27 July 2022 - NW1524

Profile picture: Buthelezi, Ms SA

Buthelezi, Ms SA to ask the Minister of Water and Sanitation

What (a) areas has his department identified nationally, as being the most (i) affected by the water crisis and (ii) likely to have major water and sanitation issues and (b) plans does his department have in place to prevent day zero?

Reply:

a) Areas experiencing water shortages are mostly rural areas in the provinces of the Eastern Cape, Limpopo, Mpumalanga, North West, KwaZulu Natal, Free State and the Northern Cape. In addition, 32% households in South Africa do not have access to a reliable services due to dilapidated infrastructure as well as lack of proper operations and maintenance of existing infrastructure which results in disruptions and shortage of water supply.

Access to sanitation services is less than 85% in six provinces including in the Free State (82.3%), KwaZulu Natal (KZN) (80.9%), Limpopo (63.7%), North West (68.8%), Mpumalanga (63.7%), and Northern Cape (83.9%). Access in the provinces of, Limpopo, Mpumalanga and North West are below the national average at 82.1%. in the efforts to remedy these challenges, the DWS will be submitting a National Sanitation Framework (NSF) to Cabinet for approval.

The framework seeks to:

  • Revise the national norms and standards for sanitation and provide for equitable sanitation provision across all settlement types
  • Strengthen monitoring and compliance to the standards, and
  • Sets out measures to improve service delivery such as support in various forms to address service delivery lapses.

b) The Department of Water and Sanitation (DWS) is in the process of planning and implementing a range of major projects to augment national bulk water resource infrastructure and is in the process of establishing the National Water Resource Infrastructure Agency (NWRIA) to finance and implement the large-scale investments in national water resource infrastructure that are required to ensure that South Africa has sufficient bulk water supply now and in future. The use of groundwater, desalination of seawater and rainwater harvesting are also being implemented to address local water requirements.

The DWS will strengthen its role in supporting and intervening in municipalities where water and sanitation services are failing, in conjunction with provinces, Cooperative Governance and Traditional Affairs, National Treasury and the South African Local Government Association. This will be done in the spirit of cooperative governance in the Constitution to avoid creating inter-governmental conflict. The service delivery imporvement plan will include:

  • Optimal use of the legislative framework
  • Reconfiguration of Water Boards
  • Positioning of reconfigured Boards to work closely with Municipalities with regards to ensuring capacity for service delivery
  • Development and implementation of rolling plans for providing support and intervention for water and sanitation services to municipalities, drawing on a range of national support programmes
  • Partnerships with the private sector that includes funding as well as technical and managerial expertise

---00O00---

27 July 2022 - NW2316

Profile picture: Ceza, Mr K

Ceza, Mr K to ask the Minister of Finance

What remedial action has been taken to ensure that the four districts in the North West, which were listed as being in financial distress, fulfil their obligations of delivering on the allocated grants in their local municipalities?

Reply:

The North West province has four districts namely, Ngaka Modiri Molema, Bojanala Platinum, Dr Kenneth Kaunda and Dr Ruth Segomotsi Mompati Molema District municipalities. These districts receive grant allocations in terms of the annual Division of Revenue Act (DoRA) in accordance with the powers and functions allocated to them in terms of section 84 of the Municipal Structures Act and Regulations (Act No. 117 of 1998). Therefore, various districts and local municipalities in North West would have different powers and functions allocated to them in terms of the Structures Act. These powers are in the main the powers to provide the water, sanitation, roads, refuse, and electricity services.

In the North West province, Bojanala Platinum and Dr Kenneth Kaunda districts municipalities have no powers and functions to provide services for water, sanitation, refuse, roads and electricity, while Dr Ruth Segomotsi Mompati and Ngaka Modiri Molema districts municipalities are delivering these services on behalf of their local municipalities.

It is therefore important to distinguish and note that the local municipalities in the Bojanala Platinum and Dr Kenneth Kaunda districts are the ones responsible for delivering these services, while the other two districts in the North West province, Dr Ruth Segomotsi Mompati and Ngaka Modiri Molema districts municipalities are responsible for both receiving and spending the DoRA allocations on behalf of their local municipalities.

Through the principle of delegated and non-delegated responsibility, the Provincial Treasury is directly responsible to support these municipalities to ensure that tabled budgets are assessed and adopted in time and to ensure that municipalities consider the recommendations provided to them for various Council’s considerations. Only Rustenburg and Mahikeng local municipalities are non-delegated and remains a direct responsibility of National Treasury whilst the rest of the local and district municipalities are under a direct support of the Provincial Treasury.

The Provincial Treasury has been providing support to the municipalities in distress through placing various support skills and capacity support in those municipalities. A number of deployees through the National Treasury’s Municipal Finance Improvement Programme (MFIP) continues to support in the affected municipalities. Further, National Treasury continues to identify struggling municipalities through the process of Invoice Verification Process (IVP) wherein, payments and transfers of grants can only be made to the municipalities only after the work done and invoiced has been verified by both National Treasury (PT) and DCoG (MISA). On an annual basis, National Treasury and DCoG agree on a list of municipalities that are placed under these micro-management support.

In exceptional circumstances or persistent and material breach of the measures on prudent financial management, National Treasury may consider exploring the feasibility of utilising other organs of state to deliver these services on behalf of the municipalities that are in distress. These measures are, the utilisation of the district municipality to be a delivery vehicle against a municipality in distress to avoid conditional grants misuse or vice versa, wherein, the local municipality is considered to assist its district.

27 July 2022 - NW2302

Profile picture: Horn, Mr W

Horn, Mr W to ask the Minister of Justice and Correctional Services

Whether the National Prosecuting Authority has taken any decision on whether any prosecution will be instituted in respect of case number CAS 109/09/2021 opened at the Parkweg Police Station, with regard to possible financial crimes committed within the administration of the Mangaung Metropolitan Municipality; if not, what is the reason for the failure to take such a decision; if so, what are the relevant details?

Reply:

The Director of Public Prosecutions: Free State confirmed that the Specialised Commercial Crime Unit received the said criminal case docket, allocated to a Senior Advocate to deal with the docket. Additional information was subsequently submitted by the Investigating Officer towards the end of May 2022 for evaluation. The decision in respect of all matters is pending.

26 July 2022 - NW2172

Profile picture: Abrahams, Ms ALA

Abrahams, Ms ALA to ask the Minister of Social Development

(1)Given that the Medium-Term Expenditure Framework budget tabled for the 2022-23 financial year makes no specific reference to the increasing crisis of homelessness and noting that the subprogramme Families, where the process of family reunification falls, is the only social development programme dedicated to address homelessness, what are the reasons that she has not dedicated a specific budget to address homelessness in terms of providing dignity to such individuals; (2) what budget allocations have provincial departments made to address homelessness and street persons in the specified financial year; (3) what is the budget breakdown of the R10,5 million for the Families sub-programme in the specified financial year; (4) what (a) total amount was allocated towards the reunification of homeless persons with their families and (b) has been the success rate of the family reunification programme in each province?

Reply:

1. Homelessness is a complex and cross-cutting issue that no single Department or entity of Government can address on its own. The Department is currently leading efforts to develop a policy framework that will guide and coordinate interventions by various key role players in addressing homelessness.

The policy framework will outline the roles and responsibilities, norms and standards within which such services should be provided. The department further has to provide psychosocial support and reunification services which are part of the package of services included within the current baseline.

2. Currently, two provincial departments, namely Gauteng (R 11 545 986) and Western Cape (R R2 898 560) have a dedicated budget to address homelessness.

(3)

NATIONAL BUDGET BREAKDOWN 2022/2023

Compensation of employees

R5 168

Goods and Service

R3 295

Transfers

R1 868

Capital payments

R    241

Total

R10 573

 

(4) The table below indicate the total amount allocated towards the reunification of homeless persons with their families and the success rate of the family reunification programme per province.

Province

(a) Allocated Budget

(b) Recorded Numbers

Limpopo

 

No dedicated budget. Reunification services is part of the basket of services rendered by social workers.

No official record at the time of reply

Free State

No dedicated budget. Reunification services is part of the basket of services rendered by social workers.

117

Mpumalanga

 

No dedicated budget. Reunification services is part of the basket of services rendered by social workers.

No official record at the time of reply

Northern Cape

 

No dedicated budget. Reunification services is part of the basket of services rendered by social workers.

602

Western Cape

 

Refer to 2 above

602

Eastern Cape

 

 No dedicated budget. Reunification services is part of the basket of services rendered by social workers.

463  

Gauteng

 

Refer to 2 above

2 279

North West

 

No dedicated budget. Reunification services is part of the basket of services rendered by social workers.

97

KwaZulu-Natal

 

No dedicated budget. Reunification services is part of the basket of services rendered by social workers.

1 799

26 July 2022 - NW2343

Profile picture: Opperman, Ms G

Opperman, Ms G to ask the Minister of Social Development

(1)With reference to the report of the Auditor-General for the 2020-21 financial year, with what total amount did the debtors book increase in the specified financial year, due to the R350 grant overpayment; (2) (a) what total number of ineligible beneficiaries received (i) food parcels and/or (ii) vouchers in the past financial year and (b) to what total monetary value?

Reply:

(1) To date, there is no COVID-19 SRD Grant debtors recorded by either SASSA or DSD. Pending further investigation, an estimated amount of R11 million was recorded as a disallowance under miscellaneous due to recipients who may have potentially wrongfully benefited from the grant.  However, I must point out that this an estimated figure as the final will only be known after the investigation has been completed. The debt management process will only resume once a definitive overpayment has been confirmed or established.

2 (a) (i) and (ii) None. Any applicant who does not meet the eligibility criteria for the SRD does not receive it.

(b) None.

26 July 2022 - NW2105

Profile picture: Abrahams, Ms ALA

Abrahams, Ms ALA to ask the Minister of Social Development

(1)Whether, in the light of certain first-hand accounts contained in The Sunday Times newspaper dated 8 May 2022 regarding child malnutrition and hunger (details furnished), she has found that child malnutrition and hunger is at crisis levels in the Republic; if not, what is the position in this regard; if so, (2) whether her department has provided any support to the families; if not, why not; if so, what (a) is her department’s response and/or position regarding the accounts contained in the articles and (b) is her department’s (i) short-, (ii) medium- and (iii) long-term plan to tackle child malnutrition, hunger and death; (3) whether she will increase the Child Support Grant to be in line with the food poverty line; if not, what is the position in this regard; if so, on what date; (4) whether she will furnish the Portfolio Committee on Social Development with a copy of the maternal support policy; if not, what is the position in this regard; if so, on what date; (5) on what date will the maternal support policy be ready for implementation?

Reply:

1. Yes, child malnutrition and hunger have reached crisis levels in the Republic. This can be attributed to the following key drivers of food insecurity and vulnerability:

a) Economic decline and unemployment - The slowdown in the national economy has resulted in mass job losses over the past two consecutive years. With no employment and reduced income, millions of people could not afford to buy sufficient food including basic food items.

b) The outbreak of the COVID 19 pandemic globally and in South Africa led to the necessary introduction of lockdown restrictions. It is pivotal to note that the country entered the COVID-19 pandemic with high levels of unemployment and a decade of weak job creation. The implementation of restrictions had a negative impact on the jobs, and the resultant reduction in household income and the purchasing power of households.

c) Food price inflation has significantly increased by 30% or more as observed for certain products within the food basket. Food prices have a major impact on food access in South Africa as households and individuals struggle to purchase even the most basic food items.

d) Climate change and environmental impact - Prior to the recent floods that affected provinces such as Kwa-Zulu Natal (KZN), Eastern Cape (EC) and North West (NW), the country has also experienced drought in certain areas, which has negatively affected food production. All of these factors have had a severe impact on child nutrition, thus contributing to heightened malnutrition.

The Department is mandated by the Constitution of the Republic of South Africa: Section 27 (1) (c) to make provision for the right of access to appropriate social assistance to individuals that are unable to support themselves and their dependants.

The Department has, and continues to provide support to vulnerable individuals in households in the form of social grants including the social relief of distress for families with insufficient means. Our social assistance programme is one of the biggest social protection programmes in the country, currently reaching just over 18.7 million beneficiaries for eligible children, the elderly, and persons with disabilities.

Currently, just over 13.1 million children are beneficiaries of the Child Support Grant (CSG) at R480 per child. The Department has recently gazetted the proclamation of the Social Assistance Amendment Act No. 16 of 2020 and regulations thereof, on 30 and 31 May 2022 respectively. The legislation makes provision for supplementary payments of social grants in the form of top up (50% more on the CSG) Orphans in the care of their relatives are eligible to receive the basic CSG amount at R480 plus a top up at R240 which amounts to R720 in total. By increasing the value of the CSG, we strive to ensure that these children are enabled to achieve their full adult potential by growing in a secure environment that ensures adequate nutrition.

The Department concurs with the research findings from the Child Gauge Report (2020), which identifies exclusive breastfeeding during the first six months following birth of a child as a key protective factor for the child’s survival, cognitive development and protection against Non-Communicable Diseases (NCDs) in the adult years. Our surveys have repeatedly shown a low prevalence of exclusive breastfeeding, with the most recent South African Demographic Health Survey (SADHS) reporting that just 32% of infants below the age of six months were exclusively breastfed in 2016. Many women stop exclusive breastfeeding prematurely due to food insecurity, a hostile home environment, inadequate support from their workplace and the weaknesses in our health care system.

Poor feeding practices contribute to particularly high levels of stunting (32%) during the first six months of life. These challenges continue into the second year of life, with only 23% of infants aged 6 – 24 months reported to have consumed a minimum acceptable diet (a composite measure of dietary diversity and food frequency). Inappropriate complementary feeding practices are associated with being overweight and obesity in childhood and later in puberty. Formula feeding has been identified as a possible cause of subsequent overweight.

The Department’s (i) short- term plan to tackle child malnutrition, hunger and death is the provision of the Child Support Grant and the Social Relief of Distress to affected families;

In addition, it must be highlighted that malnutrition requires an intersectoral approach, where social grants are only one component of a broader package of services including access to school nutrition programmes and other economic interventions to reduce the cost of food and improve its accessibility.

The (ii) medium plan to tackle child malnutrition, hunger and death includes the expansion of the social protection coverage and benefits to cater for the needs of vulnerable children and adults. The Department has on 01 June 2022 commenced with implementation of CSG Top Up and has since 2020 provided the Special COVID-19 R350 SRD Grant, which will continue until March 2023. Payment of this latest iteration commenced in mid-June 2022. The intention to link the SRD grant beneficiaries to other job creation programmes within and outside government, and sustainable livelihoods and social enterprise opportunities to expand the income generation opportunities for poor households so that they can be empowered to provide for themselves and their children.

This approach of providing social grants is supported worldwide, including by the World Bank and other multilateral institutions, which have confirmed that well-designed social protection systems support incomes and domestic consumption, build human capital and increase productivity”; and

The (iii) long-term plan to tackle child malnutrition, hunger and death includes building resilience in our communities through investing in community-based food systems and building sustainable livelihoods in our communities. In addition, the Department is developing policy proposals for extension of income support to those aged between 18-59, so that households can have a more consistent income support programme to augment the very low child support grant, which is currently below the food poverty line.

e) The Department has acknowledged on many occasions that the value of the Child Support Grant should be increased to at least the food poverty line. However, the implementation of such a policy requires government to make available the necessary budget allocation. At present, such a decision has not been found to be feasible given the fiscal and economic constraints faced by government. However, government has prioritised the needs of orphaned children, by providing the top-up grant of R240 over and above the CSG value of R480, so that these vulnerable children can access R720 per month without needing to wait for the more complex foster child care process.

f) The Maternal Support policy is still in draft form and not ready for submission to Parliament as yet. Once it has followed the approval processes it will be made available.

g) The maternal support policy still requires approval and funding by government before it can be implemented. It is currently in draft form and still needs to be approved by Cabinet, following which it will necessitate legislative amendments to the Social Assistance Act, development of regulations and approval of funding by Cabinet. This process is expected to take a minimum of two years after Cabinet approval.

26 July 2022 - NW2432

Profile picture: Montwedi, Mr Mk

Montwedi, Mr Mk to ask the Minister of Social Development

With regard to the old age centre in Podimoe Location in Taung in the North West, which was completed three years ago but has not been occupied and remains a white elephant with some social workers appointed and not doing anything on a daily basis, (a) on what date is it envisaged that her department will open the old age centre, (b) what total amount did the centre cost her department and (c)(i) what total number of social workers are currently working from the specified centre and (ii) for how long?

Reply:

a) The province does not have a date as yet for the opening of the old age centre in Podimoe Location in Taung. The actual date of opening is dependant on the following which are still pending:

  • Appointment of a Nursing Manager and other nursing personnel
  • Delivery of furniture in accordance with the norms and standards
  • Registration of the facility in terms of the provisions of the Older Persons Act 13 of 2006.

Once the province has conclude on the above upon which it is working on, the old age home will be opened.

b) The total amount that the centre cost her department was R 73, 064 777.10

(c)

(i)

3 Social Workers. They are currently delivering statutory services at community level.

 

(ii)

The Social Workers have been delivering statutory services at community level from 2017/2018 financial year to date.

26 July 2022 - NW2280

Profile picture: Opperman, Ms G

Opperman, Ms G to ask the Minister of Social Development

(1)(a) What is the total number of non-governmental organisations (NGOs) that are funded by her department who provide feeding in the Northern Cape, (b) where is each NGO situated, (c) what is the name of each NGO, (d) what number of persons does each organisation feed, (e) how do they target the people they support and/or where are they from and (f) what criteria do they use in order to support the persons; (2) what (a) is the total number of persons recorded by her department who are living below the food poverty line in the Northern Cape, (b) are the reasons for extreme poverty in the specified province and (c) where is poverty the most extreme in the province?

Reply:

(a)What is the total number of non-governmental organisations (NGOs) that are funded by her department who provide feeding in the Northern Cape

  • 213 non-governmental organisations (NGOs) funded (detailed in “List A” below).

(b) where is each NGO situated

  • See areas listed below under heading “List A”

(1)(c) what is the name of each NGO,

  • See organizations listed below under heading “List A”

(1)(d) what number of persons does each organisation feed,

  • Number of persons listed below under heading “List A”.

(1)(e) how do they target the people they support and/or where are they from

  • Each NPO services the food insecure people in the community where they are located.

(1)(f) what criteria do they use in order to support the persons;

  • R0 income households, with no employment and income;
  • Beneficiary households that access DSD food provision services at the 213 Nutrition Centres. These are:
    • Chronically food insecure households that experience hunger and have no access to one balanced meal per day;
    • Households with unemployed people living with HIV/AIDS and other chronic diseases;
    • Households with malnourished individuals referred by clinics and hospitals;
    • SRD beneficiary households;
    • Child headed households; and
    • Households with learners benefitting from the School feeding scheme

 

List A: Applicable to NAPQ 2280 of 2022 question 1(a) – 1(d).

Details of the 213 funded NGO’s in the Northern Cape where feeding is provided.

TYPE OF ORGANIZATION

Child and Youth Care Centres

District

NAME

NUMBER OF BENEFICIARIES

TARGET GROUP

CRITERIA

Frances Baard

Helen Bishop

45

Children found to be in need of care and protection in the Northern Cape

  • Children who cannot be accommodated in a foster care setting and who have been placed by an order issued in accordance with section 159 of the Children’s Act 38 of 2005.
  • Children are subsidised at R 4 480 per child per month.
 

Jannie Roux

85

   
 

Christina Kiddie

28

   
 

Bophelo 1

10

   
 

Bophelo 2

10

   
 

Sinothando

35

   

ZF Mgcawu

Jogabed

10

   

Namaqua

VGK Herberg

70

   
 

Bright Lights

65

   

Pixley Ka Seme

De Aar Precinct

16

   

TOTAL

 

374

   

TYPE OF ORGANIZATION

Residential programs for older persons

DISTRICT

NAME

NUMBER OF BENEFICIARIES

TARGET GROUP

CRITERIA

Namaqua

Huis Namakwaland

61

Frail older persons who need 24-hour care

  • Residents dependant only on Older Persons Grant are subsidised at R 2000 per month
  • Residents with a private income are subsidised at R 1000 per month
 

Huis Harmonie

37

   
 

Huis Sophia

13

   
 

E.J. Appies

45

   
 

Sorgvliet

56

   
 

Amandelhof

16

   
 

Emmanuel

43

   
 

Johenco

47

   
 

Onse Rust

18

   

Pixley Ka Seme

Heldersig

19

   
 

Frank du Toit

40

   
 

Freda Kempen

13

   
 

H Du P.Pickard

66

   
 

Danie van Huysteen

14

   
 

Sonder Sorge

40

   
 

Huis Daneel

14

   
 

Huis Kiepersol

20

   
 

Spes Bona

47

   

Frances Baard

Resthaven

44

   
 

Ons Huis

36

   

ZF Mgcawu

Oranjehof

80

   
 

Jan Voster

25

   

JT Gaetsewe

Kgomotsego

24

   
 

Mimosahof

35

   

TOTAL

 

853

   

TYPE OF ORGANIZATION

Service centres for older persons

DISTRICT

NAME

NUMBER OF BENEFICIARIES

TARGET GROUP AND

CRITERIA

Frances Baard

Resego

30

  • Any active older person above the age of 60 years.
  • Funding of R12 per person per day for 16 days per month is provided by Government
 

Dr. Mandela

25

 
 

Ikageng

39

 
 

Living Waters

30

 
 

Shining Stars

24

 
 

Sunshine

30

 
 

Thebe-ya-Kgomotso

30

 
 

Theron Math

40

 
 

Pniel

20

 
 

Deborah

30

 
 

Rolihlahla

30

 
 

GAASCA

80

 
 

Gopolanang

40

 
 

Tshwaraganang(FB)

45

 
 

Phutanang

40

 

Pixley Ka Seme

BadisaLowryville

50

 
 

Rehoboth Centre

40

 
 

Masakhane

40

 
 

Morester

30

 
 

Uyaphendula

30

 
 

Silwerkrone

25

 
 

Petrusville

80

 
 

Van Wyksvlei

31

 

ZF Mgcawu

Gee my jou hand

30

 
 

Goeiejaar

25

 
 

Goeiemoed

40

 
 

KopanangBagodi

25

 
 

Lesedi Centre

20

 
 

Morningside

20

 
 

Nuwe Hoop

30

 
 

On the Top

25

 
 

Rethuseng

35

 
 

Rooisand

25

 
 

Ruach

30

 
 

Sarah Kotze

34

 
 

SkitterendeBejaarde

40

 
 

Tabita

30

 
 

Thembelihle

90

 
 

Ubuntu Abantu

30

 
 

VlytigeBejaardes

30

 
 

St Marys

30

 
 

Zamani

20

 
 

Dibasen

20

 
 

Khani Kla

40

 
 

Lena Mouers

20

 
 

Thembelihle

90

 

Namaqua

Concordia

22

 
 

Sonneblom

40

 
 

Sonskyn

60

 
 

Andrew Denise

55

 
 

Bulletrap

25

 

JT Gaetsewe

Oarabile centre

25

 
 

Kopanang club

24

 
 

Tshwaraganang(JTG)

27

 
 

ThusanangBagodi

51

 

TOTAL

 

1877

 

TYPE OF ORGANIZATION NUTRITIONAL CENTERS - SOUP KITCHENS AND COMMUNITY DEVELOPMENT CENTERS

DISTRICT

NAME

AREA

NUMBER OF BENEFICIARIES

Frances Baard

1. 3L Development

Barkly West

245

 

2. Broader Delportshoop CDC

Delportshoop

283

 

3. Hope Christian Centre CDC

Galeshewe

76

 

4. Mogomotsi Drop-in Centre

Pampierstad

228

 

5. Thabang CDC

Hartswater

235

 

6. Helping Hands CDC

Colville

0

New Organization funding in process

 

7. Readira Soup Kitchen

Galeshewe, Stok n stok

207

 

8. Abongile Soup Kitchen

Beaconsfield

283

 

9. Ark of Noah Soup Kitchen

Phutanang / Snake Park

126

 

10. BancedeniNgabantu Soup Kitchen

Lerato park

117

 

11. Batho Pele Soup Kitchen

Galeshewe / Vergenoeg

285

 

12. Bloemanda Soup Kitchen

Galeshewe

380

 

13. Kopano Soup Kitchen

Warrenton

249

 

14. Boitumelo Feeding Scheme

Romance Farm

264

 

15. Bokamoso Home-Based Care

Warrenton

99

 

16. Bophelo CNDC

Ricthie

200

 

17. Colville Soup Kitchen

Colville

108

 

18. Donkerhoek Soup Kitchen

Galeshewe

384

 

19. El Shaddai Soup Kitchen

Roodepan

157

 

20. Galeshewe Care Centre

Galeshewe

340

 

21. Ganspan Soup Kitchen

Ganspan

103

 

22. Katlego Soup Kitchen

Majeng

321

 

23. Kgatelopele Soup Kitchen

Koopmansfontein

173

 

24. Kopanang Soup Kitchen

Holpan

273

 

25. Kopano Soup Kitchen

Bonita Park, Hartswater

178

 

26. Kutlwanong Soup Kitchen

Galeshewe, Kutlwanong

351

 

27. Longlands Soup Kitchen

Longlands

228

 

28. Masakeng Soup Kitchen

Tadcaster

224

 

29. Mountain View Soup Kitchen

Pampierstad

132

 

30. Norman Mpisi Soup Kitchen

Roodepan

376

 

31. Pampierstad Soup Kitchen

Pampierstad

197

 

32. Pniel Soup Kitchen

Pniel

156

 

33. Riverton Feeding Scheme

Riverton

197

 

34. Sakhile Soup Kitchen

Pampierstad

174

 

35. Santa Soup Kitchen

Santa

112

 

36. Lesedi Soup Kitchen

Florianville

186

 

37. Bambanani Soup Kitchen

Ritchie

142

 

38. Southern San SA Soup Kitchen

Platfontein

89

 

39. Batho Botle Soup Kitchen

Greenpoint

174

 

40. Tsolofelo Soup Kitchen

Tidimalo - Delportshoop

131

 

41. Re-A-Thusa Soup Kitchen

Proefplaas

196

 

42. Kokomane Building inovaters Soup Kitchen

Vergenoeg - Galeshewe

96

 

43. Simanye Soup Kitchen

Lethabo Park - Roodepan

142

 

44. Riem-vas-maak Support Centre

Ritchie

87

 

45. Maswabi Soup Kitchen

Greenpoint - Thompson Shacks

103

 

46. Reakofella Feeding Scheme

Tswelelegang

89

 

47. Masibambaneni Care DIC

Galeshewe - Retswelele Shanties

112

 

48. Kopano Ke Maatla Soup Kitchen

Kimberley

109

 

49. New Stands Soup Kitchen

Put sonder water

205

 

50. Devine Glory DIC

Bufferzone

99

 
  1. Vaalrivier Soup Kitchen

Gong Gong

131

 
  1. Thateho Organisation

Refitlhile

117

 
  1. Bancedeni Ngubantu (Satellite)

New York / Jacksonville

89

 
  1. Bophelo CNDC (Satellite)

Vat jouklipsaam

101

 
  1. Abongile (Satellite)

Greenpoint - Old Diamond Park

99

 
  1. Bloemanda Soup Kitchen (Satellite)

Bloemanda Shanties

102

 
  1. Broader Delportshoop CDC (Satellite)

7De Laan

0

New Organization funding in process

 
  1. Broader Delportshoop CDC (Satellite)

Gatvol

0

New Organization funding in process

 
  1. Smithsmine Soup Kitchen

Barkly West - Smithsmine

198

 
  1. Thandanani Soup Kitchen

Galeshewe

0

funding in process

 
  1. Tshwaragano Soup Kitchen

Hartswater

124

 
  1. Valspan Soup Kitchen

Valspan

117

 
  1. Victory House Soup Kitchen

Jan Kempdorp

199

 
  1. Windsorton Soup Kitchen

Windsorton

598

 
  1. Women in Action

Galeshewe, Bantu Hall

191

 
  1. Women in Prayer Soup Kitchen

Galeshewe

245

Pixley Ka Seme

  1. Empilisweni CDC

Prieska

268

 
  1. Toevlugsoord CNDC

Strydenburg

376

 
  1. Gigis

Lowryville

326

 
  1. Campbell CDC

Carnarvon

216

 
  1. Sika Sonke CDC

Victoria West

382

 
  1. Ulonwabo SK

De Aar

294

 
  1. Umsobomvu DIC

Colesburg

358

 
  1. IM Possible Dream Soup Kitchen

Douglas

219

 
  1. Kediemetsi Soup Kitchen

Steynville, Hopetown

178

 
  1. Leeuwenhof SK

Leeuwenshof

213

 
  1. Lets Eat Soup Kitchen

Britstown

191

 
  1. Lukhanyo SK

Britstown

322

 
  1. Mandilive SK

Richmond

152

 
  1. Marydale SK

Marydale

293

 
  1. Masakhane SK

Lukhanyenisweni, Phillipstown

164

 
  1. Masikhuphuke SK

Hanover

261

 
  1. Masizakhe SK

Norvalspont

288

 
  1. Mathlomola SK

Griekwastad

221

 
  1. Rainbow SK

Griekwastad

203

 
  1. Rethabile SK

Niekerkshoop

308

 
  1. Korbeel Soup Kitchen

Carnavon

239

 
  1. Salt Lake Residents Action Grou

Bongani

232

 
  1. Simanye SK

Noupoort

184

 
  1. SizakheleMbekushe SK

De Aar

265

 
  1. Renosterberg Gemeenskap Projek Soup Kitchen

Petrusville/CBD

815

 
  1. Sika Sonke (Satellite)

Hutchinson

93

 
  1. Smidtsdrift Development Centre

Smidtsdrift

117

 
  1. Meals on Wheels (Satellite)

Kuyasa 1

87

 
  1. Q & A Soup Kitchen

Kareeville

146

 
  1. Grass Root Hope in SA

Richmond

169

 
  1. Ulonwabo CDC (Satellite)

De Aar

104

 
  1. Uncedo SK

Loxton

194

 
  1. United Mission Church Soup Kitchen

Kleurtjieskloof

253

 
  1. Van Wyksvlei SK

Van Wyksvlei

399

 
  1. Vosburg Soup

Kitchen

Vosburg

352

ZF Mgcawu

  1. Askham CDC /

Vroue Aksie

OntwikkelingProjeck

Askham

349

 
  1. Kgatelopele Social

Development Forum

Danielskuil

396

 
  1. Kakamas Soup

Kitchen

Kakamas

355

 
  1. Keimoes Soup

Kitchen

Keimoes

316

 
  1. Thembilihle CDC

Upington

269

 
  1. Andriesvale Soup

Kitchen

Andriesvale

318

 
  1. Aunt Wilna Soup

Kitchen

Karos

169

 
  1. Friersdale Soup

Kitchen

Friersdale

359

 
  1. Groenwater Soup

Kitchen

Groenwater

265

 
  1. Jenn Haven Soup

Kitchen

Jenn Heaven

138

 
  1. Lennertsville Soup

Kitchen

Lennertsville

278

 
  1. Louisvale Soup

Kitchen

Louisvale

263

 
  1. Maremane Soup

Kitchen

Maramane

0

funding in process

 
  1. Opwag Vroue Forum

Arendsorg

167

 
  1. Philandersbron Soup

Kitchen

Philandersbron

188

 
  1. Progress Soup

Kitchen

Progress, Upington

125

 
  1. Rietfontein Soup

Kitchen

Rietfontein

195

 
  1. Rosedale Soup

Kitchen

Rosedale, Upington

225

 
  1. Skeyfontein Soup

Kitchen

Skeyfontein

141

 
  1. The Wegdraai Care

Centre

Groblershoop

272

 
  1. Tolly Beukes Soup

Kitchen

50 Hectors

200

 
  1. Topline Soup

Kitchen

Topline

357

 
  1. Tsanstabane

Women

Community Centre

Postmasburg

153

 
  1. UAP Soup Kitchen

UAP

100

 
  1. Nnawe Soup Kitchen

Boegoeberg

156

 
  1. Dipuo Peters

Development Centre

Carnation

187

 
  1. Sonneblom

Development

and Care Centre

Groblershoop

133

 
  1. Thusanang Soup

Kitchen

Lambersdrift

148

 
  1. Blessed is the hand

that gives

Postmasburg

201

 
  1. Mumma’s

Dakotaweg

188

 
  1. Mbali’s Soup Kitchen

Jurgenskamp

137

 
  1. Just 4U Kalahari

Skills Centre

Leerkans

142

 
  1. Louisvale Drop in

Centre

Louisvale Dorp

144

 
  1. Thabita

Groot Drink

202

 
  1. Koda Soup Kitchen

Rosedale

199

 
  1. Kgatelopele Social

Development Forum

(Satellite)

Maranteng

106

 
  1. Welkom Soup

Kitchen

Welkom

104

Namaqua

  1. Amandelboom

CNDC

Williston

315

 
  1. Gharana CNDC

Garies

235

 
  1. Luvuyo CNDC

Port Nolloth

121

 
  1. Dogstone Soup

Hondeklipbaai

129

 
  1. Ubuntu CNDC

Steinkopf

301

 
  1. GOG - Soup

Kitchen

Onseepkans

0

funding in process

 
  1. Ikhitshi Soup

Kitchen

Brandvlei

119

 
  1. Komaggas

Sopkombuis

Komagas

296

 
  1. Lekkersing Soup

Kitchen

Lekkersing

123

 
  1. Little Big Cup

Leliefontein

250

 
  1. Mama's Soup

Kitchen

Nababeep

323

 
  1. Matthys

Voedselhulp

Soup Kitchen

Alexanderbaai

316

 
  1. Okiep Soup Kitchen

Okiep

263

 
  1. Peaceful Peace

Kuboes

240

 
  1. Rooifontein Cup a

Soup

Rooifontein

157

 
  1. Rooiwal Family

Soup Kitchen

Rooiwal

316

 
  1. Sandla Sancedo

Sutherland

240

 
  1. Sida !Hoas Soup

Kitchen

Sandrift

208

 
  1. Survivors Home

Soup Kitchen

Concordia

331

 
  1. The Caring Group

Bergsig, Springbok

217

 
  1. Umanyano SK

Nieuwoudville

123

 
  1. Verneukpan Soup

Kitchen

Swartkop

194

 
  1. Vioolsdrift Care &

Support

Vioolsdrift

247

 
  1. Blessed Group

Soup Kitchen

Pofadder

0

New Organization has been identified funding in process

 
  1. Kharkams

Soup Kitchen

Kharkams / Kamiesberg

152

 
  1. Loeriesfontein Soup

Kitchen

Loeriesfontein

0

New Organization has been identified funding in process

 
  1. Hantam Soup

Kitchen

Calvinia

0

New Organization has been identified funding in process

 
  1. Fraserburg bread of

life

Fraserburg

156

 
  1. Kheis Development

Initiative

Kheis

283

 
  1. Woman Prayer

Group Soup Kitchen

Carolusberg

252

JT Gaetsewe

  1. Tshwaragano H.S.

Group SK

Dibeng

176

 
  1. Bana Ba Thari CDC

Tsineng

172

 
  1. Perth CDC

Perth

122

 
  1. Bankhara Bodulong

CDC

Bankhara

0

New Organization has been identified funding in process

 
  1. Tsholofelo Soup

Kitchen

Mapoteng/Sesheng

199

 
  1. Kgatelopele

Support Group

Bendel

155

 
  1. Tshwaraganang

Caring Group Soup

Kitchen

Cassel

186

 
  1. Boikobo Soup

Kitchen

Gadiboe

149

 
  1. Boipuso HCBC

Soup Kitchen

Magojaneng West

104

 
  1. Dingleton SK

Dingleton

281

 
  1. DRYDO

Dithakong

279

 
  1. Ipontseng SK

Ipontsheng

123

 
  1. Itereleng Soup

Kitchen

Wrenchville

192

 
  1. Itshireletseng Soup

Kitchen

Penryn

105

 
  1. Kamden Soup

Kitchen

Camden

87

 
  1. Agisang Soup

Kitchen

Seoding

160

 
  1. Loago SK

Colston

210

 
  1. Loopeng

Community Based

Organisation

Loopeng

126

 
  1. Maboneng

Community

Nutritious

Development

Centre

Vanzylsrus

166

 
  1. Marang HCBC

Soup Kitchen

Ellendale

197

 
  1. Mutapolo's In

Faith Orphanage

Manyeding

181

 
  1. Omogolo Soup

Kitchen

Batlharos

146

 
  1. Ratanang Soup

Kitchen

Maipeing

116

 
  1. Reatlegile Soup

Kitchen

Madibeng

153

 
  1. Reatlegile Soup

Kitchen

Kagung

219

 
  1. Rebonethuso

Soup Kitchen

Heuningvlei

209

 
  1. Remmogo Soup

Kitchen

Laxey

133

 
  1. Thusano HCBC

Soup Kitchen

Seven Miles

206

 
  1. Washington Soup

Kitchen

Washington

0

New Organization funding in process

 
  1. Tshireletso Soup

Kitchen

Madula Ranch

80

 
  1. Tswelelopele

Elderly Club

Olifantshoek

97

 
  1. PheyoIsaka Soup

Kitchen

Bothithong

0

New Organization funding in process

 
  1. Phutanang

Bagodi for the

Aged

Maruping

102

 
  1. Lerethlabetse

Soup Kitchen

Ditshoswaneng

98

 
  1. Lerethlabetse

Orphans Care

Mapoteng

0

New Organization funding in process

 
  1. Iketleng Project

Gantatelang/Magojaneng

162

 
  1. Bomme Kenako

Vergenoeg

0

New Organization funding in process

 
  1. Ipopeng Support group, Orphans and Vulnerable People

Gamorona

135

 
  1. Tsogang HBC

Gasese

110

 
  1. MaikaeleloDrop in

Centre

Pietersham

198

 
  1. Itshwareleleng

HBC

Maphiniki

109

 
  1. Tshireletso HBC

Bothetheletsa

117

 
  1. Perdomonkie

Soup Kitchen

Perdmonkie

187

 
  1. Atlegang ka

Lorato

Community

Organisation

Letlhakajeng

209

 
  1. Baitiki Drop in

Centre

Mecwetsaneng

188

TOTAL

   

40 510

 

Responses to Parliamentary Questions 2280

Question 2(a) What is the what (a) is the total number of persons recorded by her department who are living below the food poverty line in the Northern Cape,

  • There are approximately 354 306 households in the Northern Cape.
  • Of these 354 306 households, 139 395 households have an income of less than R624 per month.
  • This constitutes 39.34% of the total number of households in the Northern Cape.
  • The average household size in the Northern Cape, in 2020, was 3.7 people per household.
  • Therefore, approximately 515 760 people in the Northern Cape, were living below the food poverty line of R624 per month in 2020.

2 (b) are the reasons for extreme poverty in the specified province and

  • The Northern Cape is a vast and rural province with the smallest population in the country.

Job opportunities are scarce in the rural areas, leading to people flocking to urban areas, in the hopes of finding employment. This leads to more mouths to be fed while the chances for employment are slim. Unemployment is also a big contributing factor towards the burden of poverty – according to the Quarterly Labour Force Survey of Statistics South Africa, 1st Quarter, the Northern Cape had an unemployment rate of 24.9%.

2 (c) where is poverty the most extreme in the province? NW2697E

In order to obtain information on the most extreme incidences of poverty in the Northern Cape, the only available data on income poverty, broken down to lower levels, is the Census 2011 information from Statistics South Africa. This information is also only available in income categories, i.e. No Income, R1 – R400, R401 – R800, etc. For the purpose of this report, the afore-mentioned categories were used to obtain information on income poverty; thus, people earning R800 or less per month. A total of 697 761 people earned R800 or less per month in 2011 – approximately 60.89% of the total population of 1 145 862 people in the Northern Cape as per the Census 2011 information.

The table below gives a breakdown of the number of people earning less than R800 per month per local municipality, in the Northern Cape according to the Census 2011 data available.

Table 1: Breakdown of individual income per local municipality

Local municipalities

Nr of people earning less than R800 per month

Total nr of people

% earning less than R800

DC6: Namakwa

62973

115842

54.36%

NC061: Richtersveld

6471

11982

54.01%

NC062: Nama Khoi

25749

47040

54.74%

NC064: Kamiesberg

5583

10185

54.82%

NC065: Hantam

12237

21579

56.71%

NC066: Karoo Hoogland

6819

12588

54.17%

NC067: Khâi-Ma

6120

12465

49.10%

 

DC7: Pixley ka Seme

116517

186351

62.53%

NC071: Ubuntu

11889

18600

63.92%

NC072: Umsobomvu

18465

28374

65.08%

NC073: Emthanjeni

26094

42357

61.60%

NC074: Kareeberg

6924

11673

59.32%

NC075: Renosterberg

6885

10980

62.70%

NC076: Thembelihle

9207

15699

58.65%

NC077: Siyathemba

13491

21591

62.48%

NC078: Siyancuma

23556

37074

63.54%

 

DC8: ZFM

131928

236784

55.72%

NC081: Mier

4140

7002

59.13%

NC082: Kai !Garib

31425

65868

47.71%

NC083: //Khara Hais

54813

93492

58.63%

NC084: !Kheis

10809

16638

64.97%

NC085: Tsantsabane

19695

35094

56.12%

NC086: Kgatelopele

11046

18687

59.11%

 

DC9: Frances Baard

233562

382086

61.13%

NC091: Sol Plaatjie

142851

248043

57.59%

NC092: Dikgatlong

30978

46842

66.13%

NC093: Magareng

16788

24204

69.36%

NC094: Phokwane

42948

63000

68.17%

 

DC45: John TaoloGaetsewe

152781

224799

67.96%

NC451: Joe Morolong

70368

89532

78.60%

NC452: Ga-Segonyana

65040

93651

69.45%

NC453: Gamagara

17376

41616

41.75%

 

Total - NORTHERN CAPE

69 7761

1 145 862

60.89%

Areas where poverty is the most extreme in the province

  1. John Taolo Gaetsewe District: Joe Morolong Local Municipality with 78.60% earning R800 or less per month;
  2. Frances Baard District: Magareng Local Municipality with 69.36% of the people earning R800 or less per month;
  3. Pixley ka Seme District: Umsobomvu Local Municipality with 65.08% earning R800 or less per month;
  4. ZF Mgawau District: !Kheis Local Municipality with 64.97% earning R800 or less per month; and
  5. Namakwa District: Hantam Local Municipality with 56.71% earning R800 or less per month.

_______________________

Ms S Wookey

Acting Head of Department

Date……………………….

_______________________

Ms N.E. Vilakazi, MPL

MEC: Social Development

Date……………………….

25 July 2022 - NW2419

Profile picture: Chirwa, Ms NN

Chirwa, Ms NN to ask the Minister of Higher Education, Science and Innovation

Noting the ongoing crisis in relation to student accommodation, (a) what total number of projects are currently underway that are facilitated and/or paid for by his department to provide sufficient accommodation for students in higher education and (b) which institutions are included in the specified projects?

Reply:

There are currently 76 student housing projects underway. The total funding allocated to these projects amount to R4.547 billion which is made of R3.842 billion from the Infrastructure and Efficiency Grant (IEG), R523 million from the Budget Facility for Infrastructure (BFI), and R182 million from the Sibusiso Bengu Development Grant. From the total funding of R4.547 billion, 56% (R2.544) billion went to the 8 institutions under the Sibusiso Bengu Development Programme. These universities constitute 31% of the total number of public universities in the country.

The institutions involved in these projects are as listed below:

  • Cape Peninsula University of Technology
  • Central University of Technology
  • Durban University of Technology
  • Mangosuthu University of Technology
  • Nelson Mandela University
  • North-West University
  • Rhodes University
  • Sefako Makgatho Health Sciences University
  • Stellenbosch University
  • Tshwane University of Technology
  • University of Fort Hare
  • University of Johannesburg
  • University of KwaZulu-Natal
  • University of Limpopo
  • University of Pretoria
  • University of the Western Cape
  • University of Venda
  • University of Zululand
  • Vaal University of Technology
  • Walter Sisulu University

25 July 2022 - NW1733

Profile picture: Ngcobo, Mr SL

Ngcobo, Mr SL to ask the Minister of Higher Education, Science and Innovation

(1)Whether his department has been informed that graduates are not inspired to build careers in the water and sanitation sector; if not, what is the position in this regard; if so, what are the relevant details; (2) whether his department has put mechanisms and/or plans in place to attract students to the study of and interest in the specified sector; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

The Department of Higher Education and Training is not aware of graduates within the higher education sector who are not inspired to build careers in the water and sanitation sector.

The Department’s role is to ensure that there is an enabling environment for institutions to provide the necessary training and skills required for the water management sector and ensure that students are supported with the necessary means, where appropriate, to pursue their careers.

There are several higher education institutions that offer disciplines in Water Resources Engineering and caters for the vocational pathway in terms of the Higher Certificate and Diploma qualifications, as well as the Bachelor of Science in Hydrology and Water Resources Management for an academic and research pathway (please see attached list).

The Energy and Water Sector Education and Training Authority (EWSETA) plays a key role in developing skills needed in the water and energy sector.

25 July 2022 - NW1886

Profile picture: King, Ms C

King, Ms C to ask the Minister of Higher Education, Science and Innovation

What are the details of the outcomes of the latest skills audit of municipal councillors conducted by the Local Government Sector Education and Training Authority?

Reply:

The Local Government Sector Education and Training Authority (LGSETA) as directed by the Skills Development Act (Act No.97 of 1998) annually develops Sector Skills Plans (SSPs) which identify, amongst others, Top Ten Sectoral Priority Occupations required by the Sector and Intervention Measures. 

In order to respond to the capacity building needs of the municipalities, the LGSETA has developed a Councillor Development Strategy in collaboration with relevant parties in response to capacitating newly appointed and returning councillors with the necessary skills and competencies to discharge their roles and responsibilities as assigned in their respective portfolios over the next five years.   The Councillor Development Strategy has three pillars namely: 1) councillor development and skills audit; 2) function-based training and development; and 3) soft skills development. 

The Councillor Development Strategy further outlines a list of skills that were informed by the previous audit and implementation of councillor training which will be used to guide any future skills priorities:

Municipal Key Performance Area

Key Skills Gaps Identified

Municipal Financial Management

  • Financial Governance
  • Municipal Financial Management and Reporting
  • Municipal Public Accounts Committee
  • Municipal Procurement
  • Finance for Non-Financial Managers

Good Governance and Leadership

  • Municipal Governance
  • Local Government Law and Public Administration
  • Leadership and Relationship Management
  • Leadership and Ethics
  • Ward Committee Governance
  • Change Management
  • Monitoring and Evaluation
  • Performance Management and Accountability

Municipal Administration

  • Media Relations and Stakeholder Engagement
  • Human Resource Planning
  • Policy Development
  • Batho Pele and Interpersonal Skills
  • Presentation skills
  • Report Writing
  • End-User Computing
  • Office Administration
  • Conflict Management
  • Negotiation skills
  • Municipal Legislations
  • Adult Education and Training (AET: level 1-4)

 

22 July 2022 - NW2174

Profile picture: Abrahams, Ms ALA

Abrahams, Ms ALA to ask the Minister of Social Development

(1)Given that in 2020 it was found that no national government policy and/or legislation exists which speaks to homelessness in the Republic, which leaves the specified group of individuals vulnerable, what progress has been made by her department regarding the specified gap in government policy and legislation; (2) by what date does she envisage such government policy and/or legislation will be available to present (a) to the Portfolio Committee on Social Development and (b) for public input; (3) what (a) is the responsibility of her department in the daily plight of homeless individuals and (b) has been the areas of co-operation between her department and (i) provinces and (ii) municipalities in this regard?

Reply:

(1) Homelessness is a cross cutting issue which requires a collaborative effort in addressing it. The department of Social Development is amongst the  key departments that are relevant in dealing with Homelessness. The department of social development's role is to provide psychosocial support services, reunification and reintegration programmes to the homelessness. the department further provide alternative care to those children and older person in terms of both the Children's Act 38 of 2005 and the Older Persons' Act 13 of 2006 to those eligible. Currently it is not clear which department is mandated to take a lead in this regard, however the department took an initiative to lead the development of the Policy for Homeless, to this end the department is in a process of finalising the rapid assessment and a diagnostic study on homeless which will be used as a basis for the development of the Policy. The aim of the study is to understand the nature and extent of the problem,  what interventions are available; and the existing policy gaps.  

(2).  Once the department working jointly with other key departments has concluded all the processes which amongst include broad consultation with key stakeholder, presentation to different  cluster departments and holding bi-laterals with the critical departments that have to directly implement the Policy, the Policy will be presented to Cabinet for consideration for approval. 

(3).  Currently there is no national policy on homelessness but each province has put various systems and interventions in place to address the plight of homeless people in their respective provinces.  For example, Gauteng and Western Cape have dedicated shelters and budget to address homelessness.  They also have guidelines and norms and standards for the operation of those shelters.  However, other provinces do not have dedicated shelters and budget, but have repurposed other existing structures in order to address the issues of homeless people.  Provinces are working closely with other key stakeholders such as COGTA, SALGA, SAPS, Home Affairs, Human Settlement, and Health, in order to provide comprehensive integrated services to the homeless. 

22 July 2022 - NW2287

Profile picture: Abrahams, Ms ALA

Abrahams, Ms ALA to ask the Minister of Social Development

With reference to her reply to question 681 on 22 March 2022, (a) which of the 424 SA Social Security Agency (SASSA) offices are (i) owned and (ii) rented by SASSA or the National Department of Public Works and Infrastructure (NDPWI) and (b) what is the (i) value of the buildings owned by SASSA and/or NDPWI in each case, (ii) monthly and/or annual rental amount for each office and (iii) name of the lessor of each office in each province?

Reply:

1)  (i) and (b) i SASSA owned properties per Region and Values:

  Limpopo Region

Office Name

Property Value

 

Bela-Bela

R   4 200 000,00

Hlanganani

R      850 000,00

Jane Furse

R 24 720 575,00

Leeufontein

R   7 290 250,00

Lulekani

R      596 475,00

Makwarela    

R 24 720 575,00

Manganeng

R   7 290 250,00

Mankweng

R   5 700 000,00

Maraba

R   7 290 250,00

Modimolle

R 24 720 575,00

Musina

R   7 290 250,00

Nkowankowa

R      662 750,00

Senwamokgope local office

R   1 060 400,00

Thabazimbi

R 24 720 575,00

Tzaneen

R 24 720 575,00

Zebedieala

R   5 302 000,00

Total

R 171,135,500.00

 

Northern Cape Region

Office Name

Property Value

 

Churchill local office

R  3,226,811.28 – estimate construction costs

Dithakong local office

R  3,226,811.28 – estimate construction costs

Total

R 6,453622.56

22 July 2022 - NW1495

Profile picture: Marais, Ms P

Marais, Ms P to ask the Minister of Social Development

What is the total number of outstanding temporary disability grant applications that needs to be finalised?

Reply:

A temporary disability grant is given for a specific period, informed by the medical assessment. At the end of that period, the grant lapses and the citizen has to re-apply for the grant, should he/she feel he/she is still unable to work as a result of the impact of the medical condition or disability. If the citizen does not return to SASSA after the grant has lapsed, it is assumed that the condition has improved, to the extent that he/she can compete in the open labour market and no longer requires a grant.

There are currently no outstanding temporary disability grants awaiting finalisation.

However, the table below indicates the numbers of applicants booked for medical assessments for disability grants. It is only once the assessment has been done that it will be known whether the grant is awarded as a temporary or permanent disability grant, as this classification is determined by the presenting medical condition. A temporary disability grant is awarded where there is a likelihood that the medical condition or disability is not likely to present for a period of longer than twelve (12) months.

Clients Awaiting To Be Medically Assessed for a Disability Grant

Region

Upcoming Assessment*

WESTERN CAPE

8 049

EASTERN CAPE

958

KWAZULU NATAL

4 461

LIMPOPO

2 657

NORTHERN CAPE

773

FREE STATE

1 427

GAUTENG

6 737

NORTH WEST

2 243

MPUMALANGA

2 653

TOTAL

29 958

  • Schedule for the period until the month of June 2022

22 July 2022 - NW2345

Profile picture: Opperman, Ms G

Opperman, Ms G to ask the Minister of Social Development

With reference to the report of the Auditor-General for the 2020-21 financial year, what total number of vacancies, other than that of the Director-General, exist within (a) her department and (b) the entities reporting to her?

Reply:

(a) The National Department of Social Development had 59 vacancies as at 31 March 2021.

(b)(i) The National Development Agency, 14 vacancies, and

(b)(ii) The South African Social Security Agency had 410 vacancies.

22 July 2022 - NW2247

Profile picture: Ismail, Ms H

Ismail, Ms H to ask the Minister of Mineral Resources and Energy

What (a)(i) strategic action plans, (ii) key performance indicators and (iii) targets does his department have in place to remove gold on surfaces in order to effectively address illegal mining, (b) total amount in budget allocation has been provided to address specific development plans, especially with regard to portions of illegal mining, such as number of shafts and/or kilometers and (c) monitoring tools does his department have in place that can be used to monitor illegal mining activities in the Republic?

Reply:

(a)(i) The strategic action plans that the Department has is to seal and close all derelict and ownerless mines so that illegal miners are denied access to the same mine, and also regular inspections in identified sites with law enforcement agencies (SAPS) to curb illicit dealing in gold.

(ii) The key indicators as per the Annual operational Plan are the percentage of complaints attended to/inspected as received as well as the criminal cases opened in respect of unlawful/illegal perpetrators who have commenced with mining activities without the necessary authorisation. This is contained in the Department’s Annual Operational Plan

(b)The compliance and enforcement directorate has a budget of R17 953 151, 26 for the purpose of compliance and enforcement.

(c) The Department does not regulate illegal mining, however when the officials of the come across it or a complaint is received such is attended to jointly with SAPS.

22 July 2022 - NW2346

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Social Development

(1)What total number of persons in the Kamiesberg Local Municipal area receive social grants for (a) old age, (b) being disabled and/or (c) child support; (2) what is the breakdown of the specified grants in each of the 16 towns in the Kamiesberg Local Municipal area?

Reply:

1.       As at the end of May 2022 the following were grants in payment:

Grant Type

Number of Beneficiaries

Old Age

1287

Disability

362

Child Support

1460

2. ​ The Region has one office in the Kamiesberg Local Municipal area i.e Garies Local office, servicing all towns in the Local Municipal Area (LMA).

Outreach services are rendered by the Garies Local office on a monthly basis to the different towns in the LMA:

Town

Old Age

Disability

Child support

Rooifontein/Kamassies

63

33

111

Nourivier

82

14

81

Leliefontein

99

12

112

Paulshoek

37

10

13

Kamieskroon

129

44

183

Kharkams

180

49

239

Tweerivier

7

5

3

Koiingnaas

19

5

2

Kheis

67

11

2

Soebatsfontein

45

17

47

Spoegrivier

52

3

5

Klipfontein

60

8

7

Garies

350

114

521

Hondeklipbaai

59

23

89

Lepelfontein

38

14

45

Total

1287

362

1460

22 July 2022 - NW2085

Profile picture: Opperman, Ms G

Opperman, Ms G to ask the Minister of Social Development

What amount of budget cuts did (a) her department experience in each province, especially in the Northern Cape, and (b) each programme receive?

Reply:

Eastern Cape Province

a) & b) The Eastern Cape Department of Social Development (DSD) did not experience a budget cut for the 2022/23 financial year and 2022 MTEF period other than the budget cuts that were implemented in the 2021 MTEF period.

The budget for the Department was however reduced because of the ECD function shift from DSD to the Department of Education (DOE).

Free State Province

a) Amount of budget cuts experienced in the Free State Province

From the final allocation for the 2020/21 financial year to the main allocation for 2021/22, the departmental budget for the FS DSD decreased by R 77.196 million.

The cuts were mainly on the Compensation of Employees as a result of the freezing of annual salary adjustments over the MTEF.

From the Main Allocation to the Final Allocation (during the Adjustment Budget) the department received:

  • R 37.336 million as a roll-over of the ECD Conditional Grant;
  • R 31.692 million for gratuities paid to officials on levels 1-12;
  • R 12 million for appointment of social workers;
  • R 10.702 in respect of the ECD Stimulus;
  • R 4.2 million towards the ENGO Payment

b) Decrease/increase ease per programme as well as final appropriation:

 

 

Gauteng Province

a) The baseline allocation for the Gauteng Department of Social Development was reduced by R 614,545 million in the 2022/23 financial year due to the ECD function shift, centralisation of the ICT budget to the Department of e-Government, infrastructure cut, and fiscal consolidation reduction.

Table 1: Baseline Reduction - 2022/23 Financial Year

ITEM

2022/23

R’000

ECD Function Shift

591 278

ICT Budge Centralisation (Department of e-Government)

7 533

Infrastructure

12 100

Cuts from Provincial Treasury (Fiscal consolidation)

3 634

TOTAL

614 545

b) Each programme received the following:

Table 2: Baseline Reduction per Programme - 2022/23 Financial Year

Programme

Amount

R’000

Administration

15 023

Social Welfare Services

0

Children & Families

542 414

Restorative Services

12 100

Development & Research

45 008

TOTAL

614 545

KwaZulu-Natal Province

a) The budget cuts experienced by KwaZulu-Natal DSD were R 322, 909 million for 2021/2022 and R 427, 238 million for 2022/2023 financial years.

b) Each programme received the following budget cuts:

Programme

2021/22

R’000

2022/23

R’000

Administration

45,779

52,278

Social Welfare Services

59,332

81,696

Children and Families

172,798

231,264

Restorative Services

20,000

29,000

Development and Research

25,000

33,000

Total

322,909

427,238

Limpopo Province

a) R 482 686 million

b) Program 1: Administration – R 80,788 million

Program 2: Social Welfare Services - R 74,649 million

Program 3: Children and families – R 225,563 million

Program 4: Restorative Services – R 56,469 million

Program 5: Development and Research –

R 45,217 million

Mpumalanga Province

a) There were no budgets cut to any of the programmes made by the National Department for the 2021/22 financial year. The departmental overall budget was reduced in the 2022/23 financial year following the ECD function shift to the Department of Education See the breakdown of the allocated budget from National to Province below:

Programme

2021/22

2022/23

Administration

R 334 631 000

R 411,885,000

Social Welfare Services

R 298 595 000

R 291 548 000

Children and Families

R 811 255 000

R 482 218 000

Restorative Services

R 209 532 000

R234 935 000

Development and Research

R 199 666 000

R 195 644 000

TOTAL

R 1,853 679 000

R 1,840,989,000

b) An amount of R 80.0 million was cut from the budget allocation of the Department at the provincial level during the budget adjustment of the 2021/22 financial year. This amount was cut from the budget allocation for new social infrastructure projects.

Northwest Province

The budget reduction implemented in 2021/22 financial was R 228.4 million and in 2022/23

R 311.5 million and a further transfer of ECD function to the Department of Education amounting to R 192 million.

Budget reduction per program.

Allocation per program for 2022/23

PROGRAM

2022/23

Administration

227 079

Social Welfare Services

587 476

Children and Families

345 313

Restorative Services

303 840

Development and Research

190 684

Total for Programmes

1 654 392

Northern Cape Province

a) & b)

The Department received a budget cut on the EPWP allocation from R 9,3 million to R 5,2 million. The reduction was mostly in Programme 5.

Western Cape

a) The Western Cape DSD has the following budget cuts for the 2022/23 financial year.

Programmes

(R’000)

Administration

1,658

Social Welfare Services

21,213

Children and Families

(351,604)

Restorative Services

4,629

Development and Research

30,884

Total

(293,220)

The department allocation for 2022/23 was reduced by R 391.531 million for the Early Childhood Development (ECD) function shift from Vote 7: Social Development to Vote 5: Education.

The department reprioritised allocations to mitigate budget shortfalls as follows:

Compensation of Employees (CoE)

The department received an additional R 40 million to provide for the 2022/23 Wage agreement. However, the additional funding will not cover the department’s CoE budget requirements and therefore, the department had to reduce its Recruitment Plan (Filling of vacant posts) by R 25 million to cover the shortfall. This compromise will hamper the filling of critical posts and effective service delivery.

Goods and Services

The departments received an additional R 1 million for digitizing the Non-profit organisation management systems (NPOMS) and R 1 million for the development of a Mobile Client Service System to support Social Workers to deliver more efficient services.

Considering baseline budget reductions, the department implemented additional budget cuts.

  • No new staff bursaries can be awarded
  • Training budget was reduced
  • Maintenance of offices and facilities was reduced
  • Austerity measures for Stationery, printing, and office supplies

Transfer Payments and Subsidy Payments

  • Non-Profit Institutions

The departments received an additional,

    • R 4.978 million for the Social Sector EPWP Incentive Grant for Provinces.
    • R 3 million for the conversion of Robbie Nurock community health centre into a homeless shelter.
    • R 21.333 for Social Development - Welfare NGOs

The impact of baseline budget reductions will have the following consequences

    • Reductions to payments for Older Persons will lead to the termination of all transport costs to service centres; 14 non-compliant service centres will not be funded, and termination of awareness programmes in old age homes.
    • The reduction of payments to the disabled will lead to a reduction in disability training and awareness programmes. Funds to Disability Forums will be reduced.
    • Funding will have to be reduced to all 33 shelters. There will be a reduction in funding of 40 Families Social Service Organisations’. This will lead to no parent, teenage, father /boys programme can continue in any of the Safety Hotspot areas and placing Families at higher risk.
    • Fewer practitioners in Substance Abuse NPO's will be trained. Reduction in early intervention services. Reduction of 80 youth beds. The reduction of bed space across the other Substance Abuse Centres. Reduction in aftercare services rendered by the NPO sector and more pressure on DSD to render aftercare services. Impact on operational cost and a decrease in student intake for universities
    • Reduction in EPWP Programme
    • Reduction in project budgets for Youth Cafés. No expansion of Youth Cafes.
  • Households

No new External Bursaries can be awarded

Capital Assets.

The department received an additional R2 million to enable Mobile connectivity. However, the procurement of IT equipment was reduced and thus affecting the departmental Technology Refresh.

Programme 1: Administration

    • The reduction in COE severely impacted service delivery monitoring and performance of administrative duties.
    • IT refresh was scaled down.

Programme 2: Social Welfare Services

    • The reduction in COE resulted in the downscaling of services and outputs within the department.
    • 2021/22 Adjusted Budget for transfer payments was maintained, thus no increases in post-funding, subsidies, and programmes funding. This resulted in downscaling of services within the NGO sector. Certain service offerings were suspended or terminated.

Programme 3: Children and Families

  • Reduction in CoE severely impacts services offered by the department.
  • The allocation for 2022/23 was reduced by

R 391.531 million for the Early Childhood Development (ECD) function shift from Vote 7: Social Development to Vote 5: Education.

Programme 4: Restorative Services

  • The reduction in CoE severely impacted services offered at facilities. Norms and standards ratio for a child vs care worker was not met and increased absenteeism.
  • 2021/22 Adjusted Budget for transfer payments was maintained, thus no increases in post-funding, subsidies, and programmes funding. This resulted in downscaling of services within the NGO sector. Certain service offerings were suspended or terminated.

Programme 5: Restorative Services

  • The reduction in CoE severely impacted services offered by the Department.
  • Ability to respond to disasters and humanitarian relief was severely impacted. There was limited ability to address food insecurity where SASSA didn't have additional funding.

22 July 2022 - NW1555

Profile picture: Arries, Ms LH

Arries, Ms LH to ask the Minister of Social Development

What number of (a) projects, (b) programmes and (c) employment opportunities were implemented by the National Development Agency in the 2021-22 financial year?

Reply:

Background

The NDA provide grant funding and capacity building interventions to CSOs. These interventions are to ensure that CSOs projects have impact to the communities they are serving.

a) In the 2021-2022 financial year, the NDA supported and funded 414 CSOs projects covering all nine provinces.

b) The NDA programmes implemented in the 2021-2022 financial year were in the following programmatic areas:

(i) Grant funding programme which provides grants to CSOs for funding their projects in food security, garment making including school uniforms, animal production including poultry and piggery, bricks making, tea production, bakery, Early childhood development and social services. This programmes links CSOs products to various markets to ensure that they achieve levels of development that can sustain themselves in the medium to long term.

(ii) Capacity Building programme provides skills development through training, mentoring and support to their institutional capacities and technical skills to better manage the CSOs and produce quality products for different markets. of CSOs across all districts and local municipalities in nine provinces.

(iii) DSD/ CARA Victim Empowerment Programme: The programme is funded through the Criminal Asset Recovery Account (CARA). The overall purpose of the programme is to identify; partner and empower, through grant funding, CSOs in the nine (9) Provinces. Over 300 CSOs have been funded to provide the following services to victims of crime and abuse:

  • Family strengthening - to increase family strengths, enhance child development, and reduce the likelihood of child abuse and neglect.
  • Social crime prevention - focusing on the structural drivers of gender based violence.
  • Social behaviour changes programs - focusing on boys and men.
  • Welfare services - focusing on social protection, maximization of human potential and fostering self-reliance and participation in decision-making.

(iv) Venture Creation Programme: This is a skills development and workplace placement intervention funded by the Unemployment Insurance Fund (UIF). The programme recruited 2000 young people to participate in the programme with the aim of training them, place them in work environment and organise them into Co-operatives to use the skills in starting new business ventures for improving their livelihoods and economic participation. They are paid R2 000.00 stipends every month whilst enrolled in the programme for 12 months.

(v) Resource Mobilisation mobilisation programe: this programme seeks to mobilise resources outside the NDA allocation to fund and support CSOs interventions so as to achieve sustainable financial resources. In the 2021/22 financial year, the NDA raised R47 million towards this programme from government and private sectors.

c) The number of employment opportunities created during the financial year through the grant funding programme was 546.

22 July 2022 - NW2202

Profile picture: Maotwe, Ms OMC

Maotwe, Ms OMC to ask the Minister of Public Enterprises

(1) What (a) are the full details of the establishment of the proposed state-owned holding company that will oversee all state-owned companies and will be free from political interference as he announced during the Budget Vote 10 on 20 May 2022, (b) mechanisms will he put in place to ensure that it is insulated from political interference. (2) whether his announcement was a recognition that there has been an undue influence by politicians on the management of state-owned companies; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

1. (a) There have been a number of studies within government over time to determine how SOEs should be governed, and on other matters such as which SOEs are required in current context, and which are not. The President established the Presidential SOE Council (PSEC) to advise him on these and related matters. Based on a review of global experience and work done within the Department, the PSEC recommended the centralised shareholder model, which is reflected in the holding company (Holdco) proposal. A policy paper, draft legislation and other legal documents have been in preparation. Once the governance process has been concluded, other formal processes will be pursued.

(b) It is proposed that the Holdco will be governed by an independent board that will be acting in the fiduciary interests of the company. However, the commercial and development mandates of Holdco will be set by government. Similarly, it is anticipated that Holdco will ensure that the governance of SOEs is carried out in a transparent and accountable manner, with a high degree of professionalism and effectiveness.

2. While evidence of state capture has recently been confirmed concerning the affairs of some but not all SOEs, the development of the shareholder management bill is based on the intent of building a capable state through among others, the adoption of globally recognised practices in managing all SOEs owned by the government of the Republic of South Africa. The work that informs the establishment of the Holding Company predates state capture and is meant to among others, insulate SOEs from undue influence based on insights derived from global best practices.

22 July 2022 - NW2087

Profile picture: Opperman, Ms G

Opperman, Ms G to ask the Minister of Social Development

(1)Whether the 44 bids referred to in the report of the Auditor-General for the 2020-21 financial year that were not awarded indicate slow processing by her department; if not, what is the position in this regard; if so, (2) Whether the bids resulted in irregular expenditure; if not, what is the position in this regard; if so, what (a) are the relevant details and (b) was the monetary value of the specified bids?

Reply:

1. The National Department had only 6 bids not awarded and not 44 as indicated.

The details of the 6 bids are as follows:

Nr

Programme

Description

Amount

 Bid

Date

Reasons

1. 

Integrated Anti-Substance Abuse

Amendment of Act 70 of 2008 Bill

R 1 200 000

Open bids

May-21

The employment contract for the end-user who of this project expired, as such the project was delayed.

2. 

Supply Chain Management

Asset Management Outsourcing

R 5 000 000

Open bids

May-21

Postponed for the next financial year. The project is included in the 2022/23 annual procurement plan.

3.

Office of Director-General

Service provider to audit, review, and develop systems for the entity Government and Oversight

R 10 000 000

Open bids

Apr-21

The project was removed from the procurement plan.

4.

Population and Development

Youth Perception Study on the Socio-Economic, Health, and Gender Impact of COVID-19

R 1 472 000

Open bids

May-21

End-user did not submit to SCM.

5.

Information Technology

Procurement for the installation, configuration, maintenance, and support for an artificial intelligence intrusion detection and prevention solution.

R 1 450 000

Open bids

Apr-21

Cancelled and will not be done in 2021.

6. 

Information Technology

Acquisition of a digital signage system for the HSRC.

R 2 500 000

Open bids

Apr-21

Business case was not supported.

2.

(a) & (b)

The 6 bids indicated above did not result in any irregular expenditure. Bids not awarded in the previous financial year and still required by the Department are carried over to the current financial year.

22 July 2022 - NW2239

Profile picture: van der Merwe, Ms LL

van der Merwe, Ms LL to ask the Minister of Social Development

(1)Whether, in light of the recent media reports of between 16 and 28 October 2021 that nearly R89,5 million was stolen from the SA Social Security Agency (SASSA) accounts from the Postbank by either Postbank employees or contractors, and considering the alarming nature of the breach, (a) the Postbank officials and/or (b) contractors working with SASSA accounts undergo security vetting; if not, why not; if so, to what extent; (2) whether any criminal investigation has been opened against any officials of the Postbank; if not, what is the position in this regard; if so, what is the status of the criminal investigations?

Reply:

​(1)      (a) Postbank Officials

As part of the recruitment and selection process within Postbank, all candidates are vetted before making appointment. This practice is in alignment with Postbank’s HR Recruitment and Selection policy. The vetting of candidates includes:

1) Criminal checks,

2) Credit checks,

3) Qualification verifications,

4) ID checks,

5) SA Citizenship checks

 (b) Contractors

      Postbank has two types of contractors:

  • Fixed-term contractors : These contractors undergo the same Recruitment and Selection process described in (1)(a) above
  • Contractors provided by Service Provider : All Postbank Service Provider contracts includes a standard clause stating that contractors must be security vetted and approved before working on Postbank IT systems.
     

(2)      A formal criminal case was opened soon after discovery of the incident. The case was opened with the Specialised unit of the Organised Crime unit of the SAPS. The case is currently being investigated by the Directorate for Priority Crime Investigation (DPCI/Hawks). Over 600 pages of information gathered by the Postbank internal investigation unit was handed over to the Hawks.

The Hawks criminal investigation is currently ongoing and includes all leads available. Postbank is cooperating fully with the investigators to try and apprehend the suspects. Postbank has a zero tolerance to any fraud or theft and will act against any staff member or any other party found guilty to the full extent of the law.
 

No specific Postbank, SAPO or SASSA staff member is separately investigated. However, all staff that were close to the environment where the incident took place are treated as suspects and are included in the list of staff being investigated by the Hawks. No arrest have been made at this point in time

22 July 2022 - NW2259

Profile picture: Gondwe, Dr M

Gondwe, Dr M to ask the Minister of Social Development

(1)With reference to her reply to question 1608 on 16 May 2022, (a) by what date and (b) how does the SA Social Security Agency intend to recover the specified monies from the implicated 5 812 public servants; (2) (a)(i) in which departments are the implicated public servants currently employed and (ii) at what salary level are they employed and (b) what is the breakdown of this in each (i) national and (ii) provincial department; (3) what (a) total number of persons form part of the multi stakeholder forum and (b) positions do they hold in their respective departments?

Reply:

1. a) It is not possible to provide a date when recovery will be made since the loss recovery process runs parallel with the criminal prosecution processes as per Section 300 of the Criminal Procedure Act, Act 51 of 1977. As and when the National Prosecution Authority starts prosecution on individual cases, the processes of loss recovery will also unfold. b) SASSA is running parallel processes that is criminal and civil action as stated above to ensure that no civil servant escapes repaying SASSA

    1. (a)(i) Employee Distribution by Department

Province

Department

Free State

Health- 34

Education-23

Social Development

28

Cooperative Governance

1

 

 

 

 

 

 

 

KwaZulu-Natal

Agriculture

13

Arts and Culture

5

Cooperative Governance

33

Economic Development

1

Education

38

Health

221

Human Settlement

1

Public Works

2

Social Development

43

Transport

101

 

Mpumalanga

Agriculture

2

Arts and Sports

3

Economic Development

3

Education

60

Health

103

Human Settlement

1

SOCDEV

12

Cooperative Governance

1

 

 

 

Northern Cape

Agriculture

1

Education

119

Health

3

Road and Public Works

1

Social Development 5

 

 

 

 

 

 

Western Cape

Agriculture

1

Education

27

Health

172

Provincial Treasury

1

 

 

 

 

 

 

 

Eastern Cape

Sports

1

Health

986

Education

8

Transport

1

Social Development

21

Cooperative Governance

1

Office of the Premier

4

 

 

 

 

Gauteng

Agriculture 1

Community Safety 1

Education

34

Health

113

Office of the Premier 14

Social Development

14

 

 

 

 

 

Limpopo

Transport and Community Safety 1

Social Development

10

Health

6

Education

113

cooperative Governance 1

 

 

 

 

 

 

Northwest

Agriculture4

Arts and Culture2

Community safety1

Cooperative Governance

5

Economic Development

19

Education

368

Health

129

Office of the Premier

2

Provincial Treasury

2

Public Works

2

Social Development

2

National

Agriculture9

Basic Education3

Correctional Service40

Employment and Labour

10

Higher Education

4

Justice

23

Mineral Resources

1

Police

4

Public Service

1

Public Works

9

Small Business

1

 

Social Development1

Stats SA8

Trade and Industry

18

Water and Sanitation2

 

 

 

 

 

 

 

  1.  2. (a)(ii) Employee Salary level distribution

Province

Department

 

Free State

 

86

Health- 34

SL0 - 8

SL2 – 6

SL3 – 5

SL5 – 7

SL7 – 8

Education-23

SL0 - 1

SL2 – 2

SL3 – 2

SL7 – 17

SL9 – 1

Social Development 28

 

SL0 - 27

SL3 – 1

 

Cooperative Governance

1

 

SL7 - 1

 

 

 

KwaZulu-Natal

 

758

Agriculture

13

 

SL0 - 13

 

Arts and Culture

5

SL0 - 0

 

Cooperative Governance

33

 

SL0 – 33

 

Economic Development

1

SL0 - 1

 

Education

338

 

SL0 - 234

SL4 – 1

SL6 – 16

SL7 -  85

SL8 - 2

 

Health

221

 

SL0 - 21

SL2 – 29

SL3 – 26

SL4 – 5

SL5 – 127

SL6 – 2

SL7 – 10

SL11 – 1

Human Settlement

1

 

SL5 - 1

 

Public Works

2

 

SL11 - 2

 

Social Development

43

 

SL0 - 42

SL8 – 1

 

Transport

101

 

SL0 - 100

SL11 - 1

 

 

Mpumalanga

 

185

Agriculture

2

 

SL0 - 2

 

 

Arts Culture and Sports

3

 

SL0 - 3

 

Economic Development

3

 

SL0 - 3

 

Education

60

 

SL0 - 7

SL2 – 1

SL6 – 1

SL7 – 51

 

Health

103

 

SL0 - 80

SL2 – 8

SL3 – 6

SL4 – 2

SL5 - 1

SL7 – 5

SL11 – 1

Human Settlement

1

 

SL0 - 1

 

Social Development

12

 

SL0 - 11

SL7 – 1

Cooperative Governance

1

 

SL0 - 0

 

 

 

Northern Cape

 

129

Agriculture

1

 

SL0 - 1

 

Education

119

 

SL0 - 110

SL3 – 1

SL6 – 3

SL7 – 5

Health

3

 

SL0 - 1

SL3– 1

SL6 - 1

 

Road and Public Works

1

 

SL3 - 1

Social Development  5

 

SL0 - 2

SL7 – 3

 

 

 

Western Cape

 

201

Agriculture

1

 

SL4 - 1

 

 

 

Education

27

 

SL0 - 5

SL2 – 1

SL3 – 2

SL5 – 1

SL7 – 18

Health

172

 

SL0 - 3

SL2 – 8

SL3 – 20

SL4 – 119

SL5 – 22

Provincial Treasury

1

 

SL0 - 1

 

 

 

Eastern Cape

 

1022

Sports

1

 

SL0 – 1

Health

986

 

SL0 - 908

SL2 – 5

SL3 – 26

SL4 – 1

SL5 – 27

SL6 – 2

SL7 – 16

SL9 – 1

Education

8

 

SL7 – 8

 

Transport

1

 

SL0 – 1

 

Social Development

21

 

SL0 - 17

SL5 – 1

SL7 – 2

SL12 - 1

Cooperative Governance

1

 

SL7 – 1

 

Office of the Premier

4

 

SL0 – 4

 

 

Gauteng

 

177

Agriculture

1

 

SL0 - 1

 

Community Safety

1

 

SL2- 1

Education

34

 

SL0 - 4

SL2 - 7

SL5 – 4

SL7 – 19

Health

113

 

SL0 - 9

SL2 - 35

SL3 – 11

SL4 – 10

SL5 – 31

SL7 – 16

SL11 - 1

Office of the Premier

14

 

SL0 - 14

 

Social Development

14

 

SL0 - 8

SL3 – 4

SL5 – 1

SL11 - 1

 

 

 

Limpopo

 

131

Transport and Community Safety

1

 

SL13 – 1

Social Development

10

 

SL0 - 10

 

Health

6

 

SL0 - 1

SL4 – 1

SL7 – 4

 

Education

113

 

SL0 - 11

SL6 – 2

SL7 – 99

SL9 - 1

Cooperative Governance

1

 

SL0 - 1

 

 

Northwest

 

536

Agriculture

4

 

SL0 - 3

SL2 – 1

Arts and Culture

2

 

SL0 - 2

Community safety

1

 

SL5 - 1

Cooperative Governance

5

 

SL0 - 5

Economic Development

19

 

SL0 - 19

Education

368

 

SL0 -  318

SL2 – 11

SL5 – 10

SL6 – 6

SL7 - 23

Health

129

 

SL0 - 62

SL2 – 6

SL3 – 17

SL4 – 8

SL5 – 15

SL6 – 1

SL7 – 15

SL8 – 2

SL9 – 1

SL10 – 1

SL11 – 1

Office of the Premier

2

 

SL6 - 2

Prov incialTreasury

2

 

SL0 - 1

SL8 – 1

 

Public Worls

2

 

SL0 - 2

Social Development

2

 

SL7 - 2

 

 

National

 

134

Agriculture

9

 

SL0 - 5

SL8 – 2

SL11 - 2

 

 

 

 

Basic Education

3

 

SL0 - 3

Correctional Service

40

 

SL5 - 36

SL7 – 3

SL8 - 1

 

Employment and Labour

10

 

SL0 - 1

SL6 – 1

SL8 – 8

Higher Education

4

 

SL0 - 2

SL2 – 1

SL5 – 1

 

Justice

23

 

SL0 - 1

SL4 – 1

SL5 – 16

SL7 – 3

SL10 – 1

SL11 – 1

Mineral Resources

1

 

SL0 – 1

Police

4

 

SL0 - 2

SL2 – 1

SL6 – 1

 

Public Service

1

 

SL4 - 1

Public Works

9

 

SL3 – 5

SL5 – 1

SL8 – 1

SL11 - 2

Small Business

1

 

SL3 - 1

 

Social Development

1

 

 

SL0 – 1

Stats SA

8

 

SL0 - 8

Trade and Industry

18

 

SL0 - 18

Water and Sanitation

2

 

SL2 – 2

 

 

                               
  1.  2. (b) (i) Breakdown at National level

Province

Department

National

Agric

9

Basic Education

3

Correctional Service

40

Emplyment and Lbour

10

Higher Education

4

Justice

23

Mineral Resources

1

Police

4

Public Service

1

Public Works

9

Small Business

1

 

Soc-Dev

1

Stats SA

8

Trade and Indistry

18

Water and Sanitation

2

 

  1. 2.(b)(ii) Breakdown at Provincial level

Province

Department

Free State

Health- 34

Education-23

Social Development

28

Cooperative Governance

1

 

KwaZulu-Natal

Agriculture

13

Arts and Culture

5

Cooperative Governance

33

Economic Development

1

Education

38

Health

221

Human Settlement

1

Public Works

2

Social Development

43

Transport

101

Mpumalanga

Agriculture

2

Arts and Sports

3

Economic Development

3

Education

60

Health

103

Human Settlement

1

SOCDEV

12

Cooperative Governance

1

 

Northern Cape

Agriculture

1

Education

119

Health

3

Road and Public Works

1

Social Development 5

 

Western Cape

Agriculture

1

Education

27

Health

172

Provincial Treasury

1

 

Eastern Cape

Sports

1

Health

986

Education

8

Transport

1

Social Development

21

Cooperative Governance

1

Office of the Premier

4

 

Gauteng

Agriculture

1

Community Safety

1

Education

34

Health

113

Office of the Premier

14

Social Development

14

 

Limpopo

Transport and Community Safety

1

Social Development

10

Health

6

Education

113

Cooperative Governance

1

 

Northwest

Agriculture

4

Arts and Culture

2

Community safety

1

Cooperative Governance

5

Economic Development

19

Education

368

Health

129

Office of the Premier

2

Provincial Treasury

2

Public Works

2

Social Development

2

  1. (3)  (a) The multi-party forum consists of twenty officials (20) made up of the NPA, FIC, SAPS, DPSA and SASSA collectively.
    1. Each organisation is led by a Senior official at the level of Chief Director/ General Manager and lowest position is that of Manager/ Deputy Director as detailed on the table below

 

No

Name

Organisation

Position

1

Adv P D Makroti

NPA (NPS)

Senior State Advocate

2

Adv S Masilela

NPA

Senior State Prosecutor

3

Adv G Mosetha

NPA

Senior State Prosecutor

4

Mable Mshego

FIC

Project Manager

5

Ahzur Mohamed

FIC

Project Manager

6

Celeste Van der Westhuizen

FIC

Project Coordinator

7

Marguerite Carreira

FIC

Project Manager

8

Michelle Maitland

FIC

Project Manager

9

General L Magson

SAPS

General

10

Brigadier DS Tsupa

SAPS

Brigadier

11

Brigadier NM Zondi

SAPS

Brigadier

12

Colonel M Phukubye

SAPS

Colonel

13

Colonel G Zwane

SAPS

Colonel

14

Dr S Hoogenraad-Vermaak

DPSA

Chief Director

15

Isaac Kabini (IK)

DPSA

Director

16

Ronelle Brandt

DPSA

Director

17

Nkosinathi Dlamini

DPSA

Deputy Director

18

Dr Hlengani Bila

SASSA

General Manager

19

Mr James Sambo

SASSA

Manager

20

Mr Majoro Pakkies

SASSA

Manager

22 July 2022 - NW1371

Profile picture: Marais, Ms P

Marais, Ms P to ask the Minister of Social Development

What total number of (a) persons are employed by her department and (b) the specified persons are (i) permanent employees and (ii) employed on a contract basis?

Reply:

(a) Total number of officials

(b) (i) Permanent officials

(ii)Contract official

733

699

34

22 July 2022 - NW2286

Profile picture: Abrahams, Ms ALA

Abrahams, Ms ALA to ask the Minister of Social Development

Whether, with regard to a recent oversight visit to the SA Social Security Agency (SASSA) local offices in Khayelitsha where it was said that building renovations will commence in July 2022, he has been informed of the renovations that will commence; if not, what is the position in this regard; if so, what (a) plans has SASSA put in place in order to ensure uninterrupted services to SASSA clients in Khayelitsha and (b) are the cost implications attached should the SASSA office have to be temporarily relocated?

Reply:

1. (a) The Department of Public Works and Transport – Western Cape has informed, SASSA Western Cape that they will be undertaking renovation on the state owned building. 

Previously when the first phase of maintenance was implemented, the office was temporarily vacated and relocated to the Women in Action office in Eerste Rivier.

Currently SASSA has signed a lease agreement for a site in Khayelitsha known as Bikitsha. Services will be rendered from this site.

SASSA is further engaging with the City of Cape Town for the rental of the Violence Prevention through Urban Upgrading (VPUU) programme sites that have already been renovated and are fit for occupation in Harare; Khayelitsha Resource Centre, Kuyasa Library and City of Cape Town halls. These sites will enable the services to remain in Khayelithsa.

SASSA has contacted the Sub Council 10 to assist with identifying alternative accommodation, and engagements with VPUU management are being made to with them before end of June 2022.

The Bikitsha site was a planned additional site for services to be delivered in Khayelitsha

SASSA will incur costs for the following:

  1. Cost of Temporary Accommodation
  2. Cost of Transportation of SASSA assets from current office to new site or storage
  3. Cost for labourers
  4. Storage costs
  5.  Cost of lease / rental of furniture and equipment to be used at alternative site.
  6. Additional hire costs for Cleaning and Security

    -The City of Cape Town still needs to advise SASSA on the cost implications of the VPUU site and the other municipal venues

22 July 2022 - NW2041

Profile picture: van der Merwe, Ms LL

van der Merwe, Ms LL to ask the Minister of Social Development

What (a) plans has her department put in place to ensure that subsidies for nongovernmental organisations (NGOs) are increased to keep up with the cost of living in each province and (b) steps has her department taken since 2020 to comply with the National Association of Welfare Organisations and Non-Governmental Organisations judgment, to address the shortfall in funding provided to NGOs who fulfil the constitutional and statutory obligations of her department by providing social care and/or welfare services?

Reply:

REPLY: EASTERN CAPE

a) The Eastern Cape Department of Social Development is currently having a challenge on increasing subsidies due to shrinking fiscus however the Department has started a multi-year funding approach towards NPOs during 2022/2023 Financial Year.

b) The Department has increased subsidies to Child and Youth Care Centres from R2000 to R4000 from 2019/2020 Financial Year from the allocation that was in line with National Department of Social Development directive in order to comply with the National Association of Welfare Organisations and Non-Governmental Organisations judgment.

REPLY: FREE STATE

a) The Free State Department of Social Development relies solely on allocations from Treasury. On specific priority programmes earmarked funds are allocated.

Over the 2022 MTEF period, the Free State Department of Social Development has increased budget allocations towards NPO’s in the different programmes as follows:

Programme

2022/23

2023/24

2024/25

Social Welfare Services

5%

7%

17%

Children and Families ***

-217%

13%

11%

Restorative Services

3%

0%

0%

  • The decrease under Children and Families in 2022/23 is due to the migration of Early Childhood Development to the Department of Basic Education.
  • The focus of the department is on Children, Older Persons and Persons with Disabilities.
  • For most part, in terms of priority areas, increases are above CPI inflation of 4.2 percent (2022/23), 4.3 percent (2023/24) and 4.5 percent (2024/25) respectively.

b) With regards to the steps taken by the Free State Department of Social Development to comply with the National Association of Welfare Organisations and Non-Governmental Organisations judgment, the Department received budget from the Provincial and National Treasury. This allocation was utilised towards increase on Child and Youth Care centres which is a top priority service.

The budget benefited 1 120 children at a R4 000 allocation per child per month. This demonstrates the Departments’ intention for progressive realization of the rights of vulnerable service beneficiaries in line with the court judgement.

Below is the budget allocation towards that purpose:

Source of funding

2020

2021

2022

Provincial Treasury

R10 000 000

R11 000 000

R12 000 000

National Treasury

R12 547 000

R13 237 000

R25 135 000

REPLY: GAUTENG

a) Gauteng DSD has ensured that any NPI budget increment received from Provincial Treasury is allocated to the NPO sector as subsidy increases to keep up with inflation. Therefore, Gauteng DSD has been implementing inflationary increases for the past five years ranging from 3% to 6% on an annual basis.

b) In terms of the steps that the Gauteng DSD has taken since 2020 to comply with the National Association of Welfare Organisations and Non-Governmental Organisations judgment, the Department has substantially increased the subsidy rates of Child and Youth Care Centres (CYCCs) from the 2019/20 financial year with the additional financial resources that were received from the National Treasury.

Thereafter, the Department made annual inflationary increases to the baseline of the 2019/20 financial year to keep up with inflation. In addition, the Department provided each CYCC with additional funding for the appointment of a social worker or auxiliary social worker over and above the capita subsidy rate.

REPLY: KWA-ZULU NATAL

a) The Kwa Zulu-Natal Province received an additional allocation from Treasury during the 2022/23 MTEF which has enabled the Department to give Non-Profit Organisation (NGOs) and increase of 5% to keep up with the cost of living.

b) The KwaZulu-Natal Province has been increased funding of R4000.00 per child per month since 2019/2020 financial year for CYCCs.

REPLY: LIMPOPO

a) Due to budget cut that the department encountered, no increases were effected on subsidies to NPOs, however, as, and when there are savings the department does consider NPOs rendering programmes for increment.

b) With regards to steps taken to comply with the NAWONGO Court judgement, the department has increased the monthly subsidy of CYCC from R2 500 to R4 000 per child per month following the NAWONGO judgement. Within the current financial year (2022-23) the subsidy has increased from R4000 to R4500.

REPLY: MPUMALANGA

a) The Mpumalanga province has submitted a budget request to Provincial Treasury, and an additional R16,6 million was allocated to Transfers during 2022/23.

Noting that the subsidies for social worker posts was last increased during 2013/14, these funds have been earmarked to increase the funding of social work posts.

This has translated into the following increases:

Occupational Category

2021/22

Monthly

subsidy

2022/23

Monthly

subsidy

Social Worker

R9 056

R16 000

Senior Social Worker

R11 247

R19 000

Due to the limited budget allocation, only organisations employing social workers will benefit from this current increase. Increases could also not be provided to other occupational categories, however these will be prioritised in the outer years, should additional allocation be made available by the Provincial Treasury.

b) During 2019/20, the department increased the unit cost per child per month (through a special allocation received from National Treasury) from R2500 to R3900 per child per month.

In 2020/21 the subsidy was further increased from R3900 to R4000 per child per month.

In 2021/22 the subsidy was increased for children with special needs from R4000 to R4500 per child per month.

In 2021/22 the province further provided additional funding to Child and Youth Care Centres to employ Social Workers as a response to the NAWONGO Court Judgement.

REPLY: NORTH WEST

(a)(b)

Response from North West not yet received at time of submission.

 

REPLY: NORTHERN CAPE

(a)(b)

Increases were given for subsidies to all NGO’s within the allocated budget, as indicated below.

In addition to the increases in subsidy of 5%, the increase for running cost was also included.

SUBSIDISED CATEGORY

2020/21

2021/22

2022/23

Social Workers

R13 525.18

R14 201.43

R14 911.50

Social Auxiliary Workers

R6 973.10

R7 321.75

R7 687.83

Community Development Workers

R6 655.97

R6 988.76

R7 338.19

Child and Youth Care Workers

R3 500.00

R4 100.00

R4 305.00

Children in CYCC’s

R4 150.00

R4 375.50

R4 480.00

REPLY: WESTERN CAPE

a) Budget restrictions has limited the initiatives by the Western Cape Department of Social Development to increase funding to NGOs. Budgets have unfortunately been cut across various programmes and funding has been sustained for the Victim Empowerment Programme and NGO CYCCs.

b) With regards to steps taken to comply with the NAWONGO Court judgement, the Western Cape Department of Social Development experienced budget constraints, thus limited effect could be given to the Court judgement. However, with NGO CYCCs an all-inclusive unitary fee was introduced since April 2022. All NGO CYCCs are now funded on the same fee structure.

21 July 2022 - NW2364

Profile picture: Malatsi, Mr MS

Malatsi, Mr MS to ask the Minister of Communications and Digital Technologies

(1)(a) Who was appointed to design and develop the Digitech website that was launched by her department on 17 May 2022 and (b) what amount did the design and development of the website cost; (2) whether her department is satisfied with the (a) functionality and (b) quality of the website; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

I have been advised by the Department as follows:-

(1)(a) The State Information Technology Agency (SITA)

(1)(b) Nil

(2) (a) No

(2) (b) The website is being redesigned.

21 July 2022 - NW2160

Profile picture: Gondwe, Dr M

Gondwe, Dr M to ask the Minister of Public Service and Administration

(1)What (a) informed the policy proposal of increasing the term of office for (i) Heads of Department (HODs) and (ii) Director-Generals (DGs) to 10 years from the existing 5 years, subject to performance and (b) will be the impact of the specified policy proposal on the existing performance management development system of (i) HODs and (ii) DGs; (2) whether his department conducted a study and/or a benchmarking exercise in arriving at the specified policy proposal; if not, why not; if so, what are the relevant details; (3) (a) how will the policy proposal benefit the Public Service and (b) by what date will the policy proposal likely come into effect and/or be implemented; (4) whether the proposed amendment of the Public Service Act, Act 103 of 1994, will provide for the appointment of a Head of Administration in the Office of the President to manage the career incidents of DGs; if not, why not; if so, what are the relevant details?

Reply:

(1) (a) (i) (ii) The National Development Plan (NDP) recognizes the importance of the stability of the administrative leadership as well as a stable political-administrative interface to the performance of State institutions and to effective service delivery. The initial intent of a 5-year contract was to ensure that there is synergy in terms of the MTEF and MTSF to improve planning and executive of budgets and strategy. Experience has shown that this practice is often not aligned, as HoDs exit the system for various reasons and new ones come in more often than not in the middle of these cycles. Whilst there is a need to understand the importance of the political mandate and translation in a specific department, it goes hand in hand with the administrative responsibilities of the Head of Department. The person appointed into a HoD post should exist beyond the tenure of the political head for purposes of business continuity and delivery of the mandate. Building administrative capacity at DG level should never be about a preference or not for a DG but their capability and their performance and capacity to deliver. Hence any consideration for longer term contracts go hand in hand with the original powers to be given to a HoD and the involvement of the Head of Public Service to support the President in the management of career incidents of Heads of Departments and at Provincial level the DG of the Province supporting the relevant Premier. For the Public Service to deliver on its mandate there needs to be clear lines in terms of the functional roles and responsibilities between the Executive and the Administration for purposes of accountability. Research and extensive consultations have given rise to various recommendations regarding the retention of HoDs. A decision has yet to be reached and discussions around whether the tenure remain five years or be increased are still being held.

(b)(i)(ii) Noting that the PMDS policy for HoDs require annual performance contracting and assessment, it is unlikely that changes to the tenure of HoDs will impact policy changes to the PMDS. It should be noted that measures to improve the performance of HODs and the rest of the Public Service are an ongoing process.

2. Yes, research was conducted. This research considered data of DGs and HoDs from 1994 in terms of the measures that contributed to long lasting contracts, institutional performance and stability. The research conducted presented the option to keep the five (5) year contracts or increase them. Further consultations held on the outcome of the research, encouraged different schools of thought in the context of the research. This gave rise to considering the tenure with the options to retain the 5-year contracts or consider longer contracts with stricter performance reviews. Benchmarking was also conducted on the tenure of HoDs around the world and the impact on service delivery and performance of both the institution and the HODs.

3. (a) The intended impact will potentially improve the stability at the leadership level which will in turn improve the operational and service delivery output of a department.

(b) This is a policy position which is being considered as part of the professionalization of the Public Service, there is no date, at this stage for implementation and a decision regarding the tenure of HoDs needs to still be formalised. The work related to this is in progress and still being consulted.

4. The amendments to the Public Service Act, 1994 consider the proposals made pertaining to same and an Amendment Bill is being proposed with due regard to the functions expected from the Head of Public Service.

End

21 July 2022 - NW2409

Profile picture: Mulder, Dr CP

Mulder, Dr CP to ask the Minister of International Relations and Cooperation

To what extent has her department been engaged in subsidising foreign countries since 1 January 2018 up to the latest specified date for which information is available; (2) (a) which foreign countries have received financial aid during the specified years to operate in the Republic and (b) what are the details of the expenses covered by the aid; (3) What (a) training payments were issued during the above years for foreign delegations coming to the Republic and (b) are the expenses covered by such aid; (4) Whether she will make a statement on the matter?

Reply:

1. The Department of International Relations and Cooperation (DIRCO) has made an annual contribution to the running costs of the Embassy of the State of Palestine in Pretoria since 1995. The Department has also since 2018 provided financial assistance for the operational needs of the Embassy of the Saharawi Arab Democratic Republic (SADR) in Pretoria.

2. (a) As stated above, foreign countries which have received financial aid during the specified years to operate in the Republic are the State of Palestine and SADR.

(b) The details of the expenses covered by the financial aid include maintenance of the Palestinian and SADR Embassies in Pretoria. From the 2018/2019 to the 2022/2023 financial year, the Department paid a total of R8 999 932 to the Palestinian Embassy, which is approximately R1,3 million a year. With regard to the SADR Embassy in Pretoria, the Department contributes R1 948 100 annually with a 10% adjustment after every two years.

3. (a) Training payments issued during the above years for foreign delegations coming to the Republic were for DIRCO’s annual International Women’s Programme for Mediation, Negotiation, and Conflict Resolution; and for the Gertrude Shope Annual Dialogue Forum and Capacity-Building Programme for Women Mediators and Peacebuilders.

(b) The expenses for the aforementioned training programmes for foreign delegations have been paid from DIRCO’s budget for training and skills development. These training payments are not regarded as foreign aid. DIRCO procures a service provider to present these training programmes and pays the training fees directly to the service provider. Fees paid to South African training presenters are based on the Department of Public Service and Administration’s (DPSA) guidelines. In addition to the presenter’s fees, the training expenditure also cover subsistence and travel, as well as international air travel for participants. Due to COVID-19, DIRCO’s training programme was held virtually in 2021. Therefore, DIRCO did not incur costs during that year.

4. The Minister will not make a statement on the matter.

21 July 2022 - NW1324

Profile picture: Hicklin, Ms MB

Hicklin, Ms MB to ask the Minister of Communications and Digital Technologies

Whether she has found that the closure of the large number of post offices in the Republic in the past three years is mainly due to the desire to reduce the footprint of the SA Post Office and the failure to pay the rental amounts; if not, what are the reasons for the closure of post offices; if so, what are the further relevant details in this regard?

Reply:

I have been advised SAPO as follows:

Most post offices in urban areas were closed due to unprofitability, as well as congestion of branches. The few branches closed in rural areas were due to incidents of crime. As a result, a total of 144 branches were closed. Out of the 144 closed branches, 26 were due to non-payment of rentals.

Authorised for submission by

 

MS. NONKQUBELA JORDAN-DYANI

DIRECTOR-GENERAL (ACTING)

DATE:

Recommended/not recommended

__________________________

HON. PHILLY MAPULANE, MP

DEPUTY MINISTER OF COMMUNICATIONS AND DIGITAL TECHNOLOGIES

DATE:

Approved/ not approved

________________________________

HON. KHUMBUDZO NTSHAVHENI, MP

MINISTER OF COMMUNICATIONS AND DIGITAL TECHNOLOGIES

DATE:

21 July 2022 - NW909

Profile picture: Majozi, Ms Z

Majozi, Ms Z to ask the Minister of Communications and Digital Technologies

Whether, in light of the assertion by the Executive Director of the African Union Mechanism for Police Cooperation, Mr Tarek Sharif, that cybercrime is one of the most rapidly developing offences among the fastest growing forms of transnational crime facing member states of the African Union, and in view of the Cybersecurity Workforce Study which found that women only make up 25% of the global cybersecurity workforce, her department has programmes in place to promote the training and recruitment of women in the cybersecurity sector; if not, why not; if so, what are the relevant, full details?

Reply:

I have been advised as follows:-

No, the Department does not have programmes in place to promote cybersecurity training as the Department does not gave a training mandate.

However, the Department identified a gap in cybersecurity skills in the country and at present, partnered with the Bank SETA and the South African Banking Risk Information Centre (SABRIC) to develop a National Cybersecurity Skills Framework to guide the training of cybersecurity professionals by the relevant institutions.

21 July 2022 - NW1573

Profile picture: Mbabama, Ms TM

Mbabama, Ms TM to ask the Minister of Communications and Digital Technologies

Whether (a) her department and/or (b) entities reporting to her concluded any commercial contracts with (i) the governmemt of the Russian Federation and/or (ii) any other entity based in the Russian Federation since 1 April 2017; if not, what is the position in this regard; if so, for each commercial contract, what are the (aa) relevant details, (bb) values, (cc) time frames, (dd) goods contracted and (ee) reasons that the goods could not be contracted in the Republic?

Reply:

I was advised by the Department and Entities as follows:

(a)(i) No

(b)(ii) No

(aa-ee) Not applicable

 

21 July 2022 - NW2385

Profile picture: Bodlani, Ms T

Bodlani, Ms T to ask the Minister of Communications and Digital Technologies:

Who are the directors of a certain company (Leratadima Marketing Solution) which is currently involved in litigation on various cases worth Millions Rands with the Universal Services and Access Agency of South Africa (USAASA)?

Reply:

I have been advised by the USAASA as follows:

The company in question was liquidated in December 2018 and the appointed liquidators are Mr. R. K. Pollock N.O, Mr. R. F. Lutchman N.O. and Ms R Pieters N.O. The directors before liquidation were Mr. Itumeleng Mafoko and Ms. Mabuyi Memela.

21 July 2022 - NW1897

Profile picture: Bodlani, Ms T

Bodlani, Ms T to ask the Minister of Communications and Digital Technologies

What (a) are the reasons for the lack of mail delivery for the residents of the Verwoerd Park suburb of Alberton in the City of Ekurhuleni for over a month and (b) plans does her department have in place in order to (i) refurbish the dilapidated area where the mailboxes are located and (ii) secure the infrastructure as the residents report that vagrants have taken occupation around the mailboxes?

Reply:

I have been advised by SAPO as follows:

a) The Verwoerd Park mail is now being redirected to the Alberton Post Office due to numerous complaints regarding the safety of clients while accessing their mail. The lobby box has a severe vagrant problem. This is despite a fence being erected and several interventions by the South African Police Service – both of which have not deterred the vagrants from returning and utilising the facility.

b) (i) No plans are in place due to lack of funds. The boxes are being relocated to Alberton Post Office lobby that have vacant boxes.

(ii) Same as above.

21 July 2022 - NW1255

Profile picture: Majozi, Ms Z

Majozi, Ms Z to ask the Minister of Communications and Digital Technologies

In light of the fanfare that has been made by her department about the long-awaited and delayed migration from analogue to digital and the concerning flurry of media reports over the past week in the run-up to the 31 March 2022 cut-off date, with broadcasters claiming that they are not ready and are asking for an extension (details furnished), (a) what number of (i) set-top boxes still need to be installed and (ii) South Africans will be left without television come 31 March 2022 and (b) will she furnish Ms Z Majozi with the complete figures?

Reply:

I have been advised by the Department as follows:

That the digital migration process commenced in South Africa around 2008 where the necessary Broadcast digital migration (BDM) Policies and Regulations guiding the broadcasters about the process was established. It is quite concerning and appalling that some broadcaster can claim that they are not ready after these many years.

(a) (i) At the time of publication of the question, the Gauteng High Court had extended the date for analogue switch off to 30 June 2022. As of 25 April 2022, 398 251 households were awaiting installations which must be completed by 30 June 2022.

(ii) Majority of South African television households are already receiving television services through satellite platforms. In addition, Digital television is also received through digital television sets which aresold in South Africa since 2012. Between 2016 to date, more than 2.6 million Digital TV sets have been sold.. Furthermore, government has taken measures to ensure South Africans do not unknowingly buy Analogue TV sets.

(b)       Refer to (a) above

21 July 2022 - NW1092

Profile picture: Majozi, Ms Z

Majozi, Ms Z to ask the Minister of Communications and Digital Technologies

Noting her media statement on 18 March 2022 relating to the auction of the highdemand frequency communication spectrum, wherein it was mentioned that the auction raised R6 billion above the initially anticipated amount, (a) what total amount was raised by the auction, (b) how will the specified amount be utilised, particularly in light of the R6 billion that was not anticipated and probably not budgeted for and (c) what is the detailed breakdown of how the funds will be used?

Reply:

I have been advised by the Department as follows:

a) The total raised by the high-demand radio frequency spectrum auction is R14 477 889 512.60.

b) The revenue collected from the auction will go to the national fiscus.

c) Any details on the spending of the amount can be directed to the Minister of Finance.

21 July 2022 - NW1417

Profile picture: Majozi, Ms Z

Majozi, Ms Z to ask the Minister of Communications and Digital Technologies

With reference to the final switch-off date for analogue that was extended to 30 June 2022, what is the detailed status update on the (a) current progress in this regard and (b) progress of (i) applications and (ii) registrations for the government-subsidised set-top boxes?

Reply:

I have been advised by the Department as follows:

a) As per the court judgement, the department needs to conclude 100% installations by 30 June 2022, for those who have registered before 31 October 2021. The numbers that were due for installations by 30 June 2022 as per Gauteng High Court judgement were completed by the set date except for 106, 571 in KZN and Eastern Cape due to the impact of the floods.

b) Applications and approved registrations from 1 November 2021 to 31 March 2022 were 260, 868. Applications received between 1 April 2022 and 30 June 2022 were only 49, 385

(i) At the time of publication of the question, the Gauteng High Court had extended the date for analogue switch off to 30 June 2022.

(ii) There is no way of knowing the number of households watching TV through analogue TV sets and it is for that reason that government called for those watching TV through analogue and qualifying for government assistance to apply for assistance. In addition, Digital television cannot only be watched through STBs but digital television sets which were already sold in South Africa since 2012. Between 2016 to date, more than 2.6 million Digital TV sets have been sold in South Africa and can be deemed majority TV sets in households. Furthermore, government has taken measures to ensure South Africans do not unknowingly buy Analogue TV sets in the market.

20 July 2022 - NW2348

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Sport, Arts and Culture

Whether, with reference to the Performing Arts Centre of the Free State, his department spent any money on artists during the COVID-19 period; if not, what was the budget then used for; if so, what (a) the total amount of the budget was spent in support of artists during the specified period and (b) is the breakdown of the (i) relevant information and (ii) circumstances around the specified budget expenditure?

Reply:

There were no funds directly spent on PACOFS during the COVID-19 period by the Department.

Budget allocated for COVID relief by the Department since 2020 to date is R808 Million that has so far benefitted 59 224 creatives and athletes.

Out of these initiatives 8355 jobs were retained and 29 211 new jobs created in the sector.

20 July 2022 - NW2370

Profile picture: Van Minnen, Ms BM

Van Minnen, Ms BM to ask the Minister of Public Enterprises

On a recent oversight visit by the Standing Committee on Public Accounts (Scopa) to the Megawatt Park Power Station, the board of Eskom indicated that (a) it is required by his department to put together a corporate plan articulating key performance indicators (KPIs), which would culminate into performance agreements and (b) a plan is in place, but it has to get the consent from his department before it will be shared with Scopa, (i) what are the details of the progress on getting consent from his department and (ii) by what date will the plan be signed off?

Reply:

 (a)

The Minister gives strategic direction to the entity through the Strategic Intent Statement (SIS).  Regulation29.1 of Treasury Regulations, read with section 52 of the Public Finance Management Act (PFMA) requires the entity to develop a Corporate Plan that covers three years and must include, inter alia, strategic objectives and outcomes identified and agreed on by the executive authority (the Minister of Public Enterprises) in the shareholder’s compact. The Shareholder’s Compact (SHC) is a negotiated performance agreement between the Shareholder and the Board.

​The Corporate Plan (which provides a perspective on Eskom’s strategy execution trajectory), drives the delivery of the approved SHC, directing the relevant business areas to deliver the KPI targets that have been compacted on. 

The Corporate Plan is reviewed annually to factor in the SHC decreed KPI targets and to ensure that Eskom’s strategy execution is realigned to the prevailing operating realities. The Corporate Plan was taken through the appropriate Eskom governance process (Exco/Board) for approval and was submitted to the Ministers of Public Enterprises and Finance on 31 March 2022, in accordance with Treasury Regulations 29.1.3.

(b)(i) (ii) 

Some of the information is deemed commercially sensitive, including industry analysis (including suppliers and customers bargaining power over the company and comparisons, benchmarking, competitive advantages, and corporate calendars). The SHC and the Corporate Plan are therefore largely company confidential internal documents. The Corporate Plan, in presentation format, can be shared with external parties, including Parliament, funders, rating agencies and other Government Departments. Given the disclosure of sensitive information that could have a negative impact on the entity, and undertaking to share information with Parliament, I will direct Eskom to share a redacted copy of the Shareholder Compact within the next month. 

20 July 2022 - NW2414

Profile picture: Maotwe, Ms OMC

Maotwe, Ms OMC to ask the Minister of Public Enterprises

What are the details of the intervention that he has made in respect of the wage talks between Eskom and the employees as they now prepare for the fourth round of negotiations?

Reply:

The Ministry does not get involved in labour relations matters at the company level. The company has a Board and an Executive Team that is fully mandated to attend to such matters. The operational matters fall within the ambit of the Executive Team.

20 July 2022 - NW2371

Profile picture: Van Minnen, Ms BM

Van Minnen, Ms BM to ask the Minister of Public Enterprises

On a recent oversight visit by the Standing Committee on Public Accounts to follow up on issues at Medupi and Kusile it was clear that the Flue Gas Desulphurisation (FGD) process was not running as smoothly as it should, resulting in an often loss of generation capacity with no adequate expertise or skills to maintain the FGD systems, despite the plan to have the technical know-how to maintain environmental emissions at Medupi and Kusile at a permissible legal level, what progress is being made in this regard?

Reply:

According to the information received from ESKOM

During the recent oversight visit by the Standing Committee on Public Accounts to Kusile Power Station, Unit 1 was on forced outage. The unit has since been repaired and it is back on load. The commercial process to establish the Operating and Maintenance Contract with Technical Support that will assist in restoring the reliability of the plant, as well as providing Kusile with skills development, is underway.

Flue Gas Desulphurisation has not yet been installed at Medupi Power Station, and when it is, the learnings from Kusile will be incorporated into the Operating and Maintenance processes.

20 July 2022 - NW2365

Profile picture: Joseph, Mr D

Joseph, Mr D to ask the Minister of Sport, Arts and Culture

(1) Whether the Cabinet decision to erect a monumental flag and the review of the project as he proposed will be referred back to Cabinet for discussion and final decision; if not, what is the process of the review; if so, what are the relevant details; (2) whether his department will initiate a public participation process, and/or alternatively provide suggestions on how the R22 million allocated for the monumental flag project will be spent as per the approved annual performance plan; if not, why not; if so, what are the relevant details? NW2787E

Reply:

  1. Cabinet’s decision to erect a monumental flag and the review of the project as proposed will be referred to Cabinet for further discussion and final decision; this is in the light of the fact that one of the key mandates of the department is to promote nation-building and social cohesion. National symbols, especially the national flag, expresses the country’s common identity, which is pivotal to building a common national identity and advancing unity.
  2. The budget of R22 million that was allocated for the monumental flag project over two financial years is within the infrastructure unit of the Department. The Infrastructure Unit is responsible for implementing various infrastructure projects. There is therefore no need for a public participation process to guide the Infrastructure Unit of the Department on the re-allocation of funds to various projects.

20 July 2022 - NW2413

Profile picture: Maotwe, Ms OMC

Maotwe, Ms OMC to ask the Minister of Public Enterprises

Whether the 42 employees who won the case in May 2022 against Denel have been paid their outstanding salaries amounting to R13,2 million dating back to 2020; if not, what is the position in this regard; if so, on what date was payment done?

Reply:

According to the information received from Denel

  1. Out of the 42 current and former employees who won the case in May 2022, three (3) of them had already been paid by the time the Court Order was issued and they failed to inform their attorneys.
  2. The amount owed to the remaining 39 claimants differ from person to person (due to some having received part-payment from the date of the Court Order to date), and to that end, Denel has been in discussions with the attorneys representing the claimants with a view to reconcile the records and agree on the legitimate amounts owed to each individual.
  3. Part of our discussions with the attorneys includes agreeing on a date by which the amounts can be paid, in view of Denel’s ongoing liquidity challenges.

19 July 2022 - NW2171

Profile picture: Myburgh, Mr NG

Myburgh, Mr NG to ask the Minister of Water and Sanitation

(1)Whether he has been informed that raw sewerage is still flowing into the Vanderkloof Dam on a daily basis as a result of the failure of the Renosterberg Local Municipality to render basic services, including a functioning wastewater treatment facility; if not, why not; if so, what are the reasons that he has not taken any steps to address the situation. (2) whether (a) the specified local municipality, (b) the Northern Cape Provincial Government and/or (c) any other person and/or entity has approached him and/or his department to intervene; if not, what is the position in each case; if so, what are the relevant details in each case. (3) whether his department will intervene to avert the looming human disaster of untreated sewerage flowing into the second largest dam in the Republic; if not, what is the position in this regard; if so, what are the relevant details of the (a) steps his department will take and (b) timelines in this regard?

Reply:

1. The Department of Water and Sanitation (DWS) is aware that there is still sewage flowing into the Vanderkloof Dam.

An initial investigation conducted by DWS into the Vanderkloof Wastewater Treatment Plant on 20 June 2018 and 13 September 2018 indicated the following:

  • There was no operations and maintenance plan for the works.
  • There was no security personnel and no protective personal equipment and working tools for the employees on site.
  • The maturation ponds were not lined, posing significant threat of pollution to groundwater resources.
  • There was no disinfecting of the final effluent before irrigating with onto open land next to the plant.
  • The quality of the final effluent discharged into the environment was not being monitored by Renosterberg Local Municipality to comply with the applicable wastewater discharge standards.
  • The untreated wastewater was flowing into the Vanderkloof Dam.
  • Two (2) pump stations were non-functional and overflowing with raw wastewater into the Vanderkloof Dam; and
  • There was no Water Use Authorisation in terms of Section 40 of the National Water Act, for all water use activities that were taking place, namely section 21(e), (f) and (g).

Following the initial investigation, the then Acting Municipal Manager was engaged by the DWS to address the non-compliances on site. When the municipality did not cooperate, a Directive was issued by the DWS to Renosterberg Local Municipality on 05 February 2019. in terms of Sections 19(3) and 53(1).

A follow up inspection was conducted by DWS at the Vanderkloof Wastewater Treatment Plant on 21 May 2019, and no improvements were found. The DWS team found that untreated wastewater was flowing into the nearest stream that flows into Vanderkloof Dam and Orange River. None of the temporary remedial solutions agreed upon were implemented by the municipality to curb pollution of the Vanderkloof dam.

2. The DWS has issued numerous administrative notices in terms of sections 19(3) and 53(1) of the National Water Act to the municipality. This administrative process has been unfolding since 2018 and includes investigations and follow up inspections as well as following up on plans and representations submitted by the Municipality to the department. The administrative action to date includes two (2) written directives and verbal directives issued to the Municipality directing it to stop pollution from its sewer reticulation networks into Vanderkloof dam, and to rectify sewer conveyance and ensure the full treatment of sewer in accordance with norms and standards.

The DWS has approached Renosterberg Local Municipality timeously about the pollution from its Vanderkloof Wastewater Treatment Works, with the latest administrative actions taken against the municipality by the issuance of a second Directive dated 24 March 2022 following recent public complaints and investigations conducted on 23 December 2021 and 18-22 March 2022 of the Vanderkloof Pump stations and Wastewater Treatment Works. From the three recent investigations as stipulated above, the following non-compliance were still observed with no remedial actions taken by the municipality:

  • Wastewater discharges from the two (2) pump stations that were overflowing and discharging inside the dam, as a result, promoting the growth of algae blooms and hyacinth (limiting oxygen levels for the flora and fauna aquatic species living inside the dam); and
  • Seepage of wastewater from the maturation ponds and the lack of chlorination of final effluent.

Furthermore, a recent site inspection conducted by the Department of Cooperative Governance, Human Settlements and Traditional Affairs on 18 May 2022 also concurred with DWS investigations and inspections that the Vanderkloof Wastewater Treatment Works and associated pump stations are causing pollution to groundwater resources and the Vanderkloof Dam.

3. The DWS has intervened by providing funding relief through WSIG (Water Sector Infrastructure Grant) to the Renosterberg LM for the lining of the maturation pond to prevent seepage of wastewater into the Vanderkloof Dam; and a further R4.5 million for the municipality to repair the two (2) non-functional and overflowing pump stations. However, due to the debt that Municipality had with ESKOM, their bank account was frozen as per court interdict in favour of ESKOM recovering outstanding monies owed to it by Renosterberg LM. As a result, no improvements were made to curb the pollution of Vanderkloof Dam and the Orange River.

It should be noted that the municipality has confirmed that the challenges with Eskom have been resolved and that the necessary repairs and maintenance to the sewer reticulation system will commence with the relief funding granted by DWS. The department will closely monitor the implementation of remedial measures and ensure that the requirements of the issued Directives are fully complied with.

---00O00---

18 July 2022 - NW1780

Profile picture: Horn, Mr W

Horn, Mr W to ask the Minister of Justice and Correctional Services

What total number of persons (a) were charged with offences in terms of the State of Disaster Regulations, as amended from time to time, declared and maintained by the Government from 15 March 2020 until 4 April 2022 in order to manage the COVID-19 pandemic and (b) formally appeared in court on a charge of contravening the said regulations?

Reply:

a) The National Prosecuting Authority (NPA) does not arrest or charge accused but is involved in the prosecution of accused persons. The South African Police Service will be in a better position to respond to the above question, especially due to admission of guilt options having been determined by the Judiciary on various of these contraventions. Persons charged with offences related to contraventions in terms of the State of Disaster Regulations, may have paid admission of guilt and those dockets would not be sent to NPA – except if the admission of guilt fine may have been set aside in terms of Section 57(7) of the Criminal Procedure Act, Act 51 of 1977.

b) Information extracted from the Electronic Case Management System consists of 265 accused still in court with cases involving 9 489 accused disposed of in court. The total accused that appeared on charges relating to the State of Disaster Regulations amounts to 9 754 accused.

18 July 2022 - NW2225

Profile picture: Shembeni, Mr HA

Shembeni, Mr HA to ask the Minister of Police

What are the details of the (a) measures and (b) legal recourse that the SA Police Service have in place to prevent the media from publishing important and confidential information of case before suspects are taken for identification parade, charged and taken to court, as the practice jeopardizes the investigation?

Reply:

Attached find here: Reply

15 July 2022 - NW2232

Profile picture: Mathulelwa, Ms B

Mathulelwa, Ms B to ask the Minister of Water and Sanitation

On what date is it envisaged that the residents of Umvoti Ward 13, who are drinking water with cattle from the river and relying on rain water, with no proper sanitation structures in place since 1994, will be provided with clean water services?

Reply:

The Department of Water and Sanitation engaged the Mvoti Local Municipality regarding the provision of water and sanitation services to the residents of Umvoti in Ward 13. The municipality reported the following:

  • A total of 1 603 households, 44% of them are served with water from the Mbuba stand-alone water scheme.
  • Water is pumped from the production borehole to supply the 700 households.
  • The water service backlog within Ward 13 stands at 56% (903 households) which are currently serviced with water tankers.
  • The Mbuba water supply scheme currently runs on a diesel generator, and the municipality has plans to connect the plant to an ESKOM power connection due to huge operational costs.
  • Regarding the sanitation services about 96% (1 543 households) are served with VIP sanitation system and there is a backlog of 60 households.

The municipality also indicated that it is currently not able to implement any new projects for water and sanitation services due to funding constraints and over commitment of grant funding for the MTEF period.

---00O00---

15 July 2022 - NW2335

Profile picture: Groenewald, Mr IM

Groenewald, Mr IM to ask the Minister of Water and Sanitation

(1)Whether, with reference to his department’s statement in its report to the Portfolio Committee on Water and Sanitation on 6 June 2022, that all municipalities whose waste water plants are in a critical condition of dysfunction were instructed to submit turnaround plans within 60 days after the publication of the Green Drop Report, he will indicate the total number of municipalities that were instructed to submit turnaround plans; if not, why not; if so, what total number of municipalities (a) did comply and/or (b) did not comply with the specified instruction; (2) whether he will make a statement on the matter?

Reply:

1.  A total of 90 Water Service Authorities responsible for 334 wastewater collection and treatment systems that achieved less than 30% during the Department’s Green Drop Assessment were issued with non-compliance letters and instructed to prepare and submit corrective action plans as highlighted in the Green Drop 2022 Report.

a) Six (6) of the Water Services Authorities have complied and submitted action plans which are currently being considered by the Department as follows:

  • Joe Morolong LM
  • Ndlambe LM
  • Koukamma LM
  • Hessequa LM
  • Alfren Nzo DM
  • Langeberg LM

Two (2) Water Service Authorities indicated below have requested and granted additional time to develop action plans:

    • Emthanjeni LM
    • Dipaleseng LM

A further five (5) Water Services Authorities did not provide action plans but requested support from DWS as follows:

    • Dr Beyers Naude LM
    • Siyancuma LM
    • Zululand DM
    • Khai Ma LM
    • Blue Crane LM

b) Seventy-seven (77) Water Services Authorities did not adhere to their non-compliance letter issued.

---00O00---

15 July 2022 - NW2321

Profile picture: Mokgotho, Ms SM

Mokgotho, Ms SM to ask the Minister of Water and Sanitation

On what date is it envisaged that sufficient bulk water and sanitation will be provided to residents of Matlapeng in the Kagisano-Molopo Local Municipality, who currently receive their water from trucks which deliver water once every three weeks?

Reply:

The Tlapeng village is currently receiving water supply through tankering and three (3) existing boreholes. The existing boreholes are unable to cater for the demand in the village. The boreholes discharge an average of 2l/s instead 3.5 l/s which is needed to meet the current demand of approximately 2900 people being serviced at RDP standards.

To address the challenge of water provision and meet the demand for water supply the following plans are to be implemented:

  • A professional service provider has been appointed to do the investigation and designs for construction project of a bulk water scheme.
  • The preliminary design report will be presented to the Department in August 2022 and the final detailed design report will be tabled in September 2022
  • Tender documents will be prepared by November 2022
  • The plan is to commence with construction in January 2023 for a period of 18 months

Should the study meet all the requirements, the Department of Water and Sanitation will avail funding under the Regional Bulk Infrastructure Grant for the implementation of Tlapeng Cluster Water Supply System.

---00O00---

14 July 2022 - NW2381

Profile picture: Van Der Walt, Ms D

Van Der Walt, Ms D to ask the Minister of Basic Education to ask the Minister of Basic Education

(1)       What total number of (a) public schools specifically cater for learners who are blind and/or visually impaired in each province and (b) learners in each (i) grade and (ii) province are registered in such schools; (2) what (a) number of these schools have the adequate learning materials which have been adapted to suit the needs of the blind and/or visually impaired learners in each province and (b) steps are taken by her department in order to ensure that the specified schools get access to such materials?

Reply:

Attached please find the response.