Questions and Replies

Filter by year

30 June 2022 - NW2267

Profile picture: Lees, Mr RA

Lees, Mr RA to ask the Minister of Public Enterprises

1) Whether the SA Airways (SAA) Captain, Vusi Khumalo, has been and/or is to be appointed as the SAA Manager: Aviation Training; if not, what is the position in this regard; if so, what are the relevant details of the aviation training qualifications held by the specified person that makes him a suitable person for appointment to the specified position. 2) What are the details of (a) the processes followed to identify a suitable person for the position and (b) all persons who were considered for appointment to the position? 3) What are the detailed reasons for concluding that Captain Khumalo was the candidate best suited for the position? 4) Whether Captain Khumalo was paid the Voluntary Severance Package (VSP) offered to SAA staff during the Business Rescue process; if not, what is the position in this regard; if so, (a) what are the details of the procedure followed that resulted in his re-employment at SAA and (b) did Captain Khumalo repay SAA for the VSP payments made to him?

Reply:

According to the information received from SAA

1. Captain Vusi Khumalo has indeed been appointed to the position of Manager: Aviation Training Organisation (ATO) for a fixed term of three years.

2. His appointment came after a comprehensive, rigorous, and interrogative process where he emerged as the best candidate, and there is no doubt that he is the right person for the job. He not only knows the inner workings of SAA, but those of the industry and has clear ideas on what priorities need to be set in terms of driving the implementation of sustainable developmental solutions and align our training needs with business objectives and priorities to enhance optimum performance.

3. Captain Khumalo’s role will include expanding the mandate of the ATO to attract external business and turn it into a profit center. Furthermore, his role will include transformation, monitoring and evaluating the impact of learning and developmental interventions on performance across the airline. Captain Khumalo is a well-known and a respected figure in our company and the industry and has the full support of the Board and Executive team in his new position.

4. Yes, Captain Khumalo did receive the VSP, but the norm is that after a 12-month period and as required by the business, those that have previously taken packages can be brought back into any position, especially those that are multi skilled like Captain Khumalo. The position was advertised after the previous incumbent retired, shortlisting and interviews were conducted in line with the SAA recruitment and selection processes.

30 June 2022 - NW2092

Profile picture: Gondwe, Dr M

Gondwe, Dr M to ask the Minister of Social Development

With reference to her reply to question 1278 on 1 April 2022, (a) on what date were the grants reinstated following their suspension on 10 September 2021, (b) what total number of the suspended grants were discovered to have been received by (i) interns and (ii) contract workers who may qualify to continue receiving the grants, (c) on what date were the affected employees sent notices informing them of the review of their grants following the reinstatement of the grants, (d) by what date will the review process for all the identified grants be completed and (e) what are the details of how the review process for all the identified grants is conducted?

Reply:

a) The suspended social grants referred to were reinstated on 28 October 2021.

b) At this stage, SASSA does not have precise information on the employment nature of the re-instated beneficiaries. It is important to note that entitlement to a grant is not reviewed based on employment, but on income, as defined in the regulations to the Social Assistance Act.

c) Notices were sent in January 2022 to the suspected government employees, indicating that their social grant will be reviewed, and that they had 3 months to report to SASSA to enable this process to be concluded. This period has ended in April 2022. In May 2022 letters were sent to all beneficiaries, who have not come forward for the review process, informing them that SASSA intends to suspend their grant at the end of July 2022.

d) Beneficiaries who do not present themselves before the end of July 2022; will be suspended at the end of the month. However, the beneficiary will then still have another 3 months to come forward and request SASSA to re-instate their grants. Failure to comply, will result in the grant being permanently cancelled and the beneficiary will need to reapply for the grant should they still require it. Thus, it is expected that the entire process until termination of the grant will be concluded by October 2022.

e) Through the review process, SASSA updates the personal, financial and medical information of a beneficiary. This is very similar to an application process, and all relevant information required to determine whether or not a beneficiary still requires a grant is reviewed. Personal information is also updated to ensure that the records of the beneficiary is accurate and current.

Types of reviews include Administrative/ Financial reviews, Medical reviews, Foster Child Grants reviews and Refugee reviews. In terms of the Regulations to the Social Assistance Act, the Agency may review a social grant at any time where it has a reason to believe that changes in the beneficiary's financial circumstances may have occurred; or on expiry of the validity of the identity document of a beneficiary, if the beneficiary is a refugee; or on the expiry of the foster care order.

The process firstly requires identification of beneficiaries due for review. This is then followed by notification letters where beneficiaries are informed to approach a local SASSA office with the required documentation for purposes of completing a review process. Beneficiaries are given 90 days’ notice to complete this process. Once the process is completed the beneficiary is provided with an outcome letter.

In the case where the beneficiary still qualifies for the grant after the review process, the process ends, and the beneficiary will continue to receive payment of the social grant. Where the beneficiary no longer qualifies, the social grant is terminated, and he/she has the right to appeal to the Independent Tribunal for Social Assistance Appeals.

In cases where overpayments were made to the beneficiary, an acknowledgment of debt is raised; and /or the matter is referred to the Fraud and Compliance Unit for further investigation.

30 June 2022 - NW2236

Profile picture: Mkhonto, Ms C N

Mkhonto, Ms C N to ask the Minister of Employment and Labour

What (a) is the total number of identified employers that should contribute towards the Compensation Fund and (b) total number of employers have filled their annual returns in the 2021 Return on Earnings year?

Reply:

(a) The total number of identified employers that should contribute towards the Compensation Fund as at 31 May 2022 is 520 860.

(b) The total number of employers who had submitted the 2021 ROE by the end of 31 May 2022 is 204 822

30 June 2022 - NW2093

Profile picture: Gondwe, Dr M

Gondwe, Dr M to ask the Minister of Social Development

What is the (a) total number of public servants who (i) applied for and (ii) received monies from the Early Childhood Development Presidential Stimulus Relief Fund and (b) breakdown of the specified number of such public servants in each government department?

Reply:

a) (i) Three thousand seven hundred and twenty nine ( 3 729) public servants have been found to have applied for Early Childhood Stimulus Relief Fund (ii) however, none of them received the monies as they were identified prior to processing the applications for payment as the Department conducted a due diligence during verification process.

b) There is no breakdown that can be provided as the department did not pay any public servants from the Early Childhood Development Presidential Stimulus Relief Fund.

 

30 June 2022 - NW2099

Profile picture: Lotriet, Prof  A

Lotriet, Prof A to ask the Minister of Public Enterprises

Whether (a) his department and/or (b) any of the entities reporting to him have found any ghost workers within their system in the past five years; if not, what is the position in this regard; if so, what (i) total number of ghost workers was discovered, (ii) total amount was paid to them and (iii) steps have been taken to (aa) recover the money lost and (bb) hold the offending parties accountable?

Reply:

According to the information received from the Department and SOCs:

DPE/SOC

REPLY:

DPE

(a) Whether his department have found any ghost workers within their system in the past five years, if not what is the position in this regard, if so, what:

(i) total number of ghost workers was discovered: None

(ii) total amount was paid to them: None

(iii) steps have been taken to: None

(aa) recover the money lost: None

(bb) hold the offending parties accountable? None

ALEXKOR

Alexkor SOC Limited and the Pooling and Sharing Joint Venture (PSJV) do not have any Ghost Workers.

DENEL

a) N/A

b) In August 2020, Denel (SOC) Ltd discovered that two apprentices whose training programme had ended on 30 June 2018 and 28 October 2019 respectively remained on the payroll until they were terminated on 30 August 2020.

(i) The total number that was discovered was two (2).

(ii) The amount paid to them during this period was a combined total of R182,082.40.

(iii) (aa) No steps were taken to recover the money paid to them.

(bb) The responsible employee resigned and left the company before the disciplinary action process could be finalised.

ESKOM

(b) In the past five years, no ghost employees have been found at Eskom.

In 2018 Eskom embarked on an exercise to validate all employees on its payroll to ensure that no ghost workers exist. The exercise involved conducting various checks across Eskom in line with best practices.

Eskom continues to implement further enhancements in terms of monitoring and identifying potential ghost employees.

(b)(i) (ii) (iii) Not applicable.

(aa) Not applicable.

SAFCOL

(a) N/A

(b) None for SAFCOL

(i) N/A

(ii N/A

(iii) N/A

(aa) N/A

(bb) N/A

SAA

SAA has not found any Ghost Workers in our SAP payroll system in the past five years.

SAA’s position in this regard is that there is a very stringent system in place to ensure that no ghost employees are paid by the company. No Ghost Workers were identified following our recent HR audit.

TRANSNET

a) Not applicable

b) On 15 June 2021 Transnet SOC (“Transnet”) commissioned Transnet Internal Audit (TIA) to conduct a Payroll Audit assessment to verify the number of employees within its system, amongst other functions. Following this assessment, a report was issued on 27 August 2021 which indicated that were no ghost employees on their system

(i) Not applicable

(ii) Not applicable

(iii) Not applicable

(aa) Not applicable

(bb) Not applicable

30 June 2022 - NW2106

Profile picture: Abrahams, Ms ALA

Abrahams, Ms ALA to ask the Minister of Social Development

(1)Whether, in view of the importance of investment in the youth of the Republic and the welcome budget increase of the Sub-programme: Youth from R25,5 million in the 2021-22 financial year to R42,4 million in the 2022-23 financial year, she will furnish Ms A L A Abrahams with a detailed breakdown on (a) how the budget for the 2021-22 financial year was (i) allocated and (ii) spent and (b) how the 2022-23 budget will be allocated and spent; if not, why not; if so, what are the relevant details; (2) what are the details of any underspending in the 2021-22 financial year?

Reply:

Budget for 2021-2022 financial year

The Sub-Programme Youth in the allocation for 2021-2022 allocated the funds according to the Goods and Services, which were programmes and interventions for youth across the country; compensation of employed staff and equipment needed for execution of tasks in the department. The allocation is as reflected below:

DIR : YOUTH 2021/22

Current Budget

Total Expenditure

Available Budget

Percentage

COMPENSATION OF EMPLOYEES

4 103

4 152

-49

101.19%

GOODS AND SERVICES

9 568

4 529

5 039

47.33%

HOUSEHOLDS(HH)

 

 

0

 

MACHINERY AND EQUIPMENT

45

-

45

0.00%

TOTAL

13 716

8 681

5 035

63.29%

Budget for 2022-2023 financial year

The Sub-Programme Youth in the allocation for 2022-2023 allocated the funds according to the Goods and Services, which are programmes and interventions for youth across the country; compensation of employed staff and equipment needed for execution of tasks in the department. The allocation and expenditure is as reflected below:

DIR : YOUTH 2022/23

Current Budget

Total Expenditure

Available Budget

Percentage

COMPENSATION OF EMPLOYEES

3 858

328

3 530

8.50%

GOODS AND SERVICES

8 701

545

8 156

6.26%

HOUSEHOLDS(HH)

 

 

0

 

MACHINERY AND EQUIPMENT

48

-

48

0.00%

TOTAL

12 607

873

11 734

6.92%

REPLY (2)

What are the details of any underspending in the 2021-22 financial year?

The financial year 2021-2022 reflects underspending due to the following reasons:

There was no facilitated National Camp as a mobilization strategy for youth due to (i) the Department embarked on the process of appointing a service provider for conducting the Design and Implementation Evaluation of Youth Camps in order to determine the impact of camps over the years since 2012-2019. The appointment of the Service provider to conduct the evaluation of camps delayed due to no responses from the advertisements. Lack of a Service provider to deliver a skills development training on Business Management also resulted in 2021-2022 underspending. The hosting of provincial engagements further led to underspending due to COVID restrictions as well provincial competing priorities.

30 June 2022 - NW2299

Profile picture: Lees, Mr RA

Lees, Mr RA to ask the Minister of Public Enterprises

What are the details of the sources of the funds to be used for the repayment of the TNUS 22 GMTN Dollar Bonds issued by Transnet that amount to a total of 1,0 billion US Dollar, which fall due on 26 July 2022?

Reply:

According to the information received from Transnet

Transnet SOC (“Transnet”) plans to raise USD ($1 billion) (~ZAR15, 6 billion) in both the domestic and international capital markets to settle the USD $1,0 billion (an obligation that is due on 26 July 2022). Transnet has also appointed Joint Lead Managers (JLMs) who will assist Transnet to access the capital markets to raise the USD $1,0 billion (~ZAR15, 6 billion).

30 June 2022 - NW2179

Profile picture: Lees, Mr RA

Lees, Mr RA to ask the Minister of Public Enterprises

With reference to the funding of the SA Airways operations, what (a) were the budgeted losses in the 2021-22 financial year, (b) are the projected budgeted losses for the 2022-23 financial year, (c) were the actual losses incurred in the 2021-22 financial year and (d) are the details of the sources of funds that (i) funded the 2021-22 losses and (ii) will fund the 2022-23 losses?

Reply:

We confirm that the operations of the airline are being funded from the working capital that was provided to the airline by Government as part of the R10.5 billion for implementing the business rescue plan. As soon as the audited fiancials are ready, these will be made public.

 

30 June 2022 - NW2237

Profile picture: Mkhonto, Ms C N

Mkhonto, Ms C N to ask the Minister of Employment and Labour

(1)Whether, with reference to his reply to question 621 on 12 March 2022, wherein he stated that there are 28 596 users registered on CompEasy compared to 45 336 that were registered on the previous system, the 28 596 number reported exclude Compensation Fund users and relates to employers only; if not, what is the position in this regard; if so, what total number of the (a) 28 596 users are registered employer representatives and (b) users are registered representatives of medical service providers (2) what (a) are the reasons that there is such a massive difference of 16 740 users between currently registered users versus previously registered users and (b) happened to the users previously transacting with the Compensation Fund who are not registered any longer?

Reply:

1. The 28 596 are users registered in the Compensation Fund’s CompEasy system of which:

a) 14 974 are Employer representatives

b) 10 632 are Medical Service Provider representatives and; 2 990 are Third Party users representing either Medical Service Providers or Employers, or both.

2. 

a) Reasons why more users registered in previous systems versus now is unknown.

b). A communication was sent to all users during 2019 who were in the previous system informing them of the eminent change of systems and the new requirements for access on the new CompEasy system.

30 June 2022 - NW2104

Profile picture: Masango, Ms B

Masango, Ms B to ask the Minister of Social Development

With reference to her reply to question 1359 on 16 May 2022, what are the reasons for an approximate decrease of 6 million beneficiaries, excluding the number of beneficiaries of the Social Relief of Distress grant, in the 2021-22 financial year when compared to the 2020-21 financial year?

Reply:

No, there isn’t a decrease of 6 million beneficiaries in the 2021-22 financial.

In the 2020/21 financial year we paid 12 628 175 beneficiaries (that is the people who actually receive the social grant). Thus there was an increase of 159 691 to 12 787 866 between the two years.

The total number of grants paid in the 2020/21 financial year was 18 440 572 and this has increased to 18 677 339 in the 2021/22 financial year. A beneficiary may receive more than one grant, e.g. a caregiver receiving 2 child grants for 2 children. Hence the number of beneficiaries are smaller than the number of grants paid.

30 June 2022 - NW1839

Profile picture: Opperman, Ms G

Opperman, Ms G to ask the Minister of Social Development

(1)What amount has been budgeted to ensure that more shelters for gender-based violence and femicide are available (details furnished); (2) whether there are any new shelters forthcoming for the Northern Cape; if not, what is the position in this regard; if so, (a) where will they be implemented and (b) what are the relevant details?

Reply:

(1)The amount of R501 000.00 is budgeted for the establishment of the shelter in the Namaqua district. The Namakhoi Municipality committed to provide the structure and to refurbish the structure and this process is already underway. This amount is for the running cost of the shelter.

(2) The province is in the process of ensuring that there is at least one victim support centre in each district. The only district that does not have a shelter is the Namaqua district. The Department in partnership with the Namakhoi Municipality in Springbok is in the process of establishing a shelter in the district in 2022/23 financial year.

30 June 2022 - NW2016

Profile picture: Siwisa, Ms AM

Siwisa, Ms AM to ask the Minister of Social Development

In light of the fact that retail stores will now be rendering services for the collection of the R350 Social Relief of Distress grants by beneficiaries, what are the terms of reference for the specified services between her department and retail stores?

Reply:

The South African Social Security Agency (SASSA) has contracted the South African Post Office (SAPO) to pay grant beneficiaries, which includes beneficiaries of the COVID-19 Social Relief of Distress. SAPO in turn has expanded their distribution network to include retailers. This agreement, however, is between SAPO and the retailers. SASSA is not a party to the agreement.

The arrangement, however, is similar to those between banks and retailers, where beneficiaries who chose to have their funds paid into their own personal bank account, can then access those funds from their bank, any other banks including ATM and/ or any merchant, which has an arrangement with their bank. For SAPO, this is done at no cost to the beneficiary.

30 June 2022 - NW2398

Profile picture: Powell, Ms EL

Powell, Ms EL to ask the Minister of Human Settlements

With reference to her reply to question 835 on 22 April 2022, what was the outcome of the disciplinary process of the National Home Builders Registration Council against the Aventino Group Pty (Ltd)?

Reply:

The NHBRC has finalised its investigation and concluded that it is unable to take disciplinary steps against this home builder based on the investigations conducted by the SIU and its internal resources. The NHBRC lacks jurisdiction on the matter as the Temporary Residential Units (TRUs) in question are not “homes” as defined in the Housing Consumer Protection Measures Act, 1998 (Act No. 95 of 1998).

30 June 2022 - NW1840

Profile picture: Opperman, Ms G

Opperman, Ms G to ask the Minister of Social Development

What amount has her department budgeted for (a) psychosocial support and (b) gender-based violence victim support in the Northern Cape?

Reply:

a) There is no specific budget allocated for psychosocial support. The psychosocial support budget is included in the overall allocation of the Gender Based Violence (GBV) which amounts to R 8 138 000, 00. This amount includes the provincial as well as district goods and services budgets.

b) An amount of R 1 904 000,00 has been allocated as a transfer allocation to NGO’s for the provision of GBV services. The total budget allocation for GBV services rendered by the Department of Social Development in Northern Cape is therefore R 10 042 000, 00.

30 June 2022 - NW2238

Profile picture: Chabangu, Mr M

Chabangu, Mr M to ask the Minister of Employment and Labour

With reference to his reply to question 483 on 11 March 2023, wherein he mentioned that 39 057 medical invoices were rejected in the 2021-22 financial year, what are the top five reasons for the rejections in numbers?

Reply:

The top Five rejection reasons for medical invoices:

 

Rejection Reason

Number of invoices

No medical report

11 759

No Pre-authorisation

8 098

Duplicate invoice

4 112

Liability not accepted

1 972

Exempted Employer claim

1 078

30 June 2022 - NW2107

Profile picture: Abrahams, Ms ALA

Abrahams, Ms ALA to ask the Minister of Social Development

(1)(a) What (i) is the purpose of the Annual National Youth Camps offered by her department and (ii) has she found to be the impact of the Annual National Youth Camp in the lives of the youth, (b) how are the youth who participate identified and (c) what are the details of the involvement of the provinces in the national youth camps;

Reply:

a) i) The purpose of the Annual Youth camp offered by the National Department of Social Development is to:

The purpose of annual Youth Camp is to empower youth by providing them with necessary employment, entrepreneurial and lifeskills. The Department provide these these interventions through partnerships with other government departments such as Department of Defence and Military Veterans, Department of Women, Youth and People with Disabilities, Youth organizations, youth structures and other relevant stakeholders. Youth are identified through DSD Youth Mobilisation programmes and are mobilized from different races, ethnicity, gender, class and language from all nine provinces. The Youth Camps are aimed at promoting national identity, nation building, social cohesion, patriotism and active citizenry under various themes each year. The camps present an environment where young people are moulded, guided and skilled to enhance their sense of responsibility and maximise their individual and collective energies for personal development as well as development of the broader society. Within the programme, young people are engaged in dialogues on topical issues that affect them and their communities, with a view of identifying root causes and identify strategic solutions to address the youth challenges.

(ii) The impact of the Annual National Youth Camp in the lives of the youth,

The impact of Youth Camps has been enormous in the sense that majority of Youth who participated in the DSD Youth Camps are involved in community development through running of the NPOs and their businesses contributing towards development of communities and building and strengthening of social cohesive communities. The department is also currently conducting a study on the ‘Design and Implementation Evaluation of youth camps’: DSD Camp model’. The study is scheduled to end in the second quarter of the financial year 2022/2023 and it will provide the department with a clear picture of the impact made by the Youth Camps and once the report is ready it will be shared with the Members as the report will identify and profile some of Youth that have participated in the Youth Camps and are making some impact in their respective areas of development.

b) How are the youth who participate identified?

The Youth camp participants are made of the youth from all the nine provinces. A youth criterion is generated to identify youth according to age, gender, race, disability, demographic location to ensure the balance concerning the participation of youth. The Youth come through the District Camp engagement per province, and Provincial Camps per province. At the District level, Youth are identified through Youth Mobilisation programmes by looking at their active participation and engagement with the programmes and their willingness to contribute towards eradication of the triple challenges of poverty, unemployment and inequalities especially as it affects the young people.

(c) What are the details of the involvement of the provinces in the national youth camps.

The Department has build-up camps first at District level that culminate into the Provincial Youth Camps. From the Provincial Camps, then the Youth will be taken to the National Youth Camps through submission of their names to National Department by the provinces.

(3) whether she will furnish Ms A L A Abrahams with a list of (a) facilities that were used to host the youth camps in the past 10 years, (b) catering service providers that were used for the specified period and (c)(i) all other service providers used, indicating service that was rendered by each in the specified period; if not, why not in each case; if so, on what date?

Response:

(a) Facilities that were used to host the youth camps in the past 10 years,

The Department has in the main used the Department of Defence and Military Veterans facilities as it had a partnership with the Department.

(b) Catering service providers that were used for the specified period and

The catering service providers in the main it was the Department of Defence and Military, who provided an all inclusive list of services.

(c) (i) all other service providers used, indicating service that was rendered by each in the specified period; if not, why not in each case; if so, on what date

The service providers used where mainly government departments and agencies (NDA, NYDA) rendering training on various aspects such as entrepreneurial and leadership skills. Other service providers included providers for promotional and training materials as well as facilitators.

30 June 2022 - NW2094

Profile picture: Gondwe, Dr M

Gondwe, Dr M to ask the Minister of Social Development

(1)Whether, with reference to her reply to question 360 on 18 February 2022, the Department of Public Service and Administration (DPSA) has advised her regarding the date on which they will be furnishing her department with the details of the residential and work addresses of the outstanding 198 public servants from the SA Social Security Agency (SASSA); (2) whether the matter of the Level 13 employee who applied for and received the R350 Social Relief of Distress grant has been brought to the attention of the relevant heads of department; if not, why not; if so, what (a) are the relevant details and (b) position does the specified employee occupy in the Public Service; (3) on what date was the complete information regarding the nine public servants handed over by the DPSA to SASSA; (4) what progress has been made by the SA Police Service in investigating the nine public servants whose complete information was handed over to SASSA by the DPSA?

Reply:

1. Information regarding the 198 government employees was received on the 29th March 2022 from DPSA.

2. No. The relevant Head of Department has not been informed yet.

a) The Agency is expecting to receive all relevant information pertaining to the level 13 official before it can open a case with the South African Police Services (SAPS). When this is received, we will concurrently inform the Head of the Department responsible for the official through the DPSA as agreed on how the process should flow.

b) The official is a Chief of Staff at one of the provincial government departments.

3. Information regarding the nine (9) government officials was received on 01 February 2022. On 29 March 2022 we received information balance of outstanding 198 officials.

4. A progress report pertaining to the nine referred cases was received from SAPS as detailed below:

Item no

Station and Cas No

Court

1

Vereeniging 249/11/2021

Under investigation

2

Edenpark 166/11/2021

Under investigation

3

JHB Central 762/11/2021

Under investigation

4

Sandton 312/11/2021

Randburg court – the prosecutor declined to prosecute

5

Fochville 140/11/2021

Fouchville court - the prosecutor declined to prosecute

6

Hillbrow 385/11/2021

Johannesburg Court - the prosecutor declined to prosecute

7

Evaton 238/11/2021

Sebokeng Court - the prosecutor declined to prosecute

8

Moroka 323/11/2021

Protea Court - the prosecutor declined to prosecute

9

Evaton 240/11/2021

Sebokeng court - the prosecutor declined to prosecute

30 June 2022 - NW2177

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Employment and Labour

Whether any of the existing (a) functions, (b) responsibilities and/or (c) programmes of (i) his department and (ii) departmental entities reporting to him are being transferred to Productivity South Africa; if not, what is the position in this regard; if so, what (aa) are they and (bb) is the rationale in each case?

Reply:

The Department of Employment and Labour, as a consequence of the change in its mandate is in a process of internal engagement on the reconfiguration of the Department. The could be functions that are transferred to certain entities of the Department, including Productivity South Africa. For now, no such a decision has been made but purely suggestions.

30 June 2022 - NW1800

Profile picture: van der Merwe, Ms LL

van der Merwe, Ms LL to ask the Minister of Social Development

(1)What (a) total number of non-profit organisations (NPOs) received increases to their budgets in 2021-22 financial year in each province, (b) are the names of the NPOs that received increases and (c) did the increases amount to in total; (2) (a) what total number of NPOs had their budgets reduced due to her department taking over and/or now providing the service in each province; (3) whether she will provide Ms L L van der Merwe with a list of the NPO services that are no longer funded due to her department now providing the service in each province; if not, what is the position in this regard; if so, what are the further, relevant details?

Reply:

1(a)  total number of non-profit organisations (NPOs) received increases to their budgets in 2021-22 financial year in each province,

1 (a)

Provincial NPOs

No. of NPO received increases to their budgets in 2021/22

 

Eastern Cape

3

 

Free State

21 HIV/AIDS

24 VEP

 

Gauteng

All funded NPOs received the inflation rate of 4% for the 2021/22 financial year

 

Kwa-Zulu Natal

0

 

Limpopo

0

 

Mpumalanga

17

 

North-West

0

 

Northern Cape

All funded NPOs received the inflation rate of 5% for the 2021/22 financial year

 

Western Cape

247

b) are the names of the NPOs that received increases and

1 (b)

Provincial NPOs

Names of NPO that received increases to their budgets in 2021/22

1.

Eastern Cape

  1. Madeira Home Housing Utility Company
  1. ACVV Huis Genot
  1. Munro Kirk Home

2.

Free State

HIV & AIDS SUB-PROGRAMME

NAME OF ORGANIZATION

INCREASED AMOUNT

THABO MOFUTSANYANA

Clocolan Child Care Forum

R12’000

Dihlabeng Development Initiative

R12 000

Ficksburg Child Care Forum

R12 000

Golden Gate Hospice

R11 000

Ikaneng Child Care Forum

R10 000

Itemoheng

R11 000

Mamafubedu Child Care Forum

R12 000

Moemaneng Child Care Forum

R12 000

Petsana Child Care Forum

R12 941

Senekal Child Care Forum

R12 000

Tshwaranang

R12 000

SUB-TOTAL

R116 000.48

MANGAUNG

Botshelo

R15 090.00

Fadimehang Home Based Care

R35 375.32

My Ride to Ikusasa

R30 347.32

Kgauhelo Project

R78 374.87

Masakhane Home Based Care

R73 692.87

Santa Botshabelo Branch

R10 000.00

Tshepong Care Centre

R64 896.93

Tswellang

R35 374.32

Paballo Home Based Care

R30 374.32

Ikgomotseng

R25 374.32

SUB-TOTAL

R398 899.22

TOTAL

R514 899.70

VICTIM EMPOWERMENT PROGRAMME

Organisation

Increase

Lejweleputswa -7 (Seven)

Boshof Victim Empowerment

R14 200

Khululeka Victim Support

R 14 200

Dr Maile Development Center

R 8 900,

Theunissen Boitelo VEP

R 14 200

Tshireletsong VE

R 8 900

Winburg VEP

R 15 200

SUB-TOTAL = R75 600

Mangaung Metro ( 8)

 

Free Care in Action

R 26 700

Free state Network on Violence against Women

R8 900

Mangaung Setshabelo

R 8 900

FAMSA

R 17 800

Heatherdale Dikonale Dienste

R 29 000

Child Welfare BFN Child Line

R 9 000

Reya Phela Safe House

R 16 799 05

Child Welfare SA Wepener

R 16 710 00

SUB-TOTAL = R 133 809 .05

Xhariep( 5)

 

Women Support Group

R 14 240

Bambanani Victim Empowerment

R 14 240

Bophelong Victim Empowerment

R 14 240

Sivile –Reutlwile Victim Centre

R14 240

Kgothalang Victim Center

R 14 240

SUB-TOTAL = R 71 200

Thabo Mofutsanyana (2)

 

Thusanang Advice Shelter

R 16 800

Bethlehem Child and Family Welfare –Tshepo ya rona Shelter

R 16 854

SUB-TOTAL = R 33 654

Organization

Increase

Thusanang Advice Shelter

R 144 231 94

Goldfields Family Advice Organization

R108 698

Total = 2 Organisations

R252 929 94

Grand total 24 Organisations

R 567 192 .99

3.

Gauteng

Refer to PQ 1484

4.

Kwa-Zulu Natal

N/a

5.

Limpopo

N/a

6.

Mpumalanga

SOS Children’s Village Association to the Republic of SA

St John’s Care Centre

Ebenezer CYCC

Uzwelo Home CYCC

SAVF Louis Hildebrandt Kinderhuis

Janell Huis CYCC

CMR Ermelo CYCC

Phephelaphi CYCC

Kosmos Kinderhawe

Bethesda Home of Hope CYCC

Octopus Network

Malekutu Development Proframme

Brothers Services Community Development

Emphilweni Multipurpose Centre

Isiphephelo Multipurpose Centre

Hlayisekani Nursing Home

Barberton Organization for the Care of the Aged

7.

North-West

N/a

8.

Northern Cape

All funded NPOs – refer to PQ 1484

9.

Western Cape

List attached

c) did the increases amount to in total;

1 (c)

Provincial NPOs

Increases amount to in total

1.

Eastern Cape

R672 000

2.

Free State

R1 082 093.00

3.

Gauteng

(4% inflationary rate

4.

Kwa-Zulu Natal

0

5.

Limpopo

0

6.

Mpumalanga

R24 449 444

7.

North-West

0

8.

Northern Cape

R10,7 million

9.

Western Cape

R48,751 million (excludes ECD Conditional grants)

(2) (a) what total number of NPOs had their budgets reduced due to her department taking over and/or now providing the service in each province;

2 (a)

Provincial NPOs

Budgets reduced due to her department taking over

1.

Eastern Cape

51

2.

Free State

None

3.

Gauteng

None

4.

Kwa-Zulu Natal

None

5.

Limpopo

None

6.

Mpumalanga

None

7.

North-West

None

8.

Northern Cape

None

9.

Western Cape

None

(3) whether she will provide Ms L L van der Merwe with a list of the NPO services that are no longer funded due to her department now providing the service in each province; if not, what is the position in this regard; if so, what are the further, relevant details?

3

Provincial NPOs

Increases amount to in total

1.

Eastern Cape

None

2.

Free State

None

3.

Gauteng

None

4.

Kwa-Zulu Natal

None

5.

Limpopo

None

6.

Mpumalanga

None

7.

North-West

None

8.

Northern Cape

None

9.

Western Cape

None

30 June 2022 - NW2201

Profile picture: Maotwe, Ms OMC

Maotwe, Ms OMC to ask the Minister of Public Enterprises

(1) Whether he has held any engagements with the Chief Executive Officer (CEO) of Eskom, Mr André de Ruyter, who announced that he expects load-shedding to happen for 295 days in the next 12 months, which is about 80% of the time next year, in order to understand the basis of his claim; if not, why not; if so, what are the relevant details; (2) Whether the explanation given by the CEO has been sufficient so as to convince him that the CEO and the management of Eskom know what they are doing; if not, what is the position in this regard, if so, what are the relevant details?

Reply:

1. The Minister, Department Officials, Eskom Board of Directors, Eskom Chief Executive Officer (CEO) and Management meet on a regular basis to discuss Generation performance challenges and plans to improve the performance. The Eskom’s worst-case scenario is assumption of unplanned unavailability between 13 500 MW and 15 000 MW for winter and between 14 500 MW and 16 000 MW for summer, this shows that 104 days of loadshedding could be expected in 2022 winter and 191 days of loadshedding could be expected in the 2022/23 summer. These result in total of the 295 days of load shedding. The Generational Recovery Plan (including Maintenance Recovery Programme) has been implemented to improve Generation performance. Eskom has been implementing defects correction mechanism plan to improve Energy Availability Factor (EAF) at Medupi and Kusile power stations. Eskom will require additional capacity of between 4 000MW to 6 00MW to minimise load shedding.

2. The explanation given by the Eskom CEO has been sufficient that the CEO and Management know what they are doing in turning around Generation performance. I have got confidence of Eskom CEO and management to turnaround Eskom’s Generation Performance and reduce loadshedding that is affecting our economy.

At the same time, the board, management and staff are being directed to make energetic and urgent efforts to avert as much load shedding as possible- recognising the deleterious effect it has on households and businesses.

Additional Information for the Minister

Eskom never plans to loadshed. The System Operator (SO) evaluates the adequacy of the power system at the beginning of each season (1 April – 31 August for winter and 1 September – 31 March for summer) based on the maintenance requirements of the generation fleet, the anticipated demand from the customers and the unplanned breakdowns of generators. The capacity unavailable due to breakdowns, is highly volatile and uncertain, leading the SO to resort to scenario planning based on the range of unplanned unavailability of generation capacity.

For the 2022 winter, the SO determined that the unplanned unavailability of generation capacity would be in the range of 12 000 MW – 15 000 MW based on a trend analysis of the previous five years performance. For the 2022/23 summer, this range is between 13 000 MW – 16 000 MW (subject to review in August 2022).

This was broken down into three scenarios which were further analysed:

• The optimistic scenario: with unplanned unavailability below 12 000 MW for winter and below 13 000 MW for summer, this illustrates those 0 days of loadshedding would be expected in winter 2022, while 16 days of loadshedding could be expected in summer 2022/23.

• The realistic scenario: with unplanned unavailability between 12 000 MW and 13 500 MW for winter and between 13 000 MW and 14 500 MW for summer, this shows that 37 days of loadshedding could be expected in 2022 winter and 132 days of loadshedding could be expected in summer 2022/23.

• The extreme scenario: with unplanned unavailability between 13 500 MW and 15 000 MW for winter and between 14 500 MW and 16 000 MW for summer, this shows that 104 days of loadshedding could be expected in the 2022 winter and 191 days of loadshedding could be expected in the 2022/23 summer. This is the total of the 295 days referred to.

The unplanned unavailability varies dynamically in time with variances in excess of 4 000 MW in a single week being common. To achieve 295 days of loadshedding in summer and winter combined, the unplanned unavailability would need to remain at 15 000 MW for every hour of winter and at 16 000 MW for every hour of summer for the 12-month period, and that is unlikely.

30 June 2022 - NW1369

Profile picture: Marais, Ms P

Marais, Ms P to ask the Minister of Social Development

Given that her the Botshabelo and Bloemfontein offices of her department do not comply with occupational health and safety standards and were instructed by the Department of Employment and Labour to either comply or close office, what are the reasons that the specified offices are still operating?

Reply:

1. Offices occupied by the Department of Social Development in Bloemfontein and Botshabelo and the conditions in terms of Occupational Health & Safety Compliance are as follows:

Office Building

OHS Condition

CIVILIA BUILDING – PROVINCIAL OFFICE

FIRE EQUIPMENT

Valid unit 31/12/2023.

FUMIGATION

Attended - 17/02/2022.

Follow Up - 17/03/2022 & 28/03/2022.

VENTILATION

New Aircons installation completed September 2021, the Chiller Machine currently being serviced.

LIFTS

New lifts installation completed November 2020.

GENERAL MAINTENACE

Inspection conducted with Landlord on 12 April 2022 to attend to maintenance matters.

OLD STANDARD BANK BUILDING – PROVINCIAL OFFICE

FIRE EQUIPMENT

Valid unit 31/10/2022.

FUMIGATION

Completed on 18/02/2022.

VENTILATION

Aircons serviced in March 2022.

LIFTS

Functioning well.

GENERAL MAINTENACE

Attended by Landlord as per request.

STANDARD BANK HOUSE BUILDING – PROVINCIAL OFFICE

FIRE EQUIPMENT

Valid unit 31/10/2022.

FUMIGATION

Completed on 18/02/2022.

VENTILATION

Aircons serviced in March 2022.

LIFTS

Functioning well

GENERAL MAINTENACE

Attended by Landlord as per request.

LEMO MALL – DISTRICT OFFICE

FIRE EQUIPMENT

Valid unit 31/12/2022.

FUMIGATION

To be attended in the current financial year.

VENTILATION

Aircons in working order.

LIFTS

In working order.

GENERAL MAINTENACE

Attended by Landlord as per request.

TSHEPONG – DISTRICT OFFICE

FIRE EQUIPMENT

Valid unit 30/09/2022.

FUMIGATION

Procurement underway for all outstanding institutions and sub offices in Mangaung.

VENTILATION

Windows available. Air conditioners to be installed during the 2022/23 Financial Year.

LIFTS

Flat structure. Ramp available.

GENERAL MAINTENACE

Attended to by the Department.

BOTSHABELO FDC – DISTRICT OFFICE

FIRE EQUIPMENT

Valid unit 30/09/2022.

FUMIGATION

To be attended to in the current financial year.

VENTILATION

Windows available. New Air conditioners installed during 2019 and functioning well.

LIFTS

N/A.

GENERAL MAINTENACE

Attended by Landlord as per request.

Last major renovations took place during August 2019.

TSHIRELETSONG CYCC

FIRE EQUIPMENT

Not in good working condition. Department of Public Works and Infrastructure in a process to service fire equipment.

FUMIGATION

Completed in April 2022.

VENTILATION

Windows available. Air conditioners in good working order.

LIFTS

N/A.

GENERAL MAINTENANCE

Attended by the Department of Public Works and Infrastructure as per the conditions of the lease contract.

BOIKETLONG OLD AGE HOME

FIRE EQUIPMENT

Valid until 30/09/2022.

FUMIGATION

Service to be completed by 17/05/2022.

VENTILATION

Windows available. Air conditioners in good working order.

LIFTS

N/A.

GENERAL MAINTENANCE

Attended by the Department as and when required.

WINKIE DIREKO & ONE STOP CHILD JUSTICE CENTRE

FIRE EQUIPMENT

Valid until 30/09/2022.

FUMIGATION

Completed in March 2022. New procurement underway. To be finalised by 30 June 2022.

VENTILATION

Windows available. Air conditioners in good working order.

LIFTS

N/A.

GENERAL MAINTENANCE

Attended by the Department.

BOTSHABELO HAVEN

FIRE EQUIPEMENT

Valid until 30/09/2022.

FUMIGATION

Procurement underway. To be finalised by 30 June 2022.

VENTILATION

Windows available. Air conditioners in good working order.

LIFTS

N/A.

GENERAL MAINTENANCE

Attended by the Department as and when required.

2. The offices are still operating due to the fact that the issues identified in the previous years in terms of Occupational Health and Safety were attended to and the buildings comply with the requirements of the Act.

3. No new Contraventions/Prohibition Notices were received by the Department to date in the offices in question.

30 June 2022 - NW2148

Profile picture: Herron, Mr BN

Herron, Mr BN to ask the Minister of Public Enterprises

(a)(i) How many litres of diesel did Eskom use for the purposes of power and/or electricity generation in the 2021-22 financial year and (ii) what was the total cost of that diesel consumption, (b) what total number of days in the current calendar year since 1 January 2022 has Eskom implemented load shedding and (c)(i) how many litres of diesel has Eskom used to generate power and/or electricity in this calendar year since 1 January 2022 and (ii) what is the total cost of that diesel consumption?

Reply:

According to the information received from Eskom:

(a)(i) In the 2021/22 financial year, 571 295 617 litres of diesel were burnt.

(a)(ii) The total cost of diesel consumption was R 6 407 million.

(b) Eskom implemented loadshedding for 50 days from 1 January 2022 to 2 June 2022. Five (5) days were at Stage 1; 35 days were at Stage 2; four (4) days were at Stage 3; and six (6) days were at Stage 4.

(c ) (i) The amount of diesel consumed at Eskom’s Ankerlig and Gourikwa OCGTs, as well as the associated cost for the current year, 2022 (January to May) is 272 911 112 litres consumed.

(c ) (ii) The total cost of the diesel consumption from January to May 2022 is R 3 843 million.

30 June 2022 - NW1934

Profile picture: Abrahams, Ms ALA

Abrahams, Ms ALA to ask the Minister of Social Development

Given that the critical position of Deputy Director-General for Welfare Services has been vacant since the tragic passing of the late Ms Connie Nxumalo in August 2020, (a) at what stage is her department with the advertisement and/or interview process for the specified vacancy and (b) by what date does she envisage the critical position will be filled permanently?

Reply:

a) The post was advertised and the preliminary shortlisting process has been finalised. The Department intends to conclude the interviews in the coming weeks, preferably June subject to the availability of all panel members whose diaries we are currently aligning.

(b) Immediately after the interviews are done, a Cabinet Memorandum will be generated and submitted for Cabinet’s concurrence, which is a requirement for all posts at this level.

30 June 2022 - NW2009

Profile picture: Maotwe, Ms OMC

Maotwe, Ms OMC to ask the Minister of Public Enterprises

(1) What are the details of the agreed upon performance indicators of the (a) Chief Executive Officer and (b) Chief Operating Officer of Eskom; (2) whether he has found that the specified officials are currently performing according to their agreed-upon performance indicators; if not, why not; if so, what are the relevant details?

Reply:

According to the information received from ESKOM

1. The performance indicators for the Group Chief Executive and Chief Operating Officer are agreed to at the beginning of each financial year. These indicators are based on the Shareholders compact / Corporate Scorecard as approved by the shareholder and includes the following key performance areas and key performance indicators:

KPA

FY23 KPI

Unit

FY23

FY24

FY25

Focus on Safety

Lost-time Injury Rate (Employee) (LTIR)1

Rate

0.30 

0.30 

0.30 

Improve Plant Operations 2

Energy Availability Factor (EAF)

%

65

TBC

TBC

 

Post Philosophy Outage UCLF (PPO UCLF)

%

14

TBC

TBC

 

Outage Readiness Indicator (ORI) at T-3

%

80

TBC

TBC

 

Boiler Tube Failure (BTF) rate

No. of failures per unit per year (12mma)

1.8

TBC

TBC

 

Number of days of load reduction (load shedding and/or curtailment)

Days

63

TBC

TBC

Reduce Environmental Footprint in Existing Fleet

Relative Particulate Emissions (Kg/MWh sent out)

Kg/MWh

0.30

0.30

0.28

 

Specific Water Usage –Litres Per Kwh (l/kWh Sent Out)

l/kWh

1.39

1.30

1.25

 

Atmospheric Emission Licences (AEL) Compliance

%

90

91

92

Primary Energy Optimisation3

Migration Of Coal Delivery Volume From Road To Rail

Mt

4.7

7.6

7.6

 

Coal Purchases Rand/Ton % Increase

%

Commercially confidential

Deliver Capital Expansion

Generation Capacity Installed and Commissioned (Commercial Operation)

MW

800

800

800

Improve Plant Operations

System Minutes Lost

Min

3.53 

3.53 

3.53

 

Transmission Lines Installed

Km

140

340

346

 

Transmission Transformers Capacity Installed and Commissioned

MVA

0

1 315

1 500

 

Payment Levels Excluding Soweto Interest

%

95.7

95.7

95.7

 

Distribution Total Energy Losses

%

9.44

9.42

9.56

 

Total Electrification Connections

Number

106 280

105 936

105 000

 

SAIDI

Hours

38.0

38.0

38.0

Ensure Financial Sustainability3

EBITDA

Rm

53 829

68 053

82 805

 

Cash Interest Cover Ratio

Ratio

1.75

2.28

2.04

 

Debt Service Cover Ratio

Ratio

0.73

1.01

0.91

 

Savings From Turnaround Initiatives

Rm

21440

22619

23863

Legal Separation

Business Separation Key Milestones (Gx legal separation)

Date

2022/12/31

 

 

 

Business Separation Key Milestones (Dx legal separation)

Date

2022/12/31

   

Socio-economic Impact: Human Capital

New intake: Learner Artisans

Number

100

100

100

 

New Intake: Learner Engineers

Number

50

50

50

 

New Intake: Learner Technicians

Number

50

50

50

 

New intake: Sector specific

Number

90

90

90

 

Training Expenditure as % of Budgeted Gross Employee Benefit Expense

%

3.75

3.75

3.75

Corporate Social Investment (CSI)

CSI Committed Spend

Rm

131

131,3

137.9

Industrialisation and Localisation

Preferential Procurement

%

80

80

80

 

Local Content

%

80

80

80

 

B-BBEE Score Level

Number

6

4

4

 

Enterprise Development

Rm

5

5

5

 

Supplier Development

Rbn

5

6

7

 

National Industrial Participation Programme

%

100

100

100

 

Research and Development

%

90

95 

95 

Data Analytics

Integrated outage solution platform

%

30

  TBC

 TBC 

 

Improved data quality

%

30

  TBC

 TBC 

 

Plant data actionable insights

%

30

  TBC

 TBC 

 

Enhance self-service capability

%

10

  TBC

 TBC 

 

The key performance areas such as Financial Sustainability and Legal Separation will have higher percentages in the Group Chief Executive compact whereas higher ratings in the Chief Operating Officer compact will be given to operational key performance areas such as improvement of plant performance and primary energy optimalisation.

(2) With all the challenges facing Eskom these officials are performing according to and beyond their agreed performance scorecards. There had been a dramatic improvement in Eskom’s performance with an 85% improvement in earnings before interest, tax and depreciation (ebitda). Eskom has also successfully reduced debt to R396 billion, from a previous high of R440 billion. The actual performance against the shareholders compact can be shared once the Audit is completed.

30 June 2022 - NW1936

Profile picture: Masango, Ms B

Masango, Ms B to ask the Minister of Social Development

Considering the devastating floods that are being experienced in KwaZulu-Natal, what (a) total number of (i) SA Social Security Agency offices and (ii) social development facilities have been damaged as a result, (b) is the total estimated cost of damages for repairs, (c) total number of beneficiaries will be unable to receive their grants, (d) are the areas where beneficiaries will and are most affected and (e) strategies are being implemented by her department in order to operationalise their offices and recover from the devastation?

Reply:

In the KwaZulu-Natal region, there is

(a)(i) One SASSA local office in Chatsworth that was damaged by the floods that services approximately 140 beneficiaries per day (ii) No facility under Social Development was damaged.

(b) The roof of the local office (the building is shared with the Department of Home Affairs) was previously affected by rain damage that resulted in the flooding of the floor space. This had a temporary effect on daily operations. According to the estimates from the Provincial Department of Public Works, the estimated costs for repairing the roof prior to the floods were estimated at R 17,5 million.

(c), (d) and (e) Due to the minimal damage no services at SASSA offices were severely compromised and services to grant applicants are continuing as normal.

30 June 2022 - NW1937

Profile picture: Masango, Ms B

Masango, Ms B to ask the Minister of Social Development

(1)What total number of Social Relief of Distress (SRD) vouchers have been provided to victims of the KwaZulu-Natal floods; (2) what is the total value of SRD vouchers that have already been provided to victims of the specified flood; (3) whether (a) her department and/or (b) the SA Social Security Agency made any food parcels available; if not, why not, in each case; if so, what is the total monetary value of the food parcels in each case; (4) whether she will furnish Ms B S Masango with a list of locations that have already been assisted; if not, why not; if so, what are the relevant details?

Reply:

(1) The South African Social Security Agency (SASSA) has issued 9 520 Social Relief of Distress vouchers between 2022/04/12 and 2022/05/23.

(2) The total value of these vouchers is R16 264 216.

(3)(b) SASSA has not disbursed any food parcels as it has relied solely on the use of vouchers for the purposes of providing Social Relief of Distress. This enables the agency to provide relief in a much more timely manner, and also enables the recipients to select their own relief items from the voucher.

(4) SASSA also provides meals at 72 shelters across the province. Refer to the attached list of shelters for further details.

30 June 2022 - NW2278

Profile picture: Marais, Mr EJ

Marais, Mr EJ to ask the Minister of Public Enterprises

What are the details of the (a) medium- and (b) long-term plans of Transnet for the (i) development of additional infrastructure and (ii) maintenance of current infrastructure at the Saldanha Bay harbour?

Reply:

According to the information received from Transnet

a) Medium Term Plans

The following infrastructure development projects are intended to materialize in the short- to medium-term and is illustrated below:

a) Land reclamation next to the current iron ore stockyard for the increase of the iron ore stockpile area (short-medium term) as well as additional space for new Liquid Natural Gas (LNG) facilities (medium-long term).

b) LNG Floating Ship Regasification Unit (FSRU) infrastructure connected to the new LNG facilities (extension of land in dunes area and oyster dam reclamation).

c) The existing Mossgas Quay converts to maritime engineering berth together with additional maritime engineering berths as provision for dedicated facilities for rig and ship repair.

d) One additional maritime engineering berth for ship repairs adjacent (southern side) to the break bulk Multi Purpose Terminal (MPT) berths.

e) One additional dry bulk berth adjacent (south) of the new ship/rig repair berth.

f) Break Bulk (MPT) extension towards the north providing one additional Break Bulk (MPT) berth at the Break Bulk terminal.

b) Long Term Plans

The following infrastructure development projects are intended to materialize in the long-term and is illustrated in Annexure B:

a) New proposed land-based LNG storage area inside the port limits.

b) Decommissioning of the LPG Multi Buouy Mooring (MBM) Facility at end of life, and subsequent replacement with fixed LNG and LPG berths (eastern side of the port).

c) Expansion of the Offshore Supply Base.

An aerial view of the port indicating the specific berths that are referred to above are provided in Annexure C.

(i) Development of additional infrastructure for the Port of Saldanha

Background

Future port development is planned for and indicated on the Port Development Framework Plans (PDFP). The PDFP aims to provide a flexible spatial guideline within which the port can develop over the next 30 years. It is defined as a spatial framework within which future port services can be provided.

The planning process comprises of the agreement and alignment of planning objectives, the assessment of the current state of port infrastructure and its associated cargo throughput or functional role, analysis of potential and latent capacity and a comprehensive cargo demand forecast. The outcome of this work defines the temporal and spatial demand for future freight handling facilities, leading to the drafting of several port developments options (PDO). The preferred development is then subjected to further rigorous evaluation in terms of cost benefit analysis, phasing to meet demand, inter-model and other port relationships and opportunity and constraint analyses, leading to the final PDFP.

The following port development framework plans (PDFP’s) are based on the approved 2019 PDFP’s. The 2022 updated PDFPs have been submitted to TNPA head office for approval.

(ii) Maintenance of current infrastructure at the Port of Saldanha

Background

Maintenance of current infrastructure is performed using the Transnet Asset Maintenance Policies and Procedures. This typically follows annual inspections, and identification of short-term maintenance requirements, and budgeted for on a 3 year rolling cycle, using operational budget (OPEX).

For medium term maintenance requirements, these typically are for extensive refurbishment activities, such a midlife refurbishment of assets, or rehabilitation that adds significant remaining useful life to the assets. These are placed onto the Capital investment corporate plan (CAPEX).

Maintenance activities typically have a short to medium term planning cycle that comprises a window of up to ten years.

(a) Short to medium term maintenance plans

At present, there are three main refurbishment programs identified over the 10-year period:

  • Refurbishment of Quay and Jetty Infrastructure – which covers Fenders, Mooring Hooks and Concrete repairs;
  • Road and Rail Upgrade – which covers 3 phased refurbishment and upgrade projects for the port road network;
  • Refurbishment of Main Breakwater and Causeway rock revetments – which covers coastal protection structures critical to the port operation;

Maintenance activities typically have a short to medium term planning cycle that comprises a window of up to ten years. Where assets are identified for replacement due to end-of-life consideration beyond this planning period or where any upgrade as per the original design or intended use becomes applicable, budget planning would consider CAPEX requirements. Such events would normally require significant planning and alignment of operational activities and could be included on the PDFP’s. This would allow for coordinated planning by all stakeholders to ensure minimal impact on operational activities.

29 June 2022 - NW2325

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Agriculture, Land Reform and Rural Development

What measures have been put in place to deal with the limited availability of critical agricultural products such as (a) seeds, (b) fertilisers, (c) pesticides and (d) equipment (i) during and (ii) post the Russian-Ukraine conflict?

Reply:

(a),(b),(c),(d),(i),(ii) None. After consultation with the industry, there is no indication of supply shortages of critical agricultural products such as seeds, fertilisers, pesticides and equipment. However, the Department of Agriculture, Land Reform and Rural Development will monitor the impact of the ongoing conflict.

29 June 2022 - NW2203

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Agriculture, Land Reform and Rural Development

What (a) number of the land restitution claims lodged by the 1998 deadline have been settled (i) to date and (ii) by means of (aa) restoration of land, (bb) granting of alternative pieces of land and (cc) financial compensation, (b) number of hectares of land has been transferred to claimants since the beginning of land restitution and (c) amount has each of the forms of restitution cost her department since the beginning of land restitution?

Reply:

(a)(i) 82 549 claims have been settled, the figure excludes the report on urban claims from 2006 to 2011/12, the verification of the statistics is work in progress because during the various stages of settling the claims counting changed from counting land claims forms to counting land rights restored.

(ii)(aa) 8 938 claims settled through land restoration (the number is not a reflection of the extent e.g one claim can represent 2 hectares in the Western Cape but 20 000 hectares in North West.

(bb) Falls away, the restoration of land includes both alternative and original restored.

(cc) 69 933 claims settled through financial compensation.

b) 2 892 966 hectares transferred and 3835167 hectares settled.

(c) Land cost is R24,578,801,491.71

Financial Compensation is R17,361,570,718.22

Approved Development Grants is R 4,018,918,373.87

END

 

29 June 2022 - NW2326

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Agriculture, Land Reform and Rural Development

What measures have been put in place to contain the shortages in fuel availability as a major input to agricultural output, food production and supply chains?

Reply:

The Department of Agriculture, Land Reform and Rural Development does not regulate fuel. The Department of Mineral Resources and Energy is best placed to respond to this question.

29 June 2022 - NW2234

Profile picture: Montwedi, Mr Mk

Montwedi, Mr Mk to ask the Minister of Agriculture, Land Reform and Rural Development

In light of the fact that her department spent R89 million buying Uitkyk Farm in Fezile Dabi District Municipality in the Free State and the very same farm is utilised by the previous owners who continues to exploit farmworkers who just continue to draw just a meagre salary at the farm whilst the owners make millions out of the farm, on what legislative provisions did her department rely when it appointed a certain person (name furnished) as Acting Chief Director for the Free State, despite the fact that the specified person was suspended for the mess during the sale of the Uitkyk Farm?

Reply:

The appointment was made in terms of Section 32(2)(b)(ii) of the Public Service Act, 1994, (as amended) and the Acting Appointments Policy of the Department

29 June 2022 - NW1691

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Agriculture, Land Reform and Rural Development

What number of the total number of 428 communal property associations (CPAs) in Mpumalanga are (a) compliant, (b) never compliant and/or (c) partially compliant with the provisions of the Communal Property Associations Act, Act 28 of 1996; (2) what are the reasons and/or factors as to why the CPAs are in the specified categories?

Reply:

The department is busy consolidating the figures and a detailed reply will be submitted once finalised.

 

29 June 2022 - NW2213

Profile picture: Mafanya, Mr WTI

Mafanya, Mr WTI to ask the Minister of Defence and Military Veterans

(1) Following her announcement that the SA National Defence Force (SANDF) is planning to downsize the number of its members and/or personnel what (a) are the full details of the reasoning behind the downsizing, (b) number of SANDF personnel will be affected and (c) has she found what will be the impact of the downsizing on the ability of SANDF to defend the territorial integrity of the Republic?

Reply:

Attached find here: Reply

29 June 2022 - NW2000

Profile picture: Cebekhulu, Inkosi RN

Cebekhulu, Inkosi RN to ask the Minister of Defence and Military Veterans:

Whether the SA National Defence Force has made any recent findings on any breaches in border security, given that hijackings persist and vehicles and other stolen goods continue to cross the borders of the Republic between KwaZulu-Natal, Mozambique and Swaziland as well as Zimbabwe; if not, why not; if so, what are the full relevant details?

Reply:

Attached find here: Reply

29 June 2022 - NW1874

Profile picture: Lees, Mr RA

Lees, Mr RA to ask the Minister of Agriculture, Land Reform and Rural Development

With reference to the Cathedral Peak Outgrowers Project in the Okhahlamba Local Municipality in KwaZulu-Natal, what are the details of all (a) government and (b) private persons and/or entities who (i) are currently participants in the project and (ii) have been participants in the project since its inception; (2) what are details of all contributions made to the project by each (a) government and (b) private person and/or entity; (3) what are details of any payments made to any persons and/or entities involved in the project; (4) what are details of all (a) consultants who are and/or have been involved in the project and (b) the services that they rendered?

Reply:

1. The tables below lists the stakeholders in the project and their participation over the years: (a) refers to government stakeholders and (b) to private person/ entities:

(a) Name of Govt Stakeholder

Years in Participation

 

2015/16

2016/17

2017/18

2018/19

2019/20

2020/21

2021/22

(a) KZN-COGTA

Project Steering Committee

Y

Y

Y

Y

Y

Y

Y

 

Project implementing

N

N

N

N

N

N

N

 

Project Funding

Y

Y

Y

N

N

N

N

(a) KZN-DARD

Project Steering Committee

Y

Y

Y

Y

Y

Y

Y

 

Project implementing

N

N

N

N

N

N

N

 

Project Funding

N

Y

Y

Y

Y

Y

N

(a) KZN-ADA

Project Steering Committee

Y

Y

Y

Y

Y

Y

Y

 

Project implementing

Y

Y

Y

Y

Y

Y

Y

 

Project Funding

N

Y

Y

Y

Y

Y

Y

(a) Okhahlamba Local Municipality

Project Steering Committee

Y

Y

Y

Y

Y

Y

Y

 

Project implementing

N

N

N

N

N

N

N

 

Project Funding

N

N

N

N

N

N

N

(a) KZN-EDTEA

Project Steering Committee

N

N

N

N

Y

Y

N

 

Project implementing

N

N

N

N

N

N

N

 

Project Funding

N

N

N

N

N

N

N

(b) Name of Private Stakeholder

Years in Participation

 

2015/16

2016/17

2017/18

2018/19

2019/20

2020/21

2021/22

(b) Grain Hills Agri (Pty) Ltd- (Mentor)

Project Steering Committee

Y

Y

Y

Y

Y

Y

Y

 

Project implementing

Y

Y

Y

Y

N

N

N

 

Project Funding

N

N

N

N

N

N

N

(b) Cathedral Peak Wine Estate- (Off taker for Winegrape’s)

Project Steering Committee

Y

Y

Y

Y

Y

Y

Y

 

Project implementing

N

N

N

N

N

N

N

 

Project Funding

N

N

N

N

N

N

N

(b) Beneficiaries

(the Cooperatives in each site)

Project Steering Committee

Y

Y

Y

Y

Y

Y

Y

 

Project implementing

Y

Y

Y

Y

Y

Y

Y

 

Project Funding

N

N

N

N

N

N

N

(b) Traditional Council Representatives

Project Steering Committee

Y

Y

Y

Y

Y

Y

Y

 

Project implementing

N

N

N

N

N

N

N

 

Project Funding

N

N

N

N

N

N

N

(2)(a) The project in its entirety was an initiative of the Okhahlamba Local Municipality, with its concept and business plan used to source initial funding from COGTA. Funding was approved by COGTA for commencement with implementation in the 2015/16 financial year. COGTA therefore provided project initiation funding and could not fund the project beyond the first two years of implementation.

COGTA then effectively contributed 14% of the total project funding until year two of implementation.

At that time of funding approval, the KZN Provincial Agribusiness Development Agency (ADA) was appointed as the project implementing agent for the project on this site which was in the 2015/16 financial year.

The ADA is a provincial entity of the Department of Agriculture and Rural Development (DARD) which implements commercial agribusiness projects for the department. The DARD through ADA, continued to fund the project from 2018/19 until 2020/21 when project review indicated that the project would not be sustainable without perpetual government support based on possible income expected from the wine grapes. The DARD then effectively contributed 86% of the total project funding until year five of implementation.

The ADA further appointed Grain Hills Agri (Pty) Ltd as mentor to provide overall capacity building and skills transfer to the beneficiaries including production and business management in relation to grapes enterprises.

Market for the wine grapes was secured with Cathedral Peak Wine Estate, a wine producer/processor in Winterton.

(b) No funding was received from private persons or entities for this project

3. Please refer to Annexure A.

4. (a),(b) Please refer to Annexure A which includes details of consultants who are, and/or have been involved in the project and the services that they rendered.

29 June 2022 - NW981

Profile picture: Masipa, Mr NP

Masipa, Mr NP to ask the Minister of Agriculture, Land Reform and Rural Development

With regard to the Agriculture and Agro-processing Master Plan (AAMP) that plans to accelerate the opening of markets and better access conditions, (a) will she furnish Mr N P Masipa with a list of markets that were opened since 2019 and (b) what changes in conditions regarding market access were made to date as a result of the AAMP; if not, why not; if so, on what date?

Reply:

Plant and Animal Products Export Markets from 2019 to date:

(a) Markets opened since 2019

  • Market access for the export of South African Pears to China was granted in 2021 and the protocol of sanitary and phytosanitary requirements for the export of pears from the Republic of South Africa to the People’s Republic of China was signed on 30 November 2021. The implementation date for the signed protocol was confirmed to be 17 January 2022.
  • Market access for the export of South African Citrus to the Philippines was granted in 2020. The protocol was signed on 20 July 2020.
  • Poultry meat market access to the United Arab Emirates (UAE) was granted in 2019.
  • The market for the export of raw beef to Malaysia was opened. The Malaysian Veterinary Authority approved an abattoir to start exporting in October 2020.
  • Wool, hides and skins were exported to the People’s Republic of China after a new health certificate was negotiated in 2020.
  • Live cattle, sheep, and goat health certificates were negotiated with Botswana in 2020.

(b) Changes in conditions regarding market access made to date:

The revised protocol of phytosanitary requirements for the export of South African citrus fruit to China was signed on 18 June 2021. South Africa has been exporting citrus to China under a protocol that was bilaterally agreed upon and signed on 21 June 2006. Under this protocol, the potential risk of a false codling moth (FCM), a pest of quarantine concern to the People’s Republic of China, was addressed through a cold treatment regime of 24 days at 0.6°C in transit which was not ideal for lemons. Currently, under the revised protocol, cold treatment for lemons will be 3°C or below for not less than 18 consecutive days.

  • Re-opened markets since 2019: Botswana, ESwatini and Namibia have been re-opened.
  • Poultry Meat markets in the process of negotiation: Saudi Arabia and the United Kingdom.
  • Beef markets re-opened since 2019 in Angola, Bahrain, Botswana, China, Egypt, Jordan, Kuwait, Lesotho, Mozambique, Qatar, Seychelles, eSwatini, UAE and Zimbabwe.

New Markets Opened for Imports

YEAR

COMMODITY

EXPORT COUNTRY

2022

Avocado fresh fruit (Persea americana)

Tanzania

2022

Mango fresh fruit (Mangifera indica)

Peru

2021

Avocado fresh fruit (Persea americana) for processing

Tanzania

2021

Apple fresh fruit (Malus spp.)

Lesotho

2021

Mango fresh fruit (Mangifera indica)

India

2020

Mango fresh fruit (Mangifera indica)

Egypt

2020

Pineapple fresh fruit (Ananas comosus)

Angola

2019

Citrus fresh fruit (Citrus spp.)

Morocco

2019

Mango fresh fruit (Mangifera indica)

Brazil

2019

Citrus fresh fruit (Citrus spp.) for processing

Spain

2019

Mango fresh fruit (Mangifera indica)

Spain

Revised Phytosanitary Import Requirements (Plant Products)

YEAR

COMMODITY

EXPORT COUNTRY

2022

Banana fresh fruit (Musa spp.)

Mozambique

2022

Mango fresh fruit (Mangifera indica)

Namibia

2021

Pepper (Capsicum spp.)

Namibia

2021

Watermelon (Citrullus spp.)

Namibia

2021

Melon and cucumber (Cucumis spp.)

Namibia

2021

Pumpkins (Cucurbita spp.)

Namibia

2021

Tomato (Solanum lycopersicum)

Namibia

2020

Banana fresh fruit (Musa spp.)

Eswatini

2020

Citrus fresh fruit (Citrus spp.)

Eswatini

2020

Avocado fresh fruit (Persea americana)

Eswatini

2020

Banana fresh fruit (Musa spp.)

Ghana

2020

Banana fresh fruit (Musa spp.)

Uganda

2020

Banana fresh fruit (Musa spp.)

Ivory Coast

2020

Banana fresh fruit (Musa spp.)

Zambia

2020

Banana fresh fruit (Musa spp.)

Zimbabwe

2020

Banana fresh fruit (Musa spp.)

Angola

2020

Banana fresh fruit (Musa spp.)

Ecuador

2020

Banana fresh fruit (Musa spp.)

Cameroon

Revised Sanitary and Phytosanitary Import Requirements (Animals And Animal Products)

YEAR

COMMODITY

EXPORT COUNTRY

2019

Porcine semen

France

2020

Frozen pork, porcine semen

Belgium

2021

Frozen pork

Germany

2022

Cured and heat-treated pork products

Italy

New Markets Opened for Imports Animal Product

YEAR

COMMODITY

EXPORT COUNTRY

2019

Heat treated pork and poultry

France

2019

Heat treated pork

Hungary

2021

Heat treated pork

Germany

(b) The Agriculture and Agro-processing Masterplan (AAMP) has recently been signed by the Government together with its social partners. Following the signing in May, branches in the Department initiated the process of incorporating the Master Plan into their Operational Plans. As a result, no conditions with regard to market access can be attributed to the AAMP as yet.

29 June 2022 - NW841

Profile picture: Schreiber, Dr LA

Schreiber, Dr LA to ask the Minister of Agriculture, Land Reform and Rural Development

What total amount in Rand has been spent on (a) catering, (b) entertainment and (c) accommodation for (i) her, (ii) the Deputy Ministers and (iii) officials of her department since 29 May 2019?

Reply:

The department is busy consolidating the figures and a detailed reply will be submitted once finalised.

29 June 2022 - NW2205

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Agriculture, Land Reform and Rural Development

What (a) is the extent of the land that has been redistributed to black people in total as a result of the land redistribution programme of her department as at the latest specified date for which information is available, (b) is the breakdown of the redistributed land in respect of each province and (c) amount has it cost her department to buy land for redistribution since 27 April 1994?

Reply:

a) As at 31 March 2022, a total of 5 198 594 hectares has been redistributed to black people.

b) Provincial breakdown of redistributed land, in hectares:

Provinces

EC

FS

GP

KZN

LP

MP

NW

NC

WC

Redistributed Land

569 189

434 799

63 575

621 674

197 973

498 426

594 297

1 622 208

596 453

c) Since 27 April 1994, an amount of R 19 809 billion cost the Department to buy land for redistribution.

29 June 2022 - NW2115

Profile picture: Masipa, Mr NP

Masipa, Mr NP to ask the Minister of Agriculture, Land Reform and Rural Development

(1)What is the total number of farms that have been successfully leased since the advertisement of pieces of land by her department; (2) whether any support was provided by her department to all farmers who were successful with their applications; if not, why not; if so, what are the relevant details?

Reply:

1.Since the advertisement of pieces of land by the Department Agriculture, Land Reform and Rural Development (DALRRD), a total number of 204 farms are fully leased, while another 72 farms are partially leased (land units).

2. DALRRD has conducted farm assessments on 654 of these farms and provided training on 94 farms, covering 165 farmers. Skills audit has also been conducted, report of which informed the training priorities. Start-up support packages based on farm assessments have been developed to be implemented this current financial year. This planned support will be directed to the 165 farmers in 94 farms that were trained in business and entrepreneurship. The farms are distributed as follows:

  • Limpopo 40;
  • Mpumalanga 30; and
  • Northwest: 24.

This approach is in line with the recently approved National Policy on Beneficiary Selection and Land Allocation.

29 June 2022 - NW334

Profile picture: Masipa, Mr NP

Masipa, Mr NP to ask the Minister of Agriculture, Land Reform and Rural Development

What is the detailed progress made to date with regards to the building of the Foot and Mouth Disease facility at the estimated costs of R500 million?

Reply:

The first allocation for the FMD vaccine factory was made in the 2007/2008 financial year. A figure of R214 million was allocated by the National Treasury over a four–year period. An additional figure of R400 million was allocated over the MTEF beginning in 2019-2022.

The process of establishing a GMP compliant facility started with the development of new production methods. This process is to ensure that there is capability for production of GMP compliant vaccines at scale once the new factory is completed. This involves processes such as optimisation of cell culture production, optimisation of antigen production, production of master seed stocks, validation of antigenicity, scaling production to pilot amounts, optimisation of downstream processing and optimisation of formulation. This process is ongoing and will continue during the establishment of the new factory.

In preparing for the GMP compliant facility, construction preparatory work was undertaken. This process involved the management of land rights including necessary zoning, environmental, infrastructural/ external services, legal requirements in relation to such land rights (obtaining the title deed, Surveyor-General diagram, municipal account, and approval).

Currently, the project plan for the GMP compliant facility is at the stage of appointment of service providers. This process is to ensure that the specifications for the appointment of service providers to design various aspects of the project (process engineers, architectural designer, mechanical engineers, electrical and electronics engineers, quantity surveyors, civil and structural engineers as well as other key appointments such as fire engineers, occupational health safety and environmental practitioners is concluded. Appointment of service providers for the built environment has been approved by Council and is underway subject to service level agreements. Service providers will commence work immediately upon conclusion of these contracts.

29 June 2022 - NW1034

Profile picture: Montwedi, Mr Mk

Montwedi, Mr Mk to ask the Minister of Agriculture, Land Reform and Rural Development

What (a) has been the impact of the recent rainfalls on crop farmers who harvest their produce on a monthly basis and (b) measures has she put in place to assist farmers who may have been negatively affected?

Reply:

a) The start of South Africa's 2021/22 summer crop production season was challenging for farmers and agricultural role players because of excessive rains that delayed planting in various regions and threatened crop yield prospects. But the past few weeks were calm with reasonably warm weather conditions in much of the country, thus supporting crops and easing concerns about the possibility of smaller yields due to excessive soil moisture. The data released by the Crop Estimates Committee on 28 February 2022 underscores this optimistic view of crop conditions. For example, while the 2021/22 first production estimate for maize is 14,5 million tons, down 11% year-on-year (previous season=16,3 million tons), this is well above the 10-year average harvest of 12,8 million tons and annual maize consumption of about 11,8 million tons. About 7,54 million tons is white maize, and 6,99 million tons is yellow maize. The yearly decline is mainly due to a reduction in area plantings, combined with expected lower yields in some districts. Importantly, this means that South Africa will likely remain a net exporter of maize in the 2022/23 marketing year, which starts in May (this corresponds with the 2021/22 production season). The exports for the 2022/23 marketing year is expected to be 2,8 million tons, which is 28% less than the 3,9 million tons of the 2021/22 marketing year.

The soybean's 2021/22 crop is estimated at 1,82 million tons, down by 4% year on year, and the second largest harvest on record. The expansion in area plantings, combined with expected better yields in some districts, are the major factors behind these expected relatively large harvests. On the upside, the 2021/22 sunflower seed production is forecasted at 914 350 tons, up by 35% year on year. This is the third-largest harvest on record, primarily due to an expansion in area plantings and expected better yields in some regions. Thus, there is enough supplies for South Africa and the neighboring Southern African Custom Union (SACU) countries for the foreseeable future, and therefore no need to panic that the country could experience shortages. We have benefitted from good harvests of a range of crops and fruits and have already imported a large share of products that we are import-dependent on, such as wheat and rice..

b) To date, the Food and Agriculture Organisation (FAO) of the United Nations and the World Food Programme (WFP) have reached out to DALRRD for possible collaboration in formulating and implementing a food security response to the situation as follows:

  • The FAO and WFP have availed immediate technical support towards strengthening the assessment of the impact to the agriculture sector. This support includes the rapid geospatial analysis that was undertaken by the FAO starting from the 11 to 20 March 2022 and work on finalising the Geospatial analysis draft report on the likely impact;
  • The WFP has also availed drones for conducting the assessment in areas that are not easily accessible. DALRRD is in the process of requesting the clearance from the Aviation Authority;
  • Both organisations are keen to work with the national and provincial government in planning and implementing the mid to long term food security interventions that are aimed at restoring livelihoods that have been disrupted by this situation; and
  • Task teams have been set up and response implementation plan developed and costed under National Disaster Management Centre to provide much needed support to affected farmers.

The following are the short-term interventions from DALRRD:

  • Rehabilitation of infields roads to the amount of R23 083 100;
  • Assistance to farm workers, dwellers and vulnerable households amounting to R56 930 000;
  • Soil fertility soil PH balance support (soil testing, liming and fertiliser support scheme to farmers) amounting to R1 238 000;
  • Supply household garden packages (household food security intervention): R5 million budgeted for this initiative;
  • Soil liming for R6 484 000;
  • Crop Maintenance to the value of R20 840 400;
  • Support re-enforcement of Bio security measures of farms to the value of R10 million;
  • R19 481 365 is budgeted for resuscitating livestock operations on affected farms; and
  • Sugar cane support initiative amounting to R71 590 400.

The budget required for these interventions is R214 647 265 and the reprioritised budget amounts to R60 524 000, resulting in a shortfall of R154 123 265.

The medium to long term interventions are the following:

  • Replanting programme (production input support for crop enterprises) 772 farmers to be assisted to the value of R75 257 000
  • Expansion of household food security programme (household garden packages), 1500 households, amount required here is R15 million
  • Rehabilitation of the tunnels, eight (08) projects with 35 tunnels to be erected to the value of R7 million
  • Rehabilitation of the fencing, 26 projects to be fenced for the distance of 33,5km costing R3 224 000
  • Rehabilitation of irrigation, 16 projects covering 57 hectares to the value of R5 670 000
  • 14 animal housing projects amounting to R3 038 000
  • 17 dipping tanks projects to the value of R2 707 300

It is envisaged that the above-mentioned projects will cost R111 896 300 in total.

29 June 2022 - NW1690

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Agriculture, Land Reform and Rural Development

What number of the total number of 1 707 established communal property associations are regarded as (a) functional and/or (b) operational?

Reply:

a) Of the total number of 1707 CPAs that have been registered, 1612 CPAs are functional.

b) Of the total number of 1707 CPAs that have been registered, 1612 CPAs are operational.

29 June 2022 - NW2212

Profile picture: Mafanya, Mr WTI

Mafanya, Mr WTI to ask the Minister of Defence and Military Veterans

1) Whether the SA National Defence Force conducts competency assessments of its members, so as to allow deserving soldiers to be promoted to senior positions based on merit; if not, why not; if so, how often is the exercise conducted?

Reply:

Attached find here: Reply

28 June 2022 - NW2195

Profile picture: Roos, Mr AC

Roos, Mr AC to ask the Minister of Home Affairs

Whether, in respect of each engagement in the 2021-22 financial year between his department and the Unions, he will furnish Mr A C Roos with a list detailing the (a) dates of the meetings, (b) participating Unions and stakeholder organisations, (c) resolutions of each meeting, (d) outstanding issues, (e) next steps and (f) timeline for the resolution of the issues in order for the Home Affairs offices to reopen on Saturdays as it has been almost five years since his department and Unions engaged on the issue; if not, why not; if so, what are the relevant details in each case?

Reply:

There has been no engagement in the 2021-22 financial year.

The last engagement between the Department of Home Affairs and Organised Labour on this matter was on 3 November 2020, at the General Public Service Sector Bargaining Council, GPSSBC.

The minutes of the said meeting noted a concern from Organised Labour and this resulted in Unions invoking Clause 17, thus declaring a dispute on the matter. An agreement was reached by both Labour and the Department that this matter should be facilitated by the GPSSBC. The Department has approached Organised Labour to reopen this matter for further engagement.

END

28 June 2022 - NW2427

Profile picture: Arries, Ms LH

Arries, Ms LH to ask the Minister of Home Affairs

What total number of refugees have been provided with assistance through the refugee assistance fund in the past five years?

Reply:

The Department of Home Affairs does not administer a refugee assistance fund.

 

END

 

28 June 2022 - NW2197

Profile picture: Horn, Mr W

Horn, Mr W to ask the Minister of Justice and Correctional Services

(a) What is the current status of the drafting of the enabling regulations in respect of the (i) Criminal Law (Sexual Offences and Related Matters) Amendment Act, Act 13 of 2021, (ii) Criminal and Related Matters Amendment Act, Act 12 of 2021, and (iii) Domestic Violence Amendment Act, Act 14 of 2021, and (b) by what date will the enabling regulations be (i) published and (ii) enforced in each case?

Reply:

a) The draft Regulations in respect of (i) Criminal Law (Sexual Offences and Related Matters) Amendment Act, Act 13 of 2021, (ii) Criminal and Related Matters Amendment Act, Act 12 of 2021 have been prepared and consulted on, while the Regulations on the Domestic Violence Amendment Act, Act 14 of 2021 are still undergoing public consultation.

b) It is envisaged that the three (3) Acts and their related Regulations will be proclaimed and published for commencement as from 31 July 2022.

28 June 2022 - NW2297

Profile picture: Roos, Mr AC

Roos, Mr AC to ask the Minister of Home Affairs

What (a) are the performance measures of the 200 border patrol staff being employed by the Border Management Authority and (b) is the difference between their responsibilities and the responsibilities of the SA National Defence Force border patrol staff?

Reply:

Performance Area 1: Conduct general border management activities and security services to ensure effective and efficient border management

(i) Attend the on and off duty parades and be stationed as per deployment schedule of border guards.

(ii) Process proactive and responsive complaint attendances.

(iii) Report on arrested illegal foreigners held in the temporary holding cells.

(iv) Safeguard and control exhibits / evidence found to be handed over to other Agencies.

(v) Conduct arrest of illegal foreigners/ detainees to be transferred to the nearest ports of entry or police station for further handling.

(vi) Gather information for compiled reports as required by higher authority.

Performance Area 2: Implement controls on the movement of goods and people in the identified ports and segments

(i) Search people, luggage and vehicles as per the relevant regulations on the planned roadblock / check point operations in the port of entry and the vulnerable areas in the borderline.

(ii) Perform borderline duties, traffic check point operations and other law enforcement duties at outer/inner perimeter areas.

(iii) Report on all illegal movement of people and goods.

(iv) Maintain surveillance from covert positions at or near the international borders.

Performance Area 3: Control the access/egress at the identified port of entry and in border law enforcement area

(i) Conduct vehicle/foot patrols around the inner perimeter.

(ii) Control and regulate illegal movement of people and goods.

(iii) Identify and report on international visitors, travellers and shoppers for monitoring purposes.

(iv) Respond to electronic sensor alarms in remote areas as a Mobile Response Team.

(b) As clearly captured in the South African Constitution and the Defence Act, the responsibility of members of the Defence Force is to protect and safeguard the country’s territorial integrity through the patrolling of the 4773 kilometres of the land border areas, including the maritime coastline. They have currently deployed 13 companies to fulfil this responsibility through the application of high mobility patrol mechanism from on point to the other.

Therefore, as for the Border Guards, it should be noted that our sub-region has a number of inter-linked communities whereby the border fence had divided them into two halves. For instance, in the North-West Province, there are Batswana on the South African side and the Batswana on the Botswana side. In Mpumalanga, there are communities with Ba-Swati on the South African side and Ba-Swati on the eSwatini side. In the Free State, there are Basotho on the South African side and the Basotho on the Lesotho side. Therefore, this situation means that there is a lot of civilian activities taking place between South Africa and its immediate neighbours. These activities have been taking place in those areas for centuries. Therefore, at this point our concern is the fact that those areas have been hijacked by criminal elements who are then moving counterfeit goods through those.

communities for their own nefarious gains. It is for this reason that the BMA Border Guards would be statically deployed in those communities to monitor their activities with the intention to decisively deal with any criminal elements taking advantage of the situation. Further, the BMA would be registering those kind of areas and declaring them as Informal Community Crossing Points and statically deploy the Border Guards for monitoring those civilian activities.

In addition, there are certain areas outside the communities along the borderline which are being exploited by criminal elements for advancing their illegal activities. In this case, members of the SANDF and the Border Guards would collectively identify such areas (known as vulnerable segments of the border line) and get the latter to be statically deployed in those segments. This approach seeks to enable members of SANDF to freely apply their high mobility deployment mechanism while areas of concern are properly protected by the Border Guards. Further, since the Border Guards would have immigration, agricultural, and environmental legal empowerment amongst other prescript, the SANDF would be able to hand over intercepted civilians to the Border Guards for processing (e.g finger printing, declaring them undesirable and effecting deportations). Lastly, the BMA Act empowers the Border Guards to effectively protect the Port of Entry, including its 10 kilometres radius to detect any traveller who avoid using the port for whatever reasons. The deployment of the Border Guards to the borderline does not seek to compete with the deployed members of the SANDF, but

END

28 June 2022 - NW2306

Profile picture: Breytenbach, Adv G

Breytenbach, Adv G to ask the Minister of Justice and Correctional Services

What is the current position regarding the extradition of Rajesh and Atul Gupta after having been arrested in Dubai, subsequent to a Red Notice being issued; (2) Whether the extradition treaty with the United Arab Emirates has been finalised; if not, why not; if so, on what basis will extradition be achieved bearing in mind that the agreement in all likelihood will not have retrospective application?

Reply:

1. On 6 June 2022, the authorities in the United Arab Emirates (UAE) informed me that the suspects have been arrested on the Red Notices issued. On 8 June 2022, the National Prosecuting Authority (NPA) forwarded a Request to the Department for the Provisional Arrest of the suspects in terms of Article 14(3) of the Extradition Treaty. The request containing the charge sheet and warrants of arrest for the suspects were forwarded under cover to the Department of International Relations and Cooperation (DIRCO) for onward transmission to the authorities in the UAE. On 10 June 2022, the Department was advised that the Investigating Directorate in the NPA is finalising the official extradition request, where-after same will be translated into Arabic, and thereafter forwarded to the Department for onward transmission to the authorities in the UAE via the diplomatic channel.

2. On 25 September 2018, South Africa and the United Arab Emirates concluded an Extradition Treaty. The Treaty came into force on 10 July 2021. The request for the extradition of Mr Atul Kumar Gupta and Mr Rajesh Kumar Gupta will be made to the UAE in terms of the Extradition Treaty.

28 June 2022 - NW2301

Profile picture: Khanyile, Ms AT

Khanyile, Ms AT to ask the Minister of Home Affairs

What number of whole-day downtime was experienced by offices of his department in Stellenbosch over the past two years; (2) what (a) was the total number of work hours lost in the past two years as a result of the downtime at the Stellenbosch office, (b) were the causes of most of the downtime at the office, (c) steps have been taken to reduce and/or eradicate downtime at the office and (d) is the total of the number of hours lost as a result of system downtime at the office in each month over the past two years?

Reply:

1. We consulted with SITA and requested the network outage statistics for the stated period, unfortunately their monitoring systems (eHealth & NMS) overrides data after12 months. According to the attached report from the e-Health system, the office experienced downtime for a whole day on the 29 Nov 2021over the 12-month period 01 June 2021 to 15 June 2022. We have also extracted information from the DHA network monitoring system (Manage Engine). The office experienced downtime on the following days 03/10/2022, 03/23/2022, 04/12/2022, 04/13/2022 and 06/10/2022, see the attached report for detailed downtime information.

The office downtimes would have been due to SITA Switching Centre network outage emanating from Cable Breaks, load shedding, and infrastructure theft in the Stellenbosch area.

2. The office is already running on a 2Mbps fibre optic line. The Department has made stabilisation a top priority. In addition, the department is working closely with SITA to carry out the various commitments made on this matter. A number of these measures were outlined during the recent budget vote speech by the Minister of Home Affairs. See attached summary slide.

END

28 June 2022 - NW2369

Profile picture: Van Minnen, Ms BM

Van Minnen, Ms BM to ask the Minister of Home Affairs

Whether he has been informed of the apparent ongoing victimisation of a member of the public at the Home Affairs Office in Somerset West who had to queue seven times for hours at a time to collect an identity document only to be barred by the security guard every time from entering the building and eventually gained access via another door in order to be assisted by the staff inside on 14 March 2022; if not, what is the position in this regard, if so, (2) Whether the alleged victimising staff member will be facing consequence management; if not, why not; if so, what are the relevant details?

Reply:

1.  The Department of Home Affairs does not condone such conduct by our outsourced security guards. It remains the responsibility of the Office Manager to communicate with clients and grant access. It should be noted that the Department has an immediate complaint resolution process which might be used by clients to escalate and report the conduct of employees to senior managers immediately. It is to this end that a photograph and contact details of the Office Manager, District Manager and the Provincial Manager are displayed in all our front offices. Contact details are also available from the DHA website. The Department has no record of any formal complaint lodged on or after 14 March 2022 related to the mentioned scenario. The matter was however raised with the Office Manager and the security guards. The Department will however be in a better position to launch a formal investigation once a complaint is lodged by the applicant or representative.

2. Once a formal complaint is received, the Department will then launch an investigation, and apply the necessary consequence management, should the perpetrator be found guilty of committing such an offence.

END