Questions and Replies

Filter by year

15 April 2019 - NW755

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

What number of (a) persons were diagnosed with HIV/Aids in each province (i) in 2018 and (ii) since 1 January 2019 and (b) the specified persons are on anti-retroviral treatment?

Reply:

A) The following table reflects the details in this regard

 

January-December 2018

January 2019

Province

HIV test positives

HIV test positives

Eastern Cape

92,939

9,043

Free State

41,489

3,914

Gauteng

234,043

21,137

KwaZulu Natal

230,525

21,267

Limpopo

56,160

5,307

Mpumalanga

76,007

6,562

North West

47,602

4,278

Northern Cape

11,301

1,026

Western Cape

48,546

4,484

National

838,612

77,018

b) The following table reflects the details in this regard

Province

December 2018

January 2019

Eastern Cape

483,691

486,365

Free State

265,232

267,148

Gauteng

1,000,503

1,011,319

KwaZulu Natal

1,353,561

1,351,281

Limpopo

349,340

351,281

Mpumalanga

448,098

453,876

North West

268,465

262,985

Northern Cape

59,698

59,612

Western Cape

265,014

268,086

National

4,493,602

4,512,378

END.

15 April 2019 - NW121

Profile picture: America, Mr D

America, Mr D to ask the Minister of Basic Education

With reference to the reply of the Minister of Public Service and Administration to question 3797 on 21 December 2018, what was the total expenditure incurred by her department relating to the travel privileges contained in the 2007 Ministerial Handbook of former (a)(i) Ministers and (ii) their spouses, (b)(i) Deputy Ministers and (ii) their spouses, (c) Ministers’ widows or widowers and (d) Deputy Ministers’ widows or widowers (i) in each of the past five financial years and (ii) since 1 April 2018?

Reply:

(a)(i)(ii) (b)(i)(ii) (c) (d) (i) (ii)

Chapter 10 of the Ministerial Handbook, Handbook for Members of the Executive and Presiding Officers indicates that the Minister and Deputy Minister are considered former “on the first day following the date on which they relinquished their office”

The political leadership of the Department of Basic Education (DBE) has been constant in the past five financial years and since 1 April 2018 and therefore there is neither a former Minister nor Deputy Minister.

15 April 2019 - NW750

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Public Enterprises

What is the lifespan of each of Eskom’s coal mines?

Reply:

According to the information received from Eskom

Eskom directly owns one mine, called Kilbarchan Colliery[1]. Indirectly, the utility owns some equity[2] in the cost-plus mines as a result of ownership of a portion of the mine assets through the cost-plus coal supply agreements (CSA).

Mining houses have the statutory right to mine the coal, and the statutory obligation to rehabilitate the mine. Eskom, through the CSA has the financial obligation to pay for these costs. The reserves dedicated to Eskom, can only be sold to Eskom. In a case where the mining house intends to transfer its rights and obligations, Eskom would have to provide consent. It should be noted that the CSAs do not include BEE ownership requirements as the last cost-plus agreement was signed prior to Eskom’s current BEE Policy.

Eskom does not disclose the lifespan of the cost-plus mines due to the following reasons:

  • Production at some of the cost-plus mines will end before the CSA end date.
  • As part of the life-extension projects, ongoing efforts to recapitalize some of the cost-plus mines will result in the stated life of the mine changing
  • Some reserves in the cost-plus mine complex are not dedicated to Eskom.
  1. Kilbarchan Colliery is recorded in Eskom’s balance sheet under the subsidiary Natal Navigation Colliery. It is recorded at R1, while the associated rehabilitation liability has been fully raised in Eskom’s financial statements.

  2. Eskom’s balance sheet does not include the cost-plus mines because the direct ownership rests with the mining houses and their balance sheets.

15 April 2019 - NW741

Profile picture: Tshwaku, Mr M

Tshwaku, Mr M to ask the Minister of Basic Education

What is the total number of schools which were connected to the internet in the 2018-19 financial year in each province?

Reply:

As education is a concurrent function, the requested information must be sought from the provinces.

 

15 April 2019 - NW789

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Economic Development

What (a) total amount has the Competition Commission paid to a certain company (Mokwana Incorporated Attorneys) since the specified company first started doing work for the Commission and (b) are the details of the (i) scope and (ii) nature of this work?

Reply:

I am advised by the Competition Commission that the total amount paid to Mokwana Incorporated Attorneys is R 3 644 724,90 for the period from January 2015 to December 2018.

The scope and nature of the work is investigation and litigation.

Eight cases were involved, covering litigation (six cases); review of electronic data (one case) and work connected to a raid on the premises of an entity (one matter).

-END-

15 April 2019 - NW446

Profile picture: America, Mr D

America, Mr D to ask the Minister of Basic Education

With reference to the Edleen Primary School, situated in the City of Ekurhuleni, (a) why is the school in such a state of disrepair, (b) when last was maintenance conducted at the school, (c) on what date will all repairs be completed at the school and (d) on what date will the five asbestos classrooms be replaced?

Reply:

Infomation has been requested from the Gauteng Department of Education and the response will be provided as soon as it is received.

15 April 2019 - NW788

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Economic Development

Whether the contract of a certain official (details furnished) of the Competition Commission has been renewed; if not, (a) why not and (b) who has been appointed to succeed the specified person?

Reply:

I am advised by the Competition Commissioner that the contract of the former CFO, Mr Molathlegi Kgauwe came to an end on 14 March 2019 and has not been renewed. The Competition Commission recruitment process is underway and the Commission will employ a new CFO in due course.

-END-

15 April 2019 - NW811

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

What number of staff strikes has his department experienced in each province since 1 January 2018?

Reply:

The following table reflects the details in this regard.

Table 1.

NO.

PROVINCE

NUMBER OF STAFF STRIKES

1.

Eastern Cape Province

02 (two) staff strikes

2.

Free State Province

04 (four) staff strikes

3.

Gauteng Province

38 (thirty-eight) staff strikes

4.

KwaZulu- Natal Province

04 (four) staff strikes

5.

Limpopo Province

01 (one) staff strike

6.

Mpumalanga Province

04 (four) staff strikes

7.

Northern Cape Province

02 (two) staff strikes

8.

North West Province

29 (Twenty-nine) staff strikes

9.

Western Cape Province

0 (No staff strikes)

 

END.

15 April 2019 - NW510

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

(a) What number of (i) buildings, (ii) properties and (iii) facilities does his department currently (aa) own and (bb) rent, (b) what is the value and purpose of each (i) owned and (ii) rented property and (c)(i) for how long has each property been rented, (ii) from whom is each property rented and (iii) what is the monthly rental fee for each property?

Reply:

The National Department of Health does not own any properties or buildings. All properties and buildings used or occupied by the National Department of Health are either:

  • State Owned and managed by the Department of Public Works as custodian, or;
  • State Owned and rented directly from the Department concerned where the Department of Public Works is not the custodian, or;
  • Rented from the private sector, using the Department of Public Works as procurement agent.

For this reason, records are not available within National Department of Health to respond directly to the Honorable Member’s question of 1 March 2019. All contract data is held by Department of Public Works, who invoice the Department of Health for payment as follows:

  • Quarterly in advance for State Owned buildings, or;
  • Monthly in arrears for privately owned properties leased by DPW on behalf of National Department of Health.

It is suggested that the question be referred to the Minister of Public Works for a comprehensive response.

END.

15 April 2019 - NW697

Profile picture: Bodlani, Ms T

Bodlani, Ms T to ask the Minister of Economic Development

What is the (a) make, (b) model, (c) price and (d) date on which each vehicle was purchased for use by (i) him and (ii) his deputy (aa) in the (aaa) 2016-17 and (bbb) 2017-18 financial years and (bb) since 1 April 2018?

Reply:

No vehicles were purchased for the Minister or the Deputy Minister during the years 2016-17, 2017-18 and since 1 April 2018.

-END-

15 April 2019 - NW763

Profile picture: Ntlangwini, Ms EN

Ntlangwini, Ms EN to ask the Minister of Health

With reference to his reply to question 317 on 11 March 2019, what (a) is the total number of public healthcare facilities that were nonoperational in each province as at 1 February 2019 and (b) type of facility is each?

Reply:

The following table reflects the details in this regard

Province

No of facilities

Type of facility

Comments

Eastern Cape

4

  1. Gengqe clinic
  1. Rosedale clinic (12-20) February 2019
  1. Gqeberha clinic

The clinic was under construction for the duration of 2018/19. It was just handed over in March 2019. It will be opened for services in the first quarter of 2019/20

Rosedale clinic was closed for few days by the community.

Gqeberha was closed for few days and was later reopened community protest.

Hellenvale clinic closed due to gangsterism in the area. The safety of the staff and the patients was taken into consideration

Gauteng

7

  1. Orchards Clinic
  1. Florida Clinic
  1. 4th Avenue Clinic
  1. Jeppe Street Clinic
  1. 80th Albert Street Clinic
  1. Joubert Park Clinic
  1. Claremont Clinic

All these clinics in the City of Johannesburg are undergoing major renovations.

Free State

NIL

N/A

 

KwaZulu- Natal

NIL

N/A

 

Limpopo

2

  1. Mogalakwena/Potgietersrus clinic
  1. Naboomspruit clinic

Both these clinics were operating from the houses that were offered by the Municipality. The services were discontinued when the Municipality took their houses back.

The Department had to build Manyoga clinic to continue with the services in Mogalakwena/ Potgietersrus

Mpumalanga

NIL

N/A

 

Northern Cape

2

  1. Olifant’s Hoek Community Health Centre
  1. Wrenchville Clinic

Olifant’s hoek CHC is under major renovation.

Wrenchville clinic was burnt by the community during protests. The contractor is on site for repairs.

North West

5

  1. Boitekong Community Health Centre
  1. Jouberton Community Health Centre
  1. Sun Rise Park clinic
  1. Ramokokastad clinic
  1. Tshiretso clinic
  • Boitekong is undergoing construction. It is due to be opened during the first quarter of 2019/20
  • Jouberton CHC is an old facility which is being replaced with a brand new CHC will be opened during the course of this year.
  • Both Sunrise Park and Ramokoka were burned down during community protest respectively.
  • Tshireletso clinic was closed by the Department of Labour in 2015 and since not been replaced or upgraded.

Western Cape

0

Still waiting for response

N/A

Total

20

   

END.

15 April 2019 - NW294

Profile picture: Dudley, Ms C

Dudley, Ms C to ask the Minister of Basic Education

(1)Whether any audits of infrastructure shortcomings and needs have been conducted at Pinedene Primary School in Parow in the Western Cape (details furnished); if not, why not; if so, (a) on what date(s) were such audits conducted and (b) what were the findings in each case; (2) whether any infrastructural parts of the school are considered to be unsafe; if not, how was this conclusion reached; if so, (3) whether any plans have been put in place to effect infrastructural (a) repairs and/or (b) improvements at the specified school; if not, (i) why not and (ii) by what date is it expected that the specified plans will be put in place; if so, what (aa) are the full relevant details of the infrastructural aspects that will be addressed, (bb) total amount will the planned work cost and (cc) are the relevant details of the time line covering the period from commencement to the completion of the planned infrastructural upgrades; (4) whether any budget allocations have been made to cover the envisaged costs of infrastructural repairs and/or improvements; if not, how will the specified repairs and/or improvements be funded; if so, what are the relevant details?

Reply:

The information has been requested from the Western Cape Education Department and will be provided as soon as it is received.

15 April 2019 - NW440

Profile picture: Dreyer, Ms AM

Dreyer, Ms AM to ask the Minister of Health

What proportion of the population has he found to be obese?

Reply:

Adults: Women – 41%

Men – 11%

Children: 2 to 14 years – Girls – 7.1%

2 to 14 years – Boys – 4.7%

END.

15 April 2019 - NW164

Profile picture: Alberts, Mr ADW

Alberts, Mr ADW to ask the Minister of Basic Education

(1) (a) What number of schools in Gauteng comply with or do not comply with the legally prescribed infrastructure standards of her department or any other relevant department and (b) what requirements are complied with or not complied with, in each case; (2) whether infrastructure inspections are conducted at schools; if not, why not; if so, (a) what is the nature of the inspections and what are the intervals between inspections, (b) at which schools were inspections conducted within the correct timeframe and at which schools were they not conducted, (c) at which schools were no inspections conducted despite requests by the school concerned, (d)(i) at which schools have inspections never been conducted and (ii) what is the reason in each case and (e) what action will be taken to conduct inspections at schools where it is overdue or has never been conducted?

Reply:

Infomation has been requested from the Gauteng Department of Education and the response will be provided as soon as it is received.

12 April 2019 - NW422

Profile picture: Lekota, Mr M

Lekota, Mr M to ask the Minister of Police

Whether the Government intends to continue with its non-statutory forces project; if so, (a) what criteria is being applied to determine the promotions to be effected in terms of the programme and (b) how will (i) these promotions be effected in a fair, meritorious and transparent manner given the rights and aspirations of other members of the SA Police Service and (ii) this programme assist in advancing the need to boost the professionalism and capacity of the organisation?

Reply:

(1) The continuation of the South African Police Service Non Statutory Forces (SAPS NSF) project is currently the subject of a review application which was brought against the South African Police Service by the Solidarity Union in the Gauteng North High Court. An interdict prohibits the South African Police Service to continue with the SAPS NSF project pending the outcome of Solidarity Union’s review application. Once the review application is finalised, a clear Judicial directive will be issued as a court order in this regard.

 

 

- , LIEUTENANT GENERAL D ISIONAL COMMISSIONER: PERSONNEL MANAGEMENT

NTSHIEA

Date: \ ’ ” ‘

Reply to question 422 recommended

BC MGWENYA

LIEUTENANT GENERAL MMISSIONER: HUMAN RESOURCE MANAGEMENT

Reply to question 422 recommended d

AL

OLE (SOEG)

Date: › ‹J- 0 I

GENERAL SIO ?SOUTH AFRICAN POLICE SERVICE

Reply to question 422 approved/nopgeds

MINIST BH CELE

Date:

OLICE

12 April 2019 - NW86

Profile picture: Steenhuisen, Mr JH

Steenhuisen, Mr JH to ask the Minister of Police

(1) What is the current status of the investigation into CAS 501/04/2017 opened at the Randfontein Police Station in Gauteng; (2) what are the names of the investigating officer(s) who was or were assigned to investigate the charges; (3) whether the case has been finalised; if not, what is the envisaged date for the finalisation of the case; if so, what are the details of the outcome of the case?

Reply:

1. The Inquest docket, Randfontein, CAS 501/04/2017, was opened after an explosion at Wilmar Continental Oils, Randfontein, at the SalVent Plant, where one person succumbed to his injuries. The case docket was discussed with the Senior Public Prosecutor (SPP), who instructed that the case be referred to the Occupational Health and Safety Department, in Johannesburg, for a report. The case docket was sent to the Occupational Health and Safety Department, on 16 July 2018. The report from the Occupational Health and Safety Department is outstanding.

2. In the interest of the case being investigated without fear or favour, the particulars of the investigating officer cannot be divulged.

3. Yes, the investigation of the case docket was finalised by the South African Police Service (SAPS) and referred to the SPP for a decision. The SPP instructed that the incident must be referred to the Occupational Health and Safety Department, for a report. This report is still outstanding. As soon as the report is received, the case docket will be returned to the SPP at the Randfontein Magistrate’s Caurt. The date of the finalisation of this case cannot be provided, as the court process is managed by the Department of Justice and Constitutional Development.

 

Reply to question 86 recommended

OM

KJ 2E (SOEG)

Date: 201tl -0t- 0 t

Reply to question 86 approved/

MINI OF POLICE BH CELE, MP

Date:/ D

GENERAL H AFRICAN POLICE SERVICE

11 April 2019 - NW645

Profile picture: Mathys, Ms L

Mathys, Ms L to ask the Minister of Public Works

What (a) income does his department and/or entities reporting to him generate from rent on state-owned properties and (b) amount is his department spending to rent property for the State?

Reply:

In respect of the Department of Public Works:

(a) The Department generated R34 884 619.23 from renting out of State-owned properties during the 2017/18 financial year.

(b) The Department spent R4 413 643 340.29 to rent property for the State during the 2017/18 financial year.

In respect of the Department of Public Works Entities:

Entity

a) [Renting of State-owned properties during 2017/18 financial year]:

Agrément South Africa

None

Council for the Built Environment

None

Construction Industry Development Board

None

Independent Development Trust

None

11 April 2019 - NW775

Profile picture: Ryder, Mr D

Ryder, Mr D to ask the Minister of Public Works

(1) (a) How often are deviations from the prescribed supply chain management policies and processes by the Property Management Trading Entity reported on, (b) to whom are the deviation reports supplied, (c) who signs off on the specified reports and (d) why are the reports not tabled and/or presented to the Portfolio Committee on Public Works; (2) whether he will furnish Mr D R Ryder with copies of the most recent deviation reports; if not why not; if so, what are the relevant details?

Reply:

(1) (a) Internally within the Department of Public Works, all deviations processed, approved and recorded are reported on a monthly basis to the Department’s Standing Accountability Management Committee (AMC).

(b) Deviations that are above the tender threshold of one million rand (R1 million) procured from a sole source supplier or arising out of an emergency and approved by the relevant delegated authority within the Department, are reported to the National Treasury and the Auditor General of South Africa (AGSA) within the prescribed 10 days of such approval per case.

Deviations other than sole source or arising out of an emergency are considered by the relevant delegated authority within the Department and then recommended to the National Treasury for approval/support. The National Treasury supported deviations are then reported to the AGSA within 10 days of approval.

All reported deviations of the Department are published in the National Treasury website after approval.

(c) Internally within the Department all deviations’ registers and reports are presented to the AMC. Deviations that are above the tender threshold procured either from a sole source supplier or arising out of an emergency are reported to the NT and AGSA. All NT supported deviations that are not a sole source transaction nor arising out of an emergency are provided to the AGSA

The Chief Director: Supply Chain Management (CD: SCM) or his/her delegate accounts for all deviations that are presented at the AMC. The deviation reports to National Treasury and AGSA for all sole source procurement and those arising out of emergencies and which were approved by the relevant authority are signed off by the CD: SCM. Reports to AGSA for deviations that are neither sole source nor arising out of emergencies that are supported by the National Treasury are signed off by the CD: SCM.

(d) There is currently no specific regulatory provision or stipulation that provides for the reporting of deviations to the National Assembly Portfolio Committee on Public Works. However, the Department of Public Works is always prepared to respond to any invitation from the Portfolio Committee on Public Works in order to report on the deviations as and when the Committee is able to find a slot to deliberate on such.

2. Yes, deviation reports to the AGSA for deviations that have been supported by the National Treasury are attached as Annexure A.

11 April 2019 - NW738

Profile picture: Mente-Nkuna, Ms NV

Mente-Nkuna, Ms NV to ask the Minister of Higher Education and Training

What was the total number of graduates for each degree and diploma at each university in each of the past 25 years?

Reply:

Information on the total number of students who graduated with 3-year diplomas, 3-year degrees, Bachelor of Technology and 4-year degrees by institution from 1993 to 2017 are attached as Annexure A.

Annexure A: Number of students graduated with 3-year diplomas, 3-year degrees and 4-year degrees by institution from 1993 to 2017

3 Year Diploma Graduates (UNIVERSITIES)

Institution

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

University of Cape Town

120

76

115

83

67

65

169

102

64

324

441

356

University of Durban-Westville

1

2

2

1

0

1

0

3

2

2

20

n.a.

University of KwaZulu-Natal

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

870

University of Fort Hare

3

21

19

2

10

1

1

4

4

5

10

237

Medical Uni. of South Africa

29

21

22

26

11

10

5

3

36

5

39

6

University of Natal

161

163

184

232

273

246

0

505

248

436

1087

n.a.

University of the North

17

58

95

108

65

33

20

106

262

152

206

308

University of the Free State

10

18

26

9

6

6

5

5

13

224

475

371

University of Port Elizabeth

48

130

108

102

81

312

739

897

1012

526

1019

1627

Potchefstroom University

31

28

32

35

120

344

1443

898

1444

1093

1057

n.a.

North West University

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

2578

University of Pretoria

132

153

252

351

377

508

4461

3625

3002

2980

1751

2437

Rand Afrikaans University

27

867

2272

2390

2096

2823

1952

1574

1358

1099

1381

1596

Rhodes University

41

40

162

209

83

124

391

88

260

145

788

241

University of South Africa

600

536

497

525

668

835

2830

694

3079

4746

2297

4274

University of Stellenbosch

63

101

96

102

98

104

153

84

65

85

115

42

University of Western Cape

282

214

196

191

228

139

149

174

187

326

513

272

University of Witwatersrand

84

96

77

84

154

206

165

119

273

436

407

180

University of Zululand

204

152

221

237

261

176

187

72

193

173

387

126

Vista University

4970

4840

4783

4431

3337

3167

2033

2077

1384

883

373

n.a.

University of Transkei

n.a.

n.a.

124

199

121

n.a.

36

57

32

140

821

575

University of North West

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

46

202

231

333

n.a.

University of Venda

n.a.

n.a.

147

277

167

127

54

32

352

190

443

359

TOTAL

6823

7516

9430

9594

8223

9227

14793

11165

13472

14201

13963

16455

3 Year Diploma Graduates (TECHNIKONS)

Institution

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

Cape Technikon

1541

1483

1612

1630

1562

1540

1504

1539

1646

1740

2009

2220

Northern Gauteng Technikon

326

673

778

948

941

1078

1062

1051

1071

1225

1276

n.a.

Mangosuthu Technikon

234

29

430

481

706

817

860

874

845

865

856

926

M.L. Sultan Technikon

753

869

959

942

1069

908

1157

1156

1076

1270

n.a.

n.a.

Natal Technikon

1135

967

n.a.

n.a.

1073

n.a.

1053

1026

941

927

n.a.

n.a.

Technikon Free State

596

585

767

759

777

690

649

654

744

868

893

1041

Peninsula Technikon

798

n.a.

n.a.

918

777

1025

1081

1090

1428

1228

1392

1275

Port Elizabeth Technikon

867

924

1041

1063

1117

1124

1083

1067

1115

1088

1126

1225

Pretoria Technikon

2076

2032

2108

2056

1903

2288

2186

2043

2204

2476

2789

n.a.

Technikon SA

286

2248

3221

3746

4260

3285

4003

2478

1493

1317

1624

n.a.

Vaal Triangle Technikon

788

572

640

903

441

925

997

393

1290

1529

1775

1876

Witwatersrand Technikon

1273

1533

1434

1521

1477

1539

1433

1051

1170

1248

1211

1478

Border Technikon

n.a.

n.a.

n.a.

117

162

353

n.a.

14

520

574

676

675

Technikon North West

n.a.

n.a.

n.a.

187

36

71

407

287

339

451

622

n.a.

Eastern Cape Technikon

n.a.

n.a.

n.a.

178

440

429

872

435

683

861

1309

1061

Durban Institute of Technology

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

2315

2629

Tshwane University of Technology

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

5133

TOTAL

10673

11915

12991

15449

16741

16072

18347

15158

16565

17667

19873

19539

3 Year Diploma Graduates (UNIVERSITIES POST MERGER)

Institution

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

Cape Peninsula University of Technology

3496

3984

3933

3810

4112

3650

3921

4088

4141

4093

4127

4091

4177

Central University of Technology, Free State

1186

1360

1240

1392

1121

1209

1418

1492

1419

1378

1443

1498

1400

Durban University of Technology

2952

2928

3298

3008

3836

3297

3499

3936

4061

4207

3858

4148

4372

Mangosuthu University of Technology

1140

1779

1792

1732

1731

1530

1800

1858

2110

2203

2262

2082

2088

Nelson Mandela Metropolitan University

1410

1205

1121

1157

1631

1574

1534

2059

2261

1925

1835

1836

1756

North West University

334

520

586

825

743

886

1071

1272

1609

1874

2394

3738

3338

Tshwane University of Technology

4796

4922

5434

6120

6149

6293

6272

6522

6666

6611

7125

7469

8034

University of Cape Town

55

90

25

21

22

25

18

15

24

37

28

27

31

University of Fort Hare

267

419

13

82

156

93

53

106

126

85

42

45

27

University of Free State

544

480

18

69

165

158

158

136

148

196

395

509

532

University of Johannesburg

1886

2047

2113

2351

2485

2492

2852

3061

3227

3260

3052

3038

3042

University of KwaZulu Natal

8

9

14

18

11

7

30

17

10

9

13

1

3

University of Limpopo

868

910

1047

258

119

329

260

177

130

163

17

0

0

University of Pretoria

2911

12

4

15

4

10

8

9

2

3

9

5

3

University of South Africa

1938

1773

1862

2642

1541

3613

3755

3404

3958

4292

4624

4225

3442

University of Stellenbosch

0

0

0

0

0

47

11

10

19

22

13

4

8

University of Venda

487

14

214

103

96

154

171

91

106

172

100

102

112

University of Western Cape

4

0

2

1

2

0

0

0

0

0

0

0

0

University of Witwatersrand

154

6

28

7

6

7

5

3

3

1

2

 

1

University of Zululand

115

4

8

41

225

320

361

410

335

271

296

290

257

Vaal University of Technology

1885

1890

2103

2410

2381

2221

2678

2875

2797

2947

2813

2747

2764

Walter Sisulu University

1664

1856

1554

1696

1248

1540

2048

2198

2211

2346

2097

2451

2505

Sol Plaatje University, Northern Cape

0

0

0

0

0

0

0

0

0

0

0

49

41

University of Mpumalanga

0

0

0

0

0

0

0

0

0

0

0

145

85

TOTAL

28100

26208

26409

27758

27784

29455

31923

33739

35363

36095

36545

38500

38018

B Tech Graduates

Institution

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

Cape Technikon

n.a.

n.a.

155

318

378

407

558

442

543

741

959

1031

Northern Gauteng Technikon

n.a.

n.a.

n.a.

90

146

269

225

240

221

276

303

n.a.

Mangosuthu Technikon

n.a.

n.a.

8

7

5

10

2

3

4

9

21

26

M.L. Sultan Technikon

n.a.

n.a.

17

86

150

227

209

231

278

301

n.a.

n.a.

Natal Technikon

n.a.

n.a.

n.a.

n.a.

242

n.a.

249

374

494

377

n.a.

n.a.

Technikon Free State

n.a.

n.a.

12

99

116

166

188

172

271

366

442

701

Peninsula Technikon

66

n.a.

n.a.

104

236

373

340

380

473

514

592

761

Port Elizabeth Technikon

n.a.

n.a.

71

201

285

333

374

322

393

468

441

472

Pretoria Technikon

n.a.

n.a.

n.a.

176

354

456

2192

3317

2178

1762

2364

n.a.

Technikon SA

n.a.

n.a.

51

174

221

254

644

916

672

719

1060

n.a.

Vaal Triangle Technikon

n.a.

n.a.

48

86

78

109

110

33

195

249

320

399

Witwatersrand Technikon

n.a.

n.a.

93

219

338

378

504

427

476

543

545

563

Border Technikon

n.a.

n.a.

n.a.

n.a.

n.a.

10

n.a.

9

40

49

45

80

Technikon North West

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

7

2

18

33

30

n.a.

Eastern Cape Technikon

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

2

5

3

89

100

106

Durban Institute of Technology

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

642

925

Tshwane University of Technology

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

3662

TOTAL

66

n.a.

455

1560

2549

2992

5604

6873

6259

6496

7864

8726

B Tech Graduates (POST MERGER)

Institution

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

Cape Peninsula University of Technology

1726

1952

2018

2175

1989

2172

2231

2351

2458

2639

2651

2706

2974

Central University of Technology, Free State

576

579

536

518

602

672

698

821

874

977

1005

1026

1084

Durban University of Technology

928

989

1118

1127

1545

1873

1790

1834

2162

2235

2149

2534

2712

Mangosuthu University of Technology

38

29

56

64

68

59

164

93

164

242

221

131

122

Nelson Mandela Metropolitan University

542

418

449

449

530

584

660

874

930

883

877

923

986

Tshwane University of Technology

2800

2417

2118

2224

2426

2434

2549

2627

2691

3050

3847

3900

4727

University of Johannesburg

682

719

798

926

1072

1106

1093

1252

1358

1435

1470

1727

1661

University of South Africa

764

612

795

1091

1278

1692

2005

2079

2008

1685

1379

1300

1488

Vaal University of Technology

372

478

523

547

699

830

895

1006

1268

1100

994

1123

1181

Walter Sisulu University

67

107

183

294

320

352

333

262

390

494

489

751

881

TOTAL

8495

8300

8594

9415

10529

11774

12418

13199

14303

14740

15082

16121

17816

3 Year Degree Graduates

Institution

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

University of Cape Town

1339

1303

1172

1170

1162

1220

1121

1089

1192

1258

1522

1646

University of Durban-Westville

829

936

1069

973

946

851

750

684

665

680

696

n.a.

University of KwaZulu-Natal

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

2757

University of Fort Hare

501

487

549

496

554

487

565

376

271

228

349

406

Medical Uni. of South Africa

131

147

149

142

147

120

128

130

111

101

120

105

University of Natal

1464

1652

1667

1645

1789

1823

0

1648

1662

1749

1984

n.a.

University of the North

293

1636

1811

2324

2378

1811

1360

1047

669

415

328

502

University of the Free State

737

752

652

643

730

730

810

702

688

777

943

1119

University of Port Elizabeth

604

582

555

490

519

511

475

435

408

460

524

848

Potchefstroom University

974

923

839

804

866

902

814

1124

1234

1262

1176

n.a.

North West University

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

2032

University of Pretoria

1737

1593

1553

1709

1950

1997

1874

2011

2062

2394

2687

2968

Rand Afrikaans University

1138

1005

1048

851

1030

1083

1129

1283

1391

1749

1929

2292

Rhodes University

658

570

510

507

491

507

570

596

610

711

720

635

University of South Africa

4077

5226

5920

6374

6586

6731

5482

5564

4792

4709

4232

4330

University of Stellenbosch

1199

1303

1190

1191

1168

1208

1311

1288

1263

1384

1503

1413

University of Western Cape

1239

1076

1264

1380

1484

903

759

714

498

462

575

630

University of Witwatersrand

1549

1455

1266

1174

1126

1051

1099

1002

981

956

1022

1306

University of Zululand

455

328

405

317

230

618

576

411

432

428

627

552

Vista University

872

975

1171

1404

1549

1890

2121

1860

1640

1377

1229

n.a.

University of Transkei

n.a.

n.a.

514

497

511

n.a.

485

334

327

221

192

205

University of North West

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

561

389

258

367

n.a.

University of Venda

n.a.

n.a.

493

661

517

495

720

501

382

283

457

521

TOTAL

19795

21948

23797

24753

25733

24938

22149

23360

21667

21862

23182

24267

3 Year Degree Graduates (POST MERGER)

Institution

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

Central University of Technology, Free State

119

146

149

185

100

46

2

0

4

0

1

0

0

Nelson Mandela Metropolitan University

916

875

869

916

853

884

954

983

992

1057

989

1163

1191

North West University

2068

2424

2380

2454

2613

2711

2796

3003

3599

3610

3840

4011

3872

Rhodes University

799

807

844

745

797

854

950

1036

1026

1009

956

1090

1146

University of  Fort Hare

531

416

450

557

568

635

719

943

932

969

960

988

1121

University of Cape Town

1789

1589

1732

1556

1544

1686

1738

1942

1870

1833

1786

1791

1802

University of Free State

951

1320

1299

1442

1535

1713

1834

2058

2352

2368

2303

2187

1978

University of Johannesburg

2373

2794

2568

2653

2671

2944

3015

3304

3423

3600

3524

3563

3525

University of KwaZulu-Natal

2661

3500

3155

2931

2757

2717

2905

3324

3646

3321

3283

3726

3885

University of Limpopo

723

990

1359

1447

1128

1219

1315

1828

1970

2137

2040

1971

2200

University of Pretoria

3121

3324

3179

3225

3291

3235

3432

3400

3836

3519

3791

3976

3856

University of South Africa

3310

4153

4157

4448

5275

5725

6031

5745

8289

9079

9198

9729

8189

University of Stellenbosch

1555

1833

1851

1979

2012

2113

2097

2276

2220

2100

2152

2412

2570

University of Venda

631

723

841

997

1003

980

681

561

522

832

913

906

1107

University of Western Cape

840

1015

1054

985

990

1162

1182

1269

1420

1537

1764

1698

1691

University of Witwatersrand

1441

1495

1689

1688

1549

1672

1735

1995

2106

2159

2172

2416

2637

University of Zululand

459

669

575

724

680

600

739

1445

1264

1212

1444

1500

1424

Walter Sisulu University

193

282

308

477

419

557

532

504

456

302

370

491

484

Sefako Makgatho University

0

0

0

0

0

0

0

0

0

0

270

205

269

University of Mpumalanga

0

0

0

0

0

0

0

0

0

0

0

25

35

Sol Plaatje University, Northern Cape

0

0

0

0

0

0

0

0

0

0

0

0

13

TOTAL

24480

28355

28459

29409

29785

31453

32657

35616

39927

40644

41756

43848

42995

4 Year Degree Graduates

Institution

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

University of Cape Town

771

827

833

817

793

931

1013

871

997

1157

1126

1110

University of Durban-Westville

360

500

645

608

557

506

462

525

423

467

432

n.a.

University of KwaZulu-Natal

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

1175

University of Fort Hare

171

249

170

178

174

176

133

180

133

338

352

433

Medical Uni. of South Africa

142

150

266

299

350

362

449

362

368

397

448

422

University of Natal

647

592

582

549

595

542

0

642

664

601

769

n.a.

University of the North

221

363

388

537

683

596

412

382

281

285

271

277

University of the Free State

547

549

536

498

458

458

470

455

391

408

378

546

University of Port Elizabeth

133

143

177

191

232

212

242

523

499

518

699

883

Potchefstroom University

348

410

405

415

481

454

508

513

407

433

584

n.a.

North West University

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

1000

University of Pretoria

1538

1600

1578

1575

1520

1532

1450

1528

1566

1417

1398

1746

Rand Afrikaans University

338

361

407

341

443

469

435

506

266

324

303

410

Rhodes University

87

101

147

125

140

167

158

196

207

356

286

206

University of South Africa

882

1030

1184

1098

1105

1054

1172

557

659

690

580

1717

University of Stellenbosch

762

842

770

817

783

776

754

864

906

960

984

970

University of Western Cape

255

308

340

397

403

367

379

453

511

493

428

546

University of Witwatersrand

1194

1210

1162

954

1015

968

914

960

875

903

958

1019

University of Zululand

426

142

318

144

133

323

365

211

205

126

203

347

Vista University

249

283

431

627

563

733

741

357

281

257

175

n.a.

University of Transkei

n.a.

n.a.

341

513

377

n.a.

518

417

362

263

205

258

University of North West

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

n.a.

659

285

162

154

n.a.

University of Venda

n.a.

n.a.

122

193

212

133

154

147

187

198

189

222

TOTAL

9071

9660

10802

10876

11017

10759

10729

11308

10473

10753

10922

13287

Institution

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

University of Cape Town

1278

1341

1312

1362

1267

1295

1339

1389

1440

1471

1503

1528

Cape Peninsula University of Technology

0

0

0

0

398

491

567

572

661

654

648

733

Central University of Technology, Free State

25

18

49

85

87

108

218

301

301

292

278

449

Durban University of Technology

0

0

0

0

0

0

0

0

0

23

320

24

Nelson Mandela Metropolitan University

759

663

672

514

529

463

493

543

677

649

738

760

North West University

1167

1295

1266

1244

1289

1451

1453

1768

2025

2015

2229

2236

Rhodes University

219

233

237

231

232

212

224

250

263

230

270

234

Tshwane University of Technology

98

70

57

126

311

370

486

362

485

490

537

577

University of Fort Hare

648

694

707

529

749

844

900

697

805

909

789

826

University of Free State

819

686

640

691

635

687

798

792

912

1065

1187

1118

University of Johannesburg

459

553

507

534

523

516

637

682

850

1078

1094

1177

University of KwaZulu Natal

1765

1523

1525

1602

1464

1540

1651

1912

1897

1882

2095

2184

University of Limpopo

799

838

882

986

1070

1017

1041

1193

1335

1673

1342

1468

University of Pretoria

1870

1893

2021

2081

1981

2061

2127

2204

2534

2391

2637

2866

University of South Africa

1815

808

917

1054

1186

1360

1654

2227

3549

5079

6665

8517

University of Stellenbosch

1047

1083

1056

938

1073

1085

1131

1201

1310

1335

1397

1513

University of Venda

291

300

345

566

828

1084

883

819

820

928

957

1375

University of Western Cape

658

589

690

763

771

807

925

853

965

1141

1159

1222

University of Witwatersrand

1210

1208

1432

1301

1291

1415

1448

1550

1861

1794

1948

2064

University of Zululand

306

510

577

732

681

808

739

1602

1144

1273

1298

1526

Vaal University of Technology

0

12

28

0

0

0

0

0

0

0

0

0

Walter Sisulu University

236

270

319

432

512

460

762

1011

1072

1100

1319

1117

Sefako Makgatho Health Science University

0

0

0

0

0

0

0

0

0

0

469

432

TOTAL

15469

14587

15239

15771

16877

18074

19476

21928

24906

27472

30879

33946

11 April 2019 - NW550

Profile picture: Ryder, Mr D

Ryder, Mr D to ask the Minister of Public Works

(1) Whether the property that houses the Fairland Police Station, situated at the corner of 89 Sophia Street and 11 Avenue in Fairland, Gauteng, is owned by the State; if so, what are the details of the building maintenance planned by his department over the next 12 months; if not, (2) is the specified property leased; if so, what is the (a)(i) name and (ii) contact details of the owner of the property and (b) expiry date of the current lease agreement; (3) whether the maintenance of the building vests with the owner, the occupying department and/or his department; (4) whether the current lease agreement will be renewed; if not, will alternative premises be sought to house the police station; (5) whether a user asset management plan has been put in place; if not, why not; if so, is the plan being adhered to?

Reply:

1. The property situated at the corner of 89 Sophia Street and 11 Avenue in Fairland, Gauteng Province, which accommodates the Fairland Police Station is not a State-owned property.

2. Yes, the property is leased.

(a) (i) The property is owned by Batho Pele Projects, Close Corporation.

(ii) The Department of Public Works’ Property Manager, Mr Lufuno Nelwamondo, may be contacted for further details on this number: 011 713 6218.

(b) The lease is currently running on a month to month basis.

3. The maintenance of the building, as stipulated in the lease contract, is vested with the owner and not the Department of Public Works (DPW).

4. The DPW renews leases in line with clients’ accommodation needs. The South African Police Service (SAPS), as a client department of the DPW, has indicated a continued need for the property and therefore the DPW will seek to renew the lease with the lessor.

5. The client has submitted a User Asset Management Plan (UAMP) for the 2017/18 financial year and it is currently in place. The Department of Public Works is currently busy with the spatial planning processes.

11 April 2019 - NW525

Profile picture: Mathys, Ms L

Mathys, Ms L to ask the Minister of Public Works

(a) What number of (i) buildings, (ii) properties and (iii) facilities does his department currently (aa) own and (bb) rent, (b) what is the value and purpose of each (i) owned and (ii) rented property and (c)(i) for how long has each property been rented, (ii) from whom is each property rented and (iii) what is the monthly rental fee for each property?

Reply:

(a) (i) (ii) (iii) (aa) The Department of Public Works is currently the custodian of approximately 89 623 State-owned properties.

(i) (ii) (iii) (bb) The Department of Public Works currently rents / leases a total of 2 550 properties.

(b) (i) The value ascribed to the property under the custodianship of Department of Public Works is about R126 billion and the properties are mainly utilized for service delivery by various Government Department and State organs.

For details on the use of the properties, as well as details pertaining to part (c) (i) – (iii) please contact the Director-General’s Office to access the information on compact disc, which could not be submitted with this reply due to the sheer volume of the data.

11 April 2019 - NW729

Profile picture: Mathys, Ms L

Mathys, Ms L to ask the Minister of Public Works

(a) On what date was each of the country’s (i) ports and (ii) harbours upgraded and (b) what (i) did the upgrade entail and (ii) were the costs in each instance?

Reply:

(a)

(i) The Department of Transport and its managing entity, the Transnet National Ports Authority (TNPA), are responsible for all ports within South Africa.

(ii) The Department of Public Works is the custodian of public small harbours, public slipways and State coastal properties.

The Department of Public Works has not upgraded any of its existing harbours with respect to increasing the extent or size of these harbours. The Department is currently conducting a repair and maintenance programme to the Proclaimed Fishing Harbours in the Western Cape Province.

The Proclaimed Fishing Harbours comprise the following 13 harbours:

  1. Lamberts Bay Harbour
  2. Laaiplek Harbour
  3. St Helena Bay Harbour
  4. Saldanha Bay Harbour
  5. Pepper Bay Harbour
  6. Hout Bay Harbour
  7. Kalk Bay Harbour
  8. Gordon’s Bay Harbour
  9. Hermanus Harbour
  10. Gansbaai Harbour
  11. Struisbaai Harbour
  12. Arniston Harbour
  13. Stilbaai Harbour

(b)

(i) and (ii)

 

Scope of Work

Cost

Removal of sunken vessels

R25 584 834

Dredging

R84 103 134

Slipways and marine infrastructure

R75 789 342

Electrical and security infrastructure

To be determined once the tender specifications have been finalised

Civil infrastructure repairs

To be determined once the tender specifications have been finalised

11 April 2019 - NW765

Profile picture: Mathys, Ms L

Mathys, Ms L to ask the Minister of Public Works

What total number of (a) tenders that were advertised by (i) his department and (ii) entities reporting to him in each (i) month and (ii) province in the past 10 years required tender briefings and (b) the briefings were compulsory in each year since 2010 up into 2018?

Reply:

In respect of the Department of Public Works:

The scope and magnitude of the information requires the Department to engage with all Regional Offices to download the data of advertised tenders for the requested period. Therefore, the requested information cannot be provided at this stage due to the short-time frame within which this reply must be tabled in Parliament.

In respect of Entities reporting to the Department of Public Works:

Agrément South Africa (ASA)

YEAR

NUMBER OF TENDERS ADVERTISED

NUMBER OF BRIEFING SESSION

(b)

COMPULSORY (YES/NO)

2015-2017

ASA has advertised five tenders since 01/04/2017 (since the inception of the Agrément South Africa Act, 2015 (Act No. 11 of 2015)

Five Briefing Sessions

All five required compulsory tender briefings.

2018

Two were advertised in March 2018 and cancelled in July 2018. The one tender was subsequently re-advertised in November 2018 and was awarded in February 2019.

   

2019

One was advertised in March 2019, and the closing date was 29 March 2019.

   

TOTAL

5

 

 

Council for the Built Environment (CBE)

a) One tender was advertised.

YEAR

NUMBER OF TENDERS ADVERTISED

NUMBER OF BRIEFING SESSION

(b)

COMPULSORY (YES/NO)

2017

1

1

Yes, 21 February 2017

Construction Industry Development Board (CIDB)

  1. 57 tenders were advertised

ii) YEAR

NUMBER OF TENDERS ADVERTISED

NUMBER OF BRIEFING SESSION

(b)

COMPULSORY (YES/NO)

2010

3

0

N/A

2011

4

0

N/A

2012

2

1

YES

2013

5

2

YES

2014

3

1

YES

2015

12

1

YES

2016

7

0

N/A

2017

11

1

YES

2018

10

1

YES

TOTAL

57

7

 

Independent Development Trust (IDT)

The requested data is not readily available at this point in time due to the high volumes of data that must be sifted through and the short time-frame within which this reply must be tabled in Parliament.

11 April 2019 - NW786

Profile picture: Matsepe, Mr CD

Matsepe, Mr CD to ask the Minister of Transport

Whether, with reference to aircraft model Boeing 737 MAX 8 which crashed this month in Ethiopia and over the Java Sea in October 2018, (a) the SA Civil Aviation Authority is undertaking an audit of all aircraft of this model landing and departing any airports in the country, (b) what (i) is being done in this regard taking the recent two crashes into account and (ii) investigations are undertaken and (c) on what date will the results of such investigations be made available?

Reply:

South African Civil Aviation Authority (SACAA)

The South African Civil Aviation Authority (a) identified one operator, namely Comair that currently has one (1) Boeing 737 MAX 8 aircraft in its fleet and the second aircraft was yet to be delivered when the accident occurred. Only one foreign operator used and flew this aircraft model into South Africa, namely Ethiopian Airlines.

(b) (i) the SACAA engaged Comair following the Ethiopian airline crash and the operator voluntarily grounded its affected aircraft. Ethiopian airlines also voluntarily grounded its Boeing 737 MAX 8 fleet. Ordinarily, the Department of Transport issues a Foreign Operator Permit, on recommendation of the SACAA, to all foreign airlines intending to fly into South Africa and through this mechanism, the Authority would know the model of aircraft intended to be flown into the country and would implement and enforce any existing national or adopted airworthiness directives, etc. It is important to note that with regards to this matter, the State of design and manufacturing, i.e. the Federal Aviation Administration (FAA), has subsequently issued a directive grounding all Boeing 737 MAX 8 & 9 aircraft globally until further notice.

(ii) currently no investigations are being conducted by RSA’s Aircraft and Incident Investigation Division because South Africa is not the State of Occurrence or Registry of the two accidents; RSA suffered no fatalities in the two accidents and RSA has not yet been requested to participate or assist in the investigation.

(c) N/A

11 April 2019 - NW672

Profile picture: Ryder, Mr D

Ryder, Mr D to ask the Minister of Public Works

(a) What (i) amount has been allocated for the renovations, improvements and maintenance of (aa) ministerial houses, (bb) each parliamentary village, (cc) the parliamentary precinct and (dd) all other Prestige Portfolio assets in his department’s 2019-20 budget and (ii) are the details of the planned renovations, improvements and maintenance in each case and (b) by what date(s) are these projects envisaged to (i) commence and (ii) conclude?

Reply:

(a) (i) (aa) and (bb) In respect of Cape Town the allocated amount for the facilities management contract for both Ministerial houses and Parliamentary villages is R170 025 405. For Pretoria, the allocated amount is R5 757 000.

(cc) R273 261 084

(dd) R284 550 324

(a)(ii) (a) and (b) (i) and(ii) In terms of the details of the planned renovations, improvements, maintenance, as well as details pertaining to the dates when the projects are envisaged to commence and be concluded, please see the tables below:

(a) (i) (aa) Parliamentary Villages and Ministerial houses maintenance :

:

 

(ii) Project Description

Allocation 2019/2020

(b) (i) Commencement Date

(b) (ii) Completion Date

1

Parliamentary Villages & Official Residential Accommodation: Provide integrated Facilities Management services for a 5-year period. (Current FM)

R116 713 639

1 October 2014

30 September 2019

2

Parliamentary Villages & Official Residential Accommodation: Provide integrated Facilities Management services for a 5-year period. (New FM)

R41 160 825

1 September 2019

30 March 2020

3

Klippercourt 2: Upgrade of kitchen and bathroom

R1 021 231

1 October 2019

28 February 2020

4

Oak: Implementation of Security Measures: Construction of Guard hut, installation of electric fence and cameras and monitors.

R4 328 413

1 October 2019

30 March 2020

a (i) (bb) Parliamentary Villages:

(i) Project details are as follows:

 

(ii) Project Description

Allocation 2019/2020

(b) (i) Commencement Date

(b) (ii) Completion Date

1

Parliamentary Villages: Refurbishment of Sessional Official Accommodation.

R1 214 820

18 August 2015

18 December 2018

2

Parliamentary Villages: Upgrading of Access Control at the three Parliamentary Villages.

R675 140

10 February 2015

9 October 2015

3

Parliamentary Villages Routine and Sustainable maintenance and Minor upgrade of residences.

R4 911 337

05 April 2019

04 April 2022

(a) (i) (cc) Parliamentary Precinct:

(i) Project details are as follows:

 

(ii) Project Description

Allocation 2019/2020

(b) (i) Commencement Date

(b) (ii) Completion Date

1

Marks Building: External Repairs and Renovations

(Work entails the roof replacement / water proofing, repairs to sandstone walls, replacement of windows, repairs to windows and repairs to cooling towers.)

Funds approved to replace air conditioning system on 5th floor and to refurbish all offices on 5th floor only.

R10 796 225

07 March 2016

31 March 2019

2

NCOP: Total refurbishment of the building including HVAC, Electrical and Electronic installations

R50 491 167

11 May 2017

01 June 2019

3

Maintenance Contract for Security / Access Control on the Parliamentary Precinct.

R3 776 548

01 November 2016

31 October 2019

4

90 Plein Street building: 6th Floor: Total refurbishment for Parliament.

R7 620 519

11 June 2018

16 June 2019

5

Parliament Precinct: Upgrade of Security at Entrances to Parliamentary Precinct, installation of additional perimeter fencing and create temporary vehicle search park, and to implement urgent enhanced security measures at various buildings.

R3 000 000

Tender date 02 August 2019.

10 month contract period.

6

Parliamentary Buildings: Various Kitchens: Replace kitchen equipment and re-design 90 Plein Street kitchen.

R2 157 372

Tender date 27 September 2019.

4 month contract period.

7

100 Plein Street building: External repairs and renovations and redesign of ground floor.

R1 200 000

Tender date 05 April 2019.

12 month contract period.

8

Old Assembly Cape Stores: Structural Repairs

R4 965 939

Tender date 30 March 2019.

4 month contract period.

9

90 Plein Street Basement: Remedial work to repair leakages

R1 226 014

Tender date 30 March 2019.

4 month contract period.

10

Parliamentary Precinct: Re-sleaving of Sewerage and Storm Water pipes.

R3 242 397

Tender date 29 March 2019.

4 month contract period.

11

Stalplein: Above and underground parking: Structural Repairs to granite structures.

R1 628 430

Tender date 30 April 2019.

12 month contract period.

12

Preparation for the 6th Parliament: Painting and carpeting of offices of Members.

R1 227 170

Tender date 30 April 2019

24 month contract period.

13

Parliamentary Complex: Official Office Accommodation: Provide integrated Facilities Management services for a 5-year period.

R132 031 611

October 2014

30 September 2019

14

Parliamentary Complex: Official Office Accommodation: Provide integrated Facilities Management services for a 5-year period. (New contract)

R43 117 525

Tender date 03 May 2019

5 year contract period

15

120 Plein Street: 4th floor (create board room separate from office), 10th floor (– Upgrade kitchen) and 16th floor (minor refurbishments)

R11 791

Tender date 29 March 2019

3 month contract period

16

120 Plein Street Building: 8th floor: Home Affairs: Total refurbishment of the entire floor.

R2 324 806

Tender date 07 June 2019

3 month contract period

17

Parliament Towers: Ground floor: Reconfiguration and upgrade of ground floor.

R1 539 446

Tender date 08 June 2019

12 month contract period.

18

Parliamentary Precinct: Investigate provision of additional standby / emergency power supply to the Precinct.

R2 904 123

Consultants to be appointed once project is approved by the Director-General

6 month contract period

(a) (i) (dd) Directors-General Residences:

 

(ii) Project Description

Allocation 2019/2020

(b) (i) Commencement Date

(b) (ii) Completion Date

1

Mouille Grange : Upgrading of 25 Flats

R3 000 000

28 September 2019

27 September 2021

2

GSE: Genadendal: Upgrade of external parking, paving and storm water drainage

R1 767 000

1 September 2019

30 May 2020

PRETORIA: Project details are as follows:

 

(ii) Project Description

Allocation 2019/2020

(b) (i) Commencement Date

(b) (ii) Completion Date

1

Union Buildings: Replacement of lifts

R2 660 442

11 January 2018

July 2019

2

Union Buildings: Jakaranda Projects

R3 975 527

October 2019

12 contract

3

Brynterion Estate: Construction of Gate 1 & 2 as well as the Dog Unit

R29 667 268

Project evaluated on the 15 March 2019

2 year contract

4

Brynterion Estate: Refurbishment of existing roads on western side of Brynterion Estate & Eastwood street entrance roads

R65 286 291

Tender went to Regional Bid Adjudication Committee on 12 March 2019

36 Months contract

5

Brynterion Estate: Construction of new command centre

R29 767 500

Project is in the process of finalising sketch plan, sketch plan scheduled for 15 April 2019

20 Months

6

Union Buildings: Replacement of carpets at ground floor East Wing

R5 757 000

September 2019

3 months contract

7

Pretoria: Facilities Management for Presidency

R132 755 682

1 April 2019

5 year contract

8

Union Buildings: Installation and repairs of the fire and PA System at UB

R9 913 614

Tender adjudicated 05 March 2019

6 months period

9

Maintenance of Ministerial houses

R5 757 000

As and when required

As and when required

11 April 2019 - NW673

Profile picture: Ryder, Mr D

Ryder, Mr D to ask the Minister of Public Works

(1) Whether the Van Der Stel House on the western corner of the parliamentary precinct, which currently houses SA Police Service offices, forms part of his department’s Prestige Portfolio; (2) (a) who is responsible for the maintenance of the building, (b) what (i) is the scope and (ii) are the time frames of any planned maintenance and (c) was Heritage Western Cape consulted in the development of the maintenance plan; (3) whether a (a) Custodian Asset Management Plan (CAMP) and (b) User Asset Management Plan (UAMP) have been put in place for the building; if so, was Heritage Western Cape consulted during the development of the CAMP and UAMP; (4) whether he has found that the State is compliant with the National Heritage Resources Act, Act 25 of 1999, and its associated regulations with regard to this building; (5) whether the building is currently compliant with the Occupational Health and Safety Act, Act 85 of 1993; if not, what steps are planned to address compliance in the (a) short and (b) medium term? NW796E

Reply:

(1) Yes, the Belvedere Building forms part of the Department of Public Work’s Cape Town Prestige Portfolio;

(2) (a) The Department of Public Works is responsible for the maintenance of the Belvedere Building;

(b) (i) Requests were received from both the Presidency, as well as Parliament for the utilization of the building. The matter has been referred to the in-house heritage architect for recommendation regarding the optimal future use of the building. The outcome will allow the Department to finalise the scope of work for the total refurbishment of the building, thereby addressing the backlog of maintenance required to restore the building;

(b) (ii) The time frames will be determined by the finalisation of the process in relation to part (b) (i) above;

(c) The South African Heritage Resources Agency (SAHRA) will be part of the project team in the planning phase of this project;

(3) (a) No, a Custodian Asset Management Plan (C-AMP) has not been put in place.

(b) Yes, a User Asset Management Plan (U-AMP) was compiled for the building. Heritage Western Cape does not take part in the formulation of U-AMPs and C-AMPS, as these mainly involve the Department of Public Works and client departments. Heritage Western Cape will be involved once the scope of work in respect of the refurbishment of the building has been established.

(4) To date, SAHRA have not yet been requested to do a survey of the building to establish the compliance of the building to the Act. SAHRA will be consulted in that regard.

(5) (a) and (b) The building is non-compliant to the Occupational Health and Safety Act, 1993 (Act No. 85 of 1993). However, all the fire-fighting equipment and signage is compliant for the building and day-to-day maintenance is being carried out as required. All matters of non-compliance will be addressed as part of the upcoming major refurbishment project.

11 April 2019 - NW671

Profile picture: Ryder, Mr D

Ryder, Mr D to ask the Minister of Public Works

Whether any members of the Executive (a) requested any specific fittings or improvements to their ministerial houses and/or (b) specified suppliers of such fittings or improvements since 1 April 2018; if not, what is the position in this regard; if so, (i) which member of the Executive made each request and (ii) what was the nature of each specified request?

Reply:

(a) and (b) No.

Thus, (i) and (ii) fall away.

11 April 2019 - NW712

Profile picture: Ngwenya, Ms G

Ngwenya, Ms G to ask the Minister of Public Works

What is the (a) make, (b) model, (c) price and (d) date on which each vehicle was purchased for use by (i) him and/or the former minister and (ii) his deputy (aa) in the (aaa) 2016-17 and (bbb) 2017-18 financial years and (bb) since 1 April 2018?

Reply:

(aaa) Not applicable. No vehicles were purchased in the 2016-17 financial year.

(i) (aa) (bbb) The following motor vehicle was purchased for official use in the 2017-18 financial year for the Minister, Hon. T W Nxesi, MP:

(a) Audi

(b) Q7 NM

(c) R1 076 180.92

(d) 2017-05-09 (Vehicle was transferred to the Department of Sport and Recreation).

The following motor vehicles were also purchased for official use in the 2017-18 financial year, for the Minister in that period, Mr N Nhleko, for use in Pretoria and Cape Town.

a) Mercedes Benz

b) GLE 350D

c) R1 228 001.98

d) 2017-06-19

 

a) Toyota

b) Land Cruiser V200

c) R1 263 986.17

d) 2017-06-20

(bb) Not applicable. No vehicles have been purchased since 01 April 2018.

(ii) (aa) (aaa) and (bbb) No motor vehicles were purchased, as such this question falls away.

.

10 April 2019 - NW431

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Transport

(1)What are the (a) details of litigation that has taken place in which (i) his department and (ii) entities reporting to him were party to in the past 12 months, and (b) reasons in each case; (2) (a) what was the outcome of litigation in each case and (b)(i) which matters are outstanding and (ii) why in each case; (3) (a) what are the cost implications of each litigation case and (b) why in each case?

Reply:

Department

(1) (i)

MATTERS

(a)

DETAILS

(2) (a) OUTCOME

(b) (i) (ii)

OUTSTANDING

3 (a) (b)

COST IMPLICATIONS

DOT/Bowman /Ngidi and Morar

Proceedings to recover amounts paid to consultants without following procurement procedures

Settled

 

R448 121.15

Legal costs

Tasima/ DOT, RTMC

Application by Tasima to enforce payment of R30 million for services rendered on the eNatis. Constitutional Court ruled against Tasima

In favour

 

R691 050.00

Legal costs

Athol Terence Baikie / Minister of Transport

Application to court to have SANRAL pay R12 million for an expropriation of land by the Minister in favour of SANRAL for extension of the N3

 

Not finalized

No costs as yet

Central African Road Services / Minister of Transport and CBRTA

Review application to set aside the promulgations of the 2014 permit tariffs

In favour

 

No costs as yet

Road Freight Association / Minister of Transport and CBRTA

Review application to set aside the promulgations of the 2014 permit tariffs

 

Not finalized

No costs as yet

Reinford Sinegugu Zukulu & others / SANRAL, Minister of Transport, Minister of Environmental Affairs

Challenge on the environmental authorisations granted by DEA for the construction of the N2 in the Wildcoast

 

Not finalized

No costs as yet

Siyakhuphuka Investments / Minister of Transport and Department of Public Enterprises

Siyakhuphuka challenging the Minister of DPE on failure to incorporate the National Ports Authority as a company and Transnet as a sole member and shareholder. Minister of Transport on failure to ensure incorporation

 

Not finalized

R37 620.00

Legal costs

Jamela Norah Khoza

RAF : Claimants challenging the constitutionality of the abolition of the common law right to claim general damages from the wrong doer – all injured in a road accident and cannot claim from RAF as their injuries fall under non serious

 

Not finalized

no costs as yet

DOT/Thwala

Disciplinary proceedings on the unlawful extension of the eNatis contract. Found guilty and has brought a review application to the labour court

 

Not finalized

R518 818.00

Legal costs

Nqobile Precious Fakude

RAF : Claimants challenging the constitutionality of the abolition of the common law right to claim general damages from the wrong doer – all injured in a road accident and cannot claim from RAF as their injuries fall under non serious

 

Not finalized

no costs as yet

JV Ndorum/ Minister of Transport, Finance, Defence, Transport Eastern Cape

Summons by JV Ndorum for payment of extra works conducted at the Mthatha Airport

 

Not finalized

R82 512.50

Legal costs

Nomusa Maeko / Department of Transport

Alleged unfair labour practice for non appointment to the position of Chief Director International relations

 

Not finalized

R52 500.00

Legal costs

Levers Mabaso/DOT

Application to set aside the process followed in appointing the Chief Director : Legal Services

In favour

 

R29 070.00

Legal costs

Marine Court of enquiry, Haartebeespoort dam

Marine Court of enquiry on the sinking of a boat at the Haartbespoort Dam that led to loss of lives

In favour

 

R653 200.00

Legal costs

PSA obo H. Sayd / Department of

Transport

Labour dispute over a written warning given to employee on gross insubordination. An award granted in favour of the employee has been rescinded.

 

Not finalized

R25 375.00

Legal costs

#Unite Behind and Equal Education / Minister of Transport and PRASA

Application to set aside the decision of the Minister to appoint an interim Board of PRASA

Settled

 

R16 800.00

Legal costs

Selepe / DOT

 

Application to set aside the decision of the Minister not to confirm the probation period of Mr Selepe

Settled

 

R432 345.00

Legal costs

P. Sekhula & others / Minister of Transport

Urgent application to set aside decision to appoint new members of the international air services licensing council. Urgent application dismissed with costs.

infavour

 

R64 170.00

Legal costs

African Harvest / Minister of Transport and ACSA

Application to compel the Minister of Transport and ACSA to purchase the shares of the minority shareholders in ACSA

 

Not finalized

No costs as yet

Brackenfell Trailer Hire / Minister of Transport

Challenging the presumption in the National Road Traffic Act about the owner of the driver of a motor vehicle and also constitutionality of prosecutions based on the presumptions

 

Not finalized

No costs as yet

Ramahuma Mmaphila Caiphus / Minister of Police and Minister of Transport

Summons for alleged unlawful arrest by traffic officers and detention by police, claiming R500 000

 

Not finalized

No costs as yet

PRIVISOL and others / SANRAL, Minister of Transport, Minister of Environmental Affairs and others

Summons by SANRAL for non payment of e-tolls by privisol and others

 

Not finalized

No costs as yet

Gakona Properties / SANRAL and Minister of Transport

Summons for payment of the amount of R12,287,254 for land expropriated on behalf of SANRAL.

 

 

Not finalized

No costs as yet

Nkululeko Poya / Minister of Transport and RSR

Urgent application at the Labour Court to set aside disciplinary proceedings for alleged lack of powers of the Board of RSR

In favour

 

R87 643.80

Legal costs

 

Air Traffic and Navigation Services SOC Limited (ATNS)

(1)(i) Urgent Application for dismissal /Interdict of Internal Disciplinary Process.

(ii) Review the decision of the board to remove CFO as the Board Director of ATNS.

(iii) Review Application to interdict the disciplinary hearing and appointment of the Chairperson of the Hearing.

(iv) Review Application of the CCMA Arbitration ruling in relation to ATA theft of assessment papers

(v) Application in terms of Promotion of Administrative Justice Act (“PAJA”).

(ii) We have had 5 litigation matters in the past 12 months

(b) The matter has been defended in each case on behalf of ATNS

2. (a) what was the outcome of litigation in each case and (b)(i) which matters are outstanding

  • Labour Court – pending / ongoing
  • High Court – withdrawn with costs in favour of ATNS
  • Labour Court- pending / ongoing
  • Labour Court - pending / ongoing
  • High Court – pending / ongoing

(b)(ii) The matters are being defended on behalf of ATNS and Counsel has been briefed in all matters.

(3)(a)

Labour Court

High Court

Cost Implication

1

 

R 312,115.20

 

1

R 327 269.21

1

 

R 131 250.00

1

 

R 131 387.50

 

1

R40 380.00

(b) Defending litigation matters on behalf of ATNS.

(ii) The Cross-Border Road Transport Agency - Details of litigation that has taken place in the past 12 months

TABLE: 1

1(ii)

Commencement date

1(a)

Title of the Matter

1(b)

Fact of the Matter

(2)

Status

3(a)

Cost

3(b)

Cost-Driver Reason

14 September 2014

(carried over from previous financial year)

Central African Road Services //Minister of Transport, C-BRTA

Review application to review the legislative process followed regarding promulgation of the 2014 Permit Tariffs.

Matter dismissed, each party to pay its costs

R 1, 096, 813

Legal costs including fees

16 April 2014 (carried over from previous financial year)

Road Freight Association //Minister of Transport and C-BRTA

Review application to review the legislative process followed with regard to promulgation of the 2014 Permit Tariffs.

Dormant

R 1, 049, 736

Legal costs including fees

16 April 2014

(carried over from previous financial year)

Dermit O Brein // C-BRTA

Court Applicant claim for unlawful arrest.

Dormant

R0,00

No cost claimed

10 September 2016

(carried over from previous financial year)

C-BRTA // Shavana Ni Vukosi Trading and Projects (PTY) LTD

Recovery of monies from a service provider that failed to deliver all the stationary that was ordered by the Agency.

At a level of consultation with the State Attorney

R0,00

No cost claimed

10 June 2015

(carried over from previous financial year)

Employee // C-BRTA

Claim for defamation of character, the applicant claims she was wrongfully accused, for stealing the amount of R1000-00.

A pretrial consultation was held in January 2019

R 143,109

Legal costs including fees

25 June 2015

(carried over from previous financial year)

Manyatseng, Ficksburg, Borolelo-Trans Free State // C-BRTA

Review and setting aside of Regulatory Committee decision to issue cross-border permits to operate from South Africa to the Kingdom of Lesotho be reviewed and set aside.

Dormant

R 57, 547

Legal costs including fees

April 2017

(carried over from the previous financial year)

JJ Trauernicht, Amos Lelope

Application for damages and injuries following collision with Road Transport Inspector.

Awaiting a trial date

R 168, 859

Legal costs including fees

19 November 2018

Employee // C-BRTA

The applicant has lodged a salary disparity grievance.

The statement of case was prepared and filed

R0,00

No cost claimed

August 2018

C-BRTA // Boshielo

Review and setting aside of the CCMA decision to start the recruit process de-nova regarding a post that the respondent applied however was unsuccessful.

CCMA has filed the record however it is not complete; a complete record has been requested.

R 103, 700

Legal costs including fees

(ii) Road Accident Fund (RAF)

Table: 2

(1)(ii)(a) the details of which are,

and, (b) the reason in each case is,

(2)(a) the outcome of litigation in each case was,

(b)(i) the following matters are still outstanding,

(ii) because,

(3)(a) the cost implications in each case are,

(b) because,

Employee Relation Unit

RAF vs Nonjongo

RAF took the decision of the CCMA in relation to unfair dismissal on review

ongoing

refer to the response in respect of paragraph (2)(a)

awaiting court hearing date

salary from date of dismissal to date of judgment

the Labour Court may find for the employee

Gcanabana vs RAF

employee took the decision of the CCMA in relation to unfair dismissal on review

ongoing

refer to the response in respect of paragraph (2)(a)

awaiting court hearing date

salary from date of dismissal to date of judgment

the Labour Court may find for the employee

Matodzi vs RAF

RAF took the decision of the CCMA in relation to constructive dismissal on review

finalised in favour of the RAF

refer to the response in respect of paragraph (2)(a)

judgment delivered

None

review application was dismissed with costs in favour of the RAF

Mahlangu vs RAF

employee took the decision of the CCMA in relation to unfair dismissal on review

finalised in favour of the RAF

refer to the response in respect of paragraph (2)(a)

judgment delivered

none

review application was dismissed with costs in favour of the RAF

Corporate Secretariat

Dr. T Kommal vs the Chairperson of the Board of the RAF

dispute related to governance

settlement of the dispute is being considered

refer to the response in respect of paragraph (2)(a)

settlement of the dispute is being considered

the dispute does not relate to a capital award

the dispute relates to governance

Legal Unit

MTF Consultants (Pty) Ltd v RAF

contractual dispute

finalised

refer to the response in respect of paragraph (2)(a)

judgment delivered

R2 905 986.00

R2 714 943.22 plus interest at 9% was awarded

Mohlala Attorneys v RAF

contractual dispute

litigation pending

refer to the response in respect of paragraph (2)(a)

awaiting court hearing date

none

application for review

Caveonet (Pty) Ltd v RAF

Commission of Enquiry in terms of section 417 and 418(a) of the Companies Act, No. 71 of 2008 (liquidation)

finalised

refer to the response in respect of paragraph (2)(a)

Commission of Enquiry withdrawn

none

declaratory order

Anne Jamotte v Hogan Lovells Attorneys and RAF

outstanding payments

finalised

refer to the response in respect of paragraph (2)(a)

settlement was reached

R1 873 632.90

as per settlement

Frans Schutte and Matthews Phosa Attorneys v RAF

outstanding payments

finalised

refer to the response in respect of paragraph (2)(a)

settlement was reached

R48 256 939.

as per settlement

Mac Ndhlovu Inc v RAF

contractual dispute

litigation pending

refer to the response in respect of paragraph (2)(a)

pleadings stage

none

declaratory order

JS Thokoane and 20 Others v RAF and NPA

contractual dispute

finalised

refer to the response in respect of paragraph (2)(a)

judgment delivered

none

declaratory order

ML Hlakola vs Acting Chief Executive Officer and RAF

outstanding payments

finalised

refer to the response in respect of paragraph (2)(a)

settlement was reached

R1 287 350.00

as per settlement

LS Sambo vs Acting Chief Executive Officer and RAF

outstanding payments

finalised

refer to the response in respect of paragraph (2)(a)

settlement was reached

R980 617.95

as per settlement

Thusanang Enabling Support Services (Pty) Ltd v RAF

outstanding payments

finalised

refer to the response in respect of paragraph (2)(a)

summons withdrawn

none

legal action has been withdrawn

ES Mawai v RAF and 2 Others

subpoena served on the Acting Chief Executive Officer

finalised

refer to the response in respect of paragraph (2)(a)

subpoena withdrawn

none

declaratory order

NP Fakude and 46 Others v RAF and Minister of Transport

constitutionality of certain provisions within the Road Accident Fund Act, No. 56 of 1996 and its Regulations

litigation pending

refer to the response in respect of paragraph (2)(a)

awaiting court hearing date

none

declaratory order

Ntuli Pretty Rose Jabu obo Minors and 14 Others

appointment of curators

finalised

refer to the response in respect of paragraph (2)(a)

judgment delivered

none

declaratory order

JM Makuwe v RAF and Acting Chief Executive Officer

request in terms of the Promotion of Access to Information Act, No. 2 of 2000

finalised

refer to the response in respect of paragraph (2)(a)

settlement was reached

none

declaratory order

V G Martin obo TND v RAF and the Minister of Transport

constitutionality of certain provisions within the Road Accident Fund Act, No. 56 of 1996 and its Regulations

finalised

refer to the response in respect of paragraph (2)(a)

settlement was reached

R 6 400 000.00

as per settlement

Corlia Olivier v RAF

contractual dispute

pending

refer to the response in respect of paragraph (2)(a)

pleadings stage

R 72 417.30

as per amount claimed

Adv. Brain Hitchings NO v RAF, Netcare LTD, and Netcare Hospitals (PTY) LTD

constitutionality of certain provisions within the Road Accident Fund Act, No. 56 of 1996 and its Regulations

finalised

refer to the response in respect of paragraph (2)(a)

settlement was reached

R41 000 000

as per settlement

J Matlala v RAF, Acting Chief Executive Officer and Chief Financial Officer

outstanding payment

finalised

refer to the response in respect of paragraph (2)(a)

settlement was reached

R2 261 8714.83

as per settlement

B Mbalu v RAF

unfair dismissal

litigation pending

refer to the response in respect of paragraph (2)(a)

awaiting court hearing date

None

declaratory order

W J Mkhonza Assessors v RAF

contractual dispute

litigation pending

refer to the response in respect of paragraph (2)(a)

awaiting court hearing date

R 2 298 456

as per amount claimed

Synka Projects (Pty) Ltd v RAF

contractual dispute

litigation pending

refer to the response in respect of paragraph (2)(a)

awaiting court hearing date

R 432 495.80

as per amount claimed

LW Mofokeng v Minister of Transport, HPCSA, RAF and Chairperson of the Appeal Board

constitutionality of certain provisions within the Road Accident Fund Act, No. 56 of 1996 and its Regulations

pending

refer to the response in respect of paragraph (2)(a)

pleadings stage

none

declaratory order

Adv. WS Coughlan No v Minister of Transport, HPCSA, RAF and Chairperson of the Appeal Board

constitutionality of certain provisions within the Road Accident Fund Act, No. 56 of 1996 and its Regulations

finalised

refer to the response in respect of paragraph (2)(a)

settlement was reached

none

declaratory order

Kusini Holdings (Pty) Ltd v RAF

contractual dispute

litigation pending

refer to the response in respect of paragraph (2)(a)

pleadings stage

R16 219 518.75

as per amount claimed

K Malao Inc and KPL Malao v RAF, Acting Chief Executive Officer and 5 Others

defamation

litigation pending

refer to the response in respect of paragraph (2)(a)

pleadings stage

R 3 500 000.00

as per amount claimed

(ii) South African National Roads Agency Limited (SANRAL)

TABLE: 3

Plaintiff

Defendant

Initiation date

Details and status

Outcomes and result

Amount spent from 1 April 2015 to date

Reinford Sinegugu Zukulu

SANRAL

30/03/2010

Wild Coast environmental review application. The defendant finalised and lodged a replying affidavit.

Judgement to be handed down 7 March 2019

R 9 658 071.29

Tau Pele

SANRAL

08/11/2018

This is an application lodged by Tau Pele Construction (Pty) Ltd against SANRAL for the payment of the amount of R36 447 840.08 based on payment certificate 29, and certificate 30 in the amount of R22 652 194.62.

Matter settled by agreement between the parties on 28 February 2019

R 950 000

Mr S Nhlapo

Ms N Modise

23/04/18

Ms Modise (Sanral employee) received summons in her personal capacity due to allegations of unfair treatment of black contractors. Attorneys have been appointed by Sanral to defend Ms Modise because the allegations are as a result of her performing her duties.

A Plea and discovery affidavit have been filed. We are now waiting for a Notice of Set down.

Awaiting trial date in April 2019

R 17 036.33

Quality Plant Hire

SANRAL

10/11/2018

An application has been instituted against SANRAL on the 1st of November 2018 for imposing delay penalties upon Quality Plant Hire were received.

SANRAL has served and filed their answering affidavits and are waiting upon the applicants to reply. In the absence of a reply, SANRAL will file their practice notes heads of arguments after which the matter will be ready for a hearing.

Awaiting court date for hearing

R300 000

ASJV

SANRAL

10/02/2019

ASJV unlawfully terminated FIDIC contract for the construction of the Mtentu Bridge and launched an urgent application against SANRAL in order to interdict the latter from calling upon the performance and retention guarantees – upon acceptance of ASJV’s abandonment of site.

Awaiting judgment pending

Awaiting statements of account

(ii) Road Traffic Management Corporation (RTMC)

TABLE: 4

LITIGATION 2018/2019

REASONS FOR LITIGATION

OUTCOME / OUTSTANDING

REASONS

COST

- Rekwele vs RTMC

Rekwele issued summons to claim purported outstanding costs for rental of vehicles by the RTMC. RTMC defended the matter and filed a special plea. Special plea set down for hearing.

Litigation ongoing

Special Plea to set - down for hearing (awaiting directive from court)

R 408 129.62

- Putcomofami vs RTMC

Service provider issued summons against the RTMC for breach of contract – Repudiation. The RTMC defended the matter and took exeption. Claim abandoned.

Litigation ongoing - Claim abandoned,

RTMC to persue costs

R 133 332.54

  • RTMC vs Telkom

RTMC bring Urgent Application to order Telkom to seize service suspension

Order made in favour of RTMC

Litigation ongoing - Telkom appealed to Supreme Court Of Appeal. Awaiting directive from SCA

R 1 154 331.00

  • JPSA vs Minister of Transport & Others (4 December Answer) (Application)

JPSA brought application to contest AARTO Procedure. RTMC Opposed the application. Application dismissed by court

Application dismissed

Matter closed

R 0 .00

Costs covered by JPSA

- Tasima vs RTMC

Application to enforce Section 197 of Labour Relations Act and Tasima bring several interim order applications. RTMC opposed applications

  • (Steenkamp J ) (LCA)
  • (Rabkin Naicker J)(LCA)
  • (Solejee J)(LCA)
  • (Nkutha – Nkontwana)(LCA)
  • Tasima Petition
  • Tasima Warrant of Execution
  • Servest Landscaping vs Tasima (Joinder)
  • Rohland Industrial Design vs Tasima (Joinder)
  • Labour Appeal Court
  • Section 18(3) Labour Court
  • Section 18(4) Labour Appeal Court
  • Constitutional Court (RTMC)
  • Constitutional Court (Tasima Cross Appeal)

Labour Appeal Court Order appealed by both Parties to the Constitutional Court)

 

Litigation ongoing – Section 18(4) appeal to be heard by Labour Appeal Court and awaiting directive from the Constitutional Court

R 2 948 108.57

- Nkwatsi and Others vs RTMC (Unlawful Arrest)

The complainant issued summons against the RTMC for purported unlawful arrest. RTMC opposed the action and filed its exception and plea. Matter abandoned by complainant

Claim abandoned

Matter closed

R15 000 .00

- RTMC vs Silvercoin

RTMC issued summons for payment of undue paid amount

Litigation on going

Summons issued

R 14 381.73

- Howard Dembovsky vs RTMC (Application

Mr. Howard Dembovsky, in his personal capacity and as the chairperson of Justice Project South Africa aims to bring an application for an order, which amongst others and in as far as it relates to the Department, RTIA and the Corporation. RTMC filed answering papers as per directive of court.

Litigation on going

Applicant to file reply to answer of respective Respondents

R 267 278.00

- Waymark vs RTMC (20 Novemebr CC)

Waymark instituted legal action against the RTMC in 2010, following a contractual dispute for the outstanding contract price.

Litigation ongoing

Litigation ongoing – awaiting Constitutional Court Judgement

R 493 119.36

­ Mohlaleng vs RTMC

RTMC instituted legal action against Mohlaleng for the outstanding deposit, paid on the Silver Lakes Offices offices and other amounts owed.

Litigation ongoing

Matter postponed sine dies and to be set-down for hearing

R 532.83

- RTMC Declaratory

RTMC to declare certain administrative actions taken by erstwhile Acting CEO void and unlawful.

Litigation ongoing

Hearing date to be set by court

R 0 .00 (awaiting invoices)

- Munsammy vs RTMC

Claim for damages – matter settled out of court

matter settled

Mater closed

R 0 .00

- Doorleen Investment vs RTMC

Successfully settled matter out of court

matter settled

Mater closed

R 0 .00

- NEHAWU vs RTMC

Urgent Application against RTMC

Application abandoned

Mater closed

R 0 .00

- Wechoemang vs RTMC

Urgent Application against RTMC

Application Dismissed

Mater closed

R 790 280.00

(ii) Road Traffic Infringement Agency (RTIA)

TABLE: 5

  1. (a) LITIGATION
  1. (b) REASONS FOR LITIGATION
  1. (a)(b)(i) OUTCOME / OUTSTANDING
  1. (b) (ii) REASONS

(3) (a)(b) COSTS

Demborvsky v Minister of Transport and Others

The Applicant challenges constitutionality of certain provisions of the AARTO Act and the NRTA Act. The provisions of the AARTO Act which are being challenged are subject to amendments through the AARTO Amendment Bill.

The Demborvsky application is still outstanding

The pleadings have not closed in the Demborvsky application and therefore the matter has not been set down.

R 1 148 204 .00

The litigations were extensive and threatened the very existence of the Agency hence, the services of the external legal experts were procured.

JPSA v Road Traffic Infringement Agency and Others

The application was about the method of serving AARTO notices as prescribed in the AARTO Act. The applicant argued that the RTIA and other cited parties were utilizing a

secure mail instead of the registered mail

The JPSA matter was finalized and decided in favour of the Registrar of the Road Traffic Infringement Agency.

Matter is finalised

R 0 .00

Costs covered by JPSA

Ports Regulator of South Africa (PRSA)

  1. There are no litigations that have taken place where the Ports Regulator was party to in the past 12months
  2. Not applicable
  3. Not applicable

South African Maritime Safety Authority (SAMSA)

Year

Nature of Litigation

Cost

2018- To Date

Contractual dispute. An amount of R280 000 is being claimed for work allegedly done for SAMSA. SAMSA served our Plea on the Plaintiff on 15/02/2019.

The matter is ongoing. Total costs in legal fees to date R45 000.00

Airports Company South Africa SOC Limited (ACSA)

(1) (ii) Please find attached a spreadsheet in response to the above.

South African Civil Aviation Authority (SACCA)

LEGAL MATTERS INSTITUTED AGAINST SACAA – OVER THE PAST 12 MONTHS:

#

(1)(a) Details of the litigation

(1)(b) Reasons in each case

(2)(a) What was the outcome?

(2)(b)(i) Which matters are outstanding?

(2)(b)(ii) Why is the matter outstanding?

(3)(a) Cost for 2018/19 Financial year

(3)(b) Why this cost?

 

Applicant/Plaintiff

Respondent

           

1

Berwick

(Partially finalized – pending legal costs being paid to SACAA)

SACAA

The SACAA, the South African Hang-gliding and Paragliding Association (SAHPA) and the Minister of Transport were sued by Berwick who was injured in a paragliding accident.

SACAA defended claim successfully

Finalised

N/A

R 803,825.92

Legal fees

2

Ruiter

DCA; Minister of Transport, SACAA and SAA

An application to set aside a decision taken by the Director in respect of a medical certificate.

Settlement

Pending

Cost recovery

R3,375.54

Legal fees

3

ALPA-SA

(Zerwick)

Director, Gawie Bestbier, Thabang Phahlane and the Minister

Zerwick appealed against an enforcement decision for non-compliance with SACAA regulations. The enforcement action of the Inspector was upheld on appeal to the DCA.

High Court Appeal pending

Pending

Re-hearing of appeal

R350,819.55

Legal fees

4

SB Keyser

(Partially finalized – pending legal costs being paid to SACAA)

SACAA

An appeal against the judgement delivered by the Civil Aviation Appeal Committee.

Appeal dismissed in favour of SACAA

Pending

Cost recovery

R 217,728.44

Legal fees

5

SB Keyser

Director

An urgent application in the High Court to set aside the notice of intention to suspend a Pilot Licence.

Pending High Court appeal

Pending

Awaiting judgement

R 1,046,139.50

Legal fees

6

Kelderman

SACAA

High Court appeal against the Director’s decision to issue a fine, which was confirmed by the Appeal Committee.

Pending High Court appeal

Pending

Awaiting date of set down

R184,915.00

Legal fees

7

Quantum Leap Investments (PTY) Ltd

SACAA & Civil Aviation Appeals Committee (CAAC)

SACAA appeal against the judgement of the Appeals Committee relating to a licensing compliance.

Appeal was dismissed

Finalised

N/A

R235,923.52

Legal fees

8

South African Flight Training Academy

Minister of Transport / SACAA

SACAA sued for damages for loss of income and reputational harm.

Pending trial action

Pending

Exchange of pleadings and interim application

R 537,580.25

Legal fees

9

Former Employee

SACAA

Labour matter.

CCMA referral for arbitration

Pending

Awaiting transcript

None

Legal fees

10

Kishugu Aviation (Pty) Ltd and others // Minister of Transport

(The matter closed)

SACAA

Kishugu is requesting the setting aside of findings of an accident investigation report.

Withdrawal of the matter

Finalised

N/A

R 199 797.67

Legal fees

11

National Union of Metal Workers on behalf of a Former Employee

SACAA

Labour matter

Labour court review

Pending

Interim applications

Not billed as yet

N/A

12

AAL-SA

(Matter closed)

SACAA

Aircraft registration matter. An application was launched to compel the SACAA to register aircraft.

Application was dismissed

Finalised

N/A

None

N/A

13

AEROPRECISION

SACAA:

AEROPRECISION issued summons claiming damages for enforcement action taken by the SACAA.

Decision in SACAA favour with cost

Pending

Recovery of cost

R48,604.75

Matter commenced in 2014. Payment made in 2014 amounting to total mentioned above

Legal fees

14

Bosman

SACAA

Bosman, a Commercial Pilot licence holder challenged the suspension of his licence through an urgent High Court application, at the Civil Aviation Appeal Committee and instituted an appeal in the High Court, Gauteng North against a decision of the Civil Aviation Appeal Committee.

High Court Appeal pending

Pending

N/A

R746,351.26

Legal fees

15

Former Employee

SACAA

Labour matter.

Pending claim for damages

Pending

N/A

No bill as yet

N/A

16

Fair Aviation

SACAA

FAIR AVIATION sought an interim interdict in the High Court, asking the court to condone a non-compliance to civil aviation regulations.

Dismissal of application

Finalised

N/A

R177,606.70

Legal fees

17

Former Employee

SACAA

Labour matter.

Pending labour court review

Pending

Employee raising funds for legal representation

No bill as yet

N/A

18

CEMAIR

SACAA

CEMAIR instituted two urgent applications in the High Court, seeking interim interdicts to set aside audit findings that resulted in the suspension of their operations.

1st application was settled. 2nd application was dismissed by the court

Finalised

N/A

No payment yet

N/A

LEGAL MATTERS INSTITUTED BY SACAA – OVER THE PAST 12 MONTHS:

#

(1)(a) Details of the litigation

(1)(b) Reasons in each case

(2)(a) What was the outcome?

(2)(b)(i) Which matters are outstanding?

(2)(b)(ii) Why is the matter outstanding?

(3)(a) Cost for 2018/19 Financial year

(3)(b) Why this cost?

 

Applicant/

Plaintiff

Respondent

           

1

Former Employee (Matter closed)

SACAA

Labour matter

Claim could not be pursued due to the absence of the employee in South Africa

N/A

N/A

R149,838.05

Legal fees

2

SACAA

Phoebus Apollo Aviation

SACAA served summons to recover costs from a service provider.

Settlement agreement

Finalised

N/A

R30, 898.97

Legal fees

3

SACAA

AOPA DEFAMATION CASE

SACAA instituted a defamatory lawsuit against an association.

Awaiting trial date

Pending

Interim applications

R291 909.94

Legal fees

4

SACAA

Interface Technologies

SACAA issued summons for recovery of outstanding debt against an operator.

Court order in favour of SACAA

Finalised

N/A

R157 671.59

Legal fees

5

SACAA

Tshungu Multimedia Enterprises

Setting aside of a tender related decision in favour of SACAA.

Decision successfully overturned

Finalised

N/A

R438,671.75

Legal fees

 

Railway Safety Regulator (RSR):

  1. (a) The details of litigation that has taken place are:

Full Facilities Management v Railway Safety Regulator – August 2018

PRASA v RSR – October 2018

(b) The reasons in each case are:

Full Facilities Management v Railway Safety Regulator – August 2018

This matter relates to a contractual dispute between the parties. The RSR terminated the contract for the provision of turnkey offices pursuant to a dispute between the parties. The matter is finalised.

PRASA v RSR – October 2018

PRASA launched an urgent application after it was served by ga notice of suspension of its safety permit. This follows several non-compliance notices that were served to PRASA by the RSR. The court decided to place PRASA under supervision until PRASA has complied with all the conditions imposed by the RSR.

1. (a) The outcome of litigation in each case is:

Full Facilities Management v Railway Safety Regulator – August 2018

Parties are currently busy with an arbitration process.

PRASA v RSR – October 2018

Parties are required to give feedback to the Judge by 19 June 2019.

(b) (i) There are no matters outstanding.

(ii) Not applicable.

Litigation Case

(a)

Cost Implication

(b)

Reason

Full Facilities Management v Railway Safety Regulator

R339,436

Relates to an eviction order that was launched by Full Facilities Management

PRASA vs RSR

R529,154

Application was brought by PRASA to stop or interdict the RSR from suspending its safety permit.

Passenger Rail Agency of South Africa (PRASA):

1. (a) Please refer to attached Annexure for details of litigation that taken place. It must be noted that there are matters dating back as far as 2012 as these matters have been active in the past twelve months.

(b) Please refer to attached Annexure for reasons in each case.

2. (a) Refer to attached Annexure.

(b) Refer to attached Annexure.

(i) Refer to attached Annexure.

(ii) Refer to attached Annexure.

3. (a) Refer to attached Annexure.

(b) Refer to attached Annexure.

10 April 2019 - NW785

Profile picture: Matsepe, Mr CD

Matsepe, Mr CD to ask the Minister of Transport

With reference to the leasing of infrastructure such as trains and locomotives by the Passenger Rail Agency of South Africa (a) in the past three financial years and (b) since 1 January 2019, what (i)(aa) leases took place in each month, (bb) is the value of each contract, (cc) were the infrastructure used for and (dd) are the reasons for these leases and (ii) on what date will each lease end in each case?

Reply:

a) PRASA does not lease infrastructure and trains/locomotives except for the interface arrangements with Transnet where PRASA and Transnet rely on the usage of each other’s infrastructure and the ad hoc locomotive support required by PRASA from Transnet from time to time, especially during peak periods.

b) No Leases occurred since 1 January to Date

(i) (aa) Due to the shortage of locomotives, PRASA leased locomotives for Main Line Passenger Services for the peak period from 15 December 2017 to 30 April 2018 at a cost of R44,975m.

(bb) R44 975 million

(cc) The locomotives were used by Shosholoza Meyl during the peak periods of December and Easter to transport long distance rail passengers.

(dd) This was a temporary arrangement to assist during the peak periods of December and Easter.

(ii) The lease ended on 30 April 2018.

10 April 2019 - NW731

Profile picture: Mente-Nkuna, Ms NV

Mente-Nkuna, Ms NV to ask the Minister of Transport

What (a) number of bridges is Government building or planning to build, (b) is the location of each bridge and (c) is the date of completion of each bridge?

Reply:

a) There are presently 373 bridges on SANRAL routes that are registered as “New Under Construction” or “Planned”. These are as listed in the table below which includes the route, bridge location, bridge number, bridge name and the anticipated year of completion.

Road ID

Field km

Structure Number

Structure Name

Structure Status

Anticipated Year of Completion

N00810W

70

N008_10N_B0470

Kelly's View Underpass

Planned (Design in progress or complete)

2030+

N00302N

31.78

N003_02N_B0505C

Lynnfield Park IC: Old Main Road (R103) NB CD Underpass Bridge C

Planned (Design in progress or complete)

2024

N00302S

31.78

N003_02S_B0505D

Lynnfield Park IC: Old Main Road (R103) SB CD Underpass Bridge D

Planned (Design in progress or complete)

2024

N00302S

28

N003_02S_B0517

Dardanelles IC: N3S Onramp to R603W Overpass

Planned (Design in progress or complete)

2026

N00115S

31

N001_15S_B880B

Church St I/C: Church Street Overpass Bridge B

Planned (Design in progress or complete)

2030+

N00116S

40.2

N001_16N_B0468

Verkeerdevlei IC: Brandfort to Verkeerdevlei (R703) Overpass

Planned (Design in progress or complete)

2028

N00116N

65

N001_16N_B414A

Pleasant View Underpass Bridge A

Planned (Design in progress or complete)

2028

N00116N

74

N001_16N_B415A

Harmonia Underpass Bridge A

Planned (Design in progress or complete)

2028

N00116N

82.6

N001_16N_B518A

Winberg - Theunissen Rail Bridge

Planned (Design in progress or complete)

2028

N00116N

66

N001_16N_B907A

Groot Vet River Bridge A

Planned (Design in progress or complete)

2028

N00116N

74

N001_16N_B908A

Klein Vet River Bridge A

Planned (Design in progress or complete)

2028

N00116NX

94

N001_16NX_B0552

N1/R73 IC: R73 Bridge Overpass

Planned (Design in progress or complete)

2028

N00117NX

0.73

N001_17NX_B0161

Scholtz Street Overpass

Planned (Design in progress or complete)

2020

N00117NX

23.01

N001_17NX_B0322

Holfontein to Wonderkop Agricultural Overpass

New - under construction

2020

N00117NX

6.98

N001_17NX_B0330

Weltevreden Agricultural Overpass

Planned (Design in progress or complete)

2020

N00117NX

18.35

N001_17NX_B0341

Valkspruit to Eendracht Agricultural Overpass

New - under construction

2020

N00117NX

14.08

N001_17NX_B0342

Voorspoed to La Rochette Agricultural Overpass

New - under construction

2020

N00221NX

-0.001

N002_21N_B0297

Kokstad I/C: R56 Overpass

Planned (Design in progress or complete)

2023

N00222N

1.062

N002_22N_B0414

Caribbean Estate Underpass

Planned (Design in progress or complete)

2024

N00222N

3.531

N002_22N_B0415

Port Edward I/C: Izingolwni Road over R61

Planned (Design in progress or complete)

2024

N00222N

16.42

N002_22N_B0425

Trafalgar Beach IC: Trafalgar Drive Overpass

Planned (Design in progress or complete)

2024

N00222N

19.909

N002_22N_B0427

Marina Beach IC: D338-Marina Drive Overpass

Planned (Design in progress or complete)

2024

N00222N

23.074

N002_22N_B0428

Southbroom IC: R620-Southbroom Avenue Overpass.

Planned (Design in progress or complete)

2024

N00222N

9.9

N002_22N_B0511

Tongazi River Pedestrian Bridge

Planned (Design in progress or complete)

2024

N00222N

5.08

N002_22N_B0512

Inhlanhlinhlu River

Planned (Design in progress or complete)

2024

N00222N

15.339

N002_22N_B2563A

Mpenjati River Bridge A

Planned (Design in progress or complete)

2024

N00222NX

26.64

N002_22NX_B0222

Merlewood I/C: Cross Road Underpass

Planned (Design in progress or complete)

2030+

N00224N

19.14

N002_24N_B0394

Grants Rd I/C: Grants Rd to N2 NB

Planned (Design in progress or complete)

2026

N00224N

18.97

N002_24N_B0395

Grants Rd I/C: Grants Rd over N2

Planned (Design in progress or complete)

2026

N00224N

18.72

N002_24N_B0396

Khoto Mkhunya Pedestrian Bridge

Planned (Design in progress or complete)

2026

N00224S

18.92

N002_24S_B0397

Grants Rd I/C: N2 SB to Grants Rd

Planned (Design in progress or complete)

2026

N00224S

18.87

N002_24S_B0398

Grants Rd I/C: Grants Rd over rail

Planned (Design in progress or complete)

2026

N00224S

18.81

N002_24S_B0399

Grants Rd I/C: Andrew Zondo Drive over rail

Planned (Design in progress or complete)

2026

N00225N

17.187

N002_25N_B0153-1

EB Cloete I/C: Support Trestle

Planned (Design in progress or complete)

2026

N00225N

17.187

N002_25N_B0153-2

EB Cloete I/C: Arch

Planned (Design in progress or complete)

2026

N00225N

19.52

N002_25N_B0281

Wandsbeck Road Overpass

Planned (Design in progress or complete)

2026

N00225N

18.424

N002_25N_B0339

King Cetswayo Highway (M13) Overpass

Planned (Design in progress or complete)

2026

N00225N

7.65

N002_25N_B0369

Kenyon Howden Road Overpass

Planned (Design in progress or complete)

2026

N00225N

0.66

N002_25N_B0389

Isipingo Beach I/C: Prospecton Rd Overpass

Planned (Design in progress or complete)

2026

N00225N

0.73

N002_25N_B0409

Ispingo Beach I/C: Prospection Road W to N2N Ramp Bridge

Planned (Design in progress or complete)

2026

N00225N

5.05

N002_25N_B0410

Hull Road Overpass

Planned (Design in progress or complete)

2026

N00225N

28.55

N002_25N_B0413

KwaMashu IC: Ramp R102E to N2S over N2, R102, Avoca Rail and Umhlangane River

Planned (Design in progress or complete)

2026

N00225N

22.96

N002_25N_B0419

Sea Cow Lake Pedestrian Bridge

Planned (Design in progress or complete)

2026

N00225N

28.61

N002_25N_B0420A

KwaMashu IC: N2N over R102 Curnick Ndlovu Highway

Planned (Design in progress or complete)

2026

N00225N

12.89

N002_25N_B0421

Edwin Swales I/C: M7 WB Ramp to N2 NB

Planned (Design in progress or complete)

2026

N00225N

14.45

N002_25N_B0462

Ridge View Road Overpass

Planned (Design in progress or complete)

2026

N00225N

6.74

N002_25N_B0464

Chatsworth Rail (Merebank-Chatsworth) Overpass

Planned (Design in progress or complete)

2026

N00225N

2.7

N002_25N_B0465

Service Road Overpass

Planned (Design in progress or complete)

2026

N00225N

6

N002_25N_B0469

Chatsworth Rail (Merebank - Chatsworth) over M1 Higginson Highway

Planned (Design in progress or complete)

2026

N00225N

28

N002_25N_B0521

Curnick Ndlovu Pedestrian Overpass

Planned (Design in progress or complete)

2026

N00225S

22.32

N002_25S_B0411

Inanda Road IC: Ramp M31W Inanda Road to N2 SB over Rail

Planned (Design in progress or complete)

2026

N00225S

25.67

N002_25S_B0412

Nandi Drive IC: Ramp M45E Queen Nandi Drive to N2S over N2, M45 and Umhlangane River

Planned (Design in progress or complete)

2026

N00225S

28.6

N002_25S_B0420B

KwaMashu IC: N2S over R102 Curnick Ndlovu Highway

Planned (Design in progress or complete)

2026

N00225S

12.98

N002_25S_B0422

Edwin Swales IC: N2S to M7W Top Ramp

Planned (Design in progress or complete)

2026

N00226N

4.32

N002_26N_B0020

Centenary Boulevard Overpass

Planned (Design in progress or complete)

2030+

N00226N

4.65

N002_26N_B0021

Cornubia Boulevard Overpass

New - under construction

2019

N00226N

4.31

N002_26N_B0022

La Lucia I/C: N3N On-Ramp Over Cornubia I/C N3S Off-Ramp

Planned (Design in progress or complete)

2024

N00226S

4.55

N002_26S_B0023

Cornubia I/C: N3S On-Ramp Over La Lucia I/C N3S Off-Ramp

Planned (Design in progress or complete)

2024

N00228N

44.77

N002_28N_B1085A

Umlalazi River Bridge N2NB

Planned (Design in progress or complete)

2019

N00228N

51.52

N002_28N_B1088A

Port Durnford Underpass N2NB

Planned (Design in progress or complete)

2019

N00228N

60.6

N002_28N_B481A

Mhlatuze Rail Bridge (N2NB)

Planned (Design in progress or complete)

2019

N00228N

63.2

N002_28N_B484A

Mhlatuze River Bridge N2NB

Planned (Design in progress or complete)

2019

N00229N

31.07

N002_29N_B0431A

Mposa River Bridge A

Planned (Design in progress or complete)

2030+

N00229N

31.18

N002_29N_B0432A

Mposa I/C: P386 Underpass Bridge A

Planned (Design in progress or complete)

2030+

N00229N

17.23

N002_29N_B0446

Nkhanango I/C: Overpass Bridge

Planned (Design in progress or complete)

2030+

N00229N

24.004

N002_29N_B0447A

Nyokaneni River Bridge A

Planned (Design in progress or complete)

2030+

N00229N

27.71

N002_29N_B0451

Mposa Forestry Road Underpass

Planned (Design in progress or complete)

2030+

N00229N

8.15

N002_29N_B486A

Empangeni I/C: R34 Underpass (N2NB)

Planned (Design in progress or complete)

2030+

N00229S

31.1

N002_29S_B0431B

Mposa River Bridge B

Planned (Design in progress or complete)

2030+

N00229S

31.2

N002_29S_B0432B

Mposa I/C: P386 Underpass Bridge B

Planned (Design in progress or complete)

2030+

N00229N

24.004

N002_29S_B0447B

Nyokaneni River Bridge B

Planned (Design in progress or complete)

2030+

N00229S

53.57

N002_29S_B1026B

Mfolozi River Bridge B

Planned (Design in progress or complete)

2030+

N00229S

48.3

N002_29S_B1031B

Msunduzi River Bridge B

Planned (Design in progress or complete)

2030+

N00229S

21.8

N002_29S_B2020B

Nseleni River Bridge B

Planned (Design in progress or complete)

2030+

N00229S

22.76

N002_29S_B2021B

Nseleni South Rail Underpass Bridge B

Planned (Design in progress or complete)

2030+

N00229S

27.8

N002_29S_B2023B

Nseleni North Rail Underpass Bridge B

Planned (Design in progress or complete)

2030+

N00229S

38.1

N002_29S_B2025B

Kwambonambi Rail Underpass Bridge B

Planned (Design in progress or complete)

2030+

N00229N

8.49

N002_29S_B487B

Empangeni I/C: Road over Rail (N2SB)

Planned (Design in progress or complete)

2019

N00229S

51.8

N002_29S_B865B

Mfolozi I/C: Underpass Bridge B

Planned (Design in progress or complete)

2030+

N00230N

2.62

N002_30N_B0449

Kwamsane I/C: Underpass

Planned (Design in progress or complete)

2024

N00230N

2.85

N002_30N_B0499

Onje Underpass Bridge

Planned (Design in progress or complete)

2024

N00231N

29.07

N002_31N_B0433

Mkuze I/C: Kingfisher Avenue Overpass

Planned (Design in progress or complete)

2030+

N00232N

49.96

N002_32N_B4751A

Sivule River Bridge A

Planned (Design in progress or complete)

2030+

N00232N

48

N002_32S_B1437B

Mvunyane River Bridge B

Planned (Design in progress or complete)

2030+

N00301N

25.15

N003_01N_B0226

Mahogany Ridge I/C: N3N to New Development Overpass

Planned (Design in progress or complete)

2030+

N00301N

25

N003_01N_B0227

Mahogany Ridge I/C: N3N to Stockville Rd

Planned (Design in progress or complete)

2030+

N00301N

25.74

N003_01N_B0228

Mahogany Ridge I/C: New Development to Stockville Rd 1

Planned (Design in progress or complete)

2030+

N00301N

25.3

N003_01N_B0230

Mahogany Ridge I/C: New Development to N3N

Planned (Design in progress or complete)

2030+

N00301N

25.16

N003_01N_B0231

Mahogany Ridge I/C: Stockville Rd to New Development

Planned (Design in progress or complete)

2030+

N00301N

21.95

N003_01N_B0252

Pine Street Overpass

Planned (Design in progress or complete)

2028

N00301N

22.29

N003_01N_B0254

Richmond Road I/C : N3N to Marianhill Ramp

Planned (Design in progress or complete)

2028

N00301N

22.28

N003_01N_B0255

Richmond Road IC : N3N to M1N Richmond Road Ramp over N3 and M1

Planned (Design in progress or complete)

2028

N00301N

8.46

N003_01N_B0280

Candella Road Overpass

Planned (Design in progress or complete)

2028

N00301N

12.11

N003_01N_B0282

Spine Rd I/C: St. James Ave (M32) Overpass

Planned (Design in progress or complete)

2024

N00301N

11.07

N003_01N_B0338

Rockdale Avenue Overpass

Planned (Design in progress or complete)

2024

N00301N

14

N003_01N_B0460

Langford Road Overpass

Planned (Design in progress or complete)

2024

N00301N

14.7

N003_01N_B0461

Lancaster Road Overpass

Planned (Design in progress or complete)

2024

N00301S

25.36

N003_01S_B0229

Mahogany Ridge I/C: New Development to Stockville Rd 2

Planned (Design in progress or complete)

2030+

N00301S

22.85

N003_01S_B0256

Richmond Road I/C: N3S to Pinetown Ramp

Planned (Design in progress or complete)

2028

N00301S

22.72

N003_01S_B0257

Richmond Road I/C: N3S to Marianhill Overpass

Planned (Design in progress or complete)

2028

N00301S

17.11

N003_01S_B0284

N3 Westbound to M13 Westbound

Planned (Design in progress or complete)

2024

N00301S

17.03

N003_01S_B0285

Paradise Valley I/C: M13 Eastbound to N3 Eastbound

Planned (Design in progress or complete)

2024

N00302N

14.88

N003_02N_B0242

Harrison (D157) Overpass

Planned (Design in progress or complete)

2026

N00302N

16.87

N003_02N_B0243

Harrison West (D12) Overpass

Planned (Design in progress or complete)

2026

N00302N

18.1

N003_02N_B0244

Cato Ridge Rail Overpass

Planned (Design in progress or complete)

2026

N00302N

23.73

N003_02N_B0259

Camperdown I/C: P418 Overpass

Planned (Design in progress or complete)

2024

N00302N

19.46

N003_02N_B0262

Cato Ridge I/C : Cato Ridge to N3S Overpass

Planned (Design in progress or complete)

2030+

N00302N

19.33

N003_02N_B0264

Cato Ridge I/C : Cato Ridge to Inchanga Overpass

Planned (Design in progress or complete)

2030+

N00302N

9.25

N003_02N_B0266

Hammersdale I/C: MR385 Rd Overpass

Planned (Design in progress or complete)

2020

N00302N

31.85

N003_02N_B0278A

Lynnfield Park I/C : Camperdown to N3N Overpass

Planned (Design in progress or complete)

2024

N00302N

6.319

N003_02N_B0291A

Sterkspruit East Valley Viaduct 1A

Planned (Design in progress or complete)

2026

N00302N

7.643

N003_02N_B0293A

Sterkspruit West Valley Viaduct 2A

Planned (Design in progress or complete)

2026

N00302N

31.78

N003_02N_B0505A

Lynnfield Park IC : Old Main Road (R103) Underpass Bridge A

Planned (Design in progress or complete)

2024

N00302N

28

N003_02N_B0516

Dardanelles IC: N3N Offramp to R603W

Planned (Design in progress or complete)

2026

N00302S

19.41

N003_02S_B0261

Cato Ridge I/C : Inchanga to N3N Overpass

Planned (Design in progress or complete)

2030+

N00302S

19.44

N003_02S_B0263

Cato Ridge I/C : Inchanga to N3S Ramp

Planned (Design in progress or complete)

2030+

N00302S

19.45

N003_02S_B0265

Cato Ridge I/C : Cato Ridge Bridge over S.A.R. Reserve

Planned (Design in progress or complete)

2030+

N00302S

31.857

N003_02S_B0278B

Lynnfield Park I/C : Lynnfield Park to N3S Overpass

Planned (Design in progress or complete)

2024

N00302S

6.3

N003_02S_B0291B

Sterkspruit East Valley Viaduct 1B

Planned (Design in progress or complete)

2026

N00302S

7.61

N003_02S_B0293B

Sterkspruit West Valley Viaduct 2B

Planned (Design in progress or complete)

2026

N00302S

31.8

N003_02S_B0505A

Lynnfield Park I/C R103 Underpass B

Planned (Design in progress or complete)

2024

N00302S

28

N003_02S_B0518

Dardanelles IC: N3S Onramp from R603E Overpass

Planned (Design in progress or complete)

2026

N00303N

8.05

N003_03N_B0074A

Epworth I/C: Durban Road (R103) Underpass Bridge A

Planned (Design in progress or complete)

2026

N00303N

7.88

N003_03N_B0201

Epworth I/C: N3 NB Onramp

Planned (Design in progress or complete)

2026

N00303N

6.84

N003_03N_B0202

Epworth I/C: Market Road Overpass

Planned (Design in progress or complete)

2026

N00303N

8.49

N003_03N_B0203

Blackburrow Road Overpass

Planned (Design in progress or complete)

2026

N00303N

11.65

N003_03N_B0245

Ohrtmann Rd I/C: Ohrtmann Road (M20) Overpass

Planned (Design in progress or complete)

2027

N00303N

14.56

N003_03N_B0247

Armitage Rd I/C: Ramp over N3 and Sanctuary Rd

Planned (Design in progress or complete)

2027

N00303N

18.37

N003_03N_B0248

Peter Brown Dr I/C: Peter Brown Drive Overpass

Planned (Design in progress or complete)

2027

N00303N

25.94

N003_03N_B0250

Hilton Ave (M80) I/C: Hilton Ave (M80) Overpass

Planned (Design in progress or complete)

2030+

N00303N

6.01

N003_03N_B0258

Murray Road Overpass

Planned (Design in progress or complete)

2026

N00303N

1.77

N003_03N_B0300A

Ashburton I/C: Pope Ellis Drive EB Overpass

Planned (Design in progress or complete)

2025

N00303N

0.47

N003_03N_B0548A

Umpushini Spruit Bridge A

Planned (Design in progress or complete)

2025

N00303S

8.01

N003_03S_B0074B

Epworth I/C: Durban Road (R103) Underpass Bridge B

Planned (Design in progress or complete)

2026

N00303S

14.07

N003_03S_B0246

Armitage Rd I/C: Rail Underpass

Planned (Design in progress or complete)

2027

N00303S

18.49

N003_03S_B0249

Peter Brown Truck Bypass Overpass

Planned (Design in progress or complete)

2030+

N00303S

18.711

N003_03S_B0251

Cato Ridge I/C: Selby Road Overpass

Planned (Design in progress or complete)

2030+

N00303S

1.8

N003_03S_B0300B

Ashburton I/C: Pope Ellis Drive WB Overpass

Planned (Design in progress or complete)

2024

N00303S

0.47

N003_03S_B0548B

Umpushini Spruit Bridge B

Planned (Design in progress or complete)

2024

N00501W

0.07

N005_04E_B0356

Mckechnie I/C: Mckechnie St Underpass

Planned (Design in progress or complete)

2019

N00606N

49.85

N006_06N_B0418

Eldoradospruit

Planned (Design in progress or complete)

2020

N00608N

50.34

N006_08N_B400

Onze Rust I/C: N6 and R702 (M30) Intersection

Planned (Design in progress or complete)

2019

N00810E

69.75

N008_10N_B0456

Ring Road (N8) I/C: N8 Ring Road Overpass

Planned (Design in progress or complete)

2030+

N00810

0.77

N008_10N_B0457

Kelly's View Siding Underpass

Planned (Design in progress or complete)

2030+

N008010

8.03

N008_10N_B0458

Jagersfontein Rd I/C: Jafersfontain Rd (R706) Overpass

Planned (Design in progress or complete)

2030+

N008010

10.56

N008_10N_B0459

Ferreira Rd I/C: Spoorweg Street and Rail Underpass

Planned (Design in progress or complete)

2030+

N00810W

70

N008_10N_B0471

Lourierpark Underpass

Planned (Design in progress or complete)

2030+

N00810W

70

N008_10N_B0472

Short Street Underpass

Planned (Design in progress or complete)

2030+

N00812E

53.63

N008_12E_B0323

Hobhouse I/C: R26 Overpass

Planned (Design in progress or complete)

2028

N00812E

54.47

N008_12E_B0324

Road Over Rail Bridge (Marseilles to Vinies Stations)

Planned (Design in progress or complete)

2028

N00812E

58.9

N008_12E_B0345

Newvale ¿ Lowlands Agricultural Overpass

Planned (Design in progress or complete)

2028

N00812E

62.4

N008_12E_B0346

Road S836 Underpass

Planned (Design in progress or complete)

2028

N00812E

60.9

N008_12E_B0347

Tenniskopspruit River Bridge

Planned (Design in progress or complete)

2028

N00813E

8.1

N008_13E_B0329

Ladybrand I/C: N8W Off-ramp to Ladybrand Overpass

Planned (Design in progress or complete)

2030+

N01102N

7.26

N011_02N_B0140A

Helpmekaar Street (P32) Underpass Bridge A (NB)

Planned (Design in progress or complete)

2030+

N01102N

7.06

N011_02N_B0142A

Bell's Spruit Bridge A (NB)

Planned (Design in progress or complete)

2030+

N01102N

7.06

N011_02N_B0156

Bell's Spruit Bridge (NB Offramp)

Planned (Design in progress or complete)

2030+

N01102N

13.73

N011_02N_B0400

Rocklands I/C: Church Street (M30) over R702

Planned (Design in progress or complete)

2030+

N01102N

16.7

N011_02N_B0401

Pepworth Rail Bridge

Planned (Design in progress or complete)

2030+

N01102N

31.01

N011_02N_B0402

Elandspruit

Planned (Design in progress or complete)

2030+

N01102S

7.29

N011_02S_B0140B

Helpmekaar Street (P32) Underpass Bridge B (SB)

Planned (Design in progress or complete)

2030+

N01102S

7.08

N011_02S_B0142B

Bell's Spruit Bridge B (SB)

Planned (Design in progress or complete)

2030+

N01102S

7.08

N011_02S_B0157

Bell's Spruit Bridge (SB Onramp)

Planned (Design in progress or complete)

2030+

N01103N

51.31

N011_03N_B0375

Ladysmith Drive I/C: Ladysmith Drive Overpass

Planned (Design in progress or complete)

2025

N01103N

52.91

N011_03N_B0376

Madadeni Drive Overpass

Planned (Design in progress or complete)

2025

N01103N

55.22

N011_03N_B0377

Albert Wessels I/C: Albert Wessles Drive Overpass

Planned (Design in progress or complete)

2025

N01104N

6.95

N011_04N_B0111

Buffels River

Planned (Design in progress or complete)

2025

P00301S

0

P003_01S_B0309A

Highlands Avenue WB Overpass

Planned (Design in progress or complete)

2030+

P00301S

0

P003_01S_B0309B

Highlands Avenue EB Overpass

Planned (Design in progress or complete)

2030+

P00302S

0.71

P003_02S_B0331

Harmony Way I/C: Harmony Way Overpass

Planned (Design in progress or complete)

2030+

R02201N

5.53

R022_01N_B0429

Hluhluwe Railway and MR2 Underpass

Planned (Design in progress or complete)

2024

R03002N

1.9

R030_02N_B0308

R030/R703 I/C: R703 Underpass

Planned (Design in progress or complete)

2030+

N00222N

6.045

R061_11E_B0371

Ekubo Underpass

Planned (Design in progress or complete)

2025

N00222N

-0.001

R061_11E_B0372

Leisure Bay I/C: Torquay Ave Overpass

Planned (Design in progress or complete)

2025

N00222N

-0.001

R061_11E_B0373

Glenmore I/C: Munster Rd Overpass

Planned (Design in progress or complete)

2025

N00222N

13.319

R061_11E_B0374

Palm Beach I/C: Overpass Bridge

Planned (Design in progress or complete)

2025

N00222N

4.01

R061_11E_B0416

Owen Ellis Road Underpass

Planned (Design in progress or complete)

2025

N00222N

18.34

R061_11E_B0426

San Lameer IC: San Lameer Avenue to P383 Overpass

Planned (Design in progress or complete)

2025

R73002N

10.05

R730_02N_B0325A

Thabong I/C: Jan Hofmeyer Road Underpass Bridge A

Planned (Design in progress or complete)

2027

R73002N

8.4

R730_02N_B0387

Philander Street Pedestrian Overpass

Planned (Design in progress or complete)

2027

R73002N

9.47

R730_02N_B0390

Hani Park Pedestrian Overpass

Planned (Design in progress or complete)

2027

R73002N

9.83

R730_02N_B0393A

Thabong I/C: Jan Hofmeyer Road EB to R730 SB Ramp under R730 NB

Planned (Design in progress or complete)

2027

R73002N

11.76

R730_02N_B0406

Thabong I/C: Jan Hofmeyer Rd drainage structure 1

Planned (Design in progress or complete)

2027

R73002N

9.7

R730_02N_B0408-2

Thabong I/C: Drainage Structure 2 (Downstream)

Planned (Design in progress or complete)

2027

R73002N

1.63

R730_02N_B0482

R730 Overpass

Planned (Design in progress or complete)

2027

R73002N

10.05

R730_02N_B9001

Thabong I/C: Drainage structure on Ramp R730 NB to Jan Hofmeyer EB and Jan Hofmeyer WB to R730 SB

New - under construction

2027

R73002S

10.07

R730_02S_B0325B

Thabong I/C: Jan Hofmeyer Road Underpass Bridge B

Planned (Design in progress or complete)

2027

R73002S

10.07

R730_02S_B0325D

Thabong I/C: R730 SB to Jan Hofmeyer Road WB Ramp

Planned (Design in progress or complete)

2027

R73002S

9.77

R730_02S_B0393B

Thabong I/C: Jan Hofmeyer Road EB to R730 SB Ramp under R730 SB

Planned (Design in progress or complete)

2027

R73002S

9.75

R730_02S_B0393D

Thabong I/C: Jan Hofmeyer Road EB to R730 SB Ramp under Jan Hofmeyer Road WB to R730 SB Ramp

Planned (Design in progress or complete)

2027

R73002S

10.2

R730_02S_B0407

Thabong I/C: Jan Hofmeyer Rd Drainage structure 2

Planned (Design in progress or complete)

2027

R73002S

9.72

R730_02S_B0408-1

Thabong I/C: Drainage Structure 2 (Upstream)

Planned (Design in progress or complete)

2027

R73003N

7.63

R730_03N_B0310A

Jasons Way (R70) WB Overpass

Planned (Design in progress or complete)

2027

R73003N

7.64

R730_03N_B0310B

Jasons Way (R70) EB Overpass

Planned (Design in progress or complete)

2027

R73003N

5.3

R730_03N_B0355A

R710/Craib Ave I/C: R710 Ramp Underpass (R710NB)

Planned (Design in progress or complete)

2027

R73003N

5.17

R730_03N_B0355B

R710/Craib Ave I/C: R710 Ramp Underpass (R710SB)

Planned (Design in progress or complete)

2027

R73003N

0.12

R730_03N_B0405

Thabong I/C: Drainage structure 3 under R730

Planned (Design in progress or complete)

2027

R73003S

0.37

R730_03S_B2019B

Ross Kent South Rail Underpass Bridge B

Planned (Design in progress or complete)

2027

R73003S

0.563

R730_03S_B2064B

Constantia Street Underpass Bridge B

Planned (Design in progress or complete)

2027

R73003S

3

R730_03S_B2098B

Ndaki Street Underpass B

Planned (Design in progress or complete)

2027

R03701E

131

R037_01E_B0453

Phahlamarumo River Bridge

Planned (Design in progress or complete)

2020

N00121N

4.3

N001_21N_B0486

Erasmusrand Pedestrian Bridge

New - under construction

2019

N00126N

26.63

N001_26N_B0132

Hotel Access Road Overpass

New - under construction

2020

N00127N

17.14

N001_27N_B0055A

R37 I/C: R37 Underpass - Bridge A

New - under construction

2020

N00127N

19.5

N001_27N_B0056

Silicon Rd I/C: Silicon Rd Overpass

New - under construction

2020

N00127NX

6.94

N001_27NX_B0137

Sterkloop River Bridge

New - under construction

2020

N00127NX

4.79

N001_27NX_B0260

Weltevreden River Bridge

New - under construction

2020

N00127S

17.52

N001_27S_B0055B

R37 I/C: R37 Underpass - Bridge B

New - under construction

2020

N00128NX

43.22

N001_28NX_B0205

D2657/D750 Overpass

Planned (Design in progress or complete)

2030+

N00128NX

45.69

N001_28NX_B0209

Link Road C Underpass

Planned (Design in progress or complete)

2030+

N00129NX

95.44

N001_29NX_B0186

Malala River Tributory 1

Planned (Design in progress or complete)

2020

N00129NX

88.5

N001_29NX_B0187

Musina I/C: Overpass

New - under construction

2020

N00129NX

90.5

N001_29NX_B0188

Railway and Harper Road Underpass

New - under construction

2019

N00129NX

90.9

N001_29NX_B0189

Undermining support structure

New - under construction

2020

N00129NX

95.43

N001_29NX_B0190

Freedom Street Overpass

New - under construction

2020

N00129NX

95.58

N001_29NX_B0191

Nancefield I/C: Overpass

New - under construction

2020

N00234N

40.99

N002_34N_B0334

Panbult I/C: D803 Overpass

Planned (Design in progress or complete)

2023

N00311N

36.12

N003_11N_B0452B

Koppieskraal I/C: K148 Overpass Bridge

Planned (Design in progress or complete)

2030+

N00312N

5.58

N003_12N_B0166

Mapelton-Vosloorus Pedestrian Bridge

Planned (Design in progress or complete)

2030+

N00312N

6.93

N003_12N_B0404

Mapelton - Vosloorus Pedestrian Bridge 3

Planned (Design in progress or complete)

2030+

N00402E

48.35

N004_02E_B0154

Kusile Rail under N4

Planned (Design in progress or complete)

2030+

N00405EX

50.895

N004_05EX_B0455

Ntokozweni IC: Machado Road Overpass

Planned (Design in progress or complete)

2022

N00405EX

52.93

N004_05EX_B0467

General Smith Street (D216) Underpass Bridge

Planned (Design in progress or complete)

2022

N0045EX

47.97

N004_05EX_B0523

Milly's Access Underpass

Planned (Design in progress or complete)

2022

N00407E

35.41

N004_07E_B0167

Alkmaar Service Bridge

Planned (Design in progress or complete)

2021

N00407E

65.48

N004_07E_B0491

Karino IC: R538 Overpass

Planned (Design in progress or complete)

2021

N00407E

20.82

N004_07E_B1519AB

Karino Spruit Bridge AB

Planned (Design in progress or complete)

2021

N00410W

0.77

N004_10W_B0537

Lucas Mangope Rd IC: N4 EB to Ga-Rankuwa Off Ramp

New - under construction

2019

N00410W

0.6

N004_10W_B0538

Lucas Mangope Rd IC: N4 WB to Ga-Rankuwa Off Ramp

New - under construction

2019

N00412E

29.6

N004_12E_B0072B

N4/R560 I/C: R560 Underpass Bridge B

New - under construction

2019

N00412W

30

N004_12W_B0519

Pampoennek Game Underpass

New - under construction

2019

N00413E

33.86

N004_13E_B2223B

Rustenburg Kloof IC: Dr Moroka Street Underpass Bridge B

Planned (Design in progress or complete)

2026

N01109N

1.82

N011_09N_B0417

Bosman River

New - under construction

2019

N01113N

2.91

N011_13N_B0268

Dorps River Bridge

Planned (Design in progress or complete)

2023

N01113N

7.55

N011_13N_B0269

Rooisloot River Bridge

Planned (Design in progress or complete)

2023

N01113N

15.6

N011_13N_B0270

Dithokeng River Bridge

Planned (Design in progress or complete)

2023

N01113N

24.24

N011_13N_B0271

Groot-Sandsloot River Bridge

Planned (Design in progress or complete)

2023

N01113N

10.4

N011_13NX_B0479

Rooisloot River

Planned (Design in progress or complete)

2022

N01113N

7.61

N011_13NX_B0480

Woodland Road and Railway Underpass

Planned (Design in progress or complete)

2022

N01113N

2.92

N011_13NX_B0481

Mokopane N11-R101 IC: R101 Overpass

Planned (Design in progress or complete)

2022

N01113N

6.5

N011_13NX_B0531

Road D3519 Overpass

Planned (Design in progress or complete)

2022

N01219E

3.08

N012_19E_B0135

Edenvale Rd (M37) I/C: Edenvale Rd (M37) Access to Service Station

Planned (Design in progress or complete)

2030+

N01219W

3.08

N012_19W_B0136

Edenval Rd (M37) I/C: Edenvale Rd (M37) Exit from Service Station

Planned (Design in progress or complete)

2030+

N01219W

3.27

N012_19W_B0147

Sunnyrock Service Station Access Bridge

Planned (Design in progress or complete)

2030+

N01220E

44.1

N012_20E_B0522

Klipspruit Colliery Conveyor Overpass

New - under construction

2019

N08101N

67.1

N081_01N_B0435

Middel-Letaba River

Planned (Design in progress or complete)

2021

R03314N

12.63

R033_14N_B0483

Brakspruit

Planned (Design in progress or complete)

2022

R03314N

19.04

R033_14N_B0484

Merriespruit

Planned (Design in progress or complete)

2022

R03314N

23.56

R033_14N_B0485

Barberkuil

Planned (Design in progress or complete)

2022

R03701E

135.9

R037_01E_B0454

Hoduopong River Bridge

Planned (Design in progress or complete)

2022

R04005N

26.53

R040_05N_B0163

Maviljan Pedestrian Bridge

Planned (Design in progress or complete)

2030+

R04005N

32.26

R040_05N_B0232

MP Stream Bridge

Planned (Design in progress or complete)

2030+

R04005N

26.55

R040_05N_B0233

Street A Overpass

Planned (Design in progress or complete)

2030+

R10402E

14.26

R104_02E_B0155

Kusile Rail Over R104

Planned (Design in progress or complete)

2030+

R51001N

80.2

R510_01N_B0506

Phufani River

Planned (Design in progress or complete)

2022

R52902N

13.81

R529_02N_B0436

Nwamitwa Dam Bridge - Nwanedzi River

Planned (Design in progress or complete)

2030+

R52902N

11.98

R529_02N_B0437

Nwamitwa Dam Bridge - Hlangana River

Planned (Design in progress or complete)

2030+

R57302N

36.7

R573_02N_B0510

Kwaggafonteinspruit

Planned (Design in progress or complete)

2022

R57302N

23.18

R573_02N_B0549

Tweefontein Pedestrian Overpass

Planned (Design in progress or complete)

2022

R57302N

37

R573_02N_B0550

Kwaggafontein Pedestrian Overpass

Planned (Design in progress or complete)

2022

R57303N

16.9

R573_03N_B0536

Kgobokwane River Bridge

Planned (Design in progress or complete)

2022

N00211E

31

N002_11E_B0532

Commercial Rd IC: N2 EBC off-ramp over Papenkuils Canal

Planned (Design in progress or complete)

2023

N00211E

31

N002_11E_B0535

Commercial Rd IC: N2 EBC on-ramp over Papenkuils Canal

Planned (Design in progress or complete)

2023

N00215E

1.83

N002_15E_B0495

Tshoxa River 1 & King Williams Town Rail Underpass

Planned (Design in progress or complete)

2022

N00215E

8

N002_15E_B0503

Belstone IC: N2E Onramp from Belstone Road S (MR0688) over KWT-Belstone Rail

Planned (Design in progress or complete)

2022

N00211E

29.6

N002_11E_B0348

Stanford Road (M10) Pedestrian Bridge

Planned (Design in progress or complete)

2019

N00211E

31.4

N002_11E_B0349

Commercial Rd IC: Commercial Road (R75) Overpass Pedestrian Bridge (West)

Planned (Design in progress or complete)

2023

N00211E

31.48

N002_11E_B0350

Commercial Rd IC: Commercial Road (R75) Overpass Pedestrian Bridge (East)

Planned (Design in progress or complete)

2023

N00211E

66.74

N002_11E_B0434

Colchester I/C: R334 Overpass

Planned (Design in progress or complete)

2022

N00211E

67.84

N002_11E_B0450

Colchester Pedestrian Bridge

Planned (Design in progress or complete)

2022

N00211E

2.56

N002_11E_B0520

Shell Ultra City Overpass Bridge

Planned (Design in progress or complete)

2019

N00211E

31

N002_11E_B0533

Commercial Rd IC: R75 SBC over Papenkuils Canal

Planned (Design in progress or complete)

2023

N00211E

31

N002_11E_B0534

Commercial Rd IC: Papenkuils Canal Pedestrian Bridge

Planned (Design in progress or complete)

2023

N00215E

2.67

N002_15E_B0496

Tshoxa River 2

Planned (Design in progress or complete)

2022

N00215E

2.95

N002_15E_B0497

Buffalo River

Planned (Design in progress or complete)

2022

N00215E

9.7

N002_15E_B0504A

Breidbach IC: Welkom Street (MR0690) Underpass Bridge A

Planned (Design in progress or complete)

2022

R06314E

58

N002_15E_B0513

Buffalo IC: Birds Street Underpass

Planned (Design in progress or complete)

2022

N00215E

2

N002_15E_B0514A

Buffalo IC: N2W Offramp to R63W Overpass Bridge A

Planned (Design in progress or complete)

2022

N00215E

2

N002_15E_B0514B

Buffalo IC: N2W Onramp from R63E Overpass Bridge B

Planned (Design in progress or complete)

2022

N00215W

9.7

N002_15W_B0504B

Breidbach IC: Welkom Street (MR0690) Underpass Bridge B

Planned (Design in progress or complete)

2022

N00215W

8.4

N002_15W_B2162C

Belstone IC: N2W offramp to Belstone Road N (MR0688) Overpass Bridge C

Planned (Design in progress or complete)

2022

N00215W

8

N002_15W_B5613C

Belstone IC: N2W offramp to Belstone Road N (MR0688) Bridge C over KWT-Belstone Rail

Planned (Design in progress or complete)

2022

N00218E

24.44

N002_18E_B0448

Candu Pedestrian Overpass

Planned (Design in progress or complete)

2020

N00219E

1.86

N002_19E_B0515

Zingisa High Pedestrian Bridge

Planned (Design in progress or complete)

2023

N00219EX

98.18

N002_19EX_B0492

Kucaphothi River Bridge

Planned (Design in progress or complete)

2022

N00219EX

21.74

N002_19EX_B0507

Mhlakulo Pedestrain Overpass

Planned (Design in progress or complete)

2022

N00219EX

37.63

N002_19EX_B0508

Mbokotwana River

Planned (Design in progress or complete)

2022

N00219EX

33.02

N002_19EX_B0509

Xokonxa River Tributary 1

Planned (Design in progress or complete)

2022

N00220E

7.851

N002_20E_B0241

Luqoqweni I/C: Luqoqweni Overpass Bridge

Planned (Design in progress or complete)

2022

N00220E

44.34

N002_20E_B0500

Msikaba River Tributary 3

Planned (Design in progress or complete)

2022

N00220E

36

N002_20E_B0539

Lupondo Agricultural Overpass

Planned (Design in progress or complete)

2022

N00220E

38

N002_20E_B0540

Mkamela Interchange Bridge

Planned (Design in progress or complete)

2022

N00220E

39

N002_20E_B0541

Mataba Agricultural Overpass

Planned (Design in progress or complete)

2022

N00220E

40

N002_20E_B0542

Kwadlambu River

Planned (Design in progress or complete)

2022

N00220E

44

N002_20E_B0543

Mtonjeni Agricultural Overpass

Planned (Design in progress or complete)

2022

N00220E

46

N002_20E_B0544

Holy Cross Interchange Bridge

Planned (Design in progress or complete)

2022

N00220E

48

N002_20E_B0545

Emzinyeni Agricultural Overpass

Planned (Design in progress or complete)

2022

N00220E

49

N002_20E_B0546

Mkambati Agricultural Overpass

Planned (Design in progress or complete)

2022

N00220E

33.571

N002_20E_B4000

Msikaba River Bridge

New - under construction

2022

N00220E

61

N002_20E_B4001

Mtentu River Bridge

New - under construction

2023

N00220EX

25.35

N002_20EX_B0466

Mcetyana River Bridge

Planned (Design in progress or complete)

2023

N00220EX

62.94

N002_20EX_B0474

Phakade Pedestrian Bridge

Planned (Design in progress or complete)

2023

N00220EX

27.5

N002_20EX_B0493

Mcetyana River Tributary 1

Planned (Design in progress or complete)

2023

N00220EX

38.52

N002_20EX_B0494

Ngcweleni River

Planned (Design in progress or complete)

2023

R05608E

130.6

R056_08E_B0524

Matatiele Bridge 3

Planned (Design in progress or complete)

2022

R05608E

135.9

R056_08E_B0525

Omega Farm Stream

Planned (Design in progress or complete)

2022

R05608E

139

R056_08E_B0526

Edendale Farm Stream

Planned (Design in progress or complete)

2022

R05608E

143.3

R056_08E_B0527

Grootvlei Farm Stream

Planned (Design in progress or complete)

2022

R05608E

144

R056_08E_B0528

Colembert Farm Stream

Planned (Design in progress or complete)

2022

R05608E

148.85

R056_08E_B0529

Rietfontein Farm Stream

Planned (Design in progress or complete)

2022

R05608E

163.3

R056_08E_B0530

Mzimvubu River Tributary 7

Planned (Design in progress or complete)

2022

R06102E

68.21

R061_02E_B0298

Pauls River Bridge

Planned (Design in progress or complete)

2024

R06102E

40.05

R061_02E_B0332

Great Fish River

Planned (Design in progress or complete)

2024

R06102E

79.66

R061_02E_B0344

Wilgebooms River

Planned (Design in progress or complete)

2024

R06103E

36.33

R061_03E_B0289

Fairview

Planned (Design in progress or complete)

2021

R06103E

26.24

R061_03E_B0340

Gunsteling Stream

Planned (Design in progress or complete)

2021

R06106E

43.44

R061_06E_B0193

Qumanco River Bridge

Planned (Design in progress or complete)

2022

R06106E

43.71

R061_06E_B0194

Qumanco River Tributary 5

Planned (Design in progress or complete)

2022

R06106E

53.84

R061_06E_B0195

Mgwali River Bridge

Planned (Design in progress or complete)

2022

R06106E

55.86

R061_06E_B0196

Ngcotyama River Bridge

Planned (Design in progress or complete)

2022

R06106E

72.12

R061_06E_B0296

KwaGcina Pedestrian Bridge

Planned (Design in progress or complete)

2022

R06106E

73.82

R061_06E_B0316

Xuka River Bridge

Planned (Design in progress or complete)

2022

R06106E

75.39

R061_06E_B0317

Caca River Bridge

Planned (Design in progress or complete)

2022

R06106E

92.73

R061_06E_B0318

Mbashe River Bridge

New - under construction

2020

R06107E

26.51

R061_07E_B0266

Tabase River

New - under construction

2020

R06107E

7.61

R061_07E_B0319

Xongora River Bridge

New - under construction

2020

R06107E

11.4

R061_07E_B0320

Bhaziya River Bridge

New - under construction

2020

R06107E

29.62

R061_07E_B0361

Tabase River Tributary 2

New - under construction

2020

R06107E

36.43

R061_07E_B0362

Mthatha Dam Tributary

Planned (Design in progress or complete)

2023

N00219E

5.981

R061_08E_B0235

Ngqeleni Pedestrian Bridge

Planned (Design in progress or complete)

2018

N00219E

6.467

R061_08E_B0236A

Ngqeleni I/C: Eastbound Overpass Bridge

Planned (Design in progress or complete)

2018

N00219E

6.494

R061_08E_B0236B

Ngqeleni I/C: Eastbound Underpass Bridge

Planned (Design in progress or complete)

2018

N00219E

45.985

R061_08E_B0240

Qiti Overpass Bridge

Planned (Design in progress or complete)

2019

N00219E

75.181

R061_08E_B0337

Qhaka Overpass Bridge

Planned (Design in progress or complete)

2019

R06108E

21.65

R061_08E_B0475

Mpindweni Pedestrian Bridge

Planned (Design in progress or complete)

2019

N00219E

1.083

R061_08E_B4398A

Mtata River Bridge EB

Planned (Design in progress or complete)

2018

N00219E

2.51

R061_08E_B4538A

Corana River Bridge EB

Planned (Design in progress or complete)

2018

R06313E

47

R061_13E_B0477

Mxelo River

Planned (Design in progress or complete)

2022

R06313E

39

R063_13E_B0476

Kwatinidubu Rail Underpass

Planned (Design in progress or complete)

2022

R06313E

55.56

R063_13E_B0478

Kwezana Rail Underpass

Planned (Design in progress or complete)

2022

R06705N

15.4

R067_05N_B0473

Swart-Kei River

Planned (Design in progress or complete)

2022

R07203E

4.91

R072_03E_B0386

Rufane River

New - under construction

2020

R07203E

12.29

R072_03E_B4000

Riet River

New - under construction

2020

R07203E

52.55

R072_03E_B9060

Gqutywa River

New - under construction

2020

R33601E

30.8

R336_01E_B0498

Bezuidenhouts River

Planned (Design in progress or complete)

2022

N00701N

47.74

B007_01N_B0444

Abbotsdale West Agricultural Underpass

New - under construction

2020

N00201E

38.5

N002_01E_B0551A

Broadway (R44) I/C: Broadway Pedestrian Overpass A

New - under construction

2021

N00201E

38.6

N002_01E_B0551B

Broadway (R44) I/C: Broadway Pedestrian Overpass A

New - under construction

2021

N00207E

41.85

N002_07E_B0489

Grant's Place Underpass

Planned (Design in progress or complete)

2023

N00207E

17

N002_07E_B198A

Gwaing River Bridge A

New - under construction

2021

N00701N

26.56

N007_01N_B0379

Knollevally Agricultural Underpass

New - under construction

2019

N00701N

32.4

N007_01N_B0382A

Rondeberg Rd Underpass NB

New - under construction

2019

N00701N

35.65

N007_01N_B0383A

Klein Dassenberg Rd I/C: Klein Dassenberg Rd Underpass Bridge A

New - under construction

2019

N00701N

37.54

N007_01N_B0384A

Kalbaskraal I/C: Kalbaskraal Rd and Rail Underpass Bridge A

New - under construction

2019

N00701N

30.98

N007_01N_B0391A

Salt River

New - under construction

2019

N00701N

36.47

N007_01N_B0392A

Swart River

New - under construction

2019

N00701N

42.23

N007_01N_B0440

Leliefontein Agricultural Underpass

New - under construction

2020

N00701N

44.15

N007_01N_B0441A

Tierfontein I/C: OP05364 Underpass Bridge A

New - under construction

2020

N00701N

45.94

N007_01N_B0442

Abbotsdale East Agricultural Underpass

New - under construction

2020

N00701N

47.27

N007_01N_B0443A

Bloemendal Road Underpass Bridge A

New - under construction

2020

N00701N

48.22

N007_01N_B0445

Abottsdale I/C: Overpass Bridge

New - under construction

2020

N00701S

32.46

N007_01S_B0382B

Rondeberg Rd Underpass SB

New - under construction

2019

N00701S

35.63

N007_01S_B0383B

Klein Dassenberg Rd I/C: Klein Dassenberg Rd Underpass Bridge B

New - under construction

2019

N00701S

37.59

N007_01S_B0384B

Kalbaskraal I/C: Kalbaskraal Rd and Rail Underpass Bridge B

New - under construction

2019

N00701S

30.975

N007_01S_B0391B

Salt River

New - under construction

2019

N00701S

36.51

N007_01S_B0392B

Swart River

New - under construction

2019

N00701S

44.17

N007_01S_B0441B

Tierfontein I/C: OP05364 Underpass Bridge B

New - under construction

2019

N00701S

47.27

N007_01S_B0443B

Bloemendal Road Underpass Bridge B

New - under construction

2019

N00702N

4.01

N007_02N_B0438

Tweefontein Agricultural Underpass

New - under construction

2019

N00702N

5.91

N007_02N_B0439A

Hopefield I/C: R45 Underpass Bridge A

New - under construction

2019

N00702S

5.9

N007_02S_B0439B

Hopefield I/C: R45 Underpass Bridge B

New - under construction

2019

N00702S

5.9

N007_02S_B0439D

Hopefield I/C: N7S to R45W Ramp over R45

New - under construction

2019

R30001N

23

R300_01N_B0547

Erica Drive Overpass

Planned (Design in progress or complete)

2023

10 April 2019 - NW681

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Transport

(a) Why was the contract with a certain company (name furnished) extended, (b) what are the terms and conditions for the extension, (c) what will his department put in place when the specified contract ends and (d) what are the costs involved?

Reply:

a) The original Open Road Toll Operations contract was for an 8-year operational period for the toll system operations and maintenance and Open Road Toll (ORT) back office component that includes the operations at customer service centers.  The Transaction Clearing House and Violation Processing Centre portions of the contract was for 5 years.  Agreement was reached between SANRAL and the toll operator whereby the 8-year component of the contract was reduced to 6 years and the 5-year components extended to 6 years.  This agreement was approved by National Treasury.

b) The original terms and conditions of the contract remained in place. The relevant applicable time periods were adjusted as indicated above.

c) SANRAL is in process to develop a new toll operation tender and will commence with the tender process in terms of procurement requirements.

d) The terms of the contract including the pricing as per the original tender remains in place. There are no additional costs as a result of the adjusted contractual time periods

09 April 2019 - NW665

Profile picture: Hunsinger, Dr CH

Hunsinger, Dr CH to ask the Ms D Carter (Cope) to ask Minister of Health

(a) What is the position of the Government on the development of palliative care in the country and (b) how does the Government (i) intend to roll out palliative care and (ii) envisage working with and supporting community-based palliative care organisations?

Reply:

a) The development of Palliative care in the country is informed by the National Policy Framework and Strategy on Palliative Care 2017-2022 which is based on the WHA Resolution WHA 67.19 “Strengthening of Palliative Care as a Component of Comprehensive Care throughout the Life Course”, to which the country was a signatory. Palliative care starts at a point of diagnosis of a life-threatening disease or condition and is inclusive of but does not equate to care of the dying.

b) (i) Palliative Care will be integrated into the health service at all levels of care and implementation focuses on creating awareness on Palliative care and the provisions of the policy, auditing of provincial services on which to base Provincial Implementation Plans, Human Resource Development through in-service training and undergraduate training and access to palliative care medicines, in particular pain management and consumables.

(ii) Community-based palliative organisationa will continue to provide services at district and provincial levels and will be supported through grants, where applicable.

END.

09 April 2019 - NW736

Profile picture: Mulaudzi, Adv TE

Mulaudzi, Adv TE to ask the Minister of Justice and Correctional Services

What numbers of persons are currently in awaiting trial cells because of an inability to pay bail?

Reply:

The total number of persons granted bail as on 31 January 2019 but unable to pay is 6862.

09 April 2019 - NW746

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

With reference to his reply to question 318 on 11 March 2019, (a) what number of public health care facilities is his department planning to (i) open and (ii) close during the 2019 calendar year and (b) in each case, (i) what type of facility is it, (ii) what service does each facility provide and (iii) where is it located?

Reply:

There is no plan to close any clinic during 2019. The following tables reflect the details with regards to clinics that are due to be opened.

PROVINCE

FACILITY NAME

FACILITY TYPE

Services

Location details

(Name of District, local municipality and Closest Town or Village)

Eastern Cape

Gengqe Clinic

Clinic

Primary Health Care Services

 
 

Lusikisiki Clinic

Clinic

Primary Health Care Services

OR Tambo District

Qaukeni Municipality, Lusikisiki

 

Sakhele Clinic

Clinic

Primary Health Care Services

 
 

ZabasaCinic

Clinic

Primary Health Care Services

Chris Hani District

 

Qutse Clinic

Clinic

Primary Health Care Services

Chris Hani District

Free State

Sasolburg CBD clinic ((Sponsored & built by Sasol)

Clinic

Primary Health Care Services

Sasolburg

 

Memel clinic

Clinic

Primary Health Care Services

 

Gauteng

Kekana Gardens

Clinic

Primary Health Care Services

 
 

Dewagensdrift Clinic

Clinic

Primary Health Care Services

 
 

Mandisa Shiceka Clinic

Clinic

Primary Health Care Services

 
 

Kekanastad Clinic

Clinic

Primary Health Care Services

 
 

Boikhutsong CDC

Community Day Centre

Primary Health Care Services

 
 

Greenspark Clinic

Clinic

Primary Health Care Services

 
 

Khutsong South Clinic

Clinic

Primary Health Care Services

 

Kwa-Zulu Natal

Dr Pixley Ka IsakaSeme Hospital

Hospital

Hospital – What is the type of Hospital District , Regional or Tertiary

 
 

Grautville

Clinic

Primary Health Care Services

 

Limpopo

Manyoga Clinic

Clinic

Primary Health Care Services

Sekgakgapeng Village

 

Pienaarsrivier EMS

New Emergency Medical Services Station

Emergency Medical Services Station

 
 

George Masebe Hospital

Hospital

Extension to Maternity and Theatre

 
 

Letaba Hospital

Hospital

Extensions to Female Medical Ward, Waste Store

 
 

Mulenzhe Clinic

Clinic

Primary Health Care Services

 
 

Magwedzha Clinic

Clinic

Primary Health Care Services

 
 

Makhonde Clinic

Clinic

Primary Health Care Services

 

Mpumalanga

Schunzendal Clinic

Clinic

Primary Health Care Services

 
 

Goromane Clinic

Clinic

Primary Health Care Services

 
 

Vukuzhaki Clinic

Clinic

Primary Health Care Services

 
 

Nhlazatshe Clinic

Clinic

Primary Health Care Services

 
 

Sikhulelwe Village Clinic

Clinic

Primary Health Care Services

 
 

Rockdale CHC

Community Health Centre

Primary Health Care Services

 

Northern Cape

Kagung clinic

Clinic

Primary Health Care Services

 
 

Port Nolloth CHC

Community Health Centre

Primary Health Care Services

Namakwa District in Port Nolloth

 

New Mental Health Hospital

Specialized Hospital

Psychiatric Mental Health Care Services

Kimberley

 

Heuningvlei clinic

Clinic

Primary Health Care Services

 
 

Springbok Forensic Mortuary

Forensic Mortuary

Forensic Autopsy

Namakwa District in Springbok

 

Extension to Springbok Hospital

Pharmacy

Pharmaceuticals

Namakwa District in Springbok

North West

Jouberton CHC

Community Health Centre

Primary Health Care Services

 
 

Madikwe Clinic

Clinic

Primary Health Care Services

 
 

Boitekong CHC

Community Health Centre

Primary Health Care Services

 

Western Cape

Vredenburg Hospital

District Hospital: Phase Two B will be officially inaugurated: New Operating Theatres, Kitchen, Admin Block, Laboratory, Laundry, Mortuary and waste storage areas, new Paediatric ward, Rehabilitation unit, additional Psychiatry beds, Admissions office, Cafeterias and waiting areas

Phase Two B will be officially inaugurated: New Operating Theatres, Kitchen, Admin Block, Laboratory, Laundry, Mortuary and waste storage areas, new Paediatric ward, Rehabilitation unit, additional Psychiatry beds, Admissions office, Cafeterias and waiting areas

 
 

Wolseley Clinic

Clinic

Primary Health Care Services

 
 

Asla Clinic

Clinic

Primary Health Care Services

 

 

END.

09 April 2019 - NW655

Profile picture: Alberts, Mr ADW

Alberts, Mr ADW to ask the Minister of Basic Education

(1)Whether, with regard to the Gauteng Education Department's regulations that learners may apply for admission at any school in the province, irrespective of the feeder area in which the learner resides, she could indicate whether the specified regulations are compatible with the (a) South African Schools Act, Act 84 of 1996, and (b) court rulings that a single-medium school that is full may not be forced to take in learners; if not, what steps will she take to stop the implementation of the regulations; if so, what are the full relevant details; (2) given the change regarding the language demographics of single-medium schools to English when learners who speak different languages are taken in, what will she do to protect single-medium schools in Gauteng and also nationwide, especially, given the fact that not all learners are fluent in English or have full command of the language at all?

Reply:

The information has been requested from the Gauteng Education Department and will be provided as soon as it is received.

09 April 2019 - NW744

Profile picture: Yako, Ms Y

Yako, Ms Y to ask the Minister of Basic Education

What is the total number of principals who retired (a) in each province and (b) in each of the past two financial years?

Reply:

(a) and (b)

PROVINCE (a)

2016/17 (b)

2017/18 (b)

EASTERN CAPE

171

230

FREE STATE

21

44

GAUTENG

65

98

KWAZULU-NATAL

172

234

LIMPOPO

115

161

MPUMALANGA

30

86

NORTH WEST

41

52

NORTHERN CAPE

9

20

WESTERN CAPE

31

84

Grand Total

655

1 009

Source: PERSAL

09 April 2019 - NW815

Profile picture: Tshwaku, Mr M

Tshwaku, Mr M to ask the Minister of Basic Education

What number of (a) primary and (b) high schools (i) are equipped with the necessary computer equipment and (ii) have teachers who are trained to teach computer skills and coding?

Reply:

(a) and (b) (i)

The Provincial Education Departments (PEDs) are responsible for providing schools with the necessary computer equipment. It is for this reason that the Department of Basic Education (DBE) does not keep updated information on the number of schools provided with the necessary computer equipment. Such updated information should be requested from the PEDs.

(ii) Besides training offered by the provinces, the DBE has trained 43774 teachers in computer skills. Furthermore, teachers will be trained on coding from June to September 2019.

 

09 April 2019 - NW664

Profile picture: Madisha, Mr WM

Madisha, Mr WM to ask the Minister of Health

(1) What are the details of each supplier of air-ambulance services in terms of (a) name and (b) amounts paid to each supplier that is currently contracted to various provincial departments of health; (2) whether he has found that the manner in which the services were procured complies with the policies of (a) his department and (b) the National Treasury regulations; if not, what is the position in this regard; if so, what are the relevant details; (3) whether he has found that the bona fides and competencies of the service providers are satisfactory; if so, what are the relevant details?

Reply:

1. The tables below reflect the details in this regard.

Province

(a) Name of service provider

(b) Amounts paid

(2018/19)

Eastern Cape

National Airways Corporation

R 25 000 000

Free State

Halo Aviation (Pty) Ltd

R 6 255.885.34

Gauteng

Netcare 911, ER24 and Halo HEMS

Services are requested on demand which is operated on a fee for services. Nil paid for the current financial year

KwaZulu-Natal

Air Mercy Services

R 34 542 587

Limpopo

Phuluso JV with Black Eagle

R 3 000 000

Mpumalanga

Halo Aviation

R 11 983 477

North West

No air-ambulance services

Not applicable

Northern Cape

Aero-care

R 743 850

Western Cape

Red Cross Air Mercy Service

R 54 000 000

(2) (a) The following table reflects the details in this regard.

Province

National Treasury

Relevant Details

Eastern Cape

Yes

Month to month contract, SCM busy with adjudication of the new tender

Free State

Yes

Service procured through departmental bid processes DOH(FS) 33/2018/2019

Gauteng

Yes

Services are requested on demand

KwaZulu-Natal

Yes

Month to month contract since expiry of National RT 79 contract.

Local SCM processes are underway to award a new contract.

Limpopo

Yes

Month to month contract since the expiry of the National RT79 Contract

Mpumalanga

Yes

Service procured through the National Transversal Tenders RT 79

North West

Not applicable

No air-ambulance services provided

Northern Cape

Yes

Service procured through the National Transversal Tenders RT 79

Western Cape

Yes

Contract was just awarded for the next 5 years commencing from the 1st April 2019

(3) The following table reflects the details in this regard.

Province

Satisfactory /

Not Satisfactory

Relevant Details

Eastern Cape

Satisfactory

Service in line with the specifications.

Free State

Satisfactory

Service in line with the specifications, no challenges experienced till date.

Gauteng

Satisfactory

Services are requested from the service providers on a rotation basis only when the need arises.

KwaZulu-Natal

Satisfactory

Service provision is according to the tender specifications. No challenges experienced.

Limpopo

Satisfactory

Service provision is according to the tender specifications. There were challenges in rendering service as there were problems between the JV partners which affected the department. Matter has been resolved and service is back in operation. Penalties were issued for no service provision.

Mpumalanga

Satisfactory

The service provider has always adhered to the terms of the contract and there has been no adverse reports.

North West

Not applicable

Not applicable

Northern Cape

Satisfactory

Service provision is according to the tender specifications. No challenges experienced.

Western Cape

Satisfactory

Tender specifications match the need well and the provider has a longstanding history with the province of excellent service delivery in accordance with the specifications.

END.

09 April 2019 - NW737

Profile picture: Mulaudzi, Adv TE

Mulaudzi, Adv TE to ask the Minister of Justice and Correctional Services

What number of persons are currently in prison because of possession of marijuana in quantities under 10 grams?

Reply:

The information regarding possession of marijuana in quantities is not captured on the Admission and Release System, however the below table depicts the total number of inmates incarcerated and detained for possession of marijuana.

Number of Inmates incarcerated and detained for possession of marijuana

Remand detainees

651

Sentenced offenders

390

Total

1 041

09 April 2019 - NW820

Profile picture: Paulsen, Mr N M

Paulsen, Mr N M to ask the Minister of Agriculture, Forestry and FisheriesQUESTION

(1) Are there any industrial producers of hemp in the Republic; if so, (a) what is the location of each producer, (b) how much is produced and (iii) what is the Rand value of what is currently being produced; (2) whether there are plans to expand the hemp industry in the future; if not, what is the position in this regard; if so, what are the relevant details? NW943E

Reply:

1. Currently, hemp production is only authorised for research purposes under special conditions granted by the Director-General of the National Department of Health. The permit is issued in terms of Section 22A (9) (a) (i) of Medicine and Related Substances Act 101 of 1965. About nine permits are issued per annum. The majority of applications are from three provinces, namely KwaZulu Natal, Eastern Cape and Western Cape. Each site is largely confined to 2 hectares in size.

To date, the Department of Health has received and is still considering 36 applications for commercial hemp cultivation. The area to be cultivated ranges from 2ha to 20ha. The Department of Agriculture, Forestry & Fisheries is therefore unable to respond on the tonnage produced and its estimated rand value.

Hemp is still regarded as a drug, and thus regulated by two pieces of legislation, namely, the Medicine and Related Substances Act 101 of 1965 administered by the Department of Health and the Drugs and Trafficking Act, 1992 administered by the Department of Justice and Constitutional Development and enforced by the South African Police Services.

2. Government is working on several measures aimed at facilitating the establishment of a hemp industry with the intension of diversifying the agricultural sector and to create jobs.

The Department of Agriculture, Forestry and Fisheries collaborates with the following departments, Health, Trade and Industry, Environmental Affairs, Justice and Constitutional Development, South African Police Services, Agricultural Research Council (ARC) and the Council for Scientific and Industrial Research (CSIR) towards developing a new regulatory framework for hemp. Much progress has been made in terms of dealing with technical matters regarding production of hemp, research and technology development, commercial feasibility and other related matters. The Departments of Health as well as Justice and Constitutional Development have been requested to amend their respective legislation to facilitate commercial production of hemp and manufacturing of related products.

The Department of Agriculture, Forestry and Fisheries and the Department of Health are also developing guidelines for regulating the cultivation and manufacturing of hemp and hemp products. The two departments will make pronouncements once this process has been concluded.

09 April 2019 - NW743

Profile picture: Rawula, Mr T

Rawula, Mr T to ask the Minister of Basic Education

What is the total number of teachers who retired from teaching (a) in each province and (b) in each of the past two financial years?

Reply:

(a) and (b)

PROVICE (a)

2016/2017(b)

 

2017/2018(b)

 

Post Level L1

Post Level L2

Post Level L3

Post Level L4

Grand Total

 

Post Level L1

Post Level L2

Post Level L3

Post Level L4

Grand Total

EASTERN CAPE

552

141

44

171

908

 

763

189

56

230

1 238

FREE STATE

211

38

14

21

284

 

355

75

23

44

497

GAUTENG

419

117

44

65

645

 

706

254

70

98

1 128

KWAZULU-NATAL

472

154

67

172

865

 

724

254

60

234

1 272

LIMPOPO

536

118

30

115

799

 

959

161

43

161

1 324

MPUMALANGA

190

52

21

30

293

 

366

103

33

86

588

NORTH WEST

191

48

9

41

289

 

379

81

25

52

537

NORTHERN CAPE

47

16

3

9

75

 

110

33

14

20

177

WESTERN CAPE

146

52

20

31

249

 

418

140

59

84

701

Grand Total

2 764

736

252

655

4 407

 

4 780

1 290

383

1 009

7 462

Source: PERSAL

09 April 2019 - NW444

Profile picture: Waters, Mr M

Waters, Mr M to ask the Minister of Health

(1)(a) What action is his department taking with regard to the horrific treatment of a certain patient (details furnished), (b) what is the name of each (i) nurse and (ii) doctor who attended to the patient, (c) what action has been taken against each nurse and each doctor and (d) how did the baby land up in a mortuary in Springs; (2) whether he has found that the National Health Insurance is going to curb the horrific treatment of patients at the country’s public healthcare facilities; if not, what is the position in this regard?

Reply:

(1) (a) The Hospital and provincial department of Health could not test the allegations as the complainant declined a redress meeting.

(b) (i) PN Mpho Lebese

(ii) Dr SM Kalasa

(c) No action was implemented against the staff since the allegations could not be confirmed.

(d) The body of the baby was procedurally handed over by the hospital to the Far East Funeral Undertakers. The hospital can therefore not comment on how it “landed up” in Springs. Far East Funeral Undertakers is located in Actonville, Benoni. The parent’s residential address, as provided by her is 697 Rawat Street, Actonville.

(2) Whether there is NHI or not, there should be no horrific treatment of patients in any healthcare system.

END.

09 April 2019 - NW758

Profile picture: Rawula, Mr T

Rawula, Mr T to ask the Minister of Basic Education

What screening processes do teachers go through in order to determine whether they are sexual offenders or not before they are appointed?

Reply:

The Department of Basic Education is currently embarking on a process to strengthen measures related to the appointment of educators in general and in particular school-based educators. This includes, among other measures, a protocol clarifying the roles and responsibilities of various stakeholders with regards to vetting of educators and all other staff employed in positions where they will have contact with learners. The key stakeholders include the Departments of Social Development, Justice and Constitutional Development; the South African Council of Educators and the School Governing Body Associations.

09 April 2019 - NW576

Profile picture: Tarabella - Marchesi, Ms NI

Tarabella - Marchesi, Ms NI to ask the Minister of Basic Education

(1)What are the relevant details of the general criteria that (a) an educator needs to fulfil in order to become a marker for the National Senior Certificate (NSC) examinations and (b) educators marking Business Studies had to fulfil for the 2018 NSC examinations; (2) whether she will furnish Ms N I Tarabella Marchesi with a list of each person marking the 2018 NSC Business Studies examinations, in each case indicating the person’s (a) qualifications and (b) experience relating to Business Studies?

Reply:

1. (a) In terms of Personnel Administrative Measures, Government Gazette No. 39684, dated 12 February 2016, an educator that is appointed as a marker must have at least a recognised three year post matric qualification which must include the subject concerned at second or third year level. In addition the marker must have appropriate teaching experience, including teaching experience at the appropriate level, in the subject concerned, language competency, and preference must be given to serving educators who are presently teaching the subject concerned.

(b) In terms of the appointment of markers for 2018, including Business Studies, the marker must have taught the subject or a related subject at the Grade 12 level for a minimum of two years in the last five years.

2. In terms of the Regulations Pertaining to the conduct, administration and management of National Senior Certificate Examination, the Head of an Assessment Body (i.e. the Provincial Education Department) is responsible for the appointment of markers. These records are therefore kept at the nine provincial education departments and not at the Department of Basic Education. Therefore access to the list of markers appointed to mark the 2018 NSC Business Studies examination should be obtained directly from the Heads of Department in each of the nine provinces.

09 April 2019 - NW814

Profile picture: Tshwaku, Mr M

Tshwaku, Mr M to ask the Minister of Basic Education

What number of teachers are due to reach retirement age in the next 10 years?

Reply:

The number of teachers due to reach retirement age or age 60 in the next 10 years starting in 2019 per year by province.

YEAR

PROVINCE

TOTAL

 

EC

FS

GP

KZN

LP

MP

NW

NC

WC

 

2019

1 281

466

1 495

1 694

1 548

806

656

206

794

8 946

2020

1 362

559

1 530

1 984

1 788

888

727

236

881

9 955

2021

1 346

598

1 617

2 073

1 880

931

713

265

802

10 225

2022

1 643

721

1 882

2 537

2 215

1 179

882

249

874

12 182

2023

1 887

803

2 082

2 699

2 563

1 333

961

255

1 006

13 589

2024

2 193

825

2 337

3 070

2 753

1 554

999

307

1 157

15 195

2025

2 430

857

2 554

3 190

2 844

1 563

1 101

300

1342

16 181

2026

2 696

870

2 659

3 270

2 946

1 705

1 237

392

1 371

17 146

2027

2 828

907

2 806

3 302

3 093

1 767

1 242

385

1 326

17 656

2028

3 272

902

2 821

3 747

3 266

1 821

1 365

397

1 292

18 883

TOTAL

20 938

7 508

21 783

27 566

24 896

13 547

9 883

2 992

10 845

139 958

Source: PERSAL, February 2019

09 April 2019 - NW677

Profile picture: Steenhuisen, Mr JH

Steenhuisen, Mr JH to ask the Minister of Health

(a) Why has the Ngwelezana Hospital in Empangeni in KwaZulu-Natal not paid a certain company (name furnished) for a consignment delivered in June 2017 and (b) by what date can the specified supplier expect to receive payment?

Reply:

a) Ngwelezana Hospital requested and received a quotation from Suppliers, as well as Novak Medical, Surgical and General Supplies for 70 000 units of clear garbage bags. The quotation amount from Novak Medical was assessed to be an amount of R 23 800.00 by both the Bid Evaluation and Bid Adjudication Committees. The quotations went through all the procurement processes and Novak Medical was approved by the Bid Adjudication Committee as the approved bidder for an approved amount of R 23 800.00.

The Hospital could not process the invoice supplied by Novak Medical based on the following reasons:

  • The approved order was for R23 800.00 and not for R238 000.00 as per the invoice submitted. The quotation received from Novak Medical was for R23 800.00.

b) Communication was sent to Novak Medical on 8th November 2018 advising them of the discrepancy and that the hospital is prepared to tender the amount of R 23 800.00 in respect of the goods delivered however no response has been forthcoming from Novak Medical.

END.

09 April 2019 - NW742

Profile picture: Tshwaku, Mr M

Tshwaku, Mr M to ask the Minister of Basic Education

What (a) number of schools were (i) built and (ii) closed down in the (aa) 2017-18 financial year and (bb) since 1 April 2018 and (b) is the (i) name, (ii) location and (iii) size of each school?

Reply:

a) (i)& (ii)

Table below indicates the number of schools opened and closed since 2017 -18 financial year.

PROVINCE

Closed schools

New Schools

 

Officially
Closed

Provisionally
Closed

Total

 

EC

456

 

456

7

FS

51

 

51

13

GT

1

 

1

 

KZN

22

 

22

7

LP

2

20

22

7

MP

 

 

 

 

NC

0

 

0

0

NW

 

 

 

 

WC

5

 

5

11

NATIONAL

537

20

557

45

Source: EMIS Master list

(b) (i) ,(ii) & ( iii)

Refer to link: https://www.education.gov.za/QuestionNo742Schoolsbuiltandcloseddown.aspx

 

09 April 2019 - NW693

Profile picture: Van Dalen, Mr P

Van Dalen, Mr P to ask the Basic Education

What is the (a) make, (b) model, (c) price and (d) date on which each vehicle was purchased for use by (i) her and (ii) her deputy (aa) in the (aaa) 2016-17 and (bbb) 2017-18 financial years and (bb) since 1 April 2018?

Reply:

MINISTER (GAUTENG PURPOSE)

(aaa) 2016-17 financial year

VEHICLE PURCHASED

a) MAKE – MERCEDES -BENZ

b) MODEL – MERCEDES –BENZ GLE 500 (W166)

c) PRICE – R 849 900.00

d) DATE PURCHASED – 15/09/2016

(bbb) 2017-18 financial year =NONE

MINISTER -

VEHICLE PURCHASED

a) MAKE –

b) MODEL –

c_ PRICE –

d) DATE PURCHASED –

(bb) since 1 April 2018 =NONE

MINISTER –

VEHICLE PURCHASED

a) MAKE –

b) MODEL –

c) PRICE –

d) DATE PURCHASED –

DEPUTY MINISTER –

(aaa) 2016-17 financial year

VEHICLE PURCHASED = NONE

a) MAKE –

b) MODEL –

c) PRICE –

d) DATE PURCHASED –

(bbb) 2017-18 financial year

DEPUTY MINSTER – (CAPE TOWN PURPOSE)

VEHICLE PURCHASED

e) MAKE – BMW

f) MODEL –BMW 5 SERIES SEDAN

g) PRICE – R 833 488.41

h) DATE PURCHASED – 28/03/2018

(bb) since 1 April 2018

DEPUTY MINISTER –

VEHICLE PURCHASED

i) MAKE AUDI

j) MODEL – AUDI Q7.3 OTDI QUATTRO

k) PRICE – R 1 015 702.05

l) DATE PURCHASED –15/10/2018

COMPILER

MRS N THEBE

D: LOGISTICAL SERVICES

DATE

MR J VISSER

D: SECURITY AND ASSETS MANAGEMENT

DATE:

OFFICIALS INVOLVED

MS N MOLALEKOA

CD: ADMINISTRATION FINANCE

DATE:

MR PRM KHUNOU

DEPUTY DIRECTOR-GENERAL: FINANCE & ADMINISTRATION

DATE:

MR HM MWELI

DIRECTOR-GENERAL

DATE:

MR ME SURTY, MP

DEPUTY MINISTER

DATE:

COMMENT:

QUESTION 693 APPROVED / NOT APPROVED / AMEND

MRS AM MOTSHEKGA, MP

MINISTER

DATE:

 

09 April 2019 - NW766

Profile picture: Paulsen, Mr N M

Paulsen, Mr N M to ask the Minister of Agriculture, Forestry and FisheriesQUESTION

What total number of (a) tenders that were advertised by (i) his department and (ii) entities reporting to him in each (i) month and (ii) province in the past 10 years required tender briefings and (b) the briefings were compulsory in each year since 2010 up into 2018?

Reply:

DAFF

BID NO.

DESCRIPTION OF BID

DATE AND TIME OF BRIEFING

PLACE

BRIEFING COMPULSORY

(YES OR NO)

4.4.12.2/2/10

The appointment of a Service Provider for the creation of Firebreaks on Fala Properties in the North West Province administered by DAFF through its Directorate: Land Settlement

23, 24 and 25 June 2010

10:00

North West Farms

Yes

4.4.12.2/3/10

The appointment of a Service Provider for the creation of Firebreaks on Fala Properties in Kwa-Zulu Natal Province administered by DAFF through its Directorate: Land Settlement.

28/29 June 2010

10:00

Kwa-Zulu Natal Farms

Yes

4.4.12.2/4/10

The appointment of Service Providers for the creation of Firebreaks on Fala Properties in Limpopo Province administered DAFF through its Directorate: Land Settlement.

21 June 2010

11:00

Roedtan Post Office, Limpopo Province

Yes

4.4.12.2/6/10

The appointment of Service Providers for the creation of Firebreaks on Fala Properties in Mpumalanga Province administered DAFF through its Directorate: Land Settlement.

12 July 2010

11:00

Balfour Post Office,

Mpumalanga

Yes

4.4.12.2/7/10

The appointment of Service Providers for the creation of Firebreaks on Fala Properties in the Northern Cape Province administered by DAFF through its Directorate: Land Settelement.

8 July 2010

11:00

Shell Garage opposite Flamingo Casino on the N12 in Kimberley

Yes

4.4.12.2/8/10

The appointment of a Service Provider to undertake the economic study to determine appropriate thresholds for AgriBEE Sector Codes.

15 July 2010

10:00

Conference Room, 7th floor, Sefala Building, DAFF Office.

Yes

4.4.12.2/10/10

The appointment of a Service Provider for the Silvicultural Services at Phiphidi, Voorspoed and Rossbach Estate in Limpopo Province.

17 September 2010

10:00

Voorspoed Forestry Office, Limpopo Region Voorspoed Plantation Soekmekaar Modimolle Local Municipality

Yes

4.4.12.2/11/10

The appointment of a Service Provider for the erection of Fence on Fala Properties in the Eastern Cape Province administered by DAFF through its Directorate: Land Settlement.

21 September 2010

10:00

Oude Drift Guest House, Motherwell/Addo Elephant Park, Eastern Cape Province.

Yes

4.4.12.2/13/10

The appointment of a Service Provider to determine the Forest Transport Infrastructure requirements in relation to transport development plans at National, Provincial and Municipal Level.

8 October 2010

10:00

Imbizo Boardroom, 7th floor, Harvest House, Hamilton Street,

DAFF Offices

Yes

4.4.12.4/17/11

The appointment of a Service Provider to serve as DAFF’s implementing agency for the implementation of national skills fund (NSF) mega projects in six provinces, namely (Kwa-Zulu Natal, North West Province, Northern Cape, Free State, Eastern Cape, and Mpumalanga) of South Africa.

14 September 2011

11:00

Agriculture Place,

DAFF Offices.

Yes

4.4.12.4/21/11

The appointment of a Service Provider for the supply and delivery of stationery to DAFF for the period of two (2) years.

No briefing session

-

-

4.4.12.4/22/11

The appointment of a Service Provider for off-site storage space for 32 000 boxes for Departmental Archival Files, for a period of five (5) years.

No briefing session

-

-

4.4.12.4/34/11

Bid for the Harvesting and Sale of Timbers at Sokhulu, Qhudeni, Hlokosi and Kwa Gubeshe Plantations in Kwa-Zulu Natal, for the period of one (1) year.

14 February 2012

09:00

Hlokozi Plantation,

Kwa-Zulu Natal.

Yes

4.4.12.4/36/11

Bid for the Harvesting of Eucalyptus sawtimber at Manzamnyama, Gomo, Tabankulu, Papane, Fort Donald, Elubaleko, Tonti, Camsholo, Longweni, Bencuti, Qumbu, Ntaboduli, Sampompolo, Mtamo, Mtywenka, Mbophelelo, Libode, Luthubeni, Sebeni Zibungu, Xosheni, Wilo, Nququ, Mnyameni, Nqamakwe, Mazizini, Ngunduza, Camama, Hoyana, Tamara, Kei-mouth, Kentani, Mbulu, Mgomazi, Mission , Mngcozo, Tsojana, Needs Camp, Katberg, Zikhova and Langanci Plantations in the Eastern Cape Province for a period of thirty six (36) months.

29 February 2012

12:00

PRD II Building

Cnr Durham & Sutherland Street

3rd/4th Floor

Mthatha

Yes

4.4.12.4/37/11

The appointment of a Service Provider for the Sale of Pine Timbers at Etwa, Amanzamnyama, Gomo, Tonti, Manina, Nququ and Mnyameni Forestry Plantations, Eastern Cape for a period of one (1) year.

29 February 2012

09:00

PRD II Building,

Cnr Durham & Sutherland Street,

3rd/4th Floor,

Mthatha

Yes

4.4.12.4/6/11

The appointment of a Security Companies at Nomadamba, Libode, Etwa and Mzimvubu Plantation Estate in the Eastern Cape.

4 May 2012

10:00

DAFF Office, King Williams’ Town

Yes

4.4.12.4/11/11

The appointment of a Service Provider to render cleaning and deep cleaning services to the Department of Agriculture, Forestry and Fisheries at Agriculture Place, Harvest House, Sefala Building and Hamilton Forum for a period of two (2) years.

4 August 2011

10:00

DAFF

Agriculture Place

Yes

4.4.12.4/1/12

The appointment of a Contractor to render a Security Service for DAFF at Hebron and Injaka Plantations, Mpumalanga Province for a period of twelve (12) months.

11 May 2012

11:00

DAFF

Agriculture Place

Yes

4.4.12.4/2/12

The appointment of an accredited Contractor to provide ABET lessons to employees of DAFF based inn Kruger North and South for the period of three (3) years.

2 May 2012

11:00

DAFF

Sefala Building

Yes

4.4.12.4/3/12

The appointment of a Contractor to provide ABET lessons to employees of the Department of Agriculture, Forestry and Fisheries based in Thabazimbi, and Lephalale for a period of three (3) years

2 May 2012

10:00

DAFF Office

Thabazimbi

Yes

4.4.12.4/4/12

The appointment of an accredited contractor to provide ABET lessons to the Department of Agriculture, Forestry and Fisheries based in North West, Northern Cape and Musina for a period of three (3) years.

2 May 2012

10:00

DAFF Office

Northern Cape

Yes

4.4.12.4/5/12

The appointment of an accredited contractor to provide ABET lessons to employees of the Department of Agriculture, Forestry and Fisheries based in East London for a period of three (3) years.

3 May 2012

10:00

DAFF Office

East London

Yes

4.4.12.4/6/12

The appointment of a Contractor to render Security Services to Department of Agriculture, Forestry and Fisheries at Nomadamba, Libode, Etwa and Mzimvubu Plantation Estate for a period of twenty four (24) months.

4 May 2012

10:00

DAFF Office

East London

Yes

4.4.12.4/7/12

The appointment of a Service Provider for the weeding and tending work at Amanzamnyama and Ntsubane Estates Plantation in the Eastern Cape for a period of one (1) year.

11 May 2012

11:00

King Williams’ Town DAFF Office

Yes

4.4.12.4/8/12

The appointment of a Service Provider for the weeding and tending work at Etwa and Ntywenka Estate Plantations in the Eastern Cape for a period of one (1) year.

11 May 2012

11:00

DAFF

King Williams’ Town Office

Yes

4.4.12.4/9/12

The appointment of a Service Provider for the weeding and tending work at Mpofu, Nomadamba, Nququ and Mt. Coke Estate Plantation in the Eastern Cape Province for a period of one (1) year.

11 May 2012

10:00

DAFF

King Williams’ Town

Office

Yes

4.4.12.4/10/12

The appointment of a Private Security Contractor to render a Security Service for the DAFF for a period of two (2) years.

11 May 2012

11:00

DAFF

Agriculture Place

Yes

4.4.12.4/11/12

The appointment of a Service Provider for the development of network that will assist both small holder farmers and subsistence farmers to generate the income through Zero Hunger Programme

8 May 2012

11:00

DAFF Agriculture Place

Yes

4.4.12.4/12/12

The appointment of a Service Provider to assist DAFF in the mobilization of farmers and communities around the activities of the National Zero Hunger Programme for a period of three (3) years.

8 May 2012

11:00

DAFF

Agriculture Place

Yes

4.4.12.4/15/12

The appointment of a Service Provider (PSP) to develop toolkits to enhance potential of SMME and rolling out pilot-training programmes in the Forestry Sector for the period of twelve (12) months.

29 May 2012

11:00

110 Hamilton Building, DAFF

Yes

4.4.12.4/17/12

The appointment of a Service Provider to assist DAFF in the development of network that will assist both smallholder farmers and subsistence farmers to generate the income through Zero Hunger.

No briefing session

-

-

4.4.12.4/20/12

Bid for the Sale of Eucalyptus Coppice Timbers at Voorspoed, Rossbach and Phiphidi Forestry Plantation in Limpopo Province for the period of one (1) year.

10 August 2012

11:00

DAFF Office

Limpopo Province

Yes

4.4.12.4/1/13

The appointment of a Private Contractor to render a security service at the DAFF

26 April 2013

11:00

Agriculture Place,

DAFF Office

Yes

4.4.12.4./2/13

Supply and delivery of an estimated quantity of

3 000 x 3.05m standards (3.05 length) for a period of two (2) years.

No briefing session

-

-

4.4.12.4/3/13

Supply and delivery of an estimated quantity of

6 00 000 of fully galvanized double twisted 2.5mm barb wire for a period of two (2) years.

No briefing session

-

-

4.4.12.4/4/13

Supply and delivery of an estimated of 1 200 x

3 600mm 1-section x (305mm x 102mm x 25kg/m) 300w hot rolled steel for a period of two (2) years.

No briefing session

-

-

4.4.12.4/5/13

Supply and delivery of 7 x 4mm x 13mm hot dipped fully galvanized stay wire for a period of two (2) years.

No briefing session

-

-

4.4.12.4/6/13

The appointment of a Service Provider to assist DAFF to conduct farmer field school pilot projects in support of smallholder development for a period of one (1) year.

No briefing session

-

-

4.4.12.4/7/13

Supply and delivery of rounded hardwood droppers (32-58mm) x 2.45m for a period of two (2) years

No briefing session

-

-

4.4.12.4/8/13

Supply and delivery of Portland cement cem 1 or cem 11 42.5N (50kg) bags for a period of two (2) years.

No briefing session

-

-

4.4.12.4/9/13

Supply and delivery of an estimated quantity of 240.000m fully galvanized 2.5mm binding wire for a period of two (2) years.

No briefing session

-

-

4.4.12.4/10/13

The appointment of a Private Security Guards at Injaka Stat Plantation for DAFF in the Directorate: Forestry Management: Limpopo/Mpumalanga.

21 June 2013

10:00

Injaka Plantation, Mpumalanga Province.

Yes

4.4.12.4/12/13

The appointment of a Service Provide to develop the Policy to guide the conservation and sustainable use of natural agricultural resources Act, Act No. 43 of 1983 (CARA) for a period of twelve (12) months.

11 July 2013

11:00

Delpen Building,

DAFF Offices

Yes

4.4.12.4/16/13

The appointment of a Private Security Contractor to render a Security Service(s) for DAFF at the Plant Quarantine Station, Stellenbosch, and the Animal Quarantine Station, Milnerton, Western Cape Province for a period of two (2) years.

11 September 2013

11:00

Plant Quarantine Station, 2 Polkadraai Road, Stellenbosch, Western Cape Province.

Yes

4.4.12.4/11/13

The appointment of a Private Security Guards at Hebron Stat Plantation for DAFF in the Directorate: Forestry Management: Limpopo/Mpumalanga

21 June 2013

11:00

Injaka Plantation, Mpumalanga Province

Yes

4.4.12.2/1/13

Supply and delivery of 400 x 165mm inside diameter steel borehole casing with 4 – 4.5mm wall thickness (177mm outside diameter) six meter lengths.

No briefing session

-

-

4.4.12.2/3/13

The appointment of a Professional Service Provider to develop Mbazwana, Manzengwenya and Mabaso Plantations Business Plan for a period of four (4) months.

No briefing session

-

-

4.4.12.2/4/13

The appointment of a Service Provider to assist DAFF to develop and compile a land care evaluation report for compliance to division of revenue Act No. 1 of 2012

No briefing session

-

-

4.4.12.2/5/13

The appointment of a Service Provider for the Construction of firebreaks in the North West Province for DAFF for a period of two (2) months.

19 August 2013

10:00

Agricultural Offices,

Agri Centre Building,

Cnr Dr James Moroka Road and Stadium road, Mafikeng

Yes

4.4.12.2/6/13

The appointment of a Service Provider for the Construction of firebreaks in Mpumalanga Province for DAFF for a period of two (2) months.

21 August 2013

09:00

Agricultural Offices, 18 Jones Street, Nelspruit, Mpumalanga Province.

Yes

4.412.2/7/13

The appointment of a Service Provider for the Construction of firebreaks in Free State Province for DAFF for a period of two (2) months

17 August 2013

10:00

Glen Agricultural College, Auditorium, Bloemfontein.

Yes

4.4.12.4/27/14

The appointment of a Professional Service provider for Management of an Integrated Employee Health and Wellness Programme (EWP) for DAFF for a period of twelve (12) months

10 April 2014

10:00

Wellness Centre,

Agriculture Place,

DAFF Offices.

Yes

4.4.12.2/2/15

The appointment of a Service Provider for the creation of Firebreaks in the North West Province administered by DAFF.

26 May 2015

10:00

Agri Centre building,

Cnr James Moroka Drive and Stadium Road,

Mafikeng, North West Province

Yes

4.4.12.4/22/12

The appointment of a Service Provider to assist DAFF to recruit, train and manage cluster development agents in support of the smallholder sector.

No briefing session

-

-

4.4.12.4/23/12

The appointment of a Service Provider to assist DAFF to conduct farmer field school pilots in support of smallholder development.

No briefing session

-

-

4.4.12.4/24/12

The appointment of a Service Provider for the acquisition of printing equipment on contract (leasing maintenance and consumables) for the period of three (3) years.

19 September 2012

11:00

DAFF Agriculture Place

Yes

4.4.12.4/25/12

The appointment of a Private Security Contractor to render security service to DAFF at Makhado Office, Limpopo Province for the period of two (2) years.

21 September 2012

10:00

Makhado DAFF Office, Limpopo Province

Yes

4.4.12.4/26/12

The appointment of a Blasting Contractor/s to set and detonate fuel explosions for the control of quelea for the period of two (2) years

No briefing session

-

-

4.4.12.4/27/12

The appointment of a Service Provider for auditing the micro agricultural financial institutions of South Africa (MAFISA) intermediaries.

No briefing session

-

-

4.4.12.4/28/12

The appointment of a Service Provide to compile annual report on commercial timber resources and primary roundwood processing in South Africa.

21 September 2012

11:00

DAFF Agriculture Place

Yes

4.4.12.4/30/12

Supply and delivery of a registered avicide for the control or redbilled quelea for a period of twenty four (24) months.

No briefing session

-

-

4.4.12.4/31/12

The appointment of aerial migratory pest control contractors for a period of twenty four (24) months.

No briefing session

-

-

4.4.12.4/33/12

The supply and delivery of registered insecticide for the control of locust for the period of two (2) years.

No briefing session

-

-

4.4.12.4/40/12

The appointment of a Professional Service Provider to develop a toolkit to enhance the potential of SMME and rolling out pilot training programme in the Forestry Sector for a period of one (1) year.

No briefing session

-

-

4.4.12.2/4/15

The appointment of a Service Provider for the equipping/repairing of boreholes in the Free State Province.

26 May 2015

09:30

Glen Agricultural College,

Bloemfontein, DAFF Officesl

Yes

4.4.12.2/5/15

The appointment of a Service Provider to supply, delivery and installation of Bentley Combi 150 Machine (Eastern Cape=2, Mpumalanga=1, Northern Cape=1 and Free State=2)

4 June 2015

10:00

141 Delpen Building,

Cnr Annie-Botha and Union Street,

Riviera.

Yes

4.4.12.2/7/15

Supply, delivery and installation of pipette calibration centre (Western Cape=1 and Northern Cape=1) to DAFF

8 June 2015

13:00

Stellenbosch Provincial Veterinary Laboratory,

Western Cape.

Yes

4.4.12.2/10/15

The appointment of a Service Provider to conduct Land Rights enquiry for individuals and / or communities affected by recommissioning areas in the Western Cape.

10 July 2015

09:00

Strand Street 17,

Bellevilee, Siyaya Building.

Yes

4.4.12.4/10/15

The appointment of a Service Provider to supply and deliver various agricultural tools and production inputs to support subsistence producers on behalf of DAFF for a period of twelve (12) months.

14 July 2015

09:00

Agriculture, Place,

DAFF Offices,

Pretoria

Yes

4.4.12.2/16/15

The appointment of a Service Provider to equip boreholes in Limpopo Province for a period of three (3) months.

17 July 2015

09:00

Limpopo DAFF Offices

69 Biccard Street,

Polokwane

Yes

4.4.12.2/1/15

The appointment of a Service Provider to supply, delivery and installation of un-interruptible power supply (UPS) to DAFF.

23 June 2015

11:00

King Williams’ Town,

DAFF Offices

Yes

4.4.12.4/13/15

The appointment of a Service Provider to supply and deliver various agricultural tools and production inputs to support subsistence producers on behalf of DAFF, for a period of twelve (12) months.

24 June 2015

09:00

Agriculture Place,

DAFF Offices,

Pretoria

Yes

4.4.12.2/21/15

Supply, delivery and installation of two (2) 200 KVA standby generator sets to the Grootfontein Agricultural Development Institute in Middelburg, Eastern Cape for DAFF.

30 July 2015

11:00

DAFF Offices, Grootfontein Agricultural Development Institute,

NI/N9 Highway to Port Elizabeth, Middelburg, Eastern Cape

Yes

4.4.12.2/12/15

Supply, delivery and installation of colony doc-it-system (lab equipment) and Autoclave machines to DAFF

5 August 2015

Delpen Building,

Boardroom G-10,

Cnr Annie Botha & Union Street, Riviera,

Pretoria

Yes

4.4.12.4/13/15

The appointment of a Professional Service Provider to undertake a study to investigate various Agro-forestry system and develop a comprehensive Agro-Forestry framework for DAFF.

28 August 2015

10:00

110 Hamilton Building,

DAFF Offices,

Pretoria

Yes

4.4.12.2/22/15

Supply and delivery of a 65kw TLB (tractor, loader backhole) to Grootfontein Agricultural Development Institute in Middelburg, Eastern Cape.

30 July 2015

10:00

Grootfontein Agricultural Development Institute,

NI/N9 Highway to Port Elizabeth,

Middelburg, Eastern Cape.

Yes

4.4.12.2/14/15

The appointment of a Service Provider for the equipping of boreholes in the Mpumalanga Province, administered by DAFF

15 July 2015

09:00

DAFF Offices,

18 Jones Street, Nelspruit.

Yes

4.4.12.2/1/17

The appointment of a Service Provider for the manufacturing and delivery of two (2) Personnel Carriers for DAFF.

29 May 2017

11:00

DAFF Offices,

110 Hamilton Building,

Pretoria.

Yes

4.4.12.4/2/17

The appointment of a Service Provider to render Provision and Maintenance of Deep Cleaning Services to DAFF

2 June 2017

14:00

DAFF Offices,

Cnr, Independent Avenue and Circular Drive,

Bhisho,

Yes

4.4.12.2/3/17

The appointment of a Professional Service Provider to conduct a Forest Resource Assessment Pilot Study in Buffalo City Municipality For DAFF

15 June 2017

10:00

DAFF Offices,

110 Hamilton Building,

Pretoria

Yes

4.4.12.4/3/17

The appointment of a Service Provider to provide Cleaning Service at the Bhisho Regional Office in the Eastern Cape to DAFF, for a period of three (3) years.

2 June 2017

12:00

DAFF Offices,

Cnr Independent Avenue and Circula Drive,

Bhisho.

Yes

4.4.12.4/14/17

The appointment of a Service Provider to (a) Produce four Annual Reports on Commercial Timber Resources and Primary Roundwood Processing in S.A. (2017/18-2020/21) over a period of five (5) years and (b) to create capacity in DAFF.

8 September 2017

10:00

DAFF Offices,

110 Hamilton Building,

Pretoria

Yes

4.4.12.4/6/17

The appointment of an In-House Travel Management Company to provide Travel Services to DAFF for a period of three (3) years.

15 June 2017

10:00

DAFF Offices,

Agriculture Place,

Pretoria

Yes

4.4.12.4/7/17

The appointment of a Service Provider to conduct Aerial Migrant Pests Control to DAFF for a period of twenty four (24) months.

31 May 2017

10:00

 

Wellness Centre,

Agriculture Place,

Pretoria,

Yes

4.4.12.2/4/18

The appointment of a Service Provider for the Purchasing, Delivery and Commissioning of the following:

  1. Inductively Coupled Plasma Emission Spectroscopy System (ICP-OES) for the Analytical Services South Laboratory in Stellenbosch.
  1. Ultra Performance Liquid Chromatograph coupled with an Ultraviolet Diode Array Detector (UPLCUV) for the Analytical Services South Laboratory in Stellenbosch.

4 May 2018

11:00 am

Dept. of Agriculture, Forestry and Fisheries, Quarantine Station,

Polkadraai Road,

Stellenbosch.

Yes

4.4.12.2/5/18

The appointment of a Service Provider for the creation of Fire Breaks in Limpopo Province Administered by the Department of Agriculture, Forestry and Fisheries.

27 June 2018

10:00 am

Limpopo Department of Agriculture and Rural Development,

69 Biccard Street,

Polokwane

Yes

4.4.12.2/6/18

The appointment of a Service Provider for the creation of Fire Breaks in Mpumalanga Province Administered by the Department of Agriculture, Forestry and Fisheries.

26 June 2018

10:00 am

Department of Agriculture and Rural Development and Land Administration,

Cycad Building, Block 4, Riverside Park,

Nelspruit

Yes

4.4.12.2/8/18

The appointment of a Service Provider for the Supply, Delivery and Commissioning of one (1) Automated Multi-Parameter Wine Analyzer for the Analytical Services South Laboratory in Stellenbosch.

15 June 2018

11:00 am

Dept. of Agriculture, Forestry and Fisheries,

Quarantine Station,

Polkadraai Road,

Stellenbosch.

Yes

4.4.12.2/9/18

The appointment of a Service Provider for the Purchasing, Delivery and Commissioning of the following: Ultra High Performance Liquid Chromatograph Coupled with an Ultraviolet/Diode Array Detector (UPLC/UHPLC-UV/DAD) for the Analytical Services South Laboratory in Stellenbosch.

15 June 2018

11:00 am

Dept. of Agriculture, Forestry and Fisheries,

Quarantine Station,

Polkadraai Road,

Stellenbosch

 

Yes

4.4.12.2/10/18

The appointment of a Service Provider for the Equipping of Boreholes in the Northern Cape Province Administered by the Department of Agriculture, Forestry and Fisheries.

22 June 2018

10:00 am

Dept. of Agriculture, Forestry and Fisheries,

Agriculture Place,

Wellness Centre,

Arcadia,

Pretoria

Yes

4.4.12.2/17/18

The appointment of Service Provider for Manufacturing and Delivery of one 1000 LT complete Fire Truck Unit for Fire Fighting in the Eastern Cape for the Department of Agriculture, Forestry and Fisheries.

7 September 2018

10:00 am

Dept. of Agriculture,

Forestry and Fisheries,

No. 2 Hagrevies Avenue,

King Williams Town,

Eastern Cape.

Yes

4.4.12.2/23/18

The appointment of Service Provider to supply network equipment and local area network at DAFF offices for the producer register project

08 November 2018

11H00am

Dept. of Agriculture,

Forestry and Fisheries,

30 Hamilton street

Room 562, Harvest House,

Pretoria,

Acardia

Yes

4.4.12.2/24/18

Appointment of a service providers for the equipping of boreholes in the North West province, administered by the Administered by the Department of Agriculture, Forestry and Fisheries through its Directorate: Climate change and Disaster management

28 November 2018

10:00am

North west: Department of rural, environment and agricultural development,

CNR DR James Moroka drive and stadium road,

Mafikeng

Yes

4.4.12.2/26/18

Appointment of service provider for creation of fire breaks in Gauteng provinces

11 February 2019

10h00am

Department of Agriculture forestry and fisheries,

110 Hamilton street,

Pretoria,

0001

Yes

4.4.12.2/27/18

Appointment of service provider for creation of fire breaks in Free State province

13 February 2019

10h00am

Glen Agricultural College ,

Glen,

Bloemfontein

Yes

4.4.12.4/6/18

Appointment of a security company to render security services in the North West provinces at Mmabatho nursery (Danville), Buffelspoort and Mahikeng to the Department of agriculture, Forestry and Fisheries for a period of three (3) years.

19 July 2018

09h00am

Buffelspoort Quarantine Station Plot (A)

37 old Pretoria Road,

North west province,

0284

Yes

4.4.12.4/6/18

Appointment of a security company to render security services in the North West provinces at Mmabatho nursery (Danville), Buffelspoort and Mahikeng to the Department of agriculture, Forestry and Fisheries for a period of three (3) years.

20 July 2018

09h00am

Mmabatho Nursery,

Stand 59,

Flew View (Danville Township)

Mahikeng,

2745

Yes

4.4.12.4/6/18

Appointment of a security company to render security services in the North West provinces at Mmabatho nursery (Danville), Buffelspoort and Mahikeng to the Department of agriculture, Forestry and Fisheries for a period of three (3) years.

20 July 2018

11h00am

Daff office

57 Molopo Road ,

Mahikeng,

North West province,

0284

Yes

4.4.12.4/7/18

The appointment of a security companies to provide security services in the Kei, Matiwane and East Griqualand districts in the Eastern cape for the period of three (3) years.

23 November 2018

10h00am

No 2 Hargreaves Avenue old Radio,

Xhosa Building,

King Williams town,

Eastern cape

Yes

4.4.12.4/8/18

The appointment of service provider for Aerial blackfly control for the Department of Agriculture, Forestry and Fisheries for the period of two years.

17 July 2018

10h00am

Agriculture place,

Wellness centre,

20 Steve Biko Road,

Acardia,

Pretoria

Yes

4.4.12.4/9/18

Appointment of a security company to render security services at Agriculture place building, Harvest house building, Delpen building, Roodeplaat building, 110 Hamilton building, 140 Hamilton forum building and Kempton park building for the Department of Agriculture, Forestry and Fisheries.

12 October 2018

10h00am

Agriculture place,

Wellness centre,

20 Steve Biko Road,

Acardia,

Pretoria

Yes

4.4.12.4/11/18

Appointment of a security company to render security services in the Mpumalanga province at Mbombela to the Department of Agriculture, Forestry and Fisheries for a period of three (3) years

10 September 2018

10h00am

27 brown Street Nelspruit,

Mpumalanga

Yes

4.4.12.4/12/18

Appointment of a service providers for the equipping of boreholes in the North West province, administered by the Administered by the Department of Agriculture, Forestry and Fisheries through its Directorate: Climate change and Disaster management

17 October 2018

10h00am

North west: Department of rural, environment and agricultural development,

CNR DR James Moroka drive and stadium road,

Mafikeng

Yes

4.4.12.4/14/18

The appointment of a service provider to render project management services in the implementation of training, mentorship and placement of graduates in farms funded by the national skills fund

25 October 2018

10h00am

Department of Agriculture, Forestry and Fisheries,

20 Steve Biko Road,

Arcadia,

Pretoria

Yes

4.4.12.4/15/18

The appointment of service provider to supply a centralized telephone management system for realities ISDX PABX and AASTRA BP250 PABX’s for the period of five(5) years

13 August 2018

10h00am

Room 562, Harvest House,

30 Hamilton Street,

Arcadia,

Pretoria

Yes

4.4.12.4/16/18

The appointment of a service provider for the procurement of network equipment and local area network installations at Head office, all regional and land border offices of Directorate: Inspection services for the Department of Agriculture, Forestry and Fisheries

31 August 2018

11h00am

Room 562,

5th Floor,

Harvest House,

30 Hamilton Street,

Arcadia,

Pretoria

Yes

4.4.12.4/17/18

The appointment of a project manager to manage land restitution projects through the Kabelo land restitution and development trust

21 February 2019

10h00am

1st floor Boardroom,

110 Hamilton street,

Pretoria

Yes

4.4.12.4/18/18

Appointment of a service provider to implement silvicultural activities on 400 Hectares that include tending/weeding and pruning of trees at Katberg, Benholm, Nomadamba, Ntywenka, Amanzamnyama, Ntsubane and MT coke estates in the Eastern cape province for the Department of Agriculture, Forestry and Fisheries for a period of twelve (12) months.

27 August 2018

10h00am

No 2 Hargreaves Avenue old Radio,

Xhosa Building,

King Williams town,

Eastern cape

Yes

4.4.12.4/19/18

Appointment of a bidder to implement TUP reduction operations on 400 hectares that include land clearing, marking, pitting and planting at Katberg, Benholm, Nomadamba, Ntywenka, Amanzamnyama, Ntsubane and MT coke estates in the Eastern cape province for the Department of Agriculture, Forestry and Fisheries for a period of twelve (12) months.

27 August 2018

10h00am

No 2 Hargreaves Avenue old Radio,

Xhosa Building,

King Williams town,

Eastern cape

Yes

4.4.12.4/24/18

The appointment of a service provider to render gardening and cleaning service at Roodeplaat for a period three (3) years

06 November 2018

10h00am

Plot 47 Evaluation centre,

Moloto Road,

Roodeplaat

Yes

4.4.12.4/28/18

The appointment of service provider to supply a centralized telephone management systems for realities ISDX PABX and AASTRA BP250 PABX’s for a period of five (5) years

04 December 2018

10h00am

Room 562,

Harvest House,

30 Hamilton Street,

Arcadia,

Pretoria

Yes

4.4.12.4/27/18

Appointment of a service provider for the upscaling of Biogas production integrated Grop-livestock system administered by the Department of Agriculture, Forestry and Fisheries for a period of three (3) years.

08 November 2018

10h00am

Block: UA-GF-07,

Agriculture place building,

Department of Agriculture, Forestry and Fisheries,

20 Steve Biko Road,

Arcadia,

Pretoria

Yes

4.4.12.4/1/18

Appointment of a suitably qualified service provider to develop, host, maintain, provide training and after care services of an online decision support system including Ndimo desk for Agricultural extension, Forestry and Fisheries advisory and management services for a period of five (5) years

26 July 2018

10h00am

Room 218,

Harvest House,

30 Hamilton Street,

Arcadia,

Pretoria

Yes

4.4.12.4/2/18

Appointment of a service provider for the supply of charter service for government officials from different construction sites to various destinations in the Republic of South Africa on a monthly basis over a period of two (2) years for the Department of Agriculture, Forestry and Fisheries.

25 May 2018

10h00am

Agriculture place building,

Department of Agriculture, Forestry and Fisheries,

20 Steve Biko Road,

Arcadia,

Pretoria

Yes

4.4.12.4/4/18

Appointment of a service provider for the supply and delivery of 7 x 4MM x 12MM Hot dipped fully Galvanized stay wire for a period of two (2) years.

06 August 2018

10h00am

Department of Agriculture, Forestry and Fisheries,

141 Cresswell Road,

Silverton,

Pretoria

Yes

OBP

TOTAL NUMBER OF TENDERS ADVERTISED FROM 2010 – 2018

DESCRIPTION OF SERVICES

COMPULSORY BRIEFING

MONTH TENDERED

1.

Waste removal

Yes

05/11/2018

2.

PPE

Yes

13/07/2018

3.

Insurances Service

Yes

06/04/2018

4.

Internal Audit

No

26/03/2018

5.

Catering Services

Yes

22/03/2018

6.

Garden Service

Yes

01/02/2018

7.

GMP: Facility Reconstruction and Upgrade

Yes

21/09/2017

8.

Supply Erograstics currvula

Yes

27/07/2017

9.

Logistics Service

No

23/03/2016

10.

Security services

Yes

03/03/2016

11.

Supply of Coal

Yes

02/03/2016

12.

Cleaning Services

Yes

02/03/2015

13.

Internal Audit Services

Yes

12/01/2015

14.

Insurance

No

20/09/2014

15.

Multi-disciplinary engineering and and consulting firms

No

19/09/2014

16.

Catering services

Yes

07/08/2014

17.

Satellite Canteen

Yes

06/08/2014

18.

Pilot Freeze dryer

No

04/06/2014

19.

Cross flow filtration

No

16/04/2014

20.

Quantity Surveys

Yes

24/03/2014

21.

Supply Erograstics Curvula grass

Yes

17/12/2013

22.

Water treatment of cooling towers

Yes

02/12/2013

23.

Water Purification

Yes

02/08/2013

24.

Renovation of canteen and reception

Yes

20/06/2013

25.

Boiler services

Yes

18/04/2013

26.

Garden Service

Yes

17/04/2013

27.

Autoclaves

No

12/04/2013

28.

Maintenance of HVAC system

Yes

07/09/2012

29.

Packaging facility upgrade

 

07/09/2012

30.

Internal Audit

Yes

07/09/2012

31.

Fire detection

Yes

22/08/2012

32.

Security services

Yes

25/07/2012

33.

Supply of Coal

No

18/06/2012

34.

Viral Washer and Sterilization Tunnel equipment

No

14/11/2011

ALL TENDERS ARE ADVERTISED ON THE E-TENDER SYSTEM

PPECB

Date Published

 

Project Name

Province

Compulsory Briefing

(i)

   

(ii)

(b)

Jan-10

1

VMware Infrastructure

 

No

Jun-10

2

EDI System

 

No

Aug-10

3

AETP Conference and Accommodation

 

No

Sep-10

4

High Performance Liquid Chromatograph System

 

No

Feb-11

5

Skills Audit

 

No

Apr-11

6

PTA Lab Office Accommodation

 

No

Aug-11

7

Head Office Multipurpose Printers

 

No

 

8

PTA Lab Interior Design

 

No

 

9

AETP Conference and Accommodation

 

No

Nov-11

10

Values Roll Out

 

No

Jan-12

11

Internal Audit Services

 

No

Sep-12

12

External Audit Services

 

No

 

13

Employee Value Proposition

 

No

 

14

Gas Chromatograph MS-MS

 

No

 

15

Laptop Replacement

 

No

Jul-13

16

Mobile Application Development

 

No

May-14

17

UPLC

 

No

Aug-14

18

Android Mobile Devices

 

No

Nov-14

19

PE Office Space

 

No

 

20

Cold Store Labels

 

Yes

Jan-15

21

Durban office Space

 

No

 

22

Winterveld Farm Renovations

 

Yes

Mar-15

23

Wide Area Networking (WAN) Services

 

Yes

Sep-15

24

Internal Audit Services

 

No

Feb-16

25

Android Mobile Devices

 

No

Mar-16

26

LCMSMS

 

No

Jun-16

27

Time Sheet Software

 

No

Oct-16

28

Quality Management System

WC

Yes

Date Published

 

Project Name

Province

Compulsory Briefing

(i)

   

(ii)

(b)

Jan-17

29

Project and Construction Management for Roof Installation

WC

Yes

 

30

Development of Software Application for Master data

 

No

Feb-17

31

Design, Layout, Proofread and Print Annual Report

 

No

 

32

Renovation of PPECB Head Office

 

No

 

33

Branded Promotional Items

 

No

Apr-17

34

Design and Creative Services

 

No

 

35

Design, layout, proofread and print of PPECB History Book

 

No

Feb-17

36

Travel Management Services to PPECB

 

No

Oct-17

37

Corporate Clothing

WC

No

Aug-17

38

Employed Learner ship

 

No

Jan-18

39

Head Office Renovations

 

Yes

 

40

Internal Audit Services

 

No

MLRF

Table 1: MLRF Bids: 2010 - 2018

No.

Bid Number

Date of Advertisement

Cancelled

Compulsory Briefing Session

1.

MLRF 082

January 2010

 

Yes

2.

MLRF 083

January 2010

 

Yes

3.

MLRF 084

November 2010

 

Yes

4.

MLRF 087

November 2010

 

Non compulsory

5.

MLRF 088

February 2011

Cancelled

Yes

6.

MLRF 089

March 2011

Cancelled

Non compulsory

8.

MLRF 090

April 2011

 

No

9.

MLRF 095

January 2012

 

Yes

10.

MLRF 096

February 2012

 

Yes

11.

MLRF 098

May 2012

Cancelled

Yes

12.

MLRF 099

May 2012

Cancelled

Yes

13.

MLRF 100

June 2012

 

No

14.

MLRF 101

June 2012

Cancelled

No

15.

MLRF 102

August 2012

Cancelled

Yes

16.

MLRF 103

August 2012

Cancelled

No

17.

MLRF 105

September 2012

Cancelled

Yes

18.

MLRF 106

September 2012

 

Yes

19.

MLRF 107

September 2012

Cancelled

No

20.

MLRF 108

September 2012

 

No

21.

MLRF 109

October 2012

Cancelled

Yes

22.

MLRF 110

October 2012

 

Yes

23.

MLRF 111

March 2013

 

No

24.

MLRF 112

April 2013

 

Yes

25.

MLRF 113

April 2013

 

Yes

26.

MLRF 114

April 2013

 

No

27.

MLRF 115

June 2013

Cancelled

Yes

28.

MLRF 116

July 2013

Cancelled

Yes

29.

MLRF 117

August 2013

 

No

30.

MLRF 118

August 2013

 

No

31.

MLRF 119

August 2013

 

Yes

32.

MLRF 120

August 2013

 

No

33.

MLRF 122

October 2013

Cancelled

No

34.

MLRF 123

April 2014

Cancelled

Yes

35.

MLRF 124

August 2014

 

Yes

36.

MLRF 125

September 2014

 

No

37.

MLRF 126

October 2014

 

Yes

38.

MLRF 127

September 2014

 

No

39.

MLRF 128

October 2014

Cancelled

Yes

40.

MLRF 129

October 2014

Cancelled

Yes

41.

MLRF 130

August 2015

 

Yes

42.

MLRF 131

October 2015

 

Yes

43.

MLRF 132

October 2015

 

Yes

44.

MLRF 133

December 2015

 

Yes

45.

MLRF 135

August 2016

 

Yes

46.

MLRF 136

July 2016

 

No

47.

MLRF 137

September 2016

 

Yes

48.

MLRF 138

October 2016

Cancelled

No

49.

MLRF 139

October 2016

Cancelled

No

50.

MLRF 140

November 2016

Cancelled

No

51.

MLRF 141

January 2017

 

No

52.

MLRF 142

March 2017

Cancelled

No

53.

MLRF 143

April 2017

 

No

54.

MLRF 144

May 2017

 

Yes

55.

MLRF 145

May 2017

Cancelled

Yes

56.

MLRF 146

June 2017

 

No

57.

MLRF 147

July 2017

 

No

58.

MLRF 148

September 2017

 

No

59.

MLRF 149

October 2017

Cancelled

Yes

60.

MLRF 150

November 2017

 

No

61.

MLRF 151

March 2018

 

Yes

62.

MLRF 154

February 2018

Cancelled

No

63.

MLRF 155

October 2018

Cancelled

No

64.

MLRF 156

April 2018

 

No

65.

MLRF 157

September 2018

Cancelled

Yes

NAMC

No input

ARC

(a)    The total number of tenders advertised by ARC during the period under review is 321 (three hundred and twenty-one)

(b)    The total of 81(eighty-one) tenders required had briefing sessions

Description of the service

Bid number

Briefing session date

Place

Briefing Compulsory

Security Guarding Services-Pretoria

ARC/042/01/10

02/02/2010 at 10:00

Pretoria campus in Gauteng

Yes

Security Guarding Services - Infruitec

ARC/042/01/10

03/02/2010 at 09:00

Stellenbosch campus in Cape Town

Yes

Security Guarding Services-Rustenburg

ARC/042/01/10

04/02/2010 at 10:00

Rustenburg campus in North West

Yes

Security Guarding Services-Nelspruit

ARC/042/01/10

05/02/2010 at 10:00

Nelspruit campus in Mpumalanga

Yes

Internal Audit Services

ARC/043/01/10

02/03/2010 at 10:00

Pretoria campus in Gauteng

Yes

IP Attorneys

ARC/052/02/10

03/03/2010 at 10:00

Pretoria campus in Gauteng

Yes

Cleaning Services

ARC/053/02/10

31/08/2010 at 10:00

Pretoria campus in Gauteng

Yes

SUPPLY & BUILD A SURFACE MOUNTED WEIGHING BRIDGE

ARC/062/06/10

23/07/2010 at 10:00

Pretoria campus in Gauteng

Yes

Supply and installation of palisade fencing-API

ARC/063/06/10

22/02/2011 at 10:00

Pretoria campus in Gauteng

Yes

Supply of a Tractor-api

ARC/064/06/10

23/07/2010 at 10:00

Irene campus in Gauteng

Yes

Supply of a tractor-VOPI

ARC/065/07/10

23/07/2010 at 10:00

Moloto road campus in Gauteng

Yes

Provision of Cleaning Services

ARC/066/08/10

01/09/2010 at 09:00

Pretoria campus in Gauteng

Yes

Garden Services

ARC/073/10/10

23/11/2010 at 10:00

Pretoria campus in Gauteng

Yes

The Supply, Delivery, Installation and Configuration of:
Secure Web Gateway

ARC/082/11/10

 

Pretoria campus in Gauteng

No

For the support and maintenance of the ARC financial and laboratory systems.

ARC/083/11/10

 

Pretoria campus in Gauteng

No

Supply, Install and Commission
2 X Compressors-Infruitec

ARC/084/11/10

 

Stellenbosch campus in Cape Town

No

THE SUPPLY, DELIVERY, INSTALL AND COMMISSIONING OF EMERGENCY STANDBY GENERATOR

ARC/085/11/10

 

Pretoria campus in Gauteng

No

INDUCTIVELY COUPLED PLASMA OPTICAL EMISSION SPECTROMETER INCLUDING A SAMPLER, CHILLER, COMPUTER AND APPPLICABLE SOFTWARE - ISCW

ARC/086/12/10

 

Pretoria campus in Gauteng

No

Disaster Recovery Site

ARC/088/01/11

 

Pretoria campus in Gauteng

No

Refurbishment of the ARC-OVI accommodation facilities situated on the ARC-OVI main campus and Trans-Boundary Animal Diseases Programme campus.

ARC /089/01/11

02/02/2011 at 10:00

Pretoria campus in Gauteng

Yes

Design, layout and construction of the OIE Laboratory building

ARC /090/01/11

03/02/2011 at 09:00

Pretoria campus in Gauteng

Yes

Supply and Delivery of Computer Hardware

ARC/092/02/11

22/02/2011 at 10:00

Pretoria campus in Gauteng

Yes

Leasing, Supply and Maintenance of ICT Desktop Equipment to the ARC

ARC/093/02/11

30/03/2011 at 10:00

Pretoria campus in Gauteng

Yes

Maintenance of Air Conditioners, Cooling units, Cold Rooms and Electrical Repairs Contract

ARC/094/02/11

22/03/2010 at 10:00

Pretoria campus in Gauteng

Yes

Refurbishment of the floor in the Trans-Boundary Animal Disease Programme (TAD)

ARC/095/02/11

01/03/2011 at 10:00

Pretoria campus in Gauteng

Yes

Repair of Glasshouses at VOPI

ARC/096/02/11

23/03/2011 at 10:00

Pretoria campus in Gauteng

Yes

Financing of Computer Hardware

ARC/097/04/11

 

Pretoria campus in Gauteng

No

Design and Place advertisements in the media & administration of psychometric assessments

ARC/098/04/11

18/05/2011 at 10:00

Pretoria campus in Gauteng

Yes

Appointment of a service provider / consultant to develop the ARC ICT Strategy

ARC/099/05/11

01/06/2011 at 10:00

Pretoria campus in Gauteng

Yes

PROVISION OF ARCHITECTURE SERVICES FOR THE ARC PPRI

ARC/100/06/11

29/06/2011 at 10:00

Pretoria campus in Gauteng

Yes

Supply of 72 tractor packages for 7 provinces

ARC/101/07/11

26/07/2011 at 10:00

Department of Agriculture

Yes

Short Term Insurance Brokerage Service

ARC/102/08/11

 

Pretoria campus in Gauteng

No

Appointment of a panel of Law Firms to advise the ARC on Intellectual Property matters.

ARC/103/08/11

17/08/2011 at 10:00

Pretoria campus in Gauteng

Yes

SUPPLY, DELIVERY, INSTALLATION AND COMMISSION OF A COMPLETE MALDI TOF/TOF MASS SPECTROMETRY WORKFLOW SYSTEM

ARC/104/08/11

 

Pretoria campus in Gauteng

No

Equipment: Water for injection system

ARC/105/09/11

23/09/2011 at 10:00

Pretoria campus in Gauteng

Yes

2 Steam Generators

ARC/106/09/11

22/09/2011 at 10:00

Pretoria campus in Gauteng

Yes

Supply of one Commercial Harvester.

ARC/107/10/11

 

Potchefstroom in North West

No

Supply, delivery, installation and commissioning of a Generator.

ARC/108/10/11

 

Pretoria campus in Gauteng

No

Facility projects (5) as follows: Entomology, Insectarium, Motor Fleet, Boikutsong and Polystyrene Store (Stable 63)

ARC/109/10/11

 

Pretoria campus in Gauteng

No

Automated Extraction System for the Molecular Epidemiology Diagnostics (MED) Programme

ARC/110/10/11

 

Pretoria campus in Gauteng

No

Garden Service Maintenance at ARC-GCI

ARC/111/10/11

18/11/2011 at 10:00

Potchefstroom in North West

Yes

SUPPLY AND INSTALLATION OF INDUCTIVELY COUPLED PLASMA MASS

ARC/112/10/11

 

Pretoria campus in Gauteng

No

PROCUREMENT OF A GAS CHROMATOGRAPH MASS SPECTROMETER SYSTEM (MACHINE) INCLUSIVE OF A LIQUID CHROMATOGRAPH SYSTEM

ARC/113/11/11

 

Pretoria campus in Gauteng

No

Robotic liquid handling platform

ARC/114/11/11

 

Pretoria campus in Gauteng

No

Laser capture micro-dissection microscope

ARC/115/11/11

 

Pretoria campus in Gauteng

No

2 x Medium throughput Next Generation DNA sequencing system (1 for ARC-Biotechnology at Onderstepoort and 1 at ARC-Biotechnology at Stellenbosch)

ARC/116/11/11

 

Stellenbosch campus in Cape Town

No

High performance computing cluster solution or environment

ARC/117/11/11

 

Pretoria campus in Gauteng

No

Large computer storage array system

ARC/118/11/11

 

Pretoria campus in Gauteng

No

Laboratory Information Management System for Next Generation Sequencing Facility

ARC/119/11/11

 

Pretoria campus in Gauteng

No

Provision of security services at Burgershall Farm

ARC/120/11/11

24/11/2011 at 10:00

Nelspruit campus in Mpumalanga

Yes

SUPPLY OF CARBON, HYDROGEN, NITROGEN, SULPHUR (CHNS) ANALYSER INSTRUMENT

ARC/01/01/12

 

Pretoria campus in Gauteng

No

Extension and upgrade of the Gene Bank building at ARC-VOPI

ARC/03/02/12

01/03/2012 at 10:00

Pretoria campus in Gauteng

Yes

Travel and Accommodation Services

ARC/04/02/12

01/03/2012 at 10:00

Pretoria campus in Gauteng

Yes

Supply, Delivery and Installation of Access Control System at ARC-Central Office

ARC/05/02/12

07/03/2012 at 10:00

Pretoria campus in Gauteng

Yes

Supply, Delivery and Installation of Mittel Telephone System at SGI

ARC/06/02/12

17/02/2012 at 10:00

Pretoria campus in Gauteng

Yes

Supply, delivery, installation and commissioning of an Incinerator

ARC/07/03/12

 

Pretoria campus in Gauteng

No

Procurement of a Mitel telephone system at OVI.

ARC/08/03/12

06/09/2012 at 10:00

Pretoria campus in Gauteng

Yes

Design , Layout and Printing of the ARC Annual Report over a three year period.

ARC/09/04/12

 

Pretoria campus in Gauteng

No

Provision of short term insurance brokerage service.

ARC/10/04/12

 

Pretoria campus in Gauteng

No

Provision of Organizational design and restructuring services.

ARC/11/04/12

 

Pretoria campus in Gauteng

No

Provision of a fleet management solution.

ARC/12/06/12

05/07/2012 at 10:00

Pretoria campus in Gauteng

Yes

Electrical Work requirements at the Trans-Boundary Animal Diseases Programme (TADP)

ARC/13/07/12

26/07/2012 at 10:00

Pretoria campus in Gauteng

Yes

ANIMAL FEED: BULL MEAL FOR ARC-API

ARC/14/08/12

22/08/2012 at 10:00

Pretoria campus in Gauteng

Yes

LIQUID NITROGEN GENERATOR FOR ARC-API

ARC/15/08/12

 

Pretoria campus in Gauteng

No

MOBILE RESEARCH LABORATORY (MOBITECH) FOR ARC-API

ARC/16/08/12

 

Pretoria campus in Gauteng

No

Implementation of a Microsoft Dynamics AX and Microsoft Sharepoint Solution

ARC/17/10/12

24/10/2012 at 10:00

Pretoria campus in Gauteng

Yes

OCCUPATIONAL HEALTH AND SAFETY SERVICES FOR THE AGRICULTURAL RESEARCH COUNCIL – (ARC-OVI) FOR A PERIOD OF 36 MONTHS

ARC/18/10/12

02/11/2012 at 10:00

Pretoria campus in Gauteng

Yes

Relocation of PPRI Rietondale to Roodeplaat.

ARC/19/10/12

08/11/2012 at 10:00

Pretoria campus in Gauteng

Yes

Supply, delivery, installation and commissioning of an Ultra Centrifuge with Rotors and Scale / Balance that will be used together

ARC/20/11/12

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of an Iso-Thermal Micro-Calorimetry System

ARC/21/11/12

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of an Automated Extraction System

ARC/22/11/12

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of Electrical Cable at Block H for the Pure Steam Generator at TADP *

ARC/23/11/12

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of Switchgear and Cabling for new Generator at TADP *

ARC/24/11/12

 

Pretoria campus in Gauteng

No

Provision of e-Journals over a three year period.

ARC/25/11/12

29/11/2012 at 10:00

Pretoria campus in Gauteng

Yes

Supply, delivery, installation and commissioning of Steam Generator and Vacuum Pump for Parasites, Vector and Vector-Borne Diseases Programme

ARC/26/11/12

 

Pretoria campus in Gauteng

No

Request for Proposal for Architectural firm to assist in the design, construction and overall project management for the construction of the BSL 3 Foot-and-Mouth Vaccine Facility **

ARC/27/11/12

27/06/2013 at 10:00

Pretoria campus in Gauteng

Yes

Provision of a Negative Pressure System for BSE Lab

ARC/28/11/12

 

Pretoria campus in Gauteng

No

INTEGRATED ACCESS CONTOL SYSTEM FOR INFRUITEC-NIETVOORBIJ

ARC/01/01/13

01/02/2013 at 10:00

Stellenbosch campus in Cape Town

Yes

Supply, delivery, installation and commissioning of an Automated filling machine for Cryo preservation straws

ARC/02/01/13

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of a Plasmon resonance equipment

ARC/03/01/13

 

Pretoria campus in Gauteng

No

Supply and Installation of security fencing and gate at Umthiza experimental farm

ARC/04/01/13

21/02/2013 at 10:00

East London campus in Eastern Cape

Yes

Renovation of buildings at Umthiza experimental farm

ARC/05/01/13

22/02/2013 at 10;00

East London campus in Eastern Cape

Yes

Supply of one TLB

ARC/06/01/13

 

Bethlehem campus in North West

No

Supply, delivery, installation and commissioning of a Real-Time PCR Machine

ARC/07/02/13

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of a Flow Cytometer

ARC/08/02/13

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of a Liquid Nitrogen Plant

ARC/09/02/13

 

Pretoria campus in Gauteng

No

Provision of internal audit service for a period of five years.

ARC/10/02/13

20/03/2013 at 10:00

Pretoria campus in Gauteng

Yes

Supply and delivery of corporate gifts and promotional material over a three year period

ARC/11/02/13

 

Pretoria campus in Gauteng

No

Provision of signage refreshing service at ARC.

ARC/12/02/13

21/03/2013 at 10:00

Pretoria campus in Gauteng

Yes

Provision of security guarding service at Pretoria based institutes

ARC/13/03/13

03/04/2013 at 10:00

Pretoria campus in Gauteng

Yes

Provision of security guarding service at Stellenbosch

ARC/14/03/13

09/04/2013 at 10:00

Stellenbosch campus in Cape Town

Yes

Provision of security guarding service at Rustenburg

ARC/15/03/13

11/04/2013 at 10:00

Rustenburg campus in North West

Yes

Provision of security guarding service at Nelspruit

ARC/16/03/13

16/04/2013 at 10:00

Nelspruit campus in Mpumalanga

Yes

Provision of security guarding service at Addo and Umthiza experimental farm.

ARC/17/03/13

17/04/2013 at 10:00

Port Elizabeth campus in Eastern Cape

Yes

Procurement of a Mitel telephone system at VOPI.

ARC/18/03/13

20/02/2014 at 10;00

Pretoria campus in Gauteng

Yes

Planning, Architectural Design, Project Management and Construction Supervision for the construction of a Multipurpose Training Facility at ARC Roodeplaat

ARC/19/05/13

06/06/2013 at 10:00

Pretoria campus in Gauteng

Yes

Design and placing of adverts in the media and conducting psychometric / competency assessments for three years.

ARC/20/07/13

01/11/2013 at 10;00

Pretoria campus in Gauteng

Yes

AN AUTOMATED ULTRA HIGH PRESSURE LIQUID CHROMATOLOGRAPHY SYSTEM (UHPLC) FOR INFRUITEC-NIETVOORBIJ

ARC/21/07/13

 

Stellenbosch campus in Cape Town

No

Supply and delivery of building materials and Construction Equipment, such as; cement, stones, river sand, spades, shovels, wheelbarrows etc.

ARC/22/09/13

 

Pretoria campus in Gauteng

No

Supply and deliver of Steel, such as; flat bar, angle iron, round tubing, etc

ARC/23/09/13

 

Pretoria campus in Gauteng

No

Supply and deliver of Chicken House Equipment, such as; bell drinkers, gas cylinders, gas brooder, thermometers, foot bath, etc.

ARC/24/09/13

 

Pretoria campus in Gauteng

No

PROVISION OF COMPETENCY ASSESSMENTS AND SKILL AUDIT FOR FINANCE AND SUPPLY CHAIN MANAGEMENT(SCM) SECTIONS.

ARC/25/09/13

 

Pretoria campus in Gauteng

No

Cooling Units for glasshouses-ARC-PPRI, Vredenburg Farm, Stellenbosch

ARC/26/10/13

08/11/2013 at 10;00

Stellenbosch campus in Cape Town

Yes

ERECTION OF SECURITY FENCING AT ARC – INFRUITEC NIETVOORBIJ

ARC/27/11/13

29/11/2013 at 10:00

Stellenbosch campus in Cape Town

Yes

Supply and delivery of building materials and construction equipment, such as; concrete mixer, spades, shovels, water tanks, wheelbarrows etc.

ARC/28/11/13

 

Pretoria campus in Gauteng

No

The building of a Cubicle Greenhouse at ARC-Grain Crops Institute, Potchefstroom

ARC/29/11/13

14/03/2014 at 10;00

Potchefstroom in North West

Yes

SUPPLY OF A LIQUID HANDLING STATION (BIOSPRINT

ARC/30/11/13

 

Bethlehem campus in North West

No

Construction of a multi-purpose training facility at ARC-VOPI

ARC/31/11/13

13/12/2014 at 10:00

Pretoria campus in Gauteng

Yes

Supply and Conversion of Steel containers into offices and processing complex at ARC-VOPI

ARC/32/11/13

12/12/2013 at 10:00

Pretoria campus in Gauteng

Yes

Supply and Commissioning of Capsule filling machines

ARC/33/11/13

 

Pretoria campus in Gauteng

No

Supply and Installation of a palisade fence at API

ARC/34/11/13

13/12/2013 at 10:00

Pretoria campus in Gauteng

Yes

The re-configuration of office space at ARC-Central Office

ARC/35/11/13

20/02/2014 at 10;00

Pretoria campus in Gauteng

Yes

PROVISION OF GARDENING AND CLEANING SERVICES AT ARC-SGI FOR THREE YEARS

ARC/01/01/14

10/01/2014 at 10:00

Bethlehem campus in North West

Yes

Provision for the basic Environmental Impact Assessment (EIA Consultation) for hatchery and chicken abattoirs at nine different sites in nine (9) provinces

ARC/02/04/14

 

Pretoria campus in Gauteng

No

Provision to Supply and deliver of Steel (Steel Square Tubing) at ARC in Silverton, Pretoria

ARC/03/04/14

16/04/2014 at 10:00

Pretoria campus in Gauteng

Yes

Supply and deliver of Ready-Mix Concrete, for Feedmill Structure (Concrete Slap). The supply and delivery of the ready-mix concrete will be in all nine provinces divided into three categories.

ARC/04/04/14

 

Pretoria campus in Gauteng

No

The Provision to supply, deliver and erection of the Feedmill Steel Structure in all nine (09) provinces

ARC/05/04/14

15/04/2014 at 10:00

Pretoria campus in Gauteng

Yes

The Provision to supply, deliver and erection of the Feedmill Steel Structure in all nine (09) provinces

ARC/05/04/14

16/04/2014 at 10:00

Nelspruit campus in Mpumalanga

Yes

The supply and delivery of the Main structure Materials will be in all nine provinces.

ARC/06/04/14

22/04/2014 at 10:00

Pietermaritzburg campus in Kwa-Zulu Natal

Yes

The Provision to supply and deliver the Feedmill Equipment, such as Pellet mill, Pellet cooler, Hammer mill, Auger, etc, in all nine (09) provinces

ARC/07/04/14

23/04/2014 at 10:00

Potchefstroom in North West

Yes

Supply, delivery and Installation of a New Micro Imaging Unit

ARC/08/04/14

 

Pretoria campus in Gauteng

No

HIGH PERFORMANCE LIQUID CHROMATOGRAPHY SYSTEM (HPLC) FOR INFRUITEC-NIETVOORBIJ

ARC/09/06/14

 

Stellenbosch campus in Cape Town

No

TAILOR MADE TRAINING FOR MIDDLE AND SENIOR MANAGEMENT DEVELOPMENT PROGRAMS AND OFFER ONE ON ONE EXECUTIVE DEVELOPMENT PROGRAMMES FOR 3 YEARS

ARC/10/07/14

 

Pretoria campus in Gauteng

No

SUPPLY AND DELIVERY OF FENCING MATERIALS AND TOOLS AT NOKANENG, MPUMALANGA

ARC/11/07/14

08/08/2014 at 10:00

Nelspruit campus in Mpumalanga

Yes

Conversion of the old Kitchen area into Research and Diagnostic Laboratories for the Trans-Boundary Animal Diseases Programme at ARC-OVI

ARC/12/07/14

14/08/2014 at 10:00

Pretoria campus in Gauteng

Yes

Conversion of ARC-CO Guest House into office space

ARC/13/07/14

15/08/2014 at 10:00

Pretoria campus in Gauteng

Yes

Supply and delivery for Point of Lay Hens for nine Provinces which are Kwazulu Natal ,Mpumalanga ,Limpopo, Free State , Gauteng, Eastern Cape, Northern Cape, Western Cape and North West.

ARC/14/08/14

 

Pietermaritzburg campus in Kwa-Zulu Natal

No

Supply, delivery and installation of two Lifts with new digital types at ARC- API (Irene)

ARC/15/08/14

29/08/2014 at 10:00

Irene campus in Gauteng

Yes

Supply, delivery and installation of rotor gene Q5 plex HRM platform light cycler for real-time PCR.

ARC/16/08/14

 

Pretoria campus in Gauteng

No

PROVISION OF DESIGN AND DEVELOPMENT OF ONLINE/VIRTUAL ONBOARDING CONTENT AND CONCEPT.

ARC/17/09/14

 

Pretoria campus in Gauteng

No

SUPPLY AND DELIVERY OF ECONOMIC NO-TILL PLANTERS AND BOOM SPRAYERS

ARC/18/09/14

 

Pretoria campus in Gauteng

No

Construction of four (4) nursery structures at Limpopo Province

ARC/19/09/14

23/09/2014 at 10:00

Pretoria campus in Gauteng

Yes

Construction of four (4) nursery structures at KwaZulu Natal Province

ARC/20/09/14

24/09/2014 at 10:00

Pietermaritzburg campus in Kwa-Zulu Natal

Yes

Construction of four (4) nursery structures at the Eastern Cape Province

ARC/21/09/14

25/09/2014 at 10:00

East London campus in Eastern Cape

Yes

Construction of two (2) nursery structures at Mpumalanga Province

ARC/22/09/14

26/09/2014 at 10:00

Nelspruit campus in Mpumalanga

Yes

Construction of a prefabricated building at ARC-VOPI

ARC/23/09/14

29/09/2014 at 10:00

Pretoria campus in Gauteng

Yes

Supply, delivery, installation and commissioning of a Non-Destructive Seed Phenotyping Instrument for Sunflower seeds

ARC/24/10/14

31/10/2014 at 10:00

Pretoria campus in Gauteng

Yes

PREPARATIVE HIGH PERFORMANCE PRESSURE LIQUID CHROMATOGRAPHY FOR INFRUITEC-NIETVOORBIJ

ARC/25/10/14

 

Stellenbosch campus in Cape Town

No

Supply, delivery, installation and commissioning of a DNA Fragmentation System

ARC/26/10/14

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of a DNA Fragment Analysis Device

ARC/27/10/14

 

Pretoria campus in Gauteng

No

Refurbishment of the Genebank building at ARC-VOPI, Roodeplaat

ARC/28/10/14

14/11/2014 at 10:00

Pretoria campus in Gauteng

Yes

Construction and Refurbishment of Glass houses at ARC-VOPI, Roodeplaat

ARC/29/10/14

13/11/2014 at 10:00

Pretoria campus in Gauteng

Yes

Supply, delivery, installation and commissioning of a Flow Cytometer for Parasites, Vector and Vector borne Diseases Programme

ARC/30/11/14

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of a Flow Cytometer for Parasites, Vector and Vector borne Diseases Programme

ARC/31/11/14

 

Pretoria campus in Gauteng

No

APPOINTMENT OF A CONSULTANT FOR DEVELOPMENT OF A PROCESS FOR THE FREEZE DRYING OF ATTENUATED HEARTWATER VACCINE FOR PVVD

ARC/32/11/14

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of a desktop Liquid Chromatography Mass Spectrometry (LC-MS/MS) Instrument for Residue Laboratory

ARC/33/11/14

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of male and female mobile type ablution blocks

ARC/34/11/14

 

Pretoria campus in Gauteng

No

THE SUPPLY AND DELIVERY OF GPRS COMMUNICATION EQUIPMENT-ARC-ISCW

ARC/35/11/14

 

Pretoria campus in Gauteng

No

THE SUPPLY AND DELIVERY AUTOMATIC WEATHER STATIONS-ARC-ISCW

ARC/36/11/14

 

Pretoria campus in Gauteng

No

Provision of Microsoft support systems for three years

ARC/37/11/14

12/12/2014 at 10:00

Pretoria campus in Gauteng

Yes

Provision of organizational self-assessment

ARC/38/11/14

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of a Medium Pressure Liquid Chromatography System (MPLC)

ARC/39/11/14

 

Pretoria campus in Gauteng

No

Rendering of cleaning services for all Pretoria-based offices for period of 36 months

ARC/40/11/14

11/12/2014 at 10:00

Pretoria campus in Gauteng

Yes

Electron Microscope for PVVD

ARC/41/11/14

 

Pretoria campus in Gauteng

No

Building Monitoring System for fridges / freezers

ARC/42/11/14

 

Pretoria campus in Gauteng

No

Access Control and CCTV Cameras

ARC/43/11/14

18/12/2014 at 10:00

Pretoria campus in Gauteng

Yes

Small Animal Holding Cages

ARC/44/11/14

 

Pretoria campus in Gauteng

No

Supply and delivery of Diesel and Genx for ARC-OVI main campus and TADP for period of 36 months

ARC/45/11/14

 

Pretoria campus in Gauteng

No

Prefabricated rooms

ARC/46/11/14

17/12/2014 at 10:00

Pretoria campus in Gauteng

Yes

CONVERSION OF LABORATORIES AT API MAIN BUILDING INTO OFFICE SPACE

ARC/47/11/14

06/01/2015 at 10:00

Pretoria campus in Gauteng

Yes

Steam Boiler

ARC/01/01/15

 

Pretoria campus in Gauteng

No

IMPROVEMENTS OF SECURITY MEASURES (CCTV-CAMERAS, SET UP OF THE CONTROL ROOM AND GATES HOUSES)

ARC/02/02/15

26/02/2015 at 10:00

Pretoria campus in Gauteng

Yes

THE REPLACEMENT OF LOCAL AREA NETWORK SWITCHES FOR THE ARC

ARC/03/02/15

06/03/2015 at 10:00

Pretoria campus in Gauteng

Yes

Installation of Mushroom Containers

ARC/04/02/15

05/03/2015 at 10:00

Stellenbosch campus in Cape Town

Yes

The appointment of a supplier to supply and deliver 420 layer chicken nest boxes for six provinces ( KwaZulu Natal ,Free State, Limpopo ,Eastern Cape, Northern Cape, and North West).

ARC/05/02/15

19/03/2015 at 10:00

Potchefstroom in North West

Yes

Construction of two Plunge Dipping Tanks in the Eastern Cape Province (Willowvalle and Matatiele)

ARC/06/03/15

 

East London campus in Eastern Cape

No

Appointing an events management company for three years

ARC/08/06/15

 

Pretoria campus in Gauteng

No

Waste Management and Atmospheric Emission licenses.

ARC/09/06/15

 

Pretoria campus in Gauteng

No

Public Relations/communications agency to assist the ARC with corporate communication

ARC/10/07/15

 

Pretoria campus in Gauteng

No

IAE Generators

ARC/11/07/15

 

Pretoria campus in Gauteng

No

Gardening and cleaning services

ARC/12/07/15

15/10/2015 at 10:00

Pretoria campus in Gauteng

Yes

Laboratory for Avian influenza over a period of 36 months

ARC/13/08/15

 

Pretoria campus in Gauteng

No

Test kits for the Bovine spongiform encephalopathy laboratory for three years

ARC/14/08/15

 

Pretoria campus in Gauteng

No

Travel and Accommodation services for the ARC for three years.

ARC/15/09/15

 

Pretoria campus in Gauteng

No

Employee Wellness Programme for three years

ARC/16/09/15

 

Pretoria campus in Gauteng

No

Provisioning of E-Journals over a period of three years

ARC/17/09/15

 

Pretoria campus in Gauteng

No

Leasing, supply and maintenance of the ICT Desktop equipment to the ARC.

ARC/18/09/15

13/10/2015 at 10:00

Pretoria campus in Gauteng

Yes

Refurbishment of glasshouses at the ARC-Roodeplaat

ARC/20/10/15

30/10/2015 at 10:00

Pretoria campus in Gauteng

Yes

Supply and commissioning of an inductively optical emission spectrometer at ARC.

ARC/21/10/15

 

Pretoria campus in Gauteng

No

Supply and commissioning of a mass spectrometer and HPLC at ARC.

ARC/22/10/15

 

Pretoria campus in Gauteng

No

Supply, install and configuration of audio visual equipment at ARC Roodeplaat.

ARC/23/10/15

 

Pretoria campus in Gauteng

No

Electrical services for the connection of an existing standby generator with the substation

ARC/24/10/15

 

Pretoria campus in Gauteng

No

Supply, installation of furniture at a multi-purpose training centre at ARC Roodeplaat.

ARC/25/11/15

 

Pretoria campus in Gauteng

No

Re-configuration of office space at the ARC-Central Office

ARC/26/11/15

27/11/2015 at 10:00

Pretoria campus in Gauteng

Yes

Forensic and Imaging services for the ARC

ARC/27/11/15

 

Pretoria campus in Gauteng

No

Laboratory machine

ARC/28/11/15

 

Pretoria campus in Gauteng

No

Print, supply and install the ARC Signage

ARC/29/11/15

 

Pretoria campus in Gauteng

No

Generators

ARC/30/11/15

 

Pretoria campus in Gauteng

No

Gardening services

ARC/31/11/15

04/12/2015 at 10:00

Pretoria campus in Gauteng

Yes

Application trial of bio control agent in liquid and cranular formulation against the Alien invader

ARC/32/11/15

 

Pretoria campus in Gauteng

No

Supply, deliver and installation of field spectroradiometer at ARC-ISCW

ARC/33/11/15

 

Pretoria campus in Gauteng

No

Supply, delivery and installation of new compact, bench mounted simultaneous inductively plasma

ARC/34/11/15

 

Pretoria campus in Gauteng

No

Real-Time PCR Platform

ARC/35/12/15

 

Pretoria campus in Gauteng

No

Supply, delivery, installation and commissioning of ultra-centrifuge for ARC-OVI

ARC/36/12/15

 

Pretoria campus in Gauteng

No

Insurance brokering Services

ARC/01/01/16

 

Pretoria campus in Gauteng

No

Debt collection

ARC/03/02/16

 

Pretoria campus in Gauteng

No

Video Conference

ARC/04/02/16

16/03/2016 at 10:00

Pretoria campus in Gauteng

Yes

Supply, deliver and installation of ARC Sense Earth Observation systems instruments

ARC/05/02/16

 

Pretoria campus in Gauteng

No

Supply, deliver and installation of Palisade Fence

ARC/06/02/16

04/03/2016 at 10:00

Pretoria campus in Gauteng

Yes

Upgrading of Infrastructure substation, dam substation and DB.

ARC/07/02/16

04/03/2016 at 10:00

Stellenbosch campus in Cape Town

Yes

Occupational Health and Medical Surveillance for a period of 36 months.

ARC/08/02/16

 

Pretoria campus in Gauteng

No

Health Care Services

ARC/09/04/16

 

Pretoria campus in Gauteng

No

Tractors for Potchefstroom

ARC/10/05/16

 

Potchefstroom in North West

No

Garden Services for Potchefstroom for three years

ARC/11/05/16

 

Potchefstroom in North West

No

Security Service for three years

ARC/12/06/16

12/09/2016 at 10:00

Pretoria campus in Gauteng

Yes

Security Service for three years

ARC/12/06/16

13/09/2016 at 10:00

Rustenburg campus in North West

Yes

Security Service for three years

ARC/12/06/16

14/09/2016 at 10:00

Stellenbosch campus in Cape Town

Yes

Supply, deliver and installation of 39 Mushroom units within the greater JHB municipality

ARC/13/06/16

01/07/2016 at 10:00

Pretoria campus in Gauteng

Yes

Renovation of Building AI in VOPI

ARC/13/07/16

15/09/2016 at 10:00

Pretoria campus in Gauteng

Yes

Diaries, desk calendars, year planners, filo fax and filo fax inserts

ARC/14/08/16

 

Pretoria campus in Gauteng

No

Intellectual Property Audits

ARC/15/08/16

 

Pretoria campus in Gauteng

No

Vehicle tracking system

ARC/16/09/16

 

Pretoria campus in Gauteng

No

Steam Generator

ARC/17/10/16

 

Pretoria campus in Gauteng

No

Laboratory Equipment

ARC/18/10/16

 

Pretoria campus in Gauteng

No

Installation of new Barbes Wire Fence

ARC/19/10/16

01/12/2016 at 10:00

Nelspruit campus in Mpumalanga

Yes

Installation of new security fence

ARC/20/10/16

02/12/2016 at 10:00

Nelspruit campus in Mpumalanga

Yes

Project Management for reconfiguration of office space

ARC/21/11/16

18/11/2016 at 10:00

Pretoria campus in Gauteng

Yes

Renovation of building A7 in VOPI

ARC/22/11/16

17/02/2017 at 10:00

Pretoria campus in Gauteng

Yes

Data Storage Upgrade

ARC/23/12/16

20/12/2016 at 10:00

Pretoria campus in Gauteng

Yes

Nuclear Extraction System

ARC/24/12/16

 

Pretoria campus in Gauteng

No

X-Ray Diffraction Instrument

ARC/25/01/17

 

Pretoria campus in Gauteng

No

Veeam Availability Solution

ARC/26/01/17

 

Pretoria campus in Gauteng

No

High Speed Centrifuge

ARC/27/01/17

 

Pretoria campus in Gauteng

No

Refurbishment of glasshouses at the ARC-Roodeplaat

ARC/28/01/17

16/02/2017 at 10:00

Pretoria campus in Gauteng

Yes

Bioreactor, supply and install microbial bioreactor

ARC/29/02/17

 

Pretoria campus in Gauteng

No

Multimode Reader

ARC/30/02/17

 

Pretoria campus in Gauteng

No

Replacing a cooling system in the glasshouse in Stellenbosch

ARC/31/02/17

02/03/2017 at 10:00

Stellenbosch campus in Cape Town

Yes

Security Fence in Infruitec

ARC/32/02/17

31/03/2017 at 10:00

Stellenbosch campus in Cape Town

Yes

Digital Plant Phenomics Infrastructure

ARC/33/03/17

 

Pretoria campus in Gauteng

No

Security Services in East London

ARC/34/03/17

27/03/2017 at 10:00

East London campus in Eastern Cape

Yes

Support & Maintenance of the Microsoft Dynamics

ARC/01/04/17

 

Pretoria campus in Gauteng

No

Design and place the adverts in the newspapers & conduct the administration psychometric assessment

ARC/02/04/17

31/05/2017 at 10:00

Pretoria campus in Gauteng

Yes

Linkedin to advertise positions

ARC/03/05/17

 

Pretoria campus in Gauteng

No

Professional Engineering Services

ARC/04/06/17

 

Pretoria campus in Gauteng

No

Agricultural Technology Franchising

ARC/05/06/17

 

Pretoria campus in Gauteng

No

Sequencing, genotyping & Potical Mapping

ARC/06/07/17

 

Pretoria campus in Gauteng

No

Design and place the adverts in the print media

ARC/07/08/17

05/10/2017 at 10:00

Pretoria campus in Gauteng

Yes

Installation of Plastic Tunnel at Harleem

ARC/08/08/17

22/09/2017 at 10:00

Stellenbosch campus in Cape Town

Yes

Building of Complex at Haarleem

ARC/09/08/17

06/11/2017 at 10:00

Stellenbosch campus in Cape Town

Yes

Improvement of security measures at the central office

ARC/10/08/17

10/11/2017 at 10:00

Pretoria campus in Gauteng

Yes

Renovation of the central office on the ground floor

ARC/11/08/17

11/11/2017 at 10:00

Pretoria campus in Gauteng

Yes

Develop and Provide an electronic recruitment system

ARC/12/08/17

13/11/2017 at 10:00

Pretoria campus in Gauteng

Yes

ARC organizational and 360 degree assessments

ARC/13/09/17

07/03/208 at 10:00

Pretoria campus in Gauteng

Yes

Supply, delivery and installation of an automated bio-methane potential test system at ARC-Silverton

ARC/14/09/17

17/10/2017 at 10:00

Pretoria campus in Gauteng

Yes

Replacement of cooling pipes at cooling facility at infruitec

ARC/15/09/17

 

Stellenbosch campus in Cape Town

No

SYNC Temperature control system of existing RA rooms to 12 CA rooms and existing CA Control systems

ARC/16/09/17

 

Stellenbosch campus in Cape Town

No

Supply, deliver, installation and commissioning of an export simulation of cold room

ARC/17/09/17

09/11/2017 at 10:00

Pretoria campus in Gauteng

Yes

Automic absorption spectrometer

ARC/18/09/17

 

Pretoria campus in Gauteng

No

Commercialization of the ARC's research and development

ARC/19/09/17

 

Pretoria campus in Gauteng

No

Supply, Delivery, construction and commissioning of 24 broiler houses (2500 broilers each) and 6 layer houses (5000 layers each)

ARC/20/10/17

26/10/2017 at 10:00

Pretoria campus in Gauteng

Yes

Cooling system and PVC Pipes

ARC/21/10/17

 

Stellenbosch campus in Cape Town

No

Solar Power System

ARC/22/10/17

08/11/2017 at 10:00

Stellenbosch campus in Cape Town

Yes

NIR Based Analytical Tool

ARC/23/10/17

08/11/2017 at 12:00

Stellenbosch campus in Cape Town

Yes

Thatch Roof overhauling

ARC/24/10/17

09/11/2017 at 10:00

Stellenbosch campus in Cape Town

Yes

Upgrading of experimental cellar

ARC/25/10/17

09/11/2017 at 12:00

Stellenbosch campus in Cape Town

Yes

Upgrading of commercial cellar

ARC/26/10/17

10/11/2017 at 10:00

Stellenbosch campus in Cape Town

Yes

Supply and install boiler

ARC/27/10/17

 

Irene campus in Gauteng

No

Supply and install fencing

ARC/28/10/17

23/11/2017 at 10:00

Irene campus in Gauteng

Yes

Supply and install freeze dryer

ARC/29/10/17

23/11/2017 at 12:00

Irene campus in Gauteng

Yes

Supply and install fire detectors

ARC/30/10/17

 

Irene campus in Gauteng

No

FMD Factory Upgrade-Disposable

ARC/31/10/17

21/11/2017 at 10:00

Pretoria campus in Gauteng

Yes

Renovation of replacement of cooling system in glasshouses

ARC/32/11/17

15/12/2017 at 10:00

Pretoria campus in Gauteng

Yes

Pump house at Bien Donne

ARC/33/12/17

08/02/2018 at 10:00

Stellenbosch campus in Cape Town

Yes

Procurement and replacement of network switches

ARC/34/12/17

07/02/2018 at 10:00

Pretoria campus in Gauteng

Yes

Video conference expansion at central office

ARC/35/12/17

14/02/2018 at 10:00

Pretoria campus in Gauteng

Yes

Procurement and replacement of the check point firewall

ARC/36/12/17

15/02/2018 at 10:00

Pretoria campus in Gauteng

Yes

Cleaning Services for all the Pretoria based offices for a period of three years

ARC/37/17/17

05/02/2018 at 10:00

Pretoria campus in Gauteng

Yes

Non-Intellectual Property

ARC/38/12/17

12/02/2018 at 10:00

Pretoria campus in Gauteng

Yes

Upgrading of Tunnel Structure

ARC/39/12/17

09/02/2018 at 10:00

Stellenbosch campus in Cape Town

Yes

Upgrading of Nietvoorbij Main Building

ARC/40/12/17

09/02/2018 at 12:00

Stellenbosch campus in Cape Town

Yes

Refurbishment of main building

ARC/41/01/18

01/03/2018 at 10:00

Pretoria campus in Gauteng

Yes

Fencing for Robertson Farm

ARC/42/01/18

08/02/2018 at 10:00

Stellenbosch campus in Cape Town

Yes

Intellectual Property

ARC/43/01/18

12/02/2018 at 12:00

Pretoria campus in Gauteng

Yes

Construction of container-based agro processing facilities in Hammanskraal

ARC/44/02/18

15/10/2018 at 10:00

Pretoria campus in Gauteng

Yes

Internal Audit and Advisory Services

ARC/01/04/18

 

Pretoria campus in Gauteng

No

Internal Audit and Advisory Services (re-advertisement)

ARC/01/04/18

 

Pretoria campus in Gauteng

No

Animal Holdings Facility at the Transboundary Animal Dieses Facility of OVI

ARC/02/05/18

 

Pretoria campus in Gauteng

No

Security Guarding Services for Western Cape and Port Elizabeth Campuses

ARC/03/06/18

09/07/2018 at 09:00

Pretoria campus in Gauteng

Yes

Electrical Services for a period of three years

ARC/04/07/18

17/09/2018 at 10:00

Pretoria campus in Gauteng

Yes

Plumbing Services for a period of three years

ARC/05/07/18

17/09/2018 at 12:00

Pretoria campus in Gauteng

Yes

Lab Equipment: Rotor Gene Q HRM

ARC/06/07/18

21/08/2018 at 10:00

Nelspruit campus in Mpumalanga

Yes

Tractors

ARC/07/07/18

15/08/2018 at 10:00

Bethlehem campus in North West

Yes

Supply and install the Fence around Nietvoorbij

ARC/08/07/18

20/09/2018 at 10:00

Stellenbosch campus in Cape Town

Yes

Credit Management Specialist

ARC/09/08/18

 

Pretoria campus in Gauteng

No

Replacing the cooling pipes at Infruitec

ARC/10/08/18

25/09/2018 at 10:00

Stellenbosch campus in Cape Town

Yes

Travel, accommodation and conference services

ARC/11/09/18

03/10/2018 at 10:00

Pretoria campus in Gauteng

Yes

Employee Wellness Programme

ARC/12/09/18

 

Pretoria campus in Gauteng

No

Supply and install the fence at VOP

ARC/13/09/18

12/10/2018 at 10:00

Pretoria campus in Gauteng

Yes

Construction of an Agro-Processing facility in Nelspruit

ARC/14/09/18

16/10/2018 at 10:00

Pretoria campus in Gauteng

Yes

Flow Cytometer

ARC/15/09/18

22/10/2018 at 10:00

Pretoria campus in Gauteng

Yes

Refrigerated cross-border transport and clearing of cargo, including payment of the import

ARC/16/09/18

 

Pretoria campus in Gauteng

No

Journal Subscription for three years

ARC/17/10/18

 

Pretoria campus in Gauteng

No

Renovating of glass house, green house tunnels and net structures for the insect mass rearing

ARC/18/10/18

24/10/2018 at 10:00

Pretoria campus in Gauteng

Yes

Upgrading of tunnel complex on Nietvoorbij premises

ARC/19/10/18

19/11/2018 at 10:30

Stellenbosch campus in Cape Town

Yes

Supply and Installation: Air Compressor with PSA Nitrogen Generator

ARC/20/10/18

16/11/2018 at 10:30

Stellenbosch campus in Cape Town

Yes

Digital Plant Phenomics Solution

ARC/21/10/18

 

Pretoria campus in Gauteng

No

Support and maintenance of the AX Microsoft Dynamics

ARC/22/10/18

 

Pretoria campus in Gauteng

No

Replacement of Electrical CA Boxes and Sync and CA Control Systems

ARC/23/10/18

19/11/2018 at 12:30

Stellenbosch campus in Cape Town

Yes

Supply and Installation: 90kw cool chiller system for cooling unit

ARC/24/10/18

20/11/2018 at 10:30

Stellenbosch campus in Cape Town

Yes