Questions and Replies
02 November 2015 - NW3729
Mazzone, Ms NW to ask the Minister of Public Enterprises
What are the detailed reasons for Denel’s acquisition of BAE Land Systems SA, which led to Denel exhausting its cash reserves; (2) what has been the detailed, real impact of the specified acquisition on the financial status of Denel; (3) will Denel’s exhaustion of cash reserves affect its employees and contractors; if so, what will the extent of this impact be; (4) will all (a) employees and (b) suppliers be paid on time and in full; (5) what total amount is owed by Denel to its contractors?
Reply:
(1) Cash Reserves
- The impression that the acquisition of Land System South Africa (LSSA) by Denel led to the exhaustion of Denel’s cash reserves is not correct. The acquisition was funded separately from Denel’s cash reserves. The acquisition is fully financed by financial institutions and has had no impact on the cash reserves of Denel.
Strategic Relevance of LSSA
i. LSSA is of critical sovereign importance to the country from a national security point of view, as the company is an Original Equipment Manufacturer (OEM) and continues to support and maintain all strategic military vehicles and some landward logistical equipment of the South African National Defence Force (SANDF). These vehicles include the Olifant Main Battle Tank (weapon platform and turret); Ratel; Rooikat Platform; Samil logistic trucks; Casspir; Mamba; Hornet; G6 Platform and Floatable Foldable Bridging Systems (FFB).
ii. Secondly, acquiring LSSA into a state owned company such as Denel was logical for purposes of securing the design and manufacturing capability
iii. In addition, LSSA has a proven track record for financial self-sustainability through its renowned diversified market portfolio incorporating key strategic export markets which the Denel Group can leverage on.
Capabilities
i) The world class level 4 capability of LSSA, together with the world class level 5 systems integration capability of Denel, will open new markets for the design and production of multi-purpose armoured vehicles.
(2)
- The immediate impact is the increase in total assets with the acquired asset of R855 million with a contra increase in Liabilities by the loan funding that asset of R855 million. There is therefore no impact on the net asset value, nor cash reserves of the company. The acquisition of LSSA is supported by a robust business case, which is expected to increase the net asset value of Denel by approximately R1 billion after payments of the loans and interest in the next 3 years.
- Since the acquisition by Denel, LSSA has signed contracts to the value of about R1.5bn which are now in execution phase. Within a period of less than 6 months since the acquisition, LSSA‘s prospects have substantially increased from the business case Denel used to value the business. Therefore, Denel is convinced that the acquisition is complementary to its current business and makes good business sense.
(3) No cash exhaustion as a result of the acquisition has occurred. Denel’s cash balance as at the end of September 2015 is R1.4 billion (including the ring-fenced cash).
(4)
- All employees have always been and will continue to be paid on time.
- Denel’s order book has grown to levels that result in sales coverage of not less than 7 years. The order book level implies an average growth (year on year) of no less than 12% and as a normal course of business, organisations in this growth cycle will occasionally experience some normal day to day cash challenges. Denel continues to pay its suppliers on a daily basis. The SOC has entered into deferment agreements with a core of about 10% of its suppliers.
(5) As 30 September 2015, Denel owed contractors and/or suppliers an amount of R390 million. To date, Denel has paid an amount of R205 million. There are deferment agreements with the suppliers who have not yet been paid.
02 November 2015 - NW3735
Mackay, Mr G to ask the Minister of Public Enterprises
(1) What has been Eskom’s total electricity (a) generation and (b) demand figures for each day since 30 November 2014; (2) was there a decrease in electricity (a) generation and (b) demand in the specified period; if so, what were the reasons for this decrease?
Reply:
(1) Please take note of the following:
- Eskom generation in the Eskom context is the electricity sent out from Eskom power stations plus imports across the border, being mainly the Cahora Bassa imports.
- Customer demand in the Eskom context is the sum of Eskom generation, plus Independent Power Producer (IPP) generation (for IPPs selling their energy to Eskom, including renewables and some conventional generators), plus customer demand actions, being predominantly demand reduced either through contracted Demand Response or Interruptible Load Shedding; or load shedding.
(1)(a)
Date |
Eskom Generation(MWh) |
2014/11/30 |
578 756 |
2014/12/01 |
630 963 |
2014/12/02 |
638 433 |
2014/12/03 |
647 476 |
2014/12/04 |
635 984 |
2014/12/05 |
612 986 |
2014/12/06 |
573 580 |
2014/12/07 |
572 699 |
2014/12/08 |
627 606 |
2014/12/09 |
644 498 |
2014/12/10 |
642 123 |
2014/12/11 |
641 043 |
2014/12/12 |
629 450 |
2014/12/13 |
605 528 |
2014/12/14 |
581 021 |
2014/12/15 |
621 518 |
2014/12/16 |
610 679 |
2014/12/17 |
623 169 |
2014/12/18 |
625 738 |
2014/12/19 |
620 630 |
2014/12/20 |
584 394 |
2014/12/21 |
571 936 |
2014/12/22 |
602 037 |
2014/12/23 |
592 089 |
2014/12/24 |
580 135 |
2014/12/25 |
537 821 |
2014/12/26 |
529 268 |
2014/12/27 |
546 364 |
2014/12/28 |
545 398 |
2014/12/29 |
564 978 |
2014/12/30 |
567 027 |
2014/12/31 |
570 693 |
2015/01/01 |
534 303 |
2015/01/02 |
558 219 |
2015/01/03 |
567 233 |
2015/01/04 |
563 298 |
2015/01/05 |
604 698 |
2015/01/06 |
621 243 |
2015/01/07 |
632 390 |
2015/01/08 |
632 665 |
2015/01/09 |
633 088 |
2015/01/10 |
606 775 |
2015/01/11 |
594 196 |
2015/01/12 |
641 883 |
2015/01/13 |
659 696 |
Date |
Eskom Generation(MWh) |
2015/01/14 |
654 672 |
2015/01/15 |
653 681 |
2015/01/16 |
640 907 |
2015/01/17 |
609 410 |
2015/01/18 |
590 668 |
2015/01/19 |
646 069 |
2015/01/20 |
657 368 |
2015/01/21 |
661 808 |
2015/01/22 |
660 411 |
2015/01/23 |
657 848 |
2015/01/24 |
619 816 |
2015/01/25 |
606 225 |
2015/01/26 |
644 622 |
2015/01/27 |
648 116 |
2015/01/28 |
651 566 |
2015/01/29 |
659 784 |
2015/01/30 |
653 656 |
2015/01/31 |
611 674 |
2015/02/01 |
590 463 |
2015/02/02 |
639 638 |
2015/02/03 |
644 380 |
2015/02/04 |
641 530 |
2015/02/05 |
627 725 |
2015/02/06 |
635 242 |
2015/02/07 |
601 393 |
2015/02/08 |
590 178 |
2015/02/09 |
660 547 |
2015/02/10 |
674 361 |
2015/02/11 |
672 620 |
2015/02/12 |
684 395 |
2015/02/13 |
681 791 |
2015/02/14 |
609 675 |
2015/02/15 |
592 297 |
2015/02/16 |
659 581 |
2015/02/17 |
659 439 |
2015/02/18 |
660 731 |
2015/02/19 |
666 432 |
2015/02/20 |
669 626 |
2015/02/21 |
616 261 |
2015/02/22 |
603 605 |
2015/02/23 |
659 430 |
2015/02/24 |
671 780 |
2015/02/25 |
670 638 |
2015/02/26 |
646 383 |
2015/02/27 |
659 272 |
2015/02/28 |
614 049 |
2015/03/01 |
596 611 |
Date |
Eskom Generation(MWh) |
2015/03/02 |
646 139 |
2015/03/03 |
655 131 |
2015/03/04 |
653 905 |
2015/03/05 |
654 915 |
2015/03/06 |
659 595 |
2015/03/07 |
624 880 |
2015/03/08 |
604 260 |
2015/03/09 |
658 244 |
2015/03/10 |
663 519 |
2015/03/11 |
669 379 |
2015/03/12 |
665 825 |
2015/03/13 |
669 401 |
2015/03/14 |
632 138 |
2015/03/15 |
604 051 |
2015/03/16 |
654 986 |
2015/03/17 |
662 898 |
2015/03/18 |
666 691 |
2015/03/19 |
666 581 |
2015/03/20 |
665 638 |
2015/03/21 |
620 301 |
2015/03/22 |
614 278 |
2015/03/23 |
666 732 |
2015/03/24 |
670 772 |
2015/03/25 |
658 540 |
2015/03/26 |
646 774 |
2015/03/27 |
651 994 |
2015/03/28 |
613 534 |
2015/03/29 |
592 406 |
2015/03/30 |
645 184 |
2015/03/31 |
653 596 |
2015/04/01 |
644 047 |
2015/04/02 |
630 578 |
2015/04/03 |
573 625 |
2015/04/04 |
564 804 |
2015/04/05 |
550 425 |
2015/04/06 |
561 540 |
2015/04/07 |
623 087 |
2015/04/08 |
642 058 |
2015/04/09 |
649 858 |
2015/04/10 |
651 494 |
2015/04/11 |
617 225 |
2015/04/12 |
572 859 |
2015/04/13 |
623 971 |
2015/04/14 |
614 182 |
2015/04/15 |
607 088 |
2015/04/16 |
624 413 |
2015/04/17 |
623 214 |
Date |
Eskom Generation(MWh) |
2015/04/18 |
594 320 |
2015/04/19 |
590 557 |
2015/04/20 |
633 948 |
2015/04/21 |
644 856 |
2015/04/22 |
646 765 |
2015/04/23 |
644 561 |
2015/04/24 |
655 311 |
2015/04/25 |
607 875 |
2015/04/26 |
580 876 |
2015/04/27 |
598 433 |
2015/04/28 |
642 072 |
2015/04/29 |
640 837 |
2015/04/30 |
634 325 |
2015/05/01 |
592 895 |
2015/05/02 |
587 419 |
2015/05/03 |
591 139 |
2015/05/04 |
633 702 |
2015/05/05 |
644 061 |
2015/05/06 |
635 055 |
2015/05/07 |
645 770 |
2015/05/08 |
646 860 |
2015/05/09 |
602 641 |
2015/05/10 |
598 103 |
2015/05/11 |
653 257 |
2015/05/12 |
653 953 |
2015/05/13 |
649 259 |
2015/05/14 |
642 964 |
2015/05/15 |
647 772 |
2015/05/16 |
603 791 |
2015/05/17 |
581 184 |
2015/05/18 |
633 468 |
2015/05/19 |
645 843 |
2015/05/20 |
642 315 |
2015/05/21 |
626 664 |
2015/05/22 |
626 168 |
2015/05/23 |
594 155 |
2015/05/24 |
590 283 |
2015/05/25 |
646 513 |
2015/05/26 |
655 347 |
2015/05/27 |
658 980 |
Date |
Eskom Generation(MWh) |
2015/05/28 |
656 093 |
2015/05/29 |
647 941 |
2015/05/30 |
607 979 |
2015/05/31 |
597 922 |
2015/06/01 |
635 557 |
2015/06/02 |
651 258 |
2015/06/03 |
656 137 |
2015/06/04 |
666 278 |
2015/06/05 |
680 469 |
2015/06/06 |
656 803 |
2015/06/07 |
631 345 |
2015/06/08 |
669 208 |
2015/06/09 |
678 704 |
2015/06/10 |
685 050 |
2015/06/11 |
684 724 |
2015/06/12 |
662 137 |
2015/06/13 |
636 584 |
2015/06/14 |
611 143 |
2015/06/15 |
644 926 |
2015/06/16 |
625 905 |
2015/06/17 |
673 569 |
2015/06/18 |
679 072 |
2015/06/19 |
674 545 |
2015/06/20 |
640 561 |
2015/06/21 |
624 080 |
2015/06/22 |
663 906 |
2015/06/23 |
669 845 |
2015/06/24 |
666 918 |
2015/06/25 |
668 623 |
2015/06/26 |
662 240 |
2015/06/27 |
642 001 |
2015/06/28 |
598 845 |
2015/06/29 |
662 150 |
2015/06/30 |
678 103 |
2015/07/01 |
669 141 |
2015/07/02 |
670 101 |
2015/07/03 |
665 420 |
2015/07/04 |
632 214 |
2015/07/05 |
615 172 |
2015/07/06 |
654 321 |
Date |
Eskom Generation(MWh) |
2015/07/07 |
667 525 |
2015/07/08 |
663 161 |
2015/07/09 |
657 342 |
2015/07/10 |
653 336 |
2015/07/11 |
626 462 |
2015/07/12 |
606 680 |
2015/07/13 |
658 591 |
2015/07/14 |
674 178 |
2015/07/15 |
651 307 |
2015/07/16 |
657 591 |
2015/07/17 |
662 343 |
2015/07/18 |
634 578 |
2015/07/19 |
590 284 |
2015/07/20 |
649 609 |
2015/07/21 |
649 751 |
2015/07/22 |
668 486 |
2015/07/23 |
670 627 |
2015/07/24 |
658 947 |
2015/07/25 |
622 613 |
2015/07/26 |
609 759 |
2015/07/27 |
665 270 |
2015/07/28 |
671 639 |
2015/07/29 |
669 020 |
2015/07/30 |
657 291 |
2015/07/31 |
679 727 |
2015/08/01 |
637 311 |
2015/08/02 |
607 729 |
2015/08/03 |
636 299 |
2015/08/04 |
642 524 |
2015/08/05 |
651 050 |
2015/08/06 |
642 989 |
2015/08/07 |
646 820 |
2015/08/08 |
606 894 |
2015/08/09 |
583 584 |
2015/08/10 |
603 617 |
2015/08/11 |
657 160 |
2015/08/12 |
660 460 |
2015/08/13 |
646 812 |
2015/08/14 |
648 734 |
2015/08/15 |
602 957 |
Date |
Eskom Generation(MWh) |
2015/08/17 |
626 974 |
2015/08/18 |
635 440 |
2015/08/19 |
634 955 |
2015/08/20 |
632 887 |
2015/08/21 |
623 709 |
2015/08/22 |
596 125 |
2015/08/23 |
582 524 |
2015/08/24 |
616 890 |
2015/08/25 |
620 678 |
2015/08/26 |
624 544 |
2015/08/27 |
622 084 |
2015/08/28 |
610 296 |
2015/08/29 |
578 111 |
2015/08/30 |
570 841 |
2015/08/31 |
615 499 |
2015/09/01 |
622 811 |
2015/09/02 |
628 798 |
2015/09/03 |
637 396 |
2015/09/04 |
659 525 |
2015/09/05 |
624 540 |
2015/09/06 |
592 077 |
2015/09/07 |
627 980 |
2015/09/08 |
644 515 |
2015/09/09 |
636 993 |
2015/09/10 |
635 199 |
2015/09/11 |
638 149 |
2015/09/12 |
615 652 |
2015/09/13 |
586 444 |
2015/09/14 |
620 244 |
2015/09/15 |
633 865 |
2015/09/16 |
631 170 |
2015/09/17 |
631 164 |
2015/09/18 |
636 441 |
2015/09/19 |
606 490 |
2015/09/20 |
594 972 |
2015/09/21 |
644 197 |
2015/09/22 |
640 287 |
2015/09/23 |
631 009 |
2015/09/24 |
591 012 |
2015/09/25 |
610 111 |
Date |
Eskom Generation(MWh) |
2015/09/26 |
592 081 |
2015/09/27 |
571 277 |
2015/09/28 |
617 732 |
2015/09/29 |
642 341 |
2015/09/30 |
639 808 |
2015/10/01 |
634 253 |
2015/10/02 |
638 957 |
2015/10/03 |
604 244 |
2015/10/04 |
584 857 |
2015/10/05 |
630 257 |
2015/10/06 |
645 349 |
2015/10/07 |
645 239 |
2015/10/08 |
642 990 |
2015/10/09 |
638 493 |
2015/10/10 |
599 265 |
2015/10/11 |
586 398 |
2015/10/12 |
632 374 |
2015/10/13 |
640 141 |
2015/10/14 |
644 053 |
2015/10/15 |
634 139 |
(1)(b)
Date |
Customer Demand MWh |
2014/11/30 |
614 773 |
2014/12/01 |
652 504 |
2014/12/02 |
658 698 |
2014/12/03 |
666 501 |
2014/12/04 |
667 600 |
2014/12/05 |
661 519 |
2014/12/06 |
631 278 |
2014/12/07 |
617 190 |
2014/12/08 |
659 295 |
2014/12/09 |
667 839 |
2014/12/10 |
662 811 |
2014/12/11 |
659 975 |
2014/12/12 |
651 849 |
2014/12/13 |
623 061 |
2014/12/14 |
602 952 |
2014/12/15 |
642 892 |
Date |
Customer Demand MWh |
2014/12/16 |
630 796 |
2014/12/17 |
641 361 |
2014/12/18 |
646 228 |
2014/12/19 |
640 496 |
2014/12/20 |
604 096 |
2014/12/21 |
593 812 |
2014/12/22 |
620 334 |
2014/12/23 |
614 089 |
2014/12/24 |
599 689 |
2014/12/25 |
559 594 |
2014/12/26 |
549 761 |
2014/12/27 |
562 026 |
2014/12/28 |
562 926 |
2014/12/29 |
582 607 |
2014/12/30 |
590 377 |
2014/12/31 |
591 629 |
2015/01/01 |
552 386 |
2015/01/02 |
578 062 |
2015/01/03 |
584 390 |
2015/01/04 |
580 635 |
2015/01/05 |
624 267 |
2015/01/06 |
641 990 |
2015/01/07 |
650 941 |
2015/01/08 |
654 458 |
2015/01/09 |
658 410 |
2015/01/10 |
624 717 |
2015/01/11 |
611 978 |
2015/01/12 |
664 274 |
2015/01/13 |
678 964 |
2015/01/14 |
676 747 |
2015/01/15 |
674 977 |
2015/01/16 |
667 243 |
2015/01/17 |
628 761 |
2015/01/18 |
611 902 |
2015/01/19 |
668 597 |
2015/01/20 |
678 586 |
2015/01/21 |
682 946 |
2015/01/22 |
681 396 |
2015/01/23 |
677 922 |
2015/01/24 |
638 834 |
Date |
Customer Demand MWh |
2015/01/25 |
623 534 |
2015/01/26 |
673 947 |
2015/01/27 |
681 891 |
2015/01/28 |
672 377 |
2015/01/29 |
676 011 |
2015/01/30 |
669 748 |
2015/01/31 |
630 383 |
2015/02/01 |
610 002 |
2015/02/02 |
660 164 |
2015/02/03 |
666 711 |
2015/02/04 |
681 407 |
2015/02/05 |
676 212 |
2015/02/06 |
674 520 |
2015/02/07 |
638 341 |
2015/02/08 |
625 706 |
2015/02/09 |
684 858 |
2015/02/10 |
696 146 |
2015/02/11 |
701 262 |
2015/02/12 |
704 915 |
2015/02/13 |
701 343 |
2015/02/14 |
662 979 |
2015/02/15 |
636 190 |
2015/02/16 |
678 073 |
2015/02/17 |
678 782 |
2015/02/18 |
683 821 |
2015/02/19 |
691 391 |
2015/02/20 |
690 313 |
2015/02/21 |
649 175 |
2015/02/22 |
629 863 |
2015/02/23 |
680 422 |
2015/02/24 |
690 519 |
2015/02/25 |
688 200 |
2015/02/26 |
693 423 |
2015/02/27 |
678 878 |
2015/02/28 |
632 385 |
2015/03/01 |
615 989 |
2015/03/02 |
669 051 |
2015/03/03 |
674 638 |
2015/03/04 |
675 675 |
2015/03/05 |
678 546 |
Date |
Customer Demand MWh |
2015/03/06 |
678 138 |
2015/03/07 |
644 353 |
2015/03/08 |
622 464 |
2015/03/09 |
677 087 |
2015/03/10 |
685 801 |
2015/03/11 |
687 776 |
2015/03/12 |
688 292 |
2015/03/13 |
689 000 |
2015/03/14 |
650 059 |
2015/03/15 |
625 750 |
2015/03/16 |
677 776 |
2015/03/17 |
684 592 |
2015/03/18 |
686 001 |
2015/03/19 |
687 755 |
2015/03/20 |
682 914 |
2015/03/21 |
644 010 |
2015/03/22 |
630 664 |
2015/03/23 |
683 404 |
2015/03/24 |
687 956 |
2015/03/25 |
685 945 |
2015/03/26 |
690 873 |
2015/03/27 |
669 502 |
2015/03/28 |
632 650 |
2015/03/29 |
608 103 |
2015/03/30 |
661 626 |
2015/03/31 |
669 967 |
2015/04/01 |
668 627 |
2015/04/02 |
651 398 |
2015/04/03 |
594 235 |
2015/04/04 |
590 128 |
2015/04/05 |
579 514 |
2015/04/06 |
589 727 |
2015/04/07 |
655 740 |
2015/04/08 |
666 176 |
2015/04/09 |
672 502 |
2015/04/10 |
672 108 |
2015/04/11 |
637 678 |
2015/04/12 |
619 241 |
2015/04/13 |
663 577 |
2015/04/14 |
677 597 |
Date |
Customer Demand MWh |
2015/04/15 |
677 271 |
2015/04/16 |
679 907 |
2015/04/17 |
671 634 |
2015/04/18 |
645 426 |
2015/04/19 |
630 322 |
2015/04/20 |
669 247 |
2015/04/21 |
679 860 |
2015/04/22 |
683 606 |
2015/04/23 |
679 504 |
2015/04/24 |
680 109 |
2015/04/25 |
635 071 |
2015/04/26 |
611 130 |
2015/04/27 |
624 250 |
2015/04/28 |
666 329 |
2015/04/29 |
668 547 |
2015/04/30 |
663 547 |
2015/05/01 |
617 955 |
2015/05/02 |
612 217 |
2015/05/03 |
617 004 |
2015/05/04 |
662 729 |
2015/05/05 |
679 554 |
2015/05/06 |
675 633 |
2015/05/07 |
686 368 |
2015/05/08 |
683 972 |
2015/05/09 |
653 427 |
2015/05/10 |
630 569 |
2015/05/11 |
680 763 |
2015/05/12 |
684 688 |
2015/05/13 |
683 584 |
2015/05/14 |
683 452 |
2015/05/15 |
680 843 |
2015/05/16 |
652 459 |
2015/05/17 |
627 987 |
2015/05/18 |
672 777 |
2015/05/19 |
682 316 |
2015/05/20 |
680 819 |
2015/05/21 |
684 597 |
2015/05/22 |
678 270 |
2015/05/23 |
649 686 |
2015/05/24 |
636 941 |
Date |
Customer Demand MWh |
2015/05/25 |
680 562 |
2015/05/26 |
691 093 |
2015/05/27 |
689 785 |
2015/05/28 |
687 883 |
2015/05/29 |
678 297 |
2015/05/30 |
636 299 |
2015/05/31 |
624 217 |
2015/06/01 |
663 832 |
2015/06/02 |
678 966 |
2015/06/03 |
687 834 |
2015/06/04 |
699 092 |
2015/06/05 |
702 533 |
2015/06/06 |
677 867 |
2015/06/07 |
653 802 |
2015/06/08 |
694 948 |
2015/06/09 |
703 928 |
2015/06/10 |
716 499 |
2015/06/11 |
716 836 |
2015/06/12 |
714 953 |
2015/06/13 |
661 765 |
2015/06/14 |
640 077 |
2015/06/15 |
673 059 |
2015/06/16 |
650 032 |
2015/06/17 |
706 515 |
2015/06/18 |
711 768 |
2015/06/19 |
705 245 |
2015/06/20 |
669 921 |
2015/06/21 |
650 940 |
2015/06/22 |
697 149 |
2015/06/23 |
706 460 |
2015/06/24 |
706 658 |
2015/06/25 |
706 221 |
2015/06/26 |
697 005 |
2015/06/27 |
672 992 |
2015/06/28 |
651 838 |
2015/06/29 |
688 460 |
2015/06/30 |
698 407 |
2015/07/01 |
692 949 |
2015/07/02 |
693 312 |
2015/07/03 |
690 260 |
Date |
Customer Demand MWh |
2015/07/04 |
653 354 |
2015/07/05 |
637 854 |
2015/07/06 |
679 880 |
2015/07/07 |
698 275 |
2015/07/08 |
692 722 |
2015/07/09 |
686 403 |
2015/07/10 |
682 469 |
2015/07/11 |
655 458 |
2015/07/12 |
635 239 |
2015/07/13 |
685 843 |
2015/07/14 |
698 754 |
2015/07/15 |
695 409 |
2015/07/16 |
691 166 |
2015/07/17 |
696 565 |
2015/07/18 |
660 855 |
2015/07/19 |
646 471 |
2015/07/20 |
683 527 |
2015/07/21 |
690 396 |
2015/07/22 |
699 851 |
2015/07/23 |
708 383 |
2015/07/24 |
701 131 |
2015/07/25 |
670 257 |
2015/07/26 |
651 721 |
2015/07/27 |
694 919 |
2015/07/28 |
700 715 |
2015/07/29 |
704 311 |
2015/07/30 |
698 663 |
2015/07/31 |
703 594 |
2015/08/01 |
661 007 |
2015/08/02 |
636 444 |
2015/08/03 |
682 407 |
2015/08/04 |
689 477 |
2015/08/05 |
692 994 |
2015/08/06 |
690 907 |
2015/08/07 |
678 144 |
2015/08/08 |
638 883 |
2015/08/09 |
614 219 |
2015/08/10 |
628 776 |
2015/08/11 |
681 094 |
2015/08/12 |
685 460 |
Date |
Customer Demand MWh |
2015/08/13 |
679 649 |
2015/08/14 |
677 149 |
2015/08/15 |
634 823 |
2015/08/16 |
607 120 |
2015/08/17 |
652 403 |
2015/08/18 |
660 354 |
2015/08/19 |
657 677 |
2015/08/20 |
657 116 |
2015/08/21 |
647 200 |
2015/08/22 |
617 489 |
2015/08/23 |
604 102 |
2015/08/24 |
644 647 |
2015/08/25 |
645 891 |
2015/08/26 |
646 045 |
2015/08/27 |
644 655 |
2015/08/28 |
634 684 |
2015/08/29 |
601 424 |
2015/08/30 |
591 426 |
2015/08/31 |
632 223 |
2015/09/01 |
669 042 |
2015/09/02 |
676 263 |
2015/09/03 |
682 373 |
2015/09/04 |
700 260 |
2015/09/05 |
661 441 |
2015/09/06 |
636 233 |
2015/09/07 |
675 372 |
2015/09/08 |
687 079 |
2015/09/09 |
677 477 |
2015/09/10 |
678 821 |
2015/09/11 |
678 059 |
2015/09/12 |
653 847 |
2015/09/13 |
629 895 |
2015/09/14 |
670 489 |
2015/09/15 |
679 680 |
2015/09/16 |
675 104 |
2015/09/17 |
676 985 |
2015/09/18 |
682 142 |
2015/09/19 |
653 659 |
2015/09/20 |
637 410 |
2015/09/21 |
688 762 |
Date |
Customer Demand MWh |
2015/09/22 |
683 341 |
2015/09/23 |
673 321 |
2015/09/24 |
633 573 |
2015/09/25 |
650 464 |
2015/09/26 |
629 960 |
2015/09/27 |
617 185 |
2015/09/28 |
661 945 |
2015/09/29 |
675 770 |
2015/09/30 |
675 378 |
2015/10/01 |
662 080 |
2015/10/02 |
665 036 |
2015/10/03 |
630 343 |
2015/10/04 |
611 024 |
2015/10/05 |
658 813 |
2015/10/06 |
669 966 |
2015/10/07 |
670 396 |
2015/10/08 |
668 657 |
2015/10/09 |
670 214 |
2015/10/10 |
633 378 |
2015/10/11 |
615 977 |
2015/10/12 |
662 540 |
2015/10/13 |
671 910 |
2015/10/14 |
673 013 |
2015/10/15 |
667 974 |
(2) It is very difficult to comment on the increase or decrease in the electricity generation or demand as the period from November 2014 to October 2015 includes all the seasons and tariff periods; and no comparative period is given. In general, the demand has been normal.
(2)(a) There is a trend of somewhat reducing Eskom generation during the specified period, as IPPs are able to replace some of the Eskom generation (most of them are currently self-dispatched) the reliance on Eskom generation is reducing.
(2)(b) There are no abnormal trends seen over the specified period. The customer demand varies significantly depending on the weather, winter demand being higher than summer demand. This is true for both residential and industrial customers.
02 November 2015 - NW3787
Steenhuisen, Mr JH to ask the Minister of State Security
Whether his department has (a) state security agents and/or (b) any other departmental staff stationed in Parliament; is so, in each specified case, (i) (aa) for how long has the specified persons been stationed in Parliament and (bb) when is their deployment period expected to end, (ii) under whose instruction and/or request were such persons deployed and (iii) for what purpose were they deployed
Reply:
(a)&(b) The State Security Agency (SSA) has deployed its staff members from the Chief Directorate External Vetting and Advising to be stationed at Parliament to conduct vetting of Parliamentary support staff.
(i)(aa) The specified SSA staff has been stationed in Parliament since September 2015.
(bb) The SSA is expected to complete the vetting project in March 2016.
(ii) The SSA was requested by Mr.Gengezi Mgidlana, the Secretary to Parliament.
(iii) The Secretary to Parliament requested the SSA to conduct security vetting to all Parliamentary support staff.
02 November 2015 - NW3696
Alberts, Mr ADW to ask the Minister of Public Enterprises
(1) (a)How many pensioners of the Transport Pension Fund and the Transnet Second Defined Benefit Fund died during the period January 1, 2015 to September, 30 2015 (i)during each month and (ii)in total for the period; and (b) what was indicated on the death certificate as the cause of death in each of the cases mentioned?; ( 2 ) In how many cases where suicide was the cause of death, did such pensioners die during the period 1 November 2011 up to the latest specified date for which information is available, ( a) in total and (b) during each month ?
Reply:
- The information presented below is a summary of the information received from the Department of Home Affairs; no additional detail is provided.
Transport Pension Fund |
2015 01 |
2015 02 |
2015 03 |
2015 04 |
2015 05 |
2015 06 |
2015 07 |
2015 08 |
2015 09 |
Total |
|
PRASA Sub Fund |
NATURAL CAUSES |
1 |
1 |
1 |
2 |
5 |
|||||
UNNATURAL CAUSES |
1 |
1 |
|||||||||
1 |
1 |
2 |
2 |
6 |
|||||||
Transnet Sub Fund |
NATURAL CAUSES |
13 |
14 |
5 |
14 |
17 |
15 |
15 |
14 |
16 |
123 |
UNDER INVESTIGATION |
1 |
1 |
|||||||||
UNNATURAL CAUSES |
1 |
1 |
|||||||||
13 |
14 |
5 |
15 |
17 |
16 |
15 |
14 |
16 |
125 |
||
SAA Sub Fund |
NATURAL CAUSES |
1 |
1 |
||||||||
1 |
1 |
||||||||||
Transnet Second Defined Benefit Fund |
ADVANCED CA. CERVIX |
1 |
1 |
||||||||
CEREBROVASCULAR INCIDENT |
1 |
1 |
|||||||||
DEMENTIA |
1 |
1 |
|||||||||
DIZZYNESS |
1 |
1 |
|||||||||
HEART FAILURE |
1 |
1 |
|||||||||
NATURAL CAUSES |
188 |
174 |
156 |
196 |
229 |
297 |
266 |
230 |
208 |
1944 |
|
PULMONARY EMBOLISM |
1 |
1 |
|||||||||
UNDER INVESTIGATION |
1 |
1 |
2 |
2 |
6 |
||||||
UNNATURAL CAUSES |
8 |
3 |
5 |
2 |
2 |
3 |
2 |
1 |
4 |
30 |
|
196 |
177 |
163 |
199 |
233 |
303 |
271 |
231 |
213 |
1986 |
||
Total |
210 |
191 |
169 |
214 |
250 |
319 |
287 |
247 |
231 |
2118 |
2. The nature of the “unnatural cause of death” is not provided by the Department of Home Affairs, and it is therefore not possible to provide the information requested in respect of suicide.
02 November 2015 - NW3703
Waters, Mr M to ask the Minister of Police
(a) How many (i) private firearms, (ii) police firearms and (iii) illegal substances, with respect to (aa) quantity, (bb) value and (cc) name of each illegal substance, went missing from each police station in the Tembisa cluster and (b) what are the relevant details of each individual police station (i) for the (aa) 2013-14 and (bb) 2014-15 financial years and (ii) from 1 April 2015 up to the latest specified date for which information is available?
Reply:
Please see attached table for details.
|
|
2013/2014 |
2014/2015 |
2015/2016 1 April 2015 to 30 September 2015 |
|
||||||
|
|
i |
ii |
iii |
i |
ii |
iii |
i |
ii |
iii |
|
|
|
Private firearm |
Police firearm |
Illegal Substances |
Private firearm |
Police firearm |
Illegal Substances |
Private firearm |
Police firearm |
Illegal Substances |
|
|
TEMBISA |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
SEBENZA |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
TEMBISA SOUTH |
0 |
0 |
0 |
0 |
2 |
0 |
0 |
0 |
0 |
|
|
RABIE RIDGE |
0 |
2 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
|
|
IVORY PARK |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
|
|
EDENVALE |
0 |
2 |
0 |
0 |
2 |
0 |
0 |
0 |
0 |
|
|
KEMPTON PARK |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
OLIFANTSFONTEIN |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
NORKEM PARK |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
TOTAL |
0 |
6 |
0 |
0 |
6 |
0 |
0 |
0 |
0 |
|
|
|
NOTE: No illegal substances went missing from SAPS13 Stores, thus no values are tabulated. |
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
02 November 2015 - NW3762
Esterhuizen, Mr JA to ask the Minister of Energy
In light of the recent unveiling of the R150m clean energy power plant by Anglo American Platinum to reduce its reliance and draw on the national energy grid thus reducing demand for electricity from Eskom, has she considered promoting the specified kind of self-help and self-reliance strategy to other mining organisations and industries as this would greatly assist in reducing supply side shortages of electricity; if so, what are the relevant details?
Reply:
The electricity Regulation Act permits generation for own use (under schedule 2). This greatly assists in reducing demand for those entities like Anglo Platinum, that are able to provide their own power instead of relying on Eskom.
02 November 2015 - NW3768
Sithole, Mr KP to ask the Minister of Police
Whether, given the current challenge of the shortage of police officers, he will consider the shortening of the recruitment process of police officers to deal with the specified shortage; if not, why not; if so, what are the relevant details?
Reply:
The South African Police Service received criticism in the past on the poor quality of police recruits. The Recruitment Strategy for the recruitment of new police officers was therefore revised to strengthen the recruitment processes with a focus on quality than quantity and to professionalise the Police Service in terms of the National Development Plan, Vision 2030. The new process included in the Strategy includes the following:
- Targeted recruitment (Community consultation / vigorous marketing and advertising of posts)
- Segregation of functions related to the Strategy
- Integrity Testing
- Grooming Camps
- Publishing of names of applicants in the media for public comment
- Presentation of applicants to the communities for inputs / comments
- Recruitment Board (to involve both internal and external stake-holders in the final decision of recommended candidates)
The recruitment strategy currently in place is continuously subjected to review informed by operational challenges and demands of the organization.
30 October 2015 - NW3525
Kopane, Ms SP to ask the Minister of Social Development
(1)Will her department increase the budget of the Central Drug Authority (CDA) for the 2016-17 financial year in order to enable the CDA to (a) adequately assess the impact of the National Drug Master Plan and (b) collect the necessary baseline data against which it will measure the impact of its interventions; (2) since her reply to question 79 on 18 March 2015, how many (a) Provincial Drug Forums (PDFs) and (b) Municipal Action Committees (MACs) are currently (i) in place and (ii) operational in each province; (3) does her department have the capacity to monitor all the PDFs and MACs; if not, why not; if so, what does her department plan to do in order to capacitate itself in this regard?
Reply:
(1) (a) Yes. The budget of the Central Drug Authority (CDA) for the 2016-2017 financial year by 6.2% according to Medium Term Expenditure Framework. The current budget is R6.1 million which covers both personnel and goods and services.
(b) Yes. The budget will to some extent enable the Department to collect baseline data against which we will measure the impact and efficacy of current interventions, at least in one province.
(2) To ensure a seamless and coordinated approach to the implementation of the National Drug Master Plan, the Department has commenced with the process to conduct an audit of all structures. I will furnish the Honourable Member with a comprehensive reply upon completion of this process.
(3) Yes. Measures currently underway include the upgrading of the Directorate to a Chief Directorate to ensure proper coordination and support to the CDA.
30 October 2015 - NW3718
Mokgalapa, Mr S to ask the Minister of International Relations and Cooperation
Which (a) hotels and (b) conference venues did the visiting delegations from (i) African and (ii) other countries use during the African Union Summit held in Johannesburg in June 2015?
Reply:
a) Hotels in and around Sandton area were used
b) The following conference venues were utilised:
- The O R Tambo Conference Centre
- The Sandton International Convention Centre
UNQUOTE
30 October 2015 - NW3543
Paulsen, Mr N M to ask the Minister of Agriculture, Forestry and Fisheries
With regard to the announcement by his department that the 24 Aquaculture projects under the Operation Phakisa have to be implemented by 2019, (a) how many of these projects will be implemented in 2015 and (b) what are the relevant details of the specified projects?
Reply:
a) The 24 catalyst projects are the original projects identified during the Operation Phakisa Aquaculture LAB phase held in Durban during July and August 2014. Twenty of these projects have started their implementation.
b) An overview of the 24 Operation Phakisa Catalyst Projects are provided in the table below.
Initiative |
Name |
Species |
Location |
Province |
Expansion or new |
1a |
Expansion-Venteresdorp- Catfish |
Catfish |
Ventersdorp |
North West |
new |
1b |
Dooringbaai Abalone Farm |
Abalone |
Dooringbaai |
Western cape |
expansion |
1c |
Paternoster Oyster Hatchery |
Oysters |
Paternoster |
Western cape |
new |
1d |
Hamburg Oyster Farm |
Oysters |
Hamburg |
Eastern Cape |
expansion |
1e |
Oceanwise |
Dusky kob |
East London |
Eastern Cape |
expansion |
1f |
HIK Abalone Buffeljags Expansion |
Abalone |
Hermanus/Bredarsdorp |
Western cape |
expansion |
1g |
Abagold |
Abalone |
Hermanus |
Western cape |
expansion |
1h |
Jacobsbaai Sea Products |
Abalone |
Jacobsbaai |
Western cape |
expansion |
1i |
Amatikulu ornamental Farm |
Various oramental species |
Amatikulu |
kwaZulu Natal |
new |
1j |
Amatikulu kob farm |
Dusky kob |
Amatikulu |
kwaZulu Natal |
new |
1k |
Hamburg Kob Farm |
Dusky kob |
Hamburg |
Eastern Cape |
expansion |
1L |
Saldanha Bay Molapong Trout and Salmon |
Trout and Salmon |
Saldanha Bay |
Western cape |
new |
1n |
Catfish cluster/ADZ Ventersdorp |
Catfish |
Ventersdorp |
North West |
new |
1o |
Blue Oceans Mussels (Growout) |
Mussels |
Saldanha Bay |
Western cape |
expansion |
1p |
Southern Atlantic Mussels |
Mussels |
Saldanha Bay |
Western cape |
new |
1q |
Algoa Bay Sea Cage Farming - Yellowtail |
Yellowtail |
Algoa Bay |
Eastern Cape |
new |
1r |
Richards Bay Kob Cage culture |
Dusky Kob |
Richards Bay |
kwaZulu Natal |
new |
1s |
Hondeklip Baai Abalone |
Abalone |
Hondeklip Baai |
Northern Cape |
expansion |
1t |
Diamond Coast Abalone Ranching |
Abalone |
Hondeklip Baai |
Northern Cape |
new |
1u |
Saldanha Bay Oysters |
Oysters |
Saldanha Bay |
Western cape |
expansion |
1v |
Wild Coast Abalone |
Abalone |
Haga Haga |
Eastern Cape |
expansion |
1vb |
Wild Coast Abalone Ranching |
Abalone |
Port Elizabeth/Cape Recife |
Eastern Cape |
new |
1w |
Roman Bay Abalone Farm |
Abalone |
Gansbaai |
Western cape |
expansion |
1x |
Marine Growers Abalone Farm |
Abalone |
Gansbaai |
Western cape |
expansion |
30 October 2015 - NW3726
Vos, Mr J to ask the Minister of Home Affairs
Has his department implemented a special dispensation for minors from the Kingdom of Lesotho whereby they do not need to produce an unabridged birth certificate on entrance to the Republic of South Africa as long as they have a letter from a learning institution stating that they are in possession of the original unabridged birth certificate; if so, (a) on what date did the specified dispensation come into effect, (b) which (i) piece of legislation and/or (ii) regulation empowers his department to institute the specified dispensation, (c) on (i) what date and (ii) under what Government Gazette notice was the specified dispensation published and (d) what is his department’s definition of learning institution?
Reply:
No, therefore (a-c) falls away.
(d) The Immigration Regulations, 2014 defines a "learning institution" as-
(a) an institution of higher education established in terms of the Higher Education Act, 1997 (Act No. 101 of 1997); or
(b) a college established in terms of the Further Education and Training Colleges Act, 2006 (Act No. 16 of 2006), but does not include-
(i) a school offering further education and training programmes under the South African Schools Act, 1996 (Act No. 84 of 1996); or
(ii) a college under the authority of a government department other than the Department of Higher Education and Training; or
(c) a school contemplated in section 1 of the South African Schools Act, 1996 (Act No. 84 of 1996);
30 October 2015 - NW3700
Mokgalapa, Mr S to ask the Minister of International Relations and Cooperation
With regard to (a) the diplomatic immunities and privileges awarded to delegates attending the African Union (AU) summit in Johannesburg in June 2015 as gazetted on 5 June 2015 (details furnished) and (b) the reply of President, Mr Jacob G Zuma, to oral question 14 in the National Assembly on 6 August 2015, that her department had gazetted the specific areas that would be the AU area, what was or were the exact geographical area or areas declared to be the AU area under the specified Gazette notice?
Reply:
- None
UNQUOTE
29 October 2015 - NW2935
Basson, Mr LJ to ask the Minister of Water and Sanitation
(1)What (a) is the current capacity of the Groblersdal Water Purification Plant in the Sekhukhune District Municipality and (b) will be the plant’s capacity after the completion of the construction, measured in mega litres per day; (2) (a) what (i) will be the final cost and (ii) is the current status of the project and (b) when will the specified project be completed; (3) (a) who was appointed to undertake the construction, (b) what is the tender (i) amount and (ii) contract number and (c) who is the implementing agent; (4) whether the appointed contractor is still on site; if not, why not; if so, what are the relevant details; (5) whether the additional extraction of water will have any effect on farmer quotas downstream?
Reply:
(1)(a) The current capacity of the Groblersdal Water Purification Plant is 22 mega litres per day (Ml /day).
(1)(b) The new capacity will be 40Ml/day.
(2)(a)(i) Total estimated completion cost will be R 38,866,533.67.
(2)(a)(ii) Current status of the project is 90% complete.
(2)(b) Estimate completion date for the Groblersdal Water Purification Plant is 26 May 2016.
(3)(a) Paparich Property Development was appointed on the project.
(3)(b)(i) The tender amount was R 32,366,533.67.
(3)(b)(ii) The Contract number is SK/8/3/1-05/2011/12.
(3)(c) The Implementing Agent is the Sekhukhune District Municipality.
(4) The contractor (Paparich Property Development) is no longer on site. The contractor’s contract was terminated by the Sekhukhune District Municipality due to poor performance on site. My Department’s Construction West Unit has taken over the project and it is anticipated to be completed by 26 May 2016.
(5) The additional extraction of water from the Olifants River will have no negative effect on the farmers with a registered allocation downstream.
---00O00---
29 October 2015 - NW37720
Breytenbach, Adv G to ask the Minister of Justice and Correctional Services
(a) What progress has been made in moving the corporate services component of the National Prosecuting Authority (NPA) into the Department of Justice and (b) what functions of corporate services are still left with the NPA?
Reply:
a) I wish to inform the Honourable Member that the Senior Management of the Department of Justice and Constitutional Development [DoJ&CD] and the National Prosecuting Authority [NPA] are continuing to engage with a view to ensuring alignment and continued cooperation within the corporate support services environment. This will ensure that a single set of policies and systems are in place by the end of the current financial year, which would be applicable to both the DoJ&CD and the NPA.
The 2014/2015 Annual Report of the DoJ&CD submitted to Parliament was a consolidated document, which also included NPA information and henceforth the planning and reporting processes will also be integrated.
I as the Minister of Justice and Correctional Services, the Director-General [DG] and the National Director of Public Prosecutions [NDPP] have agreed that the NDPP will shortly submit a proposal to the Minister for discussion, such proposal addressing a possible way forward with regards to administrative support services which will remain in the NPA in order for the NDPP to fulfill the administrative legislation requirements, including reporting. This proposal will then also address issues of structure within the NPA and post provisioning associated with such structure of support.
b) Currently the NPA still performs the corporate support services as previously, until the matters in the response to [a] above, have been finalized.
29 October 2015 - NW3706
Selfe, Mr J to ask the Minister of Justice and Correctional Services
(1)What (a) is the current status of the parole application for a certain person (Mr Nicholas Pike) and (b) are the reasons for the delay in processing the specified application; (2) when are the specified delays expected to be resolved ?
Reply:
(1)(a) The offender was sentenced on 6 December 2006 to four (4) years imprisonment in terms of section 276(1)(i) of the Criminal Procedure Act, Act 51 of 1977 for driving a motor vehicle without the owner’s permission and theft. He was placed on Correctional Supervision on the 17 August 2007. The offender absconded from the system of community corrections. He committed crimes during this period and was sentenced on the 19th April 2008 to 15 years imprisonment for fraud and forgery and again on 20th April 2010 was sentenced to five (05) years imprisonment for fraud and forgery and the court ordered that the sentence to run concurrently with the 15 years imprisonment. He was considered by the Correctional Supervision and Parole Board (CSPB) for possible placement on parole on the 16th October 2014 and was given a further profile for the 18th February 2015.
(b) During consideration by the CSPB it was discovered that the offender did not complete his Correctional Supervision period and Community Corrections Office of Kgoši Mampuru II Management Area was approached for clarity on the number of outstanding days to be served for parole violation. Clarification was received from the Community Corrections offices that the offender still has to serve an additional 1193 days of his previous sentence. The effective sentence is currently 15 years plus 1193 days imprisonment.
(2) On 20 October 2015 the Community Corrections Office at Kgoši Mampuru II Management Area visited the CSPB at Leeuwkop Management Area, explained to the offender the period to be served for his absconding. Subsequently, he appeared before the CSPB on the 20th October 2015 and it was decided that he will be reconsidered on the 21st July 2016.
29 October 2015 - NW3705
Selfe, Mr J to ask the Minister of Justice and Correctional Services
(1) Whether there was an outbreak of Leptospirosis at the Pollsmoor remand detention facility; if so, what are the relevant details; (2) What actions have been taken to (a) quarantine inmates, (b) fumigate their personal effects, (c) deal with the rat infestation and (d) transfer inmates to other facilities; (3) What long term steps are being taken to improve sanitation, hygiene and overcrowding problems at the specified facility as recently highlighted by the report by the former judge of the SA Constitutional Court, Justice Cameron?
Reply:
- Yes, there was an outbreak of Leptospirosis at the Pollsmoor Remand Detention facility.
The details are as follows:
- Two cases of Leptospirosis have been identified in August 2015.
- One Leptospirosis case identified in September 2015.
Case 1 |
Case 2 |
Case 3 |
|
Patient Initials |
Patient BC |
Patient AM |
Patient DV |
Age |
52 |
49 |
44 |
Race |
Coloured |
African |
Coloured |
Gender |
Male |
Male |
Male |
Unit |
Section A (Cell 591) |
Section A (Cell 545) |
Section E 2 |
Date of onset of illness |
25.07.2015 Returned to Clinic: 01.08.2015 |
04.08.2015 Returned to Clinic: 11.08.2015 |
31.08.2015 Returned 04.09.2015 |
Referred to Victoria Hospital |
01.08.2015 |
11.08.2015 |
04.09.2015 |
Treatment Outcome date |
Demised : 02.08.2015 at Victoria hospital |
Discharged from Victoria hospital on the 20th August 2015 |
Discharged from Victoria hospital on the 17.09.2015 |
N.B. Confirmation of Leptospirosis Diagnosis by the Communicable Disease Control: Department of Health Western Cape was received by DCS on the 20th August 2015 for the first two cases identified at Victoria Hospital. Third case confirmation was received on the 07th September 2015.
2. Actions that had been taken to :
(a) Quarantine inmates,
- Inmates were not quarantined; however those with moderate to severe signs were transferred immediately to Victoria Hospital as recommended by the National Institute for Communicable Diseases (NICD).
- All inmates who presented with nonspecific signs and symptoms were tested and treated empirically for Leptospirosis.
(b) Fumigate their personal effects,
- Fumigation intervals of the cells have been increased.
- Personal Protective Clothing and Equipment (PPE) was purchased and distributed for use in all areas that can expose one to risk of infection (e.g. waste handlers, cleaners).
- All Remand Detainees were issued with the prescribed uniform.
- Frequent washing and disinfecting of personal clothing was encouraged.
(c) deal with the rat infestation :
Pest Control service providers have been contracted for rodents and other pests control measures.
- Advanced mechanical rodent traps were placed at access points to eradicate the rodents.
- Gas fumigation of the tunnel will be implemented as per evacuation plan.
- The Society for the Prevention of Cruelty to Animals (SPCA) was contacted to remove feral rats.
- Waste Management has been intensified and waste collection has been reviewed from twice a week to daily. Waste storage procedures have been implemented.
- Environmental hygiene was intensified through identification of additional cleaning teams, increasing the frequency of cleaning programs to twice daily and the entire facility scrub down was conducted as per facility evacuation plan.
- Weekly inspection is being done by the City of Cape Town Environmental Health Practitioners and DCS officials.
(d) Transfer inmates to other facilities
- In-service training was provided to clinical staff with regard to clinical presentation, diagnosis and prevention of Leptospirosis by 4th September 2015.
- Inmates were screened as per NICD guidelines before they were evacuated to other Correctional Centers.
- Evacuation plan was developed and inmates were transferred to other facilities in the Western Cape as per plan. The evacuation and transfer plan was implemented per schedule to mitigate risk factors.
- All Provincial Stakeholders were informed about the evacuation plan.
3.Long term steps being taken to improve sanitation, hygiene and overcrowding problems at the specified facility as recently highlighted in the report by the former judge of the SA Constitutional Court, Justice Cameron.
Sanitation and hygiene:
- Medication available and issued as prescribed.
- Meals are provided three times per day as per meal plan.
- Mattresses and blankets are issued on admission for sleeping purposes to all offenders.
- Cleaning material availability monitored and cleaning procedures intensified.
- Overcrowding:Comprehensive HIV and AIDS as well as Tuberculosis programmes and services are implemented with the support of external partners. Condoms are distributed however there is malicious misuse of condoms (trafficking of contraband).
The Department of Correctional Services implements a multi-pronged strategy to manage overcrowding .The strategy consists of the following dimensions:
- Managing levels of remand detainees (RD’s) through IJS Case Management Task Team & Inter-Sectoral Committee on Child Justice;
- Managing levels of sentenced inmates through improving effective & appropriate use of conversion of sentence to community correctional supervision, release on parole, & transfers between correctional centres to attempt to establish some degree of evenness of overcrowding;
- Ensuring progress with DCS capital works programme to upgrade correctional facilities & to build new correctional centres that are both cost effective & rehabilitation oriented;
- Encouraging debate in South Africa about reason for incarceration as a sentence & encouraging an approach to appropriate sentencing that is focused on facilitating rehabilitation;
- Enhancing community correctional supervision so that it can be better utilized as an appropriate sentence for less serious crimes;
- Improving correction & development programmes within DCS to ensure enhanced facilitation of rehabilitation that targets offending behaviour;
- Encouraging improvement of first & second levels of correction in family & social institutions & social & economic sector government departments respectively to decrease rate of entry into criminal justice system; and
- Encouraging community involvement in social reintegration of offenders back into their community in order to assist in reducing levels of repeat offending
.
28 October 2015 - NW3754
Carter, Ms D to ask the Minister of Environmental Affairs
Whether the Government intends to implement any plan through local government to allow owners of businesses and residential properties to get certification for being carbon neutral and therefore to enjoy a 10% rebate on their rates in order that such a dispensation will help to improve air quality, reduce pollution, create sizeable job opportunities and help mitigate climate change; if not, why not; if so, what are the relevant details?
Reply:
The Department of Environmental Affairs is responsible for facilitation and co-ordination within environmental projects/interventions implemented by the municipalities and does not take the lead in as far as the implementation of local government incentive programmes for residents is concerned.
Notwithstanding this role, it is noted that the above is an innovative proposal that will be considered in consultation with the Department of Cooperative Governance and Traditional Affairs.
---ooOoo---
28 October 2015 - NW3368
De Freitas, Mr MS to ask the Minister of Transport
How does her department intend to recover the billions of rand lost by the Passenger Rail Agency of South Africa (PRASA) as a result of the alleged fraud and mismanagement attributed to the Group Chief Executive Officer, Mr Lucky Montana, (b) and what measures will her department put in place to ensure that PRASA is able to successfully fulfill its mandate to provide the public with safe affordable and reliable rail services? NW 4027E
Reply:
The Minister of Transport and the Board have commissioned forensic investigations on several aspects that include maladministration and improper conduct by the former Group CEO, any employee of the Agency and any Board Member. Once these investigations on all aspects are finalized, the Minister will peruse the report and its recommendations and decide on the way forward for implementation of the outcome of the reports. Currently the group CEO is challenging the outcome of the Public Protector’s report by making some submissions, once the Public Protector has considered the submissions, a final report of the Public Protector will be issued and the Minister of Transport will be in the position to decide on the way forward, including reporting to the President
The Minister of transport have already advised the Board of PRASA to ensure that all employees are sent to various training which will enhance their capacity of comprehending amongst others the PFMA and its regulations and all other statutes that may be relevant for the performance of their dities.
The Minister will first peruse the recommendations of the forensic investigations, the final Public Protector’s report. Once all the parties has submitted their motivations and a final outcome of the investigations have taken into account all the affected parties statements the Minister will decide on the action to take. Currently it is premature to decide or announce what steps will be taken before the forensic investigation and the Public Protector’s investigations are finalized and perused. The Minister however guarantee to the members that steps will be taken against any person who may be fingered by the investigation reports.
28 October 2015 - NW3090
Ollis, Mr IM to ask the Minister of Water and Sanitation
(1)On what date was the most recent biomonitoring report compiled for (a) Kaap River, (b) Ngodwana River, (c) Nels River, (d) Sabie River, (e) Olifants River, (f) Limpopo River, (g) Vaal River, (h) Orange River and (i) Buffels River; (2) What was the water quality of each specified river as reflected in the report; (3) On what date was the sample for each specified river taken; (4) What was the geographical location where each of the samples were taken?
Reply:
Refer to the table below for responses.
NAME OF THE RIVER |
(1) RECENT BIOMONITORING |
(2) WATER QUALITY |
(3) SAMPLE DATE |
(4) GEOGRAPHICAL LOCATION |
Kaap River |
done in 2013. |
moderately impacted |
The sample in Kaap River was taken on March/April 2012 (wet season) and August /September 2012 (dry season). |
The geographical location of each samples were taken at the following sites; Holversum, Suid Kaap, Decedale; Noord Kaap, Oratava, Figtree, Lancaster and Louwscreek |
Ngodwana River |
done in 2013. |
moderately impacted |
March/April 2012 (wet season)and August /September 2012 (dry season). |
Ngodwana dam |
Nels River |
|
|
March/April 2012 (wet season) and August /September 2012 (dry season |
Rhenoesterhoek and spitzkopje. |
NAME OF THE RIVER |
(1) RECENT BIOMONITORING |
(2) WATER QUALITY |
(3) SAMPLE DATE |
(4) GEOGRAPHICAL LOCATION |
Sabie River, |
done in 2014. |
largely good with a few sites showing fair quality particularly at the headwaters which were impacted by trout fishing and forestry. |
Sabie River samples were last taken in February 2013 (Wet season) and September 2013 (Dry season). |
Sabie headwaters, Long Tom, above Horseshoe Falls, Sabie Hoek, Above York Saw Mill, Below Horseshoe Falls, Sabie Sewage Farm, Above Rietfontein Mine, Rietfontein Mine, DR de Wet Sabie, Frankfort Bridge, Lunsklip, Brandwag, and Aand-de-Vliet. |
Olifants River, |
Done in 2015 |
fair state |
February 2015 (Wet season) and August/ September |
Klein Olifants, Kranspoortspruit, Selons, Steelpoort River, Watervals, Sterkspruit, Spekboom and Blyde. |
Limpopo River |
Monitoring of the Limpopo River started in 2010, in 2012 and 2013 and as it is toxic it may destroy some of aquatic life including invertebrates which indicate toxic substances in the water. |
Only chemical programme is carried out with nutrients trend not posing threat. Most of the aquatic weeds are washed down the system from upstream |
The sampling dates are as follows: 12-15 July 2010, 19-25 September 2011, 25June-01 July 2012, 11-14December 2013, 30- 31July2014, 02-04 2015 |
Kruger National Park after Limpopo River & Luvuvhu confluence. Kruger National Park bridge on Luvuvhu River., Kruger National Park on Limpopo River, Beitbridge, Limpopo River before the weir, Downstream of Beitbridge sewage works(Zim) Limpopo River, Grobler bridge weir Limpopo River, Lephalale River on R572 Road Bridge, Mokolo River on Bridge in R572 Road, Mogalakwena River bridge on R572, Matlabas River( Bridge to Thabazimbi), Crocodile River(Bridge to Rustenburg) |
Vaal River |
Biomonitoring of the Upper Vaal WMA was last done on the 26th – 28stMay 2015 for Quarter 2. |
Water Quality analyses were not done for the two specified WMAs because (a) No accredited laboratory services contracted and (b) No site equipment available for on-site monitoring. |
No Water Quality samples taken. Macro-invertebrate sampling was done on-site for the Upper Orange WMA (26 – 28 May 2015) |
260768573” 270678081”; S26.87437 E28.116292; 26088336” 270356332”; S26.73864 E27.592506 (for other tributary rivers, |
NAME OF THE RIVER |
(1) RECENT BIOMONITORING |
(2) WATER QUALITY |
(3) SAMPLE DATE |
(4) GEOGRAPHICAL LOCATION |
Orange River |
Biomonitoring of the Upper Orange WMA was last done on the 9th – 11th June 2015 for Quarter 1 and the next biomonitoring of the Upper Orange WMA will be on the 14th – 18th of September 2015 |
Water Quality analyses were not done for the two specified WMAs because (a) No accredited laboratory services contracted and (b) No site equipment available for on-site monitoring. |
11 of June 2015 |
290573464” 24007414344”; S270531084” E80475889” |
Buffels River |
The Buffels River is a non-perennial river and mostly dry throughout the year. It however flows during winter seasons only after heavy rainfall. There is therefore no active monitoring programme being implemented for this river. |
N/A |
N/A |
N/A |
---00O00---
28 October 2015 - NW3752
Bozzoli, Prof B to ask the Minister of Higher Education and Training
What is the (a) prescribed and (b) targeted period by which a service provider’s course and/or programme should receive accreditation through the (i) Council on Higher Education’s (CHE) and (ii) SA Qualifications Authority’s (SAQA) respective systems; 2) how many service providers’ applications for course and/or programme accreditation are awaiting results in (i) the CHE offices and (ii) the SAQA offices; 3) are any of the specified applications overdue in respect of the (a) prescribed and/or (b) targeted date for accreditation; if so, why in respect of each specified case; 4) with reference to each specified service provider whose application for course and/or programme accreditation is still awaiting result (a) what is the name of the service provider, (b) what is the original date of the submission of the application and (c) what is the reason for the delay in the resolution of applications in the (i) CHE offices and (ii) SAQA offices?
Reply:
- (a) The Council on Higher Education (CHE) has provided information that there is no prescribed period by which a service provider’s course and/or programme should receive accreditation as this is not possible, given the nature of the accreditation processes and the variety of applications received. Accreditation is a peer driven qualitative evaluation process.
(b) (i) CHE’s target period for the application for accreditation of new programmes is six months. Factors affecting the achievement of this target are the following:
- Deferrals, i.e. sent back to the institution for omitted or additional information. This could happen multiple times until all the necessary information has been received and the application is sent to a peer evaluator.
- A site visit is undertaken to verify that the programme will meet the Higher Education Qualifications Committee’s (HEQC’s) criteria for programme accreditation. The site visit report and paper-based evaluation report need to be integrated before the application is tabled.
- A large number of applications are received and they cannot all be tabled on the agenda of the Accreditation Committee (AC) that has the capacity to consider approximately 140 applications of various kinds (accreditation of new programmes, reaccreditation of existing programmes, deferrals, representations, relocation of sites and approval of new sites) in a two-day meeting. This year, one–two day meetings were extended to three days and an additional unscheduled meeting will take place at the end of October to deal with the large number of applications. This expansion in the number of applications submitted is due to new nursing and education programmes submitted to meet the changed professional bodies’ and Higher Education Qualifications Sub-Framework (HEQSF) regulations. In addition, many institutions are submitting replacement programmes for those that cannot be aligned to the HEQSF.
(ii) In terms of the National Qualifications Framework (NQF) Act, section 13(1)(h)(i) and (ii), the South African Qualifications Authority (SAQA) is responsible for the development, registration and publication of qualifications and part qualifications; and to register a qualification or part qualification recommended by a Quality Council (QC) if it meets the relevant criteria. SAQA does not accredit education and training providers or service providers that offer learning programmes. Accreditation is the responsibility of the CHE, which conducts the accreditation and then submits the documents to SAQA for a qualification or part qualification to be registered on the NQF. The service provider will be recorded as the accredited provider on the NQF. The prescribed and targeted period by which SAQA will register qualifications or part qualifications on the NQF is four months from the time of receipt from the CHE.
2. (i) There were approximately 120 applications submitted at the CHE for accreditation of new programmes between January and August 2015 that are still at various stages of processing and peer evaluation. At the next HEQC meeting scheduled to take place at the end of November 2015, 72 applications for accreditation of programmes will receive an outcome and 15 programmes are still in process or have already been through an application process, but may have been referred back for further amendments. These applications will be on the agenda of the Accreditation Committee meeting in January 2016.
(ii) There is no backlog at SAQA regarding qualification registrations.
3. (a) and (b) In terms of the targeted date for accreditation and overdue applications, 84 private institutions submitted applications for accreditation in 2014. Of these, 14 programmes from 9 institutions are still in process as either deferrals or a representation (an opportunity for an institution to provide information in response to the reasons for non-accreditation of a programme submission) after receiving a non-accreditation.
4. (a), (b) and (c) (i) Programmes submitted in 2015: 1 January–30 April 2015: programmes from the following institutions as per the table below, are still in process. Each of these applications went through more than one process and was returned to the institution either for more information (a deferral) requested by the Accreditation Committee or have had a non-accreditation outcome; in this instance they have sent in a representation that again had to go through the evaluation process. These applications will be on the agenda of the Accreditation Committee meeting scheduled for January 2016
.
Name of Institution |
2015 submission dates |
|||||||||||||
12 Jan |
19 Jan |
10 Feb |
12 Feb |
23 Mar |
24 Mar |
26 Mar |
31 Mar |
1 Apr |
9 Apr |
13 Apr |
22 Apr |
24 Apr |
Grand Total |
|
African Academy |
- |
- |
- |
- |
- |
- |
1 |
- |
- |
- |
- |
- |
- |
1 |
Akademia |
- |
- |
- |
- |
- |
- |
1 |
- |
- |
- |
- |
- |
- |
1 |
Caerus Nursing School |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
- |
- |
1 |
Chatsmed Candlelight Nursing School |
- |
- |
- |
1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
Darul Uloom Zakariyya |
2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
2 |
Equine-Librium College |
- |
- |
- |
- |
- |
1 |
- |
- |
- |
- |
- |
- |
- |
1 |
Foundation for Professional Development |
- |
1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
Oakfields College |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
- |
- |
- |
- |
1 |
Prestige Academy (Pty) Ltd |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
- |
- |
- |
1 |
S Buys Academy |
- |
- |
- |
- |
1 |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
SAISI (South African Institution of Sensory Integration) |
- |
- |
- |
- |
- |
- |
- |
1 |
- |
- |
- |
- |
- |
1 |
Thembelani Institute of Nursing Education and Training |
- |
- |
1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
Tshwane University of Technology |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
1 |
2 |
Grand Total |
2 |
1 |
1 |
1 |
1 |
1 |
2 |
1 |
1 |
1 |
1 |
1 |
1 |
15 |
(c)(ii) SAQA has no current delay regarding processing qualifications and part qualifications received from the CHE for registration.
Compiler/Contact persons:
Ext:
DIRECTOR – GENERAL
STATUS:
DATE:
REPLY TO QUESTION 3752 APPROVED/NOT APPROVED/AMENDED
Dr BE NZIMANDE, MP
MINISTER OF HIGHER EDUCATION AND TRAINING
STATUS:
DATE:
28 October 2015 - NW3593
Volmink, Mr HC to ask the Minister of Health
(1)How many (a) basic ambulance assistants, (b) ambulance emergency assistants, (c) operational emergency orderlies, (d) paramedics, (e) emergency care technicians and (f) emergency care practitioners are employed in the public sector in each province; (2) whether there are staffing targets for each of the specified categories in each province; if not, why not; if so, what are the staffing targets in each case?
Reply:
(a) to (f) The table below indicates the provincial operational human resources, per category. Operational Emergency Care Orderlies are not employed by the Department.
PROVINCES |
BAA |
AEA |
PARAMEDICS |
ECT |
ECP |
TOTAL |
Eastern Cape |
1890 |
493 |
25 |
15 |
2 |
2425 |
Free State |
1372 |
181 |
15 |
41 |
1 |
1610 |
Gauteng |
976 |
115 |
35 |
103 |
0 |
1229 |
Kwa Zulu Natal |
1254 |
715 |
72 |
15 |
8 |
2064 |
Limpopo |
1184 |
627 |
21 |
11 |
1 |
1844 |
Mpumalanga |
580 |
174 |
3 |
0 |
0 |
757 |
North West |
377 |
175 |
2 |
122 |
3 |
679 |
Northern Cape |
556 |
197 |
4 |
11 |
0 |
768 |
Western Cape |
674 |
620 |
131 |
38 |
6 |
1469 |
Total |
8863 |
3297 |
308 |
356 |
21 |
12845 |
Abbreviations:
BAA - Basic Ambulance Assistants
AEA - Ambulance Emergency Assistants
ECT - Emergency Care Technicians
ECP - Emergency Care Practitioner
(2) The current staffing target is derived from a figure of 1 ambulance per 10 000 population, and 10 personnel to man a single vehicle on a 24 hour basis. A study has been proposed to scientifically determine the norm for ambulances to population as well as the staffing norms which will be guided by the Human Resource for Health Strategy 2030.
END.
28 October 2015 - NW3643
Msimang, Prof CT to ask the Minister of Basic Education
Whether she has any plans in place to replace the two teachers who were suspended in February 2015 for allegedly sexually assaulting students in Phusela High School in Tzaneen; if not, why not; if so, what are the relevant details?
Reply:
The Minister has no jurisdiction to replace the two teachers who were suspended in February 2015 for allegedly sexually assaulting students in Phusela High School in Tzaneen.
Subject to the provisions of Section 6 of the Employment of Educators Act, 76 of 1998, the appointment of any person, or the promotion or transfer of any educator in the service of a provincial Department of Education shall be made by the Head of Department. It is therefore, the responsibility of the Head of the Limpopo Education Department to deal with the matter.
28 October 2015 - NW3517
Van Der Walt, Ms D to ask the Minister of Basic Education
(1)Since her reply to question 1972 on 9 July 2015, has her department gathered any statistics with regard to female learners that are allegedly absent from school for up to 55 days in respect of each year due to lack of (a) sanitary towels and (b) proper sanitation facilities in schools, including bathrooms sanitary bins; if not, when will her department conduct an audit in this regard; if so, what are the relevant details; (2) What measures is her department willing to put in place immediately in affected schools to ensure that (a) sanitary bins and (b) other resources are available at such schools to keep female learners in school?
Reply:
(1) Since her reply to question 1972 on 9 July 2015, has her department gathered any statistics with regard to female learners that are allegedly absent from school for up to 55 days in respect of each year due to lack of (a) sanitary towels
RESPONSE
1(a) The Department does not have information indicating that female learners do not attend school as a result of poor and/or no ablution facilities. The Third Youth Risk Behaviour Survey, 2011 interviewed Grade 8-11 learners on, amongst others how easy or difficult it was for them to access sanitary towels when they needed them. Nationally, the majority of the female learners reported that it was easy to access sanitary towels when they needed them, with no significant variation by grade. Details are provided in the table below:
Grade |
Number of respondents |
% of high school learners who have access to sanitary towels (pads) when they need them |
Grade 8 |
1 387 |
70.1% |
Grade 9 |
1 427 |
75.1% |
Grade 10 |
1 498 |
73.5% |
Grade 11 |
1 344 |
73.1% |
There is very limited research in this area. A significant research study in this regard was conducted in Nepal. These could also not provide substantial evidence in this regard. The Nepal research was undertaken in a two-pronged approach (control group and focus group) with the other group provided with sanitary ware. After some time, both groups were interviewed to assess improvement in attendance of learners who were provided with sanitary ware. The findings indicated that learners who were provided with sanitary ware reported no improvement in school attendance, despite the access to sanitary ware. This suggests that menstruation (lack of and unaffordability of sanitary ware) has no impact on school attendance.
Furthermore, the Department, through the analysis of 2014 General Household Survey (GHS) data from Statistics South Africa has found that there is no difference between boys and girls absenteeism rate at school (Table 1). On the reasons for being absent at school, the data did not include lack sanitary wares as a reason for absenteeism amongst female learners. But almost 15 per cent of female learners indicated that they were absent from school due to illness or injury compared to 11 per cent of male learners. The detailed reasons for learner absenteeism are provided in the table below disaggregated by gender (Table 2);
Table 1: Percentage of learners by number of days absent
No. of days |
2014 |
|
Male |
Female |
|
1 day |
2.8 |
2.6 |
2 days |
1.3 |
1.2 |
3 days |
0.6 |
0.5 |
4 days |
0.3 |
0.3 |
5 days |
1.6 |
1.5 |
Not Absent |
93.4 |
94.0 |
Total |
100.0 |
100.0 |
Source: General Household Survey, 2014, DBE own calculations
Table 2: Reasons given for learners who were absent for 5 days
Main reasons for being absent at school |
2014 |
|
Male |
Female |
|
Illness/injury |
11.0 |
14.5 |
Did not want to go to school |
8.7 |
8.5 |
Need to take care of someone else at home |
0.0 |
0.0 |
Employed/working outside home |
0.0 |
0.0 |
Doing household chores |
0.0 |
0.0 |
The weather was bad |
4.0 |
6.5 |
No money for transport |
3.4 |
0.6 |
Lack of transport/problems with transport |
0.0 |
1.5 |
Writing exams |
73.0 |
68.4 |
Does not feel safe at school |
0.0 |
0.0 |
Total |
100.0 |
100.0 |
Source: General Household Survey, 2014, DBE own calculations
1(b) Proper sanitation facilities in schools, including bathrooms sanitary bins; if not, when will her department conduct an audit in this regard; if so, what are the relevant details;
Response:
1(b) The Department does not have information indicating that female learners do not attend school as a result of poor and/or no ablution facilities. Instead of carrying out a survey whose outcomes would assess the impact of the absence of these facilities on absenteeism, the Department rather conducted condition assessments on the schools to asses those that do not have sanitation facilities and has put in place plans to provide these facilities as part of the ASIDI Programme and where these are available but insufficient or require upgrading, the Provincial Departments of Education have provided for those under the Education Infrastructure Grant and their Equitable Share.
2. What measures is her department willing to put in place immediately in affected schools to ensure that (a) sanitary bins and (b) other resources are available at such schools to keep female learners in school?
Response:
2(a) Schools are encouraged to ensure that sanitary towels bins and / or burners are made available in all female toilets and districts/circuits and health units in provinces are responsible for monitoring that.
2(b) As mandated by the Regulations Relating to Minimum Uniform Norms and Standards for Public School Infrastructure (Gazette 37081 of 2013) the Provincial Education Departments have submitted implementation plans to provide adequate infrastructure, this includes the provision of basic services (sanitation, water and electricity) and other educational spaces, part of the purpose of providing sanitation facilities at schools is to create a conducive learning and teaching environment that would reduce learner absenteeism at schools. In cases where these facilities do not exist at all, they are provided for under the ASIDI Programme.
28 October 2015 - NW3760
Madisha, Mr WM to ask the Minister of Environmental Affairs
Whether she approached the United Nations with a view to soliciting its support for South Africa and other African countries that are losing rhinos, elephants and other wildlife through systematic and wide-scale poaching in order for this matter to be dealt with at both national and international level, leading to a treaty coming into force so that South Africa and other African countries can continue to derive economic benefits through ecotourism and community based enterprises linked to the efficient management of wildlife and ecosystems; if not, why not; if so, what are the relevant details?
Reply:
No. Existing multilateral agreements are being used to address poaching and illegal trade in wildlife, as well as ensuring that economic benefits can be derived from the efficient management of wildlife and ecosystems.
The Convention on Biological Diversity is a United Nations convention that has, as objectives, the conservation of biological diversity, the sustainable use of its components; and the fair and equitable sharing of the benefits arising out of the utilisation of genetic resources. Furthermore, the Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES) provides for sustainable utilisation, and is aimed at ensuring that international trade in specimens of wild animals and plants does not threaten their survival. South Africa is a Party to these conventions, and through collaboration with other Parties, issues of concern, including poaching, is being addressed, while sustainable utilisation is promoted.
--ooOoo--
28 October 2015 - NW3683
Volmink, Mr HC to ask the Minister of Health
Has there been a moratorium placed on health posts; if so, (a) when was this moratorium put into place in the Eastern Cape Department of Health, (b) how many posts have been affected by this moratorium in respect of each staffing category and (c) when is it envisaged that this moratorium will be lifted?
Reply:
(a) No, there is no moratorium on health posts. The moratorium is on administration posts from 06 June 2015. The posts that are however exempted from this moratorium are on the appointments made against all the conditional grants.
(b) All vacant and funded non-clinical posts are affected by the moratorium. In cases, where these non-clinical posts are critical (e.g hospital managers/ CEO's), special motivation is made to the Head of Department for approval.
(c) The moratorium is reviewed by the Head of Department on quarterly basis, and will be uplifted when the Head of Department is satisfied that the financial position has stabilized and the potential over expenditure is averted.
END.
28 October 2015 - NW3224
Balindlela, Ms ZB to ask the Minister of Water and Sanitation
(1)With reference to her media release on 14 August 2015, what are the names of the 250 water supply systems that need intervention due to non-submission of data and low performance of the operational compliance with the SA National Standard 241; (2) whether, besides communicating with water service institutions, her department has taken any further action to address this; if not, why not; if so, what are the relevant details?
Reply:
(1) The names of the 250 water supply systems are attached as Annexure A.
(2) Besides communicating with the water services institutions, non-compliance letters have been issued for some municipalities and site inspections conducted. Others have been assisted with development of action plans to address the identified short comings and task teams have also been established in other Provinces.
---00O00---
28 October 2015 - NW3714
Gqada, Ms T to ask the Minister of Health
(1)Whether there is a shortage of the chicken pox vaccine in the country; if so, (a) for how long has there been a shortage, (b) what (i) are the reasons for the shortage and (ii) is his department doing to mitigate the situation and (c) when will the vaccine be available again; if not, (2) is he aware that parents who take their children to public health facilities are told that there is a shortage of the vaccine?
Reply:
- The Chicken Pox vaccine is not part of the Expanded Programme on Immunisation (EPI) schedule in South Africa and is therefore not provided for in the public sector. The vaccine is provided for by the private sector where the shortage has been recognised.
- Since it is not part of the schedule of vaccines provided for in the public sector, there is no need for any form of action from the Department.
END.
27 October 2015 - NW3705
Selfe, Mr J to ask the Minister of Justice and Correctional Services
(1) Whether there was an outbreak of Leptospirosis at the Pollsmoor remand detention facility; if so, what are the relevant details; (2) What actions have been taken to (a) quarantine inmates, (b) fumigate their personal effects, (c) deal with the rat infestation and (d) transfer inmates to other facilities; (3) What long term steps are being taken to improve sanitation, hygiene and overcrowding problems at the specified facility as recently highlighted by the report by the former judge of the SA Constitutional Court, Justice Cameron?
Reply:
- Yes, there was an outbreak of Leptospirosis at the Pollsmoor Remand Detention facility.
The details are as follows:
- Two cases of Leptospirosis have been identified in August 2015.
- One Leptospirosis case identified in September 2015.
Case 1 |
Case 2 |
Case 3 |
|
Patient Initials |
Patient BC |
Patient AM |
Patient DV |
Age |
52 |
49 |
44 |
Race |
Coloured |
African |
Coloured |
Gender |
Male |
Male |
Male |
Unit |
Section A (Cell 591) |
Section A (Cell 545) |
Section E 2 |
Date of onset of illness |
25.07.2015 Returned to Clinic: 01.08.2015 |
04.08.2015 Returned to Clinic: 11.08.2015 |
31.08.2015 Returned 04.09.2015 |
Referred to Victoria Hospital |
01.08.2015 |
11.08.2015 |
04.09.2015 |
Treatment Outcome date |
Demised : 02.08.2015 at Victoria hospital |
Discharged from Victoria hospital on the 20th August 2015 |
Discharged from Victoria hospital on the 17.09.2015 |
N.B. Confirmation of Leptospirosis Diagnosis by the Communicable Disease Control: Department of Health Western Cape was received by DCS on the 20th August 2015 for the first two cases identified at Victoria Hospital. Third case confirmation was received on the 07th September 2015.
PARLIAMENT OF THE REPUBLIC OF SOUTH AFRICA NATIONAL ASSEMBLY |
2. Actions that had been taken to :
(a) Quarantine inmates,
- Inmates were not quarantined; however those with moderate to severe signs were transferred immediately to Victoria Hospital as recommended by the National Institute for Communicable Diseases (NICD).
- All inmates who presented with nonspecific signs and symptoms were tested and treated empirically for Leptospirosis.
(b) Fumigate their personal effects,
- Fumigation intervals of the cells have been increased.
- Personal Protective Clothing and Equipment (PPE) was purchased and distributed for use in all areas that can expose one to risk of infection (e.g. waste handlers, cleaners).
- All Remand Detainees were issued with the prescribed uniform.
- Frequent washing and disinfecting of personal clothing was encouraged.
(c) deal with the rat infestation :
Pest Control service providers have been contracted for rodents and other pests control measures.
- Advanced mechanical rodent traps were placed at access points to eradicate the rodents.
- Gas fumigation of the tunnel will be implemented as per evacuation plan.
- The Society for the Prevention of Cruelty to Animals (SPCA) was contacted to remove feral rats.
- Waste Management has been intensified and waste collection has been reviewed from twice a week to daily. Waste storage procedures have been implemented.
PARLIAMENT OF THE REPUBLIC OF SOUTH AFRICA NATIONAL ASSEMBLY |
- Environmental hygiene was intensified through identification of additional cleaning teams, increasing the frequency of cleaning programs to twice daily and the entire facility scrub down was conducted as per facility evacuation plan.
- Weekly inspection is being done by the City of Cape Town Environmental Health Practitioners and DCS officials.
(d) Transfer inmates to other facilities
- In-service training was provided to clinical staff with regard to clinical presentation, diagnosis and prevention of Leptospirosis by 4th September 2015.
- Inmates were screened as per NICD guidelines before they were evacuated to other Correctional Centers.
- Evacuation plan was developed and inmates were transferred to other facilities in the Western Cape as per plan. The evacuation and transfer plan was implemented per schedule to mitigate risk factors.
- All Provincial Stakeholders were informed about the evacuation plan.
3. Long term steps being taken to improve sanitation, hygiene and overcrowding problems at the specified facility as recently highlighted in the report by the former judge of the SA Constitutional Court, Justice Cameron.
Sanitation and hygiene:
- Medication available and issued as prescribed.
- Meals are provided three times per day as per meal plan.
- Mattresses and blankets are issued on admission for sleeping purposes to all offenders.
- Cleaning material availability monitored and cleaning procedures intensified.
PARLIAMENT OF THE REPUBLIC OF SOUTH AFRICA NATIONAL ASSEMBLY |
- Comprehensive HIV and AIDS as well as Tuberculosis programmes and services are implemented with the support of external partners. Condoms are distributed however there is malicious misuse of condoms (trafficking of contraband).
Overcrowding:
The Department of Correctional Services implements a multi-pronged strategy to manage overcrowding .The strategy consists of the following dimensions:
- Managing levels of remand detainees (RD’s) through IJS Case Management Task Team & Inter-Sectoral Committee on Child Justice;
- Managing levels of sentenced inmates through improving effective & appropriate use of conversion of sentence to community correctional supervision, release on parole, & transfers between correctional centres to attempt to establish some degree of evenness of overcrowding;
- Ensuring progress with DCS capital works programme to upgrade correctional facilities & to build new correctional centres that are both cost effective & rehabilitation oriented;
- Encouraging debate in South Africa about reason for incarceration as a sentence & encouraging an approach to appropriate sentencing that is focused on facilitating rehabilitation;
- Enhancing community correctional supervision so that it can be better utilized as an appropriate sentence for less serious crimes;
- Improving correction & development programmes within DCS to ensure enhanced facilitation of rehabilitation that targets offending behaviour;
PARLIAMENT OF THE REPUBLIC OF SOUTH AFRICA NATIONAL ASSEMBLY |
- Encouraging improvement of first & second levels of correction in family & social institutions & social & economic sector government departments respectively to decrease rate of entry into criminal justice system; and
- Encouraging community involvement in social reintegration of offenders back into their community in order to assist in reducing levels of repeat offending.
27 October 2015 - NW3758
Lekota, Mr M to ask the Minister of Justice and Correctional Services
Whether his department has evaluated the number of requests from citizens and organizations to the Public Protector to investigate complaints of the abuse of authority from 1 September 2010 to 31 August 2015, in order to (a) pick out the common threads and deal with it systemically through legislative reform, (b) draw the attention of the President, Mr Jacob G Zuma, and the national executive to deal with such abuse of power, (c) work with the Minister of Police to ensure that hotspots of corruption in the Government are regularly and systematically investigated and transgressors prosecuted to maintain the confidence of citizens in the Government, (d) work with the Minister of Finance and the Auditor-General to ensure that better systems are put in place to prevent the serial and large-scale abuse of state funds and resources by rogue elements in the Government and (e) determine how best to provide the Public Protector’s Office with adequate resources in order to meet the avalanche of requests for the specified office to investigate; if not, why not; if so, what are the relevant details?
Reply:
(a), (b), (c) and (d):
As the Honourable member is aware, in terms of section 181(3) of the Constitution of the Republic of South Africa, 1996, all organs of state, through legislative and others measures, must assist and protect all the institutions supporting constitutional democracy, including the Public Protector, to ensure the independence, impartiality, dignity and effectiveness of these institutions.
It is, therefore, the responsibility of all organs of state, including the President, the national executive and Government, as referred to by the Honourable member, to evaluate the number of requests from citizens and organisations to the Public Protector to investigate the complaints of the abuse of authority from 1 September 2010 to 31 August 2015, in order to act upon it as indicated in paragraphs (a) to (d) of the Honourable member’s question.
In view of the above, I would kindly advise the Honourable member to scrutinize the relevant findings in all the Public Protector’s reports during the period in question and if necessary address his questions to the organs of state concerned.
As far as could be ascertained from the reports of the Public Protector during the period in question, there were no requests from citizens and organisations to the Public Protector to investigate complaints of the abuse of authority against the Department of Justice and Constitutional Development and it was therefore not necessary for the Department to act upon it as indicated in paragraphs (a) to (d) of the Honourable member’s question.
(e) Government has been supportive of the Public Protector’s requests for increasing its investigative capacity as is evident by the significant increase in its budget allocation throughout the previous Medium Term Expenditure Framework (MTEF) periods. The Honourable member may also be aware that Parliament approved the revised organizational structure of the Public Protector comprising of 420 posts in the 2012/2013 financial year. At the time, the Public Protector was advised by my colleague the Minister of Finance to develop a multi-year implementation plan to ensure that critical posts are prioritized and filled within the medium term expenditure framework allocations. During his 2015 Medium Term Budget Policy Statement on 21 October 2015, the Minister of Finance also indicated that the Public Protector will receive an additional allocation to address capacity challenges.
It should also be noted that within the current economic climate it is expected of all institutions supporting constitutional democracy, including the Public Protector, to work together to determine how to deal with matters in a more economic, cost effective and efficient manner and to ensure that there is no duplication as it relates to their mandates.
The Honourable member may further be aware, that the National Assembly is still seized with the report of the Ad hoc Committee on the Review of Chapter 9 and associated Institutions often referred to as the Kader Asmal report. This report contains a number of recommendations that may have far-reaching implications for the institutions supporting constitutional democracy, including the Public Protector. The Speaker of the National Assembly recently convened a workshop of relevant stakeholders in order to exchange views and to finalize the National Assembly’s position in order to help Parliament to adopt the report.
With all the above in mind and given our limited resources, it is my view that the Public Protector should be able to execute its mandate and deliver on its core business responsibilities within the budget allocation and assistance that was provided for by Government.
27 October 2015 - NW3490
Selfe, Mr J to ask the Minister of Justice and Correctional Services
(1)How many persons who are sentenced to life imprisonment and who qualify for consideration for parole are still incarcerated; (2) whether any case of the specified persons has not yet been considered by the National Council for Correctional Services (NCCS); if so, (a) why have the specified cases not been considered and (b) how many such persons are affected; (3) whether the NCCS has put in place measures to deal with any backlogs that exist; if not, why not; if so, what are the relevant details?
Reply:
1. As at 10 September 2015 there was a total of two thousand two hundred and fifty eight (2258) persons who are sentenced to life imprisonment and who qualify for consideration for parole.
2. Yes, at the outset it is important that the Honourable member takes note that members of the National Council for Correctional Services are professionals appointed by the Minister in terms of Section 83 of the Correctional Services Act, 1998 (Act 111 of 1998). They are not in full time employment of Correctional Services.
As a result of the backlog created by the Van Wyk Judgment (case nr: 40915/10 in the North Gauteng High Court Pretoria) the newly appointed NCCS meets on a regular basis; meetings have been scheduled on a two weekly basis.
The consideration of offenders for parole is not a matter that can be dealt with lightly. Considerable time and effort is put into the deliberation of individual cases before a recommendation is made to the Minister of Justice and Correctional Services. Approximately thirty (30) cases are considered during a one day meeting and fifty (50) during a two day meeting. As at 10 September 2015 a total of three hundred and eighty eight (388) of the specified persons has not yet been considered by the National Council for Correctional Services.
3. Yes; Regular meetings are scheduled in an attempt to deal with the backlog.
27 October 2015 - NW3704
Selfe, Mr J to ask the Minister of Justice and Correctional Services
What (a) are the reasons for the delay in the submission of periodic reports as required by the United Nations Convention against Torture and Other Cruel Inhuman or Degrading Treatment or Punishment (UNCAT) and (b) corrective measures have been taken to avoid future delays in submitting reports as required by UNCAT?
Reply:
a) Government is dealing with a delay in submitting country reports due to a huge backlog of outstanding reports, lack of capacity and coordination mechanism over the years.
b) As a response, Government in early 2012 committed itself to make a positive turn- around in this regard. An Inter-departmental Committee on Treaty Obligations (IDC) has been established to work, amongst others, on the backlog of country reports. The IDC reports to the Directors- General of the Justice, Crime Prevention and Security (JCPS), International Cooperation, Trade and Security (ICTS) and Social Protection Community and Human Development (SPCHD) Clusters. The Ministers of Justice and Correctional Services, International Relations and Co-operation and Minister in the Presidency responsible for Performance, Monitoring and Evaluation have oversight on compliance with treaty obligations. Officials are undergoing training on report writing; and a Government Manual on Treaty Obligations has been prepared by the Department of Justice and Constitutional Development, which co-chairs the IDC with the Department of International Relations and Co-operation. The report under the Convention Against Torture, although there was a delay, has been submitted to the United Nations Human Rights Council (HRC). This report is being summarized currently as requested by the HRC.
27 October 2015 - NW3706
Selfe, Mr J to ask the Minister of Justice and Correctional Services
(1)What (a) is the current status of the parole application for a certain person (Mr Nicholas Pike) and (b) are the reasons for the delay in processing the specified application; (2) when are the specified delays expected to be resolved ?
Reply:
(1)(a) The offender was sentenced on 6 December 2006 to four (4) years imprisonment in terms of section 276(1)(i) of the Criminal Procedure Act, Act 51 of 1977 for driving a motor vehicle without the owner’s permission and theft. He was placed on Correctional Supervision on the 17 August 2007. The offender absconded from the system of community corrections. He committed crimes during this period and was sentenced on the 19th April 2008 to 15 years imprisonment for fraud and forgery and again on 20th April 2010 was sentenced to five (05) years imprisonment for fraud and forgery and the court ordered that the sentence to run concurrently with the 15 years imprisonment. He was considered by the Correctional Supervision and Parole Board (CSPB) for possible placement on parole on the 16th October 2014 and was given a further profile for the 18th February 2015.
(b) During consideration by the CSPB it was discovered that the offender did not complete his Correctional Supervision period and Community Corrections Office of Kgoši Mampuru II Management Area was approached for clarity on the number of outstanding days to be served for parole violation. Clarification was received from the Community Corrections offices that the offender still has to serve an additional 1193 days of his previous sentence. The effective sentence is currently 15 years plus 1193 days imprisonment.
(2) On 20 October 2015 the Community Corrections Office at Kgoši Mampuru II Management Area visited the CSPB at Leeuwkop Management Area, explained to the offender the period to be served for his absconding. Subsequently, he appeared before the CSPB on the 20th October 2015 and it was decided that he will be reconsidered on the 21st July 2016.
26 October 2015 - NW3335
Carter, Ms D to ask the Minister of Public Works:
(1) What is the total cost and purpose of work or contracts awarded relating to renovations and building works carried out at the Ministerial Executive Estate in Newlands, Cape Town, from 1 January 2009 up to the latest specified date for which information is available; (2) whether any representations were made or decisions taken to replace any existing tarred surfaces within the Estate with any other type of surface such as cobble stones; if so, (a) what was the rationale in arriving at that decision, (b) when was the decision taken, (c) from whom did the representations emanate that resulted in the matter being considered and (d) what were or are the costs associated with the replacement of the tarred surfaces?
Reply:
The Minister of Public Works
No. |
Residence Name |
Purpose of work |
Cost |
Project Concluded in year |
1. |
Groote Schuur Estate, Avenue 4 – Heritage Residence |
Kitchen, floors, roof, bathrooms, electricity, cottage and garage. |
R7 256 956.72 |
2012 |
2. |
Groote Schuur Estate, Mecklenburg - Heritage Residence |
Kitchen, floors, roof, bathrooms, electricity, cottage and garages. |
R10 283 780.27 |
2013 |
3. |
Groote Schuur Estate, Avenue 5 – Heritage Residence |
Kitchen, floors, roof, bathrooms, electricity, cottage and garages. |
R17 804 451.59 |
2013 |
4. |
Groote Schuur Estate, La Maisonette – Heritage Residence |
Kitchen, floors, roof, bathrooms, electricity, cottage and garages |
R13 612 785.00 |
2013 |
(2) No.
(a), (b), (c) and (d) Fall away.
___________________________________________________________________________
26 October 2015 - NW3408
Groenewald, Dr PJ to ask the Minister of Health
(1)How many bodies were received at State mortuaries in each province (a) in (i) 2010, (ii) 2011, (iii) 2012, (iv) 2013 and (v) 2014 and (b) since 1 January 2015; (2) how many of these bodies in each specified year in each specified province were deaths as a result of (a) gunshot wounds, (b) stabbings, (c) motor vehicle accidents, (d) drownings, (e) fires, (f) pedestrian deaths, (g) motor cycle accidents and (h) cyclist deaths; (3) whether he will make a statement on the matter?
Reply:
(1) and (2) Please refer to Tables 1 to 9 below:
TABLE 1: EASTERN CAPE |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
7812 |
9713 |
10747 |
9131 |
8763 |
6430 |
Gunshot wounds |
515 |
515 |
586 |
937 |
641 |
509 |
Stabbings |
2225 |
1018 |
2219 |
2169 |
2194 |
1598 |
Motor vehicle accidents |
1467 |
1489 |
1449 |
1429 |
1337 |
1165 |
Drowning |
319 |
486 |
340 |
368 |
306 |
208 |
Fires |
377 |
372 |
303 |
273 |
263 |
188 |
Pedestrian deaths |
371 |
365 |
280 |
229 |
252 |
218 |
Motorcycle accidents |
4 |
8 |
7 |
1 |
3 |
2 |
Cyclist deaths |
1 |
3 |
4 |
2 |
2 |
1 |
TABLE 2: FREE STATE |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
4020 |
3799 |
4000 |
3086 |
3472 |
1853 |
Gunshot wounds |
194 |
180 |
213 |
135 |
246 |
128 |
Stabbings |
544 |
528 |
494 |
392 |
476 |
229 |
Motor vehicle accidents |
1202 |
1056 |
1163 |
857 |
906 |
571 |
Drowning |
151 |
137 |
137 |
90 |
154 |
64 |
Fires |
148 |
139 |
151 |
164 |
169 |
92 |
Pedestrian deaths |
218 |
186 |
218 |
188 |
207 |
108 |
Motorcycle accidents |
21 |
23 |
22 |
27 |
32 |
10 |
Cyclist deaths |
Included in motorcycle accidents |
Included in motorcycle accidents |
Included in motorcycle accidents |
Included in motorcycle accidents |
Included in motorcycle accidents |
Included in motorcycle accidents |
TABLE 3: GAUTENG |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
14761 |
14019 |
13602 |
14586 |
14866 |
6601 |
Gunshot wounds |
Data not available |
Data not available |
1413 |
1552 |
1608 |
175 |
Stabbings |
Data not available |
Data not available |
1097 |
1164 |
1257 |
115 |
Motor vehicle accidents |
Data not available |
Data not available |
1881 |
1927 |
1707 |
206 |
Drowning |
Data not available |
Data not available |
270 |
268 |
210 |
15 |
Fires |
Data not available |
Data not available |
665 |
710 |
715 |
349 |
Pedestrian deaths |
Data not available |
Data not available |
1212 |
1276 |
1193 |
541 |
Motorcycle accidents |
Data not available |
Data not available |
148 |
177 |
188 |
20 |
Cyclist deaths |
Data not available |
Data not available |
Included in the motor vehicle accidents |
Included in the motor vehicle accidents |
Included in the motor vehicle accidents |
Included in the motor vehicle accidents |
TABLE 4: KWA-ZULU NATAL |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
13330 |
12551 |
12643 |
12824 |
12718 |
6935 |
Gunshot wounds |
Data not available |
1450 |
1425 |
1418 |
1538 |
641 |
Stabbings |
Data not available |
1516 |
1560 |
1510 |
1534 |
615 |
Motor vehicle accidents |
Data not available |
3209 |
2997 |
2998 |
2908 |
1291 |
Drowning |
Data not available |
1703 (Asphyxial – drowning, hanging, etc) |
1842 (Asphyxial – drowning, hanging, etc) |
1730 (Asphyxial – drowning, hanging, etc) |
1660 (Asphyxial – drowning, hanging, etc) |
592 (Asphyxial – drowning, hanging, etc) |
Fires |
Data not available |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
Pedestrian deaths |
Data not available |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
Motorcycle accidents |
Data not available |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
Cyclist deaths |
Data not available |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
TABLE 5: LIMPOPO |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
2401 |
2376 |
2277 |
2224 |
2321 |
3167 |
Gunshot wounds |
221 |
201 |
194 |
186 |
217 |
175 |
Stabbings |
238 |
230 |
283 |
267 |
304 |
209 |
Motor vehicle accidents |
1660 |
1641 |
1509 |
1443 |
1465 |
1204 |
Drowning |
151 |
168 |
143 |
181 |
177 |
81 |
Fires |
131 |
136 |
148 |
147 |
158 |
101 |
Pedestrian deaths |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
Motorcycle accidents |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
Cyclist deaths |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
TABLE 6: MPUMALANGA |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
3855 |
3802 |
4271 |
4635 |
4561 |
3014 |
Gunshot wounds |
221 |
245 |
355 |
470 |
448 |
138 |
Stabbings |
279 |
258 |
258 |
288 |
333 |
222 |
Motor vehicle accidents |
1090 |
1058 |
1224 |
1360 |
1095 |
493 |
Drowning |
137 |
114 |
118 |
165 |
158 |
59 |
Fires |
96 |
129 |
161 |
191 |
153 |
81 |
Pedestrian deaths |
434 |
481 |
439 |
394 |
402 |
288 |
Motorcycle accidents |
4 |
3 |
20 |
20 |
9 |
6 |
Cyclist deaths |
3 |
2 |
3 |
7 |
2 |
5 |
TABLE 7: NORTHERN CAPE |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
1626 |
1634 |
1713 |
1707 |
1803 |
705 |
Gunshot wounds |
360 |
32 |
30 |
35 |
29 |
6 |
Stabbings |
Included in gunshot wounds above |
264 |
261 |
294 |
308 |
90 |
Motor vehicle accidents |
390 |
318 |
304 |
254 |
356 |
114 |
Drowning |
243 |
84 |
107 |
117 |
102 |
15 |
Fires |
Included in above |
85 |
79 |
71 |
79 |
30 |
Pedestrian deaths |
Included in motor vehicle accidents |
90 |
103 |
123 |
132 |
43 |
Motorcycle accidents |
Included in motor vehicle accidents |
3 |
2 |
3 |
4 |
2 |
Cyclist deaths |
Included in motor vehicle accidents |
9 |
20 |
7 |
5 |
4 |
TABLE 8: NORTH WEST |
||||||
(1)(i) 2010 |
(1)(ii) 2011 |
(1)(iii) 2012 |
(1)(iv) 2013 |
(1)(v) 2014 |
(1)(b) 2015 |
|
Total bodies received in: |
3627 |
3539 |
3316 |
3695 |
3560 |
2678 |
Gunshot wounds |
157 |
183 |
235 |
222 |
188 |
198 |
Stabbings |
392 |
504 |
401 |
364 |
409 |
279 |
Motor vehicle accidents |
914 |
936 |
883 |
813 |
856 |
755 |
Drowning |
96 |
115 |
96 |
83 |
132 |
49 |
Fires |
202 |
183 |
134 |
177 |
137 |
130 |
Pedestrian deaths |
313 |
251 |
288 |
161 |
192 |
176 |
Motorcycle accidents |
38 |
33 |
17 |
21 |
25 |
19 |
Cyclist deaths |
34 |
15 |
25 |
41 |
25 |
7 |
TABLE 9: WESTERN CAPE |
||||||
(1)(i) 2010 |
(1)(ii) 2011 |
(1)(iii) 2012 |
(1)(iv) 2013 |
(1)(v) 2014 |
(1)(b) 2015 |
|
Total bodies received in: |
9372 |
9394 |
9800 |
9989 |
10297 |
7692 |
Gunshot wounds |
607 |
712 |
875 |
1045 |
1343 |
982 |
Stabbings |
1265 |
1239 |
1330 |
1338 |
1402 |
962 |
Motor vehicle accidents |
1451 |
1355 |
1279 |
1227 |
1289 |
943 |
Drowning |
181 |
204 |
210 |
197 |
200 |
117 |
Fires |
370 |
359 |
341 |
350 |
302 |
261 |
Pedestrian deaths |
619 |
614 |
587 |
588 |
573 |
436 |
Motorcycle accidents |
66 |
64 |
80 |
70 |
75 |
48 |
Cyclist deaths |
23 |
40 |
28 |
22 |
27 |
19 |
END.
26 October 2015 - NW3400
Madisha, Mr WM to ask the Minister of Public Works:
Whether the Government has launched any investigation into new buildings contracted for the state which on the date of delivery showed such serious structural defects that it made the brand new building unsafe to occupy as was evident at Scottsdene Secondary School in Cape Town; if not, why not; if so, what was the reason for such building(s) proceeding to completion without proper engineering checks at every stage to ensure that construction met the standard requirements?
Reply:
The Minister of Public Works
As per the earlier undertaking to provide a reply to this question to the Honourable Member the response is as follows:
The Department of Public Works has not launched an investigation to date, as the Department has not received reports of its buildings having structural defects such as the one the Honourable Member is alluding to.
Within the current system of managing infrastructure projects, there is a process to address latent defects (defects that happen or are detected after the practical handover of projects / buildings) which goes as such:
- When a project is practically completed and declared fit for the intended use, the Practical Completion Certificate is issued by the Principal Agent.
- From the practical completion date an allowance of 3 to 12 months is made for the unforeseen defects to be reported and corrected. The defects have to be corrected by the Contractor who was responsible for the project within a reasonable time after an instruction has been issued by the Principal Agent. This is done by way of retainer provisions within the contract between the Department and the contractor. Once these defects have been corrected the final account can be signed off, paving a way for a well completed project, free of defects.
The school referred in the question is a project that was implemented by the Western Cape Provincial Department of Transport and Public Works.
____________________________________________________________________
26 October 2015 - NW3697
Alberts, Mr ADW to ask the Minister of Transport
(1) How many road users have bought e-tags for the Gauteng Freeway Improvement Project (GFIP) e-tolling system in Gauteng in each month since 03 December 2013; (2) How many of the e-tags that have been bought since 03 December 2013 are (a) still active accounts and (b) no longer being used; (3) How many road users have been using the GFIP freeways where the e-tolling system has been installed in each month since 03 December 2013; (4) What is the monthly amount that has been levied by the e-tolling system since December 2014?
Reply:
- The number of road users who bought e-tags for the Gauteng Freeway Improvement Project (GFIP) e-tolling system in Gauteng in each month since 03 December 2013 are as follows:
Date period |
Tag assigned to account |
20131203 |
265 514 |
201401 |
168 175 |
201402 |
114 062 |
201403 |
89 689 |
201404 |
71 590 |
201405 |
63 963 |
201406 |
67 275 |
201407 |
52 854 |
201408 |
41 796 |
201409 |
35 696 |
201410 |
32 398 |
201411 |
26 329 |
201412 |
19 426 |
201501 |
25 628 |
201502 |
23 285 |
201503 |
22 673 |
201504 |
19 892 |
201505 |
23 810 |
201506 |
30 626 |
201507 |
37 852 |
201508 |
31 738 |
201509 |
32 190 |
Total |
1 296 461 |
- All e-tags bought since 03 December 2013 are (a) active as and when the road network is used.
- See (a) above.
(3) How many road users have been using the GFIP freeways where the e-tolling system has been installed in each month since 03 December 2013;
Unique VLN's (Unique vehicle plate numbers) |
|
Class |
Overall |
Dec-13 |
2,410,896 |
Jan-14 |
2,364,201 |
Feb-14 |
2,262,121 |
Mar-14 |
2,356,039 |
Apr-14 |
2,389,110 |
May-14 |
2,389,987 |
Jun-14 |
2,373,444 |
Jul-14 |
2,423,919 |
Aug-14 |
2,442,606 |
Sep-14 |
2,437,115 |
Oct-14 |
2,521,269 |
Nov-14 |
2,539,513 |
Dec-14 |
2,654,032 |
Jan-15 |
2,544,343 |
Feb-15 |
2,483,322 |
Mar-15 |
2,599,570 |
Apr-15 |
2,593,900 |
May-15 |
2,571,134 |
Jun-15 |
2,521,515 |
Jul-15 |
2,607,359 |
Aug-15 |
2,614,246 |
Sep-15 |
2,585,302 |
(4) The monthly amount that has been levied by the e-tolling system since December 2014?
Please see the graph below
Please note that the cash flow projections for August and September 2015 took into account the 60% discount offering for historic debt that will now become available to the public from 2 November 2015.
26 October 2015 - NW3591
Volmink, Mr HC to ask the Minister of Health
(a) How many ambulances are currently registered for use and (b) how many of the specified ambulances are fully operational in respect of each province?
Reply:
a) A total of 2690 ambulances are currently registered for use in the country.
b) There is a total of 1431 fully operational and stipulated in the table below by Province:
Provinces |
Total Ambulance Fleet |
Number of Operational Ambulances |
Eastern Cape |
425 |
200 |
Free State |
186 |
135 |
Gauteng |
667 |
389 |
Kwa Zulu Natal |
531 |
290 |
Limpopo |
381 |
165 |
Mpumalanga |
212 |
110 |
North West |
120 |
59 |
Northern Cape |
166 |
95 |
Western Cape |
259 |
156 |
Total |
2690 |
1431 |
END.
26 October 2015 - NW3649
De Freitas, Mr MS to ask the Minister of Transport
What (i) contracts, (ii) tenders, (iii) memorandums of understanding and/or (iv) any similar documents have been signed with the People’s Republic of China for the (aa) construction of locomotives or (bb) manufacturing of parts for locomotives, (b) when were the specified documents signed, (c) who signed the specified documents, (d) what are the locomotives going to be used for, (e) where will the locomotives be built, (f) when will the locomotives be completed and ready for operation and (g) what is the projected cost of each specified project?
Reply:
(i) (ii) (ii) None
(iv) (aa) (bb) (b) (c) (d) (e) (f) (g) The rest of the question falls away
Please refer this question to Department of Public Enterprise for response
26 October 2015 - NW3651
De Freitas, Mr MS to ask the Minister of Transport
(a) What (i) agreements, (ii) tenders, (iii) memorandums of understanding or (iv) any similar document have been signed with the Peoples Republic of China by (aa) her department and (bb) any of the entities reporting to her and (b) in each respect of each specified case, (i) when were such documents signed, (ii) who signed the documents, (iii) what are the relevant details, (iv) where would the realisation of such projects take place, (v) when will the projects be completed and ready for operation and (vi) what are the projected costs for each project?
Reply:
Department
i) Agreements NONE
ii) Tenders NONE
iii) Memorandum of Understanding;
- Memorandum of Understanding between the Government of the Republic of South Africa and the People’s Republic of China on Cooperation in Transport Related Matters.
- Signed in 2010.
- Memorandum of Understanding between the Government of the Republic of South Africa and the People’s Republic of China on Cooperation in Railway Related Matters.
- Signed in 2010.
- The above mentioned agreements have lapsed and are due for review and renegotiation.
Air Traffic & Navigation Services SOC Limited (ATNS)
(a) ATNS has not signed any documents with the Peoples Republic of China.
(i) None
(ii) None
(iii) None
(iv) None
(b) Not applicable
(i) Not applicable
(ii) Not applicable
(iii) Not applicable
(iv) Not applicable
(v) Not applicable
(vi) Not applicable
Airports Company South Africa (ACSA)
Airports Company South Africa (SOC) Limited does not have any (i) agreements, (ii) tenders, (iii) memorandums of understanding or (iv) any similar document signed with the People’s Republic of China.
South African Civil Aviation Authority (SACAA)
(a)(i) N/A (ii) N/A (iii) N/A (iv) A Letter of Intent (LoI) was signed (aa) N/A (bb) between the South African Civil Aviation Authority (SACAA) and the Civil Aviation Administration of China (CAAC). (b) (i) The LoI was signed on the 15th April 2015.(ii) The LoI was signed by Mr Gawie Bestbier, in his capacity as acting Director of Civil Aviation on behalf of SACAA and by Mr Li Jian, the Deputy Administrator of CAAC. (iii) The SACAA and CAAC agreed to cooperate in the field of civil aviation safety, especially in the airworthiness certification of aircraft and to start the process of the certification of aircraft LE500. (iv)The type acceptance of the LE500 will be done in accordance with the Civil Aviation Regulations, 2011. The process requires Certification Engineers of SACAA to audit the manufacturer of the aircraft in China. This is followed by the consideration of the application in the SACAA offices in Midrand. (v) The type acceptance process will commence once the manufacturer applies for the type acceptance of the aircraft and will be completed once the type acceptance certificate is issued by SACAA. (vi)The costs of the visit to the manufacturer are borne by the applicant, in this case, the manufacturer.
Cross Border Road Transport Limited (CBRTA)
(a) (i), (ii), (iii), (iv); (bb), (b) The Cross-Border Road Transport Agency (C-BRTA) does not have any agreements, tenders, memorandums of understanding with the People’s Republic of China. (i), (ii), (iii), (iv), (v) and (vi) are not applicable as the C-BRTA does not have any agreements, tenders, memorandums of understanding with the People’s Republic of China.
South African National Roads Agency Limited (SANRAL)
SANRAL has no agreement, tenders or memorandums of understandings or any similar documents with the People’s Republic of China.
Road Accident Fund (RAF)
(a)(bb) The Road Accident Fund has not signed any (i) agreements, (ii) tenders, (iii) memorandums of understanding or (iv) any similar document with the Peoples Republic of China, and (b) therefore none of the further questions under this paragraph are relevant to the Road Accident Fund.
Road Traffic Management Corporation (RTMC)
The RTMC has not signed any agreements, tenders, memoranda of understandings with the Peoples Republic of China
Road Traffic Infringement Agency (RTIA)
The RTIA has not signed any agreements, tenders, memoranda of understandings with the Peoples Republic of China
Railway Safety Regulator (RSR)
The RSR as an agency of the DoT does not have authority to enter into international agreements with states and therefor the RSR has no agreements, tenders, and memorandums of understanding or any similar document signed with the People’s Republic of China.
Passenger Rail of South Africa (PRASA)
- PRASA has no agreement, tender or memorandum of understanding with the People’s Republic of China. PRASA has a contract with Huawei, a global information and communications technology solutions provider from the People’s Republic of China.
- (i) PRASA entered into the contract with Huawei in March 2013.
(iii) I am told that after an open and competitive procurement process, Huawei was selected as the successful bidder, to provide PRASA with a digital radio railway signaling system for passenger rail services in South Africa. The system provides digital communications to the train driver and equipment on train protection (best practice), which replaces the current antiquated analogue system.
(iv) The system is being implemented across PRASA’s rail system.
(v) the completion date is January 2017. Gauteng is 70% complete while Kwa-Zulu Natal and the Western Cape is 30% complete.
(vi) The total cost of the project is R750 million.
Ports Regulator (PR)
- The Ports Regulator has not signed any agreements, tenders, memorandums of understanding with the Peoples Republic of China.
South African Maritime Safety Authority (SAMSA)
SAMSA does not enter into bilateral arrangements with countries. Accordingly SAMSA has not signed any agreements or tenders with the People’s Republic of China.
26 October 2015 - NW3532
Groenewald, Dr PJ to ask the Minister of Health
(1)How many bodies were received at State mortuaries in each province (a) in (i) 2010, (ii) 2011, (iii) 2012, (iv) 2013 and (v) 2014 and (b) since 1 January 2015; (2) how many of these bodies in each specified year in each specified province were deaths as a result of (a) motor cycle accidents, (b) cyclist deaths, (c) Aids, (d) tuberculosis, (e) other diseases and (f) old age; (3) whether he will make a statement on the matter?
Reply:
The reply to questions (1) and (2) are summarized in Table 1 to 9 below: Forensic Pathology Service (FPS)
TABLE 1: EASTERN CAPE |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
7812 |
9713 |
10747 |
9131 |
8763 |
6430 |
Motorcycle accidents |
4 |
8 |
7 |
1 |
3 |
2 |
Cyclist deaths |
1 |
3 |
4 |
2 |
2 |
1 |
Aids |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Tuberculosis |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Other diseases |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Old age |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
TABLE 2: FREE STATE |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
4020 |
3799 |
4000 |
3086 |
3472 |
1853 |
Motorcycle accidents |
21 |
23 |
22 |
27 |
32 |
10 |
Cyclist deaths |
Included in a above |
Included in a above |
Included in a above |
Included in a above |
Included in a above |
Included in a above |
Aids |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Tuberculosis |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Other diseases |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Old age |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
TABLE 3: GAUTENG |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
14761 |
14019 |
13602 |
14586 |
14866 |
6601 |
Motorcycle accidents |
Data not available |
Data not available |
148 |
177 |
188 |
20 |
Cyclist deaths |
Data not available |
Data not available |
1881 Including Motor Vehicle Accidents |
1927 Including Motor Vehicle Accidents |
1707 Including Motor Vehicle Accidents |
206 Including Motor Vehicle Accidents |
Aids |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Tuberculosis |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Other diseases |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Old age |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
TABLE 4: KWA-ZULU NATAL |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
13330 |
12551 |
12643 |
12824 |
12718 |
6935 |
Motorcycle accidents |
Data not available |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
Cyclist deaths |
Data not available |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
Aids |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Tuberculosis |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Other diseases |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Old age |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
TABLE 5: LIMPOPO |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
2401 |
2376 |
2277 |
2224 |
2321 |
3167 |
Motorcycle accidents |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
1 |
Cyclist deaths |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
Not specified |
Aids |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Tuberculosis |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Other diseases |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Old age |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
TABLE 6: MPUMALANGA |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
3855 |
3802 |
4271 |
4635 |
4561 |
3014 |
Motorcycle accidents |
4 |
3 |
20 |
20 |
9 |
6 |
Cyclist deaths |
3 |
2 |
3 |
7 |
2 |
5 |
Aids |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Tuberculosis |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Other diseases |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Old age |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
TABLE 7: NORTHERN CAPE |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
1626 |
1634 |
1713 |
1707 |
1803 |
705 |
Motorcycle accidents |
Included in c above |
3 |
2 |
3 |
4 |
2 |
Cyclist deaths |
Included in c above |
9 |
20 |
7 |
5 |
4 |
Aids |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Tuberculosis |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Other diseases |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Old age |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
TABLE 8: NORTH WEST |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
3627 |
3539 |
3316 |
3695 |
3560 |
2678 |
Motorcycle accidents |
38 |
33 |
17 |
21 |
25 |
19 |
Cyclist deaths |
34 |
15 |
25 |
41 |
25 |
7 |
Aids |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Tuberculosis |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Other diseases |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Old age |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
TABLE 9: WESTERN CAPE |
||||||
2010 |
2011 |
2012 |
2013 |
2014 |
2015 |
|
Total bodies received in: |
9372 |
9394 |
9800 |
9989 |
10297 |
7692 |
Motorcycle accidents |
66 |
64 |
80 |
70 |
75 |
48 |
Cyclist deaths |
23 |
40 |
28 |
22 |
27 |
19 |
Aids |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Tuberculosis |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Other diseases |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
Old age |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
* FPS only conducts autopsies on unnatural deaths |
END.
26 October 2015 - NW3592
Volmink, Mr HC to ask the Minister of Health
(a) Which third parties have been contracted for the provision of ambulance services in each province and (b) what is the (i) length and (ii) value of each contract in each case?
Reply:
a) Free State Province: There is an existing contract between the Provincial EMS and Buthelezi Ambulance Service.
North West Province: Private Emergency Medical Services are contracted for provision of services only when there are outstanding emergency calls.
b) (i) Free State Province: The contract with Buthelezi Ambulance Service is for three years, which commenced on 1 December 2013.
North West Province: The MOU with the private Emergency Medical Services is for a year, which is renewed on a yearly basis.
(ii) Free State Province: Buthelezi Ambulance Service is mainly used for inter-hospital transfers and benefits include:
- EMS ambulances are available for primary response community emergencies;
- Improved EMS response times;
- There is a positive impact on maternal and obstetric cases;
- The life span of the provincial ambulances is increased because of reduced kilometres being travelled. This has a direct impact on the on the monthly fleet expenditure;
- There is a reduction in overtime for EMS staff;
- Nurses do not leave their facilities during transfers.
North West Province: The MOU states that the private service will be used as and when the need arises and the services are rendered at the Uniformed Patient Fee Schedule rates.
The main benefit is that the response time to the Priority 1 patient (emergency) has improved.
END.
23 October 2015 - NW3537
Mokause, Ms MO to ask the Minister of Human Settlements
Whether she is taking any steps to assist the residents of Malvern flats at Arundel Road in the eThekwini Metropolitan Municipality who were forcefully removed from the houses that the Government had provided to them; if not, why not; if so, what steps?
Reply:
The Arundel Garden Flats in Malvern were previously government owned rental units and managed by the eThekwini Metropolitan Municipality. The households occupying the Arundel Gardens were given the opportunity to acquire ownership of the units through the Enhanced Extended Discount Benefit Scheme. This is a government subsidy programme aimed at assisting beneficiaries, who rented state property prior to 27th April 1994, to purchase their units at discounted prices. All the households occupying the units in question were transferred for individual ownership because the occupants elected to take ownership of their units. In that case, these are privately owned houses now which the responsibility of the owners. The role of government has been served and concluded.
Thus the units have been converted to sectional title ownership. The units form part of a body corporate and these are currently being managed by private body corporates. The body corporates charge owners levies for the maintenance and repairs. In instances where owners default on their levy payments, the body corporate then undertakes legal process to recover such amounts.
The Department unfortunately is not able to intervene in the legal processes, which have been activated in this matter.
It is however suggested that should the tenants’ grievances be legitimate, a complaint should be lodged with the Community Schemes Ombud Services (CSOS), for investigation and a ruling on the matter. The CSOS is a state entity established to ensure the regulation, compliance and monitoring of matters related to community ownership schemes and this includes related disputes between owners and managing agents.
23 October 2015 - NW3685
Mokause, Ms MO to ask the Minister of Human Settlements
Whether, with reference to her replies to questions (a) 3287 and (b) 3280 on 18 September 2015, her department’s annual report for the 2014-15 financial year outlines the specified information as requested in questions 3287 and 3280; if not, why not, in each case; if so, in each case, what are the costs incurred by her department regarding (i) air travel between Cape Town and Gauteng, (ii) accommodation in Cape Town and (iii) car rental for officials in Cape Town?
Reply:
The Honourable member is referred to the audited financial statements in the 2014/15 Annual Report of the Department of Human Settlements.
23 October 2015 - NW3415
Sithole, Mr KP to ask the Minister of Human Settlements
Whether her department has a new turnaround strategy to speed up the process of providing persons with Breaking New Ground houses in order to prevent protests that continue to take place in the Eastern Cape, Gauteng and Limpopo?
Reply:
Yes, Honourable member, the Department does have a turnaround strategy to speed up the provision of housing and specifically in the areas where we have witnessed protests. The Department adopted the War Room Strategy which involves the allocation by the Department of Professional Response Teams (PRTs) in each region. PRTs are qualified professionals who are on the database to provide services as needed. These include engineering, town panning, and other technical services employed in the built environment. It is intended that when problems are identified in respect of any project, a municipality or province will, in the joint teams with the Department, identify the professional services required then bring on board the PRT required.
23 October 2015 - NW2873
Carter, Ms D to ask the Minister of Police
(1)How many SA Police Service (SAPS) officers in each province were charged with aiding an escapee (a) in the 2014-15 financial year and (b) from 1 April 2015 up to the latest specified date for which information is available; (2) how many such cases against the specified SAPS officers have been (a) withdrawn and/or (b) are pending; (3) how (a) many escapees did a SAPS officers assist in escaping and (b) did they assist the escapee in each specified case?
Reply:
(1)(a) and (b)
Province |
(1)(a) 2014-2015 |
(1)(b) 1 April – 30 June 2015 |
Eastern Cape |
40 |
1 |
Free State |
30 |
14 |
Gauteng |
51 |
4 |
KwaZulu-Natal |
34 |
16 |
Limpopo |
4 |
2 |
Mpumalanga |
44 |
10 |
North West |
16 |
13 |
Northern Cape |
6 |
3 |
Western Cape |
102 |
15 |
Total |
327 |
78 |
(2)(a) and (b)
(2)(a) Cases withdrawn |
(2)(b) Cases pending |
1 |
0 |
0 |
3 |
10 |
3 |
8 |
0 |
0 |
0 |
3 |
0 |
6 |
1 |
0 |
0 |
11 |
13 |
39 |
20 |
(3)(a) and (b).
Province |
(3)(a) Escapees assisted by SAPS officers |
(3)(b) How escapees were assisted by SAPS officers |
Eastern Cape |
106 |
The members of the Service failed to comply with the existing governance, governing custody management. The prescripts regarding the safe and secure detention management of persons which are in SAPS custody were not complied with. The provisions of the National Plan to prevent escapes from and deaths in police custody (NCCF Instruction 16/2015) were not complied with. |
Free State |
16 |
|
Gauteng |
55 |
|
KwaZulu-Natal |
63 |
|
Limpopo |
4 |
|
Mpumalanga |
13 |
|
North West |
29 |
|
Northern Cape |
58 |
|
Western Cape |
64 |
|
Total |
408 |
23 October 2015 - NW3644
Sithole, Mr KP to ask the Minister of Human Settlements
With reference to her reply to question 1943 on 29 May 2015, will she provide the full details on the current status of the process of attaining information from provinces which relates to the current socio-economic status of residents occupying old hostel buildings?
Reply:
The National Department of Human Settlements did embark on a process of attaining information from provinces which related to the socio-economic status of residents who occupy old hostel buildings. It has since been established that provinces do not have databases that contain personal information for individuals who are residing in old hostel buildings in question. The efforts to obtain this information will continue so that my department is properly informed of the situation in the drafting of the new policy.
22 October 2015 - NW3629
Esau, Mr S to ask the Minister of Defence and Military Veterans
What steps has she taken to address the grievances of the Khoisan Kingdom and All People Party regarding the re-integration of former Khoisan soldiers into the SA National Defence Force?
Reply:
The integration process under the Termination of Integration Intake Act of 2001 terminated on 31 March 2002.
21 October 2015 - NW3470
Kopane, Ms SP to ask the Minister of Communications
(a) What is her department doing to resolve the signal problem in Beauvallon, Northern Cape, where residents cannot pick-up a radio and/or television signal and (b) when will her department complete putting measures in place to ensure that the specified residents have access to a radio and/or television signal?
Reply:
The Department is still in the process of investigating the signal distribution challenges in Beauvallon. The report will be made available once completed.
MR N MUNZHELELE
[ACTING] DIRECTOR GENERAL
DEPARTMENT OF COMMUNICATIONS
DATE:
MS AF MUTHAMBI, MP
MINISTER OF COMMUNICATIONS
DATE:
21 October 2015 - NW3732
Hill-Lewis, Mr GG to ask the Minister of Trade and Industry
With reference to the award of a multi-million rand grant by the National Lotteries Commission to the Thobeka Madiba Zuma Foundation, which is run by the wife of the President, Mr Jacob G Zuma: (a) What was the intended use of the specified grant (b) What was it actually used for, (c) Did the recipient meet all of the (i) reporting and (ii) audit requirements for the use of the grant, (d) Has the specified commission found that no person improperly benefited from the grant and (e) What process was followed by the specified commission in reaching this conclusion?
Reply:
According to the response received from National Lotteries Commission
(a) The Grant was intended for Breast Cancer Awareness initiatives which included concerts in Mafikeng & Umtata and compilation of a Documentary.
(b) The NLC is not in position to answer this question right now as it awaits the first progress report from the beneficiary.
(c) The project is still being currently implemented and the NLC awaits the first progress report. The NLC will be in a position to comment on (i) and (ii) after assessing the progress report. Once the first progress report is found to be satisfactory, the second tranche payment will be made.
(d) No. With all grants made from the NLDTF, the NLC studies the progress reports to ensure that the funds were used for the intended purposes.
(e) The NLC has not reached any “conclusion”. The NLC is not investigating any impropriety. In assessing of the progress report, and should the NLC find cause for concern, the NLC will raise the matter with the beneficiary.
21 October 2015 - NW2854
Davis, Mr GR to ask the Minister of Communications
Did a certain person (name and details furnished) conduct an enquiry into SA Broadcasting Corporation Board members without their knowledge; if so, (a) on what statutory provisions did the specified person rely when she did so, (b) on what date was the enquiry instituted, (c) what were the terms of reference and (d) what where the findings?
Reply:
The Company Secretary did not conduct any enquiry into the SABC Board members.
(a), (b), (c) and (d) are therefore not applicable.
MR N MUNZHELELE
[ACTING] DIRECTOR GENERAL
DEPARTMENT OF COMMUNICATIONS
DATE:
MS AF MUTHAMBI, MP
MINISTER OF COMMUNICATIONS
DATE: