Questions and Replies

Filter by year

10 December 2021 - NW2464

Profile picture: Motsepe, Ms CCS

Motsepe, Ms CCS to ask the Minister of Transport

What immediate interventions will be implemented by his department regarding the taxi riots in Atteridgeville, which are affecting the transportation of pupils to school during the examination period?

Reply:

The Department enquired about the taxi riots in Atteridgeville from the Gauteng Department of Roads and Transport as well as the Taxi Industry in the Tshwane Region. Their response is that they are not aware of such an occurrence of taxi riots in that area.

10 December 2021 - NW2589

Profile picture: Hicklin, Ms MB

Hicklin, Ms MB to ask the Minister of Health

(1)What concrete measures has the Government taken to prioritise the (a) dissemination of information regarding the necessity to be vaccinated (details furnished) and (b) vaccination of poorer, older persons living in rural communities; (2) what number of persons living in the rural areas have received vaccines?

Reply:

1. The National Department of Health (NDoH) and the GCIS has worked together on a national information dissemination strategy, supported by a range of non-government partners. The strategy is informed through analysis of national and sub-national surveys and social listening, analysed by the Risk Communication and Community Engagement Committee of the NDoH and the multi-sectoral Demand Acceleration Task Team mandated by the NDoH. Together these structures have produced a variety of communication outputs, including:

  • Mass dissemination of over 25 million information brochures in all 11 languages (distribution with the support of the PEPKOR group)
  • Distribution of 300,000 posters in 14 languages through health facilities, retail stores and 40,000 spaza shops;
  • Production and broadcast of radio public service announcements on 11 public radio stations and talk-shows and live reads on over 60 community radio stations;
  • Production of videos for people with hearing disability and pamphlets in large print and Braille for people with visual impairment;
  • Extensive use of social media through the use of both banners and voice clips in all 11 languages.

The use of this material has been mediated through partnership with trade unions, faith-based organisations, traditional and Khoi-San leadership, the business sector and community-based organisations. This is facilitated through the National Communications Partnership convened by GCIS. In addition, a number of other social partners have facilitated large-scale public communication and social mobilisation strategies, including the ‘Roll Up Your Sleeves” campaign and UNICEF outreach vehicles.

Working with these partners, the private sector and clinical operators of outreach programmes at SASSA queues, provincial departments of health have extended services to poorer, older people living in rural communities. It is particularly gratifying that the highest vaccination first dose coverage for people aged 60 years and older is in Limpopo (77%), closely followed by the Western Cape (70%), Eastern Cape (68%), Free State (67%) and KwaZulu-Natal (61%) respectively. It is of concern to the Department that the highest number of unvaccinated older people in fact reside in Gauteng, with over half a million people aged sixty years and older still to be vaccinated. This illustrates the fact that urban informal settlements and inner city areas should equally be regarded as national priorities.

 

The National toll-free COVID hotline is promoted in all communication as an accessible channel through which the public discuss/can get answers to questions and concerns re vaccination, registration/booking, side effects etc. In addition, Govt leads specific communication and engagement campaigns to maximise key moment uptake, or focus on key groups i.e. Vooma Vaccination weekend launched in October,  and Vooma III week scheduled for 3 to 10 December, linking pop up sites with Vooma media (community radio imbizos and talkshows and on the ground activation of community networks and stakeholders for imbizos and one to one discussions, Festive Season Noku Mashaba communication campaign launching on 13 December, through multiple communication channels: commuter TV, billboards, community and national radio PSAs,  digital banners, digital videos, posters and social media.

Zwakala #takeyourshot youth focused campaign led by community youth influencers, across multiple mass media channels and rapidly extending into community activations and micro level co-ordination around vaccination drives, TheTruck community engagement campaigns in collaboration with provincial departments of health, district health services and UNICEF,  a multimedia truck broadcasting local stories in local languages has visited multiple high risk areas in all provinces, to focus attention of local communities on real stories of COVID 19, and encourage them to engage with ground support teams and services around COVID prevention and vaccination  This adds to existing community engagement and door to door work conducted by provinces.

 

The national Vax Champs programme launched in November, invites everyone living in South Africa to sign up to become an ambassador for vaccination against Covid-19by by encouraging friends, family and neighbours to vaccinate. This will grow a network of local champions to lead the way to higher vaccination rates.

Vaccination of poorer, older persons living in rural communities:

  • R200 Vooma Voucher (Checkers/Shoprite/USave) for every person over 50 who vaccinates for the first time during November/December
  • Pop up vaccination sites activated through Vooma campaigns, in December will focus on shopping malls, taxi ranks and recreational areas, in addition to existing vaccination sites.
  • NDoH campaign for youth to get older family members vaccinated.
  • Young people in communities volunteering to assisting older persons to register/access vaccination e.g. Grandkids4Gogos.
  • Involving the elderly tell their stories of vaccination in the stories broadcast on theTruck.

2. The following table reflects the details in this regard.

Province

District

Subdistrict

Total No of Individuals Vaccinated

Eastern Cape

Alfred Nzo

Matatiele LM

56117

Eastern Cape

Alfred Nzo

Umzimvubu LM

57755

Eastern Cape

Amathole

Amahlathi LM

37925

Eastern Cape

Amathole

Great Kei LM

10287

Eastern Cape

Amathole

Mnquma LM

68125

Eastern Cape

Amathole

Ngqushwa LM

19193

Eastern Cape

Amathole

Raymond Mhlaba LM

54348

Eastern Cape

Chris Hani

Emalahleni LM

35617

Eastern Cape

Chris Hani

Engcobo LM

40251

Eastern Cape

Chris Hani

Enoch Mgijima LM

80015

Eastern Cape

Chris Hani

Intsika Yethu LM

35129

Eastern Cape

Chris Hani

Inxuba Yethemba LM

21098

Eastern Cape

Chris Hani

Sakhisizwe LM

17292

Eastern Cape

Joe Gqabi

Elundini LM

36567

Eastern Cape

Joe Gqabi

Senqu LM

43327

Eastern Cape

Joe Gqabi

Walter Sisulu LM

25860

Eastern Cape

OR Tambo

Mhlontlo LM

48888

Eastern Cape

Sarah Baartman

Blue Crane Route LM

13550

Eastern Cape

Sarah Baartman

Dr B Naude LM

25911

Eastern Cape

Sarah Baartman

Kouga LM

34558

Eastern Cape

Sarah Baartman

Kou-Kamma LM

10512

Eastern Cape

Sarah Baartman

Makana LM

46295

Eastern Cape

Sarah Baartman

Ndlambe LM

16273

Eastern Cape

Sarah Baartman

Sundays River Valley LM

19808

Free State

Fezile Dabi

Mafube LM

10470

Free State

Fezile Dabi

Moqhaka LM

41052

Free State

Fezile Dabi

Ngwathe LM

28278

Free State

Lejweleputswa

Masilonyana LM

14156

Free State

Lejweleputswa

Matjhabeng LM

165221

Free State

Lejweleputswa

Nala LM

17612

Free State

Lejweleputswa

Tswelopele LM

17908

Free State

Thabo Mofutsanyana

Dihlabeng LM

98363

Free State

Thabo Mofutsanyana

Mantsopa LM

17315

Free State

Thabo Mofutsanyana

Nketoana LM

11677

Free State

Thabo Mofutsanyana

Phumelela LM

10440

Free State

Thabo Mofutsanyana

Setsoto LM

26445

Free State

Xhariep

Kopanong LM

24237

Free State

Xhariep

Letsemeng LM

9441

Free State

Xhariep

Mohokare LM

8126

Free State

Mangaung

Botshabelo SD

43328

Free State

Mangaung

Thaba N'chu SD

26697

Gauteng

Sedibeng

Lesedi LM

30662

Gauteng

Sedibeng

Midvaal LM

34739

KwaZulu-Natal

Amajuba

Dannhauser LM

15412

KwaZulu-Natal

Amajuba

Emadlangeni LM

5385

KwaZulu-Natal

Harry Gwala

Dr N Dlamini Zuma LM

31651

KwaZulu-Natal

Harry Gwala

Gr Kokstad LM

21176

KwaZulu-Natal

Harry Gwala

Ubuhlebezwe LM

28615

KwaZulu-Natal

King Cetshwayo

Mthonjaneni LM

11360

KwaZulu-Natal

King Cetshwayo

Nkandla LM

25250

KwaZulu-Natal

uMgungundlovu

Impendle LM

8758

KwaZulu-Natal

uMgungundlovu

Mkhambathini LM

13862

KwaZulu-Natal

uMgungundlovu

Mpofana LM

11545

KwaZulu-Natal

uMgungundlovu

Richmond LM

20912

KwaZulu-Natal

uMgungundlovu

uMngeni LM

37759

KwaZulu-Natal

uMgungundlovu

uMshwathi LM

19527

KwaZulu-Natal

Umkhanyakude

Big 5 Hlabisa LM

45860

KwaZulu-Natal

Umkhanyakude

Jozini LM

39606

KwaZulu-Natal

Umkhanyakude

uMhlabuyalingana LM

42313

KwaZulu-Natal

Umzinyathi

Endumeni LM

30232

KwaZulu-Natal

Umzinyathi

Msinga LM

29791

KwaZulu-Natal

Umzinyathi

Umvoti LM

25456

KwaZulu-Natal

Uthukela

Inkosi Langalibalele LM

45722

KwaZulu-Natal

Uthukela

Okhahlamba LM

22102

KwaZulu-Natal

Zululand

AbaQulusi LM

45325

KwaZulu-Natal

Zululand

eDumbe LM

15334

KwaZulu-Natal

Zululand

Ulundi LM

33722

KwaZulu-Natal

Zululand

uPhongolo LM

25392

Limpopo

Capricorn

Blouberg LM

56965

Limpopo

Capricorn

Lepelle-Nkumpi LM

67007

Limpopo

Capricorn

Molemole LM

34635

Limpopo

Mopani

Ba-Phalaborwa LM

44320

Limpopo

Mopani

Greater Giyani LM

74173

Limpopo

Mopani

Maruleng LM

44626

Limpopo

Sekhukhune

E Motsoaledi LM

82495

Limpopo

Sekhukhune

Ephraim Mogale LM

27245

Limpopo

Vhembe

Collins Chabane LM

61997

Limpopo

Vhembe

Makhado LM

139444

Limpopo

Vhembe

Musina LM

35627

Limpopo

Waterberg

Bela-Bela LM

24078

Limpopo

Waterberg

Lephalale LM

50594

Limpopo

Waterberg

Mogalakwena LM

111255

Limpopo

Waterberg

Mookgophong/Modimolle LM

42416

Limpopo

Waterberg

Thabazimbi LM

56965

Mpumalanga

Ehlanzeni

Bushbuckridge LM

150730

Mpumalanga

Ehlanzeni

Thaba Chweu LM

39159

Mpumalanga

Gert Sibande

Chief Albert Luthuli LM

39955

Mpumalanga

Gert Sibande

Dipaleseng LM

7464

Mpumalanga

Gert Sibande

Dr Pixley Ka Isaka Seme LM

12970

Mpumalanga

Gert Sibande

Lekwa LM

30997

Mpumalanga

Gert Sibande

Mkhondo LM

17138

Mpumalanga

Gert Sibande

Msukaligwa LM

46778

Mpumalanga

Nkangala

Emakhazeni LM

17010

Mpumalanga

Nkangala

Steve Tshwete LM

67574

Mpumalanga

Nkangala

Victor Khanye LM

18563

North West

Bojanala

Kgetlengrivier LM

15879

North West

Bojanala

Moses Kotane LM

64412

North West

Dr Kenneth Kaunda

JB Marks LM

80366

North West

Dr Kenneth Kaunda

Maquassi Hills LM

23957

North West

Dr Ruth Segomotsi Mompati

Greater Taung LM

36109

North West

Dr Ruth Segomotsi Mompati

Kagisano-Molopo LM

24018

North West

Dr Ruth Segomotsi Mompati

Lekwa-Teemane LM

14557

North West

Dr Ruth Segomotsi Mompati

Mamusa LM

16013

North West

Dr Ruth Segomotsi Mompati

Naledi LM

36651

North West

Ngaka Modiri Molema

Ditsobotla LM

60547

North West

Ngaka Modiri Molema

R Moiloa LM

53031

North West

Ngaka Modiri Molema

Ratlou LM

30624

North West

Ngaka Modiri Molema

Tswaing LM

26478

Northern Cape

Frances Baard

Dikgatlong LM

11806

Northern Cape

Frances Baard

Magareng LM

5917

Northern Cape

Frances Baard

Phokwane LM

19391

Northern Cape

John Taolo Gaetsewe

Gamagara LM

19338

Northern Cape

John Taolo Gaetsewe

Ga-Segonyana LM

43067

Northern Cape

John Taolo Gaetsewe

Joe Morolong LM

3410

Northern Cape

Namakwa

Hantam LM

9113

Northern Cape

Namakwa

Kamiesberg LM

3536

Northern Cape

Namakwa

Khai-Ma LM

6452

Northern Cape

Namakwa

Nama Khoi LM

19393

Northern Cape

Namakwa

Richtersveld LM

2749

Northern Cape

Pixley ka Seme

Emthanjeni LM

16908

Northern Cape

Pixley ka Seme

Renosterberg LM

350

Northern Cape

Pixley ka Seme

Siyancuma LM

7222

Northern Cape

Pixley ka Seme

Siyathemba LM

9357

Northern Cape

Pixley ka Seme

Ubuntu LM

6798

Northern Cape

Pixley ka Seme

Umsobomvu LM

9032

Northern Cape

ZF Mgcawu

!Kheis LM

221

Northern Cape

ZF Mgcawu

Dawid Kruiper LM

34303

Northern Cape

ZF Mgcawu

Kai !Garib LM

33835

Northern Cape

ZF Mgcawu

Tsantsabane LM

17278

Western Cape

Cape Winelands

Breede Valley LM

71510

Western Cape

Cape Winelands

Langeberg LM

35492

Western Cape

Cape Winelands

Witzenberg LM

48771

Western Cape

Central Karoo

Beaufort West LM

13220

Western Cape

Central Karoo

Laingsburg LM

2470

Western Cape

Central Karoo

Prince Albert LM

2950

Western Cape

Garden Route

Bitou LM

17872

Western Cape

Garden Route

George LM

72928

Western Cape

Garden Route

Hessequa LM

19894

Western Cape

Garden Route

Kannaland LM

8067

Western Cape

Garden Route

Knysna LM

31696

Western Cape

Garden Route

Mossel Bay LM

40162

Western Cape

Garden Route

Oudtshoorn LM

28566

Western Cape

Overberg

Cape Agulhas LM

13656

Western Cape

Overberg

Overstrand LM

44048

Western Cape

Overberg

Swellendam LM

13671

Western Cape

Overberg

Theewaterskloof LM

50439

Western Cape

West Coast

Bergrivier LM

23371

Western Cape

West Coast

Cederberg LM

26012

Western Cape

West Coast

Matzikama LM

20566

Western Cape

West Coast

Saldanha Bay LM

37267

Western Cape

West Coast

Swartland LM

39939

   

Total

4969800

END.

10 December 2021 - NW2400

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

With reference to the pending final court ruling on the Langa rail occupancy matter, what are the full details of the measures that (a) his department and (b) the Passenger Rail Agency of South Africa have put in place to relocate the rail occupants?

Reply:

a) There is currently in excess of 7800 households in the Western Cape Province who have illegally occupied the PRASA railway reserve along the Central Line. The areas occupied covers the rail reserves in Langa, Phillipi and Khayelitsha. Therefore, it is currently impossible for PRASA to rehabilitate or upgrade railway infrastructure or resume commuter rail services in the Central Line.

The Department, together with the National Departments of Human Settlements, Public Works & Infrastructure, Western Cape Provincial Departments of Human Settlements, Transport and Public Works, the City of Cape Town Metropolitan Municipality and PRASA has decided that a joined approach will be taken to come up with sustainable solutions to be able to relocate households who have illegally occupied the railway reserve. In order to effect this decision, the parties has decided to enter into an Implementation Protocol that will facilitate decisions taken to find suitable alternative land to resettle the households and to ensure a process to restore the rail services in the Central Line corridor.

b) PRASA is working together with the Western Cape Department of Human Settlement and the City of Cape Town to identify suitable parcels of land and to install minimum services on this land to relocate the illegal occupants. Two (2) land parcels were identified in Eersterivier offered by the National Department of Public Works and Infrastructure and the Western Cape Provincial Department of Transport and Infrastructure for the Langa Relocation Program.

The Court Order stipulates that the relocation should take place on or before 26th November 2021, subject to conditions, including implementation of services which will necessitate preparation of the two land parcels. To access the identified state land, a motivation was made to the City of Cape Town to undertake an internal application to declare these two land parcels as emergency relocation sites so that immediate access could be obtained and land preparation could resume. On 22 September 2021, PRASA and the Housing Development Agency made this application to the City of Cape Town. On 18 October 2021, the City of Cape Town declined the application on the basis that there is threat of opposition from a Developer owning an Estate in the Eersterivier area and that there is a petition from the receiving community in opposition of the relocation.

PRASA is currently addressing the matter through intensive consultations with the City of Cape Town, WC Provincial Government, the Eersterivier receiving community and the Langa affected communities. The consultations are currently on-going.

 

10 December 2021 - NW2354

Profile picture: Shembeni, Mr HA

Shembeni, Mr HA to ask the Minister of Transport

What measures has he put in place to resolve the long-standing strike by truck drivers across the Republic?

Reply:

My Department participates in the Inter-Ministerial Committee (IMC) which is constituted by the President of Republic of South Africa, led by Minister of Labour. The IMC amongst others is responsible to deal with migration of foreign nationals for employment and related opportunities. Departments constituting the IMC are tasked with the responsibilities of developing an implementation plan to arrest the problems affecting the Road Freight and Logistics Industry.

The Implementation Plan had four action steps, being the review of legislation, review of policy, inspections of all companies in the truck industry and roadblocks, vehicle check points as well as high visibility patrols at affected routes. The Department of Transport and its entities, i.e, the RTMC and CBRTA participates in inspections of road freight companies, roadblocks and vehicle checks.

In addition to the above activities, my Department has proposed the insertion of Regulation 116A in the National Road Traffic Regulations, 2000, which still recognises a professional driving permit issued by countries within the SADC and prescribed territories. These professional driving permits shall in line with the proposed amendment be valid only when operating a motor vehicle registered in the country that issued any such professional driving permit and further that South African registered trucks shall only be operated by drivers who possess a South African issued professional driving permit.

10 December 2021 - NW2563

Profile picture: Ismail, Ms H

Ismail, Ms H to ask the Minister of Health

(1)What (a) total number of provinces have reported to him that they are (i) withdrawing their support to the Nelson Mandela-Fidel Castro Medical Collaboration Programme and (ii) stopping payments towards the specified programme and (b) total amount in funds was meant to be paid by his department towards the programme for the 2021 academic year in each province; (2) whether he and/or his department requested the provinces to make an additional payment over and above the payments they were supposed to make; if not, what is the position in this regard; if so, what are the relevant details; (3) what is the (a) allocated annual stipend by his department for each student and (b) full breakdown as reported to his department of the costs for the programme in each province with regard to (i) stipends, (ii) insurance, (iii) administrative costs, (iv) wasteful expenditure and (v) any other costs; (4) whether his department is in possession of an audit report of the programme that he can provide to Ms H Ismail; if not, why not; if so; if so, what are the relevant details?

Reply:

1. (a) (i) None

 (ii) None

(b) The total cost per student to date, depending on the Rand/Dollar Exchange Rate at the time of transfer, is reflected below and based on:

(i) Scholarship Programme, jointly funded by both Governments.

  • Preparatory (one year) : $2000.00 per student
  • 1st – 5th Year (per student) : $5000.00
  • Stipend (per student per year) : $2400.00

(ii) Expanded Training Programme (ETP) is wholly funded by the South African Government is reflected in the table 1 below:

Table: 1

Level

Tuition Fees

Meals & acc.

Ave. cost Med. Ins.

Stipend

Preparatory

$6000.00

$6022

$450

$2400.00

1st – 2nd Year

$12, 500

$6022

$500

$2400.00

3rd – 4th Year

$11, 500

$6022

$500

$2400.00

5th Year

$13, 500

$6022

$600

$2400.00

(iii) Local Universities

Tuition fees at South African universities during the integration since inception until 2018 varies from one university to another. After the agreement signed with local universities, the cost of integration per student has been standardized since July 2018 and adjusted according to Consumer Price Index. Students have all to be in the clinical training platform for 18 months which translates into three (3) semesters. Additional costs included transportation of the final year students to local universities which depends on the mode of transport and distance to the university.

  • July 2018 – June 2019 : R231 325.00 (R115 662.50 per semester).
  • July 2019 – June 2020 : R241 734.63 (R120 867.31 per semester).
  • July 2020 – June 2021 : R252 612.68 (R126 306.34 per semester).
  • July 2021 – June 2022 : R260 696.28 (R130 348.14 per semester).

(2) Yes

This was a shortfall for the 2019/2020 academic period of students in Cuba. The shortfall was because the exchange rate baseline that was used in calculating tuition fees for students in Cuba was at R15 for the 2019/2020 academic period. Since the exchange rate escalated so much above the base line, this meant that the amount transferred to Cuba was lower than the amount received from Provincial Department of Health. The amount transferred to Cuba did not cover the total amount due.

(3) (a) (i)(ii)(iii) See Table 1 above

(iv) None known

(v) Additional costs include two return flight tickets per student during six years and/ or during a bereavement of next of kin.

(4) The department has just concluded an internal audit and reconciliation exercise from October 2021 to November 2021.The findings have been sent to Provinces for review and approval. Provinces have been requested to correct the findings by 17 December 2021.

 

END.

10 December 2021 - NW2383

Profile picture: Nolutshungu, Ms N

Nolutshungu, Ms N to ask the Minister of Transport

Whether his department has conducted a rail infrastructure audit; if not, why not; if so, what percentage of the infrastructure network is (a) functional and (b) carries (i) goods and (ii) passengers?

Reply:

An infrastructure audit has been undertaken by PRASA, with the below breakdown per region:

(a) Please see response below.

(b) (i) Goods fall within the portfolio of the Department of Public Enterprises

(ii) Please see response below.

Gauteng Region

17% of the network is functional

  • 2 lines under electric traction (TFR Vereeniging & Saulsville)
  • 2 lines under diesel traction (Naledi & Leralla)

List of functioning lines:

  • TFR Vereeniging – Union (249 patronage per day)
  • Saulsville – Pretoria (1973 patronage per day)
  • Naledi – Johannesburg (4096 patronage per day)
  • Leralla – Germiston (6142 patronage per day)

Kwa-Zulu Natal

47% of the network is functional

 

List of functioning lines:

  • Umlazi – Durban (9830 patronage per day)
  • TFR Cato Ridge – Durban (5830 patronage per day)
  • Kelso - Durban Partially Functional from Umkomaas to Durban (1660 patronage per day)

Western Cape

 

40% of the network is functional

List of functioning lines:

  • Kraaifontein - Cape Town via Monte Vista (4583 patronage per day)
  • Cape Town - Langa via Mutual (325 patronage per day)
  • TFR Cape Town - Malmesbury (429 patronage per day)
  • Cape Town – Retreat via Athlone (1112 patronage per day)
  • Cape Town – Simon’s Town (3257 patronage per day)

Eastern Cape

The infrastructure network utilised by PRASA in the Eastern Cape belongs to Transnet Freight Rail (TFR)

List of functioning lines:

  • TFR Gqeberha - Uitenghage (466 patronage per day)
  • TFR East London - Berlin (5826 patronage per day)

10 December 2021 - NW2590

Profile picture: Hicklin, Ms MB

Hicklin, Ms MB to ask the Minister of Health

(a) Whether he will re-introduce a requirement for the (a) SA Nursing Council and (b) training colleges registered with the National Qualifications Framework to include courses in Gerontological Nursing Science and/or Gerontology including Geriatrics in the up-coming nursing training curricula as the requirements of the National Health Act, Act 61 of 2003, indicate a clear need for the training of nursing care staff members in residential care facilities; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

The South African Nursing Council (SANC) as the regulator of nurses and midwives in South Africa, takes responsibility, amongst others, for –

  • Setting and maintaining standards of education, training, and practice and
  • Providing mandatory guidance and additional advice to people designing and developing education programmes

Gerontology Nursing/ Geriatrics is currently not listed as a Post Graduate Diploma (Nursing Speciality) programme. However, the content of Gerontology nursing/ Geriatrics is covered in the curricula of the legacy professional nurse qualifications, the new higher education 4-year Bachelor degree as well as the new 3-year diploma programme under the following exit level outcome:

  • Provide nursing care throughout the lifespan in various healthcare settings of which the following criteria are evaluated:
  • Preventive, promotional, curative and rehabilitative nursing care is provided to different age groups in various health care settings,

Based on the above information, all professional nurses trained whether through the legacy professional nurse qualifications and the new qualifications at higher education level are full capacitated to holistically nurse geriatric patients throughout the levels of care. All other categories of nurses work under the direct supervision of the professional nurse who guide the nursing process. Should there be specific gerontology nursing needs that have to be developed, the establishment can provide that by way of in-service training and continuous professional development.

END.

10 December 2021 - NW2558

Profile picture: Van Staden, Mr PA

Van Staden, Mr PA to ask the Minister of Health

(1)Whether the Pelonomi Academic Hospital in Bloemfontein, Free State, is maintained in accordance with a five-year maintenance plan; if not, why not; if so, what are the relevant details of the specified plan; (2) whether his department has reviewed the plan; if not, why not; if so, (a) on what date was it reviewed and (b) what changes were implemented; (3) what are the relevant details of the current shortages of (a) beds, (b) medicine, (c) oxygen, (d) theatre beds, (e) theatre equipment and (f) general medical equipment; (4) (a) what are the names of the various suppliers contracted for the specified resources and (b) how frequently is medical waste products removed from the specified hospital (5) whether he will make a statement on the matter?

Reply:

1. It can be confirmed that Pelonomi Hospital is maintained in accordance with a 5-year maintenance plan. The objective of the departments’ maintenance plan is to address maintenance backlog, user needs, clinical standards, and statutory requirements (as per the occupational health and safety act).

2. The department is reviewing the plan on an annual basis through the User Asset Management Plan and Infrastructure Programme Implementation Plan (IPMP). This is to allow for new activities that need to be added and escalation of costs.

3. (a) The hospital is experiencing shortages in beds due to the maternity ward not yet being complete. The contractor terminated when progress was still at 40% to complete due to poor workmanship. New contractor is expected to be on site by March 2022 for 14 months.

(b) Medicine Shortages experienced as per the table below:

Medicine Name

Suppliers

Amphotericin B

Waiting for Buy-Out

Acetylcysteine Vials

Equity not paid by depot

Ganciclovir 500mg vials

Waiting for Buy-Out

Nylon 3/0

Waiting for Buy-Out

Phenylephrine drops

Waiting for Buy-Out

Prontosan cleaning solution 350 and 1000ml

Waiting for Buy-Out

Tramadol 100mg ampoules

Waiting for Buy-Out

Sodium Valproate 400mg vials

Waiting for Buy-Out

Nylon 1/0

Waiting for Buy-Out

Soda Lime

Depot cancelled order and awaiting buy-out

AMIKACIN 100 MG

Waiting stock – Medical Depot (DDV)

Cefepime 1g and 2g

Waiting stock – Medical Depot (DDV)

SALBUTAMOL RESP SOL 5MG/1ML 20

Depot out of stock

FLUMAZENIL 0.5 MG/5 ML AMP

Waiting for Buy-Out

CARBIMAZOLE 5 MG TAB

Waiting Buy-Out

CLOTHIAPINE 40 MG TAB

Waiting Buy-Out

DIGOXIN 0.25MG 28'S 1 TAB

Depot out of stock

RINGER'S LACTATE SOLUTION 200

Waiting stock – B-Braun awaiting stock

Saline 50ml, 100ml and 200ml

Waiting stock – B-Braun awaiting stock

Paracetamol syrup

Barrs not being paid

Augmentin syrups

Sandoz not being paid

Aldactone tabs

Sandoz not being paid

Hydralazine 25mg

Sandoz not being paid

Hibiscrub and Steriprep

Barrs not being paid

Tuberculin PPD

Company out of stock

Actilyse

Awaiting buy-out

Artesunate

Equity not being paid

Midazolam 5 and 15mg

Worldwide problem

(c) Oxygen Shortages

There is currently no challenge with oxygen. All vacuum and oxygen points are serviced. The medical gas plant room was upgraded to provide the following capacity:

  • Main tank = 19 500 Tons
  • Standby tank = 8 500 Tons

Tanks were also furnished with sensors that are directly linked to Afrox supply chain platform. Afrox is thus informed when levels go beyond 50% and is then actioned to refill such.

(d) Theatre Beds Shortages:

There are currently 4 theatre beds shared between surgical and maternity. This shortage dur to the maternity Ward and its theatre still being under upgrade and renovation.

(e) Theatre Equipment Shortages:

The following equipment is required:

  • Orthopaedic Drills = 6
  • Operating Light with Camera = 6
  • Anesthetic Machine = 3
  • Dermatome = 2
  • Tourniquet Machine = 4
  • Autoclave for non-heat item = 2
  • Mobile Suction Machine = 20
  • Electrical Suction Machine = 10
  • Theatre Chair = 18
  • CMAC = 2
  • Video System, Laparoscopic, General Surgery with Instruments = 1
  1. f) General Medical Equipment Shortages

The following general medical equipment shortages exists:

  • Cardiotocography (CTG) or Fetal Monitor = 15
  • Transport Incubator = 3
  • Hemodialysis Machine = 16
  • Mobile Theatre Light = 2
  • Dental Chair = 10
  • CPAP Machine = 10
  • Examination Light = 6
  • Ultrasound (Sonar) Machine = 4
  • Plaster (Cast) Cutter with Vacuum System = 6
  • Defibrillator = 15
  • AEEG Machine = 2
  • Instrument Washer = 2
  • Bronchoscope = 1
  • Electrosurgical Unit Tester = 2
  • ECG Simulator = 4
  • Examination Couch, Paediatric = 4
  • Electrical Safety Analyzer = 2
  • Digital Bucky X-Ray Machine = 4
  • Anesthetic Machine, MRI Compatible = 1
  • Contrast Warmer = 1
  • Injector Pump = 1

4. (a) Suppliers:

• Medical waste service provider is Buhle Waste.

• General waste service provider is Mangaung Metro Municipality.

• Recyclable waste: (e.g. white paper, card boxes and plastic cartons) the service is Waste Recyclers.

(b) Medical waste services are provided daily from Monday to Friday.

(5) No.

END.

10 December 2021 - NW2294

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

(1)What (a) total number of buses are currently registered in the Autopax fleet of the Passenger Rail Agency of South Africa and (b) is the breakdown of (i) vehicle types and (ii) year of purchase of the specified buses; (2) what total number of the passenger buses were in daily use in the past financial year versus the prior financial year?

Reply:

(1) (a) The total number of buses registered in the Autopax fleet is 428.

(b) The breakdown of (i) vehicle types and (ii) year of purchase of specified buses is tabulated below:

Vehicle type

Number of vehicles

Year of purchase

MAN 26.310 6x2 FOCNR City to City

5

2009

M/Benz 24.360 6x2 0500 ORSD Andare City to City

262

2010

M/Benz 24.360 6x2 0500 ORSD Paradiso Trans-Lux

156

2010

MAN Lion Explorer

5

2009

Total

428

 

2. The total number of passenger buses in daily use during the 2021 financial year (April 2020 – March 2021) is 66. Number of passenger buses in daily use during the 2020 financial year (April 2019 – March 2020) is 117.

10 December 2021 - NW2554

Profile picture: Gela, Ms A

Gela, Ms A to ask the Minister of Health

What steps will be taken by his department to intensify the COVID-19 vaccination rollout to ensure that the nation reaches herd immunity by the end of the year, especially now in the post-elections period?

Reply:

The goals of the vaccination programme are to save lives by vaccinating those at highest risk of severe disease and death, and to vaccinate as many people as possible so that society and the economy can open up and resume full capacity, thus protecting livelihoods.

Herd or population immunity refers to a situation where a high enough proportion of the population are immune (as a result of natural infection or immunisation) that the virus is unable to circulate; as a result even those who are not immune are protected from infection. Whilst it was initially thought that herd immunity for Covid-19 was achievable, scientists now consider this unlikely because of factors such as vaccine hesitancy, the emergence of new variants and the delayed approval of vaccinations for children.

The immediate target of the vaccine roll-out is to ensure that at least 70% of adults have received at least one dose of vaccine. As of 2nd December, 41% of adults had been vaccinated. Sufficient vaccines and capacity to vaccinate are now available, and the main constraint to achieving higher vaccination coverage relates to poor uptake of vaccines. In response, a comprehensive Demand Acceleration Strategy has been put in place in an effort to generate demand and increase the number of individuals accessing vaccination. Key components of this strategy include:

Raising the profile of the vaccine roll-out

  1. Vooma Vaccination weekends were held during October and November 2021. These included a national call to action led by the President, as well as other political, trade union, religious, traditional and other leaders. Events were also hosted by national, provincial and local leadership at vaccination sites.
  2. Working with a range of stakeholders at national, provincial and local levels in order to mobilise communities through a range of activities including mobilisation at events (e.g. religious gatherings), in public spaces (e.g. taxi ranks) and through door to door campaigns.
  3. Recognition of good performance at provincial and district level, and of outstanding performance by healthcare and other workers during Vooma Vaccination weekends.

Making reliable information regarding the safety and effectiveness of vaccines widely available

4. Increasing the availability of reliable information regarding vaccination through various media platforms including TV, radio and print media.

5. Improved signage at vaccination sites, and improving locally available information regarding location and opening times of local vaccination sites.

6. Monitoring and addressing misinformation circulating on social media.

7. Developing a network of local vaccination champions who volunteer to motivate those around them to vaccinate and report any problems with vaccination sites.

Providing incentives and rewards to vaccinated individuals

8. Limiting access to sports and other events to those who are vaccinated.

9. A pilot project whereby individuals 50 years and older can access a R100 (recently increased to R200) grocery voucher to offset any costs incurred through vaccination (e.g. transport costs).

10. Encouraging retail stores and other companies to provide rewards (e.g. entry to a lucky draw) for those who are vaccinated.

11. Consideration of making vaccines mandatory in some settings providing that these are implemented within the current legislative and regulatory framework.

Removing barriers to vaccination

12. Increasing the number of outreach and pop-up sites in an effort to take vaccinations as close as possible to people and communities.

13. Ensuring that as many sites as possible are open during weekends (especially but not exclusively during Vooma Vaccination weekends).

14. Pilot projects including provision of free transport to vaccination sites.

 

END.

10 December 2021 - NW2399

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

What amount has the Passenger Rail Agency of South Africa (Prasa) (a) allocated in the budget and (b) actually paid to (i) contractors and (ii) internal Prasa security for securing assets in each of the past three financial years?

Reply:

a) The total amount PRASA allocated in the budget for the past three financial years is R3,857,356,575-49.

b) Please refer to the breakdown in the table link below for the actual amount paid for securing assets in each of the past three financial years.

https://pmg.org.za/files/RNW2399-2021-12-10.pdf

10 December 2021 - NW2278

Profile picture: Shembeni, Mr HA

Shembeni, Mr HA to ask the Minister of Transport

What interventions has he put in place to assist truck drivers who queue for more than 30km from Lebombo Port of Entry every day and who are being robbed in the process?

Reply:

The challenges affecting the flow of cross-border traffic are because of the delays which are being experienced on the Mozambican side of the border owing to several new processes and requirements which were recently introduced. This has resulted in significant delays and vehicle pileup on the Mozambican side, as well as on the South African side. Due to the infrastructure layout on the border approach road, vehicles tend to queue on the side of the road all the way to the border mouth. The law enforcement of the Cross-Border Road Transport Agency (C-BRTA) is therefore, supporting the South African Police Service (SAPS) to detect and prosecute criminal elements who target truck drivers to ensure their safety. The Road Transport Inspectorate of the C-BRTA, under the Road Traffic Management Corporation, is also working with the Provincial Traffic and Nkomazi Local Traffic to control traffic flow with a view to reduce build up in traffic. Furthermore, the C-BRTA is engaging with Mozambican counterparts to urgently address the challenges with a view of mitigating against increased congestion at the Lebombo Port of Entry.

10 December 2021 - NW2603

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Employment and Labour

With regard to the publication in the Government Gazette on 19 October 2021 of a notice enforcing new banking information requirements for the compensation of occupational injuries and disease related claims, (a) what is the rationale behind the regulations and (b) what are the reasons that the Compensation Fund is determined to stifle third-party pre-funding administrators?

Reply:

a) what is the rationale behind the regulations?

The Minister of Employment and Labour has not issued any a regulation on the 19th October 2021. The Compensation Commissioner issued a notice to prescribe administrative rules for the payment of claims using the Account Verification System. The notice highlights the intention by the Compensation Fund to strictly enforce the payments of claims to claimant’s bank account using validations that come with the Account Verification System.

This notice is part of the Compensation Fund’s efforts to strengthen systems of internal control the Fund by the implementation of Account Verification System (AVS).

b) what are the reasons that the Compensation Fund is determined to stifle third-party pre-funding administrators?

There is nowhere in the notice published on the 19th October 2021 where reference is made to third party pre-funding administrators.

10 December 2021 - NW2562

Profile picture: Ismail, Ms H

Ismail, Ms H to ask the Minister of Health

(1)With regard to the oversight measures that he implemented for the COVID-19 Vaccine Injury No-Fault Compensation Scheme, which includes the creation of the Governance Oversight Committee, what (a) are the reasons that the draft regulations state that the specified committee will be headed by a retired judge, (b) is the date on which the final members for the committee will be chosen and (c) are the relevant (i) qualifications and (ii) job descriptions for all the positions in the committee; (2) (a) through which system and/or entity will disbursements be made and (b) what are the criteria for (i) disbursements for claimants and (ii) deciding on the amounts payable; (3) whether he will provide Ms H Ismail with a list of candidates nominated for the committee; if not, why not; if so, what are the relevant details?

Reply:

1. (a) Initially the National Department of Health (NDOH) anticipated that the adjudication and appeals process of the NFC Scheme would be complicated and onerous and that a retired judge would be better placed to oversee the scheme and adjudicate the appeals.  Upon re-assessment the NDOH has realised that the processes and caseload are not as complicated and burdensome hence the requirement for a retired judge and a Governance Oversight Committee has been done away with and this will reflect in the amended Regulations and Directions that will be published soon.  All oversight powers will now vest with the DG as the Accounting Officer of the NDOH.

(b) No committee members have been appointed on the basis that the Governance Oversight Committee will no longer be required.

(c) See (a) and (b) above.

2. (a)-(b) The disbursements will be done by the NDOH.  Disbursements will be made once claimants have been able to establish a causal link between the vaccine and the injury.  This will be assessed by the National Immunisation Safety Expert Committee and the Adjudication Panel will set the quantum.

3. The NDOH is not able to provide a list of nominated candidates for the Governance Oversight Committee since the Committee was never established based on the reasons outlined above.

END.

10 December 2021 - NW2605

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Employment and Labour

Whether the Special Investigating Unit has uncovered any officials of (a) his department and/or (b) the Unemployment Insurance Fund who conspired to illegally claim COVID-19 Temporary Employee Relief Scheme benefits; if not, what is the position in this regard; if so, what (i) are the officials’ names and designations, (ii) is the nature of their alleged crimes and (iii) are the criminal charges and/or disciplinary measures instituted against them by his department?

Reply:

(a) Yes, at the Department under Compensation Fund in the Western Cape province (b) the Department has zero tolerance on all employees who conspire to defraud UIF

(i) The name of the official is Ms Pumla Kenya working as a Nurse at the Compensation Fund

(ii) The official unlawfully received TERS benefit to the amount of R7 594.62 and used it

(iii) The matter was investigated and referred to the Hawks for prosecution. The matter is currently in court, however the funds were fully recovered from the official. The disciplinary measures were not taken because the employee immediately resigned after the commencement of the investigation.

10 December 2021 - NW2352

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

(1)What total amount (a) of payments is due from the Passenger Rail Agency of South Africa (Prasa) to Transnet SOC Ltd for each year in the past five financial years and (b) did Prasa pay Transnet for rental and/or use of Transnet locomotives in the past three financial years;

Reply:

  1. (a) Amount recorded as being owed by PRASA to Transnet

A picture containing table

Description automatically generated

(b) Amount paid to Transnet for rental of locomotives over the last 5 years

(2) PRASA has undertaken a national verification of its assets during the period of March 2021 up to August 2021.

  1. The following were the findings raised by Auditor General South Africa (AGSA) in the past financial year:
  1. Network assets – limitation to existence and completeness.
  2. Completeness of facilities and lease improvements.
  3. Internal control deficiencies identified on the Land Asset Register.
  4. Facilities and leasehold improvement information not submitted for audit.
  5. Retirement on facilities and leasehold improvement has been accounted incorrectly and no supporting documents obtained to ascertain the accuracy of the retirement amount.
  6. Intangible assets could not be traced back to the fixed asset register.
  7. Completed assets under work in progress.
  8. Difference between amount per Intangible Asset Register and Trial Balance/Annual Financial Statements.
  9. De-recognition certificates of vehicles were approved after year end.
  10. Misstatements identified in investment property.
  11. Completeness of land on PPE and investment property could not be confirmed.
  12. Inadequate impairment assessment on all classes of PPE.
  13. Assessment of useful lives of assets not performed in accordance with GRAP 17.
  14. Assets captured at no cost.
  15. Facilities and leasehold improvement - valuation of work in progress.
  16. Facilities and leasehold improvement - findings on valuation and verification of work in progress.
  17. Existence and completeness of rolling stock could not be confirmed.
  1. The network infrastructure assets shows significant areas of loss.
  1. It will not be practical to provide, at this stage, the estimated replacement value of the entire damaged infrastructure as an assessment to replace all the assets has not been done for the entire network. This will be an exercise which is done as and when each area of the damaged infrastructure is replaced, i.e. on a phased approach. The focus currently is on the replacement of Mabopane line in Gauteng and Central line in the Western Cape which is Phase 1.

Assessment has been done on the two area in terms of replacing the assets. It is estimated that the two areas will be will be replaced at an estimated value of R1,2bn.

The second phase assessment is on ten (10) identified corridors which cut across all the provinces with a Metrorail footprint.

10 December 2021 - NW2295

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

(1)What total amount of Bus Rapid Transit System funding did the SA National Roads Agency (Sanral) transfer to each of the 13 cities in the past three financial years; (2) what total amount has been paid by Sanral to a certain company (name furnished) since the beginning of their engagement, distinguishing between (a) contract agreement and (b) operational agreement payments?

Reply:

1. The SA National Roads Agency (SANRAL) mandate does not include public transport, as such SANRAL has not made any Bus Rapid Transit (BRT) System funding transfers to any of 13 cities in the past three financial years.

2. SANRAL has made payments to Electronic Toll Collection (Pty) Ltd, (ETC), in which Kapsch TrafficCom (Sweden and Austria) has 25% direct shareholding, for the development of an Account Based Ticketing (ABT) module as part of the SANRAL Transaction Clearing House (TCH) system to enable pilot projects to commence at selected cities. The Automatic Fare Collection (AFC) systems of the BRT’s will interface to the SANRAL ABT module for account hosting and transaction processing.

a) The amount that was paid to date to ETC for the ABT module project is R1,711,282.65, excluding VAT for development and integration of the module on the SANRAL TCH.

b) No operational costs have been incurred to date as the project is still in the development stages and has not gone operational

10 December 2021 - NW2275

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

(1)(a) What total number of senior staff members of the Passenger Rail Agency of South Africa (Prasa) has been and/or was suspended since 2019 and (b) on what charges; (2) what total number of the suspended Prasa members (a) have been reinstated, (b) are still suspended and/or (c) had their services terminated; (3) with reference to the specified Prasa members who have been reinstated, are still suspended and/or had their services terminated, at what cost has this taken place in each specified case, including (a) salary and benefits expenses to Prasa and (b) legal costs; (4) with reference to the Prasa members who are still suspended, (a) what is the next expected step and (b) by what date does he envisage will the specified step be implemented?

Reply:

1. (a) The total number of senior staff members of the Passenger Rail Agency of South Africa (PRASA) that has been and/or was suspended since 2019 and (b) on what charges are listed in the table below:

(a)

Financial Year

(b)

Charges

2019/20

TOTAL = 17

Participating in the irregular appointment of private security providers

 

Failing breathalyser test when reporting for duty and colluding with competitors.

 

Procurement related irregularities

 

Misconduct:

  • sexual harassment
  • nepotism and violation of recruitment policy
  • gross dishonesty
  • gross negligence
  • dereliction of duties
  • damage to company property
  • theft
  • operational irregularities

2020/21

TOTAL = 14

Procurement related irregularities

 

Misconduct:

  • gross dishonesty
  • gross negligence
  • dereliction of duties
  • damage to company property
  • operational irregularities

2021/22

TOTAL = 11

Procurement related irregularities

 

Theft

 

Sexual harassment

2. The total number of the suspended PRASA members which (a) have been reinstated, (b) are still suspended and/or (c) had their services terminated are listed below:

Financial Year

(a)

Reinstated

(b)

Still Suspended

(c)

Service Terminated

2019/20

5

46

18

2020/21

12

36

30

2021/22

9

22

14

3. With reference to the specified PRASA members who have been reinstated, are still suspended and/or had their services terminated, the cost at which this has taken place in each specified case, including (a) salary and benefits expenses to Prasa and (b) legal costs are listed below:

(a)

FY2020/21: EMPLOYEE COST TO COMPANY

PRASA Corporate

R5,316,062-92

AUTOPAX

R1,228,945-43

PRASA CRES

R2,460,022-63

PRASA Rail

R13,497,814-55

PRASA Tech

R6,951,264-48

TOTAL

R29,454,110-01

(a)

FY2021/22: EMPLOYEE COST TO COMPANY

PRASA Corporate

R6,680,079-48

AUTOPAX

R492,277-49

PRASA CRES

R4,709,643-24

PRASA Rail

R3,617,636-63

PRASA Tech

R593,538-19

TOTAL

R16,093,175-03

(b)

FY2021/22: LEGAL COSTS

Internal disciplinary hearings

R11,024,796-36

CCMA

R7,309,533-83

Labour Court

R5,766,758-82

TOTAL

R24,101,089-01

 

4. With reference to the PRASA members who are still suspended, (a) the next expected step and (b) by which date the specified step is envisaged to be implemented is listed below.

(a)

BUSINESS UNIT

PROGRESS STATUS

PRASA Corporate

  • 4 Senior members: disciplinary hearing in progress for Procurement related irregularities
  • One manager: still under investigation for Gross dishonesty and fraud allegations

AUTOPAX

  • Disciplinary Hearings in progress for gross negligence, false declaration, shortages and theft

PRASA CRES

  • Disciplinary hearings are in progress for all suspended employees for procurement related irregularities

PRASA Rail

  • Disciplinary hearings are in progress for all suspended employees for various acts of misconduct

PRASA Technical

  • One Employee undergoing disciplinary process
  • Attorneys appointed to finalise charges and proceed with disciplinary hearing in another matter

(b) Dates

The matters are all at different stages of either the investigation or the disciplinary process. It is not possible to give an exact date of the next step for each matter, since this is influenced by a number of factors, like the complexity of the matter, the availability of the parties, the stage of the investigation by either internal or external investigators, etc.

10 December 2021 - NW2179

Profile picture: Chabangu, Mr M

Chabangu, Mr M to ask the Minister of Transport

What progress has he made to ensure that trains are running efficiently again in the major cities in the Republic?

Reply:

PRASA, in its quest to restore the operations of public commuter and passenger rail transport is executing the following programs: -

a) PRASA has prioritised the rehabilitation of what is themed Presidential Projects in the Mabopane Line in Gauteng, and Central Line in the Western Cape.

b) Several other key corridors and lines across the country are also project listed for rehabilitation and completion within the current financial year up to 2022/23.

c) PRASA has put in multiple strategic processes to ensure that security challenges are resolved as soon as possible to secure the safety of all passengers and employees.

10 December 2021 - NW2360

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Transport

What steps will his department take to mitigate the increasing incidents of the overloading of learners on small taxis and bakkies operating as scholar transport, which result in injury and death in the case of accidents?

Reply:

The National Learner Transport Policy of 2015, National Land Transport Act of 2009 and National Road Traffic Act of 1993 regulate and manage the safety of learner transport services.

The Road Traffic Management Cooperation (RTMC) is empowered by the Act, to act on public transport operators who disregard the provisions of the Road Traffic Act and compromise the safety of passengers and other road users. Overloading of passengers is strictly forbidden and different punitive measures are being exercised to ensure compliance with the Act.

Regulation 250 of the National Road Traffic Act of 1993 provides that no person shall on a public road convey school children in the goods compartment of a motor vehicle for reward.

The Department together with the Road Traffic Management Cooperation (RTMC) and provinces will continue to strengthen the enforcement of the Act and its regulations to ensure zero tolerance to these violations.

10 December 2021 - NW1757

Profile picture: Mohlala, Ms MR

Mohlala, Ms MR to ask the Minister of Transport

What is the national backlog in respect of the issuing of operating licences to taxi operators, (b) what has he found to be the cause of the delays and (c) on what date is it envisaged he will fix the problem?

Reply:

Currently, the issuing of operating licenses to Taxi operators is the responsibility of the Provincial Regulatory Entities (PREs) in the respective Provinces. In order to determine a national backlog in respect of the issuing of operating licenses to Taxi operators, the Department, on 05 November 2021, requested each of the nine (9) Provinces to submit details of their backlogs, the causes of the delays and indications of when the backlogs will be dealt with.

To date, only seven (7) Provinces have responded, namely the Eastern Cape, Western Cape, Northern Cape, Kwa Zulu Natal, Free State, Limpopo and Mpumalanga province. The Gauteng and North West Provinces have not yet responded. The Eastern Cape and Western Cape Provinces have indicated that they have no backlog in respect of issuing of operating licenses to Taxi operators in their Provinces.

There is a combined total of seven thousand nine hundred and twenty (7920) applications in backlog in respect of the issuing of operating licenses to Taxi operators as reported by Kwa-Zulu Natal, Northern Cape, Limpopo and Free State Provinces. The reasons for the delays vary between the slowness and unreliability of the NLTIS system and the impact of the COVID-19 pandemic. It is envisioned that the backlog will be dealt with and finalized by 31 March 2022.

The table below depicts the responses received from Provinces in respect of the backlog in numbers, reasons for the delay and envisioned dates to finalize the backlog per Province.

Province

a) Backlog

b) Reasons for the delay

(c) Date to finalize the backlog

Gauteng

No response received

-

-

North West

No response received

-

-

Western Cape

No backlog reported

-

-

Eastern Cape

No backlog reported

-

-

Mpumalanga

No backlog reported

 

-

Free State

821 applications

Restrictions imposed by the National Lockdown.

31 March 2022

Northern Cape

2698 applications

COVID-19 protocols and restrictions

31 March 2022

Kwa-Zulu Natal

2859 applications

Taxi operators are not uplifting the operating licenses due to vehicles being repossessed or due to reduced profit collections on operations.

Applications are cancelled on the system in accordance with the National Land Transport Regulation time-frames.

Limpopo

1542 applications

Lack of evidence of demand/supply of transport information from ITPS of municipalities in the province.

31 March 2023

09 December 2021 - NW2633

Profile picture: Msane, Ms TP

Msane, Ms TP to ask the Minister of International Relations and Cooperation

How does the Government’s policy positions on apartheid Israel align when she pledges solidarity with the Palestinian People in her statement on 8 June 2021 on Justice for the Palestinian People and the Government and others moved in October for the rescission of the African Union’s decision to grant Israel observer status, while it permits Ms South Africa to attend the 70th Annual Miss Universe pageant to be held in Eilat, Israel and (b) what is the Government’s position on the Republic of South Africa being represented by Miss South Africa in an international event that will give credibility and acceptance amongst the community of nations to the apartheid state of Israel?

Reply:

a) The South African Government remains steadfast in its approach with regard to the Middle East Peace Process (MEPP) and its support for the State of Palestine. The establishment of a viable Palestinian state, living side-by-side in peace with Israel, within the internationally recognised borders, which came into existence on 4 June 1967, with East Jerusalem as its capital, in compliance with all relevant United Nations resolutions, international law and internationally agreed parameters, remains a fundamental pillar of South Africa’s Foreign Policy. The commitment of solidarity with the Palestinian people made on 8 June 2021, as well as South Africa’s reaction to the granting of Observer Status to Israel by the African Union, are testimony to the Government’s efforts to bring Palestine back into the global mainstream.

b) The Government has indicated its views on the Miss Universe pagearnt and called on Miss South Africa to refrain from participating in the pageant. Miss South Africa has not agreed to the governments proposal.

09 December 2021 - NW2473

Profile picture: Montwedi, Mr Mk

Montwedi, Mr Mk to ask the Minister of Public Works and Infrastructure

(a) On what policy does she rely in the leasing of state buildings for (i) residential and/or (ii) business purposes and (b) how consistent is the application of the policy in each province?

Reply:

The Minister of Public Works and Infrastructure

a) I have been informed by the Department that the Government Immovable Asset Management Act 19 of 2007 (GIAMA) provides guidance in respect of the disposal of immovable assets. The National Department of Public Works and Infrastructure Immovable Asset Disposal Policy, which was approved by the Minister on 30 May 2013, is used when leasing state-owned buildings for both (i) residential and/or (ii) business purposes.

b) In addition to the above, the 2007 Business Processes for Property Management, developed in terms of Public Finance Management Act of 1999, is used by all provincial Regional Offices to ensure consistency. In addition the revised circular 135 of 2020 on letting out of state-owned properties further ensures consistency.

09 December 2021 - NW2567

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

Noting that once a taxi is scrapped and the Government has paid out R124 000 to the owner, which in essence is money derived from tax contributions in the hands of the National Treasury, (a) what happens to the vehicle that has been written-off, (b) are such vehicles re-sold, sold for parts and/or scrap-metal and (c) is this income returned to the National Treasury?

Reply:

a) Vehicles processed under the Taxi Recapitalisation Programme (TRP) and Revised Taxi Recapitalisation Programme (RTRP) are surrendered by the owner/applicant to the appointed service provider.

b) Old Taxi Vehicles (OTVs - minibus taxi vehicles older than 4 September 2006) processed for scrapping are physically compacted and the bales of scrap metal are sold.

The panel vans that were unlawfully converted to operate as taxis, are scrapped through the Revised Taxi Recapitalisation Program following the remedial action by the Public Protector. However, because they are not defined as OTVs, only spare parts that are not safety critical components, are salvaged and sold. The chassis, body and remaining parts are physically compacted and the bales of scrap metal sold.

c) The revenue generated from the sale of the scrap metals bales and spare parts is ring fenced and accounted for by the appointed service provider for the benefit of the minibus taxi industry. Therefore, no income is returned to National Treasury.

09 December 2021 - NW2609

Profile picture: Graham-Maré, Ms SJ

Graham-Maré, Ms SJ to ask the Minister of Transport

(1)What (a) number of municipalities are in arrears on motor vehicle license fees payable to his department and (b) amount does each municipality owe; (2) what number of municipalities are (a) having licence paper withheld as a result of outstanding monies and (b) at risk of losing their agencies as a result of outstanding monies; (3) what other measures will be taken against the defaulting municipalities?

Reply:

Question 1: What (a) number of municipalities are in arrears on motor vehicle license fees payable to his department and (b) amount does each municipality owe;

Response:

A) The national department of transport is not responsible for the collection of licence fees, it is the provincial departments of transport that are responsible for the collection of the licence fees.

It is worth noting that the DLCA only withhold driving licence cards for DLTCs that have been in arrears for more than 90 days without entering into or honouring the payment arrangement. As at 1 November 2021, the DLCA withheld cards for 9 DLTCs that are in arrears for more than 90 days. Refer to the Age analysis below.

Name

120+ Days

90 Days

Category : 2 - KWAZULU-NATAL

   

Estcourt/Wembezi DLTC

R -

R 20,372.54

Eshowe DLTC

R -

R 22,199.00

     

Category : 3 - EASTERN CAPE

   

Komga DLTC - Great Kei Municipality

R 190.94

R 12,878.11

     

Category : 4 - WESTERN CAPE

   

Eastridge / Mitchells Plain DLTC

R -

R 2,942.00

Riversdale DLTC (incl.1067)

R -

R 8,096.50

     

Category : 7 - NORTHWEST

   

Ventersdorp DLTC/ JB Marks Mun

R 15,326.00

R -

Wolmaranstad Reg Auth

R 13,750.17

R 0.48

     

Category : 9 - NORTHERN CAPE

   

Upington DLTC / Khara Hais

R -

R 37,213.27

Springbok DLTC Nama Khoi

R 15,465.15

R 24,411.00

Furthermore, the following process is followed before cards are withheld:

  1. 30 days outstanding - The DLCA will telephonically liaise with DLTCs that are owing invoices for more than 30 days which a view of trying to obtain results for late payment.
  2. 60 days outstanding - Reminder letters are sent to remind DLTCs that their invoices are outstanding for more than 60 days and must come up with a payment plan to address the debt owing with is in line with the DLCA policies.
  3. 90 days outstanding - When no feedback is received from the above steps, DLCA will then resolve to withhold cards until we have an active payment plan or the amount owing is paid in full.
  4. 120 days outstanding - interest is charged on all invoices that have been outstanding for than 120 days.

B) This question is no more relevant, kindly be referred to the 1A above.

Question 2: What number of municipalities are (a) having licence paper withheld as a result of outstanding monies and (b) at risk of losing their agencies as a result of outstanding monies;

  1. The National Department of Transport is not responsible for withholding of the licence paper, however it is worth noting that municipalities themselves procure the face value documents directly from the GPW OR alternatively from the provincial department of transport.
  2. The national department of transport does not enter into any agency agreement with municipalities for that reason the department is not aware of any risk where municipalities are losing their agencies.

Question 3: What other measures will be taken against the defaulting municipalities?

The national department of transport cannot take any measures against the defaulting municipalities because of the explanation furnished at the 1A and 1B above.

The action to be taken is contained within agency agreements concluded by provinces and their agents and the decision to act is the sole prerogative of the province concerned as custodian of the function of vehicle and driving licences.

09 December 2021 - NW2566

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

(1)Whether, given that this year marks 15 years since the inception of the Taxi Recapitalisation Programme (TRP) and that the allowance has been increased to encourage a higher uptake of what should bring about safe, effective, reliable, affordable and accessible taxi operations by introducing new taxi vehicles designed to undertake public transport functions, and noting that in the 2019-20 financial year less than 2 000 taxis have been scrapped while over R5 billion has been paid in scrapping allowances to date, he has found that the TRP has succeeded in the specified objectives; if not, wat is the position in this regard; if so, what are the relevant details; (2) whether, given the continued low uptake amongst taxi owners, he has found that the TRP should be continued; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

1. The Taxi Recapitalisation Programme (TRP) has been successful in that to date, 77 763 old and unsafe minibus taxi vehicles have been removed from active operation and over R5 billion of support has been provided to an industry that transports approximately 69% of the public commuters daily while not receiving operational subsidy from government. Only minibus taxi vehicles older than 04 September 2006 are processed for scrapping and only if they are in possession of a valid operating license. As a result, the slow uptake in scrapping cannot simply be attribute to lack of interest from operators but it is equally a consequence of not meeting the requirements.

2. The objective of the TRP goes beyond the scrapping of old taxi vehicles. It forms a key pillar of the national programme to improve public transport, and is focused on the two pillars of improving the safety of passengers using the taxi mode, and the transformation and empowerment of the taxi industry. The South African public transport system consists of the rail, bus and minibus taxi services, with the latter being the only public transport service not receiving operational subsidy.

According to the National Household Travel Survey, the minibus taxi commuters account for approximately 69% of public transport users for work, school and other purposes. Over and above being the main mode of transporting public transport passengers, the taxi industry forms a critical and complex part of the South African economy with its business operations and activities. As a critical strategy in transforming and integrating the public transport system, the Taxi Recapitalisation Programme is aimed, amongst others, at:

  • replacing old unsafe taxi vehicles with safe compliant vehicles,
  • promoting modal integration through addressing the fragmentation in the minibus taxi industry, and
  • promoting the formalisation of the taxi industry and its operations into business units thereby facilitating modal integration and effective structuring and institutionalisation of the taxi industry.

Therefore, the Taxi Recapitalisation Programme will be an ongoing programme that ensures the use of safe and compliant vehicles for the majority of commuters and also provide a form of capital subsidy to the industry to incentivise compliance.

09 December 2021 - NW2666

Profile picture: Sithole, Mr KP

Sithole, Mr KP to ask the Minister of Transport

Given the mass movement of persons during the election campaigns in the period 1 September 2021 to 1 November 2021, what (a) additional measures were put in place to ensure that social distancing and the relevant COVID-19 protocols were adhered on all forms of transportation, (b) support was given to the public in relation to personal protective equipment in taxis, trains and buses and (c) was the success rate of each measure put in place?

Reply:

a) PRASA started to provide services under COVID-19 on the 01 July 2020 operating under difficult conditions of stolen and vandalised rail network infrastructure while operating limited services to ensure that staff is familiar with the handling of customers under the Covid-19 conditions. Limited services were introduced, and the limited number of stations were identified for the stoppage of trains to avoid overcrowding. Measurers were put in place to mitigate the spread of the pandemic in all modes of transport.

However, there were no additional measures put in place during the period from 1 September 2021 to 1 November 2021 across all modes.

b) No Personal Protective Equipment (PPE) was provided to the public and passengers on taxis, trains and buses over this period. A number of municipalities provided PPEs and sanitisers to public transport operators before this period.

c) Because there were no additional measures introduced for the said period, the success rate was not measured.

09 December 2021 - NW2722

Profile picture: Khumalo, Dr NV

Khumalo, Dr NV to ask the Minister of Basic Education to ask the Minister of Basic Education

Whether there are currently any collaborative interventions undertaken by her department and the SA Police Service to deal with the (a) violence in schools amongst learners and (b) kidnapping of children from schools; if not, why not; if so, (i) what has been the method of measuring the impact of the interventions and (ii) to what extent has she found this to be a reflection of an ineffective national intelligence function?

Reply:

(a) and (b) The Department signed a Partnership Protocol Agreement with the South African Police Service (SAPS) to support its efforts in combatting violence and crime in schools. This Protocol, sets out the framework for close inter-departmental co-ordination in order to create Safe, Caring and Child Friendly Schools, in which quality learning and teaching can take place. The aims of this protocol are to:

  1. Strengthen Safe School Committees to curb crime and violence in schools;
  2. Encourage all role players at school and in communities to play an active role as members of Safe School Committees;
  3. Link all schools to local Police Stations;
  4. Establish reporting systems at schools;
  5. Raise awareness amongst learners regarding crime and violence and its impact on individuals, families and education;
  6. Establish a school-based crime prevention service and interventions, which will deter potential offenders and empower potential victims and past victims;
  7. Extend  crime  prevention  programmes  to  Early  Childhood  Development Centres in order to raise awareness amongst young children on how to keep themselves safe;
  8. Mobilise communities to take ownership of schools; and
  9. Promote the image of the South African Police Service, and to build positive relationships between schools, police stations, children and school communities.

The abduction of learners outside school premises is a worrisome development for the Basic Education Sector and the school communities in general. Due to the complexity of this threat to the Sector, a broader national collaboration is being marshalled by the department with other relevant departments, especially those in the Security Cluster.

The Minister of Basic Education collaborates and works effectively with the SAPS through the National Joint Operations and Intelligence Structures (Natjoints) which coordinates all security and law enforcement throughout the country to source intelligence regarding incidences of violence in schools.

The Department also utilises the Quality Learning and Teaching Campaign (QLTC) to work with school communities to ensure the safety of school communities. The QLTC constantly reaches out to communities, including the traditional leaders, in promoting the participation of  parents and the broader society to make our schools safe places of teaching and learning.

09 December 2021 - NW2667

Profile picture: Sithole, Mr KP

Sithole, Mr KP to ask the Minister of Public Works and Infrastructure

What (a) total number of (i) buildings and (ii) vacant land in the eThekwini Metropolitan Municipality are owned by her department, (b) total number of the specified buildings and vacant land are unoccupied and (c) plans are in place to make use of them?

Reply:

The Minister of Public Works and Infrastructure

(a) I have been informed by the Department that in the eThekwini Metropolitan Municipality:

(i) There are one-thousand-and-eighty-three (1083) buildings owned by the Department of Public Works and Infrastructure (DPWI).

(ii) There are ninety-six (96) vacant land parcels owned by DPWI.

(b) The total number of the specified buildings and land parcels that are unoccupied and vacant, is one-hundred-and-two (102).

(c) The plans by the Department are to use some of these for: (i) the Gender-Based Violence (GBV) sites through Social Development; (ii) student housing; (iii) Waste Management Bureau through the Department of Environmental, Forestry and Fisheries; and (iv) advertisement and revenue generation.

 

09 December 2021 - NW2333

Profile picture: Shelembe, Mr ML

Shelembe, Mr ML to ask the Minister of Public Works and Infrastructure

(1)What (a) is the current status of the Akasia Police Station’s R4 626 222,47 owed in arrears of rental payments to the City of Tshwane, (b) payments have been made to date on the outstanding amount and (c) are the details of the available budget for the settlement of the outstanding amount in the current financial year; (2) whether any payment agreements have been concluded with the City of Tshwane to settle the debt; if not, why not; if so, (a) what are the details of the payment agreement(s) and (b) have the payment agreements been honoured to date?

Reply:

The Minister of Public Works and Infrastructure

1 I have been informed that the Department received the letter of demand without a breakdown of the amount claimed as well as a copy of a non-compliant lease which was signed by one party to a contract. The matter was referred to the attorneys of City of Tshwane to provide the breakdown of the claim and justify its legitimacy. To date, the region has not received response. No payment will be effected until the claim is verified.

(2) No payment arrangement has been concluded with City of Tshwane.

a) There is no payment agreement in place.

b) The Department through its Legal Services has requested the breakdown of the amount claimed from the Attorneys as this information was not included, so that the Department knows from what period is the claim based. Once the department is in receipt of such information, verification will be conducted on the system. Finance and REMS through Legal Service will confirm whether the claim is payable or not.

09 December 2021 - NW2466

Profile picture: Langa, Mr TM

Langa, Mr TM to ask the Minister of Basic Education to ask the Minister of Basic Education

By what date(s) will schools in Wards (a) 5, (b) 6 and (c) 7 in Hammarsdale, KwaZulu-Natal be refurbished, given the poor state of school buildings in the specified areas?

Reply:

Please find attached response as provided by KZN DoE

09 December 2021 - NW2556

Profile picture: Siwela, Mr EK

Siwela, Mr EK to ask the Minister of Basic Education to ask the Minister of Basic Education

In view of the fact that several schools (names furnished) were ravaged by storms in January 2021, and that to date no repairs have been done in the specified schools and both learners and teachers are confronted daily with the reality of dilapidated schools, (a) by what date(s) does she envisage her department will ensure the schools are repaired and (b) what are the reasons that it has taken her department so long to repair the schools and restore the dignity of the learners and teachers?

Reply:

Please find response as provided by Mpumalanga Department of Education 

09 December 2021 - NW2647

Profile picture: Siwisa, Ms AM

Siwisa, Ms AM to ask the Minister of Public Works and Infrastructure

Whether, with reference to her reply to question 243 for oral reply on 17 November 2021, job creation means that novice contractors will be given an opportunity to create jobs in their areas where projects of infrastructure will be taking place; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure

One of the roles of Infrastructure South Africa (ISA) is to develop a comprehensive infrastructure project pipeline. ISA is not a project owner. The procurement of service providers remains the responsibility of the project owners and sponsors. The Construction Industry Development Board’s mandate is to, among others, ensure uniformity in construction procurement, industry transformation and efficient and effective infrastructure delivery. The CIDB ensures that local contractors are empowered to take advantage of the opportunities arising out of infrastructure projects at a local level. The CIDB issues quarterly Construction Monitoring reports to track employment in relation to construction of infrastructure projects.

09 December 2021 - NW2635

Profile picture: Msane, Ms TP

Msane, Ms TP to ask the Minister of International Relations and Cooperation

What support South Africa has offered to ensure that the State of Libya holds peaceful elections, free from foreign interference, on 17 December 2021?

Reply:

Since the beginning of the Libyan crisis in 2011, South Africa has been calling for a political solution to the crisis in Libya as the only viable means towards achieving durable peace. We believe that the holding of free and fair national elections on 24 December 2021 will create confidence whilst at the same time contributing towards the enhancement of security, stability and development for the Libyan people.


South Africa supports the ongoing efforts of the African Union (AU) Peace and Security Council. We have consistently called for the AU to remain seized with the Libyan conflict with a view towards ensuring the achievement of transition towards a stable, durable and inclusive political order in the interest of all Libyans. South Africa is also a member of the AU High Level Committee on Libya, chaired by President Sassou-Nguesso of the Republic of Congo. We also acknowledge the efforts of the AU high Representative for Libya in his continuing enagement with the various stakeholders in Libya.


At the United Nations (UN), South Africa has made consistently articulated its principled position on the matter. In this regard, and as a member of the UN Security Council from 1 January 2019 to 31 December 2020, we called for a peaceful political solution that is Libyan-led and owned, emphasizing the importance of unified institutions and reconciliation among Libyans. In addtion,South Africa supported peace efforts in Libya by voting in favour of a number of resolutions. The latest of which are 2570 and 2571 (2021), which were aimed at creating conditions conducive for an intra-Libyan political process under the auspices of the UN. South Africa has also welcomed the efforts of the UN Support Mission in Libya (UNSMIL) aimed at bringing about an early and peaceful resolution to the Libyan crisis.

We met Libya at UN and offered assistance with elections preparation and constitutional process. We indicated that South Africa’s experience of transition could be of great help to Libya especially the writing of a new constitution and training of public service.


Finally, South Africa reiterates its support for free, fair, peaceful and credible elections in Libya.

COMPILER DETAILS

NAME AND SURNAME: DR JOHNNY PITSWANE

CONTACT: x10982

RECOMMENDATION

It is recommended that the Minister signs Parliamentary Reply 2635.

 

MR TC MONYELA

ACTING DIRECTOR–GENERAL: INTERNATIONAL RELATIONS AND COOPERATION

DATE:

PARLIAMENTARY REPLY 2635 IS APPROVED / NOT APPROVED / AMENDED.

COMMENT/S

DR GNM PANDOR, MP

MINISTER OF INTERNATIONAL RELATIONS AND COOPERATION

DATE:

09 December 2021 - NW2441

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

(1)What is the current number of manual authorisations (MAs) served by the Railway Safety Regulator on rail sections owned by (a) the Passenger Rail Agency of South Africa and (b) Transnet respectively; (2) when looking at each of these sections being declared as an MA, (a) which 10 are the longest and most frequently found to be unsafe and (b) on what date was each of the specified sections mentioned for the first time?

Reply:

1.   Railway Operators are required to report occurrences and incidents as prescribed by SANS 3000-1 by contacting the RSR Contact Centre, using the National Information Management System (NIMS) and a designated occurrence reporting email address. These occurrence statistics are reported and recorded to the RSR according to mandatory categories included in the South African National Standard on Railway Safety Management. These reportable categories operational occurrences and security incidents include derailments, collisions signals passed at danger, level crossing occurrences and security incidents such as theft and vandalism. Manual Train Authorisations are a daily procedural arrangement and are not reportable to the RSR. The RSR does not serve the authorisations, it is the Operator’s responsibility.

Safe train movement relies on the effective combination of all aspects of a railway system. Train control and communications systems play an important in this respect. Asset condition and maintenance faults also contribute to manual authorizations. That is, faulty signalling cables, defective rail, rail washaways or security violations like theft and vandalism of railway assets.

Manual train authorization is an accepted fallback method of train operations during abnormal conditions.

The required information can be obtained from the Operators.

09 December 2021 - NW2477

Profile picture: Siwisa, Ms AM

Siwisa, Ms AM to ask the Minister of Public Works and Infrastructure

With regard to the past fruitless and wasteful expenditure caused by a certain company (name furnished), what guarantee does her department give that the specified company will not be considered for the contract to upgrade the Beitbridge Boarder Post port of entry in order to accommodate the high influx of persons at the specified port?

Reply:

The Minister of Public Works and Infrastructure

National treasury has restricted the relevant companies from doing business with the State for 10 years and therefore will not qualify to participate in any bid while they are restricted.

09 December 2021 - NW2543

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

With reference to the Taxi Recapitalisation Programme and taxis returned and scrapped under the programme, what total number of taxis have been scrapped (a)(i) in each province and (ii) in each month in the past three financial years and (b) to date?

Reply:

(a)(i)(ii) Annual Scrapping Statistics – Financial Year 2018/19:

Province

Apr 18

May 18

Jun 18

Jul 18

TOTAL

Eastern Cape

5

30

34

57

126

Free State

3

7

14

5

29

Gauteng

4

23

51

75

153

KwaZulu-Natal

18

25

56

54

153

Limpopo

-

11

15

6

32

Mpumulanga

2

10

30

7

49

Northern Cape

-

-

2

-

2

North West

-

10

21

13

44

Western Cape

14

29

34

101

178

TOTAL

46

145

257

318

766

Note: Vehicles were scrapped for a 4 month period (April – July 2018) only in this financial year as the previous TRP contract ended in September 2018.

 

(a)(i) Annual Scrapping Statistics – Financial Year 2019/20:

Province

May 19

Jun 19

Jul 19

Aug 19

Sep 19

Oct 19

Nov 19

Dec 19

Jan 20

Feb 20

Mar 20

TOTAL

Eastern Cape

-

-

-

-

12

34

16

39

95

30

55

281

Free State

-

-

-

-

14

2

19

11

11

5

3

65

Gauteng

18

22

37

22

34

50

71

64

68

22

49

457

KwaZulu-Natal

-

19

47

30

30

51

28

59

81

53

63

461

Limpopo

-

-

-

12

1

21

18

60

14

24

15

165

Mpumulanga

-

-

-

-

3

8

37

21

9

38

62

178

Northern Cape

-

-

-

-

-

-

-

10

2

1

-

13

North West

-

-

-

4

5

25

27

32

24

13

8

138

Western Cape

-

-

-

-

10

36

24

49

22

19

25

185

TOTAL

18

41

84

68

109

227

240

345

326

205

280

1 943

Note: New RTRP contract concluded on 13 March 2019 with actual scrapping of vehicles only commencing in May 2019 on a staggered site establishment approach.

(a)(i)(ii) Annual Scrapping Statistics – Financial Year 2020/21:

Province

Apr 20

May 20

Jun 20

Jul 20

Aug 20

Sep 20

Oct 20

Nov 20

Dec 20

Jan 21

Feb 21

Mar 21

TOTAL

Eastern Cape

 

 

32

32

9

24

32

17

21

18

32

17

234

Free State

 

 

6

16

-

8

2

1

8

1

-

8

50

Gauteng

 

 

21

29

15

88

31

78

34

-

58

62

416

KwaZulu-Natal

 

 

39

27

37

54

61

58

63

39

70

104

552

Limpopo

 

 

1

20

18

8

5

8

5

5

6

3

79

Mpumulanga

 

 

19

29

33

21

16

15

18

9

17

9

186

Northern Cape

 

 

2

-

3

-

1

-

-

-

-

-

6

North West

 

 

4

-

7

6

6

-

4

9

1

10

47

Western Cape

 

 

16

17

18

41

16

23

47

11

36

9

234

TOTAL

-

-

140

170

140

250

170

200

200

92

220

222

1 804

Note: There was no scrapping of vehicles during April and May 2020 due to the hard lockdown imposed during COVID.

  1. Annual Scrapping Statistics – Current Financial Year 2021/22 to date:

Province

Apr 21

May 21

Jun 21

Jul 21

Aug 21

Sep 21

Oct 21

Nov 21

TOTAL

Eastern Cape

26

26

20

7

29

29

63

49

249

Free State

3

6

9

10

13

8

2

16

67

Gauteng

30

63

26

9

50

23

20

33

254

KwaZulu-Natal

-

113

3

75

40

113

7

55

406

Limpopo

8

6

4

4

9

7

10

4

52

Mpumulanga

8

-

23

17

18

10

7

13

96

Northern Cape

5

3

10

-

6

3

6

-

33

North West

-

-

1

-

1

-

1

-

3

Western Cape

9

28

24

9

22

27

43

31

193

TOTAL

89

245

120

131

188

220

159

201

1 353

09 December 2021 - NW2501

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

(a) What total number of trains (i) have been manufactured at the Gibela Rail Manufacturing Plant in Ekurhuleni in each month of each year since the opening of the factory and (ii) have been sold and (b) to which countries were the trains sold?

Reply:

a) As at 19 November 2021, a total number of 61 new trains have been manufactured at the local factory in Dunottar. A further 18 new trains were manufactured in Brazil and deliver to PRASA.

(i) The total number of trains that have been manufactured at the Gibela Manufacturing Plant in Ekhurhuleni in each month of each year since the opening of the factory is listed below:

Year

Month

Number of trains manufactured

Total per year

2018

December

1

1

2019

February

1

8

 

March

1

 
 

April

1

 
 

June

1

 
 

September

1

 
 

October

1

 
 

November

1

 
 

December

1

 

2020

January

1

20

 

February

1

 
 

March

2

 
 

July

4

 
 

August

1

 
 

September

3

 
 

October

2

 
 

November

4

 
 

December

2

 

2021

January

2

32

 

February

3

 
 

March

4

 
 

April

2

 
 

May

4

 
 

June

2

 
 

July

4

 
 

August

4

 
 

September

4

 
 

October

2

 
 

November

1

 

(ii) As at 19 November 2021, 51 new trains have been produced at the local factory and delivered to PRASA in terms of the Manufacturing and Supply Agreement entered into between PRASA and Gibela. The delivery of further 10 trains in currently in progress.

b) The Gibela Factory currently only manufactures trains for PRASA in terms of a Manufacturing and Supply Agreement.

08 December 2021 - NW2503

Profile picture: Gondwe, Dr M

Gondwe, Dr M to ask the Minister of Public Service and Administration

(1)Whether any disciplinary and/or legal steps have been taken against the 241 Public Service employees who, according to the Department of Social Development, received the Social Relief of Distress (SRD) grant in May 2020; if not, why not; if so, what are the relevant details; (2) What steps has her department put in place to deter Public Service employees from applying for the SRD grant following its recent reintroduction by the President, Mr M C Ramaphosa

Reply:

1. No disciplinary and/or legal steps have been taken against the 241 Public Service employees who received Social Relief of Distress (SRD) grants in May 2020.

The South African Social Security Agency (SASSA) is working with the departments of identified Public Service employees to ensure legal steps are taken where required. The Department of Public Service Administration (DPSA) is working closely with SASSA to ensure that disciplinary steps are taken against Public Service employees who received SRD grants in an unlawful way.

In terms of this arrangement, investigations are conducted by SASSA (supported by the Fusion Centre), as the DPSA has no investigative mandate. Furthermore, However, the DPSA plays a coordinating role and provides technical assistance to departments as far as that is concerned.

Up to date, the DPSA verified a list of 241 employees identified to have received SRD grants unlawfully. During the screening process, the DPSA found that only 198 employees on the list of 241 employees were in fact Public Service employees.

The investigating team therefore is currently focussing on the remaining 198 cases, and works with the South African Police Service to obtain statements and to collect evidence. This collated information is packaged in files which were opened for each accused. These files will be used during the criminal and disciplinary process so as to synchronize the two processes. The charges levelled against the employees will be fraud and misrepresentation. The investigation process is not yet finalised, but is continuing.

On 16 November 2021, the DPSA and investigation team from SASSA met to assess progress. The meeting resolved that the allegations against the public service employees are of a serious nature and therefore:

a) Disciplinary hearings should be held;

b) SASSA and DPSA agreed on the information/evidence to be included in the files to be opened for each employee;

c) For employees employed in provinces, the offices of the Premier will coordinate and monitor cases;

d) SASSA will provide witnesses;

e) Departments will have 90 days to finalise their cases from the dates of receiving files;

f) DPSA and SASSA will monitor the adherence to the timelines; and

g) SASSA will finalise the packaging of files.

 

Once investigations are finalised, the DPSA and investigators will reconvene with the identified departments, where guidance will be provided to labour relations officers to take the disciplinary cases forward in a coordinated way. The DPSA will source additional resources to assist those provinces with the most cases.

(2) SASSA is responsible for managing the payment of SRD grants and utilises its own electronic system to do that. The DPSA and SASSA linked the SASSA system to access information on the Personnel Salary System (PERSAL) so that current payments to applicants are only made after it was confirmed that the applicants are not appointed as Public Service employees.

End

08 December 2021 - NW2588

Profile picture: Gondwe, Dr M

Gondwe, Dr M to ask the Minister of Public Service and Administration

Whether her department has conducted an investigation into the reasons that some government departments are battling to finalise and/or conclude disciplinary cases within the stipulated time frame; if not, what is the position in this regard; if so, what (a) are the reasons that some government departments are battling to finalise their disciplinary cases within the stipulated time frame and (b) steps has her department taken in order to capacitate government departments that are failing to finalise their disciplinary cases within the stipulated time frames?

Reply:

The Department of Public Service and Administration (DPSA) has conducted an investigation into the reasons why some government departments are battling to finalise and/or conclude disciplinary cases within the stipulated time frame.

During Quarter (Q) 3 of the previous financial year (October to December 2020), the Public Administration Ethics, Integrity and Disciplinary Technical Assistance Unit (PAEIDTAU), assisted by the Strengthening Ethics and Integrity Project that are funded by the Canadian Government, contracted an independent expert to conduct research into the reasons for case backlogs and long overdue precautionary suspensions.

a) The following reasons were identified why some government departments are battling to finalise their disciplinary cases within the stipulated time frame:

  • Interference were reported, where it was alleged that suspensions were sometimes used as a tool to neutralize opposition, or employees from different camps or interest groups.
  • Heads of Departments and labour relations officials are scared to address interferences due to a fear for retaliation.
  • Unavailability of chairpersons in provinces.
  • Use of legal services to assist with discipline management cases without involving the labour relations official.
  • Appeals instituted on the side of the employer with the aim to keep an official out of the work place, usually when this person reported wrongdoing or corruption.
  • Shortage of labour relations employees.
  • Unavailability of tools of the trade, especially where educators are involved.
  • Complexity of cases due to sector specific challenges, such as in Education and Health.

b) To capacitate government departments that are failing to finalise their disciplinary cases within the stipulated time frames, the DPSA launched a project where the Minister for the Public Service and Administration (MPSA) held one-on-one meetings with Executive Authorities of departments identified to have long overdue disciplinary cases and precautionary suspensions to ascertain the reasons for backlogs and to pledge support. This was immediately followed by a workshop conducted by the PAEIDTAU to the identified departments to address their backlogs. The PAEIDTAU developed, with the assistance of the Strengthening Ethics and Integrity Project, an electronic tool that was utilised by the affected departments to register their backlog cases on, and to provide monthly feedback. In January 2021, the Director-General (DG) DPSA embarked on provincial meetings, where the issue of discipline management is addressed and compliance statistics are shared with departments. The MPSA also addressed a special FOSAD meeting in May 2021 to raise this issue with director-generals.

To assist departments with managing discipline and to address the findings of the PAEIDTAU research, a new Guide on managing discipline in the public service was adopted and approved by the MPSA. From 1 April 2021, the implementation of this Guide is compulsory. This guide specifically addresses the issues of appeals and precautionary suspensions. During 2020, the DPSA also facilitated the training of 204 (out of 246) public service employees on a PSETA accredited course for presiding officers (chairpersons and initiators) to address the issue of capacity. With the assistance of the Strengthening Ethics and Integrity Project, the PAEIDTAU is currently developing training material for labour relations officials and managers, to improve implementation of the newly adopted guide.

The above outlined interventions undertaken by the MPSA, PAEIDTAU and DG yielded significant success. A decrease in suspensions and in the costs of precautionary suspensions, as well as an improvement in the capturing of cases on the Personnel Salary System (PERSAL) were noted at the end of March 2021. By the end of March 2021, provinces finalised 78% of their backlogs (up from only 1% in Q1, 8% in Q 2, and 18% in Q 3). The cost of precautionary suspensions for National Departments stabilised around R 20 million per quarter and the cost for precautionary suspensions in provinces decreased to a new low level - almost R 25 million less than what the year started with (Q1: R 87 million compared to Q4: R62 million). The two provinces that had the most precautionary suspensions also managed to reduced their backlogs. The Free State reduced their cost from R 12 million in Q 3 to R 6 million in Q 4. Kwa-Zulu Natal managed to reduce their cost from a high of R 92 million in Q 3 to R 21 Million in Q 4. The amounts reflected here are based on all disciplinary cases captured on PERSAL.

End

07 December 2021 - NW2444

Profile picture: Msimang, Prof CT

Msimang, Prof CT to ask the Minister of Justice and Correctional Services

In view of the important and serious extradition case of the Bushiris having been delayed once again, what is the (a) latest development regarding the extradition of the Bushiris and (b) cause of the delay?

Reply:

The extradition proceedings against Shepherd Huxley Bushiri and Mary Bushiri (the Bushiris) commenced on the 8th March 2021 before the Chief Resident Magistrate’s Court in Lilongwe, Malawi. During these proceedings, Counsel for the Bushiris brought a number of preliminary applications relating to the following issues:

a) The Magistrate should recuse himself from the proceedings. This application was dismissed.

b) The State is using SADC Protocol when it is not law in Malawi. This application was dismissed.

c) The State should furnish counsel for the Bushiris with the transcript of the bail hearing of the Bushiris in South Africa. This application was successful. The State has since complied with the order.

d) The various witnesses of the State of South Africa should appear in person in the extradition proceedings in order to:

(i) Authenticate documents; and

(ii) Sign depositions.

This application was successful.

Counsel for the Bushiris applied for the review of all applications that were dismissed. The High Court dismissed the application without a hearing.

The State made an application to the Chief Resident’s Magistrate Court for the review of the decision regarding witnesses, and asked the Court to order that witnesses must appear through video conferencing or link. The Court dismissed the application.

The State then applied for a review in the High Court of the order of the Chief Resident’s Magistrate Court regarding witnesses. The review was argued in Court on 21 July 2021.

The High Court directed both parties to file submissions on whether the State witnesses from South Africa could testify via video link. The matter has since been adjourned pending the delivery of the order on a date to be communicated by the Court through the office of the Registrar.

07 December 2021 - NW2129

Profile picture: Schreiber, Dr LA

Schreiber, Dr LA to ask the Minister of Justice and Correctional Services

Whether, with reference to the decision his department took in terms of paragraph 4.7 of Resolution 1/2016 of the Departmental Bargaining Chamber, Dr LA Schreiber has been informed that in some cases, former officials have not yet received their payments, while in other cases the calculations used for the pay-outs of former officials were incorrect; if not, what is the position in this regard; if so, (a) what is the reason that (i) some former officials were not paid and (ii) other officials were paid incorrect amounts and (b) on what date will the outstanding payments to former officials be made; (2) whether his department will pay interest to former officials who did not receive their payments by the deadline of March 2020, which was before the outbreak of the COVID-19 pandemic; if not, why not; if so, what are the relevant details; (3) whether his department has different regulations and/or policy positions for serving officials who have already received their payments and for former officials who have not received their payments yet; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

1.It should be noted that not all former officials have received their payment. This is due to the system utilised to process calculations providing incorrect outcomes.

(1)(a)(i) Some former officials have not been paid due to the department having to suspend the process and subject all payments to an audit due to discrepancies in percentages used to calculate payments.

(1)(a)(ii) Rectification is underway with regard to all officials that were paid incorrect amounts.

(1)(b) The Department anticipates finalising this process during the 2022/23 financial year due to the magnitude of transactions to be audited. It must be noted that out of 6 306 transactions, 3 567 (57%) have been concluded.

2. The Department will not be paying interest. DCS was compelled to undertake the verification process to avoid overpayments to ex – officials as it would be difficult if not impossible to recover such amounts.

3. No, the Department does not have different regulations and/or policy positions for serving and former officials. The Department opted to initially pay serving officials as they are on the payroll system of Government (PERSAL) and as such processing such emoluments was less onerous administratively, however after commencement of the process the errors in calculations were discovered and a comprehensive audit was commissioned to rectify / prevent any errors. As such former officials’ payments are pending finalisation of the audits.

END

07 December 2021 - NW2641

Profile picture: Tafeni, Ms N

Tafeni, Ms N to ask the Minister of Human Settlements

(a) What total number of (i) Chief Director and, (ii) Deputy Director-General positions are occupied by persons on an acting basis in her department and (b) by what date is it envisaged that the positions will be filled by permanent employees?

Reply:

Honourable Member, here is the reply:

a) There are currently two employees acting in higher positions:

(i) Chief Director: Communications

(ii) Deputy Director-General: Informal Settlement Upgrading and Emergency Housing

b) The Chief Director: Communication was advertised and shortlisting is scheduled to take place before 20 December 2021, with the interview taking place before the end of January 2022. The Deputy Director-General post will be advertised by 28 January 2022 and be filled by the end of the financial year (31 March 2022).

07 December 2021 - NW2247

Profile picture: Steenhuisen, Mr JH

Steenhuisen, Mr JH to ask the Minister of Justice and Correctional Services

(1)Whether he has found that the National Commissioner of Correctional Services, Mr Arthur Fraser, complied with all the requirements and provisions set out in section 79 of the Correctional Services Act, Act 111 of 1998, as amended, before placing the former President, Mr J.G Zuma, on medical parole; if not, which requirements and provisions did he find the National Commissioner did not comply with in processing the medical parole; if so, what are the relevant details; (2) whether he established a medical advisory board to provide an independent medical report to the National Commissioner before the specified inmate was placed on medical parole; if not, why not; if so, (a) on what date did he establish the medical advisory board, (b) what are the (i) names and (ii) professional designations of each person who served on the medical advisory board, (c) on which date(s) did the medical advisory board meet and (d) what are the details of the recommendation of the independent medical report that the medical advisory board gave to the National Commissioner; (3) whether the inmate, his legal representatives and/or the inmate’s medical practitioner(s) lodged the request for medical parole; if not, what is the position in this regard; if so, (a) on what date was the request for medical parole lodged and (b) what are the full details of the inmate’s medical parole conditions, including the appropriate arrangements made for the inmate’s supervision, care and treatment; (4) whether he was consulted before the National Commissioner decided to place the inmate on medical parole; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

The matter is sub judice and therefore the Department is not in a position to respond until court proceedings are finalised.

END

06 December 2021 - NW2517

Profile picture: Abrahams, Ms ALA

Abrahams, Ms ALA to ask the Minister of Social Development

With reference to the approved organisations in receipt of the 2016 Comprehensive Addiction and Recovery Act grant funding for Victim Empowerment Programmes administered by the National Development Agency (details furnished), (a) on what date (s) did the organisations receive their (i) first and (ii) second tranche payments, (b) what are the reasons that the specified organisations did not receive their full tranche payment, (c) on what date is it envisaged that all organisations will receive their full tranche payment and (d) what gender-based violence programmes do these organisations provide?

Reply:

I would like to point out to the Honourable Member that South Africa does not have any legislation referred to in the question. Rather, the Comprehensive Addiction Recovery Act 2016 is a piece of legislation that has its origins from the United States of America.

CARA is an abbreviation for the Criminal Assets Recovery Accounts, a fund that is currently administered by the National Development Agency (NDA). The contract for the NDA to manage the CARA Fund to support NGOs/civil society organisations that provide services to survivors and victims of gender-based violence as guided by the National Strategic Plan on Gender-Based Violence and Femicide (2019-2024).

a) (i) (ii) Refer to Annexure A

b) The Public Finance Management Act (PFMA), which is the principal Act in terms of funding of non-profit organisations/civil society organisations prescribes that due diligence be conducted before the transfer of funds to any organisation, and the CARA Fund is no exception. All funded CSOs are subjected to verifications and performance reviews before funds can be transferred to the CSOs’ bank accounts. The organisations are expected to submit progress reports and thereafter the performance reviews are conducted before second tranches can transferred. Therefore, all the CSOs that have not been paid second tranches are yet to submit progress reports and be subjected to performance review before the transfer of second tranches as per the Service Level Agreement.

c) Refer to (b)

d) Refer to second paragraph above.

06 December 2021 - NW2516

Profile picture: Abrahams, Ms ALA

Abrahams, Ms ALA to ask the Minister of Social Development

With reference to the vacant position of director in the Care and Services to Older Persons sub-directorate of her department, (a) how long has the position been vacant, (b) what are the reasons that her department has been unable to fill the specified position, (c)(i) who has been acting in the position and (ii) for how long, (d) what is the status of her department’s progress in the advertising and recruitment process for the position and (e) on what date is it envisaged this critical position will be filled?

Reply:

a) The post became vacant on 14 December 2014.

b) In 2018, a moratorium was placed on the filling of posts due to financial constraints occasioned by a drastic cut to the Compensation of Employees (COE) budget The Department has commenced with the process of identifying and prioritising critical posts to be filled.

c) (i) Initially two Deputy Directors, namely Ms MG Keetse and Ms MN Maloba acted in the vacant post before it became unfunded.

(ii) 2 years and 5 months

d) Refer to (b)

e) The Department is currently prioritising posts that will give effect to the Departmental Strategy as required in the MTSF. While this process is under way, this function is currently performed by the four (4) Social Work Managers in the unit.

06 December 2021 - NW2523

Profile picture: Opperman, Ms G

Opperman, Ms G to ask the Minister of Social Development

(1)In light of the fact that the National Development Agency paid R29 million in stipends to volunteers which were not approved by a delegated official, (a) who paid and (b)(i) who did not sign and (ii) what were the reasons; (2) with regard to the fruitless and wasteful expenditure of (a) R1,9 million in car damages and (b) R1 million in hotel no-shows, (i) who are the responsible persons and (ii) what consequences have been instituted?

Reply:

1. Following President Cyril Ramaphosa’s declaration of the state of emergency in 2020, the volunteers were recruited as part of the NDA’s response to control the further spread and mitigation of the COVID-19 pandemic through community education, identification and registration of individuals/households for SRD application, including the Special COVID-19 SRD Grant, distribution of food parcels to eligible individuals/households provided by the Social Development Portfolio and providing queue management at SAPO and SASSA pay points, amongst others.

The programme plan and costing of the volunteer programme was presented to the NDA for approval and it was granted by the NDA Board as per their delegated authority. The NDA administratively, executed the programme through the NDA Grant Funding Policy. However, the processing and appointment of the CSOs that were appointed did not go through the structures required in the grant funding policy. This was declared during the audit as irregular expenditure.

When President Ramaphosa extended Special COVID-19 SRD Grant earlier this year, the NDA was requested to render services alluded to earlier. As a result, the volunteer programme was extended with an additional 3 (three) months (January-March 2021). However, the Accounting Officer implemented the extension of the volunteer programme without the approval of the NDA Board.

1 (a) The R29 million that the Honourable Member is referring to is not entirely related to the NDA volunteer programme, the total sum of irregular expenditure for the Agency for the financial year 2020/2021. The total is inclusive of the following irregular expenditure reported in the NDA annual financial report:

Nature of Irregular Expenditure

Amount

Tender not approved in accordance with NDA Delegations

R 1 182 735

Competitive process not followed for price quotations

R 1 214 943

Price charged by supplier for PPE no in line with Treasury guidelines

R 21 710

Award made prior to approval

R 59 112

Extension of extension of Volunteer Programme not in accordance with Delegations of Authority

R 4 522 025

Volunteer programme approved without following Grant funding policy

R 22 471 235

TOTAL IRREGULAR EXPENDITURE - NOTE 29 OF ANNUAL REPORT

R 29 471 760

1 (b)(i) The NDA Board duly approved the programme budget, but not the expenditure of R22 471 235 which was incurred under this programme as it did not comply with the NDA Grant Funding Policy.

1 (ii) Refer to 1 and 1 (a) above

SASSA

2(a) The reported R1 million fruitless and wasteful expenditure disclosed in SASSA’s 2020/21 Annual Report is not only for the hotel no shows. Of the total amount, only R8, 908 is relates to hotel no shows. SASSA recorded the R1 million fruitless and wasteful expenditure. The fruitless and wasteful expenditure breakdown of the R1, 083, 218 as reported by AGSA is made up of the following (Refer to note no. 30 of SASSA Annual Report):

  • Interest and penalties R61, 147 which include a material amount of R58, 136.99 (R50, 000 with interest) paid to an official for the unfair disciplinary process and defamation of character as per the court judgement made on a matter employee vs SASSA. There were penalties and interest levied by municipalities relating to car renewals and accounts payments cycle negatively impacted by the pandemic making the balance of the amount.
  • Hotel no shows amounted to R8, 908 sometimes officials are booked and due to circumstances related to Covid-19 the accommodation could not be utilised. An amount of R 3,303.06 associated to a SASSA appointed medical doctor for purposes of disability assessment. The amount was then deemed recoverable from the relevant doctor. Hotel no shows does not make a major portion of the fruitless and wasteful expenditure. All the cases have been finalised, four were finalised in the previous financial year (2020/21) and last one was finalised during the current financial year (2021/22). Three cases were written off and two are being recovered.
  • Payment made to a service provider R266, 760 (the service provider did not render the service but claimed the money, a case of fraud has been opened). The corrective disciplinary process was undertaken and the affected official who has since left the agency was cleared due to insufficient evidence of wrong doing. The agency awaits the outcome of the criminal case.
  • Other matters R746, 403 made out of the following amounts:
    • R 549,942.75 salary paid to an official from KZN who was not at work, when SASSA requested the alleged sick notes could not get any. The employee has since been dismissed. We are currently trying to recover funds, she does not have adequate pensions benefits as she started work the past two years. SASSA is following a due legal process to recover the amount paid.
    • R187,920.53 relate to salary paid to an official in Gauteng region together with legal costs (There is currently a disciplinary process underway to deal with this matter). Only once the corrective disciplinary process is finalised will the matter be finalised in line with the outcome.
    • R8, 381.20 a KZN official did not attend arranged training. The circumstances are still being investigated.
    • R158.52, a beneficiary was booked for medical assessment in the month the grant was still valid.

(b) (i) who are the responsible persons and (ii) what consequences have been instituted?

From the stated information hotel no shows does not make a major portion of the fruitless and wasteful expenditure recorded in 2020/21. The hotel no shows cases have been finalised, four were finalised in the previous financial year (2020/21) and last one was finalised during the current financial year (2021/22). Three cases were written off and two are being recovered.

DSD

(2)(a)

With regards to fruitless and wasteful expenditure, the National Department of Social Development had R1,132 million related to car damages. 51 cases were recorded as car damages.

(2)(a)(i)

The Loss Control Committee recommended that 35 cases (R674 437, 04) be recovered from officials and the Travel Agent. The cases have been referred to the Finance to commence with the recovery process. 12 cases (R170 624, 55) were written off on the basis that the officials were not negligent; and

(2)(a)(ii)

4 cases (R286 298, 47) were referred to Labour Relation for further investigation and if the officials are found to be liable for the expenditure, it will be recovered and disciplinary processes will commence.

(2)(b)

In terms of R 1 million in hotel no-shows, only R21 638.96 has been recorded in the Annual Report for Social Development as “Hotel no-shows” and not R1 million as indicated.

14 Cases were recorded during the 2020/21 financial year 2020/2021 for “Hotel No-Show”. Eight (8) cases has already been recommended to be recovered from the officials and the Travel Agent to the amount of R11 714,52 and these cases have already been referred to commence with the recovery process.

1 case (R1 200, 00) was written off and the official was not liable due to travel restrictions imposed and the late cancellation of an event as a result of Covid-19 restrictions

The remaining 5 cases (R8 724.44) has been investigated and will be finalised by the Loss Control Committee in due course.

 

06 December 2021 - NW2659

Profile picture: Tambo, Mr S

Tambo, Mr S to ask the Minister of Basic Education to ask the Minister of Basic Education

(1)       What has she found to have been the impact of load shedding on the 2021 matric examinations; (2) whether there are any measures to assist learners who have reported that they have been disadvantaged by the blackouts; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

1.  The writing of Grade 12 examinations is reaching its conclusion and as at 31 November 2021, there are four more days to the end of the writing of the examination. In terms of the writing of the examination, the impact of load shedding has been minimal, as observed during the monitoring process. In subjects like Computer Applications Technology (CAT) and Information Technology (IT), where computers are used, and where learners may have been affected, the DBE, will offer to these candidates an opportunity to rewrite the examination on 7 December 2021. The other subject that required electricity, is South African Sign Language (SASL). But given the very small numbers, these candidates were not adversely affected, as the schools could put in place alternative mechanisms. However, there is still the impact of load shedding on the final preparations for the examination, undertaken by learners during the examination period. This impact, if any, will only be established after the marking has been completed and the results are analysed.

 

2. In terms of addressing the possible disadvantage that may have been suffered by learners in terms of their final preparations for the examinations, this together with other factors that may have negatively impacted on learner performance, these will be addressed during the standardisation of results. The standardisation of results is a process, undertaken by the Quality Assurance Council, Umalusi, to mitigate, factors other than learners knowledge, ability and aptitude, that may impact on learner performance.     

06 December 2021 - NW2522

Profile picture: Opperman, Ms G

Opperman, Ms G to ask the Minister of Social Development

(1) What are the details of the position of her department regarding Note 17 of the Department of Social Development in respect of the Fund-Raising Act, Act 107 of 1978; (2) In light of the fact that both the SA Social Security Agency and the National Development Agency received findings adverse on compliance with legislation and are not taking effective steps to prevent irregular expenditure, what corrective measures will she and/or her department take to put in place in this regard?

Reply:

1. The Fund-Raising Amendment Bill, once signed into law, will culminate in the dissolution of the Refugee Relief, Social Relief, State President and Disaster Relief Funds with the exception of South African National Defence Force Fund (in terms of clause 7 of the amendment Bill), The amendment Bill establishes a new Disaster Relief and National Social Development Fund, and in terms of clause 7, transfers all the assets and liabilities of the existing funds to the new Fund. There should thus be no impact on the Funds, as the four funds are being consolidated into one, and all their assets and liabilities will be transferred to the new Fund once the President has signed the Bill into law.

2. (a) SOCIAL DEVELOPMENT

The Department has an established an Entity Oversight Forum. This engagement was prompted by the Auditor General’s report that the Department strengthen its oversight on its public entities. The main focus of the Forum is to:

  • Built a harmonious relationship with DSD Entities and Associated institutions;
  • To address Auditor general’s concerns of oversight;
  • To take note of governance issues in all Entities;

The Audit Steering Committee has also been re-established to address all Auditor-General’s findings within the Department and its Entities. The Committee meets on monthly basis to discuss the Audit Implementation Action Plan. Responses to challenges related to audit findings and related implementation plans are managed and overseen as preparations for the scheduled Audit Committee meetings.

2(b) NATIONAL DEVELOPMENT AGENCY:

The NDA has put in place the following measures in place to prevent the occurrence of irregular expenditure:

a) The development a policy and detailed Standard Operating Procedure manual on Irregular Expenditure - In the 2021 Financial year, the entity developed a policy on Irregular expenditure, guided by the requirements of the Framework for Irregular expenditure that was issued by the National Treasury. The Framework and the policy are intended to institutionalise the processes for the treatment of Irregular expenditure identification, determination of losses and investigation of cases of irregular expenditure. After approval of the policy, awareness workshops were held across all NDA offices where NDA staff were workshopped on the policy.

b) Establishment of an independent Loss Control Committee to investigate all reported cases of Irregular Expenditure - The establishment of this committee is informed by the requirement of the Framework on Irregular expenditure that was issued by National Treasury. The Loss Control Committee is expected to investigate all reported cases within 30 days of these instances being reported. This committee will ensure that all cases are dealt with timeously. The process to appoint the Loss Control Committee is s expected to be finalised by end of January 2022.

2. SASSA

SASSA takes issues of irregular expenditure very seriously and has focused on the areas listed below;

a) Focus on office accommodation procurement for SASSA:

SASSA recorded additional Irregular expenditure amounting R73 million during the 2020/21 reporting period of which over R43 million relate to occupation of office accommodation with expired lease agreements. The procurement of alternative accommodation by the Department of Public Works and Infrastructure was not concluded by the time a lease expired and SASSA did not request approval to extend the existing lease agreement on time.

Mechanism being put in place are:

  • SASSA is currently developing an appropriate procurement strategy to fast track procurement of office accommodation currently occupied by SASSA for which lease agreements already expired. This is being done in consultation with Department of Social Development and Department of Public Works and Infrastructure to be finalised 31 December 2021.
  • SASSA with the assistance of Department of Social Development is currently reviewing Immovable Property management policy to be concluded by 31 March 2022.
  • Review the Memorandum of Agreement (MOA) entered with DPWI by 28 February 2022.

b) Strengthen internal controls

  • Requests for procurement of alternative office accommodation by Department of Public Works and Infrastructure will be sent eighteen (18) months before expiry of any lease agreement.
  • Where DPWI has not finalised procurement of requested office accommodation, SASSA will timeously request for the extension of the existing lease agreement before expiry of lease agreement.
  • Supply Chain Management Compliance unit performs pre-audit or reviews of all new contracts before an award is made.
  • Prioritised Supply Chain Management (SCM) unit capacity (Currently busy with recruitment process to augment current manpower across the agency).
  • Re-trained SCM and users at head office on SCM Legislative framework and processes and procedures.
  • Reviewed Supply Chain Management Policy and Standard Operating Procedures and work shopped all SCM officials in the Agency on 26 November 2021
  • Trained EXCO and officials serving as Bid Adjudication Committee members. The first training took place on 22 October 2021 and the second training should take place during the fourth (4th) quarter of 2021/22.
  • Treasury training of all SCM officials in SASSA on 02 June 2021
  • Develop and implement a Corporate Audit Action plan to respond to 2020/21 audit findings.

c) Strengthen implementation of disciplinary corrective measures for already incurred irregular expenditure cases:

  • Accurate and complete recording of all incurred irregular expenditure including where currently SASSA is in occupation of office accommodation where leases have expired thus continue to incur irregular expenditure.
  • A target on financial misconduct cases has been included in 2021/22 Annual Performance Plan (APP) allowing adequate monitoring.
    • 95% of long outstanding cases to be finalised by 31 March 2022, timeous implementation of disciplinary corrective measure will serve as a deterrent.
  • SASSA Head Office to strengthen regional Support
  • Outcome of the disciplinary corrective measures will become the basis for consideration of recovery or support for National Treasury to condone Irregular Expenditure where appropriate.

06 December 2021 - NW2630

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Basic Education to ask the Minister of Basic Education

How does her department intend to ensure that the nature of professional misconduct by educators is reduced, given the increase in the number of such cases?

Reply:

The Department has the Disciplinary Code and Procedures for Educators which are provided in Schedule 2 of the Employment of Educators Act (EEA), 1997 (Act No. 76 of 1998). The Code is aimed at, amongst others, promoting acceptable conduct. It is therefore, the responsibility of the employer, who in terms of section 3(1)(b) of the EEA, is the Head of the Provincial Education Department, to implement and enforce the Code.