17 July 2023 - NW2101

Profile picture: Mohlala, Ms MR

Mohlala, Ms MR to ask the Minister of Water and Sanitation

Whether he is responsible for water provision to marginalised communities in municipalities; if not, what is the position in this regard; if so, what (a) measures has he put in place to prioritise the needs of the marginalised communities such as those in the Zakheni Village in the Thembisile Hani Local Municipality, in Mpumalanga, where residents have been experiencing the water crisis and have been deprived of consistent running water for three years and (b) immediate actions have been taken to ensure access to the fundamental right and work towards a sustainable solution, considering the social and economic challenges faced by the marginalised and oppressed of the society?

Reply:

The roles of the Department of Water and Sanitation (DWS) are defined in the National Water Act and Water Services Act. DWS is the regulator of the sector, issues water use licenses, and has responsibilities relating to water resource planning and catchment management. Water provision to marginalised communities in municipalities is the responsibility of municipalities. However, the Department has a responsibility to support municipalities, this includes providing allocation to municipalities from the Water Services Infrastructure Grant (WSIG) and the Regional Bulk Infrastructure Grant (RBIG).

The DWS engaged the Thembisile Local Municipality and they confirmed that the pipeline supplying Zakheni village was damaged by the floods for a period of three (3) to four (4) months which affected water supply. The status is reported as follows:

  • The contractor was appointed, and repairs to the damaged pipeline were completed on 30 April 2023.
  • Water has been restored in the area and is supplied on rationing scheduling.
  • Other areas still receive water through the water tanks to augment the unconnected or unserved areas.
  • The municipality is building a new reticulation pipeline.
  • The long-term water supply plans for the area are as follows: The Thembisile Hani Local Municipality is supplied by Rand Water and the City of Tshwane based on agreed contracts as it does not have a dedicated water source to supply water to the residents of the municipality. The water supply contracts with Tshwane and Rand Water are under review to increase the current water supply.
  • The community of KwaMhlanga and Zakheni will also benefit from the Loskop Bulk water supply scheme once it is completed. The anticipated completion of the project is planned for November 2024.

---00O00---

17 July 2023 - NW1960

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Home Affairs

With reference to electronic visa applications (a) in the past three financial years and (b) from 1 April 2023 to date, (i) what (aa) total number of applications were rejected in each month and (bb) are the reasons for the rejections in each case, (ii) from which countries were applications rejected in each month and (iii) what is the average time taken between an application received and an application rejected in each month?

Reply:

The Total received in the last 3 Financial years:

  1. 1 April 2020 to 31 March 2023 = 28 761
  2. Total received from 1 April 2023 to May 2023 = 6 824

(i)(aa) Total rejected – 16190 in 3 years

(i)(bb) Most common reasons for rejection are:

1. Bank statements

- Invalid

- Not certified

- More than 3 months old

2. Lack of supporting documents

3. No air ticket or expired air ticket

(ii) The top 10 countries for rejection are Nigeria, India, Pakistan, Kenya, Egypt, Philippines, China, Mexico, Uganda, Cameroon and Ethiopia.

(iii) Average turnaround time: 10 working days.

 

END

17 July 2023 - NW2145

Profile picture: Msimang, Prof CT

Msimang, Prof CT to ask the Minister of Justice and Correctional Services

Whether, with reference to his maiden Budget Vote on 16 July 2019, wherein he affirmed that fighting corruption and fraud forms part of his department’s core mandate, he has found that his department has won, or at least made positive strides in the war against the levels of brazen corruption and avarice; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

In the anti-corruption sphere, we significantly expanded the capacity of the Investigating Directorate (ID) and are institutionalising its operations as an integral part of the National Prosecuting Authority (NPA). The ID has enrolled eighteen (18) new matters this financial year, meaning a total of thirty-four (34) matters have been enrolled with 203 accused over the last four (4) years. Thirteen (13) new investigations were authorised, totalling ninety-seven (97) matters authorised over the last four (4) years.

A significant success of the ID during the financial year was its contribution to the recovery of R2.5 billion, which was paid into Criminal Asset Recovery Account (CARA). Whilst it is acknowledged that there is still a long way to go, this represents a significant milestone in the recovery of assets that were illegally obtained through state capture.

Over the last year, the NPA’s Asset Forfeiture Unit (AFU) secured freezing orders valued at R570 million as part of its strategy to pursue the monies stolen by the perpetrators of corruption and the enablers and facilitators of state capture. The finalisation of two (2) high value corruption cases contributed to the AFU obtaining recoveries in corruption and related matters to the value of R2.83 billion during the financial year.

Cumulatively, R10.2 billion has been frozen over the past four (4) years of the five-year Medium-Term Expenditure Framework (MTEF) period. The NPA has recovered R2.55 billion in state capture cases alone.

An Integrated Task Force chaired by the Deputy National Director of Public Prosecutions (DNDPP): NPS was introduced early in 2022 to coordinate the response of the NPA and DPCI to the recommendations of the Zondo Commission. The establishment of an Advisory Panel of experienced prosecutors and investigators to hear and advise on cases has been a very successful initiative, increasing the confidence of prosecutors and investigators dealing with complex matters.

Following additional funding from National Treasury, the NPA establishment was increased from 4 967 to 5 353. The capacitation of specialised units, especially the SCCU and the ID, remained a priority as a response to the Zondo Commission. The filling of the Aspirant Prosecutor posts and newly appointed Prosecutors allowed for more experienced staff to be promoted to specialised areas such as the ID, Specialised Commercial Crimes Unit (SCCU) and Specialised Tax Units.

With the assistance of the Chief Justice and the Department of Justice and Constitutional Development (DoJ&CD)’s Capacity Enhancement Committee, the SCCU set up dedicated Specialised Commercial Crime Courts (SCCCs) in regions that did not have such courts. There are currently twenty-two (22) dedicated courts throughout the country with a footprint of dedicated commercial crime courts in all Provinces – Limpopo, North-West, Northern Cape and Mpumalanga previously in 2019 did not have such courts. SCCU Prosecutors increased from 105 to 225. Support staff stand at thirty-seven (37) with additional twelve (12) posts created between 31 December 2019 and 31 March 2023.

The additional SCCCs allowed the NPA to focus on backlog cases resulting in a 2% decrease (from 823 to 808) in the past financial year. This represents a 22% decrease from the end of the 2021 financial year (1 040 to 808).

In the 2022/2023 financial year, the DoJ&CD took steps to enhance six (6) of the SCCC with technological tools to enable virtual testimony and the receipt of digital evidence. This will go some way to avoiding postponements that may arise when witnesses, etc are not physically available. In the 2023/2024 financial year, a further two (2) SCCC will be enhanced in the same manner.

The focus on old cases had a slightly negative impact on the conviction rate as there were challenges with some of these cases. However, the additional courts did result in a 5.8% increase in the number of cases finalised, from 344 to 364. An increase in percentage of accused being sent to direct imprisonment from 29.2% in 2020/21, then to 34.9% in 2021/22 and now currently at 38.2% has also been significant in the fight against serious commercial crimes. Furthermore, an increase in compensation orders granted, from 39 in 2020/21 to 65 by the end of March 2023, was also noted.

The SCCU actively participated in the Fusion Centre, which serves as a good example of stakeholder collaboration. As a result, thirty-four (34) cases of fraud and related offences related to COVID-19 and South African Social Security Agency grants have been enrolled in the past year.

On the Anti-Corruption Task Team (ACTT) Priority List of identified cases, seventy-nine (79) cases are enrolled with 363 accused (21 enrolled in High courts). Nineteen (19) of these cases are already partly heard.

With effect from 1 April 2022, a Special Director of Public Prosecutions responsible for the General Prosecutions and Specialist Tax Component portfolios was appointed in the NPA. The regional capacity of the Specialist Tax Component has increased in the past financial year. The approved establishment throughout the country has grown to hundred (100) posts, of which eighty-five (85) are filled. The upward performance trajectory of the Unit continued. Prosecutors finalised 138 cases and achieved a conviction rate of 96.4%. This success is underpinned by the component’s ability to attract and retain highly experienced staff.

The impact of COVID-19 during the 2020/21 financial year can be seen in the Table below. However, since middle of 2020, a remarkable improvement in all areas of corruption and fraud related matters has been recorded.

Although significant impact can already be seen, a lot of work is still in progress with refinement and changes to be effected. The ID still needs to broaden its establishment and be capacitated as a permanent structure. I have already approved Regulations that bestow peace officer powers on ID Investigators. These Regulations are significant as they provide investigators with the necessary powers to conduct their work prior to arresting suspects.

Details of specific inroads to arrests, prosecutions and convictions will be released in the Annual Report of the National Director of Public Prosecutions.

Over and above the progress noted by the NPA, from a policy and legislative perspective, I have recently released the discussion document on whistle-blower protection which contains far reaching proposals to amend the Protected Disclosures Act, 2000 (Act No. 26 of 2000) and the Witness Protection, 1998 (Act No. 112 of 1998).

The definition of occupational detriment should be expanded to include persons who are not employees but who have disclosed in terms of the PDA.

  • ‘Occupational detriment’ should be changed to ‘detrimental action’ or improper conduct to avoid a narrow interpretation of who may make a disclosure.
  • Improved measures to keep a protected disclosure confidential where information might identify the discloser.
  • The creation of a reverse onus where any conduct or threat against a whistleblower is presumed to have occurred as a result of a possible or actual disclosure that a person makes.
  • The creation of an offence where a person uses force, coercion, threats, intimidation, or any other coercive means against another person with intent to prevent that person from, or influence that person to refrain from, making a disclosure.
  • Creation of a mechanism for the provision of legal assistance to whistleblowers.
  • Proactive measures by appointing a “whistle blower champion” who is responsible for ensuring and overseeing the integrity, independence and effectiveness of the firm’s policies and procedures on whistleblowing; and to establish, implement, and maintain appropriate and effective internal arrangements.
  • The creation of a fund for whistleblowers. This will assist whistleblowers who have been dismissed, and who face severe financial hardship in meeting their basic needs and that of their dependents.
  • Make it an offence if a person or body does act upon a protected disclosure after it has been made to it.
  • Protection by the state to whistleblowers and their immediate family members in instances where their lives or property is endangered.
  • Inclusion of whistleblower in the definition of witness in terms of the Witness Protection Act.

Parliament has also introduced legislation through the Judicial Matters Amendment Bill, 2023 to amend the section 34 of the Prevention and Combatting of Corrupt Activities Act, 2004 to hold the failure by members of the private sector or incorporated state-owned entities to prevent corrupt activities by creating a criminal offence in that regard.

Legislation has also been drafted to create amend the National Prosecuting Act, 1998 to make the Investigating Directorate a permanent entity instead of one declared by the President by way of a proclamation.

The Department of Justice and Constitutional Development is also finalising the review of the anti-corruption architecture of South Africa, with a view to introduce legislation to further strengthen the fight against corruption.

 

17 July 2023 - NW2038

Profile picture: Abrahams, Ms ALA

Abrahams, Ms ALA to ask the Minister of Social Development

What number of (a) persons and (b) households that receive a social grant have been linked to (i) permanent and/or (ii) temporary economic and employment opportunities through her department since 1 January 2019 in each province?

Reply:

The department developed a framework for linking social grant beneficiaries to sustainable livelihoods and economic opportunities in provinces through sustainable livelihoods programmes.

a) (i) (ii).The department has linked 49 449 persons that receive a social grant to economic and employment opportunities. The linking data is not disaggregated according to the permanent or temporary opportunities but only economic or sustainable livelihoods opportunities. Since 1 January 2019 the department of Social Development have managed to link 49 449 persons receiving social grants to Sustainable Livelihoods opportunities as follows:

PERSONS LINKED TO ECONOMIC OPPORTUNITIES

Province

Linked to economic opportunities

Type of linkages

Eastern Cape

6 262

Skills, employment, cooperatives

Free State

2 348

Skills, employment, cooperatives

Gauteng

25 900

Skills, employment, cooperatives

Kwa Zulu Natal

976

Skills, employment, cooperatives

Limpopo

848

Skills, employment, cooperatives

NDA

2300

Volunteerism

Mpumalanga

18

Skills, employment, cooperatives

Northern Cape

848

Skills, employment, cooperatives

North West

329

Skills, employment, cooperatives

Western Cape

9620

Skills, employment, cooperatives

Total

49 449

 

b) The department link persons and households that receive a social grant, to economic and sustainable livelihoods in all nine provinces. Since 1 January 2019 the department of social development and its entities have managed to link an average of 12 362 households to sustainable Livelihoods opportunities.

SASSA

(a) (i) and (ii)

SASSA has a target on its Annual Performance Plan to link beneficiaries to economic and developmental opportunities. Activities which support this target include sharing details of children who are in grade 12 and are benefiting from social grants with the National Student Financial Aid Scheme. This ensures that the children on the social grant system are first in line for financial aid, to enable them to study further. It is believed that education will enable these young people to break the cycle of inter-generational poverty and dependence on social grants.

Another initiative which SASSA is engaged with is to collaborate with the Project Office in the Presidency which is responsible to implement the Presidential Youth Employment Programme. SASSA assisted in sending SMS notifications to all the young people aged 18 to 35 years who had applied for the social relief of distress grant of R350 to alert them of the youth.mobi website. This website contains information of multiple work opportunities in both the public and private sector, where young people can get information to follow up if they feel they are suited.

GENERAL

The Department and its Agencies (SASSA and NDA) with the support from FinMark Trust (FMT), an independent trust, are piloting the “Generating Better Livelihoods for Grant Recipients” project in line with the Department’s Framework on Linking Social Protection Beneficiaries to Sustainable Livelihoods Opportunities. The project aims to develop pathways for social grant recipients to attain sustainable livelihood opportunities through employment, skills development and/or entrepreneurship. The project’s primary target is child support grant; However, the support will not be limited to this target group. It will be extended to other household members including the beneficiaries of the Covid-19 SRD grant.

17 July 2023 - NW1560

Profile picture: Horn, Mr W

Horn, Mr W to ask the Minister of Justice and Correctional Services

What progress has been made to address the serious shortage of office space at the High Court in Kimberley through the possible relocation of the Master of the High Court?

Reply:

The updated progress made to address the serious shortage of office space at the High Court in Kimberley through procurement of alternative office accommodation for Master of High Court is as follows:

    1. The Department of Justice and Constitutional Development received the request for confirmation of funding through an Actual Cost Analysis (ACA) on the 12 June 2023 from the Department of Public Works and Infrastructure (DPWI) with regards to the procurement of an alternative accommodation for Master of High Court Kimberley.
    2. The approved Actual Cost Analysis was approved and forwarded to DPWI on the 22 June 2023.
    3. This will enable the DPWI to finalize the procurement of the alternative accommodation with the awarded bidder.

17 July 2023 - NW2132

Profile picture: Siwisa, Ms AM

Siwisa, Ms AM to ask the Minister of Public Works and Infrastructure

Whether, with reference to his recent budget vote speech, wherein he indicated that his department will review the accommodation provisions for Members of Parliament and the Executive, his department is providing any accommodation services to former members of the executive who were members of the apartheid government; if not, what is the position in this regard; if so, what are the relevant details? NW2421E

Reply:

The Minister of Public Works and Infrastructure:

The Department of Public Works and Infrastructure does not provide any accommodation for former members of the executive who served in the apartheid government. There is no policy provision or law that provide for such.

___________________________

MR. S ZIKALALA, MP

MINISTER OF PUBLIC WORKS AND INFRASTRUCTURE

DATE:

17 July 2023 - NW1622

Profile picture: Khoza, Mr AV

Khoza, Mr AV to ask the Minister of Transport

Whether, given the fact that goods transportation in the Republic relies mainly on road freight, particularly trucks, and also bearing in mind that the amount of fatally devastating accidents are caused by trucks on our roads nationally and in KwaZulu-Natal in particular, her department has any specific plan to alleviate the challenges brought about by the ever-increasing number of trucks on our roads; if not, why not; if so, (a) what is the plan and (b) on what date is the plan envisaged to be implemented?

Reply:

The Department is currently implementation , busy with the Rail Policy which is geared at dealing with the provision of rail services across the country. The Policy is founded on the principle of the modal shift of rail-friendly cargo from road to rail and the need to revitalise the railways to supply a range of industrial supply-chain logistics services.

The ultimate objective being to upgrade the existing and future rolling stock to ensure that they are better utilised and more volume of cargo moves from road to rail and the resultant reduction of haulage of bulk commodities by road transport. We have started with stringent law enforcements on hazardous chemical cargo to be completely on rail.

Currently there are law enforcement teams at strategic positions to ensure that truck drivers obey the rules and laws of the roads, These Provincial Law enforcement teams have been augmented by National Traffic Police under RTMC, and is yielding good results. The Department of Public Enterprises and Transnet are responsible for freight rail in SA.

17 July 2023 - NW1106

Profile picture: Zondo, Mr  S S

Zondo, Mr S S to ask the Minister of Public Works and Infrastructure

Whether, following reports of damaged and dilapidated hospitals, his department, jointly with the Department of Health, has any plans for the refurbishment and/or remodeling of key hospitals; if not, why not; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure

With regard to plans for refurbishment and/or modeling of damaged and dilapidated hospitals, the matter can be best dealt with by our sister Department of Infrastructure Development, as it is not within the purview of the Department of Public Works and Infrastructure. Therefore, the question should be referred to the relevant MEC, accordingly.

17 July 2023 - NW1252

Profile picture: Engelbrecht, Mr J

Engelbrecht, Mr J to ask the Minister of Justice and Correctional Services

(a) On what date was his department informed that the body found in the cell of Mr Thabo Bester was not his and (b)(i) by whom was his department so informed and (ii) via which medium?

Reply:

a) The National Commissioner was informed on 22 March 2023.

(b)(i) The notification was received from the DCS, Director: Contract Management.

(b)(ii) The notification was received by means of a written investigation report on the escape of the mentioned offender.

END

17 July 2023 - NW1778

Profile picture: Nolutshungu, Ms N

Nolutshungu, Ms N to ask the Minister of Public Works and Infrastructure

(1)Whether, in light of the presented amounts and completion dates set at the beginning of the construction of the Mtentu and Msikaba Eastern Cape Bridges, which are the largest bridge construction projects in the Republic, the completion date is still the same as was announced at the start of the project; if not, why not; if so, what is the total cost of (a) each of the projects and (b) payments of all consultants; (2) whether the relevant details that the contractors engaged on the project are still the same as was presented at the start of the project; if not, why were the original contractors replaced; if so, what are the relevant details

Reply:

The Minister of Public Works and Infrastructure:

The Department of Public Works and Infrastructure has assessed Parliamentary Question 1778 and had since established that the construction of the Mtentu and Msikaba Eastern Cape Bridges, are some of the National Strategic Infrastructure Projects that are managed by the South African National Roads Agency SOC Ltd (SANRAL), which is a Government-owned public company that reports to the Department of Transport (DoT), therefore our colleagues in the Department of Transport will be best suited to response to this question. It will be advisable to re-refer the question accordingly

17 July 2023 - NW2050

Profile picture: Myburgh, Mr NG

Myburgh, Mr NG to ask the President of the Republic

Whether, during the visit of the Prime Minister of Singapore, Mr Lee Hsien Loong, he was able to extract the most important lessons that Singapore, a former British colony, learned along the way towards becoming one of the world’s economic success stories; if not, why not; if so, (a) what were the lessons that were learnt, and (b) how does he plan to implement the lessons in the Republic?

Reply:

The visit provided South Africa and Singapore with an opportunity to discuss areas of cooperation that are firmly focused on the future. This included cooperation in the fields of digitalisation, communications and technology, water and sanitation, and skills development, among others.

The Memorandum of Understanding (MoU) on Skills Development that was signed during the official visit on 16 May 2023 aims to enhance skills development in the areas of exchange and training of best practices in digitalisation, leadership and governance, women’s empowerment, youth development and education, science and innovation, port management and trade and economy. More than 1,000 South African officials have been trained under the auspices of the Singapore Development Programme.

The MoU on Information and Communications Technology aims to exchange best practices in ICT, digital technologies and artificial intelligence and robotics. The two countries also agreed to deepen their cooperation in science and innovation.

There is significant potential to further develop the two countries' economic partnership.

This was evident in the business delegation that accompanied Prime Minister Lee, comprising representatives of a number of sectors, including ports, logistics, healthcare and biomedical, food manufacturing and engineering.

While there is much opportunity for cooperation in these and other areas, the country’s respective development paths are not comparable.

South Africa’s colonialism lasted for hundreds of years, followed by the exclusion of the majority of the population, through apartheid, from economic opportunities, education and other forms of capabilities needed for inclusive development. South Africa’s development path, through the establishment of a constitutional democracy, was not necessarily followed by several of the so-called Asian Tigers.

We can draw on each other’s respective capabilities, but we cannot make simplistic comparisons of each country’s historic progress as we work to develop pathways to address systemic poverty and inequality.

 

17 July 2023 - NW1980

Profile picture: Tito, Ms LF

Tito, Ms LF to ask the Minister of Transport

In light of the social housing development project on land of the Passenger Rail Agency of South Africa, that is expected to benefit individuals who earn between R3 500 and R22 500 a month, which measures have been put in place to ensure that (a) only rightful beneficiaries will benefit and (b) no corruption will occur on the specified project?

Reply:

(a) In terms of the Legal Succession Act No. 38 of 2008 establishing the Passenger Rail Agency of South Africa, section 23(2) states that, “the second object and the secondary business of the Corporation (“PRASA”) is to generate income from the exploitation of the assets acquired by it.

Subsection 3 states that, “In carrying out its objects and business, the Corporation shall have due regard to key government social, economic and transport policy objectives.

The Department of Transport and PRASA are not a custodian of housing delivery, however, in the context underpinned by the principles of cooperative government and intergovernmental relations, the entity has a duty to ensure that the goals and objectives of the Department of Human Settlement are supported and promoted. Therefore, PRASA made available land located near areas of economic activity for construction of decent and affordable housing opportunities with easy access to public transport services and social amenities.

Through an open tender land-release programme (National Station Precinct Development Programme), PRASA awarded development rights to a non-profit Social Housing Institution (“SHI”) to develop and manage the top structure rental stock in line with the Social Housing Regulatory Authority terms and conditions.

Therefore, the Social Housing units at Goodwood Station (in Cape Town) will be allocated by the Social Housing Institute directly to deserving beneficiaries. In order to qualify for this rental subsidy, rightful beneficiaries need to earn a gross monthly income between R1,850 and R22,000, and must:

  • Be South African citizen or have a permanent residency permit.
  • Be 18 years or older.
  • married or living with a partner.
  • May be single or divorced and have proven financial dependants permanently living together.

(b) The Department of Transport also supports an anonymous tip-off call centre established by the Human Settlement Department in collaboration Social Housing Regulatory Authority for anyone who wish to report any suspicion of fraud, corruption, bribery etc. The contact number is 0800 111 670 or [email protected].

17 July 2023 - NW948

Profile picture: Zondo, Mr  S S

Zondo, Mr S S to ask the Minister of Public Works and Infrastructure

In view of the reported 360 courts that were operating with partially functioning generators, and in light of the fact that his department issued 80 instructions for the installation of new generators in various courts across the Republic, what (a) is the detailed breakdown of the costs with regard to the installation and maintenance of the generators and (b) are the details of the 80 courts that were identified?

Reply:

The Minister of Public Works and Infrastructure

a) The Generator Programme is aimed at rolling out 80 new generator installations at various courts in Limpopo, Free State, Northern Cape, Western Cape, Kwa-Zulu Natal, Mpumalanga and Gauteng Provinces respectively. The projects are currently in the planning and design phase which entails the site inspections, status quo reporting, drawings, specifications and approvals including municipal approvals. The market prices and cost breakdowns are determined upon the conclusion of the procurement process which will take place upon the approval of the 2023/24 procurement plan, anticipated at 30 April 2023 and the completion of the planning and design phase. The anticipated cost estimates range from R400 000 to R2 000 000, which varies per facility. The size of the facility and cabling length to the main supply are some of the parameters that determine the cost, which varies per facility.

b) The detailed list of the 80 generator installations are shown below:

PROVINCE

REGIONAL OFFICE

DESCRIPTION

WCS NO

FREE STATE

PROVINCE

BLOEMFONTEIN

REVISED PI : BLOEMFONTEIN HIGH COURT: UPGRADING AND RENOVATING OF ELECTRICAL SYSTEMS INCLUDING BACK UP GENERATOR AND AIR CONDITIONING SYSTEM

54928

GAUTENG PROVINCE

JOHANNESBURG

INSTALLATION OF STANDBY GENERATOR: VANDERBILJPARK, SEBOKENG AND VEREENIGING

54987

NORTHERN CAPE PROVINCE

KIMBERLEY

KIMBERLY HIGH COURT: APPOINTMENT OF CONSULTANT FOR PRE FEASIBILITY STUDY FOR INSTALLATION OF STANDBY GENERATOR

55044

FREE STATE

BLOEMFONTEIN

TSEKI: MAGISTRATE OFFICE: INSTALLATION OF BACK UP GENERATOR

55377

PROVINCE

BLOEMFONTEIN

FICKSBURG MAGISTRATE OFFICE: UPGRADING OF DB BOARD AND ELECTRICITY AND INSTALLATION OF AIR CONS SPILT UNITS AND BACK UP GENERATOR

055496

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO CARNAVON, WILLISTON, BRITSTOWN SUPPLY AND INSTALLATION OF GENERATORS

056551

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO PORT NOLLOTH, KENHARDT SUPPLY AND INSTALLATION OF GENERATORS

056549

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO HANOVER, DE AAR, NOUPORT, RICHMOND SUPPLY AND INSTALLATION OF GENERATORS

056526

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO SUTHERLAND, VICTORIA WEST SUPPLY AND INSTALLATION OF GENERATORS

056502

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO HARTSWATER SUPPLY AND INSTALLATION OF GENERATORS

056563

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO GRIEKWASTAD PRIESKA, DOUGLAS, SUPPLY AND INSTALLATION OF GENERATORS

056561

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO CLANWILLIAM, ATLANTIS, MALMESBURY, VREDENBURG, VAN RHYNSDORP, VREDENDALE MOORREESBURG SUPPLY AND INSTALLATION OF GENERATORS

056571

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO BLUE DOWNS, MITCHELL'S PLAIN SUPPLY AND INSTALLATION OF GENERATORS

056570

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO GRABOUW HERMANUS GEORGE SOMERSET WEST UNIONDALE SUPPLY AND INSTALLATION OF GENERATORS

056573

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO BISHOP LAVIS, KUILS RIVIER SUPPLY AND INSTALLATION OF GENERATORS

056565

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO SWELLENDAM, MONTAGUE, HEIDELBERG, CALEDON, MOSSELBAY, ROBERTSON, BONNIEVALE. LADISMITH SUPPLY AND INSTALLATION OF GENERATORS

056566

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO KATHU, OLIFANTSHOEK SUPPLY AND INSTALLATION OF GENERATORS

056564

NORTHERN CAPE PROVINCE

KIMBERLY

GALESHEWE MAGISTRATE COURT: A STRUCTURAL ENGINEER BE APPOINTED TO CONDUCT A COMPLETE STATUS QUO REPORT OF THE COURT AND A COST ESTIMATE FOR NEW MAJOR REPAIRS AND RENOVATIONS

056669

KWA-ZULU NATAL PROVINCE

DURBAN

PIETERMARITZBURG HIGH COURT: INSTALLATION OF A GENERATOR

056689

GAUTENG PROVINCE

JOHANNESBURG

LENASIA MAGISTRATE COURT: INSTALLATION OF BACKUP GENERATOR

056676

MPUMALANGA PROVINCE

NELSPRUIT

CLUSTER 3- MPUMALANGA PROVINCE- INTALLATION OF BACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT SABIE, ACORNHOEK, BUSHBUCKRIDGE MAGISTRATE COURTS:

056683

MPUMALANGA PROVINCE

NELSPRUIT

CLUSTER 2- MPUMALANGA PROVINCE- INTALLATION OF BACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT SECUNDA AND OGIES MAGISTRATE COURTS

056682

WESTERN CAPE PROVINCE

CAPE TOWN

CLUSTER 2 WESTERN CAPE PROVINCE INSTALLATION OF GENERATORS AT CALITZDORP AND BEAUFORT WEST MAGISTRATE OFFICE

056686

WESTERN CAPE PROVINCE

CAPE TOWN

CLUSTER 4 WESTERN CAPE PROVINCE INSTALLATION OF GERERATORS AT VANRHYSDORP AND VREDENDAL MAGISTRATE OFFICE

056690

MPUMALANGA PROVINCE

NELSPRUIT

CLUSTER 2: MPUMALANGA PROVINCE: INSTALLATION OFBACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT OGIES AND SECUNDA MAGISTRATE COURTS

056682

WESTERN CAPE PROVINCE

CAPE TOWN

CLUSTER 1 WESTERN CAPE PROVINCE INSTALLATION OF GENERATORS AT BLUE DOWNS AND BISHOP LAVIS MAGISTRATE COURTS

056565

WESTERN CAPE PROVINCE

CAPE TOWN

WESTERN CAPE PROVINCE INSTALLATION OF GENERATORS AT GRABOUW MAGISTRATE COURT

056573

WESTERN CAPE PROVINCE

CAPE TOWN

CLUSTER 3 WESTERN CAPE PROVINCE INSTALLATION OF GENERATORS AT GEORGE AND UNIONDALE MAGISTRATE COURTS

056687

MPUMALANGA PROVINCE

MPUMALANGA

CLUSTER MPUMALANGA PROVINCE INSTALLATION OF BACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT PIET RETIEF AMSTERDAM CAROLINA AND ERMELO MAGISTRATE COURTS

056681

GAUTENG PROVINCE

JOHANNESBURG

GAUTENG PROVINCE INSTALLATION OF BACK UP GENERATOR AT JEPPE MAGISTRATE OFFICE

056713

GAUTENG PROVINCE

JOHANNESBURG

BOKSBURG MAGISTRATE'S OFFICE REPAIRS AND RENOVATIONS AND UPGRADING OF ELECTRICITY AND INSTALLATION OF STANDBY GENERATOR

054596

GAUTENG PROVINCE

JOHANNESBURG

VARIOUS CENTRES (JOHANNESBURG REGION) MAGISTRATE'S OFFICE SUPPLY AND INSTALLATION OF STANDBY GENERATORS:VANDERBIJLPARK SEBOKENG AND VEREENIGING

054987

GAUTENG PROVINCE

JOHANNESBURG

VARIOUS CENTRES (JOHANNESBURG REGION) MAGISTRATE'S OFFICE SUPPLY AND INSTALLATION OF STANDBY GENERATOR: SPRINGS,NIGEL, HILLBROW,DAVEYTON AND HEIDELBURG

054990

GAUTENG PROVINCE

JOHANNESBURG

VARIOUS CENTRES (JOHANNESBURG REGION) MAGISTRATE'S OFFICE SUPPLY AND INSTALLATION OF STANDBY GENERATOR: SPRINGS,NIGEL, HILLBROW,DAVEYTON AND HEIDELBURG

054990

GAUTENG PROVINCE

JOHANNESBURG

VARIOUS CENTRES (JOHANNESBURG REGION) MAGISTRATE'S OFFICE SUPPLY AND INSTALLATION OF STANDBY GENERATOR: SPRINGS,NIGEL, HILLBROW,DAVEYTON AND HEIDELBURG

054990

GAUTENG PROVINCE

JOHANNESBURG

VARIOUS CENTRES (JOHANNESBURG REGION) MAGISTRATE'S OFFICE SUPPLY AND INSTALLATION OF STANDBY GENERATOR: SPRINGS,NIGEL, HILLBROW,DAVEYTON AND HEIDELBURG

054990

LIMPOPO PROVINCE

POLOKWANE

POLOKWANE HIGH COURT INTERIM MAINTENANCE FOR LIFTS, GENERATORS,FIRE DETECTION AND AIR CONDITIONERS

 

LIMPOPO PROVINCE

HEAD OFFICE

(D: CPM)

POLOKWANE MAGISTRATE'S OFFICE RECONSTRUCTION OF OFFICES, REPLACEMENT OF GENERATOR, FIRE EQUIPMENT, AIR CONDITIONERS,DAMAGED BY FIRE

055206

NORTHERN CAPE PROVINCE

KIMBERLEY

KUDUMANE MAGISTRATE'S OFFICE UPGRADING,REPAIRS AND RENOVATIONS INCLUDING INSTALLATION OF WTER TANKS WITH ELECTRICAL PUMP AND GENERATOR SET

053756

NORTHERN CAPE PROVINCE

KIMBERLEY

CALVINIA MAGISTRATE'S OFFICE INSTALLATION OF STANDBY GENERATOR

053762

NORTHERN CAPE PROVINCE

KIMBERLEY

KURUMAN MAGISTRATE'S OFFICE INSTALLATION OF STANDBY GENERATOR

053764

FREE STATE PROVINCE

BLOEMFONTEIN

SASOLBURG MAGISTRATE COURT. INSTALLATION OF A GENERATOR

056519

FREE STATE PROVINCE

BLOEMFONTEIN

BETHLEHEM MAGISTRATE COURT. INSTALLATION OF A GENERATOR

056519

FREE STATE PROVINCE

BLOEMFONTEIN

KROONSTAD MAGISTRATE COURT. INSTALLATION OF A GEGERATOR

056520

FREE STATE PROVINCE

BLOEMFONTEIN

HARRISMITH MAGISTRATE COURT. INSTALLATION OF A GENERATOR

056521

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO CLANWILLIAM, ATLANTIS, MALMESBURY, VREDENBURG, VAN RHYNSDORP, VREDENDALE MOORREESBURG SUPPLY AND INSTALLATION OF GENERATORS

056571

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO CLANWILLIAM, ATLANTIS, MALMESBURY, VREDENBURG, VAN RHYNSDORP, VREDENDALE MOORREESBURG SUPPLY AND INSTALLATION OF GENERATORS

056571

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO CLANWILLIAM, ATLANTIS, MALMESBURY, VREDENBURG, VAN RHYNSDORP, VREDENDALE MOORREESBURG SUPPLY AND INSTALLATION OF GENERATORS

056571

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO CLANWILLIAM, ATLANTIS, MALMESBURY, VREDENBURG, VAN RHYNSDORP, VREDENDALE MOORREESBURG SUPPLY AND INSTALLATION OF GENERATORS

056571

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO CLANWILLIAM, ATLANTIS, MALMESBURY, VREDENBURG, VAN RHYNSDORP, VREDENDALE MOORREESBURG SUPPLY AND INSTALLATION OF GENERATORS

056571

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO CLANWILLIAM, ATLANTIS, MALMESBURY, VREDENBURG, VAN RHYNSDORP, VREDENDALE MOORREESBURG SUPPLY AND INSTALLATION OF GENERATORS

056571

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO BLUE DOWNS, MITCHELL'S PLAIN SUPPLY AND INSTALLATION OF GENERATORS

WCS 056570

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO GRABOUW HERMANUS GEORGE SOMERSET WEST UNIONDALE SUPPLY AND INSTALLATION OF GENERATORS

WCS 056573

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO SWELLENDAM, MONTAGUE, HEIDELBERG, CALEDON, MOSSELBAY, ROBERTSON, BONNIEVALE. LADISMITH SUPPLY AND INSTALLATION OF GENERATORS

WCS 056566

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO SWELLENDAM, MONTAGUE, HEIDELBERG, CALEDON, MOSSELBAY, ROBERTSON, BONNIEVALE. LADISMITH SUPPLY AND INSTALLATION OF GENERATORS

WCS 056566

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO SWELLENDAM, MONTAGUE, HEIDELBERG, CALEDON, MOSSELBAY, ROBERTSON, BONNIEVALE. LADISMITH SUPPLY AND INSTALLATION OF GENERATORS

WCS 056566

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO SWELLENDAM, MONTAGUE, HEIDELBERG, CALEDON, MOSSELBAY, ROBERTSON, BONNIEVALE. LADISMITH SUPPLY AND INSTALLATION OF GENERATORS

WCS 056566

WESTERN CAPE PROVINCE

CAPE TOWN

VARIOUS MO SWELLENDAM, MONTAGUE, HEIDELBERG, CALEDON, MOSSELBAY, ROBERTSON, BONNIEVALE. LADISMITH SUPPLY AND INSTALLATION OF GENERATORS

WCS 056566

NORTHERN CAPE PROVINCE

KIMBERLEY

ADDENDUM VARIOUS MO WARRINGTON, PAMPIERSTAD SUPPLY AND INSTALLATION OF GENERATORS

WCS 056563

NORTHERN CAPE PROVINCE

KIMBERLEY

VARIOUS MO KATHU, OLIFANTSHOEK SUPPLY AND INSTALLATION OF GENERATORS

WCS 056564

MPUMALANGA PROVINCE

NELSPRUIT

CLUSTER 3- MPUMALANGA PROVINCE- INTALLATION OF BACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT SABIE, ACORNHOEK, BUSHBUCKRIDGE MAGISTRATE COURTS:

056681

MPUMALANGA PROVINCE

NELSPRUIT

CLUSTER 3- MPUMALANGA PROVINCE- INTALLATION OF BACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT SABIE, ACORNHOEK, BUSHBUCKRIDGE MAGISTRATE COURTS:

056681

MPUMALANGA PROVINCE

NELSPRUIT

CLUSTER 3- MPUMALANGA PROVINCE- INTALLATION OF BACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT SABIE, ACORNHOEK, BUSHBUCKRIDGE MAGISTRATE COURTS:

056681

MPUMALANGA PROVINCE

NELSPRUIT

CLUSTER 2- MPUMALANGA PROVINCE- INTALLATION OF BACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT SECUNDA AND OGIES MAGISTRATE COURTS

056682

 

 

POMEROY MAGISTRATE COURT OFFICE CONSTRUCTION OF ADDIDTIONAL ACCOMMODATION REPAIRS AND RENOVATIONS AND INSTALLATION OF A GENERATOR

056667

MPUMALANGA PROVINCE

NELSPRUIT

CLUSTER 2: MPUMALANGA PROVINCE: INSTALLATION OFBACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT OGIES AND SECUNDA MAGISTRATE COURTS

056682

WESTERN CAPE PROVINCE

CAPE TOWN

WESTERN CAPE PROVINCE INSTALLATION OF GENERATORS AT GRABOUW MAGISTRATE COURT

056573

MPUMALANGA PROVINCE

NELSPRUIT

CLUSTER MPUMALANGA PROVINCE INSTALLATION OF BACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT PIET RETIEF AMSTERDAM CAROLINA AND ERMELO MAGISTRATE COURTS

056683

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO CARNAVON, WILLISTON, BRITSTOWN SUPPLY AND INSTALLATION OF GENERATORS

056551

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO CARNAVON, WILLISTON, BRITSTOWN SUPPLY AND INSTALLATION OF GENERATORS

056551

GAUTENG PROVINCE

JOHANNESBURG

VARIOUS CENTRES (JOHANNESBURG REGION) MAGISTRATE'S OFFICE SUPPLY AND INSTALLATION OF STANDBY GENERATORS:VANDERBIJLPARK SEBOKENG AND VEREENIGING

054987

WESTERN CAPE PROVINCE

CAPE TOWN

WESTERN CAPE PROVINCE INSTALLATION OF GENERATORS AT GRABOUW MAGISTRATE COURT

056573

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO PORT NOLLOTH, KENHARDT SUPPLY AND INSTALLATION OF GENERATORS

056549

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO HANOVER, DE AAR, NOUPORT, RICHMOND SUPPLY AND INSTALLATION OF GENERATORS

056526

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO HANOVER, DE AAR, NOUPORT, RICHMOND SUPPLY AND INSTALLATION OF GENERATORS

056526

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO HANOVER, DE AAR, NOUPORT, RICHMOND SUPPLY AND INSTALLATION OF GENERATORS

056526

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO SUTHERLAND, VICTORIA WEST SUPPLY AND INSTALLATION OF GENERATORS

056502

NORTHERN CAPE PROVINCE

KIMBERLY

VARIOUS MO GRIEKWASTAD PRIESKA, DOUGLAS, SUPPLY AND INSTALLATION OF GENERATORS

056561

MPUMALANGA PROVINCE

NELSPRUIT

CLUSTER MPUMALANGA PROVINCE INSTALLATION OF BACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT PIET RETIEF AMSTERDAM CAROLINA AND ERMELO MAGISTRATE COURTS

056683

MPUMALANGA PROVINCE

NELSPRUIT

CLUSTER MPUMALANGA PROVINCE INSTALLATION OF BACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT PIET RETIEF AMSTERDAM CAROLINA AND ERMELO MAGISTRATE COURTS

056683

MPUMALANGA PROVINCE

NELSPRUIT

CLUSTER MPUMALANGA PROVINCE INSTALLATION OF BACKUP GENERATORS AND UNINTERRUPTIBLE POWER SYSTEM AT PIET RETIEF AMSTERDAM CAROLINA AND ERMELO MAGISTRATE COURTS

056683

17 July 2023 - NW2079

Profile picture: Msimang, Prof CT

Msimang, Prof CT to ask the Minister of Justice and Correctional Services

In light of the fact that the Government has eventually terminated its contract with the Mangaung Correctional Centre and the private security company, G4S, whereupon he committed that his department was working on a plan to take over the facility in two months’ time after the completion of the vetting of staff within the same period, what are the details of the measures that he has put in place to guarantee the effectiveness of the two months’ vetting and training of staff to ensure that escapes such as the one executed by the notorious murderer and rapist, Mr Thabo Bester, will not happen in future?

Reply:

The Department has since embarked on a project to conduct vetting of the Mangaung Correctional Centre (MCC) personnel including contractors and staff members. A total of 507 Staff and 57 Contractors Personnel Suitability Checks (PSC) were conducted and processed. The PSC include the following:

  • Criminal Record Checks
  • Qualification verification (Matric and Tertiary)
  • Financial record checks
  • Property checks
  • Directorship checks

As of the 05 June 2023, the Department will be processing the Confidential Security Clearances for all Mangaung staff members. The process involves:

  • Completion of Security Clearance Application Forms (Z204) and quality checking for correctness upon submission; &
  • Evaluating submitted additional documentations as per security clearance application requirement, well as PSC outcome reports.

Issuing of security clearance certificate is the responsibility of the State Security Agency (SSA) the department will then submit all files for processing to SSA. The envisaged submission date to SSA is 26 June 2023.

In addition, DCS also plans to implement a phased-in training plan for the MCC staff from 01 July to 30 September 2023, for all categories of officials needed for the Centre to function optimally. The training plan will target three groups of officials that are envisaged to staff the centre as follows:

  • current qualifying staff who may be considered by the Department;
  • officials from the Department who will be transferred from other components / centres; and
  • qualifying former officials who will be recruited.

The detailed training needs are currently being determined and existing training curricula and manuals are being adapted for this purpose. Continuous training will also be provided beyond the dates mentioned supra.

END

17 July 2023 - NW1963

Profile picture: Herron, Mr BN

Herron, Mr BN to ask the Minister of Water and Sanitation

(1)Whether, considering that in 2022 the residents lodged complaints to his department following the contamination of the Rooiwal Waste Water Treatment Works, and noting the investigations conducted by the SA Human Rights Commission that also found that the water posed serious health risks and that the residents’ constitutional right to have access to clean water was not met by the City of Tshwane Metropolitan Municipality, his department has been informed of the specified issues; if not, does his department not have an oversight team looking into complaints received from residents and/or organisations; if so, what remedial actions have been taken to remedy the specified situation; (2) What total number of times since its establishment has the specified Rooiwal plant undergone major upgrades to increase its capacity to handle the pressures of demand from the area it services; (3) What type of maintenance has taken place at the Rooiwal plant in the past year? NW2214E

Reply:

1. The Department has issued Notices and Directives to the City of Tshwane (CoT) Metropolitan Municipality and the Department is currently engaging CoT to reach an agreement that will be approved by the Courts. This is yet to be finalised.

2. The Rooiwal Wastewater Treatment Works (WWTW) consists of three (3) works: Rooiwal North, Rooiwal West, and Rooiwal East. The biofilter effluent of Rooiwal West must be further treated by the activated sludge system of the Rooiwal North Works. Rooiwal East is biofilters with a separate effluent stream.

A project to upgrade the WWTW was started in 2008 and completed in 2012, with the following deliverables:

  • Replacement of centrifugal blowers on the Rooiwal Northern Works.
  • The replacement of return activated sludge (RAS) pumps at Rooiwal Northern Works.
  • The structural refurbishment of 3 anaerobic digesters at Rooiwal Western Works.
  • New mechanical and electrical equipment for anaerobic digesters at Rooiwal Western Works and EW.
  • Extension of the sludge drying pans.
  • SCADA for blowers and RAS pumps

3. Maintenance is being performed on all the infrastructure. Details of the dates and status of planned maintenance are enclosed in Annexure 1 attached.

Despite the above, Rooiwal WWTW is dysfunctional and under-capacitated. In June 2023, the Tshwane City Council voted R450 million for short-term repairs to the Rooiwal Waste Water Treatment Works and DWS, National Treasury, the DBSA and the City are in the process of developing a financing plan for the medium upgrading of the capacity of the Rooiwal Waste Water Treatment Works. This will involve the upgrading of the plant’s treatment capacity by 130 Ml of waste water per day (ML/day), coupled with desilting of sludge at the Leeukraal dam. The desilting of the dam will enable the Temba Water Treatment Works to function better and produce drinking water which meets minimum standards. The current capacity of the plant is 250 ML/day. The capacity will be increased to 380 ML/day. This will be sufficient to treat the current and future projected waste water load in Hammanskraal. The project is due to start in July 2024 and end in June 2026.

DWAS Logo RGB

ANNEXURE 1

Rooiwal East and West Wastewater Treatment Works

Ref No.

AREA

Required Maintenance

Planned Start Date

Planned End Date

Estimated Costs

Status

Actual Costs (R)

 
   

Rooiwal East WWTP

 
   

Inlet Works

 

1.1

Screens

Service screen No. 1 and 2

10-Jan-23

28-Feb-23

 

Completed

804471.80

 

1.1.1

Screens

Repair screen no.1

Emergency

repairs

 

Completed

61238.94

 

1.1.2

Screens

Repair screen no.2

Emergency

repairs

 

Completed

62555.90

 

4

Grit Classifier

Repair Grit Classifier No. 2

01-Aug-22

30-Sept-22

366 000

Complete

295000.00

 

5.1

Degritter

Service Grit pump No.1 and 2

01-Sept-22

30-Sept-22

50 000

Complete

171892.88

 

6.1

Degritter

Service Grit scrapper No. 1 and 2

01-Nov-22

30-Nov-22

110 000

Complete

59190.51

 

6.1.1

Degritter

Remove sand from Degritter no.1 and 2

Emergency

repairs

 

Completed

65000.00

 

7

Degritter

Replace Grit scrapper rubbers

01-Nov-22

30-Nov-22

 

Complete

25000.00

 
   

Primary Settling Tanks

 

10.1

PST

Remove sand from PST no.1 to 8

Emergency

repairs

 

Completed

1120838.39

 

11

Raw sludge sump

Service Fine screens No. 2

01-Sept-22

30-Jan-23

 

Completed

475737.93

 

12

Raw sludge sump

Service Fine screens No. 1

01-Mar-23

30-Mar-23

 

Screen removed for repair

475737.93

 

13.1

Raw sludge pump station

Repair Raw sludge pump no.2

Emergency

repairs

 

Completed

15930.40

 
   

Rooiwal West WWTW

 
   

Humus Pump Station

 

1.1.2

HPS

Repair Humus pump and motor

Emergency

repairs

 

Completed

134907.84

 
   

Anaerobic Digesters

 

4

Anaerobic digesters

Service digested sludge pumps non-return valves

30-Oct-22

30-Oct-22

 

Complete

297402.82

 

Rooiwal North Wastewater Treatment Works

No.

AREA

Required Maintenance

Planned Start Date

Planned End Date

Estimated Costs

Status

Actual Costs

 
   

Inlet Works

 

1.1 

Inlet Works

Service screen No. 1

01-Jul-22

30-Jul-22

 

Completed

367227.89

 

1.2

Inlet Works

Service screen No. 2

01-Aug-22

30-Aug-22

 

Completed

367227.89

 

1.2a

Inlet Works

Repairs on Screen 2 and 3

Emergency

repairs

 

Completed

158017.82

 

3.1

Inlet Works

Service Conveyor belts

01-Oct-22

30-Oct-22

 

Complete

167816.92

 

4.1

Inlet Works

Repair Grit Classifier no.2 motor and gearbox

Emergency

repairs

 

Complete

160882.92

 

4.2

Inlet Works

Repair grit pump no.2

Emergency

repairs

 

Complete

49909.97

 
   

Inlet Works

           

4.3

Inlet Works

Repair grit pumps x 4

Emergency

repairs

 

Complete

166336.56

 
   

Primary Settling Tanks

 

5.1

PST

Remove sand PST 1

01-Sept-22

30-Sept-22

 

Complete

252359.20

 

5.2

PST

Remove sand PST 2

10-Jan-23

30-Jan-23

 

Complete

252359.20

 

5.3

PST

Remove sand PST 3

01-Apr-23

30-April-23

 

Complete

252359.20

 

7

PST

Refurbish PST Panel boxes

01-Oct-22

30-Oct-22

 

Service provider busy

121537.48

 

9.1

PST

Service PST 1 Rotating Bridge

01-Jul-22

30-Jul-22

 

Complete

28752.24

 

9.2

PST

Service PST 2 Rotating Bridge

01-Aug-22

30-Aug-22

 

Complete

15868.68

 

9.3

PST

Service PST 3 Rotating Bridge

01-Sept-22

30-Sept-22

 

Complete

31115.96

 
   

BNR Reactors

 

15.1

Reactor 1

Repair leaks on gas pipes, main gas pipe actuator and gearbox

Emergency

repairs

 

Leaks closed, service provider still busy

548701.80

 

18

Reactor 3

Repair Internal Recirculation Pump x 1

01-Aug-22

30-Aug-22

 

Complete

29037.47

 

20.2a

Reactor 2

Repair Screw pump no.2 gearbox

Emergency

repair

 

Service provider busy with repairs

342833.84

 
   

Blowers

 

24.1

Blowers 3

Quarterly maintenance

01-Sept-22

30-Sept-22

 

Service provider awaiting spares

442750.00

 

24.1a

Blowers

Repairs on Blowers main supply

Emergency

Repairs

 

Complete

407662.00

 

24.1b

Blowers

Repairs on Blower 2 and 5

Emergency

Repairs

 

Complete

115943.36

 

24.1c

Blowers

Repairs on Blower 5

Emergency

Repairs

 

Complete

68642.30

 

24.1d

Blowers

Repairs on electric panels of Blower 2,3,4,5 and 8

Emergency

Repairs

 

Complete

147193.46

 

24.4

Blowers 8

Quarterly maintenance

01-Dec-22

30-Dec-22

 

Busy with repairs

442750.00

 

24.6

Blowers 4

Quarterly maintenance

01-Feb-23

28-Feb-23

 

Service provider awaiting spares

442750.00

 

24.7

Blowers 5

Quarterly maintenance

01-Mar-23

30-Mar-23

 

Service provider awaiting spares

442750.00

 

24.9

Blowers 2

Quarterly maintenance

01-May-23

30-May-23

 

Service provider awaiting spares

442750.00

 

26

Blowers 1-9

Level 3 Electric Motor Preventative Maintenance

01-Aug-22

30-Aug-22

1 900 000

Included in quarterly maintenance quotations

   
   

Clarifiers

 

29.1

Reactor 2 Clarifiers

Service Clarifier Rotating bridges

01-Sept-22

30-Sept-22

 

Complete

132000.00

 

29.1a

Reactor 2 Clarifiers

Repair Clarifier 2.6 Rotating bridge

Emergency

Repairs

 

Complete

19702.26

 

29.2a

Reactor 1 Clarifiers

Repair Clarifier1.4 Rotating bridge

Emergency

Repairs

 

Complete

19593.62

 

29.2b

Reactor 1 Clarifiers

Repair Clarifier 1.5 Rotating bridge

Emergency

Repairs

 

Complete

21540.98

 

29.3

Reactor 3 Clarifiers

Service Clarifier Rotating bridges

01-Nov-22

30-Nov-22

 

Complete

148048.78

 

29.3a

Reactor 3 Clarifiers

Repair Clarifier 3.3 and 3.5 Rotating bridges

Emergency

Repairs

 

Complete

22502.26

 

29.3b

Reactor 3 Clarifiers

Repair Clarifier 3.6 Rotating bridge

Emergency

Repairs

 

Complete

23048.95

 

29.3c

Reactor 3 Clarifier

Repair Clarifier 3.4 Rotating bridge

Emergency

Repairs

 

Complete

66000.00

 

30.1

Reactor 1 Clarifiers

Service tip valves

01-Dec-22

30-Dec-22

35 000

Serviced 1.1; 1.2 and 1.3

97365.28

 

31.1

Reactor 1 Clarifiers

Service bottom valves

01-Jul-22

30-Jul-22

 

Serviced 1.5 bottom valve

13435.24

 

31.2

Reactor 2 Clarifiers

Service bottom valves

01-Aug-22

30-Aug-22

 

Serviced 2.6 bottom valve

15645.80

 
   

Dissolved Air Floatation Pump Station

 

32.1a

DAF Screen

Electrical repair on Rake screen

Emergency

Repairs

 

Complete

55307.38

 

33

DAF sump pumps

Service DAF Bypass pumps x 2

01-Sept-22

30-Sept-22

 

Serviced pump no.2

57633.29

 

33.1

DAF sump pumps

Repair DAF Bypass pumps no.1

Emergency

Repairs

 

Complete

116107.90

 
   

Aerobic Digester

 

34.1

Aerobic pump station

Repair Sludge Pumps non-return valves x 2

Emergency

Repairs

 

Complete

138856.88

 

34.2

West Anaerobic Digesters

Repair Digested sludge pump

Emergency

Repairs

 

Complete

157607.86

 

34.3

West Humus Pump Station

Repair Humus sludge pumps

Emergency

Repairs

 

Complete

134907.84

 

34.4

West Farmers Pump Station

Repair Farmers pump motor

Emergency

Repairs

 

Complete

319711.90

 

35

Aerobic digester

Service Fine Screens x 2

01-Oct-22

30-Oct-22

 

Quotation for approval

726211.80

 
   

Chlorination System

 

37

Chlorine building

Replace Chlorine pump no1 rotating unit

01-Jul-22

30-Jul-22

 

Complete

253416.00

 

Transformers

             

42.1

Transformers

Service of transformers

01-Sept-22

30-Sept-22

 

Complete

493141.80

 

Flow Meters

             

44.1

All Works

Calibrate flow meters

01-Sept-22

30-Sept-22

 

Complete

46946.40

 

Other Equipment

             

48

Bin trailers

Repair bin trailers x 3

01-Sept-22

30-Sept-22

 

1 x trailer repaired

3205.00

 

51

Grass Slasher

Repair grass slasher x 2

01-Oct-22

30-Oct-22

16 000

Complete

   

52

Computers

Repair computers x 3

01-Jul-22

30-Jul-22

47 000

Call logged with IT

   

Rooiwal Belt Filter Press Maintenance

No.

Area

Required Maintenance

Planned Start Date

Planned End Date

Estimated Costs

Status

Actual Costs

 
   

Bottom Belt Presses

 

53

Press no. 5

Refurbish Belt press

01-Sept-22

30-Jan-23

 

Spares used to repair others 4 Belt Presses

860718.65

 

54

All Presses

Service

01-Jul-22

30-Jun-23

2 200 000

     

54.1

All Presses

Preventative maintenance

01-Jul-22

30-Aug-23

 

Complete

245477.60

 

54.2

Press no.2

Repair poly pump, actuator valve

Emergency

Repairs

 

Complete

368413.93

 
   

Top Belt Presses

 

61.1

Press no. 4

Replace top and bottom belts

Emergency

Repairs

 

Complete

198172.96

 

61.2

All Presses

Preventative maintenance

01-Sept-22

30-Oct-23

 

Complete

334247.04

 

61.3

Top Belt Presses

Repair rear gate to Sludge Hopper

Emergency

Repairs

 

Complete

19840.57

 

17 July 2023 - NW2088

Profile picture: Ngcobo, Mr SL

Ngcobo, Mr SL to ask the Minister of Employment and Labour

With reference to the road and freight industry being dominated by foreign nations despite his acknowledgement that there is no shortage of skilled truck drivers in the Republic, as a result the inter-ministerial committee, consisting of the Ministries of Employment and Labour, Transport, Home Affairs and the Police, together with relevant stakeholders have come up with an action plan to address the grievances of local truck drivers who have continued to block national roads, what (a) is the time frame and/or number of years of implementation of the 11-stages action plan signed by the Road and Freight InterMinisterial Committee and the road and freight industry stakeholders, (b) total amount of investment has already been made to the plan and (c) are the details of the progress made to date in its implementation?

Reply:

Hon. Ngcobo, the Inter-Ministerial Committee continues to be hard at work into resolving issues around road freight industry. As you are perfectly aware, because part of what you have stated in your question is that indeed we have multiple stages of implementations.

These will always be in various stages of progress. There are some that would be progressing quite well and there would be those that will continue to need a lot of engagement time with all the stake-holders. Negotiations with the relevant stakeholders, especially those who see stakes being too high, would always be a bit sticky and riddled with manifold intricacies. This is the reason why it would not be possible to then say on this particular time and date all will be well and good.

The other issue which is connected with this is that we are avoiding the issue of piecemeal publication of progress that we are making, when some of these areas are intertwined. But having stated that, in the area of persuading different groupings who ordinarily ought to be a single one, given their common interests, there is much focus in it. Yes, sometimes, the progress can easily be seen as the back and forth one, in the sense that, one time there is an agreement, in the next time others define themselves outside of what you would have thought has been dispensed with.

In the area of Employment and Labour, we are also pushing very strongly for the holistic resolution into the matter. Yes, we are very much aware that some of the challenges that we face as the country is economy that is not rising, in cases where it does, it is not necessarily inclusive. Remember, economic growth will lead to employment. So, hence we are pushing for the Labour Migration Policy, which is one leg of the Employment Policy. But even there, it is not in our plans to push a policy that may be quickly be found to be inconsistent with the country’s constitution – that is one. But, two, the one that is full of unintended consequences. And three, the one that adding to the challenges than solving them. So, we are so focused, meticulous and diligent in the work that we do.

17 July 2023 - NW815

Profile picture: Msimang, Prof CT

Msimang, Prof CT to ask the Minister of Justice and Correctional Services

Whether, in view of reports in August 2022 that the Republic was dealing with about 50 cases of extradition and related mutual legal assistance with other countries, he will provide an update and/or details on the total number of (a) cases and (b) successful extraditions; if not, why not in each case; if so, what are the relevant details in each case?

Reply:

1. The Department is responsible for the processing of all incoming and outgoing requests for mutual legal assistance and extraditions to and from foreign states. Although detailed records are kept of all cases processed by the Department, due to the nature of these matters, some cases cannot be divulged due to the confidentiality and sensitive nature thereof and the fact that the matter has not yet been finalised.

2. Since August 2022, the Department received 78 new requests for extradition and mutual legal assistance.

17 July 2023 - NW2172

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Transport

In each month and in each case in the (a) past three financial years and (b) since 1 January 2023, (i) what number of staff have been suspended at the Passenger Rail Agency of South Africa, (ii) what amount was spent on salaries and/or any other type of remuneration on the specified staff, (iii) what are the reasons for each suspension, (iv) what are the details of each suspension that (aa) has been lifted and (bb) is still in place, (v) who is fulfilling the tasks that were performed by the suspended personnel and (vi) what are the costs associated with each suspension and the working conditions for the persons performing the functions of the suspended staff members in each case?

Reply:

(a)(i) The following numbers of employees were suspended in the months indicated below:

2021/2022

MONTH

(i)

(ii)

(iii)

(iv)

(v)

(vi)

April 2021

3

R19 445 569,25

Procurement-related irregularities

Case 1: Matter awaiting outcome of arbitration at CCMA.

No acting incumbent

N/A

       

Case 2: Disciplinary hearing postponed sine die pending a legal opinion.

No acting incumbent

 
       

Case 3: Hearing continued in June 2023.

No acting incumbent

 

August 2021

1

R3 267 486,60

Gross negligence

Hearing pending due to unavailability of witness from SCM

Person Acting

 

January 2022

2

R4 768 846,14

Case1: Unfair disqualification of bidder who scored the highest points resulting in an incorrect award.

Employee found guilty on all charges on 12 May 2023. Awaiting date from Chairperson for evidence in mitigation and aggravation.

No acting incumbent

 
     

Case2: Gross Negligence, Gross Deereliction of Duty

Charges finalised , hearing date 16-01-2023

Acting incumbent

 

February 2022

2

R6 440 994,70

Case 1: Dereliction of duty; dishonesty

Case 2:

Gross misconduct, contravening PFMA and breaching company policy

Case 1: Forensic investigation is yet to be undertaken.

No acting incumbent

 
       

Case 2:

Awaiting dates for continuation of hearing.

No acting incumbent

 

March 2022

1

R453 000,00

Threatening behaviour, inciting violence and false allegations

Suspension has been extended. Employee charged - pending disciplinary hearing. Hearing scheduled 13-14 March 2023.

No acting incumbent

N/A

2022/2023 FINANCIAL YEAR

June 2022

1

R1 636 690,00

Contrevenion of Recruit/Selection policy

Investigation finalised Line to advise on way forward

Acting incumbent

 

July 2022

1

R2 001 725,80

Misconduct

Employee being engaged for mutual separation

Acting incumbent

 

August 2022

1

R345 792,44

Gross misconduct

Investigation in progress

Acting incumbent

R26712.98

September 2022

2

R2 168 423,00

Case 1: Investigation ongoing

Attorneys in process of drafting charges for new evidence submitted

No acting incumbent

N/A

     

Case 2: Investigation ongoing

RFQ for forensic investigation to be finalised

No acting incumbent

N/A

October 2022

4

R2 977 716,96

Case1: under investigation

Forensic investigation in progress

Person appointed on fixed term contract

 
     

Case2: Insubordination and gross misconduct

Matter was held on 31 March 2023 and awaiting new date from the Chairperson

No acting incumbent

N/A

     

Case3: Misconduct

Investigation ongoing awaiting report

No acting incumbent

N/A

     

Case4: Misuse of Company Vehicle

Disciplinary finalized awaiting verdict

No acting incumbent

N/A

November 2022

3

R1 897 216,50

Case1: Gross negligence and insubordination

Closing arguments were made on 21 April 2023. Awaiting Chairperson's ruling.

Acting incumbent

 
     

Case2: Charges to be confirmed

Awaiting final investigation report from Protection Services.

Acting incumbent

 
     

Case3: Theft of identity

Pending - Awaiting appointment of initiator

No acting incumbent

 

2023 CALENDAR YEAR TO DATE

February 2023

3

R157 031,28

Fraud, theft and gross dishonesty

Hearing was held on 30 May 2023. Plea bargain was entered into. Employer revoked the plea bargain and aggravated for dismissal. Awaiting employees to resubmit mitigating evidence.

No acting incumbent

 
     

Fraud, theft and gross dishonesty

Hearing was held on 30 May 2023. Plea bargain was entered into. Employer revoked the plea bargain and aggravated for dismissal. Awaiting employees to resubmit mitigating evidence.

No acting incumbent

 
     

Fraud, theft and gross dishonesty

Hearing was held on 30 May 2023. Plea bargain was entered into. Employer revoked the plea bargain and aggravated for dismissal. Awaiting employees to resubmit mitigating evidence.

No acting incumbent

 

March 2023

5

R155 030,38

Absence without leave

Employee was served with suspension letter on 24 March 2023 pending investigation

   
     

Assault

Awaiting investigation report

   
     

Serious Misconduct

Investigations is being carried out. Pending the outcome of investigations

   
     

Theft

Employee charged criminally, out on bail.

   
     

Theft

Employee charged criminally, out on bail.

   
             

17 July 2023 - NW1662

Profile picture: Breytenbach, Adv G

Breytenbach, Adv G to ask the Minister of Justice and Correctional Services

Given the increase in cybercrime experienced in the Republic, what total number of (a) prosecutors, (b) judges and (c) magistrates have training and/ or qualifications in (i) cybercrime and security and/ or (ii) cryptocurrency crime and security; (2) Whether there are any plans to implement further training on (a) cybercrime and (b) cryptocurrency security; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

I wish to inform the Hon Member that I have been informed that:

(1)(a) 744 prosecutors have received training in (i) cybercrime and security; and (ii) cryptocurrency crime and security, during the 2021/2022 to 2022/2023 financial years.

(b) Numbers of (b) judges and (c) magistrates, trained, has been referred to the South African Judicial Education Institute at the Office of the Chief Justice, which is mandated to provide training to the High and Lower Court Judiciary. The response is as follows:

(i) Cybercrime and Security

2015/16

Topic

Target audience

#

Cybercrime and Electronic Evidence(ToT)

Judges

12

Cybercrime and Electronic Evidence (ToT)

Judges

10

Cybercrime and Electronic Evidence (ToT)

Judges

8

Cybercrime and Electronic Evidence

Judges

17

Cybercrime and Electronic Evidence (ToT)

District Court Magistrates (DCM)

16

Cybercrime and Electronic Evidence

District Court Magistrates

13

Cybercrime and Electronic Evidence

District Court Magistrates

22

Cybercrime and Electronic Evidence

District Court Magistrates

21

Cybercrime and Electronic Evidence

District Court Magistrates

72

Cybercrime and Electronic Evidence

District Court Magistrates

15

Cybercrime and Electronic Evidence (ToT)

Regional Court Magistrates (RCM)

15

Cybercrime and Electronic Evidence

Regional Court Magistrates

85

Cybercrime and Electronic Evidence

Regional Court Magistrates

29

Note: ToT stands for Train the Trainer course on Cybercrime and Electronic Evidence facilitation skills.

Totals:

Judges: 47

RCM: 129

DCM: 149

2016/17

Topic

Target audience

#

Cybercrime and Electronic Evidence

Judges

19

Cybercrime and Electronic Evidence

Judges

21

Cybercrime and Electronic Evidence

Regional Magistrates

57

Cybercrime and Electronic Evidence

District Court Magistrates

14

Cybercrime and Electronic Evidence

District Court Magistrates

10

Cybercrime and Electronic Evidence

District Court Magistrates

77

Cybercrime and Electronic Evidence

District Court Magistrates

15

Cybercrime and Electronic Evidence

District Court Magistrates

12

Totals:

Judges: 40

RCM: 57

DCM: 128

2017/18

Topic

Target audience

#

Technology used in Cybercrime

Regional Court Magistrates

154

Cybercrime and Electronic Evidence

District Court Magistrates

18

Totals:

RCM: 154

DCM: 18

2019/20

Topic

Target audience

#

Cybersecurity, cyber specific offences and Budapest Convention

District Court Magistrates

17

2020/21

Topic

Target audience

#

Cybercrime and Electronic Evidence

Regional Court Magistrates

52

2021/22

Topic

Target audience

#

Cybercrime and Electronic Evidence

Regional Court Magistrates

49

2022/23

Topic

Target audience

#

Cybercrime and Electronic Evidence

District Court Magistrates

17

Cybercrime Amendment Act 12/2021

District Court Magistrates

14

Totals:

DCM: 31

(ii) Number of Judges and Magistrates trained on cryptocurrency crime and security

2018/19

Topic

Target audience

#

ICT, Cryptocurrency and Organised Crime

Judges

84

Totals:

Judges: 84

2. (a)(b) Yes. In fact, I regard training and capacitation on the management and prosecution of cybercrime and cryptocurrency cybercrime as so important, that I have signed a Cooperation Protocol with the Minister for Europe and Foreign Affairs of the French Republic, to promote such training and capacitation, during June 2023.

(i) Furthermore, 334 Prosecutors have applied to be trained on Cybercrimes at Justice College, during the 2023/ 2024 financial year. Such training will take place during seven (7) planned training sessions.

(ii) In addition, the Cyber Response Committee has planned for training for 60 prosecutors. The training will cover the following:

  1. Basic Cybercrime Investigation;
  2. Financial Investigation triage and techniques;
  3. Overview of digital evidence for prosecutors; and
  4. Mobile device evidence for prosecutors.

(iii) I have great pleasure in announcing that three (3) NPA officials who have undergone intensive training through the FBI’s Law Enforcement Academy in the areas of the Dark Web and crypto investigations, are now also responsible for rolling out training to NPA and SAPS officials. The first such training is scheduled for 17 July 2023.

(iv) Lastly, I have been informed that the NPA’s Specialised Commercial Crimes Unit (SCCU), has recently established its own Training Desk to ensure that specialist training needs are sourced, which includes training at an advanced level in Cyber-crime and crypto currencies. This includes collaboration with the following counterparts and organizations:

  1. The UNODC;
  2. The Office of the US Legal: FBI;
  3. SABRIC; and
  4. FIC.

Plans will also be developed when there is additional budget for refresher training of Judicial trainers by experts.

I therefore wish to assure the Honorable Member that my Ministry and the JCPS Cluster are taking cybercrimes seriously and are addressing these crimes as a priority.

17 July 2023 - NW1621

Profile picture: Mkhonto, Ms C N

Mkhonto, Ms C N to ask the Minister of Transport

Whether there are any existing working relations between Truckers Association South Africa and her department; if not, why not; if so, what agreements and/or Memoranda of Understanding exist between the two to manage their working relations, specifically in small towns along the national roads where they seem to be at loggerheads?

Reply:

Yes, the then Minister of Transport, Mr Fikile Mbalula, established a Road Freight and Logistics Task Team (Task Team) to serve as a conduit to the Inter-Ministerial Committee (IMC) and it comprises all stakeholders within the road freight industry, the Departments of Transport, DHA, DEL, SAPS and DIRCO. Trucking Association of South Africa (TASA) is also a member.

At a meeting held on 22 June 2022 with some of the Ministers constituting the IMC wherein a media briefing was held where three documents were signed and they are

(i) The terms of Reference;

(ii) An implementation Plan; and

(iii) A pact.

were signed by the RFL stakeholders and some of the Departments in attendance.

The Task Team was formally established with a maximum of 2 representatives from each organisation,

The Task Team is hosted by the Department and its meets on a monthly basis wherein progress is monitored and evaluated on the activities of the outlined in the Implementation Plan.

17 July 2023 - NW1838

Profile picture: Seitlholo, Mr IS

Seitlholo, Mr IS to ask the Minister of Public Works and Infrastructure

Whether, with reference to the former minister’s reply to question 368 on 25 February 2022, regarding the application to rent Portion 1008 of the Farm Hartbeespoort 418JQ, the projected timeline advert of March 2022 was achieved; if not, why not; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure:

The projected timeline on advertisement of unutilised properties was not achieved as the Department is finalising the list of properties to be advertised. The revised date on advertisement of unutilised properties is projected to be on July 2023.

17 July 2023 - NW1565

Profile picture: Hicklin, Ms MB

Hicklin, Ms MB to ask the Minister of Public Works and Infrastructure

(1)With reference to the reply to question 1606 on 16 July 2021 regarding the introduction of recycling in the parliamentary villages in Cape Town, wherein his predecessor undertook that all future facilities management contracts will include recycling and a contract was signed in 2022 with TEFLA to maintain the parliamentary villages and there is no evidence of any recycling initiatives being introduced in Acacia Park or any other parliamentary villages, what is the value of the facilities management contract signed with TEFLA; (2) whether provision has been made for recycling to be included in the specified contract; if not, and despite a commitment being made by his predecessor and/or her department that such a clause would form part of all facilities management contracts in the parliamentary villages, what measures are going to be introduced to ensure that recycling can be part of the waste collection services in the parliamentary villages with immediate effect; if so, why has it not been implemented?

Reply:

The Minister of Public Works and Infrastructure

(1) The recycling was included in the scope of work of Tefla under Waste Management Duties (WMD), however due to an existing contract having the same scope the services were excluded for three until the existing contract expire. The value of the Facilities Management contract signed with Tefla Group is R510 565 626,33.

(2) Recycling was included as part of the Facilities Management Contract (FMC) under Waste Management Duties (WMD). However, these services were excluded from the scope of TEFLA for the first three years of the contract with the intention to deal with them separately through an existing contract. The existing contract for waste management will expire in year three of the five year FM contract, at which point TEFLA will take over the services and implement them as per the service level agreement.

17 July 2023 - NW1590

Profile picture: Nolutshungu, Ms N

Nolutshungu, Ms N to ask the Minister of Transport

(1)Whether she has met with the Cross-Border Road Transport Agency management to understand the challenges facing the entity and to find out if there are any serious allegations of irregular appointments and termination of employment contracts; if not, why not; if so, what are the relevant details; (2) whether she has been informed that the entity recently lost labour arbitrations cases involving senior managers because the Chief Executive Officer failed to take due diligence and perform his function in line with fiduciary duty expected to safeguard public finances; if not, what is the position in this regard; if so, how will she hold the accounting officer of the Cross-Border Road Transport Agency accountable for all the financial losses as a result of the arbitration process?

Reply:

1. Attending to challenges relating to the operations of any entity falls within the ambit of the fiduciary duties of the Board. The Board then accounts to the Minister n line with the Shareholder compact, quarterly reports on performance amongst other. The Minister can therefore not meet with management of the C-BRTA on operational challenges, this is the duty of the Board. However, if there are such challenges, the Board has an obligation to investigate these and report to the Minister. Such a report will also be disclosed in the Annual Report of the entity that will be tabled in Parliament.

2. I have been advised that the C-BRTA has lost one labour arbitration case recently, and the Agency is studying the judgement in order to make a determination on the course of action. Performance and other career incidents of the Chief Executive Officer are the responsibility of the Board.

17 July 2023 - NW2144

Profile picture: Msimang, Prof CT

Msimang, Prof CT to ask the Minister of Justice and Correctional Services

Whether, given that he allocated R820 million towards infrastructure development of which R200 million was set aside to be used for the maintenance and/or upkeep of existing courts, and noting that in 2023, courts such as the Thohoyandou High Court in Limpopo still have a backlog of cases dating back to 2011 due to shortages of necessary equipment such as recorders, which often forces the court to resort to using nearby court buildings and in the process delays justice, he has found that his department has been successful in its own promise of rolling out the Court Recording Technology system and modernising the justice system; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

The budget allocated towards the maintenance of courts relates to the physical aspects of maintenance. The modernisation of the Court Recording Technology (CRT) solution is to be funded via other programs of the Department, which includes the Modernisation program and the Integrated Justice System (IJS) program.

The modernisation of the CRT solution will be implemented in an integrated approach. It will cater for the recording of court proceedings, have audio and visual capabilities and will be known as the Court Recording Audio-Visual Solution (CRAVS).

This CRAVS solution will comprise of features that includes, amongst others, a digital courtroom platform to enable face-to-face online court sessions from anywhere within, or outside the country. In this regard, participants only need a camera connected with an internet device to attend the court session virtually and can interact with the Judicial Officer and court through a secure video stream. It will be a very simple solution to use, where each participant can add documents with a secure sharing facility with counsel, clients and opposing parties. It will have real-time transcription software that helps view and maintain live court proceedings and in the case of fines as an example, defendants can instantly resolve fines or set up a payment plan, virtually.

It is envisaged that the 1st phase of the CRAVS solution will be rolled out to 170 courtrooms by 31 March 2024, in line with the Departments 2023/24 APP.

It should also be noted that the CRAVS solution will require a stable underlying ICT infrastructure and network. Accordingly, the Department is also engaging on a project to upgrade both the WAN and LAN networks of all the courts. All courts with copper lines will be upgraded to fibre, and those that already have fibre will have their bandwidth upgraded, if it is found to be insufficient.

17 July 2023 - NW2017

Profile picture: Horn, Mr W

Horn, Mr W to ask the President of the Republic

Whether he intends to review and adjust the judicial post establishment of the Labour Court, given the substantial increase in the workload of the court?

Reply:

I am advised by the Minister of Justice and Correctional Services that there are currently 13 Judges in the Labour Court.

To deal with the current backlog of cases, the court is using Acting Judges appointed on a pro bono basis.

The Minister of Justice and Correctional Services has agreed with the Judge President of the Labour Court on a process to address this situation as required in the regulations for the expansion of judicial establishments.

Upon receipt of a recommendation on the proposed increase of the judicial establishment from the Minister of Justice and Correctional Services, which will take into account the required resources, I will indeed consider the best option on the judicial establishment of the Labour Court.

It should be noted that the Minister of Justice and Correctional Services has appointed a Committee on the Rationalisation of the High Courts led by former Deputy Chief Justice Dikgang Moseneke. It is mandated to, among others, assess the judicial establishment of each division of the High Court with a view to ensuring equitable distribution of judicial posts across all the divisions.

17 July 2023 - NW1942

Profile picture: Mthenjane, Mr DF

Mthenjane, Mr DF to ask the Minister in The Presidency for Electricity

What are his comprehensive plans to resolve the ongoing electricity crisis in the Republic?

Reply:

The Energy Action Plan (EAP), announced in July 2022 remains government’s overarching strategy to tackle the energy crisis and to attain energy security.

Our set of interventions are buttressed on the following pillars.

  • Fix Eskom and improve the availability of existing supply.
  • Enable and accelerate private investment in generation capacity.
  • Accelerate procurement of new capacity from renewables, gas and battery storage;
  • Unleash businesses and households to invest in rooftop solar and other demand side management progammes.
  • Fundamentally transform the electricity sector to achieve long-term energy security

These interventions are geared to ensure the Country is safely navigated out of the immediate crisis of load shedding and our energy demand and supply is harmonized. The roll out of an aggressive national demand side management campaign will further help stabilize demand with the immediate generation capacity constraints, and in the medium-term additional emergency energy will be introduced through the uptake of surplus energy within the South African energy pool.

The Ministry continues to work with Energy Intensive Users, the renewable energy sector Eskom, and other stakeholders across the energy value chain to ensure that beyond the immediate crisis, in the medium to long term, energy security is restored by increasing production in line with the energy-mix profile set out in the Integrated Resource Plan, and the strengthening and expansion of the national transmission infrastructure as codified in the Transmission Development Plan.

17 July 2023 - NW1807

Profile picture: Madokwe, Ms P

Madokwe, Ms P to ask the Minister of Justice and Correctional Services

Given that a documentary from around 2016 exposed human rights abuses and the improper management of a G4S-run youth detention facility in the United Kingdom (UK), whereupon the UK government terminated G4S’s contract with a different G4Srun facility after it was revealed that prisoners had taken control of the facility, and in view of a protest by local prisoners citing the same in South Africa a few years later, what (a) are the reasons that his department did not review its contract with G4S then, as its UK counterparts and (b) consequences did G4S management and officials face for the allegations made by South African prisoners in its facilities?

Reply:

a) The Department has not entered into any contracts with the mentioned service provider, however the mentioned company is a sub-contractor of the Bloemfontein Correctional Contracts (Pty) Ltd (BCC) which operates the Mangaung Correctional Centre (MCC) as a Public Private Partnership (PPP) Correctional Centre under sections 103 – 112 of the Correctional Services Act 111 of 1998, as amended (CSA).

Since the inception of the Concession Contract between Department of Correctional Services (DCS) and the Bloemfontein Correctional Services Contract (BCC), the department has closely monitored the contract in terms of all obligations through a DCS Controller who is permanently employed to oversee all operations in relation thereto as well as note any deviations to the contract for action. G4S’s contractual obligations from UK have no bearing on the agreement between DCS and BCC.

b) All allegations were dealt with in terms of the concession contract, in the event that BCC and its sub-contractors have failed to comply with any contractual obligations relevant penalties have been instituted.

END

17 July 2023 - NW1585

Profile picture: Mkhonto, Ms C N

Mkhonto, Ms C N to ask the Minister of Transport

What total number of designated parking spots for truck and/or heavy duty vehicles are there in the Republic in each (a) province, (b) district and (c) town?

Reply:

There are no official designated parking spots for truck and/or heavy duty vehicles provided by SANRAL and the Provincial or Municipal Road Authorities. These are generally are located away from the Road Reserve at private trucks stops/service stations. As part of implementation of the Road Freight Strategy, research will be commissioned to identify the needs of road freight for parking and handling space on corridors and in urban areas.

However, truck stop are located in all the National Freight Corridors as well as the parallel provincial corridors in accordance to the traffic volumes on the corridors.

Corridor

Corridor Name

N1 South

Gauteng – Cape Town

N1 North

Gauteng – Beit bridge

N2 South

Cape Town - Durban

N2 Central

East London – Durban

N3

Gauteng - Durban

N4 West

Gauteng - Skilpadshek

N4 East

Gauteng - Lebombo

N5

Harrismith - Winburg

N6

East London – Bloemfontein

N7

Cape Town – Viooldrift

N8

Bloemfontein - Maseru

N9

George - Colesburg

N10

Britstown - Nakop

N11

Ladysmith – Groblersbrug

N12

Gauteng – Beaufort West

N14

Gauteng Springbok

N17

Gauteng - Oshoek

17 July 2023 - NW1281

Profile picture: Pambo, Mr V

Pambo, Mr V to ask the Minister of Justice and Correctional Services

Whether, in view of the experience the Republic had with the former president of Sudan, Mr Omar al-Bashir, who paid a visit to the Republic whilst having an International Criminal Court (ICC) warrant of arrest issued against him, and in light of the upcoming visit of the Russian President, Mr Vladimir Putin, he intends to introduce a Bill with the aim of withdrawing the Republic’s participation in and membership of the ICC; if not, what is the position in this regard; if so, what legislative progress has been made with earlier attempts to disengage the Republic from the ICC?

Reply:

1. In October 2016, the 5th administration of South Africa took a decision to withdraw from the Rome Statute of the International Criminal Court (“Rome Statute”). Following this decision, South Africa sent a written notice to withdraw from the Rome Statute to the Secretary General of the United Nations.

2. In February 2017, the North Gauteng High Court unanimously ruled that the withdrawal notification sent by South Africa to the United Nations was unconstitutional and invalid without prior parliamentary approval, and ordered the Government to rescind the notice with immediate effect. In line with the court decision, the South African government revoked its notice of withdrawal from the Rome Statute in March 2017.

(a) There is currently no intention to introduce a Bill with the aim of withdrawing the Republic’s participation in and membership of the ICC.

(b) South Africa remains a full member of the ICC with all the rights and obligations that accrue to all members of the Rome Statute.

(c) The International Crimes Bill, introduced in Parliament in 2017, whose purpose was to withdraw South Africa from the ICC by repealing the Implementation of the Rome Statute of the International Criminal Court Act 27 of 2002, has been withdrawn from Parliament.

17 July 2023 - NW1649

Profile picture: Seitlholo, Mr IS

Seitlholo, Mr IS to ask the Minister of Public Works and Infrastructure

Whether his department built a satellite police station in the village of Magogong, Greater Taung, in the North West; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure

According to our records, the Department of Public Works and Infrastructure (DPWI) has not built a satellite police station in the village of Magogong. Upon engagement with the South African Police Services (SAPS), they confirmed that they once had a service point in the area long time ago, and that it has been closed down.

17 July 2023 - NW1694

Profile picture: De Villiers, Mr JN

De Villiers, Mr JN to ask the Minister of Finance

Whether he will furnish Mr J N de Villiers with a comprehensive breakdown of the procurement allocation of (a) the National Treasury and (b) every entity reporting to him in terms of the percentages allocated to (i) small-, medium- and micro-enterprises, (ii) cooperatives, (iii) township enterprises and (iv) rural enterprises with a view to evaluating the effectiveness of the set-aside policy of the Government in fostering an inclusive and diverse economic landscape (details furnished) in the (aa) 2021-22 financial year and (bb) since 1 April 2023?

Reply:

(aa) Procurement by National Treasury is largely for equipment, consultants or advisory services and it is not possible to accurately allocate amounts in the categories requested, as such classifications are not recorded on the BAS system. Our best estimate is that R98 460 381.90 has been allocated to SMME in the 2021/22 Financial Year.

(bb) For 2023/24, the information will be made available in 2024 after the end of the financial year.

17 July 2023 - NW1253

Profile picture: Engelbrecht, Mr J

Engelbrecht, Mr J to ask the Minister of Justice and Correctional Services

(a) On what exact date was his department informed that the body found in the cell of Thabo Bester had suffered blunt force trauma and showed no signs of smoke inhalation and (b)(i) by whom was his department so informed and (ii) via which medium?

Reply:

a) The National Commissioner was informed on 22 March 2023.

(b)(i) The notification was received from the DCS, Director: Contract Management.

(b)(ii) The notification was received by means of a written investigation report on the escape of the mentioned offender.

END

17 July 2023 - NW1814

Profile picture: Groenewald, Dr PJ

Groenewald, Dr PJ to ask the Minister of Justice and Correctional Services

Whether, in a further follow-up to his reply to question 1789 on 21 October 2021, any progress has been made with the disciplinary hearing against the suspended KwaZulu-Natal Regional Court President, Mr Eric Nzimande, which began in 2018; if not, why not; if so, what was the finding; (2) Whether he will make a statement on the matter?

Reply:

(1) As stated in my previous reply, the Magistrates Commission has encountered a number of challenges in finalizing the appointment of a Presiding Officer (PO) and Persons Leading the Evidence (PLEs). However, it was stated in our last reply that the issue of the evidence leaders (PLEs) has been resolved. The Magistrates Commission has since resolved that as Mr Nzimande is a Regional Court President, that a retired Judge should be appointed as Presiding Officer due to the rank and seniority of the magistrate involved. A retired Judge has been identified and he has indicated his willingness to preside over the disciplinary hearing.

(2) No. As the Magistrates Commission is an independent statutory body, any requests for statements on Mr Nzimande’s matter should be referred to the Secretary of the Magistrates Commission.

17 July 2023 - NW2161

Profile picture: Breedt, Ms T

Breedt, Ms T to ask the Minister of Public Works and Infrastructure

(1)Whether the Matjhabeng Local Municipality in the Lejweleputswa district of the Free State has submitted a business plan to Infrastructure South Africa to address the (a) current water crisis and (b) replacement of all old asbestos pipes; if not, why not, in each case; if so, what are the relevant details in each case; (2) whether any commitments have been made to the specified municipality; if not, what is the position in this regard; if so, (a) what are the relevant details and (b) by what date will such commitments be implemented?

Reply:

The Minister of Public Works and Infrastructure:

1. The Matjhabeng Local Municipality in the Lejwaleputswa District in the Free Street submitted their Replacement of old Asbestos Cement and Galvanised Steel pipes project to Infrastructure South Africa. This submission was borne out of the municipality-led feasibility study that was concluded in September 2021. The study indicated that the municipality is experiencing high water losses due to pipe bursts attributable to high network pressures and aging Asbestos Cement and old Galvanised Steel pipe network. The municipality is incurring high costs to repair the old and deteriorated water distribution pipe networks. This infrastructure requires replacement. The total estimated cost for this project is R1.6 billion.

2. This water and sanitation project has been prioritised by Infrastructure South Africa for project preparation and packaging. The Matjhabeng Local Municipality does not have funding allocated for this project. In this regard, Infrastructure South Africa is currently packaging the project to comply with the requirements of the National Treasury’s Budget Facility for Infrastructure (BFI). Some of the requirements by the BFI includes detailed cost benefit analysis, economic viability assessments, financial modelling and procurement strategy. Infrastructure South Africa, working closely with the municipality, will be submitting the BFI application on or before 14 July 2023, for consideration for funding through this process.

17 July 2023 - NW1283

Profile picture: Ntlangwini, Ms EN

Ntlangwini, Ms EN to ask the Minister of Finance

Whether (a) the National Treasury and/or (b) any of the entities reporting to him have any current contracts with the security company G4S; if not, what is the position in this regard; if so, what (i) are the relevant details of the specified contracts and (ii) is the monetary value of each contract?

Reply:

1. NATIONAL TREASURY

  1. No

(a)(i)(ii) N/A

2. ASB

We do not have contracts with G4S.

3. CBDA

  1. CBDA does not have any contract with G4S. The CBDA is currently housed in National Treasury building with dependence on their security.
  2. Not applicable
  3. Not applicable

 

4. DBSA

The Development Bank of Southern Africa (DBSA) has no security contract with the security firm G4S. The DBSA security officers are Bank employees.

5. FAIS OMBUD

We confirm that the Office of the FAIS Ombud does not have any contracts with G4S

6. FIC

(b) The Financial Intelligence Centre (FIC) does not currently have any contract in place with the security company G4S.

  1. Not applicable
  2. Not applicable

7. FSCA

The FSCA does not have any contract with G4S. The security company responsible for the FSCA premises is Tatanium Guarding Services.

8. GEPF

The Government Employees Pension Fund (GEPF) does not have a security contract with the company G4S.

9. GPAA

The Government Pensions Administration Agency (GPAA) can confirm that it has no contracts with G4S.

10. GTAC

GTAC does not have any contracts with the security company G4S.

11. IRBA

The Independent Regulatory Board for Auditors does not have a contract with G4S and has no position in this regard.

12. LANDBANK

Land Bank does not have any contract with G4S.

13. OPFA

The Office of the Pension Funds Adjudicator does not have any current contracts with the security company G4S. Its offices are leased from a service provider/landlord who is responsible for building security.

14. PIC

The PIC has no contracts with G4S.

15. SARS

(b) SARS follows a competitive procurement process and awarded security related services to various service providers. G4S did not win any award from SARS and currently is NOT a service provider to the institution.

16. SASRIA

Sasria SOC Limited does not have any current contracts with the security company G4S.

17. OFFICE OF THE TAX OMBUD (OTO)

Whether (a) the National Treasury and/or

  • any of the entities reporting to him have any current contracts with the security company G4S;

The OTO does not have current contract with G4S.

  • if not, what is the position in this regard;

The OTO relies on and follows the SARS procurement policies and procedures including awarding of contracts.

17 July 2023 - NW1830

Profile picture: Phillips, Ms C

Phillips, Ms C to ask the Minister of Public Works and Infrastructure

(1)Whether, with reference to the former minister’s reply to question 68 on 24 February 2023, wherein she confirmed that the department had informed her that the security companies engaged at Knoflokskraal had fulfilled their brief (details furnished), he will furnish Mrs C Phillips with the relevant details regarding the total number of (a) completed structures on the relevant properties when a certain security company (name furnished) took over on 29 July 2022, (b) half-completed structures demolished and/or removed by the specified company when they took over on the specified date and (c) completed structures on the relevant properties when the contract of the company expired on 29 August 2022; if not, why not; if so, what are the relevant details; (2) whether he will furnish Mrs C Phillips with the relevant details regarding the total number of (a) completed structures on the relevant properties when a different security company took over on 29 August 2022, (b) half-completed structures demolished and/or removed by the specified company when they took over on the specified date and (c) completed structures on the relevant properties when the contract of the company expired on 29 September 2022; if not, why not; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure:

(1)

(a) The number of completed structures were not recorded on 29 July 2022. However, they were recorded during a count carried out by the Sheriff of the Court in August 2022 as 4880.

(b) No further demolitions were carried since February 2022.

(c) The number of structures were not recorded at the end of the security company’s contract. However, they were recorded in August 2022 as 4880.

(2)

(a) The number of completed structures were not recorded when the security took over.

(b) There were no further demolition of structures since February 2022.

(c) The number of completed structures were not recorded on 29 September 2022. However, they were recorded during a count carried out by the Sheriff of the Court in August 2022 as 4880.

17 July 2023 - NW2041

Profile picture: Graham, Ms SJ

Graham, Ms SJ to ask the Minister of Public Works and Infrastructure

(1)(a) Who approved the provision of a security detail for the Acting Chief Executive Officer of the Independent Development Trust and (b) what are the details of the form that the procurement of the security services took; (2) whether a risk assessment was done prior to the decision being taken; if not, on what basis was the decision taken; if so, what are the details of the outcome of the assessment; (3) whether the need for the security detail will be regularly assessed; if not, why not; if so, (a) on what date was the last assessment conducted, (b) what was the determination and (c) on what date will the next assessment be carried out; (4) what is the (a) duration of the contract and (b) total expenditure on the security detail to date?

Reply:

The Minister of Public Works and Infrastructure

(1)

(a) The Board of Trustees on the 26 August 2022, resolved to approve the provision of security for the Acting Chief Executive Officer (ACEO).

(b) The procurement process was undertaken through the IDT’s SCM processes allowing for urgency and a single source bid.

(2) The approval was granted based on the ACEO’s report tabled to the Board on 26 August 2022. The CEO reported that the Hawks were conducting a risk assessment and the Board directed that the risk assessment by the by the relevant law enforcement agencies should be comprehensive in context so that it is treated with the seriousness it deserves.

(3) Yes, the need for continued security services will be reviewed as and when necessary. The Board will assess the security services at the Board meeting of 31 May 2023.

(4)

(a) Duration of contract: 1 year starting from 01 November 2022.

(b) Expenditure to date is R855 600.00

17 July 2023 - NW2082

Profile picture: Buthelezi, Ms SA

Buthelezi, Ms SA to ask the Minister of Human Settlements

Considering that the department allocated R111 million for the development of informal settlements in Cape Town alone for the relocation of residents living along the city’s central line tracks, and in view of the Housing Development Agency (HDA) pointing fingers at the City of Cape Town for delaying the relocation of vulnerable and impoverished persons who find themselves having to dwell in the makeshift unsafe and unsanitary shelters, whilst the City of Cape Town claims it is awaiting direction from the HDA and that funds were distributed late, what is her department doing to ensure that the (a) R111 million it allocated is indeed used for the development of informal settlements (b) City of Cape Town is held responsible for its slow pace and apparent disinterest in attending to the matter at the expense of the poor and (c) matter is resolved timeously as winter is approaching while the vulnerable and poor persons find themselves..homeless?

Reply:

The City of Cape Town was allocated R111 Million in March 2023, with the intention to relocate 16 informal settlements that are currently on unsafe land that is prone to flood disasters and those that are residing on the PRASA line in Khayelitsha.

  1. A stakeholder meeting between the National Department of Human Settlements: Informal Settlements & Emergency Housing branch (NDHS); Western Cape Department of Human Settlements (WCDHS), Housing Development Agency (HDA) and the City of Cape Town on the 22nd of May 2023 to deliberate on the progress of this relocation process and the challenges thereof. It was then reported to the meeting that the HDA has proactively procured two land parcels that at a cost of R72 Million, with the intention of fast-tracking the relocation process. However, the challenge is that the City of Cape Town doesn’t have a funding agreement with HDA that will enable the municipality to transfer funds to HDA for the land parcels and to be the implementing agent for the provision of basic services. Therefore, it was then resolved from this meeting that an urgent meeting between NDHS, National Treasury (NT) and City of Cape Town (CCT) to conclude on the most legally viable approach to resolving this matter, which might warrant a possible rollover of funds considering the 30th of June 2023 end of the financial year.
  2. During the 2023 Budget vote the Minister pronounced that the HDA has been appointed as the implementing agent for upgrading all informal settlements in City of Cape Town, as a strategy to improve the pace.
  3. A follow-up meeting between NDHS, NT, WCDHS and CoCT will be convened before the end of July, to conclude the financial and non-financial implementation plan for this project and a final report will be submitted to the Minister of Human Settlements for consideration and approval.

17 July 2023 - NW1602

Profile picture: Zungula, Mr V

Zungula, Mr V to ask the Minister of Finance

What are the reasons that the National Treasury did not take any steps to prevent the Republic from being greylisted, considering that the Cabinet has known for several years due to illicit financial flows (IFFs), reports of spaza shop owners and the sanctioning of certain Durban businessmen (names furnished) that should have been an even bigger eye-opener; (2) Why must it take international bodies to punish the Republic before the National Treasury heed the calls of the opposition political parties, which it has ignored, to investigate and prioritise IFFs; (3) What (a) policy measures will the National Treasury take to ensure that grey-listing is prevented in future and that the Republic makes its way off the grey list as soon as possible (details furnished) and (b) framework has the National Treasury put in place that will ensure that the prevention of IFFs is both a (i) public and (ii) private sector duty that is highly punishable when transgressed; (4) What (a) time frames does the National Treasury have to resolve the grey-listing issue and (b) accountability measures are in place to ensure that the specified time frames are adhered to; (5) How does the National Treasury work together with the State Security, the SA Police Service and the Department of Justice to not only protect whistleblowers whose lives are constantly endangered in the Republic and yet they are integral to preventing IFFs, but also bring down persons who are suspected and accused of IFFs?

Reply:

1. Government has provided the reasons for South Africa being greylisted through public statements by National Treasury at the time (e.g. statement issued by National Treasury dated 24 February 2023[1], and related frequency asked questions), and responses to the many parliamentary questions, for eg Nos PQ943, PQ3967, PQ2641, PQ2642, and also a question for oral response for the Deputy President (CO254E).

The Financial Action Task Force (FATF) greylisted South Africa despite acknowledging the “significant and positive progress” made by the country in addressing many of the deficiencies identified in the 2021 Mutual Evaluation Report on South Africa. This included the enactment of two major pieces of legislation, namely the General Laws (Anti-Money Laundering and Combating Terrorism Financing) Amendment Act, 2022 (“General Laws Amendment Act”) and the Protection of Constitutional Democracy Against Terrorism and Related Activities Amendment Act, 2022 (“POCDATARA Amendment Act”). The two pieces of legislation amended six Acts of Parliament, to deal with technical deficiencies in the legislative framework of the country’s Anti-Money Laundering/Combating the Financing of Terrorism (AML/CFT) system. FATF concluded that the country needed to make further effectiveness (in implementation) improvements, through sustained progress in addressing eight (8) areas of strategic deficiencies related to the effective implementation of South Africa’s Anti-Money Laundering/Combating the Financing of Terrorism (AML/CFT) laws.

2. Dealing or not dealing with illicit financial flows is not the reason for South Africa been greylisted, but is based on the extent of compliance by a country with the 40 FATF Recommendations and 11 effectiveness outcome measures, as assessed through a Mutual Evaluation conducted or overseen by FATF or associated regional bodies. It is important to note that the fight against money laundering and terror financing is generally broader than the fight against IFFs.

Also, contrary to the assumptioin made by the Honourable Member, Government has not ignored the call by opposition parties to deal with illicit financial flows and taken a number of measures to counter it. Government established an Illicit Financial Flows Working Group, which reports to the Interdepartmental Committee on AML/CFT that is chaired by the Director-General of National Treasury, to analyse illicit financial flows into and out of the country. There is also a working group that comprises of the SARS, NICOC, National Treasury and the DTIC that is currently working on formulating a National Anti-Illicit Economy strategy. This process will include an analysis of the underlying causes for IFFs and make recommendations that will enable IFFs to be traced, tracked and the perpetrators to be arrested.

3. (a) South Africa has committed to an Action Plan to address all remaining deficiencies identified in its anti-money laundering and combating the financing of terrorism. Implementing the Action Plan will assist South Africa to be removed from the FATF greylist, and further, to prevent South Africa from been greylisted in the fugure when the next mutual evaluation is conducted in the next seven to ten years. The General Laws (Anti-Money Laundering and the Combating of the Financing of Terrorism) Amendment Act, together with the POCDATARA Amendment Act (see above) are expected to improve the effectiveness of the country’s AML/CFT system. It is however important to note that as FATF standards or recommendations change, the South African AML/CFT system will also need to be continuously improved to address the evolving money laundering and terror financing risks.

(b) Refer to (2) above.

4. The FATF set, in consultation with South African authorities, a timeframe of January 2025 to address all outstanding deficiencies, for South African to be removed from the greylist. It is our hope that we will be removed sooner, sometime in 2024.

The Interdepartmental Committee on AML/CFT that is chaired by the Director-General of National Treasury monitors progress towards addressing all outstanding deficiencies fully and within the timelines agreed between South African authorities and the FATF. The Interdepartmental Committee on AML/CFT is required to report to Cabinet on a quarterly basis.

5. The Honourable member would be aware that National Treasury does not have the mandate and competence to offer protection to whistle blowers and relies on the law enforcement authorities to do so. National Treasury recognises the need to improve and strengthen our whistleblower system, as it is an essential tool to fight fraud and corruption in the public sector.

  1. https://www.treasury.gov.za/comm_media/press/2023/2023022401%20Media%20statement%20-%20Response%20to%20FATF.pdf

17 July 2023 - NW2141

Profile picture: Buthelezi, Ms SA

Buthelezi, Ms SA to ask the Minister of Water and Sanitation

Considering that there have been suspicions that water tanker business owners are sabotaging water supplies so they can keep on raking in millions of Rand even in the face of the current cholera outbreak, what steps has his department taken to address and/or get to the bottom of such serious allegations?

Reply:

Water tanks are an interim measure employed by municipalities in areas where there is insufficient infrastructure and shortages of water supply through the water distribution system. This interim measure ensures availability of water to those affected communities as an alternative.

It is a costly exercise and should be properly managed by municipalities to ensure that these services are procured through a competitive bidding process. The key solution is proper operations and maintenance of the available infrastructure, to avoid water supply interruptions. The department is also supporting municipalities through its grants to fund refurbishment and upgrades, including the development of new infrastructure to meet the water demands efficiently, with proper water services to all.

All water sources or water services provided through tankers must be tested for acceptable water quality before being dispatched to the communities concerned. This water testing exercise should be conducted daily and consistently to ensure compliance with SANS on water quality. The norms and standards of the department prescribe that if traces of poor water quality are identified, the municipalities must immediately inform the communities.

---00O00---

14 July 2023 - NW204

Profile picture: Krumbock, Mr GR

Krumbock, Mr GR to ask the Minister of Social Development

(1)What are the details of the (a) destination and (b) total costs for (i) accommodation, (ii) travel and (iii) any other costs incurred for international travel of each (aa) Minister and (bb) Deputy Minister of her department since 1 June 2019; (2) what is the total cost incurred for domestic air travel for each (a) Minister and (b) Deputy Minister of her department since 1 June 2019?

Reply:

  1. (aa) Minister

(a)Destination

(b)(i)

Accommodation

cost

(ii)

Travel cost (Flights)

(iii)

Other costs (S & T, Incidental, DIRCO Expenditure: Road Transport,)

16th international inter-ministerial conference on South Africa cooperation in Pop Dev

30 August – 05 September 2019

Tunis, Tunisia

R 14 594.63

R 31 300.00

R 13 353.15

The Nairobi Summit on the International Conference on Development (ICPD25)

10 -14 November 2019

Nairobi, Kenya

R 43 995.94

R 27 268.97

R 154 424.72

Global Entrepreneurship Congress

27 – 30 March 2022

Riyadh, Saudi Arabia

R 39 475.14

R 137 885.00

R 52 186.29

SheDecides+5 Event and Nexus High-level Roundtable.

19 – 20 May 2022

Brussels, Belgium

R 56 400.00

R 82 543.00

R 59 727.84

3rd session of the specialized technical committee (STC) on health population and drug control.

12 – 13 September 2022

Geneva, Switzerland

R 29 226.89

R 150 862.00

R 86 250.35

Meeting with Maryland sister state committee members and Co-Host Side event on driving entrepreneurship agenda for Africa on the margins of the 77th United Nations General Assembly

18 – 23 September 2022

New York, USA

R 42 519.88 (this is for the Washington trip that happened at the same time as New York)

R 133 751.04 (this amount is for the New York leg of the USA trip)

R 9 827.00

 

High-level commission on the Nairobi summit

7 – 12 November 2022

Zanzibar, Tanzania

The Minister’s Travel arrangements were sponsored and paid for by UNFPA.

  1. (bb) Deputy Minister

(a)Destination

(b)(i)

Accommodation

cost

(ii)

Travel cost

(iii)

Other costs (S & T, Incidental, DIRCO Expenditure: Road Transport,)

The 3rd Session of the Specialized Technical Committee (STC) on Health, Population, and Drug Control,

26 July - 04 August 2019

Cairo, Egypt

R 7330.69

R 95 990.00

R 30 063.12

24th International AIDS Conference from

26 July- 04 August 2022

Montreal, Canada

R 496 600.00

R 98 841.00

-

15th Conference of State to the Convention on the Rights of Persons with Disabilities, 14-22 June 2022.

New York

R 1 193 149.00

R 111 700.00

R 561 094.56

TOTAL

     

(2)

 

Domestic Travel

  1. Minister

R 910 240.

  1. Deputy Minister

R 270 428.00

14 July 2023 - NW2325

Profile picture: Msimang, Prof CT

Msimang, Prof CT to ask the Minister of Mineral Resources and Energy

What measures has his department adopted in the past two years to deal with and stop illegal mining, which has become popular amongst illegal immigrants recently?

Reply:

a) The National Environmental Management Act, 107 of 1998 (NEMA) provides for regulation of activities which cannot be undertaken without an Environmental Authorisation, such listed activities includes mining and prospecting activities. If any person conducts a listed activity without an approved Environmental Authorisation they are committing an offense in terms of section 49A of NEMA and can be prosecuted following an investigation.

b) The Department is working with law enforcement authorities to deal with the scourge of illegal mining. There are several multi-disciplinary and intelligence led operations which include the Depart of Home Affairs (Immigration) that have been successfully undertaken in various provinces in this financial year.

c) It should also be noted, especially with recent experiences in illegal mining, that the scourge has become an organised crime often led by sophisticated crime syndicates. Further operations are being planned together with law enforcement authorities to respond to challenges caused by illegal mining activities in the country.

d) The South African Police Service has also set up the Economic Infrastructure Task Team (EITT) which role is to address the scourge of crimes within the non-ferrous metals, essential infrastructure, critical infrastructure, extortion, and illegal mining. The Department of Minerals and Energy is working together with the envisaged unit with the immigration teams.

14 July 2023 - NW2524

Profile picture: Herron, Mr BN

Herron, Mr BN to ask the Minister of Mineral Resources and Energy

(1) Whether, with reference to his reply to question 214 on 24 February 2023, regarding the partnership between Eskom and Cape Peninsula University of Technology (CPUT), his department has any role to play in the just energy transmission programme (JETP); if not, why not; if so, (2) whether the retraining programme that is being implemented by Eskom and CPUT therefore is of no interest to his department as it has a role to play in the JEPT; if not, why not; if so, what are the relevant details; (3) whether his department has its own JETP; if not, (a) why not and (b) which department is responsible for ensuring a just transition in the energy supply chain; if so, what are the relevant details; (4) whether there are any plans to replicate or implement similar programmes as part of his department’s just energy transition plans; if not, what is the position in this regard; if so, what are the further, relevant details; (5) what total number of affected employees has his department targeted for retraining under its own JETP plan?

Reply:

1. As stated previously, the details of the partnership between Eskom and South African Renewable Energy Technology Centre (SARETEC) could best be responded to by the relevant department. In so far as the JETP, the department continues to work with the Presidential Climate Commission (PCC) and provides comments as and when it is necessary to do so.

2. The department is on record in saying that the transition programme is not an event but a process that should not be rushed as it has to adequately respond to the needs of the people, central to which is the issues of retention of jobs, skills and reskilling of people and ensuring that no one is worse of. To this effect, the department is conducting analysis on social impacts not only understand the extent of the impact, but to also inform the decision-making process on the protection of jobs, and the required skills and reskilling, including the issues of health.

3. The department has developed a Just Energy Transition Framework which forms the basis for developing indicators for monitoring the socio-economic impacts of the transition.

4. The analysis we are currently conducting on socio-economic impacts and the definition of indicators to monitor such impacts will outline the details of what actions the department will be taking in the next financial year.

5. Similarly, the analysis should inform us on this by the end of this financial year.

14 July 2023 - NW1931

Profile picture: Mkhonto, Ms C N

Mkhonto, Ms C N to ask the Minister of Employment and Labour

Following the visit of the Portfolio Committee of Employment and Labour to the Eastern Cape where the issue of unsafe queue conditions was raised, what steps has he taken to improve and/or remedy the situation, specifically at labour centres where persons are subjected to queueing on busy streets and must stand for long hours?

Reply:

Honourable Mkhonto, firstly, let me indicate to you that on this matter we do share the same concern. Secondly, let me thank you for making follow up on this issue after the Portfolio Committee on Employment and Labour conducted an oversight visit to the Eastern Cape Province. Sometimes, matters of this nature benefit from progress after the investment of some consistency on them.

It is also important to state, adding to our shared view above, that as a Minister of Employment and Labour, I consistently visit all our Labour Centres found in every corner of our country. And as I supposed to do, I intervene in so many matters, some of them right on the spot.

I must say that there are many of those that are a model in particular for the Department, in general for the government and the country. But as you perhaps know by now, that we are so transparent and open that we hide no weaknesses, that may hold back the progress that we all must work towards.

I happen to know one of the Labour Centres where you witnessed, what is in your question. In the East London Labour Centre the route of getting sponsorship from business became unviable. Then, in that Labour Centre, they started a procurement process for 3m x 6m Heavy Duty PVS Gazibo x 8. This happened in October 2022. As the procurement process was underway budgetary constraints held it back. But it has now resumed in 2023/2024 Financial Year. Administrative and operational processes of that are at an advance stage, to such an extent that 500 chairs for those whom the Department has to provide services to, have been procured and distributed to all Labour Centres, including East London Labour Centre.

On days when there is inclement weather, the East London Labour Centre accommodates workers and others at the basement. Let me conclude replying to your question by stating that, for me the approach on many of these matters is not one of dealing with the symptoms but the other of digging deep up until the root-causes are found and uprooted, and more often than not, this particular course necessary and desperately needed as it might be, seldom deliver immediate desired results, with outcome and impact that would have been envisaged. One of its challenges is that some parts of the solution lie on partners that can only be persuaded to cooperate. But with all of that stated, we are on course Honourable Mkhonto.

Once again, thank you for your question.

 

14 July 2023 - NW272

Profile picture: Horn, Mr W

Horn, Mr W to ask the Minister of Justice and Correctional Services

(a) What progress has been made to ensure that court proceedings will be recorded from 1 April 2023 onwards and (b) on what date will the existing extended contract come to an end?                                                                         [

Reply:

a) The Court Recording Technology (CRT), software and/or hardware licences belongs to the Department of Justice and Constitutional Development. The Maintenance and Support contract has been outsourced to an Information and Communications Technology (ICT) company, namely, Datacentrix (PTY) Ltd. All court proceedings will always be recorded using this technology (CRT).

b) The current maintenance and support contract with Datacentrix came to an end on 26 June 2023, and has been renewed on a month to month basis until November 2023, so as to ensure that service delivery is not impacted, whilst awaiting the procurement processes to unfold for the longer term contract.

c) The longer term two-year maintenance and support contract is procured via SITA. SITA delays have been experienced in this regard and in mitigation the Department’s executive had met with SITA executive in February 2023. SITA executive had undertaken to fast track the procurement and provide regular feedback.

d) The bid (SITA RFB 2713-2022 ) was subsequently advertised and initially meant to close on 31 March 2023, however, due to an erratum that had to be issued by SITA, the bid closing date had to be extended to 05 May 2023. The bid has since been evaluated and is undergoing SITA quality assurance processes.

e) SITA has provided a project plan indicating that the final recommendation for award by the Department, will be submitted to the Department by 06 November 2023.

f) The existing contract has therefore been renewed on a month to month basis until November 2023, so as to ensure that service delivery is not impacted, whilst awaiting the SITA procurement processes to unfold.

13 July 2023 - NW2497

Profile picture: Sonti, Ms NP

Sonti, Ms NP to ask the Minister of Higher Education, Science and Innovation

With reference to the fatal stabbing of a female student at a residence of the Nelson Mandela University, (a) what steps does he intend to take to mainstream security features across all institutions of higher learning to avoid incidents of gender-based violence and femicide continue to haunt institutions of higher learning and (b) by what date will the efforts be initiated?

Reply:

The strategic interventions put in place by the Minister to combat gender violence and femicide in the sector include the publication of the Policy Framework to address Gender-Based Violence in the Post-School Education and Training System. The framework compels all PSET institutions to raise awareness about GBV; prevent the occurrence of GBV; and support survivors by having procedures for reporting and dealing with GBV.

Higher Health, which is the entity of the Department of Higher Education and Training has released a set of instruments that further strengthen the realisation of this policy framework. These include Procedural Guidelines on GBV, Sexual and Gender Related Misconduct in PSET Institutions; Protocol on Rape and Sexual Assault Cases in the PSET campuses; and Protocol on the PSET Code of Ethics. These instruments also serve as directives to all institutions to put the necessary infrastructure towards a comprehensive response on cases of sexual and gender misconduct, rape, sexual assaults across all our campuses.

All universities work cooperatively with Higher Health in implementing programmes towards addressing the challenges of sexual and gender-based violence within the PSET system. Its programme of implementation incorporates prevention, systems strengthening, capacity and skills building, care and support. In addition, I established the multisectoral PSET Gender-based Violence Technical Task Team to ensure the effective and coordinated implementation of the DHET GBV Policy Framework.

Funds have been made available in the Infrastructure Efficiency Grant (IEG) for safety and security projects submitted by universities to the Department. These include upgrading of universities security systems. I also committed to establish a National Task Force (NTF) which will assist in the development of intervention strategies to assist with campus safety and security measures.

With regards to the case of a student murdered at Nelson Mandela University, the university has confirmed that that perpetrator was arrested. The university with the assistance of Higher Health provided psychosocial support to affected students and staff.

13 July 2023 - NW2473

Profile picture: Ngcobo, Mr S

Ngcobo, Mr S to ask the Minister of Higher Education, Science and Innovation

(1) Considering the rising levels of gender-based violence and other crimes in institutions of higher learning and training, what are the reasons that his department is deferring the full implementation of the Safety and Security Minimum Norms and Standards to the 2024-25 financial year; (2) what steps is his department currently taking to ensure the safety and security of students and staff in institutions of higher learning and training across the Republic?

Reply:

The Department of Higher Education and Training (the Department) has been working towards finding mechanisms to address the scourge of violence on campuses. The work on the development of safety and security blueprint for universities which will serve as a framework for universities to have minimum norms and standards on the provision of safety and security measures at the universities is underway. The department is prioritising this project as soon the framework is adopted by all stakeholders it will be implemented even before the 2024-25 financial year.

In addition, there has been continuous engagements with universities to assess and understand the different threats experienced by universities and identify urgent matters that need to be addressed at institutions, including the need to improve protection of staff members and students. Funds have been made available in the Infrastructure Efficiency Grant (IEG) for safety and security projects submitted by universities to the Department. These include upgrading of universities security systems.

I also committed to establish a National Task Force (NTF) which will assist in the development of intervention strategies to assist with campus safety and security measures.

13 July 2023 - NW2492

Profile picture: Komane, Ms RN

Komane, Ms RN to ask the Minister of Finance

(1) Which departments are the main drivers of the misalignment of the economic policy; (2) whether the misalignment of the economic policy is because the Government does not have legislation that enforces collaboration and coordination; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

1. The Honourable Member is asking a very vague question. All departments and public entities must act in terms of the law, and the law may have both economic and non-economic objectives, like social or developmental objectives, as well as constitutional objectives. So, for example, spending on school education or health is necessary, and cannot be regarded as “mis-aligned” because it is not directly related to an economic policy programme.  The Honourable Member is therefore requested to be more precise when asking such a question.

2. Not applicable, refer to (a) on the need for the question to be more precise.

13 July 2023 - NW2495

Profile picture: Sonti, Ms NP

Sonti, Ms NP to ask the Minister of Higher Education, Science and Innovation

With reference to the recommendations contained in the report submitted to him by Professor Norman Duncan, in which it is stated that students claimed that they were scammed by the employees of the Central University of Technology, (a) what steps will he take to intervene in the matter, (b) in what way will the involved parties be held accountable and (c) on what date is it envisaged that consequence management will take place?

Reply:

I have shared the Report with the Council of the University, as required by the Higher Education Act No 101 of 1997 as amended; and requested the Council to respond to the findings and recommendations of the Report.

I will then consider the response of the Council; and decide on the appropriate action as provided for and guided by the Higher Education Act, considering the interests of the Central University Technology (CUT) as a public higher education institution.

The Council of the University is the employer, and by law, it determines the conditions of service, disciplinary provisions, privileges, and functions of the employees of the public higher education institution, subject to the applicable labour law. Thus, I cannot respond to how and when the employees will be held accountable.

Notwithstanding above, the Act provides various mechanisms through which the Minister can intervene following the Report of the Independent Assessor; and ensuring that the findings are addressed, and recommendations are implemented. However, that process will follow receipt and proper consideration of the Response of the Council.

13 July 2023 - NW2482

Profile picture: Maotwe, Ms OMC

Maotwe, Ms OMC to ask the Minister of Finance

(1)What (a) number of tenders did Eskom award using deviations that required the approval of the National Treasury in the period 1 December 2019 to 28 February 2023 and (b) are the details of tenders that (i) were approved and (ii) were not approved; (2) what (a) was the total monetary value of each of the tenders, (b) were the services for which each tender was awarded and (c) were the entities that were awarded the tenders?

Reply:

The office of the Chief Procurement Officer within the National Treasury has provided the following information:

  1. (a) The total number of tenders that Eskom awarded using deviations was 49. Details are attached as Annexure A. Please note that the list ends on 31 March 2022 as from 1 April 2022, organs of the state were not required to seek approval from the National Treasury.

(b) Details of tenders [(i) approved and (ii) not approved)] are attached as Annexure A.

  1. (a) Details of each tender’s monetary value (R76 266 103 275,27) are attached in Annexure A.

(b) Details of each service on awarded tenders are attached in Annexure A.

(c) Details of each entity awarded tender/s are attached in Annexure A.