names and (ii) ranks of the specified non-compliant members of the SMS’ 2. Whether non-complaint SMS members have been charged; if not; why so, what are the relevant details; 3. What number (a) of employees in his department at each post level are currently suspended on full pay and (b) of the specified employees at each post level have been suspended for the specified number of days (details furnished); 4. What is the total amount of cost attached to the days of service lost as a result of the suspensions in each specified case

Reply:

All the SMS members have declared their financial interest for the year 2017/ 2018 as required by the Public Service Regulations, except for three (3) SMS officials (a) this was an oversight from the officials who missed the concession deadline of 31 May 2018 (b) Three (3) officials did not declare their financial interest (c) the names of officials who missed the concession deadline are (i) Mr LF Aphane, Mr P Musekwa and Mr L Phakati and their ranks are (ii) DDG: Energy Planning and Policy, Director and Parliamentary Officer;

The process is currently underway wherein non-complaint SMS members will be issued with written warnings for failure to declare their interests by the due date;

There are currently (a) Two (2) officials that are suspended on full salary both the employees are on post level 15 and (b) employee one was suspended on 19 May 2017 which is a total of 396 days; employee two was suspended on 27 July 2017 which is a total of 327 days.

The total amount of cost attached to the days of service lost as a result of the suspensions is (a) the first official’s total amount of cost attached to the days of service lost as a result of suspension on full pay is R1 453 379.62, the second official’s total amount of cost attached to the days of service lost as a result of suspension on full pay is R1 234 357.92

Approved / Not Approved

Mr J T Radebe, MP

Minister of Energy

Date:

02 July 2018 - NW1330

Profile picture: Basson, Mr LJ

Basson, Mr LJ to ask the Minister of Water and Sanitation

(1)With reference to the reply to question 475 on 31 March 2016, (a) by what date will the first phase of the Madibeng Water Purification Plant be completed and (b) at what cost; (2) (a) by what date will construction on the second module of 20 megalitres of the specified plant begin and (b) (i) by what date will construction be completed and (ii) at what cost; (3) whether any plans have been put in place to build additional reservoirs in Madibeng; if not, why not; if so, (a) by what date, (b) where and (c) at what cost; (4) Whether any new pipelines will be built to carry water to existing reservoirs in Madibeng; (5) by what date will the pipeline from the pump station at the Crocodile River to the plant be built?

Reply:

(1)(a) The first phase of the Madibeng Water Purification Plant is projected to be completed by 31 March 2019 provided that an additional R100 million is made available in the current financial year for electrical and mechanical works of the plant.

(1)(b) The estimated cost for completion of the first phase of the Madibeng Water Purification Plant is R528 million.

(2)(a) The construction of additional 20 megalitres (second module) will commence in the financial year 2022/23.

(2)(b)(i) The construction is projected to be completed by the end of 2025/26 financial year.

(2)(b)(ii) The estimated cost of R701 million for the second module of 20 megalitres of the specified plant.

(3) There are no plans to build additional reservoirs in Madibeng; there are currently enough existing reservoirs in Letlhabile, Sonop, Maboloka, Mothutlung, Ouskral, Madidi, Mmakau, Jericho, and Majakaneng.

(3)(a) Falls away.

(3)(b) Falls away.

(3)(c) Falls away.

(4) Yes, construction of new pipelines to carry water to existing reservoirs is projected to commence in 2019/20 financial year.

(5) The pipeline from the pump station at the Crocodile River to the plant to be completed by the end of 2018/19 financial year.

---00O00---

02 July 2018 - NW436

Profile picture: Figg, Mr MJ

Figg, Mr MJ to ask the Minister of Public Works

(a) What is the current amount that is outstanding in terms of rental income for each Ministerial residence, (b) which Ministers are in arrears, (c) what is the (i) location and (ii) description of each residence with outstanding rental income, (d) what is the cost of monthly rental of each of the specified residences and (e) what processes have been followed to collect outstanding debt?

Reply:

I appreciate this question from the Honourable Member, as it has brought to my attention a crucial matter regarding the payment of rental costs for Ministerial houses. The officials of the Department of Public Works are currently in the process of verifying the debt owed to the Department with the relevant Ministries. Thus, it would be premature of me to release unverified figures at this stage.

Nevertheless, what is apparent is that there may have been a systemic lapse in terms of the collection of rent from Members of the National Executive, because some amounts are beyond what would be regarded as normal debt (i.e. under 3 months of rental owed).

To this effect I have asked the Departmental officials to reconcile the debt and verify all the amounts owed to the Department of Public Works in respect of Ministerial houses. I have also sought assurance that measures have been undertaken to ensure that rent for Ministerial houses is collected on a monthly basis from all the Ministers and Deputy Ministers who are supposed to be paying that rent.

I can assure the Honourable Member that the Members of the Executive are fully committed to paying their rental costs. What we must ensure is that we address the systemic gap that has caused the debt to escalate for certain Ministerial houses.

02 July 2018 - NW1831

Profile picture: Horn, Mr W

Horn, Mr W to ask the Minister of Public Works

(1) Whether (a) his spouse and/or (b) an adult family member accompanied him on any official international trip (i) in each of the past five financial years and (ii) since 1 April 2018; if not, what is the position in this regard; if so, what (aa) is the name of the person(s), (bb) was the (aaa) purpose and (bbb) destination of the trip and (cc) was the (aaa) total cost and (bbb) detailed breakdown of the costs of the accompanying person(s) to his department; (2) whether each of the specified trips were approved by the President in terms of the provisions of Section 1, Annexure A of the Ministerial Handbook; if not, why not; if so, what are the relevant details?

Reply:

In 2015, Mr T W Nxesi, MP, as the Minister of Public Works and accompanied by his spouse, Mrs Nombulelo Nxesi, undertook an international trip from 27 to 31 March 2015 to Singapore to represent the Government and the President of the Republic of South Africa at the State funeral of Singapore’s founding Prime Minister, the late Mr Lee Kuan Yew. The cost with respect to the spouse as the accompanying person was R145 810.60. The trip was approved by the President of the Republic in terms of the provisions of Section 1, Annexure A, of the Ministerial Handbook.

In 2015, the Minister was accompanied by Mrs Nxesi on an official trip to Cuba from 13 to 20 December 2015 in preparation for the recruitment of Cuban Technical Advisors to the country, for purposes of skills transfer and capacity development to the benefit of the Department of Public Works. The cost in respect of the accompanying person was R112 561.42. The trip was approved by the President of the Republic in terms of the provisions of Section 1, Annexure A, of the Ministerial Handbook.

In 2017, the then Minister of Public Works, Mr N Nhleko, was accompanied by his spouse, Dr Yvonne Nomcebo Mthembu, to China, from 22 to 31 August 2017. The purpose of the trip was to attend the Ministerial Workshop on China’s developmental experience for developing countries. The cost in respect of the accompanying person was R119 307.14. The trip was approved by the President of the Republic in terms of the provisions of Section 1, Annexure A, of the Ministerial Handbook.

In 2017 the former Minister of Public Works was accompanied by his spouse, Dr Mthembu, to France on 6 - 12 July 2017, in order to attend the 101st Commemoration of the Battle of Delvillewood. The cost in respect of the accompanying person for the trip was R71, 830.14. The trip was approved by the President of the Republic in terms of the provisions of Section 1, Annexure A, of the Ministerial Handbook.

_________________________________________________________________________

02 July 2018 - NW1042

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Public Enterprises

Did a certain company, namely Hernic Ferrochrome conclude an empowerment deal in 2007 that involved a certain persons company namely Colin Matjila’s Matlapeng Resources? NW1043E

Reply:

DPE RESPONSE

The Department is unable to respond to this question as the information required relates to contracts awarded by Hernic Ferrochrome which is a private company.

Responses are based on information received from the respective SOCs stated below:

ALEXKOR SOC LIMITED

Alexkor is not in a position to comment on Hernic Ferrochrome business and would like to refer the question directly to Hernic Ferrochrome.

DENEL SOC LIMITED

Based on the information made available to Chairperson Hlahla, Denel has never concluded any empowerment deal in 2007 with a company called Hernic Ferrochrome that involved a person called Colin Matjila’s Matlapeng Resources.

ESKOM SOC LIMITED

Eskom is not aware of a company called Henric, however we will respond regarding a company called Hernic Ferrochrome (Hernic).

Hernic is one of Eskom’s Key Industrial Customer since 1996, and subsequently participated in Eskom’s Demand Response (DR) programme where customers are incentivised by reducing their own power consumption on request from Eskom.

Although Eskom is not privy to the details regarding an empowerment deal in 2007, Eskom is aware that Matlapeng Resources and Matlapeng Chrome had a shareholding at Hernic Ferrochrome during Eskom financial years 2014 and 2015. Eskom is also aware that Collin Matjila was a Director at Matlapeng Chrome and a Non- Executive Director at Hernic Ferrochrome, during financial years 2013, 2014 and 2015.

Eskom’s records do not indicate any direct dealings with Matlapeng Resources.

SAFCOL SOC LIMITED

According to SAFCOL’s records, they have not concluded an empowerment deal with the company namely Hernic Ferrochrome nor with the person namely Colin Matjila’s Matlapeng Resources.

 

SAX SOC LIMITED

SA Express is not aware of any deal concluded with the said company or person.

TRANSET SOC LIMITED

Transnet is not aware of any empowerment deal that Hernic Ferrochrome and Colin Matjila Matlapeng Resources were involved in, in 2007.

   
       
       
         
       
       

02 July 2018 - NW2141

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Energy

What steps have been or will be taken to address the impact of coal Independent Power Producers (IPPs) on Eskom, in view of the fact that Eskom may have to close certain of its own coal plants early to meet the offtake requirements of the coal IPPs, and even earlier in a low greenhouse gas emission scenario, and will be faced with having to sell electricity at very high prices in circumstances where more and more electricity consumers are defecting from the grid?

Reply:

Eskom is not closing its own coal plants early as a result of offtake requirements of the coal IPPs. Eskom’s policy on the decommissioning of its fleet is informed by an optimal balance of cost efficiencies, reduced capacity and carbon emission considerations. Eskom’s planned decommissioning of the Arnot, Camden, Grootvlei, Hendrina, Komati coal-fired power stations was already projected in the Integrated Resource Plan (IRP) 2010 which indicated that the decommissioned capacity would be replaced by approximately 8 800MW new Coal Generation capacity through Kusile and Medupi. The efficiency of Eskom’s older coal-fired power plants have deteriorated rapidly and these plants cost substantially more to operate, resulting in a spill-over into tariff increases.

Standard impact mitigation measures at a local and regional level can be planned on the basis of Paris Agreement and OECD just transition principles which are largely based on the International Labour Organisation (ILO) just transition guidelines.

Government’s energy policy is, among others, premised on a balanced energy mix recognizing our country’s natural endowment of energy carriers, including coal., Government’s policy also supports techno-economic solutions for power production from environmentally hazardous discard coal stock-piled over years above ground. Notably, one such solution is presented by one of the coal IPP projects as a first of kind in South Africa.

Government’s policy position to reduce carbon emissions as well as continue with the new build coal plants, contained in its 2015 submitted Nationally Determined Contributions, remains unchanged.

Approved / Not Approved

Mr J T Radebe, MP

Minister of Energy

Date:

02 July 2018 - NW1332

Profile picture: James, Ms LV

James, Ms LV to ask the Minister of Health

Whether he has put any mechanisms in place to address the rising number of medical legal claims?

Reply:

Yes.

Medico-legal Workshop

A Medico-legal Workshop was held in Pretoria on the 13th January 2015 to look at medico-legal claims. The workshop looked at the following issues:

  • Patient safety;
  • The impact of medico-legal litigation on the recruitment of specialists and on access to care in South Africa;
  • Management of claims; and
  • Ensuring access to justice for patients harmed.

This workshop culminated in the Medico-Legal Summit which was held on 09 -10 March 2015.

Medico-legal Summit

The Medico-Legal Summit was attended by various stakeholders which included medical and legal personnel (public and private sectors); private and public health establishments (hospitals) and the World Health Organisation among others. The Medico-Legal Summit came up with the Medico-Legal Declaration. The Declaration recommended interventions in 3 areas namely: medical (patient safety), administration and legal solutions.

1. Medical Solution (Patient Safety) - This is aimed at reducing the incidences of the negligence, medical malpractice or unethical behaviour and adverse events amongst others.

2. Administrative Solution - This strives to ensure proper record keeping that will minimize the loss or theft of medical records and proper communication with patients and members of the public.

3. Legal Solution - This looks at various legal interventions including but not limited to mediation; contingency fees; the common law rule of “once and for all”; the periodic or staggered payment instead of a lump sum payment.

Medical Solution (Patient Safety)

In implementing the Medical solution (Patient Safety), the following interventions are being implemented:

(a) Ensuring that there is a Patient Experience of Care;

(b) Ensuring that there is Patient Safety Incident and Reporting, Complaints and Compliments Guidelines;

(c) The Office of Health Standards Compliance and the Health Ombud are also critical role players on the compliance with norms and standards for the provision of health services in South Africa;

(d) Ensuring that there are also Committees on Confidential Enquiries into Maternal, Neonatal and Under 5 Deaths; and

Administration

In implementing the Administrative solution, the Department has started with the following interventions:

(a) Improvement of Filing and record systems (from manual record keeping to electronic filling and record keeping);

(b) Patient Record Management;

(c) Patient Registers; and

(d) Health Patient Registration System.

Legal

In implementing the Legal solution, the Department with the assistance of Department of Justice and Constitutional Development is currently busy with the following interventions:

(a) The South African Law Reform Commission (SALRC) under Project 141 – Medico-Legal Claims has undertaken an investigation on various interventions such as mediation; contingency fees; the common law rule of “once and for all”; the periodic or staggered payment instead of a lump sum payment among others. These investigations will lead to legislative reform. In this regard, the SALRC had issued the Issue paper calling for public comments. The closing date was 30 September 2017.

(b) The Department of Justice and Constitutional Development is also introducing the State Liability Amendment Bill, 2018 to introduce periodic or staggered payment of claims instead of a lump sum payment. The State Liability Amendment Bill, 2018 is to provide for the periodic payments instead of lump sum as it is currently and the treatment of Medico-Legal claimants to be provided for in the public sector facilities (Hospitals), free of charge.

The National Health Council (“MinMEC”) passed a resolution to standardize the patient admission forms across Provinces to also include language that allow for mediation as the first compulsory step for resolution of Medico-Legal disputes. This is done with the assistance of the Department of Justice and Constitutional Development (Judge Cassim Sardiwalla and the State Attorney).

END.

02 July 2018 - NW2150

Profile picture: Khawula, Ms MS

Khawula, Ms MS to ask the Minister of Energy

What are the (a) Government and (b) relevant entities projected to spend both directly and indirectly on the Renewable Energy Independent Power Producer Programmes; (2) has he found that the Government and the entities can afford the cost; if so, what are the details of how this was determined?

Reply:

There is no direct or indirect spend by Government or relevant entities exclusively attributable to the Electricity Regulation Act, 2006, Section 34 sanctioned Renewable Energy Independent Power Producer Programme (REIPPPP). Regulation 10 of the New Generation Regulations enable Eskom, as the single buyer, to recover all costs in respect of the Section 34 Ministerial Determinations and includes payments for the purchase of electricity from Independent Power Producers (IPP) in terms of a power purchase agreement. Eskom only pays for actual electricity evacuated into the grid at a predetermined fixed price that can only escalate by CPI annually.

Approved / Not Approved

Mr J T Radebe, MP

Minister of Energy

Date:

02 July 2018 - NW2185

Profile picture: Carter, Ms D

Carter, Ms D to ask the Minister of Justice and Correctional Services

What is the current status of a certain person (name and details furnished) in his department, who was found guilty of rape, bribery and defeating the ends of justice?

Reply:

The official is on suspension. He was suspended on 08 June 2018, the disciplinary hearing is scheduled for 28-29 June 2018.

02 July 2018 - NW2143

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Energy

Whether he is aware of the development fee to be paid by Independent Power Producers (IPPs) to the National Treasury and to his department in order to set up the Project Development Fund for Baseload Coal Energy (details furnished); if so, what is the (a) total amount in Rand of the development fee and (b) breakdown of all costs that (i) have been incurred and (ii) will be incurred by his department for the procurement of energy from IPPs?

Reply:

(A) The development fee of the Baseload Coal Independent Power Producers Procurement Programme has been set in the Request for Proposals (RFP) (December 2015) at 1.75% of the Total Project Value. The development fee is utilised as a cost recovery mechanism for costs incurred in the design, development, procurement and implementation over a 30-year contract term. The exact Rand value of the Development Fee can only be calculated once all the preferred bidders have reached Financial Close.

Approved / Not Approved

Mr J T Radebe, MP

Minister of Energy

Date:

02 July 2018 - NW1621

Profile picture: Kopane, Ms SP

Kopane, Ms SP to ask the Minister of Health

(1)(a) What is the total number of doctors who are currently registered with the Health Professions Council of SA, (b) of the specified total number of doctors, what number of doctors are (i) practising in (i) each province and (ii) outside the borders of the country and (c) what is the name of each country that the doctors are practising in; (2) whether any of the specified doctors are facing (a) disciplinary hearings and/or (b) criminal charges; if so, what are the relevant details in each case?

Reply:

(1) (a) There are 50 538 doctors (Medical and dental) on the HPCSA register.

(b) (i) The following table reflects the details in this regard.

Province

No. of Doctors in Province

Eastern Cape

3494

Free State

2102

Gauteng

18062

KwaZulu Natal

8747

Limpopo

1976

Mpumalanga

2001

North West

1614

Northern Cape

775

Western Cape

11765

TOTAL

50538

(ii) The HPCSA does not keep a register/record of practitioners leaving the country to practice elsewhere.

(2) (a) Total number of doctors facing disciplinary hearing are as follows:

  • Preliminary- 1523
  • Professional Conduct – 418

PRELIMINARY

TYPE OF OFFENCE

MEDICAL AND DENTAL

Unethical Advertising

2

Incompetence

607

Over servicing

13

Breach of confidentiality

20

Damaging Professional Reputation of Colleague

12

Insufficient Care/Treatment & Mismanagement of Patients

263

Negligence

2

Unacceptable/Inappropriate Relationship with Patients

25

Refusing to treat patients

53

Misdiagnosis

0

Practicing Outside Scope of competence

0

Fraudulent Certificates/Incorrect Information on Death Certificates

95

Refusing to complete forms / producing inaccurate reports

74

Overcharging / charging for Services not Rendered

56

Issues relating to Consent

23

Fraud and theft

77

Bringing the Professions into disrepute

25

Employing unregistered practitioners

0

Unethical dispensing, using of unregistered medicine and prescribing of drugs

5

Contempt of Council

0

Supersession / Contravening the Hazardous Substances Act, 1973

37

Incorrect Accounts

49

Bad Communication

27

Touting

5

Expose patients to danger

40

Section 51

2

Practicing without registration

11

TOTAL

1523

 

PROFESSIONAL CONDUCT CASES FOR PROSECUTION

TYPE OF OFFENCE

MEDICAL AND DENTAL

Unethical Advertising

4

Incompetence

51

Breach of confidentiality

1

Insufficient Care/Treatment & Mismanagement of Patients

58

Negligence

98

Unacceptable/Inappropriate Relationship with Patients

18

Refusing to treat patients

4

Misdiagnosis

4

Practicing Outside Scope of competence

14

Fraudulent Certificates/Incorrect Information on Death Certificates

16

Refusing to complete forms / producing inaccurate reports

6

Overcharging / charging for Services not Rendered

40

Issues relating to Consent

14

Fraud and theft

52

Bringing the Professions into disrepute

7

Employing unregistered practitioners

6

Unethical dispensing, using of unregistered medicine and prescribing of drugs

2

Contempt of Council

15

Practicing without registration

8

TOTAL

418

(b) This is a matter for South African Police Services

END.

02 July 2018 - NW2149

Profile picture: Khawula, Ms MS

Khawula, Ms MS to ask the Minister of Energy

Whether any studies regarding (a) costs and (b) feasibility were conducted before signing any of the Renewable Energy Independent Power Producer Programme (REIPPP) deals; if not, (i) why not and (ii) on what grounds and basis were the REIPPPs pursued; if so, (aa) was each study published, (bb) who conducted each study, (cc) was a tender issued to conduct each study, (dd) what was the cost of conducting each study, (ee) what is the title of each study and (ff) where are the copies of the studies available?

Reply:

Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) projects are procured and contracted pursuant to Ministerial Determinations issued by the Minister of Energy, in consultation with the National Energy Regulator of South Africa (NERSA) in terms of Section 34 of the Electricity Regulation Act, No 4 of 2006. Considerations include issues of carbon emission reduction commitments, new technology uncertainties such as costs, operability and lead time to build, water usage, localisation and job creation as well as regional development and integration and security of supply.

Each Independent Power Producer (IPP) participating in the tender process is responsible to undertaking a feasibility of its own project before bid submission to ensure the bankability of the project. At bid submission the IPPs have to comply with various qualification criteria which can only be complied with if they did undertake feasibility studies.

Approved / Not Approved

Mr J T Radebe, MP

Minister of Energy

Date:

02 July 2018 - NW1305

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Public Enterprises

(a) Whether he has been informed of the 12 Transnet Employees at the Ngqura Container Terminal in Port Elizabeth (names furnished), who were unfairly dismissed after lodging grievances against their supervisor (name furnished), who had continuously victimised and abused them racially; if not, what is the position in this regard; if so, what has he done to ensure that (a) the 12 former employees get re-employed, (b) the grievances were investigated and (c) unfair dismissal investigated?

Reply:

This response is according to information received from Transnet:

(a) The 12 Employees who were dismissed were charged with insubordination, underwent formal disciplinary process, were found guilty and dismissed. At no point were victimization and racism cited during their disciplinary process. The matter followed proper employment law processes and has even been referred to the labour court.

(b) There is currently no suggestion that the employees were unfairly dismissed and at all appeal processed outside the Company, the Company decision has been upheld.

(c) At all material times, the employees have appealed for re-employment but at no time have they ever raised allegations of victimization or racial abuse as reason for dismissal.

02 July 2018 - NW2152

Profile picture: Ketabahle, Ms V

Ketabahle, Ms V to ask the Minister of Energy

How much less electricity will Eskom be required to produce because of the approval of the bids of Independent Power Producers by his department?

Reply:

Eskom is not required to produce less electricity as a consequence of Independent Power Producers. Eskom’s policy on the decommissioning of its fleet is informed by an optimal balance of cost efficiencies, reduced capacity and carbon emission considerations. Eskom’s planned decommissioning of the Arnot, Camden, Grootvlei, Hendrina, Komati coal-fired power stations was already projected in the Integrated Resource Plan (IRP) 2010 which indicated that the decommissioned capacity would be replaced by approximately 8 800MW new Coal Generation capacity through Kusile and Medupi. The Wind and Solar Photovoltaic technologies introduced through the renewable energy programme do not displace coal-fired power stations as these technologies do not provide base load capacity.

Approved / Not Approved

Mr J T Radebe, MP

Minister of Energy

Date:

02 July 2018 - NW2047

Profile picture: Esterhuizen, Mr JA

Esterhuizen, Mr JA to ask the Minister of Energy

With reference to the cost of (a) Medupi that stands at R86.5 billion from R49.8 billion and (b) Kusile that stands at R83 billion from R57 billion but neither of which are near completion, what are the reasons that Eskom’s finance cost for the current financial year has increased with 82% whereas the specified amount excludes all the capitalised finance cost for work construction, like Medupi, Kusile and all other projects that are still under construction?

Reply:

I wish to inform the Member that it is not part of the mandate of the Department of Energy to build power stations such as Medupi and Kusile.

Approved / Not Approved

Mr J T Radebe, MP

Minister of Energy

Date:

29 June 2018 - NW2111

Profile picture: Marais, Mr S

Marais, Mr S to ask the Minister of Defence and Military Veterans

(a) What is the level of medical stock in the pharmacy at 1 Military Hospital, (b) why has this very important indicator been removed by her department and (c) what is the direct impact of the medical stock level on soldiers and military veterans?

Reply:

(1)(a) What is the level of medical stock in the pharmacy at 1 Military Hospital,

Pharmaceuticals and medical consumables for emergencies and life-threatening situations are fully stocked and available at 1 Military Hospital. The medical stock levels at the 1 Military Hospital pharmacy stands at 75%. The stock levels should improve to 85% by the first week in July when more deliveries of stock are expected. Some challenges are experienced with the suppliers of pharmaceuticals at a national level.

(b) Why has this very important indicator been removed by her department and

The performance indicator that refers to the stock levels of pharmaceuticals and medical consumables has not been removed by the department. A decision was made to register the performance indicator as classified as stock levels are regarded as sensitive strategic information.

(c) What is the direct impact of the medical stock level on soldiers and military veterans?

The impact of medical stock levels is minimised by alternative arrangements such as the buying-out of medication that is not available in the SA Military Health Service. There is thus no direct impact on soldiers and military veterans, except the increased cost to the Department of Defence of the buy-out from private pharmacies.

29 June 2018 - NW327

Profile picture: Dreyer, Ms AM

Dreyer, Ms AM to ask the Minister in the Presidency

What amount did (a) his Office and (b) each entity reporting to him spend on the promotion or celebration of the Year of O R Tambo on the (i) Africa News Network 7 channel, (ii) SA Broadcasting Corporation (aa) television channels and (bb) radio stations, (iii) national commercial radio stations and (iv) community (aa) television and (bb) radio stations since 1 January 2017?

Reply:

The Department of Planning, Monitoring and Evaluation (DPME) did not spend money for the OR Tambo campaign

   

Approved

Not

Approved

Approved

as amended

   

Comment:

Dr NC Dlamini-Zuma

Minister in the Presidency: Planning Monitoring and Evaluation

   

Date:

   

29 June 2018 - NW2135

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Transport

With reference to the statistics generated during the Easter period in 2018, (a) what road campaigns took place (i) leading up to, (ii) during and (iii) after the specified period, (b) what were the objectives of each campaign in each province, (c) were the objectives met, (d) how was this measured, (e) where did each campaign take place, (f) to whom were the campaigns targeted and (g) what amount was spent on each campaign in each province?

Reply:

a) (i)      The following campaigns were undertaken leading up to Easter :

Driver workshops – road safety education workshop was conducted among drivers of major bus companies that were scheduled to transport people to different places of pilgrimageThe emphasis of the workshop was on fatigue management, pre-trip inspections, safe vehicles, impaired driving as well as reckless driving. Drivers were exposed to public transport accident scene that took place during the 2017 Easter Period. The Department of Health and the Road Accident Fund provided information on issues related to health fitness and wellbeing.

 

Road Awareness at institutions - road safety awareness activities were undertaken at churches, Taxi Ranks, Schools, places of entertainment, as well as filling stations along the major routes.  The purpose of the awareness activities was to increase knowledge and skills among travellers in relation to vehicle safety, overloading of passengers and goods, as well as substance abuse. Road safety officials were deployed at various transport public hubs which were known to be congested during Easter period as a result of travellers to raise awareness about safety on the roads.

Pedestrian Awareness - heightened pedestrian awareness activities were undertaken in areas, which are identified as hazardous locations. The focuses of the pedestrian activity were primarily on visibility, the safe crossing of roads, impaired walking as well as jay-walking.

 Youth road safety - Young people are largest group involved in reckless and negligent driving due to their attitudes towards safe road usage.  Road safety education campaigns were undertaken leading up to Easter at institutions of higher learning and the focus was on impaired walking and driving, dangerous walking and pedestrian visibility.

  

The activities were supported by a strong media campaign that included interviews and social media activations.

 (ii)     The following campaigns were undertaken during the Easter period:

  • Intensified law enforcement operations by national, provincial and local traffic authorities took place during the Easter period focussing inter alia on speed management, drunken driving, reckless and negligent driving, overloading, vehicle roadworthiness and cross-border operations.
  • Road safety education activities were staged on all routes that were identified.
  • Radio and television interviews were conducted on local, regional and national stations throughout the period to sustain the messages on safe Easter travel. Social media interactions were also intensified to reach young travellers.

(iii)   The following campaigns were undertaken after the Easter period:

Media interactions continued after the Easter period on all the platforms including TV and road interviews and social media platforms. The campaigns continued over the Worker’s day (May 1)  long weekend.

(b)     The objectives of the campaigns were to reduce fatalities on the identified hazardous routes and improve road user behaviour.

(c)       There was a reduction in crashes on identified hazardous routes however new hazardous routes emerged in other areas. The number of passenger fatalities were reduced although pedestrian fatalities increased suggesting that more work is still required.

(d)    This was measured by analyzing crashes and fatalities and comparing the outcome to the similar period in the previous years.

(e)    The campaigns took place at churches, institutions of higher learning, taxi ranks, halfway station along major routes, premises of major bus operators, on the roads in the form of roadblocks and on various media platforms.

(f)     The campaigns were targeted at drivers of public transport vehicles, passengers, pedestrians, the youth and faith-based organisations.

(g)   The campaigns were undertaken with approved operational budgets of provincial departments and municipalities.

 

29 June 2018 - NW705

Profile picture: Stander, Ms T

Stander, Ms T to ask the Minister of Basic Education

(1)Whether her department has a sexual harassment and assault policy in place; if not, (a) why not and (b) by what date will her department have such a policy in place; if so, (i) how are reports investigated and (ii) what are the details of the consequence management and sanctions stipulated by the policy; (2) (a) what is the total number of incidents of sexual harassment and assault that have been reported in her department (i) in each of the past three financial years and (ii) since 1 April 2017, (b) what number of cases were (i) opened and concluded, (ii) withdrawn and (iii) remain open based on the incidents and (c) what sanctions were issued for each person who was found to have been guilty?

Reply:

  1. (a) Yes, the Department of Basic Education has a sexual harassment and assault policy in place.

(b) (i) The policy has been in place since 2014. The policy stipulates the procedure which should be followed in the reporting and investigation of allegations of sexual harassment in the Department. Clauses 19.1 to 19.3 of the policy provide a detailed procedure that must be followed in the investigation of alleged reports of sexual harassment. The procedure includes both formal and informal investigation. The formal procedure involves the following:

  • The sexual harassment complaint must be reported to the Director-General or the Sexual Harassment Advisor in writing and the statement must include:

(i) The name of the respondent;

(ii) Date when the incident occurred;

(iii) Where it occurred; and

(iv) Details of how the actual sexual harassment occurred.

(ii) In the event where the grievance procedure has been finalised, and management is of the view that there is a prima facie case against the respondent, disciplinary steps must be instituted as per the provisions of the Disciplinary Code and Procedure in the Public Service (PSCBC Resolution 1 of 2003 read with Chapter 7 of SMS Handbook).

The sanctions provided in clause 19.4 of the policy include, should the respondent be found guilty of the offence: a) Counselling, b) Verbal warning, c) Final written warning, d) suspension/fine, e) demotion or f) dismissal.

If the Director-General is the perpetrator, the Executive Authority becomes the authority that appoints the Sexual Harassment Advisor and makes decisions on the case. Once the Sexual Harassment Advisor has been appointed, all terms and procedures set out in the policy for subsequent action shall apply without exception, read with the necessary changes.

A complainant of sexual harassment has the right to press separate criminal charges and/or civil claims against the respondent if they so wish. The legal rights of the complainant are in no way limited by the DBE policy.

2. (a) (i) Financial years 2014/15 to 2016/17: No incidents of sexual harassment and assault reported.

(ii) Since April 2017: No incidents of sexual harassment and assault reported.

(b)(i) Not applicable. No cases reported.

(ii) Not applicable. No cases reported.

(iii) Not applicable. No cases reported.

(c) Not applicable. No cases reported.

29 June 2018 - NW1960

Profile picture: Khawula, Mr M

Khawula, Mr M to ask the Minister of Economic Development

Whether the Competition Commission is investigating collusion, price fixing and/or uncompetitive behaviour by fuel suppliers (details furnished); if not, what is the position in this regard; if so, what are the further relevant details?

Reply:

The Competition Commission is investigating a number of cases of collusion and other uncompetitive behaviour in different sectors. However, as a matter of policy, the Competition Commission does not disclose which sectors it is currently investigating nor which sectors it is not investigating, unless such disclosure is warranted and in the public interest. Disclosing such detail may risk compromising any current or potential future investigation if prematurely released.

-END-

29 June 2018 - NW2020

Profile picture: Mhlongo, Mr TW

Mhlongo, Mr TW to ask the Minister of Higher Education and Training

(1)What are the details of the (a) number of accidents that vehicles owned by her department were involved (i) in each of the past three financial years and (ii) since 1 April 2018, (b) cost for repairs in each case and (c)(i) number of and (ii) reasons for vehicles being written off in each case; (2) whether all vehicles owned by her department have tracking devices installed?

Reply:

(a) (i) In the 2015/16 financial year, one vehicle was involved in a major accident and written off.

In the 2016/17 financial year, one vehicle was involved in a major accident and written off.

In the 2017/18 financial year, five vehicles were involved in minor accidents.

(ii) No accidents have been reported since 1 April 2018 to date.

(b) The table below shows the total repair costs for each of the five vehicles involved in minor accidents in the 2017/18 financial year.

Vehicle Make

Registration

Cost for Repairs

1. Toyota Condor

RYJ 186 GP

R 18 129.25

2. Toyota Corolla

FXN 411 EC

R 16 210. 00

3. BMW 335 GT

FF 18 RB GP

R 51 235.69

4. Mercedes Benz E 200

BB 36 GR GP

R 7 008.25

5. Toyota Corolla

BV 60 ZZ GP

R 4 111.82

Total

R 96 695.01

(c) (i) Two vehicles, i.e. VW Polo models with registration numbers DN 35 DP GP and DN 35 DL GP, were written off respectively in the 2015/16 and 2016/17 financial years.

(ii) The vehicles were damaged beyond repairs.

2. The Director-General has approved the installation of tracking devices, and the process is at the implementation phase.

29 June 2018 - NW1084

Profile picture: Mhlongo, Mr P

Mhlongo, Mr P to ask the Minister of Defence and Military Veterans

(1)Whether, with reference to her reply to question 579 on 10 April 2018, any assessment or investigation by the Military Psychological Institute or Management Renewal Services confirmed that a certain person (name furnished) was the cause of the unhealthy work environment; if not, what is the position in this regard; if so, what are the relevant details; (2) was there any suggested intervention or recommendation; if so, what are the details of the suggested interventions; (3) was one of the recommendations that the specified person be assigned an executive coach; if so, (a) who was the executive coach, (b) did the coach give a report and (c) what did the coach recommend; (4) whether she has found that the Internal Audit Division and the Secretary of Defence came to the same conclusion at any time of engaging with the unit?

Reply:

(1) The assessment by Military Psychological Institute (MPI) and the South African Air Force’s Directorate Management and Renewal Service (DM&RS) did not make its findings on an individual, however conducted an organisational diagnosis on the entire Division. The assessment’s findings were far reaching ranging from strategy and purpose, structure, rewards and recognitions, helping mechanism, relationships, leadership, and external environment.

(2) The following recommendations were recommended by the MPI intervention:

a. It was recommended that the CAE works with an executive coach of senior status.

b. A strategic planning session needs to be conducted, followed by the implementation of a supportive organisational structure and culture.

c. The CAE should operate in a more strategic and functional capacity and focus on intern development, project output and quality control.

d. Staffing of critical positions to avoid staff burnout.

e. The appointment of Divisional Chief of Staff to act as a link between the Divisional Head and staff members.

f. All members (including the CAE and her management team) should be given the opportunity to see a clinical psychologist to debrief.

(3) Yes, one of the recommendations was that the CAE works with an executive coach.

(a) Prof Frans Cilliers, Phd, an Industrial & Organisational Psychologist from the University of South Africa was appointed as an executive coach.

(b) The executive coach gave a report on his coaching task.

(c) The Department is still processing the report of the executive coach.

(4) The department is still processing the various intervention reports for recommendation of the way forward to the Minister of Defence and Military Veterans. The matter is therefore not yet concluded.

29 June 2018 - NW1655

Profile picture: Schmidt, Adv H

Schmidt, Adv H to ask the Minister of Justice and Correctional Services

(a) What number of cases relating to the Prevention and Combating of Corrupt Activities Act, Act 12 of 2004, as amended, have been referred to the (i) SA Police Service (SAPS) and (ii) Directorate for Priority Crime Investigation (DPCI) by (aa) his department and (bb) each entity reporting to him for further investigation since the Act was assented to and (b) what number of the specified cases have (i) been investigated by SAPS and DPCI, (ii) been followed up by the respective accounting officers and (iii) resulted in a conviction in each specified financial year since 2004?

Reply:

(aa) According to information kept by the Forensic Audit Unit (FAU), the statistics being provided are from 2005 until 2018. However, only few records for the years 2005 – 2009 could be retrieved and provided. The statistics for the year 2007 and 2010 could not be retrieved at all.

The FAU then provided the statistics for the years 2011 – 2018 with the exception of those cases that were referred to the South African Police Service (SAPS) and those that were referred to the Directorate for Priority Crime Investigation (DPCI). All the statistics for the years 2005 - 2009 were largely stated as only being referred to the SAPS.

The presentation of the statistics was done in four categories to indicate (i) successful prosecution (ii) Withdrawn and closed by either the SAPS or DPCI (iii) Feedback not being provided by (in most cases the SAPS) despite several efforts trying to contact them and (iv) Investigation is still in progress and further update was never provided.

It must be noted that there has been and still is a problem as far as the communication between the SAPS and those directorates in the Department of Justice & Constitutional Development to obtain the feedback on all the matters/cases referred to the SAPS. It appeared to be a bit effective between the DPCI and the directorates of the Department to provide feedback on the matters/cases referred to the DPCI.

The table representing the statistics of the cases referred to either the SAPS or DPCI (or both) for the years 2005 until 2018 (excluding 2007 and 2010):

Financial Year

Number of cases reported to SAPS/DPCI

South African Police Service (SAPS)

Directorate for Priority Crime Investigation (DPCI)

2005

5

(i) Three (3) successful prosecution

(ii) Two (2) feedback never provided

0

2006

6

(iii) Six (6) feedback never provided

0

2008

4

0

  1. Four (4) closed by the commercial crime

2009

5

(i) One (1) successful prosecution

(iii) Four (4) feedback never provided

0

2011

3

(iv) One (1) still being investigated

  1. Two (2) further update was never provided.

2012

3

(i) One (1) successful prosecution

(ii) One (1) withdrawn

(iii) One (1) feedback never provided

0

2013

8

(i) One (1) successful prosecution

(iv) Five (5) investigation still in progress

  1. Two (2) investigation still in progress

2014

15

(i) Four (4) successful prosecution

(ii) One (1) withdrawn

(iii) Three (3) feedback never provided

(iv) One (1) investigation still in progress

  1. Two (2) successful prosecution
  1. Two (2)withdrawn
  1. Two (2) investigation still in progress

2015

27

(i) Three (3) successful prosecution

(ii) Five (5) withdrawn

(iii) Seven (7) feedback never provided

(iv) Ten (10) investigation still in progress

  1. Two (2) investigation still in progress

2016

13

(i) Four (4) successful prosecution

(iii) Three (3) feedback never provided

(iv) Six (6) investigation still in progress

0

2017

25

(i) One (1) successful prosecution

(ii) Five (5) withdrawn

(iii) Two (2) feedback never provided

(iv) Seven (7) investigation still in progress

  1. One (1) successful prosecution
  1. Three (3) withdrawn
  1. Six (6) investigation still in progress

2018

16

(i) One (1) successful prosecution

(ii) Two (2) withdrawn

(iv) Eleven (11) investigation still in progress

  1. Two (2) investigation still in progress

The Honourable Member should kindly note that all the category of cases that are being reflected as “investigation still in progress” on the above table, is due to unavailability of case dockets in certain instances and also the fact that the key officers could not be located within the Law Enforcement Agencies. These cases are still kept open even though they are more than three (3) years old, due to the fact that the Law Enforcement Agencies are of the view that evidence may still come to light.

(bb) The entities reporting to me have reported as follows:

A. National Prosecuting Authority: Questions (a)(i); (ii); and (b)(i) are not applicable to the NPA.

(b)(ii) The table below indicates the number of cases investigated by the Integrity Management Unit within the NPA which were referred to diferrent Agencies within the Justice Cluster since 2012.

Agency

No. of cases

SAPS

12

SCCU

1

DPP offices

3

Hawks

4

ACTT

1

IPID

1

Magistrates Commission

1

The table below indicates the number of matters referred to the Labour Unit within the NPA involving officials for dishonesty/corruption, the number of officials dismissed as well as matters that were referred by the Unit to the SAPS since 2012.

Number of disciplinary actions

Number of Officials Dismissed

Number of matters referred to the SAPS

28

20

26

(b)(iii) The table below indicates the number of officials convicted from the various Departments within the Justice Cluster. The corruption was measured only since 2011 and no data is available to include before the 2011/2012 financial years.

Financial Year

Total Convicted

DoJ&CD Cluster

DoJ&CD

JUDICIARY

LASA

NPA

2011/12

9

5

1

1

2

2012/13

18

16

0

0

2

2013/14

17

16

0

0

1

2014/15

11

8

0

0

3

Grand Total

55

45

1

1

8

Since the financial year 2015/16 the reporting template of the NPA was altered without differentiating between specific Departments. Apart from NPA, information pertaining to other Departments was not measured separately. The only information that is available consists of the number of officials from the NPA convicted of corruption since 2015/16 as indicated on the table below:

FINANCIAL YEAR

NPA

2015/16

0

2016/17

3

2017/18

4

Grand Total

7

B. Legal Aid South Africa: Legal Aid SA has not referred any cases relating to the Prevention and Combating of Corrupt Activities Act, Act 12 of 2004, as amended to the (i) SA Police Service (SAPS) and (ii) Directorate for Priority Crime Investigation (DPCI) for further investigation since the Act was assented to.

C. Special Investigating Unit: The table below provides details of the SIU’s response:

ACHIEVEMENTS FROM INCEPTION TO DATE

 

2005/6

2006/7

2007/8

2008/9

2009/10

2010/11

2011/12

2012/13

2013/14

2014/15

Total

Total Cases Referred

632

2 675

4 204

3 930

3 797

2 809

2 213

865

170

-

21 295

Convictions

355

2 215

3 625

3 605

3 345

2 477

2 258

855

-

-

18 735

29 June 2018 - NW1972

Profile picture: Steenkamp, Ms J

Steenkamp, Ms J to ask the Minister of Environmental Affairs

On what date (a) was a certain report (details furnished) given to her, and (b) will the report be made public?

Reply:

a) The report was received on 09 April 2018.

b) The report will be released as soon as the process of developing a policy response to key policy messages as contained in the report has been finalised. Such requires consultation with affected sector departments, provincial conservation authorities and relevant stakeholders. However, there is a special publication on the African Biodiversity and Conservation Journal (open access) titled “Contributions to the National Status Report on Biological Invasions in South Africa” consisting of various scientific papers that informed the development of the status report.

---ooOoo---

29 June 2018 - NW1751

Profile picture: Bozzoli, Prof B

Bozzoli, Prof B to ask the Minister of Higher Education and Training

With regard to the policy on the Minimum Norms and Standards for Student Housing at Public Universities published in the Government Gazette Notice: R.897 on 29 September 2015, did any council of a public university (a) fail to submit approved plans and strategies for the phasing in of the minimum norms and standards in terms of its existing stock to her department by June 2016 as per section 12(a), and (b) fail to report the level of compliance with student housing minimum norms and standards in the annual report of the specified university as per section 11(c)?

Reply:

a) Only the University of Johannesburg submitted an approved plan and strategy for the phasing in of the minimum norms and standards by June 2016. The Department is developing a process to monitor compliance as part of its implementation of the new Macro Infrastructure Framework (MIF). Universities will be required to upload relevant policy documents, plans and reports on the MIF.

b) 14 Universities reported on their level of compliance with the norms and standards on student housing and 11 universities reported on their student housing target achievements but did not specify their compliance to the norms and standards on student housing. The University of South Africa was not required to report on student housing as it is a distance education institution.

29 June 2018 - NW1800

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Environmental Affairs

What (a) number of air quality monitoring stations (i) exist in Ethekwini Municipality and (ii) are fully operational, (b) steps have been taken to date to ensure the full functionality of all the stations and (c) plans are in place going forward to address the functionality of all the stations?

Reply:

(a) (i) EThekwini Municipality has a total number of:

  • fourteen (14) continuous ambient air quality monitoring stations;
  • ten (10) non-continuous “bubbler SO2” stations; and
  • six (6) Dust Fallout Monitors.

(ii) The non-continuous and dust fallout network are working optimally. However, the continuous monitoring network is ageing and requiring more attention from both an Operational and Capital perspective.

(b) Of the fourteen (14) continuous ambient air quality monitoring stations, nine (9) are fully operational, one (1) has an electricity supply problem at the moment whilst four (4) stations have problems with the NOx analysers. A service provider has recently been appointed to repair, service and calibration of these analysers. In addition, a service provider was awarded the contract to upgrade the Data Acquisition System and ensure that the stations are communicating reporting information online. Capital Funding has been made available in the 2018/2019 financial year to commence the replacement process.

The Department of Environmental Affairs (DEA) has initiated a project of establishing the new South African National Air Quality Indicator (NAQI) stations across the country. In this program, four (4) stations from eThekwini Metropolitan Municipality located at City Hall, Ganges, Settlers and Southern Works were identified as suitable stations to be utilised for the reporting of the NAQI. DEA has appointed a service provider to assist with implementation of this project over a period of five (5) years of which the four (4) stations listed above form part of this project. Some of the activities to be undertaken by the service is to carry out activities relating to this project which include, but are not limited to the following:

  • Installation and commissioning of new PM10, PM2.5 and SO2 instruments;
  • The assessment of the NAQI stations;
  • Development of an Air Quality Monitoring Plan;
  • NAQI stations data management and reporting; and
  • Capacity building for handover to network owners.

(c) The Air Quality Management Plan (AQMP) was approved by council during May 2018 together with a Capital and Operational Budget over a five (5) year period commencing on 01 July 2018. This includes a five year capital recommendation to refurbish the entire network over the period of the AQMP.

---ooOoo---

29 June 2018 - NW1929

Profile picture: Ntlangwini, Ms EN

Ntlangwini, Ms EN to ask the Minister of Economic Development

What (a) is the total number of incidents of sexual harassment that were reported to the human resources offices of entities reporting to him in (i) 2016 and (ii) 2017 and (b) are the details of each incident that took place; (2) Was each incident investigated; if not, why not in each case; if so, what were the outcomes of the investigation in each case?

Reply:

I am informed that the Economic Development Department and its entities: the IDC, ITAC, Competition Commission and Competition Tribunal, do not have sexual harassment cases reported during the 2016 and 2017 financial years.

-END-

29 June 2018 - NW1915

Profile picture: Mulaudzi, Adv TE

Mulaudzi, Adv TE to ask the Minister of Justice and Correctional Services

What (a) is the total number of incidents of sexual harassment that were reported to the human resources offices of entities reporting to him in (i) 2016 and (ii) 2017 and (b) are the details of each incident that took place; (2) was each incident investigated; if not, why not in each case; if so, what were the outcomes of the investigation in each case?

Reply:

Department of Justice and Constitutional Development

1. (a) The total number of incidents of sexual harassment that have been reported in the Department of Justice and Constitutional Development, are as follows:

(i) In each of the past two financial years:

(aa) 2016/17                   :       Two (2) cases were reported; and

(bb) 2017/18                   :       Three (3) cases were reported.

(b) The details of each incident that took place are as follows:

(i) Regarding the two (2) cases reported in 2016/17: In one case, the incident involved negative sexual comments and in the second case, the incident involved gestures deemed as unwanted sexual advances.

(ii) Regarding the three (3) cases reported in 2017/2018: In one case, the incident involved negative sexual description of a female colleague, in the second case, the incident involved gestures deemed as unwanted sexual advances and the last case involved statements deemed sexually negative to a colleague.

2. Regarding the investigation and outcomes of each incident, I have been informed as follows:

(a) Regarding the two (2) cases which were reported in 2016/17 financial year, the two (2) cases were investigated and disciplinary hearings were conducted. In the one case, the employee was found guilty and a sanction of suspension without pay was imposed. In the other case, the matter was withdrawn by the Department as there was insufficient evidence.

(b) Regarding the three cases which were reported in 2017/18 financial year, the three (3) cases were investigated. Two cases were withdrawn, with a bilateral settlement relating to one case; the second matter was withdrawn by the Department as there was insufficient evidence and the last case is still pending finalization (not concluded).

(ii) The entities have reported as follows:

A. Legal Aid South Africa:

1. (a) Total number of sexual harassment incidents reported at Legal Aid SA is as follows:

(aa) 2016: zero (0) incidents reported to Human Resources (HR); and

(bb) 2017: one (1) incident reported to HR.

(b) The details regarding the one (1) incident reported in 2017/18 are that the incident involved gestures deemed as unwanted sexual advances.

(2) Regarding the investigation and outcomes of each incident, I have been informed as follows:

Regarding the one case which was reported in 2017/18 financial year, the grievance was thoroughly investigated. The outcome of the investigation confirmed the complaint and that there were sufficient grounds for a formal disciplinary hearing. The employee was afforded an opportunity to make representations as to why he should not be suspended, pending a disciplinary hearing. In response, the employee resigned with immediate effect from the employment of Legal Aid SA. This matter was thus closed internally.

B. National Prosecuting Authority:

1. (aa) 2016: One (1) incident of sexual harassment was reported. However, in paragraph (2) below, the NPA reported on an outcome made in 2016 of an incident that occured in a prior year (2014).

(bb) 2017: One (1) incident was reported.

2. In October 2016, an official from the Office for Witness Protection (OWP) was dismissed for sexual harassment.  While the incident took place in 2014 and was investigated and the disciplinary hearing commenced in 2015,  the appeal process was finalised in September 2016. 

Additional information for 2016:

Allegations of sexual harassment against a prosecutor were reported to Employee Relations in June 2016. The allegations were investigated and it was found that the prosecutor had a case to answer. Formal disciplinary action was recommended, however the NPA did not proceed with formal disciplinary action as the complainant formally withdrew the allegation of sexual harassment against the prosecutor on 7 October 2016. The NPA was informed by her attorney that the allegation has been formally withdrawn and a copy of the formal withdrawal of the allegation was sent to the NPA. The NPA responded to the complainant’s attorney on 14 October 2016 that in light of the formal withdrawal of the allegation against the prosecutor, the NPA will not proceed with disciplinary action against the official. 

 

2017:

The incident of sexual harassment in the Director of Public Prosecutions: Free State region was reported to Labour Relations in October 2017. The matter was investigated and it was found that a District Court Prosecutor made himself guilty of sexual harassment. The complainant reported the matter, however did not want to participate as a witness in a disciplinary hearing. Due to the fact that the complainant was unwilling to testify in the disciplinary hearing, progressive disciplinary action was taken against the offending official. He was served with a Final Written Warning on 31 January 2018. He appealed the Final Written Warning. The Appeal Authority dismissed the appeal  and the matter was finalised on 23 February 2018. 

 

C. Special Investigating Unit:

No incidents of sexual harassment were reported in the SIU in 2016 and 2017.

 

Office of the Chief Justice

1. (a) No incidents of Sexual Harassment were reported to the Human Resource office of the (i) Office of the Chief Justice, (ii) (aa) in 2016 and (bb) 2017.   

2. Not applicable.

 

Department of Correctional Services

3. (a) (i) (ii) (aa) (bb)

REGION

Incidents

2016/2017

2017/2018

Total number of cases reported

4

10

Total  number of cases concluded

1

6

Withdrawn

0

2

 

(1) (b)

2016/2017

REGION

INCIDENT 

SUMMARY OF DETAILON EACH INCIDENT

Free State & Northern Cape

Sexual Harassment

(2016/2017) Nil

Eastern Cape (EC)

Sexual Harrassment East London Maximum

Alleged perpertrator sent a nude picture of an elderly couple by cell-phone to the Area Commissioner during working hours.

Matter was investigated and the decision on 2016-11-14 was to charge the official with sexual harassment. The hearing was concluded on 2016.12.15 and he was sanctioned to suspension without pay for one month.

 

Kwa-Zulu Natal (KZN)

Sexual Harassment

Nil

Limpopo, Mpumalanga, Northern West (LMN)

Sexual Harassment

Barberton

Two female officials alleged that the “ perpetrator” touched them inappropriately. One complainant withdrew the matter in 2017. The case was reported on 12 September 2016 and after two disciplinary sittings case was withdrawn on 28 April 2017. The other allegation was investigated and alleged perpetrator was acquitted in 2017. 

Gauteng

Sexual Harassment

Nil

Western Cape

Sexual Harassment

Southern Cape

An allegation of sexual harassment against an offender was reported. The investigation did not recommended a disciplinary hearing.

 

2017/2018

REGION

INCIDENT

SUMMARY OF DETAIL ON EACH INCIDENT

FC & NC

Sexual Harassment

The alleged perpetrator touched the private parts of an offender. The matter was investigated and the official was formally charge with misconduct. Disciplinary hearing is to follow

EC

Sexual Harassment

Nil

KZN

Sexual Harassment

Durban Westville

Medium A

 

Area Commissioner`s Office

The complainant submitted a statement withdrawing the matter formlly without prejudice. The matter was then regarded a finalized in April 2018

 

Complainant made an allegation of unwelcome verbal advances against the perpetrator in January 2018. Final written warning was recommended but alleged perpetrator refused to accept the sanction. The official will undergo a discipline hearing in June 2018 

LMN

Sexual Harassment

The official (Social worker ) alleged that the alleged perpetrator touched her inappropriately. The matter has not been concluded yet. Mediation has nont been finalized. 

 

 

Gauteng

Sexual Harassment

Nil

WC

 

Sexual Harassment

 

Drakenstein, Goodwood, South Cape

Three from Drakenstein. Breakdown as follows:

One- unwelcome touch and two unwelcome remarks.

 

Goodwood: one unwelcome remarks, touch and lies about sexual life of the complainant.

 

4. Yes, all the incidents were investigated. Outcomes/ sanctions are depicted in the table below:

Incident

201/2017

2017/2018

Sanctions

1

5

Corrective Counselling

0

2

Final Written Warning

0

0

Suspension Without Salary

1

1

Dismissal

0

1

Acquittal

0

1

Other

3 (pending)

Carried over to 2017

3 (pending)

2 disciplinary hearing and 1 mediation to be concluded

29 June 2018 - NW1999

Profile picture: Robinson, Ms D

Robinson, Ms D to ask the Minister of Environmental Affairs

(1)Whether her Department conducted any water quality tests of any water bodies in the Ekurhuleni Metropolitan Municipality (a) in each of the past five financial years and (b) since 01 April 2018; if not, what is the position in this regard; if so, what are the details of the findings in each case; (2) Will she furnish Mrs D Robinson with copies of each report?

Reply:

1. (a) and (b)

The Parliamentary question should be answered by the Department of Water and Sanitation as it does not fall within the mandate of Environmental Affairs.

2. The Parliamentary question should be answered by the Department of Water and Sanitation as it does not fall within the mandate of Environmental Affairs.

---ooOoo---

29 June 2018 - NW1801

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Environmental Affairs

(a)Will she undertake an investigation into the neglect of Clivia plants by Customs officials at the OR Tambo International Airport due to their large value, (b) what immediate steps can be taken to ensure that (i) clearance procedures for these Clivia plants can be expedited and (ii) due diligence is practiced when these plants are being held in Customs to ensure their wellbeing, (c) can she give any assurance to breeders attending the International Conference of Clivia Breeders taking place in South Africa in September 2018, that their Clivia plants will be treated with the necessary care in Customs and (d) what recourse do plant breeders have when an entire consignment is lost due to neglect at Customs?

Reply:

a) Environmental Management Inspectors (EMIs) of the Department of Environmental Affairs investigates non-compliance with Regulations under the National Environmental Management: Biodiversity Act and the National Environmental Management: Protected Areas Act such as the Threatened or Protected Species Regulations (ToPS) and the Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES). The department has not been informed of the neglect of Clivia plants by Customs officials at OR Tambo International Airport. Please note that only one Clivia species, namely Clivia mirabilis or "Oorlogskloof" Bush Lily is listed on ToPS as protected. If the plants which were neglected by Customs at OR Tambo International have been identified as Clivia mirabilis then the departmental EMIs can investigate what has transpired and why the plants were neglected.

b) As indicated above, the Department of Environmental Affairs is responsible for the regulation of restricted activities relating to species listed under, among others, ToPS and CITES. The South African Revenue Service (SARS) Customs and Excise is the only body which can clear goods being imported into the country. You will thus need to request SARS Customs and Excise to assist with (i) clearance procedures for these Clivia plants and to ensure that (ii) due diligence is practised to ensure their well-being when these plants are being held in the Customs area.

c) It is not possible for the department to give any assurance to breeders attending the International Conference of Clivia Breeders taking place in South Africa in September 2018, that their Clivia plants will be treated with the necessary care by Customs. This request needs to be made to SARS Customs and the Department of Finance.

d) Similarly, the question would need to be referred to SARS Customs and the Department of Finance in relation to any recourse that plant breeders may have if an entire consignment is lost due to neglect at Customs.

---ooOoo---

29 June 2018 - NW2055

Profile picture: Alberts, Mr ADW

Alberts, Mr ADW to ask the Minister of Transport

(1)Whether he has found, in light of the rule that a registered motor vehicle owner may appoint an agent to administer and pay road traffic fines and also formally granted such powers in terms of the National Road Traffic Act, Act 93 of 1996, the Administrative Adjudication of Road Traffic Offenses Act (AARTO), Act 46 of 1998, and the Electronic National Administration Traffic Information System (eNatis), that external road traffic service providers acting on behalf of local governments can also depend on such law prescripts to forward fines and relevant notices to the owners instead of these legally appointed agents; if not, (3) whether he will create legal certainty so that motor vehicle owners can rely on their legally appointed agents to do the necessary administration and payments with regard to road traffic fines; if so, (4) whether he will act against service providers who are constantly in breach in this regard; if not, why not; if so, what are the relevant details?

Reply:

1. The provisions of the National Road Traffic Act, 1996 or the Administrative Adjudication of Road Traffic Offences Act, 1998, do not give any local government the authority for external service providers to forward fines and notices on their behalf.

(3) The National Road Traffic Act, 1996 provides for the appointment of a proxy that must deal with the affairs of the motor vehicle owner particularly in a case where the owner is not a natural person.

(4) There is no need for an action against service providers since there seem to be no transgression of the National Road Traffic Act, 1996.

29 June 2018 - NW2011

Profile picture: Purdon, Mr RK

Purdon, Mr RK to ask the Minister of Basic Education

(1)What are the details of the (a) number of accidents that vehicles owned by her department were involved (i) in each of the past three financial years and (ii) since 1 April 2018, (b) cost for repairs in each case and (c)(i) number of and (ii) reasons for vehicles being written off in each case; (2) whether all vehicles owned by her department have tracking devices installed?

Reply:

1. (a)

Vehicles owned by the Department

Vehicle registration

Number of accidents vehicles were involved in the last 3 financial years and 1 April 2018 to date

   

2015/16

2016/17

2017/18

1 April 2018 to date

Toyota Corolla

BW16JG GP

None

None

None

1

  1. (b)

Vehicles owned by the Department

Vehicle registration

Cost for repairs in each case

   

2015/16

2016/17

2017/18

1 April 2018 to date

Toyota Corolla

BW16JG GP

Nil

Nil

Nil

R 9 614.07

1(c) (i) and (ii)
No vehicle was written off.

2. Yes, vehicles owned by the Department have tracking devices.

29 June 2018 - NW1918

Profile picture: Tshwaku, Mr M

Tshwaku, Mr M to ask the Minister of Basic Education

(1)What (a) is the total number of incidents of sexual harassment that were reported to the human resources offices of (i) her department and (ii) entities reporting to her in (aa) 2016 and (bb) 2017 and (b) are the details of each incident that took place; (2) was each incident investigated; if not, why not in each case; if so, what were the outcomes of the investigation in each case?

Reply:

1. (a) (i) (aa) There were no sexual harassment incidents reported to the Human Resource office of the Department of Basic Education in 2016.

(a)(i) (bb) There were no sexual harassment incidents reported to the Human Resource office of the Department of Basic Education in 2017.

(a)(ii) (aa) There were no sexual harassment incidents reported to the Human Resource office of the Department of Basic Education by entities in 2016.

(a) (ii) (bb) There were no sexual harassment incidents reported to the Human Resource office of the Department of Basic Education by entities in 2017.

(b) Not applicable

2. Not applicable

 

29 June 2018 - NW1792

Profile picture: Purdon, Mr RK

Purdon, Mr RK to ask the Minister of Environmental Affairs

(1) (a) What number of black rhino have been translocated to the Republic of Chad (i) in each of the five financial years and (ii) since 1 April 2018 and (b) to which parks or facilities were they. (2) whether the government of Chad purchased the rhino; if so, what amount was paid for the rhino; if not, were they a donation from the Government of South Africa; if so, (3) whether the Government paid for the transportation costs; if so, what amount was paid to translocate the rhino?

Reply:

(1) (a)

(i) No rhinos were translocated by South Africa to the Republic of Chad in the past five financial years.

(ii) Six black rhinos were translocated on 03 May 2018.

(b)

To the Zakouma National Park in the Republic of Chad.

(2) The six black rhinos were part of the Custodianship Programme with the Republic of Chad for the purpose of reintroducing black rhinos in the Republic of Chad following the loss of their native subspecies 46 years ago. Secondly, the reintroduction of six black rhinos in the Republic of Chad is also aimed at growing the continental meta-population of black rhinos and to contribute to the conservation of black rhinos on the African continent. This is in line with the African Range States African Rhino Conservation Plan aimed at re-establishing rhino populations in former range states.

The Custodianship Agreement was part of the other two Co-operative Agreements, namely:

  • Memorandum of Understanding on Biodiversity Conservation and Management; and
  • Memorandum of Understanding on the Reintroduction of Black Rhinoceros in the Republic of Chad.

Key to the Custodian Agreement are the following arrangements:

  • South Africa will continue to own the black rhino while their offspring will be owned by the Republic of Chad.
  • Chad (in case of a dire need for re-introduction of black rhinos to South Africa in the future) will make available the progeny/offspring of the black rhinos, either to supplement or re-establish South Africa’s black rhino population.

(3) The Government of the Republic of Chad paid for the transportation costs in line with the Memorandum of Understanding signed between the Governments of South Africa and Chad.

---ooOoo---

29 June 2018 - NW2112

Profile picture: Marais, Mr S

Marais, Mr S to ask the Minister of Defence and Military Veterans

What is the current status of the intensive care unit at 2 Military Hospital?

Reply:

The Intensive Care Unit at 2 Military Hospital is at present functional and the admission of patients has been re-established.

29 June 2018 - NW2108

Profile picture: Esau, Mr S

Esau, Mr S to ask the Minister of Defence and Military Veterans

As part of the required sea hours, what number of days did each vessel of her department spend (a) in False Bay and (b) beyond False Bay in the (i) 2012-13, (ii) 2013-14, (iii) 2014-15, (iv) 2015-16 and (v) 2016-17 financial years?

Reply:

  1. The response to this question contains classified information and can only be disclosed in a closed session of the Joint Standing Committee on Defence.

29 June 2018 - NW1603

Profile picture: Steenkamp, Ms J

Steenkamp, Ms J to ask the Minister of Environmental Affairs

(1)With regard to how her Department measures the targets from the Waste Management Bureau, (a) how are the units of measurement for the specified targets determined, and (b) what formula is used to calculate the diversion rate; (2) (a) how did her Department determine pay scales for the Waste Management Bureau employees, and (b) against what did her Department benchmark the pay scales; and (3) whether she will furnish Ms J Steenkamp with copies of the detailed (a) salary scales of the appointed staff of the waste bureau and (b) amounts that are paid to advisers and consultants?

Reply:

1. (a) and (b) The formula used for the diversion rate is informed by the estimated waste tyres arising, taking into account the availability of financial resources.

Indicator title

Percentage increase in waste diverted from landfill

Short definition

Measure the amount/increase in waste which has been diverted (i.e. waste re-used, recycled and recovered)

Purpose/importance

To reduce the amount of waste going to landfill sites and protect the environment by ensuring that set targets on management of waste, as per approved industry waste management plans, are achieved and that the intended objectives are realized

Source/collection of data

Monthly operational reports from WB operations

Method of calculation

[(Waste tonnages re-used, recycled and used for energy recovery)/waste arising per annum)*100]

Waste tonnages re-used, recycled and used for energy recovery = waste tyres pyrolysed, crumbed and TDF

Waste arising = total tonnages of tyres introduced into the market

Q1: March&April&May

Q2: June&July&August

Q3: September&October&November

Q4: December&January&February

Type of indicator

Output

Calculation type

Cumulative

Reporting cycle

Annually (linked to the Year Plan, i.e. Dec – Nov)

New indicator

No

Desired performance

Achieve planned targets

Indicator responsibility

DDG: Chemicals and Waste Management

2. (a) The Waste Bureau salaries were determined based on a market research study, in comparison to the pay scales of the Department of Environmental Affairs (DEA) public entities (iSimangaliso, SANParks, SANBI and SA Weather Service).

(b) The pay scales were benchmarked against all DEA public entities based on the inputs from market research study.

3. (a) Pay scales are attached.

(b) Advisors and Consultants are paid in accordance with the Department of Public Service’s approved rates.

---ooOoo---

29 June 2018 - NW2005

Profile picture: Mileham, Mr K

Mileham, Mr K to ask the Minister of Cooperative Governance and Traditional Affairs

(1)With reference to the statement in his speech on the Budget Vote of his department on 15 May 2018 that only 7% of the country’s municipalities are considered to be functioning well, which (a) municipalities constitute the 7% of well-functioning municipalities and (b) criteria did the specified municipalities fulfil, which other municipalities did not, in order to be considered well-functioning; (2) whether his department has put any measures in place to encourage other municipalities to fulfil the criteria that the well-functioning municipalities have met; if not, why not; if so, what are the relevant details?

Reply:

1(a) The following list of municipalities constitute the 7% well performing municipalities:

     

Audit opinion

Municipality

Province

District

2016-17

2015-16

2014-15

2013-14

Senqu

EC

Joe Gqabi

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Midvaal

GP

Sedibeng

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

King Cetshwayo District

KZN

uThungulu

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

uMhlathuze

KZN

uThungulu

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Umzumbe

KZN

Ugu

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Ehlanzeni District

MP

Ehlanzeni

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

ZF Mgcawu District

NC

ZF Mgcawu District

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Breede Valley

WC

Cape Winelands

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Cape Agulhas

WC

Overberg

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Cape Winelands District

WC

Cape Winelands

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Drakenstein

WC

Cape Winelands

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

George

WC

Eden

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Hessequa

WC

Eden

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Langeberg

WC

Cape Winelands

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Mossel Bay

WC

Eden

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Overstrand

WC

Overberg

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Swartland

WC

West Coast

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Theewaterskloof

WC

Overberg

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

West Coast District

WC

West Coast

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Witzenberg

WC

Cape Winelands

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

Unqualified with no findings

All of these municipalities obtained an unqualified audit report with no findings for at least the past 4 years.

(b) Over the past few years it has become clear that there could be three root causes for distress in local government:

(i) A municipality that finds itself in distress due to failures in governance, financial management and administration (i.e. The institutional performance context), and

(ii) A municipality that finds itself in distress because it spatially and socio-economically was and always will be a financially non-viable entity (i.e. the socio-economic context);

(iii) A municipality that finds itself in distress as a result of systemic issues around powers and functions, fast growth in urbanization with expansion of capital infrastructure to fulfil increasing demand and an inability to grow operational revenue concurrent to ensure sufficient maintenance and operation of the infrastructure.

The manifestation of these root causes is however complex and often difficult to pinpoint. Distress could be a result of all three root causes or a combination of any two.

Whilst the above list focuses on sound financial management practices, it happened that a municipality such as Langeberg, for example, finds itself in the well-performing list with regard to financial management practices (audit outcomes), but simultaneously reflected on the distressed list of 87 because the Municipal Infrastructure Agent identified it as part of the 55 municipalities that are struggling to spend its Municipal Infrastructure Grant (MIG).

2) Yes, the Department has signed a Memorandum of Understanding with the National Treasury. Municipalities will be monitored continually and receive joint support from the National Treasury in the form of:

(i) Financial Recovery Plans - the Municipal Financial Recovery Service (MFRS) was established in 2007 as a Directorate in the National Treasury within the Office of the Accountant- General, Chief Directorate MFMA implementation in line with section 157 of the MFMA. In terms of section 158, the functions of the unit include:

  • Preparation of financial recovery plans;
  • Monitoring the implementation of the recovery plan;
  • Assisting municipalities to identify the causes of and potential solutions to the financial problems;
  • Information is collected on municipal financial problems and on best practices in resolving such problems.

Assistance is based on requests received from the municipality or the province and provided in a collaborative and coordinated way with other national or provincial departments. In order to support municipalities with financial recovery, National and Provincial Treasuries use the Financial Management Capability Maturity Model (FMCMM)

(ii) The Financial Management Capability Maturity model (FMCMM) is a tool (comprising 21 modules) to drive improvements in the financial, institutional and capacity disciplines in municipalities. The objective is to ensure that support is directed to areas most in need, with changes resulting in progressive maturity assessment improvements.

The project involves NT working in conjunction with Provincial Treasuries to promote actions to support, monitor and report on FM issues in specific municipalities. Actual reviews/ reassessments will be conducted through the Provincial Treasuries, who will ensure the preparation and implementation of action plans to address remaining areas of weakness. (FMCMM support is included in the MFIP Technical Advisors activities.) Assistance, where required and requested, will be provided by NT in the re-assessment process to support the development of appropriate action plans and to monitor progress within established timelines.

(iii) DCoG has identified a strategic intervention aimed at enhancing the municipal revenue management and debt collection system in local government. The intervention comprises the following stages:

  • Implementation planning and conducting an “As Is’’ assessment
  • Development of an improvement plan (municipal-specific simplified revenue plan)
  • Implementation of the municipal-specific simplified revenue plan

(iv) The Department of Cooperative Governance’s Provincial coordinators will provide support in the form of coordination of the technical task teams that work with municipalities to address the challenges identified.

29 June 2018 - NW2086

Profile picture: Ngwenya, Ms W

Ngwenya, Ms W to ask the Minister of Transport

(1)Whether any other high-speed rail systems other than the extensions to the Gautrain and the Moloto Rail Corridor are envisaged for the country over the next 30 years; if not, what is the position in this regard; if so, for which routes are the high-speed rail systems envisaged; (2) are any such new high or higher speed train routes envisaged between Gauteng and KwaZulu-Natal; if so, what are the relevant details; (3) whether any such systems are envisaged for the Western Cape or the City of Cape Town; if so, what are the relevant details?

Reply:

1. In terms of the National Transport Master Plan (NATMAP) 2050 approved by Cabinet in October 2016, there are proposed high speed rail passenger systems for the following routes :

a) Johannesburg-Durban ; and

b) Pretoria –Polokwane.

2. The proposed high speed rail between Gauteng and Kwazulu Natal is a recommendation of NATMAP 2050 and nothing in a form of pre-feasibility study or commitment from any authority has been done.

3. There is no recommendations of high speed rail in Western Cape or City of Cape Town.

29 June 2018 - NW1601

Profile picture: Steenkamp, Ms J

Steenkamp, Ms J to ask the Minister of Environmental Affairs

(1)What are the reasons for the drastic decline in performance with regard to the Waste Tyre Diversion target vs performance for the 2016-17 financial year; (2) whether the Waste Bureau target to divert 50% of all tyres from landfills in the 2018-19 financial year includes off-the-road (OTR) tyres; if not, (a) how does the Waste Bureau plan to commence with OTR tyre collections, and (b) what is the time-line in this regard; if so, how will the specified target be incorporated into the industry once the plan is approved; (3) whether, in light of the fact that the Recycling and Economic Development Initiative of South Africa could not reach the target of diverting 50% of all tyres from landfills with a budget of R520 million, she has found that the Waste Bureau can achieve the specified target with the available budget of R320 million; if not, what is the position in this regard; if so, what are the relevant details of how the Waste Bureau will reach the target; and (4) what is the Waste Bureau’s current options to enable collections and recycling of OTR tyres nationally?

Reply:

1. According to reports received from REDISA, the 2016 volumes were impacted by shortage of depot storage space and slow uptake in demand. The figures also excluded the OTR tyres, and the reporting in the late 2016/17 excluded waste tyre exportation; and when we include the figures for export, the performance exceeds the target.

2. Yes, OTR tyres are included in the target.

(a) Refer to a response in 2 above.

(b) The OTR tyre collections is already taking place, although at the slow pace. The new equipment for pre-processing of OTR tyres has been procured and is expected to be delivered in a month or two. This, together with Waste Bureau actions, will improve waste tyre processing capacity in the near future; and will also enable the organisation to improve OTR collections and processing capacity.

3. The budget will not be sufficient and, in this regard, National Treasury is being engaged.

4. The collection and recycling of OTR is currently taking place, but at a small scale. When the new equipment arrives (referred to in 2b above), then the Waste Bureau will be able to increase the OTR collection and pre-processing rate. The current initiatives by the Waste Bureau to increase the processing capacity (including going out on tender) will lead to an improved OTR recycling rate.

---ooOoo---

29 June 2018 - NW362

Profile picture: Krumbock, Mr GR

Krumbock, Mr GR to ask the Minister in the Presidency

(a) What is the total amount that was (i) budgeted for and (ii) spent on his private office (aa) in each of the past three financial years and (bb) since 1 April 2017 and (b) what was the (i) remuneration, (ii) salary level, (iii) job title, (iv) qualification and (v) job description of each employee appointed in his private office in each of the specified periods?

Reply:

R million

2014/15

2015/16

2016/17

2017/18

Budget

21.1

21.4

25.8

31.0

Expenditure

21.1

21.4

25.8

27.8

(b) 

(i) Remuneration – (R6, 395,682 PA)

(ii) Salary levels of staff in the Private Office of the Minister:

1 X Chief of Staff L14

1 X Private Secretary L13

1 X Spokesperson L13

1 X Cabinet and Parliamentary Officer L13

1 X DD: Cabinet Support L12

1 X ASD: Admin Secretary L9

1 X Ministerial Aid Cape Town L7

1 X Registry Clerk L5

1 X Snr Messenger / Driver Pretoria L5

(iii) Job Titles of staff in the Private Office of the Minister:

1 X Chief of Staff

1 X Private Secretary

1 X Spokesperson

1 X Cabinet and Admin Secretary

1 X Parliamentary Officer

1 X DD: Cabinet Support

1 X ASD: Admin Secretary

1 X Registry Clerk

1 X Snr Messenger / Driver Pretoria

 

(iv) Qualifications of staff in the Private Office of the Minister:

Position

Name

Qualification

NQF Level

Chief of Staff L14 (Remuneration P/A is R1,127 334)

TP Mhlongo

B Com: Commerce

Honours: Psychology

8

ASD: Admin Secretary L9 (Remuneration P/A is R334 545 PA)

Machogo D

Advance Diploma Certificate: Public Administration

6

   

Post-Graduate Diploma

7

Private Secretary L13

(Remuneration P/A is R991 500 PA)

M Mbele

Bachelor of Admin: International Relations

Bachelor of Arts Honours: Journalism

Master of Arts: Political Science

9

     

Deputy Director: Cabinet Support L12 (Remuneration P/A is R814 884 PA)

 

D Mokgohloa

   
   

BA: Youth Development

7

   

MPhil: Youth Development

9

Media Liaison Officer/Spokesperson L13 (Remuneration P/A is R948174 PA)

M Mtshali

Post Graduate Diploma: Management

8

Deputy Director: Admin Support L12 (Remuneration P/A is R877 866 PA

B Ngobeni

Bachelor of Arts: Social Work

7

Parliamentary Officer/Cabinet L13 (Remuneration P/A is R948174 PA)

 

N Nqaba

BA Honours: Development Studies

Master of Arts: Development Studies

8

9

   

B Admin: Sport Science

7

Snr Messenger / Driver (Pretoria) L5 (Remuneration P/A is R169 647 PA)

W Zwane

 Senior Certificate(Gr 12)

4

Secretary L6 (Remuneration is R183 558 PA)

N More

Senior Certificate(Gr 12)

4

(v) Job Description of each employee appointed in the Private Office of the Minister:

The Job Descriptions indicating the job functions and duties are attached.

   

Approved

Not

Approved

Approved

as amended

   

Comment:

Dr NC Dlamini-Zuma

Minister in the Presidency: Planning Monitoring and Evaluation

   

Date:

   

 

 

29 June 2018 - NW1463

Profile picture: Vos, Mr J

Vos, Mr J to ask the Minister of Defence and Military Veterans

(1)Whether, with reference to the reply of the President, Mr C M Ramaphosa, to the debate on the State of the Nation Address on 22 February 2018 to implement lifestyle audits, (a) she, (b) senior management service members in her department and/or (c) any of the heads of entities reporting to her have undergone a lifestyle audit in the past three financial years; if not, have any plans been put in place to perform such audits; if so, in each case, what are the details of the (i) date of the lifestyle audit, (ii) name of the person undergoing the audit, (iii) name of the auditing firm conducting the audit and (iv) outcome of the audit; (2) whether she will furnish Mr J Vos with copies of the lifestyle audit reports?

Reply:

ARMSCOR

Armscor has not undertaken any lifestyle audit in the past three financial years. Lifestyle audits are being considered by management and the process of planning will be undertaken as part of the new financial year audit process after all necessary considerations such as the legislative and resources requirements. Considerations, include, the use of the service provider in the approved panel of service providers, the basis for the lifestyle audits being management request, special assignment and the whistleblowing system and direct reports, as well as the cost benefit analysis. To date no request has been made for a lifestyle audit.

DEPARTMENT OF MILITARY VETERANS

Lifestyle audit has not been conducted in the Department of Military Veterans. There’s no plan in place.

DEPARTMENT OF DEFENCE

The Department of Defence has not conducted any lifestyle audit during the past three years.

MILOMBUD

The office of the Military Ombud to date has not exposed the head of the institution, nor senior management service members to a lifestyle audit over the past three financial years.

CASTLE CONTROL BOARD

None of the CCB's Management Team has undergone life style audits during the past five years. 

DEFENCE FORCE SERVICE COMMISSION

No lifestyle audit was conducted in the DFSC in the past three financial years.  

29 June 2018 - NW2113

Profile picture: Marais, Mr S

Marais, Mr S to ask the Minister of Defence and Military Veterans

(a) What steps has the Surgeon-General taken to address the long delays in procurement of needed medical equipment for military hospitals and (b) what are the reasons that the procurement of a computed tomography scanner at 2 Military Hospital took eight months?

Reply:

(1)(a) What steps has the Surgeon General taken to address the long delays in procurement of needed medical equipment for military hospitals and

The SA Military Health Service is not a single role player in the tender-procurement process and is largely dependent on the placing of authorised procurement on external entities. The SA Military Health Services has streamlined internal logistics processes and aligned these processes to respond speedily to concerns from the Central Procurement Services Centre. Furthermore additional funding from National Treasury are being utilised to procure medical equipment. Monitoring of these processes are addressed in the weekly Command Council of the SA Military Health Service.

(b) what are the reasons that the procurement of a computed tomography scanner at 2 Military Hospital took eight months?

The procurement of the computerised tomography (CT) scanner took place in 2009. The delay was not linked to the initial procurement process, but to the procurement process in the repair of the CT scanner. The procurement process for repair was above the SAMHS delegation and was therefore referred to the Central Procurement Service Centre. The Central Procurement Service Centre referred the initial procurement request back with questions regarding the preferred supplier. This resulted in a delay of the repair of the equipment.

29 June 2018 - NW1904

Profile picture: Alberts, Mr ADW

Alberts, Mr ADW to ask the Minister of Higher Education and Training

(1)Whether all members of the senior management service (SMS) in her department had declared their interests for the past year as required by the Public Service Regulations; if not, (a) why not, (b) how many of the specified members did not declare their interests and (c) what are the (i) names and (ii) ranks of the specified noncompliant members of the SMS; (2) whether noncompliant SMS members have been charged; if not, why not; if so, what are the relevant details; (3) what number (a) of employees in her department at each post level are currently suspended on full salary and (b) of the specified employees at each post level have been suspended for the specified number of days (details furnished); (4) what is the total amount of cost attached to the days of service lost as a result of the suspensions in each specified case?

Reply:

1. All 160 Senior Management Service members had declared their financial interests by 31 May 2017 in terms of Regulation 18 of the Public Service Regulations 2016. The Department is currently processing the Public Service Commission verification report.

2. None.

(3)-(4) The table below provides a breakdown of officials on suspension and the cost attached to the days of service lost.

(a) Number of employees that are currently suspended on full salary

Salary level

(b) Number of days

(4) Cost attached to the days of service lost

1

13

43

R82 991.39

1

10

76

R90 912.65

1

6

69

R34 700.00

2

5

266

R118 232.99

1

3

120

R37 112.54

Total

R363 949.57

29 June 2018 - NW1645

Profile picture: Wilson, Ms ER

Wilson, Ms ER to ask the Minister of Defence and Military Veterans

(a) What number of cases relating to the Prevention and Combating of Corrupt Activities Act, Act 12 of 2004, as amended, have been referred to the (i) SA Police Service (SAPS) and (ii) Directorate for Priority Crime Investigation (DPCI) by (aa) her department and (bb) each entity reporting to her for further investigation since the Act was assented to and (b) what number of the specified cases have (i) been investigated by SAPS and DPCI, (ii) been followed up by the respective accounting officers and (iii) resulted in a conviction in each specified financial year since 2004?

Reply:

ARMSCOR

Armscor has not had any cases relating to the Prevention and Combating of Corrupt Activities Act, Act 12 of 2004.

QUESTION 2

None, as per above.

DEPARTMENT OF DEFENCE

(a) No cases relating to the Prevention and Combating of Corrupt Activities Act have been referred to the South African Police Services and Directorate for Priority Crime Investigation by the Military Police Division since financial year 2004. The Military Police Division is currently investigating all reported corruption cases within the Department of Defence.

(b) No cases relating to the Prevention and Combating of Corrupt Activities Act have been referred to the South African Police Services and Directorate for Priority Crime Investigation by the Military Police Division since financial year 2004. The Military Police Division is currently investigating all reported corruption cases within the DoD.

DEPARTMENT OF MILITARY VETERANS

a) Two cases have been reported by the DMV to the SAPS relating to the Prevention and Combating of Corrupt Activities Act 12 of 2004, as amended

b) Both the above cases are being investigated by the SAPS

MILOMBUD

There was one (1) case relating to the Prevention and Combating of Corrupt Activities Act 12 of 2004 reported to the SAPS, but investigated internally, however, the outcome from SAPS investigation is still awaited

CASTLE CONTROL BOARD

No case has been made or pursued in terms of the specified Act.

DEFENCE FORCE SERVICE COMMISSION

No cases have been referred by the Defence Force Service Commission

29 June 2018 - NW1799

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Environmental Affairs

(1)What is the status of the ambient air quality in the South Durban eThekwini Municipality area? (2) has there been any recent health impact study undertaken by her department in the area; if not, why not; if so, what were the findings thereof; (3) what (a) are the details of the strategy that has been put in place to (i) address the findings of the specified study and (ii) improve the air quality in the area and (b) is the role played by the licensing authority in addressing the cumulative impact of air pollution in the area; (4) whether she will provide Mr T Z Hadebe with the (a) minutes of the Air Quality Officers forum, (b) air quality management plan and (c) allocated budget for air quality management; and (5) whether her department is considering an intervention on account of health risks posed; if not, why not; if so, what are the relevant details?

Reply:

(1)

Ambient air quality has been monitored at 14 stations in the EThekwini Municipality for 12 years to date. A range of pollutants are measured. Two stations, Southern Works and Wentworth are located in the South Durban Basin. Since 2008, particulate matter concentrations at these stations have come down and are now in compliance with South Africa national ambient air quality standards. Ganges ambient monitoring station, which falls outside the basin, is however in non-compliance with particulate matter ambient standards, and this is mostly due to the vehicle emissions from the busy Southern Freeway close to this station.

In terms of sulphur dioxide, the three stations in the basin, namely, Settlers, Southern Works and Wentworth have also reported significant decreases in the sulphur dioxide annually over the years. The reduction in pollution seen in most stations since 2008 to 2010 over eThekwini are as a result of regulatory interventions such as the Scheduled Trade Permitting system and Atmospheric Emission Licensing programs implemented by the city, to target industrial emissions within the South Durban Basin.

(2) Health studies require special scarce skills and are relatively expensive to undertake. In the recent years, the Department of Environmental Affairs has spent over 8 Million Rands on health studies. Unfortunately, for financial reasons, the department has to prioritise study areas to focus on at a given time. To date, the Department has completed a health study in the Vaal Triangle Priority area. The department is currently conducting a health study in the Highveld Priority Area (HPA). In addition to being costly, these studies also takes time to complete. The current HPA health study will only be completed in late 2019, and only after then can the Department consider other priority areas. In the meantime, provinces and municipalities are encouraged to conduct local health studies.

A South Durban Health study was conducted in 2007 to determine the health status of the Durban South residents with specific focus on respiratory diseases and to determine an association between these diseases and environmental pollution. The study also assessed the range of ambient air pollutants to determine the potential risk they pose on the health of the Durban South community. The study revealed that moderate ambient concentrations of nitrogen dioxide (NO2), nitric oxide (NO) sulphur dioxide (SO2) and PM10 were strongly and significantly associated with decrements in lung function among children with persistent asthma and/or polymorphism associated with the ability to respond to oxidative stress. Children attending school in the south of Durban as compared to the north, were significantly associated with the increased risk of persistent asthma and for marked airways hyper reactivity. For adults, residing in the south was significantly associated with hayfever and marginal associated with chronic bronchitis, wheeze, shortness of breath and hypertension.

In addition, a joint Health study was completed in the early 2000’s. This study included National, Provincial, and the Local sphere of government as well as academia, industry and international partners. The primary intervention post the study was to reduce the levels of SO2 in the area as this pollutant is a known trigger for asthma. Significant reductions for this pollutant have been achieved. The eThekwini Municipalities AQMP which has a five year life span has included a further Health study in the financial year 20/21. This will need to include multiple stakeholders as the municipality could not fund a study of this nature in isolation.

(3)(a) Since the study, a number of interventions have been deployed at national, provincial and municipal level. Below are just a few.

  • A tightening of controls on large industrial emitters with specific reference to SO2, Benzene, NOx and PM.
  • The Department of Environments Affairs developed Minimum Emission Standards to control industrial emissions. The notice in this regard was published in 2010 and finalised in 2013. There were no previous standards in this regard and this promulgation and this allows for far tighter regulation of industries. Regulatory air quality management including the assessment of all new developments by means of Specialist Studies together with the Licensing of all Listed Activities as defined in NEM; AQA (39 of 2004) have resulted in an improvement in the air quality in the area.
  • Enforcement inspections are being conducted to ensure compliance with the legislation and that conditions of the atmospheric emission licenses are adhered to.
  • Continuous monitoring of criteria pollutants to determine if the national ambient air standards are not exceeded. Since then there has been some improvements as shown below:

(b) is the role played by the licensing authority in addressing the cumulative impact of air pollution in the area:

  • The licensing authority continue to monitor the industry to ensure that they adhere to conditions of the atmospheric emissions licenses.
  • Cumulative impacts are generally considered during the approval of new developments. This is often approached by the introduction of specialist studies conducted during the EIA process

(4) The minutes of the AQO forum can be obtained from the Provincial Air Quality Officer at the provincial department responsible for environmental affairs.

(5) The intervention for addressing air pollution and therefore reducing the health risks posed are stipulated in the eThekwini Metro’s air quality management plan (AQMP). According to the said AQMP, the eThekwini Municipality Health Study is planned for 20/21. The National Department will support this process.

---ooOoo---

29 June 2018 - NW1961

Profile picture: Bozzoli, Prof B

Bozzoli, Prof B to ask the Minister of Higher Education and Training

(a) What is the status of her department’s court application to take the Public Protector’s report on maladministration at the Tshwane South Technical and Vocational Education and Training College on review and (b) on what date is the case expected to be finalised?

Reply:

a) The Department has filed its supplementary affidavit, and the Office of the Public Protector is yet to file its answering affidavit. The attorneys for the Public Protector intend filing a condonation application for the late filing of its answering affidavit, where after the Office of the State Attorney will set the matter down for hearing.