16 November 2018 - NW3176

Profile picture: Steyn, Ms A

Steyn, Ms A to ask the Minister of Agriculture, Forestry and Fisheries

(1) (a) What number of inspector positions exist in the Directorate Food Safety and Quality Assurance and (b) what number of posts are (i) filled and/or (ii) vacant; (2) Whether any work of the Food Safety and Quality Assurance is outsourced; if not, why not; if so, (a) what kind of work is outsourced and (b) what is the budget for outsourcing?

Reply:

  1. (a) The Directorate Food Safety and Quality Assurance does not have positions or designations of inspector posts in their establishment since in the main it is the policy development unit. The Directorate utilizes a matrix of inspectors residing within the Directorate Inspection Services and the designated assignees to enforce the two legislations (Agricultural Product Standards Act 119 of 1990 and the Liquor Products Act 60 of 1989). There are currently 39 inspectors who are responsible for inspection of certain regulated products and the exercise of an oversight role over the activities of the designated assignees. (b) there is a total of (i) 30 (thirty) filled posts and (ii)  9 (nine) vacant posts.\
  2. (a) There is no work of the Directorate Food Safety and Quality Assurance that has been outsourced. However, the Agricultural Product Standards Act 119 of 1990 does allow the designation of assignees to complement the inspection services. There are currently seven assignees in terms of the Agricultural Product Standards Act (b) the designation does not cost the department anything.

16 November 2018 - NW3213

Profile picture: Cassim, Mr Y

Cassim, Mr Y to ask the Minister in the Presidency

Has the National Youth Development Agency (NYDA) subsidised in any way movie tickets for the viewing of the film Black Panther; if so, does this fall within the approved programmes of the NYDA in terms of their annual performance plan?

Reply:

  1. The NYDA has not subsidised movie tickets for the viewing of the film Black Panther.
   

Approved

Not

Approved

Approved

as amended

   

Comment:

Dr NC Dlamini-Zuma

Minister in the Presidency: Planning Monitoring and Evaluation

   

Date:

   

16 November 2018 - NW3277

Profile picture: Khawula, Mr M

Khawula, Mr M to ask the Minister of Women in the Presidency

Whether (a) her Office and/or (b) entities reporting to her awarded any contracts and/or tenders to certain companies (names and details furnished) from 1 January 2009 up to the latest specified date for which information is available; if so, in each case, (i) what service was provided, (ii) what was the (aa) value and (bb) length of the tender and/or contract, (iii) who approved the tender and/or contract and (iv) was the tender and/or contract in line with all National Treasury and departmental procurement guidelines?

Reply:

a) The department did not award any contracts and/or tenders to certain companies (names and details furnished) from 1 January 2009 up to the latest specified date for which information is available.

    1. N/A
    2. (aa) (bb) N/A
    3. N/A
    4. N/A

b) The Commission Gender Equality is a Chapter 9 institution that reports to Parliament.

  1. N/A
  2. (aa) (bb) N/A
  3. N/A
  4. N/A

 

Ms BO Dlamini, MP

 

16 November 2018 - NW3391

Profile picture: Bozzoli, Prof B

Bozzoli, Prof B to ask the Minister of Science and Technology

1. Whether she has found it within normal parameters for three members of the Board of the National Research Foundation to come from a single University, the University of Johannesburg?

Reply:

 

1.1 Yes, The Board of the National Research Foundation (NRF) was appointed in line with section 6(3) of the NRF Act,1988 (Act No 23 of 1988) as amended by the Science and Technology Laws amendment, 2014 (Act No 7 of 2014). In terms of the Act, members of the NRF Board must all be persons who havs achieved distinction in the fields of research, technology, technology management, business or civil society, and they must broadly represent the higher education, broad scientific disciplines the business sector and civil society.

1.2  The three Board members from the University of Johannesburg were appointed to represent the sectors, namely; Higher Education; Broad Scientific Disciplines and Governance. Due consideration was also given to, among other things, the capacity of an individual to influence preferred outcomes (internally and externally) through his/her involvement on the Board, and the availability to meaningfully contribute their time and abilities to the affairs of the Board irrespective of their institutional association.

16 November 2018 - NW3256

Profile picture: Lees, Mr RA

Lees, Mr RA to ask the Minister of Women in the Presidency

What (a) amount did (i) her Office and (ii) each entity reporting to her borrow from any entity in the People’s Republic of China (aa) in each of the past three financial years and (bb) since 1 April 2018, (b) is the name of the lender of each loan, (c) conditions are attached to each loan and (d) are the repayment periods for each loan in each case?

Reply:

(i) The Department did not borrow any amount from any entity in the People's Republic of China.

(aa) N/A (bb) N/A

(ii) The Commission Gender Equality is a Chapter 9 institution that reports to Parliament.

(aa) N/A

(bb) N/A

b) N/A

c) N/A

d) N/A

 

 

Ms BO Dlamini, MP Minister in the Date:

Responsible for Women

 

16 November 2018 - NW2984

Profile picture: Robertson, Mr K

Robertson, Mr K to ask the MINISTER OF RURAL DEVELOPMENT AND LAND REFORM:

Whether she will furnish Mr K P Robertson with the updated list of beneficiaries of the Somhlolo Trust, which was verified by the University of Pretoria in March 2018?

Reply:

The Department and the Commission on Restitution of Land Rights have not yet received the final report on the originally dispossessed individuals from Somhlolo Trust verified by the University of Pretoria. This report will then inform the verification of all beneficiaries of this land claim.

16 November 2018 - NW3436

Profile picture: Steenhuisen, Mr JH

Steenhuisen, Mr JH to ask the Minister of Agriculture, Forestry and Fisheries

(1) (a) On what date did his department last conduct an audit of artwork owned by Government which is under his department’s curatorship and (b) what are the details of each artwork under the curatorship of his department according to the Generally Recognised Accounting Practice 103; (2) whether any artworks under his department’s curatorship have gone missing (a) in each of the past five financial years and (b) since 1 April 2018; if so, what are the relevant details?

Reply:

For the past ten (10) financial years artwork was not identified as a high risk area to be audited and therefore no internal audits were conducted of artwork owned by Government which is under the Minister’s department’s curatorship. Although no internal audits were done there are regular stock takes of assets performed by the Directorate: Asset Management. The latest stock take conducted on the artwork in the Ministry office in Cape Town was on 20 September 2017 and no discrepancies were found.

Currently there are five artwork paintings and all five of them are currently in room 106 in Cape Town. Please refer to the attached document for the details as per the stock take conducted on 20 September 2017.

16 November 2018 - NW2867

Profile picture: Kopane, Ms SP

Kopane, Ms SP to ask the Minister of Health

Whether a certain person (name furnished) employed at the Komani Psychiatric Hospital in Queenstown in the Eastern Cape met the stipulated qualifications of the advertised post at the time of the specified person’s appointment?

Reply:

No allegations of corruption and/or maladministration were brought against Ms Nosisana Toni in the period 2014 to date.

 

END.

16 November 2018 - NW2983

Profile picture: Robertson, Mr K

Robertson, Mr K to ask the MINISTER OF RURAL DEVELOPMENT AND LAND REFORM:

(1) Whether a certain person (name furnished) signed an agreement with her department to lease the Richtersfontein farm near Kamhlushwa in the Nkomazi Local Municipality in Mpumalanga; if not, what is the position in this regard; if so, (a) on what date was the agreement signed and (b) what (i) is the term and (ii) are the conditions of the agreement; (2) whether the existing agreement will be terminated and/or not renewed; if so, what are the relevant details; (3) whether the specified farm was purchased as part of her department’s redistribution programmes; if not, was it restituted; if so, what (a) was the purchase price, (b) is the size of the farm and (c) portion is arable and is currently being farmed; (4) (a) what grants have been given to groups after the purchase of the property, (b) who are the groups that have occupied and received these grants and what amount has each group received and (c) according to which programme has each group received these grants?

Reply:

  1. No.

(a),(b)(i)-(ii) Falls away.

2. Falls away

3. (a),(b) Falls away

4. (a),(b),(c) Falls away

16 November 2018 - NW3314

Profile picture: Ntlangwini, Ms EN

Ntlangwini, Ms EN to ask the Minister of Trade and Industry

(1) (a) On what date was the information technology (IT) infrastructure of (i) his department and (ii) entities reporting to him last upgraded or updated, (b) what is the name of the company contracted to do the upgrades, (c) what was the monetary value of the contract and (d) what is the name of each IT system that was upgraded; (2) (a) what is the name of the company that is currently responsible for the maintenance of the IT systems of (i) his department and (ii) entities reporting to him and (b) what is the value of the contract?

Reply:

Response from the Department

ICT Infrastructure

(a)

Date Upgraded

(b)

Name of Company responsible for upgrades

(c)

Monetary Value

Network Infrastructure

2014

Dimension Data

R10 282 962.96

Telephony

2015

ATIO

R20 523 626.31

Server Infrastructure

2017

Aptronics

R4 852 563.03

Backup Infrastructure

2017

XON

R21 134 379.99

ICT Infrastructure

(a)

Name of Company responsible for current maintenance

(b)

Monetary Value

Enterprise Content Management

We solve ECMS

R4 611 068.25

Novell / Email Infrastructure

Micro Focus

R3 977 445.62

Microsoft Enterprise Agreement

Microsoft

R27 864 735.78

Architecture for Integrated Systems (ARIS)

Software AG

R343 101.97

CA Service Desk Solution

Computer Associates

R346 560.00

Network Operating Centre

Alteram Solutions

R8 148 256.96

Antivirus Software

Datategra

R488 203.02

Web Gateway Security -MacAfee

Dynamic Recovery Services

R192 802.50

Vulnerability tool

XON

R1 431 965.40

Response from the Entities

Entity

(1)(a)(i)(ii)

(1)(b)

(1)(c)

(1)(d)

(2)(a)(i)(ii)

(2)(b)

Companies and Intellectual Property Commission (CIPC)

The CIPC (IT) infrastructure was last upgraded or updated on 21 May 2018

DAC Systems

R2 942 731

Design, implementation and support of Microsoft Sharepoint 2013

DAC Systems

R2 942 731

Companies Tribunal (CT)

CT (IT) infrastructure was last upgraded or updated on 1 April 2018

Sage VIP

R22 218.00

VIP Payroll license renewal

All maintenance of the IT systems are done internally by CT IT staff at no extra cost to CT

Not applicable

Export Credit Insurance Corporation (ECIC)

The ECIC (IT) infrastructure was last upgraded or updated is due to expire end of February 2019

-The Network and Server Hosting’s contract with Internet Solutions

-The BoardPacks solution contract with

Faranani IT solutions

- AccTech

-R6 452 404.92

-R993 623

-R 3 768 637,17

- To administer and manage committee

meetings

-Microsoft

AX 2012 in May 2015

-Internet Solutions

-Faranani IT solutions

-Bytes Solutions

-AccTech

-Jasco

-R6 452 404.92

- R993 623

-R1 920 000

-R3 768 637,17

-R894 502

National Consumer Commission (NCC)

The NCC had no upgrade of IT infratructure since its inception. Server donated by the dti in 2018 and integrated into IT infrastructure

- Sage VIP

-Lar & AssociatePs

-SOC Services

-R396 502.25

-R491 717.17

-R484 777.14

-VIP Premier

-Sge 300

-NCC Contact Centre

-The SOUTH AFRICAN BUREAU OF STANDARDS (Servers hosting and maintenance)

-SAGE VIP Premier

-LAR &Associates

-SPOC Services

R65 069.00

R396 506.25

R 350 400.00

R163 698.30

National Consumer Tribunal (NCT)

The NCT was last upgrated or updated 2 October 2018

ITATEC

R209,535.24

Access Control System

-LanLogix

-E-Software

-R484,416.00

-R447,390.00

National Credit Regulator (NCR)

The NCR was last upgrated or updated in 1/09/2015

VODACOM (PTY)LTD

R1 824 578.12

20MB FIBRE line AND 20 MBMICORWAVE LINE

NAMBITI TECHNOLOGIES

R4 366 694.59

National Empowerment Fund (NEF)

The NEF was last upgrated or updated in 2017

-Internet Solutions

-Leichan IT

-Vukani

Technologies

-R 90 100.00

-R321 204.12

-R 356 142.44

-Upgrade from ADSL to Fibre line

installation for nine (9) provinces

over the period 3 years

- Server Infrastructure upgrade

-Server storage upgrade

-PWC

-Key Concepts

-R 374 980.20

-R 141 000.00

National Gambling Board (NGB)

The NGB was last upgrated or updated in September 2018

-Server Hardware was supplied by Sizwe IT Group; and

-Server Operating System Software was supplied by EOH

JustNet Solutions

R340 770.06

R470,855,58

R326,769.00

- HP Server Generation 8 SL2500 x 2;

- Microsoft Windows Server Datacentre 2012;

- Microsoft Active Directory 2012;

- Microsoft Exchange 2010;

- Microsoft Office 2016 Professional Plus

Microsoft Exchange, and Active Directory user Client Access Licenses

   

National Lotteries Commission (NLC)

TheNLC had an Oracle Infrastructure Upgrades including Disaster Recovery Provisioning

Microsoft Infrastructure Upgrade

Oracle South Africa

EOH Mthombo (PTY) LTD

R5M

R388K

Oracle Fusion ERP (On Premise) – HCM,FIN,SCM, GMS (Grant Funding Management)

Oracle South Africa

R5M

National Metrology Institute of South Africa (NMISA)

The NMISA was last upgrated or updated in September 2018

EOH

R37 142.72

HP Virtual Datacenter

- EOH

-Tintri

- EOH

-Lemcon Likusasa

-EOH

- CSIR

- Yneldo Electronics

- ACCTECH Systems

-ACCTECH Systems

-Microsoft through Neo Technologies

-Microsoft through Greendata ICT Solutions

-FlowCentric SA

-Sage South Africa

-Scientrix

-Rhinoforce Protection Services

-Bytes

-TENET

-AvePoint

-Executive Solutions

-DAC Systems

-EOH

-R 3 065 793.68

-R2 137 242.13

-R 129 026.34

-R 49 143.95

-R 21 007.35- Exnsion of IPs for Aruba wireless

-R 478 800.00

-R 1 256 349.00- Tender amount

-R 35 921.40- Upgrade: Additional Connection Points

-R 19 317.70

-R 263 951.89

-R72 33.70 185 licenses

-R 18 433.80- 30 licenses

-R 498 430.80- E-Tendering System: Sizwe Africa IT Group

-R 11 491.20- User licenses & annual maintenance

-R 47 202.60- Annual license fee

-R 246 184.00- Sage people 300 upgrade

-R 78 472.00- Sage people 300 Hosting

-R 718 200.00- Tender amount

-R 552 763.60- Annual enterprise licenses

-R 499 765.17

-R 1 394 057.80

-R 454 752.00

-R 233 126.282

R 66 574.33- DocAve Complete 15 months license

R 300 456.72

-R 197 461.18

-R 1 312 617.20

National Regulator For Compulsory Specifications (NRCS)

The NRCS was last upgrated or updated in 17 May 2018

Trillcom

R22 462 946.25

-IBM blade servers

-IBM storage

-Fortigate Firewall 200d

-new 6 Cisco LAN Switches,

-MPLS to link 5 regional offices (Pretoria, Cape Town, Bloemfontein, Port Elizabeth, Durban), Internet line

- Disaster Recovery site and Corporate APN.

- Netscreen Consulting

- Resolve Red: JDE Financial System Support

- Sithabile Technology

- R6,201,746.58

- R349,200.00

-: R2,229,142.80

South African Bureau of Standards (SABS)

The SABS was last upgrated or updated in 2017/18

Telkom sa

Pro Networks

-R26 000.000

-R2000.000

-Telkom MPLS

-Fortigate Firewalls

Microsoft system support (FIM, Systems Centre) support

R342 000

South African National Accreditation System (SANAS)

The SANASA was updated from May 2018 and is ongoing till September 2019

-EOH Mthombo

-Core Focus

-R 1 508 374.67 -R 4 875 423.75

-Supply of 3 new servers, 1 new SAN device, 4 new network switches, 1 new switch cabinet and 1 new UPS as well as the setup and commissioning of Windows server 2016) - EOH Mthombo Upgrade

-SharePoint Environment upgrade and further automation of accreditation processes- Core Focus

-EOH Mthombo (Servers) and

-Core Focus (Sharepoint Environment SLA)

-R 1 577 416.32 for 36 months

-R 481 536.00 for 24 months

“Except as explicitly state herein the Ministry: Department of Trade and Industry (the dti) does not express an opinion in respect of any factual representations. The opinion /memo provided is limited to the matters stated in it and may not be relied on upon by any person outside the dti or used for any other purpose neither in its intent or existence. It must not be disclosed to any other person without prior written approval other than by law. Nothing contained herein shall be construed as limiting the rights of the dti to defend or oppose any claim or action against the dti."

16 November 2018 - NW3081

Profile picture: Vos, Mr J

Vos, Mr J to ask the Minister of Agriculture, Forestry and Fisheries

Why was the remainder of Groote Zalze 998 in Stellenbosch excluded from the provisions of the subdivision of Agricultural Land Act, Act 70 of 1970, as published in notice 152 in Government Gazette 41473 on 2 March 2018?

Reply:

  1. The remainder of the Farm Groot Zalze 998 in Stellenbosch was defined as an agricultural land prior to the publication of 2 March 2018, gazette 41473.
  2. Following engagement with the Western Cape Provincial Department of Agriculture, Stellenbosch Municipality and public consultation through gazette, the Farm Groot Zalze 998 was excluded in terms of section 1 of SALA

16 November 2018 - NW3101

Profile picture: Maimane, Mr MA

Maimane, Mr MA to ask the Minister of Agriculture, Forestry and Fisheries:

Whether, since he served in Cabinet, he (a)(i) was ever influenced by any person and/or (ii) influenced any of his department’s employees to take any official administrative action on behalf of any (aa) member, (bb) employee and/or (cc) close associate of the Gupta family and/or (b) attended any meeting where any of the specified persons were present; if so, what are the relevant details in each case?

Reply:

  1. Minister has never been –

(a)(i) Influenced by any person; nor has

(a)(ii) Minister ever influenced any member of staff in his department to take any official administrative action on behalf of any –

(aa) member;

(bb) employee; and/or

(cc) a close associate of the Gupta family.

 

(b) Minister has never attended any meeting where any of the specified persons were present.

16 November 2018 - NW2934

Profile picture: Tshwaku, Mr M

Tshwaku, Mr M to ask the Minister of Public Service and Administration

(a) What (i) is the total number of employees that have been outsourced from private companies and/or contractors by (aa) her department and (bb) each entity reporting to her (aaa) in the past three financial years and (bbb) since 1 April 2018 and (ii) is the name of each company or contractor and (b) what amount is each employee paid?

Reply:

The Department and its entities have not outsourced any employees from private companies/or contractors in the past 3 years including 2018.

 

16 November 2018 - NW3275

Profile picture: Tshwaku, Mr M

Tshwaku, Mr M to ask the Minister of Public Service and Administration

Whether (a) her department and/or (b) entities reporting to her awarded any contracts and/or tenders to certain companies (names and details furnished) from 1 January 2009 up to the latest specified date for which information is available; if so, in each case, (i) what service was provided, (ii) what was the (aa) value and (bb) length of the tender and/or contract, (iii) who approved the tender and/or contract and (iv) was the tender and/or contract in line with all National Treasury and departmental procurement guidelines?

Reply:

Names of companies, which have been awarded contract and or tender by the Department and its entities, including details of contracts and or tender, such as services provided were submitted to Parliament in the form of Annual Reports, which were tabled in Parliament.

16 November 2018 - NW3121

Profile picture: Figlan, Mr AM

Figlan, Mr AM to ask the Minister of Public Service and Administration

Whether, since she served in Cabinet, she (a)(i) was ever influenced by any person and/or (ii) influenced any of her department’s employees to take any official administrative action on behalf of any (aa) member, (bb) employee and/or (cc) close associate of the Gupta family and/or (b) attended any meeting where any of the specified persons were present; if so, what are the relevant details in each case?

Reply:

Parliamentary document entitled Announcements, Tablings and Committee (ATC) Report dated 25 November 2016 state that “Questions may not refer to matters under consideration of a parliamentary committee….” Therefore, allegations have been submitted to the Parliament Joint Ethics Committee on the Minister in relation to the family referred to in this Parliamentary Question.

16 November 2018 - NW3183

Profile picture: Robertson, Mr K

Robertson, Mr K to ask the MINISTER OF RURAL DEVELOPMENT AND LAND REFORM:

Whether the Government has earmarked any land (a) for foreign investment projects and/or (b) to serve as security for deals with foreign business investments (i) in each of the past three financial years and (ii) since 1 April 2018; if so, (aa) what number of hectares of land have been earmarked in each case, (bb) where is each parcel of land situated, (cc) is the parcel of land owned by the Government, (dd) how will the land be expropriated if privately owned and (ee) which foreign investment companies are involved in each case?

Reply:

(a),(b)(i),(ii) No, the Minister of Rural Development and Land Reform is not aware of any arms of Government that may have earmarked any land for foreign investment and/or to serve as security for deals with foreign business investments.

(aa),(bb),(cc),(dd) Falls away.

16 November 2018 - NW2961

Profile picture: Tshwaku, Mr M

Tshwaku, Mr M to ask the Minister of Public Service and Administration

Has the Public Service Commission received a report from the Minister of Water and Sanitation on progress made with implementing the recommendations of its report titled Investigation into the Irregularity of the Appointment of DDGs at the Department of Water and Sanitation?

Reply:

Yes, the Public Service Commission received a response dated 26 June 2017 from the former Minister of Water and Sanitation Ms NP Mokonyane.

16 November 2018 - NW3170

Profile picture: Groenewald, Dr PJ

Groenewald, Dr PJ to ask the Minister of Public Service and Administration

(1)What number of public servants were held personally liable the past five financial years for any damage and/or legal costs that the State had to incur due to the actions of the specified public servants; (2) (a) Why did the State make payments in each respective financial year and (b) what amount (i) did the State have to pay for claims against the State and (ii) has been paid to the State by each specified public servant for his or her actions that had resulted in the claim; (3) Whether she will make a statement on the matter?

Reply:

Since this parliamentary question is on public servants, therefore, every state department, which has public servants as its employees, is in a better position to account to Parliament on any damage and or legal cost incurred by the state due to actions of the specified public servants in their employ.  

16 November 2018 - NW3254

Profile picture: Mbabama, Ms TM

Mbabama, Ms TM to ask the Minister of Transport

What (a) amount did (i) her department and (ii) each entity reporting to her borrow from any entity in the People’s Republic of China (aa) in each of the past three financial years and (bb) since 1 April 2018, (b) is the name of the lender of each loan, (c) conditions are attached to each loan and (d) are the repayment periods for each loan in each case?

Reply:

Department

(a)(i) The Department of Transport has not borrowed any money from the People’s Republic of China since 1 April 2018.

(ii) None of the Entities borrowed money from the People’s Republic of China since 1 April 2018.

(aa) The Department and its entities have not borrowed any money from the People’s Republic of China over the past three years.

(bb) As per response above.

(b) As per response above.

(c) As per response above.

(d) As per response above.

Airports Company South Africa SOC Limited (ACSA)

Airports Company South Africa did not borrow money from any entity in the People’s Republic of China in each of the past three financial years and since 1 April 2018.

Air Traffic and Navigation Services SOC Limited (ATNS)

Not applicable to ATNS.

South African Civil Aviation Authority (SACAA)

NIL (i) N/A (ii) South African Civil Aviation Authority did not borrow any amount from the People’s Republic of China (aa) N/A (bb) N/A (b) N/A (c) N/A (d) N/A.

Cross-Border Road Transport Agency (CBRTA)

The (a) (ii) Cross-Border Road Transport Agency did not borrow any amount from any entity in the People’s Republic of China (aa) in each of the past three financial years and (bb) since 1 April 2018 and (b), (c) and (d) are therefore not applicable.

Road Accident Fund (RAF)

The (a) (ii) Road Accident Fund did not borrow any amount from any entity in the People’s Republic of China (aa) in each of the past three financial years and (bb) since 1 April 2018 and (b), (c) and (d) are therefore not applicable.

Road Traffic Management Corporation

The (a) (ii) Road Traffic Management Corporation did not borrow any amount from any entity in the People’s Republic of China (aa) in each of the past three financial years and (bb) since 1 April 2018 and (b), (c) and (d) are therefore not applicable.

Road Traffic Infringement Agency (RTIA)

The (a) (ii) Road Traffic Infringement Agency did not borrow any amount from any entity in the People’s Republic of China (aa) in each of the past three financial years and (bb) since 1 April 2018 and (b), (c) and (d) are therefore not applicable.

South African National Road Agency Limited (SANRAL)

The (a) (ii) South African National Road Agency Limited did not borrow any amount from any entity in the People’s Republic of China (aa) in each of the past three financial years and (bb) since 1 April 2018 and (b), (c) and (d) are therefore not applicable.

Railway Safety Regulator (RSR)

(a) No amount was borrowed by the RSR from any entity in the People’s Republic of China,

(aa) in any of the past three financial years, and

(bb) since 1 April 2018;

(b) Not applicable, refer to (a)

(c) Not applicable, refer to (a)

(d) Not applicable, refer to (a)

 

Passenger Rail Agency of South Africa (PRASA)

(a) No amount was borrowed by PRASA from any entity in the People’s Republic of China,

(aa) in any of the past three financial years, and

(bb) since 1 April 2018;

(b) Not applicable, refer to (a)

(c) Not applicable, refer to (a)

(d) Not applicable, refer to (a)

Ports Regulator of South Africa (PRSA)

(ii) The Ports Regulator does not have borrowing powers in terms of legislation and has not borrowed from any institution in the past and has no plans to borrow in the medium term.

(aa) N/A

(bb) N/A

(a) N/A

(b) N/A

(c) N/A

South African Maritime Safety Authority (SAMSA)

Not Applicable as no amounts were borrowed from any entity in the People’s Republic of China

16 November 2018 - NW3243

Profile picture: Motau, Mr SC

Motau, Mr SC to ask the Minister of Public Service and Administration

What (a) amount did (i) her department and (ii) each entity reporting to her borrow from any entity in the People’s Republic of China (aa) in each of the past three financial years and (bb) since 1 April 2018, (b) is the name of the lender of each loan, (c) conditions are attached to each loan and (d) are the repayment periods for each loan in each case?

Reply:

None

16 November 2018 - NW3278

Profile picture: Ntlangwini, Ms EN

Ntlangwini, Ms EN to ask the Minister of Agriculture, Forestry and Fisheries

Whether (a) his department and/or (b) entities reporting to him awarded any contracts and/or tenders to certain companies (DCD Group; Afrit; Elgin, Brown and Hamer, Hulisani Consortium; Elgin Dock; Diesel and Turbo Service Centre; Vox Telecommunications; Afrit Propco, Vox Holdings; Interpair Services, Simiglo, Cancerian Investments, Phuma Finance) from 1 January 2009 up to the latest specified date for which information is available; if so, in each case, (i) what service was provided, (ii) what was the (aa) value and (bb) length of the tender and/or contract, (iii) who approved the tender and/or contract and (iv) was the tender and/or contract in line with all National Treasury and departmental procurement guidelines?

Reply:

DAFF’S RESPONSE:

The Department of Agriculture, Forestry and Fisheries entered into the following contracts with the service provider: VOX Telecommunications PTY (LTD)

What was the service provided

What was the value of the tender or contract

What was the length of the tender or contract

Who approved the tender or contract

Was the tender or contract in line with all National Treasury and departmental procurement guidelines

4.4.12.2/5/14: Appointment of a service provider for the supply, delivery and implementation of audio visual solutions for Forestry board room at 110 Hamilton building and Imbizo board room at Harvest House building for DAFF for a period of 3 years

R1 269 881.30

1 October 2014 to 30 September 2017( 3 years)

The Departmental Bid Adjudication Committee

Yes. The prescribed Departmental Bid process was followed, in line with the National Treasury guidelines.

4.4.12.4/1/15:

Appointment of a service provider to perform an Internet Service Solution to DAFF for a period of 3 years

R 10 664 205.85

1 October 2015 to 30 September 2018 (3 YEARS )

The Departmental Bid Adjudication Committee

Yes. The prescribed Departmental Bid process was followed, in line with the National Treasury guidelines.

RFB 1653-2017: Appointment of a service provider to provide an internet service solution to DAFF for a period of 5 years

R10 553 922.39

1 October 2018 to 30 September 2023

The acting Director General confirmed the recommendation of the bidder via the SITA bid process.

Yes. The SITA bid process was followed and confirmed by the Acting Director- General.

NAMC

OBP has never awarded contracts or tenders to any of the companies listed as per attachment.

OBP

OBP has never awarded contracts or tenders to any of the companies listed as per attachment.

ARC

ARC has never awarded contracts or tenders to any of the companies listed as per attachment.

MLRF

No response


PPECB

Period: 2009 - 2018

 

 

 

Compliance

No.

Supplier

Service Provided (i)

Value of Tender (ii)(a)

Length of Contract (ii)(b)

Approval (iii)

National Treasury (Yes/No) (iv)

Procurement Guidelines (Yes/No) (iv)

1

Vox Telecommunications

WAN Infrastructure

R       17,880,527

5 years

PPECB Board

YES

YES

2

Vox Telecommunications

Supply of APN Services

 R             340,715

24 months

CEO

YES

YES

16 November 2018 - NW2816

Profile picture: Cebekhulu, Inkosi RN

Cebekhulu, Inkosi RN to ask the Minister of Agriculture, Forestry and Fisheries

Whether any investigation has been undertaken in order to trace what happened to tractors that went missing after they were delivered to provinces; if not, what is his department planning on doing to (a) recover the tractors that disappeared and (b) ensure that those entrusted with the tractors are held accountable; if so, what are the relevant details?

Reply:

The Department of Agriculture, Forestry and Fisheries (DAFF), donated tractors to the Provincial Departments of Agriculture (PDAs) eight years ago as a once off support. On delivery these tractors became the ownership and responsibility of each PDA to distribute within their respective provinces.

DAFF has conducted an investigation to verify the status of all tractor assets for each PDA focusing on the condition and usability of each tractor. During this investigation some tractors were found to be unavailable or missing. To date DAFF has compiled a status report that indicates the state of tractors in each province and the missing tractors have been captured as such. Currently communication to get responses on the missing tractors is in progress amongst the Engineers that were part of the investigation. The next steps are that in November DAFF will share the report and liaise with the Executive officials from PDAs to embark on further investigations to track these missing tractors with the intention of locating these back into the pool.

15 November 2018 - NW3098

Profile picture: Mhlongo, Mr P

Mhlongo, Mr P to ask the Minister of Justice and Correctional Services

What is the status of the investigation by the National Prosecuting Authority into (a) CAS/535/05/2018 and (b) CAS/499/05/2018 opened at the Orlando Police Station?

Reply:

In respect to the CAS numbers opened and recorded at Orlando Police Station, the National Prosecuting Authority (NPA) has reported as follows:

a) The case docket, CAS 535/05/2018, has been returned to the South African Police Service (SAPS) with an instruction to finalise investigations.

b) The NPA is waiting for a case docket, with CAS 490/05/2018, from SAPS before a decision can be made.

15 November 2018 - NW3147

Profile picture: Mulaudzi, Adv TE

Mulaudzi, Adv TE to ask the Minister of Justice and Correctional Services

What has been the conviction rate for (a) rape and (b) murder charges in each of the past five financial years?

Reply:

a) The National Prosecuting Authority (NPA) recorded progress on all cases of sexual offences over the past five (5) years. The table below depicts progress is:

 

Financial Years

Change over previous year

Change over period
2013/14-17/18

 

2013/14

2014/15

2015/16

2016/17

2017/18

   

Sexual Offences

67,1%

69,0%

70,1%

71,7%

72,7%

1,1%

6,9%

Convictions

5 484

5 084

4 978

4 780

5 004

4,7%

-8,8%

Verdict

8 174

7 372

7 098

6 669

6 879

3,1%

-15,8%

Sexual offences are defined as “any case involving offences committed in terms of the Criminal Law (Sexual Offences and Related Matters) Amendment Act No. 32 of 2007, and may include common law rape or indecent assault.”

b) From the 2017/18 financial year, The NPA started to measure murder convictions, a 77.7% conviction rate was achieved at the end of that financial year.

15 November 2018 - NW2544

Profile picture: Waters, Mr M

Waters, Mr M to ask the Minister of Labour

1. With reference to her reply to question 2167 on 31 October 2016, what were the findings of the follow up meeting of 30 November 2016? 2. Has the structural damage to the school been repaired; if not, what danger does the structural damage pose to pupils and teachers;? 3. Whether all the roof leaks have been repaired; if not, what number of classrooms are still affected by the leaking roofs?

Reply:

Minister of Labour’s Response;

  1. At the disposal of the current management of the province, there is no record of the initial response to the 2016 enquiry. The current senior management started after the initial query and was not able to retrieve the original response. Notices were served on the school in June 2018 and a follow up inspection conducted in August 2018.
  2. The structural damage has not been repaired. The structural damages and the non-repairs pose a danger to both the learners and the staff.
  3. The roof does not seem to have been repaired and is still leaking, alternatively it is still not maintained as the whole asbestos block is affected.

WAY FORWARD

Prosecution will be recommended to the NPA for non-compliance.

15 November 2018 - NW3042

Profile picture: Alberts, Mr ADW

Alberts, Mr ADW to ask the Minister of Justice and Correctional Services

On what date does he intend to submit legislation that will make provision for the (a) Optional Protocol to the International Covenant on Civic and Political Rights and (b) Optional Protocol of the International Covenant on Economic, Social and Cultural Rights; 2) whether he will make a statement on the matter?

Reply:

  1. In response to the question, it is best to consider each Protocol separately.

a) Optional Protocol to the International Covenant on Civic and Political Rights (ICCPR)

There are two Optional Protocols to the ICCPR, and South Africa has ratified both. The first Optional Protocol’s Preamble states,

“The State Parties to the present Protocol,

Considering that in order further to achieve the purposes of the International Covenant on Civil and Political Rights (hereinafter referred to as the Covenant) and the implementation of its provisions it would be appropriate to enable the Human Rights Committee set up on part IV of the Covenant (hereinafter referred to as the Committee) to receive and consider, as provided in the present Protocol, communications from individuals claiming to be victims of violations of any of the rights set forth in the Covenant.”

As such, the first Optional Protocol allows direct claims to be made by individuals who believe that rights they are guaranteed under the ICCPR have been violated by the State, to the ICCPR Committee, but only once all domestic remedies have been exhausted. Thus, by ratifying the first Optional Protocol, South Africa has accepted the jurisdiction of the Committee to accept direct claims from individuals who have exhausted their domestic remedies. No further legislative amendments are required to our domestic law. In fact, the Committee has heard direct claims from South African applicants, and South Africa has responded as required in the procedures of the first Optional Protocol.

With regards to the second Optional Protocol, this Optional Protocol is aimed at the abolition of the death penalty. Our Constitution and jurisprudence from the case of the State versus Makwanyane (1995), has abolished the death penalty. No further legislation is required to give effect to the second Protocol.

b) Optional Protocol of the International Covenant on Economic, Social and Cultural Rights (ICESCR)

South Africa ratified the ICESCR on 12 January 2015 and has not ratified the Optional Protocol to the ICESCR.

This Optional Protocol allows the same type of direct access by individual claimants to the ICESCR Committee. South Africa is in the process of considering the Optional Protocol’s consistency with domestic and international law to which South Africa is obligated, with a view to ratifying the Optional Protocol. Any consideration of legislative changes, if any will be considered at the appropriate time

.

2. No further statement is necessary at this stage.

15 November 2018 - NW3194

Profile picture: Hunsinger, Dr CH

Hunsinger, Dr CH to ask the Minister of Transport

(1) (a) What are the names of the railway train stations that are not being used, (b) what is the overall number of stations that are no longer in use, (c) on what date was each station decommissioned, (d) why were the stations decommissioned in each case and (e) what are the stations being used for currently; (2) What (a) plans are in place to link the Durban-North railway track to the King Shaka International Airport considering the short distance between the two, (b) are the time frames, milestones and deadlines in this regard, (c) feasibility studies have been undertaken in this regard and (d) were the results of the studies?

Reply:

(a)

(b)

(c)

(d)

(e)

PRASA Railway Train Station

Number

Date not being used

Reason for not being used

Current use

Ireagh

1

2010

Train service rationalised

None

Rolle

1

2010

Train service rationalised

None

Cottondale

1

2010

Train service rationalised

None

Acornhoek

1

2010

Train service rationalised

None

Hoedspruit

1

2010

Train service rationalised

Restaurant Lease

Zeerust

1

2015

Train service rationalised

None

Vryburg

1

2015

Train service rationalised

None

Total

7

     

Note: The above information only reflects PRASA properties. All these stations were identified for transfer with Main Line Passenger Service in 2009 from Transnet. These stations are on the Kaapmuiden-Hoedspruit line or Johannesburg-Mafikeng-Kimberley line. Stations not in use is not the same as being decommissioned.

2. (a) The option to link King Shaka International Airport (KISA) via the existing North Coast Rail

Corridor was considered along with other rail alignment options during earlier planning activities because of its proximity to KSIA. It was however not preferred, because such a service would result in lengthy journey times and inability to compete effectively with other modes of transport.

(b) As mentioned in (a), the option of linking to the North Coast Rail Corridor was not preferred. In addition, the passenger demand for such a service in the short term, is considered relatively low from a passenger rail perspective. A road-based feeder service from Verulam and/or Tongaat stations is considered more viable in the short term to provide access to KISA from the North Coast Line.

In the medium term, a more direct rail connection to KISA, with potential of linking to current and new growth areas in the northern section of eThekwini, is considered more viable.

(c) The Passenger Rail Agency of South Africa concluded a conceptual planning study in 2015 around potential rail linkages to KISA and surrounds.

(d) The outcome of the study in 2015 is in support of (2)(b).

15 November 2018 - NW3094

Profile picture: Purdon, Mr RK

Purdon, Mr RK to ask the Minister of Environmental Affairs

(1)With reference to the release of the Thai kingpin of the illegal rhino horn trade from jail in South Africa after he served just six years of his 40 year sentence, was the department consulted or given an opportunity to comment in this regard; if so, what are the relevant details;

Reply:

(1) The department was not consulted or given an opportunity to comment on the release of the Thai kingpin. It should however be noted that the sentence that he was serving was not 40 years. Although the Magistrates Court had sentenced him to 40 years imprisonment, this was reduced to 30 years in the Gauteng Local Division of the High Court in Johannesburg and then reduced to
13 years imprisonment by the Supreme Court of Appeal.

(2) The department has not found that there is a pattern of the appeal courts reducing sentences for wildlife crime.

(3) The department is of the view that generally the penalties provided for relating to wildlife crimes in terms of the National Environmental Management: Biodiversity Act, 2004 (Act No. 10 of 2004) (NEMBA) are sufficient, which are currently as follows:

a) A person convicted of an offence in terms of NEMBA is liable to a fine not exceeding
R10 million, or an imprisonment for a period not exceeding ten years, or to both such a fine and such imprisonment; and

b) If a person convicted of an offence, involving a specimen of a listed threatened or protected species, or an alien species or commencing the commercialisation phase of bioprospecting without a permit issued in terms of NEMBA, a fine may be determined. This may take place either in terms of (a) or equal to three times the commercial value of the specimen or activity in respect of which an offence has been committed, whichever is the greater. The department is however, strengthening national legislation by adding a category for those species that are specifically threatened by wildlife trafficking and which require preferential protection and stricter penal provisions. In addition, the department continues to support structures (Justice College and the South African Judicial Education Institute (SAJEI)) which are responsible for training of prosecutors and magistrates.

---ooOoo---

15 November 2018 - NW2891

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Public Enterprises

Did the CEO of Eskom receive a letter from the CEO of Rothschild Mark Kingston? If yes, did the Eskom CEO respond and what was his response?

Reply:

According to the information received from Eskom

Yes, the Group Chief Executive (GCE) of Eskom received a letter from Martin Kingston, Chief Executive Officer of Rothschild.

Yes, the GCE responded to the letter. In the letter the GCE appreciated the interest shown by Rothschild in assisting with the challenges faced by Eskom and mentioned that the Eskom’s Executive Management Committee was in the process of developing its own strategic map for the organisation. The GCE undertook to advise Rothschild on next steps once there is internal alignment.

It must be noted that the said letter did not result in any business deals between Eskom and Rothschild.

15 November 2018 - NW3148

Profile picture: Mulaudzi, Adv TE

Mulaudzi, Adv TE to ask the Minister of Justice and Correctional Services

What (a) number of correctional services facilities are currently being (i) repaired and (ii) constructed, (b) is the total amount of each construction project, (c) will be the capacity of each new facility under construction and (d) is the location of each new facility?

Reply:

(a) (i)

Correctional centres being repaired

 

Project

(b)

Anticipated Completion Cost

(c) Capacity

(d)

Province

1.

Rustenburg

R174 026 987

812

LMN

2.

Glencoe

R34 150 721

669

KZN

3.

Emthonjeni Youth Centre Baviaanspoort

R187 709 485

640

GAUTENG

(b) (ii)

Correctional centres under construction

1.

Pretoria C Max

R217 434 500

284

GAUTENG

2.

Standerton

R408 552 598

1468

LMN

3.

Estcourt

R368 527 072

500

KZN

4.

Tzaneen

R62 819 109

504

LMN

15 November 2018 - NW3084

Profile picture: Marais, Mr S

Marais, Mr S to ask the Minister of Defence and Military Veterans

(1) Whether she has been informed of any allegations of irregular and/or unlawful appointments made in the hiring of persons for the Senior Staff Officer National Codification Bureau in 2015; if so, what are the relevant details; (2) Whether any investigations have been launched into the alleged irregular and/or unlawful hiring of persons for the National Codification Bureau; if not, why not; if so, what (a) were the outcomes and (b) action was taken to (i) prevent irregular and/or unlawful appointments in the future and (ii) implement disciplinary action against any individuals found to have been involved in irregular and/or unlawful appointments; (3) Whether certain persons (names and details furnished) were appointed to the National Codification Bureau; if so, what are the details of the processes that were followed to appoint each specified person; (4) Whether her department has put a policy in place regarding the appointment of family members of current and former staff members to positions in her department, especially to senior leadership positions; if not, what is the position in this regard; if so, what are the relevant details; (5) What checks and balances action plans are in place to ensure that no irregularities occur with regard to (a) appointments and

Reply:

  1. The Minister was not informed neither was she aware of any allegation of irregular and or unlawful appointments that occurred during the hiring of persons for the Senior Staff Officer National Codification Bureau in 2015 since there has never been hiring of Senior Staff Officer at National Codification Bureau over the period mentioned. During the said period only contractors were hired and trained to be codifiers. Allegations pertaining to alleged irregularities during the acquisition of contractors were never reported through appropriate channels set up by the Department of Defence, and only came to the fore by a media enquiry from Rapport subsequently followed by an article published by Rapport and City Press on 21 October 2018.
  2. The SANDF prides itself as a well-structured and disciplined force with adequate structures in place to resolve any inconsistency, malicious deeds, ill-discipline, or any other activity that might put the organisational name into disrepute warrants disciplinary processes as regulated in our policy. It should be noted that proper channels were never used to report any irregularity regarding hiring of any member by National Codification Bureau. The Department of Defence only became aware of these allegations regarding alleged irregularities when it received a media enquiry subsequently followed by the publication of an article pertaining the same matter by Rapport and City Press newspapers on 21 October 2018. This practice is contrary to the Department of Defence’s code of ethics. Following the publication of an article pertaining alleged irregularities an investigation was launched and is still ongoing.
  3. National Codification Bureau (NCB) went on a project to acquire contract workers in support of the National Youth Development Policy Framework. All requirements were approved by the Chief of the Division and appointments of contract workers took place from 2015, 2016 and 2017. This was done in line within the prescripts of the National Youth Development Framework which encourages development of youth from the root level where opportunities for furthering education were not afforded due to different reasons stemming from non-affordability because of poor background. During the said period only contractors were hired and trained to be codifiers. The total amount of contractors employed is 71.

The Bill of Rights is a cornerstone of democracy, enshrining the rights of all people in the country and affirming the democratic values of human dignity, equality and freedom. This is inclusive of the appointment of youth from any cultural background and association without discrimination. No member can be disqualified when he/she meets the necessary requirement to be offered equal opportunities like any other youth in the country. By placing young people and their development in the broader context of reconstruction and development, common developmental goals and a spirit of cooperation and co-ordination is encouraged.

4. This should be done in line with Government’s broad approach to fundamentally address poverty and underdevelopment through comprehensive, integrated, cross-sectoral and sustainable policies and programmes. Young people ought to enjoy all the rights, responsibilities and obligations that all normal citizens of South Africa enjoy as contained in the Bill of Rights and the Constitution, so are contractors who are related to members of the Department of Defence, unless it can be said they are not supposed to have rights that are accorded every citizen of this country which were attained through blood and sweat of their fathers, mothers brothers and sisters who had to face oppression by a brutal regime. The Department of Defence policy clearly states that a member of a selection board may recuse himself/herself if his/her familiarity with the candidate might affect his/her objective judgement. In the aforementioned case, no family member was directly involved with the acquisition of contract workers. DODI C PERS NO 8/99 stipulates that applicants should not be discriminated due to their status. The policy further states that all candidates should be measured against the same objective criteria.

5. The South African National Defence Force has systems in place to deal with issues regarding all ill-discipline aspects at all levels. Necessary internal processes are always followed regarding any irregularity or ill-discipline related behaviour. In order to ensure that checks and balances within the department are in place, staffing is handled as follows:

(a) Vacant funded posts are advertisement and this is done according to C Pers [DCM (PSAP)] by Human Resource Division.

(b) Shortlisting of applicants is done by Human Resource of the requesting authority.

(c) The Staffing Board identifies the suitable candidates according to the criteria.

(d) The decision of the Staffing Board is sent back to C Pers [DCM (PSAP)] for final endorsement.

Regarding the aforementioned criteria, posts were not advertised due to the fact that, contract appointments do not meet the advertisement requirement, as per DODI C PERS NO 8/99. However in an event where shortcomings or irregularities occur, the SANDF as the organisation will not hesitate to implement corrective measures as directed by the Defence Act.

15 November 2018 - NW3146

Profile picture: Moteka, Mr PG

Moteka, Mr PG to ask the Minister of Labour

(a) What (i) is the name of the company in the private sector that has employed the most people in the past five financial years and; (ii) is the total number of employees that the specified company employs and; in which sector does the specified company conduct business?

Reply:

According to the Unemployment Insurance Fund records, Shoprite Checkers PTY LTD has employed the most people in the past five financial years, totalling 355 932 employees.  Shoprite Checkers operates in the Retail sector.

15 November 2018 - NW3195

Profile picture: Matsepe, Mr CD

Matsepe, Mr CD to ask the Minister of Transport

(1)What are the details of the (a) role of the Passenger Rail Agency of South Africa (Prasa) in the construction of the Vereeniging taxi rank, (b) budget (i) set aside and (ii) spent to date by Prasa for the specified construction, (c)(i) name and (ii) company registration number of each service provider contracted for the construction project, (d) current status of the construction of the taxi rank and (e) completion date of the project; (2) Whether Prasa lodged any disputes with any of the service providers; if so, what (a) are the details of the disputes and (b) action did Prasa take to resolve the disputes in each case; (3) Whether any disputes lodged by Prasa with any of the service providers are still unresolved; if so, (a) why and (b) by what date will the unresolved disputes be resolved?

Reply:

  1. (a) VEREENIGING INTERMODAL PUBLIC TRANSPORT FACILITY

CONTRACT NUMBER DRT: 24/07/2013

PRASA appointed the consulting engineers (AECOM/Khuthele Projects (AECOM)) to execute designs for the following:

  • Vereeniging Station
  • Commercial development around Vereeniging Station
  • Vereeniging Intermodal Facility

(b) (i) PRASA has set aside R15 million for the fees of the project. The fees include for the following:

  • Professional Services for Stages 1 to 6;
  • Environmental studies
  • Occupational Health and Safety; and
  • Specialised professional services (e.g. Geotech, etc.)

(ii) The amount spent to date is R13,508,685-00, being for designs and construction supervision, as well as Occupational Health and Safety monitoring for the Intermodal Facility.

(c) (i) The main contractor appointed by the Gauteng Department of Roads and Transport ( GDRT) for the construction works, is Moreteng Investments CC.

(ii) GDRT Contractor: Moreteng Investments CC

Registration number: 2005/004671/07

Sub-Contractor: FlyBrotherSA CC

Registration number: 2010/133800/23

PRASA Consultant: AECOM/Khuthele Projects Pty (Ltd)

Registration number: 2010/013644/07

(d) The works are currently ongoing and are measured at 83% progress. However, due to contractual disputes between GDRT and the contractor, the works have been suspended since 7 September 2018.

(e) The completion date will only be known once the contractor is back on site.

2 (a) PRASA has not lodged any dispute with a service provider.

(b) Not applicable.

3. (a) Not applicable as no disputes were lodged by PRASA.

(b) Not applicable as no disputes were lodged by PRASA.

15 November 2018 - NW3122

Profile picture: Figlan, Mr AM

Figlan, Mr AM to ask the Minister of Public Works

Whether, since he served in Cabinet, he (a)(i) was ever influenced by any person and/or (ii) influenced any of his department’s employees to take any official administrative action on behalf of any (aa) member, (bb) employee and/or (cc) close associate of the Gupta family and/or (b) attended any meeting where any of the specified persons were present; if so, what are the relevant details in each case?

Reply:

(a) (i) No.

(ii) (aa), (bb) and (cc) No.

(b) No. I am not aware of any meeting which I attended where any of the specified persons were present. However, I cannot exclude the possibility that unbeknown to me, these individuals may have been present at large functions that I attended.

15 November 2018 - NW2953

Profile picture: Xalisa, Mr Z R

Xalisa, Mr Z R to ask the Minister of Environmental Affairs

With reference to the reply to question 161, on 10 April 2018, what were the consequences in instances where conditions were contravened?

Reply:

The non-compliances that were reported in the response to Parliamentary Question 161, on 10 April 2018, were initially investigated by the Compliance team in the Department, and the matter was then referred to the Chief Directorate: Enforcement, around July 2018, to take enforcement action. An enforcement notice, as contemplated in section 31L of the National Environmental Management Act, has been prepared and is in the process of being reviewed, before it is issued. In order to undertake this process, the Department must comply with the provisions of the Promotion of Administrative Justice Act (PAJA), as well as sub-regulation 8(2) of the EMI regulations contained in GNR 480 of 31 May 2017, by providing SANRAL with an opportunity to make representations in response to the allegations of non-compliance as well as the intended instructions prior to moving forward with further enforcement action. The decision as to whether the non-compliances have or have not been addressed and so forth, and also what type of final enforcement action will be taken, is dependent on various factors such as the submissions that are made by SANRAL in response to the enforcement notice.

 

15 November 2018 - NW2930

None to ask the Minister of Labour

(a) What (i) is the total number of employees that have been outsourced from private companies and/or contractors by (aa) her department and (bb) each entity reporting to her (aaa) in the past three financial years and (bbb) since 1 April 2018 and (ii) is the name of each company or contractor and (b) what amount is each employee paid?

Reply:

Response;

The information is as follows;

DoL / Public Entity

(a)(i)(aaa) What is the total number of employees that have been outsourced from private companies and/or contractors in the past three financial years

(a)(i)(bbb) What is the total number of employees that have been outsourced from private companies and/or contractors since 1 April 2018

(a) (ii) What is the name of each company or contractor

(b) what amount is each employee paid

DoL

None

None

None

None

CCMA

Fourteen (14)

Nine (9)

1. Multilead

2. ebustech-consulting

3. Human Communication

1. 2 x P03 (R1 805 012.94 pa)

2. 4 x P06 (R 699 155.12 pa)

3. 1 x P07 (R 561 386.32 pa)

4. 2 x P08 (R454 297.90 pa

UIF

None

None

None

None

CF

None

None

None

None

NEDLAC

Six (6)

Two (2)

Thokazani Ntshingila

R30 000.00 per month ( 2015/2016)

     

Tiaan Rosslee

R30 000.00 per month (2015/2016)

     

Modiegi Mooko

R20 000.00 per month (2016/2017)

     

Portia Kekana

R72 430.66 per month (2017/2018)

     

Lorraine Mofokeng

R55 000.00 per month (2017/2018)

     

Tidimalo Chuene

R78750.00 per month (2017/2018 & 2018/2019)

     

Clarinda Simpson

R104 000.00 per month (2018/2019)

SEE

None

None

None

None

PSA

None

None

None

None

15 November 2018 - NW3093

Profile picture: Purdon, Mr RK

Purdon, Mr RK to ask the Minister of Environmental Affairs

(1)With regard to the Kruger National Park (KNP) District Court being accused of lenient sentencing for wildlife crimes, (a) does the department monitor the cases and comment accordingly and (b) has the department taken up this issue with the Chief Magistrate of Mpumulanga; (2) has bail been granted to repeat offenders; if so, (a) what are the details of cases in which bail was granted to repeat offenders in the past calendar year, (b) what is the conviction rate of the KNP District Court for the past calendar year and (c) is the department campaigning for stricter sentencing; if not, why not; if so, what are the relevant details

Reply:

(1)

(a) Although the department does monitor the cases in the Kruger National Park (KNP) Court; the department is provided with the information related to these cases and does participate in the relevant structures and attends the Mission Area Joint Operational Centre (MAJOC) meetings where monthly feedback is provided on progress related to the deployment within the area, arrests, seizures, cases and other related matters are discussed.

(b) The department has not taken the issue regarding lenient sentencing in the KNP District Court up with the Chief Magistrate of Mpumulanga. However, the South African National Parks (SANParks) has engaged with the Judge President of Mpumalanga and expressed concerns around the drop in the nature of the sentences in the district court, aspects related to bail, transfer of cases and other aspects related to cases in the KNP.

(2) The department is aware that bail has been granted to repeat offenders in some cases.

a)The South African Police Service is the custodian of this informaiton.

b) The National Prosecuting Authority and the Department of Justice determine relevant conviction rates and should be approached in this regard.

(c) The department has not formally campaigned for stricter sentencing but is amending current legislation to make provision for priority crimes linked to wildlife trafficking and to increase penalties for such crimes.

---ooOoo---

15 November 2018 - NW3464

Profile picture: King, Ms C

King, Ms C to ask the Minister of Trade and Industry

(1) (a) On what date did his department last conduct an audit of artwork owned by Government which is under his department’s curatorship and (b) what are the details of each artwork under the curatorship of his department according to the Generally Recognised Accounting Practice 103; (2) whether any artworks under his department’s curatorship have gone missing (a) in each of the past five financial years and (b) since 1 April 2018; if so, what are the relevant details?

Reply:

 

(1) (a) On what date did his department last conduct an audit of artwork owned by Government which is under his department’s curatorship and (b) what are the details of each artwork under the curatorship of his department according to the Generally Recognised Accounting Practice 103;

(2) whether any artworks under his department’s curatorship have gone missing (a) in each of the past five financial years and (b) since 1 April 2018; if so, what are the relevant details? NW3953E

15 November 2018 - NW2652

Profile picture: Purdon, Mr RK

Purdon, Mr RK to ask the Minister of Environmental Affairs

What are the details of (a) all litigation between her department and the National Council of Societies for the Prevention of Cruelty to Animals (i) in each of the past three financial years and (ii) since 1 April 2018, (b) the issues, charges and details of the case of each litigation and (c) the timeframes of each litigation?

Reply:

THE MINISTER OF ENVIRONMENTAL AFFAIRS REPLIES:

FINANCIAL YEAR

NO. OF MATTERS

DETAILS

RELIEF SOUGHT

TIME PERIODS

2015/2016

nil

n/a

n/a

n/a

2016/2017

nil

n/a

n/a

n/a

2017/2018

1

NATIONAL COUNCIL OF SOCIETIES FOR THE PREVENTION OF CRUELTY TO ANIMALS VS THE MINISTER OF ENVIRONMENTAL AFFAIRS AND ANOTHER (LION BONES QUOTA)

This is an application brought by the National Council of Societies for the Prevention of Cruelty to Animals (NSPCA). It is an application which seeks to review and set aside the decision made by the Minister of Environmental Affairs in respect to setting a quota (2017, 2018) on the number of lion bone skeletons, with or without the skulls that may be exported in a calendar year. The application is a PAJA review, alleging that the decision made on the quotas is administrative action.

The application is seeking an order in the following terms:

PART A

1 Prohibiting the first respondent and/or the second respondent from issuing permits for the exportation of lion bone pending the finalisation of Part B of the application,

PART B

1 Declaring unlawful and unconstitutional the determination of the quota for 2017, 2018 and any further extension of the lion bone exportation quota as indicated and presaged in the notice, issued on 28 June 2017.

2 Reviewing and setting aside the quota under PAJA, alternatively under the Constitution.

Application received: 10.01.2018

Notice to Oppose: 12.02.2018

Record filed: 22.03.2018

(by agreement

with applicants)

The record of decision has been filed, along with a supplementary record. The NSPCA has not indicated formally whether they intend supplementing their papers. A “without prejudice” meeting was held between the Department of Environmental Affairs and its legal representatives, and the NSPCA and their legal representatives. The purpose and intention of the meeting was to explain to the NSPCA how the 2018 quota for the export of lion bones was established and to possibly reach a settlement out of court, however this could not be achieved.

The NSPCA has since indicated its intention to supplement its papers and to join all the relevant permit holders and applicants for permits for the export of lion bones and to have the matter set down and to bring an urgent application in terms of Part A of the original application. We await such supplementation and set down from the NSPCA.

From 01 April 2018

nil

 

n/a

n/a

---ooOoo---

15 November 2018 - NW3135

Profile picture: Mente-Nkuna, Ms NV

Mente-Nkuna, Ms NV to ask the Minister of Justice and Correctional Services

What has his department done to initiate engagements in respect of the SA Law Reform Commission’s report and recommendations in respect of Project 107: Sexual Offences Adult Prostitution?

Reply:

The South African Law Reform Commission (SALRC) Report on Adult Prostitution (Project 107) (the Report) was published on 26 May 2017. Since its publication, the Report was discussed in various forums and engagements with interest groups, amongst others are:

A) Conference on Sexual Exploitation of Children in Travel and Tourism;

B) Combined SANAC and Mail & Guardian Critical Thinking Forum on the decriminalization of “sex work”, in which the Deputy Minister of Justice and Constitutional Development participated;

C) Conference on Sexual Exploitation of Children in Travel and Tourism as invited by the acting National Executive Director of Child Welfare South Africa and ECPAT International;

D) The Human Rights Baseline Assessment Inception meeting jointly organised by SANAC and the Global Fund;

E) Engagements with the Global fund baseline assessment on human rights-related barriers to HIV and TB services for key populations in South Africa (including people who provide sexual services for reward);

F) The SANAC Government Task Team (GTT) meeting;

G) Roundtable Discussion on 'Prostitution/Sex Work: Is it work and is it a choice?: SACBC Parliamentary Organization, Embrace Dignity and the Hanns Seidel Foundation;

H)The Multi Party Women’s Caucus; and many more.

The Department closely followed the views expressed during these discussions. The Department also responded to various representations by interest groups, amongst others, representations by Cause for Justice, Stop Trafficking in Person Group and the Sex Worker’s Education and Advocacy Taskforce.

The report is currently being considered by the Department with a view to advising Cabinet on the proposals with regard to legislative reform on adult prostitution. In order to do this, the Department will draft legislation which will be published for public comments. During the drafting process, the Department may further consult with interested parties. Although the Report seems to be comprehensive, the recommendations that were made on legislative interventions to deal with adult prostitution as well as other non-legislative intervention proposed in the Report are not universally accepted by different interest groups. As a result of the divergent views, further research is necessary to explore, in detail, the recommendations made in the Report in order to make legislative proposals that are acceptable to the different interest groups. In particular, there must also be extensive consultation with government departments on the implementation of the non-legislative recommendations, which has financial and other implications, before Cabinet is approached to endorse the said recommendations.

15 November 2018 - NW3115

Profile picture: Cassim, Mr Y

Cassim, Mr Y to ask the Minister of Justice and Correctional Services

WhWhether, since he served in Cabinet, he (a)(i) was ever influenced by any person and/or (ii) influenced any of his department’s employees to take any official administrative action on behalf of any (aa) member, (bb) employee and/or (cc) close associate of the Gupta family and/or (b) attended any meeting where any of the specified persons were present; if so, what are the relevant details in each case?

Reply:

(a) (i) (ii) (aa) (bb) (cc) and (b), I would like to inform the Honorable Member that I never influenced any person, department`s employees to take any official administrative action on behalf of any member or employee and neither have I been influenced by any close associate of the Gupta family and attended any meeting.

15 November 2018 - NW2818

Profile picture: Singh, Mr N

Singh, Mr N to ask the Minister of Labour

(a) Whether she has been informed of the foreign-owned (a) companies in general and (b) companies in the private security sector, particularly at Airports Company South Africa, are (i) monopolizing their respective sectors through various elite black economic empowerment partnerships, alternatively fronting and (ii) exploiting their South African labour force through illegal employment contracts and conditions that run contrary to the Basic Conditions of Employment Act, Act 75 of 1997; (c) aa) what is being done to ensure compliance with South African labour law by foreign-owned companies operating in South Africa and (bb) who can such employees contact within her department to report such illegal labour practices and how is compliance enforcement, legislation and regulation in this regard going to be tightened by Government?

Reply:

Response:

(a) All companies in the country are registering their business through the Department of Trade & Industry & SARS for tax purposes and therefore the Department of Labour does not have direct access to such information nor, does the department of labour have jurisdiction in this regard.

(b) The Black Economic Empowerment Act is administered by the Department of Trade and Industry and as such, compliance thereto is also monitored by the Dti.

(c) Our Inspection and Enforcement Services through its Annual Performance Plan, targets workplaces to be inspected in various sectors to determine level of compliance with employment law. The laws of the Department cover every person that is within the borders of SA, including foreign Nationals. In addition to companies that are identified for inspection, the Inspectors also conduct inspection on companies as and when complaints are lodged in our various labour centres.

(bb) There are Provincial Chief Inspectors in all 9 Provinces who are in charge of the Inspectorate and would take steps to address reported non-compliance. To this end, citizens are encouraged to report any suspected non-compliance to our Inspectors.

The Contact details of the Provincial Chief Inspectors are as follows:

NAME OF PROVINCE

NAME OF PROVINCIAL CHIEF INSPECTOR

CONTACT DETAILS

     

Eastern Cape

Adv. Lucky Mkhonto

0829082318

Free State

Ms. Amanda Mantutle

0829086809

Kwa-Zulu Natal

Mr. Edward Kambula

0609859286

Gauteng

Adv. Michael Msiza

0829008131

Mpumalanga

Ms. Nonyaniso Njwambe

0824157083

Limpopo

Mr. Phaswana Tladi

0845043801

Northern Cape

Mr. Solomzi Vass

0828026796

North West

Mr. Boikie Mampuru

0829082308

Western Cape

Mr. David Esau

0827914485

 

Each Province has Statutory Services personnel who handle litigations on behalf of the Director-General to refer non-compliant employers to the Courts. In addition, there is a statutory component in Head Office that deals with enforcement of workplaces that do not comply with notices and Director General’s Recommendations.

15 November 2018 - NW3012

Profile picture: Waters, Mr M

Waters, Mr M to ask the Minister of Justice and Correctional Services

(1) With regard to case number 108/06/2016 reported at the Edenvale Police Station, what (a) were the initial reasons that the Chief Prosecutor decided to proceed with the prosecution, (b) were the reasons the court withdrew the charges and (c) are the reasons that the Chief Prosecutor is now refusing to reinstate charges; (2) what evidence against the accused has changed that justifies the Chief Prosecutor’s decision not to proceed with prosecution?

Reply:

I have been informed by the National Prosecuting Authority that:

  1. The senior prosecutor was of the view that a prima facie case had not been made out. However, they relied on the wrong section of the relevant Act. The office of the Director of Public Prosecutions (DPP) reviewed the matter and decided to prosecute.
  2. This question falls away as the DPP has overruled the decision of the senior prosecutor and decided that prosecution should be instituted. The matter is on the court roll of the Germiston Regional Court and has been remanded to 16 November 2018.

15 November 2018 - NW3097

Profile picture: Mhlongo, Mr P

Mhlongo, Mr P to ask the Minister of Justice and Correctional Services

With reference to certain cases (details furnished), (a) why has the prosecution process taken so long, (b) why were some of the specified cases withdrawn without informing the complainants and (c) by what date will some cases be going to court?

Reply:

In responding to questions (a), (b), and (c), the National Prosecuting Authority (NPA) has reported as follows, as per the case number opened at Orlando Police Station:

  1. CAS 636/6/2010: This relates to an incident of drinking in public. A J534 form was issued. No docket was opened, only a control document was issued.
  2. CAS 730/1/2018: This is an invalid CAS number according to the South African Police Service (SAPS) system.
  3. 133/10/2015: This is a docket on trespassing. The docket, Orlando CAS 133/10/15, was not enrolled on 9 October 2015 as further investigations were requested. The said docket was brought back on 10 November 2016, but there were still investigations outstanding. The investigating officer was once again instructed to comply. The docket was only submitted to the prosecution during July 2018 at the the prosecution request. Investigations are still continuing. This docket is linked to Orlando CAS 130/10/15 (not 130/01/15, as indicated on the question paper).
  4. CAS 130/10/15: This docket relates to an incident of malicious damage to property, with the same complainant. Further investigation was requested, but the docket has not been presented to the prosecution.
  5. CAS 95/07/18: The same complainant, opened another docket for trespassing against the same suspect. This docket also required further investigation, again surrounding the same eviction order.
  6. 366/07/2018: The docket relates to the alleged kidnapping and assault of a minor child. This matter was enrolled on 24 July 2018. The matter is in court 13, Protea and is now set down for trial for 12 November 2018. The accused is represented by Legal Aid South Africa.
  7. CAS 244/10/2018: This relates to a housebreaking incident. There is only a statement by the complainant, with nothing to indicate who the suspect might be. This docket was not presented to the prosecution.
  8. CAS 66/10/2018: This is an assault docket opened against a member of SAPS. There are two (2) complainants in the docket. This docket was not presented to the prosecution.

14 November 2018 - NW3246

Profile picture: Mokgalapa, Mr S

Mokgalapa, Mr S to ask the Minister of Science and Technology:

What (a) amount did (i) her department and (ii) each entity reporting to her borrow from any entity in the People’s Republic of China (aa) in each of the past three flnanclal years and (bb) since 1 April 2018, (b) is the name of the lender of each loan, (c) conditions are attached to each loan and (d) are the repayments periods for each loan in each case? REPLY: (a) (i) and (ii) (aa) (bb) (b) (c) (d) 2015/16 R’000 2016/17 R'000 2017/18 R'000 Since 1 April 2018 R'00O Department of Science and Technology(DST) Nil Nil Nil Nil N/A N/A N/A Technology lnnovationAgency(TIA) Nil Nil Nil Nil N/A N/A N/A South African National Space Agency(SANSA) Nil Nil Nil Nil N/A N/A N/A Council for Scientific and Industrial Research(CSIR) Nil Nil Nil Nil N/A N/A N/A National Research Foundation(NRF) Nil Nil Nil Nil N/A N/A N/A Academy of Science of South Africa(ASSAf) Nil Nil Nil Nil N/A N/A N/A Human Sciences Research Council(HSRC) Nil Nil Nil Nil N/A N/A N/A 4

Reply:

(a) (i) and (ii)

(aa)

(bb)

(b)

(c)

(d)

 

2015/16

R’000

2016/17

R'000

2017/18

R'000

Since 1 April 2018

R'00O

     

Department of Science and Technology(DST)

Nil

Nil

Nil

Nil

N/A

N/A

N/A

Technology lnnovationAgency(TIA)

Nil

Nil

Nil

Nil

N/A

N/A

N/A

South African National Space Agency(SANSA)

Nil

Nil

Nil

Nil

N/A

N/A

N/A

Council for Scientific and Industrial Research(CSIR)

Nil

Nil

Nil

Nil

N/A

N/A

N/A

National Research Foundation(NRF)

Nil

Nil

Nil

Nil

N/A

N/A

N/A

Academy of Science of South Africa(ASSAf)

Nil

Nil

Nil

Nil

N/A

N/A

N/A

Human Sciences Research Council(HSRC)

Nil

Nil

Nil

Nil

N/A

N/A

N/A

 

14 November 2018 - NW3150

Profile picture: Paulsen, Mr N M

Paulsen, Mr N M to ask the Minister of Science and Technology

1. What number of scientists currently receives funding from (I) her department and (ii) the entities reporting to her and (b) what is the amount of funding received by each individual or group?

Reply:

The Department of Science and Technology (DST) Oversees six entities, namely, the National Reseamh Foundation (NRF), the Council for Scientific and Industrial Research (CSIR), the South African National Space Agency (SANSA), the Technology Innovation Agency (TIA), the Human Sciences Research Council (HSRC), and the Academy of Science of South Africa (ASSAf). Currently 6 967 researchers and scientists are supported by the DST and its entities through a number of projects and programmes. A total investment of R2.5b has been made towards this in the current year, details are provided in Table 1, below.

 

Table 1: DST and entitiss’ support towards scientists/researchers

Source of

Funding

Number

Researcher/Group

Funding

(R)

DST

403

 

212,087,703

 

144

Sector Innovation Fund

73,593,241

 

41

Water Technologies Demonstration and

Management Programmes

19,248,499

 

43

Hydrogen South Africa (HySA) Catalysts,

Infrastructure and System

1,000,000

 

5

USAID Peer Projects

218,000

 

08

10

European Union Collaborale P acts

Indigenous Knowledge System

7,285,863

26,360,000

 

39

Strategic Health Innovation Partnership

SHIP)

66,588,000

 

Source of

Funding

Number

Researcher/Group

Funding

(R)

 

15

Nuclear Technologies in Medicine and

Biosciences Initiative (NTeMBl)

3,000,000

 

4

Sterile Insect Technique for Malaria

Mosquitoes Project

1,273,000

 

4

Wheat and Breeding Platform

13,500,000

 

NRF

4708

 

1,684,293,868

 

31

Academic Statistics Programme

6,130,126

 

7

African Coelecanth Ecosystem Programme

3,217,949

 

31

Academic Statistics Programme

6,130,126

 

7

African Coelecanth Ecosystem Programme

3,217,949

 

29

African Origins Platform

14,337,917

 

1

African Origins Platform - Research

147,499

 

1

Astronomy in Africa (Newton Fund)

1,500.000

 

15

Astronomy Sub-Agency Funding Programme

1,919,625

 

25

Blue Skies Research Programme

9,968,239

 

5

Centre of Excellence (CoE) Grants

59,601,428

 

1

CoE: Indigenous Knowledge Systems

8,000,000

 

40

Community Engagement Programme

13,507,ze2

 

477

Competitive Programme for Rated Reseamhers

127,486,515

 

244

Competitive Support for Unrated Researchers

43,403,363

 

11

Development Grant for Knowledge Fields Development (KFD)

1,345,679

 

1

DST-NRF CoE in Epidemiological Modeling

and Analysis

8,445,635

 

1

DST- NRF CoE in Biomedical TB Research

11,862,714

 

1

DST- NRF CoE in Birds

7,161,899

 

1

DST- NRF CoE in Catalysis

s,ses,oo

 

1

DST- NRF CoE in Integrated Mineral Resoumes and Analysis

12,151,063

 

1

DST- NRF CoE in Invasion Biology

10,334,033

 

1

DST- NRF CoE in Strong Material

14,287,643

 

1

DST- NRF CoE in Tree Health Biotechnology

7,161,899

 

1

DST- NRF CoE in Tree Health Biotechnology

4,268,445

 

1

DST-NRF CoE in Palaeoeciences

12,155,063

 

20

DST-NRF Conference Fund

13,934,819

 

9

Education Research in South Africa

481,657

 

4

Economic and Social Research Council (ESRC)/NRF Collaborative Research: Urban

Transformation in SA

1,528,268

 

5

ESRC/NRF Higher Education In Africa

3,519,957

 

4

ESRC/NRF International Centre Partnership

610,150

 

54

Foundational Biodiversity Programme

9,788,293

 

2

French South Afnca Institute of Technology/ Cape Peninsula University of Technology

2,760,548

 

40

Global Change Grand Challenge

47,104,215

 

18

Human and Social Dynamics in Development

7,432,663

Source of Funding

Humber

Researcher/Group

Funding

(R)

 

4

Human Capital Development for Multi-

Wavelength Astronomy

282,500

 

2

IEPD - Institutional Engagement and Partnership Development

509,632

 

1

Institutional Engagement and Partnership Development (IEPD) Flagship - UKZN

1,084,909

 

1

IEPD Flagship - UWC

830,407

 

1

IEPD Mobililty Support for UMP

150,000

 

3253

Incentive Funding for Rated Researchers

146,ses,s37

 

36

Indigenous Knowledge Systems

9,798,034

 

24

International Council of Scientific Unions

1,150,263

 

122

International Science and Technology

Agreements

38,723,226

 

5

International Research Grants (IRG) - Argentlna / South Africa Research Cooperation Programme

673,458

 

8

IRG - BRICS Multilateral Joint Call

847,183

 

6

IRG - China / South Africa Research Cooperation Programme

1B4,678

 

14

IRG - Egypt / South Africa Research

Cooperation Programme

1,307,71g

 

3

IRG - Finland / South Africa Reseamh Cooperation Programme

879,580

 

6

IRG - Flemish / South Africa Research Cooperation Programme

2,698,674

       
 

14

IRG - France / South Africa Research

Cooperation Programme

1,249,520

 

12

IRG - Germany / South Africa Research

Cooperation Programme

3,391,626

 

14

IRG - India / South Africa Research Cooperation Programme

2,238,121

 

8

IRG - Japan Society for the Promotion of

Science / NRF Research Cooperation

Programme

2,145,635

 

11

IRG - Kenya / South Africa Research Cooperation Programme

1,081,289

 

10

IRG - Namibia / South Africa Research

Cooperation Programme

1,095,444

 

3

IRG - National Natural Science Foundation of China / NRF Research Cooperation Programme

389,905

 

3

IRG - NEPAD Flagship Programme

10,223,799

 

5

IRG - NRF/International Centre for Theoretical

Physics Joint Collaboration for Science Advancement

216,081

 

6

IRG - Poland / South Africa Research

Cooperation Programme

847,378

 

10

IRG - Romania / South Africa Research Cooperation Programme

1,194,403

 

16

IRG - South Africa / Austria Joint Scientific and

Technological Cooperation Programme

1,976,553

 

 

Source of

Funding

Number

Researcher/Group

Funding

(R)

 

6

IRG - South Africa / Canada Research Chairs Mobility Initiative

459,053

 

2

IRG - South Africa / Canada Research Chairs Trilateral Partner9hips initiatives

431,907

 

6

IRG - South Africa / Uganda Cooperation Bilateral Programme

1,023,46e

 

4

IRG - South Africa / Wallonia-Brussels Federation Science and Technology

Research Collaboration Programme

369,899

 

1

IRG - South Africa/China Joint Science and Technology Research Collaboration (Water

Research Flagship Projects)

6,660

 

5

IRG - South Africa/Tunisia Research Cooperation Programme

800,312

 

12

IRG - South Africa-Joint ln9titute for Nuclear Research (SA-JINR)-Grants for JINR Student

Practice

277,531

 

20

IRG - Sweden / South Affica Research Cooperation Programme

4,679,652

 

12

IRG - Switzerland / South Africa Research Cooperation Programme

5,065,o7e

   

IRG - Taiwan / South African Research Cooperation Programme

1,149,283

       
 

12

IRG - UK / South Africa Rasearchar Links

Grants for Travel

1,961,770

 

4

IRG - Zambia / South Africa Research

Cooperation Programme

187,201

 

447

Knowledge Interchange and Collaboration

11,390,207

 

4

Nanotechnology Flagship Programme

389,348

 

22

National Bioinformatics functional Genomics bursary & research granting

7,167,714

 

59

National Equipment

154,914,522

 

1

National Institute for Theoretical Physics

8,000,000

 

3

Natural History Collections Funding Instrument

715,747

 

4

NRF - European Research Council Partnership

367,827

 

1

National Science and Technology Forum (NSTF)/NRF Awards (Under Thuthuka)

1,492

 

1

Palaeo/Anthropology Trust

2,050,000

 

6

Research and Innovation Reward Programme

11,050,240

 

81

Research and Technology Fund

22,651,474

 

77

Research Development Grants for Y-Rated Researchers

8,094,221

 

87

Research Equipment Programme

6,977,415

 

29

SA National Antarctic Programme

38,680,172

 

15

SA Research Chairs

44,615,506

 

1

SA Research Chairs - Indigenous Knowledge

1,822,144

 

3

SA Research Chairs - Maths Education Chair Initiative

7,326,367

 

2

SA Research Chairs - Nano Technology

8,683,390

 

2

SA Research Chairs - Numeracy Chairs Initiative

6,92g,593

 

Source of Funding

Number

Researcher/Group

Funding

(R)

 

171

SA Research Chairs - Open

443,833,663

 

1

SA Research Chairs - PBMR

3,336,198

 

4

Sancor

214,843

 

17

Special Transformation Awards

1,572,537

 

101

Technology and Human Resources for

Industry Programme (THRIP)

72,331,645

 

624

Thuthuka

66,200,126

 

5

Vulnerable Disciplines - Developing Health

Sciences Research

700,000

 

CSIR

1664

 

530,010,802

 

84

Biosciances

77,437,020

 

159

Bullt Environment

52,132,354

 

382

Defence, Peace, Safety and Security

53,398,900

 

220

Implementation Unit

8,80,5000

 

72

Integrated Energy Centre

43,073,000

 

236

Materials Science and Manufacturing

106,818,631

 

86

Modelling and Digital Science

32,675,450

 

174

Meraka Institute

37,333,700

 

72

National Laser Centre

39,839,756

 

179

Natural Resources Environment

78,496,991

 
 

12

 

7,799,635

SANSA

1

Rhodes University

40,000

 

1

Universlty College London

150,000

 

9

NRF Funding

7,033,710

 

1

European Commission

576,025

 

TIA

180

TIA Programmes

115,000,000

HSRC

Not

applicable

Not applicable

Not applicable

Not applicable

 

ASSAf

Not

applicable

Not applicable

 

14 November 2018 - NW3002

Profile picture: Makeleni, Ms P

Makeleni, Ms P to ask the Minister of Basic Education

1) With reference to her reply to question 2801 on 2 October 2018, in which schools in each province have the learners with (a) hearing impairments, (b) visual impairments and (c) learners with profound to severe intellectual disabilities who are on waiting lists been accommodated; (2) What steps are taken in each province to ensure that the specified learners are receiving the education they are entitled to according to their respective disabilities? (3) are the schools in each province who accommodate these learners provided with the relevant resources like (a) SA Sign Language (i) teachers and (ii) assistant teachers, (b) braille teachers, (c) braillers and (d) large print books?

Reply:

(1) (a),(b),(c) The information is not readily available in the Department of Basic Education and it should be requested from the Provincial Education Departments.

(2) The information is not readily available in the Department of Basic Education and it should be requested from the Provincial Education Departments.

(3) (a)(i), (ii),(b),(c) and (d) The information is not readily available in the Department of Basic Education and it should be requested from the Provincial Education Departments.

14 November 2018 - NW3461

Profile picture: Kopane, Ms SP

Kopane, Ms SP to ask the Minister of State Security

1. (a) On what date did her department last conduct an audit of artwork owned by Government which is under her department’s curatorship and (b) what are the details of each artwork under the curatorship of her department according to the Generally Recognised Accounting Practice 103; 2. Whether any artworks under her department’s curatorship have gone missing (a) in each of the past five financial years and (b) since 1 April 2018; if so, what are the relevant details?

Reply:

1. The department does not apply GRAP 103 in recognising any of its assets, and therefore is not required to apply the standard to any of its artwork.  Furthermore, SSA does not have heritage assets as defined and recognised by GRAP 103.  GRAP 17 is however used to recognise assets.

 

2. Artwork is included in the SSA assets register.  Verification of artwork occurs with the normal verification of other assets’ classes and have been audited as part of the statutory audit by the Office of the Auditor General.

 

14 November 2018 - NW3123

Profile picture: Figlan, Mr AM

Figlan, Mr AM to ask the MINISTER OF RURAL DEVELOPMENT AND LAND REFORM

Whether, since she served in Cabinet, she (a) (i) was ever influenced by any person and/or (ii) influenced any of her department’s employees to take any official administrative action on behalf of any (aa) member, (bb) employee and/or (cc) close associate of the Gupta family and/or (b) attended any meeting where any of the specified persons were present; if so, what are the relevant details in each case?

Reply:

(a) No

(b) No. However, I have been invited and did attend a Diwali celebration at the Gupta residence.

14 November 2018 - NW2999

Profile picture: Boshoff, Ms SH

Boshoff, Ms SH to ask the Minister of Basic Education

(1)With reference to her department’s presentation on the progress of the implementation of the Curriculum Assessment Policy Statement (CAPS) for SA Sign Language (SASL), Grades R-12, presented to the Portfolio Committee on Basic Education on 12 September 2018, (a) why was the development of the SASL CAPS only done following a court case in 2009 between Springate and Others v the Minister of Basic Education and Others and (b) why did her department wait for legal proceedings to introduce CAPS for SASL, which is a deaf person’s constitutional right; (2) in view of 2018 being the first year that deaf learners will be examined in SASL as a Home Language subject, has she found that (a) the deaf learners are well prepared to be examined and (b) her department and the education system are sufficiently prepared to examine deaf learners in SASL; (3) what is (a) the number of suppliers of SASL learning and teaching support materials on her department’s database and (b) the experience of the specified suppliers in the field of SASL?

Reply:

Response

(1)(a) The development of the Curriculum and Assessment Policy Statement (CAPS) for South African Sign Language (SASL) prior to the 2009 court case of Springate and others versus the Minister of Basic Education and others was impeded and limited by challenges faced by government which had not yet been finalised. This is in reference to the fact that SASL is not yet the Official Language of government which essentially means it may not be provided at Home Language level in Basic Education, which is what it is for Deaf learners. However, it must be noted that the South African Schools Act 84 of 1996 already recognised Sign Language for use as language of learning and teaching (LoLT) for Deaf learners. Following the court case, the Minister instituted a process of developing SASL CAPS which is already being implemented even though the Department of Arts and Culture and the Pan South African Language Board have not yet concluded the process of making SASL one of the official languages of government.

(b) In addition to the response in (1)(a) above, it must be noted that there is nothing in legislation that prevents right holders from claiming their right from those who have a hold on it. This claim was inadvertently directed to government largely than it was directed to Basic Education given the response in (1)(a) above.

(2)(a) In preparation for the first Grade 12 NSC examinations and in an effort to prepare candidates for the exit examination, the Department of Basic Education (DBE) has set and released SASL HL exemplar question papers for Grade 10 and Grade 11 in 2017. In 2018, the DBE has set the preparatory examination question papers for SASL HL in Grade 12, so that learners have full exposure to an examination that is equivalent to the final examination.

(b)The DBE appointed a panel of experts to set and internally moderate question papers for the Grade 12 NSC examinations. These question papers were externally moderated and approved by Umalusi. In preparation for the implementation and administration of examinations in SASL HL, the DBE established a task team to ensure that all schools, teachers and learners are fully prepared for the November examination. This task team developed Guidelines for the Implementation and Conduct of Examinations in South African Sign Language Home Language and this document was issued to schools prior to the preparatory examination. The DBE and PEDs also conducted an audit of all centres where SASL HL examinations are to be conducted. In cases where there were deficiencies, these were addressed. In addition, the DBE took a decision to mark the preparatory examination papers nationally in Pretoria. Teachers from schools that offer SASL HL in Grade 12 were appointed as markers. The DBE appointed a national team for the moderation of School-Based Assessment in SASL HL. All portfolios of candidates that offer SASL HL were moderated and feedback was given to schools.

On the basis of the above initiatives, the DBE is confident that we are adequately prepared to examine Deaf learners in SASL.

(3) (a) There are six (6) suppliers of South African Sign Language (SASL) learning and teaching support material in the DBE database.

(b) The DBE puts a call for submission of SASL materials to all suppliers. The following are the only suppliers that have responded: Sign Language Education and Development (SLED), National Institute for the Deaf (NID) and University of Stellenbosch. These are the only institutions that have developed and submitted SASL materials over the years.