Questions and Replies

Filter by year

20 May 2022 - NW629

Profile picture: Mafanya, Mr WTI

Mafanya, Mr WTI to ask the Minister of Defence and Military Veterans

Whether the SA national Defence Force has the (a) capacity and (b) military intelligence to (i) detect and (ii) prevent the exploitation of the oceans of the Republic by multinational companies who come to fish illegally in the ocean spaces of the Republic; in not, what is the position in this regard; if so, what are the relevant details?

Reply:

Attached find here: Reply

20 May 2022 - NW936

Profile picture: Marais, Mr S

Marais, Mr S to ask the Defence and Military Veterans

(1) Whether, with reference to the published official opening of the A-Mess in Thabatashwane, now known as the Albertina Sisulu Mess (details furnished), a certain person (name furnished) received all the relevant approvals and acted fully in compliance of the austerity measures and prescribed financial processes and procedures; if not, why not, if so, what are the relevant details; (2) whether the total costs for the renovations, upgrades and refurbishing amounted to R500 million; if not, not, what was the total cost of the work; if so, how does she justify the amount spent on the facility while the SA National Defence Force (SANDF) does not have enough funds to maintain existing and/or procure new essential prime mission equipment; (3) whether all the requirements of the Public Finance Management Act , Act 1 of 1999, were fully complied with and that no irregular, wasteful and/or unauthorised expenditure as a result of the project will be declared by the Auditor-General of South Africa; if not, what disciplinary action will she institute to hold the members of the SANDF accountable, including the specified person; if so, what are the relevant details?

Reply:

Attached find here: Reply

20 May 2022 - NW1185

Profile picture: Tito, Ms LF

Tito, Ms LF to ask the Minister of Justice and Correctional Services

(1)What is the outcome of the investigation conducted at Tswelopele Correctional Centre in Kimberley, following an incident which led to the injury of correctional officials, death of two offenders and suspension of 17 officials; (2) whether trauma management has been provided to officials who face daily acts of terrorism from offenders; if not, why not; if so, what are the relevant details?

Reply:

1. Indeed, there was a security incident at Tswelopele Correctional Centre on 05 March 2022, wherein one (01) official was injured and two (02) offenders died. It can be confirmed that eight (08) and not seventeen (17) officials were immediately placed on precautionary suspension pending outcome of the investigation. The investigation has been finalised and consequence management is to be applied following departmental protocols including the review of suspensions.

2. Trauma management is provided to the officials who are exposed to acts of violence from offenders. Trauma counselling is provided by the Employee Assistance Programme (EAP) officers of the Department.

END

20 May 2022 - NW1328

Profile picture: Mhlongo, Mr TW

Mhlongo, Mr TW to ask the Minister of Justice and Correctional Services

With reference to (a) CAS 551/04/2018, (b) CAS 220/11/2019, (c) CAS 150/8/2019, (d) CAS 133-10-2015 and (e) CAS 40/10/2019, (i) what are the reasons that (aa) the prosecution process has taken so long and (bb) some of the specified cases were withdrawn without informing the complainants and (ii) on what date(s) is it envisaged that some of the cases will be on the court roll?

Reply:

In response to the questions above, the National Prosecuting Authority has informed me as follows:

1. Orlando CAS 150/08/19

It was declined to prosecute the matter, as the case docket contained very scant evidence. Mr Tshepo Mhlongo, provided a very cryptic statement where he mentioned that he is the lawful owner of a certain property and alleged that Sibusiso Duma and his two brothers are collecting rent. The accused denies this allegation. The decision to decline a prosecution was made on 11 December 2019. The Investigating Officer was informed that he may re-submit the case docket once further admissible evidence that objectively supports the allegation made by Mr Mhlongo is obtained. Up to date, no such evidence has been obtained.

2. Orlando CAS 220/11/2019

The matter is on the court roll as prosecution was instituted. This matter is partly heard and Mr T Mhlongo is again the complainant herein. The State of Disaster that existed, the non-availability of Legal Aid South Africa, the absence of accused on more than one occasion, the non-availability of the docket and the non-functioning of the court recording machine are cited as reasons for the number of remands. The matter was remanded to 22 April 2022 for continuation of the trial. The Presiding Magistrate came from another court to attend to the partly heard matter, but unfortunately the matter could again not proceed due to a faulty recording machine. The case was subsequently remanded to 21 June 2022 to court “A” for hearing further evidence. The State’s case is not closed yet as the Investigating Officer still needs to testify.

3. Orlando CAS 551/04/2018

This matter involves the brother of Mr T Mhlongo who is called Lincoln Mhlongo. This matter was finalised on the 29 August 2019 wherein the accused was found guilty of assault and sentenced to twelve (12) months imprisonment which was wholly suspended for five (5) years.

4. Orlando CAS 133/10/2015 (with Orlando CAS 513/04/2019)

These matters are being dealt with at the Office of the Deputy Public Prosecutor (DPP) under DPP ref 10/2/4/3-306/19 and as per the latest correspondence to the South African Police Service (SAPS) Provincial Head, Gauteng Detectives dated 30 March 2022, it is clear that there are still investigations outstanding and a return date of 14 April 2022 is stated for an update from SAPS side. SAPS is supposed to advise the DPP’s office on the appointment of an expert who will do a voice comparison.

5. Orlando CAS 40/10/2019

The complainant is also Mr T Mhlongo. This case is also on the court roll after prosecution was instituted. On 07 May 2021, warrants of arrest were authorised against the two (2) accused. As warrants of arrest were issued, it is unclear when the warrants will be executed as this function falls within the ambit of SAPS.

6. None of the cases mentioned above were withdrawn.

20 May 2022 - NW1191

Profile picture: Motsepe, Ms CCS

Motsepe, Ms CCS to ask the Minister of Cooperative Governance and Traditional Affairs

Whether she intends to intervene to implement relief measures for the residents of BelaBela in Limpopo, who have had to deal with stinking, brown, dirty water for a period of over two weeks without any intervention from the municipality; if not, why not; if so, what are the relevant details of the intervention?

Reply:

Water Service Authorities (WSAs) are required to monitor the quality of drinking water as per the South African National Standard 241 (SANS 241). The SANS 241 is a drinking water specification that provides the minimum requirements for potable water to be considered safe for human consumption. These requirements include microbiological, chemical and physical properties of water.

The Department of Water and Sanitation (DWS) monitors the management of drinking water quality compliance by WSAs and further engages the WSAs where non-compliance is detected. WSAs are required to register for the monitoring programme on the DWS’s Integrated Regulatory Information System (IRIS). The monitoring program indicates the sampling point, frequency of monitoring and what determinants are monitored. All the drinking water quality results must be uploaded on the IRIS as required.

According to DWS, DWS has resuscitated the Blue Drop Certification Programme which aims to address the challenges associated with the provision of water. This programme seeks to implement a proactive drinking water quality risk management approach to ensure that quality failures are minimised, but when and where it inevitably occurs that acceptable responses are implemented to safeguard affected communities.

In the event of non-compliance to provide access to potable water, section 63 of the Water Services Act, No. 108 of 1997 provides, among other things, as follows:

“(1) If a water services authority has not effectively performed any function imposed on it by or under this Act, the Minister (Minister of Water and Sanitation) may, in consultation with the Minister for Provincial Affairs and Constitutional Development (then), request the relevant Province to intervene in terms of section 139 of the Constitution.

(2) If, within a reasonable time after the request, the Province—

(a) has unjustifiably failed to intervene; or

(b) has intervened but has failed to do so effectively, the Minister (Minister of Water and Sanitation) may assume responsibility for that function to the extent necessary—

      1. to maintain essential national standards;
      2. to meet established minimum standards for providing services…”

In light of the above, it is suggested that this parliamentary question be redirected to the Department of Water and Sanitation (DWS).

 

20 May 2022 - NW1144

Profile picture: Horn, Mr W

Horn, Mr W to ask the Minister of Justice and Correctional Services

With reference to his written reply to oral question 52 on 7 March 2022 regarding the Framework on the Management of Case Backlogs and Priority Matters to deal with the growing backlogs in the Republic’s criminal courts, which he claims are in the final stages of development, what (a) has he found to be the reasons that this framework has not been finalised up to now, given that he made the announcement regarding the development of the framework and/or protocol to address the backlogs in the Republic’s criminal courts for the first time as far back as June 2020, (b) progress has been made in the development of the Framework and (c) is the target date for implementation?

Reply:

a) Work on the drafting of the Framework began in June 2020. Work on the draft was delayed as increasing Covid-19 infections and stringent Covid-19 Regulations required that immediate action and interventions be embarked upon wherever possible to mitigate against their impact on court operations and court efficiency.

The Directions issued by the Minister of Justice and Correctional Services contained some of the interventions such as, e.g. the keeping of Priority Rolls; Court staffing arrangements etc, whilst the Court Optimisation Committee, an intervention led by the Deputy Minister, sought to address challenges and bottlenecks being experienced at the court level by bringing together justice stakeholders and members of the judiciary.

As the rate of Covid infections dropped and the Alert Levels changed accordingly with less stringent Regulations, work could resume on bringing about a more permanent and long-term solution to the long-standing issue of criminal case backlogs.

It should be highlighted that addressing the causes of criminal case backlogs requires the buy-in of all stakeholder departments. For this purpose, extensive consultations were conducted, including workshops. Both external stakeholders as well as internal stakeholders had to be consulted in the drafting and finalising of the Framework, before it could be submitted to the Minister. Consultations began in early July 2021 and continued until November 2021. The Justice, Crime Prevention and Security Cluster was also consulted on various occasions through the Development Committee (Sub-Committee of the JCPS Director-Generals’ Cluster). Several versions were submitted for guidance until the final draft Framework was submitted to the Minister on 22 March 2022.

The Framework provides for the establishment of a National Steering Committee comprised of senior officials of all stakeholder departments and entities, viz. The Department of Justice and Constitutional Development, the Department of Correctional Services, the Department of Health, the National Prosecuting Authority, Department for Social Development, Legal Aid South Africa, the South African Police Service, and so forth. The National Steering Committee would also need to include representatives of the Judicial Accountability Committee (Magistrates).

The initial responsibility of the National Steering Committee will be to finalise, through various consultations, Memoranda of Understanding between the stakeholder departments and entities outlining each respective department or entity’s responsibility and commitment to perform their individual line functions that they are required to do within their respective mandates, so as to contribute to the reduction of criminal case backlogs.

Each stakeholder department or entity will, in turn, be finalising Annual Performance Indicators within their areas of responsibility, each of which will feed into an overall JCPS Indicator with the desired outcome being reduced criminal case backlogs.

These tools seek to ensure on-going monitoring of performance and the progress being made in reducing the criminal case backlogs consistently and progressively.

Already existing regional and district structures will deal with challenges at local, district and regional level with matters that cannot be resolved at these levels being escalated to the National Steering Committee.

b) The draft Framework will be finalised after the inputs from the Lower Courts Judiciary have been obtained. It must be stressed that these consultations must still take place. Court performance and court efficiency fall within the purview of the judiciary. The Department plans to begin the implementation of the Framework with the convening of the National Steering Committee after consultations with the Lower Courts judiciary have taken place and their inputs have been incorporated.

The Framework aims to provide for a long-term mechanism to address criminal case backlogs. However, the Department has developed an Action Plan to be implemented immediately to address challenges which have a negative impact on the courts and which fall within the Department’s responsibility.

The Action Plan includes interventions such as, amongst others, -

  1. Priority Courts identified in terms of highest backlogs and the development of priority rolls;
  2. Continuous Rolls - Matters involving multiple accused to be placed on continuous roll for trials;
  3. Backlog Courts established where feasible;
  4. Client-Liaison Meetings with service providers e.g. CRT service providers
  5. Additional Human Resources;
  6. Psycho-social support for court officials to improve on the rate of absenteeism;
  7. Repairs and Maintenance (IT) - Regional Heads and ISM meet with service provider every Wednesday to track progress;
  8. Additional Equipment Procured (IT);
  9. Facilities interventions such as procurement of portable battery packs and generators, facilitation of the carrying out of minor maintenance works and procurement of mobile units to be used as court rooms and testifying rooms; and
  10. Security measures for the courts.

20 May 2022 - NW1194

Profile picture: Ceza, Mr K

Ceza, Mr K to ask the Minister of Cooperative Governance and Traditional Affairs

Noting how a number of fire managers do not hold legal fire diplomas in accordance with the South African Qualifications Authority Act, Act 58 of 1995, but are made to run the emergency services of the public whereas qualified managers hold junior positions, what (a) action has she taken to hold municipalities accountable for such irregularities and (b) oversight mechanisms has her department implemented to monitor the redress of the situation?

Reply:

It is important to note that the Fire Brigade Services Act, 1987 (Act 99 of 1987) is the primary legislation regulating the provision of fire services. Section 5 (1)  a controlling authority shall appoint a person who possesses the prescribed qualifications and experience, as chief fire officer to be in charge of its service. In response to the above questions:

a) What  action has she taken to hold municipalities accountable for such irregularities?

The Directorate facilitated the process of developing Fire Service career path as part of Municipal Staff Regulations which will come into effect from 1 July 2022.

b) What oversight mechanisms has her Department implemented to monitor the redress of the situation?                                                

The Department is in the process of developing an oversight mechanism for Municipal Fire Services career path once the Regulations is effective. The Directorate will monitor and support the implementation of the Municipal Staff Regulations.

The link to the Municipal Staff Regulations is below

https://www.gov.za/sites/default/files/gcis_document/202109/45181gon891.pdf

BACKGROUND INFORMATION:

20 May 2022 - NW1149

Profile picture: Breytenbach, Adv G

Breytenbach, Adv G to ask the Minister of Justice and Correctional Services

Following the disastrous hacking and ransomware attack on the information and communications technology infrastructure of his department in 2021, what (a)(i) steps have been taken and (ii) preventative measures have been put in place to ensure that this does not happen again; (2) What measures have been put in place to ensure that the systems of the (a) Office of the Master of the High Court and (b) High Court function independently?

Reply:

1. The Department of Justice and Constitutional Development (DoJ&CD) has implemented a wide range of security measures within its information processing environment, intended to prevent any unauthorized access to and/or use of sensitive information and ensure that the confidentiality, integrity and availability of personal information remain protected. These security measures are categorized into two (2) groups as follows:

a) Managerial controls, including a set of approved, published and implemented information security policies, standards, procedures and guidelines. Awareness of the existing information security policies and cybersecurity risks within our information processing environment is proactively and regularly being promoted amongst DoJ&CD’s users to ensure positive security behaviors and adherence to prescribed rules.

b) Technical Controls – In addition to the native security features provided by our systems and platforms, we have deployed a set of automated security tools and processes to improve our defensive capabilities and safeguard our ICT infrastructure and systems. These technical tools enable us to effectively restrict and control access to our ICT systems, applications and services, manage vulnerabilities, proactively monitor, protect and respond to security threats and incidents. We have also deployed disaster recovery capabilities to ensure continued availability of business-critical information in case of any adverse event impacting DoJ&CD’s services. Technologies that are currently implemented include:

  1. Antivirus – Endpoint (PCs) Antivirus Software. All endpoint devices were equipped with Antivirus software which offers advanced automated threat detection and response against an ever-growing variety of threats and malware.
  2. Advanced Threat Protection – A limited number of critical servers have protection against attacks, advanced threats and ransomware, giving the Departments the power to detect, analyze and respond today’s stealthy attaches in real time.
  3. Network Discovery and Analysis – A limited number of critical services have advanced tools installed that provides 360 degrees of visibility by monitoring and reporting on all network ports network traffic. This detects targeted attacks designed to evade standard security solutions.
  4. Mail Security Gateway – providing Integrated-tiered spam prevention and anti-phishing spyware. The appliance provides a comprehensive gateway email security.
  5. Web Security Gateway – Provide a proactive web traffic detection and blocking services based on reputation services.
  6. Firewalls – Network security appliance that monitors and controls incoming and outgoing network traffic based on predetermined security rules. This device typically establishes a barrier between a trusted network and untrusted networks such as the internet. The firewall provides protection against outside cyber-attackers by shielding the Department’s computers or network from malicious or unnecessary network traffic.
  7. MIMECAST – Provides the Department with email security services. It is used to protect the Department’s email system, ensure access and simplify the tasks of managing emails system.
  8. Security Information and Event Management (SIEM) – A Software solution that aggregates and analyzes activity from many different resources across your entire IT Infrastructure. SIEM collects security data from network devices, servers, domain controllers, and may more log sources. SIEM provides real-time analysis of security alerts generated by applications and network hardware.
  9. Proxies This solution offers the Department reverse proxy services. A reverse proxy ultimately forwards user/web browser requests to the web servers. However, the reverse proxy server protects the web server’s identity. It helps increase performance, security and reliability.
  10. Vulnerability Scan Tools These tools were deployed in the environment to scan and report on a quarterly basis the vulnerability levels of the Department in terms of missing patches.
  11. Virtual Private Network Technology – This tool grants complete access to the Department’s Local Area Network to authorized users via encrypted secure tunnels.
  12. User awareness and training tools – These tools allow the Department to provide target security awareness messages to end users. It also allows for simulated attacks and end user training in the event where awareness is lacking. Post the breach, this tool was deployed to 2000 users in the Headquarters, with plans to roll it out to all users in this financial year.

a) In addition to the already implemented security tools, the Department has, post the ransomware, enabled the following additional security measures:

(i) Zero Trust Network Tool – The Zero Trust Network Access Tool will help the Department to provide secure remote user access to applications and services based on defined access control policies, the tool defaults to deny, providing only the access to services the users has been explicitly granted. With this Zero Trust Network Tool, access is established after the user has been authenticated to the tool first. The tool then provisions access to the application on the user’s behalf through a secure, encrypted tunnel. This provides an added layer of protection for the Department’s applications and services by shielding otherwise publicly visible Internet Protocol (IP) addresses. With this solution, users will only see applications that they have access to. This tool is to replace the current VPN tools which grant complete access to all applications.

(ii) The Department also implemented a tiered administrative model on the active directory and that will help the Department to better secure its ICT environments. The model defines three (3) tiers that create buffer zones to separate administration of high-risk PCs and valuable assets like domain controllers.

(iii) We have also reviewed and/or enhanced our security policies on all our security appliances to safeguard against future security attacks.

b) Going forward, the following technologies are to be implemented to further enhance the security of the ICT environment:

(i) Cyber Security Operations Centre (CSOC) will be implemented in the 2022/23 financial year.

CSOC is a centralize function within an organization employing people, processes and technology to continuously monitor and improve an organization’s security posture while preventing, detecting, analyzing and responding to cybersecurity incidents. CSOC will act like the hub or central command post, taking in telemetry from across the Department’s IT infrastructure, including its networks, devices, appliances, and information stores wherever those assets reside. The proliferation of an advanced threat places a premium on collecting content from diverse sources. Essentially, the CSOC will be the correlation point for event logged within the Department. This will be implemented by way of a hybrid model using existing tools aggregated on the one platform.

(ii) External Penetration Testing.

Discussions and planning had already commenced with some of the industry partners in terms of providing a comprehensive external penetration testing, with the aim of identifying any gaps in our security environment. This process is expected to be finalized by the middle of the year, and be completed annually going forward.

2. Where the Master of the High Court and the High Court share the same building, each operates independently as the Master’s Office falls within the ambit of the DoJ&CD and runs on the DoJ&CD Virtual Private Network (VPN), whereas the High Court falls under the ambit of the Office of the Chief Justice (OCJ) and runs on the OCJ VPN.

20 May 2022 - NW648

Profile picture: Brink, Mr C

Brink, Mr C to ask the Minister of Cooperative Governance and Traditional Affairs

(1) Whether (a) she and/or (b) her department have made any submissions to the High Level Task Team on the Framework towards the Professionalisation of the Public Service that was appointed by the Minister of Public Service and Administration in May 2021; if not, what is the position in this regard; if so, will she furnish Mr C Brink with a copy, record and/or summary of the submissions; (2) whether she has found that the local government sector has been sufficiently represented in the process of producing a final version of the Framework to date; if not, why not; if so, what are the relevant details? (2) whether she has found that the local government sector has been sufficiently represented in the process of producing a final version of the Framework to date; if not, why not; if so, what are the relevant details? NW786E

Reply:

1. (a) and (b) Yes. The Department was consulted on the development of a framework aimed at professionalising the public service and its inputs were shared with the Department of Public Service and Administration. A copy of the submission is annexured hereto.

2. Apart from participating in various processes during the development of the said framework, the Department recently promulgated the Municipal Staff Regulations setting out uniform standards and procedures governing career incidents of municipal staff below management echelon. The Regulations were consulted with the Minister of Public Service and Administration whose valuable inputs were received and incorporated into the Regulations.

BACKGROUND:

1. Government in its transformation role of enuring that South Africa becomes a truly nonracial and democratic country, it continues to be grappling with developmental challenges. To respond to these challenges, in 2012, government adopted the National Development Plan (NDP) Vision 2030 as a long-term strategic goal to address the triple challenges of reducing poverty, inequality and unemployment. In the context of the role of the state, Chapter 13 of the NDP envisions South Africa as a Capable and Developmental State. The NDP further makes an assertion that the state needs to play a transformative and developmental role. Accordingly, this requires a well-run and effectively coordinated state institutions with skilled public servants who are committed to the public good and capable of delivering consistently high quality services, while prioritising the nation’s developmental objectives.

2. To realise the above mentioned NDP 2030 vision, in 2018, the Public Service Commission conducted a roundtable discussion on the professionalisation of the pubic service. The roundtable recommended that the implemnentaion of key recommendations in Chapter 13 of the NDP need to be fasttracked, led by Office of the President. These include the creation of the Administrative Head of the Public Service and a strengtherned role for the Public Service Commission. It further recommended that the DPSA should be the champion of the project to professionalise the Public Service.

3. Emanating from the above, the Minister for the Public Service and Administration approved the publication of the draft National Implementation Framework towards the Professionalisation of the Public Service for public comments. The Framework recommends among other provisions, that the public service be merit-based and insulated from party politics. Five critical professionalisation pillars are proposed, namely;

a) Pre-entry recruitment and selection within the public service

b) Induction and onboarding

c) Planning and performance management

d) Continuous learning and professional development

e) Career progression and management of career incidence

4. A number of stakeholders, including government departments, professional bodies, civil society organisations etc were invited to participate and make written submissions during the consultation process.

19 May 2022 - NW1709

Profile picture: Mohlala, Ms MR

Mohlala, Ms MR to ask the Minister of Health

Taking into account the time that has lapsed since the Republic first administered COVID-19 vaccines, what has he found were the lessons learnt by his department about the safety and side-effects of the specified vaccines?

Reply:

Spontaneous reporting of adverse events following immunisation (AEFI) increased significantly compared to pre-COVID-19 vaccine rollout. A total number of AEFIs reported between 17 May 2021 and 30 April 2022 (SAHPRA microsite) was 5893, this represent a reporting rate of 0.0172% of total number of COVID-19 vaccine doses administered for the same time period. The most frequently reported AEFIs were in line with the available product information. No safety concerns were raised based causality assessment outcomes conducted on severe and serious AEFI reported. Vaccine safety surveillance and monitoring trends of reported AEFI are vital measures to ensure that the benefits of immunisation are maintained in the interest of public health. Transparent communication with the public is important to maintain public confidence in vaccines and prevent all AEFI being misinterpreted as caused by the vaccine. The department in collaboration with SAHPRA, provide information on the process of AEFI reporting, investigation and causality assessment on the SAHPRA microsite. The AEFI reported should be investigated and causality assessed to maintain high levels of vaccine confidence in the immunisation programme.

END.

19 May 2022 - NW1626

Profile picture: Hunsinger, Dr CH

Hunsinger, Dr CH to ask the Minister of Transport

What (a) number of ships and/or vessels were recorded under the South African flag (i) over the past five financial years and (ii) since 1 April 2022 and (b) are the future plans for the industry?

Reply:

a) Number of all ships and/or vessels recorded under the South African flag over the past 5 financial years:

Number of ships on SA Register

2017/19

2018/19

2019/20

2020/21

2021/22

2022/23

(i) Convention vessels

28

29

29

33

31

31

(ii) Ships registered since 1 April 2022

         

5

Inclusive of all fishing vessels, yachts, small vessels and other types of vessels that are not convention vessels - the SA register record 745 vessels as of 2022/2023.

Convention vessels are vessels over 500GT that can carry cargoes, passengers or offshore tugs as example, on which Standards of Training, Certification and Watchkeeping (STCW) seafarers are employed.

It should be noted that not “all vessels” on the SA register are shown for the past five years – the reason being that the list still contains deleted vessels and we were mandated to clean up the register to only reflect vessels that are registered and not since deleted. Therefore, to report on these numbers would not be accurate and as such, only the total number for vessels for the current year end and 5 years for the Convention Vessels has been included.

b) Future plans for the industry:

The Department developed the Comprehensive Maritime Transport Sector Plan (CMTP) which speaks to 37 Policy Statements. The goal of the CMTP is to facilitate growth, development and transformation of the South Africa maritime transport sector in support of socio-economic development whilst contributing to international trade, which includes the introduction of sophisticated but integrated maritime supply chain systems; the development and enhancement of the national shipping capacity and capability within a complex of logistical environment of people and machine, able to serve trade at all levels and support the goals of the broader national interest and specific Governmental developmental programmes and initiatives.

This includes creating fiscal incentives to attract ship owners to the register their ships on the South African register. Part of these measures are to engage with financing institutions to encourage ship financing and investigate a possible model and feasibility of establishing a national ship finance corporation of South Africa. The Department will be working with relevant organs of state to implement competitive mortgage and insurance regime.

The Department is finalising the Merchant Shipping Bill, Maritime Development Fund Bill and the National Shipping Bill which will assist with growing the maritime industry in South Africa.

19 May 2022 - NW1864

Profile picture: Graham-Maré, Ms SJ

Graham-Maré, Ms SJ to ask the Minister of Public Works and Infrastructure

(1)With reference to the abandoned property owned by her department situated at 11 Mile End Road, Diep River, Western Cape, what (a) steps are being taken to protect the property against further vandalism and invasion by illegal occupiers and (b) plans are in place to ensure that the (i) illegal occupiers are removed, and (ii) property is refurbished and maintained; (2) whether she and/or her department intend to meet with the residents to discuss the future plans of the building given its shocking state and the impact on the residents; if not, why not; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure:

(1)

(a) I have been informed by the Department that a Security Company has been appointed as from 4 May 2022 to secure the property, contain invasion and prevent further invasion.

(b)

(i) Yes, now that the State of Disaster has been lifted, the Department will follow due legal processes in dealing with the unlawfull occupants.

(ii) The Cape Town Regional Office has received a request from one of the departmental internal Units, Human Capital Investment, for the coversion and refurbishment of the subject property into student accommodation. The unit provides bursaries to needy and deserving students in the country in line with the unit’s service delivery objectives. The application / request is currently being processed internaly for approval and budget allocation.

(2) The Department has not yet received any request from the surrounding residents for a meeting. However, should such request be received, arrangements will be made to meet with the residents.

19 May 2022 - NW1766

Profile picture: Clarke, Ms M

Clarke, Ms M to ask the Minister of Health

What (a) is the reason that the repair of the Charlotte Maxeke Hospital has been shifted to his department, (b) is the expected additional budget to ensure that the repairs are done speedily and (c) would the time frame be for the repair to ensure that the hospital opens within the time frame that is indicated?

Reply:

a) Due to a slow progress, both the Minister and Premier have agreed to transfer the project to the National Department of Health.

b) There is no additional budget. The estimated budget is R1 billion. The project will be completed within budget.

c) End of November 2023.

END.

19 May 2022 - NW1007

Profile picture: Brink, Mr C

Brink, Mr C to ask the Minister of Public Works and Infrastructure

(1)Whether she has been advised that 19 Lyttleton Agricultural Holdings, Pretoria, T11634/1965, which is land belonging to the national government in Clubview in Centurion, is currently being occupied unlawfully, and that an unplanned settlement without access to basic services is developing on the site (details furnished); (2) whether the national Government, alone or in collaboration with any other Organs of State, will take steps to resettle the occupants, and secure the site, especially in light of its proximity to the Hennops River; if not, why not; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure

  1. I have been informed that the Department has investigated custodianship and can confirm that DPWI is the custodian of mentioned property. The Department is aware that the property is unlawfully occupied.
  2. The Department has sent a request to the Department of Social Development for profiling of the illegal occupants so that we can be able to make informed decision on the property.

19 May 2022 - NW568

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Public Works and Infrastructure

Whether her department has lease agreements with private individuals, firms and/or companies on behalf of various government departments and state-owned enterprises; if not, what is the position in this regard; if so, (a) how is this spread in terms of province, region, area and/or town, gender, race and age group and (b) what are the full details of the company names, directors and amounts involved with annual escalations by percentage and the duration of such lease agreements?

Reply:

The Minister of Public Works and Infrastructure

I have been informed that the department has lease agreements with private individuals, firms and/or companies on behalf of various government departments and state-owned enterprises.

(a) As illustrated in the summary table below, this is the spread over the nine (9) regional offices;

Indicate whether DPWI has leases on behalf of various government departments

 

 

 

 

Company details

REGION

TOTAL

TOWN

Leases with private entities YES/NO

Company Name

Names of the Director(s) of the company

Gender

Race

Amount involved with annual escalation by %

Duration of the lease

BLOEMFONTEIN

158

Various towns within the province (as appended in the spreadsheet)

119

Various - details available on attached spreadsheet

Full details provided on appended spreadsheet

Male and female (varies per company composition. Details available on appended sheet)

Black African = 82 White = 101 Indian = 17 Coloured = 3

Varies from minimum 5.5% to maximum 8.0%

Varies from minimum 2 years to 3, 5, 7 & maximum 9.11 years

                   
                   
                   

CAPE TOWN

206

Various towns within the province (as appended in the spreadsheet)

No = 39 Yes = 120

Various - details available on attached spreadsheet

Full details provided on appended spreadsheet

Male and female (varies per company composition. Details available on appended sheet)

Black African = 49 White = 228 Indian = 14 Coloured = 19

Varies from minimum 5.5% to maximum 8.0%

Varies from minimum 2 years to 3, 5, 7 & maximum 9.11 years

                   
                   
                   

DURBAN

207

Various towns within the province (as appended in the spreadsheet)

No = 39 Yes = 121

Various - details available on attached spreadsheet

Full details provided on appended spreadsheet

Male and female (varies per company composition. Details available on appended sheet)

Black African = 40 White = 112 Indian = 119 Coloured = 0

Varies from minimum 5.5% to maximum 8.0%

Varies from minimum 2 years to 3, 5, 7 & maximum 9.11 years

                   
                   
                   

JOHANNESBURG

208

Various towns within the province (as appended in the spreadsheet)

122

Various - details available on attached spreadsheet

Full details provided on appended spreadsheet

Male and female (varies per company composition. Details available on appended sheet)

Black African = 75 White = 96 Indian = 0 Coloured = 0

Varies from minimum 5.5% to maximum 8.0%

Varies from minimum 2 years to 3, 5, 7 & maximum 9.11 years

                   
                   
                   

KIMBERLEY

209

Various towns within the province (as appended in the spreadsheet)

No = 39 Yes = 123

Various - details available on attached spreadsheet

Full details provided on appended spreadsheet

Male and female (varies per company composition. Details available on appended sheet)

Black African = 27 White = 182 Indian = 30 Coloured = 23

Varies from minimum 5.5% to maximum 8.0%

Varies from minimum 2 years to 3, 5, 7 & maximum 9.11 years

                   
                   
                   

MMABATHO

210

Various towns within the province (as appended in the spreadsheet)

124

Various - details available on attached spreadsheet

Full details provided on appended spreadsheet

Male and female (varies per company composition. Details available on appended sheet)

Black African = 26 White = 62 Indian = 45 Coloured = 0

Varies from minimum 5.5% to maximum 8.0%

Varies from minimum 2 years to 3, 5, 7 & maximum 9.11 years

                   
                   
                   

NELSPRUIT

211

Various towns within the province (as appended in the spreadsheet)

No = 39 Yes = 125

Various - details available on attached spreadsheet

Full details provided on appended spreadsheet

Male and female (varies per company composition. Details available on appended sheet)

Black African = 60 White = 85 Indian = 26 Coloured = 3

Varies from minimum 5.5% to maximum 8.0%

Varies from minimum 2 years to 3, 5, 7 & maximum 9.11 years

                   
                   
                   

POLOKWANE

212

Various towns within the province (as appended in the spreadsheet)

126

Various - details available on attached spreadsheet

Full details provided on appended spreadsheet

Male and female (varies per company composition. Details available on appended sheet)

Black African = 41 White = 76 Indian = 24 Coloured = 2

Varies from minimum 5.5% to maximum 8.0%

Varies from minimum 2 years to 3, 5, 7 & maximum 9.11 years

                   
                   
                   

PORT ELIZABETH

213

Various towns within the province (as appended in the spreadsheet)

No = 39 Yes = 127

Various - details available on attached spreadsheet

Full details provided on appended spreadsheet

Male and female (varies per company composition. Details available on appended sheet)

Black African = 156 White = 253 Indian = 0 Coloured = 0

Varies from minimum 5.5% to maximum 8.0%

Varies from minimum 2 years to 3, 5, 7 & maximum 9.11 years

                   
                   
                   

PRETORIA

214

Various towns within the province (as appended in the spreadsheet)

128

Various - details available on attached spreadsheet

Full details provided on appended spreadsheet

Male and female (varies per company composition. Details available on appended sheet)

Black African = 98 White = 108 Indian = 21 Coloured = 8

Varies from minimum 5.5% to maximum 8.0%

Varies from minimum 2 years to 3, 5, 7 & maximum 9.11 years

                   
                   
                   

UMTATA

215

Various towns within the province (as appended in the spreadsheet)

No = 39 Yes = 129

Various - details available on attached spreadsheet

Full details provided on appended spreadsheet

Male and female (varies per company composition. Details available on appended sheet)

Black African = 73 White = 30 Indian = 8 Coloured = 3

Varies from minimum 5.5% to maximum 8.0%

Varies from minimum 2 years to 3, 5, 7 & maximum 9.11 years

                   
                   
                   

 

a) The full details of the company names, directors and amounts involved with annual escalations by percentage and the duration of such lease agreements have been provided in the attached, Annexure A.

19 May 2022 - NW1761

Profile picture: Abrahams, Ms ALA

Abrahams, Ms ALA to ask the Minister of Public Works and Infrastructure

(1)Whether, with reference to Erf. 5697, 56 Mossel Street, Churchill Estate, Cape Town, which has been declared a problem building by the City of Cape Town Metropolitan Municipality and has become a site for criminal activity placing the surrounding residents in danger, the specified erf falls under the jurisdiction of her department; if not, what is the position in this regard; if so, (a) what was the initial purpose of the building and site, (b) for what duration has the building/site been vacant and (c) what is her department’s short-, medium- and long-term plan for the erf; (2) has she and/or her department been advised of criminal activity taking place on the erf; if not, what is the position in this regard; if so, what steps did her department take in this regard; (3) has she received any public and/or private requests to utilise the erf; if not, what is the position in this regard; if so, what are the relevant details; (4) whether she will consider the transfer of the building and erf to the relevant provincial department and/or municipality in order for it to be repurposed; if not, why not; if so, what are the relevant details? (2) has she and/or her department been advised of criminal activity taking place on the erf; if not, what is the position in this regard; if so, what steps did her department take in this regard; (3) has she received any public and/or private requests to utilise the erf; if not, what is the position in this regard; if so, what are the relevant details; (4) whether she will consider the transfer of the building and erf to the relevant provincial department and/or municipality in order for it to be repurposed; if not, why not; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure:

1. I have been informed by the Department that Erf 5697 does fall under the jurisdiction of the Department of Public Works and Infrastructure.

a) The initial purpose of the building was for residential accommodation for SAPS members.

b) The building/dwelling has been vacant for 6 (six) years.

c) The property is in the process of being disposed of via an open tender process and will be finalised during the course of this year.

2. The Department is aware of the Criminal activity. The property was fenced and building was boarded up to prevent access and criminal activities. However the fence was broken on more than one occasion and the boards removed.

3. Numerous requests have been received from private individuals for the use of the premises. Approval has been obtained to dispose of the property by way of open tender.

4. No requests have been received from either the Provincial Government or the Municipality for the acquisition or transfer of this property.

19 May 2022 - NW1767

Profile picture: Clarke, Ms M

Clarke, Ms M to ask the Minister of Health

(1)Whether any audit has been done of the COVID-19 deaths in each province; if not, why not; if so, what was the outcome of the audit for each province; (2) whether the specified outcomes aligned and/or are congruous with the reported deaths on a daily basis by his department and that were communicated to the public at large; if not, why not; if so, what are the relevant details?

Reply:

a) The department reports the reported deaths of every person that has been diagnosed with COVID-19 at the time of death, whether the COVID-19 is the cause or incidental to a death from any other condition. There is no audit done on reported deaths in hospitals.

b) Deaths are reported by the attending clinicians at public and private facilities at the time of death, therefore on a daily basis, and the reports are captured into the national data base (DATCOV) as they are reported. A corpse may not be released to the undertakers without the death certificate. The deaths reported are available on a daily basis (https://www.nicd.ac.za/diseases-a-z-index/disease-index-covid-19/surveillance-reports/) and are reported in the national media daily. The department monitors which hospitals are reporting on DATCOV to ensure completeness of data.

END.

19 May 2022 - NW1562

Profile picture: Mthenjane, Mr DF

Mthenjane, Mr DF to ask the Minister of Agriculture, Land Reform and Rural Development

What assistance will her department provide to the local crop farmers of Ward 6 at the Kagisano Molopo Local Municipality who are in need of (a) diesel and (b) seeds to use on their farms?

Reply:

Farmers in Kagisano Molopo Local Municipality are encouraged to approach our local offices of the Provincial Department of Agriculture to be guided on how to apply for support through our various programmes designed to provide production inputs like diesel and seeds. These programmes include Comprehensive Agricultural Support Programme (CASP) and Ilima/ Letsema, Blended Finance Scheme, the Jobs Fund and Land Development Support.

19 May 2022 - NW1360

Profile picture: Yako, Ms Y

Yako, Ms Y to ask the Minister of Agriculture, Land Reform and Rural Development

Considering the growing negative impact of climate change in the Republic, what are the (a) mitigation and (b) adaptation plans that her department has put in place to ensure the (i) durability and (ii) sustainability of the agricultural sector?

Reply:

The existing departmental climate change mitigation and adaptation sector plans are currently being implemented to mitigate the risks and vulnerabilities associated with the negative impacts of climate change.

(a)(i),(ii) Mitigation plans

The Department has put in place Mitigation and Adaptation programmes to reduce the agricultural greenhouse gas emissions (mitigation) and enhance the resilience of food and agricultural production systems in the sector to ensure durability and sustainability of the agricultural sector, and safeguarding national food security. Under Mitigation programme, the Department has put in place programmes to provide support to the most vulnerable groups such as subsistence farmers on training, capacity building and creating awareness on the impact of climate change. The Department has planned to assist 44 subsistence producers to be supported with integrated bioenergy (biogas) technology over a period of three (3) years starting in the current financial year. The biogas programme is being implemented in Mpumalanga, North West, Kwazulu-Natal, Eastern Cape, Free State and Limpopo. The project on integrated bioenergy-crop production system assist farmers with the provision and installation of biogas digesters, roof water harvesting and irrigation system, rain gauges’ installation, establishment of backyard gardens as well as the provision of seedlings to subsistence producers. This also assist the Department and the sector to address priorities such as clean and renewable energy provision, climate change mitigation, adaptation, disaster risk reduction, and food security.

(b)(i), (ii) Adaptation plans

Under Adaptation programme, the Department has put in place programmes to increase the adaptive capacity of the agricultural sector to the adverse impacts of climate change through research, training and capacity building. The Department is currently implementing crop suitability to climate change in four (4) provinces, namely: Limpopo, Mpumalanga, Kwazulu-Natal and Free State. The crop-suitability programme assist with developing drought resistant cultivars or crops, capacitating farmers on climate smart agriculture approaches (crop and livestock production) and conservation agriculture, etc. The sorghum production climate change adaptation strategies will provide guidance for sorghum producers/ farmers on how adapt to the impact of climate change. These strategies are being developed to ensure that the producers/growers acquire the appropriate management information, knowledge and skills to achieve maximum yields under climate change conditions through enhancing the resilience of sorghum production systems.

The Department has also commissioned research on vulnerability assessments on crops and livestock production to the impacts of climate change. The research outputs enable the Department and sector to inform policy development decisions and actions taking into consideration the long-term projections to implement the outcomes and ensure the achievement of the long-term objectives of increased resilience and adaptive capacity, reduced risk and vulnerabilities associated with the increasing climate variability and change.

19 May 2022 - NW1016

Profile picture: Zondo, Mr  S S

Zondo, Mr S S to ask the Minister of Public Works and Infrastructure

(1)What (a) number of government properties are leased to third parties and (b)(i) departments have currently hired private facilities to house offices for the Executive and (ii) are the reasons that the departments have hired the specified private facilities; (2) whether she has considered utilising existing government buildings to house offices for departments; if not, why not; if so, what are the relevant details? (2) whether she has considered utilising existing government buildings to house offices for departments; if not, why not; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure

(1)

(a) I have been informed by the Department that it is currently leasing out about 1288 state-owned properties.

(b)

(i) There is no department that has hired a private facility for an Executive.

(ii)Not applicable

2. The primary mandate of the Department is to provide functional state-owned accommodation to various User Departments. The Department at the point of request for accommodation – does consider using State-Owned Facilities – however, in many instances – they are not readily useable nor available in areas identified for the executive. This is where the Department then considers using the private leases. In recognizing that there are challenges – the department has embarked on the following strategies in order to address overreliance on the private sector.

  • Refurbish, Operate and Transfer Model for more office space;
  • Precinct Development. Building head offices for Departments eg the Salvokop Precinct in Pretoria which will house five government Departments
  • Lease to own model for smaller service delivery nodes in remote areas where there are no buildings.

19 May 2022 - NW1644

Profile picture: Graham-Maré, Ms SJ

Graham-Maré, Ms SJ to ask the Minister of Public Works and Infrastructure

(1)Whether, with regard to the funding of green infrastructure, particularly Strategic Integrated Projects (SIPs) that deal with green energy, Green Bonds have been applied for as a funding mechanism; if not, why not; if so, (a) for what projects and (b) what (i) is the total monetary value applied for and (ii) was the outcome of the specified application; (2) whether she approached the Green Climate Fund for funding; if not, why not; if so, (a) for which projects, (b) what is the total monetary value applied for, (c) what was the outcome of the specified application, (d) what total number of green projects are gazetted as SIPs have proceeded since the date of gazetting and (e) what is the progress on the green SIPs projects?

Reply:

The Minister of Public Works and Infrastructure

1. I have been informed that the Department did not apply for Green Bonds because Strategic Integrated Project (SIP) 28, is viewed as an integrated approach to rolling out Renewable Energy and resource efficiency in Government buildings. The programme provides for engagement of various institutions such as Development Finance Institutions and Multilateral Banks, with various engagements currently underway. Green Bonds have however not been applied for. DPWI and GTAC are assessing all local and international Green Building/Infrastructure funding instruments, with focus on sustainable and cheaper funding. In this regard, discussions are underway with the Development Bank of Southern Africa (DBSA) and the Industrial Development Corporation (IDC) on their green infrastructure and climate funds; (b) (i) No monetary value has been attached to the application, (ii) no outcomes have been reached. The expectation is that all projects under SIP28 will be funded, given the interest of DFIs and green funding institutions.

2. The Department and GTAC are currently engaging the DBSA to participate on SIP28 through the DBSA’s Green Climate Fund and related funds. Actual monetary values to be potentially made available, should DBSA come on board, have not yet been discussed. Keen interest to participate has however been shown by both the DBSA and the IDC; (b) Discussions have not matured to a level of monetary value discussions; (c) Discussions are still underway; (d) All SIPs have actions linked to implementation within the current Financial Year (e). SIP28 has finalised and assessed Requests for Information (RFIs) and a process is currently underway for Client Engagement for signing of Framework Agreements/ MoUs and necessary applications with National Treasury in order to go out on a Request for Proposals (RFPs) by Q2 this Financial Year.

19 May 2022 - NW1787

Profile picture: Graham-Maré, Ms SJ

Graham-Maré, Ms SJ to ask the Minister of Public Works and Infrastructure

Noting the allocation of R260 million by her department for the refurbishment and repairs of 105 courts across the Republic, of the 105 courts that have reportedly been identified for refurbishment, what total (a) number are in the Eastern Cape, (b) amount has been earmarked for the refurbishment of the identified provincial courts and (c) amount has her department spent currently in the Eastern Cape, noting that her department has reported that only 10% of its budget has been utilised?

Reply:

The Minister of Public Works and Infrastructure:

a) The Department has total number of 17 (Seventeen) infrastructure projects for courts earmarked for the Repairs and Refurbishment Programme in the Eastern Cape Province for the 2022/23 Financial Year. This project pipeline includes 6 infrastructure projects in the Planning and Design phase, 7 infrastructure projects in the Construction phase, 3 infrastructure projects in the Practical Completion phase and 1 infrastructure projects in the Close out phase.

b) The Department has a budget allocation of R93Million (inclusive of Contractor and Consultant allocations) for the courts in the Eastern Cape Province for the 2022/23 Financial Year under the Repair and Refurbishment Programme.

c) The Department has spent R503 967 of its budget allocation as at end April 2022 for courts in the Eastern Cape under the Repair and Refurbishment Programme.

19 May 2022 - NW1037

Profile picture: Motsepe, Ms CCS

Motsepe, Ms CCS to ask the Minister of Public Works and Infrastructure

What total rental amount (a) does her department pay for leased buildings belonging to private entities in each month and (b) in arrears is owed to the specified entities currently?

Reply:

The Minister of Public Works and Infrastructure

a) I have been informed by the Department that the total rental paid for leased buildings belonging to private entities in the year to date is:

Month

Private Entities

(R )

April 2021

172 187 274

May 2021

873 817 193

June 2021

224 744 354

July 2021

413 140 464

August 2021

331 225 938

September 2021

457 371 273

October 2021

484 853 590

November 2021

415 815 885

December 2021

460 821 365

January 2022

405 637 899

February 2022

269 957 050

March 2022

443 074 700

April 2022

311 062 035

TOTAL

5 263 709 022

b) Arrear lease payments owed to private entities in April 2022 amount to R 333 890 214. The Department has an additional control measure that suspends payments so that they are verified first before released to avoid duplications which may result in overpayments. As soon as payments are verified, they are released to service providers accordingly.

19 May 2022 - NW1547

Profile picture: Mathulelwa, Ms B

Mathulelwa, Ms B to ask the Minister of Transport

By what date will his department rebuild the bridge in Bremma, Ward 6 of Umdoni Local Municipality in KwaZulu-Natal, that was washed away by floods seven years ago?

Reply:

The bridge is currently in use, the issue was that there were potholes back then which made it unsafe to go across the bridge but that was sorted, and the bridge is usable. As this is a low-level crossing, it is part of the list of all bridges that will be upgraded to large bridges as these are no longer suitable for areas where there are growing communities. Climate change is also another factor that lead the Department to embark on this exercise as there were a lot of low-level crossings that are no longer suitable as a result of these frequently experienced rainfall intensity.

It is anticipated that to attend to these structures could take more than five years depending on the availability of funds.

19 May 2022 - NW1818

Profile picture: Siwisa, Ms AM

Siwisa, Ms AM to ask the Minister of Public Works and Infrastructure

With reference to her reply to oral question 248 on 4 May 2022, what total number of novice businesses of persons with disabilities, women and youth will be assisted in taking their businesses forward and be able to create jobs that will benefit the marginalised masses who do not have the relevant qualifications to be employed by bigger companies?

Reply:

The Minister of Public Works and Infrastructure:

I have been informed by the Department that as a flagship government programme, the Expanded Public Works Programme (EPWP)’s core objective is to create work opportunities for the poor and unemployed people of South Africa. Enterprise Development support is provided at a marginal scale to assist with sustainable pathways for participants and advance the use of labour-intensive construction methods. The EPWP has a Contractor Development Programme which is called Vuk’uphile. The Vuk’uphile Contractor Development Programme is one of the programmes implemented by public bodies as part of the National Contractor Development Programme (NCDP) that is championed by the Construction Industry Development Board (CIDB). The NCDP aims to develop emerging contractors and transform the construction industry. In the 2021/22 financial year, 215 Contractors were trained through the Vuk’uphile Programme. Amongst the 215 contractors trained in the 2021/22 financial year, the following demographics were included: 91 Women, 45 Youth and 2 Persons with Disabilities. Training offered to contractors in the Vuk’uphile Learnership Programme is at National Qualification Framework (NQF) level 4, covering labour-intensive methods delivered through theoretical and practical training, to ensure contractors can acquire skills to become successful contractors. Public bodies are still being engaged for the 2022/23 financial year, with commitments to train 70 contractors thus far. The EPWP Vuk’uphile Learnership Programme will continue to ensure that the participation of Women, Youth and Persons with Disabilities is optimised in its implementation.

19 May 2022 - NW1404

Profile picture: Ntlangwini, Ms EN

Ntlangwini, Ms EN to ask the Minister of Agriculture, Land Reform and Rural Development

What (a) measures have been put in place to contain the recent spread of Foot-and Mouth- Disease and (b) are the reasons that her department has not built a proper fence along the Kruger National Park to prevent buffalos from interacting with cattle from the surrounding villages of the Collins Chabane Local Municipality and thus contain the spread of the specified disease?

Reply:

a) Affected dip tanks were placed under quarantine, while the animals in and around the affected dip tanks were subjected to clinical inspections, blood tests, vaccination and movement restrictions. The Disease Management Areas in Limpopo and KwaZulu-Natal will be enlarged accordingly. Where affected farms are well fenced, the farms and adjacent properties are under quarantine, with clinical inspections and blood tests continuing. Vaccination and controlled slaughter are allowed on a case by case basis. Forward and backward tracing continue in order to identify any other possibly infected properties without delay. There is intensified clamp down on illegal importation of animals or illegal movement out of the Food and Mouth Disease (FMD) controlled areas. The animals involved are destroyed, while the perpetrators are prosecuted for contravention of the Animal Diseases Act. Communication and awareness creation have been increased.

b) There is a fence on the western and southern boundaries of the Kruger National Park, which has been maintained by the Department for many years. Challenges, such as vandalism of fences, theft of the fencing material, damage caused by elephants and floods lead to continuous breakdown of these fences. The current FMD outbreaks in North-West Province, Free State Province and Gauteng Province are not related to recent buffalo escapes from the Kruger National Park, but to illegal movement of cloven-hoofed animals out of the northern FMD controlled areas in Limpopo Province.

19 May 2022 - NW1763

Profile picture: Steyn, Ms A

Steyn, Ms A to ask the Minister of Agriculture, Land Reform and Rural Development

Whether her department purchased the farm Dalberia in the Aliwal North area; if not, what is the position in this regard; if so, (a) on what date was it bought, (b) for what amount and (c) who is the current lessee on the land?

Reply:

Yes.

a) 3 June 2014.

b) R2 000 000.

c) Mpheqeka Mthimkhulu Farming Co-operative Limited.

19 May 2022 - NW1702

Profile picture: Ceza, Mr K

Ceza, Mr K to ask the Minister of Agriculture, Land Reform and Rural Development

What (a) total number of farms have been redistributed through the Proactive Land Acquisition Strategy and (b) is the breakdown of such farms in each province?

Reply:

a) 1 950 farms.

b) Please refer to the table below:

b) Provincial Break Down

Provinces

EC

FS

GP

KZN

MP

LP

NW

NC

WC

Total

Farms

274

273

213

282

140

307

247

143

71

1 950

19 May 2022 - NW1549

Profile picture: Montwedi, Mr Mk

Montwedi, Mr Mk to ask the Minister of Agriculture, Land Reform and Rural Development

What additional assistance will her department provide to farmers, who are required to do costly pregnancy diagnosis of their cattle more often as part of the breeding season?

Reply:

The Department of Agriculture, Land Reform and Rural Development (DALRRD) in collaboration with the Agricultural Research Council-Animal Production (ARC-AP) provides support service to farmers through provision of a mobile laboratory (gamete mobile laboratory). This provides for the delivery of assisted reproductive technologies such as synchronization, artificial insemination, pregnancy diagnosis to farmers in the most remote parts of South Africa.

Participants in the sector also receive one-stop services of readily available database of registered reproduction operators within the department to help with artificial insemination and pregnancy diagnosis. Farmers requiring assistance may contact the Registrar for the Animal Improvement Act, 1998, (Act N0. 62 of 1998), Mr Joel Mamabolo contact number (012) 319 7597/7424 Email: [email protected]

19 May 2022 - NW1311

Profile picture: Bryant, Mr D W

Bryant, Mr D W to ask the Minister of Transport

(1) Whether she intends to lower the costs associated with obtaining a skippers licence, considering that many fisherfolk are currently struggling to make ends meet due to uncertainty regarding fishing permits, multiple administrative requirements and a difficult economic climate; if not, why not; if so, what are the relevant details; (2) what are the details of how she will assist the fisherfolk with the rising cost of fuel, in particular diesel, and the impact this will have on the sector; (3) whether she intends to relax certain seaworthy requirements that may be deemed unnecessary in order to reduce costs for fisherfolk; if not, why not; if so, what are the relevant details?

Reply:

1. The South African Maritime Safety Authority (SAMSA) received a 0% increase for the 2022-2023 financial year. All fees for Skipper Licences still the same as the 2021-2022 financial year and should assist fisher in the current economic climate. The 0% increase applies to all the services that the South African Maritime Authority (SAMSA) provide and include the cost of safety surveys for fishing vessels. Should an increase be approved, due consideration will be given to the impact that any increase may have on fishers.

2. Unfortunately SAMSA do not have an influence on fuel levies.

3. The challenge with lowering the current safety standards will lead to unseaworthy ships going to sea, which will not only endanger fishers but also other users of the sea. Reducing the safety standards will lead to unnecessary deaths amongst fishers and in turn impact on the fishing communities when a bread winner is lost. It must be noted that unseaworthy vessels lead to expensive Search and Rescue operations due to the number and type of sea and air assets that need to be mobilised to rescue a casualty at sea. Lowering Safety Standards which is meant to save both people and property at sea, or prevent pollution of the marine environment is not the solution

19 May 2022 - NW1645

Profile picture: Graham-Maré, Ms SJ

Graham-Maré, Ms SJ to ask the Minister of Transport

With reference to the N1 connection road to Moloto that was proposed and has not yet commenced, (a) on what date is it envisaged that the project will commence and (b) what is the envisaged duration of the specified project?

Reply:

(a) This part of the Moloto corridor was only transferred to SANRAL on 5th June 2020 by the Gauteng Province and is still in the detail design phase. As part of the detail design phase SANRAL is currently engaged in discussions with the 139 affected landowners for the land acquisition process to be finalised. If the land related matters are all addressed, SANRAL plans to go out on tender for construction by June 2023.

(b) The planned construction commencement date is in November 2023 which will be followed by a mobilisation period of 3 months and a construction period of 36 months starting in February 2024.

19 May 2022 - NW1682

Profile picture: Chirwa-Mpungose, Ms NN

Chirwa-Mpungose, Ms NN to ask the Minister of Health

Following the National Health Laboratory Services’ insourcing of cleaners and security guards, by what date will (a) the remaining entities of his department follow suite and (b) his department insource cleaners and security guards at clinics and hospitals?

Reply:

a) Following the National Health Laboratory Services’ insourcing of cleaners and security guards, the remaining entities have advised as follows regarding insourcing of cleaners and security guards:

  • Council for Medical Schemes (CMS): The CMS insourced the cleaning personnel on 1 November 2016. The cleaning personnel enjoy employment benefits such as 100% subsidized medical aid, group life and disability cover as well as training opportunities. However, no decision has been taken on the insourcing of security personnel due to budgetary constraints.
  • South African Health Products Regulatory Authority (SAHPRA): the SAHPRA is currently making use of outsourced security and cleaning services with contracts expiring in 2024. Going forward an analysis to review the current structure of the services will be conducted before expiry of the current contracts to determine the possible insourcing of the services.
  • South African Medical Research Council (SAMRC): the SAMRC has evaluated in-sourcing and has been in discussion with labour. To this end, the in-sourcing of Patterson A and B staff has been included in the SAMRC. However, given the specialized nature of security, and the scope of business of research, the SAMRC cannot afford to develop this capacity to include security as in-sourced personnel since this requires in-depth situational analysis and specialized expertise of which the SAMRC does not have nor is able afford to acquire.
  • Office of Health Standards Compliance (OHSC): the OHSC has two (2) contracts; (1) Cleaning Services for three (3) years ending 28 February 2024; and (2) Security Services for three (3) years ending September 2023. The OHSC will, prior to the expiry of the contracts, conduct an assessment and accordingly take a decision with regard to the future of cleaning and security services.

(b) This information is not readily available at the National Department of Health, it is with the Provinces and in municipalities as these are managed there. We are sourcing this information from provinces and municipalities and submit the full response as soon as such information is received.

END.

19 May 2022 - NW1786

Profile picture: Graham-Maré, Ms SJ

Graham-Maré, Ms SJ to ask the Minister of Public Works and Infrastructure

Whether her department is covering the legal costs with regard to the disciplinary process of a certain person (name furnished); if not, what is the position in this regard; if so, (a) why and (b) what (i) agreement has been entered into with the specified person in the event of the person losing the matter and (ii) total amount in legal costs has her department paid to date in this matter?

Reply:

The Minister of Public Works and Infrastructure:

No. The Department of Public Works & Infrastructure is not covering the legal costs with regard to the disciplinary process of the Minister’s Special Advisor since public service prescripts do not provide for such payment to be made.

(a) As per the response above that the Department is not covering the legal costs.

(b)(i) There is no agreement in place between the Department, State Attorney, and Special Advisor to pay the legal cost for her disciplinary hearing.

(ii) The Department has not paid any legal cost on behalf of the Special Advisor.

19 May 2022 - NW1625

Profile picture: Hunsinger, Dr CH

Hunsinger, Dr CH to ask the Minister of Transport

What total number of deaths that were caused by vehicles were recorded in each province over the past five years?

Reply:

The table below shows the number of deaths caused by vehicles over the past five years per province.

ROAD FATALITIES

 

2017

2018

2019

2020

2021

EC

1613

1675

1603

1336

1533

FS

922

945

860

647

799

GP

2800

2539

2453

1855

2561

KZN

2734

2473

2331

2031

2409

LP

1705

1581

1496

1161

1400

MP

1577

1313

1343

1046

1261

NC

434

352

384

265

403

NW

1029

979

855

720

908

WC

1236

1064

1178

908

1271

RSA

14050

12921

12503

9969

12545

19 May 2022 - NW1168

Profile picture: Sithole, Mr KP

Sithole, Mr KP to ask the Minister of Transport

(1)Whether, with reference to the variety of online services that he launched on 17 February 2022 (details furnished), his department has any plans in place to deal with and rectify the glitches that the new system may be experiencing; if not, why not; if so, what are the details of the plans; (2) (a) how is his department making the public aware of the new online offerings and (b) what are the relevant details of the communications plan in this regard?

Reply:

1. The glitches experienced have been attended through various software updates released to date. The Road Traffic Management Corporation (the Corporation) has also in sourced the printing and packaging of the licence discs and replaced its delivery partner. Since Monday, the direct deliveries to the owners have commenced. By 01 April 2022 the backlog of licence distributions will have been attended to.

2. (a) Aligned to the nature of the service the Corporation communicates its services primarily via online platforms, social media, websites, etc. The Corporation also communicates directly via targeted SMS and email communications to motorists and drivers to make use of the service when they receive their renewal notifications.

(b) The communication plan includes interviews conducted by the RTMC and the department on community, regional and national radio stations including television stations. The MEC for transport in Gauteng has also rolled out a sustained campaign on radio television stations urging the public to book a slot.

18 May 2022 - NW1776

Profile picture: Mhlongo, Mr TW

Mhlongo, Mr TW to ask the Minister of Sport, Arts and Culture

Whether, in light of the fact that the Silapha Wellness Intervention Programme hosted four social media interventions, which according to their report not a single intervention reached more than 150 persons, his department has considered that the programme has a low success threshold in social media interventions and a particularly low outreach to the arts sector?

Reply:

The hosted 4 social media interventions on spaces; in November and December 2021; were over and above other social media activities that help to drive traffic to the call centre during Covid-19 pandemic Lockdown. See below table on numbers as of end of April 2022:

Month

Call Centre

Telephone

Face to Face

Males

Females

Social Media

Road Shows

GBV Walk

Debriefing

Total

Mar 21

11

8

3

4

7

0

0

0

0

0

Apr 21

7

5

2

6

1

0

158

0

0

0

May 21

6

3

3

3

3

0

0

0

0

0

Jun 21

11

10

1

4

7

0

0

0

0

0

Jul 21

10

3

7

6

4

0

0

0

0

0

Aug 21

13

4

9

5

8

0

0

50

0

0

Sep 21

21

10

11

14

7

0

0

0

0

0

Oct 21

18

1

17

8

10

0

153

0

0

0

Nov 21

18

14

4

4

14

250

147

0

0

0

Dec 21

12

4

8

8

4

20

0

0

0

0

Jan 22

19

4

15

10

9

0

0

0

0

0

Feb 22

22

3

19

10

12

0

0

0

7

0

Mar 22

42

18

24

20

22

0

0

0

0

0

April 22

27

13

14

12

15

0

0

0

3

0

Total

237

       

270

458

50

10

1025

 

18 May 2022 - NW1775

Profile picture: Mhlongo, Mr TW

Mhlongo, Mr TW to ask the Minister of Sport, Arts and Culture

(1).In light of the fact that certain persons (names furnished) were appointed as ambassadors for the Silapha Wellness Intervention Programme, (a) criteria were used to select the ambassadors, (b) specific experience and/or qualifications do the specified persons have to be ambassadors in matters of gender-based violence, mental health, drug abuse and lesbian, gay, bisexual, transgender, queer and others matters, (c) work has each ambassador done and (d) total amount has each ambassador been paid; (2). how representative are the five ambassadors in terms of (a) race, (b) province, (c) language, (d) genre and (e) sexuality?

Reply:

1. a) The selection criteria was based on the relevance of the experience each ambassador endured that speaks to the mandate of the programme. Their social media following was also taken into consideration, to leverage on it to reach out to as many practitioners as possible.:

(b) & c)

Penny Lebyane - She spent most of her years struggling with the art industry challenges, openly discuss her mental illness struggle, she was in psychiatric ward for her mental illness. A committed activists for women’s rights in the arts, she's also an ambassador for other wellness programs  and  organizations and a Radio 2000 host, her show focuses on wellness. Social Media: Face Book - 201 000; Twitter - 244 000; Instagram - 172 000.

Portia Modise -  A champion for the LGBTQ+ community, An openly gay women, a committed community activist  with her foundation . Portia Modise Foundation that is helping young girls through challenges of life and developing their football skills. Soon to launch her Book "From Portia with Love" where she discusses all the women challenges in football and the LGBTQ+ Community. Social Media: Facebook - 26 084; Twitter - 3 185; Instagram - 4 441.

Dawn King - A champion for mental illness and GBV movement, a motivational speaker in her own right, as well as a spiritual healer. A GBV survivor and an activists. Host her own podcast show, dealing with Mental illness and the business of the arts. Social Media: Facebook - 1 194 809 Twitter - 261 000 Instagram - 1 900 000

Gigi Lamayne - She suffered with depression for many years and was once admitted in hospital because of it. She went on to say that her difficult upbringing had detrimental effect in her life and not having a mentor in life and as an artist. In one of the interviews she credited the help and counselling she received during the ordeal. Youth Activist that encourages artist to seek counselling if needed. Social Media: Facebook - 736 715; Twitter - 334 000; Instagram - 592 000

Jabu Mahlangu - Formerly Jabu Pule, a former great player, that has been and done it all from alcohol addiction to drug addiction. Currently an Ambassador for Super Sports, teaching young people about dangers of drugs and alcohol. A great motivational Speaker. Social Media: Facebook - 6 938; Twitter - 47 200; Instagram - 114 000

(d) Each ambassador was paid R35 000.00 for a period of 5 months= to R175 000.00 per ambassador

2. The selection criteria as per the TORs was not based on race, sexuality, language or province but rather on the relevance of the experience each ambassador endured that speaks to the mandate of the programme.

Ambassador

Race

Province

Language

Genre

Sexuality

Penny Lebyane

African

Originally MP but now in GP

Sepedi

TV/Radio presenter

Female

Portia Modise

African

GP- Soweto

Sotho

Athlete

Lesbian

Dawn King

African

Originally KZN but now in GP

IsiZulu

Actress

Female

Gigi Lamayne

African

Originally KZN but now in GP

IsiZulu

Artist

Female

Jabu Mahlangu 

African

Gp- Ekurhuleni

IsiNdebele

Athlete

Male

18 May 2022 - NW1672

Profile picture: Mhlongo, Mr TW

Mhlongo, Mr TW to ask the Minister of Sport, Arts and Culture

With reference to the outreach events organized by SILAPHA, which provided him with an opportunity to address the sector, what role did SILAPHA play in mediation between him and the artists who had occupied the offices of the National Arts Council of South Africa?

Reply:

Silapha did not play any mediation role on the matter.

18 May 2022 - NW1636

Profile picture: Bodlani, Ms T

Bodlani, Ms T to ask the Minister of Police

(1) Whether, with regard to records and a case number CAS 226/04/2019 showing that a burnt down building, which was used by police reservists at the Brackendowns SA Police Service (SAPS), has not been investigated since the fire in 2019,a case of arson was investigated by the Brackendowns SAPS; if not, what are the reasons that the matter has not been investigated; if so, what was the outcome and/or status of the specified case; (2) whether SAPS has requested by the City of Ekurhuleni to restore the buildings; if not, what is the position in this regard; if so, what are the details of the outcome of the request made?

Reply:

Attached find here: Reply

18 May 2022 - NW1764

Profile picture: Nodada, Mr BB

Nodada, Mr BB to ask the Minister of Basic Education to ask the Minister of Basic Education

What (a) are the criteria for (i) the admissions for the Funza Lushaka bursary scheme, (b) what are the criteria for (ii) a student wanting to change subjects when receiving the scholarship, (b) number of learners have (i) been accepted for mathematics and science, (ii) passed with mathematics and science in the past three academic years and (iii) dropped out of their studies before completion?

Reply:

a) What are the criteria for the admissions for the Funza Lushaka bursary scheme?

     (i) There are criteria for first time applicants who include the District and Community-based recruits and the returning or existing students who are already enrolled at an HEI. The              criteria are stipulated as follows:

A. For 1st time entrants to a Higher Education Institution

  • An exemption, endorsement, or ‘admission to bachelor degree studies’ pass at Grade 12 level.
  • At least a level 4 pass at Grade 12 level in the subject which leads on to the priority area/subject in which the applicant will specialize to teach.
  • For students who wish to specialize in the Foundation Phase, a pass in Mathematics or at least level 4 pass in Mathematical Literacy at Grade 12 level is required. In addition, a level 4 pass in the Home Language is required.
  • Students who wish to specialize in the teaching of Technology subjects, including CAT, and who do not have these subjects at matric level, must have at least a level 4 pass in Mathematics.
  • If the institution’s admission requirements are higher than the bursary requirement and vice versa then the higher requirement will apply.

 

  1. For existing bursars
  • The student must have passed at least two-thirds (66.6%) of all the subject modules studied in the last year of study at the university.
  • The student must have passed at least two-thirds (66.6%) of the priority subject area modules studied in the last year of study at the Higher Education Institution. This should include specific province-specific subjects of students selected through the District and Community Based teacher recruitment programme.
  • For the Foundation Phase, Language, Mathematics and Life Skills will form the priority subjects for purposes of the re-awarding of the bursary.
  • If a student is doing one priority subject, he/she must pass it to qualify for re-award.
  • The student must be progressing to the next level/year of study.
  • The students must achieve at least a 55% average across all subject modules.
  • Students who register and fail a module twice in a year, that module will be counted twice for purposes of determining the course load and the number of modules failed.
  • Students who fail to meet the above will have their bursaries temporarily withdrawn until they redeem themselves by meeting these requirements, where they will again be considered for funding.

B. What are the criteria for a student wanting to change subjects when receiving the scholarship?

            Students are not allowed to change subjects, once awarded they have to adhere to the subject until the qualification is completed.

        b. (i) The number of learners have that been accepted for mathematics and science,

  • For 2022, selections at HEIs are still being conducted and the data will be made available after the outcome of the selections have been concluded. However, the table below illustrates the number of Mathematics and Sciences students for the previous academic year (2021).

   

SUBJECTS/MODULES

Number of students

Mathematics

5958

Physical Science

1970

Source: FLIMS SUBMITTED Q4 LIST

 

       b. (ii)  The number of student passed with mathematics and science in the past three academic years is indicated in the table below:

       

Mathematics and Physical Science Pass Rate in the past three academic years

Subject

2019

2020

2021

Total

Mathematics

1500

2355

2408

6263

Physical Science

430

687

807

1924

 

      b. (iii) The number of drop out of their studies before completion?    

  • No drop-outs from the Funza Lushaka bursars, however, one (1) student was reported as deceased.                         

18 May 2022 - NW1725

Profile picture: Groenewald, Dr PJ

Groenewald, Dr PJ to ask the Minister of Police

(1) Whether air support was rendered by the SA Police Service during the floods in KwaZulu-Natal; if not, why not; if so, (a) what type of aircraft and/or helicopter was used, (b) on what date was each aircraft and/or helicopter used and (c) what was the nature of each specified application; (2) whether he will make a statement on the matter?

Reply:

Attached find here: Reply

18 May 2022 - NW1670

Profile picture: Mhlongo, Mr TW

Mhlongo, Mr TW to ask the Minister of Sport, Arts and Culture

(1).Whether a certain person (name furnished) did business with the SA Sports Confederation and Olympic Committee before the specified person became a board member; if not, what is the position in this regard; if so, what (a) services were provided by the person and (b) settlements were made; (2). whether he has found any conflict of interest as the person is part of the current board; if not, what is the position in this regard; if so, what are the further, relevant details?

Reply:

In terms of Section 13 (5) (b) (ii) of the National Sport and Recreation Act, the Minister is debarred from involvement in matters of administration in sport. Therefore, the Minister cannot pronounce on whether there is a conflict of interest because this is an administrative matter for SASCOC to manage.

18 May 2022 - NW1736

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Sport, Arts and Culture

(1). What (a) total amount did it cost Cricket SA to conduct the recent Social Justice and Nation Building hearing involving a certain person (name and details furnished) and (b) is the detailed breakdown of all the costs incurred; (2). what amount did Cricket SA incur for (a) legal and (b) any other costs incurred on behalf of the specified person? NW2063E

Reply:

Cricket SA has responded to the questions as follows:

The total cost of the entire process has not yet finalized, once that is done Cricket South Africa will furnish the Honourable with the relevant amounts.

18 May 2022 - NW1777

Profile picture: Mhlongo, Mr TW

Mhlongo, Mr TW to ask the Minister of Sport, Arts and Culture

Whether, in light of the fact that by the end of February 2022, the Silapha Wellness Intervention Programme has reached out to only 953 persons at a budget of R3 388 615,97 and furthermore most of the engagements were through social media posts which implies that Silapha has earned an average of R3 388 per person reached out, his department considers this to be accountable and responsible expenditure; if not, what is the position in this regard; if so, what are the further relevant details?

Reply:

It is important to note that the Silapha Wellness programme renders a 24 hour Call Centre services with costs paid monthly. It is therefore misleading to equate the amount spent to only the number of the beneficiaries assisted as the total amount spent is made up of the following elements:

-The expenses of executing the outreaches, equates to the biggest percentage spent. Other costs are the monthly payment of the ambassadors; the monthly costs of running social media platforms and other media & PR expenses, as well as the branding and merchandise expenses for marketing. All these are accounted for as per the contract that the service provider entered into with the Department.

18 May 2022 - NW1637

Profile picture: Bodlani, Ms T

Bodlani, Ms T to ask the Minister of Police

(1) Whether the SA Police Service (SAPS) has considered the request of the community of Ward 38 for permanent buildings for the Brackendowns SAPS; if not, why not; if so, what steps have been taken to ensure the need is met; (2) whether, given that SAPS is leasing from the City of Ekurhuleni, he has found that it is of benefit to SAPS to keep renewing the lease with the City; if not, what has been done to acquire the property from the City; if so, what are the reasons that it is wise to do so?

Reply:

Attached find here: Reply

18 May 2022 - NW1779

Profile picture: Marais, Mr S

Marais, Mr S to ask the Minister of Defence and Military Veterans:

Whether, with reference to her reply to question 638 on 22 April 2022, the house (a) previously occupied by Gen (rent) Shoke belongs to her department and (b0 appears on the asset register of her department and/or the SA National Defence Force (SANDF); if not, what is the position in this regard; if so, (i) what rental amount has been determined for the Chief of the SANDF to occupy the specified house, (ii) on what date did Gen (ret) Shoke vacate the house, (iii) what rental amount did Gen (ret) Shoke pay for the period he occupied the house after he left the service of the SANDF at the end of May 2021 and (iv) what were the cost details to clean and prepare the house for the current Chief of the SANDF after Gen (ret) Shoke vacated the house?

Reply:

Attached find here: Reply

18 May 2022 - NW1701

Profile picture: Ismail, Ms H

Ismail, Ms H to ask the Minister of Defence and Military Veterans:

Whether she has taken any action in terms of speeding up the completion of the vehicle verification panel process of military veterans; if not, why not; if so, what are the relevant details?

Reply:

Attached find here: Reply

18 May 2022 - NW1735

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Sport, Arts and Culture

What number of Social Justice and Nation Building hearings have been held by governing bodies of the various sporting codes in the Republic since 29 May 2019, (b) which governing bodies held the hearings, (c) on what dates were the specified hearings held, (d) what was (i) each hearing about and (ii) the outcome of each hearing and (e) what did it cost to conduct each hearing?

Reply:

The social justice and nation building SJN hearings were confined to Cricket South Africa only.

18 May 2022 - NW1662

Profile picture: Nodada, Mr BB

Nodada, Mr BB to ask the Minister of Basic Education to ask the Minister of Basic Education

What (a) components of her department make up the Inclusive Basket of Results score for the National Senior Certificate (NSC) examinations, (b) are the reasons that the particular components of the score were chosen, (c) are the reasons that the score is not announced at the same time as the pass rate at the beginning of the year and (d) are the Inclusive Basket scores for each (i) province and (ii) education district in the 2021 NSC results?

Reply:

(a) The nine criteria that constitute the reporting in terms of the Inclusive Basket framework, are as follows:

        (i)     Overall Achievement (%).

        (ii)    Mathematics Participation (%).

        (iii)    Mathematics Achievement (%).

        (iv)    Physical Science Achievement (%).

        (v)    Technical Mathematics Achievement (%)

        (vi)    Accounting Achievement (%)

        (vii)   Admission to Bachelor Studies (%)

        (viii)  Distinction Achievement (%)

        (ix)   Throughput rate (%) 

       

(b)    The rationale for the Inclusive Basket of Criteria, is to move away from a single determinant of the performance of the schooling system (i.e. Overall Pass Percentage) to a more comprehensive set of quality indicators that more accurately reflect the performance of the schooling system at the end of Grade 12. The specific subjects which include Mathematics, Physical Science, Technical Mathematics and Accounting, represents the priority subject fields that need to be promoted in the schooling system. Accounting has been added as a proxy subject for the Business, Commerce and Management subjects, and Technical Mathematics added as a proxy subject for the Technology stream. Admission to Bachelor Studies and the Distinction Achievement are strong indicators of the quality of the achievement and throughput rate reflects the efficiency of the system.

(c)  The Council of Education Ministers (CEM) made a decision that the Inclusive Basket of Criteria will be piloted for a few years so as to obtain feedback on the uptake of this new system of reporting and to ensure that the criteria are appropriately selected. Therefore, over the last three years the criteria have been amended based on feedback on what should be the priority drivers in the system and there has been a shift from aggregating the individual scores of the selected indicators to reporting on each of the criteria individually. The Inclusive Basket of Criteria has been used as the secondary mode of reporting, while overall pass percentage remained the primary reporting tool. This will be reviewed once again this year and a decision will be made as to how the Inclusive Basket of Criteria will be used in 2022 and beyond.

(d)  (i) Table representing the Performance of the Nine PEDs, in the 2021 NSC Examination, in terms of the Inclusive Basket of Criteria.

Province Name

% Achieved  

% Accounting Achieved

% Mathematics Achieved

% Physical Sciences Achieved 

% Technical Mathematics

% Maths Participation  

% Bachelors  

% Distinctions Achieved

% Throughput

EASTERN CAPE

73.0%

76.4%

46.6%

62.3%

50.7%

48.0%

34.3%

3.7%

66.2%

FREE STATE

85.7%

81.9%

66.6%

75.1%

73.5%

36.4%

39.9%

3.5%

58.7%

GAUTENG

82.8%

81.9%

68.2%

73.5%

63.4%

31.2%

43.8%

5.2%

70.4%

KWAZULU-NATAL

76.8%

70.1%

54.2%

71.2%

63.0%

36.9%

37.1%

5.0%

73.5%

LIMPOPO

66.7%

65.2%

54.5%

67.8%

53.6%

42.7%

26.7%

2.4%

70.1%

MPUMALANGA

73.6%

71.4%

54.0%

61.5%

78.0%

42.8%

31.5%

2.4%

77.3%

NORTH WEST

78.2%

79.6%

71.5%

77.5%

48.4%

23.9%

33.8%

2.8%

61.5%

NORTHERN CAPE

71.4%

80.8%

59.2%

65.2%

59.8%

21.1%

30.3%

2.1%

58.1%

WESTERN CAPE

81.2%

80.1%

73.4%

78.3%

63.2%

26.3%

45.3%

7.2%

73.4%

NATIONAL

76.4%

74.7%

57.6%

69.0%

60.1%

36.8%

36.4%

4.2%

69.8

(d) (ii)  Annexure A, Representing the Performance of the Seventy Five Education Districts in the 2021 NSC Examinations, in terms of the Inclusive Basket of Criteria.  

18 May 2022 - NW1755

Profile picture: Van Minnen, Ms BM

Van Minnen, Ms BM to ask the Minister of Police:

Whether, with reference to his reply to question 366 on 2 March 2022 that seven out of the 10 police vehicles were in operational order and three were awaiting services and/or repairs at the Gordon’s Bay Police Station situated in the Cape Town Metro, he can advise (a) for how long the three non-operational vehicles have been in for service and/or repairs and (b) what the turn-around time will be before they are operational again?

Reply:

Attached find here: Reply