Questions and Replies

Filter by year

17 May 2023 - NW1271

Profile picture: Madokwe, Ms P

Madokwe, Ms P to ask the Minister of Finance

(1)Whether the National Treasury is informed of any investigations into the affairs of municipalities; if not, why not; if so, (2) whether he was informed of the squandered millions of Rand that were allocated to build the Ngcobo stadium in the Dr A B Xuma Local Municipality without being completed; if not, why not; if so, what are the relevant details; (3) whether he has been informed that the stadium was not completed when the municipality asked for a top up for the Nogqala bridge in Ward 19 that was initially allocated a budget of approximately R12,9 million, but left incomplete; if not, why not; if so, (4) whether the National Treasury has any obligation to regularly assess projects that municipalities claim to have spent money on and commission speedy investigations into corruption with the intention to ensure the prosecution of persons who are accountable; if not, why not; if so, what are the relevant details?

Reply:

1. I presume the Honourable Member is referring to a criminal investigation by the South African Police Services (SAPS). Like all such criminal investigations, the National Treasury is generally not informed of such investigations, unless any specific request is required from the National Treasury by SAPS. In terms of section 106 of the Municipal System Act, the MEC for Local Government (Cooperative Governance and Traditional Affairs) may conduct investigations if there are allegations of maladministration, fraud and corruption and other serious malpractices. The MEC would generally inform the National Treasury of the outcome of the investigation.

Also in terms of Section 5(2)(d) of the Municipal Financial Management Act (MFMA) “National Treasury may investigate any system of financial management and internal control in any municipality or municipal entity and recommend improvements”

2. National Treasury was not informed of the millions of Rand that was allocated by Dr A B Xuma Local Municipality to build Ngcobo Stadium.

a) The Transferring Officer i.e., the national department administering the conditional grant is responsible for the allocation and monitoring of funds to municipalities, as well as the approval of projects to be implemented and the budgets for the projects. The Department of Cooperative Governance (DCoG) administers the Municipal Infrastructure Grant (MIG) and National Treasury receives monthly financial reports, and quarterly financial and non-financial reports on the overall programme performance, and not on specific projects.

b) The specific details pertaining to the said project would be at the disposal of DCoG, i.e. the budgeted amount for the project, the progress on the project, and whether the project has been completed or not and also the reasons.

3. National Treasury was not informed that the stadium was incomplete when the municipality asked for a top up for the Nogqala bridge in Ward 19.

a)The National Treasury is not ordinarily informed of what projects have been approved for implementation and specific project budget for a particular year. The department administering the conditional grant is responsible for the administration of the programme and the said department must hold recipient municipalities of the grant accountable on the funding, approved projects and also ensure compliance with the conditions of the funding as outlined in the conditional grant framework.

4.Unless this is a conditional grant with such conditions, the DCoG is responsible to ensure compliance with the MIG framework in the Division of Revenue Act by holding municipalities accountable on allocated funding and approved projects to ensure projects are implemented and completed at the approved amounts, in compliance with the set conditions. Where funds are unspent at the end of the year and are not eligible for rollover and or funds are not spent in line with the intended purpose, the DCoG will not recognise such expenditure and, National Treasury will be duly informed and the said funds will be recouped from future transfers due to the municipality. Where maladministration, fraud and corruption and other serious malpractice is suspected, the onus is on the MEC of Cooperative Governance and Traditional Affairs to initiate an investigation in terms of section 106 of the Municipal Systems Act.

17 May 2023 - NW1437

Profile picture: van der Merwe, Ms LL

van der Merwe, Ms LL to ask the Minister of Home Affairs

What (a) were the outcomes of the Ministerial Task Team that was assigned the responsibility of reviewing the employment of foreign nationals, particularly considering that the Minister of Employment and Labour and other government officials admitted that some sectors employ up to 100% foreign nationals and (b) are the full, relevant details of the (i) joint programmes that are currently being run with the Departments of Small Business and Employment and Labour to address the employment of illegal migrants, (ii) total number of programmes annually and in which sectors and (iii) outcomes and progress made to address the employment of illegal foreign nationals

Reply:

(a&b) The inter-Ministerial Committee that was assigned the responsibility off reviewing the employment of foreign nationals is chaired by the Minister of Employment and Labour and the Minister of Home Affairs. The task team includes departments in the security and economic cluster as well as employers and unions. The following departments are involved: Department of Transport, Department of Employment and Labour, Department of Home Affairs, South African Police Services and the Bargaining Council. The task team also includes the All Truckers Driver Forum (ATDF), the Road Freight Association (RFA), The Truckers Association of South Africa (TASA), amongst others.

The task team has so far developed an 11point plan with the employers and unions involved in the trucking and logistics sector. This plan was finalised in June 2022. The plan includes the following:

i) Facilitate the appointment of the Task Team

ii) Validity of Foreign Driving Licences

iii) Enforcement of the VISA requirement in issuance of a work visa

• Validity of SA driving licences issued to Traffic Register Number (TRN);

• Interphase between NaTIS, DHA and SAR

iv) Registration with the labour laws ATDF and other organisation to provide details of companies that they are aware of employing foreign nationals

v) Operating Licence processes for freight industry

vi) Driver Capacity and skills (Driving training project)

vii) Integrated and Multi-disciplinary joint law enforcement operations conducted

viii) Amendment of the National Road Traffic Regulations, 2000

ix) Review the Cross-Border Road Transport Legislation

x) Review of the TRN

xi) Registration of operator in terms of section 45 of the National Road Traffic Act, 2000 (NRTA) - Assessment of the requirements for an “Operator Permit/Card” as per the National Road Traffic Act to determine its effectiveness to achieve the objectives to seek compliance to other laws in South Africa

Due to the economic challenges that arise when there is disruption in this sector, the plans of the IMC have focussed on the trucking and logistics sector. Meetings on this matter are held monthly led by senior officials of the Department of Transport and the Department of Employment and Labour. With regard to addressing the employment of foreign nationals, a total of 1291 drivers have been inspected for their immigration status with 131 found to be undocumented. The Department of Home Affairs through its Annual Performance Plan has planned to conduct 1296 inspections/operations in this financial year to combat the employment of illegal foreign nationals.

END

17 May 2023 - NW1436

Profile picture: Cebekhulu, Inkosi RN

Cebekhulu, Inkosi RN to ask the Minister of Agriculture, Land Reform and Rural Development

What total number of applications (a) have been received for the Comprehensive Agricultural Support Programme since 2020, which provides support for processing infrastructure and (b) were successful; (2) whether any of the applications were not successful; if not, why not; if so, what are the reasons for this?

Reply:

1. (a) Nationally, approximately 15 000 applications.

(b) The total number of applications that were successful since 2020 is 1 595.

2. Yes. As an example; using just two provinces for 2023/24 financial year. Mpumalanga received 310 applications and only 22 (7%) applications were approved for funding. While in North West the province received 8 088 applications and only 68 (1%) could be approved. Reasons for this amongst others are as follows:

  • Some of the applications that were declined do not have proof of land ownership/access: no title deed, no lease agreement nor permission to occupy. State resources cannot be spent on land illegally occupied.
  • Some applications are declined due to conflicts amongst beneficiaries. The conflicts must be resolved first before the investment is made available from public funds.
  • Availability of water for the envisaged production plays a major role in whether the projects or application will be approved. In some instances, the water source must first be identified, and authorisations be received before the project is approved for funding of infrastructure. This work (pre-funding support) gets done in all instances where production potential is established.
  • The demand for support far exceeds the amount of money available (the resources from government).

The Comprehensive Agricultural Support Programme (CASP) programme is only responding to 11% of the need for support as expressed through the number of applications received versus the number of applications that can be supported.

17 May 2023 - NW1401

Profile picture: Masualle, Mr PG

Masualle, Mr PG to ask the Minister of Finance

Whether, given that in March 2023 the International Monetary Fund cut the Republic’s gross domestic product growth outlook to 0,1% for 2023 (details furnished), he has found that at this rate of negligible growth the Republic is likely to experience a recession this year; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

Yes, the IMF has projected growth of 0.1 per cent for 2023 in its latest World Economic Outlook, published last month during its Spring Meetings, which is lower than the National Treasury’s projected GDP growth of 0.9 per cent in 2023 published in the 2023 Budget Review. There are other more recent projections on growth in 2023, and market consensus is currently for growth of 0.6 per cent in 2023. While growth projections are low and risks are high, the likelihood of a recession will largely depend on the impact of load shedding along with high inflation, rising borrowing costs and weak external demand. The National Treasury will announce a further update on its projections in the MTBPS later this year in October 2023.

The 2023 Budget projection itself was a downward adjustment from projected growth of 1.4 per cent for 2023 in the MTBPS last year. The 2023 Budget revision was informed by the negative impacts of loadshedding on the economy, stubbornly high inflation and accompanying rising borrowing costs and a relatively less supportive external environment among others. Since the publication of the Budget Review, some of the risks to the economy that were identified have materialized. These include the further worsening of domestic structural constraints in electricity and logistics, which continue to limit production and exports; a higher cost of living and higher borrowing costs which are expected to weigh on consumption and investment. Additionally, real GDP growth in the final quarter of 2022 was worse than anticipated by most forecasters, including the Treasury, (declining by 1.3 per cent). This contraction meant that annual GDP in 2022 came out weaker than expected, at 2 per cent, posing adverse carry-over effects into 2023. Beyond this, significant risks still remain including weaker global growth and lower commodity prices.

On balance however, while the occurrence of these risks weighs on the 2023 Budget Review economic growth outlook, available high-frequency data at the start of 2023 points to a marginal rebound in GDP growth in the first quarter. This is also supported by the lower than initially anticipated intensity of load-shedding in the first quarter of 2023. Moreover, GDP growth is expected to gradually recovery in the second half of 2023, as the worst impact of the electricity supply shortages start to ease following the peak winter demand period, and some electricity generation capacity is restored. Taken together, the prevailing view is for a positive GDP growth in 2023, albeit with higher downside risks compared to the time of the Budget Review. Lastly, the additional potential impact of the prevailing risks to the outlook can be seen in the uniform downward revisions by other official forecasters, which on aggregate still show positive growth projections in 2023.

17 May 2023 - NW1372

Profile picture: Engelbrecht, Mr J

Engelbrecht, Mr J to ask the Minister of Justice and Correctional Services

(1)What precisely was done to investigate the very obvious crime of murder related to the escape of the convicted rapist, Mr Thabo Bester, in light of the ineluctable conclusion that the person found in Mr Thabo Bester’s cell had died before being set alight and that the specified person suffered blunt force trauma and did not exhibit smoke inhalation; (2) (a) on what exact date was the crime reported to the SA Police Service and (b) what are the details of the relevant case docket; (3) what progress has been made in the investigation, bearing in mind the seriousness of the situation and that it occurred over a year ago; (4) what are the reasons that his department did not divulge the full facts about the murder and the escape to the Portfolio Committee on Justice and Correctional Services and its subcommittee and the public at large?

Reply:

1. As per the Department of Correctional Services (DCS) Standard Operating Procedure (SOP), the scene was handed over to South African Police Services (SAPS) for investigation in relation to the fire that had occurred in the affected cell. It was based on the SAPS investigation by means of an autopsy that it was determined that the body found in the cell did not match that of offender Bester. The investigation also revealed that the individual suffered blunt force trauma and did not exhibit smoke inhalation. The matter is currently under investigation by the SAPS, therefore all further details in relation to the investigation should be directed to the SAPS.

(2)(a) The initial incident of fire which was purported to be a suicide was reported to SAPS on 03 May 2022.

(2)(b) The inquest case in relation to the purported suicide was recorded as CAS25/05/2022 by the SAPS.

(3) The case is currently under investigation by the SAPS of which this is the only institution which is able to provide progress in this regard.

(4) Facts about the escape were provided to the Portfolio Committee on Justice and Correctional Services on 13 April 2023, as conclusive information became available. No information was provided to the subcommittee as it forms part of the Portfolio Committee. Media briefings were held by the DCS on the following dates: 30 March 2023 and 13 April 2023, to ensure that the public is informed on the matter.

The facts relating to allegations of murder fall outside the scope of DCS and as such should be directed to SAPS.

END

17 May 2023 - NW1160

Profile picture: Tambo, Mr S

Tambo, Mr S to ask the Minister of Justice and Correctional Services

What (a) number of contracts does the Department of Correctional Services have with private security companies to run security operations in correctional facilities and (b) what is the name of each security company?

Reply:

a) The Department of Correctional Services (DCS) has two concession contracts namely Kutama Sinthumule and Mangaung Correctional Centre.

b) The Bloemfontein Correctional Contracts (Pty) Ltd is contracted to run operations at Mangaung Correctional Centre and South African Custodial Services (Pty) Ltd is contracted to manage Kutama Sinthumule Correctional Centre.

END.

17 May 2023 - NW1227

Profile picture: Breytenbach, Adv G

Breytenbach, Adv G to ask the Minister of Finance

Whether, with regard to a legal obligation on a certain person (name furnished) to declare the person’s possession of currency in terms of section 15 of the Customs and Excise Act, Act 91 of 1964, upon his entry into the Republic, and in light of the fact that the failure to so declare is an offence in terms of section 81 of the specified Act, wherein the definition of goods includes currency, the SA Revenue Service has laid a criminal complaint with the SA Police Service in terms of the statute above read with section 34(2) of the Prevention and Combating of Corrupt Activities Act, Act 12 of 2004; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

Section 4(3) of the Customs and Excise Act prohibits the Commissioner and/or SARS officials from disclosing any information relating to any person, firm or business acquired in the performance of SARS duties, except in circumstances outlined in the Act. Accordingly, SARS is not able to disclose information requested to the Minister and Parliament.

17 May 2023 - NW1397

Profile picture: Denner, Ms H

Denner, Ms H to ask the Minister of Sport, Arts and Culture”.

(1). With reference to his reply to question 1 000 on 16 April 2023, what is the Rand value of the costs related to the mentioned name changes of each of the three towns to (a) his department, including (i) the mentioned public consultation notices and (ii) honoraria for the committee and council sittings, (b) each local municipality and (c) the Eastern Cape fiscus; (2). what are the details of all 103 name changes that have been done in the Eastern Cape, in terms of the (a) old name, (b) new name and (c) total amount in related costs in each case?

Reply:

(1)(a)(i)(ii). The costs incurred by the Department relates to the sitting of the South African Geographical Names Council including public awareness workshops, honoraria, travel, and accommodation is R12 732 430,32.

The Department of Sport, Arts and Culture does not have information related to costs incurred by (b) each local municipality and (c) the Eastern Cape province fiscus relating to public consultations and committee sittings.

(2). The details of the 103 names given in the previous answer include existing name registrations that have been done in the Eastern Cape. The name changes are 23 and are listed in the tables below and include (a) old name and (b) new name.

(c) However, the Department does not determine the rand value cost related to name changes but pays for Council sittings, public awareness workshops and honoraria for members as indicated above.

No

New_Name

Feature Description

Date

Province

Previous Name

     
 

Chief Dawid Stuurman International Airport

Airport

2021-02-22 0:00:00

Eastern Cape

Port Elizabeth Airport

     
 

Gqeberha

City

2021-02-22 0:00:00

Eastern Cape

Port Elizabeth

     
 

Kariega

City

2021-02-22 0:00:00

Eastern Cape

Uitenhage

     
 

King Phalo Airport

Airport

2021-02-22 0:00:00

Eastern Cape

East London Airport

     
 

Makhanda

Town

2018-06-29 0:00:00

Eastern Cape

Grahamstown

     
 

Makhazi

Village

2019-03-22 0:00:00

Eastern Cape

Makazi

     
 

Marhubeni

Village

2020-03-23 0:00:00

Eastern Cape

Marubeni

     
 

Khwenxurha

Village

2022-08-26 0:00:00

Eastern Cape

Mooiplaas

     
 

Gxarha

Town

2022-08-26 0:00:00

Eastern Cape

Morgan’s Bay

     
 

Enxuba

Town

2022-08-26 0:00:00

Eastern Cape

Cradock

     
 

Qumrha River

River

2022-08-26 0:00:00

Eastern Cape

Komga River

     
 

Tlokoeng

Town

2021-03-16 0:00:00

Eastern Cape

Mount Fletcher

     
 

Mahlubini

Village

2021-03-16 0:00:00

Eastern Cape

St Augustine

     
 

Makhalitseng

Human Settlement

2021-12-10 0:00:00

Eastern Cape

Kinirha Poort

     
 

Ngqayi

Village

2021-02-22 0:00:00

Eastern Cape

Katkop

     
 

Nqanqarhu

Town

2021-02-22 0:00:00

Eastern Cape

MaClear Town

     
 

Ntabozuko

Town

2021-02-22 0:00:00

Eastern Cape

Berlin

     
 

Qonce

Town

2021-02-22 0:00:00

Eastern Cape

King William’s Town

     
 

Pirie Mission

Village

2021-02-22 0:00:00

Eastern Cape

Pierie Mission

     
 

Khohlombeni

Settlement/Village

2021-02-22 0:00:00

Eastern Cape

Mfabantu

     
 

KwaMaqoma

 Town

2023-03-13 17:00:04

Eastern Cape

Fort Beaufort

     
 

Ben Mbizweni

 

2023-03-13 17:03:27

Eastern Cape

Brooksnek

     
 

KwaNojoli

 Town

2023-03-13 17:05:36

Eastern Cape

Somerset East

     

(PQ 1397 21 April 2023)

17 May 2023 - NW1277

Profile picture: Shaik Emam, Mr AM

Shaik Emam, Mr AM to ask the Minister of Finance

(1)Whether all tenders awarded by municipalities are reported to the National Treasury; if not, what is the position in this regard; if so, 2. whether he will furnish Mr A M Shaik Emam with a list of the (a) tenders awarded in the Zululand District Municipality, (b) names of the companies, (c) monetary value of the tenders, (d) itemised billing and (e) legal costs in the past financial year; if not, why not, in each case; if so, what are the relevant details in each case?

Reply:

1. No, municipalities do not currently report all their tenders to the National Treasury.

National Treasury issued MFMA Circular 83 (2016) regarding the advertisement of bids and the publication of notices in respect of awarded bids, cancelled bids, variations, and extensions of existing contracts on the eTender Publication Portal. This circular makes provision for the publication of tender opportunities and awards on the National Treasury Tender portal. Since this is a Circular, it is not mandatory for municipalities to publish procurement opportunities on the Treasury tender portal, unless the Municipality Council adopts the circular as policy. Some municipalities publish their tender opportunities while others are not publishing on the eTenders portal. National Treasury is considering reforms to make such publication of tender awards mandatory, but this will likely require legislative amendments.

2. We do not have any tender information regarding Zululand District Municipality or any procurement-related data for this municipality.

17 May 2023 - NW1373

Profile picture: Engelbrecht, Mr J

Engelbrecht, Mr J to ask the Minister of Justice and Correctional Services

(1)With reference to the convicted rapist, Mr Thabo Bester, (a) what was done to ensure the safety and protection of the victims of the escaped convict and (b) on what exact date were each of them informed of the material risk posed to themselves and (c)(i) who informed the specified victims and (ii) via which medium; (2) (a) on what exact date was the National Prosecuting Authority (NPA) informed of the circumstances, (b) who informed the NPA and (c) via which medium?

Reply:

(1)(a) As soon as the Department of Correctional Services (DCS) discovered that the offender had indeed escaped from lawful custody the matter was reported to the South African Police Service (SAPS) for investigation.

(1)(b) A case of escape was opened with the SAPS on the 12 January 2023. In addition a track and tracing team was established to re-enforce the tracing and re-arrest of the offender. None of the victims were informed of the escape in line with the General Procedure in relation to informing victims about offender/perpetrators who died, escaped from custody.

(1)(c) Not applicable.

(2) The National Prosecuting Authority (NPA) was not informed directly by DCS. However, a criminal case was reported to the SAPS for further investigation and possible prosecution by the NPA.

END

17 May 2023 - NW1290

Profile picture: Madlingozi, Mr BS

Madlingozi, Mr BS to ask the Minister of Sport, Arts and Culture

Whether (a) his department and/or (b) any of the entities reporting to him have any current contracts with the security company G4S; if not, what is the position in this regard; if so, what (i) are the relevant details of the specified contracts and (ii) is the monetary value of each contract?

Reply:

(a) & (b). My department and the Entities reporting to me have no contract with the security company G4S.

16 May 2023 - NW1299

Profile picture: Mogale, Mr T

Mogale, Mr T to ask the Minister of International Relations and Cooperation

Whether any pressure is being applied by external forces on the Government to arrest the Russian President, Mr Vladimir Putin, in the event that he attends the 15th BRICS summit from 22 to 24 August 2023; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

No there is no external power putting pressure on the government of South Africa.

15 May 2023 - NW1308

Profile picture: Tafeni, Ms N

Tafeni, Ms N to ask the Minister of Home Affairs

What are the details of the progress that has been made in stabilising the system and network disruptions experienced at Home Affairs offices that render them non-operational?

Reply:

1. Network connectivity remains a challenge in the success of system implementation and stabilisation in the Department. The Department has implemented the following to address challenges: -

a) To review current Service Level Agreements (SLAs) with SITA

b) To be exempted from SITA in order to approach service providers directly

c) Procuring LTE network backup for each District.

d) Continue to replace copper links to fiber.

2. The Department is also engaging CSIR to achieve the following objectives to improve network connectivity and stabilising the system:

a) Review of Infrastructure, Network and Systems architectures to determine their adherence to the DHA Modernisation Programme, the DHA EA Principles, the DHA EA Policy and the Government Wide Enterprise Architecture.

b) Determine whether systems development, deployment, support, and maintenance are aligned to the best practices.

c) Determine whether infrastructure refresh, support and maintenance are executed in a manner that supports the DHA Modernisation Programme.

d) Conduct a thorough analysis of selected current and new system downtime incidents experienced by the DHA including the frequency, duration, and impact of each incident.

e) Review the DHA’s existing IT infrastructure, systems, and procedures, to assess their effectiveness in minimising and addressing system downtime.

f) Identify the root causes of selected system downtime incidents, taking into consideration factors such as hardware failure, software issues, cyber-attacks, network issues, human error, and other relevant factors.

g) Propose remedial actions to minimise future occurrences of system downtime, including technical, procedural, and training recommendations.

h) Provide a comprehensive report that outlines the findings of the investigation and the proposed remedial actions and present this report to DHA's Exco in a clear and concise manner.

i) Provide agreed to follow-up support or assistance to the DHA to ensure that the proposed remedial actions are implemented effectively and that system downtime incidents are minimised.

j) Timeously provide progress reports/documents to the DHA and the CSIR Executives as required.

END

15 May 2023 - NW1438

Profile picture: van der Merwe, Ms LL

van der Merwe, Ms LL to ask the Minister of Home Affairs

Considering that according to his department’s website, there are currently 25 banks that provide the service for passport and identity applications (details furnished), thereby noting that it appears that not even 10% of bank branches offer home affairs services, what (a) are the reasons that the bank footprint of his department is not expanding and (b) plans are afoot to ensure that all bank branches will be able to offer home affairs services?

Reply:

a) The expansion of the banks footprint is dependent on the signing of partnership agreements with the banks and has been delayed due to the banks requirements that DHA should guarantee minimal system downtime and quicker response to calls logged for IT support.

b) The DHA and Banking Association of South Africa (BASA) which represent all banks are crafting plans that will mitigate the issues raised by banks to ensure that the partnership agreements are eventually signed in the current financial year.

END

15 May 2023 - NW1163

Profile picture: Msane, Ms TP

Msane, Ms TP to ask the Minister of Public Works and Infrastructure

Whether her department has lodges and guesthouses that are administered by municipalities; if not, what is the position in this regard; if so, what (a) is the total number of (i) lodges and (ii) guesthouses (aa) that are administered by municipalities and (bb) have been leased out to private entities and (b) amount is each municipality generating from each specified property leased out?

Reply:

The Minister of Public Works and Infrastructure

According to the records of the National Department of Public Works and Infrastructure, the DPWI has no lodges or guest houses under its custodianship being administered by any municipalities.

a) N/A

b) N/A

c) N/A

d) N/A

_________________________

15 May 2023 - NW1442

Profile picture: Montwedi, Mr Mk

Montwedi, Mr Mk to ask the Minister of Agriculture, Land Reform and Rural Development

Whether the Republic has enough vaccines available for African horse sickness; if not, why not; if so, what are the relevant details of the available vaccines?

Reply:

No. The Onderstepoort Biological Products (OBP) has been experiencing challenges because of aging infrastructure which has resulted in reduced vaccine production.

The Department of Agriculture, Land Reform and Rural Development, working with the OBP is implementing a sustainable vaccine production strategy, central to which is finding a competent vaccine manufacturing partner to contract manufacture vaccines on-behalf OBP. A consistent availability of vaccines will alleviate the challenge of farmers not finding vaccines when it is time for vaccination.

15 May 2023 - NW1482

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Basic Education to ask the Minister of Basic Education

Whether her department is responsible to intervene to provide relief to the learners of Nqabeni Senior Primary School, who are currently using a makeshift bridge, risking their lives to cross the deadly Mvumbeni River to get to school as the provincial education department has failed to provide any form of relief; if not, why not; if so what intervening steps has been taken to provide relief?

Reply:

The relevant provincial department/municipality is responsible for the provision of the relief sought. The provincial department of education, is however, responsible for liaising with the relevant entity in government to ensure access to education by learners and that their safety is not compromised. 

15 May 2023 - NW1582

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Agriculture, Land Reform and Rural Development

Which urgent steps of intervention have been taken since the avian flu outbreak, which was detected in the Western Cape two weeks ago?

Reply:

The Highly Pathogenic Avian Influenza protocol is being applied. The farm is placed under quarantine, no eggs and birds can leave the farm. Birds on infected properties have been destroyed. Cleaning and disinfection are being applied. The outbreak has been reported as per normal protocol to the World Organisation for Animal Health and trade partners.

15 May 2023 - NW1503

Profile picture: Ngcobo, Mr SL

Ngcobo, Mr SL to ask the Minister of Basic Education to ask the Minister of Basic Education

(1)       Whether, considering that the results of the 2023 Reading Panel background report for the 2030 Reading Panel indicates that 82% of Grade 4 children in the Republic cannot read for meaning, which has increased from the 78% that was recorded in 2016, she will furnish Mr S L Ngcobo with an overview of the measures that her department has implemented to address the reading challenge since 2016; if not, what is the position in this regard; if so, what are the relevant details; (2) (a) what factors have led to the steep deterioration and (b) how doer her department intends to address the specified factors?

Reply:

(1)  The Department of Basic Education (DBE) has been giving focused attention to improving literacy and reading development, and has declared two key outcomes which have an impact on reading, in the current MTEF, as part of the key priority outcomes. These are Outcome 1, which is about improving school readiness for children; and Outcome 2, which is about getting 10-year-old learners enrolled in publicly funded schools to read for meaning.

Furthermore, the DBE has a National Reading Sector Plan, and Provincial Education Departments (PEDs) have developed their Reading Strategies that target the early grades informed by the National Reading Sector Plan, but taking into account the provinces' contexts. The PEDs' reading strategies outline different activities that are being implemented in schools to improve reading outcomes. To ensure that the reading strategies are implemented across by PEDs, the implementation of the Reading Strategies forms part of the indicators of the DBE's Annual Performance Plan (APP).

 There are also various intervention programmes and strategies that are coordinated at the DBE to support the improvement of reading outcomes in the early grades. They include the following:

  • Annual Teaching Plans (ATPs) for Home and First Additional Languages
  • Guidelines on the implementation of ATPs
  • National Framework for the Teaching of African Languages in the Foundation Phase
  • Primary School Reading Improvement Programme (PSRIP) for Home Languages and English First Additional Language (EFAL)
  • Early Grade Reading Study
  • Early Grade Reading Assessment
  • Workbooks Programme
  • Foundation Phase Home Languages literacy lesson plans 
  • Reading Norms
  • Reading Champions Programme
  • Read to Lead campaign
  • Comprehension across the curriculum

(2)  

(a) We have been making steady gains, but the pandemic interrupted our progress. A number of reports detailing the impact COVID-19 has had on educational provision generally, and the literacy development of our children in particular, have been shared. We also acknowledge that the ability to read well, and with comprehension, is a result of a number of factors, and what happens at school level, is but a part of that.  The other factors, which are equally important, are linked to the environment outside of school, which is the home and the greater society. With regard to what happens at school level, there are challenges that we are trying to address, and these include the competencies of some of our teachers to teach reading for meaning, particularly in the lower grades, and in the language of the learners; teacher support; access to reading resources, particularly in the home languages of the learners; ensuring that schools have environments conducive to successful reading development; and the general readiness of our children when they start school.

(b) The Department will be focusing on strengthening foundational learning. This includes improving early learning, and to do this, we will be providing under-resourced ECDs with a minimum package of educational resources which will comprise resources to stimulate early literacy. The Department has also been reflecting on its current strategy to ensure its agility to respond to challenges that have been exacerbated by the pandemic. To this end, we will be finalising a new and improved Integrated Sector Reading Strategy with a sharpened focus on skilled and versatile teachers, availability of age-appropriate and culturally relevant resources, as well as strengthened involvement of parents and the community. In acknowledging that literacy development is an integrated function that requires coordination, the DBE will be working with PEDs and the sector at large, which includes parents and communities, in finalising the revised strategy.  

15 May 2023 - NW1146

Profile picture: Zondo, Mr  S S

Zondo, Mr S S to ask the Minister of Public Works and Infrastructure

Whether, given that the N2 Nodal Development project (details furnished) that forms part of the Infrastructure Investment Plan was approved by the Cabinet in May 2020 and gazetted in July 2020 as Strategic Integrated Project 24e, in line with the Infrastructure Development Act, Act 23 of 2014, he will furnish Mr S S Zondo with the relevant details and/or an update on the specified development; if not, why not; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure

The N2 Nodal Development, gazetted as SIP 24e, is a fully integrated mixed-use development with a strong economic component centred around the Bay West development precinct. The R 33,4 billion node is one of three declared Urban Development Nodes across the Nelson Mandela Bay Metro Municipality and is strategically important to the Western Areas of Port Elizabeth.

The development node is located along the N2 and south of the industrial areas of Kuyga and Greenbushes. The Nodal Development comprises of 4 sub-projects that are projected to yield over 12,100 new housing opportunities on greenfield land and formalise the small informal settlement of Gro-Gro with approximately 210 units. The sub-projects are the Baywest development, Utopia Estate Mixed Use Development, N2 North Integrated Development and Erf 432, Hunters Retreat. The projects are private initiatives except for municipal driven project called the N2 North Integrated Mixed-Use Development. This initiative provides for approximately 3000 residential units, schools, business sites and various community facilities and amenities.

Infrastructure South Africa monitors the level of implementation of this project and receives quarterly reports from the project sponsor. Elements completed within the N2 Nodal development includes the Bay West Mall, the filling station and the Redhouse Chelsea arterial. The Utopia Estate Mixed Use Development is currently in construction. In terms of the overall N2 Nodal Development progress, Pre-planning is 84% complete, Planning is 53% complete and Construction of Bulk infrastructure is 14% complete.

The N2 Nodal development is one of many projects within the portfolio which requires assistance with the funding of bulk infrastructure for the development. Infrastructure South Africa, together with the Infrastructure Fund is working with the Nelson Mandela Bay Metro municipality to identify new, innovative mechanisms to fund and finance bulk infrastructure requirements.

__________________________

MR. S ZIKALALA, MP

MINISTER OF PUBLIC WORKS AND INFRASTRUCTURE

DATE:

15 May 2023 - NW1156

Profile picture: Komane, Ms RN

Komane, Ms RN to ask the President of the Republic

Whether he has found that the amount of R166 562 058 that will be spent with regard to the employment of the SA National Defence Force (SANDF) for one month up to 17 April 2023 in anticipation of violent protests that did not materialise was justified; if not, what is the position in this regard; if so, what justification is there for the costs of the one-month employment of the SANDF in light of the peaceful protests that only lasted for one day?

Reply:

The expenditure for the employment of the South African National Defence Force (SANDF) to safeguard and protect National Key Points and critical infrastructure was justified. The deployment of the SANDF in support of the SAPS provided the SAPS and other law enforcement agencies with adequate capacity to create conditions in which the protests organised for 20 March 2023 were conducted in a safe and secure environment.

The employment assisted in providing safe and secure conditions for all the people in the country who were not participating in the protests to safely continue with their normal activities.

Soon after the successful completion of the security cluster effort to ensure a safe, secure and peaceful environment before and after 20 March 2023, the SANDF withdrew from that particular deployment and continued with the safeguarding and protection of Eskom power stations in Mpumalanga, Limpopo and Free State under the same Presidential Authority for Operation Prosper.

15 May 2023 - NW1096

Profile picture: Cebekhulu, Inkosi RN

Cebekhulu, Inkosi RN to ask the Minister of Agriculture, Land Reform and Rural Development

Whether, with reference to a certain person (name and details furnished) stating that incomplete statistics on the Republic’s agriculture have resulted in missed opportunities, her department has any plans in place to address the issue through (a) new data technology and (b) providing funds to data collectors to see the improvement of data collection methods; if not, why not; if so, what are the relevant details?

Reply:

Yes.

a) The Department of Agriculture, Land Reform and Rural Development (DALRRD) is in the process of developing the Agricultural Statistics Strategy in partnership with Statistics South Africa, including other industry stakeholders such as State-Owned Enterprises and provincial departments of agriculture. It is envisaged that the Strategy will among other things address the bias in the availability of agricultural statistics within the country through the development of more representative statistical products, while continuous oversight will be provided to the process. The draft strategy is undergoing consultation before is presented before the executive of the Department.

b) If successfully implemented, the Strategy will resolve the main challenges faced with the collection, processing, and dissemination of agricultural statistics. Among others, the Strategy addresses the Data Management System, which will ensure that technology becomes an intricate part of producing the statistics. The strategy will contribute to the enhancement of an ongoing process of data collection that includes the census, surveys, farmer register, and crop estimates. In 2007 Stats SA collaborated with the Department of Agriculture in conducting Censuses 2007 and more recently another Census was conducted in 2017. Both Censuses were funded by the DALRRD. Additionally, the Annual Agricultural Surveys are released by Stats SA. Stats SA uses the DALRRD Economic Accounts figures as a benchmark on a regular basis. If the strategy is funded fully, among others, data collectors will be resourced.

15 May 2023 - NW1465

Profile picture: Chirwa-Mpungose, Ms NN

Chirwa-Mpungose, Ms NN to ask the Minister of Public Works and Infrastructure

Considering reports that a bid rigging had occurred regarding the leasing of the Department of Health headquarters to the tune of R480+ million, (a) what are the full, relevant details of the situation, (b) which parties were involved and (c) what current (i) internal and (ii) external investigation and/or legal processes are underway?

Reply:

The Minister of Public Works and Infrastructure

a) The Department of Public Works and Infrastructure (DPWI) Supply Chain Unit is not aware of “reports” of bid rigging in the awarding of the lease and as such, cannot provide any specific details in this regard. The DPWI can however confirm that tender PT19/008 was advertised in the open market and closed on 6 August 2019 for 28 397.09sm of office accommodation and 474 parking bays for Department of Health (DoH) for a period of 5 years within the areas of Arcadia, Hatfield, Menlyn, Lynwood, Persequor Park or Pretoria CBD.

Notwithstanding the above, on 22 October 2019 DoH wrote to DPWI and requested to participate in a lease contract that was previously awarded by DPWI for COGTA. In this letter DoH further stated that their initial requirement of 28 397.09sm was now reduced to 12 000sm. Due to the change in the space requirement, the tender PT19/008 was then cancelled.

Regarding the contract for COGTA, the DPWI signed a lease agreement on 6 December 2019 with Hiroworx who offered the EXXARO building situated in Thaba Tshwane. This lease was concluded through an open tender process under Tender No HP18/086. Subsequently on 31 January 2020 COGTA wrote to DPWI advising that they would not be able to move into the leased building.

The DPWI was now seized with having a contractual commitment and a signed lease agreement for a building without a tenant. In order to avert wasteful expenditure and possible litigation and whilst recognizing that the initial DoH tender was cancelled but the need for 12 000sm of office accommodation was still required by DoH; DPWI then wrote to National Treasury on 6 March 2020 requesting NT to approve/support the substitution of COGTA as a tenant of EXXARO building by DoH. On the 20 March 2020 NT responded stating that they supported the deviation.

DPWI then informed DoH and on 21 September 2020 an addendum to the lease agreement was signed between DPWI and Hiroworx substituting COGTA with DoH as the tenant in the EXXARO building.

b) PWI officials were involved in acquiring EXXARO building on behalf of the client department.

c) With respect to:

(i) internal investigation and/or legal process, there is nothing we know of; and

(ii) external investigation and/or legal processes, there is nothing we know of.

15 May 2023 - NW1505

Profile picture: Ngcobo, Mr SL

Ngcobo, Mr SL to ask the Minister of Basic Education to ask the Minister of Basic Education

Whether, with reference to the reply to question 966 on 24 April 2023, and given that the total number of schools without laboratories is 19 694 and the total number of schools without libraries is 17711, there are any plans in place to address the shortage of laboratories and libraries, in an attempt to meet the demand; if not, why not; if so, what are the relevant details?

Reply:

The Regulations Relating to Minimum Uniform Norms and Standards for Public School Infrastructure provides that: 

(i)    " All schools must have a school library or a media centre and a minimum, adequate and suitable school library collection." These may be in a form of a mobile library, cluster library, classroom library, centralised library or a community library. Since the promulgation of the Regulations, all new and replacement schools are being provided with libraries and there are also standalone programmes by PED's to provide these. Of the schools that have provided information, 3 205 primary schools have corner libraries and information is being collated on these and schools using mobile and community libraries. Further, over 213 000 learners have been provided with learner devices and connectivity  in the 2022/23 financial year only. This gives these learners access to reading material through online libraries.

(ii) With regard to laboratories, all schools that offer science subjects must be provided with a laboratory. This can be in a form of a fixed laboratory, mobile laboratory or in a form of a classroom  or safe container as determined by the school. All new and replacement schools are also  being provided with laboratories and there are also standalone programmes by PED's to provide these.

COMPILED BY:

MR E RAMASEDI MAFOKO

DIRECTOR: GRAND MANAGEMENT AND COMPLIANCE

DATE: 09/05/2023

OFFICIALS INVOLVED

QUESTION NO: 1505.   IS APPROVED

MR D VANDERWESTHUIJZEN

DEPUTY DIRECTOR GENERAL: SECTOR INFRASTRUCTURE

DATE: 11/05/2023

QUESTION NO: 1505.   IS APPROVED

DR G WHITTLE

ACTING DIRECTOR-GENERAL

DATE: 11/05/2023

QUESTION NO: 1505.   IS APPROVED

DR MR MHAULE, MP

DEPUTY MINISTER

DATE: 12/05/2023

QUESTION NO: 1505.   IS APPROVED

MRS AM MOTSHEKGA, MP

MINISTER

DATE: 15/05/2023

15 May 2023 - NW917

Profile picture: Graham-Maré, Ms SJ

Graham-Maré, Ms SJ to ask the Minister of Public Works and Infrastructure

(1)What is the requirement with respect to the number of checks on fire protection equipment on the Parliamentary Precinct in each year; (2) whether the facilities management at the Parliamentary Precinct adheres to the requirements regarding the number of checks on fire equipment; if not, what steps will he take to address the prescribed requirements; if so, (3) whether he will furnish Ms S J Graham with the report on the fire protection equipment check that was performed in 2022; if not, why not, if so, what are the relevant details; (4) whether fire panels are checked within the prescribed periods; if not, what steps will he take to address the prescribed requirements; if so, will he furnish Ms S J Graham with the report on the fire panels check that was performed in 2022; (5) (a) what is the total number of fire extinguishers required to be on the precinct, (b) does Parliament comply with the required number of equipment, (c) what number of fire extinguishers have been replaced in 2022 and (d) what are the reasons for the replacements?

Reply:

The Minister of Public Works and Infrastructure

1. The requirement with respect to the number of checks on fire protection equipment on the Parliamentary Precinct in each year are as follows.

  • Fire extinguishers, fire hose reels and fire hydrants are subject to annual service and monthly visual inspection in all buildings.
  • Fire Alarms, have a life of 10 years when used in dry, non-corrosive atmospheres and provided that they are serviced or regularly inspected, tested, cleaned and recalibrated twice a year.
  • Routine replacement of detectors after 10 years of service In the interests of safety and the avoidance of unwanted alarms, is recommend.
  • The Gas Suppression system, on the mechanical side is pressure tested every 10 years provided no discharge occurred. The pipe network should be pressure tested annually The Gas Suppression system Controls on the Electronic side should be serviced in 6 months provided there are no faults occurring.
  • Sprinkler system has a life of 20 years. On fire sprinkler there should be a yearly service conducted, Pumps for should be serviced Yearly, so that pumps are able to supply water at the correct pressure and flow in case of need, and the valves should be tested every three years to ensure that they function correctly and to check any leaks leak.

(2) The latest annual service of fire equipment was performed over the period from mid-November to December 2022 into and until mid-January 2023 and after which monthly visual inspections were performed in February and March 2023. Monthly visual inspections will continue to take place on a monthly basis until the next due annual service of equipment.

(3) The service records of the latest annual service of fire equipment performed by DPW service provider, Messrs Transfire is attached for ease of reference.

(4) Yes, checks are done annually. The following reports are available where the entire building’s maintenance checks were completed in 2022, namely Tuynhuys, Good Hope and NCOP buildings. See the attached service records.

Maintenance checks are ongoing in Marks Building which is 80% complete. The building is earmarked to be completed end of April 2023.

90 Plein Street Building to be completed end of May 2023

120 Plein Street Building to be completed end of April 2023

100 Plein Street Building to be completed end of April 2023

(5) (a) There are a total of 706 fire extinguishers, 277 fire hose reels, 101 fire hydrants/boosters and 4 fire blankets

b) A survey by a qualified fire marshal would have to be conducted in order to determine if the number existing units are adequate or inadequate.

c) The number of fire extinguishers that were replaced in 2022 is unknown. The latest annual service performed by service provider Transfire was a service of all fire equipment that were found on site in their designated positions as recorded. Missing extinguishers were to be replaced/installed with each monthly visual inspection that followed after servicing. Fire extinguishers which were replaced or installed during the monthly inspections will be have been recorded in the inspection records for each month which is still to be received by Transfire.

d) The reasons for replacement of fire extinguishers are when a unit is found to be condemned or damaged. Other possible reasons will be when a unit is missing due to it being taken off its recorded position for improper reasons and not being put back, another likely reason is theft.

___________________________

MR. S ZIKALALA, MP

MINISTER OF PUBLIC WORKS AND INFRASTRUCTURE

DATE:

15 May 2023 - NW949

Profile picture: Zondo, Mr  S S

Zondo, Mr S S to ask the Minister of Public Works and Infrastructure

Whether his department has any programmes in partnership with the Office of the Minister in The Presidency for Women, Youth and Persons with Disabilities, the Department of Social Development and the Department of Human Settlements aimed at addressing the resettlement of victims of the 2022 flood disaster in KwaZulu-Natal; if not, why not; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure

In supporting the resettlements of victims of the 2022 flood disaster in KwaZulu-Natal, a total of 05 land parcels measuring 1,5990 hectares from the DPWI portfoilio has been approved for release to the Housing Development Agency (HDA).

DPWI has issued the Special Power of Attorney to the HDA to commence with the planning processes while DPWI is finalising the release of land parcels.

15 May 2023 - NW1328

Profile picture: van der Merwe, Ms LL

van der Merwe, Ms LL to ask the Minister of Home Affairs

(1)Whether he will furnish Ms L L van der Merwe with the full details of the qualifications and training provided to the permitting agents; if not, why not; if so, what are the relevant details; (2) whether he will furnish Ms L L van der Merwe with the full details of the process of quality control; if not, why not; if so, what is the extent of checking whether a marriage is valid; (3) whether he will furnish Ms L L van der Merwe with the full details of the vetting process of documents; if not, why not; if so, is it policy that agents phone universities to check if a person is enrolled? (4) what processes are in place to escalate queries with banks when they are reluctant to confirm the authenticity of bank statements?

Reply:

1. Section 46 of The Immigration Act, No. 13 of 2002 giving recognition to Immigration Practitioners (Agents) was repealed by section 23 of Act No. 13 of 2011. There is therefore no legislation that recognises or regulates immigration agents. The Department does not provide any training to immigration / permitting agents.

2. The full details of the process of quality control on applications is available on request. It details the workflow of applications within the Visa Application System (VAS) and the various activities that are performed with regard to verification of supporting documents such as a marriage certificate to confirm whether such a marriage is valid. The validity of marriages, for instance is verified on the National Population Register (NPR).

3. Supporting documents to a visa or permanent residence application are verified, not vetted. Verification includes contacting the author of the supporting document to verify the authenticity of the document. Verification can be obtained orally through a telephone call or in writing through an email confirmation.

4. Most banks do have access to verification services. Some banks issue bank statements with QR codes that DHA officials can scan to verify without the need to contact the bank but it is ultimately the applicant’s responsibility to ensure that the author of any document in support of their application is verifiable.

END

 

15 May 2023 - NW1212

Profile picture: Graham-Maré, Ms SJ

Graham-Maré, Ms SJ to ask the Minister of Public Works and Infrastructure

(1)What (a) total number of (i) flats and (ii) houses are located at Periwinkle Gardens in eThekwini, (b) number of the specified flats and houses are occupied by (i) SA National Defence Force (SANDF) personnel and (ii) non-SANDF personnel and (c) number are unoccupied; (2) Which department is responsible for (a) day-to-day maintenance, (b) repairs and refurbishment and (c) fire-safety mechanisms; (3) (a) on what date was the last fire safety assessment done, (b) what are the details of any adverse findings that were made and (c) on what date is the next assessment scheduled to take place?

Reply:

The Minister of Public Works and Infrastructure:

(1)

(a)

(i) There are 22 Duplexes allocated to Department of Defense, totaling 44 units.

(ii) There are no houses located at Periwinkle Gardens.

(b)

(i) 42 units currently occupied by Department of Defense

(ii) None.

(c) 2 units are currently vacant but already allocated to SANDF officials who will occupy shortly.

(2)

(a) SANDF and Department of Public Works and Infrastructure (DPWI) are responsible for Day to Day Maintenance. Based on the approved Maintenance guidelines responsibilities.

(b) Both Departments are responsible for the Repairs. Based on the approved Maintenance guidelines responsibilities. The refurbishment and renovations is the responsibility of DPWI.

(c) SANDF as the user Client is responsible for Fire and Safety mechanism

(3)

(a) An inspection was conducted by the DPWI and SANDF officials on the 03/04/2023

(b) Fire equipment is due for servicing and minor repairs (last service date is not visible: see attached picture)

(c) 2023 Servicing of Fire equipment: Client logged the calls which should be completed by Mid-July 2023.

__________________________

MR. S ZIKALALA, MP

MINISTER OF PUBLIC WORKS AND INFRASTRUCTURE

DATE:

15 May 2023 - NW1354

Profile picture: Graham-Maré, Ms SJ

Graham-Maré, Ms SJ to ask the Minister of Public Works and Infrastructure

Whether, with reference to the response of the President, Mr M C Ramaphosa, to the debate on the State of the Nation Address wherein he conceded that there has been severe underinvestment in public infrastructure over the years with increasing evidence of a deterioration in the quality of public infrastructure, (a) he will consider instituting a national public infrastructure audit to ascertain the quality of major public infrastructure in the Republic; if not, why not; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure

Infrastructure investment is critical to South Africa’s economic welfare, recognising that the provision of superior quality infrastructure allows an economy to be more efficient, improves productivity levels and raises long-term growth and living standards. Accelerating the pace and quality of infrastructure in the country requires a whole-of-government approach and establishing an enabling environment for private sector participation.

The DPWI, amongst others, relies on period publications by both public and private sector institutions such as the South African Institution of Civil Engineering (SAICE)’s 2022 Infrastructure Report Card for South Africa and Stats SA’s Capital Expenditure by the Public Sector Report to track where infrastructure investment is taking place and the quantum thereof.

The DPWI coordinates the efforts of government to ensure that high quality public infrastructure takes place to achieve the targets set out in the National Development Plan. The DPWI will not be duplicate audits that have already been undertaken on the quality of major public infrastructure, but will focus its efforts on coordinating public sector infrastructure investment programme and working closely with the private sector to increase the pace and quality of infrastructure investments in South Africa.

__________________________

MR. S ZIKALALA, MP

MINISTER OF PUBLIC WORKS AND INFRASTRUCTURE

DATE:

15 May 2023 - NW921

Profile picture: Schreiber, Dr LA

Schreiber, Dr LA to ask the Minister of Public Works and Infrastructure

What is the amount spent on (a) maintenance, (b) repairs, (c) cleaning, (d) gardening, (e) upgrading and (f) any other services provided at state-owned residences that have been occupied by (i) Ministers and (ii) Deputy Ministers since 1 February 2018?

Reply:

The Minister of Public Works and Infrastructure

(a) See the attached list of maintenance expenditure, which include repairs, cleaning and gardening, linked to the address of each house. Annexure A are Cape Town houses and Annexure B are Pretoria houses

___________________________

MR. S ZIKALALA, MP

MINISTER OF PUBLIC WORKS AND INFRASTRUCTURE

DATE:

15 May 2023 - NW1024

Profile picture: Schreiber, Dr LA

Schreiber, Dr LA to ask the Minister of Public Works and Infrastructure

What is the (a) name of each Minister and Deputy Minister who occupied a state-owned residence in the 2021-22 financial year and (b) detailed breakdown of the amounts spent on (i) maintenance, (ii) repairs, (iii) cleaning, (iv) gardening, (v) upgrading and (vi) any other services provided at residences occupied by each specified Minister and Deputy Minister?

Reply:

The Minister of Public Works and Infrastructure

a) Kindly note that due to security sensitivities we cannot provide names of Ministers and Deputy Ministers linked to the houses they occupied.

b) See the attached list of maintenance expenditure, which include repairs, cleaning and gardening, linked to the address of each house. Annexure A are Cape Town houses and Annexure B are Pretoria houses.

15 May 2023 - NW1120

Profile picture: Van Staden, Mr PA

Van Staden, Mr PA to ask the Minister of Public Works and Infrastructure

Whether, with reference to the reply by the former Minister to question 225 on 7 March 2023, he will provide Mr P van Staden with lists containing the relevant details of the (a) 360 courts that have partially functioning generators, (b) 80 courts for which instructions have been issued for the installation of new generators and (c) date(s) by which the new installations will be rolled out and completed; if not, why not, in each case; if so, what are the relevant details in each case?

Reply:

The Minister of Public Works and Infrastructure

(a) and (b)

The detailed list of the 360 courts that have partially functioning generators and the 80 generator installations for new generators are attached herewith as Annexures A and B respectfully.

(c) The Generator Programme is aimed at rolling out 80 new generator installations at various courts in Limpopo, Free State, Northern Cape, Western Cape, Kwa-Zulu Natal, Mpumalanga and Gauteng Provinces respectively. The projects are currently in the planning and design phase which entails the site inspections, status quo reporting, drawings, specifications and approvals including municipal approvals. The size of the facility and cabling length to the main supply are some of the parameters that determine the milestones, which varies per facility. In terms of the overall programme milestones, it is anticipated that the following will be achieved:

  • Procurement Plan approval = 30 April 2023
  • Complete planning and design = 30 June 2023
  • Complete Bid Specification Committee = 31 June 2023
  • Complete Bid Procurement Strategy (approvals) = 31 June 2023
  • Tender advertisement = 30 August 2023
  • Tender Award and Site handover = 30 November 2023
  • Construction Duration = 3 to 6 months (based on the specifications)

__________________________

MR. S ZIKALALA, MP

MINISTER OF PUBLIC WORKS AND INFRASTRUCTURE

DATE:

15 May 2023 - NW1213

Profile picture: Graham-Maré, Ms SJ

Graham-Maré, Ms SJ to ask the Minister of Public Works and Infrastructure

(1)What progress has been made in terms of (a) repairing the boundary wall and (b) building the retaining wall in accordance with the recent assessment conducted by officials of his department at Periwinkle Gardens in eThekwini; (2) what is the progress with regard to the devolution of the site to the Department of Defence and Military Veterans; (3) (a) on what date is the devolution scheduled to take place and (b) what further work must be undertaken by his department before the devolution takes place; (4) whether any further work must be undertaken with regard to the projects; if not, why not; if so, what are the relevant details; (5) whether the projects must be registered; if not, why not; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure

(1)

(a) An assessment was done by day to day works and it was found that Professional engineer must be involved.

(b) It was referred to engineers to conduct an assessment and provide a report. A report has been issued, indicating that the site terrain is approximately 2 kilometers away from the sea. The area has a limited vegetation growth on sandy soil conditions, which insures speedy infiltration due to the large un-compactable voids present. This means that the soil would naturally become over saturated faster than slow infiltration soil types thus creating faster flooding plane. A proper retaining wall will need to be built together with an engineer’s designs.

(2) The Regional Office will only be able to devolve the site, once formal agreement has been reached between DPWI and Department of Defence (DOD) regarding the transfer of custodial functions.

(3)

(a) At this stage, no date has been agreed to regarding the proposed devolution of function.

(b) Prior to custodial devolution taking place, formal agreement/s must be reached between the DPWI and DOD.

(4) No project has been registered for this property.

(5) SANDF has not prioritized any projects for this property.

__________________________

MR. S ZIKALALA, MP

MINISTER OF PUBLIC WORKS AND INFRASTRUCTURE

DATE:

15 May 2023 - NW1300

Profile picture: Mogale, Mr T

Mogale, Mr T to ask the Minister of Public Works and Infrastructure

(1)What total number of fixed properties does his department own in Pretoria West; (2) whether he will furnish Mr T Mogale with a detailed asset register of such fixed properties; if not, why not; if so, what are the relevant details; (3) what (a) total number of buildings owned by his department have been hijacked and (b) plans have been put in place to recover the specified buildings?

Reply:

The Minister of Public Works and Infrastructure

1. The total number of fixed properties owned by the department within the Pretoria West area is = Sixteen (16).

2. The departmental asset register is available and a summary of the cited properties within Pretoria West is availed under Annexure A.

3. The

a. Total number of known buildings illegally occupied within the Pretoria jurisdiction is nine (9).

b. The department has instituted legal processes through the office of the state attorney to commence the processes of eviction.

__________________________

MR. S ZIKALALA, MP

MINISTER OF PUBLIC WORKS AND INFRASTRUCTURE

DATE:

15 May 2023 - NW1381

Profile picture: Van Der Walt, Ms D

Van Der Walt, Ms D to ask the Minister of Basic Education to ask the Minister of Basic Education

(a) What was the total amount budgeted for the National School Nutrition Programme in each province in the (i) 2020-21, (ii) 2021-22 and (iii) 2022-23 financial years, (b) what was the total spend in each specified financial year, (c) what total number of contracts were awarded in each financial year, (d) what was the total amount of each contract awarded in each financial year, (e) who were the contractors and (f) what is the allocation for the 2023-24 financial year for each province?

Reply:

Response to (a); (b) and (f) is outlined in attached file (Annexure 1).

Response to (c); (d) and (e).  See attached PED summary Annexure 2 and MP Supplier database Annexure 3.

15 May 2023 - NW1353

Profile picture: Graham-Maré, Ms SJ

Graham-Maré, Ms SJ to ask the Minister of Public Works and Infrastructure

(1)Whether the SA Council for the Project and Construction Management Professions (SACPCMP) engaged the services of a certain company (name furnished) to undertake a forensic audit in 2017; if not, what is the position in this regard; if so, what are the full details of the report; (2) whether any other audit has been undertaken by any other company on the SACPCMP in the past 10 years; if not, what is the position in this regard; if so, (3) whether he will furnish Ms S J Graham with a copy of the report including details of (a) the major findings, (b) what remedial actions were taken to resolve any identified issues and (c) what consequence management resulted from the audit; if not, why not; if so, what are the relevant details; (4) whether all issues identified in the audit reports have been addressed; if not, why not; if so, what are the relevant details?

Reply:

The Minister of Public Works and Infrastructure

  1. The Registrar, who was appointed in 2019, is neither in possession of an approved forensic audit report, which would have been adopted by what would be the 4th Term Council, which was in place at the time, in 2017, nor was it part of a handover process upon his assumption of duty. The Registrar also could not find any record of approved minutes of the 4th Term Council in relation to the adoption and approval of the said audit report. However, the Registrar, in his endeavour to respond to this Parliamentary question, managed to get a hold of an unprocessed report, which relates to an audit conducted in 2017. The summary of the scope of the audit was to investigate suspected fraudulent certificates being issued by the SACPCMP in late 2016.

The summary of the findings are as follows:

    1. Concerns were raised regarding the integrity of the Council’s registration platform, Your Membership (YM), in relation to data security and registration certificates.
    2. Concerns were raised regarding the maladministration and incompetence of the then administration.

The current Registrar and 6th Term Council are not aware of any resolutions that would have been adopted by the 4th Term Council on the items referred to above and the governance processes with regards to reporting, which were led by the then Audit and Risk Committee. The Registrar has learned however that the Audit and Risk Committee who would have been responsible for working with the forensic auditors and addressing the report, resigned before the matter was finalised.

Nonetheless, through the requisite internal and external audits conducted during the tenure of the current Registrar, as described in the response to Section 2 below, many improvements have been effected to address gaps in the operating environment. Some of the improvements are as follows:

  1. The registration platform has been changed to a new, more secure platform called My Membership (MM), which is managed by a legal entity in South Africa.
  2. The Council’s registration certificates now have a unique security feature that makes it difficult to forge certificates. Furthermore, the MM system allows the public to verify the validity of any registration certificate.
  3. Certificates are renewed annually after payment of annual fees.
  4. Three (3) staff members were dismissed, four (4) staff members were warned, while other staff members resigned as a result of their complicity in the irregularities that have been discovered over the years.
  5. The organisational structure has been changed to a fit-for-purpose structure with a consistent and simple operating model and clear accountability and authority.
  6. Formal Business Processes have been documented and approved with regard to the discharge of the Council’s legislative mandates so as to improve accountability and controls.
  7. Key policies with regard to Registration, Continuous Professional Development (CPD) and Accreditation, amongst others, have been reviewed and approved to address areas of concern.
  8. Background and criminal checks are conducted on all newly appointed Council employees.
  9. Following a governance structure review, a project to review the delegation of authority to align with the new organisational structure and governance framework is underway.

The above have been consistently reported in the Council’s Annual Reports, which are submitted to Parliament, through the office of the Minister, annually.

2. The SACPCMP constitutes an Audit and Risk Committee (ARC), empowered by Section 17 of the Project and Construction Management Professions Act, No. 48 of 2000, through which the Council provides regular oversight on all activities and reporting by internal and external auditors for the term of the Council.

All internal and external audits are based on an approved audit plan and conducted to ensure good governance within the entity and its operations. As part of the Council’s audit planning the following applies:

2.1. External audits

These audits are conducted by external audit firms and an opinion on the Council’s financial statements is issued. The audited financial statements and signed audit report part of the Council’s Annual Report, which is submitted to Parliament, annually.

There have not been any significant audit findings in the past three years. Most findings are cleared by the time the audit report is issued. The Council has achieved an unqualified audit opinion for the past few years, indicating that the financial statements were free from material misstatements.

2.2. Internal Audits

These audits are conducted regularly as per the approved internal audit plan. The plan, which details the areas to be reviewed, is prepared by internal auditors and approved by the Audit and Risk Committee (ARC). The activities of the ARC are reported in the Annual Report. The following areas are reviewed regularly:

  • Financial Management – mainly the revenue and debt management processes
  • Asset Management review
  • Supply Chain Management review
  • Human Resource Management review
  • Management of operations (Registration processes)
  • Management of operations (Programme accreditation processes)
  • Governance Processes

The above audits are conducted to assess the Council’s internal controls and identify any deficiencies.

As part of remedial action following any audit, Management develops an implementation plan to enhance current processes and to address material deficiencies noted by internal auditors. Management developed an audit matrix for all areas audited during the 2021/2022 financial and quarterly monitoring is done by the ARC on the progress with implementation (ref: SACPCMP Annual Report 2021/22; Section C, Part 16).

3. Question: whether he will furnish Ms S J Graham with a copy of the report including details of (a) the major findings, (b) what remedial actions were taken to resolve any identified issues and (c) what consequence management resulted from the audit; if not, why not; if so, what are the relevant details

SACPCMP Response: See SACPCMP Response above to Questions 1 and 2:

4. As part of the SACPCMP’s audit remedial action, in relation to all audits that are undertaken, Council Management develops implementation plans to address material deficiencies noted by internal auditors. This is informed by the audit matrix for all areas where remedial actions are required. Quarterly monitoring is done by the ARC on the progress with regard to implementation. Most of the findings are cleared and Council ensures that internal controls are improved to prevent repeat or recurring findings.

The following are issues that are put on the audit matrix and summary is provided in terms of the outcomes of the management actions around the findings:

  • Financial Management – mainly the revenue and debt management processes) – No repeat findings. A finding that has not been cleared relates to the review of the policy, which will be done by the 2nd quarter of the 2023/24 financial year.
  • Asset Management review - No repeat findings. The finding that has not been cleared is around the review of the policy, this will be done by the 2nd quarter of the 2023/24 financial year.
  • Supply Chain Management review - No repeat findings. The finding that is yet to be cleared is around the review of the policy, this will be done by the 2nd quarter of the 2023/24 financial year.
  • Human Resource Management review - No repeat findings. The finding that has not been cleared is around the review of the policy, this will be done by the 2nd quarter of the 2023/24 financial year.
  • Management of operations (Registration processes) – all findings were cleared.
  • Management of operations (Programme accreditation process) – Findings were cleared through new accreditation processes applied in the new programme accreditation cycle.
  • Governance Processes - Findings were cleared.

__________________________

MR. S ZIKALALA, MP

MINISTER OF PUBLIC WORKS AND INFRASTRUCTURE

DATE:

15 May 2023 - NW862

Profile picture: Khoza, Mr AV

Khoza, Mr AV to ask the President of the Republic

(1)What were the reasons for declining the request for a special funeral for Kiernan ‘AKA’ Forbes; (2) whether there is a precedent in recent history when the Government declined such a request; if not, what is the position in this regard; if so, (a) who was the artist and (b) what were the reasons?

Reply:

The granting of honours is at the discretion of the President.

There have been requests for special funerals in the past that have been declined. However, out of respect for the families involved, it would be inappropriate for the Presidency to divulge the names of individuals on whose behalf official funerals were requested and declined.

15 May 2023 - NW1573

Profile picture: Msane, Ms TP

Msane, Ms TP to ask the Minister of Agriculture, Land Reform and Rural Development

Whether the Ingonyama Trust head offices are still operational and assisting clients; if not, why not; if so, what total number of (a) clients have been assisted in obtaining longterm leases since 2021 and (b) the specified clients were women?

Reply:

Yes.

a) There are 97 clients that have been assisted in obtaining longterm leases since 2021.

b) 34 clients were women.

15 May 2023 - NW635

Profile picture: Masipa, Mr NP

Masipa, Mr NP to ask the Minister of Agriculture, Land Reform and Rural Development

Whether she will furnish Mr N P Masipa with (a) a detailed breakdown of the costs of cattle that were bought by her department for farmers in each province since 1 JaNoary 2012, (b) the details of the recipients of the cattle and the name of each of the specified farms in each province in the specified period and (c) the relevant details of the conditions of the farms as it pertains to water rights, grazing capacity and veld conditions; (2) whether all farms are still in production; if not, (a) why not and (b) what steps have been taken to resuscitate the farms; if so, what are the relevant details; (3) whether there was additional support provided besides the purchase of cattle; if not, why not; if so, what additional support was provided; (4) what (a) is the total Nomber of applications that were received in each year in each province, (b) Nomber of applications were declined and (c) were the reasons for declining each application?

Reply:

(1)(a),(b),(c) Please refer to Annexure A.

(2)(a),(b) Please refer to Annexure A.

(3),(4) Please refer to Annexure A.

ANNEXURE A TO NA-QUES-635 OF 2023

(1)(a),(b),(c),(2),(3) Eastern Cape Province: Sarah Baartman District: Please refer to the table below.

 

(1)(a)

Costs of cattle bought for farmers

(1)(b) Details of Recipient

Name of Farm

(1)(c) Conditions of the farm, i.e. water rights, grazing capacity and veld conditions

(2) Is the farm still in production

Yes/ No

(2)(a),(b)If No Why and what steps have been taken to resuscitate

(3) Additional support, If not, why not, if so what additional support was provided

2020/21

678 000.00

 

Meyers family trust

Water is a challenge as there’s only one borehole working; other camps have water for animals

Yes

Falls away

The farmer is also supported with chicory inputs, grass seeds and fertilizers. Cattle Feed and medication were provided

2020/21

201 030.39

Kruisfontein in Alexandria commonage

Overgrazing is the issue in the commonage, DRDAR installing camps, farmers are also engaged on overgrazing

Yes

Falls away

Cattle Feed and medication were provided.

2020/21

624 000.00

Injica (forest hill farm)

Conditions are good

Yes

Falls away

The farmer is also supported with chicory inputs, grass seeds and fertilizers. Cattle Feed and medication were also provided Cattle Feed and medication were provided

2020/21

346 000.00

Soqhayisa( Dekselsfontein Farm)

Contract bridged with Property management

No

The farm is in the process of being reallocated to a new beneficiary

Cattle Feed and medication were provided

(4): Sarah Baartman District: Please refer to the table below.

 

(4)(a)Total No of applications received

(4) (b)Total No of applications declined

(4)(c)

Reasons for declining of each application

2012/2013

0

Falls away

Falls away

2013/14

11

06

Not aligned with departmental mandate, some were still ideas.

2014/15

15

10

Not aligned with departmental mandate, some were still ideas.

2015/16

13

09

Not aligned with departmental mandate. some were still ideas.

2016/17

08

04

Not aligned with departmental mandate. some were still ideas.

2017/18

02

01

Not aligned with departmental mandate

2018/19

03

0

Falls away.

2019/20

03

01

Not aligned with departmental mandate

2020/21

04

3

Budget constraints and forwarded to the next financial year

2021/22

05

0

Falls away

2022/23

04

0

Falls away

Chris Hani District: Please refer to the table below.

 

Total No of applications received

Total No of applications declined

Reasons for the declining of each application

2012/13

0

Falls away

Falls away

2013/14

54

38

Insufficient information, not within the mandate of the Department, limited budget, inactive farmers

2014/15

34

30

Budget limitation, implementation was through SLA’s

2015/16

21

5

Insufficient information

2016/17

19

13

Unfenced cropping fields, outstanding supporting documents, Budget limitation

2017/18

18

9

Outstanding supporting documents, Budget limitation

2018/19

17

9

Insufficient information Limited budget,

2019/20

930

351

Unfenced fields, encroached fields with invader species, sharing of plot Numbers, absent farmers

2020/21

12

5

Limited budget, inactive farmers, not within the FPSU recommended commodities, outside the jurisdiction of the FPSU

2021/22

22

15

Limited budget, inactive farmers, not within the FPSU recommended commodities, outside the jurisdiction of the FPSU

2022/23

17

0

Awaiting approval

(4) Joe Gqabi District: Please refer to the table below.

 

Total No of applications received

Total No of applications declined

Reasons for the declining of each application

2012/13

3

0

Falls away

2013/14

3

None, but the Emadlelweni Special day Care Centre was not supported on that financial year due to lease agreement that was need from Municipality

Falls away.

2014/15

0

0

Falls away

2015/16

0

0

Falls away

2016/17

5

1

The project did not have lease agreement on the site they were using, they were using old railway station in Burgersdorp.

2017/18

3.

0

Falls away

2018/19

3

0

Falls away

2019/20

5

0

Falls away

2020/21

1

0

Falls away

2021/22

3

The projects were not declined but they were not supported due to budgetary deficit. They will be considered on the coming financial years

Falls away

2022/23

1

0

The project will be considered in the next financial year.

(4) OR Tambo District: Please refer to the table below.

 

Total No of applications received

Total No of applications declined

Reasons for the declining of each application

2012/13

0

Falls away

Falls away

2013/14

1

0

Falls away

2014/15

1

0

Falls away

2015/16

1

0

Falls away

2016/17

9

0

Falls away

2017/18

25

0

Falls away

2018/19

13

0

Falls away

2019/20

33

0

Falls away

2020/21

15

0

Falls away

2021/22

47

0

Falls away

2022/23

0

Falls away

Falls away

 

(1)(a),(b),(c),(2),(3): Free State Province: Xhariep District. Please refer to the table below.

 

(1)(a) Costs of cattle bought for farmers

(1)(b) Details of Recipient

Name of Farm

(1)(c) Conditions of the farm, i.e. water rights, grazing capacity and veld conditions

(2) Is the farm still in production

Yes/ No

(2)(a),(b)

If No, Why and what steps have been taken to resuscitate

  1. Additional support If not, why not, if so what additional support was provided

2012/13

0

Falls away

Falls away

Falls away

Falls away

 

2013/14

R 1 368 000.00

Wimbley farm 460

The farm is 6ha/LSU Carrying capacity, good condition, no water rights

Yes

Falls away

Feed and medication

2018/19

R 589 000.00

Maleho kodisang

Milton Agricultural coop

(Milton farm) Thaba Nchu

No irrigation, grazing is 6 to 1 of 320 hacters, veld conditions are good

Yes

Falls away

Feeds and medication

2019/20

R499 796,36

Project Name Galowe Family Farming and Transport Enterprise Pty Ltd, Farm Name; Kotze’s Rust No.1171, Contact Person: Mrs. Ipeleng Gaedie- 060 550 0243

342 ha natural grazing, Veld Condition: Very Good

Yes

Falls away

The project was also supported with livestock Medication

 

R339 280,19

Project Name: PTO Farming Pty Ltd, Farm Name: Klein Bos aar no.1523, Contact Person- Paul Mogoerane-084 958 4711

431 ha natural grazing, Veld Conditions: Good

Yes

Falls away

The project was also supported with 155 Lucerne bales, livestock Medication, winter and summer licks.

 

R 577 000.00

Earnest Kgaetsewe

(Katlego Primary coop) Blydskap Farm Thaba Nchu

No irrigation/water rights grazing is ratio 6 to 1 of 376 ha. Good veld conditions

yes

Falls away

Feeds and medication

 

R 647 000.00

Esau Monwametsi

(Smmerset primary Coop)

Sommerset farm Thaba Nchu

No water rights, 6 to1 out of 375 ha. Veld conditions in good shape

yes

Falls away

Feeds and medication

2019/20

R 552 000.00

Dieketseng Mahlelehlele(Re monateng primary coop)

Monateng farm Dewetsdorp

Water rights application in process, 6 to 1 carrying capacity of 904 ha, veld conditions are good

yes

Falls away

Feeds and medication

2019/20

R1 569 807,36

Mrs Aletta Malesetla Mokoena

Farm: Slangheuwel Farm

The farm is still in good condition. The farm has 226 hectares available for grazing, with carrying capacity in Sasolburg area expressed as 4 ha/LSU: the condition of the veld is very good. There are no water rights on the farm. The farm also has 265ha arable land

Yes

Falls away

There was no additional support provided; however, the farmer can be in need for production inputs for grain production as the farm still have 265 ha of arable land. This kind of support can contribute towards commercialisation of the farm.

2019/20

R 1 499 976.48

10 Cooperatives at Zastron Commonage ( MooiFontein Farm)

- Matiase Zastron Commonage Primary Cooperative

-Thandokuhle Zastron Commonage Primary Cooperative

-Pele Ya Pele Ma Afrika Zastron Commonage Primary Cooperative

-Moeti Zastron Commonage Primary Cooperative

-Inkqubela Zastron Commonage Primary Cooperative

-Phaphamang Zastron Commonage Primary Cooperative

-Iteme Zastron Commonage Primary Cooperative

-Sibanye Zastron Commonage Primary Cooperative

-Mabe Zastron Commonage Primary Cooperative

-Tswelopele Zastron Commonage Primary Cooperative

2000 Ha of communal land, no water rights, 6ha/LSU and veld condition is poor

yes

Falls away

Lucerne bales, and rye grass seeds

2022/23

R 1 340 000.00

Mabote Ramalefane

(Kopanong dihwai coop)

Wepener commonage

Wepener

No water rights, 6 to 1 carrying capacity, on 500 ha veld conditions are good

yes

Falls away

Feeds and medication

 

R 360 000.00

Musa Makhube

(Ikemeleng primary coop)

Schoonzicht commonage

Botshabelo

No water rights, 6 to 1 carrying capacity on 1509ha, veld conditions good.

yes

Falls away

Feeds and medication

2022/23

R295 500,00

Project Name: TMJ Mixed Farming Pty Ltd, Farm Name: Skaap Kamp camp B, Contact Person- Boitumelo Mogorosi-071 094 5676

141 ha natural grazing, Veld Condition: Good

Yes

Falls away

The project was also supported livestock Medication, winter and summer licks.

 

R455 000,00

Project Name: Belties Beef Farmers Pty Ltd, Farm Name: Klein Bos aar no.1523, Contact Person- Paul Mogoerane-084 958 4711

171, 4 ha, Wesselsrus No.451, Veld Condition Good

Yes

Falls away

The project was also supported livestock Medication and 120 lucerne bales.

2022/23

R 2 606 424.96

Bokgabane Agricultural Cooperative located at Smithsfield Commonage

Eskol Agricultural Primary Cooperative Located at Eskol farm

Butlhabe Agricultural Primary Cooperative

Five Ways holdings located at Susterstroom farm

Rouxville Commonage farm with the following Coops

Khulani Rouxville Primary Cooperative

Iksasa Agricultural Primary Cooperative

Lerole batho Agricultural Primary Cooperative

Thusano Ke Matla Primary Cooperative

Tlhomelanang Agricultural Primary Cooperative

Bohlale Bahlaho Agricultural Primary Cooperative

Mpho Agricultural Primary Cooperative

The Fam Agricultural Primary Cooperative

Rucca Dusteng Agricultural Primary Cooperative

Bafeng Batho Agricultural Primary Cooperative

Re-A-Iteka Agricultural Primary Cooperative

Tshwaranang Farming Primary Cooperative

The farms are in a fair conditions with 6ha/LSU they do not have water rights, veld improvement is needed.

Yes

Falls away

Medication

 

(4) Xhariep District: Please refer to the table below.

   

Total No of applications received

Total No of applications declined

Reasons for the declining of each application

2012/17

 

0

Falls away

Falls away

2017/18

 

10

6

Budget constraints, not meeting the selection criterial

2018/19

 

40

40

Budget constraints, not meeting the selection criterial

2019/20

 

30

20

Budget constraints, not meeting the selection criterial

2020/21

 

10

10

Budget constraints, not meeting the selection criterial

2021/22

 

20

20

Budget constraints, not meeting the selection criterial

2022/23

 

20

4

Budget constraints, not meeting the selection criterial

 

  1. Mangaung Metro: Please refer to the table below.
   

Total No of applications received

Total No of applications declined

Reasons for the declining of each application

2012/16

 

0

Falls away

Falls away

2016/17

 

10

8

Did not meet qualifying criteria

2017/18

 

8

6

Did not meet qualifying criteria

2018/19

 

7

6

Did not meet qualifying criteria

2019/20

 

14

10

Did not meet qualifying criteria

2020/21

 

0

Falls away

Falls away

2021/22

 

7

3

Did not meet qualifying criteria

2022/23

 

8

4

Did not meet qualifying criteria

Lejweleputswa District: Please refer to the table below.

 

Total No of applications received

Total No of applications declined

Reasons for the declining of each application

2012/18

0

Falls away

Falls away.

2018/19

14

3

Limited budget allocated to the district, incomplete required supporting documents (e.g. lease agreement, Registration certificate, SARS tax clearance and Business Bank Account) Some project already received support from RECAP and DARD through Ilima and CASP.

2019/20

10

2

Limited budget allocated to the district, incomplete required supporting documents (e.g. lease agreement, Registration certificate, SARS tax clearance and Business Bank Account), Some project already received support from RECAP and DARD through Ilima and CASP.

2020/21

5

0

Poor land management e.g. over grazing, incomplete required supporting documents (e.g. lease agreement, Registration certificate, SARS tax clearance and Business Bank Account), Some project already received support from RECAP and DARD through Ilima and CASP.

2021/22

3

3

Limited budget allocated to the district,

2022/23

3

2

Limited budget allocated to the district,

(4) Gauteng Province: None to report on.

(1)(a),(b),(c),(3) KwaZulu-Natal Province. Please refer to the table below

Financial Year

 

(1)(a) Costs of cattle bought for farmers

(1)(b) Details of Recipient

Name of Farm

(1)(c) Conditions of the farm, i.e. water rights, grazing capacity and veld conditions

(2) Is the farm still in production

Yes/ No

(2)(a),(b) If No Why and what steps have been taken to resuscitate

(3) Additional support

If not, why not, if so what additional support was provided

2012/19

0

Falls away

Falls away

Falls away

Falls away

Falls away

Falls away

2019/20

ZULULAND

R 354 950 000

Liberty Farm:

Siyakhula Kwa Gwebu Agricultural Primary Cooperative

The farm was at an acceptable condition, i.e.; grazing camps and access to water.

No

High mortality rate as there was a red water outbreak disease that killed most of the cows in this region. Project members also suffered the same problem.

No additional support. Reviewed feasibility and non-existence of the SLA / capacity to Implement through ARC a “1 HH, 2 Dairy Cows” Dairy Value Chain (DVC) program that ARC conceived.

2019/20

AMAJUBA

R263 650.000

Pelser farm:

Sebenzani CPA

The farm was at an acceptable condition, i.e.; grazing camps and access to water.

No

There was conflict among members/beneficiaries which led to lack of proper management of the project as a result a lot of cows died. Meetings were conducted to try and resolve the conflict but could not succeed.

No additional support. Social conflicts / dynamics and non-existence of the SLA / capacity to Implement through ARC a “1 HH, 2 Dairy Cows” Dairy Value Chain (DVC) program that ARC conceived.

(4) Zululand District. Please refer to the table below.

 

Total No of applications received

Total No of applications declined

Reasons for the declining of each application

2012/13

2

Falls away

Falls away

2013/14

5

Falls away

Falls away

2014/15

9

Falls away

Falls away

2015/16

4

2

Does not fall within radius of the FPSU

2016/17

5

2

Does not fall within radius of the FPSU

2017/18

1

2

Does not fall within radius of the FPSU and commodity does not aligned to Agripark

2018/19

14

1

Does not fall within radius of the FPSU

2019/20

2

2

Commodity not aligned to FPSU

2020/21

1

1

Commodity not aligned to FPSU

2021/22

1

1

Request as the commodity group not as a project and we refer him to national office

2022/23

0

Falls away

Falls away

 

(1)(a),(b)(c),(2),(3): Limpopo province. Please refer to the table below.

 

(1)(a)

Costs of cattle bought for farmers

(1)(b)

Details of Recipient

Name of Farm

(1)(c) Conditions of the farm, i.e. water rights, grazing capacity and veld conditions

(2) Is the farm still in production

Yes/ No

(2)(a),(b)

If No

Why and what steps have been taken to resuscitate

  1. Additional support

If not, why not, if so what additional support was provided

2012/13

0

Falls away

Falls away

Falls away

Falls away

Falls away

2013/14

0

Falls away

Falls away

Falls away

Falls away

Falls away

2014/15

0

Falls away

Falls away

Falls away

Falls away

Falls away

2015/16

R330 000.00

Vhembe Dairy Value Chain

Communal Land

They are farming on communal land

Overgrazed

Yes

Communal land

Falls away

They were trained and participated in exposure visits, supported with feeds and cactus pear seeds

2016/17

R345 000.00

Sekhukhune Dairy Value Chain Primary Cooperative LTD on communal land, R/E of Vergelegen 819 KS (state land) with ten members, who, on average, each got 2 cows.

Generally, the farm is not in good condition since it is a communal land, which, in most cases, are overgrazed

Yes

(Members of the cooperative are also still farming on the same land)

Falls away

Cooperative members are still operating but various trainings on the production, management and processing of milk were provided

2017/18

R200 000.00

Vhembe Dairy Value Chain

Communal Land

They are farming on communal land

Overgrazed

Yes

Communal land

Falls away

They were trained and participated in exposure visits, supported with feeds and cactus pear seeds

2018/19

R260 925.00

Sekhukhune Dairy Value Chain Primary Cooperative LTD on communal land, R/E of Vergelegen 819 KS (state land) with ten members, who, each, got one cow.

Generally, the farm is not in good condition since it is a communal land, which, in most cases, are overgrazed

Yes

(Members of the cooperative are also still farming on the same land)

Falls away

Cooperative members are still operating but various trainings on production, management and processing of milk were provided

2019/20

0

Falls away

Falls away

Falls away

Falls away

Falls away

2020.21

0

Falls away

Falls away

Falls away

Falls away

Falls away

2021/22

0

Falls away

Falls away

Falls away

Falls away

Falls away

2022/23

0

Falls away

Falls away

Falls away

Falls away

Falls away

(4) Limpopo province. None to report on

 

(1)(a),(b),(c),(2),(3) Mpumalanga Province: Nkangala District. Please refer to the table below.

 

(1)(a) Costs of cattle bought for farmers

(1)(b) Details of Recipient Name of Farm

(1)(c) Conditions of the farm, i.e. water rights, grazing capacity and veld conditions

  1. Is the farm still in production

(2)(a),(b) If No, Why and what steps have been taken to resuscitate

  1. Additional support If not, why not, if so what additional support was provided

2012/13

0

Falls away

Falls away

Falls away

Falls away

Falls away

2013/14

0

Falls away

Falls away

Falls away

Falls away

Falls away

2014/15

0

Falls away

Falls away

Falls away

Falls away

Falls away

2015/16

0

Falls away

Falls away

Falls away

Falls away

Falls away

2016/17

0

Falls away

Falls away

Falls away

Falls away

Falls away

2017/18

0

Falls away

Falls away

Falls away

Falls away

Falls away

2018/19

R396 000.00

Mzinti FPSU (Nkomazi Red Meat Producers)

The farm is in good condition, Water–using a borehole

Grazing-capacity is adequate in the villages.

-The FPSU has a feedlot and an abattoir

Yes

Falls away

DALRRD:

Supported with Livestock, vaccinations, animal feed, tractors and implements

Provincial Department of Agriculture:

Farmer support–Assisting with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

2019/20

None

Mzinti FPSU (Nkomazi Red Meat Producers)

The farm is in good condition,

Grazing-capacity is adequate in the villages.

Water- using a borehole

-The FPSU has a feedlot and an abattoir

Yes

Falls away

DALRRD:

No financial support

Provincial Department of Agriculture:

Farmer support–Continuous Assistance with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

2020/21

None

Mzinti FPSU (Nkomazi Red Meat Producers)

The farm is in good condition, Water–using a borehole

Grazing-capacity is adequate in the villages.

-The FPSU has a feedlot and an abattoir

Yes

Falls away

DALRRD:

No financial support

Provincial Department of Agriculture:

Farmer support–Assisting with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support.

2021/22

None

Mzinti FPSU (Nkomazi Red Meat Producers)

The farm is in good condition, Water - Municipality connection

Grazing - capacity is adequate in the villages.

-The FPSU has a feedlot and an abattoir

Yes

-The co-operative signed a contract with a strategic partner to operate the abattoir and the feedlot

Falls away

DALRRD:

No financial support

Provincial Department of Agriculture:

Farmer support–Assisting farmers with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

2022/23

None

Mzinti FPSU (Nkomazi Red Meat Producers)

The farm is in good condition, Water-on site there is Municipality connection of water,

Grazing - capacity is adequate in the villages.

-The FPSU has a feedlot and an abattoir

Yes (But due to floods in Nkomazi area there was a disaster and solar panel batteries were damaged

-The FPSU is included in the disaster list on projects that were affected

DALRRD:

No financial support

Provincial Department of Agriculture:

Farmer support–Assist with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

(1)(a),(b),(c),(2),(3) Gert Sibande District : Please refer to the table below.

 

(1)(a) Costs of cattle bought for farmers

(1)(b) Details of Recipient

Name of Farm

(1)(c) Conditions of the farm, i.e. water rights, grazing capacity and veld conditions

(2) Is the farm still in production

Yes/ No

(2)(a),(b) If No

Why and what steps have been taken to resuscitate

(3)Additional support

If not, why not, if so what additional support was provided

2012/18

0

Falls away

Falls away

Falls away

Falls away

Falls away

2018/19

R 2 412 000.00

Dundonald FPSU

The farms are in good condition

Water–using dams

Grazing–farms have different camps and can rest some in each season

Yes

Falls away

DALRRD:

Supported with Livestock, vaccinations, animal feed

DALRRD:

Provincial Department of Agriculture:

Farmer support–Assisting with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

2019/20

R 7 714 476.00

Mkhondo /Dundonald

The farms are in good condition

Water–using dams

Grazing–farms have different camps and can rest some in each season

Yes

Falls away

DALRRD:

Supported with Livestock, vaccinations, animal feed,

Provincial Department of Agriculture:

Farmer support–Assisting with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

2020/21

0

Falls away

Falls away

Falls away

Falls away

Falls away

2021/22

R1 994 235.00

Mkhondo FPSU

The farms are in good condition

Water–using dams

Grazing–farms have different camps and can rest some in each season

Yes

Falls away

DALRRD:

Supported with Livestock

Provincial Department of Agriculture:

Farmer support–Assisting with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

2022/23

R 2 982 840.00

Mkhondo FPSU

The farms are in good condition

Water–using dams

Grazing–farms have different camps and can rest some in each season

Yes

Falls away

DALRRD:

Supported with Livestock

Provincial Department of Agriculture:

Farmer support–Assisting with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

2017/18

0

Falls away

Falls away

Fall away

Falls away

Falls away

2018/19

R396 000.00

Mzinti FPSU (Nkomazi Red Meat Producers)

The farm is in good condition, Water–using a borehole

Grazing-capacity is adequate in the villages.

-The FPSU has a feedlot and an abattoir

Yes

Falls away

DALRRD:

Supported with Livestock, vaccinations, animal feed, tractors and implements

Provincial Department of Agriculture:

Farmer support–Assisting with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

2019/20

None

Mzinti FPSU (Nkomazi Red Meat Producers)

The farm is in good condition,

Grazing-capacity is adequate in the villages.

Water-using a borehole

-The FPSU has a feedlot and an abattoir

Yes

Falls away

DALRRD:

No financial support

Provincial Department of Agriculture:

Farmer support–Continuous Assistance with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

2020/21

None

Mzinti FPSU (Nkomazi Red Meat Producers)

The farm is in good condition, Water–using a borehole

Grazing-capacity is adequate in the villages.

-The FPSU has a feedlot and an abattoir

Yes

Falls away

DALRRD

No financial support

Provincial Department of Agriculture:

Farmer support–Assisting with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

2021/22

None

Mzinti FPSU (Nkomazi Red Meat Producers)

The farm is in good condition, Water-Municipality connection

Grazing-capacity is adequate in the villages.

-The FPSU has a feedlot and an abattoir

Yes

-The co-operative signed a contract with a strategic partner to operate the abattoir and the feedlot

DALRRD:

No financial support

Provincial Department of Agriculture:

Farmer support – Assisting farmers with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

2022/23

None

Mzinti FPSU (Nkomazi Red Meat Producers)

The farm is in good condition, Water-on site there is Municipality connection of water,

Grazing-capacity is adequate in the villages.

-The FPSU has a feedlot and an abattoir

Yes (But due to floods in Nkomazi area there was a disaster and solar panel batteries were damaged

-The FPSU is included in the disaster list on projects that were affected

DALRRD:

No financial support

Provincial Department of Agriculture:

Farmer support–Assist with Market linkages and facilitation of registration of farmers

VET provides regular inspections and support

  1. None

(1),(a),(b),(c),(2),(3) North West Province: Bojanala Platinum District. Please refer to the table below.

 

(1)(a) Costs of cattle bought for farmers

(1),(b) Details of Recipient

(1),(b) Name of farm

(1)(c) Conditions of the farm, i.e. water rights, grazing capacity and veld conditions

  1. Is the farm still in production

Yes/ No

(2)(a),(b) If No

Why and what steps have been taken to resuscitate

(3)Additional support

If not, why not, if so what additional support was provided

2012/20

0

Falls away

Falls away

Falls away

Falls away

Falls away

Falls away

2020/21

R1 167 468 00

Joel Sekwane

Matlametlong Village

No water rights as the farmers are using boreholes as their source of water supply.

Veld conditions and grazing capacity is still in a good condition.

YES

Falls away

It was a once off support as the beneficiaries falls under SADT and PLAS farms. The support was for livestock improvement.

The unit is currently focusing on supporting the Farmers Production Support unit (FPSU)

   

Ofentse Moeketsa

Nkogolwe Village

 

YES

Falls away

 
   

Thabang Gabriel Maluxe

Nkogolwe Village

 

YES

Falls away

 
   

Johannes Matlou

Matlametlong Village

 

YES

Falls away

 
   

Johanes Masimine

Northam Village

 

YES

Falls away

 
   

Andrew Aphane

Mabieskraal Village

 

YES

Falls away

 
   

Josiah Jabosigo

Rarostekop Village

 

YES

Falls away

 
   

Piet Joseph Motaung

Bapong 2 Village

 

YES

Falls away

 
   

Mabyane Molefi

Bapong Village

 

YES

Falls away

 
   

Keitumetse Koos

Mabalstad Village

 

YES

Falls away

 
   

Kefilwe Daphney Medupe

Districhoek Village

 

YES

Falls away

 
   

Khompola Mokowe

Dorenlagte Village

 

YES

Falls away

 
   

George Malatsi

Flakfontein Village

 

YES

Falls away

 
   

Oupa Sam Mosuwe

Flakfontein Village

 

YES

Falls away

 
   

Collen Setshedi Medupe

Mokgalwaneng Village

 

YES

Falls away

 

(4) None

(1)(a),(b),(c),(2),(3) Northern Cape Province. Please refer to the table below.

 

(1)(a) Costs of cattle bought for farmers

(a),(b) Details of Recipient

Name of Farm

(1)(c) Conditions of the farm, i.e. water rights, grazing capacity and veld conditions

(2) Is the farm still in production

Yes/ No

(2),(a),(b) If No

Why and what steps have been taken to resuscitate

  1. Additional support

If not, why not, if so what additional support was provided

2012/15

0

Falls away

Falls away

Falls away

Falls away

Falls away

2015/16

R 1 754 242.00

180 Bonsmara calves were procured for the Northern Cape Gasegonyana Primary Cooperative – a custom feeding project in JTG District

Poor condition need fencing and livestock water

No

The Primary Cooperatives collapsed

The plan is to resuscitate the project under the support of Yale Farmer Production Support Unit, which is the next FPSU targeted by the District

2016/17

R 1 000 000.00

20 Bonsmara bulls were procured for 13 communal areas within the John Taolo Gaetsewe District municipality benefiting a total of 271 communal farmers

Poor condition need fencing and livestock water

Yes

Falls away

Yes, from time to time these farmers are supported with feeds and medications

2017/18

0

Falls away

Falls away

Falls away

Falls away

Falls away

2018/19

R 1 428 000.00

30 Bosmara bulls were procure to benefit 117 communal farmers with 7 farms (Harrow, Darnell, Ashfield, Magwagwe, Manaaneng, Derwent and Bunhill farms) and 4 enterprises (Madiakgomo, Reatswelela, Dithebe and Matshela enterprises) all located within the Heuningvlei FPSU

Fairly good condition, the 7 farms were selected because Provincial Department of Agriculture (PDA) have supported those with infrastructure improvement (water and fencing) and REID followed with livestock improvement procuring 30 Bonsmara bulls for those farms

Yes

Falls away

Yes, the farmers are receiving additional support because they are withing the Farmer Production Support Unit

2019/23

0

Falls away

Falls away

Falls away

Falls away

Falls away

Financial Year

Costs of cattle bought for farmers

Details of Recipient

Name of Farm

Conditions of the farm, i.e. water rights, grazing capacity and veld conditions

Is the farm still in production

Yes/ No

If No

Why and what steps have been taken to resuscitate

Additional support

If not, why not, if so what additional support was provided

2012/13

R192 500.00

Swarheuwels Boerdery CC Clifford Louw and James

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2014/2015

R600 000.00

Vaalboschfontein: Mr Nkeu

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2015/16

R625 000.00

Membys Vlakte

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2015/16

R1 301 950.00

Rockley farm: Mr S. Shuping

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2015/16

R690 600.00

Boomplaas farm: Mr O. Kgopodithata

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the far.

2015/16

R705 000.00

Bella Vista: Mr M. Seikaneng (Deceased)

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2015/16

R1 672 801.22

Harvey: Mr P. Malgas

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2015/16

R575 000.00

R116 092,13

Vaalboskop: Mr Chaka

Plot 25C6: Mr P. Siqoko

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2016/17

R1 350 000.00

Olyn Boerdery

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2016/2017

R250 800.00

Miershoopholte

Good but there farm is invaded by three thorn in some camps

Yes

Falls away

Machinery, Shed, Two farm houses and water infrastructure

2016/2017

R50 000.00

Spieelkop

The Veldt is in a good condition

Yes

Falls away

Machinery ,Shed, Two farm houses , water infrastructure and production inputs

2016/17

R730 500.00

Masadifontein farm: Mr S.A. Itumeleng

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2016/17

R 75 000.00.

Bellsbank 84 A: Mr M. Thuntsi

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2016/17

R75 000.00

Bellsabnk 107: Mr B. Khonkhobe

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2016/17

R 95 000.00

Vh20: Mr K. Mocumi

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2016/17

R75 000.00

Bellsbank 85: Mr E. Nyanyiwa

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2016/17

R75 000.00

Bellsbank 87: Mr T. Charlie

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2017/18

R1 500 000.00

Katlani Mazelsfontein CPA

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2017/18

R1 454 356.00

Aoud: K. Segano & Mr Segano

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2017/18

R530 047.47

Bucklands farm: Mr R. Masiane

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2018/19

R 488 180.00

Farm No 148 (Paaiskloof): Mr G. Mokgoro

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2018/19

R 3 620 400.00

Koopmansfontein: Mr Modise

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2019/20

R509 985.00

Dankbaar farm: Mr P. Tshetlho

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2019/20

R 1 282 500.00

Eben heazer: Mr D. Barend

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2019/20

R 1 608 450.00

Rust n vrede 1: Mr F. Ngqeza

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2019/20

R2 018 343.00

Rust n Vrede 2: Mrs M. Kantwan

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm.

2019/20

R 1 951 450.00

Kalkput: Mr J. Morgan

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2019/20

R1 075 000.00

Weltervrede: Mr D. Coetzee

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2020/21

None

None

N/A

N/A

Falls away

N/A

2021/22

None

None

N/A

N/A

Falls away

N/A

2022/23

R1 330 550.00.

Compton farm: Mr T. Kgopodithata

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

2022/23

R120 000.00

Ghaapseberg: Mr I Van Bosch

The Veldt is in a good condition

Yes

Falls away

No additional support is required at the farm

  1. Please refer to the table below.
 

Total No of applications received

Total No of applications declined

Reasons for the declining of each application

2012/15

0

Falls away

Falls away

2015/16

1

Falls away

Falls away

2016/17

1

Falls away

Falls away

2017/18

0

Falls away

Falls away

2018/19

1

Falls away

Falls away

2019/20

0

Falls away

Falls away

 

(1),(a),(b),(c),(2),(3),(4) Western Cape Province: No cattle procured.

15 May 2023 - NW1162

Profile picture: Tambo, Mr S

Tambo, Mr S to ask the President of the Republic

Whether there was any credible intelligence on which he relied when he employed the SA National Defence Force for a month until 17 April 2023 regarding the national shutdown that was held on 20 March 2023; if not, what is the position in this regard; if so, is such a threat still existing?

Reply:

The South African National Defence Force (SANDF) was authorised to deploy in support of the South African Police Service (SAPS) under Operation Prosper in preparation for protests planned for 20 March 2023. This deployment was at the request of the National Joint Operational and Intelligence Structure (NATJOINTS), which determined that the SANDF would be required to deploy for the protection and safeguarding of National Key Points and critical infrastructure in order to relieve the police from that function.

The NATJOINTS had conducted an assessment and identified the need for the police to be on the ground across the entire country to provide a safe and secure environment for the planned protests to take place, as well as the condition of a safe and secure environment, freedom of movement and action for those who were not going to participate in the protests.

The SAPS returned to their posts on 23 March 2023 and the SANDF withdrew, with some of the elements returning back to their units whilst other elements continued with the protection and safeguarding of Eskom power stations until 17 April 2023 as per the Presidential Authority.

15 May 2023 - NW1329

Profile picture: van der Merwe, Ms LL

van der Merwe, Ms LL to ask the Minister of Home Affairs

(1)Whether he has been able to ascertain whether the seven suspects arrested for the recent murder of retired journalist, Jeremy Gordin, were undocumented foreign nationals; if not, what is the position in this regard; if so, what steps has (a) he and (b) his department taken to stem the unceasing flow of undocumented foreign nationals into the Republic; (2) which visas did the foreign nationals hold if they were documented; (3) what are the details of the checks-and-balances that are in place to ascertain whether documented foreign nationals have criminal records in their countries of origin before granting them visas?

Reply:

(1)(a) According to the investigation docket from the South African Police Service, there are eight (8) suspects, of whom six (6) are undocumented persons, one (1) is in possession of Zimbabwe Exemption Permit(ZEP) and one (1) with a suspected fraudulent document.

(1)(b) The Department efforts to stem the flow of undocumented foreign nationals into the Country include the implementation of the Border Management Authority and the appointment of the Border Guards which commenced in July 2022. The Department also participates in joint operations which is coordinated by Provincial and National Joint intelligent structures aimed at combatting illegal immigration. In addition, the department leads law enforcement operations through Operation Siyasebenta, which is supported by the structures mentioned above.

(2) One (1) foreign national is in possession of Zimbabwe Exemption Permit.

3. The Department has a visa and entry stop list at ports of entry wherein a criminal who is sought, can be placed on that list through SAPS working with Interpol. On application for certain category of visas, Police clearances are required from the Country of origin and Countries where the applicant has lived for a prescribed duration of stay in terms of the relevant visa, except for countries that are exempt from visa requirements. For these nationals who come from visa free countries, the visa and entry stop will create alerts on the ports of entry systems if a person is a wanted person or fugitive from justice.

END

 

15 May 2023 - NW766

Profile picture: Graham-Maré, Ms SJ

Graham-Maré, Ms SJ to ask the Minister of Public Works and Infrastructure

(1)Whether the forensic report on the incident of fire that gutted Parliament’s buildings has been completed according to the deadline of 28 February 2023; if not, what is the amended date of completion; if so, (2) whether he will furnish Ms S J Graham with a copy of the report; if not, why not; if so, what are the relevant details? NW865E

Reply:

The Minister of Public Works and Infrastructure

  1. The forensic investigation on the incident of fire that gutted Parliament was conducted by the law enforcement agencies and not by DPWI. The DPWI conducted an investigation on the extent of the damages and the costs of restoring Parliament.
  2. DPWI does not have a copy of the forensic investigation as this was conducted by the law enforcement agencies

15 May 2023 - NW1494

Profile picture: Zungula, Mr V

Zungula, Mr V to ask the Minister of Basic Education to ask the Minister of Basic Education

Given the statistics by the Council on Higher Education that 60% of learners who enrolled in Grade 1 wrote Matric and only 12% went to university, and the fact that the 40% deficit amounts to 3,2 million children between the ages of 15 to 24 who are not in school, employment and/or in any skills-based training opportunities, what (a) plans has her department put in place to reduce the 40%- gap between learners who enrol in Grade 1 and those who write the matric exams and (b) did the assessments of her department find to be the cause of the drop-outs

Reply:

Before answering the questions, it is first important to note a few problems with the statistics referenced in the preamble to the question. The statistics referenced by the Council on Higher Education are taken from a 2016 research report, which was based on data analysis of the 2008 matric cohort (Van Broekhuizen, H.; S. Van Der Berg & H. Hofmeyr (2016) ‘Higher Education Access and Outcomes for the 2008 National Matric Cohort’ in Stellenbosch Economic Working Papers: 16/16;). So this analysis was based on the situation for the 2008 matrics. Given the significant progress since 2008, the numbers are quite outdated. For example, the number of NSC bachelor passes produced annually has nearly tripled since 2008 (just over 100 000 in 2008 compared to nearly 300 000 in 2022). Therefore, the statistics referenced are outdated and overstate the extent of the current problem given consistent reductions in dropout since 2008 and increases in university entrance qualifications. Nevertheless, the department is still concerned about the ongoing problem of learners exiting the education system without attaining a National Senior Certificate or an equivalent qualification.

The Department's mission to ensure that children attend school during compulsory schooling age and increase the percentage of youths who complete Grade 12 is critical. The Department has implemented various activities and initiatives to advance this mission, resulting in a decline in dropouts before completing the National Senior Certificate and almost 100% schooling among children at compulsory ages, although the pandemic caused some setbacks. Successful completion of twelve years of schooling in South Africa is similar to other middle-income countries, as detailed in the Department's annual reports.

Understanding why youths drop out is essential to promoting successful completion of schooling. Research shows that those who struggle with their studies and poverty at home are the most likely to drop out. The 2019 General Household Survey revealed that 34% of youths aged 16 to 18 were not coping academically, and 25% indicated "no money for fees." Coping academically is a significant factor in parents and guardians' decision not to invest in a child who is not performing well. (Refer to the Department's General Household Survey (GHS): Focus on Schooling publications.)

To increase "survival" to Grade 12, the government's strategies are multi-pronged, focusing on mitigating poverty's effects and improving learning and teaching in the classroom. The following key initiatives contributed to past reductions in dropouts and are likely drivers of future improvements in this regard:

1a) Efforts to reduce learner dropout

  • The National School Nutrition Programme (NSNP). This intervention encourages children to attend school, and promotes learning by reducing levels of hunger and malnutrition, which inhibit successful learning.
  • No fee schools. This longstanding intervention ensures that children and youths in poorer communities are not prevented from attending school due to the inability of the household to pay for school fees.
  • Policies on teenage pregnancies. Government Notice 704 of 2021 formalised policy on the protection of the schooling of pregnant learners. Among females aged 16 to 18, around 10% did not attend school due to pregnancy, according to the 2019 GHS.
  • Ongoing strengthening of the Curriculum and Assessment Policy Statement (CAPS). A more focussed curriculum is one reason that has been put forward as a reason for past improvements in South Africa’s performance in international testing programmes – see the Department’s Action Plan to 2024.
  • Efforts aimed at improving learning in the early grades. A key government priority is improving reading, and learning and teaching in general, in the early grades. Several interventions contribute towards this, including the shift in the responsibility for pre-schooling from the social development sector to basic education, the Early Grade Reading Study and associated teacher development innovations, and the introduction of the Systemic Evaluation.
  • Special examination preparation support for Grade 12 learners. Activities here, aimed largely at ensuring that learners leave school with the NSC, include the so-called winter schools.
  • The expansion of the learner-level enrolment and attendance monitoring systems. The Learner Unit Record Information and Tracking System (LURITS), the SA-SAMS school management system and the partnership-driven Data Driven Districts (DDD) initiative have all contributed to a more robust approach to monitoring exactly where in the country dropping out is occurring. These systems proved invaluable for providing information on, for instance, where children were not returning to school during the pandemic.

1b) Causes of dropout

In South Africa, the problem of learner dropout is complex and multifaceted. However, research has shown that the fundamental underlying cause of dropping out is weak learning foundations. Academic difficulties, poor school resources and facilities, weak teaching and school management, and access to schools in the context of mobility are some of the risk factors highlighted in a 2007 Ministerial Report on learner retention. The socio-emotional issues among learners were also identified as a risk factor for dropping out. Females are less likely to drop out of school than males despite facing certain risk factors that affect females in particular, like pregnancy.

According to the General Household Survey (GHS), the main reasons for learners not attending educational institutions are household poverty and income shocks, household labour and family responsibilities, migration, and health problems. However, it is important to interpret these reasons in the light of research showing that weak early learning outcomes are the main predictor of dropping out. The GHS results showed that "other" reasons, not listed in the questionnaire, were the main reasons given for 7-15 year-olds not attending school, which could be a comfortable response option given the sensitive nature of disclosing some of the reasons for dropping out.

Grade repetition is another factor that could contribute to dropout rates, but its impact is uncertain. Repetition discourages children about their educational prospects and makes them relatively old for their grade, which could make opting out of school more socially or economically attractive. However, grade repetition could have a positive impact on educational outcomes if it is accompanied by effective remedial support. Despite the uncertainty around the impact of grade repetition on dropout, it should primarily be understood as a symptom of weak learning rather than as a cause of educational problems such as dropout. High rates of grade repetition lead to education system inefficiencies such as higher class sizes and more "person-years" of public spending on education to achieve the same outcomes.

Overall, the reasons for learner dropout in South Africa are interlinked, and dropping out is often understood as a series of circumstances rather than an isolated event. While poverty, household responsibilities, and other external factors can trigger dropping out, weak early learning outcomes remain the major underlying vulnerability to dropping out. Improving the quality of education in the earlier grades, addressing academic difficulties, and strengthening teaching and school management are crucial steps to reduce dropout rates and improve educational outcomes in South Africa.

15 May 2023 - NW935

Profile picture: Schreiber, Dr LA

Schreiber, Dr LA to ask the President of the Republic

(1)Whether he has ever commissioned a formal costing exercise to determine the total cost to the taxpayer of all benefits for Ministers and Deputy Ministers contained in the Guide for Members of the Executive; if not, why not; if so, what are the relevant details; (2) whether there is any specified legal provision on which he relies to implement the Guide for Members of the Executive; if not, what is the reason that he continues to implement its provisions ultra vires; if so, which legal provision?

Reply:

A cost analysis on the staff establishment was done by the Department of Public Service and Administration and the National Treasury in respect of the Guide for Members of the Executive. The outcome of the analysis revealed a cost reduction to the State.

The Department of Public Works and Infrastructure has similarly done a cost analysis with regards to ministerial residences.

The National Treasury concluded a transversal contract with original equipment manufacturers in terms of which vehicles for Members of the Executive must be purchased. A general reduction on the costs related to motor vehicles has been reported.

The cost related to day-to-day matters, such as travel and accommodation, in respect of each Member of the Executive will vary depending on the nature and extent of their respective duties. The total costs incurred in this regard will be within the purview of the relevant Department. In line with the principles of accountability, the costs to each Department are disclosed in their individual financial statements.

The Guide for Members of the Executive provides a guideline for benefits, tools of trade and allowances to support Ministers, Deputy Ministers, Premiers and Members of the Executive Council in the execution of their duties.

The Guide for Members of the Executive seeks to limit the extent to which the State would provide resources and enabling facilities (tools of trade) to Members to ensure that the Members perform their duties effectively, efficiently and prudently. The Guide seeks to ensure that all Departments and Accounting Officers apply consistent measures to ensure that expenditure does need exceed the prescribed limits and conditions.

This Guide is necessary to set parameters related to administrative and support assistance provided to Members to ensure good governance with due regard to cost effectiveness and efficiency

The implementation of the Guide is informed by the Public Finance Management Act, 1999, the Public Service Act, 1994, their resultant Regulations, the Executive Members’ Ethics Act, 1998 and the applicable Public Service Coordinating Bargaining Council collective agreements.

15 May 2023 - NW1459

Profile picture: Komane, Ms RN

Komane, Ms RN to ask the Minister of Basic Education to ask the Minister of Basic Education

Considering that around 15 000 learners were left at home unable to attend school for the first term, due to her department failing to provide scholar transport, despite budget provision for such transport, what (a) has she found to be the reasons for the situation, (b) are the consequences of such a gross violation of the human rights of the learners and (c) steps has she taken to address the specified situation?

Reply:

a) Learner Transport Programme is a shared responsibility between the Department of Basic Education and the Department of Transport. The provisioning and prioritisation of learner transport programme is a provincial competency and the National Departments of Basic Education and Transport monitor the provisioning of learner transport programme in provinces. As such, the provisioning of learner transport in the Eastern Cape resides with the Provincial Department of Transport and it is funded through the Equitable Share allocations. Information forthcoming from this department, is that the Province transported 125 331 learners against the total need of 139 823 learners and the target of 102 998 learners in 1009 schools which is 122% against the target and 90% against the total need. The province was allocated R 856 000 000.00 sufficient to transport the targeted 102 998 learners but went over the target by transporting 125 331 which resulted in the over-expenditure totalling R 1 085 045 000.00. Therefore, the additional budget allocation only catered for the accruals and not for the additional learner transport needs.

b) None

c) The Eastern Cape Provincial Department of Transport has been requested to have discussions with their Provincial Treasury to reprioritize budgets and cater for these excluded learners on the provision of learner transport in the province.

12 May 2023 - NW1219

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Tourism

(1)With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism (a) in the past three financial years and (b) since 1 April 2023, (i) what number of disciplinary cases were dealt with in each month, (ii) on what date was each case initiated and concluded, (iii) what were the reasons for the action, (iv) what number of staff members were found (aa) guilty and fired, (bb) guilty and not fired and (cc) innocent; (2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and (b) were the reasons that staff members were found not guilty in each specified case?

Reply:

(1) With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism

(a) in the past three financial years

Financial Year 2020/2021

i) what number of disciplinary cases were dealt with in each month,

  • I have been informed of one disciplinary case in FY20/21

ii) on what date was each case initiated and concluded,

  • The employee was charged in March 2020 and the disciplinary enquiry was convened in July 2020 over three days.

iii) what were the reasons for the action,?

  • The employee was charged with gross negligence as it relates to supply chain and procurement processes for one of the in-country offices;
  • The secondary charges were around the failure to follow procedures in relation to a procurement process.

iv) what number of staff members were found?

(aa) guilty and fired,

  • The employee was found guilty of gross negligence and the sanction meted out was dismissal

(bb) guilty and not fired and

  • Not applicable

(cc) innocent;

- Not applicable

(2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and

- Not applicable

(b) were the reasons that staff members were found not guilty in each specified case?

- Not applicable

Financial Year 2021/2022

With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism

(i)  what number of disciplinary cases were dealt with in each month,

  • Three disciplinary cases took place in the organisation

(ii) on what date was each case initiated and concluded,

  1. The first case involved the GM: ICT and was initiated in April 2021 and was concluded in May 2021;
  2. The second case involved the Enterprise Architecture Manager and was initiated in October 2021 and was concluded in the same month;
  3. The third case involved the Data & Security Implementation Specialist and was initiated in March 2022 and was concluded in the same month.

(iii) what were the reasons for the action,?

  1. The case involving the GM: ICT involved charges of gross negligence in relation to the management and payment of invoices for systems and failure to follow organisational procedures and compliance;
  2. The case involving the Enterprise Architecture Manager involved charges of gross negligence, dereliction of duty as well as insubordination;
  3. The case involving the Data & Security Implementation involved failure to deliver work of the required standard and negligence.

(iv) what number of staff members were fired?

(aa) guilty and fired,

  • Employees under (a) and (b) were found guilty and the sanction meted out was dismissal

(bb) guilty and not fired and

  • Not applicable

(cc) innocent;

- Employee under (c) was found not guilty

(2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and

- Not applicable

(b) were the reasons that staff members were found not guilty in each specified case?

- The evidence presented for employee under (c) did not support a guilty verdict. It was recommended that the employee undergo a performance counselling process.

Financial Year 2022/2023 and (b) since 1 April 2023,

With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism

(i) what number of disciplinary cases were dealt with in each month,

  • A total number of two disciplinary cases for the fiscal

(iii) on what date was each case initiated and concluded,

  1. The first case involved the Head: Analytics and was initiated in February 2022;
  2. The second case involved the Brand Innovation Manager and was initiated in July 2022;

(iv) what were the reasons for the action?

  1. The employee under (a) was charged with gross insubordination and gross negligence;
  2. The employee under (b) was charged with dereliction of duty, gross negligence and negligence;

(v) what number of staff members were found

(aa) guilty and fired,

  1. The employee under (a) was found guilty and the sanction meted out was dismissal;
  2. The employee under (b) was found guilty and the sanction meted out was dismissal;

(bb) guilty and not fired and

  • Not applicable

(cc) innocent;

  • Not applicable

(2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and

- Not applicable

(b) were the reasons that staff members were found not guilty in each specified case?

- Not applicable

12 May 2023 - NW1218

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Tourism

(1)With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism (a) in the past three financial years and (b) since 1 April 2023, (i) what number of disciplinary cases were dealt with in each month, (ii) on what date was each case initiated and concluded, (iii) what were the reasons for the action, (iv) what number of staff members were found (aa) guilty and fired, (bb) guilty and not fired and (cc) innocent; (2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and (b) were the reasons that staff members were found not guilty in each specified case?

Reply:

(1) With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism

(a) in the past three financial years

Financial Year 2020/2021

i) what number of disciplinary cases were dealt with in each month,

  • I have been informed of one disciplinary case in FY20/21

ii) on what date was each case initiated and concluded,

  • The employee was charged in March 2020 and the disciplinary enquiry was convened in July 2020 over three days.

iii) what were the reasons for the action,?

  • The employee was charged with gross negligence as it relates to supply chain and procurement processes for one of the in-country offices;
  • The secondary charges were around the failure to follow procedures in relation to a procurement process.

iv) what number of staff members were found?

(aa) guilty and fired,

  • The employee was found guilty of gross negligence and the sanction meted out was dismissal

(bb) guilty and not fired and

  • Not applicable

(cc) innocent;

- Not applicable

(2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and

- Not applicable

(b) were the reasons that staff members were found not guilty in each specified case?

- Not applicable

Financial Year 2021/2022

With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism

i) what number of disciplinary cases were dealt with in each month,

  • Three disciplinary cases took place in the organisation

ii) on what date was each case initiated and concluded,

  1. The first case involved the GM: ICT and was initiated in April 2021 and was concluded in May 2021;
  2. The second case involved the Enterprise Architecture Manager and was initiated in October 2021 and was concluded in the same month;
  3. The third case involved the Data & Security Implementation Specialist and was initiated in March 2022 and was concluded in the same month.

iii) what were the reasons for the action,?

  1. The case involving the GM: ICT involved charges of gross negligence in relation to the management and payment of invoices for systems and failure to follow organisational procedures and compliance;
  2. The case involving the Enterprise Architecture Manager involved charges of gross negligence, dereliction of duty as well as insubordination;
  3. The case involving the Data & Security Implementation involved failure to deliver work of the required standard and negligence.

iv) what number of staff members were fired?

(aa) guilty and fired,

  • Employees under (a) and (b) were found guilty and the sanction meted out was dismissal

(bb) guilty and not fired and

  • Not applicable

(cc) innocent;

- Employee under (c) was found not guilty

(2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and

- Not applicable

(b) were the reasons that staff members were found not guilty in each specified case?

- The evidence presented for employee under (c) did not support a guilty verdict. It was recommended that the employee undergo a performance counselling process.

Financial Year 2022/2023 and (b) since 1 April 2023,

With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism

i) what number of disciplinary cases were dealt with in each month,

ii) 

  • A total number of two disciplinary cases for the fiscal

iii) on what date was each case initiated and concluded,

  1. The first case involved the Head: Analytics and was initiated in February 2022;
  2. The second case involved the Brand Innovation Manager and was initiated in July 2022;

iv) what were the reasons for the action?

  1. The employee under (a) was charged with gross insubordination and gross negligence;
  2. The employee under (b) was charged with dereliction of duty, gross negligence and negligence;

(v) what number of staff members were found

(aa) guilty and fired,

  1. The employee under (a) was found guilty and the sanction meted out was dismissal;
  2. The employee under (b) was found guilty and the sanction meted out was dismissal;

(bb) guilty and not fired and

  • Not applicable

(cc) innocent;

  • Not applicable

(2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and

- Not applicable

(b) were the reasons that staff members were found not guilty in each specified case?

- Not applicable

12 May 2023 - NW1344

Profile picture: Gondwe, Dr M

Gondwe, Dr M to ask the Minister of Public Service and Administration

What (a) total number of funded posts are currently vacant in the Public Service, (b) is the breakdown of the specified number in each (i) national and (ii) provincial department and (c)(i) is the salary level of each vacant funded post and (ii) are the reasons that each post is vacant?

Reply:

(a) The total number of funded posts that are currently vacant in the Public Service is 181 607 as at 31 March 2023.

b) The breakdown of the specified number of vacant funded posts nationally and in each provincial department is presented (as at 31 March 2023) in the attached Annexure A. It must be noted that some of the vacancies on the establishments of departments captured on PERSAL may not be funded.

National

47 642

   

Provinces

 

Eastern Cape

30 759

Free State

5 909

Gauteng

20 707

KwaZulu-Natal

22 128

Limpopo

12 863

Mpumalanga

5 775

North West

17 178

Northern Cape

4 983

Western Cape

13 663

c) (i) The breakdown of vacancies per salary level is as follows:

Salary level

Number of vacant posts

1

1 848

2

11 394

3

16 274

4

6 129

5

20 815

6

15 704

7

19 280

8

14 658

9

15 102

10

8 554

11

20 375

12

28 950

13

1 749

14

579

15

163

16

33

(ii) With reference to the previous response to parliamentary question 920, departments have in the past reported the following causes and challenges that hinder the filling of the vacancies and cause posts to be vacant-

1. Managing the prioritisation of posts to be filled due to budget constraints or reprioritization of funds.

2. Competition with private sector with regard to appointment of registered OSD professionals and technicians. It was mentioned that it is not easy to recruit and attract some of those skills due to scarcity in the job market in line with the inherent job requirements. Current serving staff under this category are not keen to register, which further hampers existing staff mobility and utilization in higher level posts.

3. The departments have previously raised the matter of internal and external administrative challenges, which ultimately delay the finalisation of appointments. The prescribed pre-employment verifications were also raised. However, departments did not provide substantive proof of such delays.

4. There has been a process of settling down following the determinations issued regarding merged departments impacted by the National Macro-Organisation of Government. The affected departments were required to develop macro-structures and finalise placements as per Resolution 1 of 2019.

End

12 May 2023 - NW1340

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Tourism

(1)With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism (a) in the past three financial years and (b) since 1 April 2023, (i) what number of disciplinary cases were dealt with in each month, (ii) on what date was each case initiated and concluded, (iii) what were the reasons for the action, (iv) what number of staff members were found (aa) guilty and fired, (bb) guilty and not fired and (cc) innocent; (2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and (b) were the reasons that staff members were found not guilty in each specified case?

Reply:

(1) With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism

(a) in the past three financial years

Financial Year 2020/2021

i) what number of disciplinary cases were dealt with in each month,

  • I have been informed of one disciplinary case in FY20/21

ii) on what date was each case initiated and concluded,

  • The employee was charged in March 2020 and the disciplinary enquiry was convened in July 2020 over three days.

iii) what were the reasons for the action,?

  • The employee was charged with gross negligence as it relates to supply chain and procurement processes for one of the in-country offices;
  • The secondary charges were around the failure to follow procedures in relation to a procurement process.

iv) what number of staff members were found?

(aa) guilty and fired,

  • The employee was found guilty of gross negligence and the sanction meted out was dismissal

(bb) guilty and not fired and

  • Not applicable

(cc) innocent;

- Not applicable

(2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and

- Not applicable

(b) were the reasons that staff members were found not guilty in each specified case?

- Not applicable

Financial Year 2021/2022

With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism

i) what number of disciplinary cases were dealt with in each month,

  • Three disciplinary cases took place in the organisation

ii) on what date was each case initiated and concluded,

  1. The first case involved the GM: ICT and was initiated in April 2021 and was concluded in May 2021;
  2. The second case involved the Enterprise Architecture Manager and was initiated in October 2021 and was concluded in the same month;
  3. The third case involved the Data & Security Implementation Specialist and was initiated in March 2022 and was concluded in the same month.

iii) what were the reasons for the action,?

  1. The case involving the GM: ICT involved charges of gross negligence in relation to the management and payment of invoices for systems and failure to follow organisational procedures and compliance;
  2. The case involving the Enterprise Architecture Manager involved charges of gross negligence, dereliction of duty as well as insubordination;
  3. The case involving the Data & Security Implementation involved failure to deliver work of the required standard and negligence.

iv) what number of staff members were fired?

(aa) guilty and fired,

  • Employees under (a) and (b) were found guilty and the sanction meted out was dismissal

(bb) guilty and not fired and

  • Not applicable

(cc) innocent;

- Employee under (c) was found not guilty

(2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and

- Not applicable

(b) were the reasons that staff members were found not guilty in each specified case?

- The evidence presented for employee under (c) did not support a guilty verdict. It was recommended that the employee undergo a performance counselling process.

Financial Year 2022/2023 and (b) since 1 April 2023,

With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism

i) what number of disciplinary cases were dealt with in each month,

  • A total number of two disciplinary cases for the fiscal

ii) on what date was each case initiated and concluded,

  1. The first case involved the Head: Analytics and was initiated in February 2022;
  2. The second case involved the Brand Innovation Manager and was initiated in July 2022;

iii) what were the reasons for the action?

  1. The employee under (a) was charged with gross insubordination and gross negligence;
  2. The employee under (b) was charged with dereliction of duty, gross negligence and negligence;

(v) what number of staff members were found

(aa) guilty and fired,

  1. The employee under (a) was found guilty and the sanction meted out was dismissal;
  2. The employee under (b) was found guilty and the sanction meted out was dismissal;

(bb) guilty and not fired and

  • Not applicable

(cc) innocent;

  • Not applicable

(2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and

- Not applicable

(b) were the reasons that staff members were found not guilty in each specified case?

- Not applicable

12 May 2023 - NW1342

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Tourism

(1)With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism (a) in the past three financial years and (b) since 1 April 2023, (i) what number of disciplinary cases were dealt with in each month, (ii) on what date was each case initiated and concluded, (iii) what were the reasons for the action, (iv) what number of staff members were found (aa) guilty and fired, (bb) guilty and not fired and (cc) innocent; (2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and (b) were the reasons that staff members were found not guilty in each specified case?

Reply:

(1) With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism

(a) in the past three financial years

Financial Year 2020/2021

i) what number of disciplinary cases were dealt with in each month,

  • I have been informed of one disciplinary case in FY20/21

ii) on what date was each case initiated and concluded,

  • The employee was charged in March 2020 and the disciplinary enquiry was convened in July 2020 over three days.

iii) what were the reasons for the action,?

  • The employee was charged with gross negligence as it relates to supply chain and procurement processes for one of the in-country offices;
  • The secondary charges were around the failure to follow procedures in relation to a procurement process.

iv) what number of staff members were found?

(aa) guilty and fired,

  • The employee was found guilty of gross negligence and the sanction meted out was dismissal

(bb) guilty and not fired and

  • Not applicable

(cc) innocent;

- Not applicable

(2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and

- Not applicable

(b) were the reasons that staff members were found not guilty in each specified case?

- Not applicable

Financial Year 2021/2022

With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism

i) what number of disciplinary cases were dealt with in each month,

  • Three disciplinary cases took place in the organisation

ii) on what date was each case initiated and concluded,

  1. The first case involved the GM: ICT and was initiated in April 2021 and was concluded in May 2021;
  2. The second case involved the Enterprise Architecture Manager and was initiated in October 2021 and was concluded in the same month;
  3. The third case involved the Data & Security Implementation Specialist and was initiated in March 2022 and was concluded in the same month.

iii) what were the reasons for the action,?

  1. The case involving the GM: ICT involved charges of gross negligence in relation to the management and payment of invoices for systems and failure to follow organisational procedures and compliance;
  2. The case involving the Enterprise Architecture Manager involved charges of gross negligence, dereliction of duty as well as insubordination;
  3. The case involving the Data & Security Implementation involved failure to deliver work of the required standard and negligence.

iv) what number of staff members were fired?

(aa) guilty and fired,

  • Employees under (a) and (b) were found guilty and the sanction meted out was dismissal

(bb) guilty and not fired and

  • Not applicable

(cc) innocent;

- Employee under (c) was found not guilty

(2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and

- Not applicable

(b) were the reasons that staff members were found not guilty in each specified case?

- The evidence presented for employee under (c) did not support a guilty verdict. It was recommended that the employee undergo a performance counselling process.

Financial Year 2022/2023 and (b) since 1 April 2023,

With reference to disciplinary action and/or any related action taken against staff in each level within SA Tourism

i)n what number of disciplinary cases were dealt with in each month,

  • A total number of two disciplinary cases for the fiscal

iii) on what date was each case initiated and concluded,

  1. The first case involved the Head: Analytics and was initiated in February 2022;
  2. The second case involved the Brand Innovation Manager and was initiated in July 2022;

iv) what were the reasons for the action?

  1. The employee under (a) was charged with gross insubordination and gross negligence;
  2. The employee under (b) was charged with dereliction of duty, gross negligence and negligence;

(v) what number of staff members were found

(aa) guilty and fired,

  1. The employee under (a) was found guilty and the sanction meted out was dismissal;
  2. The employee under (b) was found guilty and the sanction meted out was dismissal;

(bb) guilty and not fired and

  • Not applicable

(cc) innocent;

  • Not applicable

(2) what (a) alternative sanction was meted out in each case where a staff member was found guilty but not fired and

- Not applicable

(b) were the reasons that staff members were found not guilty in each specified case?

- Not applicable