08 June 2017 - NW1553
Schmidt, Adv H to ask the Minister of Mineral Resources
Whether, with reference to the commitment made by him during the Debate on Vote 29 – Mineral Resources, Appropriation Bill, in Parliament on 16 May 2017, he has determined the date on which the revised Mining Charter will be released; if not, (a) why not and (b) by when will the release date be determined; if so, what are the relevant details?
Reply:
The Department has finalised the consultation process on the Mining Charter, 2017 to be published in the Government Gazette within the next coming weeks.
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
08 June 2017 - NW477
Alberts, Mr ADW to ask the Minister of Mineral Resources
(1) Whether, with reference to his reply to question 1155 on 5 May 2016, any of the directors of Oakbay accompanied him to Switzerland to facilitate the transaction between Oakbay and Glencore, as he indicated in his reply as to the purpose of his visit to Switzerland; if not, (2) whether he facilated the transaction on his own without any representative of Oakbay; if so, which role (a) he as Minister and (b) the director(s) played in negotiations with Glencore; (3) whether he personally has any direct or indirect interests in Oakbay or Optimum or had any in the past; if so, what are the relevant details?
Reply:
1.Minister was accompanied by an official from the Department.
2. I did not facilitate any transaction. I went there to promote mining and address company issues relating to investment climate in the country in general and to mitigate imminent of retrenchment
3. No, I don’t have any interest in Oakbay or Optimum
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
06 June 2017 - NW1423
Esau, Mr S to ask the Minister of Mineral Resources
(a) What number of cases of (i) fruitless, (ii) wasteful and (iii) irregular expenditure in his department were identified by the Auditor-General in the (aa) 2014-15, (bb) 2015-16 and (cc) 2016-17 financial years, (b) what was the amount in each case and (c) how much of the specified amount has been recovered in each case?
Reply:
(a) Number of cases:
(i) (aa) (bb) (cc): None
(ii) (aa) (bb) (cc): None
(iii) (aa) 1 (bb)(cc)none
(b) Amount:
(i) (aa) (bb) (cc): Falls away
(ii) (aa) (bb) (cc): Falls away
(iii) (aa) R260 000 (bb)(cc)none
(c) Recovery:
(i) ((aa) (bb) (cc): Falls away
(ii) (aa) (bb) (cc): Falls away
(iii) Not applicable no loss condoned (bb) (cc) falls away
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
06 June 2017 - NW1418
Dreyer, Ms AM to ask the Minister of Mineral Resources
What is the total amount that his department has spent on (a) travel , (b) accommodation and (c) subsistence costs for (i) him, (ii) his deputy Minister and (iii) their respective spokespersons and media liaison officers in the (aa) 2014-15, (bb) 2015-16 and (cc) 2016-17 financial years?
Reply:
(a) Travel:
(i) (aa) N/A (bb) R233 070 and (cc) 746 100 (unaudited)
(ii) (aa) R411 601 (bb) R1 152 9850 and (cc) R1 117 209(unaudited)
(iii) (aa) N/A (bb) R36 120 and (cc) R96 630 (unaudited)
(b) Accommodation:
(i) (aa) N/A (bb) R210 959.63 and (cc) 236 148.06 (unaudited)
(ii) (aa) R86 140 (bb) R260 567 and (cc) R274 288 (unaudited)
(iii) (aa) N/A (bb) R56 509.12 and (cc) R121 521.91 (unaudited)
(c) Subsistence costs:
(i) (aa) N/A (bb) N/A and (cc) 76 165 (unaudited)
(ii) (aa) R24 206.88 (bb) R124 675.04 and (cc) R118 816.65 (unaudited)
(iii) (aa) N/A (bb) N/A and (cc) R57 821.93 (unaudited)
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
06 June 2017 - NW1406
Lorimer, Mr JR to ask the Minister of Mineral Resources
(1)Why did a certain person SADPMR change the (a) recruitment policies to enable the Board to recruit staff above the level of deputy manager and (b) advertisement for the position of assistant company secretary to include a requirement for a background in education; (2) whether the specified person has any background in education; if so, what are the relevant details; (3) whether there was any business or personal relationship between the specified person and the assistant company secretary before the secretary was appointed; if so, what are the relevant details?
Reply:
1a. The new Board of Directors of the SADPMR were appointed by the Minister of Mineral Resources on 1 November 2016. In exercising their fiduciary duties, the Board called for all the company policies to be presented to them. This was done in a Board meeting on 26 January 2017. Amendments were effected to certain policies, as discussed and agreed by the Board.
1b. The Assistant Company Secretary would be required to assist with training and development and facilitation with the organisation. The incumbent would need to support the Company Secretary particularly in the areas of writing, amending and collating Board and Committee policies and procedures. This required someone with an educational background.
2. Amongst a myriad of skills and qualifications, the Chairperson of the Board worked in the Department of Education for 26 years.
3. Whilst the incumbent and the Chairperson know each other of each other, there is no business or personal relationship between them.
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
06 June 2017 - NW1227
Motau, Mr SC to ask the Minister of Mineral Resources
Whether (a) his department and (b) each entity reporting to him has (i) procured any services from and/or (ii) made any payments to the Decolonisation Foundation; if not, in each case, what is the position in this regard; if so, what (aa) services were procured, (bb) were the total costs, (cc) is the detailed breakdown of the costs, (dd) was the total amount paid, (ee) was the purpose of the payments and (ff) is the detailed breakdown of the payments in each case?
Reply:
Whether (a) his department and (b) each entity reporting to him has (i) procured any services from and/or (ii) made any payments to the Decolonisation Foundation; if not, in each case, what is the position in this regard; if so, what (aa) services were procured, (bb) were the total costs, (cc) is the detailed breakdown of the costs, (dd) was the total amount paid, (ee) was the purpose of the payments and (ff) is the detailed breakdown of the payments in each case? |
|||
(i) |
(ii) |
||
a) DPT |
DMR |
No |
No |
b)Entities |
CGS |
No |
No |
MINTEK |
No |
No |
|
SDT |
No |
No |
|
SADPMR |
No |
No |
|
MHSC |
No |
No |
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
06 June 2017 - NW1495
Marais, Mr EJ to ask the Minister of Mineral Resources
Whether (a) his department and (b) each entity reporting to him procured any services from and/or made any payments to (i) a certain company Bell Pottinger or (ii) any other public relations firms; if not, in each case, why not; if so, in each case, what (aa) services were procured, (bb) was the total cost, (cc) is the detailed breakdown of such costs, (dd) was the total amount paid, (ee) was the purpose of the payments and (ff) is the detailed breakdown of such payments?
Reply:
Whether (a) his department and (b) each entity reporting to him procured any services from and/or made any payments to (i) a certain company Bell Pottinger or (ii) any other public relations firms; if not, in each case, why not; if so, in each case, what (aa) services were procured, (bb) was the total cost, (cc) is the detailed breakdown of such costs, (dd) was the total amount paid, (ee) was the purpose of the payments and (ff) is the detailed breakdown of such payments? |
|||
(i) |
(ii) |
||
a) DPT |
DMR |
No |
No |
b)Entities |
CGS |
No |
No |
MINTEK |
No |
No |
|
SDT |
No |
No |
|
SADPMR |
No |
No |
|
MHSC |
No |
No |
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
20 April 2017 - NW928
Mackay, Mr G to ask the Minister of Mineral Resources
(1)Whether there is any position of (a) chief executive officer, (b) chief financial officer and/or (c) chief operating officer that is currently vacant in each entity reporting to him; if so, (i) how long has each specified position been vacant and (ii) what is the reason for each vacancy; (2) have the vacancies been advertised; if so, (a) were interviews done and (b) on what date will the vacancies be filled; (3) (a) what is the total number of persons who are currently employed in the specified positions in an acting capacity, (b) for what period has each person been acting in each position and (c) has any of the specified persons applied for the positions?
Reply:
1. |
2. |
3 |
||
ii)Entities |
CGS |
(a)CEO post is Vacant (i)May 2015 (ii)Previous incumbent resigned |
(a)Yes, (b) but no suitable candidate was identified. |
(a)1 person (b)16 and 4 months respectively (c)Not applicable |
MINTEK |
No vacant positions |
|||
SDT |
No vacant positions |
|||
SADPMR |
(a)CEO post is vacant (i)1 June 2016 (ii) Contract lapsed (b) CFO post is vacant (i)14 May 2016 (ii)Resignation |
(a)Firstly advertised on 15/05/2016 Re-advertised: 20/02/2017 Closing date was 03/03/2017 (a)Advert: 14/02/2016 Re-advertised: 15/01/2017 Closing date was 27/01/2017 |
(a) Two (2) employees are currently employed in an acting capacity, (1) Acting Chief Executive Officer (1) Acting Chief Financial Officer. (b) Acting Chief Executive Officer: the first one acted from 01/06/2016 – 30/08/2016 The second one acted from 01/09/2016 – 30/11/2016 and was re-appointed again from 01/12/2016 – 31/01/2017. The third acted from 01/02/2017 to date. Acting Chief Financial Officer: first one acted from 21/04/2016 - 20 /06/2016 and 31/06/2016 – 31/07/2016 Reappointed on 14 /12/ 2016 to 31/01/2017 and 01/03/2017 to 31 March 2017 Another acting was appointed on 11/10/2016 to 30/11/2016 (c) Acting Chief Executive Officer, yes. Acting Chief Executive Officer, yes. |
|
MHSC |
No vacant positions |
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
07 April 2017 - NW695
Grootboom, Mr GA to ask the Minister of Mineral Resources
(1) Did (a) his department or (b) any entity reporting to him participate in the Dialogue with the President: Unpacking of the SONA 2017 on Radical Economic Transformation Implementation event hosted at the Oyster Box Hotel in Umhlanga, Durban, on 25 February 2017; if so, what amount was spent in each case; (2) did (a) his department or (b) any entity reporting to him participate in the auction of the (i) souvenirs or (ii) personal belongings of the President of the Republic, Mr Jacob G Zuma; if so, (aa) which items were purchased and (bb) at what cost, in each case?
Reply:
1.Did (a) his department or (b) any entity reporting to him participate in the Dialogue with the President: Unpacking of the SONA 2017 on Radical Economic Transformation Implementation event hosted at the Oyster Box Hotel in Umhlanga, Durban, on 25 February 2017; if so, what amount was spent in each case;
2. did (a) his department or (b) any entity reporting to him participate in the auction of the (i) souvenirs or (ii) personal belongings of the President of the Republic, Mr Jacob G Zuma; if so, (aa) which items were purchased and (bb) at what cost, in each case? |
|||
|
|
1. |
2. |
|
|
No |
(aa) None (bb) Not applicable |
|
CGS |
No |
(aa) None (bb) Not applicable
|
MINTEK |
No |
(aa) None (bb) Not applicable |
|
SDT |
No |
(aa) None (bb) Not applicable |
|
SADPMR |
No |
(aa) None (bb) Not applicable |
|
MHSC |
No |
(aa) None (bb) Not applicable |
05 April 2017 - NW928
Mackay, Mr G to ask the Minister of Mineral Resources
(1)Whether there is any position of (a) chief executive officer, (b) chief financial officer and/or (c) chief operating officer that is currently vacant in each entity reporting to him; if so, (i) how long has each specified position been vacant and (ii) what is the reason for each vacancy; (2) have the vacancies been advertised; if so, (a) were interviews done and (b) on what date will the vacancies be filled; (3) (a) what is the total number of persons who are currently employed in the specified positions in an acting capacity, (b) for what period has each person been acting in each position and (c) has any of the specified persons applied for the positions?
Reply:
(1.1) Vacant Positions
- Chief Executive Officer
- Chief Financial Officer
(1.2) Vacant from
(a) Chief Executive Officer - 01/06/2016
(b) Chief financial Officer - 14/05/2016
(1.3) Reasons
(a) Chief Executive Officer, End of Contract
(b) Chief Financial Officer, Resignation
(2.1) Date of advert
Post |
Date Advertised |
Closing date |
|
(a) |
Chief Executive Officer |
Advert: 15/05/2016 Re-advertised: 20/02/2017 |
27/05/2016 03/03/2017 |
(b) |
Chief Financial Officer |
Advert: 14/02/2016 Re-advertised: 15/01/2017 |
29/02/2016 27/01/2017 |
(3.1) Acting CEO’s and duration
(a) Ms Linda Nkhumishe (01 June 2016 to 30 August 2016)
(b) Mr Cecil Khosa (01 September 2016 to 30 November 2016)
(01 December 2016 to 31 January 2017)
(c) Mr Xolile Mbonambi (01 February 2017 to date)
(3.1.2) Acting CFO’s and duration
(a) Mr Sibusiso Mandlazi (01 March 2017 to 31 March 2017)
(14 December 2016 to 31 January 2017)
(31 June 2016 to 31 July 2016)
(21 April 2016 to 20 June 2016)
(b) Ms Busisiwe Mahlungulu (11 October 2016 to 30 November 2016)
(C) Mr Xolile Mbonambi applied for CEO post and Mr Sibusiso Mandlazi, applied for the CFO position.
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
03 April 2017 - NW459
Cassim, Mr Y to ask the Minister of Mineral Resources
Whether his department procured any services from and/or made any payments to (a) Mr Mzwanele Manyi, (b) the Progressive Professionals Forum, (c) the Decolonisation Fund and/or (d) the Black Business Council; if not, in each case, why not; if so, what (i) services were procured, (ii) was the total cost, (iii) is the detailed breakdown of such costs, (iv) was the total amount paid, (v) was the purpose of the payments and (vi) is the detailed breakdown of such payments in each case?
Reply:
a) No (b) No (c) No and/or (d) No; because there was no contractual obligation to pay nor services procured in both (a)-(d),
b) (i)(ii) (iii) (iv)(v) (vi) Falls away
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
31 March 2017 - NW478
Alberts, Mr ADW to ask the Minister of Mineral Resources
Whether he, with reference to his reply to question 1155 on 5 May 2016, (a) previously or (b) since he intervened in the sale of the Glencore mine, took similar actions to rescue mining companies and to retain jobs; if not, why did he find it expedient to intervene in this instance by virtue of his position as Minister of Mineral Resources; if so, what are the relevant details, with specific reference to (a) the companies involved, (b) his actions and (c) the outcome of the actions?
Reply:
There are several interventions that can be taken to save jobs depending on the challenges faced by the company. These interventions may include but not limited to interventions as declaration signed by the stakeholders.
Sale of assets might be considered if jobs are to be saved and two parties agrees. This intervention will always be persued if there is high probability that jobs will be saved.
I revived the Mineral and Petroleum Board (MPB) with a mandate to focus on section 52 notices
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
13 March 2017 - NW270
Schmidt, Adv H to ask the Minister of Mineral Resources
(1) Whether mining permits have been issued for mining activities on the (a) Wintersveld 417 KS, (b) Jagdlust 418 KS and (c) Zeekoeigat 421 KS farms located next to the R37 road between Burgersfort and Polokwane in Limpopo; if not, in each case, is he aware of the illegal mining activities taking place on each of the specified farms; if so, (i) to whom were mining rights issued and (ii) for which minerals respectively; (2) what steps will he take in line with the court order handed down by the Gauteng High Court in case 46483/206 to ensure that (a) he and (b) his department act in accordance with the responsibilities of the State being the custodian of all mineral resources on behalf of the people of South Africa to prevent illegal mining on the specified farms?
Reply:
1. (a)(b)(c)All mining permits (processing of dumps) that were issued over these properties have lapsed, however, two mining rights have been granted and issued respectively.
(i)(ii) Samancor Chrome – granted for Chrome
Lebowa Platinum Mines (Bokoni Platinum Mines) – Issued for All minerals on different reef/seam
2. The Department is working with law enforcement agencies and have also opened cases at the local police station. According to the latest developments, a lot of machineries were confiscated / impounded on site. The Department will continue to work with law enforcement agencies hoping that the perpetrators will be successfully prosecuted. The Department has served notices to most perpetrators as part of administrative enforcement but furthermore opened cases as part of criminal enforcement.
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
13 March 2017 - NW363
Terblanche, Ms JF to ask the Minister of Mineral Resources
What is the (a) make, (b) model, (c) price and (d) date on which each vehicle was purchased for use by (i) him and (ii) his deputy (aa) in the (aaa) 2014-15 and (bbb) 2015-16 financial years and (bb) since 1 April 2016?
Reply:
i. Minister Office
(aaa) 2014/15 Fin Year |
(bbb) 2015-16 Fin year |
(bb) since 1 April 2016 |
(a) N/A |
(a)N/A |
(a) Mercedes Benz E400 |
(b) N/A |
(b) N/A |
(b) 2017 model |
(c) N/A |
(c) N/A |
(c) R1,2 mil |
(d) N/A |
(d) N/A |
(d)February 2017 |
ii. Deputy Minister Office
(aaa) 2014/15 Fin Year |
(bbb) 2015-16 Fin year |
(bb) since 1 April 2016 |
(a) N/A |
(a) N/A |
(a) Porsche Cayanne GTS |
(b) N/A |
(b) N/A |
(b) 2017 model |
(c) N/A |
(c N/A |
(c) R1,3 mil |
(d) N/A |
(d) N/A |
(d) November 2016 |
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
13 March 2017 - NW183
Schmidt, Adv H to ask the Minister of Mineral Resources
(1) How many mining companies do not have sufficient resources for rehabilitation activities? (2) What steps are being taken to ensure that mining companies comply with the statutory requirements for rehabilitation activities? (3) What steps will his department take against mining companies that do not comply with the law?
Reply:
1. 130
2. The Department issues Pre-compliance Notice in terms of section 31 of NEMA following review of report and outcome of the compliance inspections
3. The Department will issue compliance Notice as part of administrative enforcement. However, if non-compliance persist, criminal enforcement will be persued.
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
27 February 2017 - NW182
Schmidt, Adv H to ask the Minister of Mineral Resources
(1)How many mining companies have been granted permission to (a) access and/or (b) use funds from their statutorily required rehabilitation funds to conduct concurrent rehabilitation in the (i) 2013-14, (ii) 2014-15 and (iii) 2015-16 financial years; (2) What criteria did his department use to allow mining companies permission to access the specified rehabilitation funds to ensure concurrent rehabilitation?
Reply:
No mines have been granted access to their rehabilitation fund
- Please see (1) above
Approved/Not Approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2017
20 December 2016 - NW2577
Mokoena, Mr L to ask the Minister of Mineral Resources
(a) How does his department intend to deal with zama-zamas and (b) how will the outputs of this plan be measured?
Reply:
(a) The department has established provincial illegal mining stakeholder forums in Mpumalanga, Free State, Gauteng and Northern Cape Provinces. Various stakeholders such as government departments (i.e. National, Provincial and local government), law enforcement agencies, mining companies, unions and associations, municipalities, certain SOEs, refineries and organized communities participate in these forums. Physical activities such as closure of open mine holes, arrests, prosecutions and convictions, deportations, disruptive operations and encouragement of land use/occupation have been conducted which led to a significant decrease of this practice. The illegal mining space is decreasing which result to illegal miners fighting for the remaining limited space and resorting to other crimes.
(b) The above mentioned Provincial Stakeholder Forums have action plans of which the output is measured against the action plan. Since the establishment of the Provincial Illegal Mining Stakeholder Forums progress has been made on combating illegal mining activities. The following has been achieved through the Provincial Illegal Mining Stakeholder Forums:
- Illegal miners were arrested and continued to be arrested and convicted.
- Illegal imigrants who are also involved in illegal mining activities were arrested and continued to be arested and deported.
- Mining permits have been issued to mining companies to conduct legitimate mining in areas that were infested with illegal mining.
- Most of the open holes and open shafts where illegal mining was taking place have been sealed, rehabilitated or closed.
- Land where illegal mining was taking place has been rehabilitated and used for development.
- People were employed through rehabilitation and shaft sealing projects.
- Conviction rates have increased from 2 months to 8 years.
- Reef outcrop and sub-oucrop areas where illegal mining was taking place has been succesfully mined and continued to be mined by legitimate mining companies.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2016
15 December 2016 - NW2567
Mokoena, Mr L to ask the Minister of Mineral Resources
(a) How many persons in his department are employed in senior management with a special salary level and (b) what (i) amount has each person been paid, (ii) is the basis for each specified salary level and (iii) are the further relevant details of each appointment?
Reply:
(a) The Department employed only one official at the senior management level with a special salary level (b) (i) the amount paid to the official is R1, 420,944 per annum (ii) The official possesses more than fifteen years experience in the public service and was already in this salary level during the time of her transfer to the Department (iii) based on experience and competencies the official was laterally transferred to serve in the current position.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2016
15 December 2016 - NW2691
Lorimer, Mr JR to ask the Minister of Mineral Resources
(1)Did he appoint a certain person (name furnished) to the position of acting deputy director-general of his department; if not, who did he appoint in the specified position; if so, (a) when did the specified appointment take place and (b) what are the full relevant details of the process followed to appoint the specified person to the position; (2) has he taken any steps to fill the vacant position; if not, why not; if so, (a) by what date will the specified position be filled and (b) what are the further relevant details in this regard?
Reply:
1. Yes, (a) 1 November 2016 (b) The official was appointed to act in terms of chapter 3 of the Senior Management Services (SMS) Handbook.
2. No. The position is not vacant. (a) N/A (b) N/A.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2016
15 December 2016 - NW2633
Alberts, Mr ADW to ask the Minister of Mineral Resources
(1)(a) How long does it usually take him and his department to give approval for the transfer of exploration and mining rights and (b) what has been the average period for finalising the transfer of the specified rights over the past five years; (2) (a) how long did it take to approve the transfer of the mining and mineral rights from Optimum to Tegeta and (b) on what date (i) was the request of Tegeta received and (ii) was approval given for the transfer of the mining and mineral rights; (3) (a) why is there a difference between the specified average transfer period and the transfer period of Optimum to Tegeta and (b) who requested that the transfer should be expedited; (4) whether he had discussions and/or written communication with Tegeta and Optimum concerning expediting the transfer of the mining and mineral rights; if not, on what basis did he and his department make the decision to expedite the transfer; if so, (a) on what date, (b) where and (c) with whom did they communicate?
Reply:
(1)(a) There is no timeframe in the legislation for the processing of applications for the transfer of a right/interest in a right.
(b) On average three to six months
(2)(a) Three months and two weeks
2(b)(i) 15 December 2015
(ii) 29 March 2016
3(a) There is no difference
(b) There was no request to expedite this application.
4 Please see 3(a) above. The application was not handled differently by the Department
Approved/not approved
Mr MJ Zwane
Minister of Mineral Resources
Date Submitted:-……………/………………/2016
15 December 2016 - NW2570
Mbatha, Mr MS to ask the Minister of Mineral Resources
(a) What is the total number of consultants that his department contracted from 1 September 2015 to 1 October 2016, (b) what services did the consultants render and (c) what was the total cost to his department?
Reply:
(a) Three.
(b) Business and advisory services (audit, research reports and project management).
(c) Total contract amount is R1, 148,069.88
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2016
15 December 2016 - NW2507
Carter, Ms D to ask the Minister of Mineral Resources
(1)Whether he appointed or overseen the appointment of a certain person in his department (name and details furnished); if not, what is the position in this regard; if so, (a) what process was followed in the appointment of the specified person and (b) what are the further relevant details; (2) can he provide Ms D Carter with a copy of the (a) advertisement for the position, (b) list of all persons who applied for the position, (c) list of all persons who were shortlisted and (d) interviews score sheets; (3) whether the appointment of the specified persons was approved by Cabinet as required by Public Service legislation; if not, why not; if so, what are the relevant details? NW2921E
Reply:
1. Minister of Mineral Resources has not appointed or overseen an appointment of any person in the Department.
2. Not Applicable.
3. Not Applicable.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/2016
21 November 2016 - NW2231
Lorimer, Mr JR to ask the Minister of Mineral Resources
(1)Whether, with reference to his reply to question 1808 on 27 September 2016, the area of the intended Yzermyn underground coal mine is protected under the National Environmental Management: Protected Areas Act, Act 57 of 2003, as amended; if so, what are the relevant details; (2) why was a mining right for the specified mine issued on 28 June 2016, despite the recommendation contained in the biodiversity baseline and impact assessment report compiled for WSP Environmental by the Natural Scientific Services that the specified mining right should not be issued due to the impacts of the proposed mining project; (3) (a) how many mining rights have been issued in each province for the specified mining projects where environmental impact reports recommended against the issuing of such rights (i) in the (aa) 2013-14, (bb) 2014-15 and (cc) 2015-16 financial years and (ii) since 1 April 2016 and (b) what are the (i) names of the mining projects and (ii) dates on which the specified rights were issued; (4) whether mining has commenced at the mining site; if not, on what date will it commence; if so, on what date did it commence? NW2561E
Reply:
1. The question must be directed to the Department of Environmental Affairs as the custodian of NEMPA.
2. The Department considered comments and authorisation to be issued by other organs of state in that potential impacts will be constantly monitored and managed in concurrence with other organs of state through prescribed conditions of authorisations and monthly, quarterly to annual reporting by the right holder
3. a)
- None
NB: If the recommendations suggest that the proposed operation will pose unacceptable pollution, ecological degradation or damage to the environment, such a right will not be issued.
4. Not yet commenced, in terms of section 25(b) of the MPRDA Act 28 of 2008, the holder must commence with mining operations within one year from the date on which the mining right becomes effective in terms of section 23 (5) or such extended period as the minister may authorise.
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
QUESTION NUMBER: 1808
DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: 09 September 2016
INTERNAL QUESTION PAPER NUMBER:
1808. Adv H C Schmidt (DA) to ask the Minister of Mineral Resources:
(1) Whether Atha-Africa Ventures has been issued with (a) a prospecting and/or (b) mining right and/or permit in Mabola, a proclaimed protected environment area close to Wakkerstroom in the Dr Pixley Ka Isaka Seme Local Municipality in Mpumalanga; if not, what is the position in this regard; if so,
(2) whether the relevant (a) Environmental Impact Assessment and/or (b) Environmental Management Programme was undertaken before the specified rights and/or permits were issued; if not, why not; if so, what were the (i) results of the assessments and/or programmes undertaken and (ii) details of the public participation process followed;
(3) whether the public participation process, as required in terms of the Minerals and Petroleum Resource Development Act, Act 28 of 2002, as amended, and its regulations were complied with in this regard; if not, why not; if so, what are the relevant details? NW2116E
REPLY
- A Mining Right issued on 28th June 2016.
- (b) Environment Management Progrmme (EMP) was undertaken.
- The EMP provided an assessment on the potential impacts of the proposed mining activties, which therefore also provided measures to modify, remedy, control or stop any actions, or process which may cause pollution or degradation to the environment. Measures were informed by recommendations of the specialist reports undertaken amongst others, these includes, Floral assesment specialist report, Fauna assesment specialist report, Wetland assement specialist report, Air quality assement specialist report, Hydrological assesment specilist studies (Ground and surface water).
- Public participation was undertaken with land owners, Organs of State, Interested and affected parties, through newspaper advertisement, site notices, meetings, distribution of Background information Documents (BID) to both interested and affected parties.
- Details of public participation undertaken with land owners, Organs of State, Interested and affected parties, through newspaper advertisement, site notices, meetings with minutes, distribution of Background information Documents (BID) to both interested and affected parties. All interested and affected parties, land owners, were provided with opportunity to comment or raise concerns or objections. All comments, concerns and objection were addressed in the EMP in the form of mitigation measures.
16 November 2016 - NW2231
Lorimer, Mr JR to ask the Minister of Mineral Resources
(1) Whether, with reference to his reply to question 1808 on 27 September 2016, the area of the intended Yzermyn underground coal mine is protected under the National Environmental Management: Protected Areas Act, Act 57 of 2003, as amended; if so, what are the relevant details; (2) why was a mining right for the specified mine issued on 28 June 2016, despite the recommendation contained in the biodiversity baseline and impact assessment report compiled for WSP Environmental by the Natural Scientific Services that the specified mining right should not be issued due to the impacts of the proposed mining project; (3) (a) how many mining rights have been issued in each province for the specified mining projects where environmental impact reports recommended against the issuing of such rights (i) in the (aa) 2013-14, (bb) 2014-15 and (cc) 2015-16 financial years and (ii) since 1 April 2016 and (b) what are the (i) names of the mining projects and (ii) dates on which the specified rights were issued; (4) whether mining has commenced at the mining site; if not, on what date will it commence; if so, on what date did it commence? NW2561E
Reply:
1. The question must be directed to the Department of Environmental Affairs as the custodian of NEMPA.
2. The Department considered comments and authorisation to be issued by other organs of state in that potential impacts will be constantly monitored and managed in concurrence with other organs of state through prescribed conditions of authorisations and monthly, quarterly to annual reporting by the right holder.
3. a)
• None
NB: If the recommendations suggest that the proposed operation will pose unacceptable pollution, ecological degradation or damage to the environment. such a right will not be issued.
4. Not yet commenced, in terms of section 25(b) of the MPRDA Act 28 of 2008, the holder must commence with mining operations within one year from the date on which the mining right becomes effective in terms of section 23 (5) or such extended period as the Minister may authorise.
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-..... . ........ ... ./. ... .... ......... ./2016
QUESTION NUMBER: 1808
DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: 09 September 2016
INTERNAL QUESTION PAPER NUMBER:
1808. Adv H C Schmidt (DA) to ask the Minister of Mineral Resources:
(1) Whether Atha-Africa Ventures has been issued with (a) a prospecting and/or (b) mining right and/or permit in Mabola, a proclaimed protected environment area close to Wakkerstroom in the Dr Pixley Ka lsaka Seme Local Municipality in Mpumalanga; if not, what is the position in this regard; if so,
(2) whether the relevant (a) Environmental Impact Assessment and/or (b) Environmental Management Programme was undertaken before the specified rights and/or permits were issued; if not, why not; if so, what were the (i) results of the assessments and/or programmes undertaken and (ii) details of the public participation process followed ;
(3) whether the public participation process, as required in terms of the Minerals and Petroleum Resource Development Act, Act 28 of 2002, as amended, and its regulations were complied with in this regard; if not, why not; if so, what are the relevant details? NW2116E
REPLY
1) A Mining Right issued on 28th June 2016.
2) (b) Environment Management Progrmme (EMP) was undertaken.
i) The EMP provided an assessment on the potential impacts of the proposed mining activities, which therefore also provided measures to modify, remedy, control or stop any actions, or process which may cause pollution or degradation to the environment. Measures were informed by recommendations of the specialist reports undertaken amongst others, Floral assessment specialist report, Fauna assessment specialist report, Wetland assessment specialist report, Air quality assessment specialist report, Hydrological assessment specialist studies (Ground and surface water).
ii) Public participation was undertaken with land owners, Organs of State, Interested and affected parties, through newspaper advertisement, site notices, meetings, distribution of Background Information Documents (BID) to both interested and affected parties.
3) Details of public participation undertaken with land owners, Organs of State, interested and affected parties, through newspaper advertisement, site notices, meetings with minutes, distribution of Background Information Documents (BID) to both interested and affected parties. All interested and affected parties, land owners, were provided with opportunity to comment or raise concerns or objections.
All comments, concerns and objection were addressed in the EMP in the form of mitigation measures.
10 November 2016 - NW2302
Mokgalapa, Mr S to ask the Minister of Mineral Resources
Whether any (a) internal and/or (b) external forensic reports pertaining to (i) his department and/or (ii) each entity reporting to him were completed from 1 January 2009 up to the latest specified date for which information is available; if not, in each case, why not; if so, what is the (aa) name, (bb) subject matter and (cc) date of conclusion of each of the specified forensic reports?
Reply:
Department of Mineral Resources |
aa) |
bb) |
cc) |
|
1 |
Mining permit application |
Objection of mining permit application |
11/10/2016 |
|
i)Dept |
2 |
Prospecting right application |
Unfair administrative procedures in processing mining right application |
11/10/2016 |
3 |
Corruption on the issuing of mining permit |
Investigation into allegations of corruption on the issuing of mining permit |
23/02/2016 |
|
4 |
Stationery procurement |
Irregular expenditure relating to procurement of stationery |
15/12/2015 |
|
5 |
Mining permit |
Incorrectly allocated mining permit |
13/10/2015 |
|
6 |
Mining permit application |
Irregular proof of submission of documents |
13/10/2015 |
|
7 |
Mining permit application |
Alleged conflict of interest |
13/10/2015 |
|
8 |
Fraud and corruption |
Fraudulent blasting certificates. |
28/07/2015 |
|
9 |
Mine Managers Certificate of Competency (MMCC) |
|
07/11/2014 |
|
10 |
Corruption |
Allegations of irregular appointment |
10/06/2014 |
|
11 |
Corruption |
Abuse of GG vehicles |
12/05/2014 |
|
12 |
Theft |
Theft and loss of cash |
12/03/2014 |
|
13 |
Irregular award of ICT Infrastructure |
Allegations of irregular award of ICT Infrastructure |
20/01/2012 |
|
aa) |
bb) |
cc) |
||
ii)Entities |
Council for Geoscience |
Fraud |
Recruitment process (mispresentation of qualifications) |
30/10/2014 |
Contravention of Supply Chain Management regulations |
Procurement irregularities |
28/02/2014 |
||
Contravention of Supply Chain Management Practice Note |
Collusion of suppliers |
18/05/2016 |
||
South African Diamond and Precious Metal Regulator |
Report on the contravention of ICT policy |
Misconduct |
31/12/2011 |
|
Corruption/fraud investigation |
Alleged misconduct |
24/03/2014 |
||
Disclosure of confidential information |
Misconduct |
28/05/2015 |
||
Mine Health and Safety Council |
N/A |
N/A |
N/A |
|
MINTEK |
N/A |
N/A |
N/A |
|
South African Diamond Trader |
N/A |
N/A |
N/A |
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
07 November 2016 - NW2214
Carter, Ms D to ask the Minister of Mineral Resources
Whether, in light of the approval that he granted for the transfer of funds from the Optimum Mine Rehabilitation Trust, he will provide details of (a) the request made to him, (b) the rationale which he applied in giving favourable consideration to the request, (c) details of the approval granted and (d) any conditions attached thereto; if not, why not?
Reply:
As the question relates to a matter which is now the subject of ongoing legal proceedings, the Minister is constrained from providing any details or information in this regard.
In view of the above, paragraphs (a) to (d) falls away.
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
07 November 2016 - NW2302
Mokgalapa, Mr S to ask the Minister of Mineral Resources
Whether any (a) internal and/or (b) external forensic reports pertaining to (i) his department and/or (ii) each entity reporting to him were completed from 1 January 2009 up to the latest specified date for which information is available; if not, in each case, why not; if so, what is the (aa) name, (bb) subject matter and (cc) date of conclusion of each of the specified forensic reports?
Reply:
Department of Mineral Resources |
aa) |
bb) |
cc) |
|
1 |
Mining permit application |
Objection of mining permit application |
11/10/2016 |
|
i)Dept |
2 |
Prospecting right application |
Unfair administrative procedures in processing mining right application |
11/10/2016 |
3 |
Corruption on the issuing of mining permit |
Investigation into allegations of corruption on the issuing of mining permit |
23/02/2016 |
|
4 |
Stationery procurement |
Irregular expenditure relating to procurement of stationery |
15/12/2015 |
|
5 |
Mining permit |
Incorrectly allocated mining permit |
13/10/2015 |
|
6 |
Mining permit application |
Irregular proof of submission of documents |
13/10/2015 |
|
7 |
Mining permit application |
Alleged conflict of interest |
13/10/2015 |
|
8 |
Fraud and corruption |
Fraudulent blasting certificates. |
28/07/2015 |
|
9 |
Mine Managers Certificate of Competency (MMCC) |
|
07/11/2014 |
|
10 |
Corruption |
Allegations of irregular appointment |
10/06/2014 |
|
11 |
Corruption |
Abuse of GG vehicles |
12/05/2014 |
|
12 |
Theft |
Theft and loss of cash |
12/03/2014 |
|
13 |
Irregular award of ICT Infrastructure |
Allegations of irregular award of ICT Infrastructure |
20/01/2012 |
|
aa) |
bb) |
cc) |
||
ii)Entities |
Council for Geoscience |
Fraud |
Recruitment process (mispresentation of qualifications) |
30/10/2014 |
Contravention of Supply Chain Management regulations |
Procurement irregularities |
28/02/2014 |
||
Contravention of Supply Chain Management Practice Note |
Collusion of suppliers |
18/05/2016 |
||
South African Diamond and Precious Metal Regulator |
Report on the contravention of ICT policy |
Misconduct |
31/12/2011 |
|
Corruption/fraud investigation |
Alleged misconduct |
24/03/2014 |
||
Disclosure of confidential information |
Misconduct |
28/05/2015 |
||
Mine Health and Safety Council |
N/A |
N/A |
N/A |
|
MINTEK |
N/A |
N/A |
N/A |
|
South African Diamond Trader |
N/A |
N/A |
N/A |
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
07 November 2016 - NW2230
Lorimer, Mr JR to ask the Minister of Mineral Resources
(1)(a) What were the detailed outcomes of the discussions on Mining Operation Phakisa held in 2015, (b) how long did the specified discussions take, (c) where were the specified discussions held, (d) who attended the specified discussions and (e) what did the specified discussions cost; (2) whether the specified outcomes were published in a report; if not, why not; if so, (a) on what date was the specified report published and (b) will he furnish Mr J R B Lorimer with a copy of the specified report? NW2560E
Reply:
1. The Mining Operation Phakisa is a programme of the President assigned to the Department of Planning, Monitoring and Evaluation (DPME) as a lead department with the Department of Mineral Resources providing substantive support. The DPME would be better placed to respond to these questions.
(a– (e) – Refer to (1)
2. Refer to (1)
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
25 October 2016 - NW1186
Lorimer, Mr JR to ask the Minister of Mineral Resources
(a) What are the (i) names of each of his advisors and (ii) relevant details of their (aa) professional qualifications, (bb) experience and (cc) previous employers and (b) what is the (i) job description, (ii) date of hiring and (iii) length of contract of each specified advisor?
Reply:
The Minister has two advisors, Mr Malcolm Mabaso and Advocate Zarina Kellerman (BA, LLB, FA ARb, ACI Arb, CEDR UK). Between them, the Minister’s advisors have a wealth of knowledge and experience (spanning over 25 years collectively) in the commercial, legal, governance and mining sectors. They advise Minister on the political environment, legal and regulatory environment, compliance matters and corporate and commercial sectors. Mr Mabaso is a businessman and entrepreneur, having owned and run a number of companies and Advocate Kellerman’s CV is already a matter of public record. Mr Mabaso was employed in October 2015 and Advocate Kellerman in April 2016. Both advisors’ contracts are linked to that of the Minister, with a contractual period of 3 years.
Approved/not approved
Mr MJ Zwane
Minister of Mineral Resources
Date Submitted:-……………/………………/2016
14 October 2016 - NW2098
Macpherson, Mr DW to ask the Minister of Mineral Resources
What amount did (a) his department and (b) each entity reporting to him spend on advertising on the (i) Africa News Network 7 channel, (ii) SA Broadcasting Corporation (aa) television channels and (bb) radio stations, (iii) national commercial radio stations and (iv) community (aa) television and (bb) radio stations (aaa) in the 2015-16 financial year and (bbb) since 1 April 2016?
Reply:
What amount did (a) his department and (b) each entity reporting to him spend on advertising on the (i) Africa News Network 7 channel (ii) SA Broadcasting Corporation (iii) national commercial radio stations (iv) community (aa) television (bb) radio stations (aaa) in the 2015-16 financial year (bbb) since 1 April 2016 |
|||
i)Dept |
DMR |
(aaa) (i) African News Network 7 channel – R0.0 (ii) SA Broadcasting Corporation – R0.0 (iii) National commercial radio stations – R0.0 (iv)Community television and radio stations - R 68 883.75 Total: R 68 883.75 |
(bbb) (i) African News Network 7 channel – R0.0 (ii) SA Broadcasting Corporation – R0.0 (iii) National commercial radio stations – R0.0 (iv)Community television and radio stations - R 285 923.00 Total: R 285 923.00 |
i)Entities |
CGS |
(aa)Television (i)R0 00 (ii)R0.00 (bb)Radio Stations (iii)R0.00 (iv)R0.00 |
((aa)Television (i)R0 00 (ii)R0.00 (bb)Radio Stations (iii)R0.00 (iv)R0.00 |
MINTEK |
(aa)Television (i)R0 00 (ii)R0.00 (bb)Radio Stations (iii)R0.00 (iv)R0.00 |
(aa)Television (i)R0 00 (ii)R0.00 (bb)Radio Stations (iii)R0.00 (iv)R0.00 |
|
SDT |
(aa)Television (i)R0 00 (ii)R0.00 (bb)Radio Stations (iii)R0.00 (iv)R0.00 |
(aa)Television (i)R0 00 (ii)R0.00 (bb)Radio Stations (iii)R0.00 (iv)R186.960.00 |
|
SADPMR |
(aa)Television (i)R0 00 (ii)R0.00 (bb)Radio Stations (iii)R0.00 (iv)R0.00 |
(aa)Television (i)R0 00 (ii)R0.00 (bb)Radio Stations (iii)R0.00 (iv)R0.00 |
|
MHSC |
(aa)Television (i)R0 00 (ii)R0.00 (bb)Radio Stations (iii)R0.00 (iv)R0.00 |
(aa)Television (i)R0 00 (ii)R0.00 (bb)Radio Stations (iii)R0.00 (iv)R0.00 |
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
14 October 2016 - NW2028
Bozzoli, Prof B to ask the Minister of Mineral Resources
What formal qualifications does each of his department’s (a)(i) Chief Financial Officers and/or (ii) acting Chief Financial Officers and (b)(i) Directors-General and/or (ii) acting Directors-General possess?
Reply:
(a) (i) Higher Certificate in Accountancy (IAC), B.Compt.Hons (CTA), AGA (SA)
(ii) Falls away
(b) (i) vacant
(ii) BSC Mining Engineering Degree, Mine Managers Certificate and Executive Management Programme.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
11 October 2016 - NW2063
Hadebe, Mr TZ to ask the Minister of Mineral Resources
(1) Whether each Head of Department (HOD) of his department signed a performance agreement since their appointment; if not, (a) what is the total number of HODs who have not signed performance agreements, (b) what is the reason in each case, (c) what action has he taken to rectify the situation and (d) what consequences will the specified HOD face for failing to sign the performance agreements; if so, (i) when was the last performance assessment of each HOD conducted and (ii) what were the results in each case; (2) whether any of the HODs who failed to sign a performance agreement received a performance bonus since their appointment; if not, what is the position in this regard; if so, (a) at what rate and (b) what criteria were used to determine the specified rate; (3) whether any of the HODs who signed a performance agreement received a performance bonus since their appointment; if so, (a) at what rate and (b) what criteria were used to determine the rate? NW2374E
Reply:
(1) Yes.
(2) Not applicable.
(3) No
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-.... .. ..... ..... .. / ....... ... .. .. ... ./2016
27 September 2016 - NW1683
Lorimer, Mr JR to ask the Minister of Mineral Resources
(1) With reference to his reply to question 1418 on 11 August 2016, what (a) were the terms and conditions of the specified mining permit that was not complied with that led to the specified permit’s withdrawal and (b) is the relationship between the communal property association and the original claimants to the specified portion of land; (2) whether all members of the specified communal property association are original land claimants; if not, why not; if so, what are the relevant details; (3) whether any safety inspections have been conducted on the specified operation (a) in (i) 2013, (ii) 2014 and (iii) 2015 and (b) since 1 January 2016; if not, in each case, why not; if so, in each case, what are the relevant details; (4) whether any administrative notices have been issued to Oersonskraal Mining (Pty) Ltd since the granting of the specified mining permit; if not, why not; if so, what are the relevant details; (5) what are the full relevant details regarding the value of benefits transferred by Oersonskraal Mining (Pty) Ltd to the specified communal property association since it commenced operations on the specified portion of land?
Reply:
1. (a)There were no terms and conditions of the permit as the permit was not issued.
(b)The Department of Rural Development and Land Affairs will be in a better position to respond to this question
2. The department Rural Development and Land Affairs will be in a better position to respond to this question
3. Should be referred to Mine Health and Safety
4. A notice in terms of section 93 of the MPRDA was issued on 17 August 2011. Issues to be addressed related to Environmental matters as well as implementation of the Social and Labour Plan.
5. The right holders are not obliged to report to the Department of any payments made to communities.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
27 September 2016 - NW1892
Maynier, Mr D to ask the Minister of Mineral Resources
(1)Whether, with reference to his media statement of 1 September 2016, the report of the recommendations (a) was tabled at and (b) approved by Cabinet; if not, in each case, why not; if so, in each case, on what date was the specified report (i) tabled at and (ii) approved by Cabinet; (2) whether he was authorised to release the specified media statement; if not, why not; if so, by whom; (3) when was an Inter-Ministerial Committee to investigate the termination of financial services to Oakbay Investments (Pty) Ltd established and (b) by whom; (4) whether he intends to pursue the recommendations of the specified report; if not, why not; if so, what are the relevant details; (5) whether he intends to pursue the recommendation of the establishment of a Judicial Commission of Inquiry into the termination of financial services to the company, since the company has recourse to the courts; if not, why not; if so, why?
Reply:
The Minister of Mineral Resources released a statement on 01 September 2016. This was followed by an interview on SABC news on 02 September 2016. The Minister was not speaking in his personal capacity but in his capacity as Chairperson of the IMC. On 13 April 2016, Cabinet established an IMC to consider allegations that certain banks and other financial institutions acted unilaterally and allegedly in collusion, when they closed bank accounts and/or terminated contractual relationships with Oakbay Investments. The Minister recorded recommendations made to Cabinet by the IMC as well as the related resolutions taken by Cabinet at its meetings of 06 July 2016 and 31 August 2016 respectively. The IMC made 5 recommendations to Cabinet. 4 of the recommendations were approved by Cabinet and 1 was referred to the President for further consideration as it was not within the purview of Cabinet to take a decision on the matter. The Minister is not at liberty to make any further statements on this matter.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
27 September 2016 - NW1810
Lorimer, Mr JR to ask the Minister of Mineral Resources
(1)How many appeals (a)(i) are pending in terms of section 96 of the Minerals and Petroleum Resources Development Act, Act 28 of 2002, as amended and (ii) were pending as at 1 April 2016 and (b) have been dealt with in each of the past five months of the 2016-17 financial year, in each case indicating the number of appeals (i) granted and (ii) denied; (2) (a) for how many days has the oldest pending appeal been outstanding and (b) what plans have been put in place to address the specified pending appeals?
Reply:
1(a) (i) As at 31 August 2016 the number of outstanding appeals are 957.
1(a) (ii) At 1 April 2016, the number of outstanding appeals were 947.
1(b) The following number of appeals were finalised in the months as indicated
April 2016 - 4 Appeals
- Appeals granted – 1
- Appeals dismissed – 3
May 2016 – 6 Appeals
- Appeals Granted – 4
- Appeals Dismissed – 2
June 2016 – 31 Appeals
- Appeals granted – 27
- Appeals dismissed – 4
July 2016 – 20 Appeals
- Appeals granted – 10
- Appeals dismissed – 10
August 2016 – 10 Appeals
- Appeals granted – 4
- Appeals dismissed – 6
2(a) Considering the timeframes provided for in Regulation 74, it takes approximately 120 days to process and finalise internal appeals in the prescirbed manner. The attainment of this period is dependent on number of appeals received during a given period as well as the complexity of such appeals and capacity constrains. The 2010 Constitutional Court judgement in Bengwenyama held that internal remedies must exhuasted before judicial review proceedings may be instituted. This led to the lodgement of significantly more appeals than before as more applcants were required to exercise internal remedies.
2(b) Action Plans:
- There is a continuous liaison with internal and external parties involved to expedite conclusion of the Regulation 74 process which appears to be yielding positive results.
- From time to time, the Office of the State Attorney is requested to assist with the finalisation of certain appeals.
- While implementing the above measures, historic appeals are prioritised.
- Draft regulations to significantly streamline the appeal process has already been formulated and is to be promulgated soon.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
27 September 2016 - NW1811
Lorimer, Mr JR to ask the Minister of Mineral Resources
(a) How many successful mining rights applications have been made through the SA Mineral Resources Administration System without the assistance of his department’s officials (i) in the (aa) 2013-14, (bb) 2014-15 and (cc) 2015-16 financial years and (ii) since 1 April 2016 and (b) what is the approximate annual cost of (i)(aa) maintaining and (bb) operating the specified system and (ii) remunerating officials assigned to the specified system?
Reply:
Question (i) |
PERIOD |
NO OF MINING RIGHTS |
(aa) |
01 APR 2013 – 31 MAR 2014 |
185 |
(bb) |
01 APR 2014 – 31 MAR 2015 |
139 |
(cc) |
01 APR 2015 – 31 MAR 2016 |
142 |
Question (ii) |
01 APR 2016 – 31 AUG 2016 |
55 |
TOTAL |
521 |
(b) Approximate annual cost are as follows:
Cost Driver |
2013 - 2014 |
2014 – 2015 |
2015 - 2016 |
Maintenance |
R 786 600.00 |
R 786 600.00 |
None - R0 |
Operating |
R 897 180.00 |
R 533 346.72 |
R 304 970.52 |
(iii) Remuneration:
- There are nine (9) officials each at salary level:10 (R389 145.00 p.a). One (1) offficial in each Regional Office, Assistant Director: Mineral Information Management (MIM). There are responseble for the day to day spatial verification.
- One (1) official at salary level:5 (R142 461.00). Administrative Clerk located at Head Office, responsible for helpdesk.
- One (1) official at salary level:12 (R726 276.00), Deputy Director: Administration and Information Systems, located at Head Office.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
27 September 2016 - NW1808
Schmidt, Adv H to ask the Minister of Mineral Resources
(1)Whether Atha-Africa Ventures has been issued with (a) a prospecting and/or (b) mining right and/or permit in Mabola, a proclaimed protected environment area close to Wakkerstroom in the Dr Pixley Ka Isaka Seme Local Municipality in Mpumalanga; if not, what is the position in this regard; if so, (2) whether the relevant (a) Environmental Impact Assessment and/or (b) Environmental Management Programme was undertaken before the specified rights and/or permits were issued; if not, why not; if so, what were the (i) results of the assessments and/or programmes undertaken and (ii) details of the public participation process followed; (3) whether the public participation process, as required in terms of the Minerals and Petroleum Resource Development Act, Act 28 of 2002, as amended, and its regulations were complied with in this regard; if not, why not; if so, what are the relevant details? NW2116E
Reply:
1. A Mining Right issued on 28th June 2016.
2. (b) Environment Management Progrmme (EMP) was undertaken.
(i) The EMP provided an assessment on the potential impacts of the proposed mining activties, which therefore also provided measures to modify, remedy, control or stop any actions, or process which may cause pollution or degradation to the environment. Measures were informed by recommendations of the specialist reports undertaken amongst others, these includes, Floral assesment specialist report, Fauna assesment specialist report, Wetland assement specialist report, Air quality assement specialist report, Hydrological assesment specilist studies (Ground and surface water).
(ii) Public participation was undertaken with land owners, Organs of State, Interested and affected parties, through newspaper advertisement, site notices, meetings, distribution of Background information Documents (BID) to both interested and affected parties.
3. Details of public participation undertaken with land owners, Organs of State, Interested and affected parties, through newspaper advertisement, site notices, meetings with minutes, distribution of Background information Documents (BID) to both interested and affected parties. All interested and affected parties, land owners, were provided with opportunity to comment or raise concerns or objections. All comments, concerns and objection were addressed in the EMP in the form of mitigation measures.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
22 September 2016 - NW1810
Lorimer, Mr JR to ask the Minister of Mineral Resources
(1) How many appeals (a)(i) are pending in terms of section 96 of the Minerals and Petroleum Resources Development Act, Act 28 of 2002, as amended and (ii) were pending as at 1 April 2016 and (b) have been dealt with in each of the past five months of the 2016-17 financial year, in each case indicating the number of appeals (i) granted and (ii) denied (2) (a) for how many days has the oldest pending appeal been outstanding and (b) what plans have been put in place to address the specified pending appeals?
Reply:
Question 1 (a) (i)
As at 31 August 2016 the number of outstanding appeals are 957.
Question 1 (a) (ii)
At 1 April 2016, the number of outstanding appeals were 943.
Question 1 (b)
The following number of appeals were final ised in the months as indicated
April 2016 - 4 Appeals
(i) Appeals granted - 1
(ii) Appeals dismissed - 3
May 2016 - 6 Appeals
(i) Appeals Granted - 4
(ii) Appeals Dismissed – 2
June 2016 - 31 Appeals
(i) Appeals granted - 27
(ii) Appeals dismissed - 4
July 2016 - 20 Appeals
(i) Appeals granted - 10
(ii) Appeals dismissed – 10
August 2016 - 10 Appeals
(i) Appeals granted - 4
(ii) Appeals dismissed – 6
Question 2(a)
Considering the timeframes provided for in Regulation 74, it takes approximately 120 days to process and finalise internal appeals in the prescribed manner. The attainment of this period is dependent on the number of appeals received during a given period as well as the complexity of such appeals and capacity constraints. The 2010 Constitutional Court judgment in Bengwenyama held that internal remedies must be exhausted before judicial review proceedings may be instituted. This led to the lodgement of significantly more appeals than before as more applicants were required to exercise internal remedies.
Question 2(b)
Action Plans:
• There is continuous liaison with internal and external parties involved to expedite conclusion of the Regulation 74 process which appears to be yielding positive results.
• From time to time, the Office of the State Attorney is requested to assist with the finalisation of certain appeals.
• While implementing the above measures, historic appeals are prioritised.
• Draft regulations to significantly streamline the appeal process has already been formulated and is to be promulgated soon.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-.. . .... ....... . .. ./. .. ......... ..... ./2016
23 August 2016 - NW1682
Lorimer, Mr JR to ask the Minister of Mineral Resources
(a) How many advisors are paid to advise him, (b) what are the (i) names, (ii) designations, (iii) qualifications, (iv) brief employment histories and (v) remuneration packages in each case and (c) what are the full relevant details of the processes followed to employ each of the specified advisors?
Reply:
The Minister has two advisors, Mr Malcolm Mabaso and Adv Zarina Kellerman. Between them, the Minister’s advisors have a wealth of knowledge and experience spanning over 25 years collectively, in the commercial, legal, governance and mining sectors. They advise Minister on the political environment, legal and regulatory environment, compliance matters and corporate and commercial sectors. Mr Mabaso was employed in October 2015 and Advocate Kellerman in April 2016. Both advisors’ contracts are linked to that of the Minister with a contractual period of 3 years. Advisors are appointed and remunerated according to applicable rules as set out in the Public Services Act, the Ministerial Handbook and with concurrence of the Department of Public Service and Administration.
11 August 2016 - NW1418
Lorimer, Mr JR to ask the Minister of Mineral Resources
(1) (a) Why was the mining permit issued to the successful land claimants of the Khanyisa community near Wolmaransstad in the North West withdrawn by his department and (b) to whom was the specified permit subsequently issued; (2) whether the specified permit has changed hands since it was reissued after being taken away from the Khanyisa community; if not, what is the position in this regard; if so, (a) on what dates were such changes made and (b) what are the further relevant details in this regard; (3) (a) who currently holds the specified mining permit and (b) what is the estimated value of all diamonds mined on the specified community’s land since it lost the specified mining permit; (4) (a) what was the reason for stopping mining on the specified community’s land in February 2016 and (b) what are the full details of the rectification work that was done, which enabled mining to begin on 25 April 2016 again; (5) where are the officials based who (a) stopped operations on the specified community’s land and (b) allowed operations to recommence in April 2016? NW1566E
Reply:
(1)(a) The Mining Permit was never withdrawn but operations suspended due to non compliance with the terms and conditions of the consent granted and disputes that were unresolved in the community.
(b) A Mining Right was issued to Oersonskraal Mining (Pty) Ltd.
(2) Please see (1)(a) above
(3)(a) The current holder of the right is Oersonskraal Mining (Pty) Limited. The relevant Communal Property Association has a 15% shareholding in this company.
(b) The value has not been determined yet. The value of the diamonds can only be determined through a physical inspection/valuation of the diamonds according to the three C’s (Colour, clarity and carats of the diamond).
(4)(a)(b)The Department has not issued any administrative notice to suspend any operations on the relevant land during 2016.
(5) No official from the Department stopped operations on the specified community land.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
15 June 2016 - NW1362
Mahlangu, Mr JL to ask the Minister of Mineral Resources
(1)Whether he is aware (a) of the existence of a provincial heritage site, Canteen Kopje, in the Northern Cape, which is of archeological and heritage significance and is facing imminent destruction, (b) that research at the specified site began in the mid-20th century and has been on-going since 1997 (c) that various excavations in a number of locations at the site have revealed tools dating back 2,3 million years to the three phases of the Acheulean hand axe, Middle and Later Stone Age occupations, a Tswana/!Kora occupation relating closely to local communities and the remains of historic activities, (d) that a mining permit was issued in 2014 and the SA Heritage Resources Agency successfully acquired a Cease Works Order which was lifted in March 2016 after which work by a diamond mining company commenced on 16 March 2016, (e) that the current mining programme will, conservatively estimated, destroy up to 40% of the heritage site, (f) that the fenced-off area includes the excavation areas of the University of the Witwatersrand and of Toronto and the area developed for tourism, (g) that no heritage impact assessment or archaeological impact assessment was conducted and the mining company does not have a heritage permit, which is in contravention of the National Heritage Resources Act, Act 25 of 1999, (h) that there is a conservation management plan for the site and (i) that our country has a constitutional, legal and moral obligation and responsibility to preserve and protect the heritage resources and resources with archaeological significance; if so, what steps does he intend to take to ensure the protection and preservation of the specified heritage resources; (2) (a) how many schools for the visually impaired learners are registered with each provincial department of education and (b) how many appropriately trained educators in the field of braille are teaching at schools for the visually impaired?
Reply:
- The legality, lawfulness or otherwise of the activity in question is currently the subject of legal proceedings before the High Court.
- The Department’s further conduct in this matter will be guided by the outcome of these legal proceedings.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
07 June 2016 - NW1230
Mahlangu, Mr JL to ask the Minister of Mineral Resources:
With regards to the evaluation of safety at Lily Mine in Mpumalanga South Africa, the world and the community members of Mpumalanga were shocked with the incident that occurred in Lilly Mine in Nkomazi Mpumalanga where 3 mine workers went down 80m into a sink hole. The communities across the country shared a hope and anxiety of the families and miners at Lily Mine that are distraught. In your recent media and public announcement you made the point that it will take between 6 to 8 months for the rescue team to reach the container. Up to the date “The families of Mnisi, Mazibuko and Nyerende are still in our prayers and we trust that the emotional and psychological support they are receiving will assist them to cope with the traumatic experience.
Reply:
The question is:-
- Whether the department was aware that the container office was actually located in such a dangerous location.
A formal investigation is underway in terms of the legal provisions and will assist in identifying the underlying causes of the accident. On completion of investigation, recommendations will be made to prevent similar accidents.
2. Is it your expectation the mine would have known that the container is in a dangerous location.
The above-mentioned formal investigation will assist in identifying the underlying causes of the accident.
3. Has your department conducted assessment on other mines in the country to determine that no such dangers await other mineworkers?
The mine inspections and audits are continuously being conducted with the aim of preventing harm on the mineworkers.
In a case where sub-standard condition, act or non compliance to the provisions of the Mine Health and Safety Act is observed during a mine inspection or audit, appropriate actions are immediately taken to remedy such conditions.
4. If yes which mines? If not why not?
The mine inspections and audits are conducted at all the operating mines.
5. Do we have assurance that such or similar accident will not revisit the country
We endeavor to prevent mine accidents from occurring and lessons learnt from the above-mentioned investigation will be used to improve safety in the mining sector.
6. Does the country have requisite skills to deal with disasters of this nature?
South Africa has the requisite skills to deal with disasters at mines and our country’s Mine Rescues Services (MRS) assisted in the Chile Mine disaster in which 33 trapped mine workers were rescued successful after 69 days.
7. If yes where is it located, and why do we find ourselves in this situation like it is at Lily Mine where it will take close to a year to reach the container where miners are trapped?
At the Mine Rescue Services of South Africa. The rescue operations have not been abandoned but options which will ensure safe rescue operations are being pursued. This is as a result of the deterioration of ground conditions at the mine.
8. If not why don’t we have such capacity?
South Africa has the requisite skills and capacity.
9. Who is thus responsible for the situation that we find ourselves in?
The accident investigation will assist in identifying the underlying causes of the accident.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
27 May 2016 - NW1015
Lorimer, Mr JR to ask the Minister of Mineral Resources
(1)Whether the abandoned quarry situated in the heart of Heidedal in Bloemfontein in the Free State, which was once mined by a certain company (name furnished), received a closure certificate; if so, what are the relevant details; (2) whether the specified quarry is in the process of rehabilitation; if not, why not; if so, (a) what has been done to date in the rehabilitation process, (b) when will it be completed and (c) what amount has been set aside for the rehabilitation process of the specified quarry; (3) whether any safety precautions have been put in place at the specified quarry; if not, why not; if so, what safety precautions have been put in place; (4) whether any concerns with regard to safety of the quarry were reported to his department since 5 April 2015; if so, what (a) was the content of such concerns that were communicated, (b) was his response in each case and (c) is being done to make the quarry safe? NW1147E
Reply:
1. Yes. The Company lodged an application for a closure certificate in terms of section 12 of the Minerals Act and the closure certificate was issued on the 06th of December 2006.
(2)(a) As a closure certificate was issued, there are no rehabilitation activities taking place on the quarry area.
(b) The complaint lodged to the Department lead to the investigation which confirms that there is a need to work further on the area to address issues of concern and a meeting will be held during the second week of May 2016 to ensure that urgent steps are taken to address the rehabilitation of this abandoned quarry.
(c) The amount is not known at this stage and will only be known after the abovementioned meeting and concomitant site inspections.
3. Yes, warnings signs were put around the quarry and the safety trench were dig.
4. (a) Yes. A complaint was received from the Volksblaad. The complaint was about rehabilitation, safety of the people living in Heidedal and surrounding areas from the dangers associated with an unfenced and abandoned mining site, drowning of community members and various serious crimes been committed over the area.
(b) The site inspection was conducted as a response to the complaint. The complainant was advised that further investigations will be conducted and the outcome will be communicated.
(c) The investigation is being conducted which include consultation with the Department of Water and Sanitation, the Mangaung Municipality or the town council and the land owner. The outcome of the investigation will determine cause of action to be taken.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
25 May 2016 - NW1552
Kopane, Ms SP to ask the Minister of Mineral Resources
(a) What amount did (i) his department and (ii) each entity reporting to him spend on advertising in the 2015-16 financial year and (b) how much has (i) his department and (ii) each entity reporting to him budgeted for advertising in the 2016-17 financial year?
Reply:
(a)What amount did (i) his department and (ii) each entity reporting to him spend on advertising in the 2015-16 financial year and (b) how much has (i) his department and (ii) each entity reporting to him budgeted for advertising in the 2016-17 financial year? |
|||
i)Dept |
a)2015/16 |
b) 2016/17 |
|
DMR |
R455 563.39 |
R2 160 000 |
|
a)2015/16 |
b)2016/17 |
||
ii)Entities |
CGS |
R1 698 000 |
R1 900 000 |
MINTEK |
R2 023 534 |
R2 864 050 |
|
SDT |
R455 701.79 |
R430 460 |
|
SADPMR |
R903 844 |
R809 725 |
|
MHSC |
R1 157 940.94 |
R1 120 000 |
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-……………/………………/ 2016
23 May 2016 - NW893
Ndlozi, Dr MQ to ask the Minister of Mineral Resources
(1)Has he earned any additional income from businesses, in particular businesses doing work for the Government, since his appointment as Minister; if so, (a) when, (b) how much did he earn, (c) from which businesses and (d) for what work;
Reply:
1. No. The Minister has not earned any additional income from doing business with government
a) N/A
b) N/A
c) N/A
d) N/A
(2) whether his (a) spouse, (b) children and (c) close family earned income from businesses, in particular businesses doing work for the Government, through his appointment as Minister; if so, in respect of each case, (i) when, (ii) how much did each earn, (iii) from which businesses and (iv) for what work? NW1019E
ANSWER
2. No family members of the Minister have earned incoming from doing business with government.
i) N/A
ii) N/A
iii) N/A
iv) N/A
Reply
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted:-………………/………………/2016
23 May 2016 - NW940
Brauteseth, Mr TJ to ask the Minister of Mineral Resources
Has (a) he and/or (b) his Deputy Minister ever (i) met with any (aa) member, (bb) employee and/or (cc) close associate of the Gupta family and/or (ii) attended any meeting with the specified persons (aa) at the Gupta’s Saxonwold Estate in Johannesburg or (bb) anywhere else since taking office; if not, what is the position in this regard; if so, in each specified case, (aaa) what are the names of the persons who were present at each meeting, (bbb)(aaaa) when and (bbbb) where did each such meeting take place and (ccc) what was the purpose of each specified meeting?
Reply:
The Minister has not met with any member, nor close associate of the Guptas. He has also not attended a meeting with a specified person at the Gupta’s Saxonworld Estate in Johannesburg.
13 May 2016 - NW1079
Mokause, Ms MO to ask the Minister of Mineral Resources
(1) Was he in Dubai at any time in December 2015; if so, (a) when and (b) what was the purpose of his visit;(2) whether he held any meetings while in Dubai; if so, (a) what was the purpose of the specified meetings and (b) was any of the specified meetings with the President, Mr Jacob G Zuma? (2) whether he held any meetings while in Dubai; if so, (a) what was the purpose of the specified meetings and (b) was any of the specified meetings with the President, Mr Jacob G Zuma?
Reply:
(1) Yes, Official trip to promote mining and investment opportunities in South Africa. The trip was also as opportunity to be apprised about the work done with African countries on matters pertaining to stemming the flow of illicit diamonds, and precious metals.
(2) Yes (a) To promote mining investment opportunities, as well as South Africa, as a preferred destination; (b) No.
Approved/not approved
Mr MJ Zwane, MP
Minister of Mineral Resources
Date Submitted: 11/05/2016
10 May 2016 - NW1185
Lorimer, Mr JR to ask the Minister of Mineral Resources
(a) How many mine closure certificates were issued in the (i) 2011-12, (ii) 2012-13, (iii) 2013-14, (iv) 2014-15 and (v) 2015-16 financial years and (b) what was the (i) name and (ii) location of each mine that was issued with a closure certificate and (c) on what date was each specified certificate issued?
Reply:
(a) (i) 2011 – 2012 = 71
(ii) 2012 – 2013 = 96
(iii) 2013 – 2014 = 102
(iv) 2014 – 2015 = 75
(v) 2015 – 2016 = 101
(b)(c) Please see Annexure A
ANNEXURE A
ABBREVIATIONS ON THIS DOCUMENT:
MP-MINING PERMIT
ML-MINING LICENSE (OLD ORDER MINING RIGHT)
MR-MINING RIGHT
2011 / 2012 Financial Year |
|||
Reference |
Name |
Location |
Date Issued |
KZN30/5/1/3/2/366MP |
Obreeze Business Enterprise |
A portion of sub 13 of the farm reserve No.5 No.15824 |
22/06/2011 |
KZN30/5/1/3/2/528MP |
MJ Schuit |
Portion of the remainder of portion 8 of the farm Hyde Park No.10233 |
18/08/2011 |
KZN30/5/1/3/2/452MP |
DK Pillay |
A portion of the Matigulu river adjacent to the remainder of the farm 7638HV |
08/02/2012 |
KZN30/5/1/3/2/340MP |
SR Khuzwayo |
A portion of the farm Wigton No.12693 |
20/01/2012 |
6/2/2/543 |
North Brick cc |
Res Van Ond B Nooitgedacht No. 60 |
23/02/2012 |
= 05
2012 / 2013 Financial Year |
|||
Reference |
Name |
Location |
Date Issued |
= 00
2013 / 2014 Financial Year |
|||
Reference |
Name |
Location |
Date Issued |
KZN30/5/1/3/2/733MP |
Mr C L Campher |
Remainder of the farm Vaalkrantz |
16/04/2013 |
KZN30/5/1/3/2/10MP |
E & G Redinger |
Rem of Rottenberg 14966 |
16/04/2013 |
KZN30/5/1/3/2/193MP |
Homefront Trading cc |
Remainder of subdivision 4 of the farm Camptonsdale No.2135 |
16/04/2013 |
KZN30/5/1/3/2/73MP |
P2X Construction (Pty) Ltd |
The Kwahlati river which forms part of reserve No.18 No.15838 |
08/05/2013 |
KZN30/5/1/3/2/195MP |
CZX Consulting cc |
A portion of sub 6 of the farm Camptons dale No.2135 |
10/06/2013 |
KZN30/5/1/3/2/215MP |
Joost Hendrik Von Zon |
Remainder of a portion of the farm Jachtdrift No.41 |
27/06/2013 |
KZN30/5/1/3/2/279MP |
Totekh Trading Projects cc |
A portion of portion 179 of the farm Cottonlands No.1575 |
14/10/2013 |
KZN30/5/1/3/2/71MP |
P2X Construction (Pty) Ltd |
Blood river which forms part of reserve No.18 and rem of Uithoek No.156 |
24/02/2014 |
KZN30/5/1/3/2/580MP |
Mr N V Chetty |
Sub 46 of 7 of the farm Louisiana No.3239 |
21/02/2014 |
= 09
2014 / 2015 Financial Year |
|||
Reference |
Name |
Location |
Date Issued |
6/2/2/868 |
HFE Wichmann & Company (Pty) Ltd |
Lot 1997 Uvongo |
08/05/2014 |
KZN30/5/1/3/2/282MP |
HFE Wichmann & Company (Pty) Ltd |
Lot 1997 of the farm Seaview |
08/05/2014 |
6/2/2/921 |
RBM |
Townboard Lease Area |
08/05/2014 |
= 03
2015 / 2016 Financial Year |
|||
Reference |
Name |
Location |
Date Issued |
56MP |
Eskom Holdings Limited |
Portion of the Farm Trekboer 1002 |
14/10/2015 |
327MP |
Eskom Holdings Limited |
A portion of the farm Paardekraal No.1979 |
14/10/2015 |
671MP |
Kusakusa Agricultural Farming cc |
A portion of the farm Pencarrow No.17860 |
20/04/2015 |
607MP |
H C Harley |
Remainder of the farm Zandplaats No.178 |
26/05/2015 |
10296MP |
Grace Brick and Block cc |
Alexandra Native Location No.4, No.16460, and part of remainder of Mishack No.9176 |
26/05/2015 |
639MP |
ANPG |
Portion 22 of the farm Lot 61 No.1521 |
25/08/2015 |
642MP |
ANPG |
Portion 22 of the farm Lot 61 No.1521 |
25/08/2015 |
583MP |
Transnet |
Portion 77 of Hardings Dale Farm No.822FT |
03/02/2016 |
584MP |
Transnet |
Stocklands and Oatlands Farm No.878FT |
03/02/2016 |
62MP |
Eskom Holdings Limited |
A portion of the Farm Welkom 1310 |
14/10/2015 |
326MP |
Eskom Holdings Limited |
A portion of the farm Braamhoek No.1220 |
14/10/2015 |
60MP |
Eskom Holdings Limited |
Portion 2 of the Farm Braamhoek 1220 - PMB |
14/10/2015 |
739MP |
SM Chowles |
Portion of the farm Kinglen No.16319 |
25/02/2016 |
130MP |
Willsyl Business Enterprises |
A portion of sub 1 of the Farm Fairview No.7915 |
03/02/2016 |
6/2/2/1249 |
SANRAL |
Portion 17 of Poogaskraal |
03/02/2016 |
108MP |
K Padayachee |
Portion 3 of the Farm Woodland Lodge No.2364 |
30/03/2016 |
128MP |
South Coast Stone Crushers t/a NPC aggregate |
Remainder of Portion 1 of the Farm Fairview No.15590 |
03/02/2016 |
=17
MPUMALANGA
2011 / 2012 Financial Year |
|||
Reference |
Name |
Location |
Date Issued |
MP 30/5/1/3/3/2/1/(632)MP |
B&E International (Pty) Ltd |
Portion of Portion 3 of Klipfontein 566 JR |
15/2/2012 |
MP 30/5/1/3/3/2/1/(633)MP |
B&E International (Pty) Ltd |
Portion of Portion 3 of Klipfontein 566 JR |
15/2/2012 |
MP 30/5/1/3/3/2/1/(634) MP |
B&E International (Pty) Ltd |
Portion of Portion 3 of Klipfontein 566 JR |
15/2/2012 |
= 03
2012 / 2013 Financial Year |
|||
Reference |
Name |
Location |
Date Issued |
0 |
2013 / 2014 Financial Year |
|||
Reference |
Name |
Location |
Date Issued |
MP30/5/1/3/3/2/1/(159) MP |
SANRAL |
Ptn 19 of Leeubank 427 JS,Ptn 5 of Wintershoek 390 JS,R/E of Weltevreden 381 JT,R/E of ptn 29 of Paardeplaats 380 JT,Ptn 17 of Weltevreden 381 JT |
22/07/2013 |
MP 30/5/1/3/3/2/1/(91) MP |
Department of Water Affairs and Forestry |
Ptn 5 of Van Tondershoek 317 IS |
15/10/2013 |
=02
2014 / 2015 Financial Year |
|||
Reference |
Name |
Location |
Date Issued |
MP 30/5/1/3/3/2/1/(460) MP |
Hectorspruit Sand & Klip cc |
Savannah 396 JU |
29/07/2014 |
=01
2015 / 2016 Financial Year |
|||
Reference |
Name |
Location |
Date Issued |
0 |
NORTH WEST |
|||
FILE NO |
APPLICANT |
LOCATION |
CLOSURE ISSUED |
2011/2012 |
|||
3166 |
Swanvest 234 (Pty) Ltd |
Klipbankfontein 26 IP & Witklip 6 IP: Lichtenburg |
30/11/2011 |
6/2/2/1072 |
Visser PJ |
Klipbankfontein 26 IP: Lichtenburg |
06/12/2011 |
6/2/2/3106 |
Wettige Praatjies BK |
Remaining extent of the farm Abelskop 75 HO: Schweizer-Reneke |
01/11/2011 |
6/2/2/1486& 5/3/2/1341 |
E.P Roodt |
rem extent of portion 2 of the farm Vliegenkraal 13 HO. Schweizer-Reneke |
07/11/2011 |
250 MP |
Rachel Charlotte Elizabeth Stone |
Portion 16 (A portion of portion 7) of the farm Goedgedacht 197 (Area C): Wolmaransstad |
signed on 15/11/2011 |
251 MP |
Rachel Charlotte Elizabeth Stone |
Portion 16 (A portion of portion 7) of the farm Goedgedacht 197 (Area A): Wolmaransstad |
Signed on 28/09/2011 |
377 MP |
R. Engelbrecht |
ptn of ptn 14 of Rietfontein 394 JP. Swartruggens |
14/07/2011. |
5/3/2/2733 or 6/2/2/1760 |
Dirk Jacobus Nieuwoudt |
ptns 10, 15 all of the farm biesieslaagte 53 HO. Schweizer-Reneke |
01/11/2011. |
316 MP |
G.A Takang |
cert ptn of the farm Christiana Town and Townlands 325 HO. Christiana |
CC Signed on 24/10/2011. Sub no: 01/2011 |
5/2/2/4001 |
F Kairuz |
ptn 22, 31 & 32 of the farm London 112 HO. Schweizer-Reneke |
CCsigned on 27/10/2011. Sub no: 46/2011 |
5/2/2/668 |
Jan Van Vuuren |
remaining portion of portion 5 ( a portion of portion 2) and the remaining portion of portion 2 of the farm Werdiend 151 HO.Wolmarannstard |
CC signed on 29/02/2012. Sub no: 04/2012 |
TOTAL: 11 |
|||
2012/2013 |
|||
5/2/2/2393 |
De Beers Consolidated Mines Limited |
the farm Welgeval 267 KP. Rustenburg |
Closure certificate issued on 09/10/2012 |
5/2/2/2393 |
IFO van Rooyen |
Doornfontein 313 IP: Wolmaransstad |
Signed on 27/11/2012 |
5/3/2/2351/6/2/2/2994 |
M. J. Kellerman & F. M. Kellerman |
Portions 20 & 23 (portion of portion 16) of the farm Welverdient 151 HO: Wolmaransstad |
signed on 20/08/2012 |
209 MP |
J. C. Lock |
ptn 20 of the farm Maraechesfontein 54 HO. Schweizer Reneke |
signed on 18/06/2012 |
6/2/2/1792 |
C & C Delwery BK |
Rem ext of ptn 3 of the farm Brankvalley 396 IO, Wolmaransstad |
Closure certificate issued on 09/10/2012 |
665 MP |
M. E. Timana |
farm molopo ratshidi 302 JQ. Molopo |
CC signed on 21/05/2012. Sub no: 20/2012 |
309 MR |
South African National Roads Agency Limited |
remainder of the farm Kromellenboog 320 HO. Christiana |
CC signed on 25/05/2012. sub no: 18/2012 |
305 MR |
South African National Roads Agency Limited |
ptn 3 of the farm Zendelingsfontein 290. Bloemhof |
CC on 24/05/2012. sub no: 13/2012 |
302 MR |
South African National Roads Agency Limited |
ptn 12 of the farm Palmietfontein 295 HO. Bloemhof |
CC signed on 25/05/2012. sub no: 14/2012 |
497 MP |
South African National Roads Agency Limited |
ptns 5 & 11 of the farm Kareefontein 340 HO. Bloemhof |
CC signed on 25/05/2012. sub no: 19/2012 |
500 MR |
South African National Roads Agency Limited |
the farm Zoutpan 301 HO. Christiana & Bloemhof |
CC signed on 24/05/2012. sub no: 17/2012 |
501 MR |
South African National Roads Agency Limited |
ptn 10 of the farm Zoutpan 301 HO. Christiana & bloemhof |
CC signed on 24/05/2012. sub no: 16/2012 |
499 MR |
South African National Roads Agency Limited |
ptn 5 of the farm Matlabaandstad 299 HO. Christiana & Bloemhof |
CC signed on 25/05/2012. sub no: 15/2012 |
5/3/2/ 2453& 6/2/2/3392 |
Kalklaagte Delwery CC |
rem ptn of ptn 6 of the farm Klipfontein 137 HO. Schweizer-reneke |
CC signed on 27/11/2012. Sub no: 48/2012 |
723 MP |
H.M Du Prees |
ptn of ptn 6 of the farm Oog Van Schoonspruit 18 IP. Ventersdorp |
CC Signed on the 14/06/2012. Sub no: 33/2012 |
6/2/2/1881 & 5/2/2/3263 |
Louis ehlers |
Erf 507 HO. Bloemhof |
CC Signed on the 18/06/2012. Sub no: 23/2012 |
6/2/2/3272 & 5/3/2/2595 |
Kobus Roos Boerdery (Pty) Ltd |
rem ext of the farm Delareyskraal 69 HO. Schweizer-Reneke |
CC Signed on the 06/08/2012. Sub no: 37/2012 |
213 MP |
J.C Lock |
cet ptn of tn 20 of the farm Maraetchesfintein 54 HO. Schweizer-Reneke |
CC Signed on the 18/06/2012. Sub no: 28/2012 |
170 MP |
Sybrand Van Dyk |
rem ext of ptn 13 of the farm Vuuefontein 117 HO. Schweizer-Reneke |
CC Signed on the 30/05/2012. Sub no: 12/2012 |
209 MP |
J.C Lock |
cet ptn of tn 20 of the farm Maraetchesfintein 54 HO. Schweizer-Reneke |
CC issued on the 19/06/2012 |
1202 MP |
G.B Masilo |
ptn 30 of Weltevreden 268 HO Bloenhof |
CC signed on 27/11/2012. sub no: 10/2013 |
6/2/2/1374 & 5/3/2/3457 |
Mineral Resources Corporation SA ([PTY) Ltd |
ptn 11(ptn of ptn 3) and remaining extent of portion 3 of the farms Holfontein 297 HO, Christiana |
CC signed on 25/05/2012. Sub no: 21/2013 |
6/2/2/3375 |
Goedgenoeg Ontwikkelings BK |
Certain portion of the farm Palmietfontein 295 HO,Wildehoenderkraal 296 HO, Panfontein 270 HO and Uitkyk 342. |
CC issued on 07/06/2012. Sub no: 32/2012 |
920 MP |
G.B Masilo |
portion 21 of the farm Klipfontein 344 HO,Bloemhof |
CC issued on 27/11/2012. sub no: 11/2013 |
TOTAL: 25 |
|||
2013/2014 |
|||
418 MP |
A. P. Symons |
remainder of the fram Kareepan 177 HO. |
closure certificate issued on the 12/11/2013 |
38 MR |
Etruscan Diamonds (Pty)Ltd |
rem ext of the farm Klipgat 18 IQ. Ventersdorp |
closure certificate issued on the 15/10/2013 |
651 MP |
Imvozabantu Contractors |
ptn 15 of the farm Christiana town and town lands 325 HO:Christiana |
closure certificate issued on the 15/10/2013 |
803 MP |
8 Mile Investments 169 (Pty) Ltd |
cert ptn of ptn 4 of the farm Welgelegen 677 IN. Vryburg |
CC signed on 18/03/2013. Sub no: 18/2013 |
212 MR & 6/2/2/2674 |
Wynand Johannes Visser |
cert ptn of the farm Christiana Town and Town Lands 325 HO. Christiana |
CC signed on 18/01/2013. sub no. 01/2013 |
1100 MP |
Department of Transport, Roads and Community Safety |
Majeakgoro Village JQ,Taung |
CC signed on 19/03/2013. Sub no:22/2013 |
958 MP |
Daniel Bhoodoo |
ptn 21 of the farm klipkuil JP, Lichtenburg |
CC signed on 26/11/2013. Sub no: 45/2013 |
1202 MP |
G.B Masilo |
ptn 30 of Weltevreden 268 HO Bloenhof |
CC signed on 27/11/2012. sub no: 10/2013 |
6/2/2/1374 & 5/3/2/3457 |
Mineral Resources Corporation SA ([PTY) Ltd |
ptn 11(ptn of ptn 3) and remaining extent of portion 3 of the farms Holfontein 297 HO, Christiana |
CC signed on 25/05/2012. Sub no: 21/2013 |
920 MP |
G.B Masilo |
portion 21 of the farm Klipfontein 344 HO,Bloemhof |
CC issued on 27/11/2012. sub no: 11/2013 |
83 MP |
F.E Marx |
crt ptn of the Rem Ext of ptn 5 of the Farm Syferfontein no 2 HO.Wolmransstsd |
CC signed on 18/03/2013. sub no: 20/2013 |
99 MP |
F.E Marx |
crt ptn of the Rem Ext of ptn 5 of the Farm Syferfontein no 2 HO.Wolmransstsd |
CC signed on 18/03/2013. sub no: 19/2013 |
5/3/2/2460 |
M.J Toit |
extent of ptn 1 of the farm Gezicht 265 HO. Bloemhof |
CC issued on the 15/10/2013 |
1312 MP |
Blink Klip Mining (Pty) Ltd |
portion 20 (portion of portion 3) of the farm Vlakfontein 37 HP, Wolmarannstad |
CC issued 20/08/2013. sub no: 32/2013 |
1313 MP |
Blink Klip Mining (Pty) Ltd |
over portion 20 (portion of portion 3) of the farm Vlankfontein 37 HP, Wolmaransstad |
CC issued 20/08/2013. sub no: 33/2013 |
729 MP |
D.W.Hughes |
Certain portion of the farm Molopo Ratshidi 302 JO. Molopo/Mafikeng. |
Granted on 29/10/2013, sub no.46/2013 |
730 MP |
D.W.Hughes |
Certain portion of the farm Molopo Ratshidi 302 JO. Molopo/Mafikeng. |
Granted on 29/10/2013, sub no.47/2013 |
731 MP |
D.W.Hughes |
Certain portion of the farm Molopo Ratshidi 302 JO. Molopo/Mafikeng. |
Granted on 29/10/2013, sub no.48/2013 |
6/2/2/420 & 5/3/2/435 |
Northern Cape Crushers BK |
Portion 3 (a portion of portion 3) of the farm Waterloo 739 IN and portion 8 ( a portion of portion 5) of the farm Waterloo 730 IN, Vryburg |
CC 23/07/2013. sub no: 33/2013 |
6/2/21185 |
Mr. H. C. Gerber |
Ptn 10 (ptn of ptn 2) of the farm Eerstebegin, Schweizer Reneke |
CC issued 19/02/2014 |
6/2/2/1023 & 5/3/2/456 |
Schalk Jacobus Boerdery |
the farm Varkenskraal 93. Ventersdorp |
CC issued on 10/06/2014 no. 15/2014 |
381 MP |
J.J.C Buitendag |
portion of portion 19 of woodstock 397 JP |
CC issued on 15/10/2014 sub no: 29/2014 |
382 MP |
J.J.C Buitendag |
portion of portion 19 of woodstock 397 JP |
CC issued on 15/10/2014 sub no: 30/2014 |
378 MP |
J.J.C Buitendag |
portion of portion 19 of woodstock 397 JP |
CC issued on 15/10/2014 |
5/2/2/477 & 6/2/2/1945 |
Daniel Rudolf Kriel |
the farm Oshoek 367 IO. Delareyville |
CC issued on 21/01/2014, Sub no: 01/2014 |
TOTAL : 25 |
|||
2014/2015 |
|||
6/2/2/1023 & 5/3/2/456 |
Schalk Jacobus Boerdery |
the farm Varkenskraal 93. Ventersdorp |
CC issued on 10/06/2014 no. 15/2014 |
381 MP |
J.J.C Buitendag |
a portion of portion 19 of woodstock 397 JP |
CC issued on 15/10/2014 sub no: 29/2014 |
382 MP |
J.J.C Buitendag |
a portion of portion 19 of woodstock 397 JP |
CC issued on 15/10/2014 sub no: 30/2014 |
378 MP |
J.J.C Buitendag |
portion of portion 19 of woodstock 397 JP |
CC issued on 15/10/2014 |
5/2/2/477 & 6/2/2/1945 |
Daniel Rudolf Kriel |
The farm Oshoek 367 IO. Delareyville |
CC issued on 21/01/2014, Sub no: 01/2014 |
461 MP |
Syfergat Delwery CC |
Certain portion of the remaining extent of portion 19 ( portion of portion 3) of the farm Baviaanskraans 80 HP, Wolmaransstad |
CC issued 10/06/2014 no. 16/2014 |
6/2/2/3624 |
Syfergat Delwery BK |
Portion 21 (a portion of portion 4) and remaining portion of portion 4 of the farm Baviaanskraans, Wolmaransstad |
CC issued 10/06/2014 no 18/2014 |
1108 MP |
T.A Tlape |
Certain portion of the farm Molopo Ratshidi 302 JO. Molopo. |
CC issued 10/06/2014 no. 09/2014 |
443 MR |
Carel-Lo-Andries Botha |
Remaining extent of the farm Webb 159 HO, Wolmaransstad |
CC 03/09/2014. sub no: 25/2014 |
239 MP |
Ntombiningi Margaret Manda |
The farm Welverdien 361 JP, Lichtenburg |
CC 25/06/2014. sub no: 11/2014 |
1169 MP |
Leala Trading 107 (Pty) Ltd |
Remaining ptn of ptn 8 (ptn of ptn 2) of the farm Elandslaagte 427 IP, Klerksdorp |
CC 25/06/2014. sub no: 12/2014 |
1170 MP |
Leala Trading 107 (Pty) Ltd |
Remaining ptn of ptn 8 (ptn of ptn 2) of the farm Elandslaagte 427 IP, Klerksdorp |
CC 25/06/2014. sub no: 13/2014 |
1171 MP |
Leala Trading 107 (Pty) Ltd |
Remaining ptn of ptn 8 (ptn of ptn 2) of the farm Elandslaagte 427 IP, Klerksdorp |
CC 25/06/2014. sub no: 14/2014 |
TOTAL : 13 |
|||
2015/2016 |
|||
6/2/2/367 |
O.J Steyn |
Muiskraal 127 IQ: Ventersdorp |
CC issued 27/02/2015 |
289 MP |
J & P Delwery |
rem ptn of ptn 2 iof the farm roodepan 163 HO, Wolmaransstad |
CC 14/10/2015, sub no.25/2015 |
6/2/2/3545 |
C.F Du Plooy |
ptn 27 of the farm Zamenkomst 86 IQ. Ventersdorp |
CC 22/10/2015, sub no.35/2015 |
703 MP |
Selebedi Serame |
certain ptn of the farm Town and Townlands 184 HO. Wolmaransstad |
CC issued 14/10/2015, sub no 46/2015 |
5/2/2/4006 |
J.H Lubbe |
ptn 8 of the farm Olievenfontein ,Bloemhof |
CC issued 14/10/2015, sub no 43/2015 |
6/2/2/3443 |
G.J.J Van Rensburg |
ptns of the farm Palmietfontein 8 HP. Wolmaransstad |
CC issued 06/02/2015 no 03/2015 |
1440 MP |
Dept of Public Works, Roads & Transport |
Kagisano Local /Municipality, Phaposane village. Mafikeng |
CC issued 27/02/2015 no.08/2015 |
1374 MP |
Mulonga Investment (Pty) Ltd |
Certain ptn of the remaining extent of ptn 14 of Bokfontein 448 JQ, Madibeng |
CC 14/10/2015, sub no 42/2015 |
1373 MP |
Mulonga Investment (Pty) Ltd |
Certain ptn of the remaining extent of ptn 14 of Bokfontein 448 JQ, Madibeng |
CC 14/10/2015, sub no 42/2015 |
1381 MP |
KGOSHIHADI Trading and Project 24 cc |
On area B of the farm KameelBoom 284 KP, Rustenburg |
CC 24/06/2015, sub no.19/2015 |
1010 MP |
Rich Rewards Trading 213 (Pty) Ltd |
Portion 31 of the farm Boekenhoutfontein 260 JQ, Rustenburg |
CC 14/10/2015, sub no.33/2015 |
959 MP |
M.H Roos |
Portion 9 of the farm Heuningboom 99 JQ, Marico |
CC 14/10/2015, sub no.24/2015 |
10124 MP |
ABIGAK 1 Generaltrading & investment CC |
Certain ptn of ptn 21 of the farm Klipkuil 352 JP, Lichtenburg |
CC 24/06/2015, sub no.16/2015 |
10125 MP |
ABIGAK 1 Generaltrading & investment CC |
Certain ptn of ptn 21 of the farm Klipkuil 352 JP, Lichtenburg |
CC 24/06/2015, sub no.17/2015 |
10126 MP |
ABIGAK 1 Generaltrading & investment CC |
Certain ptn of ptn 21 of the farm Klipkuil 352 JP, Lichtenburg |
CC 24/06/2015, sub no.18/2015 |
1254 MP |
Mtanzani excavation diamond dealer |
Ptn 21 (ptn of ptn 20) of the farm Klipkuil 352 JP, Lichtenburg |
CC issued 06/02/2015 no 06/2015 |
1253 MP |
Mtanzani excavation diamond dealer |
Ptn 21 (ptn of ptn 20) of the farm Klipkuil 352 JP, Lichtenburg |
CC issued 06/02/2015 no 05/2015 |
6/2/2/367 |
O.J Steyn |
Zwartplaat 170 IP |
CC issued on 27/02/2015 no. 13/2015 |
220 MP |
B.B Roselt |
Certain ptn of the remaining Ptn 29 (-1-6) of the farm Nooitgedacht 434 IP, Klerksdrop |
CC 14/10/2015, sub no.36/2015 |
221 MP |
Aurico Gold Reclamation (Pty) Ltd |
The remainder of ptn 5 of the farm Strathmore 436 IP, Klerksdrop |
CC 14/10/2015, sub no.37/2015 |
222 MP |
Aurico Gold Reclamation (Pty) Ltd |
The remainder of ptn 5 of the farm Strathmore 436 IP, Klerksdrop |
CC 14/10/2015, sub no.38/2015 |
1166 MP |
E.M Kuntwane |
The farm Taung Reserve 894 HN, Taung |
CC issued 06/02/2015 no 10/2015 |
952 MP |
DNI Makenete |
ptn 1 of the farm Grasfontein 356 JP, Ditsobotla |
CC 22/10/2015, sub no.39/2015 |
TOTAL : 23 |
WESTERN CAPE
2011-2012
Type of application |
Company Names |
Location |
Date Issued |
Mining right |
PAWC MR97 |
Borrow pit |
28 March 2012 |
Mining right |
J.D Stemmet (Old order MR 5/3/2/784) |
R/Ext Portion 289 Vredendal 292 |
10 January 2012 |
Mining right |
Brickrush (Old Order MR 5/3/2/982) |
Farm Doornkloof |
07 August 2011 |
Mining right |
MaccSand (Pty) Ltd (MP 224) |
Rem of Farm 996 |
07 August 2011 |
Mining right |
Pieter Visser Vervoer (Old Order MR 5/3/2/908) |
Farm Bloemedalsfontein |
08 July 2011 |
Mining right |
Corobrick (Pty) Ltd (MR 335) |
R/Extent of Farm Houddenbeck 22 |
14 June 2011 |
Mining right |
MaccSand (Pty) Ltd (MR 64) |
ERF 1915 |
13 September 2011 |
Mining right |
MaccSand (Pty) Ltd (MR 65) |
Erf 4891 |
20 October 2011 |
Mining right |
MaccSand (Pty) Ltd (MR 66) |
Erf 4889 |
20 October 2011 |
Mining right |
MaccSand (Pty) Ltd (MP 05) |
Erf 1169 |
13 September 2011 |
Mining right |
MaccSand (Pty) Ltd (MP 36) |
ERF 4885 |
20 October 2011 |
= 11 2012-2013 |
|||
Type of application |
Company Names |
Location |
Date Issued |
Mining right |
Trans Sand (Old Order MR 5/3/2/858) |
Remainder of Farm Vaalevalley 219 |
24 May 2012 |
Mining right |
PAWC: Dept of Works (MR 236)
|
Borrow Pit |
02 August 2012 |
Mining right |
Sibathathu Mining (Old Order MR 5/3/2/985) |
Farm DroogValley |
24 May 2012 |
Mining right |
Serina Kaolin (Pty) Ltd (Old Order MR 5/3/2/105 |
Farm 932 |
17 August 2012 |
Mining right |
SANRAL (Rail Bridge quarry MR 212) |
Borrow pit |
17 August 2012 |
Mining permits |
Buy Line Trading (Pty) Ltd (MP 196) |
Farm 1385 |
19 July 2012 |
Mining right |
PAWC: Department of Transport and Public works (MR 186) |
Borrow Pit |
20 March 2013 |
=07 |
|||
Year 2013-2014 |
|||
Type of application |
Company Names |
Location |
Date Issued |
Mining right |
Beaufortwest Municipality (Old Order MR 5/3/2/572) |
Farm Dorpsmeer 185 |
17 September 2013 |
Mining right |
PAWC: Department of Transport and Public works (MR 277) |
Erf 4016 |
10 June 2013 |
Mining right |
Mercedes Trust (Old Order MR 5/3/2/476) |
Farm Rheeboksfontein 142 |
10 June 2013 |
Mining permit |
Afrimat Aggregate (Pty) Ltd (MP 264) |
Farm Vlakfontein 911 |
16 September 2013 |
Mining permit |
Afrimat Aggregate (Pty) Ltd (MP 275) |
Farm Vlakfontein 911 |
16 September 2013 |
Mining permit |
MaccSand (Pty) Ltd (MP 225) |
Remainder of Farm 996 |
18 December 2013 |
Mining permit |
MaccSand (Pty) Ltd (MP 249) |
Erf 1905 |
18 December 2013 |
Mining permit |
MaccSand (Pty) Ltd (MP 250) |
Portion 12 Farm 508 |
18 December 2013 |
Prospecting right |
Hoderkloof Nickel (Pty) Ltd (PR 267) |
Portion 1 of Farm Kleinmajiesfontein No. 2 |
18 April 2013 |
=08 |
|||
2014/2015 |
|||
Type of application |
Company |
LOCATION |
DATE ISSUED |
Mining right |
PAWC: Department of Transport and Public works (MR 338) |
Borrow pit |
09 March 2015 |
Mining permit |
Moodie Broers (Pty) Ltd (MP 221) |
R/EXT Westfield 483 |
27 August 2014 |
Mining permit |
MaccSand (Pty) Ltd (MP 271) |
Erf 989 |
27 January 2015 |
Mining permit |
MaccSand (Pty) Ltd (MP 1005) |
Portion 12 Farm 508 |
12 February 2015 |
Mining right |
Afrisam (SA) (Pty) Ltd (Old order MR 5/3/2/69) |
Farm Groenekloof 971 |
12 February 2015 |
Mining right |
Atlantic Sands (Pty) Ltd (MR 299) |
Erf 494 |
27 January 2015 |
Mining permit |
Donadio Plant Hire CC (MP 09) |
Erven 542-546 |
27 January 2015 |
= 07 2015/2016 |
|||
Type of application |
Company Names |
Location |
Date Issued |
Mining permit |
Zola Lamla (MP 17) |
Ptn 28 Rietkloof 144 |
21 September 2015 |
Mining right |
Kirsten & Tulleken Vervoer (Old order MR 5/3/2/782) |
Farm 191 Re Portion 2 |
27 July 2015 |
Mining right |
Imvusa Trading 240 CC (MR 46) |
Morningstar 141 |
15 May 2015 |
Mining right |
De Beers Consolodated Mines Ltd (Old order MR 5/3/2/53) |
11a |
03 August 2015 |
= 04 |
NORTHERN CAPE
Financial year 2011 – 2012
Reference |
Name |
Location |
Date of issue |
NCS 528 MR |
Departemnt of Trasport, Roads and Public Works |
ERF 147 & 254 Vioolsdrift,Namakwaland District |
12/10/2011 |
NCS 526 MR |
Departemnt of Trasport, Roads and Public Works |
Plot 266 Vioolsdrift Settlement |
12/10/2011 |
NC 6/2/2/1318 MP |
Maredi Sethole |
Farm Longlands, Barkley West District |
01/08/2011 |
NC 1348 MP |
Departemnt of Trasport, Roads and Public Works |
Farm No 219, Kuruman District |
08/08/2011 |
NC 1349 MP |
Departemnt of Trasport, Roads and Public Works |
Farm No 219, Kuruman District |
08/08/2011 |
NC 1503 MP |
Departemnt of Trasport, Roads and Public Works |
Farm 690 HM Kuruman, Kuruman District |
24/09/2011 |
NC 6/2/2/950 MP |
Teko Joseph Makoko |
Delpoorts Commonage, Barkley West |
26/08/2011 |
NC 172 MP |
Freid Delwery CC |
ERF 1 Windsorton, Barkley West District |
26/08/2011 |
NC 487 MP |
Puleng Samuel Makoisa |
ERF 1 Windsortorn, Barkley West |
08/08/2011 |
NC 489 MP |
James Fritz |
Erf 1 Windsorton, Barkley West |
08/08/2011 |
NC 1505 MP |
Departemnt of Trasport, Roads and Public Works |
Remainder of Farm 154 HM Montontonyane, Kgalagadi District |
08/08/2011 |
NCS 753 MP |
Departemnt of Trasport, Roads and Public Works |
Farm Steinkopf 122, Namakwaland District |
12/10/2011 |
NCS 769 MP |
Departemnt of Trasport, Roads and Public Works |
Farm Steinkopf 22, in Namakwaland District |
12/10/2011 |
NCS 754 MP |
Departemnt of Trasport, Roads and Public Works |
Erf 1251 Concordia, Namakwaland |
12/10/2011 |
NC 1504 MP |
Departemnt of Trasport, Roads and Public Works |
Fairfield Farm 153, Kuruman District |
12/10/2011 |
NC 1349 MP |
Departemnt of Trasport, Roads and Public Works |
Farm 219, Kurumana District |
08/08/2011 |
NCS 596 MP |
Ms T.L Griebenow |
Lot 226, Vioolsdrift Settlement |
26/03/2012 |
NC 1348 MP |
Departemnt of Trasport, Roads and Public Works |
Farm 219, Kuruman District |
26/03/2012 |
NC 1029 MP |
Butinyana Abram Bonokwane |
Farm Gong-Gong 371, Barkley West District |
05/03/2012 |
= 20
Financial Year 2012 – 2013
Reference |
Name |
Location |
Date of issue |
NCS 631 MP |
Kaboep River Resources (Pty) Ltd |
Farm Lukas vlei No 93, Kenhardt |
10/05/2012 |
NCS 637 MP |
Daniel Johannes Malan |
Farm Bethesda No 38, Kenhardt |
07/11/2012 |
NCS 687 MP |
Daniel Johannes Malan |
Farm Bethesda No 38, Kenhardt |
0711/2012 |
NC 082 MP |
J.E Cook |
Farm Longlands 350, Barkley West |
07/11/2012 |
NC 260 MP |
J.E Cook |
Farm Longlands 350, Barkley West District |
07/11/2012 |
NC 027 MP |
I.A Peyper |
Erven 5024, 6376 & 5058 of Farm Vooruitzight 81, Kimberley District |
07/11/2012 |
NC 1213 MP |
K.Susan Thlabaki |
Farm 350, Longlands, Barkley West |
07/11/2012 |
NCS 500 MP |
A.P Stone |
Portion of Farm Drogedap 258, NAmakwaland |
07/12/2012 |
NCS 6/2/2/110 MP |
Namakwa Diamante Pty Ltd |
Farm Reimbreek No 364, Namakwaland |
28/10/2012 |
NC 6/2/2/1252 MP |
Francois Maritz |
Farm Blaauwklip 519, Hay District |
07/12/2012 |
NCS 555 MP |
Jacobus Andrian Louw |
Portion of remainder of Fram Ouourskloof 661, Calvinia |
08/01/2013 |
NCS 813 MP |
Department Of Transport, Roads |
Portion 29 of the Farm Uap 418, Kenhardt |
08/01/2013 |
NCS 819 MP |
Daniel Johannes Malan |
Remainder Erf 1076, Olywenhoutsdrift Settlement, Kenhardt |
08/01/2013 |
NCS 742 MP |
Department Of Transport, Roads |
Erf 161 Garries, Namakwaland District |
08/01/2013 |
NC 066 MP |
Dansil Hendrik Jarts |
ERF 1 Douglas, Herbert |
08/01/2013 |
NCS 821 MP |
Daniel Crockrell Cc |
Portion of portion 1 of Melk Boschkuil 132, Namakwaland |
13/02/2013 |
NCS 738 MP |
Sizwe Planthire Cc |
Portion of the Farm Janniesepan 39, Kenhardt |
14/01/2013 |
NCS 736 MP |
Jolanda Oberholster |
Portion of the Farm Janniesepan 39, Kenhardt |
07/02/2013 |
NCS 680 MP |
Transnet Limited |
Remainder of the Farm Kleinbegin 116, Kenhardt |
11/02/2013 |
NCS 501 MP |
J.P Van Der Westhuizen |
Portion of Erf 424 of the Niewouldtville, Calvinia |
07/02/2013 |
NC 1268 MP |
Soliter Mynbou Onderneming Cc |
Farm Bovenzeekoebaart, Hay District. |
11/02/2013 |
NCS 818 MP |
Daniel Johannes Malan |
Remainder Erf 1076, Olywenhoutsdrift Settlement, Kenhardt |
08/01/2013 |
=22
Financial Year 2013 – 2014
Reference |
Name |
Location |
Date of issue |
NC-S 6/2/2/84 ML/MR |
Atlantic Mining Holdings (Pty) Ltd |
Remainder of portion 5 of the farm buffelsfontein no.515, namaqualand district |
03/06/2013 |
NC 30/5/1/2/2/211 MR |
J.K Plant Hire Cc |
Portion 2 of the farm morgenzon no.35 and portion 12 of the farm slypklip, kimberley district |
17/04/2013 |
= 02
Financial Year 2014 – 2015
Reference |
Name |
Location |
Date of issue |
NCS 6/2/2/194 MP |
Jacobus Gilbert |
Portion of the vioolsdrift south commonage, namaqualand district |
05/05/2014 |
NCS 6/2/2/274 MP |
Life Stones (Pty) Ltd |
A portion of the rural area steinkopf, namaqualand district |
08/05/2014 |
NC 1939 MP |
D J Scherman |
A certain portion of longlands no.350, barkly west district |
17/06/2014 |
NCS 730 MP |
J W Van Zyl |
Portion of the remainder of the farm blaauwskop no.36, kenhardt district |
23/07/2014 |
NCS 718 MP |
J Oberholster |
Portion of the remainder of blaauwskop no.36, kenhardt district |
23/07/2014 |
NCS 719 MP |
Sizwe Planthire Cc |
Portion of the remainder of blaauwskop no.36, kenhardt district |
23/07/2014 |
NCS 670 MP |
J S Esau |
Portion of the farm graces puts no.201, namaqualand district |
25/09/2014 |
NC 1260 MP |
Tyron Erol Ruiters |
Erf 71 and 72 windsorton, barkly west district |
19/12/2014 |
NC 5007 BP |
South African National Roads Agency Ltd |
Remaining extent of erf 1, farm gannahoek n0140, portion 1 of farm haartebeest hoek no.99 and erf 260, strydenburg district |
18/02/2015 |
NC 1990 BP |
South African National Roads Agency Ltd |
The farm gannahoek no.265, hopetown district |
18/02/2015 |
NC 019 MP |
A Dunwoody |
Erf 146 windsorton, barkly west district |
18/02/2014 |
= 11
Financial Year 2015 – 2016
Reference |
Name |
Location |
Date of issue |
NCS 514 MR |
De Beers Consolidated Mines Limited |
Sea bed 2(c), 3 (c), 4 (c) and 5 (c), namaqualand district |
21/10/2015 |
NC 1670 MP |
Nancy Kleinhans |
Longlands 350, barkly west district |
08/05/2015 |
NCS 10105 MP |
Group Five Civil Engeneering (Pty) Ltd |
Portion of the remainder of the farm dikdoorn no.535, namaqualand district |
11/06/2015 |
NCS 10049 MP |
Group Five Civil Engeneering (Pty) Ltd |
Portion of portion 4 of the farm zonderhuis no.249, namaqualand district |
11/06/2015 |
NCS 854 MP |
Sph Kundalila (Pty) Ltd |
Portion of remainder of farm no.742, calvinia district |
02/09/2015 |
NC 189 MP |
ELSIE NOTSHOKWAKHE Dyasie |
Certain portion of wildecks plant, barkly west district |
13/11/2015 |
NCS 731 MP |
F.J Brand |
Portion of steinkopf, namaqualand district |
18/11/2015 |
NCS 734 MP |
Dorothy Beets |
Portion of remainder of farm steinkopf no.22, namaqualand district |
21/10/2015 |
NCS 733 MP |
Dorothy Beets |
Portion of remainder of farm steinkopf no.22, namaqualand district |
21/10/2015 |
NCS 545 MP |
Nungu Trading 391 (Pty) Ltd |
Portion of erf 2100 steinkopf , namaqualand district |
18/11/2015 |
NCS 541 MP |
Golden Dividend 6 (Pty) Ltd |
Portion of erf 2100 steinkopf, namaqualand district |
18/11/2015 |
NCS 540 MP |
Golden Dividend 6 (Pty) Ltd |
Portion of erf 2100 steinkopf, namaqualand district |
18/11/2015 |
NCS 544 MP |
Inyanga Trading 202 (Pty) Ltd |
Portion of erf 2100 steinkopf, namaqualand district |
18/11/2015 |
NCS 543 MP |
Inyanga Trading 202 (Pty) Ltd |
Portion of erf 2100 steinkopf, namaqualand district |
18/11/2015 |
NCS 546 MP |
Nungu Trading 391 (Pty) Ltd |
Portion of portion 23 of the farm melkboschkuil no.132, namaqualand district |
18/11/2015 |
NCS 651 MP |
Theresa Loretta Joubert |
Portion of the remainder of plot 226, violsdrift sttlement, namaqualand district |
18/11/2015 |
NCS 580 MP |
Johan Werner Mulder |
Portion of the remainder of plot 226, vioolsdrift settlement, namaqualand district |
18/11/2015 |
NCS 579 MP |
Johan Werner Mulder |
Portion of the remainder of plot 226, vioolsdrift settlement, namaqualand district |
18/11/2015 |
NCS 683 MP |
Booi Jacobus Jasson |
A portion of the farm steinkopf no.22, namaqualand district |
18/11/2015 |
NC 10100 MP |
Group Five Civil Engeneering (Pty) Ltd |
Remaining extent of the farm harvard no.171, kuruman district |
17/02/2016 |
NC 10102 MP |
Group Five Civil Engeneering (Pty) Ltd |
Remaining extent of the farm harvard no.171, kuruman district |
17/02/1016 |
NC 10129 MP |
Mosito Farming Enterprise Cc |
On erf 687, barkly west district |
09/02/2016 |
NC 6/2/2/1909 MP |
Sal Cloete Diamante (Pty) Ltd |
longlands 350, barkly west district |
17/02/2016 |
= 23
FREE STATE REGION
2011/2012
FILE NUMBER |
RIGHT/ PERMIT HOLDER |
LOCATION |
DATE ISSUED |
197 MR |
SANRAL |
Bpt 29.0 on Rexford Diqalo 1 |
23/09/2011 |
206 MR |
SANRAL |
Bpt 33.0 on Rexford 1 |
23/09/2011 |
209 MR |
SANRAL |
Bpt 25.8 on Kookhuis 1569 |
23/09/2011 |
210 MR |
SANRAL |
Bpt 26.5 on Fort Besters Rust 1571/1 |
23/09/2011 |
211 MR |
SANRAL |
Bpt 26.5 on Kookhuis 1569/1 |
23/09/2011 |
212 MR |
SANRAL |
Bpt 27.8 on Besters Rust 1570 |
23/09/2011 |
= 06
2012/2013
FILE NUMBER |
RIGHT/ PERMIT HOLDER |
LOCATION |
DATE ISSUED |
196 MR |
SANRAL |
Rem ext of the farm Hakkies 742 |
06/07/2012 |
191 MR |
SANRAL |
Remainder of Theunissen 252 |
30/11/2012 |
192 MR |
SANRAL |
The Farm Koppies Vlei |
30/11/2012 |
152 MR |
SANRAL |
Majwemaswea (Brandfort Townlands) |
08/01/2013 |
153 MR |
SANRAL |
Petrusrust 577 |
30/11/2012 |
154 MR |
SANRAL |
Fertuna 302 |
30/11/2012 |
155 MR |
SANRAL |
Waterval 513 |
30/11/2012 |
193 MR |
SANRAL |
BP on port. 1 of |
30/11/2012 |
126 MR |
SANRAL |
BP No 3 on the farms Glen Quinn 2890 & Bishop's Glen 273 |
29/01/2013 |
121 MR |
SANRAL |
Klein Osspruit 136 |
29/01/2013 |
128 MR |
SANRAL |
BP No 1B on the farm Bishop's Glen 273 |
29/01/2013 |
129 MR |
SANRAL |
BP No 2 on the farms Glen Quinn 2890 |
29/01/2013 |
144 MR |
SANRAL |
BP No 4B on the farm Weltrtvreden 243 |
29/01/2013 |
190 MR |
SANRAL |
Port. 1 of Afrikander Oord 80 |
29/01/2013 |
217 MP |
Bethlehem Deo Sand Cc |
Nil Desperandum 1452 |
05/10/2012 |
228 MP |
Bethlehem Deo Sand Cc |
Nil Desperandum 1452 |
30/11/2012 |
56 MP |
CEC Crous |
Pt 3 of Waterford 173 |
30/11/2012 |
150 MP |
Goerge Henry Luttig |
A pt of pt known as the farm nebo 886 of the farm Kleinbegin 434 |
10/01/2013 |
223 MP |
Waymar Trading Trading 001 CC |
A pt of sudv 16 of the farm Krantzkraal 134 |
29/01/2013 |
|
|
|
|
= 19
2013/2014
FILE NUMBER |
RIGHT/ PERMIT HOLDER |
LOCATION |
DATE ISSUED |
180 MR |
Invest In Property (Pty) Ltd |
Rem Ext of Kalkfontein ''A' 13' |
26/06/2013 |
201 MR |
SANRAL |
BP 12.2 of Klipfontein 356 |
22/05/2013 |
204 MR |
SANRAL |
BP 51/0 on Bethulie 495/B |
22/05/2013 |
207 MR |
SANRAL |
BP 47/0 on Bethulie 443/1B |
22/05/2013 |
200 MR |
SANRAL |
BP No 1.6 on Hamilton Manor 409 |
26/09/2013 |
158 MR |
SANRAL |
BP No 4 on the farm Weltervreden 243 |
29/01/2014 |
77 MP |
The Halyn Trust |
Turner's Estate 657 |
12/04/2013 |
78 MP |
The Halyn Trust |
A port of Rietpan 399 |
24/04/2013 |
197 MP |
Maskhasa Transport CC |
Port. 1 of the rem ext of Schuinshoogte 210 |
22/05/2013 |
357 MP |
Jacobus Christiaan Botes |
Rem Ext of the farm Avondster 209 |
23/08/2013 |
358 MP |
Jacobus Christiaan Botes |
Rem Ext of the farm Avondster 209 |
23/08/2013 |
323 MP |
Transnet Limited |
BP 31 on the rem of the farm Krynaaus Lust 275 |
23/08/2013 |
325 MP |
Transnet Limited |
BP 60 on the rem of the farm |
23/08/2013 |
326 MP |
Transnet Limited |
BP 46 on port 3 of the farm Paarden |
23/08/2013 |
327 MP |
Transnet Limited |
BP 45 on port 0 of the farm Maritz Drift 1649 |
23/08/2013 |
328 MP |
Transnet Limited |
BP No 43 on pt 0 of the farm Berrysvale 1656 |
23/08/2013 |
324 MP |
Transnet Limited |
BP No 4 on pt 3 of the farm Paarden Plaat 192 |
23/08/2013 |
43 MP |
SANRAL |
Site A,B, & C of on portion 1 of the farm Koppieskraal 407 |
19/12/2013 |
184 MP |
Prompvest Nine (Pty) Ltd |
A port of port 1 of Van Niekerk's Rust 1782 |
19/12/2013 |
267 MP |
SANRAL |
BP 8 on a port of the rem of the Unnamed farm No 720 |
13/02/2014 |
265 MP |
SANRAL |
BPT No 9 on a port of the farm Bojesvlakte 548 |
04/03/2014 |
266 MP |
SANRAL |
BP No 3 on a port 1 of the Middlewater 159 |
04/03/2014 |
268 MP |
SANRAL |
BP No 1 on a port 1 of the Middlewater 159 |
04/03/2014 |
272 MP |
SANRAL |
BP 7 on a port of the rem of the Unnamed farm No 720 |
04/03/2014 |
|
|
|
|
=24
2014/2015
FILE NUMBER |
RIGHT/ PERMIT HOLDER |
LOCATION |
DATE ISSUED |
229 MR |
SANRAL |
BPT at KM 27.0 on the farm Saightton 577 |
19/11/2014 |
231 MR |
SANRAL |
BPT at KM 65.2 on the farm Dorpsgronden 451 |
19/11/2014 |
232 MR |
SANRAL |
BPT at KM 30.9 on pt 1 of the farm Beauchamp 8 & the rem of the farm Rapiuskop 8 |
19/11/2014 |
233 MR |
SANRAL |
BPT at KM 40.5 on the farm Ethel's Hope 608 |
19/11/2014 |
6/2/2/634 |
Oranje Mynbou en Vervoer Maatskappy (Pty) Ltd |
Subd 1 of the farm Lusthof 1104, etc |
11/11/2014 |
230 MR |
SANRAL |
Quarry at KM 55.3 on the farm Ferndale1097 |
19/11/2014 |
234 MR |
SANRAL |
Quarry at KM 31.6 on rem of port 3 (Wyndham) of the farm Westminister 374 |
19/11/2014 |
269 MP |
SANRAL |
BP No 2 on a port of the farm Roseville 1114 |
04/04/2014 |
402 MP |
B & E International (Pty) Ltd |
Port of the Rem of the farm Vanstadensrust Townlands, Streets & Squares 471 |
15/07/2014 |
408 MP |
B & E International (Pty) Ltd |
Port of the Rem of the farm Vanstadensrust Townlands, Streets & Squares 471 |
15/07/2014 |
333 MP |
Oranje Mynbou en Vervoer Maatskappy (Pty) Ltd |
The Rem of the farm Vermeulenskraal Noord 480 |
25/07/2014 |
49 MP |
Bua Fela Trading 507 CC |
Port of the Rem Ext of the farm Caledondraai 21 |
11/11/2014 |
376 MP |
SANRAL |
|
19/11/2014 |
10065 MP |
Nulime (Pty) Ltd |
Remainder of the farm Geluk 235 |
23/01/2015 |
10016 MP |
Nulime (Pty) Ltd |
Remainder of the farm Geluk 235 |
23/01/2015 |
10017 MP |
Nulime (Pty) Ltd |
Remainder of the farm Geluk 235 |
23/01/2015 |
10018 MP |
Nulime (Pty) Ltd |
Remainder of the farm Geluk 235 |
23/01/2015 |
|
|
|
|
= 17
2015/2016
FILE NUMBER |
RIGHT/ PERMIT HOLDER |
LOCATION |
DATE |
240 MR |
SANRAL |
BPT 5.8 on the rem of the of the farm Smithfields Townlands 277 |
23/04/2015 |
202 MR |
SANRAL |
BPT 58.4 on the rem of the Olivenplaat 559/2 |
30/10/2015 |
184 MR |
SANRAL |
BPT 82.4 edenburg 104A on the rem of the farm Edenburg Townlands No 104 |
29/01/2016 |
6/2/2/887 |
Afrisam South Africa (Pty) Ltd (Alpha Limited) |
portions of the farms Jus 251, Oberon 253 and Kleinvooruitzicht 238 |
01/02/2016 |
309 MP |
SANRAL |
BT 23.7 on the rem of the farm Oekraine 621 |
23/04/2015 |
310 MP |
SANRAL |
Quarry 15.9 on the farm Sewefontein 767 |
23/04/2015 |
273 MP |
SANRAL |
BPT 6 on port of the remainder of the farm Enkeldoorn No 1200 |
08/05/2015 |
59 MP |
Naledi CC |
A port of the farm Warerford 99 |
06/07/2015 |
417 MP |
SANRAL |
BPT 2 on pt 1 of the farm Vospost 538 |
06/07/2015 |
419 MP |
SANRAL |
BPT 2 on pt 1 of the farm Vospost 538 |
20/08/2015 |
291 MP |
SANRAL |
BPT 1 on the farm Kelin Parys 733 |
27/08/2015 |
64 MP |
Botes Groewe Business Trust |
A port of Subdv 2 of the farm Glen Thorne 2163 |
06/07/2015 |
319 MP |
SANRAL |
BPT No 17.8 on pot 7of the farm Leeuwberg 330 |
27/08/2015 |
320 MP |
SANRAL |
Quarry 8.2 on the Rem of the farm Bekerfontein 253 |
27/08/2015 |
321 MP |
SANRAL |
BPT No 26.8 on the Rem of the farm Kolbe 1538 |
20/08/2015 |
421 MP |
SANRAL |
BPT 4 on the farms Kalkvley 987 & Kalkvley 826 |
20/08/2015 |
422 MP |
SANRAL |
BPT 4 on the farms Kalkvley 987 & Kalkvley 826 |
27/08/2015 |
239 MP |
Lehlabathe Development (Pty) Ltd |
A pt of the farm Alphen 938 |
29/01/2016 |
316 MP |
SANRAL |
Quarry 45.1 on port 3 of the farm Nalasview 2835 |
29/01/2016 |
18 MP |
Majormatic 150 (Pty) Ltd |
Petrus Hennenman 596 |
29/01/2016 |
10130 MP |
Rhino Crushers CC |
The remainder of the farm Roodewal 293 |
29/01/2016 |
= 21
LIMPOPO
2011-12
FILE NO |
APPLICANT |
FARMS |
Date Issued |
5/2/2/1148 |
Southernera Management Services |
Pusella 555 LT |
16-Nov-11 |
260 MP |
RAL |
Valdezia |
16-Nov-11 |
37 MP |
VMR Earth Moving Enterprises |
Vlakgte 317 KG |
17-Nov-11 |
932 MP |
RAL |
lodewykveil 505 LS |
30-Nov-11 |
930 MP |
Roads Agency Limpopo |
lodewykveil 505 LS |
30-Nov-11 |
185 MP |
Road Agency Limpopo |
Mabuladihlare |
05-Dec-11 |
86 MP |
Julius Makwatlo |
Smitsplaats 697 LS |
10-Jan-12 |
=07
2012-13
FILE NO |
APPLICANT |
FARMS |
Date Issued |
187MP |
Road Agency Limpopo |
Waterberg |
03-Apr-12 |
991 MP |
Sekoko Coal (Pty) Ltd |
Smitspan 306 LQ |
03-Apr-12 |
990 MP |
Sekoko Coal (Pty) Ltd |
Smitspan 306 LQ |
03-Apr-12 |
992 MP |
Sekoko Coal (Pty) Ltd |
Smitspan 306 LQ |
03-Apr-12 |
1162MP |
African Dune Investments 242 (Pty) Ltd |
Groothoek 256 KT |
25-Apr-12 |
1163MP |
African Dune Investments 242 (Pty) Ltd |
Groothoek 256 KT |
25-Apr-12 |
1164MP |
African Dune Investments 242 (Pty) Ltd |
Groothoek 256 KT |
25-Apr-12 |
36MP |
Carolina Erasmus |
Vlakfontein 522 KR |
25-May-12 |
740MP |
Roads Agency Limpopo |
Kafferboom 664 LR |
08-Jun-12 |
5/2/2/310 |
De beers Cons. Mines |
Luna 61 MS |
13-Jun-12 |
719 MP |
Bopape M2 |
Cyferfontein 925 LS |
09-Jul-12 |
731MP |
Roads Agency Limpopo |
Rietfontein 665 LR |
09-Jul-12 |
607MP |
Collateral Trading 351 CC |
Vera 815 MS |
30-Aug-12 |
776MP |
Roads Agency Limpopo |
Mooimeisjesfontein 363 KT |
17-Jan-13 |
90MP |
Christiaan Lourens Klopper |
Ptn 14 of Klipgat 348 KQ |
18-Jan-13 |
= 15
2013-14
FILE NO |
APPLICANT |
FARMS |
Date Issued |
198MP |
John Smit |
Springbokvlagte 41JR |
11-Jun-13 |
311MP |
Roads Agency Limpopo |
Ceres 599 LS |
22-Jul-13 |
182MP |
Roads Agency Limpopo |
Sekororo-Oaks |
20-Aug-13 |
1034MP |
Eudan Mines (Pty) Ltd |
Shamfana Village (Unsurveyed) |
20-Aug-13 |
1032MP |
Eudan Mines (Pty) Ltd |
Shamfana Village (Unsurveyed) |
20-Aug-13 |
1035MP |
Eudan Mines (Pty) Ltd |
Shamfana Village (Unsurveyed) |
20-Aug-13 |
445MP |
Roads Agency Limpopo |
Klipheuvel 573 KS |
28-Aug-13 |
617MP |
Roads Agency Limpopo |
Klipheuvel 573 KS |
28-Aug-13 |
897MP |
RAL |
Makonde Thengwe |
21-Nov-13 |
1065MP |
Highveld Steel and Vanadium |
Uitvlust 887KS |
10-Dec-13 |
1236MP |
Basil Read Mining (PTY) Ltd |
Uitvlust 887KS |
10-Dec-13 |
1235MP |
Basil Read Mining (PTY) Ltd |
Uitvlust 887KS |
10-Dec-13 |
1066MP |
Highveld Steel and Vanadium |
Uitvlust 887KS |
19-Feb-14 |
165MP |
Road Agency Limpopo |
Mavambe Roads |
06-Mar-14 |
164MP |
Roads Agency Limpopo |
D4300 Ga-matlala |
06-Mar-14 |
887 MP |
RAL |
Marobyane |
06-Mar-14 |
140 MP |
RAL |
Goergenhotlz 256 MT |
06-Mar-14 |
1067MP |
Highveld Steel and Vanadium |
Uitvlust 887KS |
19-Mar-14 |
796 MP |
RAL |
Gelukfontein 547 |
24-Mar-14 |
744MP |
Coetzee Johannes Hendrik |
Ehrenbreitstein 525 LQ |
24-Mar-14 |
1357MP |
Mabotja Shimane Samson |
Diamant 346 KR |
24-Mar-14 |
1356MP |
Mabotja Shimane Samson |
Diamant 346 KR |
28-Mar-14 |
1358MP |
Mabotja Shimane Samson |
Diamant 346 KR |
28-Mar-14 |
= 23
2014-15
FILE NO |
APPLICANT |
FARMS |
Date Issued |
1237MP |
Basil Read Mining (Pty) Ltd |
Uitvlugt 887 KS |
13-Jun-14 |
1364MP |
Roads Agency Limpopo |
Njelelepoort 193 MT |
07-Oct-14 |
840MP |
Roads Agency Limpopo |
Zonagsfontein 32 JS |
07-Oct-14 |
504MP |
Roads Agency Limpopo |
Marken to Rebone |
07-Oct-14 |
1362MP |
Roads Agency Limpopo |
Njelelepoort 193 MT |
07-Oct-14 |
1365MP |
Roads Agency Limpopo |
Njelelepoort 193 MT |
07-Oct-14 |
1366MP |
Roads Agency Limpopo |
Njelelepoort 193 MT |
07-Oct-14 |
767MP |
Roads Agency Limpopo |
Weiranshorne 78 LS |
07-Oct-14 |
778MP |
Roads Agency Limpopo |
De goedverwaghting 362 KT |
07-Oct-14 |
7/2/2/331 |
Phaladi Mining Services C.C |
Grootvlei 605 LS |
15-Jan-15 |
= 10
2015-16
FILE NO |
APPLICANT |
FARMS |
Date Issued |
1533MP |
Shisemo Mining Resources CC |
Syferfontein 925 LS |
01-Jun-15 |
10010MP |
Greater Tzaneen Municipality |
Vallambrosa 681 LT |
01-Jun-15 |
10009MP |
Greater Tzaneen Municipality |
Vallambrosa 681 LT |
01-Jun-15 |
10008MP |
Greater Tzaneen Municipality |
Vallambrosa 681 LT |
24-Jul-15 |
780 MP |
Jan Willem Van Waveren |
Doornbult 624 LS |
24-Jul-15 |
1339 MP |
Jan Willem Van Waveren |
Doornbult 624 LS |
24-Jul-15 |
367MP |
Ndowana Exploration (Pty) Ltd |
Mooiplats 434 LT |
12-Oct-15 |
895MP |
RAL |
Goergenhotlz 256 MT |
21-Nov-15 |
855MP |
The Willcas Group |
Riversdale 75 LT |
30-Mar-16 |
=09
EASTERN CAPE
2011 (April) / 2012 (March) FINANCIAL YEAR: CLOSURE CERTIFICATES ISSUED (EASTERN CAPE) |
||||
Seq No. |
TYPE OF APPLICATION |
NAME |
LOCATION |
DATE CLOSURE CERTIFICATE ISSUED |
1 |
Mining Licence |
The Trustees of Waldemar Kretschmer Trust |
Portion 42 (portion of portion 17) of Farm 807, Division of East London |
11/04/2011 |
2 |
Mining Licence |
Arlington Sandpits CC |
Portion 11 of the Farm Goedemoedsfontein 18 and the remainder of the Farm Goedemoedesfontein 15, Division of Port Elizabeth. |
30/06/2011 |
3 |
Mining Licence |
D O Eales |
Remainder of Erf 1999 and Erf 2000 of Portion 1952 in the area of Walmer, Division of Port Elizabeth |
30/06/2011 |
4 |
Mining Permit |
Haw & Inglis |
Primeston Quarry, Farm 286, Division of Adelaide |
06/07/2011 |
5 |
Mining Permit |
Great Kei Municipality |
Remainder of Erf 1 , Kei Mouth, Division of Komga. |
29/11/2011 |
6 |
Mining Permit |
W Swart |
Lemoenfontein, Remainder of the farm Kromme River, Farm 269, Division of Humansdorp |
31/01/2012 |
7 |
Mining Permit |
Rustoord Sand & Stone |
Portion of Farms 76 and 62, Division of Uitenhage |
31/01/2012 |
8 |
Mining Permit |
Johan Nicolaas Venter |
Farm 690, Sundays River Valley, Division of Uitenhage |
31/01/2012 |
TOTAL NUMBER OF CLOSURES FOR FINANCIAL YEAR 2011-2012: 8 |
||||
2012 (April) / 2013 (March) FINANCIAL YEAR: CLOSURE CERTIFICATES ISSUED (EASTERN CAPE) |
||||
Seq No. |
TYPE OF APPLICATION |
NAME |
LOCATION |
DATE CLOSURE CERTIFICATE ISSUED |
1 |
Mining Permit |
Sawren Construction (Pty) Ltd |
Remainder of Farm 148, Division of Bedford |
18/04/2012 |
2 |
Mining Permit |
H H Bezuidenhout |
Remainder of portion 18 of Goedemoesfontein, Division of Port Elizabeth |
18/04/2012 |
3 |
Mining Permit |
Trustees Francois Vosloo Family Trust |
Portion 1 of Farm 389, Division of Port Alfred |
18/04/2012 |
4 |
Mining Permit |
C M Van Der Watt |
Remainder od portion 5 of Rondebos, Division of Humansdorp |
18/04/2012 |
5 |
Mining Permit |
C G Hopgood |
Remainder of portion 2 (the meadows) of Cuyler Manor, Farm 320, Division of Uitenhage |
19/07/2012 |
6 |
Mining Permit |
C G Hopgood |
Remaining extent of Cuyler Manor, Farm 322, Division of Uitenhage |
19/07/2012 |
7 |
Mining Permit |
Pacific Brick CC |
Remainder of Farm Klipdrif, Farm 426, Division of of Graaff-Reinet |
19/07/2012 |
8 |
Mining Permit |
Middelstraat Slagtery |
Remainder of Farm Klipdrif, Farm 426, Division of of Graaff-Reinet |
19/07/2012 |
TOTAL NUMBER OF CLOSURES FOR FINANCIAL YEAR 2012-2013: 8 |
||||
2013 (April) / 2014 (March) FINANCIAL YEAR: CLOSURE CERTIFICATES ISSUED (EASTERN CAPE) |
||||
Seq No. |
TYPE OF APPLICATION |
NAME |
LOCATION |
DATE CLOSURE CERTIFICATE ISSUED |
1 |
Mining Permit |
Thembinkosi Patrick Nqumashe |
Erf 1814, Division of Graaff-Reinet |
17/09/2013 |
2 |
Mining Permit |
Garrick Denis Botha |
The Grove, Farm 402, Division of Bathurst |
17/09/2013 |
8 |
Mining Permit |
Say Cheese Trust |
Sand mining on portion 97 (portion of portion 6) of the farm Twee Rivieren, Farm 358, Division of Uniondale |
25/02/2014 |
9 |
Mining Permit |
Gamtoos Quarries |
Remainder of portion 8 of the farm Kabeljauws Rivier, Farm 321, Division of Jeffrey's Bay |
25/02/2014 |
TOTAL NUMBER OF CLOSURES FOR FINANCIAL YEAR 2013-2014: 9 |
||||
2014 (April) / 2015 (March) FINANCIAL YEAR: CLOSURE CERTIFICATES ISSUED (EASTERN CAPE) |
||||
Seq No. |
TYPE OF APPLICATION |
NAME |
LOCATION |
DATE CLOSURE CERTIFICATE ISSUED |
1 |
Mining Permit |
H B Meyer |
Portion 6 of the farm Vlakte, Farm 316, Division of Humansdorp |
08/05/2014 |
2 |
Mining Permit |
Arlington Sandpits CC |
Erf 1953 and Erf 4195, Walmer, Division of Port Elizabeth |
08/05/2014 |
3 |
Mining Permit |
Tom Coombs and Associates Trust |
Remainder of farm Fairview, Farm 395, Division of Bathurst |
08/05/2014 |
4 |
Borrow Pit |
South African National Road Agency Limited (SANRAL) |
Remainder of portion 2 of Farm Lynx Drift, Farm 54, Division of Bedford |
08/05/2014 |
5 |
Borrow Pit |
South African National Road Agency Limited (SANRAL) |
Farm Kopies Kraal, Farm 6, Division of Middelburg |
08/05/2014 |
7 |
Mining Permit |
Hendrik Benjamin Grundlingh |
Remainder of portion 32 of farm Chelsea, Farm 25, Division of Port Elizabeth |
12/03/2015 |
9 |
Mining Permit |
Hendon Haulers |
Remainder of Erf 474, Division of Cathcart |
12/03/2015 |
10 |
Mining Permit |
Gary Robert Kaschula |
Area of State Land in the Daweni Area, Division of Qumbu |
12/03/2015 |
11 |
Mining Permit |
Gary Robert Kaschula |
Farm 0, Tsolo area and Farm 35C, Ntwenka area, Division of Tsolo |
12/03/2015 |
12 |
Mining Permit |
Bulk Brick Supplies CC |
Prospecting at Sidwadweni, Division of Tsolo |
12/03/2015 |
13 |
Mining Permit |
L P Alberts |
Portion 22 (portion of portion 1) of the farm Seaview, Farm 28, Division of Port Elizabeth |
25/03/2015 |
TOTAL NUMBER OF CLOSURES FOR FINANCIAL YEAR 2014-2015: 13 |
||||
|
|
|
|
|
2015 (April) / 2016 (March) FINANCIAL YEAR: CLOSURE CERTIFICATES ISSUED (EASTERN CAPE) |
||||
TYPE OF APPLICATION |
NAME |
LOCATION |
DATE CLOSURE CERTIFICATE ISSUED |
|
1 |
Mining Permit |
Power Construction (Pty) Ltd |
Portion 3 of the Farm Uithek, Farm 67, Division of Molteno |
14/12/2015 |
2 |
Mining Permit |
Johan Smith |
Portion 8 (portion of portion 3) of the farm Kabeljauws River, Farm 339, Division of Humansdorp |
29/01/2016 |
3 |
Mining Permit |
Wahloo Sand CC |
Portion 13 (portion of portion 3) of Farm 809, Division of Humansdorp |
29/01/2016 |
TOTAL NUMBER OF CLOSURES FOR FINANCIAL YEAR 2015-2016: 3 |
GAUTENG REGION
2011/12 N/A
2012/13 N/A
2013/14
2014/15
2015/16
Approved/not approved
Mr MJ Zwane
Minister of Mineral Resources
Date Submitted:-……………/………………/2016
10 May 2016 - NW1155
Alberts, Mr ADW to ask the Minister of Mineral Resources
(1)With reference to his reply to question 287 on 14 March 2016, (a) what was (i) his specific role and (ii) the extent of his involvement in discussions that were held in Switzerland around the sale of the Optimum mine by Glencore to Oakbay, (b) which persons were involved and (c) who requested his involvement in the specified discussions; (2) who was the official of the department who accompanied him on the visit?
Reply:
(1)(a)(i)(ii) To promote mining and address company issues relating to investment climate in the country in general, and to mitigate imminent of retrenchments.
(b) The Department is not at liberty to disclose the identity of persons involved outside of its employment.
(c) No person in particular. I identify challenges and act upon them in a manner I deem appropriate.
(2) As previously indicated, the Minister was accompanied by a senior official of the Department. It is not normal practice for the Department to disclose the identity of officials who travel and accompany the Minister in their official capacity, as it may potentially compromise the performance of their official duties.
NA QUESTION FOR WRITTEN REPLY
QUESTION NUMBER: 287 : CO582E
DATE OF PUBLICATION IN INTERNAL QUESTION PAPER:
INTERNAL QUESTION PAPER NUMBER:
287. Mr J S Malema (EFF) to ask the Minister of Mineral Resources:
(a) What was the purpose of his recent trip to Switzerland, (b) who was part of the delegation and (c) how much did the trip cost the department? NW294E
Reply
- To promote mining and investment opportunities in South Africa
- Minister was accompanied by an official from the department.
- R347 000, 00.
Approved/not approved
Mr MJ Zwane
Minister of Mineral Resources
Date Submitted:-……………/………………/2016
09 May 2016 - NW287
Malema, Mr J to ask the Minister of Mineral Resources
(a) What was the purpose of his recent trip to Switzerland, (b) who was part of the delegation and (c) how much did the trip cost the department?
Reply:
(a) To promote mining and investment opportunities in South Africa
(b) Minister was accompanied by an official from the department.
(c) R347 000, 00.
Approved/not approved
Mr MJ Zwane
Minister of Mineral Resources
Date Submitted: 05/05/2016