10 December 2018 - NW2831
Steyn, Ms A to ask the MINISTER OF RURAL DEVELOPMENT AND LAND REFORM
(1) With regard to the successful land claims that have been submitted in the Vhembe district, in each case, (a) what farm(s) is/are part of the claim, (b) who is/are the claimant(s) and (c) on what date was each claim (i) submitted and (ii) finalised, (2) whether each claim was subject to expropriation; if so, (a) on what date was the owner of the farm notified, (b) what was the amount of compensation that was paid out and (c) on what basis was the compensation calculated; (3) whether the parties agreed to said compensation; if not, was the owner of the farm afforded the opportunity to make representations in a court of law; if so, what are the relevant details; (4) on what date was the ownership transferred to the (a) State and (b) beneficiaries?
Reply:
1. Please refer to Annexure A.
2. One: Moeketse Ga Chatleka Community (S42E) (Phase 2).
(a) 28/08/2008
(b) R14 129 321.45
(c) The office employed the services of an independent professional valuer.
(3) Yes.
(4) (a) Not yet transferred
(b) Not yet transferred
ANNEXURE A TO NA-QUESTION 2831 OF 2018
|
(b) Names of Claimant(s) |
(c)(i) Date claim lodged |
(ii) Finalised |
Locatie Van Knopneuzen 230 LT |
Maluleke M |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Chauke MJ |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Makamu J |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Mathebula NA |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Nukeri PR |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Mugwambani KJ |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Chauke MG |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Khoza MW |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Maluleke GJ |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Mabasa RM |
29/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Hlayangwane N |
29/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Manganyi M |
15/05/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Shivambu K |
29/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Maluleke MT |
29/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Chauke MD |
29/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Maluleke MT |
28/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Mabasa TJ |
29/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Khosa M |
29/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Nkwinika M |
29/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Mabasa KM |
29/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Hlongwane MM |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Shivandza M |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Malungana YA |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Ngonyama HM |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Chauke GE |
19/04/2018 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Maluleka GS |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Makamu SG |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Makambeni RJ |
19/04/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Makaringi MC |
11/01/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Mnisi MS |
11/01/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Chauke KA |
11/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke RE |
14/09/1997 |
Financial Compensation: Finalised |
Samari Village |
Musaveni Fammily Clan |
15/04/1998 |
Financial Compensation: Finalised |
Chibase 213MT |
Mtorine W |
29/04/1998 |
Financial Compensation: Finalised |
Chibase 213MT |
Maluleke MS |
04/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabasa M |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Risenga MS |
29/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Pungana MS |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani TS |
11/01/1998 |
Financial Compensation: Finalised |
Tshilungoma |
Mathe TP |
29/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chirinde RJ |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Tshikororo JN |
27/03/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mafunzwaini EP |
27/03/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Randima TL (Khubvi Community) |
27/03/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mzamani MM |
19/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke JH |
21/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Shilenga M |
12/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mabasa KN |
19/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Macebele MJ |
05/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke K |
05/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Ndobe MN |
21/09/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Baloyi M |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Makhubela KM |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Shilenge MJ |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Masia M |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Salani PT |
19/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Maluleke M |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Maswanganye N |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Maswanganye N |
19/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Chauke MP |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Matsimbi TM |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mkhatshane ME |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Ndengeza MJ |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Makamu HF |
19/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Golele M |
12/10/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Makondo M |
14/09/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Maluleke NA |
27/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Shikuwani MT |
12/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mangane MM |
12/10/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Baloyi MD |
27/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mochabi MN |
27/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mahori M |
12/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Shibambu MB |
14/09/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mandlazi T |
28/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Makasani MD |
19/12/1997 |
Financial Compensation: Not Finalised |
Sterkstroom 277 MT |
Chauke T |
19/12/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Chauke T |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Masingi MW |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mashaba MF |
28/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mathusi MS |
19/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mashaba YJ |
19/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mabaso S |
28/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chuma MD |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Bopape MF |
2212/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Sithole VA |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Hlungwani MA |
11/08/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Tshabalala M |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke MS |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Sambo M |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Nyabani MN |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke M |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Baloyi HS |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke M |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke GS |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Sitlhelani HE |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Maluleke MD |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke M |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke T |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Baloyi MA |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Baloyi MS |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Makondo MS |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Macevele M |
19/12/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Majovane M |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Makondo HJ |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Makondo M |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT, Sterkstroom 277 MT, Mpapuli 278 MT |
Gezani VP |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shilenge MR |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke M |
28/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Masiya GS |
19/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Shilenge MJ |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Ndlovu MM |
27/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Ramarada T |
26/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mahuntse MR |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Ntsemi T |
25/01/1998 |
Financial Compensation: Not Finalised |
Mpapuli 278 MT |
Mathe M |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Khosa MT |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabasa TJ |
24/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maluleka NW |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke M |
12/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Hobyani M |
14/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Shigamani MS |
14/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Hobyane M |
14/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chuma M |
21/09/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Minyuko MM |
14/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Shirinda RS |
14/09/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Baloyi DL |
27/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Risimate PH |
2404/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Ndobe M |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Hlungwani MJ |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Shilenge MR |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Mathye M |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Hlongwane N |
19/12/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Mathe RE |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Maluleke MB |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Masia TC |
28/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mokwebo TJ |
25/04/1997 |
Financial Compensation: Finalised |
Tshifudi |
Shirindi M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT, Georgenholtz 256 MT |
Mandlazi ME |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makwakwa KS |
11/01/1998 |
Financial Compensation: Finalised |
Manamani Village |
Machebele S |
11/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke M |
04/04/1998 |
Financial Compensation: Not Finalised |
Mpapuli 278 MT |
Mphakati M |
04/04/1998 |
Financial Compensation: Not Finalised |
Tshidziru Village |
Baloyi RT |
19/12/1997 |
Financial Compensation: Finalised |
Manuru Village |
Mathye TI |
19/12/1997 |
Financial Compensation: Finalised |
Tshisela Lufala Village |
Mabasa YW |
04/04/1998 |
Financial Compensation: Finalised |
Tshakuma Lavhalani Village |
Maluleke P |
04/04/1998 |
Financial Compensation: Finalised |
Tshakuma Lavhalani Village |
Mabasa VT |
04/04/1998 |
Financial Compensation: Finalised |
Mbalani Ha Mmabana Village |
Matsimbi M |
04/04/1998 |
Financial Compensation: Finalised |
Lufule Village |
Mabuyangwa S |
04/04/1998 |
Financial Compensation: Finalised |
Lufule Village, Tshibielwe 268 MT, Mpapuli 278 MT, Sterkstroom 277 MT |
Hlupheka TE |
04/04/1998 |
Financial Compensation: Finalised |
Manuru Village |
Mabasa MS |
04/04/1998 |
Financial Compensation: Finalised |
Tshikambe Village |
Mabasa M |
11/01/1998 |
Financial Compensation: Finalised |
Hankabele Village |
Mathebula SK |
12/10/1997 |
Financial Compensation: Finalised |
Tshidzini Mutsha Village |
Resimate HN |
22/12/1997 |
Financial Compensation: Finalised |
Hankabele Village |
Baloyi MP |
27/04/1998 |
Financial Compensation: Finalised |
Lufule Village |
Koza N |
04/04/1998 |
Financial Compensation: Finalised |
Tshakuma Lavhalani Village |
Ntuli MJ |
04/04/1998 |
Financial Compensation: Finalised |
Lufule Mphephula Village |
Hlongwane GW |
19/04/1998 |
Financial Compensation: Finalised |
Hlomele Village |
Masingi T |
14/09/1997 |
Alternative Remedy: Finalised |
Hlomele Village |
Makhubele F |
28/12/1997 |
Alternative Remedy: Finalised |
Marude Ngovhela Village |
Nefale TJ |
06/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mzamane MS |
22/12/1998 |
Financial Compensation: Finalised |
MarudeNgovhela Village |
Mphephu NP |
04/01/1998 |
Financial Compensation: Finalised |
Maniene Mmbi Village |
Manganye SJ |
04/04/1998 |
Financial Compensation: Finalised |
Maniene Village |
Manganye GJ |
04/04/1998 |
Financial Compensation: Finalised |
MarudeNgovhela Village |
Ndonyane MS |
05/01/1998 |
Financial Compensation: Finalised |
Unclear Property |
Khosa RE |
14/10/1997 |
Financial Compensation: Finalised |
Mbahe Village |
Munisi M |
19/12/1997 |
Financial Compensation: Finalised |
Tshidziru Village |
Chauke M |
26/12/1997 |
Financial Compensation: Finalised |
Tshidziru Village |
Chauke MP |
26/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT, Tshibielwe 268 MT, Georgenholtz 256 MT |
Ngobeni MA |
26/12/1997 |
Financial Compensation: Finalised |
Maraxwe-Ha Tshivhase Village |
Semandela MJ |
26/12/1997 |
Financial Compensation: Finalised |
Luvhimbi-Ndaedzo Village |
Khoza MW |
22/12/1997 |
Financial Compensation: Finalised |
Lufule Mphephu Village |
Nobela MW |
19/04/1998 |
Financial Compensation: Finalised |
Unclear Property |
Masia MS |
22/12/1997 |
Financial Compensation: Finalised |
Luvhimbi Village |
Mahesu M |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke GA |
28/12/1997 |
Financial Compensation: Finalised |
Ramputa's Location 196 MT |
Sisinyane MW |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi YA |
28/12/1997 |
Financial Compensation: Not Finalised |
Ngudza-Ramugondo Village |
Miyambo HA |
28/12/1997 |
Financial Compensation: Finalised |
Maunuwi Village |
Khosa M |
12/10/1997 |
Financial Compensation: Finalised |
Hlomela Village |
Masinga T |
14/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT (Tshikambe Village) |
Mbokota HS |
20/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT (Tshifulanini Village) |
Hobjane KJ |
28/03/1998 |
Financial Compensation: Not Finalised |
Chibase 213 MT |
Baloyi ME |
28/12/1997 |
Financial Compensation: Finalised |
Tshikundeni Village |
Matonsi DD |
25/01/1998 |
Financial Compensation: Finalised |
Makuleke-Pafuri Village |
Matosi HK |
28/12/1997 |
Financial Compensation: Finalised |
Sanari Village |
Chauke MD |
28/12/1997 |
Financial Compensation: Finalised |
Ngudza Village |
Tsemi MN |
28/12/1997 |
Financial Compensation: Finalised |
Venda Homeland |
Miyabo MN |
19/10/1998 |
Financial Compensation: Finalised |
Ha-Mukoma Mbahe |
Maluleke GM |
11/01/1998 |
Financial Compensation: Finalised |
Malamangwa |
Masingi M |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makondo MR |
28/12/1998 |
Financial Compensation: Finalised |
Magidi-Mmbara Village |
Shitlhelani RE |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shivambu MV |
11/01/1998 |
Financial Compensation: Finalised |
Ha-Mukoma a sina Nndu |
Shirinda N |
14/09/1997 |
Financial Compensation: Finalised |
Tshikambe Magayisa Village |
Muhingi SM |
28/09/1997 |
Financial Compensation: Finalised |
Nkavele Tshamutilikwa Village |
Sambo M |
14/09/1997 |
Financial Compensation: Finalised |
Nkavele Tshamutilikwa Village |
Ngobeni MM |
05/01/1997 |
Financial Compensation: Finalised |
Maninj Village |
Hlongwane M |
28/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT (Tshitanani Village) |
Mdungazi MM |
05/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani M |
14/09/1997 |
Financial Compensation: Finalised |
Tshamatuvha Village |
Tlaweni KD |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT (Mbahe Village) |
Mokondo MG |
14/09/1997 |
Financial Compensation: Not Finalised |
Malangwa Village |
Mashaba M |
21/09/1997 |
Financial Compensation: Finalised |
Tshitanini Village |
Maluleke GD |
05/10/1997 |
Financial Compensation: Finalised |
Nkavele Tshamutilikwa Village |
Sambo MN |
14/09/1997 |
Financial Compensation: Finalised |
Tshimutilikwa Village |
Ngonyama M |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Matshebele W |
12/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Ndengeza MF |
14/09/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Maluleke S |
28/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleke KG |
12/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Chauke KF |
22/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mathe MM |
26/12/1997 |
Financial Compensation: Finalised |
Shapela 269 MT |
Makhuvele KN |
05/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabaso MM |
28/10/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Shibambu PE |
14/09/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Baloyi VJ |
28/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Nkanyane T |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hobyani MT |
12/04/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maluleke MS |
28/12/1997 |
Financial Compensation: Finalised |
Unclear Property |
Mangane M |
05/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Tshibambu M |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makhuba HW |
04/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ntelele M |
28/09/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Chauke MG |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makwakwa KS |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Sithole T |
05/10/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Maluleke MC |
22/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Khotso M |
25/01/1998 |
Financial Compensation: Not Finalised |
Chibase 213 MT |
Monyai MP |
24/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mhlava M |
28/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke TM |
12/10/1997 |
Financial Compensation: Finalised |
Tshimbufe 563 LT |
Chauke T |
04/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Kabeni MM |
14/09/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mabasa ST |
22/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mathusi DM |
27/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Malati N |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke T |
22/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke M |
19/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke MS |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mthebula MM |
25/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mashaba MM |
14/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Maluleke M |
28/09/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Baloyi MA |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mathebula M |
24/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Chauke MT |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Makhubela HJ |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maswanganyi MW |
28/12/1997 |
Financial Compensation: Finalised |
Tshifudi |
Chauke M |
14/08/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hobyani M |
28/03/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Jaftan MG |
22/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Masese PJ |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke M |
12/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke M |
31/12/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Philwane A |
31/12/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Jeleni BM |
31/12/1998 |
Financial Compensation: Finalised |
Muhuyu |
Mabaso VP |
28/12/1997 |
Financial Compensation: Finalised |
Makuya |
Mabasa MM |
28/12/1997 |
Financial Compensation: Finalised |
Makuya |
Mashamba RW |
09/08/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mathebula MM |
11/01/1998 |
Financial Compensation: Finalised |
Dididi |
Mabasa M |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Manganye M |
31/12/1998 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Ngobeni ME |
31/12/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke HD |
07/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Baloyi T |
17/02/1998 |
Financial Compensation: Finalised |
Tshilungoma |
Chauke PM |
29/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabaso WP |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa M |
29/12/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Mabasa M |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi J |
18/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Manganye MW |
31/12/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Dau ML |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Vukeya ME |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke MM |
11/01/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Masinga MG |
31/12/1998 |
Financial Compensation: Finalised |
Tshifudi Portion of Phaswane 257 MT |
Ndlovu SD |
29/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ramaditja FK |
11/01/1998 |
Financial Compensation: Finalised |
Unclear Property |
Chauke MS |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Machebele N |
28/12/1997 |
Financial Compensation: Finalised |
Matsika |
Munyoko GE |
14/09/1997 |
Financial Compensation: Finalised |
Unclear Property |
Chauke ME |
21/09/1997 |
Financial Compensation: Finalised |
Unclear Property |
Mphephu TM |
21/09/1997 |
Financial Compensation: Finalised |
Unclear Property |
Chauke T |
14/09/1997 |
Financial Compensation: Finalised |
Tshaulu |
Makondo MF |
28/12/1998 |
Financial Compensation: Finalised |
Unclear Property |
Baloyi NM |
19/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maluleke M |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mtileni RW |
12/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Muzamani MM |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Rebele M |
22/12/1997 |
Financial Compensation: Finalised |
Unclear Property |
Mabasa M |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Baloyi T |
12/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke M |
25/01/1998 |
Financial Compensation: Not Finalised |
Mpapuli 278 MT |
Hlungwani M |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Sambo HP |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Sambo MD |
24/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabasa N |
25/01/1998 |
Financial Compensation: Not Finalised |
Mpapuli 278 MT |
Matsakala ZG |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke N |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mathye SS |
28/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke M |
28/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mbazima M |
12/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Ngobeni RG |
26/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Moyana MT |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi HJ |
25/01/1998 |
Financial Compensation: Finalised |
Unclear Property |
Mabasa KS |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Ngoveni DM |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke M |
25/01/1998 |
Financial Compensation: Finalised |
Unclear Property |
Hlungwani N |
25/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Chauke N |
24/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke M |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mhlauli M |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Sambo M |
25/01/1998 |
Financial Compensation: Finalised |
Unclear Property |
Mathebula M |
25/01/1998 |
Financial Compensation: Finalised |
Tshidzini |
Mabasa RS |
29/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Macebele MA |
11/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Munyuku N |
14/09/1997 |
Financial Compensation: Finalised |
Tshimbupfe |
Novela DW |
04/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe 563 |
Ngobeni N |
04/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mokhatshame M |
04/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke T |
04/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maluleke M |
04/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Baloyi M |
04/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hanyane AW |
04/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hobyani HS |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Minyuku M |
12/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Ngobeni M |
05/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Baloi MK |
21/01/1998 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Chauke M |
25/03/1998 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Makamu M |
29/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Shirinda SM |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabasa N |
12/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Ngobeni M |
12/04/1997 |
Financial Compensation: Finalised |
Unclear Property |
Sithole HD |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani MD |
22/12/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Hlungwani MR |
21/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Sithole SM |
14/09/1997 |
Financial Compensation: Not Finalised |
Chibase 213 MT |
Machebele MR |
28/12/1997 |
Financial Compensation: Finalised |
Unclear Property |
Machebele MR |
26/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mdungasi N |
19/12/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Makamu TA |
22/12/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Tshuma MN |
22/12/1997 |
Financial Compensation: Finalised |
Unclear Property |
Chauke M |
14/09/1997 |
Financial Compensation: Finalised |
Unclear Property |
Ndlopfu N |
29/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Vukeyo HJ |
25/01/1998 |
Financial Compensation: Finalised |
Thamutavha |
Chauke M |
28/09/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Chauke T |
28/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mashao KP |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maluleke GJ |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maluleke M |
15/05/1998 |
Financial Compensation: Finalised |
Tshifudi 257 MT |
Chauke T |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke TM |
19/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke TM |
26/12/1997 |
Financial Compensation: Finalised |
Unclear Property |
Hlungwani MG |
28/12/1997 |
Financial Compensation: Finalised |
Unclear Property |
Masingi M |
19/10/1997 |
Financial Compensation: Finalised |
Tshitavha |
Hlungwani MA |
12/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke TH |
28/12/1997 |
Financial Compensation: Finalised |
Sambadou |
Mashaba N |
28/12/1997 |
Financial Compensation: Finalised |
Mukumela |
Mathebula M |
28/12/1997 |
Financial Compensation: Finalised |
Ha-mukuya |
Chauke TM |
28/12/1997 |
Financial Compensation: Finalised |
Mailani |
Hanyane RP |
19/12/1997 |
Financial Compensation: Finalised |
Muhuvu |
Mabaso HJ |
09/08/1997 |
Financial Compensation: Finalised |
Ha-mukuya |
Mabasa T |
28/12/1997 |
Financial Compensation: Finalised |
Makuya-Fandani |
Mabasa MT |
09/08/1997 |
Financial Compensation: Finalised |
Makuya |
Baloyi P |
17/08/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Ndlovu M |
29/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Chuma TM |
28/12/1997 |
Financial Compensation: Finalised |
Lukala Lambani |
Makondo HT |
05/10/1997 |
Financial Compensation: Finalised |
Property Unclear |
Baloyi MS |
24/03/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mohlaba LD |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mathebula JM |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Sholwana JM |
28/04/1998 |
Financial Compensation: Finalised |
Ha-Budeli |
Makarenge EK |
25/01/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Mathebula KM |
19/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Mathebula MM |
19/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Chauke M |
19/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Givha NA |
26/12/1997 |
Financial Compensation: Finalised |
Hamutoti |
Mabasa MH |
25/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mashaba M |
21/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hlungwani TH |
05/10/1997 |
Financial Compensation: Finalised |
Tshidzini |
Baloi MS |
12/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke JM |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke EN |
29/03/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ngobeni M |
12/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mashimbye TJ |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Muhlaba MJ |
04/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Nwaila M |
28/12/1997 |
Financial Compensation: Finalised |
Gaba |
Chauke GW |
17/08/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Makamu MM |
25/03/1998 |
Financial Compensation: Finalised |
Ha-Makuya |
Mabasa MM |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke GJ |
17/08/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Nghonyama MJ |
28/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mgwambane LG |
26/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Nobela HJ |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mathebula T |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke MD |
26/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke MJ |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Khosa MW |
26/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke M |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mthavini EH |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hatlane MP |
22/12/1997 |
Financial Compensation: Finalised |
Tshilivho |
Mabasa SJ |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hlungwane HF |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT, Sterkstroom 277 MT, Tshibielwe 268 MT |
Maluleke M |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Manganyi N |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hletshwayo MT |
25/12/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Shibambu M |
26/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Muhlaba M |
14/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chaoke HP |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabasa M |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Rivhavu T |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maluleke N |
25/01/1998 |
Financial Compensation: Finalised |
Unclear Property |
Magaringe M |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Miyambu ME |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Tlhavani MM |
24/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Manganxi NE |
25/01/1998 |
Financial Compensation: Finalised |
Ha-Magadi |
Ndlopfu S |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hlongwane MJ |
25/01/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Sithole NM |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Baloyi GJ |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Hlongwane NN |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Chauke HJ |
19/12/1997 |
Financial Compensation: Finalised |
Tsimbupfe |
Mayeso MJ |
11/01/1998 |
Financial Compensation: Finalised |
Tsimbupfe |
Tandane MS |
28/04/1998 |
Financial Compensation: Finalised |
Unclear Property |
Maluleke MM |
26/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ndlopfu S |
11/01/1998 |
Financial Compensation: Finalised |
Tsimbupfe |
Baloyi HE |
28/04/1998 |
Financial Compensation: Finalised |
Tsimbupfe |
Simango M |
28/04/1998 |
Financial Compensation: Finalised |
Tsimbupfe |
Mjaka MT |
28/04/1998 |
Financial Compensation: Finalised |
Tsimbupfe |
Baloyi NS |
28/04/1998 |
Financial Compensation: Finalised |
Unclear Property |
Ndobe MS |
19/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mathebula HJ |
28/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mashaba M |
05/01/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Kwinika N |
04/12/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleka MT |
12/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Sithole M |
12/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Magezi PE |
22/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke MS |
27/04/1998 |
Financial Compensation: Finalised |
Unclear Property |
Ratshivhetshele MB |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlongwani NG |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloi S |
11/10/1998 |
Financial Compensation: Finalised |
Unclear Property |
Simangwe T |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani D |
27/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Chauke M |
28/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabaso HW |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Vukeya M |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke NM |
25/01/1998 |
Alternative Remedy: Finalised |
Chibase 213 MT |
Simangwe M |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabasa N |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabasa TM |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mashau MM |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Makamo M |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shivala TD |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Matonsi GJ |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Sithole NS |
24/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Hlongwane GA |
25/01/1998 |
Financial Compensation: Finalised |
Unclear Property |
Mkhubele MS |
24/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Msapa T |
24/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Sono MP |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mathebula N |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Tshabane HP |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Resenga J |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Rikhotso T |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke M |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Shibambo MJ |
24/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke T |
25/01/1998 |
Financial Compensation: Finalised |
Unclear Property |
Sithole TJ |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Macebele GS |
15/05/1998 |
Financial Compensation: Finalised |
Unclear Property |
Maswanganyi MC |
28/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Masingi HP |
28/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maluleke VO |
28/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Khuzwayo MJ |
26/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mhlaba NM |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Magaisa RC |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabasa TM |
25/01/1998 |
Financial Compensation: Finalised |
Tshikhudeni |
Chauke MM |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maluleke M |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlengani NM |
14/09/1997 |
Financial Compensation: Finalised |
Unclear Property |
Masingi TT |
14/09/1997 |
Financial Compensation: Finalised |
Ha-Mukoma a sina Nndu |
Maluleke N |
28/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maluleke M |
15/05/1998 |
Financial Compensation: Finalised |
Unclear Property |
Mahori M |
05/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Maluleke M |
12/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Msesenyani T |
28/01/1998 |
Financial Compensation: Finalised |
Mangeni |
Mangeni MK |
15/05/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shilenge M |
22/12/1997 |
Financial Compensation: Finalised |
Property Unclear |
Mathebula NF |
29/04/1998 |
Financial Compensation: Finalised |
Lukala Lambani |
Mabasa KS |
26/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa PM |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hobyane M |
24/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Resumati JS |
25/01/1998 |
Financial Compensation: Finalised |
Manini |
Madiza M |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Simange T |
25/01/1998 |
Financial Compensation: Finalised |
Mbilwi |
Mabasa T |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke M |
05/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Masangu M |
25/01/1998 |
Financial Compensation: Finalised |
Manini |
Masia RJ |
24/01/1998 |
Financial Compensation: Finalised |
Tshitomboni |
Makhubela M |
25/01/1998 |
Financial Compensation: Finalised |
Property Unclear |
Mabaso KS |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Khosa MN |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke N |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shilenge MA |
22/12/1997 |
Financial Compensation: Finalised |
Property Unclear |
Risimate H |
22/12/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shirinda GA |
15/05/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Risemate H |
15/05/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mudau BM |
20/11/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ramabulana NW |
30/12/1998 |
Financial Compensation: Finalised |
Ha-Tshikambe |
Shirinde T |
14/09/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Ndlovu BB |
12/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mathye BM |
28/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleke GK |
19/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke TM |
19/10/1997 |
Financial Compensation: Finalised |
Property Unclear |
Chauke NS |
26/04/1998 |
Financial Compensation: Finalised |
Mbahe |
Mathonsi M |
14/09/1997 |
Financial Compensation: Finalised |
Mbahe |
Mathonsi M |
12/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Tshinyandza MA |
14/09/1997 |
Financial Compensation: Finalised |
Nkawela |
Hlungwani N |
21/09/1997 |
Financial Compensation: Finalised |
Ha-Lambani |
Sithole T |
05/10/1997 |
Financial Compensation: Finalised |
Tengwe's Location 255 MT (Gunda) |
Mathonsi M |
14/09/1997 |
Alternative Remedy: Finalised |
Property Unclear |
Manganyi T |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 M (Tshamufilikwa) |
Mabasa M |
14/09/1997 |
Financial Compensation: Finalised |
Tshamufilikwa |
Chauke N |
19/10/1995 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabasa N |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Ngonyana M |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Minyuku N |
12/10/1997 |
Financial Compensation: Finalised |
Property Unclear |
Chauke N |
19/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Baloyi MN |
12/10/1997 |
Financial Compensation: Finalised |
Property Unclear |
Chabalala MR |
28/09/1997 |
Financial Compensation: Finalised |
Tshifumpfe |
Mathe N |
29/04/1998 |
Financial Compensation: Finalised |
Vuwani |
Hlatswayo TG |
29/04/1998 |
Financial Compensation: Finalised |
Lufule |
Chaukwe GM |
24/01/1998 |
Financial Compensation: Finalised |
Lufule |
Mhlava M |
25/01/1998 |
Financial Compensation: Finalised |
Lufule |
Baloyi KN |
25/01/1998 |
Financial Compensation: Finalised |
Lufule |
Vukeya RJ |
25/01/1998 |
Financial Compensation: Finalised |
Lufule |
Chauke M |
25/01/1998 |
Financial Compensation: Finalised |
Lufule |
Chauke M |
25/01/1998 |
Financial Compensation: Finalised |
Lufule |
Chauke MS |
24/01/1998 |
Financial Compensation: Finalised |
Tshikundeni |
Chavalala JH |
25/01/1998 |
Financial Compensation: Finalised |
Lufule |
Msesenyane MD |
25/01/1998 |
Financial Compensation: Finalised |
Tshikundini |
Mathonsi FO |
10/02/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT (Lufule) |
Mathebula M |
24/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Tshabani M |
25/01/1998 |
Financial Compensation: Finalised |
Tshisele (Mpapuli 278 MT) |
Hlungwani M |
25/01/1998 |
Financial Compensation: Not Finalised |
Property Unclear |
Simangwe M |
15/05/1998 |
Financial Compensation: Finalised |
Geogenholtz 256 MT |
Mabasa HS |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mashaba GM |
25/01/1998 |
Financial Compensation: Finalised |
Tshamutilikwa |
Hlungwane MJ |
21/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mdjadji N |
05/10/1997 |
Financial Compensation: Finalised |
Lufule |
Chauke D |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ndlovu G |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlongwani N |
27/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT (Mbubana) |
Chauke HJ |
28/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hlungwane ME |
19/10/1997 |
Financial Compensation: Finalised |
Property Unclear |
Miyambo MN |
15/05/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Matshebele M |
28/09/1997 |
Financial Compensation: Finalised |
Property Unclear |
Nyalunga LM |
28/09/1997 |
Financial Compensation: Finalised |
Tswinga |
Mabasa M |
05/10/1997 |
Financial Compensation: Finalised |
Waterpoort |
Sebola SJ |
29/12/1998 |
Financial Compensation: Finalised |
Tshilongana |
Maluleka MG |
29/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shibambu MT |
28/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Gezane HW |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa RT |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ngonyama MM |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makhubela MM |
27/04/1998 |
Financial Compensation: Finalised |
Mphego |
Phahlela TB |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwane JM |
27/04/1998 |
Financial Compensation: Finalised |
Tswinga |
Sambo KR |
28/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Chauke JM |
27/04/1998 |
Financial Compensation: Finalised |
Property Unclear |
Mudzhiba NS |
17/12/1998 |
Financial Compensation: Finalised |
Tshitomboni |
Ndobe GF |
04/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Khoza TN |
04/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Matshebele MP |
04/04/1998 |
Financial Compensation: Finalised |
Makhova |
Chauke RJ |
04/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi MM |
28/12/1997 |
Financial Compensation: Finalised |
Mahunuhwi |
Baloyi YA |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Khazamula GS |
28/12/1997 |
Financial Compensation: Finalised |
Tshikondeni 304 MT |
Mabasa RF |
28/12/1997 |
Financial Compensation: Finalised |
Mbahe |
Mamaila M |
17/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Vukela M |
11/01/1998 |
Financial Compensation: Finalised |
Tshitanini |
Maluleke MG |
11/07/1998 |
Financial Compensation: Finalised |
Unclear Property |
Chauke MA |
11/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Sithole TN |
04/04/1998 |
Financial Compensation: Finalised |
Unclear Property |
Mabaso MN |
04/04/1998 |
Financial Compensation: Finalised |
Kohlomela |
Baloyi MM |
14/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Ngonyamu MM |
14/09/1997 |
Financial Compensation: Finalised |
Unclear Property |
Ndove HE |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ngozi MK |
26/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Macebele M |
22/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Makondo S |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani T |
28/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Shirinda T |
19/12/1997 |
Financial Compensation: Finalised |
Unclear Property |
Maluleke M |
19/12/1997 |
Financial Compensation: Finalised |
Ngezimani |
Mabaso HJ |
28/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke MM |
28/12/1997 |
Financial Compensation: Finalised |
Mbahe |
Mamaila M |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Munisi MS |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Chauke M |
11/01/1998 |
Financial Compensation: Finalised |
Mbahe |
Mnisi DM |
11/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT (Malamangiva) |
Mashaba MN |
11/01/1998 |
Financial Compensation: Finalised |
Ha-Mutele |
Baloyi S |
17/08/1997 |
Financial Compensation: Finalised |
Ha-Livhimbi |
Chauke SM |
11/01/1998 |
Financial Compensation: Finalised |
Tengwe's Location 255 MT (Dzimauli) |
Ngobeni PH |
29/12/1997 |
Alternative Remedy: Finalised |
Chibase 213 MT |
Maluleke M |
28/12/1997 |
Financial Compensation: Finalised |
Property Unclear |
Mphelo SJ |
31/12/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maswanganyi ML |
11/01/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Machele MN |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbufe 563 LT |
Mabasa TM |
28/04/1998 |
Financial Compensation: Finalised |
Tshino Village |
Misengi RT |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Gaveni RB |
14/09/1997 |
Financial Compensation: Finalised |
Tshilate ( property unclear) |
Mathebula MM |
29/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Nxumalo MT |
29/04/1998 |
Financial Compensation: Finalised |
Chibase 213MT |
Mathonsi YE |
29/04/1998 |
Financial Compensation: Finalised |
Unclear |
Chauke M |
25/01/1998 |
Financial Compensation: Finalised |
Ramputa's Location 196 MT |
Mphephu NM |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Mohlava MS |
04/04/1998 |
Financial Compensation: Finalised |
Mutshenzenzheni Hatshithukeni |
Manganye EM |
21/12/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Hlungwani NM |
04/04/1998 |
Financial Compensation: Finalised |
Chibase 213MT |
Hetisani M |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Hlungwani GS |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Hlungwane N |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Nwamba HJ |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Hlungwana SF |
29/12/1997 |
Financial Compensation: Finalised |
Shangoni, Maguweni, |
Hlungwane PP (Madonsi Community) |
19/03/1998 |
Financial Compensation: Not Finalised |
Mavunde |
Baloyi MS |
24/09/1998 |
Financial Compensation: Finalised |
Tshakhuwadza, Luvhanga |
Mbubana MP |
24/09/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke R |
28/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke M |
14/09/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Mathe MW |
19/12/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Ngwaila MM |
27/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke M |
05/10/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Mathe MW |
21/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Tsanane MW |
21/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Hobyane T |
14/09/1998 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Hobjane MP |
28/03/1998 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Maswanganye MJ |
12/10/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Makondo T |
14/09/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Mashaba SF |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabunda LT |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MS |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MM |
26/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabaso MS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mhlanga GS |
19/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Chauke NM |
12/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mandarene M |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Machebele B |
28/091997 |
Financial Compensation: Finalised |
Ha-makhuvha |
Hlungwani MV |
28/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Xirinda GA |
23/12/1998 |
Financial Compensation: Finalised |
Tshitavha |
Baloi P |
12/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleke N |
15/05/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa HJ |
17/04/1997 |
Financial Compensation: Finalised |
Property Unclear |
Ngobeni TF |
12/10/1997 |
Financial Compensation: Finalised |
Property Unclear |
Chauke GE |
19/10/1997 |
Financial Compensation: Finalised |
R/E of Ptns 32, 43, 50, 57, 89, 90, Ptns 101 & 104 of of Mpapuli 278 MT |
Nkhumeleni MN |
20/12/1998 |
Financial Compensation: Not Finalised |
Plange 221 LT |
Makambeni FJ |
26/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mugwambani MF |
27/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hobyani HW |
03/01/1996 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mabasa T |
14/09/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Khoza TE |
27/04/1998 |
Financial Compensation: Finalised |
Grootfontein 47 LT |
Sikhunyani Community |
14/05/1996 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi ME |
09/11/1998 |
Financial Compensation: Finalised |
Molenje 204 LT |
Phaphazela Land Claim Community |
28/07/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Masuluke MC |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabunda NM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maphosa NM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula SM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi ML |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Vukeya MF |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabunda GP |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maringa MO |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mosapa BW |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maswanganyi MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula TM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Khoza N |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula KS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Nkwinika PS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MR |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Ndove KM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Nyambi ME |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mapengo SH |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Kwinika M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabaso N |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Joka MM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sambo MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bilankulu MT |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maloleka GJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke RD |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makhubela SE |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maloleka PS |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bila M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mashaba SF |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Khoza MM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mapengo SR |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MB |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MR |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Nkwinika HR |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mashaba MN |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mndau SS |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula KR |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Masebenza SE |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlomani TG |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Tshabalala N |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlongwane M |
24/08/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Masuluke TR |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa MH |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Khoza GR |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke YM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mhlongo GR |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makambeni RJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabunda LT |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Ngonyama SN |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Vukeya MT |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Vukeya MB |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Macevele TF |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi NS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke ME |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mboweni MR |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MS |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sambo TM |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MM |
26/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabaso MS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bilankulu NF |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mapengo CT |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Nyambe MT |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Manthonsi TI |
21/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke HM |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathevula TE |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mashele M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mugwambane GW |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlungwani M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sambo T |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mashaya M |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke GW |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleka KM |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Vukeya M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Muhlanga HE |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Salane ME |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula PW |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MN |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Simango MD |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlatswayo ME |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Kwinika T |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mategane TH |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Masuluki M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mashila SR |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mthombeni N |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Ntlemu KS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula KS |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Shilenge MF |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Ngobeni MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Vukeya M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Vukeyo M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi TM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Khosa TS |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bila T |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa MS |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Tshabalala KJ |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa MW |
27/04/1998 |
Financial Compensation: Finalised |
Molenje 204 LT |
Hlongwane HS |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Khosa KR |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maswanganyi M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Ndabane MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Khoza HT |
19/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Tshuma MT |
28/09/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa MS |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlungwani SM |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makambeni TL |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makambeni MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa DM |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maringa NM |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula GK |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Phephenyane MC |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makondo MT |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makamu M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa N |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MP |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Marikela TP |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MG |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathevula MD |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Ntlemo LT |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke NM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula GF |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mahlaule TJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa TC |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chabalala GG |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makondo MT |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlungwane MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Khosa T |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlongwani KM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makamu N |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Nohlodzi LH |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makhubele MA |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlongwane MS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MR |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula TR |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi MN |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makamu N |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke GR |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke TM |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa KL |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mhlanga GS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mthombeni MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke KJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mahlaule VM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa A |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makambeni M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi MW |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Manganyi MM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Khasa KE |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mahlaula M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sithole HJ |
27/04/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Chabalala MN |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MK |
27/04/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa M |
27/04/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Makhubele MA |
27/04/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Vukeya MH |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Novela MD |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Ngobeni MN |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mudau L |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Khosa MA |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula TJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Vukeya NM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Nyambi M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlongwane EM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Shilenge VL |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa MS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makhambeni NB |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke N |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mbara KM |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MJ |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MG |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Simango M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mahladla MM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathevula M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Ndove M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke K |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MT |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MT |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MN |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathe MM |
19/04/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Maphose M |
11/01/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Chauke M |
11/01/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Chauke MM |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Hlengane MJ |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Phahlela MW |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Makondo ME |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Hlungwani M |
19/12/1997 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Maswanganye M |
19/12/1997 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Maswangane M |
19/12/1997 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Ningwani GW |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Mhangani MG |
11/01/1998 |
Financial Compensation: Not Finalised |
Tshibielwa 268 MT |
Khuzwayo MO |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Nwanati MM |
19/12/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Mbiza T |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Macebele N |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Maswanganyi N |
19/12/1997 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Mbayimbayi M |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Chauke MA |
19/12/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Mboweni M |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Nkomo T |
19/12/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Mabasa M |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Tshabalala T |
19/12/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Mashuvhamele MR |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Maswanganye M |
11/01/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Chauke GF |
12/10/1997 |
Financial Compensation: Finalised |
Tshibielwa 269 MT |
Matsimbi T |
27/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Vilankulu HR |
26/04/1998 |
Financial Compensation: Not Finalised |
Plange 221 LT |
Chauke TN |
26/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makondo RS |
28/12/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MM |
04/04/1998 |
Financial Compensation: Finalised |
Molenje 204 LT |
Mhlaba MG |
04/04/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Munyoko GE |
21/09/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Mabasa M |
14/09/1997 |
Financial Compensation: Not Finalised |
Georgenholtz 256 MT |
Bila M |
29/12/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Khambane MD |
28/12/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Chauke M |
28/12/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Madingani M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani M |
19/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Tlawini N |
27/04/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Khuzwayi M |
27/04/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Hlungwani TS |
27/04/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Hlunguani KS |
25/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Maswangane M |
27/04/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Maswanganyi ME |
19/02/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Baloi TM |
04/04/1998 |
Financial Compensation: Finalised |
Tshibielwa 269 MT |
Chauke N |
04/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Khosa M |
25/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Hatlani MP |
24/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 269 MT |
Vukeya D |
19/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 269 MT |
Vukeya T |
19/12/1997 |
Financial Compensation: Finalised |
Molenje 204 LT |
Nyambe MG |
15/05/1998 |
Financial Compensation: Not Finalised |
Mangundi 279 MT |
Tibane WH |
17/08/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke S |
19/04/1988 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Shibambo N |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke HT |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Shivambu M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Nkwinika MW |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa TM |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Pisi M |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa K |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa HS |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mashava M |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke JH |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MN |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mbiza KN |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MM |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MT |
19/04/1998 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Jeleni JJ |
28/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mabasa S |
28/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Maluleke MS |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Manyane T |
11/01/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Nghayo TG |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makhamo DM |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke P |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke RJ |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Khupani T |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mbiza TM |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MH |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Vilankulu TM |
04/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Ngubeni M |
16/02/1998 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Matshebele T |
14/09/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Chauke T |
29/12/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Hobyani ME |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke M.J |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Matshebele NP |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makonda M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Risenga SM |
28/12/1997 |
Financial Compensation: Finalised |
Briggs 289 MT |
Makhuvha T |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maluleke M |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maranela MN |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke MS |
25/01/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Pecu K |
11/01/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Shimbambu S |
19/12/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Mashaba W |
05//0/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Baloyi GD |
14/09/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Hobyani MM |
26/04/1998 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Chauke ME |
28/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Shilenge MT |
19/12/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Baloyi DM |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mazhake RR |
22/12/1997 |
Financial Compensation: Not Finalised |
Tshibielwe 268 MT |
Maluleke KE |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Manganye M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke MJ |
26/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Thanyani KJ |
26/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi T |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Muzamani MC |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke GP |
22/12/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Chauke N |
12/04/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Ngobeni TM |
28/09/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Mathe MW |
12/10/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlatywayo GD |
04/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathe MS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa TC |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MR |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makondo MS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi MG |
29/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Tsenani MT |
12/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Hlungwani N |
19/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mabasa T |
26/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Ndou NF |
28/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Makhuvele GS |
28/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke TC |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mathebula MJ |
22/12/1997 |
Financial Compensation: Finalised |
Senthimula 291 LS |
Baloyi K |
26/12/1997 |
Alternative Remedy: Finalised |
Tshibielwe 268 MT |
Mboweni M |
29/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Hlungwani MS |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Baloyi MM |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke MM |
18/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Maluleke M |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Ngobeni MD |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Maluleke T |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Ntshani MG |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Maluleke MF |
2704/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Maluleke MT |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Shibambo T |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Khazamula RH |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Maswanganyi MM |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mashamba S |
11/01/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Chauke N |
12/10/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Masiya H.M |
19/12/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Shuma MJ |
14/09/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Miyambo MN |
14/09/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Hobyane GP |
21/09/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Nghonyama MM |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke GS |
28/04/1998 |
Financial Compensation: Not Finalised |
Plange 221 LT |
Mathebula MR |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sambu M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa M |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MJ |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mtombeni MS |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makhomo M |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bilankulu MT |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke SM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Nkuna SR |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Twala M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula HW |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MS |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makambeni HM |
28/04/1998 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Yingwana SD |
25/01/1998 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Mathebula M |
09/08/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Sithole M |
12/10/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Chauke HE |
28/12/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Chauke M |
28/12/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Chauke W |
14/08/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Baloyi M |
28/12/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Chauke MM |
05/10/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Madoni NA |
28/12/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Chauke MT |
19/12/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Maluleke N |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maduvula SW |
07/01/1998 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Maluleke M |
11/01/1998 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Baloi S |
21/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Masia MR |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Matshebele MS |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabaso M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shibite M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ndlopfu GR |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makondo MM |
04/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Matshebele M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani M |
09/08/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Sithole ME |
26/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Manganyi MS |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Msesinyane HE |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maswanganyi ME |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa GC |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi N |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ngobeni TE |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makondo T |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makondo MN |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Sithole M |
26/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ndlopfu GR |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ndlopfu S |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ndobe M |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa M |
12/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa M |
28/03/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Manganye M |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maswanganyi RS |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa MD |
29/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makamu BH |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlengani PM |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Khosa PG |
17/08/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Tshabane KG |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makamo K |
04/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke KS |
28/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi K |
09/08/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Yengwane MS |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabedhle MM |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Dumazi S |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Manganyi K |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maswanganyi NJ |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke R |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Msesinyane HE |
25/03/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabaso M |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi HH |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Machebele M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke SP |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleke RB |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani M |
09/08/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke GW |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Masungwini RE |
27/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ritsuli M |
04/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mtsemi MS |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hatlane M |
05/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke MN |
11/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Makamu NS |
11/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke ME |
19/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Ritshuli M |
04/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mahlaule NT |
04/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hlungwane T |
11/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Ndambi MP |
28/12/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Marokane WS |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mashaba MG |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Nkwinika M |
28/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabandi NM |
12/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hlongwane MM |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Ndlovu MG |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hlongwani T |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Tsemi M |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Khosa N |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Nghoyama MR |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Hlungwani MJ |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mudungasi M |
24/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke N |
14/09/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Chauke MA |
28/09/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Baloyi MR |
28/09/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Miyambo MC |
20/08/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Maluleke MT |
05/10/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Mtileni GD |
26/04/1998 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Maluleke M |
29/12/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Matsheke TJ |
28/09/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Phahlela MM |
21/09/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Mabasa TM |
19/10/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Hobyani MD |
21/09/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Ngubeni M |
14/09/1997 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Shigalo C |
26/12/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Hlungwani RS |
14/09/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Chauke MD |
12/10/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Chauke ME |
28/12/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Chauke MD |
14/09/1997 |
Financial Compensation: Finalised |
Molenje 204 LT |
Shibambu KT |
28/04/1998 |
Financial Compensation: Finalised |
Molenje 204 LT |
Makwakwa S |
05/10/1997 |
Financial Compensation: Finalised |
Molenje 204 LT |
Shibambo ME |
28/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Salani PS |
28/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Linda T |
28/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mabasa T |
28/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Shirindi P |
28/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Hobyane T |
05/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Hobjana M |
12/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Shakudiwa GA |
28/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke RE |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Hlungwane N |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Simangwa M |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Makondo ME |
12/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke ME |
12/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke MM |
28/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Munwanati T |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabasa KT |
21/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Baloyi RA |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Maranele SS |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke T |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Khoza M |
05/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ndlovu MJ |
19/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Nghonyama M |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Nemukula AS |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mathebule M |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke TG |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke MJ |
28/12/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maswanganye HJ |
28/12/1998 |
Financial Compensation: Not Finalised |
Chibase 213 MT |
Chauke KA |
23/12/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Mkhacwa ML |
29/04/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Mhlaba RM |
29/04/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Bilankulu ME |
29/04/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Kwinika KJ |
26/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sithole MS |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke RS |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi S |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke M |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sithole MK |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sithole MT |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa NQ |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Ndlovu NM |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makhubela TM |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sethole GF |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke M |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi N |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Kwinika ME |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi HS |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Nkwinika ME |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MF |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke N |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sambo MN |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa M |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Masango MM |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Shilenge KT |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Ringane JH |
20/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Nkuna NF |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi MP |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Manganyi ME |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bilankulu T |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi MG |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mahlaule BM |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathye MC |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke N |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa P |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Kwinika MM |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlungwani M |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke YC |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi BW |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathye MT |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke IJ |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makhubela NR |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bilankulu T |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mhatsana MJ |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makamu BW |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa MB |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Gezane NM |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke NE |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathe MS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mbiza MN |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke M |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sambo K |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Nkwinika ME |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mahlaula MN |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Phahlela JM |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mphahlela MN |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MP |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MR |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mapoko D |
29/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Simangwa KJ |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Baloyi PE |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Chauke T |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Chauke KR |
25/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Chauke MN |
19/02/1997 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Maluleke GJ |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Mashaba MW |
25/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Shilenge MR |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Hlungwani JM |
28/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Mathebula MM |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Maluleke MM |
19/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Bila TM |
27/04/1997 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Baloyi MG |
27/04/1997 |
Financial Compensation: Finalised |
Paswane 's Location 257 MT |
Chauke HJ |
04/04/1998 |
Financial Compensation: Finalised |
Paswane 's Location 257 MT |
Baloye RJ |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makamu M |
12/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hanyani M |
24/01/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Mahori M |
14/09/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Baloyi T |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Khankela W |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mkhatshane HS |
25/01/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke HS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi ME |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makamu T |
19/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke MA |
28/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Maluleke M |
27/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Pimango ME |
28/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Nwaila MM |
19/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Maswanganyi M |
27/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Khuzwayo M |
26/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Gabeni MS |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mashaba M |
27/04/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Nkomo T |
11/01/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Maghevele ME |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Hlaise RD |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Nghayo KA |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Makondo MJ |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mudau M |
27/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Baloyi ME |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MR |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mthombeni M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mhlaba MD |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathebula MW |
15/05/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke KS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bila N |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Tshabane PJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bila MD |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MG |
26/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Shibambo NM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa N |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlongwane MF |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makamo GS |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makama MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makhubele TH |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlungwani MD |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke T |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Masoya N |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sithole HM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makamu MC |
27/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Musetsho M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makondo M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mahatshane M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke RR |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mukhwanazi N |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke RJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Shibambu M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Rangani GM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Vukeya M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makamu T |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makama MM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Khubaye PJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makamu M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makhamo M |
19/04/1998 |
Financial Compensation: Not Finalised |
Plange 221 LT |
Makamu N |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mathombeni M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bila M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sithole MT |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke SW |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke GF |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mbatha MR |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bila MN |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bila M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Sitole M |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makamu M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Bila M |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Masingi HJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MM |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Maluleke MN |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Mabasa MT |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Baloyi M |
19/04/1998 |
Financial Compensation: Finalised |
Molenje 204 LT |
Mallotane I |
05/09/1995 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Phahlela HD |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Mahesu SM |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Chauke RE |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Shilenge M |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Phulwana MJ |
17/08/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Phulwane A |
07/01/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi H |
03/03/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani M |
29/12/1997 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Hlungwani MP |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Ngobeni HJ |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Hlungwani LA |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Ngobeni GW |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mabasa TA |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mashaba MM |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Chauke N |
04//04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mashava M |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Makhondo KJ |
04/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani M |
29/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Tsenane RW |
14/09/1997 |
Financial Compensation: Finalised |
Plange 221 LT |
Masingi MG |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Chauke MJ |
19/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Khazamula S |
28/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Hlungwani CC |
29/04/1998 |
Financial Compensation: Finalised |
Plange 221 LT |
Makondo ME |
28/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Themba TM |
28/12/1997 |
Financial Compensation: Finalised |
Makuya-Fandani |
Mabasa MM |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi HP |
29/04/1998 |
Financial Compensation: Finalised |
Muhuyu-Mavhulani |
Mabaso PR |
28/12/1997 |
Financial Compensation: Finalised |
Tshidzini |
Makamu MM |
29/12/1997 |
Financial Compensation: Finalised |
Tengwe's Location 255 MT |
Mnisi ME |
28/12/1997 |
Alternative Remedy: Finalised |
Chibase 213 MT |
Mabasa GW |
28/12/1997 |
Financial Compensation: Finalised |
Tshiombo |
Chauke HJ |
28/12/1997 |
Financial Compensation: Finalised |
Ramputa's Location 196 MT |
Makondo T |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ngwamba TM |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Novela MS |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa MT |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ndlopfu T |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Rangani M |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabaso MM |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Simangwe T |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mathebula ML |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi S |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Machebele M |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleke M |
11/01/1998 |
Financial Compensation: Finalised |
Tswinga |
Ndhove NS |
28/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shivambu VM |
27/04/1998 |
Financial Compensation: Finalised |
Tengwe's Location 255 MT (Vhurivhuri) |
Nemukula CN |
11/01/1998 |
Alternative Remedy: Finalised |
Tshidzivhe |
Khosa MR |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ngobeni KE |
27/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Sholwana M |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Thusi MM |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makhubele K (Mkhacani Family) |
11/01/1998 |
Financial Compensation: Finalised |
Muhuyu-Mavhulani |
Mabasa ME |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa D |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makamu KM |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Sithole T |
19/12/1997 |
Financial Compensation: Finalised |
Makonde |
Mathye AR |
19/08/1997 |
Financial Compensation: Finalised |
Makuya |
Khosa T |
28/12/1997 |
Financial Compensation: Finalised |
Muhuyu-Mavhulani |
Makamo WG |
28/12/1997 |
Financial Compensation: Finalised |
Vondwe |
Khosa M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleke ME |
28/12/1997 |
Financial Compensation: Finalised |
Tshiombo |
Maluluke M |
28/12/1997 |
Financial Compensation: Finalised |
Pile |
Maluleke HN |
28/12/1997 |
Financial Compensation: Finalised |
Tshiombo |
Maluleke M |
29/12/1997 |
Financial Compensation: Finalised |
Tshidzini |
Ndloviu M |
28/12/1997 |
Financial Compensation: Finalised |
Tshidzivhe |
Chauke MF |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa WR |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makwakwa M |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mafhungo MS |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ndlovu K |
19/12/1997 |
Financial Compensation: Finalised |
Makhuva farm |
Chauke MF |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Magezi MJ |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke M |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi MP |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mudzanani M |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ndlovu MP |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani MM |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mashava M |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Khabaleng LJ |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi DM |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleke MA |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlongwane MM |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleke M |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Malungani M |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Sithole M |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Macevele SM |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke KP |
02/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleke MJ |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shibambo MS |
11/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Simangwe M |
11/01/1998 |
Financial Compensation: Finalised |
Manuru Village |
Nkuna GT |
27/04/1998 |
Financial Compensation: Finalised |
Manuru Village |
Chauke PS |
04/04/1998 |
Financial Compensation: Finalised |
Pafuri |
Baloyi GF |
31/12/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabunda NS |
31/12/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Manganyi F |
29/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke M |
07/01/1997 |
Financial Compensation: Finalised |
Muhuyu |
Maswanganyi VL |
17/08/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Vukeya HS |
25/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Shivambu MM |
14/10/1997 |
Financial Compensation: Finalised |
Paswane's Location 257 MT |
Baloi MJ |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Nwaba HR |
27/01/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Khosa HD |
26/12/1997 |
Financial Compensation: Finalised |
Unclear Property |
Risenga TW |
22/12/1997 |
Financial Compensation: Finalised |
Property Unclear |
Shirinda NM |
28/09/1997 |
Financial Compensation: Finalised |
Mabunda |
Manganyi TC |
28/08/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Munisi M |
11/01/1998 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Tshauke MG |
14/09/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Mitileni MJ |
14/09/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Shitlhangoma M |
19/10/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Nkwinika HS |
21/09/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Makamu N |
28/12/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Shirindi M |
14/10/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Maluleke MN |
28/12/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT, Georgenholtz 256 MT |
Chauke M |
28/12/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Mashaba P |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Sithole M |
29/04/1998 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Maluleke MT |
14/09/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Serenda GL |
21/09/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Mabasa G |
29/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke T |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke RE |
28/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Munyuku MM |
14/09/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Mashaba RW |
14/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Maluleke M |
18/09/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleke MN |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Sithole MS |
28/12/1997 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Chauke M |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Masango RJ |
28/12/1997 |
Financial Compensation: Finalised |
Tshitungulwane |
Mashangu NM |
24/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlongwane HJ |
24/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 268 MT |
Hlungwani MG |
22/12/1997 |
Financial Compensation: Not Finalised |
Chibase 213 MT |
Maluleke M |
29/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe 213 MT |
Sithole MM |
29/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ribombo KK |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT, Tshibielwe 268 MT |
Mahori M |
21/09/1997 |
Financial Compensation: Finalised |
Madodi |
Masingi HA |
19/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shivambi M |
29/04/1998 |
Financial Compensation: Finalised |
Tshitungulwane |
Makondo GB |
29/04/1998 |
Financial Compensation: Finalised |
Ha Budeli |
Hlungwani ME |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleke RJ |
04/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mathebula M |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Khoza KJ |
04/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mathebula M |
24/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Risenga MN |
25/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maswanganyi T |
26/10/1997 |
Financial Compensation: Finalised |
Sibasa 210 MT |
Ndlovu BB |
12/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Makondo TM |
14/09/1997 |
Financial Compensation: Finalised |
Shapela 269 MT |
Sambo MS |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT (Muhuyu) |
Hlungwani HJ |
24/01/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT (Budeli) |
Ngobeni M |
25/01/1998 |
Financial Compensation: Not Finalised |
Mphaphuli 278 MT |
Hlungwane ME |
16/02/1998 |
Financial Compensation: Finalised |
Mphaphuli 278 MT |
Mahesu MS |
12/10/1997 |
Financial Compensation: Finalised |
Ha Makuya |
Mabaza MT |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hanyani RP |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke N |
28/12/1997 |
Financial Compensation: Not Finalised |
Molenje 204 LT |
Maswanganye HJC |
18/11/1998 |
Financial Compensation: Finalised |
Tshimbupfe 213 MT |
Nyambi MW |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe 213 MT |
Hlangwani KJ |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe 213 MT |
Ngoveni KE |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe 213 MT |
Bilankulu RE |
28/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mathebula MM |
12/10/1997 |
Financial Compensation: Finalised |
Tshimbupfe 213 MT |
Mashele RV |
22/12/1997 |
Financial Compensation: Finalised |
Tshimbupfe 213 MT |
Makhubele F |
26/12/1997 |
Financial Compensation: Finalised |
Tshimbupfe 213 MT |
Khoza N |
19/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe 213 MT |
Hlungwani MR |
19/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Mathebula N |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Chauke MY |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Chisi HJ |
19/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Maluleke RW |
19/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Baloyi Magezi Silas |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Khoza MW |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Mathebula GT |
29/04/1998 |
Financial Compensation: Finalised |
Chibase 213MT |
Mashava AN |
29/04/1998 |
Financial Compensation: Finalised |
Tshidzini |
Sithole HD |
05/10/1997 |
Financial Compensation: Finalised |
Tshidzini |
Chauke NM |
28/09/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Mwamba MS |
28/12/1997 |
Financial Compensation: Finalised |
Unclear |
Mabasa M |
28/02/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Mahesu RM |
31/12/1998 |
Financial Compensation: Not Finalised |
Lomondo 252 MT |
Masingi M |
19/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Mashimbyi NF |
19/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Mashau PM |
28/04/1998 |
Financial Compensation: Finalised |
Tshikonelo |
Mashele NR |
28/04/1998 |
Financial Compensation: Finalised |
Chibase 213MT |
Ndlovu MY |
22/12/1997 |
Financial Compensation: Finalised |
Tshimbupfe |
Mhlongo GR |
15/05/1998 |
Financial Compensation: Finalised |
Tshibielwa 268 MT |
Mihlabe P |
26/12/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Mayeso JM |
19/12/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Chauke M |
22/12/1997 |
Financial Compensation: Finalised |
Unclear |
Ntimbani GJ |
28/12/1997 |
Financial Compensation: Finalised |
Tshimbupfe |
Nobela ME |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Mthombeni RD |
28/04/1998 |
Financial Compensation: Finalised |
Tshimbupfe |
Masingi BE |
28/04/1998 |
Financial Compensation: Finalised |
Chibase 213MT |
Mphephu N |
14/09/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mahada MJ- Badugela NA |
17/09/1997 |
Financial Compensation: Finalised |
Madimbo Corridor |
Gumbu-Mutele Community |
15/04/1996 |
Land Restoration: Not Finalised |
Mpapuli 278 MT |
Muthige MT |
17/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke TM |
22/12/1997 |
Financial Compensation: Finalised |
3/24 Tshikota |
Mokwena DS |
28/12/1998 |
Financial Compensation: Finalised |
Makula Ptn of Tshibielwe 268 MT |
Risimati Wm |
14/10/1997 |
Financial Compensation: Finalised |
Makula Ptn of Tshibielwe 268 MT, Chibase 213 MT |
Mahesu M |
14/09/1997 |
Financial Compensation: Finalised |
Kruger National Park |
Maluleke KB (Muyexe Community) |
03/11/1998 |
Financial Compensation: Not Finalised |
Hasani |
Tshabalala H |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlengane TJ |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maluleke M |
21/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mbiza GP |
15/05/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke M |
14/09/1997 |
Financial Compensation: Finalised |
Unclear Property |
Baloyi MN |
15/05/1998 |
Financial Compensation: Finalised |
Shapela 269 MT |
Mbhazima RH |
15/05/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mabasa TM |
12/04/1998 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Mkatshane KM |
21/09/1997 |
Financial Compensation: Not Finalised |
Unclear Property |
Mashaba RW |
24/04/1998 |
Financial Compensation: Finalised |
Unclear Property |
Valoyi MS |
19/10/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Sithole M |
14/09/1997 |
Financial Compensation: Finalised |
Tonondwe 198 MT |
Vondwe Community |
18/12/1997 |
Financial Compensation: Finalised |
Mpepule, Jokong, Xamfana |
Dzumeri Tribal Authority |
29/04/1996 |
Financial Compensation: Not Finalised |
Property unclear |
Makuleke Tribe |
20/12/1995 |
Land Restoration: Finalised |
Alverton 26 LT |
Hlomela Tribe |
25/06/1995 |
Alternative Remedy: Finalised |
Vredeburg 266 MT |
Ndlovhu MD |
28/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke MM |
12/10/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Mabasa M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Shirinda T |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Chauke PH |
28/09/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Mafemane DN |
14/09/1997 |
Financial Compensation: Finalised |
Green 290 MT |
Ndobe JH |
05/02/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Manganyi MR |
22/12/1997 |
Financial Compensation: Finalised |
Mpapuli 278 MT |
Chauke T |
28/04/1998 |
Financial Compensation: Not Finalised |
Chibase 213 MT |
Salani MN |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maranele RJ |
09/08/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi MJ |
17/08/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mahlayile RJ |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213MT, Georgenholtz 256 MT |
Madingane N |
07/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Salani MN |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mzamane ME |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Maswanganyi RS |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi NM |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke SE |
28/12/1997 |
Financial Compensation: Finalised |
Khubvi |
Nyabani M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mahunise MC |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Nkuna MR |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Madingana TG |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke HJ |
28/12/1997 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Mabasa T |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Manganye N |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Mafemane EM |
28/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277MT |
Shuma MN |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213MT |
Maswanganyi HM |
28/12/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Mihlaba N |
28/03/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani KR |
09/08/1997 |
Financial Compensation: Finalised |
Paswane 257 MT |
Ndlovu M |
26/11/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa M |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Ndlovu MJ |
12/04/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mukhachane W |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi M |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shivhindi S |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mathebula MS |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi PJ |
26/12/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Hlungwane MJ |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mhlaba M |
12/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke TM |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Ntsanwisi S |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Maluleke MM |
11/01/1998 |
Financial Compensation: Finalised |
Tshibielwe 269 MT |
Shirindi M |
25/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke M |
14/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mahori T |
14/09/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mbavala MM |
28/09/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Baloyi DG |
05/10/1997 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Mabasa M |
19/12/1997 |
Financial Compensation: Finalised |
Sterktroom 277 MT |
Chauke HJ |
11/01/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Mabasa N |
11/01/1998 |
Financial Compensation: Finalised |
Georgenholtz 256 MT |
Baloyi MM |
22/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Manganye HS |
09/08/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi MM |
26/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloi DF |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi M |
17/08/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Tsatsawane S |
17/08/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Mthavini SS |
11/01/1998 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Nkanyane MM |
12/10/1997 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Chauke RP |
04/04/1998 |
Financial Compensation: Finalised |
Vredeburg 266 MT |
Manganye HS |
14/09/1997 |
Financial Compensation: Finalised |
Unclear Property |
Nenngwekhulu ME |
22/03/1996 |
Financial Compensation: Finalised |
Chibase 213 MT |
Nyavhane BJ |
28/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hobyane GP |
12/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa MT |
14/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Sithole M |
24/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shebambu ME |
21/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Shibambu MS |
15/05/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Makhama GR |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke ML |
19/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Baloyi NM |
14/09/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mathebula MM |
19/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Valoyi MS |
19/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Hlungwani MM |
12/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Tshabalala HR |
15/05/1998 |
Financial Compensation: Finalised |
Dzwerani 22 LT |
Dzwerani Land Claim |
19/04/1998 |
Land Restoration: Finalised |
Tengwe's Location 255 MT |
Mabasa M |
09/08/1997 |
Alternative Remedy: Finalised |
Lomondo 252 MT |
Mabasa HJ |
04/04/1998 |
Financial Compensation: Finalised |
Molenje 204 LT |
Makwakwa S |
12/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mabasa N |
28/09/1997 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mabaso KD |
29/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mboweni M |
28/04/1998 |
Financial Compensation: Finalised |
Molenje 204 LT |
Shibambu M |
09/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Chauke HT |
19/10/1997 |
Financial Compensation: Finalised |
Matlicatt of Murzia Fera 25 MT |
Hlungwane JRR |
19/04/1998 |
Financial Compensation: Finalised |
Dzwerani 22 LT |
Makhubele TW |
11/08/1998 |
Land Restoration: Finalised |
Lomondo 252 MT |
Malevele MP |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Shirindi M |
19/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Makamo MS |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Masingi M |
27/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Chauke NF |
17/02/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mabasa HW |
27/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Ntlemo HJ |
04/04/1998 |
Financial Compensation: Finalised |
Stand No 1, Miluwani Village |
Maumela TA |
30/12/1998 |
Financial Compensation: Finalised |
Stand 26, Tabaan 55 LT, Gazankulu |
Makwakwa MS |
23/12/1998 |
Financial Compensation: Finalised |
Stand 15, Tabaan 55 LT, Gazankulu |
Makwakwa MN |
23/12/1998 |
Financial Compensation: Finalised |
Stand 16, Tabaan 55 LT, Gazankulu |
Makwakwa KD |
23/12/1998 |
Financial Compensation: Finalised |
Stand 14, Tabaan 55 LT, Gazankulu |
Makwakwa RM |
23/12/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mabasa RH |
19/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Hlayisi MG |
27/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Maluleke MS |
26/12/1997 |
Financial Compensation: Finalised |
Tshikambe Village |
Nkanyani MT |
12/04/1998 |
Financial Compensation: Finalised |
Locatie Van De Knopneuzen 230 LT |
Chauke GS |
29/04/1998 |
Financial Compensation: Finalised |
Loatie Van De Knopneuzen 230 LT |
Chauke MW |
19/04/1998 |
Financial Compensation: Finalised |
Locatie Van De Knopneuzen 230 LT |
Maluleke SW |
19/04/1998 |
Financial Compensation: Finalised |
Small Ptn of Tabaan Location No. 2240 |
Makwakwa MR |
23/12/1998 |
Financial Compensation: Finalised |
R/E of Ptn 7 of Miluwani |
Lukuto NM |
31/12/1998 |
Financial Compensation: Finalised |
Lwamondo 252 MT |
Dombo MA |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mabasa M |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Chauke MJ |
14/09/1997 |
Financial Compensation: Finalised |
R/E OF Cross 117 MT |
Nelutshindu MR (Nelutshundu Community) |
28/10/1998 |
Land Restoration: Finalised |
Mpapuli 278 MT |
Maluleke PJ |
27/04/1998 |
Financial Compensation: Not Finalised |
Lomondo 252 MT |
Mabasa N |
05/10/1997 |
Financial Compensation: Finalised |
Sterkstroom 277 MT |
Chauke RD |
25/01/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mabasa PL |
14/09/1997 |
Financial Compensation: Finalised |
Ha Lambani |
Baloi S |
12/10/1997 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Baloyi MR |
27/09/1997 |
Financial Compensation: Finalised |
Molenje 204 LT |
Mukhatshane MW |
21/09/1997 |
Financial Compensation: Finalised |
Molenje 204 LT |
Mabasa PF |
26/04/1998 |
Financial Compensation: Finalised |
Molenje 204 LT |
Baloyi NP |
25/01/1998 |
Financial Compensation: Finalised |
Mhinga's Location 258 MT |
Chauke S |
30/12/1998 |
Financial Compensation: Finalised |
R/E of Ptn 2 of Locatie van de Knopneuzen 230 LT |
Tshilindi Tribal Authority |
04/06/1995 |
Financial Compensation: Not Finalised |
Tswinga |
Zaba MD |
19/10/1997 |
Financial Compensation: Finalised |
Molenje 204 LT |
Mabasa T |
25/01/1998 |
Financial Compensation: Finalised |
Molenje 204 LT |
Mabasa TL |
26/03/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mpande HD |
25/01/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mudau M |
05/10/1997 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mathebula GM |
29/04/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mzamani RS |
14/09/1997 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Hletswayo ME |
29/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Sambo M |
29/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Ndhambhi ML |
07/12/1998 |
Financial Compensation: Finalised |
Paswane 257 MT |
Baloyi MW |
22/12/1997 |
Financial Compensation: Finalised |
Nkuri |
Mathebula M |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Baloyi MS |
04/04/1998 |
Financial Compensation: Finalised |
Locatie van Tabaan 55 LT(Tshimbufe |
Makhubela MR |
28/04/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Hlangwani RS |
28/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Makasela L |
28/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Maluleke HT |
29/04/1998 |
Financial Compensation: Finalised |
Khubvi( Unclear Property) |
Mashila VW |
11/11/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Maswanganyi M |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Hlungwani MS |
22/12/1997 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mikasi M |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Chauke MS |
19/10/1997 |
Financial Compensation: Finalised |
Chibase 213 MT |
Mabasa VM |
11/01/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mutabini MW |
04/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mabasa NM |
29/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Mathebula TM |
29/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Maluleke MS |
27/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Maluleke GS |
29/04/1998 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Machebele M |
25/01/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Hlongwane PJ |
19/04/1998 |
Financial Compensation: Finalised |
Vygeboomsdrift 53LT |
Hlomela Community |
23/11/1998 |
Alternative Remedy: Finalised |
Tshikota 163 |
Ngoveni TE |
17/12/1998 |
Financial Compensation: Finalised |
House No. 26 Tshikota |
Phaswana MA |
28/12/1998 |
Financial Compensation: Finalised |
House No. 1046, Tshikota |
Mabasa NT |
20/12/1998 |
Financial Compensation: Finalised |
Tshikota 317 |
Nobela TG |
09/12/1998 |
Financial Compensation: Finalised |
R/E of Vondeling 285 LS |
|
02/11/1998 |
Land Restoration: Not Finalised |
Bellevue 74 LT |
Wayeni Community, Malele and Mahlangu Famalies |
12/02/1996 14/02/1996 07/10/1997 |
Financial Compensation: Not Finalised |
Grootplaats 399 LS, |
|
03/10/1998 |
Financial Compensation: Not Finalised |
Geraldine 119 LT |
Manganye RF (Olifantshoek Community) |
31/12/1998 |
Financial Compensation: Finalised |
Vaalkop 48 LT |
Chabalala MP (Nwamhadi Community) |
23/06/1996 |
Financial Compensation: Finalised |
Driefontein 77 LT |
Mabunda M.S (Bungeni Community) |
10/06/1996 |
Financial Compensation: Not Finalised |
R/E, R/E of Ptn 1, R/E of Ptn 2, Ptns |
Makhabele MN (Shihambanyisi Community) |
24/05/1996 |
Financial Compensation: Not Finalised |
Rossbach 83 LT |
Magobo TE (Magobo Community) |
13/06/1998 |
Land Restoration: Finalised |
Malmesbury 72 LT |
Shirindza EF (Shitachi Community) |
07/11/1997 |
Financial Compensation: Finalised |
R/E OF Geraldine 119 LT |
Ndhima FPP |
10/03/1997 |
Financial Compensation: Finalised |
Kranspoort 48 LS |
Boakamela Community |
28/12/1998 |
Land Restoration: Finalised |
Vyboomspruit 286LS |
Manavhela Community |
29/08/1996 |
Land Restoration: Finalised |
Bushy Park 76 LT |
Ntuli NW (Ntshuxi Community) |
14/08/1996 |
Financial Compensation: Finalised |
Zoetfontein 137 LT |
Manganyi RN (Shigalo Community) |
29/07/1997 |
Financial Compensation: Not Finalised |
Kruisfontein 48 LT |
Manganyi KT |
12/05/1996 |
Financial Compensation: Finalised |
Piesangfontein 71 LT |
Mathonsi ME (Njakanjaka Community) |
14/12/1998 |
Financial Compensation: Finalised |
Avondale 88 LT, Groenvallei 89 LT, R/E of the farms Middlefontein 78 LT, Rivierplaats 87 LT, Zeekoegat 79 LT, Maschappe 82 LT, R/E & Ptn 1 of Bushypark 76 LT |
Makhubele MJ |
05/08/1996 |
Financial Compensation: Not Finalised |
Masor 63 LT |
Mbombi MM (Nwa Matatani Community) |
31/12/1998 |
Financial Compensation: Finalised |
Syferfontein 85 LT |
Rambau TJ |
22/07/1998 |
Land Restoration: Finalised |
Helderwater 95 LT |
Shondlani NE (Shihimo Community) |
17/06/1996 |
Financial Compensation: Finalised |
Kutama 's Location 225 LS |
Hlongwane SE |
19/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Makondo M |
22/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Baloyi KS |
26/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Ndlovu MA |
26/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Baloyi TM |
26/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Nkuna M |
26/12/1997 |
Alternative Remedy: Finalised |
Mpapuli 278 MT (Mangodi) |
Chilenge M |
14/09/1997 |
Financial Compensation: Finalised |
Kutama 's Location 225 LS |
Mashavha GP |
26/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Makhubela S |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Mkhatsane MP |
28/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Chauke TH |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Makhobela AN |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Mashibyi MA |
26/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Chauke M |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Koae MA |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Fukeya N |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Khosa E.P |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Mashele TS |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Chauke M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Manganyi JD |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Baloyi M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Hlaisi N |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Baloyi MF |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Mamedja MS |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Mathebula MS |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Khosa AM |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Macevele JP |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Mametsa SE |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Chauke PM |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Chauke EM |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Chauke MM |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Sithole TA |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Mathonsi DT |
29/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Maswanganyi M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Maluleke MS |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Hlungwani TE |
30/04/1996 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Mashimbye J |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashimbie BD |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Hlungwane TE |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chauke TE |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Chauke TM |
22/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Maluleke FS |
22/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Maluleke M |
26/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Mboweni T |
22/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Mitilene HJ |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chauke M |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chauke RS |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi MJ |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashimbye K |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Rengani K |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashele MJ |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Makhubela ML |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Maximbye M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chauke MM |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chauke MM |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Ngobeni N |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Hlungwani NJ |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Makhubele MN |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashosho JD |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Makhubela LM |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Maluleke N |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mitileni MJ |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chauke ME |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Macebele TB |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Hlavangwani A |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi NJ |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mabasa HM |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashimbi MJ |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Ringani L |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Maluleke MM |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Maluleke ES |
27/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Kheto NF |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Hlungwani GJ |
15/05/1998 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chauke MJ |
27/04/1998 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi HN |
28/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Nkanyane RS |
15/05/1998 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mathebula MF |
27/04/1998 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chuma ME |
27/04/1998 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Makhubele GP |
27/04/1998 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mbambo M |
15/05/1998 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Baloyi GP |
26/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Chauke F |
26/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Ntimbani GJ |
26/12/1997 |
Alternative Remedy: Finalised |
Piesanghoek 244 MT |
Makatu ME |
02/04/1998 |
Financial Compensation: Finalised |
Kutama 's Location 225 LS |
Baloyi M |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Mdungazi NS |
28/12/1997 |
Financial Compensation: Finalised |
Kutama 's Location 225 LS |
Ndhlovu SH |
28/12/1998 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Mbowene KE |
19/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Nxumalo JE |
15/05/1998 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Makhayeni M |
14/09/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mahlaule MJ |
12/10/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Hlungwani MM |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashaba RO |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Ndhlovu MJ |
25/10/1998 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi M |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi HK |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Lebese RM |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mathebula MF |
12/04/1998 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Manganyi S |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mathonsi TD |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Hlungwane ST |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Nkanyani MA |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Maluleke MF |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Maringa SE |
31/12/1998 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Phiri ML |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Resenga N |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Baloyi ME |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Maluleke MN |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Manganyi MM |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Mashimbye M |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Mthombeni P |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Ngobeni N |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Mashimbye M |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Sithole NE |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Mohau KP |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Makondo GS |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Baloyi M |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Bungele N |
26/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Manganyi MM |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Nkanyane MJ |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Manyange SS |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Baloyi M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Makhubele NM |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Makhubele HJ |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashimbe M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Hlungwane GM |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mangani GW |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Maluleke MG |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chabalala M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chauke KP |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Makhubela AI |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Ringani NC |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Mangani GW |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Chauke HG |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Makhubela N |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Ngobeni NM |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mabasa M.J |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Mhlaba N |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Maluleke JH |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Mabasa MJ |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Marindi MF |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Maluleke RP |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Malungete RS |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Marindi CG |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Maluleke SM |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Mkhatshane M |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Nkanyani MA |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Malete S |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Mbambo MB |
19/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Rihlampfu M |
19/12/1997 |
Alternative Remedy: Finalised |
Kutama 's Location 225 LS |
Mutileni GJ |
22/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Makhubele MS |
19/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Mhlongo BM |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Nkanyana M |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Watch M |
19/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Marilete PP |
22/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Baloyi N |
28/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Ngobene HS |
26/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Masiya KE |
28/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Mboweni MJ |
28/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Ndlopfu N |
28/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi MJ |
28/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Tshisondo W |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashosho MW |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi N |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Rambau MJ |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashaba KJ |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mkhare PS |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Maluleke L |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashimbye MF |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mabasa JA |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Maifala R |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Maluleke TJ |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Manyika G |
28/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mathafeni M |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Marindi MR |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Makondo N |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Hlungwane M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Makhubele GE |
22/12/1997 |
Alternative Remedy: Finalised |
Sinthumula's Location 291 LS |
Makonde MJ |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mathebula ME |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mtileni RM |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Bilankulu HP |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Marindi HA |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Vukeya IS |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mabasa MM |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Manganye NE |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi MS |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Matlale MW |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Moyo MT |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mathebula GJ |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashele SG |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashosho F |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mahwai R |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi TJ |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Marindi NA |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mathodzi M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi T |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashembye TM |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chauke T |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Minyuku M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Doboro P |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi M |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Ndhlovu KG |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Bilankulu HP |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Mbambo LV |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Maluleke HE |
28/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Vukeya RE |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashila MS |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi HD |
28/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Makindi N |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chauke TM |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Chauke M |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mathebula N |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Marindi SA |
28/09/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Dongosi F |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashimbye MF |
14/09/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Modungasi MF |
28/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Nyalungu TJ |
19/12/11197 |
Alternative Remedy: Finalised |
Kutuma's Location 225 LS |
Rihlampelu T |
29/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Ntefang MM |
22/12/1197 |
Alternative Remedy: Finalised |
Overschot 408 LS, Klein Kemp 409 LS |
Mpofu/Khwali Community |
21/12/1998 |
Land Restoration: Finalised |
Rossbach 83 LT |
Maanda PJ |
03/12/1998 |
Land Restoration: Finalised |
Kutuma's Location 225 LS |
Salani V |
26/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Mabasa MS |
26/12/1997 |
Alternative Remedy: Finalised |
Kutama's Location 225 LS |
Nkuna K |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi RT |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Mathekga MD |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Maluleke MV |
22/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Matsebele M |
26/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Maringa MS |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Hlongwane M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mashele MR |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mabara ME |
28/12/1998 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Baloyi MW |
15/05/1998 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Sambo MA |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Mangwani GW |
27/04/1998 |
Alternative Remedy: Finalised |
Senthimula's Location 291 LS |
Sibisi BA |
22/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Khoza T |
26/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Manganyi MG |
26/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Mashosho MA |
26/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Macevele MJ |
26/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Chauke MJ |
22/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Baloyi YW |
26/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Baloyi HG |
27/04/1998 |
Alternative Remedy: Finalised |
Kutuma's Location 255 LS |
Maluleka MM |
28/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 255 LS |
Maluleke RW |
22/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 255 LS |
Marindi L |
22/12/1997 |
Alternative Remedy: Finalised |
Kutuma's Location 255 LS |
Nkuna MT |
27/04/1998 |
Alternative Remedy: Finalised |
Kutuma's Location 255 LS |
Baloyi T |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Hlungwani ME |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Mashaba N |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Dlomo G |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Hlungwani SS |
22/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Mboweni NG |
22/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Hlongwane MG |
22/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Malongete HS |
22/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Masiya MJ |
22/12/1997 |
Alternative Remedy: Finalised |
Locatie Van Den Knopneu |
Mtititi Community |
19/04/1998 |
Financial Compensation: Finalised |
Senthimula 291 LS |
Maluleka MG |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Salane SM |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Maluleke MT |
26/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Chauke N |
22/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Mabasa MT |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Ramaigela MG |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Baloyi MJ |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Makhubele J |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Mashimbyi TG |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Chauke FC |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Maluleke M |
22/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Chauke TM |
28/12/1997 |
Alternative Remedy: Finalised |
Senthimula 's Location 291 LS |
Chauke TM |
28/12/1997 |
Alternative Remedy: Finalised |
R/E & Ptn 9 of Ledig 289 LS |
Thangavhuelelo AP (Gertrudsburg Mission Station Committee) |
22/05/1995 |
Land Restoration: Finalised |
Vondeling 285 LS |
Ramavhoya Tribe |
22/08/1995 |
Land Restoration: Not Finalised |
Vleifontein 310 LS |
Tsonga Community/ Mavungeni |
07/10/1995 |
Land Restoration: Finalised |
Kranspoort 48LS |
Kranspoort Community |
31/05/1997 |
Land Restoration: Finalised |
Hous no 574 Tshikota |
Baloyi MJ |
11/12/1998 |
Financial Compensation: Finalised |
Hous no 530 Tshikota |
Banda BD |
11/12/1998 |
Financial Compensation: Finalised |
Hous no 528 Tshikota |
Banda BD |
11/12/1998 |
Financial Compensation: Finalised |
Hous no 969 Tshikota |
Baloyi TJ |
11/12/1998 |
Financial Compensation: Finalised |
Hous no 557Tshikota |
Baloyi MF |
09/12//1998 |
Financial Compensation: Finalised |
Hous no 1155 Tshikota |
Maluleke MA |
09/12/1998 |
Financial Compensation: Finalised |
Hous no 975 Tshikota |
Maphophe HE |
12/12/1998 |
Financial Compensation: Finalised |
Hous no 558 Tshikota |
Madimele TA |
13/12/1998 |
Financial Compensation: Finalised |
Hous no 1052 Tshikota |
Maswanganyi NG |
13/12/1998 |
Financial Compensation: Finalised |
Hous no 293 Tshikota |
Baloyi PP |
10/12/1998 |
Financial Compensation: Finalised |
Hous no 920 Tshikota |
Shiringani RF |
13/12/1998 |
Financial Compensation: Finalised |
Hous no 214 Tshikota |
Chauke KT |
11/12/1998 |
Financial Compensation: Finalised |
Hous no 298 Tshikota |
Chabalala MW |
09/12/1998 |
Financial Compensation: Finalised |
Hous no 199 Tshikota |
Maboko MO |
08/12/1998 |
Financial Compensation: Finalised |
Hous no 195 Tshikota |
Maseluke MJ |
09/12/1998 |
Financial Compensation: Finalised |
Hous no 209 Tshikota |
Mashaba DS |
09/12/1998 |
Financial Compensation: Finalised |
Hous no 208 Tshikota |
Hlungwani HT |
09/12/1998 |
Financial Compensation: Finalised |
Hous no 1107 Tshikota |
Mutileni T |
11/12/1998 |
Financial Compensation: Finalised |
House no 457 Tshikota |
Manganyi N |
10/12/1998 |
Financial Compensation: Finalised |
House no 757 Tshikota |
Mofi KK |
11/12/1998 |
Financial Compensation: Finalised |
House no 299 Tshikota |
Mathonsi WM |
11/12/1998 |
Financial Compensation: Finalised |
House no 532 Tshikota |
Maluleke TE |
10/12/1998 |
Financial Compensation: Finalised |
Hous no 779 Tshikota |
Nkuna EJ |
09/12/1998 |
Financial Compensation: Finalised |
Hous no 175 Tshikota |
Masaluke MS |
18/12/1998 |
Financial Compensation: Finalised |
House no 644 Tshikota |
Chauke M |
11/12/1998 |
Financial Compensation: Finalised |
House no 457 Tshikota |
Mahange DT |
21/12/1998 |
Financial Compensation: Finalised |
Hous no 235 Tshikota |
Khosa MM |
09/12/1998 |
Financial Compensation: Finalised |
Hous no 313 Tshikota |
Modise RG |
17/12/1998 |
Financial Compensation: Finalised |
Hous no 907 Tshikota |
Malueke JH |
21/12/1998 |
Financial Compensation: Finalised |
Hous no 206 Tshikota |
Maluleke MT |
22/12/1998 |
Financial Compensation: Finalised |
Hous no 1 Tshikota |
Mabasa TM |
14/12/1998 |
Financial Compensation: Finalised |
Hous no 397 Tshikota |
Makhubela B |
18/12/1998 |
Financial Compensation: Finalised |
Hous no 182 Tshikota |
Magadagela MR |
28/12/1998 |
Financial Compensation: Finalised |
Hous no 204 Tshikota |
Khosa M |
10/12/1998 |
Financial Compensation: Finalised |
Hous no 442 Tshikota |
Rangani MH |
13/12/1998 |
Financial Compensation: Finalised |
Hous no 231 Tshikota |
Nkuna S |
10/12/1998 |
Financial Compensation: Finalised |
Hous no 7 Tshikota |
Maluleke MF |
10/12/1998 |
Financial Compensation: Finalised |
Hous no 416 Tshikota |
Ngobeni MS |
09/12/1998 |
Financial Compensation: Finalised |
Hous no 416 Tshikota |
Mabusa FS |
09/12/1998 |
Financial Compensation: Finalised |
Hous no 275 Tshikota |
Mabunda ME |
09/12/1998 |
Financial Compensation: Finalised |
Hous no 295 Tshikota |
Mavumane MS |
11/12/1998 |
Financial Compensation: Finalised |
Hous no 83 Tshikota |
Maluleke MJ |
10/12/1998 |
Financial Compensation: Finalised |
Hous no 102 Tshikota |
Chuma KJ |
10/12/1998 |
Financial Compensation: Finalised |
Hous no 1178 Tshikota |
Mathevula ME |
11/12/1998 |
Financial Compensation: Finalised |
Hous no 9194 Tshikota |
Mabuela ER |
12/12/1998 |
Financial Compensation: Finalised |
Hous no 545 Tshikota |
Shiringani HP |
10/12/1998 |
Financial Compensation: Finalised |
House No 554, Tshikota |
Shilwane SS |
09/12/1998 |
Financial Compensation: Finalised |
Hous no 309 Tshikota |
Mabasa HG |
10/12/1998 |
Financial Compensation: Finalised |
Hous no 530 Tshikota |
Makhasa MG |
09/12/1998 |
Financial Compensation: Finalised |
Hous no 155 Tshikota |
Maswanganyi PG |
08/12/1998 |
Financial Compensation: Finalised |
Hous no 1163 Tshikota |
Masia SJ |
10/12/1998 |
Financial Compensation: Finalised |
Hous no 414 Tshikota |
Shirilele MD |
13/12/1998 |
Financial Compensation: Finalised |
Hous no 12 Tshikota |
Ngwenya MS |
11/12/1998 |
Financial Compensation: Finalised |
Hous no 416 Tshikota |
Hlungwani CN |
13/12/1998 |
Financial Compensation: Finalised |
House No 970, Tshikota |
Baloyi E |
13/12/1998 |
Financial Compensation: Finalised |
House No 1031, Tshikota |
Chauke P |
09/12/1998 |
Financial Compensation: Finalised |
Tshikota 272 LS |
Rambau KT |
09/12/1998 |
Financial Compensation: Finalised |
House No85 Tshikota |
Hlungwani HE |
09/12/1998 |
Financial Compensation: Finalised |
House No663 Tshikota |
Shipika MT |
11/12/1998 |
Financial Compensation: Finalised |
House No743 Tshikota |
Chauke KS |
10/12/1998 |
Financial Compensation: Finalised |
House No292 Tshikota |
Tshabani ZL |
10/12/1998 |
Financial Compensation: Finalised |
House No1106 Tshikota |
Fazi NM |
11/12/1998 |
Financial Compensation: Finalised |
House No935 Tshikota |
Chuma SH |
10/12/1998 |
Financial Compensation: Finalised |
House No263 Tshikota |
Chauke TF |
10/12/1998 |
Financial Compensation: Finalised |
House No721 Tshikota |
Rikhotso R |
31/12/1998 |
Financial Compensation: Finalised |
House No997 Tshikota |
Hlongwane MB |
11/12/1998 |
Financial Compensation: Finalised |
House No974 Tshikota |
Banda JT |
12/12/1998 |
Financial Compensation: Finalised |
House No274 Tshikota |
Baloyi RG |
12/12/1998 |
Financial Compensation: Finalised |
House No596 Tshikota |
Baloyi M |
13/12/1998 |
Financial Compensation: Finalised |
House No7740 Tshikota |
Ngwana WH |
10/12/1998 |
Financial Compensation: Finalised |
House No77 Tshikota |
Nyanise NR |
10/12/1998 |
Financial Compensation: Finalised |
House No15 Tshikota |
Khubana L |
10/12/1998 |
Financial Compensation: Finalised |
House No110 Tshikota |
Maringa TP |
11/12/1998 |
Financial Compensation: Finalised |
House No172 Tshikota |
Muzamane WT |
12/12/1998 |
Financial Compensation: Finalised |
House No7745 Tshikota |
Shihlangu M |
10/12/1998 |
Financial Compensation: Finalised |
House No54 Tshikota |
Shetlele T |
11/12/1998 |
Financial Compensation: Finalised |
House No171 Tshikota |
Shietlele TS |
10/12/1998 |
Financial Compensation: Finalised |
House No7748 Tshikota |
Magigwane MM |
11/12/1998 |
Financial Compensation: Finalised |
House No129 Tshikota |
Ringane ME |
10/12/1998 |
Financial Compensation: Finalised |
House No139 Tshikota |
Ringani T |
10/12/1998 |
Financial Compensation: Finalised |
Shirley Village |
Shishana AM |
11/12/1998 |
Financial Compensation: Finalised |
68 Shirley Village |
Maboko MW |
10/12/1998 |
Financial Compensation: Finalised |
176 Shirley Village |
Hlungwane KE |
10/12/1998 |
Financial Compensation: Finalised |
162 Shirley Village |
Ngwenyana MA |
11/12/1998 |
Financial Compensation: Finalised |
174 Shirley Village |
Ndavane DS |
11/12/1998 |
Financial Compensation: Finalised |
237 Shirley Village |
Makobo MA |
11/12/1998 |
Financial Compensation: Finalised |
213 Shirley Village |
Baloyi S |
10/12/1998 |
Financial Compensation: Finalised |
202 Shirley Village |
Ndavane HN |
11/12/1998 |
Financial Compensation: Finalised |
Shirley Village |
Ngobeni HP |
10/12/1998 |
Financial Compensation: Finalised |
2193 Shirley Village |
Nkomo RA |
10/12/1998 |
Financial Compensation: Finalised |
186 Shirley Village |
Malanguti M |
11/12/1998 |
Financial Compensation: Finalised |
205 Shirley Village |
Maringa EM |
11/12/1998 |
Financial Compensation: Finalised |
17 Shirley Village |
Mabasa KL |
10/12/1998 |
Financial Compensation: Finalised |
206 Shirley Village |
Mabunda SL |
10/12/1998 |
Financial Compensation: Finalised |
148 Shirley Village |
Shishavele H |
08/12/1998 |
Financial Compensation: Finalised |
457 Shirley Village |
Ringane TA |
10/12/1998 |
Financial Compensation: Finalised |
21 Shirley Village |
Hlungwane TL |
11/12/1998 |
Financial Compensation: Finalised |
65 Shirley Village |
Madali KJ |
11/12/1998 |
Financial Compensation: Finalised |
136 Shirley Village |
Baloyi HJ |
11/12/1998 |
Financial Compensation: Finalised |
268 Shirley Village |
Mahura D |
17/12/1998 |
Financial Compensation: Finalised |
15 Shirley Village |
Hlungwani T |
14/12/1998 |
Financial Compensation: Finalised |
224 Shirley Village |
Hlungwani VL |
11/12/1998 |
Financial Compensation: Finalised |
1605 Shirley Village |
Maringa SM |
11/12/1998 |
Financial Compensation: Finalised |
7774 Shirley Village |
Ramanyimi TS |
10/12/1998 |
Financial Compensation: Finalised |
7775 Shirley Village |
Maboko JL |
23/12/1998 |
Financial Compensation: Finalised |
7776 Shirley Village |
Moimane FM |
14/12/1998 |
Financial Compensation: Finalised |
7777 Shirley Village |
Hlongwane JN |
23/12/1998 |
Financial Compensation: Finalised |
7778 Shirley Village |
Maboko ML |
21/12/1998 |
Financial Compensation: Finalised |
7779 Shirley Village |
Hlungwane FE |
17/12/1998 |
Financial Compensation: Finalised |
7780 Shirley Village |
Hobyane NG |
14/12/1998 |
Financial Compensation: Finalised |
7781 Shirley Village |
Munyai M |
21/12/1998 |
Financial Compensation: Finalised |
176 Shirley Village |
Maluleke MJ |
17/12/1998 |
Financial Compensation: Finalised |
House no 52 Tshikota |
Sivungwana ML |
17/12/1998 |
Financial Compensation: Finalised |
House no577 Tshikota |
Shilubane JN |
23/12/1998 |
Financial Compensation: Finalised |
Tshikota 203 |
Marandela M |
17/12/1998 |
Financial Compensation: Finalised |
House no215 Tshikota |
Modise KK |
23/12/1998 |
Financial Compensation: Finalised |
House no299 Tshikota |
Mukhari MA |
23/12/1998 |
Financial Compensation: Finalised |
House no1001 Tshikota |
Mabuela GL |
17/12/1998 |
Financial Compensation: Finalised |
House no856 Tshikota |
Maluleke S |
18/12/1998 |
Financial Compensation: Finalised |
House no528 Tshikota |
Banda CS |
23/12/1998 |
Financial Compensation: Finalised |
House no764 Tshikota |
Jeleni HD |
27/12/1998 |
Financial Compensation: Finalised |
House no171 Tshikota |
Ramadwa MW |
23/12/1998 |
Financial Compensation: Finalised |
House no297 Tshikota |
Baloyi RJ |
21/12/1998 |
Financial Compensation: Finalised |
House no 1058&1059 Tshikota |
Chabalala MK |
21/12/1998 |
Financial Compensation: Finalised |
House no931 Tshikota |
Chauke ZM |
17/12/1998 |
Financial Compensation: Finalised |
House no528 Tshikota |
Chauke M |
17/12/1998 |
Financial Compensation: Finalised |
House no 804 Tshikota |
Ndlovu ZJ |
23/12/1998 |
Financial Compensation: Finalised |
House no 1006 Tshikota |
Nkuna HI |
28/12/1998 |
Financial Compensation: Finalised |
House No 541, Tshikota |
Chauke BT |
28/12/1998 |
Financial Compensation: Finalised |
House No 56, Tshikota |
Chuma ZT |
31/12/1998 |
Financial Compensation: Finalised |
Stand No 755, Tshikota |
Matshomela TL |
14/12/1998 |
Financial Compensation: Finalised |
563 Tshikota |
Munzhelele NA |
27/12/1998 |
Financial Compensation: Finalised |
House No 76, Tshikota Location 184 |
Makhado JM |
27/12/1998 |
Financial Compensation: Finalised |
Tshikota |
Tshikota AA |
31/12/1998 |
Financial Compensation: Finalised |
Tshikota |
Mutileni NP |
17/12/1998 |
Financial Compensation: Finalised |
Tshikota |
Mongwai RJ |
17/12/1998 |
Financial Compensation: Finalised |
House No 932, Tshikota |
Muhlango NB |
10/12/1998 |
Financial Compensation: Finalised |
House No 961, Tshikota |
Maguoa MS |
09/12/1998 |
Financial Compensation: Finalised |
House No 630, Tshikota |
Mashaba DP |
11/12/1998 |
Financial Compensation: Finalised |
House No 176, Tshikota |
Mathebula TC |
09/12/1998 |
Financial Compensation: Finalised |
Shapele 269 |
Tsanwani HS |
14/09/1997 |
Financial Compensation: Finalised |
Shapela 269 MT |
Baloyi NN |
24/12/1997 |
Financial Compensation: Finalised |
Sinthumule 291 LS |
Mabasa M |
22/12/1997 |
Financial Compensation: Finalised |
Shapela 269 |
Baloyi GE |
19/12/1997 |
Financial Compensation: Finalised |
Lomondo 252 MT |
Tsheane MP |
12/10/1997 |
Financial Compensation: Finalised |
Nwamatatani Village |
Jaji MR |
14/09/1997 |
Financial Compensation: Finalised |
Ptn 0 of Morgenzon 94 LT |
Mdono Tribe |
10/12/1996 |
Financial Compensation: Finalised |
Ha-Masia |
Maluleke NT |
04/04/1998 |
Financial Compensation: Finalised |
House No 998, Tshikota |
Mmboyi TN |
10/12/1998 |
Financial Compensation: Finalised |
House No 231, Tshikota |
Mashaba BM |
10/12/1998 |
Financial Compensation: Finalised |
Vleyfontein 316 LS |
Tseli MA |
28/12/1998 |
Land Restoration: Finalised |
Erf 379, 37 Joubert Street, Louis Trichardt |
Mahomet A |
10/12/1998 |
Financial Compensation: Finalised |
Tshikota |
Not Available |
27/12/1998 |
Financial Compensation: Finalised |
423 Tshikota |
Not Available |
27/12/1998 |
Financial Compensation: Finalised |
Locatie Van Knopneuzen 230 LT |
Nkuri Tribal Authority |
05/10/1997 |
Financial Compensation: Finalised |
Tshikota |
Ramabulana MS |
22/12/1998 |
Financial Compensation: Finalised |
Shapela 269 MT |
Makamu HJ |
11/01/1998 |
Financial Compensation: Finalised |
Erf 208, Kruger Street, Louis Trichardt LS |
D'arsy-Herman PW/ABBA |
27/01/1998 |
Financial Compensation: Finalised |
Chibase 213 MT |
Netshidzivhani NT |
29/12/1997 |
Financial Compensation: Not Finalised |
24 Trichardt Street, Louis Trichardt |
Kharbai AMC |
30/12/1998 |
Financial Compensation: Finalised |
Stands 97&99 Louis Trichardt |
Ramailane OE |
27/12/1998 |
Financial Compensation: Finalised |
37 Vleifontein Location |
Matshotshi P |
28/12/1998 |
Financial Compensation: Finalised |
House No 1046, Tshokota |
Mabasa NT |
10/12/1998 |
Financial Compensation: Finalised |
709 Vleifontein, Louis Trichardt |
Ramadwa MW |
28/12/1998 |
Land Restoration: Finalised |
Chibase 213 MT |
Baloyi MM |
29/12/1998 |
Financial Compensation: Finalised |
Kutuma's Location 255 LS |
Monyai JN |
24/02/1998 |
Financial Compensation: Finalised |
Doornspruit 41 LT |
Mukhari TJ |
06/08/1996 |
Financial Compensation: Finalised |
Senthimula 291 LS |
Mashimbe M |
27/04/1998 |
Alternative Remedy: Finalised |
Lomondo 252 MT |
Maluleke TG |
27/04/1998 |
Financial Compensation: Finalised |
Senthimula 's Location 291 LS |
Chauke NE |
22/12/1997 |
Financial Compensation: Finalised |
Kutama 's Location 225 LS |
khoza KS |
22/12/1997 |
Alternative Remedy: Finalised |
Lomondo 252 MT |
Chauke TM |
11/01/1998 |
Financial Compensation: Finalised |
Vliegenpan 391LS |
Sadiki Community |
28/12/1998 |
Land Restoration: Finalised |
Kutama's Location 225 LS |
Ntefang MM |
Alternative Remedy: Finalised |
|
Residential Plot No 420 Tshikota Township |
Mmboyi ME |
28/12/1998 |
Financial Compensation: Finalised |
Ptn 2 of Alverton 26 LT |
Mphephu TD |
24/12/1998 |
Land Restoration: Finalised |
105 Kruger Street, ERF 215, |
Ahmed Adam |
14/12/1998 |
Financial Compensation: Finalised |
Tshikota 203 |
Chuma KP |
09/12/1998 |
Financial Compensation: Finalised |
182 Louis Trichardt |
Masindi SM |
26/12/1998 |
Financial Compensation: Finalised |
Vleifontein 316 LS |
Maphangwa BC |
28/12/1998 |
Land Restoration: Finalised |
Senthimula 291 LS |
Mathebula M |
19/12/1998 |
Alternative Remedy: Finalised |
Vleifontein 712 LS |
Tshifhumulo SS |
28/12/1998 |
Financial Compensation: Finalised |
Kutamas Location 225 LS |
Masia MW |
19/12/1997 |
Alternative Remedy: Finalised |
Kutamas Location 225 LS |
Khosa M |
19/12/1997 |
Alternative Remedy: Finalised |
Senthimula 291 LS |
Mzamani HJ |
22/12/1997 |
Alternative Remedy: Finalised |
Tshikota 555 |
Mabasa KA |
13/12/1998 |
Financial Compensation: Finalised |
Tshikota 1028 |
Mashavha MS |
13/12/1998 |
Financial Compensation: Finalised |
Tshikota 115 |
Baloyi M |
09/12/1998 |
Financial Compensation: Finalised |
Tshikota 21 |
Ngomani MD |
09/12/1998 |
Financial Compensation: Finalised |
Tshikota 200 |
Mathonsi KG |
13/12/1998 |
Financial Compensation: Finalised |
Tshikota 54 |
Mashaba MJ |
13/12/1998 |
Financial Compensation: Finalised |
Tshikota 337 |
Mathonisi M |
13/12/1998 |
Financial Compensation: Finalised |
Tshikota 279 |
Maluleke MQ |
11/12/1998 |
Financial Compensation: Finalised |
Tshikota 763 |
Maluleke JS |
13/12/1998 |
Financial Compensation: Finalised |
Tshikota 976 |
Baloyi MJ |
09/12/1998 |
Financial Compensation: Finalised |
Tshikota 319 |
Mametja TN |
11/12/1998 |
Financial Compensation: Finalised |
Tshakuma |
Mabunda MT |
29/04/1998 |
Financial Compensation: Finalised |
Erf No 317 & 319 Louistrichardt |
Kalan K (Pioneer Investments Pty Ltd) |
31/12/1998 |
Financial Compensation: Finalised |
Tshikota 772 |
Baloyi MG |
11/12/1998 |
Financial Compensation: Finalised |
Kutama 225 LS |
Ngobeni MN |
15/05/1998 |
Alternative Remedy: Finalised |
Tshikota 174 |
Ngomane J |
11/12/1998 |
Financial Compensation: Finalised |
Tshikota 23 |
Maluleke J |
11/12/1998 |
Financial Compensation: Finalised |
Tshikota 1009 |
Mathonsi NF |
11/12/1998 |
Financial Compensation: Finalised |
Tshikota 537 |
Maluleke NP |
11/12/1998 |
Financial Compensation: Finalised |
Tshikota 929 |
Ngobeni MG |
10/12/1998 |
Financial Compensation: Finalised |
Tshikota 267 |
Baloyi SS |
08/12/1998 |
Financial Compensation: Finalised |
Tshikota 218 |
Masindi M |
08/12/1998 |
Financial Compensation: Finalised |
Tshikota 709 |
Hlungani NS |
10/12/1998 |
Financial Compensation: Finalised |
R/E of Syferfontein 85 LS |
Baloyi RD (Ximangi Clan) |
27/12/1995 |
Financial Compensation: Finalised |
Tshikota 227 |
Ngobeni ND |
09/12/1998 |
Financial Compensation: Finalised |
Tshikota 585 |
Mulaudzi M |
09/08/1998 |
Financial Compensation: Finalised |
Tshikota 960 |
Maguga TS |
10/12/1998 |
Financial Compensation: Finalised |
Buysdorp 37 LS |
Rasidile MPP (Thalana Community) |
08/11/1998 |
Land Restoration: Finalised |
Haenertskloof 124 LT |
Cakata Community |
31/10/1998 |
Financial Compensation: Finalised |
Blinkwater 67 LT |
Mphelo BE |
06/11/1997 |
Land Restoration: Finalised |
Scot 465 MS |
Mosegwa MA |
21/12/1998 |
Land Restoration: Finalised |
Minnie Skirving 34 MT |
Mapakoni Community |
18/11/1998 |
Financial Compensation: Finalised |
Vrouensbron 80 MT |
The full Gospel Church |
28/12/1998 |
Financial Compensation: Finalised |
Tengwe's Location 255 MT |
Chauke MN |
11/01/1998 |
Alternative Remedy: Finalised |
Tengwe's Location 255 MT |
Ndlopfu N |
29/12/1997 |
Alternative Remedy: Finalised |
Tengwe's Location 255 MT |
Baloyi VB |
28/12/1997 |
Alternative Remedy: Finalised |
Tengwe's Location 255 MT |
Siaga NA |
20/12/1996 |
Alternative Remedy: Finalised |
Tengwe 's Location 255 MT |
Baloyi HJ |
25/03/1998 |
Alternative Remedy: Finalised |
Thengwe 255 MT |
Magona Community |
17/04/1998 |
Alternative Remedy: Finalised |
Nthlaveni Tengwe 's Location 255 MT |
Shivambu HG |
21/09/1997 |
Alternative Remedy: Finalised |
Ramputas Location 196 MT |
Khoza NE |
09/08/1997 |
Financial Compensation: Finalised |
Ramputa's Location 196 MT |
Mathebula MM |
26/12/1997 |
Financial Compensation: Not Finalised |
Ramputa's Location 196 MT |
Baloyi MA |
09/08/1997 |
Financial Compensation: Not Finalised |
Ramputa's Location 196 MT |
Mathozi MI |
14/09/1997 |
Financial Compensation: Finalised |
Ramputa 's Location 196 MT |
Hlengane M |
04/03/1998 |
Financial Compensation: Finalised |
Ramputa 's Location 196 MT |
Mavunda M |
04/04/1998 |
Financial Compensation: Finalised |
Unclear Property |
Siphuma MM |
11/02/1997 |
Financial Compensation: Finalised |
Mpaphuli 278 MT |
Maluleke HS |
31/12/1998 |
Financial Compensation: Finalised |
Sambandou |
Maluleke GT |
28/12/1997 |
Financial Compensation: Finalised |
Ramputa's Location 196 MT |
Hlungwani H |
29/12/1997 |
Financial Compensation: Finalised |
Chibase 213 MT (Ha-Makhuvha) |
Munchelele MM |
12/10/1997 |
Financial Compensation: Not Finalised |
Sterkstrrom 227 MT (Ha-Makhuvha) |
Shabalala RE |
14/09/1997 |
Financial Compensation: Finalised |
Luheni (Deka) |
Netili TJ |
20/12/1998 |
Financial Compensation: Finalised |
Tengwe's Location 255 MT (Tshamutavha) |
Ndlovu SN |
15/05/1998 |
Alternative Remedy: Finalised |
Ramputa 's Location 196 MT |
Maluleke NH |
28/12/1997 |
Financial Compensation: Not Finalised |
Molenje 204 LT |
Mavambe Community |
25/10/1996 |
Financial Compensation: Finalised |
Tengwe's Location 255 MT |
Netilili TJ |
20/12/1998 |
Alternative Remedy: Finalised |
Ramputa 's Location 196 MT |
Makhanani TN |
11/01/1997 |
Financial Compensation: Finalised |
Ramputa 's Location 196 MT |
Nyavale M |
28/12/1997 |
Financial Compensation: Not Finalised |
Madimbo Corridor |
Gumbi,Masisi,Tshenzelani,Swigwende |
22/10/1997 |
Land Restoration: Finalised |
Goedverwacht 224 LS, Koedoesvlei 47 LS |
Kharive Community |
15/07/1995 / 19/29/1998 |
Phase outstanding |
Ptns 21,36,50,18,37,45,25,27,34,58,22, |
Matlugang NF (Tshivhazwaulu Community) |
04/01/1997 |
Phase outstanding |
Van Der Bijl 528 MS, R/E , Ptn 2, 3 & 4 of Antrobus 566 MS, R/E of Steenbok 565 MS, Ptn 2 of Scott 567 MS, Battle 585 MS, Ptn 1 of Joffre 584 MS, Somme 611 MS, Lekkerlaag 580 MS, Dreyer 526 MS & Ptn 2 of Vriendien 589 MS, Ptn 0 of Malapchani 659 MS, Ptn 0 of Mapani Ridge 660 MS, Ptn 0 of Sandstone Edge 658 MS, Ptn 0 of Driehoek 631 MS, Ptn 4 of Coniston 699 MS, R/E of Delft 499 MS |
Mulambwane Community |
08/12/1998 |
Phase outstanding |
R/E & Ptn 1 of Paardesmid 469 LS, R/E, Ptn 1 & 2 of Haakdoorn 470 LS, R/E of Benjamin 460 LS, Haakdoorndraai 459 LS, Koppieskraal 463 LS, R/E & Ptn 1 of Ganspoort 461 LS, R/E of Malle Moelle 467 LS |
Mokororwane Community |
05/07/1997 |
Phase outstanding |
Mariniersdrift 115 LT |
Mangany HJ (Mangove Community) |
25/01/1998 |
Phase outstanding |
Ratho1 and Breslau 2MS |
Tshivula TA (Tshivula Community) |
27/12/1998 |
Phase outstanding |
Ptns 8,16,17 & 25 of Cloudend 279 LS |
Mudimeli RP (Mudimeli Community) |
06/12/1998 |
Phase outstanding |
Entabeni 251MT |
Tshakuma Community |
21/10/1998 |
Phase outstanding |
Laatsgevonden 20 MT |
Mashamba RJ (Tsianda Community) |
28/06/1995 |
Phase outstanding |
Ptn 4, 5, 13, R/E of Ptn 22, 27 & 34 of Welgevonden 4 LT, Ptn 3 of Palmietfontein 2 LT |
Nengovhela TJ (Tshifhefhe Community) |
03/12/1998 |
Phase outstanding |
Laatsgeoen 20LT |
Muhanelwa ST (Tshitwani Community) |
06/10/1996 |
Phase outstanding |
R/E of Melkhoutkopies 314 LS |
Mamphodo, Mushasha Begwa Community |
29/12/1998 |
Phase outstanding |
Ptn 7 of Rondebosch 287 LS |
Maemu Community |
31/12/1998 04/07/1995 |
Phase outstanding |
Ptn 10 & 14 of Vygeboomsdrift 283 LS |
Tshikumbane TE (Marandela Community) |
11/01/1998 18/11/1996 |
Phase outstanding |
Appelfontein 189LS |
Masakona Community |
03/11/1997 |
Phase outstanding |
Ballymore 42 LT, Moddervlei 44 LT, Boschkopies 315 LS (Moddervlei 44 LT was consolidated and settled under Moddervlei Community) |
Mulungwa MJ (Muananzhele Community) |
30/12/1998 |
Phase outstanding |
R/E of Scott 567 MS & R/E of Bennie 571 MS |
Mamuhohi Community |
29/06/1995 |
Phase outstanding |
Chelford 213 LS, Ptn 1 of Bristol 760 LS, Trigony 226 LS, India 229 LS, Booths 230 LS |
Mathivha MER |
24/08/1996 |
Phase outstanding |
Harnham 793 MS |
Ramantswana NF |
05/04/1998 |
Phase outstanding |
Ptn 1of Oog Van Doornrivier 318 LS, Ptn 3 of Waagkraal 372 LS, R/E of Palmietfontein 311 LS |
Machaba M |
12/03/1996 03/12/1998 |
Phase outstanding |
R/E of Masequa 714 MS, Salaita 188 MT, Lukin 643 MS |
Musekwa NH (Musekwa Tribe) |
26/01/1996 |
Phase outstanding |
Ptn 2 of Nooitgedacht 3 LT & Beja 39 LT |
Matidza P |
22/11/1998 |
Phase outstanding |
Beaufort 32LT |
Mashau Territorial Council |
23/06/1998 |
Phase outstanding |
Rossback 83 LT, Ptn 1 & 2 Moddervlei 44 LT |
Ramaru MA |
10/12/1998 |
Phase outstanding |
Nooitgedacht 90 LT, Weltevreden 116 LT, Weltevreden 118 LT |
Tiyani (Nkanyane)Community |
11/12/1998 |
Phase outstanding |
Moddervlei 44LT |
Nthabalala Royal Family |
28/12/1998 |
Phase outstanding |
Weltevreden 269 LS |
Muhohodi (Sinthumule) Community |
22/12/1998 |
Phase outstanding |
Levubu 15 LT |
Matumba MS |
07/11/1998 |
Phase outstanding |
Ptns 14, 21 & 28 of Schoonuizicht 10 LT, Ptn 13 of Nooitgedacht 14 LT, Ptn 1 of Klein Australie 13 LT |
Ratombo Community |
11/03/1996 |
Phase outstanding |
Brandhoek 419 MT |
Dithakone (Ga-Maroba) Community |
23/07/1995 |
Phase outstanding |
Highfield 797MS |
Mphephu ME |
10/07/1995 |
Phase outstanding |
Ptn 1 of Kalkvlakte 670 MS, R/E of Bosjesveld 669 MS, R/E of Schulpad 674 MS, Middelfontein 673 MS, Renfrew 620 MS, Thurso 616 MS, Cygnus 549 MS, Ursa Minor 551 MS |
Lishivha SJ |
11/08/1995 20/12/1998 |
Phase outstanding |
Ptns 2, 3, 5, 7 & 8 of Zyvergat 474 LS, R/E, Ptns 1, 2 & 3 of Vlakkloof 477 LS, R/E of Kameelkuil 415 LS including Ptn 3 of the farm Leeudoring 472 LS which did not form part of the claim lodged by this community. However, this Portion 3 of Leeudoring 472 LS was found to be forming an ecomonic unit with Ptn 8 of the farm Zyvergat 474 LS and thus could not be separated |
Ntjakatlene Ga Seema Community |
23/07/1995 |
Phase outstanding |
Waterpoort Alldays |
Siphuma MP |
22/11/1998 |
Phase outstanding |
Ptn 2,7,8 & 9 of Palmietfontein 2 LT, Ptn 10 & 14 of Vygeboomsdrift 283 LS |
Matamela Mulelu Community |
17/07/1995 22/06/1997 |
Phase outstanding |
Bluegumsport 779 MS, Taporley 858 MS, Bosley 778 MS |
Musingadi KP (Musingadi Community) |
31/12/1998 |
Phase outstanding |
Weltevreden 269 LS |
Makwatambani Community |
24/07/1995 |
Phase outstanding |
Ptn 6 of Elandspruit 284 LS |
Chauke SHM (Sundani Mujujwa Community) |
30/12/1998 19/07/1995 |
Phase outstanding |
Unclear Property Description |
Mavungeni Community |
18/04/1998 |
Phase outstanding |
Droogekraal 368 LS |
Mathabatha MM (Mmaehangwa Community) |
29/06/1995 |
Phase outstanding |
R/E of Ontevreden 358 LS, |
Matshaka DS (Moeketse Ga Chatleka) |
01/07/1995 |
Phase outstanding |
Bluegumsport 779 MS, Taporley 858 MS, Bosley 778 MS |
Funyufunyu Community |
17/08/1998 |
Phase outstanding |
Ptn 1 of Uniondale 756 MS, Calitzdorp 221 LS, Dundee 216 LS, R/E of Bristol 670 MS |
Matshisevhe Community |
30/12/1998 |
Phase outstanding |
Levubu 15 LT |
Ravele Community |
17/01/1995 |
Phase outstanding |
Niewe Geneva 326 MS,Gordon 310 MS |
Maside TP |
18/12/1998 |
Phase outstanding |
Magazand 123 MS |
Muvhango PR (Munungufhala Community) |
05/09/1995 |
Phase outstanding |
Grootboomen 476 MS(Consolidated into Tshivhula ) |
Makgathe MJ |
20/12/1998 |
Phase outstanding |
Geselschap 395 MS |
Manetsha LJ |
21/12/1998 |
Phase outstanding |
Loretto 264 MS |
Ramalebana MP |
21/12/1998 |
Phase outstanding |
Cange 677 MS |
Sebutla ML |
21/12/1998 |
Phase outstanding |
Adelaide 91 MT |
Mandiwana TP |
19/12/1998 |
Phase outstanding |
Farnel 473 MS |
Sebola MS |
24/12/1998 |
Phase outstanding |
Secrabje 470 MS |
Tshivhula TS |
19/12/1998 |
Phase outstanding |
Krige 495 MS, Richmond 492 MS |
Sekhwama GP |
23/12/1998 |
Phase outstanding |
Arcadia 74 MS, Lauriston 76 MS, R/E of William Porter 90 MS, Ammondale 278 MS, Montagu 77 MS, Fleischerton 89 MS, Braam 92 MS, Ptn 1 & R/E of Ptn 3 of Dorsig 364 MS |
Tshivhula Tribal Authority |
26/06/1998 28/12/1998 19/12/1998 27/12/1998 |
Phase outstanding |
Ostend 63 MT |
Ramphabana PA |
17/12/1998 |
Phase outstanding |
Ptn 1 of Den Staat 27 MS, Ptn 1 & 2 of Oryx 841 MS, Grootboomen 476 MS(Consolidated into Tshivhula ) |
Machete LP (Machete Community) |
30/12/1998 |
Phase outstanding |
07 December 2018 - NW3660
Paulsen, Mr N M to ask the Minister of Agriculture, Forestry and FisheriesQUESTION
What are the top 5 agricultural products produced in each province?
Reply:
South Africa has diverse agro-climatic regions that enable the country to produce a wide variety of agricultural products. The top five (5) agricultural products that are produced in each province are as follow:
PROVINCE |
TOP 5 AGRICULTURAL PRODUCTS PRODUCED |
Eastern Cape |
|
Free State |
|
Gauteng |
|
KwaZulu Natal |
|
Limpopo |
|
Mpumalanga |
|
Northern Cape |
|
North West |
|
Western Cape |
|
07 December 2018 - NW3558
Mhlongo, Mr TW to ask the Minister of Sport and Recreation
By what date will (a) she release the SA Sports Confederation and Olympic Committee (SASCOC) Report and (b) the recommendations from the SASCOC report be implemented?
Reply:
(a) The Minister intends to issue the report of the Committee of Inquiry into the Governance Affairs of the South African Sports Confederation and Olympic Committee (SASCOC) on the 07th of December 2018.
(b) We will assign an implementation timetable to be agreed upon with SASCOC.
MS. T. XASA, MP
MINISTER OF SPORT AND RECREATION
DATE:06-11-2018
07 December 2018 - NW3720
Dlamini, Ms L to ask the Minister of Energy
(a) What is the (i) daily capacity and (ii) location of each oil refinery in the country and (b) who owns each refinery?
Reply:
Refineries |
(i) Daily capacity (barrels per day) |
(ii) Location of the oil refinery |
Sapref |
180 000 |
Durban |
Enref |
135 000 |
Durban |
Chevref |
100 000 |
Cape Town |
Natref |
108 000 |
Sasolburg |
Sasol Coal to Liquids (CTL) |
150 000 |
Secunda |
PetroSA |
45 000 |
Cape Town |
(b)
- Sapref is co-owned by BP and Shell
- Enref is owned by Engen
- Chevref is owned by Astron Energy (formerly known as Chevron)
- Natref is owned Total and Sasol
- Sasol (Secunda) is owned by Sasol
- PetroSA is owned by the State
06 December 2018 - NW2879
Dlamini, Ms L to ask the Minister of Public Enterprises
With reference to the reply of the Minister of Energy to question 2189 on 4 September 2018, what number of jobs will be lost at Eskom once all Independent Power Producer (IPP) companies which had their bids approved by the Department of Energy come onto the national grid?
Reply:
According to the information received from Eskom
Eskom is currently in the process of reviewing its long term strategy. The strategy will inform Eskom’s future structure and positioning, taking into account various scenarios of future IPP capacity. Energy from IPPs is only one of many factors that will influence Eskom’s future.
06 December 2018 - NW3322
Nolutshungu, Ms N to ask the Minister of Transport
Whether (a) his department and/or (b) entities reporting to him awarded any contracts and/or tenders to certain companies (names and details furnished) from 1 January 2009 up to the latest specified date for which information is available; if so, in each case, (i) what service was provided, (ii) what was the (aa) value and (bb) duration of the tender and/or contract, (iii) who approved the tender and/or contract and (iv) was the tender and/or contract in line with all National Treasury and departmental procurement guidelines?
Reply:
Department
a) The Department did not award any tender or contract to the companies (names and details furnished) during the period from 1 January 2009 to 30 September 2018.
Air Traffic and Navigation Services SOC Limited (ATNS)
(b)(i) Vox Telecommunications: For the Provision of a budgeting, forecasting and reporting tool for ATNS
(ii)(aa) value - R 3, 829,135.40 VAT Exclusive.
(bb) Once off
(iii) Bid Adjudication Committee and contract was signed by Achmed Wadee (Chief Information Officer) in the year 2016.
(iv) Yes
Airports South Africa SOC Limited (ACSA)
(b)(i) Supplier and Services Provided
From the list provided, ACSA has only awarded contracts to Vox Telecommunication. The rest of the suppliers listed have not been awarded contracts over the period stipulated. Vox Telecommunications provided various IT Connectivity Services
(b)(ii)(aa) Total Value of Business Awarded
2008/2009 |
454 963,01 |
2009/2010 |
790 883,62 |
2010/2011 |
881 159,22 |
2011/2012 |
798 161,99 |
2012/2013 |
555 392,22 |
2013/2014 |
391 813,83 |
2014/2015 |
302 805,09 |
2015/2016 |
42 000,00 |
Grand Total |
4 217 178,98 |
(b)(iii) Awards Approvals
The awards were approved in line with stipulated ACSA DLA’s for the periods covered.
(b)(iv) National Treasury Regulations
Yes, the process followed National Treasury procurement guidelines.
South African Civil Aviation Authority (SACAA)
a) Not applicable (b), out of all the companies named, Vox Telecommunications is the only company that was awarded a contract by the South African Civil Aviation Authority (SACAA) . The table below provide further details relating to the following portions of the Parliamentary Question: (i) services provided, (ii) (aa) the value of the contract, and (bb) duration of the contract, (iii) approval pertaining to the contract and (iv) whether the contract was done in line with all National Treasury and departmental procurement guidelines?
South African Civil Aviation Authority (SACAA) information relating to tender(s) awarded after 01 January 2009 to specific companies as named in Parliamentary Question Number: 3322 |
|||||
Name of company |
Services provided |
Duration of the contact |
Tender approval |
Were National Treasury and departmental procurement guidelines followed when awarding the tender? |
Value of the contract |
Vox Telecommunications (2011/000797/07) |
Internet and Mail Hosting Solution |
01 December 2016 until 30 November 2021 (Five years) |
In line with SACAA procurement processes and policies, the Bid Adjudication Committee, Bid Evaluation Committee, Director of Civil Aviation (CEO), the Board’s Procurement Oversight Committee, and the Board respectively played their part in the approval process. |
The SACAA confirms that the tender process complied with all National Treasury and organisational procedures and guidelines. The Tender was also vetted by Internal audit as per section 3.5 of the National Treasury Instruction Note on Enhancing Compliance Monitoring and Improving transparency and accountability in SCM on Auditing of bidding processes for bids in excess of R 10 million (all applicable taxes included). |
R17 121 910.46 (Seventeen million one hundred and twenty-one thousand nine hundred and ten rand and forty six cents) |
Total |
R17 121 910.46 |
Cross-Border Road Transport Agency (C-BRTA)
(b) The Cross-Border Road Transport Agency awarded a contract to Vox Telecommunications in 2014.
(i) The service that was provided by Vox Telecommunications to the C-BRTA was for a Right Fax solution
(ii) (aa) The value of the contract was R56 220.24 (bb) The duration of the contract was once off installation in 2014
(iii) The contract was approved by the Chief Financial Officer in line with the C-BRTA’s Supply Chain Management delegations (iv) Yes, the contract was in line with all the National Treasury and C-BRTA procurement guidelines.
Road Accident Fund (RAF)
(b) The Road Accident Fund awarded contracts and/or tenders to the following companies from 1 January 2009 up to 31 October 2018: Vox Telecommunication
(i) the service provided was, |
(ii) (aa) value of the tender and/or contract was |
(bb) duration |
(iii) approved by |
and (iv) the tender and/or contract was in line with all National Treasury and departmental procurement guidelines |
Right Fax |
R2 878 090.00 |
3 years Date signed: 2013-03-14 |
ACEO |
Yes |
Right Fax |
R 1 090 774.80 |
1 Year Date signed: 2016-09-08 |
ACEO |
Yes |
Fax solution |
R9 593 996.15 |
5 years Date signed: 2017-11-20 |
ACEO |
Yes |
Road Traffic Management Corporation (RTMC)
(b) The Road Traffic Management Corporation (RTMC) did not awarded a contract and/or tender to Vox Telecommunications from 1 January 2009 up to date.
(i) Not applicable
(ii) (aa) (bb) Not applicable
(iii) Not applicable
(iv) Not applicable
Road Traffic Infringement Agency (RTIA)
(b) The Road Traffic Infringement Agency (RTIA) did not awarded a contract and/or tender to Vox Telecommunications from 1 January 2009 up to date.
(i) Not applicable
(ii) (aa) (bb) Not applicable
(iii) Not applicable
(iv) Not applicable
South African Road Agency Limited (SANRAL)
(b) The South African Road Agency Limited did not awarded a contract and/or tender to Vox Telecommunications from 1 January 2009 up to date.
(i) Not applicable
(ii) (aa) (bb) Not applicable
(iii) Not applicable
(iv) Not applicable
Ports Regulator of South Africa (PRSA)
b) The Ports Regulator did not award any contracts/tenders to any company as per the atatched list to the question from 1 January 2009 up to 09 November 2018. (i) N/A, (ii) N/A, (iii) N/A, (iv) N/A.
c) South African Maritime Safety Authority (SAMSA)
The South African Maritime Safety Authority did not award any contracts/tenders to any company as per the atatched list to the question from 1 January 2009 up to 09 November 2018. (i) N/A, (ii) N/A, (iii) N/A, (iv) N/A.
Railway Safety Regulator (RSR):
(b) Name of supplier |
Contract / Tender |
(i) Service Provided |
(ii) |
(iii) |
(iv) |
|
(aa) |
(bb) |
|||||
Vox Telecommunications (2011/000797/07) |
Yes |
Provision of maintenance, support and management of wide area network infrastructure |
R4,184,661-84 |
36 months |
CEO |
Yes |
Passenger Rail Agency of South Afrcia (PRASA):
(b) Name of supplier |
Contract / Tender |
(i) Service Provided |
(ii) |
(iii) |
(iv) |
|
(aa) Value |
(bb) Duration |
|||||
DCD Group (2006/037611/07) |
Yes |
|
R17,959,667 R22,000,000 |
1 August 2012 to 31 December 2014 1 April 2014 to 30 June 2019 |
Approved by PRASA Approved by PRASA (all work relating to ad-hoc suppliers was cancelled on 30 June 2016) |
The ad-hoc contracts were found to be irregular by the Auditor General during the audit of the 2015/16 financial year as they were procured through a confinement process. The irregular expenditure has since been disclosed in the subsequent financial years ending March 2017 and 2018. PRASA is busy with and open tender process for this work. |
06 December 2018 - NW3396
Macpherson, Mr DW to ask the Minister of Public Enterprises
What amount does the (a) Kwadukuza Local Municipality and (b) Ilembe District Municipality owe Eskom for the (i) 2017/18 and (ii) 2018-19 year?
Reply:
According to the information received from Eskom
The amount owed by Kwadukuza Local Municipality and iLembe District Municipality for financial years 2017-18 and 2018-19 is presented in the table below. It is to be noted that both municipalities currently have no overdue debt.
Table 1: Amount owed by Kwadukuza Local Municipality and iLembe District Municipality
Name of Municipality |
As at end of March 2018 (i) |
As at end of October 2018 (ii) |
||
Total Debt |
Overdue Debt |
Total Debt |
Overdue Debt |
|
Kwadukuza Local Municipality (a) |
R48 418 494 |
- |
R54 049 387 |
- |
Ilembe District Municipality (b) |
R696 579 |
R490 001 |
R438 070 |
- |
06 December 2018 - NW3539
De Freitas, Mr MS to ask the Minister of Transport
(a) Why has the Fish Hoek and Simon’s Town link been closed, (b) by what date will the link be re-opened and (c) what alternatives are in place?
Reply:
a) On 28 January 2018, a delivery truck struck a descending boom at the level crossing. The force of the accident sent the boom crashing into a 3,000 volts overhead power supply with disastrous consequences. The powerful current rippled down the line, destroying three relay rooms (cabins) in its wake. The damage affected both the automated signaling system and the operation of the boomed level crossings.
b) The line was re-opened end of April 2018.
c) During extended closures the train shuttle is replaced by a bus shuttle.
06 December 2018 - NW3541
Hunsinger, Dr CH to ask the Minister of Transport
With reference to Passenger Rail Agency of South Africa train stations near economic activity hubs, (a) how have the specified stations been identified, (b) what criteria were used to identify stations near economic activity hubs, (c) what are the current status of the stations, (d) what are the plans for stations that do not meet the requirements for economic activity hubs, (e) who will undertake the specified plans and (f) what are the timelines, timeframes and deadlines in this regard?
Reply:
a) PRASA has inherited and thus operates services with train stations which to a large extent reflect the past regime’s historical planning, which located people outside of the economic hubs.
b) As per the above response in (a), the stations near the economic hubs referred to, have been inherited and were developed in the past regime motivated by the policy of housing certain races outside of economic hubs.
c) The PRASA property portfolio train stations near economic hubs are limited to areas within the following Cities:
- City of Johannesburg
- Park Station in City Centre
- Naledi (Soweto)
- City of Tshwane
- Mabopane station
- Pretoria Station
- Saulsville Station
- City of Ekurhuleni
- Dunswart
- Germiston
- City of Ethekwini
- Durban Station
- Berea Station
- City of Cape Town
- Woodstock Station
- Saltriver Station
- Cape Town Station
- Buffalo City and Nelson Mandela.
- East London Station
- Port Elizabeth Station
Stations are in various states of functioning, depending on the demographics of the area and the demand of transport in the area. PRASA has over the past five (5) years invested a substantial amount of Capital in improving the major stations through various programmes such as National Station Upgrade Programme (NSUP) and National Station Improvement Programme (NSIP). Whilst upgrading and improving stations, PRASA will identify the commercial opportunity and include it in the upgrade project. Other commercial opportunities identified will be as and when capital is available to cater for the commercial requirements or offered to the market for leasing.
d) Stations are classified as Super Core, Core, Medium, Small and Halts based on the number of commuters making use of the stations. Furthermore, the Local Authorities/Cities earmarks areas based on the demographics and development planning of the City.
Stations that do not meet the requirements of economic hubs are normally stations that have very limited commercial potential and only small station cafés or informal trade will take place until the fabric of the surrounding area changes, making it potential commercial hubs. Once again PRASA does not decide whether the area is earmarked as economic hubs as it is the Local Authority that determines this based on their Integrated Urban Development Plans, such as housing development, retail, etc. PRASA responds to these plans.
e) The Local Authority decides on an area and undertakes studies depending on demographic changes of the area.
f) The time frames are based on the Local Authority planning cycle and once the areas are developed into economic hubs, PRASA will respond with the upgrade of stations which includes commercial development and or residential developments.
06 December 2018 - NW3413
De Freitas, Mr MS to ask the Minister of Transport
With reference to television, radio and newspaper advertising done by his department and the entities reporting to him, (a)(i) what are the details of adverts that were flighted and/or printed and (ii) on what medium were the adverts flighted and/or printed, (b) on what dates were the adverts printed and/or flighted, (c)(i) what were the objectives for the adverts in each case and (ii) how were those objectives measured in each instance and (d) what was the monthly spend on advertising?
Reply:
Department
(a)(i) In the 2017/18 The Department of Transport (DOT) requested Government Communications and Information System (GCIS) to assist with the media buying of their campaign to communicate their various programmes, events, new developments, future projects and their achievements. The department implemented the campaign on radio and television only there was no printing advertising.
The television advert was a road safety message recorded by the Honorable Minister to heighten awareness about road safety during the festive season and this was flighted on SABC stations during December 2017.
The radio adverts which were recorded and flighted highlighted the department’s achievements with regards to Public Transport and a road safety message.
(ii) The adverts were flighted on Television and Radio.
(b) The television advert flighted from 21/12/2017 – 04/01/2018
Radio Phase 1: 09 March 2018 – 16 March 2018
Radio Phase 2: 26 March 2018 – 03 April 2018
Radio Phase 3: 04 October 2018 – 11 October 2018
-
- The television advert flighted from 21/12/2017 – 04/01/2018.This was the Minister’s Festive Season Message with the objective of creating awareness about road safety and to encourage travellers to be safe on the road.
Radio Phase 1 & 2: 09 March 2018 – 03 April 2018. Easter Campaign, once again the main objective was to encourage people to drive and travel safely on the roads to their places of destination.
Radio Phase 3: 04 October 2018 – 11 October 2018 Transport Month Launch. The objective was creating awareness regarding the launch of Transport Month and also highlight the key projects and events for the month.
- The only element to be measured was the reach and frequency of the campaign which is measured using an independent media buying software called Telmar.
(d) The total expenditure on Television, SABC Stations, Community Stations and Commercial stations for the 2017/18 was R 9 678 478.48. Unfortunately, this cannot be broken down per month as the campaign was an ongoing campaign that started in December and ended at the start of Transport month this year.
Cross-Border Road transport Agency (C-BRTA)
(a)(i) The Cross-Border Road transport Agency (C-BRTA) does not utilise television, radio and newspaper advertising (ii) (b), (c) (i) (ii) and (d) Not applicable as no television, radion and newspaper advertising is utilised.
(a)(i) With reference to television, radio and newspaper advertising done by the Road Accident Fund (RAF) since 1 April 2018 to 31 October 2018,
(a)(ii) the details of the adverts flighted or printed are, |
and (ii) the medium on which the adverts were flighted and/or printed was, |
(b) the adverts were printed and/or flighted on the following dates, |
(c)(i) in each case the objectives for the adverts were, |
and (ii) in each instance the objectives were measured as follows, |
road safety for primary school learners on TRU FM and Good Hope FM |
radio |
TRU FM: 16 April 2018 to 20 April 2018 and Good Hope FM: 23 April 2018 to 27 April 2018 |
to promote road safety among primary school learners |
reach of targeted audience: TRU FM - estimated listenership of 300 000 people and Good Hope FM - estimated listenership of 667 000 people |
youth claimant’s statistics and road safety in Move! Drum, Daily Sun, Sunday Sun and Isolezwe |
magazine and newspaper |
Move! and Drum: 18 July 2018 Daily Sun: 11 July 2018 Sunday Sun: 15 July 2018 Isolezwe: 12 July 2018 |
to promote road safety and create awareness in respect of the RAF’s post-crash care |
reach of targeted audience: Drum - estimated readership of 2.9 million people Daily Sun - estimated readership of 2.9 million people Sunday Sun - estimated readership of 2.5 million people Isolezwe - estimated readership of 1.2 million people |
to clarify whether outstanding RAF claims will be processed under the Road Accident Benefit Scheme on Ukhozi FM, Umhlobo Wenene FM, Phalaphala FM, Munghana Lonene FM, Radio 2000, RSG, Ikwekwezi FM, Ligwalagwala FM Motsweding FM, Lesedi FM, Metro FM and Thobela FM |
radio |
17 September 2018 to 24 September 2018 |
to inform the public that the RAF has not ‘shut down’, but that it is still operating and processing claims and will continue to do so under the Road Accident Benefit Scheme dispensation |
reach of target audience: Ukhozi FM - estimated listenership of 7.5 million people Umhlobo Wenene FM - estimated listenership of 4.1 million people Phalaphala FM - estimated listenership of 739 000 people Munghana Lonene FM - estimated listenership of 1.2 million people Radio 2000, RSG - estimated listenership of 447 000 people Ikwekwezi FM - estimated listenership of 1.3 million people Ligwalagwala FM - estimated listenership of 947 000 people Motsweding FM - estimated listenership of 2.6 million people Lesedi FM - estimated listenership of 3.4 million people Metro FM - estimated listenership of 4.1 million people Thobela FM - estimated listenership of 2.8 million people |
to promote the RAF’s products and services in the Daily Sun |
newspaper |
2, 16 and 31 October 2018 |
to promote direct claims processes, funeral benefits and the RAF’s footprint |
reach of target audience: Daily Sun - estimated readership of 5.3 million people |
Skeem Saam storyline integration on North West FM, YFM and Capricorn FM |
radio |
30 October 2018 to 31 October 2018 |
to create awareness in respect of the Skeem Saam storyline integration and the RAF’s products and services |
reach of target audience: North West FM - estimated listenership of 212 000 people YFM - estimated listenership of 706 000 people Capricorn FM - estimated listenership of 549 000 people |
event advertising for RAF – on – the – Road in Motherwell, East London on Umhlobo Wenene FM and Algoa FM |
radio |
Umhlobo Wenene FM: 23 April 2018 to 27 April 2018 and Algoa FM: 16 April 2018 to 27 April 2018 |
activation of communities to attend the RAF - on – the - Road campaign in the respective areas to promote direct claims and claims verification |
reach of target audience: Umhlobo Wenene FM - estimated listenership of 4.1 million people Algoa FM - estimated listenership of 588 000 people |
event advertising for RAF – on – the – Road in George, mini RAF – on – the – Road in Siyabuswa, RAF Mobi Blitz and Cape Town direct claims campaign on Eden FM, Ikwekwezi FM, Good Hope FM, Radio Zibonele, Rise FM and uMhlobo Wenene FM |
radio |
8 May 2018 to 31 May 2018 |
activation of communities to attend the RAF - on – the - Road campaign in the respective areas to promote direct claims, claims verification and RAF access points |
reach of target audience: Eden FM - estimated listenership of 115 000 people Ikwekwezi FM - estimated listenership of 1.3 million people Good Hope FM - estimated listenership of 667 000 people Radio Zibonele - estimated listenership of 236 000 people Rise FM - estimated listenership of 47 000 people uMhlobo Wenene FM - estimated listenership of 4.1 million people |
event advertising for Cape Town direct claims campaign, Comrades Marathon, mini RAF – on – the – Road in Bizana, Libode and Mbombela and Mobi Blitz on Radio Zibonele, Umhlobo Wenene FM, Metro FM, 5 FM, Heart FM, Radio 2000, Ukhozi FM, Good Hope FM, Vaaltar FM, North West FM, Kanyamazane FM, Radio Turf, Madibaz, Rhodes FM, TUT FM, VUT FM and Ligwalagwala FM |
radio |
7 June 2018 to 30 June 2018 |
promoting RAF direct claims processes, claims verification and RAF access points |
reach of target audience: Radio Zibonele - estimated listenership of 236 000 people Umhlobo Wenene FM - estimated listenership of 4.1 million people Metro FM - estimated listenership of 4.1 million people 5 FM - estimated listenership of 862 000 people Heart FM - estimated listenership of 838 000 people Radio 2000 - estimated listenership of 477 000 people Ukhozi FM - estimated listenership of 7.2 million people Good Hope FM - estimated listenership of 588 000 people Vaaltar FM - estimated listenership of 71 000 people North West FM - estimated listenership of 203 000 people Kanyamazane FM - estimated listenership of 10 000 people Radio Turf - estimated listenership of 29 000 people Madibaz - estimated listenership of 27 000 people Rhodes FM - estimated listenership of 24 000 people TUT FM - estimated listenership of 1 000 people VUT FM - estimated listenership of 96 000 people Ligwalagwala FM - estimated listenership of 1.5 million people |
event advertising for mini RAF – on – the – Road in De Aar, Butterworth and Strand, RAF – on – the – Road in Bungeni and Empangeni and RAF open days in Kroonstad and Bothaville on Ukhozi FM, Icora FM, Gagasi FM, Umhlobo Wenene FM, Zibonele FM, Heart FM, Munghana Lonene FM, Capricorn FM, Segosese FM, Giyani FM, Hlanganani FM, Lesedi FM and RSG |
radio |
14 July 2018 to 28 July 2018 |
activation of communities to attend the RAF – on – the - Road campaign in the respective areas to promote direct claims, claims verification and RAF access points |
reach of target audience: Ukhozi FM - estimated listenership of 7.2 million people Icora FM - estimated listenership of 135 000 people Gagasi FM - estimated listenership of 1.4 million people Umhlobo Wenene FM - estimated listenership of 4.1 million people Zibonele FM - estimated listenership of 236 000 people Heart FM - estimated listenership of 634 000 people Munghana Lonene estimated listenership of 1.2 million people Capricorn FM - estimated listenership of 1.4 million people Segosese FM - estimated listenership of 110 000 people Giyani FM - estimated listenership of 25 000 people Hlanganani - FM estimated listenership of 41 000 people Lesedi FM - estimated listenership of 4 million people RSG - estimated listenership of 1.5 million people |
event advertising for RAF – on – the – Road in Thokoza, mini RAF – on – the – Road in Mqanduli, Boitekong and Volsrust and a RAF open day in Thabazimbi on Lesedi FM, Kasie FM, Motsweding FM and Umhlobo Wenene FM |
radio |
4 August 2018 to 25 August 2018 |
activation of communities to attend the RAF – on – the - Road campaign in the respective areas to promote direct claims, claims verification and RAF access points |
reach of target audience: Lesedi FM - estimated listenership of 4 million people Kasie FM - estimated listenership of 97 000 people Motsweding FM - estimated listenership of 2.6 million people Umhlobo Wenene FM -estimated listenership of 4.1 million people |
to promote the #Keepitsimple campaign (direct claims promotion) and event advertising for RAF – on – the – Road and mini RAF – on – the – Road in Lusikisiki on Umhlobo Wenene FM, Motsweding FM, Rise FM, and Mughana Wenene FM |
radio |
1 September 2018 to 30 September 2018 |
activation of communities to attend the RAF -on – the - Road campaign in the respective areas to promote direct claims, claims verification and RAF access points |
reach of target audience: Umhlobo Wenene FM - estimated listenership of 4.1 million people Motsweding FM - estimated listenership of 2.6 million people Rise FM - estimated listenership of 46 000 people Mughana Wenene FM - estimated listenership of 925 000 people |
event advertising for RAF – on – the – Road in Port Shepstone and Nyanga, radio story integration (direct claims promotion), Paddle Power collaboration (road safety awareness drive) and support for the Durban regional office on Radio Zibonele, Umhlobo Wenene FM, Ukhozi FM, Thobela FM, Metro FM, Voice of Cape Town and Radio786 |
radio |
6 October 2018 to 29 October 2018 |
activation of communities to attend the RAF – on – the - Road campaign in the respective areas to promote direct claims, claims verification and RAF access points |
reach of target audience: Radio Zibonele - estimated listenership of 236 000 people Umhlobo Wenene FM - estimated listenership 4.1 million Ukhozi FM - estimated listenership of 7.2 million people Thobela FM - estimated listenership of 2.1 million people Metro FM - estimated listenership of 4.1 million people Voice of Cape Town - estimated listenership of 122 000 people Radio786 - estimated listenership of 155 000 people |
direct claims promotion on SABC 1 (Sports @ 10 interview) and SABC 2 (Comrades Marathon advertising with rotating logo, squeeze backs and a TVC) |
television |
9 June 2018 to 10 June 2018 |
to promote direct claims and RAF access points |
reach of target audience: SABC 2 - estimated average weekly target audience of 24.9 million people |
direct claims promotion on SABC 1 (Skeem Saam story integration), SABC 2 (TVC, squeeze backs, opening and closing billboards) |
television |
24 September 2018 to 30 September 2018 |
to promote direct claims and RAF access points |
reach of target audience: SABC 1 - estimated average weekly target audience of 25.8 million people |
direct claims promotion on Skeem Saam story integration on SABC 2 |
television |
1 October 2018 to 31 October 2018 |
to promote direct claims and RAF access points |
reach of target audience: SABC 2 - estimated average weekly target audience of 24.9 million people |
direct claims promotion in By the Way newspaper |
newspaper |
1 June 2018 to 30 June 2018 |
to promote direct claims and RAF access points |
reach of target audience: By the Way - estimated readership of 100 000 people |
direct claims promotion for women’s month in Drum and Sunday Times |
magazine and newspaper |
9 August 2018 to 24 August 2018 |
to promote direct claims and RAF access points |
reach of target audience: Drum - estimated average weekly target audience of 51 000 people Sunday Times - estimated readership of 3.5 million people |
direct claims promotion in By the Way newspaper |
newspaper |
1 September 2018 to 30 September 2018 |
to promote direct claims and RAF access points |
reach of target audience: By the Way - estimated readership of 100 000 people |
event advertising for RAF – on – the – Road in Nyanga in the Voice of Cape Town newspaper |
newspaper |
10 October 2018 |
activation of communities to attend the RAF – on – the - Road campaign in the respective areas to promote direct claims, claims verification and RAF access points |
reach of target audience: Voice of Cape Town - estimated listenership of 122 000 people |
and (d) the monthly spend on advertising was |
||||
Media and public relations |
Marketing |
|||
April |
R121 509.00 |
R696, 319.95 |
||
May |
N/A |
R519,268.80 |
||
June |
R266 327.24 |
R1,712,916.00 |
||
July |
N/A |
R2,236,278.64 |
||
August |
N/A |
R 753,683.63 |
||
September |
R1 408 209.50 |
R616, 806.19 |
||
October |
R357 403.44 |
R1 996 251.00 |
Road Traffic Management Corporation (RTMC
(a)(i) The Road Traffic Management Corporation (RTMC) took out adverts about the introduction of the National Traffic Information System (NaTIS) Online Pre-Booking Service in Gauteng. The online services are: Online Pre-booking for Learner’s Licence appointments; Online Pre-Booking for Driving licence appointments; Online Booking for renewal of driving licence cards
(ii) The adverts were placed in the following publications: Business Day, The Citizen, Pretoria News, Sowetan, The Star, Sunday World and City Press
(b) The print adverts were placed between 3 September to 4 October 2018
Pretoria News |
3 September 2018 |
3 October 2018 |
The Star |
31 August 2018 |
4 October 2018 |
Citizen |
3 September 2018 |
4 October 2018 |
City Press |
2 September 2018 |
|
Sowetan |
5 September 2018 |
|
Sunday World |
2 September 2018 |
|
Business Day |
31 August 2018 |
(c) (i) the objectives for the adverts in each case were:
To introduce, create awareness and promote the NaTIS Online Pre-Booking and licence renewal services.
To generate maximum publicity and awareness for the Pre-Booking online services which will eliminate bribery and fraudulent activities at DLTCs as it pertains to the ‘selling’ of slots online system.
To reduce the number of people queuing to renew their licences and time spent in queues.
(ii) The objectives were measured by monitoring the number of people that were using the system compared to those who walked into the DLTCs to make applications.
As of 30 September, the online applicants have exceeded walk-ins consistently
Data extracted as at 31 October 2018.
(d) Total Advertising spend in print publications: August – September = R 500 000.00
South African Nations Road Agency (SANRAL)
(a)(i) The South African Nations Road Agency (SANRAL) the details of the advert flighted and printed below under the heading Campaigns
(ii) The mediums of adverts flighted and printed below under the heading Detail.
(b) The dates of the flighting and publications listed below under the heading Dates.
(i) CAMPAIGNS |
(ii) MEDIUMS UTILISED |
(b) DATES |
"Coffee" Launch Campaign |
Radio-Power Fm, Capricorn Fm, East Coast Radio, Jacaranda Fm, Kaya Fm, 702, Cape Talk, Metro FM, Ukhozi Fm, Motsweding Fm, Thobela Fm, Umhlobo Wenene Fm, Ikwekwezi Fm, Phalaphala Fm, RSG & Jozi Fm. |
Week commencing (wc) 27 May - wc 5 August |
"Coffee" Launch Campaign |
Print Schedule – Mainstream (City Press, Daily Sun, Sowetan, Sunday Sun, Sunday World, Mail & Guradian, Business Report, Citizen, Sunday Times & Rapport) |
27 May - 24 July |
"Coffee" Launch Campaign |
TV-SABC 1,2 3, eTV, eNCA news package, Tennis package, Breaking news package (CNN, Sky News & BBC), Limited offer Package. |
27 May - 30 June |
Youth Month Campaign |
Youth Month Campaign- 38 Community print titles |
wc 24 June |
Adhoc Print Schedule |
IMIESA Magazine- IFC |
August, Oct, Nov |
Adhoc Print Schedule |
ON ROUTE Magazine - A4FC |
September & December |
Brand Family TV Phase 3 Mainstream |
S1, S2, S3, Etv, DSTV Packages 3 x 30" Ads |
26 Aug- September |
Adhoc Print Schedule |
Aspire magazine, Pan African Parliament, Business Day Empowerment, African Decisions, Future Stars & The Thinker. |
August & October |
Youth Event OB |
OB - Ikwekwezi FM |
30th June 2018 |
Bell MOU Print |
The Business Report (The Star, Mercury, Cape Times, Pretoria News) |
29th July |
PIARC 2018 |
Engineering News, PSM, Kuluma, Construction World & Sawubona) |
Aug, Sep, Oct |
Women's Month Campaign |
City Press, Daily Sun, Rapport, Son, Sowetan, The Star, The Mercury, Daily Dispatch, Mail& Guardina, Cape Argus & Citizen. |
August |
Nelson Mandela Centenary Print MainStream |
City Press, Daily Sun, Beeld, Sowetan, Daily Dispatch, Sunday World, Mail&Guardian, Business Report, Isolezwe & Citizen. |
August |
Nelson Mandela Centenary Print Community |
Imbewu news, Inhlumelo news, Rainbow news, St Frances Chronicle, Skawara news, Pondo news, Taxi mail, Izimvo zabantu, Xhamla Press, Ikhwezi la se Mthata, Dikelethu news. |
August |
Brand TV Phase 3 Community |
Soweto, 1KZN, Bay & Tshwane TV = 30" @150 spots |
August - September |
Brand TV Phase 3 Mainstream |
Cape Town TV = 30" @93 spots |
August - September |
Brand Radio Phase 3 Mainstream |
23 Stations @ 382 spots - 30" |
August-September |
Brand Radio Phase 3 Community |
11 Stations @304 spots |
August-September |
Albertina Sisulu Outdoor MS |
2 X Sites Orlando West Soweto |
September & October |
Albertina Sisulu Print Mainstream |
City Press, Daily Sun, Rapport, Isolezwe, Sowetan, The Star, The Mercury, Daily Dispatch, Mail& Guardian and The Herald. |
September |
Albertina Sisulu Print Community |
16 Titles @30x6FC |
September |
Road Safety 365 Radio mainstream |
30" ads All languages |
September & October |
Road Safety 365 TV mainstream |
45" & 30" Ads - SABC, ETV, DSTV PACKAGES |
September & October |
Road Safety 365 Print mainstream |
City Press, Rapport, Daily Sun, Beeld, Sowetan, Daily Dispatch, Sunday World, Mail&Guardian, Cape Argus, The Star, The Herald, The Mercury & The Citizen. |
September |
Road Safety 365 TV Community |
Soweto, 1KZN, Bay & Tshwane TV = 45" @196 spots |
September & October |
Road Safety 365 Radio Community |
Jozi Fm, Rise Fm, Motheo Fm, Mahikeng Fm, Radio Unitra, Icora, Energy Fm, Radio Teemaneng & Radio Tygerberg. |
September & October |
Road Safety 365 Print Community |
46 titles |
September |
Adhoc Print Schedule |
4 Titles - Car&Getaway magazine, MansiTravel, Business Intergrator, AA Travel |
Dec, Jan, March |
FMS TOLL CAMPAIGN |
City Press, Rapport, Daily Sun, Sowetan, Sunday Times (Lifestyle Magazine), Mail&Guardian (Transport Month Supplement) & Transport Tribune. |
October |
Top Employer |
M&G Feature |
October |
Transport Month Ministerial Interviews |
5 Stations @ 2 x 30 minutes interviews |
October |
Transport Month Ministerial Pre-Event Print MS |
The Mercury, Isolezwe (KZN edition, Daily News, Zululand Observer, Sowetan (KZN edition), Daily Sun (KZN edition), Mail Guardian (Transport Month supplement) |
October |
Transport Month Ministerial OB |
Morning Live OB plus News Clock & Squeeze backs |
30th October |
(c)(i) SANRAL develops a detail communication strategy that links to the National Communication Strategy Framework (NCSF). All sub-strategies and campaigns link to the overall SANRAL communication strategy as well as SANRAL pillars of operations. The objectives of the campaigns indicated were as follows:
- Business coffee campaign: An approved strategy guides SANRAL’s marketing and communications and it was informed by and consistent with the National Communication Strategy Framework. SANRAL strives continually to improve our communication engagement with members of the public, to inform them of our work and increase understanding of what the SANRAL brand represents. The good reputation of SANRAL is invaluable to our ability to play a role in promoting national investment, growing the economy and creating jobs.
We have endeavored to present a comprehensive picture of how we deliver on our mandate to assist road users. The business coffee concept was developed to reinforce the universal truth of how interconnected our lives are, even the everyday things that we may overlook are the products of an interconnected network of people, business, and products that are all woven together by a vast system of national roads. SANRAL manages 22 214km of roads throughout South Africa. These roads are the driving force of South Africa that contribute to the GDP of the south African economy.
Business relies on the infrastructure of the roads to drive the economy. SANRAL has a responsibility to ensure that it delivers roads that are well designed, constructed and maintained. This safely engineered infrastructure aids in the driving experience; assists in prolonging the wear and tear of cars and trucks using these roads and enabling users to get themselves and goods to their intended destinations. This advert is pertinent in the current environment of needing to stimulate economic growth by investing in infrastructure.
The coffee ad was powerful and in line with SANRAL’s Horizon 2030 strategy. The commercial demonstrates the role and impact of road infrastructure in supporting businesses both large and small.
The commercial took the agricultural sector as an example and demonstrated through the harvesting and logistical transportation of coffee beans, bringing them to market and eventually at the consumer's hand to enjoy. It also reaffirms SANRAL’s slogan of beyond roads, as roads are not an end in themselves but a means to improving people's lives.
- Brand Family:
As with the Business Coffee campaign the strategic intent was to profile how SANRAL goes ‘Beyond Roads’ to build advancements that connect. We want South Africans to think of SANRAL as the brand that brings the ability to connect with their loved ones, their jobs, new business opportunities, tourism, etc. We want them to see how easy and convenient it is to connect with the things that matter in their lives. The emotive approach to communications generated positive feedback about the brand from which we can be able to leverage.
- Youth Month:
The objective behind our youth campaign is to attract young talent and future leaders to our organisation whilst building the key stakeholder pillar. Whilst showcasing the bursary we offer to students. The tactic here has been to profile young graduates and their success stories within the different departments of SANRAL.
- Bell MOU: SANRAL has embarked on partnerships with companies to promote SMME utilisation and access to equipment. The advertorial aimed to showcase the importance of the MOU as well as to encourage other entities to come forth and offer similar opportunities for SMMEs.
- PIARC 2018:
The World Road Association-PIARC was established in 1909. It brings together the road administrations of 122 governments and has members -individuals, companies, authorities and organizations- in over 140 countries. The purpose of this is to share knowledge and techniques on roads and road transportation SANRAL was awarded the contract to host and run the PIARC conference in Cape Town from 4th – 9th November 2018. It is an international conference that is attended by road agencies, engineers and other road entities. As part of the commitment to this committee SANRAL was required to produce communication that would be used to announce the date and venue for this conference, invite delegates to attend and share knowledge about their countries or ideas on how to make roads work better for road users. In addition to this, an opportunity was awarded to students to attend a hackathon over a weekend to develop a road app that could be launched to public to assist with road usage. This hackathon was promoted in publications and on line. Entities were also invited to display posters showcasing their business at the conference.
- Women’s Day:
As part of the Horizon 2030, SANRAL has committed to uplift and empower women in South Africa. 9th August is international women’s day and SANRAL wanted to show their appreciation and respect of women.
- Nelson Mandela Centenary:
The commemoration of Nelson Mandela was integrated into the four communication blocks which already inform SANRAL’s communication strategy. These are: marketing and advertising; owned media; internal communications; social media; media engagement; community outreach; stakeholder engagement; and partnerships with other government departments and SOEs.
- Albertina Sisulu Centenary:
The commemoration of Albertina Sisulu was integrated into the four communication blocks which already inform SANRAL’s communication strategy. These are: marketing and advertising; owned media; internal communications; social media; media engagement; community outreach; stakeholder engagement; and partnerships with other government departments and SOEs.
The commemorative adverts were done to profile the role played by this amazing female leader during the apartheid era as well as her contribution towards education and the upliftment of communities. The aim was for South Africans especially our youth, who are our future leaders, to find inspiration in ma Sisulu and her achievements as a leader, as a woman, a mother, a wife, a daughter and still being a mother to all. SANRAL worked together with the Sisulu family to respectfully pay homage to a great female leader.
- Road Safety 365: Road safety is still one of South Africa’s biggest challenges. Every year 1,24 million people die in the world due to road crashes. South Africa contributes to the highest number of injuries and fatalities due to crashes on the roads. 60% of these victims are young people between ages 15 – 35 years of age. In addition to the effect on the economy it robs the country of skills and future leaders and affects economic growth. Bad and irresponsible behavior cannot be changed without all stakeholders working together (i.e. DOT, roads entities, the public, civil society groups, schools and more). So, when we look at a SANRAL Road Safety Campaign, we look at it from a ‘partners’ view. We see it as SANRAL contributing to the fight against road crashes and fatalities in SA. We look at other campaigns that have the same objectives in mind – and then see how we can add a different voice, a different point of view – that may resonate with South Africans.
While other campaigns are focused on the Easter and Festive Season periods, SANRAL’s approach is that of a year-long campaign. When other campaigns use gory visuals and scare tactics to make their point, we look at a more emotional, more ‘adult’ approach but also relatable to different target audiences – hence the theme of the legacy left by parents for their kids. That as ‘adults’ we should be mindful of our actions as they may encourage the next generation of drivers to do as we do.
The objective of the campaign is to:
promote safe road practices and behaviour amongst South Africans when travelling on the roads throughout the year.
increase road user engagement and personalise the message to the road users.
encourage all road users to respect the rules of the road – they are there for your safety.
As we reframe ‘road safety’ in the hearts and minds of South Africans, we are also reminding them of the results of irresponsible behaviour on our roads. The legacy element – even if you are not a parent but an aunt or uncle, your nieces and nephews also look up to you.
- FMS Toll Campaign: As an agency of the government, much like others, SANRAL is painted with the same brush of mistrust, corruption and lack of questionable leadership. The past and the looming elections thrusts SANRAL at the centre of the conversation as another agency that doesn’t have the interest of the people at heart. So much so that even the road users who advocated for and are compliant are starting to lose faith in being the only ones who continue to do the right thing.
The overall objective is therefore educational in nature to shift perceptions about the user-pays, user-benefits principle as a road funding method from negative to neutral and/or positive. The aim is to
To educate the South African public about tolling
Promote the user-pays, user-benefits principle as a sustainable model for funding SA roads
To build effective relations with media and other relevant stakeholders
Encourage increased voluntary compliance regarding e-tolls and reduce opposition thereto.
Tolling is ultimately about the consumer’s hard-earned money and therefore the focus of this campaign is on the consumer: ME, MY CAR, MY JOURNEY AND MY MONEY.
- Top Employer:
The Top Employers Institute is a global HR certification organization that enables employers to improve their HR practices and enhance the working environment for their employees. Established more than 25 years ago, this year the Top Employers Institute certified over 1 500 organizations in 118 countries. These Certified Top Employers positively impact the lives of over 5,000,000 employees globally.
SANRAL was certified a Top Employer for the ninth consecutive year by the Top Employers Institute. In the face of fierce competition for engineering skills, SANRAL seeks to attract and retain talent through good working conditions, skilled human resources management, and growing its own talent. The approach has yielded results. SANRAL has a staff turnover rate of just 2.5% a year.
It is for this reason that SANRAL advertised in the official publication of the Top Employers
Awards.
- Transport Month: Transport Month is hosted yearly in October. SANRAL is one of Department of Transports entities that supports the awareness and significance of this month, in highlighting infrastructure delivery and its effect on the development of South Africa’s communities. The month also advances the economic benefits of the sector.
The Minister officially launched the Mt Edgecombe interchange during this month. The aim of the advertising was to profile the interchange and its benefits for the community as the communities and road users were interested in the progress of this massive upgrade. At an investment of R1.1 billion rand the interchange is one of the largest projects undertaken by SANRAL in KwaZulu-Natal and is more than a masterpiece of award-winning architecture - it is a vital artery of the greater eThekwini metropolitan highway system and has greatly contributed to SMME development. This upgrade has forever changed the landscape, and will no doubt become a recognizable landmark.
- Ad hoc advertising: SANRAL manages a fiscal year planning calendar and plots out its themes to be communicated per month. The Ad hoc advertising is carried out when approached by publications and broadcasts that offer value for money as well as links to the theme’s planned for in the year.
c(ii) The performance is tracked using the industry performance planning tool that provides the performance of the campaign which is reach, frequency and impact for broadcast. The campaign was tracked against viewership statistics supplied from the performance. For print, readership and circulation figures are reviewed.
(d) The following is the monthly spend for television, print and radio to date.
2018/19 FISCAL YEAR |
SPEND AND ANTICIPATED SPEND |
APRIL |
R0,00 |
MAY |
R23 562 438,50 |
JUNE |
R854 710,13 |
JULY |
R200 001,90 |
AUGUST |
R5 390 291,83 |
SEPTEMBER |
R10 309 136,13 |
OCTOBER |
R5 550 691,37 |
Road Traffic Infringement Agency (RTIA)
(a)(i) The Road Traffic Infringement Agency (RTIA) With reference to television, radio and newspaper
Adverts were flighted on radio and newspapers focusing on AARTO public awareness and education.
(ii) medium the adverts were flighted and/or printed,
The Bursaries were flighted on community radio stations and advertised on community newspapers.
Ministerial Imbizo adverts were flighted on community radio stations and community print newspapers
(b) dates when the adverts were printed and/or flighted,
1st August to 31st September 2018
15 -28 September 2018.
National Prayer day 10 October 2018 outside broadcast through Tembisa FM
26 October 2018 AARTO activation in Soweto, Maponya Mall
A Mandela centenary celebration done through print adverts and took place on the 1st to 18th July 2018
Albertina Sisulu centenary awareness campaign -1st to15th August 2018.
Traffic Reports on AARTO National Radio station- 15 September to 31st October 2018.
(c)(i) objectives for the adverts in each case and
The objective was to encourage potential first year’s students to apply for a bursary to study at a university of their choice. The focus was on Finance, Law and Road Traffic qualifications.
Ministerial Imbizo in Khayelitsha was focusing on AARTO and road safety education
To invite Ekurhuleni communities to the Agency’s flagship programme and to promote AARTO and road safety awareness
AARTO Mobile Office public awareness and educational drive. An Outside Broadcast was done via Jozi FM community radio station. The objective was to inform and invite the Soweto community to learn more about their rights and responsibility as prescribed by the AARTO Act.
To highlight the importance of education to the youth through the RTIA’s bursary scheme.
Albertina Sisulu centenary awareness campaign to highlight the role played by this stalwart in social cohesion. This print campaign was in line with motorists’ rights and responsibilities as prescribed in the AARTO Act.
Sponsoring AARTO Traffic Reports on National Radio station to educate motorists on AARTO Act.
(ii) how objectives measured in each instance and
The adverts are measured by the number of calls received in the call center and ratings reports from the media buyer from radio station on how many people were reached.
(d) what was the monthly spend on advertising?
Campaigns |
Month of Placement |
Amount |
Bursary Recruitment Campaign |
20 July 2018; 12 Aug – 18 Sept 2018 30 Seconds adverts |
R 818 831.51 |
Ministerial Imbizo (Radio broadcast) |
Sept – Oct One week live reads |
R 493 802.99 |
Ministerial Imbizo Print |
21 Sept – Oct 2018 |
R 71 262.00 |
National Prayer Radio |
14,19,21 &26 October 2018 |
R 179 978.00 |
Aarto Mobile Office Soweto Outreach |
22-26 October One week live reads adverts |
R 191 506.00 |
Mandela Campaign |
13,18 & 22 July 2018 |
R 1 340 182.00 |
Mam Sisulu Campaign |
8,12&14 August 2018 |
R 1 458 444.00 |
Traffic Reports |
15 Sept – 30 Oct 30 Seconds Traffic sponsorship live reads |
R 10 072348.68 |
TOTAL AMONUT |
R 14 626 355.18 |
Railway Safety Regulator (RSR)
- (i) A public service announcement was made that deals with the challenges facing the railway
industry and the role that all stakeholders should play to ensure safer railways.
(ii)The announcement was flighted on SABC 1, 2, 3 and Cape Town TV.
- The adverts were flighted as follows:
Sales Area |
Date |
Time |
Programme |
SABC 1 |
2018/11/02 |
15h40 |
YOTV |
2018/11/05 |
15h50 |
YOTV |
|
2018/11/16 |
06H20 |
KIDS NEWS AND CURRENT AFFAIRS |
|
2018/11/24 |
09H50 |
IMIZWILILI |
|
2018/11/29 |
15H50 |
YOTV |
|
SABC 2 |
2018/11/01 |
07H20 |
MORNING LIVE |
2018/11/07 |
16h40 |
HECTIC NINE |
|
2018/11/10 |
11H10 |
BLEACH |
|
2018/11/14 |
16H40 |
HECTIC NINE |
|
2018/11/26 |
07H10 |
MORNING LIVE |
|
2018/11/28 |
07H40 |
MORNING LIVE |
|
2018/11/30 |
06H50 |
MORNING LIVE |
|
SABC 3 |
2018/11/02 |
12H50 |
MIAMI VICE S3 |
2018/11/05 |
13H40 |
ON POINT |
|
2018/11/06 |
06H10 |
EXPRESSO |
|
2018/11/11 |
10H10 |
ISIDINGO |
|
2018/11/19 |
06H20 |
EXPRESSO |
|
2018/11/26 |
06H40 |
EXPRESSO |
|
2018/11/27 |
15H50 |
TOP BILLING |
CAPE TOWN TV |
|||||||
SLOT |
MONDAY |
TUESDAY |
WEDNESDAY |
THURSDAY |
FRIDAY |
SATURDAY |
SUNDAY |
12/11/2018 |
13/11/2018 |
13/11/2018 |
14/11/2018 |
15/11/2018 |
16/11/2018 |
17/11/18 |
|
08:00 - 12:00 |
X |
X |
X |
X |
X |
X |
X |
12:00 - 15:00 |
X |
|
X |
|
X |
X |
X |
15:00 - 18:00 |
X |
X |
X |
X |
X |
X |
X |
18:00 - 20:00 |
|
|
|
|
|
|
|
20:00 - 22:00 |
|
|
|
|
|
|
|
22:00 - 00:00 |
X |
X |
X |
X |
X |
X |
X |
- (i) The objectives for the adverts are to heighten awareness of rail safety and to communicate
that rail safety is everyone’s responsibility.
(ii) The campaign started on 1 November 2018 and will conclude on 30 November 2018. The
objectives have not been measured yet, but the reach will be measured at the end of the
month when the campaign ends.
- The amount spent on advertising is R299,000.
Passenger Rail Agency of South Africa (PRASA):
- (i) Two television adverts with a new story line and incorporating progress that PRASA has
made since it was launched in 2009 and the rail modernisation programme.
Advert 1: We Do It for You
The purpose of “We Do It for You” campaign is about PRASA’s investment programme in transforming rail infrastructure and service delivery. It is designed to position rail as a backbone of public transport and mode of choice.
This is PRASA’s flagship programme highlighting:
- Rolling Stock Fleet Renewal
- Signalling System
- Depot Modernisation
- Station Modernisation
- Station Upgrades / Improvement
- 120km Programme
Advert 2: In the Future
The purpose of “In the Future” is to showcase how PRASA is delivering on its promise in reviving rail as the backbone of public transport in South Africa and a mode of choice. This campaign showcases the future of public transport and is designed to excite and prepare the commuter for the ultimate: A World Class Metro Service.
(ii) The adverts were flighted on television and radio
- The adverts were flighted on:
- Television – SABC 1, 2 and 3
Please refer to Annexure A and B for the TV Media Schedule
(18 November to 15 December 2017)
- Radio
5FM
Metro FM
Radio Sonder Grense
Ukhozi FM
Umhlobo Wenene
Lesedi FM
Thoblea FM
Motsweding FM
Please refer to Annexure C for the Radio Schedule (21 November 2017 to 4 December 2017)
- (i) The objectives for the adverts in each case were to:
Create awareness and affinity with the PRASA brand and its business imperatives;
Promote PRASA’s Modernisation Programme and Services;
Position rail as the backbone of public transport and mode of choice;
Build positive media and stakeholder relations and instil public trust; and
Promoting a sense of ownership of the assets (trains, stations and infrastructure) amongst commuters, communities and the public at large.
(ii) This was a once off campaign over the period of November and December 2017.
- The amount spent on advertising were as follow:
Television: R6,230,000 excluding VAT (Media cost for flighting on SABC 1,2, & 3)
Radio: R3,100,000 excluding VAT (Radio Sports)
Air Traffic and Navigation Services SOC Limited (ATNS)
(a)(i) In 2017/2018 there was no advertising, in 2018/2019 the advertising is as per the table below
(ii) The medium used were Print, Online and Inflight TV
(b) The dates are as per the media plan table above
(c)(i) The objectives per medium are listed below:
and (ii) the objectives were measured as follows;
(ii)(a) the correct target audience
(ii)(b) the reach of the publication
(ii)(c) the cost per insert
(d) what was the monthly spend on advertising?
Airports South Africa SOC Limited (ACSA)
Airports Renaming Advertising Spend
Medium |
Title |
Cost |
Date |
Measure |
Content/Objective |
Print- newspaper |
Weekend Argus / Independent Newspapers |
R53464.32 |
C/Times Monday, 28 May, C/Argus Wed, 30 May & Weekend Argus (26 & 27 May) |
Number of name suggestions received |
To create awareness of this meeting print and radio platforms were used. |
Print-newspaper |
Die Burger |
R13415.36 |
Saturday, Die Burger 26 May 2018 |
Number of name suggestions received |
To create awareness of this meeting print and radio platforms were used. |
Print-newspaper |
Die Burger |
R13415.36 |
Friday, 1 June 2018 |
Number of name suggestions received |
To create awareness of this meeting print and radio platforms were used. |
Print newspaper |
16 community newspapers |
R50434.78 |
23 May 2018 |
Number of name suggestions received |
To create awareness of this meeting print and radio platforms were used. |
Radio Advertisements |
Cape Talk / Prime Media |
R57499.20 |
Tues, 29 May - 4 June 2018 (excl Sun 3 June) |
Number of name suggestions received |
To create awareness of this meeting print and radio platforms were used. |
Radio Advertisements |
Good Hope FM |
R44640.00 |
Tues, 29 May - 4 June 2018 (excl Sun 3 June) |
Number of name suggestions received |
To create awareness of this meeting print and radio platforms were used. |
Medium |
Title |
Cost |
Date |
Measure |
Content/Objective |
Print- newspaper |
Diamond Fields |
R3 847.54 |
23 May 2018 |
Number of name suggestions received |
Cape Town International Airport, East London Airport, Port Elizabeth International Airport & Kimberley Airport Renaming Suggestions |
Print-newspaper |
Cape Times |
R10 006.66 |
23 May 2018 |
Number of name suggestions received |
Cape Town International Airport, East London Airport, Port Elizabeth International Airport & Kimberley Airport Renaming Suggestions |
Print-newspaper |
Daily Dispatch |
R8 500.80 |
23 May 2018 |
Number of name suggestions received |
Cape Town International Airport, East London Airport, Port Elizabeth International Airport & Kimberley Airport Renaming Suggestions |
Print newspaper |
The Herald |
R9 028.80 |
23 May 2018 |
Number of name suggestions received |
Cape Town International Airport, East London Airport, Port Elizabeth International Airport & Kimberley Airport Renaming Suggestions |
Print newspaper |
Sunday Times |
R47 995.20 |
23 May 2018 |
Number of name suggestions received |
Cape Town International Airport, East London Airport, Port Elizabeth International Airport & Kimberley Airport Renaming Suggestions |
Print newspaper |
City Press |
R47 995.20 |
23 May 2018 |
Number of name suggestions received |
Cape Town International Airport, East London Airport, Port Elizabeth International Airport & Kimberley Airport Renaming Suggestions |
Airports Company South Africa OAG Award Adverts Advertising Spend
Medium |
Title |
Cost |
Date |
Measure |
Content/Objective |
Print- newspaper |
Business Report National |
R74 641.50 |
16, 18 & 20 July 2018 |
Publications Readership & Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Print-newspaper |
Isolezwe Ngesonto |
R9 366.00 |
17 & 19 July 2018 |
Publications Readership & Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Print-newspaper |
Isolezwe Ngesonto |
R17 087.00 |
15 July 2018 |
Publications Readership & Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Print-newspaper |
Financial Mail |
R68 700 |
20 July 2018 |
Publications Readership & Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Print newspaper |
Sunday Times |
R260 178.00 |
15 July 2018 |
Publications Readership & Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Radio Advertisements |
702 |
R32 524.86 |
16 – 19 July 2018 |
Radio Station Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Radio Advertisements |
KFM |
R34 584.74 |
16 – 19 July 2018 |
Radio Station Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Radio Advertisements |
East Coast Radio |
R42 941.12 |
16 – 19 July 2018 |
Radio Station Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Radio Advertisements |
Ukhozi Fm |
R57 024.90 |
16 – 19 July 2018 |
Radio Station Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Radio Advertisements |
Kaya Fm |
R22 045.40 |
16 – 19 July 2018 |
Radio Station Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Radio Advertisements |
Power Fm |
R27 989.34 |
16 – 19 July 2018 |
Radio Station Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Radio Advertisements |
Metro Fm |
R90 423.56 |
16 – 19 July 2018 |
Radio Station Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Radio Advertisements |
Cape Talk |
R11 347.46 |
16 – 19 July 2018 |
Radio Station Geographic Reach. |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Digital Platforms |
Isolezwe Ngesonto |
R20 000 |
16 July 2018 |
Home page Take Over, views & impressions |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Digital Platforms |
Financial Mail |
R20 000 |
19 July 2018 |
Home page Take Over, views & impressions |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Digital Platforms |
Sunday Times |
R30 000 |
17 & 23 July 2018 |
Home page Take Over, views & impressions |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Outdoor |
R24 Freeway, O.R. Tambo International Airport |
R137 724.00 |
15 July – 14 August 2018 |
Traffic volumes and billboard views |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Outdoor |
St George’s hotel, R21 Freeway, enroute O.R.T & Pretoria |
R38 203.44 |
15 July – 14 August 2018 |
Traffic volumes and billboard views |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Outdoor |
Cape Town International Airport exit |
R111 580.00 |
15 July – 14 August 2018 |
Traffic volumes and billboard views |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Outdoor |
King Shaka International Airport Entrance |
R100 598.40 |
15 July – 14 August 2018 |
Traffic volumes and billboard views |
Airports Company South Africa’s OAG Award Recognition Campaign. |
Airports Company South Africa’s 25th Birthday Celebration Advertising Spend
Medium |
Title |
Cost |
Date |
Measure |
Content/Objective |
Print- newspaper |
Business Report |
R24 880,50 |
23 July 2018 |
Publications Readership & Geographic Reach. |
25 Years Celebration Campaign Ads |
Print-newspaper |
Isolezwe |
R21 770,00 |
22 July 2018 |
Publications Readership & Geographic Reach. |
25 Years Celebration Campaign Ads |
Print-newspaper |
Sunday Times |
R260 178,00 |
22 July 2018 |
Publications Readership & Geographic Reach. |
25 Years Celebration Campaign Ads |
Radio Advertisements |
702 |
R16 262,43 |
23 July 2018 |
Radio Station Geographic Reach. |
25 Years Celebration Campaign Ads |
Radio Advertisements |
East Coast |
R21 470, 56 |
23 July 2018 |
Radio Station Geographic Reach. |
25 Years Celebration Campaign Ads |
Radio Advertisements |
Ukhozi |
R28 512,45 |
23 July 2018 |
Radio Station Geographic Reach. |
25 Years Celebration Campaign Ads |
Radio Advertisements |
Kaya |
R22 318,46 |
23 July 2018 |
Radio Station Geographic Reach. |
25 Years Celebration Campaign Ads |
Radio Advertisements |
Metro |
R45 211,18 |
23 July 2018 |
Radio Station Geographic Reach. |
25 Years Celebration Campaign Ads |
Radio Advertisements |
Power |
R13 994,67 |
23 July 2018 |
Radio Station Geographic Reach. |
25 Years Celebration Campaign Ads |
Radio Advertisements |
Cape Talk |
R5673, 73 |
23 July 2018 |
Radio Station Geographic Reach. |
25 Years Celebration Campaign Ads |
Digital Platforms |
Business Report |
R30 000,00 |
17 - 23 July 2018 |
Home page Take Over, views & impressions |
25 Years Celebration Campaign Ads – Home Page Take Over |
Regional Airports Advertising Spend
Medium |
Title |
Cost |
Date |
Measure |
Content/Objective |
Print- newspaper |
The Herald -Port Elizabeth |
26 548.00 |
09 November 2018 |
Number of attendees at workshops |
Invitation for SMMEs to attend ESD and SCM Workshops |
Print-newspaper |
Daily Dispatch |
14 490.00 |
09 November 2018 |
Number of attendees at workshops |
Invitation for SMMEs to attend ESD and SCM Workshops |
Print-newspaper |
Idinga- George |
3 100.00 |
09 November 2018 |
Number of attendees at workshops |
Invitation for SMMEs to attend ESD and SCM workshops |
Radio |
Algoa FM |
28 750.00 |
09 November – 13 November 2018 |
Number of attendees at workshops |
Invitation for SMMEs to attend ESD and SCM workshops |
Radio |
Eden FM |
8167.00 |
06 November -10 November 2018 |
Number of attendees at workshops |
Invitation for SMMEs to attend ESD and SCM workshops |
Cape Town International Airport Advertising Spend
Airport profiling
Medium |
Title |
Cost |
Date |
Measure |
Content/Objective |
Magazine |
Western Cape Business |
R39 350,00 |
2018 Edition |
Inquiries received from passengers, business opportunity proposals and SED proposals. |
To position the airport positively and to provide information about projects and opportunities. |
Magazine |
Hello magazine |
R14 700,00 |
Mar-18 |
Inquiries received from passengers, business opportunity proposals and SED proposals. |
To position the airport positively and to provide information about projects and opportunities. |
Magazine |
Mining Decisions |
R46 000,00 |
Issue 01/2018 |
Inquiries received from passengers, business opportunity proposals and SED proposals. |
To position the airport positively and to provide information about projects and opportunities. |
Magazine |
Leadership |
R56 000,00 |
Feb-18 |
Inquiries received from passengers, business opportunity proposals and SED proposals. |
To position the airport positively and to provide information about projects and opportunities. |
Peak Season Campaign
Medium |
Title |
Cost |
Date |
Measure |
Content/Objective |
Radio Advertisements |
Cape Talk / Prime Media |
99 610.50 |
12- 20 January 18 |
Facilitation time and efficiency of processes – ASQ survey results and various feedback received from passengers on social media platforms and other. |
To support operational requirements. |
Radio Advertisements |
Good Hope FM |
149805,00 |
12-19 January 18 |
Facilitation time and efficiency of processes – ASQ survey results and various feedback received from passengers on social media platforms and other. |
To support operational requirements. |
Radio Advertisements |
Heart FM |
75036,00 |
12-19 January 18 |
Facilitation time and efficiency of processes – ASQ survey results and various feedback received from passengers on social media platforms and other. |
To support operational requirements. |
Radio Advertisements |
Smile FM |
99977,00 |
12 -21 January 18 |
Facilitation time and efficiency of processes – ASQ survey results and various feedback received from passengers on social media platforms and other. |
To support operational requirements. |
Radio Advertisements |
Cape Times |
29000,00 |
12-Jan-18 |
Facilitation time and efficiency of processes – ASQ survey results and various feedback received from passengers on social media platforms and other. |
To support operational requirements. |
Radio Advertisements |
Cape Argus |
36500,00 |
12-Jan-18 |
Facilitation time and efficiency of processes – ASQ survey results and various feedback received from passengers on social media platforms and other. |
To support operational requirements. |
Radio Advertisements |
Weekend Argus |
36500,00 |
13-Jan-18 |
Facilitation time and efficiency of processes – ASQ survey results and various feedback received from passengers on social media platforms and others. |
To support operational requirements. |
Radio Advertisements |
Saturday Die Burger |
38650,00 |
13-Jan-18 |
Facilitation time and efficiency of processes – ASQ survey results and various feedback received from passengers on social media platforms and other. |
To support operational requirements. |
ESD
Medium |
Title |
Cost |
Date |
Measure |
Content/Objective |
Radio Advertisements |
Cape Talk / Prime Media |
46 188.48 |
15 - 22 August 2018 |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Radio Advertisements |
Good Hope FM |
56 385.00 |
15 - 22 August 2018 |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Radio Advertisements |
Heart FM |
59 850.00 |
15 - 22 August 2018 |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Radio Advertisements |
Smile FM |
50 388.00 |
15 - 22 August 2018 |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Radio Advertisements |
Bush Radio |
11 242.00 |
15 - 22 August 2018 |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Radio Advertisements |
Radio Tygerberg |
7 000.00 |
15 - 22 August 2018 |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Radio Advertisements |
Voice of the Cape |
13 600.00 |
15 - 22 August 2018 |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Radio Advertisements |
Radio 786 |
8 000.00 |
15 - 22 August 2018 |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Radio Advertisements |
Radio Zibonele |
12 641.60 |
15 - 22 August 2018 |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Radio Advertisements |
CCFM Radio |
5 400.00 |
15 - 22 August 2018 |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Print- newspaper |
Cape Times / Argus & Weekend Argus |
28 641.60 |
18 - 22 August 18 |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Print- newspaper |
Die Burger |
13 424.00 |
22-Aug-18 |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Print- newspaper |
16 community newspapers (Independent) |
34 977.60 |
22 & 23 August |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
Print- newspaper |
Tygerburger (MEDIA 24) x14 areas |
30 600.00 |
22-Aug |
The amount of people who attended the roadshow, email feedback received |
To create awareness of the roadshow and to ensure that smme’s attend and benefit from its content. |
South African Civil Aviation Authority (SACAA)
The table below outlines all television, radio and newspaper advertising done by the South African Civil Aviation Authority (SACAA) since the beginning of the year. Further, the table outlines as per (a)(i), (ii),(b), (c)(i) (ii) (d): the objectives of the adverts, the media platform used to flight the adverts, the details of the flighted advert, the return on investment measurement criteria, as well as the total spend in each instance and for that particular month.
South African Civil Aviation Authority (SACAA) Advertising: 1 January 2018 – 30 October 2018 |
||||||
Media platform |
Dates |
Objective |
Details |
Measurement |
Monthly Spend (R) |
Total |
Television |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
Radio |
||||||
SAfm - Interviews |
8 - 10 Aug 2018 |
Promote Global Aviation Gender Summit |
The interviews were used to promote the Global Aviation Gender Summit, and South Africa as the first country to host such an event. |
Media monitoring analytics. All were positive stories. |
R41 079.15 |
R41 079.15 |
SAfm – Outside Broadcast |
10 Aug 2018 |
Promote Global Aviation Gender Summit |
To share the outcome of the summit and the way forward on the discussions held. |
Media monitoring analytics. All were positive stories. |
R239 700.00 |
R239 700.00 |
Publications (Newspaper /Magazines) |
||||||
African Decisions |
Jan 2018 |
Promoting transformation |
2 page feature which was promoting transformation in aviation. |
Media monitoring analytics of the printed copy. The featured content was positive. |
R46 388.4 |
R46 388.4 |
Women Magazine (Leadership) |
May 2018 |
Promoting women in leadership |
8 page feature in which SACAA female executive members were featured as women in leadership. |
Media monitoring analytics of the printed copy. The featured content was positive. |
R34 595.00 |
R34 595.00 |
BMF Magazine (Sunday Times) |
June 2018 |
Promoting transformation |
2 page - feature which was promoting transformation in aviation and celebrating youth month. |
Media monitoring analytics of the printed copy. The featured content was positive. |
R77 625.00 |
R77 625.00 |
|
July 2018 |
Launch of the Civil Aviation Industry Awards |
Announcement and call for entries to the Civil Aviation Industry Awards. |
Media monitoring analytics of the printed copy. The featured content was positive. |
R55 033.25 |
R55 033.25 |
Pan African Parliament |
Oct 2018 |
Promoting transformation |
2 page feature which was promoting transformation in aviation. |
Media monitoring analytics of the printed copy. The featured content was positive. |
R84 246.70 |
R84 246.70 |
Total |
R578 667.5 |
R578 667.5 |
Ports Regulator Of South Africa (PRSA)
a)(i) The Ports Regulator did not use television, radio nor newspapers for advertising purposes.
(b) N/A
(c)N/A
(d) N/A
South African Maritime Safety Authority (SAMSA)
(a) (i) Details of the advert:
Chief Financial Officer
(ii) Advertising Mediums
Sunday Times
City press
(b) Dates of advertising:
6 to 14 May 2018
(c) (i) What were the objectives for the adverts in each case?
The objective was to attract a wider pool of applicants
(ii) How were those objectives measured in each instance?
85 applications were received
(d) Monthly spend on advertising
Sunday Times |
17 191.20 |
City Press |
11 801.04 |
Vat |
4 348.84 |
Total |
33 341.08 |
06 December 2018 - NW3357
Dlamini, Mr MM to ask the Minister of Public Enterprises
(1)What is Eskom’s current renewable energy capacity? (2) Are there any plans to increase this capacity in the future; if so, what are the relevant details?
Reply:
According to the information received from Eskom
(1)
As at 31 March 2018, Eskom’s total installed renewable energy capacity is 161 MW: Sere Wind Farm is at 100MW and the four hydroelectric stations total 61MW.
(2)
Currently Eskom has no plans to increase renewable capacity because there are no determinations in terms of section 34 of Electricity Regulation Act made by Minister of Energy for Eskom to build new renewables.
06 December 2018 - NW3411
De Freitas, Mr MS to ask the Minister of Transport
(a) What is the total number of (i) promotional buses, (ii) mobile offices and (iii) other such vehicles that are owned by (aa) his department and (bb) the entities reporting to him in each province, (b) what is the purpose of each specified vehicle in each instance, (c) how is the efficiency and effectiveness of each vehicle measured and (d) what costs are involved for each vehicle?
Reply:
Department
a) (i)(ii)(ii) The Department does not own such vehicles.
(aa)(b)(c)(d) Not applicable
Air Traffic and Navigation Services SOC Limited (ATNS)
a (i) Only 1 vehicle 3D, Air Traffic Control 3D Mobile Simulator (ii) None (iii) None (aa) N/A (bb) None (b) to provide awareness on air traffic control and associated equipment for (career awareness in Air Traffic Management), (c) Air Traffic Management and associated Aeronautical Engineering is rarely known. Awareness campaigns are improving the understanding of ATNS core business and Career Awareness to learners at schools. Number of schools visited or number of people who visited the simulator and shown the process (d) The Mobile Simulator was purchased at a price of R1,2 million. Other costs are operating costs (Fuel and tolls)
South African Civil Aviation Authority (SACAA)
- (bb) The South African Civil Aviation Authority does not own any (i) promotional buses, (ii) mobile offices and (iii) other such vehicles. (aa) N/A (b) N/A (c) N/A (d) N/A.
Airports Company South Africa SOC Limited (ACSA)
Airports Company South Africa SOC Ltd (ACSA) does not own any promotional buses or mobile offices. It does however have operational vehicles that operate mostly on the airside of the airports. These would include the following:
Fire & Rescue vehicles that are used for any eventuality at the airports but more specifically to assist in event of aircraft emergencies. Depending on the Category of the airport the number of vehicles will differ to ensure that the appropriate volumes of water, foam and powder is available in the event of an incident.
Maintenance vehicles used for activities around the airport. ACSA does first line maintenance in-house in the areas of electrical and civil maintenance.
Marshalling vehicles used by staff assigned to guide aircraft into the parking bays. The number of vehicles differ per airport depending on the number of flights that need to be handled, ORTIA does just over 300 arriving aircraft per day.
Vehicles used by the training academy to transport staff to and from their place of work for regulated training.
All ACSA vehicles are properly marked with signage, strobe lights and all decals as per Aviation standards. The vehicles are therefore very visible and also tracked. A full vehicle management system is in place through which we manage the distance travelled per month, the average fuel consumption, damage to vehicles and areas of operation.
Cross-Border Transport Agency (C-BRTA)
(a)(i)(ii) The (bb) Cross-Border Road transport Agency (C-BRTA) does not own any promotional buses, mobile offices and (iii) any such vehicles (b), (c), and (d) are not applicable as no promotional buses, mobile offices and any such vehicles are owned by the C-BRTA.
Road Accident Fund (RAF)
(a)(i)(ii) The (bb) Road Accident Fund (RAF) does not own any promotional buses, mobile offices and any such vehicles (b), (c), and (d) are not applicable as no promotional buses, mobile offices and any such vehicles are owned by the RAF.
Road Traffic Management Corporation (RTMC)
(a)(i)(ii) The (bb) Road Traffic Management Corporation does not own any promotional buses, mobile offices and any such vehicles (b), (c), and (d) are not applicable as no promotional buses, mobile offices and any such vehicles are owned by the RTMC.
Road Traffic Infringement Agency (RTIA)
(a)The (bb) Road Traffic Infringement Agency does not onw any (i) promotional buses and (iii) such vihiches (ii) onws 05 AARTO Mobile Offices.
(b) The mobile offices bring all AARTO services to motorists; a road safety awareness drive in the form of a “Know Your Traffic Fine Status” campaign; The aim of the campaign is to assist raod users with tracking of their traffic fines and managing them; To advise motorists are also about available payments platforms such as banks, Post Office, Registering Authorities (RA’s) and Driving Licence Testing Centres (DLTC’s); The Points Demerit System; Enforcement Orders; Available options to an alleged infringer after receiving an infringement notice.
(c) The consolidated monthly statistics reports about members who have been assisted through the AARTO mobile offices; The mobile offices covers country wide communities (All Provinces); Payments can be made at in the mobile offices for those with outsatanding fines;
(d) Total costs for the 5 busses is R 27.7 million
South African National Roads Agency Limited (SANRAL)
(a)(i)(ii) The South African National Roads Agency Limited (SANRAL) owns none of (i) promotional buses, (ii) mobile offices
(iii) Other Vehicles are Freeway Management Services provided on the Gauteng road network as part of GFIP:
23 Mobile Policing Vehicles (MPV) purchased in 2010 for Gauteng Freeway Improvement Projects (operated by the Department of Community Safety (GDCS).
10 Incident Response Units (IRUs),
10 Light Towing Recovery Units (LTRUs),
8 Heavy Towing Recovery Units (HTRUs),
6 Medical Response Units (MRUs), and
6 Motorcycle Medical Response Units (MMRUs)
(b) Mobile Payment Stations - The purpose of the mobile payment stations is to provide Customer Service to road users i.e. taking and receiving payments of E-Toll Accounts to Customers/E-toll users, and account registrations and do promotions on the GFIP network and to do joint Enforcement deployments with policing vehicles for number plate and other traffic offences.
Medical Response and Light and Heavy Towing
The primary responsibility of the IRUs is to respond to an incident, cordon off the scene and
ensure the safety of the motorist and victims.
The primary responsibility of the LTRUs and HTRUs are to remove stationary vehicles in or
overhanging a travel lane and take them to an area of the road network where traffic is not
obstructed.
The primary responsibility of the MRUs and MMRUs is to provide intermediate life support
services.
Mobile Policing Vehicles - The purpose of the Policing vehicles is to do normal traffic patrolling and enforcement deployments on the GFIP network.
(c) Efficiency and Effectiveness (MPS’s) - The Customer service deployments are measured in accordance with performance requirements set in the contract.
Efficiency and Effectiveness (Medical Response and Light and Heavy Towing)
Each category of vehicles (i.e. IRU, MRU/MMRU, L) have target response times. Example, the target response time for IRUs are less than 11.2 minutes.
The average response times to an incident of all IRUs in a month is calculated. Should the average response time be more than 11.2 minutes the Main Contractor is penalized (in terms on the monthly fee), similar if its less than 11.2 minutes the Main Contractor is rewarded.
The other categories of vehicles are measure similarly. Each have their own target response times.
Efficiency and Effectiveness (MPV’s) - The contractor is expected to provide a minimum of 18 operational vehicles per day to undertake roads safety and law enforcement activities in accordance with an agreed strategy.
(d) Costing (MPS’s)
Purchase cost of fully equipped vehicle = R1 471 254.00
Monthly Operations: Vehicle and equipment maintenance and operational costs are paid according to contracted payment rates. Average monthly cost of 10 Mobile payments stations is R376 000
Costing (Medical Response and Light and Heavy Towing)
Purchase cost of fully equipped vehicles:
-
- LTRU: R7 038 500 (total cost for all 10 vehicles – 2011)
- HTRU: R15 523 496 (total cost for all 8 vehicles – 2011)
- IRU: R6 317 500 (total cost for all 10 vehicles – 2011)
- MRU/MMRU: R323 800 (total cost for all 6 vehicles – 2011)
Operation and Maintenance per month (operations, maintenance of vehicles, staffing, travel kilometers, replacement of emergency equipment as and when required)
-
- LTRU: R500 000 (fully inclusive – all costs as described above for all the vehicles, 2010)
- HTRU: R640 000 (fully inclusive – all costs as described above for all the vehicles, 2010)
- IRU: R700 000 (fully inclusive – all costs as described above for all the vehicles, 2010)
- MRU/MMRU: R768 000 (fully inclusive – all costs as described above for all the vehicles, 2010)
Costing (MPV’s)
Purchase cost of fully equipped vehicle = R229 751.00 per vehicle (2010)
Operational Costs - Average monthly cost of 23 Mobile police vehicles is R475 000
Railway Safety Regulator (RSR):
a) (i) The RSR does not own any promotional buses
(ii) The RSR does not own any mobile offices
(iii) The RSR does not own any other such vehicles
b) Not applicable. Refer to (a) (i) – (iii)
c) Not applicable. Refer to (a) (i) – (iii)
d) Not applicable. Refer to (a) (i) – (iii)
Passenger Rail Agency of South Africa (PRASA):
a) (i) PRASA does not own any promotional buses
(ii) PRASA does not own any mobile offices
(iii) PRASA does not own any other such vehicles
b) Not applicable. Refer to (a) (i) – (iii)
c) Not applicable. Refer to (a) (i) – (iii)
d) Not applicable. Refer to (a) (i) – (iii)
Ports Regulator of South Africa (PRSA)
- (i) The Ports Regulator does not own promotional buses, (ii) No mobile offices, (iii) No other such vehicles. (bb) The Ports Regulator does not have provincial offices as there’s only one office in the country.
- N/A
- N/A
- N/A
South African Maritime Safety Authority(SAMSA)
The South African Maritime Safety Authority (SAMSA) response is as follows:
Total number Question (a) (i) |
Description Question (a) (ii) |
Costs of vehicles (2016/2017 financial year) Question (a) (iii) |
Costs of (2017/2018 financial year) Question (a) (iii) |
Costs of vehicles (2018/2019 financial year) Question (a) (iii) |
What is the purpose of each of the specified vehicles Question (b) |
5 |
|||||
Toyota Hilux SC 2.7 VVTI RB SX |
R315 000.01 |
Transporting of staff and official passengers, collecting and delivering of parcels and documents at various places; travelling to training venues, meetings and other official matters, travelling to places to inspect/survey vessels and investigate incidents, travelling to oil pollution incidents |
|||
Toyota Corolla 1.6 Prestige x 2 |
R275 617.80 |
Transporting of staff, Board Members and official passengers, collecting and delivering of parcels and documents at various places; travelling to training venues, meetings and other official matters, travelling to places to inspect vessels and investigate incidents |
|||
Toyota Corolla 1.6 Prestige |
R275 617.80 |
Transporting of staff, Board Members and official passengers, collecting and delivering of parcels and documents at various places; travelling to training venues, meetings and other official matters, travelling to places to inspect vessels and investigate incidents |
|||
Ford Ranger Wildtrack 3.2 TDCI Double Cab |
R507 143.82 |
Transporting of staff and official passengers, collecting and delivering of parcels and documents at various places; travelling to training venues, meetings and other official matters, travelling to places to inspect/survey vessels and investigate incidents, travelling to oil pollution incidents |
|||
Toyota Hilux 4.0 V6 D/C 4x4 Raider Automatic |
R395 748.26 |
Transporting of staff and official passengers, collecting and delivering of parcels and documents at various places; travelling to training venues, meetings and other official matters, travelling to places to inspect/survey vessels and investigate incidents, travelling to oil pollution incidents |
06 December 2018 - NW3742
Macpherson, Mr DW to ask the Minister of Trade and Industry
(1)What was the total cost of the report of the Agency Rationalisation Report that was prepared for his department by a certain company? (2) has he accepted the findings of the report in respect of each agency as recommended; if not, why not; if so, what are the relevant details? NW4318E
Reply:
1. The total cost of the study on the Agency Rationalisation was R487 200.
2. The Department commissioned the Agency Rationalisation Report and the findings were accepted as the study provided a good basis to inform and guide the decision making processes within the Department. One of the main recommendations was to move from a board governance structure to a commission (regulator) structure as boards were found to be generally ineffective. The commission or regulator without a board structure was the decision taken by the Department except for one entity that has a different funding model. Research findings serve as guidelines and may be implemented by the Department.
06 December 2018 - NW3727
Ntlangwini, Ms EN to ask the Minister of Trade and Industry
“Whether, his department subsidises any industries in the country; if not, what is the position in this regard; if so, (a) which industries, (b) where is each industry located, (c) what does each industry produce and (d) what is the monetary value of each subsidy?”
Reply:
The department does not subsidise industries in the country. The department does offer incentives to qualifying companies for manufacturing investment, services investment, broadening participation, competitiveness investment and infrastructure development in line with sectors under National Development Plan and the Industrial Policy Action Plan. An Incentive Report, showing the performance of incentives across provinces and sectors as well as a list of supported beneficiaries, is published annually on the dti website.
05 December 2018 - NW3390
Van der Westhuizen, Mr AP to ask the Minister of Higher Education and Training
(1)According to the database of the records of learners of the SA Qualifications Authority, what number of learners achieved full qualifications on Level 4 as a result of the learnership programme(s) in the (a) 2015, (b) 2016 and (c) 2017 academic years; (2) whether her department is content with the number of learners who are improving their qualifications through learnership contracts; if not, what (a) changes or initiatives will her department be initiating to improve the opportunities for learners to receive formal, work-place based training and (b) would be the targeted number of learners who will undergo training in future; if so, why?
Reply:
- The number of achievements against the qualifications at NQF Level 4 in learnerships is as follows:
Year |
Number of Achievements |
2015 |
5 648 |
2016 |
3 909 |
2017 |
2 573 |
2. Given the increasing number of young people who are not in employment, education or training, the Department has put measures in place to improve the quality and number of those undertaking workplace-based training.
a) The Department is embarking on various initiatives to improve the opportunities for learners to receive formal, workplace-based training, such as the Sector Education and Training Authority (SETA) Workplace-Based Learning Programme Agreement Regulations, which was published on 16 November 2018 and reviewing the current SETA landscape with a view to better position SETAs to appropriately respond to the needs of their respective sectors. This, amongst others, is intended to increase learner uptake in workplace-based training. The establishment of the Centres of Specialisation is another initiative to make a meaningful contribution in this regard.
b) In terms of the 2014 - 2019 Medium Term Strategic Framework, the Department has targeted 140 000 workplace-based learning opportunities annually by 31 March 2019.
05 December 2018 - NW2710
Rawula, Mr T to ask the Minister of Mineral Resources
(a) What is the total number of operational mines in the country and (b) what are the relevant details of the (i) location, (ii) size, (iii) minerals extracted, (iv) years of operation, (v) company which operates and (vi) number of employees at each specified operational mine?
Reply:
(a) (b)
Company Name |
Location |
Commodity |
Years of Operation |
Size in Hectares |
Number of Employees |
Maharaj Bothers Transport C. C. |
Ilembe |
Sand |
15 |
8.3 |
10 |
Brandwyne Valley Investments |
Amajuba |
Coal |
10 |
1190 |
572 |
Zululand Anthracite Colliery |
Zululand |
Coal |
20 |
1781,1319 |
1360 |
Port - Shepstone Country quarry |
Ugu |
Aggregate, Stone, Crusher Sand, Granite/Synite |
30 |
33,9345 |
15 |
Natal Sand Supplies |
Mandeni |
Sand |
6 |
3.7 |
1 |
Larfarge S. A. (Pty) Ltd |
Uthungulu |
aggregate |
30 |
108.60 |
32 |
Moodley Sugars |
Ethekwini |
Aggregate |
30 |
250 |
9 |
N. P. C. Aggregate (T/A South Coast Stone Crushers) |
Ugu |
Granite |
30 |
25.6763 |
52 |
Maritzburg Quarries |
Umgungundlovu |
Coal |
20 |
27,5084 |
14 |
Umfolozi Co - Op Sugar Planters Ltd |
Mtubatuba |
Stone Aggregate & Gravel |
15 |
27,5054 |
35 |
Idwala Industrial Holdings (Pty) Ltd |
Ugu |
Calcite & Dolomite |
30 |
877.529 |
34 |
37.6635 |
|||||
Kovacs Investments 490 (Pty) Ltd |
Ethekwini |
Sand |
30 |
105.5762 |
35 |
KwaZulu Bulk Logistics CC |
Ilembe |
Dolerite |
20 |
7.18 |
20 |
Miwa Farming & Waldene Estates |
Kwadukuza |
Shale and Clay |
30 |
94.05 |
16 |
Nanxing Brick & Tile (Pty) Ltd |
Umgungundlovu |
Sand |
30 |
116,3230 |
40 |
Waldene Estates (Pty) Ltd |
Kwadukuza |
Aggregate, Crusher sand and Quartzite |
16 |
2.93 |
10 |
Marble Gold 335 (Pty) Ltd |
Ugu |
Coal |
20 |
7,6420 |
13 |
Exxaro Sands (Pty) Ltd |
Uthungulu |
Heavy Minerals |
30 |
3809.7466 |
321 |
Zincede Ngokwakho Housing C. C. |
Sisonke |
Stone aggregate,gravel |
10 |
7.0474 |
11 |
Sisonke |
Building sand |
165.5372 |
|||
Tendele Coal Mining (Pty) Ltd |
Umkhanyakude |
Coal |
27 |
660.5321 |
186 |
20 |
779,8109 |
377 |
|||
30 |
21233.053 |
899 |
|||
Afrisam S.A. (Pty) Ltd |
Ungungundlovu |
Coal |
16 |
25.5820 |
26 |
Barmin Mining Cc |
Zululand |
Coal |
6 |
502.1 |
120 |
Mbongoto Mining C. C. |
Ugu |
Aggregate |
4 |
6.1694 |
24 |
Moneyline 1705 CC |
Zululand |
Coal |
4 |
133.5968 |
54 |
Moneyline 1705 CC |
Zululand |
Coal |
4 |
25.601 |
|
Bay Stone Sales - Ninians Quarry |
Uthungulu |
Weathered Shale |
30 |
105,11 |
26 |
Corobrick (Pty) Ltd |
Umzinyathi |
Clay (General) |
30 |
225.1235 |
30 |
Noluvo Integrated Solutions (Pty) Ltd |
Sisonke |
Aggregate |
16 |
36.9891 |
39 |
Zinoju Investments (Pty) Ltd |
Amajuba |
Coal |
2 |
670.9953 |
1100 |
15 |
1307.6913 |
||||
30 |
232,3948 |
||||
30 |
3163,5343 |
||||
Tongaat Hullet Group - Flanders Quarry |
Ethekwini |
Aggregate |
30 |
35.05 |
33 |
Natal Portland Cement |
Ugu |
Limestone, Dolerite and Argillite |
30 |
26.4 |
343 |
Ugu |
20 |
966.3 |
|||
Midmar Crushers C. C. |
Umgungundlovu |
dolerite |
20 |
20.025 |
39 |
Adheel Sands |
Ilembe |
Coal |
10 |
18.91 |
14 |
Future Coal (Pty) Ltd |
Amajuba |
Coal |
10 |
2023.9191 |
60 |
Amasundu Gravel CC |
Uthungulu |
Gravel |
20 |
12.0866 |
5 |
Afrisam S.A. (Pty) Ltd |
Ethekwini |
Dolerite |
30 |
78.8924 |
25 |
Afrisam S.A. (Pty) Ltd |
Umgungundlovu |
Quartize, Tillite and Dolerite |
30 |
219.8408 |
21 |
Afrisam S.A. (Pty) Ltd |
Ethekwini |
Quartize, Tillite and Dolerite |
30 |
88.0167 |
23 |
Ballito Crushers (Pty) Ltd |
Ilembe |
Aggregate |
30 |
20.00 |
61 |
30 |
7.1 |
||||
Leeuw Mining & Explo Ltd |
Amajuba |
Coal |
28 |
922.1333 |
96 |
15 |
7232.7469 |
||||
Zululand Anthracite Colliery |
Zululand |
Coal |
10 |
9831,8107 |
800 |
Ukumba Brick & Quarry (Pty) Ltd |
Uthungulu |
Aggregate |
10 |
32.3030 |
33 |
Bay Stone Sales t/a Stanger Quarry |
Ilembe |
Clay (General) |
30 |
40.25 |
26 |
Mainstreet 57 (Pty) Ltd |
Ethekwini |
Clay (General) |
30 |
143.1227 |
12 |
Mainstreet 57 (Pty) Ltd |
Ethekwini |
Clay (General) |
30 |
116.9102 |
12 |
Mainstreet 57 (Pty) Ltd |
Ethekwini |
Clay (General) |
30 |
53.7121 |
12 |
Sterkspruit Agreegate (Pty) Ltd |
Umgungundlovu |
Aggregate |
10 |
35.7698 |
26 |
Mainstreet 57 (Pty) Ltd |
Ethekwini |
Clay (General) |
30 |
92.6334 |
12 |
Scottburgh Quarries (Pty) Ltd |
Ugu |
Aggregate |
10 |
7.4251 |
15 |
Ready Mix Materials (Pty) Ltd |
Ethekwini |
Aggregate |
30 |
133.70 |
16 |
F. M. Crushers (Pty) Ltd |
Umkhanyakude |
Ryolite-crushed stone |
5 |
5.1311 |
26 |
Tisand (Pty) Ltd |
Uthungulu |
Heavy Minerals |
29 |
8130.4048 |
4400 |
Zululand Titanium (Pty) Ltd |
Uthungulu |
Heavy Minerals |
29 |
3037.0070 |
|
Afrisam S.A. (Pty) Ltd |
Amajuba |
Tillite |
30 |
87.8 |
15 |
Afrisam S.A. (Pty) Ltd |
Umgungundlovu |
Tillite |
30 |
97.6786 |
21 |
Mr Carl Simpson |
Umzinyathi |
Coal |
15 |
2436.669 |
50 |
Lancaster Quarries (Pty) Ltd |
Zululand |
Dolerite |
10 |
93.9881 |
24 |
Lancaster Quarries (Pty) Ltd |
Zululand |
Dolerite |
10 |
49.9297 |
24 |
Blurock Quarries (Pty) Ltd |
Uthukela |
Aggregate |
10 |
91.552 |
80 |
Canton Trading (Pty) Ltd |
Umgungundlovu |
Aggregate |
10 |
42.82 |
6 |
Street Spirit Trading 54 (Pty) Ltd |
Umzinyathi |
Aggregate |
30 |
4540.3461 |
91 |
Ndwedwe Road Quarry CC |
Ethekwini |
Gravel |
10 |
2.0965 |
14 |
Stockville Quarries C. C. |
Ethekwini |
Aggregate |
10 |
18.4 |
10 |
Ultimate Goal Investments C. C. |
Umzinyathi |
COAL |
8 |
210.1797 |
10 |
Mattioda Collabora |
Ilembe |
Sand |
10 |
4.3084 |
5 |
Ikwezi Mining CC |
Amajuba |
Coal |
30 |
12181.1700 |
225 |
Southern Cross Cement Co. (Pty) Ltd |
Ugu |
Limestone, Dolerite and Argillite |
30 |
302.7230 |
33 |
Future Coal (Pty) Ltd |
Amajuba |
Coal |
20 |
2963.1919 |
142 |
Afrimat Aggregate (Pty) Ltd |
Uthukela |
Granite / rhyolite |
30 |
44.9999 |
15 |
N'dongweni Lime Works (Pty) Ltd |
Ugu |
Calcite, Dolomite, Dolomic Limestone And Limestone |
30 |
746.5324 |
14 |
Ubuntu Blocks And Sands CC |
Uthungulu |
Silica sand (general) |
30 |
4.305 |
10 |
Proxor (Pty) Ltd |
Vryheid |
Coal |
30 |
1252.5311 |
250 |
Caspeco |
Umgungundlovu |
Clay (General) |
15 |
28.24 |
9 |
Company |
Location |
Minerals |
Size/ha |
Years of operation |
Number of employees |
NC |
|||||
Idwala Industrial Holdings Ltd |
Barkley West |
Limestone |
1544.6494 |
30 years |
289 |
Industrial Salt (Pty) Ltd |
Gordonia |
Salt |
245.5515 |
10 years |
13 |
Industrial Salt (Pty) Ltd |
Gordonia |
Salt |
855.9773 |
30 years |
13 |
Industrial Salt (Pty) Ltd |
Gordonia |
Salt |
31.0297 |
10 years |
13 |
Saamwerk Soutwerke (Pty) Ltd |
Gordonia |
Salt |
214.8455 |
10 years |
9 |
Van Zyl Broers Oersonskraal BK |
Barkley West |
Diamonds |
42.5900 |
16 years |
5 |
Ringside Trading 520 (Pty) Ltd |
Hay |
Manganese Ore and Iron Ore |
4899.6299 |
20 years |
289 |
Kareevlei Mining (Pty) Ltd |
Barkley West |
Diamonds |
3088.9234 |
17 years |
45 |
United Manganese of Kalahari (Pty) Ltd |
Kuruman |
Manganese Ore |
15220 |
30 years |
273 |
PPC Lime Limited |
Hay |
Limestone |
1530.6472 |
30 years |
306 |
Sedibeng Iron Ore (Pty) Ltd |
Hay |
Iron Ore |
4490.7928 |
30 years |
116 |
DVD Quality Engineering (Pty) Ltd |
Kuruman |
Manganese Ore and Iron Ore |
593.1384 |
30 years |
14 |
Bondeo 140 Cc |
Hopetown |
Diamonds |
210.5584 |
5 years |
76 |
Huatian SA Mining (Pty) Ltd |
Hay |
Manganese Ore and Iron Ore |
6404.0460 |
15 years |
224 |
Upington Supersalt (Pty) Ltd |
Gordonia |
Salt |
363.4942 |
30 years |
6 |
Afrisam South Africa (Pty) Ltd |
Barkley West |
Limestone |
16366.5494 |
30 years |
253 |
South 32 (Pty) Ltd |
Kuruman |
Manganese Ore |
1085.4745 |
30 years |
2059 |
South 32 (Pty) Ltd |
Kuruman |
Manganese Ore |
1071.1934 |
30 years |
2035 |
Assmang Ltd |
Kuruman |
Iron Ore |
5634.1386 |
30 years |
1295 |
Tshipi E Ntle Manganese (Pty) Ltd |
Kuruman |
Manganese Ore |
767.3155 |
30 years |
163 |
D J Duraan |
Hopetown |
Diamonds |
3427.5160 |
10 years |
13 |
Pioneer Minerals (Pty) Ltd |
Prieska |
Diamonds |
1585.36 |
8 years |
178 |
Sishen Iron Ore Company (Pty) Ltd |
Hay |
Iron Ore and Quartzite |
26032.0819 |
30 years |
9440 |
IT5 Siviel 5 (Pty) Ltd |
Gordonia |
Aggregate and Clay |
3465.2555 |
10 years |
19 |
Assmang Limited |
Kuruman |
Manganese Ore |
3698.6315 |
30 years |
3425 |
West Coast Resources (Pty) Ltd |
Namaqualand |
Diamonds |
14634.5541 |
24 years |
665 |
Verde Bitterfontein (Pty) Ltd |
Namaqualand |
Granite |
2233.343 |
30 years |
9 |
Verde Bitterfontein (Pty) Ltd |
Namaqualand |
Granite |
47.8093 |
30 years |
9 |
Rooipoort Community Development (Pty) Ltd |
Kimberley |
Diamonds |
20587.9873 |
15 years |
175 |
Kudumane Manganese Resources (Pty) Ltd |
Kuruman |
Manganese Ore |
11807.5935 |
30 years |
362 |
PMG Mining (Pty) Ltd |
Kuruman |
Manganese Ore |
543.3402 |
15 years |
189 |
Bondeo 140 Cc |
Kimberley |
Diamonds |
849.2083 |
14 years |
39 |
United Salt (Pty) Ltd |
Prieska |
Salt |
30.9355 |
30 years |
8 |
Rex Exploration (Pty) Ltd |
Hay |
Diamonds |
44.74 |
22 years |
14 |
Morokwa Manganese (Pty) Ltd |
Kuruman |
Manganese Ore |
165.3798 |
20 years |
9 |
Kalagadi Manganese (Pty) Ltd |
Kuruman |
Manganese Ore |
6250.8753 |
30 years |
669 |
Dwaggas Soutwerke (Pty) Ltd |
Calvinia |
Salt |
2338.3161 |
10 years |
9 |
Kalkpoort Soutwerke (Pty) Ltd |
Gordonia |
Salt |
227.933 |
5 years |
18 |
Assmang Limited |
Kuruman |
Iron Ore |
1136.8563 |
30 years |
2033 |
Black Mountain Mining (Pty) Ltd |
Namaqualand |
Lead, Zinc, Copper and Associated minerals |
24195.2078 |
30 years |
1581 |
Black Mountain Mining (Pty) Ltd |
Namaqualand |
Lead, Zinc, Copper and Associated minerals |
9505.7326 |
30 years |
1528 |
Sishen Iron Ore Company (Pty) Ltd |
Hay |
Iron Ore |
16941.92 |
30 years |
1229 |
Petra Diamonds (Pty) Ltd |
Hay |
Diamonds |
1567.5377 |
30 years |
3169 |
Ekapa Minerals (Pty) Ltd |
Kimberley |
Diamonds |
4359.9722 |
30 years |
1426 |
Misty Falls 45 (Pty) Ltd |
Postmansburg |
Iron Ore and Manganese Ore |
1726.5624 |
10 years |
66 |
Company |
Location |
Minerals |
Size/ha |
Years of operation |
Number of employees |
Free state |
|||||
G & W Base & Industrial (Pty) Ltd |
Viljoenskroon |
Bentonite clay |
1420.5627 |
10 years |
63 permanent employees |
Star Diamonds (Pty) Ltd |
Theunissen |
Diamonds (kimberlite) |
246.2900 |
15 years |
113permanent employees |
S Bothma & Sons Transport (Pty) Ltd |
Sasolburg |
Sand |
18.940 |
7 years |
23 permanent employees |
Anglo Allied Brick Products Ltd |
Odendaalsrus |
Clay |
15.4172 |
20 years |
3 permanent employees |
De Beers Consolidated Mines Ltd |
Kroonstad |
Diamonds |
62.9957 |
16 years |
380 permanent employees 29 Contract workers |
Harmony Gold Mining Company Ltd Joel Operation |
Theunissen |
Gold ore |
2355.8467 |
11 years |
2047 employees ( 1947 permanent & 129 contractors) |
Harmony Gold Mining Company Ltd Target 1 & Lorraine Operation |
Odendaalsrus |
Gold ore |
4237.00 |
18 years |
1967 employees (1718 permanent and 249 contractors) |
Janko Boerdery CC |
Wepener |
Sand |
11.4800 |
30 years |
7 permanent employees |
WG Wearne Ltd, now ceded to Afrimat |
Bethlehem |
Stone, Aggregate & Gravel |
65.8862 |
10 years |
21 permanent employees |
Petra Quarry (Pty) Ltd |
Bloemfontein |
Aggregate |
54.9874 |
10 years |
44 permanent employees |
Sibanye Gold Ltd (GFI Mining SA (Pty) Ltd) |
Virginia & Theunissen |
Gold ore & Associated Minerals |
16821.4861 |
12 years |
9616 employees (7835 permanent & 1781 contractors) |
Harmony Gold Mining Co Ltd – Unisel and Masimong operation |
Welkom & Virginia |
Gold ore |
22582.9876 |
22 years |
5170 employees (4498 permanent employees and 672 contractors) |
Harmony Gold Mining Company Ltd Bambanani Operation |
Welkom & Virginia |
Gold ore |
2355.8467 |
22 years |
2146 employees (1720 permanent employees and 426 contractors) |
Harmony Gold Mining Company Ltd Phakisa and Tshepong Operation |
Welkom & Odendaalsrus |
Gold ore |
10798.7352 |
22 years |
8771 employees (8191 permanent employees and 580 contractors). |
Henque 4052 CC |
Bloemfontein |
Clay (general), Gravel & Sand (general) |
214.1279 |
30 years |
2 permanent employees |
Blue Diamond Mines (Pty) Ltd |
Koffiefontein |
Diamonds |
968.5600 |
30 years |
906 employees (618 permanent and 288 contractors) |
J R Familie Trust |
Wepener |
Sand |
4.0026 |
15 years |
7 permanent employees |
Afrimat Aggregates (KZN) (Pty) Ltd (former Lancaster Quarries) |
Harrismith |
Aggregate |
38.1325 |
30 years |
29 permanent employees |
Lafarge SA Holdings (Pty) LTD |
Bloemfontein |
Gravel (Stone Aggregate) |
79.4412 |
30 years |
24 permanent employees |
Hendrik Sand van Heerden (Pty) Ltd |
Virginia |
Sand |
146.1804 |
9 years |
13 permanent employees |
S Bothma & Sons Transport (Pty) Ltd |
Sasolburg |
Sand (general) |
81.3515 |
5 years |
23 permanent employees |
Copper Sunset Trading (Pty) Ltd |
Sasolburg |
Sand (general) |
355.7394 |
20 years |
24 permanent employees |
Tradeworx 25 (Pty) Ltd |
Vredefort |
Bentonite clay |
101.5699 |
30 years |
4 permanent employees |
Tradeworx 25 (Pty) Ltd |
Vredefort |
Bentonite clay |
298.0967 |
30 years |
4 permanent employees |
Afrimat Aggregates (KZN) (Pty) Ltd (former Lancaster Quarries) |
Harrismith |
Aggregate |
25.9153 |
13 years |
17 permanent employees |
Seriti Coal (Pty) Ltd (Former Anglo Operations Ltd) |
Sasolburg |
Coal |
4 652 |
30 years |
1428 employees (1028 permanent and 400 contractors) |
Thaba Stone (Pty) Ltd |
Thaba 'Nchu |
Aggregate |
80.9896 |
30 years |
1 permanent employee |
Coromining (Pty) Ltd |
Welkom |
Clay (general) |
111.6438 |
20 years |
12 contractors |
Sasol Mining (Pty) Ltd |
Koppies & Parys |
Coal |
4 938.4374 |
30 years |
513 employees (485 permanent and 28 contractors). |
Mission Point Trading 41 (Pty) Ltd |
Sasolburg |
Silica sand & Silica (general) |
496.9084 |
10 years |
26 permanent employees |
Hendrik Sand van Heerden (Pty) Ltd |
Kroonstad |
Sand |
12.07 |
15 years |
21 permanent employees |
Bestrein Eiendomme (Pty) Ltd |
Boshof |
Diamonds (general) |
1163.0448 |
15 years |
26 permanent employees |
Lengana Health SA (Pty) Ltd |
Koppies |
Bentonite clay & Clay general |
1026 |
25 years |
60 permanent employees |
Trakone Mining Servicess CC |
Hennenman |
Clay |
146.5638 |
30 years |
52 permanent employees |
Trakone Mining Servicess CC |
Bloemfontein |
Clay |
140.75 |
30 years |
30 permanent employees |
Sweet Sensation 168 (Pty) Ltd |
Parys |
silica sand |
101.2877 |
10 years |
14 permanent employees |
Thaba Tafita Diamond Mining CC |
Boshof |
Diamonds |
96.6940 |
30 years |
4 permanent employees |
Tja Naledi Beafase Investment Holdings (Pty) Ltd |
Parys |
silica sand |
437.8330 |
10 years |
4 contractor employees |
Company |
Location |
Minerals |
Size/ha |
Years of operation |
Number of employees |
EC |
|||||
Ikwezi Quarries |
OR Tambo District Municipality |
Aggregate |
7.134 |
30 years |
31 |
Queenstown Quarries (Pty) Ltd |
Chris Hani District Municipality |
Aggregate, Clay (General) & Stone Aggregate; Gravel |
36.2505 |
30 years |
23 |
Ignatius Petrus Muller |
Sarah Baartman District Municipality |
Quartzite/Sandtone(Dimesion Stone) |
5.41 |
06 years |
7-Mining is seasonal |
Lafarge South Africa Holdings (Pty) Ltd |
Buffalo City Metropolitan Municipality |
Aggregate, Stone Aggregate, Gravel, Quartz (Gemstone), Quartzite/Sandstone (Dimensio Stone) |
2567.678 |
30 years |
14-Mine has been mothballed |
Sunshine Coast Quarries Cc |
Nelson Mandela Bay Metropolitan Municipality |
Sand (General) |
39.4716 |
30 years |
7 |
Ngqura Brick (Pty) Ltd |
Nelson Mandela Bay Metropolitan Municipality |
Clay (General) |
26.423 |
20 years |
138 |
Kate Crews |
Nelson Mandela Bay Metropolitan Municipality |
Sand (General) |
5.326 |
|
3,mining is seasonal |
Public Servants Association Of South Africa |
Buffalo City Metropolitan Municipality |
Sand (General) |
24.6865 |
2 years |
1 |
Addo Minerals (Pty) Ltd |
Nelson Mandela Bay Metropolitan Municipality |
Limestone, Building Sand (Silica), Concrete Sand (Silica), Shale/Brick clay |
162.9107 |
30 years |
5, Mining is seasonal |
Grahamstown Brick (Pty) Ltd |
Sarah Baartman District Municipality |
Clay (General), Kaolin |
644.9686 |
30 years |
265 |
Gamtoos Quarry |
Sarah Baartman District Municipality |
Gravel |
31.7982 |
26 years |
3-Mining is seasonal |
Voortbou Stene (Pty) Ltd |
Sarah Baartman District Municipality |
Clay (General) |
58.32.0 |
30 years |
3 |
Owl Eye Trading 92 (Pty) Ltd Not operating |
OR Tambo Local Municipality |
Stone Aggregate; Grave |
15.3 |
|
9-Mining is seasonal |
East London Bricks Cc |
Buffalo City Metropolitan Municipality |
Clay (General) |
18.52 |
20 years |
4 |
G & W Base & Industrial Minerals (Pty) Ltd |
Sarah Baartman District Municipality |
Kaolin |
202.1015 |
30 years |
7 |
Stutt Brick |
Buffalo City Metropolitan Municipality |
Clay (General) |
75.2416 |
10 years |
261 |
Elitheni Coal (Pty) Ltd |
Chris Hani District Municipality |
Coal |
9279.7 |
30 years |
98-Mining right active but no mining taking place. Mine is under business rescue |
Laman (Pty) Ltd |
OR Tambo District Municipality |
Aggregate, Stone Aggregate, Gravel, Sand (General), Sand (Manufactured) - From Hardrock |
28.573 |
30 years |
22-Mining right active but no mining taking place. Mine is under business rescue |
Matyamhlophe Quarry Cc |
Joe Gqabi District Municipality |
Aggregate, Stone Aggregate; Gravel |
17.2789 |
|
20-Mining is seasonal |
Stutt Quarries Cc |
Amahlathi Local Municipality, Amathole District Municipality |
Stone Aggregate; Gravel |
18.54 |
30 years |
2 |
Lafarge South Africa Holdings (Pty) Ltd (Moregrove) |
Nelson Mandela Bay Metropolitan Municipality |
Aggregate |
1117.3453 |
30 years |
35 |
Pretoria Portland Cement Company Ltd |
Sarah Baartman District Municipality |
Gypsum |
1159.8585 |
08 years |
5 mining is seasonal |
Pretoria Portland Cement Company Ltd |
Nelson Mandela Bay Metropolitan Municipality |
Gypsum, Limestone |
12881.362 |
30 years |
101 |
Pondoland Quarries CC |
OR Tambo District Municipality |
Aggregate |
6.8369 |
25 years |
42 |
Milogranite (Pty) Ltd |
Amathole District Municipality |
Dimension Stone (General) |
20.6754 |
30 years |
37 |
Kowie Quarry Cc |
Sarah Baartman District Municipality |
Stone Aggregate, Gravel, Quartzite/Sandstone (Dimension Stone) |
7.123 |
11 years |
36-Mining is seasonal |
Cannosia Trading 62 |
OR Tambo District Municipality |
Aggregate, Granite/Synite, Stone Aggregate Gravel |
41.4 |
16 years |
36-Mining is seasonal |
Inzulu Mining Co (Pty) Ltd (0177 MR) |
Nelson Mandela Bay Metropolitan Municipality |
Sand (General) |
80.4 |
30 years |
8 |
Sunshine Enterprises (Pty) Ltd |
Amathole District Municipality |
Aggregate, Stone Aggregate Gravel |
16.1634 |
30 years |
35 |
Lafarge South Africa Holdings (Proprietary) Limited (Blue Rock Quarry) |
Buffalo City Metropolitan Municipality |
Aggregate |
11.2 |
|
33 |
Andre Klopper |
Sarah Baartman District Municipality |
Stone Aggregate Gravel, Sand (General) |
29.2946 |
30 years |
7 |
Mvubu Quarries |
OR Tambo District Municipality |
Stone Aggregate Gravel, Gravel |
8 hectares |
20 years |
19 |
Lafarge South Africa Holdings (Proprietary) Limited (Coega Kop) |
Nelson Mandela Metropolitan Municipality |
Aggregate |
33.4567 |
30 years |
11 |
Lafarge South Africa Holdings (Proprietary) Limited |
Nelson Mandela Bay Metropolitan Municipality |
Stone Aggregate Gravel, Sand (General) |
252.3634 |
30 years |
11 Mining is seasonal |
East Cape Quarries (Pty) Ltd |
Sarah Baartman District Municipality |
Clay (General), Kaolin, Shale/Brickclay |
10.5823 |
30 years |
1 |
Mayfield Clays (Pty) Ltd |
Sarah Baartman District Municipality |
Clay (General), Kaolin, Shale/Brickclay |
82.0416 |
30 years |
1 Mining is seasonal |
East Cape Quarries (Pty) Ltd |
Sarah Baartman District Municipality |
Clay (General), Kaolin, Shale/Brickclay |
4.08 |
30 years |
1 Mining is seasonal |
Duncan Stuart Lethbridge |
Sarah Baartman District Municipality |
Sand (General) |
2.0171 |
15 years |
1 Mining is seasonal |
Sandman Quarries Cc |
Nelson Mandela Bay Metropolitan Municipality |
Clay (General), Stone Aggregate Gravel, Sand (General) |
232.9103 |
30 years |
19 |
Francois Burger And Izak Jacobus Van Zyl |
Sarah Baartman District Municipality |
Clay (General) |
23.45 |
15 years |
4 |
Inzulu Mining Co (Pty) Ltd (0211 MR) |
Nelson Mandela Bay Metropolitan Municipality |
Stone Aggregate Gravel, Gravel, Sand (General) |
111.78 |
30 years |
5 |
Prima Quarries 1987 (Pty) Ltd |
Nelson Mandela Bay Metropolitan Municipality |
Quartzite/Sandtone (Dimesion Stone) |
20.4063 |
5 years |
30 |
Aliwal Dolerite Quarries (Pty) Ltd |
Joe Gqabi District Municipality |
Aggregate |
55.5166 |
25 years |
30 |
Scarlet Dawn Trading (Pty) Ltd |
Buffalo City Metropolitan Municipality |
Aggregate |
55.9847 |
30 years |
12 |
Afrimat Aggregates (Pty) Ltd Denver Quarries |
Nelson Mandela Bay Metropolitan Municipality |
Aggregate, Gravel, Sand (General) |
23.456 |
15 years |
57 |
Propnet A Division Of Transnet Limited |
Chris Hani District Municipality |
Aggregate |
202.4875 |
30 years |
17 |
Teviot Salt Works (Pty) Ltd |
Chris Hani District Municipality |
Salt |
674.0029 |
30 years |
14 |
Independent Crushers Cc |
Buffalo City Metropolitan Municipality |
Aggregate |
99.8399 |
25 years |
65 |
Jan Sebastian Rabie Schwarz |
Amathole District Municipality |
Sand (General) |
11.7913 |
10 years |
2 Mining is seasonal |
David Peter Coetzer (Wansley Quarries |
Buffalo City Metropolitan Municipality |
Gravel |
5.2149 |
10 years |
17 |
Wahloo Sand Cc |
Sarah Baartman District Municipality |
Sand (General) |
24.5765 |
5 years |
1 |
Amatola Quarry Products Cc |
Sarah Baartman District Municipality |
Stone Aggregate Gravel |
5.6174 |
30 years |
17 |
National Salt Limited |
Nelson Mandela Bay Metropolitan Municipality |
Salt |
15.3 |
25 years |
144 employees shared with 2 National Salt Limited mines below |
National Salt Limited |
Nelson Mandela Bay Metropolitan Municipality |
Salt |
1009.6647 |
30 years |
144 employees shared with 2 National Salt Limited mines above and below |
National Salt Limited |
Nelson Mandela Bay Metropolitan Municipality |
Salt |
695.3011 |
30 years |
144 employees shared with 2 National Salt Limited mines above |
Inzulu Mining Co (Pty) Ltd |
Nelson Mandela Bay Metropolitan Municipality |
Sand (General) |
24.88 |
22 years |
5 |
Vaduba Investments Cc |
Buffalo City Metropolitan Municipality |
Stone Aggregate Gravel, Sand (General) |
122.6312 |
30 years |
3 |
Eastern Province Brick Mining (Pty) Ltd |
Nelson Mandela Bay Metropolitan Municipality |
Clay (General) |
14.5084 |
30 years |
3 contracted employees |
Bigwill Enterprises 10 (Pty) Ltd |
Nelson Mandela Bay Metropolitan municipality |
Stone Aggregate Gravel |
150.9073 |
30 years |
87 |
De Hoop Quarries C.C. |
Nelson Mandela Bay Metropolitan Municipality |
Stone Aggregate Gravel, Gravel, Sand (General) |
101.34 |
20 years |
16 |
Civil And General Contractors Cc |
Queenstown, |
Stone Aggregate Gravel, Gravel, Sand (General) |
11.4315 |
30 years |
18 |
Impuma Quarries (Pty) Ltd |
Sarah Baartman District Municipality |
Aggregate |
52.9566 |
|
4-Mining is seasonal |
SA Lime Eastern Cape (Pty) Ltd |
Steytlerville, Jansenville |
Gypsum |
153.4741 |
30 years |
8 |
Metro Quarries (Pty) Ltd |
Nelson Mandela Bay Metropolitan Municipality |
Aggregate, Gravel, Stone Aggregate, Gravel, Sand (Genera), Sand (Manufactured From Hard Rock) |
346.5435 |
30 years |
18 |
Eastern Cape Quarries (Pty) Ltd |
Amathole District Municipality |
Aggregate, Clay (General) & Stone Aggregate; Gravel |
27.56 |
30 years |
12 |
Blue Rock Quarries (Pty) Ltd |
OR Tambo District Municipality |
Gravel & Stone Aggregate |
17.1115 |
30 years |
20 |
Stutt Quarries Cc |
Buffalo City Metropolitan Municipality |
Stone Aggregate; Gravel |
50.1299 |
30 years |
14 |
Stutt Quarries Cc |
Buffalo City Metropolitan Municipality |
Gravel & Stone Aggregate |
29.1209 |
30 years |
18 |
Swartkops Sea Salt |
Nelson Mandela Bay Metropolitan Municipality |
Salt |
17867 |
30 years |
230 |
Zwartebosch Quarry (Pty) Ltd |
Sarah Baartman District Municipality |
Aggregate, Stone Aggregate, Gravel, |
Approximately 40 hectares |
30 years |
16 |
Bay Tower Properties 188 Cc |
Sarah Baartman District Municipality |
Stone Aggregate; Gravel, Sand (General) |
22.28 |
20 years |
17 |
Albert Harbron Trust |
Nelson Mandela Bay Metropolitan Municipality |
Aggregate, Gravel, Stone Aggregate Gravel, Sand (General) |
35.1454 |
10 years |
20 |
Potgieter Quarry (Pty) Ltd |
Sarah Baartman District Municipality |
Aggregate |
24.4612 |
30 years |
14 shared by both Potgieter Mines |
Potgieter Quarry (Pty) Ltd |
Sarah Baartman District Municipality |
Aggregate |
34.8378 |
30 years |
14 shared by both Potgieter Mines |
Sunshine Enterprises (Pty) Ltd |
OR Tambo District Municipality |
Aggregate, Stone aggregate and gravel |
48.7746 |
30 years |
35 |
DW Steenmakery |
Nelson Mandela Bay Metropolitan Municipality |
Clay |
8.6898 |
15 years |
3 -Mining is seasonal |
Kouga Bricks CC |
Sarah Baartman District Municipality |
Clay (General) |
5.093 |
30 years |
8-Mining is seasonal |
Ignatius Petrus Muller |
Sarah Baartman District Municipality |
Quartzite |
7.7633 |
|
4 -Mining is seasonal |
Stanley Niemand |
Nelson Mandela Bay Metropolitan Municipality |
Sand (General) |
12.6652 |
10 years |
4 |
OPJ Fourie |
Sarah Baartman Disrtict Municipality |
Clay (General), Sand and Aggregate |
38.439 |
30 years |
6 contracted employees shared with OPJ Fourie mine below |
OPJ Fourie |
Sarah Baartman Disrtict Municipality |
Clay (General) |
2.8977 |
30 years |
6 contracted employees shared with OPJ Fourie mine above |
Stutt Quarries CC |
Amathole District Municipality |
Sand |
67.27 |
30 years |
2 |
Company |
Location |
Minerals |
Size/ha |
Years of operation |
Number of employees |
WC |
|||||
National Salt Limited |
Malmesbury |
Salt |
333.209 |
30 |
77 |
ML Steenkamp Family Trust |
Malmesbury |
Aggregate |
|
20 |
27 |
Atlantic Sands (Pty) Ltd |
Malmesbury |
Sand |
|
20 |
4 |
Brickrush (Pty) Ltd |
Malmesbury |
Sand |
|
30 |
3 |
Prima Klipbrekers (Pty) Ltd |
Robertson |
Aggregate |
92.2494 |
20 |
3 |
Read Mix Materials (Pty) Ltd |
Cape Town |
Aggregate |
31.2027 |
20 |
21 |
Mineral Sands Resources (Pty) Ltd |
Van Rhynsdorp |
Heavy Minerals |
95.8932 |
10 |
30 |
Sithembile Distributors (Pty) Ltd |
George |
Sand |
20.3867 |
13 |
4 |
Full Score Trading 145 CC |
Malmesbury |
Sand Gravel |
128.262 |
20 |
5 |
Montagu Brick CC |
Montagu |
Clay |
13.2837 |
11 |
4 |
Brickrush (Pty) Ltd |
Cape Town |
Aggregate |
|
10 |
32 |
South Cape Clay Mine (Pty) Ltd |
Riversdale |
Clay |
|
15 |
6 |
Brickrush (Pty) Ltd |
Cape Town |
Sand |
537.55 |
10 |
3 |
JLJ Logistics |
Cape Town |
Sand |
32.1532 |
10 |
3 |
Mouton's Siviel (Pty) Ltd |
Malmesbury |
Sand |
90.2439 |
10 |
8 |
Elsana Quarry (Pty) Ltd |
Malmesbury |
Granite |
71.25 |
20 |
29 |
Sibathatu Mining CC |
Malmesbury |
Sand/Aggregate |
135.686 |
13 |
5 |
Uitkyk Sandmyn CC |
Vredenburg |
Sand |
657.064 |
20 |
1 |
Ecca Holdings (Pty) Ltd |
Swellendam |
Bentonite Zeolite |
467.907 |
13 |
43 |
Ecca Holdings (Pty) Ltd |
Swellendam |
Bentonite Zeolite |
332.234 |
13 |
43 |
Donadio Mining (Pty) Ltd |
Cape Town |
Building Sand/Filling Sand/Sand |
22.2 |
15 |
3 |
Atlantic Sands (Pty) Ltd |
Wynberg |
Sand |
21.4 |
10 |
3 |
Counterpoint Trading 70 (Pty) Ltd |
Malmesbury |
Sand, Gravel, Koalin |
50.9864 |
10 |
13 |
Atlantic Sands (Pty) Ltd |
Wynberg |
Sand |
42.8342 |
15 |
3 |
Sizisa Ukhanyo Trading 410 CC |
Gansbaai |
Sand |
11.6636 |
16 |
10 |
Pretoria Portland Cement Company Ltd |
Van Rhysndorp |
Gypsum |
626.05 |
15 |
8 |
Cape Lime (Pty) Ltd |
Van Rhynsdorp |
Dolomite/Limestone |
321.11 |
30 |
9 |
MaccSand CC |
Cape Town |
Sand |
17.919 |
25 |
5 |
Tip Trans Resources (Pty) Ltd |
Cape Town |
Building Sand |
138.846 |
30 |
5 |
Aglime (Pty) Ltd |
Riversdale |
Limestone |
9.074 |
30 |
1 contractor |
Rapicorp (Pty) Ltd |
Cape Town |
Sand |
4.0266 |
15 |
7 |
EarthCom (Pty) Ltd |
George |
Clay/Gravel/Aggregate |
16.8678 |
20 |
49 |
Gecko Fert (Pty) Ltd |
Malmesbury |
Phosphate |
78.63 |
17 |
1 contractor |
Sibathatu Mining CC |
Malmesbury |
Building Sand |
27.4815 |
15 |
10 |
Maria Petronella Loubser |
Malmesbury |
Clay |
15 |
30 |
2 |
Isitena Trust |
Paarl |
Clay |
4.8481 |
30 |
3 |
Tronox Mineral Sands (Pty) Ltd |
Van Rhynsdorp |
Heavy Minerals/Ilmenite/Rutile/Leucoxene/Zircon/Garnets/Kyanite/Monazite/Silica Sand/Cassiterite |
5832.59 |
30 |
1083 |
Elandsfontein Exploration and Mining (Pty) |
Malmesbury |
Phosphate/Limestone/Silics Sand (General)/Silica Sand (Silica) |
1529.671 |
15 |
12 |
Global Pact Trading 370 (Pty) Ltd |
Malmesbury |
Sand/Salt |
79.1382 |
20 |
3 |
Tip Trans Resources (Pty) Ltd |
Malmesbury |
Sand/Gravel/Silica Sand |
2435.252 |
30 |
2 |
Afrimat Aggregates (Operations) (Pty) Ltd |
Malmesbury |
Sand |
92.75 |
10 |
4 |
ZLLD Sand Mining (Pty) Ltd |
Cape Town |
Sand |
94.5038 |
15 |
12 |
Ecca Holdings (Pty) Ltd |
Swellendam |
Bentonite/Zeolite |
349.6961 |
11 |
40 |
Buy-Line Trading (Pty) Ltd |
Mossel Bay |
Sand |
25.1541 |
14 |
2 |
Rheebok Brick Holdings (Pty) Ltd |
Mossel Bay |
Clay |
6.39 |
30 |
124 |
Siyabonwa Resources (Pty) Ltd |
Cape Town |
Building Sand (Silica)/Sand |
74.8259 |
15 |
3 |
Velvet Mountain Aggregates (Pty) Ltd |
Malmesbury |
Granite/Syenite |
15.7683 |
30 |
11 |
MaccSand CC |
Somerset West |
Sand |
54.5224 |
25 |
5 |
Aglime (Pty) Ltd |
Bredasdorp |
Limestone |
13.1254 |
16 |
1 contractor |
Cawood Saltworks (Pty) Ltd |
Vredendal |
Salt |
261.2 |
30 |
26 |
Velddrift Salt Company (Pty) Ltd |
Vredenburg |
Salt |
270.299 |
30 |
38 |
I S de V Beukes CC |
Caledon |
Ball Clay |
11.7642 |
30 |
39 |
Denton Potts t/a Klipberg Sand Mine |
Malmesbury |
Sand |
31.3419 |
11 |
10 |
PVVK Management Services CC |
Malmesbury |
Sand |
35.6576 |
5 |
9 |
Ecca Holdings (Pty) Ltd |
Riversdale |
Bentonite/Zeolite |
687.45 |
9 |
40 |
Tip Trans Resources (Pty) Ltd |
|
Sand |
21.0505 |
5 |
3 |
Tip Trans Resources (Pty) Ltd |
Piketberg |
Sand/Building Sand |
18.2358 |
5 |
3 |
Trans Hex Operations (Pty) Ltd |
Off-Shore |
Diamonds |
3194.68 |
30 |
3 |
Tip Trans Resources (Pty) Ltd |
Malmesbury |
Sand |
324.926 |
5 |
3 |
Tip Trans Resources (Pty) Ltd |
Piketberg |
Sand |
155.188 |
5 |
3 |
Kliphoek Soutwerke (Pty) Ltd |
Vredenburg |
Salt |
97.1996 |
30 |
3 |
Corobrick (Pty) Ltd |
Malmesbury |
Clay |
22.4528 |
20 |
32 |
Otto Trust |
Mossel Bay |
Sand/Stone |
44.3147 |
24 |
25 |
James Malcolm Bishop |
Hermanus |
Sand |
21.4 |
13 |
3 |
Trans Hex Operations (Pty) Ltd |
Vredendal |
Alluvial Diamonds |
40.9 |
10 |
23 |
Prima Klipbrekers (Pty) Ltd |
Rawsonville |
Aggregate |
|
20 |
12 |
Anglo Operations Limited |
Van Rhynsdorp |
Heavy Minerals |
9327.6 |
30 |
757 |
Anglo Operations Limited |
Van Rhynsdorp |
Heavy Minerals |
4113.3 |
30 |
757 |
Prima Klipbrekers (Pty) Ltd |
Bredasdorp |
Aggregate |
39.7892 |
15 |
13 |
Ecca Holdings (Pty) Ltd |
Swellendam |
Bentonite/Zeolite |
679.79 |
11 |
43 |
Ecca Holdings (Pty) Ltd |
Swellendam |
Bentonite/Zeolite |
205.002 |
11 |
43 |
Ecca Holdings (Pty) Ltd |
Swellendam |
Bentonite |
631.485 |
11 |
38 |
Ecca Holdings (Pty) Ltd |
Swellendam |
Bentonite/Zeolite |
462.479 |
11 |
43 |
Ecca Holdings (Pty) Ltd |
Swellendam |
Bentonite |
477.834 |
11 |
43 |
Steenvas (Pty) Ltd |
Van Rhynsdorp |
Garnet/Ilmenite/Leucoxene/Quartz/Rutile/Zircon |
26.6091 |
10 |
30 |
Alwyn Petrus Naudé |
Worcester |
Ball Clay |
36.96 |
10 |
12 |
Lafarge South Africa (Pty) Ltd |
Stellenbosch |
Base Minerals |
145.42 |
30 |
72 |
Sibathatu Mining CC |
Malmesbury |
Sand |
52.2535 |
10 |
3 |
Corobrick (Pty) Ltd |
Cape Town |
Clay |
271.376 |
30 |
32 |
Elandskloof Sand (Pty) Ltd |
Malmesbury |
Sand |
63.5951 |
10 |
|
Lime Sales Limited |
Malmesbury |
Dolomite |
168.55 |
30 |
57 |
Space Minerals (Pty) Ltd |
Ceres |
Gypsum |
50.0083 |
30 |
8 |
Holcim SA (Pty) Ltd |
Cape Town |
Sand |
237.592 |
30 |
6 |
Holcim SA (Pty) Ltd |
Cape Town |
Hornfells Grewaeke |
842.304 |
30 |
24 |
Hippo Quarries Granite (Pty) Ltd |
Malmesbury |
Granite |
39.1423 |
30 |
11 |
Bertie Derbyshire & Sons (Pty) Ltd |
Knysna |
Sand |
8.3119 |
14 |
3 |
Robberg Quarry CC |
Knysna |
Aggregate |
54.5302 |
10 |
17 |
Pretoria Portland Cement Company Limited |
Malmesbury |
Sand/Clay/Shale/Limestone |
1104.95 |
30 |
24 |
Cabrico (Pty) Ltd |
Stellenbosch |
Clay |
34.0199 |
10 |
|
Pretoria Portland Cement Company Limited |
Piketberg |
Shale/Limestone |
1534.65 |
30 |
217 |
Capmat (Pty) Ltd |
Caledon |
Aggregate |
26.6299 |
25 |
23 |
Prima Klipbrekers (Pty) Ltd |
Worcester |
Aggregate |
50.2 |
13 |
39 |
Lafarge South Africa (Pty) Ltd |
Cape Town |
Aggregate |
|
30 |
54 |
Lafarge South Africa (Pty) Ltd |
Cape Town |
Aggregate |
|
30 |
41 |
Suidwes Verfkontrakteurs (Pty) Ltd |
Mossel Bay |
Sand |
2.8676 |
15 |
8 |
Bontebok Limeworks (Pty) Ltd |
Bredasdorp |
Limestone |
309.496 |
10 |
15 |
Quarryman (Southern Cape) (Pty) Ltd |
George |
All Minerals |
14.508 |
30 |
15 |
Corobrik (Pty) Ltd |
Paarl |
Clay |
53.3685 |
30 |
12 |
Transand (Pty) Ltd |
Mossel Bay |
Stone/Sand |
176.603 |
30 |
31 |
Trans Hex Operations (Pty) Ltd |
Vredendal |
Diamonds |
115.826 |
10 |
26 |
Trans Hex Operations (Pty) Ltd |
Van Rhynsdorp |
Precious Stones |
64.9413 |
10 |
26 |
Trans Hex Operations (Pty) Ltd |
Vredendal |
Diamonds |
73.8857 |
10 |
26 |
Trans Hex Operations (Pty) Ltd |
Vredendal |
Diamonds |
74.6425 |
10 |
26 |
Trans Hex Operations (Pty) Ltd |
Van Rhynsdorp |
Diamonds |
61.1032 |
10 |
26 |
Trans Hex Operations (Pty) Ltd |
Van Rhynsdorp |
Precious Stones |
663.672 |
10 |
26 |
Trans Hex Operations (Pty) Ltd |
Vredendal |
Diamonds |
1225.3 |
10 |
26 |
Trans Hex Operations (Pty) Ltd |
Vredendal |
Diamonds |
3223.37 |
10 |
26 |
National Portland Cement Company Limited |
Malmesbury |
Limestone |
98.367 |
30 |
11 |
Malans Quarries (Pty) Ltd |
Malmesbury |
Gravel |
50.5755 |
20 |
3 |
Lezmin 2021 CC |
George |
Stone/Sand/Gravel |
28.858 |
10 |
13 |
Consol Limited |
Wynberg |
Silica Sand |
99.2443 |
30 |
54 |
Samrec (Pty) Ltd |
Swellendam |
Bentonite |
990.415 |
15 |
48 |
Trans Hex Operations (Pty) Ltd |
Robertson |
Dolomite |
171.92 |
30 |
5 |
Derby Concrete CC |
George |
Sand |
9.9691 |
12 |
12 |
Derby Concrete CC |
Knysna |
Stone |
3.7154 |
12 |
3 |
Voelmoed Quarries |
Oudtshoorn |
Stone |
52.94 |
30 |
18 |
Owen Vincent Morgan |
Knysna |
Sand/Stone |
11.1207 |
30 |
6 |
Owen Vincent Morgan |
Knysna |
Sand |
96.1333 |
30 |
6 |
Shelfcorp 63 CC |
Knysna |
Sand |
8.3886 |
10 |
7 |
R Brochetto Transport (Pty) Ltd |
Wynberg |
Sand |
42.8 |
10 |
49 |
Pronto Beleggings 117 (Pty) Ltd |
Cape Town |
Sand |
20.2446 |
15 |
49 |
Prima Klipbrekers (Pty) Ltd |
Caledon |
Aggregate/Sand |
24.8 |
130 |
3 |
Tygervalley Hills Developments (Pty) Ltd |
Bellville |
Aggregate |
|
20 |
36 |
Steenkampskraal Monazite Mine (Pty) Ltd |
Van Rhynsdorp |
Monazite |
473.704 |
20 |
147 |
Mercedes Trust |
George |
Gravel |
16 |
10 |
25 |
Rheebok Bricks Holdings (Pty) Ltd |
Mossel Bay |
Clay |
18.1316 |
15 |
124 |
Villiersdorp Quarries (Pty) Ltd |
Villiersdorp |
Quartzitic/Sandstone |
62.422 |
25 |
38 |
Joostenberg Brick (Pty) Ltd |
Paarl |
Clay |
45.5549 |
30 |
1 |
Johannes Andries Jamneck |
Bredasdorp |
Clay |
15.4 |
10 |
3 |
S S F Boedery CC |
Vredenburg |
Granite/Sand |
229.068 |
15 |
3 |
Rivetprops 49 (Pty) Ltd |
Malmesbury |
Clay |
43.2123 |
30 |
1 |
Brakkefontein Properties (Pty) Ltd |
Malmesbury |
Clay |
317.055 |
20 |
180 |
Company |
Location |
Minerals |
Size/ha |
Years of operation |
Number of employees |
GP |
|||||
Newberry Recovery Works (Lewisham) CC |
Krugersdorp |
Platinum Group Metals |
10.6677 ha |
06 |
02 |
B & E Silica (Pty) Ltd (ceded to Bronx Mining PtyLtd) |
Bronkhorstspruit |
Silica Sand |
289.1626 |
30 |
16 |
Anglogold Ashanti Ltd West Wits |
Oberholzer |
Gold |
5289.7537 |
30 |
8510 |
Sub Nigel Gold Mining Co Ltd (Gold One) |
Nigel |
Gold |
3013 |
30 |
2 390 |
Krosa (Eiendoms) Beperk |
Bronkhorstspruit |
Sand |
106.3275 |
25 |
13 |
Regal Brick (Pty) Ltd |
Westonaria |
Clay |
759.1466 |
30 |
406 |
Regal Brick (Pty) Ltd |
Krugersdorp |
Clay |
39.8251 |
30 |
Share ( rotate) employees with the above- 406 |
Westside Trading 534 (Pty) Ltd |
Nigel |
Stone, Shale, Clay |
46.65 |
6 |
30 |
Ilangabi Investments 12 (Prop) Limited |
Bronkhorstspruit |
Shale/Clay |
41.8344 |
6 |
184 |
Corobrik (Pty) Ltd |
Pretoria |
Clay |
9.345 |
21 |
78 |
Labucon Resources (Pty) Ltd |
Cullinan |
Sand |
229.7 |
20 |
14 |
Verlesha Investments (Pty) Ltd |
Bronkhorstspruit |
Sand |
433.70 |
15 |
31 |
Zimbiwa Resources (Pty) Ltd |
Ekhurhuleni |
Dolomite,Aggregate,Dolerite, Quartzite |
73.1541 |
30 |
71 |
Ilangabi Investments 12 (Pty) Limited |
Bronkhorstspruit |
Clay |
214.6647 |
20 |
114 |
Crown Gold Recoveries (Pty) Ltd (TOPSTAR DUMP) |
Johannesburg |
Gold, Silver |
10.86 |
3 |
40 |
Bedford Plant Hire (Pty) Ltd |
Carletonville |
Aggregate, Sand |
28331 |
30 years |
58 |
Main Reef Crushers CC |
Roodepoort |
Sand, Stone (from waste) |
156,7262 |
10 years |
8 |
Trustees for the time being of the WITPOORT SAND TRUST |
Kungwini |
Sand, Clay, Silica Sand, Stone |
146.999 |
24 |
19 |
Apollo Brick (Pty) Ltd |
Kempton Park |
Clay, |
130.2313 |
10 |
280 |
Corobrick (Pty) Ltd |
Roodepoort |
Clay |
95.7931 |
30 |
290-share employees with 120 MR |
Corobrik (Pty) Ltd |
Roodepoort |
Clay |
35.8810 |
30 |
290-share employees with 120 MR |
Corobrik (Pty) Ltd |
Kempton Park |
Clay |
7.1515 |
01 |
290-share employees with 120 MR |
Pienaarspoort Ontwikkelings (Pty) Ltd |
Cullinan |
Sand, Silica Sand, Foundry sand, Glass sand, MetallurgicalSilica, Aggregate and Stone aggregate |
203.4475 |
30 |
155 |
Mystic Blue Trading 135 (Pty) Ltd |
Pretoria |
Sand,Sand maanufactured from hard rock |
85.4756 |
10 |
11 |
Purple Rain Properties No 421 (Pty) Ltd |
Vereeniging |
C;ay,Shale |
377.429 |
10 |
17 |
Yakani Bricks (Pty) Ltd |
Sandton |
Clay |
181.2098 |
10 |
466 |
Lafarge Mining SA.(Pty)Ltd |
Vereeniging |
Aggregate |
121.0385 |
30 |
5 |
Corobrick (Pty) Ltd |
Pretoria |
Clay |
7.0061 |
7 |
87 |
Sundowner Investment(Pty)Ltd |
Pretoria |
Stone, Sand, Clay, Cabbro-Norite |
60.5 |
15 |
14 |
Ilangabi Investments 12 (Pty) Ltd |
Nigel |
Clay, Coal, Stone |
84.7579 |
30 |
56 |
Life Reign |
Bronkhorstspruit |
Sand |
28 |
5 |
6 |
Mystic Blue Trading 135 (Pty) Ltd |
Kempton Park |
Aggregate |
150 |
10 |
103 |
City of Tshwane |
Pretoria |
Gravel |
24.1564 |
10 |
8 |
Forfar Mining (Pty) Ltd |
Bronkhorstspruit |
Clay (general) and sand (general) |
42.8 |
14 |
3 |
Nokeng Fluorspar Mine (Pty) Ltd |
Cullinan |
Fluorspar |
4410.4414 |
20 |
526 |
Bundu Mining (Pty) Ltd |
Tshwane |
Sand & Stone |
97.5679 |
10 |
27 |
City of Tshwane Metropolitan Municipality |
Pretoria |
Gravel |
45.3388 |
10 |
5 |
Brandbach Mining (Pty) Ltd |
Cullinan |
Stone aggregate, (gravel), sand (general) and sand manufactured from hard rock |
373.85 |
20 |
14 |
City of Tshwane Metropolitan Municipality |
Pretoria |
Gravel |
70.39 |
10 |
8 |
Coromining (Pty) Limited |
Roodepoort |
Clay |
338.3652 |
30 |
12 |
African's Best Minerals 146 Ltd |
Carletonville |
Stone aggregate (waste dump), Sand manufactured from (waste dump) and gold ore |
49.2496 |
14 |
23 |
Four Rivers Trading 263 (Pty) Ltd |
Pretoria |
sand general and stone aggregate |
125.8996 |
20 |
7 |
Ulpac (Pty) Ltd (NOW WALLMANNSTHAL (PTY) LTD) |
Cullinan |
Fluospar and Rare Earths |
290 |
16 |
381 |
City of Tshwane Municipality |
Pretoria |
Gravel |
99.9892 |
10 |
5 |
Infrasors Holdings Limited |
Pretoria |
Silica sand, silica sand (silica), silcrete (silica), metallurgical (silica), glass sand, foundry sand and crusher sand |
364.9264 |
10 |
28 |
Oakleaf Investments Holdings 95 (Pty) Ltd |
Bronkhorstspruit |
Coal |
519.9619 |
10 |
40 |
Simmer Deep Mining (Pty) Ltd |
Krugersdorp |
Gold Ore |
147.4602 |
30 |
61 |
Ngwenya Mining and Exploration (Pty) Ltd |
Heidelberg |
Irone ore |
279.1422 |
10 |
12 |
Lengeo (Pty) Ltd |
Randfontein |
Stone aggregate gravel and sand (general) |
368.25 |
10 |
7 |
Black Royalty Minerals (Pty) Ltd |
Bronkhorstspruit |
Coal |
250 |
24 |
60 |
Anglogold Ashanti Ltd |
Johannesburg |
Gold |
30 |
9477 |
|
Delf Sand (Pty) Ltd |
Cullinan |
Sand |
125.2473 |
30 |
10 |
Mocke Willem Rudolf |
Pretoria |
Sand |
98.89 |
11 |
12 |
Randfontein Estates Ltd (Elandskraal Operation) |
Roodepoort & Randfontein |
Gold |
7023.447 |
30 |
4588 |
Randfontein Estates Ltd |
Roodepoort & Randfontein |
Gold |
7451.056 |
30 |
5574 |
Pretoria Brickworks (Pty) Ltd |
Pretoria |
Clay |
56.00625 |
9 |
189 |
Pretoria Brickworks (Pty) Ltd |
Pretoria |
Clay |
58.7717 |
9 |
Same employees as above (189) |
M R AUST BK |
Cullinan |
Sand |
95.4135 |
20 |
28 |
Eckraal Quarries (Pty) Ltd |
Wonderboom |
Sand, Silica |
390.7425 |
10 |
105 |
Impafa Resources (Pty) Ltd |
Randfontein |
Gold |
882.115 |
05 |
They have applied for renewal – they were not operational |
Era Stene (Pty) Ltd |
Pretoria |
Clay, Sand |
118.8995 |
30 |
93 |
5 J Sand (Pty) Ltd |
Cullinan |
Sand |
19.8 |
1 |
7 |
Lion Park Quarries (Pty) Ltd |
Randburg |
Sand, Stone, Gravel |
46.554 |
20 |
78 |
Sterkfontein Bricks (Pty) Ltd |
Pretoria |
Clay |
61.7416 |
30 |
203 |
Unicorn Bricks CC |
Krugersdorp |
Clay |
18.8437 |
30 |
48 |
Corobrik (Pty) Ltd |
Springs |
Clay |
39.6167 |
29 |
129 |
GFI Mining SA (Pty) Ltd (changed name to Sibanye Gold Ltd) |
Westonaria |
Gold |
20087.0016 |
20 |
11068 |
Glen Douglas Dolomite (Pty) Ltd |
Vereeniging |
Dolomite |
445.927 |
30 |
186 |
Disbergen Property Investment (Prop) Ltd |
Heidelberg |
Sand |
534.0364 |
30 |
4 |
De Bruyn W |
Randfontein |
Sand |
42.2987 |
30 |
4 |
Corobrik (Pty) Ltd |
Pretoria |
Clay |
212.0067 |
10 |
152 |
De Beers Cons Mines Ltd |
Cullinan |
Diamonds |
453.1975 |
30 |
1475 |
Corobrik (Pty) Ltd |
Oberholzer |
Clay |
337.4556 |
30 |
197 |
Nova Bricks (Pty) Ltd |
Pretoria |
Coal and Clay |
613.337 |
1 |
12 |
SPH Kundalila (Pty) Ltd |
Midrand |
Sand |
72.5724 |
30 |
25 |
Willow Quarries |
Pretoria |
Sand stone |
84.1194 |
1 |
38 |
Class A Trading 32 (Pty) Ltd |
Springs |
Clay |
95.81 |
1 |
250 |
Drift Super Sand (Pty) Ltd |
Krugersdorp |
Sand, Stone, Gravel |
87.1395 |
25 |
113 |
Klipfontein Sand HQ (Pty) Ltd |
Bronkhorstspruit |
Stone, gravel, sand |
112.0171 |
25 |
59 |
Corobrik (Pty) Ltd |
Roodepoort |
Clay |
682.3112 |
10 |
290 |
Corobrik (Pty) Ltd |
Roodepoort |
Clay |
213.7664 |
30 |
290 -Share with the above |
Brandbach Sand CC |
Cullinan |
Sand |
68ha |
23 |
14 |
Johan Booysen |
Pretoria |
Norite |
37.84 |
30 |
29 |
Victoria Bricks (Pty) Ltd |
Olifantsfontein |
Clay |
100.0046 |
Granted on 23 -04-12 |
6 |
African Brick (Pty) Ltd |
Krugersdorp |
Clay |
95.266 |
18 |
21 |
Sandtoria CC |
Cullinan |
Sand |
13.31 |
18 |
4 |
Crushco (Pty) Ltd |
Kempton Park |
Sand |
150 |
10 |
48 |
J J Maritz and Son (Pty) Ltd |
Culinan |
Sand |
203.061 |
30 |
150 |
Quarry Cats Mining Licence Laezonia (Pty) Ltd |
Tshwane |
Sand Stone |
93.5140 |
30 |
77 |
Arslanian Armen |
Cullinan |
Diamonds |
38.0182 |
15 |
10 |
Corobrik (Pty) Ltd |
Kempton Park |
Clay |
10.3402 |
30 |
12 |
CPJ KUHN |
Cullinan |
Diamonds |
286 |
6 |
10 |
ERGO MINING (PTY) LTD |
Benoni and Springs |
Gold, PGM, Pyrite |
2738.5825 |
12 |
129 |
Corobrik (Pty) Ltd |
Bronkhorstspruit |
Clay |
10.3402 |
30 |
12 |
Holcim (SA) (Pty) Ltd |
Pretoria |
Dolomite |
211.1371 |
30 |
40 |
Afrisam (SA) Properties (Pty) Ltd |
Pretoria |
Quartzite |
70.7652 |
23 |
44 |
Afrisam (SA) Properties (Pty) Ltd |
Randburg |
Granite |
104.6248 |
30 |
47 |
Parkin Mine Enterprises(Pty) |
Nigel |
Clay |
236.0892 |
20 |
25 |
Brikor Vitro (Pty) Ltd |
Nigel |
Clay |
23.1637 |
12 |
7 |
Canyon Rock (Pty) Ltd |
Tshwane |
Granite,Norite |
123.7830 |
30 |
55 |
Canyon Rock (Pty) Ltd |
Wonderboom |
Norite |
58.0098 |
01 |
22 |
Randfontein Estates Limited |
Randfontein |
Gold |
3130.4301 |
30 |
3622 |
Randfontein Estates Limited |
Randfontein |
Gold and associated minerals |
1518.2310 |
16 |
862 |
Pretoria Portland Cement Company Limited |
Gauteng |
Aggregate,Sand |
219.0905 |
30 |
16 |
Mooiplaas Dolomite(Pty) Ltd |
Tshwane |
Dolomite |
1039.49 |
30 |
89 |
African Brick (Pty) Ltd |
Lenasia |
Clay |
108.1716 |
30 |
21 |
New Kleinfontein Gold Mine |
Nigel |
Gold and associated minerals |
3989.2093 |
15 |
2828 |
Crown Gold Recoveries (Pty) Limited |
Johannesburg |
Gold and all minerals |
1125.2539 |
3 |
181 |
Crown Gold Recoveries (Pty) Limited |
Johannesburg |
Gold and all minerals |
570.2483 |
3 |
117 |
Crown Gold Recoveries (Pty) Limited |
Johannesburg |
Gold and all minerals |
616.0635 |
3 |
181 |
Crown Gold Recoveries (Pty) Limited |
Johannesburg |
Gold and all minerals |
575.9063 |
7 |
116 |
David Solomons Tortello Investments |
Brakpan |
Calaine Residue |
35.1629 |
3 |
12 |
Afrisam (SA) Properties (Pty) Ltd |
Springs |
West Rock |
11.7179 |
04 |
29 |
Afrisam (SA) Properties (Pty) Ltd |
Springs |
West Rock |
6.8 |
04 |
Same employees as the above (29) |
Afrisam (SA) Properties (Pty) Ltd |
Springs |
West Rock |
31.1482 |
09 |
Same employees as the above (29) |
Afrisam (SA) Properties (Pty) Ltd |
Springs |
West Rock |
5.6327 |
11 |
Same employees as the above (29) |
Afrisam (SA) Properties (Pty) Ltd |
Heidelberg |
West Rock |
7.7875 |
12 |
Same employees as the above (29) |
Afrisam (SA) Properties (Pty) Ltd |
Heidelberg |
West Rock |
8.2682 |
15 |
Same employees as the above (29) |
Afrisam (SA) Properties (Pty) Ltd |
Heidelberg |
West Rock |
4.6891 |
20 |
Same employees as the above (29) |
Afrisam (SA) Properties (Pty) Ltd |
Heidelberg |
West Rock |
32.4771 |
10 |
Same employees as the above (29) |
Afrisam (SA) Properties (Pty) Ltd |
Heidelberg |
West Rock |
12.1926 |
12 |
Same employees as the above (29) |
Afrisam (SA) Properties (Pty) Ltd |
Heidelberg |
West Rock |
8.1201 |
13 |
Same employees as the above (29) |
Afrisam (SA) Properties (Pty) Ltd |
Heidelberg |
West Rock |
6.5873 |
9 |
Same employees as the above (29) |
Afrisam (SA) Properties (Pty) Ltd |
Heidelberg |
West Rock |
12.6923 |
11 |
Same employees as the above (29) |
Mogale Gold (Pty) Ltd |
Roodepoort |
Gold, Silver, Uranium |
265,5872 |
15 |
577 |
Strydom Sand (Pty) Ltd |
Krugersdorp |
Sand (General) |
41.1917 |
23 |
5 |
Sky Sands (Pty) Ltd |
Vereeniging |
Sand (General) |
1315.3007 |
19 |
64 |
Goldfields Operation (Pty) Ltd |
Westonaria |
Gold and associated minerals |
3566.3740 |
30 |
4 279 |
C.H Du Plooy |
Randfontein |
Various Sand |
26.031 |
2 |
15 |
Dr Cornelius Tobias Verwey |
Pretoria |
Sand, Clay and Silica Sand |
53.4 |
1 |
3 |
Protea Mines (Pty) Ltd |
Mogale City |
Gold |
763.6811 |
10 |
40 |
Afrisam (SA) Properties (Pty) Ltd |
Johanneasburg |
Waste Rock |
305.3467 |
30 |
39 |
Afrisam (SA) Properties (Pty) Ltd |
Randfontein |
Waste Rock |
119.0570 |
30 |
28 |
Afrisam (SA) Properties (Pty) Ltd |
Brakpan |
Waste Rock |
307.7288 |
30 |
48 |
Rhino Quarries (Pty) Ltd |
Randfontein |
Sand and Aggregate |
235 |
30 |
10 |
Donkerhoek Quatzit (Pty) Ltd |
Cullinan |
Quartzite |
87.7536 |
20 |
32 |
Gravelotte Mines Limited |
Benoni |
Gold ore & associated minerals |
1042.014 |
30 |
50 |
Ceramic Industries Ltd |
Vanderbijlpark |
Clay |
97.6399 |
22 |
14 |
Lyttelton Dolomite (Pty) Ltd |
Tshwane |
Dolomite & Aggregate |
30 |
28 |
|
Ocon Brick Manufacturing (Pty) Ltd |
Vereeniging |
clay (CA), clay (CY), clay (CN) & shale/brickclay (CS) |
220.1038 |
30 |
622 |
Goldplat Recovery (Proprietary) Limited |
Benoni |
Gold Ore & Platinum Group Metals |
21.8952 |
10 |
320 |
P,J&G Hertz (Pty) Ltd |
Kungwini |
Sand (General) |
245.347 |
15 |
14 |
P,J&G Hertz (Pty) Ltd |
Bronkhorstspruit |
Sand (General) |
13.7583 |
10 |
3 |
Brikor Limited |
Nigel |
Clay ,Coal |
83.5565 |
10 |
24 |
Multisand (Pty) Ltd |
Dewildt |
Sand(QY) Sand (QH),Aggregate, Metallugical Silica (QM),Silica (Q) |
249.0995 |
30 |
35 |
Walberer's Brick Works (PTY) Ltd |
Mogale |
Sand |
56.11646 |
4 |
48 |
Oosthuizen Gerhard Dirk |
Cullinan |
Sand |
4.3263 |
10 |
9 |
Klei Minerale (Pty) Ltd |
Pretoria |
Clay |
136.1829 |
30 |
9 |
Klei Minerale (Pty) Ltd |
Pretoria |
Clay |
104.6883 |
30 |
9 -same employees as above-rotating |
Izinyoni Trading 142 (Pty) Ltd |
Pretoria |
Sand & Clay |
313.35 |
10 |
6 |
Benoni Gold Mining Company LTD |
Benoni |
Gold & Stone Aggregate (From waste Dump) |
23.9269 |
6 |
76 |
Benoni Gold Mining Company LTD |
Benoni |
Gold & Stone aggregate (From Waste Dump) |
49.4884 |
30 |
76-same employees as above-rotating |
Benoni Gold Mining |
Benoni |
Gold ore & stone aggregate (Waste rock dump |
23.5026 |
30 |
76-same employees as above-rotating |
Benoni Gold Mining |
Benoni |
Gold ore & Stone aggregate (From Waste rock dump) |
28.8514 |
30 |
76-same employees as above-rotating |
Wearne Quarries Gauteng (Pty) Limited |
Krugersdorp |
Sand & Stone |
111.0953 |
20 |
34 |
Vereeniging Refractories (Pty) Ltd |
Temba |
Refractory Clay |
175.5891 |
20 |
30 |
Vereeniging Refractories (Pty) Ltd |
Springs |
Refractory Clay |
140.3307 |
20 |
83 |
Vergenoeg Mining Company (Pty) Ltd |
Cullinan |
Flurspar and Associated Minerals |
393.4052 |
30 |
264 |
Ceramic Industries Limited |
Vereeniging |
Clay and Shale/Brick Clay |
55.8425 |
10 |
14 |
Ceramic Industries Limited |
Vanderbijlpark |
Clay and Shale/Brick Clay |
205.6586 |
10 |
14 -same employees rotating-as above |
National Ceramic Industries (Pty) Ltd |
Pretoria |
Clay and Shale/Brick Clay |
59.9968 |
18 |
14 -same employees rotating-as above |
Frisarco Trust |
Krugersdorp |
Aggregate |
25.8 |
21 |
16 |
HJG Vervoer BK |
Cullinan |
Sand |
50 |
20 |
10 |
Mono Diamonds (Proprietary) limited |
Cullinan |
Diamonds,Gravel,building sand |
156.7262 |
10 |
8 |
Clyde brickfields (Pty) Ltd |
Benoni |
Clay |
1143.6831 |
30 |
369 |
T.J Maritz & Sons (Pty) Ltd |
Kempton Park |
Sand |
915 |
01 |
63 |
A B Brickworks (Pty) Ltd |
Benoni |
Clay |
41.7544 |
01 |
100 |
Kilo Sand (Pty) Ltd |
Pretoria |
Sand (QY), Sand (QH), Stone Aggregate, Gravel(ST) Gravel (GRAV),Concrete Sand (QO) Crusher Sand (QC) |
128 |
30 |
12 |
Wesbrix (Pty) Ltd |
Pretoria |
Clay |
57.40 |
20 |
106 |
Lancaster Gold Mining Company (Pty) Ltd |
Krugersdorp |
Gold Silver |
27.8286 |
15 |
35 |
Company |
Location |
Minerals |
Size/ha |
Years of operation |
Number of employees |
LP |
|||||
FOSKOR LIMITED 0003MR 0009MR 0022MR 0124MR 0125MR |
PHALABORWA PHALABORWA PHALABORWA PHALABORWA |
PHOSPHATE APATITE PHOSPHATE APATITE APATITE (GEMSTONE) COAL COPPER PHOSPHATE MAGNESITE PSEUDOCOAL SHALE BRICK CLAY TORBNITE OIL SHALE PHOSPHATE MICA COPPER PHOSPHATE IRON ZIRCORNIUM BADDELEYITE |
82.0548 434.025 271.60 365.1983 |
30 30 20 30 |
1243 |
ZEBEDIELA BRICKS (PTY) LTD 083MR |
ZEBEDIELA |
CLAY(GENERAL) |
30 |
18 |
|
NORTHAM PLATINUM LIMITED 36 MR 37 MR |
THABAZIMBI THABAZIMBI |
CHROME COBALT COPPER GOLD NICKEL PGM PRECIOUS METALS |
773.8 6853.7 |
30 30 |
850 |
Exxaro (Grootegeluk) 10013 MR |
LEPHALALE |
COAL |
5434.767 |
30 |
1720 |
RUSTENBURG PLATINUM MINES LTD Amandabult 0048MR |
THABAZIMBI TUBATSE 0129MR |
CHROME COBALT COPPER NICKEL PGM GOLD NICKEL SILVER PGM |
14162.7388 14092.6691 |
30 30 |
12066 |
PRETORIA PORTLAND CEMENT COMPANY LTD 0051MR |
THABAZIMBI |
LIMESTONE, SHALE, LAVA AND OTHER MINERAL REQUIRED FOR CEMENT MANUFACTURE |
6344.2152 |
30 |
328 |
ANDALUSITE RESOURCES (PTY) LTD 0056MR 0100 MR |
THABAZIMBI |
DALUSITE ANDALUSITE |
288.3128 |
30 30 |
197 225 |
DE BEERS CONSOLIDATED MINES LIMITED 0058MR |
MUSINA |
DIAMOND DIAMOND(GENERAL) DIAMOND (KIMBERLITE) DIAMOND ALLUVIAL |
879.7565 |
30 |
3914 |
IMPALA PLATINUM LTD / MARULA PLATINUM (PTY) LTD 0061MR |
TUBATSE |
CHROME COBALT COPPER GOLD NICKEL NIOBIUM(COLUMBIUM0 PGM SILVER SULPHUR |
1273.4845 |
30 |
946 |
RHINO MINERALS (PTY) LTD Sekhukhune Thabazimbi 0072MR 0073MR 0074MR |
TUBATSE SEKHUKHUNE THABAZIMBI |
DALUSITE ANDALUSITE ANDALUSITE |
219.8810 13937.3931 3765.1557 |
13 17 13 |
120 197 |
CONTINENTAL CEMENT (PTY) LTD 0076MR |
THABAZIMBI |
LIMESTONE |
20 |
26 |
|
SAMANCOR CHROME LIMITED 0172MR 0084MR 0191MR 0192MR 1008MR 10042MR |
TEBATSE |
CHROME CHROMITE CHROME (MG & LG REEFS) |
1995.9310 6650.0703 |
30 10 |
192 610 |
UMNOTHO WE SIZWE RESOURCES (PTY) LTD (Black Chrome) 0090MR |
TUBATSE |
CHROME PGM |
3564.1386 |
24 |
692 |
COROBRIK (PTY) LTD 96 MR |
POLOKWANE |
BRICKMAKING CLAY |
96.7552 |
30 |
191 |
CRONIMET CHROME MINING SA (PTY) LTD 115MR |
THABAZIMBI |
CHROME PGM |
2129.1207 |
30 |
40 |
PALABORA MINING COMPANY LTD 0116MR 0118MR 0119MR 0120MR 0121MR 0122MR 0123MR 0117MR |
PHALABORWA |
PHOSPHATE VERMICULITE APATITE(GERMSTONE) BRYTES ALL BASE MINERALS ALL PRECIOUS METALS CLAY GENERAL ALL BASE MINERALS EXCEPT PHOSPHATE |
652,2 356.4 23.9 9.5 154.9 216.9 |
30 30 30 30 30 30 |
4800 |
BLOEMHOF SALT AND CHEMICALS (PTY) LTD 0128MR |
SALT |
30 |
37 |
||
Modikwa Platinum Mine 0129MR |
TUBATSE |
PGM CHROME & ASSOCIATED MINERALS |
14092.6691 |
30 |
4103 |
ATTACLAY (PTY) LTD 0133MR |
TUBATSE |
ATTAPULGITE SEPIOLITE BENTONITE CLAY |
30 |
42 |
|
XSTRATA SOUTH AFRICA (PROPRIETARY) LTD 0176MR |
TUBATSE |
CHROME PGM |
3568.5086 |
30 |
1821 |
CRM BRICK & ASSOCIATED INDUSTRIES (PTY) LTD 0195MR |
MODIMOLLE |
CLAY SHALE/BRICK CLAY |
NOT YET CONVERTED |
||
DMI MINERALS SOUTH AFRICA 10011MR 10017MR |
MUSINA |
DIAMOND DIAMOND(GENERAL) DIAMOND (KIMBERLITE) DIAMOND ALLUVIAL DIAMOND DIAMOND(GENERAL) DIAMOND (KIMBERLITE) DIAMOND ALLUVIAL |
657.7111 |
30 |
60 |
AFRIMAT AGGREGATE TRADING PTY LTD 10023MR |
LEPHALALE |
QUARTZITE CONGLOMARATE |
25.4689 |
30 |
13 |
PLATREEF RESOURCES (PTY) LTD 10067MR |
MOGALAKWENA |
CHROME COBALT COPPER GOLD IRON LEAD NICKEL PGM SILVER VANADIUM ZINC |
7841.265 |
30 |
870 |
SEFATENG CHROME MINE (PTY) 10062 |
TUBATSE |
CHROME |
4558.3638 |
30 |
514 |
BAUBA A HLABIRWA MINING INVESTMENTS PTY LTD 10096MR |
TUBATSE |
CHROME IRON |
2270.9632 |
30 |
200 |
SPITZKOP PLATINUM LTD |
TUBATSE |
30 |
33 |
||
LYTTLETON DOLOMITE LTD |
MABLE HALL |
30 |
36 |
||
CONSOLIDATED METALLURGICAL INDUSTRIES LIMITED 196MR |
MPUMALANGA / LYDENBURG |
CHROME |
108.7676 |
30 |
149 |
ASSMANG LIMITED 0179MR |
TUBATSE |
PGM CHROME & ASSOCIATED MINERALS |
30 |
4185 |
|
TWO RIVERS PLATINUM PROPRIETARY LIMITED 178MR |
TUBATSE |
PGM, RHODIUM, RUTHENINUM, IRIDIUM, SILVER AND GOLD |
25 |
2400 |
COMPANY |
LOCATION |
MINERALS |
SIZE/HA |
YEARS OF OPERATION |
NO OF EMPLOYEES |
NW |
|||||
ANGLOGOLD ASHANTI LIMITED |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
PRECIOUS METALS |
1249.2390 ha |
30 years |
6390 employees |
ANGLOGOLD ASHANTI LIMITED |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
GOLD ORE |
286.4739 ha |
15 years |
|
ANGLOGOLD ASHANTI LIMITED |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
GOLD |
1249.2390 ha |
30 years |
|
ANGLOGOLD ASHANTI LIMITED |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
GOLD |
9618.66 ha |
30 years |
|
ANGLOGOLD ASHANTI LIMITED |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
GOLD |
1249.2390 ha |
30 years |
|
AFRICAN RAINBOW MINERALS PLATINUM (PTY) LTD |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
GOLD ORE |
10549.95 ha |
10 years |
152 employees |
KALAHARI GOLDRIDGE MINING COMPANY LIMITED |
NALEDI LOCAL MUNICIPALITY |
GOLD ORE |
923.4551 ha |
30 years |
123 employees |
RUSTENBURG PLATINUM MINES LIMITED |
RUSTENBURG LOCAL MUNICIPALITY |
PLATINUM GROUP METALS |
9124.3725 ha |
30 years |
14897 employees |
RUSTENBURG PLATINUM MINES LIMITED |
RUSTENBURG LOCAL MUNICIPALITY |
VAROIUS MINERALS |
3363.2745 ha |
20 years |
|
WESTERN PLATINUM LIMITED |
RUSTENBURG LOCAL MUNICIPALITY |
PLATINUM GROUP METALS |
3817.71 ha |
30 years |
32544 employees |
EASTERN PLATINUM LIMITED |
RUSTENBURG LOCAL MUNICIPALITY |
PLATINUM GROUP METALS |
3817.71 ha |
30 years |
|
EASTERN PLATINUM LIMITED |
RUSTENBURG LOCAL MUNICIPALITY |
PLATINUM GROUP METALS |
2846.5333 ha |
30 years |
|
EASTERN PLATINUM LIMITED |
RUSTENBURG LOCAL MUNICIPALITY |
PLATINUM GROUP METALS |
3817.71 ha |
29 years |
|
PANDORA JOINT VENTURE |
MADIBENG LOCAL MUNICIPALITY |
VARIOUS MINERALS |
4377.3819 ha |
30 years |
|
EASTERN PLATINUM LIMITED |
MADIBENG LOCAL MUNICIPALITY |
PGM, GOLD, SILVER, COPPER, COBALT, CHROME |
4289.812 ha |
30 years |
|
WESTERN PLATINUM LIMITED |
RUSTENBURG LOCAL MUNICIPALITY |
PLATINUM GROUP METALS |
175.0100 ha |
30 years |
|
WESTERN PLATINUM LIMITED |
RUSTENBURG LOCAL MUNICIPALITY |
VARIOUS MINERALS |
34.3032 ha |
30 years |
|
IMPALA PLATINUM (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
VAROIUS MINERALS |
14355.5626 ha |
9 years |
37337 employees |
IMPALA PLATINUM (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
VARIOUS MINERALS |
496.1516 ha |
9 years |
|
IMPALA PLATINUM (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
VAROIUS MINERALS |
373.3769 ha |
9 years |
|
IMPALA PLATINUM (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
VAROIUS MINERALS |
11711.8083 ha |
9 years |
|
WITKOP FLUORSPAR MINE (PTY) LTD |
TSWAING LOCAL MUNICIPALITY |
FLUORSPAR |
345.667 ha |
15 years |
52 employees |
XSTRATA SOUTH AFRICA (PROPRIETARY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE, PGM |
445.68 ha |
30 years |
14 034 employees |
XSTRATA SOUTH AFRICA (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE, PGM |
445.68 ha |
30 years |
|
XSTRATA SOUTH AFRICA (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE, PGM |
445.68 ha |
30 years |
|
XSTRATA SOUTH AFRICA (PROPRIETARY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE, PGM |
47.6037 |
30 years |
|
XSTRATA SOUTH AFRICA (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE, PGM |
445.68 ha |
20 years |
|
XSTRATA SOUTH AFRICA (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE, PGM |
445.68 ha |
30 years |
|
XSTRATA/SAMANCOR PRODUCTION JOINT VENTURE |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE, PGM |
678.8972 |
30 years |
|
XSTRATA SOUTH AFRICA (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE, PGM |
554.1542 |
30 years |
|
XSTRATA SOUTH AFRICA (PROPRIETARY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE, PGM |
445.68 ha |
30 years |
|
XSTRATA SOUTH AFRICA (PROPRIETARY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
VANADIUM ORE |
3609.7449 ha |
20 years |
|
XSTRATA SOUTH AFRICA (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE, PGM |
25.6168 ha |
6 years |
|
XSTRATA SOUTH AFRICA (PROPRIETARY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE, PGM |
445.68 ha |
30 years |
|
XSTRATA SOUTH AFRICA (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE, PGM |
445.68 ha |
30 years |
|
RED GRANITI S.A (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
GABBRO NORITE/DIMENSION STONE |
137.46 ha |
30 years |
87 employees |
RED GRANITE SA PTY LTD |
RUSTENBURG LOCAL MUNICIPALITY |
GABBRO NORITE |
137.4656 ha |
30 years |
|
KELGRAN AFRICA (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
GABBRO NORITE/DIMENSION STONE |
393.2838 ha |
30 years |
|
KUDU GRANITE MARIKANA (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
GRANITE/SYNITE |
748.4611 ha |
30 years |
64 employees |
KUDU GRANITE MARIKANA (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
GABBRO NORITE |
748.4611 ha |
30 years |
|
KUDU GRANITE OPERATIONS (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
GABBRO NORITE |
1069.3723 ha |
30 years |
|
SAVANNA DIAMONDS (PTY) LTD |
NALEDI LOCAL MUNICIPALITY |
DIAMONDS ALLIVUAL AND GEMSTONE |
3073.8658 ha |
25 years |
22 employees |
NELL BROTHERS (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
GRANITE |
2937.0496 ha |
30 years |
24 employees |
HERNIC FERROCHROME |
MADIBENG LOCAL MUNICIPALITY |
CHROME ORE |
1168.488 ha |
30 years |
632 employees |
HERNIC FERROCHROME |
MADIBENG LOCAL MUNICIPALITY |
CHROME ORE |
904.1 ha |
30 years |
|
HERNIC FERROCHROME |
MADIBENG LOCAL MUNICIPALITY |
CHROME |
894.9144 ha |
30 years |
|
LAFARGE SA (PTY) LTD |
DITSOBOTLA LOCAL MUNICIPALITY |
LIMESTONE AND RELATED MINERALS |
745.0 ha |
30 years |
664 employees |
BAYER (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE |
952.2410 ha |
20 years |
1300 employees |
VAMETCO MINERALS |
MADIBENG LOCAL MUNICIPALITY |
VANDIFERROUS MAGNETITE |
1507.7427 ha |
20 years |
230 employees |
WONDERSTONE LIMITED |
DITSOBOTLA LOCAL MUNICIPALITY |
PYROPHYLITE (WONDERSTONE) |
135.9160 ha |
30 years |
47 employees |
ORANJE MYNBOU EN VERVOER (PTY) LTD |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
CRUSHER SAND, MANUFACTURED FROM WASTE DUMPS, STONE AGGREGATE FROM WASTE DUMP, STONE AGGREGATE |
14.0 ha |
20 years |
47 employees |
PRETORIA PORTLAND CEMENT COMPANY LIMITED |
RAMOTSHERE MOILOA LOCAL MUNICIPALITY |
LIMESTONE, SHALE, DOLOMITE |
6286.9901 ha |
30 years |
288 employees |
ILITHA MINING (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME ORE |
271.098 ha |
30 years |
152 employees |
BARPLATS MINES LIMITED |
MADIBENG LOCAL MUNICIPALITY |
CHROME, COBALT, COPPER, GOLD |
155.6722 ha |
10 years |
1500 employees |
ROYAL BAFOKENG NATION |
RUSTENBURG LOCAL MUNICIPALITY |
COPPER, PGM, NICKEL ORE |
846.334 ha |
30 years |
264 employees |
PILANESBERG PLATINUM MINES (PTY) LTD |
MOSES KOTANE LOCAL MUNICIPALITY |
GOLD, PGM, COPPER, NICKEL, COBALT |
5453.73 ha |
30 years |
813 employees |
BAKUBUNG MINERALS (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
PGM, GOLD, SILVER, COPPER, NICKEL |
2009.6 ha |
25 years |
675 employees |
SEPHAKU DEVELOPMENT (PTY) LTD |
DITSOBOTLA LOCAL MUNICIPALITY |
LIMESTONE |
3659.36 ha |
30 years |
800 employees |
AFRISAM (SOUTH AFRICA) (PTY) LTD |
DITSOBOTLA LOCAL MUNICIPALITY |
LIMESTONE AND CLAY |
8261.24 ha |
30 years |
500 employees |
AFRISAM (SOUTH AFRICA) (PTY) LTD |
MAHIKENG LOCAL MUNICIPALITY |
SHALE |
8261.24 ha |
30 years |
|
THARISA MINERALS (PTY) LTD |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME, PGM, COPPER, NICKEL |
5515.53 ha |
30 years |
2034 employees |
WOODSTOCK SANDWERKE (PTY) LTD |
KGETLENGRIVER LOCAL MUNICIPALITY |
SAND (GENERAL) AND CONCRETE SAND |
854.0 ha |
30 years |
4 employees |
BERT'S BRICKS (PTY) LTD |
MAHIKENG LOCAL MUNICIPALITY |
CLAY |
35.4 ha |
20 years |
1 employee |
BERT'S BRICKS (PTY) LTD |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
CLAY (GENERAL) |
76.3441 ha |
30 years |
1 employees |
BERT'S BRICKS (PTY) LTD |
TLOKWE LOCAL MUNICIPALITY |
CLAY |
35.4 ha |
10 years |
|
BERT'S BRICKS (PTY) LTD |
TLOKWE LOCAL MUNICIPALITY |
CLAY |
35.4 ha |
30 years |
|
BERT'S BRICKS (PTY) LTD |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
CLAY |
34.5 ha |
10 years |
|
PRETORIA PORTLAND CEMENT COMPANY LIMITED |
MADIBENG LOCAL MUNICIPALITY |
LIMESTONE |
6313.62 ha |
30 years |
647 employees |
PLATCRO MINERALS CC |
MADIBENG LOCAL MUNICIPALITY |
CHROMITE |
28.93 ha |
6 years |
24 employees |
SAMANCOR CHROME LIMITED |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME |
10463.023 ha |
30 years |
650 employees |
SAMANCOR CHROME LIMITED |
RUSTENBURG LOCAL MUNICIPALITY |
CHROME |
10463.023 ha |
30 years |
|
JAN DE WET |
TLOKWE LOCAL MUNICIPALITY |
CLAY |
469.56 ha |
30 years |
37 employees |
RUSTENBURG PLATINUM MINES LTD |
RUSTENBURG LOCAL MUNICIPALITY |
ALL MINERALS |
212.8583 ha |
30 years |
23804 employees |
RPM |
RUSTENBURG LOCAL MUNICIPALITY |
PGM/CHROME |
1120.7494 ha |
30 years |
|
RPM |
RUSTENBURG LOCAL MUNICIPALITY |
PGM/ASSOCIATED |
10730.0057 ha |
30 years |
|
THE TRUSTEES OF THE GRATIA MAGNA TRUST |
MAMUSA LOCAL MUNICIPALITY |
DIAMONDS |
485.8378 ha |
30 years |
22 employees |
MMABATHO CRUSHERS (PTY) LTD |
MOLOPO LOCAL MUNICIPALITY |
DIAMONDS |
889.2230 ha |
10 years |
20 employees |
MMABATHO CRUSHERS |
MOLOPO LOCAL MUNICIPALITY |
CRUSH STONE |
67.1545 ha |
30 years |
|
COROMINING (PTY) LTD |
TLOKWE LOCAL MUNICIPALITY |
SAND AND CLAY |
14355.56 ha |
25 years |
46 employees |
COROMINING (PTY) LTD |
MATLOSANA |
CLAY |
14355.56 ha |
25 years |
|
COROMINING (PTY) LTD |
MATLOSANA |
CLAY |
17.0839 ha |
25 years |
|
COROMINING (PTY) LTD |
MATLOSANA |
CLAY |
28.8653 ha |
25 years |
|
COROMINING (PTY) LTD |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
CLAY (GENERAL) |
14355.56 ha |
30 years |
|
COROMINING (PTY) LTD |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
CLAY (GENERAL), BRICK MAKING MATERIAL |
28.8430 ha |
25 years |
|
PROGRAMME FOR COMMUNITY DEVELOPMENT |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
GOLD ORE |
345.7 ha |
30 years |
200 employees |
LATILLA MINERAL MARKETING |
MADIBENG LOCAL MUNICIPALITY |
LIMESTONE |
1026.62 ha |
30 years |
37 employees |
NEW VENTURE MINING |
MADIBENG LOCAL MUNICIPALITY |
DIMENSION STONE |
381.1626 ha |
30 years |
257 employees |
NEW VENTURE MINING |
MADIBENG LOCAL MUNICIPALITY |
DIMENSION STONE |
2109.4681 ha |
30 years |
|
MANNGWE MINING |
MADIBENG LOCAL MUNICIPALITY |
IRON ORE |
7683.6862 ha |
30 years |
58 employees |
RHYTHM OF THE NATION |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
GOLD ORE |
2548.6800 ha |
30 years |
82 employees |
PROGRAMME FOR COMMUNITY DEVELOPMENT |
CITY OF MATLOSANA LOCAL MUNICIPALITY |
GOLD ORE |
345.7 ha |
20 years |
22 employees |
ENERMIN AFRICA |
MAHIKENG LOCAL MUNICIPALITY |
SAND (GENERAL) |
409.0 ha |
30 years |
24 employees |
DISTANT STAR TRADING |
JB MARKS LOCAL MUNICIPALITY |
MANGANESE ORE |
2557.6288 ha |
25 years |
22 employees |
CADSA INVESTMENTS (PTY) LTD |
MAMUSA LOCAL MUNICIPALITY |
ALLUVIAL DIAMONDS |
364.0261 ha |
13 years |
23 employees |
BAROLONG SAND (PTY) LTD |
MAHIKENG LOCAL MUNICIPALITY |
SAND (GENERAL) |
136.26 ha |
30 years |
18 employees |
Company Name |
location |
Commodity |
Size/ha |
Years of operation |
Number of employees |
MP |
|||||
UMSIBITHI MINING (PTY) LTD |
CAROLINA |
COAL |
38822 |
25 |
163 |
GLENCORE OPERATIONS SOUTH AFRICA (PTY) LTD |
WITBANK |
COAL |
9878,2 |
10 |
1108 |
KANGRA COAL (PTY) LTD |
PIET RETIEF |
COAL |
5007,1129 |
8 |
1224 |
DORSTFONTEIN COAL MINES (PTY) LTD |
DELMAS |
COAL |
2608,2 |
5 |
223 |
ERA STENE (PTY) LTD |
DELMAS |
CLAY (GENERAL) |
3162 |
28 |
20 |
SASOL MINING (PROPRIETARY) LIMITED |
HIGHVELD RIDGE |
COAL |
94 |
30 |
1360 |
SASOL MINING (PROPRIETARY) LIMITED |
HIGHVELD RIDGE |
COAL |
326,3 |
12 |
186 |
SASOL MINING (PROPRIETARY) LIMITED |
HIGHVELD RIDGE |
COAL |
119,1 |
30 |
1300 |
EXXARO COAL MPUMALANGA (PTY) TD |
BELFAST |
COAL |
3979,1 |
8 |
1224 |
SILVER UNICORN TRADING 33 (PTY) LTD |
BELFAST |
COAL |
610,5 |
5 |
450 |
ELANDSFONTEIN COLLIERY (PTY) LTD. |
WITBANK |
COAL |
572,6 |
5 |
92 |
TRANSVAAL GOLD MINING ESTATES |
PILGRIMS REST |
GOLD |
57,2 |
|
1057 |
BENICON MINING (PTY) LTD |
ERMELO |
COAL |
471,8 |
5 |
107 |
STONETECH (PTY) LTD |
Nkomazi |
STONE |
12,8 |
30 |
30 |
NORTHERN COAL (PTY) LTD |
CAROLINA |
COAL |
484,4 |
10 |
99 |
BELFAST SILICA (PTY) LTD |
BELFAST |
SILICA, AGGREGATES |
19,5 |
40 |
31 |
ECCA HOLDINGS (PTY) LTD |
HIGHVELD RIDGE |
CLAY |
5664 |
30 |
140 |
ECCA HOLDINGS (PTY) LTD |
KWA MHLANGA |
CLAY |
86,9 |
|
198 |
TEGETA EXPLORATION AND RESOURCES (PTY) LTD |
DELMAS |
COAL |
1179,3 |
20 |
542 |
AFRIMAT AGGREGATES TRADING (PTY) LTD |
WITBANK |
AGGREGATE (GRAVEL) |
47,9 |
30 |
62 |
BLACK GOLD COAL ESTATES (PTY) LTD |
CAROLINA |
COAL |
703,6 |
8 |
25 |
SASOL MINING (PROPRIETARY) LIMITED |
BETHAL |
COAL |
124,9 |
30 |
1400 |
STUART COAL (PTY) LTD |
DELMAS |
COAL |
255,4 |
30 |
54 |
KLEINFONTEIN COLLIERY (PTY) LTD |
MIDDLEBURG |
COAL |
958,8 |
8 |
332 |
EXXARO COAL MPUMALANGA (PTY) LTD |
BELFAST |
COAL |
300,1 |
30 |
493 |
BLACK WATTLE COLLIERY (PTY) LTD |
MIDDLEBURG |
COAL |
1152,3 |
10 |
540 |
SASOL MINING (PROPRIETARY) LIMITED |
HIGHVELD RIDGE |
COAL |
114,1 |
30 |
1350 |
(B&E SILICA) (PTY) LTD |
DELMAS |
SILICA SAND (GENERAL) |
25,2 |
20 |
135 |
INYANDA COAL (PTY) LTD |
WITBANK |
COAL |
644,4 |
20 |
980 |
ANGLO OPERATIONS LIMITED |
WITBANK |
COAL |
207,5 |
20 |
1331 |
MIDDELWIT STENE (PTY) LTD ( MP COROBRIK (PTY) LTD MAGDALA MINING) |
MIDDLEBURG |
CLAY (SAND GENERAL) |
1428,4 |
10 |
58 |
DORSTFONTEIN COAL MINES (PTY) LTD |
ETHAL |
COAL |
2000,4 |
30 |
223 |
MAKESHIFT 1182 (PTY) LTD |
WITBANK |
CLAY (GENERAL) |
52,5 |
10 |
1057 |
MATT TRADING (PTY) LTD |
VOLKSRUST |
COAL |
2360,1 |
21 |
559 |
ELANDSFONTEIN COLLIERY (PTY) LTD. |
ERMELO |
COAL |
234,7 |
5 |
187 |
LANGCAREL (PTY) LTD |
WITBANK |
COAL |
921,5 |
30 |
206 |
ANGLO OPERATIONS LIMITED |
Burgersfort |
AGGREGATE |
58,7 |
11 |
516 |
NKOMATI ANTHRACITE (PTY) LTD |
NKOMAZI |
COAL |
11496,8 |
30 |
487 |
GOEDEHOOP STENE CC |
CAROLINA |
CLAY (GENERAL) |
85,6 |
|
42 |
MIDDELWIT STENE (PTY) LTD (MPP: COROBRIK -EAST BRICK) |
MIDDLEBURG |
SHALE/BRICKCLAY |
362,3 |
10 |
58 |
LONEROCK QUARRIES CC |
WITBANK |
SAND (GENERAL) |
312,3 |
9 |
77 |
UMCEBO MINING (PTY) LTD |
CAROLINA |
COAL |
338,4 |
|
|
PEC ( PTY) LTD |
CAROLINA |
COAL |
17,047 |
7 |
207 |
TUMELO COAL (PROPRIETARY) LIMITED |
MIDDLEBURG |
COAL ,PSEUDOCOALTORBANITE/OIL SHALE |
438,4 |
16 |
246 |
ANGLO OPERATIONS LIMITED |
MIDDLEBURG |
COAL |
14100,2 |
30 |
1311 |
ANGLO OPERATIONS LIMITED |
MIDDLEBURG |
COAL |
485,8 |
25 |
996 |
ANGLO OPERATIONS LIMITED |
BETHAL |
COAL |
1822,6 |
25 |
576 |
NORTHERN COAL (PTY) LTD |
CAROLINA |
COAL |
266,2 |
10 |
663 |
KANGRA COAL (PTY) LTD |
PIET RETIEF |
COAL |
1727,6 |
25 |
684 |
SASOL MINING (PROPRIETARY) LIMITED |
HIGHVELD RIDGE |
COAL |
3663,6 |
34 |
337 |
SASOL MINING (PROPRIETARY) LIMITED |
HIGHVELD RIDGE |
COAL |
172 |
30 |
1420 |
SASOL MINING (PROPRIETARY) LIMITED |
HIGHVELD RIDGE |
COAL |
21008,8 |
30 |
1110 |
ANGLO OPERATIONS LIMITED |
MIDDLEBURG |
COAL |
14207,1 |
30 |
1400 |
EXXARO COAL MPUMALANGA (PTY) LTD |
WITBANK |
COAL |
1036,6 |
30 |
650 |
DEPARTMENT OF WATER AFFAIRS & FORESTRY ( BORROW PIT ) |
BALFOUR |
Gravel |
49,8 |
|
|
DEPARTMENT OF WATER AFFAIRS & FORESTRY ( BORROW PIT ) |
BALFOUR |
dolerite |
22,4 |
|
|
DEPARTMENT OF WATER AFFAIRS & FORESTRY ( BORROW PIT ) |
BALFOUR |
Gravel |
192,2 |
|
|
DEPARTMENT OF WATER AFFAIRS & FORESTRY ( BORROW PIT ) |
BALFOUR |
Gravel |
17,2 |
|
|
DEPARTMENT OF WATER AFFAIRS & FORESTRY ( BORROW PIT ) |
BALFOUR |
Gravel |
39,1 |
|
|
SOUTH 32 COAL (PTY) LIMITED |
MIDDLEBURG |
COAL |
14146,5 |
25 |
734 |
EXXARO COAL MPUMALANGA (PTY) LIMITED |
DELMAS |
COAL |
1702,1 |
30 |
825 |
ANGLO OPERATIONS LIMITED |
MIDDLEBURG |
COAL |
3047,6 |
11 |
996 |
COROBRIK (PTY) LTD |
WITBANK |
CLAY (GENERAL) |
172,9 |
10 |
198 |
TRANSVAAL GOLD MINING ESTATES |
PILGRIM'S REST |
GOLD ORE |
1720,3 |
|
1057 |
ZAMORI 272 (PTY) LTD (MPP: KENDAL COLLIERY) |
WITBANK |
COAL |
556,5 |
10 |
210 |
SUDOR COAL (PTY) LTD |
HIGHVELD RIDGE |
COAL |
706,2 |
4 |
257 |
SAMQUARZ (PTY) LTD (RECORDED AS THABA CHUEU MINING- DELMAS on the system) |
DELMAS |
silica |
117,2 |
30 |
250 |
PENUMBRA COAL MINING (PTY) LTD |
ERMELO |
COAL |
3254,7 |
12 |
100 |
SOUTH 32 COAL LIMITED |
MIDDLEBURG |
COAL |
19,1018 |
|
668 |
SOUTH 32 COAL LIMITED |
MIDDLEBURG |
COAL |
8898,5 |
15 |
668 |
GLENCORE OPERATIONS SOUTH AFRICA (PTY) LTD |
WITBANK |
COAL |
107,123 |
20 |
537 |
NORTHERN COAL (PTY) LTD |
CAROLINA |
COAL |
572,4 |
30 |
650 |
LUMPASA MINING & EXPLORATION (PTY) LTD |
CAROLINA |
COAL |
569,8 |
5 |
195 |
ANALISA MINING & INDUSTRIAL SERVICES CC |
BELFAST |
COAL |
305,5 |
5 |
117 |
TAVISTOCK COLLIERIES (PTY) LTD |
WITBANK |
COAL |
993,8 |
|
76 |
LONDANI COAL (PTY) LTD |
MIDDLEBURG |
COAL |
274,6 |
8 |
450 |
NTSHOVELO MINING RESOURCES (PTY) LTD |
EMALAHLENI |
COAL |
884,6 |
9 |
141 |
EVANDER GOLD MINES |
EVANDER |
GOLD ORE |
|
30 |
2400 |
WESCOAL EXPLORATION |
WITBANK |
COAL |
2284,08 |
10 |
67 |
EXXARO COAL MPUMALANGA (PTY) LTD |
|
COAL |
222,7 |
5 |
124 |
KANGRA COAL (PTY) LTD |
PIET RETIEF |
COAL |
552 |
25 |
584 |
STUART COAL (PTY) LTD |
DELMAS |
COAL |
123,9 |
30 |
179 |
CANYON RESOURCES (PTY) LTD |
DELMAS |
COAL |
874,5 |
6 |
107 |
NUNGU TRADING |
MIDDLEBURG |
COAL |
197,4 |
5 |
115 |
MUHANGA MINES (PTY) LTD |
MIDDLEBURG |
COAL |
430,9 |
10 |
40 |
EYETHU COAL (PTY) LTD |
DELMAS |
COAL |
1399,5 |
4 |
141 |
RIETSPRUIT CRUSHERS |
ERMELO |
STONE AGGREGATE |
1101,3 |
13 |
88 |
SOUTH 32 COAL (PTY) LTD |
DELMAS |
COAL |
17115,8 |
7 |
75 |
ESKAY CRUSHERS (PTY) LTD |
PIET RETIEF |
BLUE GRANITE |
210,7 |
10 |
60 |
MUHANGA MINES (PTY) LTD |
MIDDLEBURG |
COAL |
18,6 |
5 |
219 |
SUDOR CAOL (PTY) LTD |
BETHAL |
COAL |
1010,7 |
418 |
257 |
INYANGA MINING (PTY) LTD |
DELMAS |
COAL |
56,2 |
5 |
137 |
PERISAT INVESTMENT (PTY) LTD |
DELMAS |
COAL |
1235,2 |
25 |
254 |
INYANGA MINING (PTY) LTD |
WITBANK |
COAL |
150,9 |
5 |
137 |
TROLLOPE HOLDINGS |
WITBANK |
COAL |
120,9 |
30 |
5 |
WESCOAL HOLDINGS |
DELMAS |
COAL |
298,4 |
10 |
525 |
STALPH 236 CC(VUKA CRUSHERS) |
BUSHBUCK RIDGE |
GRANITE/SYENITE |
29,8 |
30 |
25 |
ANGLO OPERATIONS LIMITED |
WITBANK |
COAL |
958,3 |
11 |
516 |
ANGLO OPERATIONS LIMITED |
WITBANK |
COAL |
3747,9 |
6 |
759 |
ANGLO INYOSI COAL (PROPRIETARY) LIMITED (Zondagsfontein) |
WITBANK |
COAL |
9059,3 |
12 |
337 |
ANGLO OPERATIONS LIMITED |
WITBANK |
COAL |
6624,3 |
6 |
516 |
ANGLO OPERATIONS LIMITED |
WITBANK |
COAL |
3593,1 |
25 |
924 |
KEATON MINING (PTY) LTD, |
DELMAS |
COAL |
1515,8 |
10 |
185 |
TAVISTOCK COLLIERIES (PTY) LTD |
|
COAL |
53,1 |
5 |
41 |
GLENCORE OPERATIONS SA (PROPRIETARY) LTD |
ERMELO |
COAL |
12562,7 |
10 |
794 |
ANGLO INYOSI COAL (PROPRIETARY) LIMITED |
WITBANK |
COAL |
268,3 |
25 |
498 |
HONINGKRANZ SAND (PTY) LTD |
DELMAS |
SAND (GENERAL) |
231,4 |
5 |
26 |
DUIKER MINING (PTY) LTD |
|
COAL |
498 |
10 |
420 |
SHANDUKA COAL (PROPRIETARY) LTD |
MIDDLEBURG |
COAL |
313,7 |
10 |
794 |
AFRISAM (SOUTH AFRICA)PROPERTIES (PTY) LIMITED |
WITBANK |
AGGREGATE |
92,1 |
30 |
53 |
TEGETA EXPLORATION & RESOURCES (PTY) LTD |
DELMAS |
COAL |
97,2 |
25 |
622 |
AFRICAN EXPLORATION MINING AND FINANCE CORPORATION LIMITED |
OGIES |
COAL |
573,4 |
20 |
159 |
ANGLO OPERATIONS LIMITED |
|
COAL |
15792,9 |
|
867 |
HCI KHUSELA COAL (PTY) LTD |
BRONKHORSTSPRUIT |
COAL |
302,7 |
28 |
241 |
Evander Gold Mines Limited |
EVANDER |
GOLD |
|
30 |
3057 |
SOUTH32 COAL HOLDINGS PROPRIETARY |
WITBANK |
COAL |
15294,1 |
8 |
5016 |
Approved/Not Approved
Mr SG Mantashe
Minister of Mineral Resources
Date Submitted:-……………/………………/2018
05 December 2018 - NW3066
Bozzoli, Prof B to ask the Minister of Higher Education and Training
(1)What (a) is the total budget allocated by each university and college for student representative council (SRC) election expenses over the past ten years, (b) amount is each person, party and/or entity standing in an SRC election at each university or college campus permitted to spend on election expenses and (c) are the specified expenses monitored; (2) have the budget allocations been exceeded or the rules related to election expenditure been broken in other ways in any case; if so, (a) on what date, (b) in which institutions and (c) what penalties have been meted out in each case?
Reply:
The Technical and Vocational Education and Training (TVET) colleges and universities monitor the Student Representative Council (SRC) budgets and expenses. Information regarding SRC funding has to be sourced from universities and colleges directly. The universities and TVET colleges listed in the tables below have provided the following responses based on the questions posed.
Universities |
|||
Name of University |
(1)(a) Total budget allocated |
(1)(b)-(c) Election expenses and monitoring |
(2) (a)-(c) Exceeding of budget allocations |
Cape Peninsula University of Technology |
2013: R36 000.00 2014: R299 535.00 2015: R695 445.60 2016: R690 258.60 2017: R246 474.85 2018: R772 360.79 |
An external agency runs elections, and no funds are allocated for parties contesting the elections. The Dean of Students is the most senior Executive who monitors the SRC election process and reports to the Executive Committee. |
There is no record of the rules having been broken or of any action having been taken against any CPUT official relating to the running of the CPUT SRC elections. |
University of Cape Town |
The total budget allocated for SRC elections for the period 2009 to 2018 amounts to R946 940.00. |
The amount each person/party and /or entity standing in an SRC election is permitted to spend on SRC election expenses is R800 per candidate for campaigning. The specified expenses are monitored. |
In the 2012 SRC elections, one of the parties campaigning in the elections received additional external funding towards its election campaign. The Electoral Committee for this transgression fined the party concerned. |
Central University of Technology |
R500 000.00 for Welkom Campus in the past decade and R2 200 000.00 for the Bloemfontein Campus |
Election expenses are part of the SRC operational budget under the item of Elections set aside for operational costs of elections and payment of the service provider (IEC/PWC) which is set aside from the University auditing funds centralised to cover both Welkom and Bloemfontein electoral staff payments. They are used for marketing, printing of ballot papers, catering, transport between campuses, etc. All specified expenses are monitored accordingly. |
The only deviation is when the IEC is unable to assist due to its primary function of running national and local elections; the University will then use the services of PWC as an alternative. |
Durban University of Technology |
2009: R180 000.00 2010: R180 000.00 2011: R180 000.00 2012: R180 000.00 2013: R180 000.00 2014: R180 000.00 2015: R210 000.00 2016: R280 000.00 2017: R470 000.00 |
Each candidate is allocated R500 for personal campaigning; however, there is no regulation of how much more each candidate may raise to spend on one’s campaign. The amount allocated to candidates is given to them to use at their discretion. |
There have been occasions that budgeted amounts were exceeded. In August 2016, a security situation occurred in the Midlands Campus – extra security measures had to be taken to defend the integrity of the elections resulting in additional costs. In 2017, a disruption during counting occurred at the Durban Campus, resulting in a new round of voting and counting. This resulted in a security company being appointed and extra costs incurred. |
University of Fort Hare |
R650 000.00 for SRC elections per annum. |
Approximately R300 000.00 is spent on the IEC that manages and conducts the SRC election. However, if the IEC is managing the SRC elections, the University pays approximately R60 000, which is mainly administrative costs. The University allocated R25 000 per organisation/individual (per Campus) for their campaigns for the SRC election in the 2017 and 2018 SRC elections. The Student Governance and Development Unit administers the allocated amount, and as such is not allocated directly to the organisation/individuals contesting the SRC elections. |
The University has not had instances where allocations have been exceeded or where the rules related to election expenditure have been broken. |
University of Free State |
2009: R169 165.00 2010: R125 000.00 2011: R93 537.00 2012: R309 500.00 2013: R254 595.00 2014: R315 064.00 2015: R300 000.00 2016: R200 000.00 2017: R784 200.00 2018: R950 000.00 |
The budget allocations cover the pre-election phase (would entail a tendering process by the Finance Department for Service Providers) and balloting phase (actual voting days). UFS does not provide funds for any campaigning that falls outside of the formal campaigning schedule. The University does, however, intervene where there has been a violation of the electoral code of conduct. The UFS Finance and Audit Departments audits and monitors the electoral budgets and associated expenditure of the SRC elections and other student governance structures. |
No budget was exceeded. |
University of Johannesburg |
2008 and 2009: There was no allocated budget 2010: R450 000.00 2011: R450 000.00 2012: R450 000.00 2013: R468 000.00 2014: R500 000.00 2015: R500 000.00 2016: R525 000.00 2017: R475 000.00 2018: R498 750.00 |
The budgeted funds are spent on marketing, printing of ballot papers and campaigning. Each contestant for SRC elections would receive R300.00 allowance for printing of campaigning material. For student organisations, the R300.00 allowance would be multiplied by the number of portfolios the organisation would be contesting. The printing of material is monitored as printing happens on campus. |
The allocated budgets were never exceeded in all the years reported on except the year 2017. |
University of Limpopo |
2015: R1 000 000.00 2016: R1 000 000.00 2017: R1 000 000.00 2018: R1 000 000.00 |
R20 000 is allocated to each registered student organisation to spend on marketing and campaigning material. The expenses are monitored, as the printing of ballot papers is done through the University’s printing division and the procurement of marketing material is done through the University’s Finance Department (Procurement division). |
The allocated budgets were never exceeded in all the years reported on except the 2017 year. |
Mangosuthu University of Technology |
2013: R250 000.00 2014: R250 000.00 2015: R404 455.60 2016: R489 927.00 2017: R709 700.00 2018: R951 900.00 |
Budget is allocated to each registered student organisation to spend on marketing and campaigning material. There is no monitoring. |
The budget has never been exceeded, and Rules relating to election expenditure have never been broken. |
Nelson Mandela University |
2009: R198 265.00 2010: R218 550.00 2011: R238 070.00 2012: R256 570.00 2013: R286 070.00 2014: R317 300.00 2015: R352 500.00 2016: No elections held 2017: R391 183.00 2018: R434 648.00 |
Budget allocations are used for general logistics related to organising and holding the actual elections. No budget allocations are made to individual persons, party or entity standing in an SRC election. Expenditure is monitored and reported on annually. |
No budgets have been exceeded |
North West University |
2009: R249 555.00 2010: R254 321.00 2011: R259 185.00 2012: R264 148.00 2013: R269 212.00 2014: R276 380.00 2015: R296 407.00 2016: R311 298.00 2017: R333 217.00 2018: R650 000.00 |
The Office of the Registrar currently provides the budget for this process and is responsible for administering the annual election process for the Student Representative Council and student campus councils at the respective campuses of the University. |
The amount allocated in the budget has not been exceeded, and the rules related to the election expenditure have not been transgressed |
University of Pretoria |
2009: information not available in the PeopleSoft IT system 2010: R201 633.30 2011: R278 633.30 2012: R262 168.78 2013: R600 573.81 2014: R527 983.77 2015: R560 014.78 2016: R947 503.05 2017: R1 794 460.28 (an electronic voting system was introduced with associated costs) 2018: R1 221 574.58 |
The University of Pretoria supports campaigning candidates for SRC elections insofar as printing an equal number of posters across all its campuses. The printing costs are part of the budget, and they are all uniform except the message from each candidate based on the portfolio they are campaigning. Electronic campaigns on the University platform are at no cost. Dedicated staff in the Finance Department monitor expenses and all activities are audited and reported to the University’s Audit and Risk Committee of Council. |
Expenses are strictly according to the budget, and this is not in control of the SRC. |
Rhodes University |
2009: R7 000.00 2010: R7 500.00 2011: R8 000.00 2012: R8 560.00 2013: R20 000.00 2014: R15 000.00 2015: R10 000.00 2016: R15 000.00 2017: R30 000.00 2018: R30 000.00 |
The election budget is planned for within the University budget. Funds are not received from any external or political party regarding the SRC elections. Candidates utilise funds for campaign purposes (including posters). |
One candidate on 10/08/2018 purchased 6 T-shirts, which were not declared. It came to the attention of the Independent Electoral Body (IEB) via the Administrator appointed to oversee the election process regarding compliance with all rules. The case was deemed a minor infringement, only a determined number of votes were deducted from the candidate post voting. |
Sefako Makgatho University |
The University allocated R365 000.00 for 2018/ 2019 SRC election process. For the previous four years, the allocated budget was R250 000.00 for each election process. |
In the 2018 elections process, the allocation per political structure was increased to R10 000. For the previous four years, the allocation was R6 000 per political structure. The expenditure of the allocated amount is specifically designated for election promotional material of whatever nature determined by the specific political organisations. These expenditures are processed through the University procurement system authorised by the University Governance Support Staff as well as the Director Student Affairs |
The allocated elections budget has never been overspent over the past five years. This is due to the monitoring and control system that is in place. |
Sol Plaatje University |
2017: R85 000.00 2018: 100 000.00 |
Election expenses are for auditors, printing and stationery as well as refreshments. These are monitored by the Head of Student Affairs and the University’s external auditors audit them annually. |
Budget allocations have not been exceeded, nor election expenditure rules contravened |
University of South Africa |
2008: R1 491 250.00 2009: R41 984.00 2010: R0 2011: R3 131 174.00 2012: R5 078.00 2013: R995 119.00 2014: R1 352 323.00 2015: R0 2016: R3 862 226.00 2017: R0 2018: R10 879 153.00 |
Elections are not held every year, and expenses are thus of a project or cyclical nature. Sometimes expenses are processed in the subsequent year and may reflect as an overspent in that year. Expenditure is monitored on a continuous basis. |
Budget allocations have not been exceeded in total, or per election, nor have the rules related to election expenditure been broken. |
Stellenbosch University |
2017/2018: R72 988.22 2018/2019: R46 237.88 There are no records for the preceding eight years. |
The amount that each person standing is permitted for marketing spend is decided by the election convenors, who are guided by the election rules, so that each candidate has a fair chance. Year 2018/2019: R500 (total spend per candidate) x 14 candidates = R7 000 Year 2017/2018: R500 (total spend per candidate) x 14 candidates = R7 000 Student Governance monitors the total amount allocated and expended. Student Governance also plays an oversight role on what is spent during the elections. Furthermore, the University has financial controls systems, which promotes financial management. |
No budget was exceeded, and no rules were broken in the 2018 and 2019 elections. |
Tshwane University of Technology |
2018: R620 000.00 |
Student Governance and Leadership Development (SGLD) Directorate operational budget covers other operational expenses related to elections amongst others; security, catering for all staff and volunteers, transport and voting venues on the day of the elections. The SRC finance committee determines the allocation to student structures. That budget is for operations and programmes for the whole year including buying T-shirts and logistics for SRC elections because the budget is not sufficient and not the same from all structures the SGLD Directorate subsidies the structures participating in SRC elections with R1000 each for elections only. Officials in the SGLD monitors the day-to-day operations of these structures including their budget. |
The SGDL directorate monitors how the structures manage their budgets. This is done to ensure that by the time SRC elections are conducted, no structures participating in elections have depleted their budgets. |
Vaal University of Technology |
2012/13: R55 000.00 2013/14: R80 000.00 2014/15: R100 000.00 2016/17: R40 000.00 2015/16: R100 000.00 2017/18: R125 000.00 |
These expenses are monitored on the basis that student structures have to bring their memorandum of request where all logistics are tabulated. All procurement will be done in accordance with what they have requested. |
The University has never exceeded its budget as student structures apply and receive their functional rights at the beginning of the year, which therefore determines the support the Student Support Services Department has to give. |
University of Venda |
2008: R114 000.00 2009: R125 000.00 2010: R377 000.00 2011: R158 000.00 2012: R127 000.00 2013: R310 000.00 2014: R181 000.00 2015: R272 000.00 2016: R324 000.00 2017: R287 000.00 2018: R600 000.00 |
The budget increase or decreases depending on whether the IEC or private service providers are facilitating elections. The University of Venda does not have a specific budget allocated to parties for SRC election purpose. Their mother body organisations fund parties. The allocations are for campaigning. The allocated budget is strictly monitored, and Management must approve any deviation. |
The budget was exceeded in 2016 and 2018. The University Management provided for safety and security during the elections, which had become increasingly confrontational. |
Walter Sisulu University |
Over the last ten years, WSU has allocated |
The University does not have a specific budget set aside for contesting parties. Political Student Organisations contesting elections are funded through a grant allocated by the SRC. The Grant is an allocation for those Parties based on the number of seats such parties obtained in the SRC elections. Such budgets vary from campus-to-campus depending on the student enrolment figures in those campuses. Expenses are monitored and processed through University procurement policies. |
SRC elections have always been held within the approved budget. The Office of Executive Director for Student Development and Support Services will make special requests for budget adjustment where the need arises. |
University of the Western Cape |
R300 000.00 annually |
R1700.00 per candidate The funds are ring-fenced and are monitored by the Institutional Liaison Team. |
No budget has ever been exceeded |
University of the Witwatersrand |
The amount has varied between R300 000.00 to R400 000.00 over the past ten years. |
The University allocates R600.00 to each candidate towards the electioneering material and processes, such as posters, refreshments, etc. However, some candidates contest the election as a collective and depending on their affiliation, also have some of their expenses covered through funds from their clubs and societies. This is minimal and monitored to a maximum of R3000.00. Funds are monitored through the Election Office |
No budget was exceeded, and no rules were broken. |
University of Zululand |
2008: R 0 2009: R90 000.00 2010: R 300 000.00 2011: R339 700.00 2012: R310 000.00 2013: R134 430.00 2014: R400 000.00 2015: R500 000.00 2016: R1 000 000.00 2017: R879 489.00 2018: R1 000 000.00 |
The budget is for operational expenses regarding elections, i.e. appointment of service providers, the appointment of an independent electoral committee, elections committee members and appeals committee members stipends, appointment of auditors. The expenditures are monitored. |
Rules regarding election expenses have not been broken, and where there were budget overruns it was for legitimate operational expenses regarding elections and duly approved within the University governance structures |
Technical and Vocation Education and Training |
|||
Name of College |
(1) (a) total budget allocated |
(1) (b)-(c) Election expenses and monitoring |
(2) (a)-(c) Exceeding of budget allocations |
Buffalo City |
2018: R473 900.00 |
An external agency runs elections, and no funds are allocated for parties contesting the elections. Expenses are carefully monitored. |
There is no record of rules having been broken or of any action being taken against any official relating to the running of the elections. |
East Cape Midlands |
No budget allocated. |
There is no budget allocation for candidates standing for elections, and the College has never spent money on elections. |
Not applicable. |
Ikhala |
No budget allocated. |
Elections are conducted internally, not outsourced, and no funds are allocated for parties. |
Not applicable. |
Ingwe |
2018: R260 000.00 2017: R180 000.00 2016: R160 000.00 |
Elections are conducted internally, not outsourced, and no funds are allocated for parties. Expenditure is monitored. |
The budget has never been exceeded, and the rules were not broken. |
King Hintsa |
The College does not have expenditure records from 2008 to 2012 for SRC elections. The IEC conducts elections for free, and the College pays for accommodation and airtime for IEC officials. However, in 2016 there was a re-run of elections in two campuses which resulted in costs incurred which amounted to R186 000 |
The College does not allocate money for individual students or any political parties. |
Not applicable. |
King Sabata Dalindyebo |
2008: R85 000.00 2009: R120 000.00 2010: R120 000.00 2011: R156 000.00 2012: R170 000.00 2013: R180 000.00 2014: R200 000.00 2015: R230 000.00 2016: R250 000.00 2017: R280 000.00 2018: R350 000.00 |
The College did not allocate funds per person, or party and expenses are monitored. |
No penalties were issued. |
Port Elizabeth |
No specific budget allocation. The IEC conducts SRC elections. The College pays IEC officials for meals, and vouchers and a stipend for other officials on duty during voting, as well as extra security. |
The College did not allocate funds per person or party, and expenses are monitored. |
The only deviation is when the IEC is unable to assist due to its primary function of running national and local elections; the College will then use the services of external companies as an alternative. |
Central Johannesburg |
No budget allocated. However, the College uses an independent body during elections. |
No parties or individuals are paid to participate in SRC elections, and expenses are carefully monitored. |
No rules were broken therefore no penalties. |
Ekurhuleni West |
2017: R210 600.00 2018: R238 491.67 |
No parties or individuals are paid to participate in SRC elections. Expenses are carefully monitored. |
The budget has never been exceeded. |
Sedibeng |
2014: R1 642.11 2015: R4 367.30 2016: R1186.10 2017: R5 400.00 2018: R4 600.00 |
No parties or individuals are paid to participate in SRC elections. Expenses are carefully monitored. |
The budget has never been exceeded. |
South West Gauteng |
2012: R33 690.75 2013: R119 400.00 2014: R137 280.00 2015: R127 789.96 2016: R97 500.00 2017: R50 000.00 2018: R200 000.00 |
No parties or individuals are paid to participate in SRC elections. The expenses are monitored. |
The budget has never been exceeded. |
Tshwane South |
2012: to 2018: R2 130 000.00 |
No budget is allocated to individual parties that stand for SRC elections. The expenses are monitored. |
The budget has never been exceeded, and rules relating to election expenditure have never been broken. |
Western |
2009: R46 394.00 2010: R42 841.00 2011: R53 074.00 2012: R48 319.00 2013: R78 289.00 2014: R64 088.00 2015: R93 858.00 2016: R413 675.00 2017: R536 285.00 2018: R440 500.00 |
Budget allocations are used for general logistics related to organising and holding the actual elections. No budget allocations are made to individual persons, parties or entities standing in an SRC election. Funding is mainly for election, catering and IEB. Expenditure is monitored. |
No budgets have been exceeded |
Goldfields |
No budget allocated for SRC elections. |
The College supports campaigning candidates for SRC elections by printing their manifestos and placing their photos on noticeboards. Expenses are monitored. |
Not applicable. |
Maluti |
No budget allocated for SRC elections. |
The College has never funded SRC election campaigns and processes. |
Not applicable. |
Motheo |
Average of R400 000.00 per annum. |
It is not a party nor person specific; the money covers elections irrespective of association Expenses are monitored through the budget management process. |
Not applicable. |
Coastal |
No budget allocated for SRC elections. |
Election expenses are for the IEB not for individuals or parties Expenses are monitored. |
Not applicable. |
Elangeni |
Not specified. |
The College’s budget for SRC elections covers all activities related to the College and not for parties. Student formations are responsible for their campaigns as per the Constitution. The Finance Unit monitors expenditure centrally. |
Budget allocations have not been exceeded, and the rules related to election expenditure have never been broken. |
Thekwini |
For 2007 to 2015, the College did not spend any money when conducting SRC elections. 2016: R70 000 2017: R48 000 2018: R31 000 |
No money had been paid to any individual, party or entity standing for SRC elections. The funds paid to service providers are monitored. |
Not applicable. |
Majuba |
2011: R200 000.00 2012: R156 500.00 2013: R200 000.00 2014: R131 033.48 2015: R162 367.00 2016: R1 835.42 2017: R194 039.00 2018: R178 074.10 |
Expenses are covered and monitored by the College. It is not allocated to any individual or party or campus |
Not applicable. |
Mnambithi |
There is no specific budget line item for SRC election. The College only pays IEC officials who oversee the elections. |
The College has never paid for any student movement for SRC elections. |
Not applicable. |
Mthashana |
Not budget allocated. |
The College has never paid for any student movement for SRC elections. |
Not applicable. |
Umfolozi |
SRC budget R650 000.00 for the past two years. |
The College conducted its elections initially by internal staff without using any funds until 2016 when the IEB conducted the elections. Expenses are monitored. |
The budget was exceeded due to re-elections as a result of disputes in Sundumbili and Isithebe campuses. Certain campuses received major disputes that caused student unrest, which led to re-elections. |
Umgungundlovu |
No budget has been allocated for SRC elections over the past ten years. |
No College funds have been allocated or used for student elections. |
Not applicable. |
Capricorn |
No budget has been allocated for SRC elections over the past ten years. |
Not applicable. |
Not applicable. |
Lephalale |
No budget has been allocated for SRC elections over the past ten years. |
Not applicable. |
Not applicable. |
Letaba |
The College did not have a specific budget allocation for SRC elections. 2018: R387 745.00 |
The College did not allocate any amount to a person, party, or entity standing for the SRC elections. Expenses are monitored in line with the policy of the College. |
The budget of the SRC was never exceeded, and no rules of election expenditure were broken as strict measures are observed. |
Mopani |
R3 000.00 was used for the past ten years for catering of IEC officials for conducting the SRC elections. There was no other funding for SRC elections. |
Elections are conducted internally, not outsourced, and no funds are allocated for parties. |
There were no rules broken, and the budget was not exceeded. |
Sekhukhune |
The College does not have expenditure records from 2008 to 2012 for SRC elections. The IEC conducts elections for free. The College pays for accommodation and airtime for IEC officials. However, in 2016 there was a |
No money is used for funding individual candidates or parties. |
Not applicable. |
Orbit |
2009: No record 2010: R50 000.00 2011: R55 000.00 2012: R60 000.00 2013: R70 000.00 2014: R80 000.00 2015: R80 000.00 2016: R90 000.00 2017: R120 000.00 2018: R150 000.00 |
Expenditure is monitored. |
The College has not exceeded the SRC budget over the years. |
Taletso |
2009: R123.00 2010: R1 850.00 2011: R2 125.00 2012: R2 826.00 2013: R3 672.00 2014: R4 800.00 2015: R5 200.00 2016: R6 347.00 2017: R8 559.00 2018: R173 000.00 |
The budget has been very low for all the years because the College utilises internal staff and resources. Challenges were experienced when some students declared disputes, and this took a toll in resolving problems. The College then resorted in utilising the IEC, which assisted in resolving the problems. The 2018 SRC budget includes the budget for the Student Support Unit. Expenditure is monitored. |
The College has not exceeded the SRC budget over the years. |
Ehlanzeni |
R444 752.00 has been used for SRC elections for the past ten years. |
Budget is mainly for logistics in conducting elections. The IEC is always requested to assist. Expenditure is monitored. |
The College has not exceeded the SRC budget over the years. |
Gert Sibande |
R300 000.00 has been used for SRC elections for the past ten years. |
Budget is mainly for logistics in conducting elections. The IEC is always requested to assist. Expenditure is monitored. |
The College has not exceeded the SRC budget over the years. |
Nkangala |
R101 636.70 has been used for SRC elections for the past ten years. |
Budget is mainly for logistics in conducting elections. The IEC is always requested to assist. Expenditure is monitored. |
The College has not exceeded the SRC budget over the years. |
Northern Cape Rural |
R200 000.00 has been used for the past ten years |
Any person that wants to stand for elections must cover their costs. The College covers the election ballot papers and cost incurred for the IEC officials. Expenses are monitored. |
The College has not exceeded the SRC budget over the years. |
College of Cape Town |
For 2008 – 2015, there was no budget. 2016 - 2018 R4 000.00 maximum |
The SRC election budget is a bare minimum, and the intention is to limit or prevent any potential opportunity to misuse funds. |
The College has not exceeded the SRC budget over the years. |
05 December 2018 - NW3414
Hunsinger, Dr CH to ask the Minister of Transport
(a) What (i) maintenance and infrastructure upgrade plans are in place for the rail tracks that run through Pinetown and surroundings areas, (ii) are the timeframes in this regard and (iii) budget has been allocated and (b) what (i) plans are there to implement additional lightening and security, (ii) are the timeframes in this regard and (iii) budget has been allocated for this?
Reply:
a) (i) Specifications for the replacement of corroded rails have been approved and a tender is expected to be issued in January 2019. Appointment of the supplier is planned for the first quarter of the 2019/20 financial year.
As part of the KZN Re-Signalling Project, all stations from Pinetown to Bellair were recently signalled and commissioned.
(ii) Timeframes for replacement of the rails will be seven months from date of delivery of the rails.
(iii) The total amount of is R103 million has been prioritised from the MTEF capital allocation in the region.
b) (i) The Pinetown line has additional lighting and security in the main stations with no permanent security but has high volumes of commuters and high crime hot spot. PRASA did a full renovation of stations including halts on the line, during 2016/17 and repaired them again in the 2017/18 financial year.
(ii) This is a going maintenance activity with no timelines.
(iii) The cost estimated to repair the vandalized electrical work amounts to R280,000 for Seaview Station and R650,000 for Sarnia Station. The budget for security on this line is R136,000 per month.
05 December 2018 - NW3305
Mokoena, Mr L to ask the Minister of Police
(1) (a) On what date was the information technology (IT) infrastructure of his (i) department and (ii) entities reporting to him last upgraded or updated, (b) what is the name of the company contracted to do the upgrades, (c) what was the monetary value of the contract and (d) what is the name of each IT system that was upgraded; (2) (a) what is the name of the company that is currently responsible for the maintenance of the IT systems of (i) his department and (ii) entities reporting to him and (b) what is the value of the contract?
Reply:
05 December 2018 - NW3517
Van Der Walt, Ms D to ask the Minister of Transport
With reference to the reply to question 625 on 29 March 2017, what (a) was the total number of accidents that occurred on the N1 between Bela-Bela and Polokwane (i) in the 2017-18 financial year and (ii) since 1 April 2018, (b) is the total number of persons who were killed in each case, (c) were the causes of each fatal accident and (d) actions did his department take to ensure that (i) road users abide by all road rules and (ii) number of fatal accidents is drastically reduced?
Reply:
a) Total number of accidents that occurred on the N1 between Bela-Bela and Polokwane
(i) As from 1 April 2017 to 31 March 2018 there were = 102 Fatal crashes
(ii) Since 1 April 2018 there were = 69 Fatal crashes
b) The total number of persons who were killed in each case
(i) As from 1 April 2017 to 31 March 2018 there were = 178 Fatalities
(ii) Since 1 April 2018 = 134 Fatalities
c) Causes of fatal crashes
Most of the fatal crashes occurred due to the following crash types: |
i. Single vehicles overturned |
ii. Head-on |
iii. Accident with pedestrian |
iv. Head-rear |
d) Actions taken by the department
(i) road users abide by all road rules - The Department through the RTMC has deployed traffic officers on the route in support of efforts that have been put in place by the Limpopo Province. This is to ensure visibility as deterrent but also to enforce traffic laws and regulations. The focus is on the following offences: speed, seat belt, overload, cell phones and reckless and negligent driving amongst others.
In addition to this, the RTMC has also intensified its road safety education and awareness programmes on the said route. These includes, amongst others, having activations at the taxi ranks targeting drivers and passengers before they embark on their journey, educational road blocks, handing out information pamphlets at the tollgates, and information exhibitions that encourage road user behaviour change.
(ii) Reduce number of fatal accidents -Based on the absolute figures, there is a slight reduction in the number of fatal crashes and fatalities when comparing the two (2) financial years (2016/17 and 2017/18).
05 December 2018 - NW3503
Nolutshungu, Ms N to ask the Minister of Higher Education and Training
With reference to the reply to question 2933 on 7 November 2018, what (a) is the total number of employees who have been outsourced from private companies and/or contractors by institutions of higher learning (i) in the past three financial years and (ii) since 1 April 2018 and (b) is the name of each company or contractor and (c) amount is each employee paid?
Reply:
Institutions of higher learning are not required in terms of the reporting regulations, as per the requirements of the Higher Education Act, to report on outsourced contracts. Such information will take significant time and resources to collate. The Department has written to all institutions and requested the information to respond to this question, with a deadline of 20 working days to provide the information. The Department will be able to provide a credible response to this question once the information has been received and verified.
05 December 2018 - NW3532
Mileham, Mr K to ask the Minister of Transport
Whether, with reference to his reply to question 2257 on 28 August 2018, the process of installing security cameras at the East London Airport open parking lot B – Long Term has been completed; if not, (a) why not and (b) by what date will the (i) installation be completed and (ii) parking lot be reopened; if so, (aa) on what date was the installation completed and (bb) why has the parking lot not yet been reopened?
Reply:
Airports Company South Africa SOC Limited (ACSA)
(a) Installations have been requested and are being processed. It requires new cable ways to be provided which was not in the original scope hence the delays.
(b)(i) Camera installations will be completed before the end of the financial year.
(ii) Parking is technically reopened for peak days only when capacity runs out. The official re-opening will be done, as the airport has had 3-meter-high fences installed. Foot patrols have been improved by adding in 6 security officers which can suffice until the cameras have been installed.
(aa) and (bb) Plans are underway to officially reopen the parking before the December 2018 school holiday 2018.
05 December 2018 - NW3569
Dreyer, Ms AM to ask the Minister of Police
What number of (a) cases of {i) murder, {ii) rape, {iii) housebreaking, {iv) carjacking, {v) theft of motor vehicles, {vi) house robbery and (vii) drug-related crimes were {aa) reported at the Elsburg Police Station, (b) such cases were sent to court and (c) convictions were obtained for the specified cases in the past three financial years?
Reply:
05 December 2018 - NW3119
Esau, Mr S to ask the Minister of Police
Whether, since he served in Cabinet, he (a}(i) was ever influenced by any person and/or (ii) influenced any of his department's employees to take any official administrative action on behalf of any (aa) member, (bb) employee and/or (cc} close associate of the Gupta family and/or (b) attended any meeting where any of the specified persons were present; if so, what are the relevant details in each case?
Reply:
(ii) No
(aa) No
(bb} No
(cc} No
(b} No
Reply to Question 3119 approved
BH , CELE
MINISTER OF POLICE
Date: 21/11/2018
05 December 2018 - NW3317
Groenewald, Dr PJ to ask the Minister of Police
What number of {a) handguns, {b) semi-automatic guns, (c} shotguns and (d) hunting rifles of the public who are individual licence holders (i) have disappeared, (ii) were stolen and (iii) were robbed in each respective financial year since the 2013-14 financial year?
Reply:
05 December 2018 - NW3389
Van der Westhuizen, Mr AP to ask the Minister of Higher Education and Training
(1)Whether the policy on staffing norms for community education and training colleges, which was published for public comment in 2016 with a proposed implementation date of 1 April 2018, has been finalised and implemented as envisaged; if not, by what date will the policy be (a) adopted and (b) implemented; (2) whether the sector has been informed of the revised date of implementation, as undertaken in Circular 1 of 2018, dated 19 January 2018; if not, by what date will the sector be informed; if so, what are the relevant details; (3) what number of (a) part-time, (b) fixed-term contract and/or (c) permanent staff members have been employed at each community education and training college (i) in the (aa) 2016 and (bb) 2017 calendar years and (ii) since 1 January 2018; (4) what steps will her department take to address employment and remuneration of educators at community education and training colleges who have (a) more and (b) less than 25 hours contact time in each week?
Reply:
- The draft policy on staffing norms for Community Education and Training (CET) colleges, which was published for public comment in 2016, has not been finalised and as such the adoption and implementation dates have not yet been established.
- The Department has put in place a Task Team to work on the Post Provisioning Model, which is a critical part in finalising the policy. Colleges and labour are represented in the Task Team. The CET colleges are engaging with stakeholders to keep them informed of developments as they unfold.
- The numbers and nature of appointments are as follows:
CET College |
2016 |
2017 |
2018 |
|||
Full-time |
Part-time |
Full-time |
Part-time |
Full-time |
Fixed term |
|
Eastern Cape |
0 |
2 997 |
5 |
2 776 |
7 |
2 864 |
Free State |
0 |
1 068 |
0 |
1 068 |
7 |
954 |
Gauteng |
532 |
1 858 |
540 |
1 878 |
421 |
1 652 |
KwaZulu-Natal |
18 |
6 522 |
19 |
6 522 |
19 |
4 159 |
Mpumalanga |
11 |
1 601 |
11 |
1 538 |
21 |
1 178 |
Limpopo |
1 790 |
0 |
1 750 |
0 |
6 |
1 440 |
Northern Cape |
0 |
186 |
0 |
182 |
7 |
161 |
North West |
5 |
1 343 |
4 |
1 171 |
11 |
1 089 |
Western Cape |
172 |
355 |
167 |
348 |
11 |
327 |
4. The nature of employment in the CET college sector is determined by instructional time. Lecturers in the CET colleges are appointed against the operational hours in the Community Learning Centres where they teach. The operational hours vary from centre-to-centre depending on whether or not the centre has its own premises. The Department cannot appoint staff beyond the actual hours worked, and remuneration is determined by the rates prescribed in the Personnel Administrative Measures.
05 December 2018 - NW3363
Mhlongo, Mr P to ask the Minister of Police
What is the number of police stations In each province?
Reply:
Currently there are 1149 police stations Nationally and their number In each Province Is as follow:
Eastern Cape: 196
Free State 110
Gauteng 142
Kwazulu Natal 184
Limpopo 103
Mpumalanga 90
North West 83
Northern Cape 91
Western Cape 150
BRIGADIER ACTING HEAD: ORGANISATIONAL DEVELOPMENT
NL MZIMA
Dater: 2018/11/12
Reply to question 3363 recommended/not recommended
LIEUTENANT GENERAL DEPUTV NATIONAL COMMISSIONER: MANAGEMENT ADVISORY SERVICES
SC MFAZI
Date; 2018/11/12
Reply to question 3363 recommended
GENERAL NATIONAL COMMISSIONER: SOUTH AFRICAN POLICE SERVICE
KJ SITOLE (SOEG)
DATE: 2018/11/13
Reply to question 3463 approved
MINISTER OF POLICE
BH CELE, MP
DATE: 2018/11/30
05 December 2018 - NW3489
Alberts, Mr ADW to ask the Minister of Transport
(1)(a) What number of road users in each month since 1 December 2013 until the present have paid e-toll accounts in relation to the total number of road users on the roads where the Gauteng e-tolling system is operative, as regards (i) the total numbers and (ii) percentages of (aa) paying road users and (bb) the total number of road users and (b) what are the particulars regarding the total amount of the monthly income generated in each month by the e-tolling system in the specified period that is paid to a certain company (name specified) and/or any other foreign firm/service provider and what amount remains in South Africa; (2) whether any plans exist to extend the e-tolling system to other roads in Gauteng or in any other provinces; if not, whether he regards the non-extension of the e-tolling system as an indication that the system has failed; if so, what are the full relevant particulars regarding the roads and timelines of the planned extension of the system; (3) whether any standards regarding legal metrological technical regulations have been created for the e-tolling instrumentation and technical system in terms of the of the Legal Metrology Act, Act 9 of 2014; if not, why not; if so, (a) what are the relevant particulars in this regard and (b) whether the e-tolling measuring instruments were verified accordingly and comply with the requirements; if so what are the full particulars in respect of the date on which it took effect; (4) whether regular inspection is required; if not what is the position in this regard; if so, what are the relevant particulars of the verification; (5) whether the e-tolling measuring instruments were imported legally in terms of the previous Act, the Trade Metrology Act, Act 77 of 1973, or any other relevant legislation; if not, how did it happen that unverified instruments were imported and taken into use; if so, what are the full relevant particulars?
Reply:
1. (a) (i) Road use on Gauteng e-tolling system is measured in terms of total individual transactions at all Toll Gantry locations. Please see table below for the Transactions Paid (aa) versus the Total Transactions (bb) in a month.
(a) (ii) Road use on Gauteng e-tolling system is measured in terms of total individual transactions at all Toll Gantry locations. Please see table below for the Paid % in a month.
Transactions |
Paid Transactions |
Total Transactions |
Paid % |
Dec-13 |
20,785,542 |
53,003,201 |
39% |
Jan-14 |
25,079,987 |
60,093,598 |
42% |
Feb-14 |
26,308,532 |
61,275,089 |
43% |
Mar-14 |
27,772,020 |
66,566,742 |
42% |
Apr-14 |
27,670,060 |
66,005,652 |
42% |
May-14 |
28,840,313 |
69,524,695 |
41% |
Jun-14 |
27,620,694 |
68,070,263 |
41% |
Jul-14 |
28,864,702 |
73,105,125 |
39% |
Aug-14 |
28,346,546 |
73,710,373 |
38% |
Sep-14 |
27,176,734 |
72,779,790 |
37% |
Oct-14 |
28,448,201 |
78,214,190 |
36% |
Nov-14 |
25,969,036 |
74,337,111 |
35% |
Dec-14 |
21,328,075 |
67,223,456 |
32% |
Jan-15 |
22,400,799 |
69,249,776 |
32% |
Feb-15 |
22,931,526 |
71,629,658 |
32% |
Mar-15 |
24,244,365 |
80,003,523 |
30% |
Apr-15 |
21,394,927 |
72,664,902 |
29% |
May-15 |
23,036,505 |
76,951,582 |
30% |
Jun-15 |
22,909,536 |
74,975,032 |
31% |
Jul-15 |
25,301,965 |
80,642,609 |
31% |
Aug-15 |
24,467,085 |
77,919,932 |
31% |
Sep-15 |
26,697,723 |
77,605,567 |
34% |
Oct-15 |
27,938,500 |
82,326,471 |
34% |
Nov-15 |
27,054,182 |
80,290,924 |
34% |
Dec-15 |
23,624,266 |
72,805,287 |
32% |
Jan-16 |
24,573,362 |
73,257,559 |
34% |
Feb-16 |
26,733,544 |
79,066,173 |
34% |
Mar-16 |
26,402,052 |
80,007,973 |
33% |
Apr-16 |
26,275,066 |
79,992,761 |
33% |
May-16 |
27,621,133 |
82,293,707 |
34% |
Jun-16 |
27,063,279 |
80,464,054 |
34% |
Jul-16 |
27,157,391 |
83,677,522 |
32% |
Aug-16 |
26,707,601 |
82,447,442 |
32% |
Sep-16 |
27,443,254 |
85,039,339 |
32% |
Oct-16 |
27,197,586 |
85,772,379 |
32% |
Nov-16 |
27,259,360 |
85,106,234 |
32% |
Dec-16 |
22,657,693 |
75,664,235 |
30% |
Jan-17 |
23,358,303 |
75,596,764 |
31% |
Feb-17 |
24,063,244 |
77,147,835 |
31% |
Mar-17 |
26,886,316 |
86,732,583 |
31% |
Apr-17 |
23,129,194 |
77,126,837 |
30% |
May-17 |
26,482,251 |
86,221,226 |
31% |
Jun-17 |
25,152,145 |
82,555,665 |
30% |
Jul-17 |
26,020,789 |
87,141,156 |
30% |
Aug-17 |
26,222,692 |
87,224,633 |
30% |
Sep-17 |
25,075,823 |
85,216,222 |
29% |
Oct-17 |
26,054,251 |
88,279,240 |
30% |
Nov-17 |
25,815,329 |
87,712,942 |
29% |
Dec-17 |
21,374,274 |
77,973,117 |
27% |
Jan-18 |
22,191,182 |
78,445,802 |
28% |
Feb-18 |
22,743,772 |
79,692,925 |
29% |
Mar-18 |
23,751,346 |
85,614,183 |
28% |
Apr-18 |
22,216,963 |
81,085,686 |
27% |
May-18 |
24,143,853 |
87,426,578 |
28% |
Jun-18 |
23,063,671 |
84,761,844 |
27% |
Jul-18 |
23,567,230 |
87,581,258 |
27% |
Aug-18 |
23,303,900 |
87,920,771 |
27% |
(b) Please see table below that reflects the projected cashflow and actual cash receipts from account holders. All payments are deposited into SANRAL’s bank accounts which are audited by the Auditor General. The toll operator was appointed through an open tender process. It is a locally registered company with local and international shareholding. SANRAL is not privy to the agreements with their shareholders and the handling of losses and/or profits. The toll operator is compensated in terms of their tendered rates for services provided under the contract and does not receive a share of the toll revenue. To render the required services under the contract, they currently employ 1029 people of which 1024 or 99.5 % are South Africans.
Month |
Actual Income |
Forecast Income |
Dec-13 |
R63 455 430 |
R37 290 000 |
Jan-14 |
R98 610 974 |
R66 670 000 |
Feb-14 |
R94 017 402 |
R74 430 000 |
Mar-14 |
R107 586 423 |
R93 930 000 |
Apr-14 |
R113 428 985 |
R85 050 000 |
May-14 |
R116 865 284 |
R114 310 000 |
Jun-14 |
R119 516 621 |
R117 530 000 |
Jul-14 |
R108 740 225 |
R131 280 000 |
Aug-14 |
R100 003 412 |
R137 480 000 |
Sep-14 |
R87 741 205 |
R124 390 000 |
Oct-14 |
R75 199 510 |
R68 400 000 |
Nov-14 |
R64 871 679 |
R57 000 000 |
Dec-14 |
R72 350 461 |
R34 200 000 |
Jan-15 |
R44 962 429 |
R45 600 000 |
Feb-15 |
R61 398 683 |
R45 600 000 |
Mar-15 |
R67 672 141 |
R45 600 000 |
Apr-15 |
R60 816 286 |
R45 600 000 |
May-15 |
R75 717 000 |
R45 600 000 |
Jun-15 |
R77 980 230 |
R54 735 730 |
Jul-15 |
R81 557 505 |
R54 735 730 |
Aug-15 |
R73 530 822 |
R119 586 705 |
Sep-15 |
R59 411 220 |
R60 000 000 |
Oct-15 |
R63 583 365 |
R60 000 000 |
Nov-15 |
R71 546 170 |
R60 000 000 |
Dec-15 |
R61 356 654 |
R115 000 000 |
Jan-16 |
R86 241 110 |
R135 000 000 |
Feb-16 |
R66 470 717 |
R145 000 000 |
Mar-16 |
R80 287 535 |
R105 000 000 |
Apr-16 |
R125 000 000 |
R130 000 000 |
May-16 |
R110 658 054 |
R101 000 000 |
Jun-16 |
R65 330 000 |
R101 000 000 |
Jul-16 |
R62 223 000 |
R101 000 000 |
Aug-16 |
R61 276 860 |
R101 000 000 |
Sep-16 |
R68 100 000 |
R101 000 000 |
Oct-16 |
R71 400 000 |
R101 000 000 |
Nov-16 |
R72 461 000 |
R65 000 000 |
Dec-16 |
R30 802 706 |
R65 000 000 |
Jan-17 |
R84 825 000 |
R65 000 000 |
Feb-17 |
R55 325 172 |
R65 000 000 |
Mar-17 |
R66 466 277 |
R65 000 000 |
Apr-17 |
R64 327 952 |
R69 000 000 |
May-17 |
R56 013 668 |
R86 000 000 |
Jun-17 |
R59 142 222 |
R65 000 000 |
Jul-17 |
R68 459 234 |
R65 000 000 |
Aug-17 |
R57 787 465 |
R65 000 000 |
Sep-17 |
R59 443 095 |
R65 000 000 |
Oct-17 |
R72 781 413 |
R65 000 000 |
Nov-17 |
R68 702 155 |
R65 000 000 |
Dec-17 |
R16 548 442 |
R65 000 000 |
Jan-18 |
R84 302 761 |
R65 000 000 |
Feb-18 |
R61 735 537 |
R65 000 000 |
Mar-18 |
R56 577 112 |
R65 000 000 |
Apr-18 |
R63 421 845 |
R65 000 000 |
May-18 |
R62 028 447 |
R65 000 000 |
Jun-18 |
R46 545 853 |
R65 000 000 |
Jul-18 |
R73 700 653 |
R65 000 000 |
Aug-18 |
R39 851 834 |
R65 000 000 |
Sep-18 |
R50 364 399 |
R65 000 000 |
2. The current phase of the Gauteng Open Road Tolling (GORT) project was the first phase of approximately 200km. An additional 150 km of new freeways were envisaged as part of the next phases of the GFIP.
The roll-out of new freeways in Gauteng is dependent on the Government’s final decision on the infrastructure funding mechanism, including that of e-tolling for any further extension in Gauteng and in the other provinces.
The of the roads and timelines will become clear once Government has decided on infrastructure funding mechanism as indicated in above.
(3) Interim requirements have been developed and accepted by the acting CEO of the National Regulator for Compulsory Specifications in accordance with Section 22 (2) (c) of the Legal Metrology Act.
(a) Contained in the interim requirements of the National Regulator for Compulsory Specifications for more detail (Copy can be provided if required).
(b) The equipment has been type approved in accordance with the interim requirements and a type approval certificate was issued on 16 May 2018 after conclusion of the type approval process.
(4) The measuring instruments are subject to regular verification at periods not exceeding 12 months (refer to the Interim technical requirements for further detail). It is noted that initial verification was successfully completed as part of the type approval process.
(5) The instruments were imported legally. There were no requirements published as technical regulations for the type of equipment that are used on the GFIP gantries in terms of the Trade Metrology Act and initially the equipment was not considered to fall within the ambit of the Trade Metrology Act. After the new act was published, SANRAL discussed the way the equipment operates with the NRCS and the agreed process as described above in paragraph (3) and (4) was developed.
05 December 2018 - NW3323
Nolutshungu, Ms N to ask the Minister of Higher Education and Training
(1)(a) On what date was the information technology (IT) infrastructure of (i) her department and (ii) entities reporting to her last upgraded or updated, (b) what is the name of the company contracted to do the upgrades, (c) what was the monetary value of the contract and (d) what is the name of each IT system that was upgraded; (2) (a) what is the name of the company that is currently responsible for the maintenance of the IT systems of (i) her department and (ii) entities reporting to her and (b) what is the value of the contract?
Reply:
(1) - (2) The details of the information technology infrastructure of the Department are provided below:
Department |
(1) (a) Date for upgrading or updating IT infrastructure |
(b) Name of the company contracted to do the upgrades |
(c) Monetary value of the contract |
(d) Name of each IT system that was upgraded |
(2)(a) Company responsible for the maintenance |
(2) Value of the contract |
|
18 June 2018 |
XON system |
R21 000 000.00 |
Replace all CAT5e cabling with CAT 6 cabling; as well as refurbish all network points and skirting. Replace all switch cabinets with built-in cooling and Uninterruptable Power Supply (UPS). Wireless Technology (Wi-Fi) the whole building and reception including INDLELA. |
DHET083: XON Systems (Pty) Ltd |
R30 148 286.07 |
DHET086: EOH MYHOMBO (Pty) Ltd |
R 2 763 360.00 |
|||||
RFB1600/2017: XON Systems (Pty) Ltd |
R 20 136 662. |
|||||
Examination IT system |
R 13 516 081.00 |
|||||
The actual software is not upgraded, but it is enhanced to accommodate changes in policy or additional reports that are required. The last enhancement was in November 2017, and there will be some additional changes to the software in November/ |
Praxis Computing |
R1 841 784.00 which is the Treasury allocation for the maintenance of the HEMIS system over three years |
Higher Education Management Information System (HEMIS) |
Praxis Computing |
Payment is only made for work undertaken as per specifications from the Department; there is no retainer on this contract. For the period August 2017 to Feb 2018, R116 148.00 was paid, and for March 2018-October 2018, R91 285 was paid. |
(1) - (2) Based on the information received from public Entities reporting to the Department, the following relevant details have been provided:
Department/Entity |
(1) (a) Date for upgrading or updating IT infrastructure |
(b) Name of the company contracted to do the upgrades |
(c) Monetary value of the contract |
(d) Name of each IT system that was upgraded |
(2)(a) Company responsible for the maintenance |
(2) Value of the contract |
|
24 April 2018 |
DataTegra (Pty) Ltd |
R163 353.18 |
|
BANKSETA Internal IT Department |
Not applicable |
1 November 2018 |
Emtelle Pty Ltd |
R391 820.08 |
Boardrooms and meeting room facility provision and upgrade (e.g. HDMI, amplifier, meeting space collaboration system, projector screen and projector, speakers, cabling, electrical works, Tabletop pro-touch panel, IPCP Pro 350, programming, Cardioid Condenser Microphone, dual wireless Microphone). |
BANKSETA Internal IT Department |
Not applicable |
|
2. Cultural, Arts, Tourism, Hospitality and Sports Sector Education and Training Authority |
20 October 2016 |
Vodacom |
R4 800 000 00 |
ICT Infrastructure (MPLS) |
Zimele Technologies |
R9 519 460.00 |
30 June 2018 |
SoluGrowth |
R1 992 642,15 |
Indicium & Microsoft Dynamics AX |
|||
04 April 2017 |
Tipp Focus |
R7 773 575,00 |
PPO and SharePoint |
|||
31 March 2017 |
LDS |
R4 072 015,00 |
Track & Trace Portal |
|||
3. Council on Higher Education |
31 August 2018 |
Praxis Computing (Pty) Ltd |
R500 000.00 |
Provision of maintenance of Pastel evolution and advance procurement/business process management |
Praxis Computing (Pty) Ltd |
R500 000.00 |
30 May 2018 |
Praxis Computing (Pty) Ltd |
R798 966.96 |
Provision of Network Support Services |
Praxis Computing (Pty) Ltd |
R798 966.96 |
|
31 October 2018 |
eS3 Consulting (Pty) Ltd |
R522 872.40 |
Provision of Web-based Online Systems Maintenance Services |
eS3 Consulting (Pty) Ltd |
R522 872.40 |
|
June 2018 Licence renewal |
Sage Pastel Accounting |
R92 819.12 |
Provision of Sage Evolution Business Care Annual License |
Sage Pastel Accounting |
R92 819.12 |
|
4. Chemical Industries Education and Training Authority |
30 October 2018 |
In-house |
Not applicable |
|
In-house Echo Pty Ltd |
Not applicable R499 083.96 |
5. Education Training and Development Practices Sector Education and Training Authority |
13 June 2014 |
Computer initiatives/Vox Telecom |
R184 000.00 |
Microsoft Great Plains 2013 ERP System |
Computer initiatives/Vox Telecom |
R1 169 863.44 |
23 October 2018 |
SAGE |
- |
HR Systems (VIP, ESS and Premier HR) |
SAGE |
R160 168.86 |
|
7 April 2016 |
Praxis |
R20 000 |
Microsoft Server 2012 Active Directory |
In-house |
Not applicable |
|
7 April 2016 |
Praxis |
R30 000 |
Microsoft Exchange Server 2013 |
In-house |
Not applicable |
|
6. Energy and Water Sector Education and Training Authority |
3 February 2015 |
Internet Solutions (MWeb) |
R333 012.04 |
|
Internet Solutions (MWeb) |
R70 000.00 p/m |
17 September 2014 |
Gijima |
R213 687.16 |
|
|
R8 470 656.00 R7 756 560.00 R301 392.00 |
|
7. Finance and Accounting Services Sector Education and Training Authority |
20 July 2018 |
New Communication and IT (Pty)Ltd |
R327 185.00 |
Windows Server 2012, Exchange server 2016 Microsoft Dynamix AX Indicium |
Solugrowth (Pty) Ltd |
R8 461 959.00 Rental and maintenance of ICT for six months from July-December 2018 |
8. Fibre Processing and Manufacturing Sector Education and Training Authority |
March 2013 |
CHM VUWANI |
R450.395.76 Once Off |
Server Infrastructure
|
FP&M SETA Internal IT Staff. |
Not applicable |
9. Insurance Sector Education and Training Authority |
Not applicable |
Not applicable |
Not applicable |
Not applicable |
|
Learner management leased at R4 342 011.56 till March 2020 ERP System leased at R5 106 898.19 till March 2020 |
10. Local Government Sector Education and Training Authority SETA |
September 2015 |
Praxis |
R116 416.80 plus hourly rate where applicable |
Microsoft Dynamics GP |
Praxis (Datanet and Microsoft Dynamics GP) |
R 11 500.00 Monthly plus hourly rate for Microsoft Dynamics GP support where applicable |
September 2015 |
Vox Telecommunications |
The appointment was based on monthly rental of R76 411.54 and a once off set up cost of R56 658.00 |
Wide Area Network (WAN) infrastructure upgrade and services (Multiprotocol Label Switching (MPLS) network, links to provincial offices and Internet break-out) |
RemoteNet (MIS) |
R 170 854.00 Monthly |
|
January 2016 |
Sage SA Pty (Ltd) |
R165 761.04 plus hourly rate where applicable |
VIP HR & Payroll Software |
|||
11. Manufacturing Engineering and Related Services Sector Education and Training Authority |
March 2012 |
Telkom |
R1 413 048.00 per annum |
Virtual Private Network |
Telkom |
R1 413 048.00 per annum |
November 2016 |
Vodacom |
R304 140.00 per annum |
Internet Connectivity |
Vodacom |
R304 140.00 per annum |
|
February 2017 |
DAJO Technologies |
R15 200 000.00 |
National Skills Development Management System |
DAJO Technologies |
R15 200 000.00 |
|
IT Master |
R1 904 582.03 |
Laptops and Desktops |
IT Master |
R1 904 582.03 |
||
12. Media, Information and Communication Technologies Sector Education and Training Authority |
1 June 2015 |
Vox Telecommunication |
R9 187 460.59 |
Internet Service Provision and GSM Data Services |
Vox Telecommunication |
R9 187 460.59 (maintenance is included in the contract amount) |
1 November 2017 |
Huawei Connect |
R14 95 876.00 |
Polycom HDX 7000 Series systems |
Huawei Connect |
R14 95 876.00 (maintenance is included in the contract amount) |
|
1 September 2018 |
Huawei Connect |
R10 139 76.72 |
PABX Telephones System |
Huawei Connect |
R10 139 76.72 (maintenance is included in the contract amount) |
|
1 November 2014 |
Deloitte/Solugrowth |
R5 550 575.64 |
Indicium System and IT-SMS and AX Dynamics |
Deloitte/Solugrowth |
R5 550 575.64 (maintenance is included in the contract amount) |
|
29 October 2018 |
Ratho M |
R960 480.00 |
Printing and Copying Solution |
Ratho M |
R960 480.00 (maintenance is included in the contract amount) |
|
7 July 2018 |
Hauwei |
R752 169.00 |
VOIP and PABX – Klerksdorp |
Hauwei |
R752 169.00 (maintenance is included in the contract amount) |
|
1 September 2018 |
Hauwei |
R406 296.00 |
VOIP |
Hauwei |
R406 296.00 (maintenance is included in the contract amount) |
|
13 Mining Qualifications Authority |
April 2018 |
Bytes Solutions |
R646 880.54 |
Storage Area Network |
Not applicable |
Not applicable |
September 2015 |
Parity Software |
R406 273.20 |
Microsoft Dynamics GreatPlains |
Parity Software |
Support and maintenance are as and when we require their services. +- R 350 000.00 spent on support and maintenance and annual license renewal |
|
July 2017 |
CHM Vuwani |
R759 194.63 |
Microsoft SharePoint |
Keystroke (Pty) Ltd |
The contract ended in March, and we have appointed Keystroke (PTY) LTD to support and maintain the system on time and material bases. We have not spent a cent for now. |
|
June 2009 |
IT Aware |
R10 440 191.19 |
WSP/ATR Management Information System |
IT Aware |
Current Services Level Agreement (April 2018 – March 2020) amount R4 270 000.00 |
|
February 2009 |
Deloitte and SoluGrowth |
R15 343 658.13 |
Core Business Management Information System |
SoluGrowth |
Current Services Level Agreement (April 2018 – March 2020) amount R3 506 993.28 |
|
14. Public Sector Education and Training Authority |
The system was never upgraded or updated. |
Deloitte/Solugrowth |
R7 721 000 |
AX and IMS |
Deloitte/Solugrowth |
R7 721 000.00 |
15. Quality Council for Trade and Occupations |
July 2018 |
Vox Telecom |
R150 000 per month over 36 months |
|
Vox Telecom |
R5 444 515.13 for three years |
June 2018 |
Galix Networking (Pty) Ltd |
R149 031.00 |
Antivirus |
Galix |
12 months support included with the licenses purchases |
|
November 2018 |
BITZ Business IT Solutions |
R23 375.36 |
Memory upgrade for the production servers |
|||
October 2017 |
Thuthuzela technologies |
R78 822.09 |
Upgrade the boardrooms’ projectors |
|||
16. Safety and Security Sector Education and Training Authority |
Infrastructure is currently being upgraded. The first Phase was the upgrading of the servers, which commenced on the 1 April 2017 and will be completed on the |
The upgrades were undertaken by server providers and project managed by SASSETA.
|
Server for GreatPlains Hardware & Software Msuthu Technologies: R491 873.58 Services: Praxis: R218 846.46 Server for Email: Hardware & Software LMNT Holdings: R456 098.00 Services: LMNT Holdings R342 577.00 |
|
(former Neotel) responsible for ICT Infrastructure
|
R1111 969.00 R2 376 318.60 R 480 000.00 R482 374.40 |
February 2018 till April 2018 |
Datacentrix |
R4.5 million |
ICT Hardware Upgrade
|
IQ Telecommunications Solutions (support ICT department and not infrastructure only) |
R1.3 million (till March 2020 |
|
January 2018 till November 2018 |
CIBER International |
R7.5 million |
Learner Management Information System (the following modules are going through enhancements/upgrades as part of
|
CIBER International (costs are for maintenance and support) |
R23 million (till March 2020 |
|
July 2018 |
SAGE |
R99 310.00 |
HR Skills Map (job portal) |
SAGE |
Support will be funded through current contract with SAGE. |
|
September 2018 |
VOX Telecoms |
R0 (upgrades were part of the maintenance contract) |
Private Automatic Branch Exchange (PABX ) Telephony |
|||
Current (till 31 Nov. 2018) |
Blue Turtle |
R857 0000 |
|
|||
17. Transport Education Training Authority |
TETA is in the process of updating its IT infrastructure with the appointment of Deloitte through an open tender process with effect from 01 June 2018 and subsequently the cession to Solugrowth in October 2018 |
Solugrowth (Pty) Ltd |
R7 026 960.00 |
|
Solugrowth (Pty) Ltd |
R7 026 960.00 |
18. Wholesale and Retail Sector Education and Training Authority SETA |
The infrastructure for the IT system was last upgraded when the data hosting facility was migrated from INetBridge to Dimension Data on the 16 September 2017. In March 2018 the data lines were upgraded (Head Office from ADSL to Fibre; regional offices migrated to a higher capacity ADSL line) |
Deloitte was contracted to do the upgrades and ceded their contract /agreement to SoluGrowth |
R610 000.00 per month from 01 August 2016 until 30 November 2018 |
|
SoluGrowth |
R 17 080 000 from |
19. National Skills Fund |
15 July 2015 |
Dimension Data |
R7 487 781.44 |
Provide information and communication (ICT) hardware - work package 2 LAN switching infrastructure. |
DHET083: XON Systems (Pty) Ltd |
R30 148 286.07 |
15 July 2015 |
Sheleba Technologies |
R1 657 022.83 |
Provide information and communication (ICT) hardware - work package one network cabling. |
|||
20. Food and Beverage Manufacturing Industry Education and Training Authority |
Not applicable |
Not applicable |
Not applicable |
Not applicable |
Pathways Outsourced IT |
R1 103 972.00 |
21. South Africa Qualifications Authority |
1 October 2018 |
Paul Cammidge Computer Consulting |
R476 748.00 |
Security and Network for LAN and WAN |
PRAXIS Computing |
R1 593 409.63 |
1 April 2018 |
Tectight Enterprise Technologies |
R999 500.00 |
Server Hardware (VMWare, vSphere, vCenter, Spectrum protect and VEEAM) |
SAGE South Africa |
R213 787.46 |
|
1 July 2018 |
VOX Telecommunications |
R4 707 757.27 |
Telephone System (VoIP & Fibre-Optic) |
Isitshixo Business Solution |
R395 024.62 |
|
3 September 2018 |
Business Connexion |
R2 561 163.00 |
Storage Area Network |
Click-CRM |
R167 210.23 |
|
12 November 2018 |
AH Power |
R67 032.00 |
Uninterrupted Power Supply |
Mysolutions |
R779 285.13 |
|
1 September 2018 |
Pac B Power Solutions |
R298 319.19 |
Power Generator |
|||
13 November 2018 |
BVI Network Security Services |
R318 391.00 |
Anti-virus and Software Patch Protection |
|||
23 April 2018 |
DRSA |
R362 940.00 |
IT Disaster Recovery |
|||
22. National Student Financial Aid Scheme |
Currently being updated (period of |
Finastra |
The cost of the update is R2.6 million and can only be performed by the service providers that NSFAS acquired the system from. |
Phoenix loan management system |
Finastra |
Finastra bills an annual maintenance fee to NSFAS. The last maintenance cost was R720 323, which covers NSFAS annually (1 January to 31 December) |
23. Council on Higher Education |
31 August 2018 |
Praxis Computing (Pty) Ltd |
R 500 000.00 |
Provision of maintenance of Pastel Evolution and advance procurement/business process management |
Praxis Computing (Pty) Ltd |
R500 000.00 |
30 May 2018 |
Praxis Computing (Pty) Ltd |
R 798 966.96 |
Provision of Network Support Services |
Praxis Computing (Pty) Ltd |
R798 966.96 |
|
31 October 2018 |
eS3 Consulting (Pty) Ltd |
R 522 872.40 |
Provision of Web-based Online Systems Maintenance Services |
eS3 Consulting (Pty) Ltd |
R522 872.40 |
|
June 2018 Licence renewal |
Sage Pastel Accounting |
R 92 819.12 |
Provision of Sage Evolution Business Care Annual License |
Sage Pastel Accounting |
R92 819.12 |
05 December 2018 - NW3538
De Freitas, Mr MS to ask the Minister of Transport
(a) What relationship do Airports Company South Africa and the SA Civil Aviation Authority have at the airport in Nelspruit, (b) what memorandums of understanding (MOUs) are in place and (c) which parties signed these MOUs?
Reply:
South African Civil Aviation Authority (SACAA)
a) The SACAA has issued aerodrome licences to two airports in Nelspruit, namely (i) Nelspruit Municipal Airport and (ii) Kruger Mpumalanga International Airport. SACAA has an oversight obligation over these airports in terms of the mandate conferred by the Civil Aviation Act, No 13 of 2009. The SACAA must ensure that airports comply with the requirements of the Civil Aviation Regulations as promulgated.
b) There are no MoU’s in place between the SACAA and Airports Company South Africa in relation to the two airports referred to under (a).
c) Not Applicable
05 December 2018 - NW3260
Yako, Ms Y to ask the Minister of Mineral Resources
With reference to the reply to question 2952 on 24 October 2018, what is the (a) black economic empowerment (BEE) arrangement regarding the potential mineral commodities mine in Xolobeni, (b) name of each BEE beneficiary and (c) company registration number of each specified BEE beneficiary?
Reply:
a) According to the information submitted at the time of application, Keysha Investments 178 Proprietary Limited (Xolco), is the BEE partner and they were to be given 26% of the issued share capital.
b) The proposed BEE beneficiaries are community trusts, however, the supporting documents have not yet been submitted by the applicant.
c) Registration number 2007/005556/07
Approved/Not Approved
Mr SG Mantashe
Minister of Mineral Resources
Date Submitted:-……………/………………/2018
05 December 2018 - NW3325
Mhlongo, Mr P to ask the Minister of Police
Why do SA Police Service officers use R5 rifles during public protests?
Reply:
Under no circumstances, are Public Order Policing (POP) unit members, allowed to utilise the R5 rifle during the policing of public protests.
Reply to question 3325 recommended/not recommended
GENERAL NATIONAL COMMISSIONER: SOUTH AFRICAN POLICE SERVICE
KJ SITOLE (SOEG)
Date: 22-11/2018
Reply to question 3325 approved
MINISTER OF POLICE
BH CELE, MP
Date: 25/11/2018
05 December 2018 - NW3542
Hunsinger, Dr CH to ask the Minister of Transport
(a) How are trains, coaches and locomotives transported via any rail that is not electrified, (b) for how long has this been the situation in each case, (c) what are the costs in each case, (d) what are the future plans for the rail lines and (e) what are the timelines, timeframes and deadlines in this regard in each case?
Reply:
a) All lines where Metrorail trains are running, are electrified and this is done through electric motor coaches with plain trailers (coaches without motor unit). The only exception is the Eastern Cape services in East London and Port Elizabeth. Here the plain trailers (coaches) are pulled with diesel locomotives.
Mainline Passenger Services coaches (sleepers and sitter coaches) are pulled with diesel locomotives.
b) The status of these lines is as it were since the start of the South African Rail Commuter Corporation. Transnet can provide exact details.
c) The cost for diesel in MLPS was R33,964m for 2017/18 and for Eastern Cape Metrorail R39,158m for the same period.
d) PRASA does not own the lines which are not electrified and therefore cannot respond on this.
e) Not applicable for PRASA.
05 December 2018 - NW3079
Schmidt, Adv H to ask the Minister of Mineral Resources
With regard to each and every mineral, what number of applications for (a) prospecting rights, (b) prospecting permits, (c) mining rights and (d) mining permits were (i) accepted, (ii) granted, (iii) issued and (iv) rejected in the 2017-18 financial year?
Reply:
|
Mining rights |
prospecting rights |
mining permits |
Accepted |
64 |
417 |
438 |
Rejected |
08 |
328 |
277 |
Granted |
26 |
128 |
- |
Issued |
32 |
113 |
99 |
Approved/Not Approved
Mr SG Mantashe
Minister of Mineral Resources
Date Submitted:-……………/………………/2018
Mining Rights
Regions |
Accepted |
Granted |
Issued |
Rejected |
Northern Cape |
13 |
- |
- |
02 |
North West |
06 |
03 |
08 |
01 |
Limpopo |
09 |
- |
- |
02 |
Free State |
04 |
- |
03 |
- |
KwaZulu Natal |
03 |
- |
- |
- |
Western Cape |
03 |
02 |
- |
- |
Eastern Cape |
06 |
- |
- |
- |
Gauteng |
08 |
- |
01 |
02 |
Mpumalanga |
12 |
21 |
20 |
01 |
TOTAL |
64 |
26 |
32 |
08 |
Prospecting Rights
Regions |
Accepted |
Granted |
Issued |
Rejected |
Northern Cape |
74 |
03 |
03 |
39 |
North West |
84 |
23 |
62 |
23 |
Limpopo |
41 |
02 |
- |
28 |
Free State |
32 |
04 |
- |
03 |
KwaZulu Natal |
33 |
- |
05 |
23 |
Western Cape |
02 |
- |
01 |
04 |
Eastern Cape |
04 |
- |
- |
- |
Gauteng |
25 |
03 |
10 |
13 |
Mpumalanga |
144 |
93 |
32 |
195 |
TOTAL |
417 |
128 |
113 |
328 |
Mining Permits
Regions |
Accepted |
Granted |
Issued |
Rejected |
Northern Cape |
49 |
- |
05 |
13 |
North West |
37 |
- |
17 |
14 |
Limpopo |
71 |
- |
12 |
102 |
Free State |
10 |
- |
11 |
06 |
KwaZulu Natal |
34 |
- |
13 |
05 |
Western Cape |
08 |
- |
15 |
02 |
Eastern Cape |
51 |
- |
01 |
06 |
Gauteng |
18 |
- |
09 |
18 |
Mpumalanga |
160 |
- |
16 |
111 |
TOTAL |
438 |
99 |
277 |
05 December 2018 - NW3516
Van der Westhuizen, Mr AP to ask the Minister of Higher Education and Training
(1)Whether she has found that the public technical and vocational education and training colleges will experience a smooth transition when the term of the current councils expires on 31 March 2019; if not, what is the position in this regard; if so, what are the relevant details; (2) Has a calendar with the time-line for the various actions required by this process been (a) drafted and (b) circulated to public technical and vocational education and training colleges; if not, on what date will the calendar be published; if so, what are the relevant details; (3) (a) what were the reasons for the delay in the appointment of the current members of councils at the beginning of their term in office and (b) which colleges had to operate without a full complement of council members for more than (i) 120 days, (ii) 90 days and (iii) 60 days?
Reply:
- The process to appoint new Technical and Vocational Education and Training (TVET) college Councils to assume office on 1 April 2019 and 1 May 2019, following the ending of their term on 31 March 2019 and 30 April 2019 respectively, has commenced. Steps have been taken to ensure a smooth transition between outgoing and incoming Councils.
- The Continuing Education and Training (CET) Act, 16 of 2006 (as amended) does not make provision for the development of a calendar with timelines and its circulation to TVET colleges.
- (a) There were delays experienced in the appointment of Council members as a result of the following reasons:
- Low response rate to a call for nominations;
- Incomplete and/or missing documentation from nominees;
- Unavailability of nominees on the contact numbers provided; and
- Delays in the scheduling of appointments for nominees to undergo the vetting process due to either their unavailability or prior commitments.
(b) None of the TVET colleges operated without a full complement of Council member for more than 60, 90 and/or 120 days respectively.
05 December 2018 - NW2948
Yako, Ms Y to ask the Minister of Mineral Resources
What (a) are the names of the companies that provided transport for the meeting held in Xolobeni in the Eastern Cape on 23 September 2018, (b) was the value of each contract to provide transport to the meeting, (c) is each company’s registration number to whom the contracts were awarded, (d) number of persons were catered for at the meeting and (e)(i) companies provided catering for the meeting and (ii) is the value of each contract?
Reply:
a) The Department was not involved in the transport logistics, Mbizana local municipality was responsible for transportation.
b) Please see (a) above
c) Please see (a) above
d) 5000 people
e)
(i) Supplier name |
(ii) Amount |
Masixasane Trading |
R 35 000.00 |
Mthi-Omhle Trading |
R 40 000.00 |
Bhukwani Farming |
R 35 000.00 |
Bongwas Trading |
R 35 000.00 |
Sigwaiza Construction |
R 35 000.00 |
LGZ Trading |
R 35 000.00 |
Ayole Trading |
R 35 000.00 |
Mia Communication |
R 35 000.00 |
Mhlobothi Trading |
R 35 000.00 |
Sizisa Ukhanyo Trading |
R 35 000.00 |
Approved/Not Approved
Mr SG Mantashe
Minister of Mineral Resources
Date Submitted:-……………/………………/2018
05 December 2018 - NW3567
Waters, Mr M to ask the Minister of Police
What number of (a) cases of (i) murder, (ii) rape, (iii) housebreaking, (iv) carjacking, (v) theft of motor vehicles, (vi) house robbery and (vii) drug-related crimes were (aa) reported at the Primrose Police Station, (b) such cases were sent to court and (c) convictions were obtained for the specified cases in the past three financial years?
Reply:
05 December 2018 - NW3540
De Freitas, Mr MS to ask the Minister of Transport
(a) What research, analysis or any other type of data-gathering exercise has been undertaken on the current state, needs analysis and upgrade requirements of the Passenger Rail Agency of South Africa train stations, (b) on what dates were the specified exercises done, (c) what were the outcomes of the exercises at each station, (d) who undertook the exercises, (e) what plans have been put in place as a result of the findings of the exercises, (f) who will undertake the specified plans and (g) what are the timelines, timeframes and deadlines in this regard?
Reply:
a) The Passenger Rail Agency of South Africa (PRASA), manages its property portfolio through its property management division; Corporative Real Estate Solutions (CRES). PRASA CRES has five (5) regional offices located in Eastern Cape, Western Cape, KwaZulu Natal, Gauteng South and Gauteng North.
Regional offices conduct, on a periodic basis, station condition assessment to achieve and maintain acceptable levels of compliance and functionality of the Railway stations facilities. The assessments include ongoing visual assessments for cleanliness, safety compliance and functionality particularly for Super and Core railway stations as these stations carry the highest commuter numbers.
b) Consolidated data relating to dates and outcomes on condition assessments is attached as Annexure A for Super and core stations.
c) Consolidated data relating to dates and outcomes on condition assessments is attached as Annexure A for Super and core stations.
d) Refer to the response in (a).
e) Station improvements, Preventative and Corrective maintenance plans have been put in place by the respective CRES regional offices in line with established programmes.
f) The Station improvements, Preventative and Corrective maintenance plans are executed by the respective CRES regional offices.
g) Planned timelines vary for each of the programmes (Station Improvements, Preventative and Corrective Maintenance) depending on the size and scale of work required for each of the station projects).
05 December 2018 - NW3574
Bagraim, Mr M to ask the Minister of Police
What number of (a) cases of (i) murder, (ii) rape, (iii) housebreaking, (iv) carjacking, (v) theft of motor vehicles, (vi) house robbery and (vii) drug-related crimes were (aa) reported at the Tembisa Police Station, (b) such cases were sent to court and (c) convictions were obtained for the specified cases in the past three financial years?
Reply:
05 December 2018 - NW3595
Van Der Walt, Ms D to ask the Minister of Transport
(1)(a) What are the names of the contractors employed by the SA National Roads Agency Ltd to construct the N1 - 27: Polokwane Eastern Ring-Road Phase 2, (b) why did this important contract (details furnished) come to a halt, (c) on what date did the project start, (d) on what date was it halted, (e) what is the total cost of the project and (f) what total amount had already been paid to the contractors of the project as at the latest specified date for which information is available; (2) whether the contract includes any penalties for late completion; if not, what is the position in this regard; if so, what are the relevant details; (3) will this project be completed; if not, why not; if so, what are the full relevant details?
Reply:
1. (a) Basil Read Limited
(b) Contract NRA N.001-270-2013/1: NATIONAL ROUTE 1 SECTION 27: THE POLOKWANE EASTERN RING-ROAD PHASE 2 : NEW CONSTRUCTION AND IMPROVEMENTS BETWEEN KM 10.5 AND KM 25.4
The project came to a halt because Basil Read Limited fell into severe cash flow difficulties early in 2018 and went into voluntary Business Rescue on 15 June 2018 in terms of applicable legislation.
(c) Commencement date was 1 December 2015.
(d) Halted on 15 June 2018.
(e) Total cost of the construction at award was R 561 919 579.46 excluding Contingencies, Contract Price Adjustment, Rise and Fall, and VAT.
(f) R 403 000 000.00 excluding VAT. Up to end October 2018.
2. Yes, the original contract includes penalties of R80 000 per day excluding VAT for late completion. Penalities become applicable only after the contractural end date has been reached.
3. Yes, the Project will be completed. Under Business Rescue Legislation SANRAL has to provide Basil Read Limited with the opportunity to complete the construction. However if the Business Rescue process fails, SANRAL will follow the contractural procedures and engage with with the guarantor to step-in and make sure that the Project is completed successfully.
05 December 2018 - NW3159
Nolutshungu, Ms N to ask the Minister of Higher Education and Training
What number of new students will each institution of higher learning have the capacity to enrol for the 2019 academic year?
Reply:
The tables below provide the number of new students each institution of higher learning will enroll for the 2019 academic year.
Table 1: New opportunities in Technical and Vocational Education and Training (TVET) colleges for the 2019 academic year
Province and College |
*NC(V) L2 |
*N1 |
*N4 |
*PLP |
Total |
Eastern Cape |
|||||
|
1 064 |
281 |
1 777 |
100 |
3 222 |
|
1 260 |
750 |
1 836 |
100 |
3 946 |
|
790 |
585 |
1 702 |
100 |
3 177 |
|
1 205 |
745 |
1 725 |
100 |
3 775 |
|
830 |
250 |
875 |
100 |
2 055 |
|
2 314 |
975 |
2 540 |
150 |
5 979 |
|
550 |
200 |
1 509 |
100 |
2 359 |
|
1 158 |
846 |
1 749 |
100 |
3 853 |
Free State |
|||||
|
770 |
700 |
3 120 |
0 |
4 590 |
|
758 |
540 |
1 900 |
100 |
3 298 |
|
2 065 |
385 |
1 785 |
105 |
4 340 |
|
305 |
2 102 |
6 001 |
100 |
8 508 |
Gauteng |
|||||
|
1 278 |
1 890 |
3 150 |
100 |
6 418 |
|
2 260 |
1 200 |
4 383 |
60 |
7 903 |
|
3 108 |
0 |
3 135 |
100 |
6 343 |
|
3 353 |
2 065 |
5 054 |
0 |
10 472 |
|
4 104 |
1 462 |
4 663 |
100 |
10 329 |
|
1 549 |
2 176 |
4 632 |
150 |
8 507 |
|
1 075 |
2 100 |
3 265 |
60 |
6 500 |
|
154 |
3 129 |
7 542 |
100 |
10 925 |
KwaZulu-Natal |
|||||
|
2 130 |
0 |
2 176 |
100 |
4 406 |
|
2 300 |
740 |
1 540 |
95 |
4 675 |
|
1 196 |
665 |
2 437 |
100 |
4 398 |
|
2 271 |
2 974 |
4 373 |
100 |
9 718 |
|
935 |
60 |
2 390 |
100 |
3 485 |
|
740 |
395 |
1 045 |
100 |
2 280 |
|
960 |
495 |
1 673 |
100 |
3 228 |
|
1 053 |
503 |
1 670 |
90 |
3 316 |
|
885 |
795 |
1 463 |
100 |
3 243 |
Limpopo |
|||||
|
1 762 |
1 520 |
4 495 |
100 |
7 877 |
|
290 |
320 |
422 |
30 |
1 062 |
|
630 |
390 |
1 304 |
100 |
2 424 |
|
1 279 |
0 |
570 |
100 |
1 949 |
|
617 |
647 |
1 028 |
100 |
2 392 |
|
1 750 |
2 474 |
3 453 |
100 |
7 777 |
|
954 |
198 |
62 |
105 |
1 319 |
Mpumalanga |
|||||
|
1 470 |
780 |
1 230 |
100 |
3 580 |
|
2 205 |
508 |
1 670 |
100 |
4 483 |
|
1 680 |
1 620 |
2 425 |
100 |
5 825 |
North West |
|||||
|
1 445 |
800 |
2 030 |
61 |
4 336 |
|
750 |
450 |
1 080 |
100 |
2 380 |
|
1 150 |
565 |
1 570 |
100 |
3 385 |
Northern Cape |
|||||
|
637 |
545 |
1 019 |
100 |
2 301 |
|
1 190 |
1 350 |
1 760 |
100 |
4 400 |
Western Cape |
|||||
|
780 |
365 |
3 402 |
200 |
4 747 |
|
1 440 |
520 |
2 859 |
90 |
4 909 |
|
704 |
1 134 |
2 011 |
60 |
3 909 |
|
1 001 |
3 334 |
4 190 |
33 |
8 558 |
|
655 |
390 |
2 242 |
119 |
3 406 |
|
1 175 |
750 |
2 100 |
100 |
4 125 |
Total |
65 984 |
47 668 |
122 032 |
4 708 |
240 392 |
* PLP: Prevocational Learning Programme
* N: NATED / Report 191
* NC(V): National Certificate (Vocational)
Table 2: The approved number of first time entering students in universities for the 2019 academic year
Universities |
Enrolment |
1. Cape Peninsula University of Technology |
9 249 |
2. University of Cape Town |
3 979 |
3. Central University of Technology, Free State |
4 587 |
4. Durban University of Technology |
8 314 |
5. University of Fort Hare |
3 800 |
6. University of Free State |
8 900 |
7. University of Johannesburg |
9 922 |
8. University of KwaZulu-Natal |
8 929 |
9. University of Limpopo |
4 849 |
10. Nelson Mandela University |
7 085 |
11. North West University |
15 717 |
12. University of Pretoria |
9 253 |
13. Rhodes University |
1 672 |
14. University of South Africa |
54 434 |
15. University of Stellenbosch |
5 152 |
16. Tshwane University of Technology |
15 513 |
17. University of Venda |
3 100 |
18. Vaal University of Technology |
5 288 |
19. Walter Sisulu University |
7 400 |
20. University of the Western Cape |
4 500 |
21. University of the Witwatersrand |
6 613 |
22. University of Zululand |
3 900 |
23. Sol Plaatje University |
1 200 |
24. Mpumalanga University |
1 755 |
25. Mangosuthu University of Technology |
4 464 |
26. Sefako Makgatho Health Science University |
1 225 |
Total |
210 800 |
05 December 2018 - NW3568
Dreyer, Ms AM to ask the Minister of Police
What number of (a) cases of (i) murder, (ii) rape, (iii) housebreaking, (iv) carjacking, (v) theft of motor vehicles, (vi) house robbery and (vii) drug-related crimes were (aa) reported at the Germiston Police Station, (b) such cases were sent to court and (c) convictions were obtained for the specified cases in the past three financial years?
Reply:
04 December 2018 - NW3566
Waters, Mr M to ask the Minister of Police
What number of (a) cases of (i) murder, (ii) rape, (iii) housebreaking, (iv) carjacking, (v) theft of motor vehicles, (vi) house robbery and (vii) drug-related crimes were (aa) reported at the Bedfordview Police Station, (b) such cases were sent to court and (c) convictions were obtained for the specified cases in the past three financial years?
Reply:
04 December 2018 - NW3575
Bagraim, Mr M to ask the Minister of Police
What number of (a) cases of (i) murder, (ii) rape, (iii) housebreaking, (iv) carjacking, (v) theft of motor vehicles, (vi) house robbery and (vii) drug-related crimes were (aa) reported at the Tembisa South Police Station, (b) such cases were sent to court and (c) convictions were obtained for the specified cases in the past three financial years? ·
Reply:
04 December 2018 - NW3434
Dreyer, Ms AM to ask the Minister of Police
By what date will a new police station be built for the Boksburg North police precinct?
Reply:
The Construction of the Police station In Boksburg North; forms part of the Top 10 Priorities of the Gauteng Province.
The Department of Public Works has already identified a site and this office commenced with site clearance In June 2018.
The site clearance is scheduled to be finalised by 2020/2021.
The planning and design to be finalised by 202112022 whereafter the execution will Commence
LIEUTENANT GENERAL DIVISKJNAL COMMISSIONER: SUPPLY CHAIN MANAGEMENT RJMOKWENA
DATE: 2018/11/15
Reply to question 3434 recommended
LIEUTENANT GENERAL DEPUTY NATIONAL COMMISSIONER: ASSET ANO LEGAL MANAGEMENT FNVUMA
DATE:2018/11/16
Reply to question 3434 recommended/not recommended
GENERAL NATIONAL COMMISSIONER: SOUTH AFRICAN POLICE SERVICE
KJ SITOLE (SOEG)
DATE: 2018/11/16
Reply to question 3434 approved
MINISTER OF POLICE
BH CELE, MP
DATE: 2018/11/30
03 December 2018 - NW3609
Wilson, Ms ER to ask the Minister of Health
By what date will the new nursing programme be rolled out in line with the National Qualifications Framework?
Reply:
The new nursing programmes will be rolled out in January 2020. All nursing colleges have prioritised the new 3-year diploma in General Nursing.
All other programmes will be rolled out in a phased approach.
END.
03 December 2018 - NW3686
Khawula, Ms MS to ask the Minister of Water and Sanitation
With reference to his reply to question 2700 on 20 November 2018, what number of litres of water were lost through leaks (a) nationally and (b) in each (i) province and (ii) municipality in the 2016-17 financial year?
Reply:
It should be noted by the Hounorable Member that the response provided in the reply to question 2700 published on 7 September 2018 was adequately responded to.
---00O00---
03 December 2018 - NW3617
Dreyer, Ms AM to ask the Minister of Water and Sanitation
(a) What strategy is in place to rehabilitate the (i) Vaal Dam and (ii) Vaal River, (b) what will be the cost of rehabilitation in each case and (c) by what date is the rehabilitation envisaged to be completed in each case?
Reply:
a) Currently the Department does not have a river rehabilitation programme for the Vaal Dam and the Vaal River; however we have the following programmes that are aimed at managing the quality of water as follows:
- River ecosystatus monitoring programme to determine the status of the river health with the following objectives:
- Measure, assess and report on the ecological state of aquatic ecosystems (river health data);
- Detect and report on spatial and temporal trends;
- Identify and report on emerging problems regarding aquatic ecosystems;
- Ensure that reports provide scientifically and managerially relevant information.
- Six (6) rivers are monitored in the Upper Vaal
- Six (6) rivers also monitored in the Middle Vaal Water Management Area; namely the Vaal, Renoster, Vals, Vet and Sand Rivers. This monitoring is done on a quarterly basis.
- Two (2) rivers (Harts and Lower Vaal) are monitored in the Lower Vaal.
- Surface water monitoring programme to determine the quality of surface water. The programme analyses chemical and microbiological variables. 28 surface monitoring points monitored in the Middle Vaal Water Management Area, of which six (6) points are on the Vaal River mainstream, four (4) on the Renoster River, three (3) on the Vals River, five (5) on the Schoonspruit, five (5) on the Sand and five (5) on the Vet Rivers.
- Resource Quality Objectives (RQOs) are used to determine compliance.
- Surface water quality samples taken are analyzed at an internal laboratory which is not accredited, therefore the results cannot be used for prosecution purposes but only for audit purposes.
- This sampling is taking place twice a year.
- Water use license authorisation process to ensure that water users comply with the water quality standards.
- Routine inspections on various water users (agriculture, industries, mines, local government) and implementation of enforcement action to ensure compliance with water use license conditions
- Infrastructure development, operation and maintenance with the following objectives:
- Minimise the pollution of water resources;
- Improve operation and maintenance of the waste water infrastructure;
- Reduce sewage spillages;
- Improve the capacity and quality of the waste water infrastructure.
b) Falls away.
c) Falls away.
---00O00---
03 December 2018 - NW3657
Tshwaku, Mr M to ask the Minister of Public Service and Administration
(1)With reference to her reply to question 2961 on 16 November 2018, what are the details of the response received on 26 June 2017; (2) will she provide Mr M Tshwaku with a copy of the response; if not, what is the position in this regard; if so, on what date will she provide the copy?
Reply:
Correspondence on the response referred to in this parliamentary Question was received from the Executive Authority of the Department of Water and Sanitation (DWS). Therefore, the DWS Executive Authority is in a better position to prove a copy of this correspondence to the Honourable Member.
03 December 2018 - NW3703
Mashabela, Ms N to ask the Minister of International Relations and Cooperation
What (a) number of (i) embassies (ii) high commissions and (iii) consulates does the Government have, (b) is the (i) location of (ii) staff contingent of and (iii) latest annual budget for each embassy, high commission and consulate?
Reply:
The information requested by the Honourable Member is provided in my reply to question 875. The reply referred to is attached for ease of reference.