Questions and Replies
18 April 2017 - NW927
Mackay, Mr G to ask the Minister of Labour
(1) Whether there is any position of (a) chief executive officer, (b) chief financial officer and/or (c) chief operating officer that is currently vacant in each entity reporting to her; if so, (i) how long has each specified position been vacant and (ii) what is the reason for each vacancy; (2) have the vacancies been advertised; if so, (a) were interviews done and (b) on what date will the vacancies be filled; (3) (a) what is the total number of persons who are currently employed in the specified positions in an acting capacity, (b) for what period has each person been acting in each position and (c) has any of the specified persons applied for the positions?
Reply:
Minister’s Responses in Matrix;
1) Whether there is any position of (a) chief executive officer, (b) chief financial officer and/or (c) chief operating officer that is currently vacant in each entity. |
|||
ENTITIES REPORTING TO THE MINISTER |
|
(1)(b) – CFO. |
(1)(c) – COO. |
NEDLAC. |
No current vacancy. |
No current vacancy |
No current vacancy |
(1)(i). |
N/a. |
N/a. |
N/a. |
(1)(ii). |
N/a. |
N/a. |
N/a. |
(2)(a) & (b). |
N/a. |
N/a. |
N/a. |
(3) (a), (b) & (c). |
N/a. |
N/a. |
N/a. |
CCMA. |
No current vacancy. |
No current vacancy |
No current vacancy |
(1)(i). |
N/a. |
N/a. |
N/a. |
(1)(ii). |
N/a. |
N/a. |
N/a. |
(2)(a) & (b). |
N/a. |
N/a. |
N/a. |
(3) (a), (b) & (c). |
N/a. |
N/a. |
N/a. |
PRODUCTIVITY SA. |
No current vacancy. |
No current vacancy. |
No current vacancy. |
(1)(i). |
N/a. |
N/a. |
N/a. |
(1)(ii). |
N/a. |
N/a. |
N/a. |
(2)(a). |
N/a. |
N/a. |
N/a. |
(2)(b). |
N/a. |
N/a. |
N/a. |
(3)(a), (b) & (c). |
N/a. |
N/a. |
N/a. |
COMPENSATION FUND. |
No current vacancy. |
No current vacancy. |
Currently vacant. |
(1)(i). |
N/a. |
N/a. |
6 months. |
(1)(ii). |
N/a. |
N/a. |
Resignation. |
(2)(a). |
N/a. |
N/a. |
Advertised & interviews done. |
(2)(b). |
N/a. |
N/a. |
01 June 2017. |
(3) (a), (b) & (c). |
N/a. |
N/a. |
No acting appointment. |
UNEMPLOYMENT INSURANCE FUND. |
No current vacancy. |
No current vacancy. |
Currently vacant. |
(1)(i). |
N/a. |
N/a. |
4 months. |
(1)(ii). |
N/a. |
N/a. |
Promotion. |
(2)(a). |
N/a. |
N/a. |
Advertised & Interviews – 04 May 2017. |
(2)(b). |
N/a. |
N/a. |
01 July 2017 – anticipated. |
(3)(a). |
N/a. |
N/a. |
01 person acting. |
(3)(b). |
N/a. |
N/a. |
04 months. |
(3)(c). |
N/a. |
N/a. |
Yes – person acting has applied for this post. |
18 April 2017 - NW845
Steenkamp, Ms J to ask the Minister of Environmental Affairs
With reference to the Minister of Arts and Culture’s reply to Question 528 on 27 March 2017, (a) by what date will the Government proclaim the Vredefort Dome as a heritage site in accordance with the proclamation of the United Nations Educational, Scientific and Cultural Organisation on 14 July 2005 that the specified site is the country’s seventh world heritage site; and (b) what are the reasons for the Government’s delay in proclaiming the site a heritage site?
Reply:
a) Vredefort Dome will be proclaimed as soon as consensus is reached with the landowners on critical issues around governance and management models, and in particular the establishment of the Management Authority. Landowners have demanded that proclamation and governance issues be addressed simultaneously. This is despite a previous arrangement that the proclamation of the Site be processed while the resolution of the governance issues is underway; and
b) Government is not delaying the proclamation of the site as a heritage site. As indicated above, the differences in governance modalities need to be resolved with the landowners associations prior to the proclamation being effected. The Department of Environmental Affairs (DEA) has made efforts to create the space for these to be addressed. However, the declarations of dispute by the landowners contribute to the slow pace in finalising the proclamation process. Failure to address these issues may lead to the undesirable withdrawal of the site from the UNESCO.
---ooOoo---
18 April 2017 - NW842
Ollis, Mr IM to ask the Minister of Labour
(1) Whether she and/or her department is aware of the formation and operation of the Workers Association Union; if so, (a) who formed the specified trade union and (b) on what date was the specified trade union formed; (2) whether she requested an inquiry into the formation and operation of the specified trade union; if not, why not in each case; if so, (a) did she use State funding to conduct the investigation and (b) will she make the results of the inquiry available to Mr IM Ollis; (3) whether she has found that members of the Executive were involved in the formation and/or operation of the trade union; if so, (a) which members of the Executive are involved and (b) in what capacity in each case; (4) whether her department has requested to view the financial statements of the trade union; if not, why not; if so, what are the sources of funding of the trade union?
Reply:
1. I am advised that the Workers Association Union (WAU) has since been deregistered
2. Not that I am aware of;
3. Not that I am aware of;
4. Not that I am aware of;
18 April 2017 - NW919
Kopane, Ms SP to ask the Minister of Environmental Affairs
Whether there is any position of (a) chief executive officer, (b) chief financial officer and/or (c) chief operating officer that is currently vacant in each entity reporting to her; if so, (i) how long has each specified position been vacant and (ii) what is the reason for each vacancy; 2) have the vacancies been advertised; if so, (a) were interviews done and (b) on what date will the vacancies be filled; 3) (a) what is the total number of persons who are currently employed in the specified positions in an acting capacity, (b) for what period has each person been acting in each position and (c) has any of the specified persons applied for the positions?
Reply:
1. South Africa National Parks (SANparks)
1.
(a) No
(b) Yes
(c) No
(i) CFO vacant since 1 April 2017
(ii) Resignation
2) Yes
a) No
b) No specific date as the post just been vacated, however, once the advertisement has been closed , short-listing and interviews will follow immediately.
3)
a) One
b) As at 1st April 2017.
c) No
2. South African National Biodiversity Institute (SANBI)
1)
(a) No
(b) No
(c) No
(i) Not applicable
(ii) Not applicable
2)
(a) Not applicable
(b) Not applicable
3)
(a) No
(b) No
(c) No
3. iSimangaliso Wetland Park
1)
(a) No
(b) No
(c) No
(i) Not applicable
(ii) Not applicable
2)
(a) Not applicable
(b) Not applicable
3)
(a) No
(b) No
(c) No
4. South African Weather Services (SAWS)
1)
(a) Yes
(b) No
(c) Not Applicable
- 5 Months - while there was an acting senior Manager
- The board released the former CEO earlier from her contract which was ending March 2017
2)
(a) Yes (October 2016) and Interviews was held in November 2016
(b) Cabinet approved appointment on the 29 March 2017 and the new incumbent will commence duty on the 1st May 2017.
3)
(a) 1
(b) 5 Months
(c) Yes – However, substantive appointment has already been done through Cabinet. A Cabinet announcement has also been done.
---ooOoo---
18 April 2017 - NW439
Maynier, Mr D to ask the Minister of Finance
Whether SA Airways procured any services from and/or made any payments to (a) Mr Mzwanele Manyi, (b) the Progressive Professionals Forum, (c) the Decolonisation Fund and/or (d) the Black Business Council; if not, in each case, why not; if so, what (i) services were procured, (ii) was the total cost, (iii) is the detailed breakdown of such costs, (iv) was the purpose of the payments, (v) was the total amount paid and (vi) is the detailed breakdown of such payments in each case?
Reply:
The following response was submitted by South African Airways (SAA).
a) SAA did not procure any services from and / or make payments to Mr Mzwanele Manyi. There was no requirement for SAA to procure any services from the identified individual.
b) SAA did not procure any services from and / or make payments to the Progressive Professionals Forum. There was no requirement for SAA to procure any services from the identified organisation.
c) SAA did not procure any services from and / or make payments to the Decolonisation Fund. There was no requirement for SAA to procure any services from the identified organisation.
d) SAA did not procure any services from and / or make payments to the Black Business Council. There was no requirement for SAA to procure any services from the identified organisation.
(i) – (vi) Not applicable.
18 April 2017 - NW547
Maimane, Mr MA to ask the Minister of Finance
Whether the National Treasury intends collecting fringe benefits tax against the President of the Republic, Mr Jacob G Zuma, in relation to the non-security related upgrades at his Nkandla homestead?
Reply:
It is not the duty of the National Treasury to collect any taxes, including fringe benefit tax. In terms of the Income Tax Act 58 of 1962 and the Tax Administration Act 28 of 2011, the South African Revenue Service (SARS) Commissioner is responsible for collecting taxes, including fringe benefit tax.
In terms of section 69 of the Tax Administration Act 28 of 2011, SARS is prohibited from disclosing taxpayer information.
18 April 2017 - NW885
Bergman, Mr D to ask the Minister of Finance
(1)With reference to the amalgamation of the (a) Modimolle and (b) Mookgophong Local Municipalities in Limpopo, what is the total amount paid to each municipality in equitable share (i) for each of the past five municipal financial years and (ii) since 1 June 2016; (2) What is the total equitable share allocated to Lim368: Modimolle and Mookgophong since the amalgamation after the 2016 local government elections; (3) (a) how is the equitable share calculated and (b) on what date were the amounts paid to each municipality?
Reply:
1. See the link: https://pmg.org.za/files/RNW885PRE-170418.docx
(2) The local government equitable share allocation for LIM368 for 2016/17 in the 2016 Division of Revenue Act was R92.5 million. In the 2017 Division of Revenue Bill the allocation to LIM368 is R93.4 million; and the indicative allocations for 2018/19 and 2019/20 are R100.8 million and R107.3 million respectively.
(3)(a) The Explanatory Memorandum to the Division of Revenue (available at www.treasury.gov.za and printed in the 2017 Division of Revenue Bill) sets out in detail how the local government equitable share allocations are calculated.
The Local Government Equitable Share (LGES) mainly funds free basic services for poor households in each municipality. For the purposes of the LGES formula, a poor household is defined as a household with an income less than the value of two state old age pensions. The number of poor households used in the LGES formula is based on the 2011 Census but is updated each year based on estimated household growth. The LGES also includes allocations for the institutional costs of municipalities and to subsidise other community services. Funds for community services and institutional costs are only allocated to municipalities with less ability to fund these costs from their own revenues.
The household numbers used to allocate the LGES since 2016 reflect the new municipal boundaries. The changes to municipal boundaries resulted in some significant changes to municipal allocations in 2016/17. To cushion the impact of these changes, all municipalities received at least 95 per cent of the equitable share formula allocation indicatively allocated to them in 2016/17 in the 2015 Division of Revenue Act. For merged municipalities, this guarantee was based on the sum of the equitable share allocations to the previously separate municipalities.
Additional funding was also allocated to the newly formed municipalities to support them with the costs of implementing the new demarcations. LIM368 was allocated R13.4 million in 2016/17 through the Municipal Demarcation Transition Grant. In 2017/18 the municipality is allocated R4.6 million through this grant.
(3)(b) The dates on which the local government equitable share is transferred to each municipality are prescribed in section 5(3) of the annual Division of Revenue Act. In 2016, local government equitable share transfers took place on 4 July 2016, 31 August 2016, 1 December 2016 and 17 March 2017. The 31 August 2016 transfer was made in terms of section 38 of the 2016 Division of Revenue Act which allowed for an additional transfer date for re-demarcated municipalities.
18 April 2017 - NW729
Figlan, Mr AM to ask the Minister of Home Affairs
Given the imperative to move towards liberalising regional and continental migration as envisaged in the African Union’s Vision 2063, what more has he found can be done to harmonise the various Southern African migration laws in a way that fairly shares financial and social benefits and burdens between countries?
Reply:
In order for progress to be made on this matter various regional blocks within the continent as well as the African Union (AU) are considering the terms of Agenda 2063 to see how the objectives can be realised. Currently various experts on immigration from within the region and continent are discussing the technical aspects and other matters in relation to this. It is envisaged that a harmonised position will eventually be considered at a heads of state summit level.
18 April 2017 - NW728
Figlan, Mr AM to ask the Minister of Home Affairs
With the range of increased security measures being introduced with regard to the immigration and refugee legislation, (a) how and (b) when will the country ensure the implementation of the objectives of the National Development Plan in the migration policy of attracting and rapidly processing skilled migrants?
Reply:
a) The National Development Plan (NDP) identifies various conditions that are necessary for its successful implementation. An enabling condition is to ensure that the Department of Home Affairs can efficiently facilitate the entry and stay of migrants with skills that are scarce and critical for economic growth.
In the chapter under Research and Development (R&D), the NDP places a responsibility on the Department to retain students from abroad who graduate from South African universities with a seven-year work permit to encourage them to stay and work here. While the Immigration Act 13 of 2002 in its current form does not allow for a work visa that exceeds 5 years, the Minister of Home Affairs issued a Directive in 2016 which allowed students who graduate in any of the fields listed in the Critical Skills List to apply for Permanent Residence.
Students who graduate and obtain their PHD at South African universities are also eligible for permanent residence on condition that there is no obligation attached to their studies which requires them to return to their country of origin.
b) Chapter 3 of the NDP on “Economy and Employment” lists a number of actions that should be taken in order to achieve the objectives of the NDP. Action 10 requires the country to “Adopt a more open immigration approach to expand supply of high-level skills” and Chapter 9, Action 67 requires that the country should “Relax immigration requirements for highly skilled science and mathematics teachers, technicians and researchers”.
Concerning implementation, it should be noted that the Department is already in the process of reviewing its Immigration Policy. To this end the Department has submitted its Draft White Paper on International Migration to Cabinet for approval before 31 March 2017. This revised policy framework makes provision for attraction of skilled migrants.
Applications for critical skills work visas are being processed within an accelerated turnaround of 4 weeks from date of application to issuance. In the 2015/16 financial year, 84.7% of critical skills applications were finalised within 4 days to 4 weeks. This represents half the time required for all other categories of temporary residence visas (8 weeks).
Critically skilled migrants are also allowed to sojourn in South Africa for a period of 12 months prior to securing employment in order to determine whether they will be interested in working and staying in the Republic on a longer term.
18 April 2017 - NW939
Marais, Mr EJ to ask the Minister of State Security
Whether there in any position of (a) chief executive officer, (b) chief financial officer and/or (c) chief operating officer that is currently vacant in each entity reporting to him; if so, (i) how long has each specified position been vacant and (ii) what is the reason for each vacancy; (2) Have the vacancies been advertised; if so, (a) were interviews done and (b) on what date will the vacancies be filled; (3) (a) what is the total number of persons who are currently employed in the specified positions in an acting capacity, (b) for what period has each person been acting in each position and (c) has any of the specified persons applied for the positions?
Reply:
1. (a) No
(b) No
(c) No
(i) Not vacant
(ii) Not vacant
2. (a) No vacant position to be advertised
(b) No vacant position to be advertised
3. (a) Not Applicable
(b) Not vacant
(c) Not vacant
13 April 2017 - NW903
Hoosen, Mr MH to ask the Minister of Transport
Whether the Rail Safety Regulator has any debt that has remained unpaid for 30 days or more; if so, (a) what (i) are the details of these debts, (ii) are the reasons for non-payment in each case, (b) on what date will each debt be settled and (c) what (i) processes, (ii) and (iii) mechanisms are in place to ensure that payments are made on time?
Reply:
Railway Safety Regulator (RSR)
Yes, the Railway Safety Regulator (RSR) had unpaid debts for 30 days and more at 31 March 2017.
a) (i)
Supplier |
Amount |
21st Century Pay Solutions Group |
7,410.00 |
Armani Office Supplies |
7,530.40 |
Baupa Trading Enteprise |
50,200.00 |
Enovative Technologies Africa |
24,582.96 |
GIBB Engineering & Science |
224,093.10 |
Khula Fleet Solutions |
328,885.90 |
Metrofile |
5,677.31 |
Times Media |
37,613.16 |
Vox Telecommunications (Pty) |
111,670.18 |
Vukile Property Fund Ltd |
54,060.71 |
Work dynamics (pty) Ltd) |
79,800.00 |
YSA Developments Leadership |
229,647.81 |
1,161,171.53
ii) Inadequate cash, Delays In collections of debtors.
b) April 2017
c) (i) To improve cash flow, operators are required to apply for renewal of their permit three months before expiry of their permits. This allows safety assessment to take place before the expiry of the permit. After the assessment has been completed, an invoice is issued to the operator. This process ensures that revenue is generated and collected in time.
(ii) According to (RSR) debtors Management Policy, debtors must be collected within 30 days of issuing an invoice. After operators have been invoiced, regular follow up is made with the debtors to ensure that payment is received.
(iii) Communication with debtors takes place through telephone, email and by sending statement of accounts. This is done to ensure that cash flow of the organisation is improved so that creditors could be paid within 30 days
13 April 2017 - NW901
Hadebe, Mr TZ to ask the Minister of Transport
Whether the Road Traffic Infringement Agency has any debt that has remained unpaid for 30 days or more; if so, (a) what (i) are the details of these debts, (ii) are the reasons for non-payment in each case, (b) on what date will each debt be settled and (c) what (i) processes, (ii) procedures and (iii) mechanisms are in place to ensure that payments are made on time?
Reply:
a) SAPO debt which has been long outstanding due to a dispute with SAPO over proof of service. The details are as follows:
a(i) Service provider / Invoice holder |
Invoice number |
Invoice dates |
a(ii) Reason for non-payment |
b) Settlement date |
South African Post office (SAPO) |
19034GS3030 8069862335 8069862334 8069880768 8069889842 8069906437 8069917673 8069906423 8069906421 8069906420 8069906422 15050007 8069949634 8069949636 8069949635 8069977529 8069977533 8069988717 8069988723 8069988722 8069988714 8069988720 8069988721 4060019 4060010 10060010 8070019964 8070019966 10060008 8070039169 8070039168 8070039170 8070039171 19060029 8070055661 8070055662 8070055658 8070055667 8070055663 8070055666 8070055665 8070055664 |
01/04/2015 – 24/06/2015 |
Dispute with SAPO over service delivery not within legislated timeframes as required by AARTO regulations |
Envisaged end of April 2017 |
(c) (i), (ii), (iii) Internal checks and balances to prove service on a monthly basis. Monthly SAPO service reports between SAPO and RTIA. A new SLA is in place to deal with proof of service mechanisms and how each party responds to instances outside of SAPO’s control.
13 April 2017 - NW893
De Freitas, Mr MS to ask the Minister of Transport
With reference to the process to appoint the Group Chief Executive Officer of the Passenger Rail Agency of South Africa which began in 2016, (a) why was the process terminated, (b) who made the decision to terminate the process and (c) what amount was spent on the process?
Reply:
Firstly, the former Minister of Transport, Ms Dipuo Peters met with staff members of PRASA. The staff members shared concerns that emerged from when SARCC became PRASA. The consolidation process of the various passenger rail entities into a single passenger entity, namely PRASA, did not also pay attention to cultivating a specific culture within the new organization. As result, hence the challenges that are now being experienced within PRASA. Secondly, the recruitment process for the Group CEO was compromised through the leaking of information to the public. The former Minister impressed upon the Board Chairperson to consider putting the appointment process on hold in light of the above developments. She emphasised that organisational stability was critical and had to be reached before a new CEO can be appointed. This would enable the incoming new CEO to focus on performance and gearing the organization for delivery.
a) The process to appoint the Group CEO of PRASA was terminated within the context of the above background. The credibility of the recruitment process was compromised.
b) The former Minister together with the Board Chairperson agreed and both took the matter to the Board for discussion and decision making
c) The amount spent on the process was R 1 767 000.00
13 April 2017 - NW894
Hunsinger, Dr CH to ask the Minister of Transport
(a) On what date was the meeting of the Passenger Rail Agency of South Africa held in which the turnaround strategy was tabled and (b) what amendments did the board make to the strategy?
Reply:
a) The Turnaround Strategy was tabled on 28 &29 November 2016 at a Board Strategy Workshop and it was tabled formally at the Board of Control meeting on the 27th February 2017.
b) The Board supported the Turnaround Strategy and made the following amendments:
(i) That Management must refine the implementation dates as these were un-realistic.
(ii) That Management get the assistance of external experts to assist management with the implementation of the Turn Around Strategy
13 April 2017 - NW725
Steyn, Ms A to ask the Minister of Agriculture, Forestry and FisheriesQUESTION
On what date was his department first informed of the presence of the fall armyworm (FAW) in South Africa, (b) (b) on what date did his department make positive confirmation of the presence of FAW in South Africa, (c) (c) how many hectares of (i) maize, (ii) soya bean and (iii) sugar cane crops have been lost due to the FAW to date? NW784E
Reply:
a) DAFF was first informed on 19 January 2017 by the ARC Grain Crops Institute through Grain SA that they had collected larvae (caterpillars) that resemble Fall Armyworm.
b) DAFF was informed by the ARC Biosystematics Division on 3 February 2017 of the positive identification of the larvae collected at various areas (which had at that passed through the pupa stage of their lifecycle and emerged as adult moths) that the pest is indeed the Fall Armyworm (FAW) (Spodoptera frugiperda).
c) (i) DAFF received no loss reports from role players, i.e. of losses due to FAW, but FAW was reported by role players to be detected in planted maize of about 11000ha.
(ii) & (iii) No FAW cases have been confirmed in South Africa from Soya or Sugarcane.
13 April 2017 - NW895
Hunsinger, Dr CH to ask the Minister of Transport
(1)(a) How were the respective increases on e-toll tariffs calculated and (b) what other criteria were used; (2) whether public participation processes took place in each province; if not, why not; if so, what submissions were received?
Reply:
1. (a)The toll tariffs were adjusted for Consumer Price Inflation (CPI) effective 3 March 2017. The average of the CPI headline year-on-year rates, for the period November 2015 to October 2016, as published by Statistics-SA, was calculated and applied to the previous year’s tariffs for the tariff adjustment. The average CPI as applicable to the adjustment effective 3 March 2017 was 6.0417%.
This CPI adjustment is to retain the real value of the toll tariffs - there is no increase of the tariffs in real terms.
(b) No other criteria were used.
(2) The processes to be followed as directed by the South African National Roads Agency Ltd and National Roads Act, No.7 of 1998 were undertaken by SANRAL. The tariffs were calculated and recommended by SANRAL for approval by the Minister and then published in the Gazette for 14 days following signature by the Director General. The Act directs the processes to be followed for the amendment of toll tariffs as follows:
S 27 (2) clarifies that the amendment of toll tariffs “will become effective only 14 days after a notice to that effect by the Agency has been published in the Gazette”.
S 27 (3) (a) specifies that the amendment “is determined by the Minister on the recommendation of the Agency”.
S (3) (c) specifies that the amendment “must be made known by the head of the Department by notice in the Gazette”.
Further, Clause 5.19 of the applicable Gazette no. 40623 of 16 February 2017 states that: “The tariffs and amounts displayed in this notice may be adjusted by a determination of the Minister annually: Provided that such adjustment shall not exceed the Consumer Price Index calculated for the preceding 12 months”.
13 April 2017 - NW891
De Freitas, Mr MS to ask the Minister of Transport
(1)(a) Which remuneration policies for the payment of board members of entities reporting to her has she not approved, (b) what are the reasons in each case and (c) when will these policies be approved; (2) (a) how have affected boards been operating in the meantime, (b) how has this been monitored and (c) what do reports reveal in this regard? NW960E
Reply:
1.(a) None. Board fees are determined by the Minister of Transport on consultation with the Minister of Finance.
(b) Not applicable
(c) Not applicable.
2. (a) Not applicable.
(b) Not applicable.
(c) Not applicable.
13 April 2017 - NW898
Groenewald, Mr HB to ask the Minister of Transport
Whether the SA National Road Agency Limited has any debt that has remained unpaid for 30 days or more; if so, (a) what (i) are the details of these debts, (ii) are the reasons for non-payment in each case, (b) on what date will each debt be settled and (c) what (i) processes, (ii) procedures and (iii) mechanisms are in place to ensure that payments are made on time?
Reply:
For the period 1 April 2016 to 31 March 2017, SANRAL had 10 suppliers being owed R318 810.23 in total, with 127 average outstanding days. The total payments for the same period was R19.8 billion. Therefore the total outstanding was less than 0,002% of the total amount paid.
(a)(i)Service Provider |
Invoice Number |
Invoice Date |
a(ii)Reason for non-payment |
(b)Settlement date |
Waterkloof Farm |
VR146/02-15/16A |
17/02/2016 |
Payment rejected by the system, the supplier changed the banking details without updating the banking with SANRAL |
Depends on correct banking details being provided |
AL Te Ver Trust |
VR404/10-16/17A |
10/10/2016 |
Payment rejected by the system, the supplier changed the banking details without updating the banking with SANRAL |
Depends on correct banking details being provided |
M Dzutsu |
VR518/12-16/17Q |
06/12/2016 |
Payment rejected by the system, the supplier changed the banking details without updating the banking with SANRAL |
Depends on correct banking details being provided |
Ultimate Consumable (Pty) Ltd |
INV282312 |
02/03/2017 |
Awaiting for the statement before payment is made |
Will be done before 14 April 2017 |
Locksmith |
201301535 |
01/11/2016 |
Payment rejected by the system, the supplier changed the banking details without updating the banking with SANRAL |
Depends on correct banking details being provided |
(a)(i)Service Provider |
Invoice Number |
Invoice Date |
a(ii)Reason for non-payment |
(b)Settlement date |
Ethekwini Municipality |
883377330019Dec 03608009769Oct |
13/12/2016 22/10/25016 |
Payment rejected by the system, the supplier changed the banking details without updating the banking with SANRAL |
Depends on correct banking details being provided |
University of Stellenbosch |
282585 |
06/05/2016 |
Payment rejected by the system, the supplier changed the banking details without updating the banking with SANRAL |
Depends on correct banking details being provided |
Express Employment |
20160407 |
04/07/2016 |
Payment rejected by the system, the supplier changed the banking details without updating the banking with SANRAL |
Depends on correct banking details being provided |
Modern Frames |
S2318 |
03/06/2016 |
Payment rejected by the system, the supplier changed the banking details without updating the banking with SANRAL |
Depends on correct banking details being provided |
ARQ Consulting Engineers |
17726 |
08/11/2016 |
Payment rejected by the system, the supplier changed the banking details without updating the banking with SANRAL |
Depends on correct banking details being provided |
(c)(i)(ii)(iii) In order to prevent fraudulent transactions or changes to banking details, SANRAL’s internal control measures requires the supplier to submit changes to banking details on a registration form accompanied by an original bank statement/letter/cancelled cheque, confirming the new account number or correct account number. These suppliers have been notified of the problem. SANRAL will pay as soon as it receives correct bank account numbers in a prescribed format. The suppliers have been informed of the prescribed format for changing banking details
12 April 2017 - NW713
Alberts, Mr ADW to ask the Minister of Justice and Correctional Services
Whether, with reference to his reply to question 2718 on 5 January 2017, the Government intends to ratify the Optional Protocol to the International Covenant on Economic, Social and Cultural Rights (ICESCR); if not, why not; if so, what timeframe has been set for the process; 2) whether the Government will draft legislation, as prescribed by section 231(4) of the Constitution of the Republic of South Africa, 1996, to put the ICESCR into operation locally once it has been ratified; if so, what are the relevant details (a) in respect of the nature of the legislation foreseen by the Government and (b) regarding when it will be put in place?
Reply:
1. With reference to my recent response to question no. 2718 in this regard, I wish to confirm that the matter is receiving Government’s attention. It is anticipated that the Cabinet will be approached during the current financial year (2017/18) with a recommendation.
2. No. As indicated in my response above, the methodology of using pre-existing legislation to give effect to subsequent treaty obligations was adopted in the case of South Africa’s ratification of the International Covenant on Economic, Social and Cultural Rights (ICESCR). This is in accordance with section 231(4) of the Constitution and widely accepted international practice.
Using this method, the substance of the ICESCR provisions can be deemed to be incorporated and are part of the South African law (if regard is had to relevant pre-existing legislation, regulations and codes on education, water, health, social security, housing, labour, amongst others). Furthermore the Bill of Rights entrenched in Chapter 2 of the Constitution of the Republic of South Africa, 1996, draws its inspiration from the Universal Declaration of Human Rights (1948) and the two United Nations International Covenants on Civil and Political Rights as well as Economic, Social and Cultural Rights.
12 April 2017 - NW538
Figg, Mr MJ to ask the Minister of Social Development
What (a) is the total amount and (b) are the full details of the amount spent by her department on legal fees (i) in the (aa) 2013-14, (bb) 2014-15 and (cc) 2015-16 financial years and (ii) since 1 April 2016?
Reply:
The amount reflected below relates mainly to legal fees on social assistance appeals.
(a) Full Amount |
(b)(i)Year |
R10 297 837.54 |
(aa) 2013-2014 |
R12 994 173.95 |
(bb) 2014-2015 |
R3 382 845.97 |
(cc) 2015-16 |
R3 568 041.93 |
(ii) since 1 April 2016 |
11 April 2017 - NW826
Boshoff, Ms SH to ask the Minister of Basic Education
With regard to the presentation by her department to the Portfolio Committee on Basic Education on 14 March 2017, entitled Kha Ri Gude Mass Literacy Campaign from 2008 to 2016/17, (a) how many volunteers have been investigated for fraud to date, (b) was any volunteer found guilty, (c) what amount of money was involved, (d) will the volunteer be criminally charged and (e) what steps have been taken to recover the amount in each case?
Reply:
a) How many volunteers have been investigated for fraud to date?
The Department has been investigating alleged cases of fraud that were reported.
90 volunteers were allegedly involved in fraud and corruption. All reported cases of fraud have been dealt with decisively.
The Department continuously updates its internal controls which assists in strengthening the validation processes and financial management of the campaign.
(b) Was any volunteer found guilty?
Yes, 90 volunteers were found guilty through the Departmental internal processes.
(c) What amount of money was involved?
90 volunteers were identified to have been paid an amount of R282 297.22 without any learners.
(d) Will the volunteer be criminally charged, and
The identified volunteers were removed from the Campaign and the monies deducted.
(e) What steps have been taken to recover the amount in each case?
The Department has recovered R 281 838.53 (99.84%) to date.
To recover monies, the Department deducted the funds owed from the stipend payments due to volunteers. The Department employs volunteers in a hierarchical structure, which are; Monitors, Coordinators, Supervisors and Volunteer Educators.
Detailed Steps:
Deceased Learners registered in the Campaign
Step 1: Once the deceased learners have been identified by the Department of Home Affairs, the volunteers who submitted list of deceased learners are identified.
Step 2: The actual stipend is determined as per the sliding scale.
Step 3: The determined amount of stipend related to the fraudulent transactions is then deducted.
Step 4: The identified volunteers are removed from the Campaign.
11 April 2017 - NW628
Marais, Mr EJ to ask the Minister of Public Enterprises
(1)Whether a tender was recently awarded for conducting work on portions of Erf 12459 and Erf 12460, known as Mossel Bay yacht and boat Club, including the walk-on-moorings; if so, (a) what date was the tender awarded, (b) who is the current operator on the premises and (c) since what date has the current operator been operating on the premises; (2) Whether the current operator at any time (a) was in arrears with its monthly rental and/or (b) operated in such a way that its activities could be regarded as (i) a liability to Transnet and (ii) not being in the interests of the Mossel Bay community; if not, why was it necessary to award a new tender; if so, what are the relevant details I each case? NW686E
Reply:
(1)(a) Transnet awarded the tender on 01 December 2016.
(1)(b) The tender was awarded to Mossel Bay Waterfront (Pty) Ltd.
(1)(c) 01 January 2017, however, occupation was not taken because the current operator, MBYBC refused to vacate the premises.
(2)(a) The current operator at the time was up to date with no arrears.
(2)(b)(i) Its business operations were and remain vitally important to Transnet.
(2)(b)(ii) Transnet appreciates the contribution of this business operation in growing the domestic economy, attracting tourism and creation of employment opportunities for the community of Mossel Bay.
Mogokare Richard Seleke Lynne Brown, MP
Director-General Minister of Public Enterprises
Date: Date:
11 April 2017 - NW716
Jooste, Ms K to ask the Minister of Social Development
What are the reasons for the resignation of the Director-General of her department, Mr Zane Dangor?
Reply:
The Director-General, Mr Z Dangor cited a breakdown in the working relationship with the Minister of Social Development, Ms BO Dlamini, in his resignation.
11 April 2017 - NW783
Ross, Mr DC to ask the Minister of Basic Education
(1)What amount was (a) allocated to and (b) spent by each province as part of the Accelerated Schools Infrastructure Delivery Initiative in the 2015-16 financial year; (2) whether any funding was (a) withdrawn and/or (b) returned to the National Treasury as a result of underspending in any of the provinces; if so, (i) what amount was returned and/or withdrawn and (ii) what were the reasons for underspending?
Reply:
1. (a) The ASIDI Programme was allocated an amount of R 2 046 825 000 for the period ending 31 March 2016 (2015/16).
(b) The table below indicates expenditure per province:
Province |
Allocation in 2015/2016 |
Expenditure |
Eastern Cape |
R 1 084 091 000 |
R 1 036 314 282.84 |
Free State |
R 478 416 000 |
R 187 121 154.00 |
Gauteng |
R 11 202 000 |
|
KwaZulu-Natal |
R 138 097 000 |
R 40 545 596.00 |
Limpopo |
R 104 316 000 |
R 18 233 998.00 |
Mpumalanga |
R 128 569 000 |
R 47 164 814.00 |
Northern Cape |
R 33 638 000 |
R 6 439 905.00 |
North West |
R 68 496 000 |
R 15 062 193.00 |
Eskom (All Provinces) |
|
R 24 806 781.00 |
Total Capital Expenditure |
|
R 1 375 688 723.84 |
Add: Operational Expenditure |
|
R 246 731 387.91 |
Programme Support Unit |
|
R 107 446 255.23 |
Operational Expenditure |
|
R 33 132 264.97 |
Furniture & Equipments |
|
R 106 152 867.71 |
Total |
R 2 046 825 000 |
R 1 622 420 111.75 |
2. a & b (i & ii), R 424 404 888.25 m was returned to the National Treasury as a result of underspending. The underspent amount was returned to the National Revenue. The primary reason for the under expenditure was the mergers and rationalisation programme undertaken by the EC DoE which resulted in the projects allocated to the Implementing Agents on the ASIDI Programme having to be suspended. The process has since been completed and all the affected projects are in the process of implementation.
11 April 2017 - NW823
Davis, Mr GR to ask the Minister of Basic Education
Whether, with regard to the presentation by her department to the Portfolio Committee on Basic Education on 14 March 2017, entitled Kha Ri Gude Mass Literacy Campaign, which ran from 2008 to 2016/17, her department has found that the Auditor-General supplied an incorrect amount for the irregular and fruitless and wasteful expenditure relating to the specified campaign; if so, (a) what is the correct amount and (b) why was the error not picked up before the end of the reporting cycle?
Reply:
(a) The correct amount is R1 549 899. At 31 March 2017 an amount of R474 737 was already deducted/recovered from the affected volunteers, leaving the balance of R1 075 161. The balance will be deducted from the affected volunteers when remaining payments are processed where possible.
(b) The Auditor-General based their findings on the information presented to them for audit purposes. Some irregularities were identified during the audit. If the Department disagreed with these findings, the Department had to provide evidence to prove the Department’s case. However, there was not enough time for the Department to agree or disagree with the findings. The investigation of the process would have gone beyond the time of the audit and, in the absence of the evidence the Department disclosed the amount as per the findings of the Auditor-General.
11 April 2017 - NW825
Boshoff, Ms SH to ask the Minister of Basic Education
With regard to the presentation by her department to the Portfolio Committee on Basic Education on 14 March 2017, entitled Kha Ri Gude Mass Literacy Campaign from 2008 to 2016/17, will the Directorate for Priority Crimes Investigation be investigating the irregular, fruitless and wasteful expenditure relating to the campaign, as directed by the Standing Committee on Public Accounts; if not, why not; if so, what are the relevant details?
Reply:
The Department engaged the Hawks regarding the matter who advised that the relevant body that needs to deal with the matter is the Asset and Forfeiture Unit.
11 April 2017 - NW440
Maynier, Mr D to ask the Minister of Public Enterprises
Whether any state-owned companies reporting to her procured any services from and/or made any payments to the Decolonisation Fund if not, in each case, why not; if so, what (a) services were procured, (b) was the total cost, (c) is the detailed breakdown of such costs, (d) was the purpose of the payments, (e) was the total amount paid and (f) is the detailed breakdown of such payments in each case?
Reply:
ALEXKOR SOC LTD
No services were procured as there were no specific needs.
(a) NIL
(b) NIL
(c) NIL
(d) NIL
(e) NIL
(f) NIL
DENEL SOC LTD
No services were procured as there were no specific needs.
(a) NIL
(b) NIL
(c) NIL
(d) NIL
(e) NIL
(f) NIL
ESKOM
Eskom has not procured any services from nor made any payments to the Decolonisation Fund.
Eskom has not raised a need that would require Commercial to procure services from the Decolonisation Fund.
(a) NIL
(b) NIL
(c) NIL
(d) NIL
(e) NIL
(f) NIL
SAFCOL SOC LTD
No services were procured as there were no specific needs.
(a) NIL
(b) NIL
(c) NIL
(d) NIL
(e) NIL
(f) NIL
SAX SOC LTD
South African Express Airways did not procure any services from and/or make any payments to the Decolonisation Fund.
The airline’s is presently facing challenges pertaining to both its liquidity and profitability. As a result, the airline is currently not in a financial position to support expenditure that does not directly support the airline’s core functionality.
(a) NIL
(b) NIL
(c) NIL
(d) NIL
(e) NIL
(f) NIL
TRANSNET
Transnet has not procured any services from and/or made any payments to the Decolonisation Fund. The company is not in the list of Transnet’s service providers.
(a) NIL
(b) NIL
(c) NIL
(d) NIL
(e) NIL
(f) NIL
Remarks: |
Reply: Approved / Not Approved |
|||
Mr Mogokare Richard Seleke |
Ms Lynne Brown, MP |
|||
Director-General |
Minister of Public Enterprises |
|||
Date: |
Date: |
11 April 2017 - NW738
Marais, Mr EJ to ask the Minister of Public Enterprises
(1)Whether the (a) community and (b) Mossel Bay Local Municipality were consulted before the issuing of a tender by Transnet for conducting activities on portions of Erf 12459 and Erf 12460, known as the Mossel Bay Yacht and Boat Club, including the walk-on-moorings; if not, in each case, why not; if so, what are the full details of the public participation process that was followed in each case; (2) What (a) are the full details of the business plan of the successful bidder and (b) is the current status of the transfer of operations to the successful bidder; (3) Whether she will make a statement regarding the matter? NW797E
Reply:
(1)(a) The advert was placed in the local newspaper (Mossel Bay Advertiser) on the 06 May 2016.
(1)(b) It is not part of Transnet leasing Policy to consult the Local Municipalities when Transnet premises are advertised for leasing. The premises were advertised for leasing in an open, fair, equitable and transparent process.
(2)(a) As this is commercially sensitive information to the successful bidder, consent must first be sought prior to disclosing this information.
(2)(b) No transfer of operations has materialized because the current operator MBYBC refused to vacate the premises.
(3) No. Sufficient information are provided in the above answer. However interested parties are welcome to ask for additional information through the relevant offices.
Mogokare Richard Seleke Lynne Brown, MP
Director-General Minister of Public Enterprises
Date: Date:
11 April 2017 - NW629
Marais, Mr EJ to ask the Minister of Public Enterprises
Whether a new tender has been awarded for Transnet activities on Erf 12459 and Erf 12460 in Mossel Bay; if so, what (a) are the names of the (i) directors and (ii) shareholders of the company that has been awarded the tender, (b) is the monthly rental paid by the current operator and (c) rental will be paid by the successful bidder;
Reply:
(a)(i) & (a)(ii) Ms Verna Durand is both the Director and Shareholder of this company.
(b) The monthly rental paid by the current operator is R108 628.51
(c) The successful bidder will pay a monthly rental fee of R118 200.00
Mogokare Richard Seleke Lynne Brown, MP
Director-General Minister of Public Enterprises
Date: Date:
11 April 2017 - NW550
Mazzone, Ms NW to ask the Minister of Public Enterprises
Whether the (a) employees, (b) directors and (c) management of Eskom filed declarations of interests; if not, in each case, why not; if so, (i) who checks the specified declarations and (ii) what are the further relevant details in this regard; (2) has any action ever been taken for a conflict of interest arising from the declarations; if so, what are the relevant details; (3) how many of the specified persons have business dealings with Eskom; (4) what are the names and designations of each Eskom employee who decides on sponsorship allocations?
Reply:
(1)(a) Yes. For the 2015/16 financial year, 99.2% of the employees required to declare completed declarations of interest. The 0.75% did not declare, because they were on suspension or extended sick leave. Employees from TASK grade 09 and above are required to complete annual declaration forms either electronically or manually (depending on the circumstances). Employees from TASK grade 08-04 must declare interest if there is a conflict.
1(a)(i) Line managers check the declarations.
1(a)(ii) Employees are required to declare interests every financial year, whether an
interest exist or not. Employees are also required to immediately declare whenever a conflict arises, the annual declaration for that employee will then be amended.
1(b) Yes
1 (b)(i) The Chairman, assisted by the Group Company Secretary, administers the filing
of declarations of interest for Board members. The annual declarations are presented to the shareholder at the AGM.
1(b)(ii) Directors are required to declare interests every financial year, whether an
interest exist or not. Directors are also required to immediately declare whenever a conflict arises, the annual declaration for that directors will then be amended.
1(c) Yes
1(c)(i) Declarations of interest submitted by the Executive Management Committee
Members (EXCO) is approved by the Group Chief Executive and administered by the Group Company Secretary.
1(c)(ii) All Eskom Executive Committee (EXCO) members are Eskom Employees.
Employees are required to declare interests every financial year, whether an interest exist or not. Employees are also required to immediately declare whenever a conflict arises, the annual declaration for that employee will then be amended.
(2) Yes, for Board and EXCO
The management of conflict of interest is governed by the Eskom Conflict of Interest (COI) Policy and Procedure, which is applicable to the Board and employees. The Policy and Procedure address noncompliance and the consequences of noncompliance.
Further to this for Board and EXCO meetings probity checks in respect of commercial transactions are conducted prior to circulation of meeting agendas. In the event that there is a potential, perceived or actual conflict of interest, the chairman of the meeting and the Group Company Secretary are advised. Should a conflict be identified the member will not be provided with the information pertaining to that matter and will be required to recuse him/herself from the proceedings when the matter is discussed.
The attending members are required to declare that they do not have any conflict in relation to matters being discussed in the meeting.
Declaration of interest is a standing agenda item of all Board and EXCO meetings. Any conflicts are recorded as part of the proceedings. The relevant member is then required to recuse him or herself at the time when the particular agenda item is discussed.
Yes, for employees.
Where there is a conflict of interest, the employee must refrain from being part of any deliberations, document preparation, execution or meetings and must not have access that deals with that particular matter.
In addition, cases reported through the Forensic Investigation department, the Eskom disciplinary process was followed. For the 2015/16 financial year, there were 10 cases of actual conflict emanating from the outcome of forensic investigations.
(3) Emanating from the results the forensic investigations for the 2015/16 financial for employees (including Exco), there were 10 cases where actual conflict was identified.
(4) The Eskom Sponsorship Committee is delegated to approve all sponsorship up to
R3 million with sponsorships above R3 million being approved by the Executive Committee (EXCO). During the previous and current financial year all approved sponsorships were less than R3 million and was therefore approved by the Eskom Sponsorship Committee in the Corporate Affairs Division.
Sponsorships are proactively planned and targeted on an annual basis, with input from all Divisions, as it enables the organisation to meet its strategic objectives.
Table 1 and Table 2 below presents the name and designation of the Eskom employees who decide on sponsorship allocations.
Table 1Name and designation of Executive Management Committee Members (EXCO) who decide on sponsorship allocations
Group Executives |
|
Name |
Designation |
Mr Matshela Koko |
Interim Group Chief Executive |
Mr Anoj Singh |
Chief Finance Officer |
Mr Willy Majola |
Group Executive Generation (Acting) |
Mr Thava Govender |
Group Executive Transmission |
Mr Mongezi Ntsokolo |
Group Executive Distribution |
Ms Ayanda Noah |
Group Executive Customer Services |
Mr Abram Masango |
Group Executive Group Capital |
Ms Elsie Pule |
Group Executive Human Resources |
Mr Sean Maritz |
Group Executive Information Technology |
Mr Freddy Ndou |
Divisional Executive Strategy Support |
Brigadier General (Ret.) Tebogo |
Divisional Executive Security |
Mr Chose Choeu |
Divisional Executive Corporate Affairs |
Ms Suzanne Daniels |
Group Company Secretary |
Table 2 Name and designations of the Sponsorship Committee
Sponsorship Committee |
|
Name |
Designation |
Chose Choeu |
Divisional Executive Corporate Affairs |
Ruwaida (Ra’eesah) Waja |
General Manager: Internal and External Communication |
Marion Hughes |
General Manager: Stakeholder Relations |
Pieter Pretorius |
General Manager Strategic Marketing and Branding (Acting) |
Cecil Ramonotsi |
CEO Eskom Development Foundation (Acting) |
Natasha Sithole |
Senior Manager: Business Enablement |
Nto Rikhotso |
Eskom Media Desk Manager |
Remarks: Reply: Approved / Not Approved
Mr. Mogokare Richard Seleke Ms. Lynne Brown, MP
Director-General Minister of Public Enterprises
Date: Date:
11 April 2017 - NW935
Malatsi, Mr MS to ask the Minister of Science and Technology
Whether there is any position of (a) chief executive officer, (b) chief financial officer and/or (c) chief operating officer that is currently vacant in each entity reporting to her; if so, (i) how long has each specified position been vacant and (ii) what is the reason for each vacancy; (2) Have the vacancies been advertised; if so, (a) were interviews done and (b) on what date will the vacancies be filled; (3) (a) what is the total number of persons who are currently employed in the specified positions in an acting capacity, (b) for what period has each person been acting in each position and (c) has any of the specified persons applied for the positions?
Reply:
- Whether there is any position of (a) chief executive officer, (b) chief financial officer and/or (c) chief operating officer that is currently vacant in each entity reporting to her; if so, (i) how long has each specified position been vacant and (ii) what is the reason for each vacancy;
Entity |
Chief Executive Officer (CEO) |
Chief Financial Officer (CFO) |
Chief Operating Officer (COO) |
||||||
(a) |
(i) |
(ii) |
(b) |
(i) |
(ii) |
(c) |
(i) |
(ii) |
|
Council for Scientific and Industrial Research |
No |
N/A |
N/A |
No. However, the CFO tendered his resignation and his last day is 30 April 2017. |
N/A |
N/A |
No |
N/A |
N/A |
Human Sciences Research Council |
No |
N/A |
N/A |
Yes |
January 2017 |
Resignation |
Yes |
16 March 2017 |
Mutual termination of agreement |
2. Have the vacancies been advertised; if so, (a) were interviews done and (b) on what date will the vacancies be filled;
Entity |
(a) |
(b) |
Council for Scientific and Industrial Research |
Yes. The interviews are scheduled for 03 May 2017. |
1 July 2017. |
Human Sciences Research Council |
Yes. The CFO position was advertised. However, interviews not yet done. |
The date is not confirmed. |
No. The position of the Deputy CEO: Management Support is yet to be advertised. |
The process is underway. |
3. (a) what is the total number of persons who are currently employed in the specified positions in an acting capacity, (b) for what period has each person been acting in each position and (c) has any of the specified persons applied for the positions?
Entity |
(a) |
(b) |
(c) |
Council for Scientific and Industrial Research |
N/A |
The Acting CFO will act until the new CFO is appointed and start on 1 July 2017. |
|
Human Sciences Research Council |
|
|
|
11 April 2017 - NW483
Carter, Ms D to ask the Minister of Public Enterprises
Whether her department will provide a schedule of all chartered flights for (a) SA Airways, (b) SA Express and (c) Mango Airlines for the period 1 January 2016 to 28 February 2017, for all routes with details of (i) each route, (ii) the date of each flight, (iii) the time of each flight, (iv) the number of passengers, (v) the occupancy rate of each flight, (vi) the total amount paid in respect of each chartered flight and (vii) the details of each service provider?
Reply:
Mango Airlines is a subsidiary of SAA which is within the oversight of the Minister of Finance.
Part (i) of the question with reference to SA Express:
Charter Airline Operation |
JNB-BFN |
JNB-KIM |
JNB-RCB |
JNB-HDS |
JNB-GRJ |
JNB-PLZ |
JNB-ELS |
JNB-FBM |
JNB-GBE |
JNB-WVB |
JNB-NTY |
JNB-MBD |
Solenta |
180 |
115 |
12 |
64 |
26 |
33 |
228 |
43 |
122 |
|||
StarAir Cargo |
384 |
141 |
86 |
399 |
18 |
94 |
235 |
100 |
245 |
|||
CemAir |
26 |
32 |
6 |
8 |
4 |
13 |
36 |
2 |
4 |
39 |
||
Global Aviation |
86 |
1 |
23 |
3 |
11 |
2 |
4 |
|||||
Golden Wings/SKA |
26 |
8 |
2 |
4 |
2 |
2 |
2 |
|||||
Flyfofa- Sahara |
10 |
10 |
4 |
2 |
6 |
22 |
||||||
Africa Charter Airline |
54 |
4 |
2 |
148 |
228 |
24 |
Charter Airline Operation |
DUR-PLZ |
DUR-ELS |
DUR-CPT |
DUR-HRE |
DUR-LUN |
Solenta |
1025 |
564 |
269 |
36 |
8 |
StarAir Cargo |
1 |
2 |
1 |
4 |
1 |
CemAir |
20 |
14 |
6 |
2 |
|
Global Aviation |
|
|
|
|
|
Golden Wings/SKA |
|
|
|
|
|
Flyfofa- Sahara |
|
|
|
|
|
Africa Charter Airline |
|
|
|
|
|
Charter Airline Operation |
CPT-BFN |
CPT-ELS |
CPT-PLZ |
CPT-HDS |
CPT-NTY |
CPT-WVB |
Solenta |
38 |
122 |
137 |
10 |
||
StarAir Cargo |
4 |
12 |
1 |
|||
CemAir |
15 |
41 |
22 |
4 |
8 |
12 |
Global Aviation |
8 |
|||||
Golden Wings/SKA |
||||||
Flyfofa- Sahara |
||||||
Africa Charter Airline |
|
|
|
|
|
|
Part (vi) of the question with reference to SA Express:
Supplier |
Actual |
MATEKANE |
50 278 977.86 |
GLOBAL AVIATION |
5 697 784.23 |
SOLENTA AVIATION |
120 141 296.91 |
STAR AIR CARGO |
86 802 316.02 |
AFRICA CHARTER |
28 740 805.08 |
CEM AIR |
10 558 845.02 |
GOLDEN WINGS |
1 339 489.92 |
303 559 515.04 |
Part (ii, iii, iv, v, vii) of the question attached as Annexure A.
Mogokare Richard Seleke Lynne Brown, MP
Director-General Minister of Public Enterprises
Date: Date:
11 April 2017 - NW812
Tlhaole, Mr L S to ask the Minister of Basic Education
What steps will she take to address the matter of the schools that were closed in the John Taolo Gaetsewe District Municipality in the Northern Cape in the 2013-14 financial year, without proper consultation with the communities and against the wishes of parents who face difficulties in ensuring that their children have access to proper schools?
Reply:
The Department has forwarded the question to the Northern Cape Provincial Education Department and is awaiting the response. The response will be forwarded as soon as the Department receives it.
11 April 2017 - NW775
Tarabella - Marchesi, Ms NI to ask the Minister of Basic Education
What progress has her department made in implementing the recommendations of the 2016 National Investigative Hearing into the Impact of Protest-related Action on the Right to a Basic Education in South Africa that was conducted by the SA Human Rights Commission?
Reply:
The process of sharing the findings and recommendations of the report of the South African Human Rights Commission with the key structures of the sector commenced as soon as the DBE received the report in September 2016. Flowing from this, the DBE has constituted an internal multidisciplinary team that will not only respond to events, but that will also develop and institutionalise proactive mechanisms to ensure the protection of the right to a basic education. To guide the work of the team, the DBE has developed terms of reference of which consultations are currently underway within the Department.
11 April 2017 - NW441
Maynier, Mr D to ask the Minister of Public Enterprises
Whether any state-owned companies procured any services from and/or made any payments to the (a) Afrikaanse Handelsinstituut, (b) SA Chamber of Commerce and Industry, (c) Black Management Forum, (d) Black Business Council and (e) Business Unity South Africa; if not, in each case, why not, if so, what (i) services were procured, (ii) was the total cost, (iii) is the detailed breakdown of such costs, (iv) was the purpose of the payments, (v) was the total paid and (vi) is the detailed breakdown of such payments in each case?
Reply:
ALEXKOR SOC LIMITED |
||
(a) |
None, cost containment measures |
|
(b) |
None, cost containment measures |
|
(c) |
None, cost containment measures |
|
(d) |
None, cost containment measures |
|
(e) |
None, cost containment measures |
|
|
(i) |
R NIL |
(ii) |
R NIL |
|
(iii) |
R NIL |
|
(iv) |
R NIL |
|
(v) |
R NIL |
|
(vi) |
R NIL |
DENEL SOC LIMITED |
|
(a) |
None |
(b) |
Yes |
(c) |
None |
(d) |
None |
(e) |
None b(i)-(vi) |
Year |
Description |
Amount |
2014 |
Annual Membership fees Denel SOC Ltd |
R 96 300.00 |
2015 |
Annual Membership fees Denel SOC Ltd |
R 101 115.00 |
2016 |
Annual Membership fees Denel SOC Ltd |
R106 200.00 |
TOTAL AMOUNT |
R 303 615.00 |
ESKOM SOC LTD
(a)
No, Eskom has not procured any services from the Afrikaanse Handelsinstituut. However Eskom has made payments to the Afrikaanse Handelsinstituut.
Eskom has not raised a need that would require Commercial to procure services from the entity.
(a)(i)
No applicable
(a)(ii)
Not applicable
(a)(iii)
Not applicable
(a)(iv)
Eskom is a member of the Afrikaanse Handelsinstituut and from time to time supports events by the organisation.
(a)(v)
Total payments is R74 563
(a)(vi)
Year |
Description |
Amount |
2016 |
Annual Corporate Membership Fee |
R66 863 |
2016 |
Annual Conference and Gala Dinner |
R7 700 |
TOTAL AMOUNT |
R 74 563 |
(b)
No, Eskom has not procured any services from the SA Chamber of Commerce and Industry. However Eskom has made payments to the SA Chamber of Commerce and Industry.
Eskom has not raised a need that would require Commercial to procure services from the entity.
(b)(i)
No applicable
(b)(ii)
Not applicable
(b)(iii)
Not applicable
(b)(iv)
Eskom is a member of the SA Chamber of Commerce and Industry and from time to time supports events by the organisation.
(b)(v)
Total payments is R563 000
(b)(vi)
Year |
Description |
Amount |
2016 |
Annual Corporate Membership |
R113 000 |
2016 |
Gala Dinner |
R450 000 |
TOTAL AMOUNT |
R 563 000 |
(c)
No, Eskom has not procured any services from the Black Management Forum. However Eskom has made payments to the Black Management Forum.
Eskom has not raised a need that would require Commercial to procure services from the entity.
(c)(i)
No applicable
(c)(ii)
Not applicable
(c)(iii)
Not applicable
(c)(iv)
Eskom is a member of the Black Management Forum and from time to time supports events by the organisation.
(c)(v)
Total payments is R74 200
(c)(vi)
Year |
Description |
Amount |
2016 |
Annual Corporate Membership |
R34 200 |
2016 |
Annual Conference and Gala Dinner |
R40 000 |
TOTAL AMOUNT |
R 74 200 |
(d)
No, Eskom has not procured any services from the Black Business Council. However Eskom has made payments to the Black Business Council
Eskom has not raised a need that would require Commercial to procure services from the entity.
(d)(i)
No applicable
(d)(ii)
Not applicable
(d)(iii)
Not applicable
(d)(iv)
Eskom is a member of the Black Business Council and from time to time supports events by the organisation.
(d)(v)
Total payments is R 350 000
(d)(vi)
Year |
Description |
Amount |
2016 |
Annual Corporate Membership |
R200 000 |
2016 |
AGM and Gala Dinner |
R150 000 |
TOTAL AMOUNT |
R 350 000 |
(e)
No, Eskom has not procured any services from the Business Unity South Africa. Eskom did not make any payments in 2016. Eskom has not raised a need that would require Commercial to procure services from the entity.
(e)(i)
No applicable
(e)(ii)
Not applicable
(e)(iii)
Not applicable
(e)(iv)
Not applicable
(e)(v)
Not applicable
(e)(vi)
Not applicable
SAFCOL SOC LIMITED |
||
(a) |
None, cost containment measures |
|
(b) |
None, cost containment measures |
|
(c) |
None, cost containment measures |
|
(d) |
None, cost containment measures |
|
(e) |
None, cost containment measures |
|
|
(i) |
R NIL |
(ii) |
R NIL |
|
(iii) |
R NIL |
|
(iv) |
R NIL |
|
(v) |
R NIL |
|
(vi) |
R NIL |
SAX SOC LTD
South African Express Airways did not procure any services from and/or make any payments to the
(a) |
None, cost containment measures |
|
(b) |
None, cost containment measures |
|
(c) |
None, cost containment measures |
|
(d) |
None, cost containment measures |
|
(e) |
None, cost containment measures |
|
|
(i) |
R NIL |
(ii) |
R NIL |
|
(iii) |
R NIL |
|
(iv) |
R NIL |
|
(v) |
R NIL |
|
(vi) |
R NIL |
The airline is presently facing challenges pertaining to both its liquidity and profitability. As a result, the airline is currently not in a financial position to support expenditure that does not directly support the airline’s core functionality.
TRANSNET SOC LTD
a) Transnet has not procured any services from and/or made any payments to the Afrikaanse Handelsinstituut. The company is not in the list of Transnet’s service providers.
b) Transnet has made payments totaling R2 859 009 (excl. VAT) to SA Chamber of Commerce and Industry in the past three years.
(i) Detailed breakdown of costs, refer to table below:
Year |
Description |
Amount |
||||||
SPONSORSHIPS |
ANNUAL /GALA DINERS |
MEMBERSHIP/ SUBSCRIPTION |
MARKETING |
STAKEHOLDER ENGAGEMENT |
CONFERENCES |
TRAINING |
||
1 994 182 |
129 839 |
550 079 |
81 589 |
30 996 |
57 368 |
14 965 |
2 859 009 |
|
2014 |
438 596 |
- |
27 337 |
81 579 |
8 996 |
57 368 |
702 |
614 578 |
2015 |
482 456 |
51 066 |
- |
- |
22 000 |
- |
- |
555 523 |
2016 |
531 902 |
33 750 |
366 147 |
- |
- |
- |
8 298 |
940 097 |
2017 |
541 228 |
45 023 |
156 595 |
- |
- |
- |
5 965 |
748 811 |
Total Amount |
R 2 859 009.00 |
(c) Transnet has made payments totaling R1 077 193.00(excl. VAT) to Black Management Forum in the past three years.
(i) Detailed breakdown of costs, refer to table below:
YEAR |
DESCRIPTION |
AMOUNT |
2014 |
Sponsorship |
R 200 000.00 |
2016 |
Sponsorship |
R 877 193.00 |
TOTAL AMOUNT |
R 1 077 193.00 |
(d) Transnet has made payments totaling R700 000 (excl. VAT) to the Black Business Council amounting in the past three years.
(i) Detailed breakdown of costs, refer to table below:
YEAR |
DESCRIPTION |
AMOUNT |
2014 |
Annual/ Gala Dinners |
R 500 000.00 |
2015 |
Annual/ Gala Dinners |
R 50 000.00 |
2017 |
Stakeholder Engagement |
150 000.00 |
TOTAL AMOUNT |
R 700 000.00 |
(e) Transnet has made payments totaling R22 800 (excl. VAT) to Business Unity South Africa in the past three years.
(i) Detailed breakdown of costs, refer to table below:
YEAR |
DESCRIPTION |
AMOUNT |
2014 |
Annual/ Gala Dinners |
R 22 800.00 |
TOTAL AMOUNT |
R 22 800.00 |
Remarks: |
Reply: Approved / Not Approved |
|||
Mr Mogokare Richard Seleke |
Ms Lynne Brown, MP |
|||
Director-General |
Minister of Public Enterprises |
|||
Date: |
Date: |
11 April 2017 - NW585
Carter, Ms D to ask the Minister of Public Enterprises
(1)With reference to SA Express’ frequent use in 2016 of chartered planes provided by Solenta Aviation and SKA Aircraft Leasing amongst others to cover its route between (a) Bloemfontein and Johannesburg, (b) George and Johannesburg and (c) Kimberley and Johannesburg, what is the total amount of chartering a flight to cover an ordinary route that is supposed to be operated by SA Express; (2) Whether there is a service level agreement in place between SA Express and the specified companies; if not, why not; if so, what are the relevant details?
Reply:
(1)
Solenta: see the link: https://pmg.org.za/files/RNW585Solenta-170411.docx
SKA: see the link: https://pmg.org.za/files/RNW585SKA-170411.docx
(2) Yes there are contracts in place for both entities and the SLA’s are contained in both contracts.
Solenta: Contract Period: 01 Feb 2017 to 31 July 2017
SKA: Contract Period: 06 December 2016 to 31 March 2017
Mogokare Richard Seleke Lynne Brown, MP
Director-General Minister of Public Enterprises
Date: Date:
11 April 2017 - NW670
Tarabella - Marchesi, Ms NI to ask the Minister of Basic Education
With reference to her reply to question 122 on 27 February 2017, does the list of schools with access to only pit latrines include those with access to only improved ventilated pit latrines; if not, what are the names of additional schools that only have access to improved ventilated pit latrines; if so, which of the listed schools have the improved ventilated pit latrines?
Reply:
The list does not include schools with access to only improved ventilated pit latrines.
The requested information can be found on the link to the following webpage: http://www.education.gov.za/Newsroom/ParliamentaryQuestions/2017NA670.aspx containing the Annexure of the list of schools with Ventilated Pit Latrines.
11 April 2017 - NW671
Brauteseth, Mr TJ to ask the Minister of Basic Education
(1)Whether, with regard to the section 100(1)(b) intervention in the Limpopo Department of Education, (a) any performance bonuses were paid to officials of the provincial department during this period; if not, why not; if so, what amount was paid out; (2) whether she authorised any bonus pay-outs; if not, (a) who authorised the payments and (b) did she delegate authorisation powers to such persons?
Reply:
1. During the Section 100 (1) (b) Intervention in Limpopo Department of Education pay performance incentives to qualifying employees were authorised by the Administrator. The value of the performance incentives paid to qualifying employees was R11 918 310.16
2. The bonus pay-outs were authorised by the Administrator only for salary level 1 – 12 employees and SMS members were only paid pay progression.
11 April 2017 - NW698
Hadebe, Mr TZ to ask the Minister of Public Enterprises
(1)Did (a) her department or (b) any entity reporting to her participate in the Dialogue with the President: unpacking of the SONA 2017 on Radical Economic Transformation Implementation event hosted at the Oyster Box Hotel in Umhlanga, Durban, on 25 February 2017; if so, what amount was spent in each case; (2) Did (a) her department or (b) any entity reporting to her participate in the auction of the (i) souvenirs or (ii) personal belongings of the President of the Republic, Mr Jacob G Zuma; if so, (aa) which items were purchased and (bb) at what cost, in each case:
Reply:
DEPARTMENT OF PUBLIC ENTERPRISES
(1) |
(b) |
Department of Public Enterprises did not participate in the event |
||
(2) |
(b) |
Department of Public Enterprises did not participate in the event |
||
(i) |
R NIL |
|||
(ii) |
R NIL |
|||
(aa) |
R NIL |
|||
(bb) |
R NIL |
|||
ALEXKOR SOC LTD |
||||
(1) |
(b) |
Alexkor did not participate in the event |
||
(2) |
(b) |
Alexkor did not participate in the event |
||
(i) |
R NIL |
|||
(ii) |
R NIL |
|||
(aa) |
R NIL |
|||
(bb) |
R NIL |
DENEL SOC LTD |
||||
(1) |
(b) |
Denel did not participate in the event |
||
(2) |
(b) |
Denel did not participate in the event |
||
(i) |
R NIL |
|||
(ii) |
R NIL |
|||
(aa) |
R NIL |
|||
(bb) |
R NIL |
ESKOM SOC LTD
(1) |
(b) |
Eskom did not participate in the event |
||
(2) |
(b) |
Eskom did not participate in the event |
||
(i) |
R NIL |
|||
(ii) |
R NIL |
|||
(aa) |
R NIL |
|||
(bb) |
R NIL |
SAFCOL SOC LTD |
||||
(1) |
(b) |
SAFCOL did not participate in the event |
||
(2) |
(b) |
SAFCOL did not participate in the event |
||
(i) |
R NIL |
|||
(ii) |
R NIL |
|||
(aa) |
R NIL |
|||
(bb) |
R NIL |
SAX SOC LTD
(1) |
(b) |
SA Express did not participate in the event |
||
(2) |
(b) |
SA Express did not participate in the event |
||
(i) |
R NIL |
|||
(ii) |
R NIL |
|||
(aa) |
R NIL |
|||
(bb) |
R NIL |
TRANSNET SOC LTD
(1) |
(b) |
Transnet did not participate in the event |
||
(2) |
(b) |
Transnet did not participate in the event |
||
(i) |
R NIL |
|||
(ii) |
R NIL |
|||
(aa) |
R NIL |
|||
(bb) |
R NIL |
Remarks: |
Reply: Approved / Not Approved |
|||
Mr Mogokare Richard Seleke |
Ms Lynne Brown, MP |
|||
Director-General |
Minister of Public Enterprises |
|||
Date: |
Date: |
11 April 2017 - NW807
Dlamini, Mr MM to ask the Minister of Public Enterprises
(a) How many tenders have state-owned entities reporting to her awarded to a certain company (name furnished) in the period 1 January 2013 to 31 December 2016 and (b) what was the value of the tenders in each case?
Reply:
ALEXKOR SOC LTD |
|
(a) |
None |
(b) |
R NIL |
DENEL SOC LTD |
|
(a) |
None |
(b) |
R NIL |
ESKOM SOC LTD
(a) |
None |
(b) |
R NIL |
SAFCOL SOC LTD |
|
(a) |
None |
(b) |
R NIL |
SAX SOC LTD
(a) |
None |
(b) |
R NIL |
TRANSNET SOC LTD
(a) |
None |
(b) |
R NIL |
Remarks: |
Reply: Approved / Not Approved |
|||
Mr Mogokare Richard Seleke |
Ms Lynne Brown, MP |
|||
Director-General |
Minister of Public Enterprises |
|||
Date: |
Date: |
10 April 2017 - NW726
Steyn, Ms A to ask the Minister of Agriculture, Forestry and FisheriesQUESTION
(1) What is the (a) total amount that his department spent on combating the fall armyworm (FAW), (b) breakdown of the expenditure on each item and (c) departmental (sub) programme from which the money was disbursed; (2) (a) what is the total number of small scale and subsistence and (b) commercial farmers/beneficiaries affected by the FAW who have received support from his department in each (i) province and (ii) district and (c) in each case, (i) what support have these farmers received and (ii) at what cost?
Reply:
(1)(a) Total amount spent by DAFF on combatting FAW to date is R88 500.
(1)(b) Sub programme: Plant Production and Health (policy) Directorate Plant Health:
Scouting, visiting farms and addressing extension personnel in provinces: R42000
Attending Portfolio Committee: R12000
Subtotal: R54 000
Subprogram: Inspection and Quarantine Services (operational)
Directorate Food Import Export Standards:
Conduct activities on awareness and education to extension personnel and producers in provinces: R13000
Subtotal: R13000
Directorate Inspection Services:
Visiting farms, taking samples, addressing provinces and extension personnel: R21000
Diagnostic analysis: R500
Subtotal: R21500
Total: R88500
Note: The above excludes costs incurred by provincial departments of agriculture, farmers and industry.
(1)(c) Departmental programme from which the above monies were disbursed is Agricultural Production, Health and Food Safety.
(2) (a),(b) & (c) Since DAFF does not have sufficient budget to cater for unforeseen pest outbreaks, there was no direct financial or pesticide support to farmers from DAFF. We are aware that some Provincial Departments of Agriculture made use of some of the unspent 2016/17 CASP Disaster funds to support producers affected by FAW. DAFF has not received reports back from Provinces on the extent of funding used for that purpose; this will be detailed in the annual CASP reports which provinces will be submitting at the end of the current financial year.
Further, DAFF facilitated the urgent process of pesticide registration for combatting FAW, as well as awareness and technical training for extension personnel to ensure farmers are provided with accurate and technically justified information on registered pesticides for combatting FAW. Accordingly, through the emergency registration procedure, DAFF registered a sufficient variety of agricultural chemicals with different modes of action to allow for proper chemical control of FAW on known hosts and potential hosts.
10 April 2017 - NW900
Hadebe, Mr TZ to ask the Minister of Transport
Whether the Air Traffic and Navigation Services has any debt that has remained unpaid for 30 days or more; if so, (a) what (i) are the details of these debts, (ii) are the reasons for non-payment in each case, (b) on what date will each debt be settled and (c) what (i) processes, (ii) procedures and (iii) mechanisms are in place to ensure that payments are made on time?
Reply:
ATNS has no debt that remained unpaid for more than 30 days. Therefore (a) to (c) with subsections are not applicable.
10 April 2017 - NW751
Van Dalen, Mr P to ask the Minister of Environmental Affairs
(1)When will the centralised national electronic permitting system of the Convention on the International Trade in Endangered Species of Wild Fauna and Flora, which her Department has said that they have been working on for almost 20 years, be implemented; and (2) will the implementation of the system enable the public to (a) be informed about the regulations that affect them, (b) access notices of receipt of application, (c) view the proposed rules and notices of availability of documents, such as permit applications which are published to provide the public an opportunity to comment; and (d) access the final version of regulations once public comments have been considered; if not, why not; if so, what are the relevant details?
Reply:
(1) The Department will pilot the Convention on International Trade in Endangered Species of Wild Fauna and Flora permit system in the 2017/18 financial year, and the final national implementation of the system will depend on the adjustments to be made based on the pilot phase.
(2) (a) The permit system is based on the requirements in the regulations. These regulations that affect the public are made available in the Government Gazette, a national newspaper and on the Department’s website.
(b) Yes. The system will generate an acknowledgement of receipt of the application and the applicant will be able to track the status of the application.
(c) No. Public participation processes relating to new legislative provisions will not be done through the permitting system, but will be done in terms of Section 100 of the National Environmental Management: Biodiversity Act, 2004 (Act No. 10 of 2004). Permit applications and the processing thereof will not be published for public comments.
(d) The final versions of regulations are published in the Government Gazette. The final versions of regulations will not be published through the permit system.
---ooOoo---
10 April 2017 - NW798
Van Dyk, Ms V to ask the Minister of Rural Development and Land Reform
(1)(a) How many land claims have been submitted in the Namaqualand area (details furnished) in the Northern Cape in each of the past 10 financial years, (b) what is the name of each community that submitted a land claim, (c) for which area(s) was each claim lodged and (d) what is the current status of each specified claim; (2) whether any person submitted any of the claims on behalf of the communities; if so, what are the relevant details in each case; (3) whether any land claims have been lodged by or on behalf of the Komaggas community; if so, (a) for which area specifically and (b) what is the current status of the claim?
Reply:
1. (a)
(b) Name of Community Claim |
(c) Local Municipality |
(d) Status |
(2) Name of Claimant |
1.DieSkool randvlei 2. NG Sendings Kerk
3.Ramkamp Community
4.Verenigende Gereformeerde Kerk |
Hantam ( 164 Claims) |
Lodgement Lodgement Lodgement Lodgement |
W.M Hendricks P.J West S. Balea P.J West |
1.Garies Community Claim
2.Soebatsfontein Community Claim |
Kamiesberg (15 Claims) |
Lodgement Lodgement |
D.R Maarman P. Clasen |
1.Grootmist Community Claim
2.Port Nolloth Community
3. Anglican Church People 4.Porth Nolloth Community Claim |
Richtersveld (150 Claims) |
Lodgement Lodgement Lodgement Lodgement |
E. Esas M.B Mtetandaba D.R Augustus P.J Cloete |
Individual Claimants |
Karoo Hoogland (27 Claims) |
Lodgement |
Skiffers Meikie; Van Sitters Johannes Jacobus; Botes Klaas; Riekert Willem Stephannus; Haas Willem German; Booisen Magrita Dorethea; Rickett Irene Henrieta; Malgas Rina Katriena; Malan Cornelius Daniel; Wilskut Anna; Beukes Jacolean; Goliath Katriena; Keyser Martha; Keyser Simon Frederik; Van der Horst Katrina; Tieties Lena Martha; De Vos Jan; Januarie Anna; Van Wyk Hanna; Matala Nicolaas Jacobus; Floors Anna Magrieta; Malgas Elias; Haas Sonja ; Hoorn Johannes; Isaacs Martheunis Johannes; Van Wyk Lena Levina; Malgas Maria; Severus Ragel; |
Pofadder Community Claim |
Khai Ma (14 Claims) |
Lodgement |
J.P.I Joseph |
Agge-oes Community Claim |
NamaKhoi (50 Claims) |
Lodgement |
B. Abraham |
(3) No.
10 April 2017 - NW745
Purdon, Mr RK to ask the Minister of Environmental Affairs
What is the total number of rhinos in the Kruger National Park that (a) died from drought conditions in 2016, (b) were killed illegally through poaching, (c) were translocated and to where and (d) were sold?
Reply:
(a) A total of 190 rhinos died from natural causes during 2016. This natural mortality includes deaths due to the drought and increased fighting amongst rhino males as a result of drought.
(b) A total of 662 rhinos were illegally killed in the Kruger National Park during 2016.
(c) Eleven rhinos were translocated internally in the Kruger National Park for security reasons in 2016. Twenty one (21) rhino orphans were rescued in 2016 and 19 are currently still alive at rhino holding facilities in the Kruger National Park and an external rhino rehabilitation centre. We cannot share locations for security reasons.
(d) A total of 106 rhinos were sold in 2016 from the Kruger National Park to two owners in the Northern Cape (further details cannot be made available for security reasons). Follow-up visits to these properties were done in November 2016 and the rhino translocations were successful.
---ooOoo---
10 April 2017 - NW722
Van der Westhuizen, Mr AP to ask the Minister of Higher Education and Training
(1) What is the total number of subject results relating to the November 2016 examinations for the national certificate (Vocational) that were only finalised and released after February 2017; (2) were any outstanding marks brought under his departments attention, even though all information required to finalise the individual results was submitted by the public colleges to the department at or before the due dates as per the examination schedule; if so, what is the total number of such subject results that that were affected; (3) whether in future his department is planning to release the final marks affected by the performance of candidate’s in the November examinations before the start of the registration period for the March supplementary examinations; if not, why not; if so, how will it be achieved?
Reply:
- The total number of National Certificate (Vocational) [NC(V)] subject results for the November 2016 examinations that were only finalised and released after February 2017 was 1 267 out of a total of 1 034 400 subject results. This was due to colleges submitting an inordinate number of absentees and incorrect marks. Colleges were requested to confirm the examination results and where colleges submitted mark changes, these had to be supported by portfolios of evidence. This exercise proved that colleges were not always meticulous in the verification of marks prior to submission to the Department for processing. The Department will be implementing consequence management to mitigate the recurrence of this behaviour.
- The final Schedule of Results for the NC(V) levels 2 to 4 for the November 2016 examinations was released to examination centres on 4 March 2017. However, 949 subject results could not be processed and released due to Colleges submitting changes/corrections of marks after the 6 to 10 February 2017 period. The 949 subject results have since been processed and submitted to Umalusi for quality assurance, and it is envisaged that the results will be re-released on 31 March 2017.
- Yes in the future, the Department is planning to release the final marks of the November examinations prior to the start of the registration period of the March supplementary examinations. The Department will also be implementing key initiatives for future examinations, where college Principals or their delegated officials, no less than a Deputy Principal or Campus Manager, will sign off on all marks before consideration by the Department for processing. This initiative will ensure that college Principals take full accountability for the completeness and accuracy of mark submissions.
COMPILER/ CONTACT PERSONS:
EXT:
DIRECTOR – GENERAL
STATUS:
DATE:
QUESTION 722 APPROVED/NOT APPROVED/AMENDED
Dr BE NZIMANDE, MP
MINISTER OF HIGHER EDUCATION AND TRAINING
STATUS:
DATE:
10 April 2017 - NW744
Hadebe, Mr TZ to ask the Minister of Environmental Affairs
With reference to a press release by the SA National Parks in 2010 (details furnished) and her press release on 27 February 2017 (details furnished), how does she explain the loss of at least 2 377 white rhinos from the Kruger National Park since 1 January 2010?
Reply:
The honorable member is aware that numerous interventions have been implemented since 2008/9 by government and other stakeholders to address the scourge of poaching and illegal trade in rhino horn. The poaching (illegal killing) remains a priority crime and the integrated strategic management approach approved by Cabinet in 2014 and implemented by the relevant government departments, is resulting in the reduction of losses experienced in Kruger National Park. This is despite a continued increase in the number of illegal incursions into the Kruger National Park. The successes achieved are because of, inter alia, our dedicated law-enforcement authorities, dedicated prosecutors, customs and excise officials and the Department of Environmental Affairs’ Green Scorpions.
South Africans are urged to report any wildlife crime so that we, as an integrated law enforcement effort team, can continue to successfully act against organised criminal enterprises fostering rhino poaching.
The Kruger National Park was specifically targeted by poachers from the onset of this onslaught and the following was implemented in the Park to address the illegal killing of rhino:
Around 2010, South African National Parks (SANParks) reacted to the escalation in poaching by training and equipping existing rangers, crime investigators and the air wing to cope with a totally new set of circumstances associated with the increase in poaching. All of a sudden the one thousand kilometres of boundary of the Kruger National Park (KNP) had to be protected from intrusions by poachers sponsored by both international and local crime networks. This endeavour was challenged by the sheer magnitude of the poaching (till 2014 mostly from Mozambique) onslaught in subsequent years. The number of poaching incidents later soared to about seven a day with up to a dozen poacher groups active inside the Park on any day. To contain this over two million hectares was challenging in all respects.
It was soon realized that the new dimension of organized crime impacting on wildlife in the (KNP) was a matter to be dealt with by all of the Security Cluster participants as well the Mozambique law enforcement agencies. None of the aforementioned were really prepared for this challenge and it took time to mobilize them given all their other priorities.
In 2012, SANParks (with the direct support of the Minister), increased the ranger numbers with 50%, resulting in one hundred and fifty extra rangers. This new capacity had to be developed into a mission ready capability of staff, equipment, training, sustainment and applicable doctrine.
Since 2013, a para military approach was adopted and a formal structure was established to deal with the threat.
In 2014, an integrated national strategy was implemented to counter the escalating poaching onslaught. Apart from law enforcement, the plan also covers the management of the asset (rhino) in the form of translocations, maximizing breeding and rhino orphanages. Another part of the plan addresses community needs and creating long term sustainable economic alternatives. The strategy furthermore addresses the quest for game changers such as the technology based force multipliers and the collapse of crime networks.
By the end of 2015 the newly established anti – poaching unit (APU) was mission ready. The air wing, canine unit and special rangers were expanded and appropriate technologies acquired. The air and ground mobility was enhanced and the capacity for night operations improved. This capability was deployed on a well thought out zoning approach to address the right priority areas at any one time. The investment started paying off and during that year rhino poaching figures could be stabilized for the first time since the start of the scourge.
During 2016 the figures decreased by twenty percent and the current drive is to continue this trend over the next three years.
SANParks also took the initiative to co-opt the various parties in Mozambique and other parks and reserves to the west of KNP in a successful alliance (Greater Kruger Environmental Asset Protection Foundation) concept that is now ensuring more preventative actions by these neighbours outside the KNP.
It is noteworthy that whilst SANParks accepts its roles and responsibilities to combat wildlife crime inside the protected area in terms of its legal mandate, the organized crime elements should be combatted at its origin outside the Park.
While the enforcement focus was needed to bring the situation under control, SANParks also recognise the need to continue to invest in the other pillars of the Integrated Strategic Management approach adopted by Cabinet in 2014.
As opposed to the figure that the honorable member quotes, in terms of our information the Kruger National Park lost 3 744 rhino between 2010 and 2016 due to poaching. This is despite our very intense fight against rhino poaching and in the face of an ever increasing number of incursions into the Park. The losses due to poaching have been reported regularly to the public through detailed quarterly progress reports.
---ooOoo---
10 April 2017 - NW813
Lotriet, Prof A to ask the Minister of Higher Education and Training
What is the total number of (a) male and (b) female students who can be accommodated in student housing at the Atlantis Campus of West Coast College; (2) what are the details of the (a) ablution facilities and (b) food preparation areas provided for at each of the residences managed by the Atlantis Campus of West Coast College; (3) How does the provision of ablution facilities and food preparation standards at this campus compare with the Minimum Norms and Standards for Student Housing at Public Universities issued in September 2015?
Reply:
(1) The West Coast Technical and Vocational Education and Training (TVET) College does not own student accommodation. The college has rented accommodation facilities at which it provides catered student accommodation. The Atlantis Campus has a total of 120 beds in 2 residences. The Grassmere residence accommodates 60 male students and Robinvale residence accommodates 60 female students.
(2) (a) There are 4 showers, 1 bathroom and 5 toilets for male students, and 10 showers and 10 toilets for female students.
(b) The Campus has 2 kitchens with food preparation areas. At the Grassmere residence, the kitchen is able to accommodate 60 students in its dining area. At the Robinvale residence the kitchen and dining area accommodates 25 students with students being required to take meals on a set schedule. The college provides catering with each kitchen having 3 gas stoves, fridge, 2 freezers, kitchen sink, food serving and dry food storage areas.
(3) The said norms and standards do not apply to TVET colleges. The Department as part of its Student Housing Infrastructure Programme will be developing policy on student housing covering both TVET colleges and universities.
CONTACT PERSONS:
Ext.:
DIRECTOR – GENERAL
STATUS:
DATE:
QUESTION 813 APPROVED/NOT APPROVED/AMENDED
DR BE NZIMANDE, MP
MINISTER OF HIGHER EDUCATION AND TRAINING
STATUS:
DATE:
10 April 2017 - NW740
Steenkamp, Ms J to ask the Minister of Environmental Affairs
Why was no Committee of Inquiry established to investigate the feasibility of a domestic trade in rhino horns, as was the case of the Committee of Inquiry to investigate the feasibility of the country tabling a proposal for an international trade in rhino horn?
Reply:
There was no need to establish a Committee of Inquiry to investigate the feasibility of a domestic trade in rhino horns, because the Department commissioned a feasibility study in 2011 to determine the viability of legalising the trade in rhino horn within South Africa, as agreed at the Rhino Summit, hosted in October 2010, by the then Minister of Water and Environmental Affairs. The feasibility study was concluded in 2013 and released in 2014. This report recommended a number of measures to be implemented, including, but not limited to, the following:
.The development and maintenance of a secure, national electronic system to monitor rhino related permits and a database for rhino horn stockpiles;
- Audits of rhino horn stockpiles;
- Deployment of sniffer dogs at ports of entry and exit to assist officials in detecting wildlife products;
- Training of officials at ports of entry and exit in methods of detecting wildlife being smuggled, as well as the relevant legislation to assist them with arrests and seizures;
- The enhancement of enforcement capacity, including the deployment of Environmental Management Inspectors at OR Tambo; and
- The development of a mechanism/system to control or regulate legal trade in South Africa to be in terms of national legislation.
6. This report is available on the following Department’s website:
---ooOoo---
10 April 2017 - NW896
Hunsinger, Dr CH to ask the Minister of Transport
Whether her department has any debts that have remained unpaid for 30 days or more; if so, (a) what (i) are the details of these debts, (ii) are the reasons for non-payment in each case, (b) on what date will each debt be settled and (c) what (i) processes, (ii) procedures and (iii) mechanisms are in place to ensure that payments are made on time?
Reply:
a) The department does not have any debts that remained unpaid for 30 days or more.
a) (i) N/A
(ii) N/A
b) N/A
c) (i) Payments to creditors are processed on a daily basis.
(ii) An invoice is received from the supplier; the invoice is certified by the project manager, a payment advice is compiled and approved by the relevant delegated authority; the payment is processed and authorised on the system and the amount is paid.
(iii) The Department implemented a payment tracking system to monitor and track payments.