Question NW1963 to the Minister of Water and Sanitation

Share this page:

17 July 2023 - NW1963

Profile picture: Herron, Mr BN

Herron, Mr BN to ask the Minister of Water and Sanitation

(1)Whether, considering that in 2022 the residents lodged complaints to his department following the contamination of the Rooiwal Waste Water Treatment Works, and noting the investigations conducted by the SA Human Rights Commission that also found that the water posed serious health risks and that the residents’ constitutional right to have access to clean water was not met by the City of Tshwane Metropolitan Municipality, his department has been informed of the specified issues; if not, does his department not have an oversight team looking into complaints received from residents and/or organisations; if so, what remedial actions have been taken to remedy the specified situation; (2) What total number of times since its establishment has the specified Rooiwal plant undergone major upgrades to increase its capacity to handle the pressures of demand from the area it services; (3) What type of maintenance has taken place at the Rooiwal plant in the past year? NW2214E

Reply:

1. The Department has issued Notices and Directives to the City of Tshwane (CoT) Metropolitan Municipality and the Department is currently engaging CoT to reach an agreement that will be approved by the Courts. This is yet to be finalised.

2. The Rooiwal Wastewater Treatment Works (WWTW) consists of three (3) works: Rooiwal North, Rooiwal West, and Rooiwal East. The biofilter effluent of Rooiwal West must be further treated by the activated sludge system of the Rooiwal North Works. Rooiwal East is biofilters with a separate effluent stream.

A project to upgrade the WWTW was started in 2008 and completed in 2012, with the following deliverables:

  • Replacement of centrifugal blowers on the Rooiwal Northern Works.
  • The replacement of return activated sludge (RAS) pumps at Rooiwal Northern Works.
  • The structural refurbishment of 3 anaerobic digesters at Rooiwal Western Works.
  • New mechanical and electrical equipment for anaerobic digesters at Rooiwal Western Works and EW.
  • Extension of the sludge drying pans.
  • SCADA for blowers and RAS pumps

3. Maintenance is being performed on all the infrastructure. Details of the dates and status of planned maintenance are enclosed in Annexure 1 attached.

Despite the above, Rooiwal WWTW is dysfunctional and under-capacitated. In June 2023, the Tshwane City Council voted R450 million for short-term repairs to the Rooiwal Waste Water Treatment Works and DWS, National Treasury, the DBSA and the City are in the process of developing a financing plan for the medium upgrading of the capacity of the Rooiwal Waste Water Treatment Works. This will involve the upgrading of the plant’s treatment capacity by 130 Ml of waste water per day (ML/day), coupled with desilting of sludge at the Leeukraal dam. The desilting of the dam will enable the Temba Water Treatment Works to function better and produce drinking water which meets minimum standards. The current capacity of the plant is 250 ML/day. The capacity will be increased to 380 ML/day. This will be sufficient to treat the current and future projected waste water load in Hammanskraal. The project is due to start in July 2024 and end in June 2026.

DWAS Logo RGB

ANNEXURE 1

Rooiwal East and West Wastewater Treatment Works

Ref No.

AREA

Required Maintenance

Planned Start Date

Planned End Date

Estimated Costs

Status

Actual Costs (R)

 
   

Rooiwal East WWTP

 
   

Inlet Works

 

1.1

Screens

Service screen No. 1 and 2

10-Jan-23

28-Feb-23

 

Completed

804471.80

 

1.1.1

Screens

Repair screen no.1

Emergency

repairs

 

Completed

61238.94

 

1.1.2

Screens

Repair screen no.2

Emergency

repairs

 

Completed

62555.90

 

4

Grit Classifier

Repair Grit Classifier No. 2

01-Aug-22

30-Sept-22

366 000

Complete

295000.00

 

5.1

Degritter

Service Grit pump No.1 and 2

01-Sept-22

30-Sept-22

50 000

Complete

171892.88

 

6.1

Degritter

Service Grit scrapper No. 1 and 2

01-Nov-22

30-Nov-22

110 000

Complete

59190.51

 

6.1.1

Degritter

Remove sand from Degritter no.1 and 2

Emergency

repairs

 

Completed

65000.00

 

7

Degritter

Replace Grit scrapper rubbers

01-Nov-22

30-Nov-22

 

Complete

25000.00

 
   

Primary Settling Tanks

 

10.1

PST

Remove sand from PST no.1 to 8

Emergency

repairs

 

Completed

1120838.39

 

11

Raw sludge sump

Service Fine screens No. 2

01-Sept-22

30-Jan-23

 

Completed

475737.93

 

12

Raw sludge sump

Service Fine screens No. 1

01-Mar-23

30-Mar-23

 

Screen removed for repair

475737.93

 

13.1

Raw sludge pump station

Repair Raw sludge pump no.2

Emergency

repairs

 

Completed

15930.40

 
   

Rooiwal West WWTW

 
   

Humus Pump Station

 

1.1.2

HPS

Repair Humus pump and motor

Emergency

repairs

 

Completed

134907.84

 
   

Anaerobic Digesters

 

4

Anaerobic digesters

Service digested sludge pumps non-return valves

30-Oct-22

30-Oct-22

 

Complete

297402.82

 

Rooiwal North Wastewater Treatment Works

No.

AREA

Required Maintenance

Planned Start Date

Planned End Date

Estimated Costs

Status

Actual Costs

 
   

Inlet Works

 

1.1 

Inlet Works

Service screen No. 1

01-Jul-22

30-Jul-22

 

Completed

367227.89

 

1.2

Inlet Works

Service screen No. 2

01-Aug-22

30-Aug-22

 

Completed

367227.89

 

1.2a

Inlet Works

Repairs on Screen 2 and 3

Emergency

repairs

 

Completed

158017.82

 

3.1

Inlet Works

Service Conveyor belts

01-Oct-22

30-Oct-22

 

Complete

167816.92

 

4.1

Inlet Works

Repair Grit Classifier no.2 motor and gearbox

Emergency

repairs

 

Complete

160882.92

 

4.2

Inlet Works

Repair grit pump no.2

Emergency

repairs

 

Complete

49909.97

 
   

Inlet Works

           

4.3

Inlet Works

Repair grit pumps x 4

Emergency

repairs

 

Complete

166336.56

 
   

Primary Settling Tanks

 

5.1

PST

Remove sand PST 1

01-Sept-22

30-Sept-22

 

Complete

252359.20

 

5.2

PST

Remove sand PST 2

10-Jan-23

30-Jan-23

 

Complete

252359.20

 

5.3

PST

Remove sand PST 3

01-Apr-23

30-April-23

 

Complete

252359.20

 

7

PST

Refurbish PST Panel boxes

01-Oct-22

30-Oct-22

 

Service provider busy

121537.48

 

9.1

PST

Service PST 1 Rotating Bridge

01-Jul-22

30-Jul-22

 

Complete

28752.24

 

9.2

PST

Service PST 2 Rotating Bridge

01-Aug-22

30-Aug-22

 

Complete

15868.68

 

9.3

PST

Service PST 3 Rotating Bridge

01-Sept-22

30-Sept-22

 

Complete

31115.96

 
   

BNR Reactors

 

15.1

Reactor 1

Repair leaks on gas pipes, main gas pipe actuator and gearbox

Emergency

repairs

 

Leaks closed, service provider still busy

548701.80

 

18

Reactor 3

Repair Internal Recirculation Pump x 1

01-Aug-22

30-Aug-22

 

Complete

29037.47

 

20.2a

Reactor 2

Repair Screw pump no.2 gearbox

Emergency

repair

 

Service provider busy with repairs

342833.84

 
   

Blowers

 

24.1

Blowers 3

Quarterly maintenance

01-Sept-22

30-Sept-22

 

Service provider awaiting spares

442750.00

 

24.1a

Blowers

Repairs on Blowers main supply

Emergency

Repairs

 

Complete

407662.00

 

24.1b

Blowers

Repairs on Blower 2 and 5

Emergency

Repairs

 

Complete

115943.36

 

24.1c

Blowers

Repairs on Blower 5

Emergency

Repairs

 

Complete

68642.30

 

24.1d

Blowers

Repairs on electric panels of Blower 2,3,4,5 and 8

Emergency

Repairs

 

Complete

147193.46

 

24.4

Blowers 8

Quarterly maintenance

01-Dec-22

30-Dec-22

 

Busy with repairs

442750.00

 

24.6

Blowers 4

Quarterly maintenance

01-Feb-23

28-Feb-23

 

Service provider awaiting spares

442750.00

 

24.7

Blowers 5

Quarterly maintenance

01-Mar-23

30-Mar-23

 

Service provider awaiting spares

442750.00

 

24.9

Blowers 2

Quarterly maintenance

01-May-23

30-May-23

 

Service provider awaiting spares

442750.00

 

26

Blowers 1-9

Level 3 Electric Motor Preventative Maintenance

01-Aug-22

30-Aug-22

1 900 000

Included in quarterly maintenance quotations

   
   

Clarifiers

 

29.1

Reactor 2 Clarifiers

Service Clarifier Rotating bridges

01-Sept-22

30-Sept-22

 

Complete

132000.00

 

29.1a

Reactor 2 Clarifiers

Repair Clarifier 2.6 Rotating bridge

Emergency

Repairs

 

Complete

19702.26

 

29.2a

Reactor 1 Clarifiers

Repair Clarifier1.4 Rotating bridge

Emergency

Repairs

 

Complete

19593.62

 

29.2b

Reactor 1 Clarifiers

Repair Clarifier 1.5 Rotating bridge

Emergency

Repairs

 

Complete

21540.98

 

29.3

Reactor 3 Clarifiers

Service Clarifier Rotating bridges

01-Nov-22

30-Nov-22

 

Complete

148048.78

 

29.3a

Reactor 3 Clarifiers

Repair Clarifier 3.3 and 3.5 Rotating bridges

Emergency

Repairs

 

Complete

22502.26

 

29.3b

Reactor 3 Clarifiers

Repair Clarifier 3.6 Rotating bridge

Emergency

Repairs

 

Complete

23048.95

 

29.3c

Reactor 3 Clarifier

Repair Clarifier 3.4 Rotating bridge

Emergency

Repairs

 

Complete

66000.00

 

30.1

Reactor 1 Clarifiers

Service tip valves

01-Dec-22

30-Dec-22

35 000

Serviced 1.1; 1.2 and 1.3

97365.28

 

31.1

Reactor 1 Clarifiers

Service bottom valves

01-Jul-22

30-Jul-22

 

Serviced 1.5 bottom valve

13435.24

 

31.2

Reactor 2 Clarifiers

Service bottom valves

01-Aug-22

30-Aug-22

 

Serviced 2.6 bottom valve

15645.80

 
   

Dissolved Air Floatation Pump Station

 

32.1a

DAF Screen

Electrical repair on Rake screen

Emergency

Repairs

 

Complete

55307.38

 

33

DAF sump pumps

Service DAF Bypass pumps x 2

01-Sept-22

30-Sept-22

 

Serviced pump no.2

57633.29

 

33.1

DAF sump pumps

Repair DAF Bypass pumps no.1

Emergency

Repairs

 

Complete

116107.90

 
   

Aerobic Digester

 

34.1

Aerobic pump station

Repair Sludge Pumps non-return valves x 2

Emergency

Repairs

 

Complete

138856.88

 

34.2

West Anaerobic Digesters

Repair Digested sludge pump

Emergency

Repairs

 

Complete

157607.86

 

34.3

West Humus Pump Station

Repair Humus sludge pumps

Emergency

Repairs

 

Complete

134907.84

 

34.4

West Farmers Pump Station

Repair Farmers pump motor

Emergency

Repairs

 

Complete

319711.90

 

35

Aerobic digester

Service Fine Screens x 2

01-Oct-22

30-Oct-22

 

Quotation for approval

726211.80

 
   

Chlorination System

 

37

Chlorine building

Replace Chlorine pump no1 rotating unit

01-Jul-22

30-Jul-22

 

Complete

253416.00

 

Transformers

             

42.1

Transformers

Service of transformers

01-Sept-22

30-Sept-22

 

Complete

493141.80

 

Flow Meters

             

44.1

All Works

Calibrate flow meters

01-Sept-22

30-Sept-22

 

Complete

46946.40

 

Other Equipment

             

48

Bin trailers

Repair bin trailers x 3

01-Sept-22

30-Sept-22

 

1 x trailer repaired

3205.00

 

51

Grass Slasher

Repair grass slasher x 2

01-Oct-22

30-Oct-22

16 000

Complete

   

52

Computers

Repair computers x 3

01-Jul-22

30-Jul-22

47 000

Call logged with IT

   

Rooiwal Belt Filter Press Maintenance

No.

Area

Required Maintenance

Planned Start Date

Planned End Date

Estimated Costs

Status

Actual Costs

 
   

Bottom Belt Presses

 

53

Press no. 5

Refurbish Belt press

01-Sept-22

30-Jan-23

 

Spares used to repair others 4 Belt Presses

860718.65

 

54

All Presses

Service

01-Jul-22

30-Jun-23

2 200 000

     

54.1

All Presses

Preventative maintenance

01-Jul-22

30-Aug-23

 

Complete

245477.60

 

54.2

Press no.2

Repair poly pump, actuator valve

Emergency

Repairs

 

Complete

368413.93

 
   

Top Belt Presses

 

61.1

Press no. 4

Replace top and bottom belts

Emergency

Repairs

 

Complete

198172.96

 

61.2

All Presses

Preventative maintenance

01-Sept-22

30-Oct-23

 

Complete

334247.04

 

61.3

Top Belt Presses

Repair rear gate to Sludge Hopper

Emergency

Repairs

 

Complete

19840.57

 