Questions and Replies

Filter by year

08 September 2015 - NW3020

Profile picture: Stander, Ms T

Stander, Ms T to ask the Minister of Environmental Affairs

(1)With regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and in view of the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 (details furnished), how detrimental the use of formaldehyde will be to the (a) ecological, and (b) hydrology systems for the study area; (2) whether it will have an impact downstream on the (a) ecological and (b) hydrology systems; if so, how far from the study area will the impact be felt in each case?

Reply:

(1) and (2) The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the MEC is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

---ooOoo---

08 September 2015 - NW3009

Profile picture: Carter, Ms D

Carter, Ms D to ask the Minister of Arts and Culture

Whether the Government is taking steps to ensure that more resources are being ploughed into the uptake of sign language training, considering that more than a million South Africans are afflicted with deafness and that, as a result of more persons learning sign language and being able to communicate in sign language, it would make it possible for deaf persons to have wider engagement in society and broader opportunities; if not, why not; if so, what are the (a) relevant details and (b) outcomes thereof?

Reply:

(a). Yes, my department, as part of the broad programme of government to build a united, non-racial, non-sexist, democratic and prosperous country, we are taking steps to ensure that more resources are being ploughed into the uptake of sign language training, by promoting, and creating conditions for the development of South African Sign Language (SASL) through funding and training projects that focus on the development and use of SASL.The department is also awarding language bursaries to Universities which are offering the training of the South African Sign Language as one of their courses.

(b). By funding training projects and awarding language bursaries we create a pool of professional sign language interpreters. Through sign language interpreters, communities are able to communicate with deaf people at a societal level.

08 September 2015 - NW3208

Profile picture: Bozzoli, Prof B

Bozzoli, Prof B to ask the Minister of Higher Education and Training

In the five months since his reply to question 734 on 24 March 2015, (a) is the specified TVET college stable, (b) are all classes taking place regularly under the supervision of fully qualified staff, (c) what has happened to the (i) staff who took part in the unprotected strike and (ii) students who supported them and (d) have the activities and threats to render the specified TVET college ungovernable subsided?

Reply:

(a) Whilst the Eastcape Midlands Technical and Vocational Education and Training College (EMC) has been operating in a stable and violence-free environment since 9 March 2015, the unprotected strike continued due to delays in the disciplinary processes initiated by EMC against a number of employees.

The National Education, Health and Allied Workers’ Union (NEHAWU) National Office Bearers, Department of Higher Education and Training and EMC Council signed a settlement agreement intended to restore and improve working relations between the parties on 7 August 2015. The strike was agreed to be called off with effect from 4 September 2015.

(b)  Regular classes have been conducted by appropriately qualified EMC employed lecturers and others engaged on short-term contracts via a temporary employment agency to replace striking or dismissed lecturers. The College participated in the interviews of the temporary lecturers to confirm that they were qualified as per the curriculum prescripts for the various programmes.

(c) (i) All employees, including dismissed employees who took part in the unprotected strike have been mandated to agree in writing on the settlement terms finalised on 7 August 2015 as a prerequisite to returning to work on 7 September 2015. The settlement agreement requires all employees who embarked in the unprotected strike to forfeit a month’s salary, repay any payments made to them while they were part of the unprotected strike, and accept a twelve month final written warning not to engage in any misconduct activities.

(ii) Students who participated in the strike action for a prolonged period of time have failed to meet the 80% attendance policy requirements for entry into trimester/semester final examinations. Therefore, they have been advised to deregister or return to the college in the following trimester/semester or the following year, depending on the programme for which they had registered.

(d)  Not only have the activities and threats to render the specified TVET college ungovernable, subsided but it has completely stopped.

 

 

 

Compiler/Contact persons:

Ext:

DIRECTOR – GENERAL

STATUS:

DATE:

REPLY TO QUESTION 3208 APPROVED/NOT APPROVED/AMENDED

Dr BE NZIMANDE, MP

MINISTER OF HIGHER EDUCATION AND TRAINING

STATUS:

DATE:

08 September 2015 - NW3292

Profile picture: Matshobeni, Ms A

Matshobeni, Ms A to ask the Minister of Arts and Culture”

1.(a)(i) What total amount did his department spend on his travel costs between Gauteng and Cape Town in the 2014-15 financial year and (ii) how many trips did he undertake between Cape Town and Gauteng in the specified financial year and (b) what total amount did his department spend on (i) hotel and (ii) residential or other accommodation for him in (aa) Cape Town and (bb) Pretoria in the 2014-15 financial year; 2.(a)(i) What total amount did his department spend on the Deputy Minister’s travel costs between Gauteng and Cape Town in the 2014-15 financial year and (ii) how many trips between Gauteng and Cape Town did the Deputy Minister undertake in the specified financial year and (b) what total amount did his department spend on (i) hotel and (ii) residential or other accommodation for the Deputy Minister in (aa) Cape Town and (bb) Pretoria in the 2014-15 financial year? (NW3896E) REPLY Ministers and Deputy Ministers are expected to travel between Gauteng and the Western Cape to carry out official duties, including parliamentary duties according the Parliamentary Programme. Costs incurred during the execution of the tasks outlined above are readily made available in Annual Reports which will be tabled in Parliament no later than the end of this month.

Reply:

Ministers and Deputy Ministers are expected to travel between Gauteng and the Western Cape to carry out official duties, including parliamentary duties according the Parliamentary Programme.

Costs incurred during the execution of the tasks outlined above are readily made available in Annual Reports which will be tabled in Parliament no later than the end of this month.

     

08 September 2015 - NW2842

Profile picture: Lees, Mr RA

Lees, Mr RA to ask the Minister of Public Works:

(1) With reference to his reply to question 2353 on 28 July 2015, what are the names of the lessors for each of the 17 leased properties listed on Annexure A to the reply; (2) is a certain company (name furnished) registered as a value-added tax (VAT) vendor; if not, why has his department entered into lease agreement/s with the specified company; if so, what is the VAT registration number for the specified company; (3) for what purpose does the SA Police Service (SAPS) use the 80 square metres of Fourieskraal farm; (4) what are the correct (a) street addresses and/or (b) directions to (i) the Devana Farm Trust at Durban Road and (ii) Ezakheni Park homes as there are no known streets named Durban Road or Vlak Plaats in the Emnambithi/Ladysmith municipality; (5) is the SAPS still in occupation of 43 Murchison Street; if so, (a) was the lease renewed and what (b)(i) process was followed to renew the lease and (ii) are the details of the new lease? NW3315E MINISTRY PUBLIC WORKS REPUBLIC OF SOUTH AFRICA Department of Public Works l Central Government Offices l 256 Madiba Street l Pretoria l Contact: +27 (0)12 406 2034 l +27 (0)12 406 1224 Private Bag X9155 l CAPE TOWN, 8001 l RSA 4th Floor Parliament Building l 120 Plain Street l CAPE TOWN l Tel: +27 21 468 6900 Fax: +27 21 462 4592 www.publicworks.gov.za NATIONAL ASSEMBLY WRITTEN REPLY QUESTION NUMBER:2842 [NW3315E] INTERNAL QUESTION PAPER:No. 28 of 2015 DATE OF PUBLICATION:07 AUGUST 2015 DATE OF REPLY:08 SEPTEMBER 2015 Mr R A Lees (DA) asked the Minister of Public Works: (1) With reference to his reply to question 2353 on 28 July 2015, what are the names of the lessors for each of the 17 leased properties listed on Annexure A to the reply; (2) is a certain company (name furnished) registered as a value-added tax (VAT) vendor; if not, why has his department entered into lease agreement/s with the specified company; if so, what is the VAT registration number for the specified company; (3) for what purpose does the SA Police Service (SAPS) use the 80 square metres of Fourieskraal farm; (4) what are the correct (a) street addresses and/or (b) directions to (i) the Devana Farm Trust at Durban Road and (ii) Ezakheni Park homes as there are no known streets named Durban Road or Vlak Plaats in the Emnambithi/Ladysmith municipality; (5) is the SAPS still in occupation of 43 Murchison Street; if so, (a) was the lease renewed and what (b)(i) process was followed to renew the lease and (ii) are the details of the new lease? NW3315E _________________________________________________________________ REPLY: The Minister of Public Works (1) The names of the lessors for each of the 17 leased properties are listed in the table below LESSOR NAME NAME OF BUILDING / PROPERTY LESSOR TELEPHONE 1. SAROSMA TRUST REPRESENTED BY DEDEKIND REAL ESTATE HERON HOUSE, 131 MURCHISON STREET (036) 637 2297 2. L.KIRSTEN 104 LEICESTER STREET (036) 631 2414 3. EMNAMBITHI LADYSMITH MUNICIPALITY WAGON HILL RIFLE RANGE UNSURVEYED PORTION OF ERF 1 (036)637 2231 4. JANORA TRADING (PTY) LTD 33 KEATE STREET (036) 637 2287 5. BILLYGREEN INVESTMENTS (PTY) LTD LADYKEATE BLDG 35-37 KEATE STREET (036) 637 2989 6. EMNAMBITHI LADYSMITH MUNICIPALITY DRIEFONTEIN THUSONG CENTRE (036) 637 2231 7. THE ROSCO FAMILY TRUST 73 MURCHISON STREET (036) 637 2989 8. KZN PROV GOV-WORKS OLD RTI SITE (033) 355 5468 9. JANORA TRADING (PTY) LTD DEVANA FARM TRUST, OLD DURBAN ROAD- R103 NEXT TO TESTING GROUNDS (036) 637 2287 10. JANORA TRADING (PTY) LTD 388,6 square metre space at 35 BUCKINGHAM STREET (036) 637 2287 11. JANORA TRADING (PTY) LTD 500 square metre space at 35 BUCKINGHAM STREET (036) 637 2287 12. JANORA TRADING (PTY) LTD 24 BUCKINGHAM STREET (036) 637 2287 13. INDUSTRIAL LEASES (PTY) LTD 43 MURCHISON STREET (031) 941 8132 14. ETERNA TRUST LADYSMITH CC 284 MURCHISON STREET (036) 637 2297 15. JAZZ SPIRIT 140 PTY LTD 284 MURCHISON STREET (036) 631 3211 16. NATAL PARKHOMES VLAK PLAATS - PARKHOMES DISTRIBUTED TO THE FOLLOWING AREARS; GROENVLEI, WASBANK, CHARLESTOWN, ELANDSLAAGTE, VAN REENEN AND BESTES (031) 701 4221 17 PEPWORTH BODY (PTY) LTD (50) PT: FOURIESKRAAL FARM (083) 620 0032 (2) No, the company is not a VAT vendor in terms of the regulations of the South African Revenue Service (SARS). It must be noted that SARS regulations stipulate that a company does not need to be registered for VAT if its annual turnover is below R1 million. The value of the Department’s lease with the said vendor is below R1 million. In addition, upon lease renewal, all landlords are required to submit their recent Tax Clearance Certificates, which indicate the VAT registration status of their companies. The Department often engages such companies, particularly because in many small towns, there is a shortage of suitable accommodation for Government departments. Also, by engaging small companies the Department contributes to their development. (3)The 80 square metres in Fourieskraal farm is used for the purpose of accommodating a South African Police Service (SAPS) Communication Tower. (4)(a), b) and (i) Devana Farm is located alongside the Old Durban Road, which is a small dirt road leading off the R103 into the leased land which is used by SAPS as a garage. (Directions: from the N3 Highway from Durban, take exit at R103 Bergville/Colenso off ramp. Turn right very shortly thereafter onto the R103 – “Durban / Colenso”. Keep on this road until you join up with a larger road, Pass the Ladysmith testing grounds on the right the Garage is immediately next to the Ladysmith testing ground.) (ii) The park homes are mobile units that can be moved, as per the client’s requirements. The park homes are leased from Natal Parkhomes and were were originally located in Vlakplaats, which is an area within the Ladysmith District. The mobile units used by SAPS were first placed at Ezakheni Police Station and were later relocated to other locations within the Ladysmith District, including the following areas: GROENVLEI, WASBANK, CHARLESTOWN, ELANDSLAAGTE, VAN REENEN AND BESTES. (5) (a) SAPS is still in occupation of 43 Murchison Street and the lease is currently running on a month to month basis. (b) (i) The lease has been identified for renewal within the prescripts of the 2nd National Treasury Dispensation on leases, which was recently granted to the Department in March 2015. (ii) Internal processes dictate that once a Special Dispensation is received from National Treasury, an internal circular on the application of the Dispensation is to be drafted, approved and communicated to all departmental officials who will utilise the dispensation prior to the Dispensation being utilised. The above lease expired before the issuing of the internal circular and in the interest of compliance and to ensure that the client department’s daily operations are not disrupted and was then renewed on a month to month basis, for a period not exceeding 12 months as an interim measure. The internal circular on the application of the Dispensation from National treasury has since been approved and the process to renew the lease based on the Dispensation has begun, thus there are no details on the new lease as yet. _________________________________________________________________

Reply:

The Minister of Public Works

(1) The names of the lessors for each of the 17 leased properties are listed in the table below

 

LESSOR NAME

NAME OF BUILDING / PROPERTY

LESSOR TELEPHONE

1.

SAROSMA TRUST REPRESENTED BY DEDEKIND REAL ESTATE

HERON HOUSE, 131 MURCHISON STREET

(036) 637 2297

2.

L.KIRSTEN

104 LEICESTER STREET

(036) 631 2414

3.

EMNAMBITHI LADYSMITH MUNICIPALITY

WAGON HILL RIFLE RANGE UNSURVEYED PORTION OF ERF 1

(036)637 2231

4.

JANORA TRADING (PTY) LTD

33 KEATE STREET

(036) 637 2287

5.

BILLYGREEN INVESTMENTS (PTY) LTD

LADYKEATE BLDG 35-37 KEATE STREET

(036) 637 2989

6.

EMNAMBITHI LADYSMITH MUNICIPALITY

DRIEFONTEIN THUSONG CENTRE

(036) 637 2231

7.

THE ROSCO FAMILY TRUST

73 MURCHISON STREET

(036) 637 2989

8.

KZN PROV GOV-WORKS

OLD RTI SITE

(033) 355 5468

9.

JANORA TRADING (PTY) LTD

DEVANA FARM TRUST, OLD DURBAN ROAD- R103 NEXT TO TESTING GROUNDS

(036) 637 2287

10.

JANORA TRADING (PTY) LTD

388,6 square metre space at 35 BUCKINGHAM STREET

(036) 637 2287

11.

JANORA TRADING (PTY) LTD

500 square metre space at 35 BUCKINGHAM STREET

(036) 637 2287

12.

JANORA TRADING (PTY) LTD

24 BUCKINGHAM STREET

(036) 637 2287

13.

INDUSTRIAL LEASES (PTY) LTD

43 MURCHISON STREET

(031) 941 8132

14.

ETERNA TRUST LADYSMITH CC

284 MURCHISON STREET

(036) 637 2297

15.

JAZZ SPIRIT 140 PTY LTD

284 MURCHISON STREET

(036) 631 3211

16.

NATAL PARKHOMES

VLAK PLAATS - PARKHOMES DISTRIBUTED TO THE FOLLOWING AREARS; GROENVLEI, WASBANK, CHARLESTOWN, ELANDSLAAGTE, VAN REENEN AND BESTES

(031) 701 4221

17

PEPWORTH BODY (PTY) LTD (50)

PT: FOURIESKRAAL FARM

(083) 620 0032

(2) No, the company is not a VAT vendor in terms of the regulations of the South African Revenue Service (SARS). It must be noted that SARS regulations stipulate that a company does not need to be registered for VAT if its annual turnover is below R1 million. The value of the Department’s lease with the said vendor is below R1 million. In addition, upon lease renewal, all landlords are required to submit their recent Tax Clearance Certificates, which indicate the VAT registration status of their companies.

The Department often engages such companies, particularly because in many small towns, there is a shortage of suitable accommodation for Government departments. Also, by engaging small companies the Department contributes to their development.

(3) The 80 square metres in Fourieskraal farm is used for the purpose of accommodating a South African Police Service (SAPS) Communication Tower.

(4) (a), b) and (i) Devana Farm is located alongside the Old Durban Road, which is a small dirt road leading off the R103 into the leased land which is used by SAPS as a garage. (Directions: from the N3 Highway from Durban, take exit at R103 Bergville/Colenso off ramp. Turn right very shortly thereafter onto the R103 – “Durban / Colenso”. Keep on this road until you join up with a larger road, Pass the Ladysmith testing grounds on the right the Garage is immediately next to the Ladysmith testing ground.)

(ii) The park homes are mobile units that can be moved, as per the client’s requirements. The park homes are leased from Natal Parkhomes and were were originally located in Vlakplaats, which is an area within the Ladysmith District. The mobile units used by SAPS were first placed at Ezakheni Police Station and were later relocated to other locations within the Ladysmith District, including the following areas: GROENVLEI, WASBANK, CHARLESTOWN, ELANDSLAAGTE, VAN REENEN AND BESTES.

(5) (a) SAPS is still in occupation of 43 Murchison Street and the lease is currently running on a month to month basis.

(b) (i) The lease has been identified for renewal within the prescripts of the 2nd National Treasury Dispensation on leases, which was recently granted to the Department in March 2015.

(ii) Internal processes dictate that once a Special Dispensation is received from National Treasury, an internal circular on the application of the Dispensation is to be drafted, approved and communicated to all departmental officials who will utilise the dispensation prior to the Dispensation being utilised.

The above lease expired before the issuing of the internal circular and in the interest of compliance and to ensure that the client department’s daily operations are not disrupted and was then renewed on a month to month basis, for a period not exceeding 12 months as an interim measure.

The internal circular on the application of the Dispensation from National treasury has since been approved and the process to renew the lease based on the Dispensation has begun, thus there are no details on the new lease as yet.

_________________________________________________________________

08 September 2015 - NW3000

Profile picture: Matlhoko, Mr AM

Matlhoko, Mr AM to ask the Minister of Cooperative Governance and Traditional Affairs

(1) Whether, with regard to the appointment of a certain company (name furnished) by the Ngaka Modiri Molema District Municipality, the project management unit for which the specified company is hired is an internal municipality unit; if so, what are the relevant details; (2) (a) for what project and (b) at what value was the specified company appointed?

Reply:

COGTA has engaged with the Ngaka Modiri Molema District Municipality (NMMDM) in order to obtain answers to these questions. The municipality has responded as follows:

  1. The Project Management Unit (PMU) is an internal unit of the municipality. It has been established under the Technical Services Section within the municipality, as provided for in the PMU Guidelines developed by the Department of Cooperative Governance.

The appointment of the company was prompted by a critical shortage of technical staff in the municipality. This included a shortage of planning, engineering and project management expertise. This had resulted in the municipality failing to spend its allocated MIG and other funds for projects within specified timeframes.

Currently, the company has suspended its support to the municipality due to non-payment of outstanding invoices by the municipality.

(2)(a) The company was appointed by the municipality for a period of three years with effect from 2 September 2013, ending on 31 August 2016, to provide technical support to the PMU unit. The company was appointed to carry out the following tasks as contained in the Terms of Reference (ToR) for the appointment:

• Provision of quality technical support and advice over the Project Life Cycle, which includes inception, planning, implementation, monitoring and reporting and close-out on the infrastructure programme in the municipality

• The development of contract briefs for submission to the Professional Service Providers appointed by the Ngaka Modiri Molema District Municipality (NMMDM).

• In respect of each project, scrutinize, approve and verify the accuracy and correctness of all practical and final completion certificates and recommend approval by the Senior Manager of the PMU

• Verification of all technical and financial aspects of the Infrastructure Programme

• Preparation of all required documentation for submission to the departments responsible for conditional grants and any other required reporting.

(2)(b)The contract amount over this period is R21,6 million from the municipality’s Equitable Share budget. Given that the NMMDM receives approximately R300 million per annum from the Municipal Infrastructure Grant (MIG), the municipality is within the 5% allowance for PMU costs in the MIG framework.

08 September 2015 - NW3019

Profile picture: Stander, Ms T

Stander, Ms T to ask the Minister of Environmental Affairs

With regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality, and in view of the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 (details furnished), what steps will her department take to ensure that no water pollution takes place?

Reply:

The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the MEC is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

---ooOoo---

08 September 2015 - NW3168

Profile picture: Dudley, Ms C

Dudley, Ms C to ask the Minister of Higher Education and Training

Whether he is aware of students who graduated but did not receive their certificates at the Motheo FET/TVET College in Thaba Nchu between 2008 and 2010; (2) has the specified matter been investigated; if not, why not; if so, what are the relevant details?

Reply:

  1. There are no outstanding National Accredited Technical Diploma (NATED) Report 190/1 certificates, as these are issued within 3 months after the release of results as per the national policy.

There are however students who did not receive their National Certificate (Vocational) [NC (V)] certificates at the Thaba Nchu campus of Motheo Technical and Vocational Education and Training (TVET) college for the period 2008 to 2010. The table below provides details on the number of outstanding NC (V) certificates:

Examination cycle

Level 2

Level 3

Level 4

Total

200811

2

8

0

10

200903

8

0

0

8

200911

6

13

5

24

201003

9

3

5

17

201011

27

9

19

55

Total

52

33

29

114

2)  Yes. The outstanding NC(V) certificates affect all public TVET and private colleges and are due to a consolidation error on the examinations Information Technology (IT) system managed and maintained by the State Information Technology Agency (SITA). Through the intervention made by my Director-General and the Portfolio Committee on Higher Education and Training, SITA has sourced additional project management and technical capacity from an outside IT service provider to eliminate the backlog and ensure that it does not recur. In accordance with the project plan tabled to the Portfolio Committee on Higher Education and Training in August 2015, all outstanding NC (V) certificates will be available at TVET college examination centres by January 2016.

The Department is intervening, on behalf of graduates being denied access to the workplace and/or higher education study programmes due to outstanding certificates, respectively in the following manner:

  • Letters of verification are issued on request;
  • Employers are contacted on behalf of students; and
  • Higher education institutions are contacted on behalf of students.

 

 

 

Compiler/Contact persons:

Contact number:

DIRECTOR – GENERAL

STATUS:

DATE:

REPLY TO QUESTION 3168 APPROVED/NOT APPROVED/AMENDED

Dr BE NZIMANDE, MP

MINISTER OF HIGHER EDUCATION AND TRAINING

STATUS:

DATE:

08 September 2015 - NW3057

Profile picture: Esau, Mr S

Esau, Mr S to ask the Minister of Environmental Affairs

(a) How does her Department define red tape and (b) what (i) specific interventions and/or (ii) systems have been implemented to (aa) identify and (bb) reduce red tape in (aaa) her Department and (bbb) the entities reporting to her?

Reply:

(a) Red tape is considered to be an excessive regulation or rigid conformity to formal rules that are considered redundant or bureaucratic and hinders or prevent decision-making.

(b) (i) (aa) (aaa) The Department is always mindful of the impact of unnecessary bureaucracy on the economy and the service delivery to the public. The Department, on a continuous basis, reconsider processes and make them more efficient and effective in its day to day operations. The socio-economic impact assessments that government needs to conduct as part of the process when new policies and legislation are developed will also ensure that unnecessary red tape is avoided.

(bb) (aaa) The Department developed norms and standards to replace the requirement to apply for licenses for certain activities. It also develops other environmental management instruments that will have the effect that the environmental impact assessment process is shortened, be more cost effective, that fewer studies would be required and that decision-making would be based on better and standardised information. The setting of minimum information requirements for certain applications will ensure that the applicant will know up-front what information the competent authority will need to make a decision, and it would be the same whether the competent authority is the national Department or provincial Department. The thresholds for activities listed under the National Environmental Management Act, 1998, are periodically reconsidered as information on their impacts on the environment becomes known.

(bbb) The Department believes that the entities also have their own systems for addressing any red tapes that might be there.

(ii) (aa) (aaa) The Department is currently reviewing its business processes to ensure that the processes are effective and that delays are avoided or minimized. The reviewing and mapping processes identify bottlenecks, which can then be eliminated. Existing mapped processes are monitored and improved.

(bb) (aaa) The Department introduced electronic systems, such as National Environmental Authorisation System, Livelink Opentext and Waste information system; and it is busy developing an electronic licensing system called Integrated Permit Management System that will be rolled out in the near future. The Department is also developing a screening tool that would upfront identify the feasibility of a particular project for which an environmental authorization is applied.

(bbb) South African Weather Service implemented the National Air Quality Information System Phase I.

--ooOoo--

08 September 2015 - NW3013

Profile picture: Waters, Mr M

Waters, Mr M to ask the Minister of Environmental Affairs

With regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and in view of the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 (details furnished) (a) who are the qualified specialists that conducted the specified peer review, (b) what are their qualifications, (c) for whom do they work and (d) what were the findings of the specified peer review?

Reply:

The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the MEC is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

---ooOoo---

08 September 2015 - NW3012

Profile picture: Waters, Mr M

Waters, Mr M to ask the Minister of Environmental Affairs

With regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and in view of the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 (details furnished) (a) how does her department intend to inform the public about anthrax and its symptoms and (b) what is the radius of the identified area in which the public will be informed?

Reply:

The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the MEC is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

---ooOoo---

08 September 2015 - NW3132

Profile picture: Majola, Mr TR

Majola, Mr TR to ask the Minister of Telecommunications and Postal Services

(1)(a) What interactions has his (i) department or (ii) the SA Connect project office had with (aa) national and (bb) provincial government departments to determine and audit what information technology infrastructure projects are in process or being planned and (b) in each case, what are the relevant details of (i) departments, (ii) their projects and (iii) the budgeted costs over the Medium Term Expenditure Framework; (2) What strategy is being developed by the SA Connect project office in the case where no interactions have been held to ensure compliance by all government departments with the protocols of SA Connect?

Reply:

(1)(a) The Department has engaged all provinces, particularly those that will form part of Phase 1 of the broadband rollout programme. The purpose of the engagements was to ensure alignment between provincial initiatives and the SA Connect; communicate the intentions of the Departments with respect to Phase 1 of SA Connect; ensure that that there is optimum coordination between provincial line departments and the service providers who may rollout the programme.

(b) Only two provinces have funding for Broadband Projects, Gauteng (R1.2bn over 5 years) and Western Cape (R1.3bn over 7 years). Other provinces have broadband plans that do not have dedicated funding.

(2) The Department has established Provincial Broadband Steering Committees (PBSC). The PBSCs are provincially based structures that will support the co-ordination, alignment and increased professionalism of broadband implementation in the provinces. In order to fully achieve the effects of well managed broadband initiatives, the management of a combined approach between provinces and municipalities have been recognised.

Priority was given to provinces that are targeted for the first phase of Digital Development implementation. Gauteng and Western Cape Provinces will also be engaged on how to collaborate for the development of the implementation plans of facilities in the respective provinces.

08 September 2015 - NW3018

Profile picture: Stander, Ms T

Stander, Ms T to ask the Minister of Environmental Affairs

With regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality, (a) how many wetlands have been identified in the specified area, (b) how are these wetlands to be protected, (c) what animal species live in and around the wetlands and (d) what flora species grow in and around the wetlands?

Reply:

The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the MEC is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

---ooOoo---

08 September 2015 - NW3076

Profile picture: Rabotapi, Mr MW

Rabotapi, Mr MW to ask the MINISTER OF ARTS AND CULTURE:

(a). How does (i) his department and (ii) entities reporting to him define red tape and (b). What (i) specific interventions and or (ii) systems have been implemented to (aa) identify and (bb) reduce red tape in (aaa) his department and (bbb) entities reporting to him? NW3617E REPLY: Guidelines for Reducing Municipal Red Tape, 2012 define red tape as rules, regulations, and / or bureaucratic procedures and processes which are excessively complex and which impose unnecessary delay(s), inaction and / or costs which exceed their benefits, and / or is no longer effective in achieving the purpose for which they were originally created. Red tape results in undesirable economic, business and / or social impacts or outcomes as a result of negatively impacting on productivity. Red tape involves excessive, or unevenly enforced, regulation or rigid conformity to formal rules that is considered redundant or bureaucratic and hinders or prevents effective action or decision-making. Government recognizes the need to review its policy and regulatory environment that continue to hinder the development, growth and competitiveness of small businesses. Government has requested all spheres to institutionalise the guidelines aimed at reducing red tape at local government level. Government sets-aside 30% of appropriate categories of State procurement for purchasing from SMMEs, cooperatives as well as township and rural enterprises. It’s proposed that the design of a National Red Tape Reduction Programme, with coordinated implementation by the Presidency’s Office, will be informed by lessons learnt from recent and current national red tape initiatives designed to accelerate national competitiveness & economic growth by setting targets to reduce the total costs of government imposed regulations on business. Other Specific interventions by Government Enacted Policies, Regulations and Legislation i. e. (the 30 days payment policy). Establishment of the Department of Performance Monitoring and Evaluation located in the Presidency The National Development Plan –vision 2030 Institutionalizing of Performance management System across all spheres of government Development of Risk assessment strategies by all departments and entities Establishment of Fraud and Corruption fighting mechanisms and many more

Reply:

Guidelines for Reducing Municipal Red Tape, 2012 define red tape as rules, regulations, and / or bureaucratic procedures and processes which are excessively complex and which impose unnecessary delay(s), inaction and / or costs which exceed their benefits, and / or is no longer effective in achieving the purpose for which they were originally created. Red tape results in undesirable economic, business and / or social impacts or outcomes as a result of negatively impacting on productivity. Red tape involves excessive, or unevenly enforced, regulation or rigid conformity to formal rules that is considered redundant or bureaucratic and hinders or prevents effective action or decision-making.

Government recognizes the need to review its policy and regulatory environment that continue to hinder the development, growth and competitiveness of small businesses. Government has requested all spheres to institutionalise the guidelines aimed at reducing red tape at local government level.

Government sets-aside 30% of appropriate categories of State procurement for purchasing from SMMEs, cooperatives as well as township and rural enterprises.

It’s proposed that the design of a National Red Tape Reduction Programme, with coordinated implementation by the Presidency’s Office, will be informed by lessons learnt from recent and current national red tape initiatives designed to accelerate national competitiveness & economic growth by setting targets to reduce the total costs of government imposed regulations on business.

Other Specific interventions by Government

  • Enacted Policies, Regulations and Legislation i. e. (the 30 days payment policy).
  • Establishment of the Department of Performance Monitoring and Evaluation located in the Presidency
  • The National Development Plan –vision 2030
  • Institutionalizing of Performance management System across all spheres of government
  • Development of Risk assessment strategies by all departments and entities
  • Establishment of Fraud and Corruption fighting mechanisms and many more

08 September 2015 - NW2960

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Telecommunications and Postal Services

(a) What system protocols have been determined to ensure open access integration and data integrity with the national broadband network as envisaged in SA Connect, (b) how were the specified protocols determined, (c) which (i) state entities, (ii) private sector companies or (iii) individuals, were involved in drawing up the specified protocols and (d) who is responsible for ensuring the adherence, effective implementation and ongoing operation of the specified protocols?

Reply:

(a) The Department is undertaking work on Open Access within the broader scope of the National Integrated ICT Policy White Paper. The white paper policy will determine, amongst other things, the appropriate policy and regulatory remedies for the management and regulation of the open access framework. Should the white paper process determine that there is a need to publish open access regulations, the system protocols will be outlined as part of the functional specification that is defined to implement the regulations.

(b) The protocols have not been defined yet but would be defined as part of the work related to the implementation of the open access regulation.

(c) See response above

(d) Oversight over the development and implementation of the functional specifications would fall within the ambit of the Independent Communications Authority of South Africa (ICASA)

08 September 2015 - NW2792

Profile picture: Carter, Ms D

Carter, Ms D to ask the Minister of Agriculture, Forestry and Fisheries

Whether the Government has developed or was developing a policy and funding plan to allow the country’s rural population to have access to biodigesters in order to create biogas for domestic cooking and electricity purposes as is happening in India and/or to stimulate large-scale production of purified biogas for fuel as in China; if not, why not; if so, (a) what are the relevant details of the biogas initiatives in the country that are led by the Government and (b) how extensive is the roll-out of the specified initiatives in the country’s rural population?

Reply:

(aWhat are the relevant details of the biogas initiatives in the country that are led by the Government?

The Department and the ARC completed a pilot phase of the Biodigester project in the Thabo Mofutsanyane District (Free State province) that started in June 2012 and just concluded in June 2015 as part of the mitigation and adaptation to climate variability and change in the Thabo Mofutsanyane District (Free State Province). This project was rolled-out in Thabo Mofutsanyane District with a number of beneficiaries, mainly community livestock farmers who received training and had the biodigesters equipment purchased for them. 

The ultimate goal of the project was to enhance agricultural productivity by promoting the adoption of an integrated crop-livestock system that effectively mitigates, adapts to and reduces vulnerabilities to climate change. It is also aimed at introducing and encouraging agricultural practices in rural communities that have the potential of mitigating climate change and adapting to adverse effects of climate change and the use of biogas for domestic cooking and electricity purposes.

About 13 biogas digesters for generation of bio-gas for cooking and/lighting from livestock manure were installed and they are operational. The farmer training was conducted and provided an opportunity to promote renewable energies and inform farmers on the possibility of self-energy generation. Capacity building and job creation was achieved through training of the local youth on biogas digester installation. Relevant weather and climate information was distributed to farmers during the planning and implementation of their agricultural activities via sms. The findings of this pilot project will assist with the climate change adaptation and mitigation measures (in the form of strategies and/or polices) for the country.

(b) How extensive is the roll-out of the specified initiatives in the country’s rural population?

This pilot project is currently been rolled out to three Provinces namely: Eastern Cape, North West and Limpopo targeting ten (10) small scale farmers per Province from the financial year 2015/16 to 2017/18. The project aims at raising awareness of climate change among different stakeholders in the agricultural community. It will promote the integrated crop-livestock production system. The beneficiaries in these provinces, mainly livestock farmers will be trained and have biodegesters purchased for them and installed. 

Biogas could be used to generate a large portion of the peaking power required and thereby effect very large cost savings for the country. More funding and resources are however, needed to roll it out at a larger scale.

08 September 2015 - NW2790

Profile picture: Madisha, Mr WM

Madisha, Mr WM to ask the Minister of Agriculture, Forestry and Fisheries

Whether he has requested or will be requesting a seminar or bosberaad with departmental officials and private sector experts to understand the implications of the report of the International Labour Organisation released in February 2015, entitled Farm Workers’ Living and Working Conditions in South Africa: key trends, emergent issues and underlying and structural problems, and in particular to address the point that outdated assumptions and oversimplifications continue to fuel unhealthy polarisation in the perceptions and views of key players in agriculture; if not, why not; if so, (a) what are the relevant details and (b) when will he make a statement regarding the failure of the Government as highlighted in the specified report?

Reply:

Although I am fully aware of the ILO study on farm workers living and working conditions in South Africa, the report that was issued in February 2015 was just a draft for input by affected stakeholders. The ILO final report on farm workers living and working conditions in South Africa was only finalized and published on 21 July 2015.

I am arranging a briefing from the International Labour Organisation on the findings of the study. Consequently, I will interact with Ministers of Labour and Rural Development and Land Reform to have an integrated approach to the recommendations of the report. We will then consult with relevant stakeholders in the agriculture sector to discuss and develop a sector action plan to address challenges addressed in the report.

08 September 2015 - NW3245

Profile picture: Lovemore, Ms AT

Lovemore, Ms AT to ask the Minister of Higher Education and Training

With reference to the summary report entitled An Examination of Aspects of Initial Teacher Education Curricula at Five Higher Education Institutions in The Initial Teacher Education Research Project, compiled by JET Education Services and issued in August 2014, for each of the key findings, what are the details of the action which (a) has already been taken and (b) will be taken to rectify the shortcomings in the university education of intermediate phase teachers identified in each of the key findings?

Reply:

The Initial Teacher Education Research Project (ITERP) that is currently being conducted by JET Education Services is a partnership project between JET, the Education Deans Forum and Departments of Basic Education, and Higher Education and Training. It is a longitudinal project, which is investigating initial teacher education programme delivery at a selected sample of universities. It is also tracking new teacher graduates as they take up posts in schools in an attempt to understand their readiness as beginning teachers and their ability to make the transition from teacher education into teaching.

The ITERP was conceptualised and is being implemented as part of efforts to strengthen teacher education and is not separate from this. The project findings are fed directly back to universities through engagements with individual universities and regular reporting on findings at the quarterly meetings of the Education Deans Forum.

It must be noted that the ITERP is researching the initial teacher education programmes that were designed and implemented in line with the former teacher education qualifications policy, i.e. the Norms and Standards for Educators in Schooling of 2000. All teacher education programmes have to be redesigned to align with the new standards set by the Higher Education Qualifications Sub-Framework of 2007, revised in 2013 and the Policy on Minimum Requirements for Teacher Education Qualifications (MRTEQ) of 2011, revised in 2015. One of the main purposes of the ITERP is to inform the design of new teacher education programmes.

The MRTEQ sets standards for teacher education at the programme level. Initial teacher education programmes have to meet the standards set for teaching specialisations in terms of knowledge mix, credits and levels. This will assist to respond to one of the key findings that emerged from the ITERP and the degree of variation between programmes offered by different universities.

The MRTEQ also, more closely, regulates the teaching practice component of teacher education programmes to strengthen this component of initial teacher education programmes. It sets standards regarding the nature of schools to be used for teaching practice, the nature of the teaching practice component within initial teacher education programmes, and the time spent in schools.

A national Teacher Education Programme Evaluation Committee (TEPEC) has been set up, chaired by the Department of Higher Education and Training, involving the participation of the Department of Basic Education, South African Council of Educators and Education and the Training and Development Practices Sector Education and Training Authority (ETDP SETA). This committee reviews all teacher education programmes to ensure that they meet the requirements stipulated in the Policy on Minimum Requirements for Teacher Education Qualifications.

In addition to the policy measures that have been put in place to strengthen teacher education, the Department of Higher Education and Training is implementing a 5 year (2015/16 – 2019/20) Teaching and Learning Development Capacity Improvement Programme (TLDCIP) that will support universities to strengthen teacher education programmes at the level of curriculum structure and curriculum delivery.

A specific project in the TLDCIP will focus on strengthening university capacity for primary teacher education. It will involve the implementation of a range of activities to strengthen the capacity and capability of universities for the delivery of quality primary school teacher education programmes, including the following:

  • Establish new initial teacher education programmes at universities where specific specialisations are not yet offered but which are needed and which the university is interested to offer;
  • Develop and roll-out a national advocacy campaign for teaching generally, specifically Foundation Phase teaching as a viable and attractive career choice;
  • Support academic communities of practice focused on priority teaching subject specialisations (Mathematics, Languages, Science and Technology), which would have the responsibility to understand university practices across the system with respect to the specialisation, with a view towards the development of knowledge and practice standards for the teaching specialisation, which could assist to achieve greater convergence and rigour in teacher education curricula;
  • Support appropriate research, programme development and material development activities that will improve the quality of initial teacher education programme delivery;
  • Finalise norms and standards for professional practice and teaching schools as well as mechanisms for their establishment;
  • Develop a national database of schools that will be developed as professional practice schools;
  • Support universities to develop business plans for the establishment of teaching schools;
  • Develop a national programme to support the professional development of school teachers that act as tutors and mentors to initial teacher education students, which can be delivered in a blended mode, with a significant online component; and
  • Develop an online platform/course for the teaching practice/work-integrated learning component of teacher education programmes.

 

 

 

Compiler/Contact persons:

Ext:

DIRECTOR – GENERAL

STATUS:

DATE:

REPLY TO QUESTION 3245 APPROVED/NOT APPROVED/AMENDED

Dr BE NZIMANDE, MP

MINISTER OF HIGHER EDUCATION AND TRAINING

STATUS:

DATE:

08 September 2015 - NW2655

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Telecommunications and Postal Services

Has he signed a performance agreement with the director-general of his department; if not, what are the reasons for this; if so, when was the performance agreement signed?

Reply:

Yes ,the Director –General signed on 01 April to March 2015.

 

08 September 2015 - NW3128

Profile picture: Mackenzie, Mr C

Mackenzie, Mr C to ask the Minister of Telecommunications and Postal Services

(1)(a) When was the Child Online Protection (COP) programme developed and (b) who developed the specified programme; (2) (a) what public participation process was held, (b) with whom was the specified process held, (c) on what date(s) and (d) where was the specified process held; (3) Whether the COP programme was published for public comment; if not, why not; if so, (a) when was it published, (b) where was it published and (c) how many responses were received; (4) (a) in which provinces was the COP programme launched, (b) who is responsible for implementing the COP programme in the specified provinces and (c) how is it being (i) implemented and (ii) monitored; (5) What is the plan for implementing the COP programme in other provinces?

Reply:

(1)(a) In 2010

(1)(b) It emanates from a resolution of the International Telecommunications Union that was taken in 2009 and the Department of Telecommunications and Postal Services (DTPS) responded as a Member State of the ITU by developing the Child Online Protection Programme that was developed in 2010.

(2)(a) Consultation workshops took place in all provinces on the Children Strategy which included the Online Protection Programme.

(2)(b) Children’s Rights Organisations; Children’s Organisations that work in the ICT Sector; State-Owned Companies, Department of Basic Education, Department of Social Development, National Prosecuting Authority, South African Police Service, the former Ministry for Women, Children and People with Disabilities; and International Bodies such as Unicef and the ITU.

(2)(c) During the financial years 2010/2011 and 2011/12.

(2)(d) Limpopo, Mpumalanga, Kwa-Zulu Natal (KZN), Free State Province, North West Province, Gauteng, Northern Cape Province and the Eastern Cape Province.

(3) No, but an advertisement ran on national television and radio. Further, a Webpage was set up for the programme;

(4)(a) On 19 August 2015 in KZN as part of the launch of the Children and ICT Strategy;

(4)(b) The DTPS and Non-Profit Organisations namely; Resources Aimed at Prevention of Child Abuse and Neglect; Centre for Justice and Crime Prevention; Childline South Africa, Disabled Children’s Action Group (DICAG); and the Film and Publication Board.

 

(4)(b)(i) Through School-based Awareness Workshops and in this regard we have conducted (5) five workshops in the Eastern Cape, KZN, Western Cape, and North West Province.

(4)(b)(ii) Evaluation workshops are conducted with the schools where the programme is implemented and in this regard we have done one evaluation workshop in KZN this year.

08 September 2015 - NW3052

Profile picture: Steenhuisen, Mr JH

Steenhuisen, Mr JH to ask the Minister in the Presidency

(a) How does (i) her office and (ii) entities reporting to her define red tape and (b) what (i) specific interventions and/or (ii) systems have been implemented to (aa) identify and (bb) reduce red tape in (aaa) her office and (bbb) the entities reporting to her?

Reply:

Not applicable.

 

 

________________________

Approved by the Minister on

Date………………………..

08 September 2015 - NW3014

Profile picture: Waters, Mr M

Waters, Mr M to ask the Minister of Environmental Affairs

With regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and in view of the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 (details furnished), what steps is her department taking to ensure that (a) no damage occurs to any of the wetlands and (b) the developers adhere to all the necessary precautions?

Reply:

The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the MEC is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

---ooOoo---

08 September 2015 - NW2657

Profile picture: Tarabella - Marchesi, Ms NI

Tarabella - Marchesi, Ms NI to ask the Minister of Women in the Presidency

(1) With regard to the science, technology, engineering and mathematics intervention outlined in the revised strategic focus document of her department which states that, 2 000 women in each year are to be inducted and trained in the specified fields, what (a) funding sources have been identified for this intervention and (b) projected funding figures have been detailed for the (i) current and (ii) any other financial years already planned for; (2) What plans are in place to ensure that the women who receive their qualifications through this intervention are eventually employed afterwards?

Reply:

  1. The department’s Annual Performance Plan of 2015/16 indicates that, in this financial year, the Department will develop intervention plans for girls’ and young women’s access to STEM fields, and that from 2016/17, the target is to enable 2000 girls and young women to access STEM fields per year.

      (a) Funding sources for this intervention will be the private sector, NSFAS and various partners.

      (b) There are no projected funding figures as the project depends on sponsorships from the private sector, and partners.   

    2.  As we are aware that these students are sponsored mainly by the private sector, getting employment is guaranteed by the sponsor.

________________________

Approved by the Minister on

Date………………………..

08 September 2015 - NW2654

Profile picture: Khawula, Ms MS

Khawula, Ms MS to ask the Minister in the Presidency

(1) In light of the strategic plan of her Ministry that was presented in July 2014, which included ensuring that 60% of women occupy senior management positions, producing four quarterly reports and running four anti-corruption initiatives during the year, has she achieved all the specified targets; if not, why not; if so, what are the relevant details; (2) (a) what is the rationale for running four anti-corruption initiatives in her Ministry and (b) could this suggest that corruption in her Ministry is so rampant to an extent that four anti-corruption units should be established?

Reply:

  1. According to the revised Strategic Plan and Annual Performance Plan of the department the target of women who occupy senior management positions was set at 50%. As at 31st March 2015, the actual performance against this target was 85.8%.
  2. (a) In terms of a 2003 Cabinet decision, all departments are required to have minimum anti-corruption capacity (MACC) requirements in place. It is therefore a government policy and not any suggestion of a rampant corruption in the department.

________________________

Approved by the Minister on

Date………………………..

08 September 2015 - NW3015

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Environmental Affairs

Whether, with regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and in view of the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 (details furnished), the specified plan include provisions to prevent that chemicals used by the demolished hospital contaminate the ground water and the surrounding soil; if not, (a) why not and (b) how will her department ensure that the ecological and social systems are not contaminated?

Reply:

The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the MEC is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

---ooOoo---

08 September 2015 - NW2882

Profile picture: Maimane, Mr MA

Maimane, Mr MA to ask the Minister of Telecommunications and Postal Services

(1)What targeted interventions has his department (a) already put in place and (b) have planned for the long term to increase access to internet connectivity for citizens in (i) underdeveloped communities and (ii) rural areas in the short to medium term; (2) does his department have plans in place to subsidise (a) internet connectivity, (b) the roll-out of broadband infrastructure and (c) mobile data providers’ prices in order to ensure increased access to those technologies for citizens in (i) underdeveloped communities and (ii) rural areas?

Reply:

(1)(a) Intervention put in place are SA Connect a programme of government to connect 100% of the country to the internet.

(b)(i) Planned interventions are Broadband Infrastructure rollout, E-strategy, internet strategy and USAASA interventions, ICT Policy review

(ii) Broadband rollout to 8 district municipalities including associated digital opportunity programmes.

(2)(a) Yes. Through USAASA, there will be an initiative to subsidise schools, public access points and people in underserved areas.

(b) Yes, in areas where it is not economically viable for operators.

(c)(i-ii) No. The Department does not have plans to subsidise mobile data providers’ prices. The department will pursue policy interventions for the reduction of voice and data costs.

08 September 2015 - NW3284

Profile picture: Matshobeni, Ms A

Matshobeni, Ms A to ask the “A Matshobeni (EFF) to ask the Minister of Arts and Culture”

(1) What (a) total amount did his department spend on air travel between Gauteng and Cape Town for employees attending Parliament business in the 2014-15 financial year and (b) is the total number of trips that were undertaken; (2) What is the total amount that his department spent on (a) accommodation and (b) car rental in Cape Town for employees attending Parliament business in the specified financial year? (NW3887E)

Reply:

Government officials are expected to travel between Gauteng and the Western Cape to carry out official duties, including ministerial and department support to the Executive who carry out parliamentary duties according the Parliamentary Programme.

Costs incurred by Government Officials are readily made available in Annual Reports which will be tabled in Parliament.

   

08 September 2015 - NW3021

Profile picture: Steenkamp, Ms J

Steenkamp, Ms J to ask the Minister of Environmental Affairs

With regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and in view of the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 (details furnished), what are the differences between the two sets of regulations; (2) whether the specified application is indeed exempted from the 2010 NEMA EIA Regulations?

Reply:

The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the MEC is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

---ooOoo---

08 September 2015 - NW3022

Profile picture: Steenkamp, Ms J

Steenkamp, Ms J to ask the Minister of Environmental Affairs

With regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and in view of the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 (details furnished), has the specified application been supplied to Gauteng Department of Agriculture and Rural Development; if not, (a) why not and (b) when will it be supplied?

Reply:

The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the MEC is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

---ooOoo---

08 September 2015 - NW2668

Profile picture: Stubbe, Mr DJ

Stubbe, Mr DJ to ask the Minister of Public Works:

Does his department have sufficient capacity to maintain a rolling schedule of proactive and regular inspections to ensure that problems with facilities in its portfolio are detected and addressed on time? STRY PUBLIC WORKS REPUBLIC OF SOUTH AFRICA Department of Public Works l Central Government Offices l 256 Madiba Street l Pretoria l Contact: +27 (0)12 406 2034 l +27 (0)12 406 1224 Private Bag X9155 l CAPE TOWN, 8001 l RSA 4th Floor Parliament Building l 120 Plain Street l CAPE TOWN l Tel: +27 21 468 6900 Fax: +27 21 462 4592 www.publicworks.gov.za NATIONAL ASSEMBLY WRITTEN REPLY QUESTION NUMBER: 2668 [NW3099E] INTERNAL QUESTION PAPER: No. 26 of 2015 DATE OF PUBLICATION: 31 JULY 2015 DATE OF REPLY: 08 SEPTEMBER 2015 Mr D J Stubbe (DA) asked the Minister of Public Works: Does his department have sufficient capacity to maintain a rolling schedule of proactive and regular inspections to ensure that problems with facilities in its portfolio are detected and addressed on time? NW3099E _________________________________________________________________ REPLY: The Minister of Public Works The State’s immovable asset portfolio consists of 99 249 buildings and other immovable assets nationally. It is not possible to inspect all the buildings on a regular basis with the current capacity of people, processes and systems. This has led to the Department’s current approach of prioritising the inspections of occupied buildings only. Currently, the Department has 33 Officials in all eleven regions that are responsible for inspections of all properties, owned and leased. In addition, the Department employs lease Portfolio Managers in the 11 regional offices, ranging from a minimum of 5 per region to 12 per region, who are also required to regularly inspect buildings which form part of their portfolio. In the 2014/15 financial year, 2 668 building inspections were conducted and 681 inspections have been conducted in quarter one of the current year 2015/16. As part of the Turnaround Plan Phase 2 - Efficiency Enhancement - the business processes, systems and Departmental structure are being updated as part of the revision of the operating model. In the revised PMTE Business Processes, which are currently in draft, and upon National Treasury’s approval of funds, this responsibility will rest with area based portfolio managers, thus increasing visibility and access to buildings nationwide. The roll out of Building Management Systems in 11 State-owned buildings over the MTEF period will also contribute largely to the better monitoring and management of State-owned facilities. The Department also plans to re-open numerous Facilities Management Workshops nationally in order to ensure rapid responses to maintenance requirements. The above mentioned initiatives along with various other planned interventions by the PMTE will ensure that the State’s immovable asset portfolio is well maintained and suitable for occupation. ____________________________________________________________________

Reply:

The Minister of Public Works

The State’s immovable asset portfolio consists of 99 249 buildings and other immovable assets nationally. It is not possible to inspect all the buildings on a regular basis with the current capacity of people, processes and systems. This has led to the Department’s current approach of prioritising the inspections of occupied buildings only.

Currently, the Department has 33 Officials in all eleven regions that are responsible for inspections of all properties, owned and leased. In addition, the Department employs lease Portfolio Managers in the 11 regional offices, ranging from a minimum of 5 per region to 12 per region, who are also required to regularly inspect buildings which form part of their portfolio.

In the 2014/15 financial year, 2 668 building inspections were conducted and 681 inspections have been conducted in quarter one of the current year 2015/16.

As part of the Turnaround Plan Phase 2 - Efficiency Enhancement - the business processes, systems and Departmental structure are being updated as part of the revision of the operating model. In the revised PMTE Business Processes, which are currently in draft, and upon National Treasury’s approval of funds, this responsibility will rest with area based portfolio managers, thus increasing visibility and access to buildings nationwide.

The roll out of Building Management Systems in 11 State-owned buildings over the MTEF period will also contribute largely to the better monitoring and management of State-owned facilities.

The Department also plans to re-open numerous Facilities Management Workshops nationally in order to ensure rapid responses to maintenance requirements.

The above mentioned initiatives along with various other planned interventions by the PMTE will ensure that the State’s immovable asset portfolio is well maintained and suitable for occupation.

____________________________________________________________________

 

08 September 2015 - NW3130

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Telecommunications and Postal Services

(1) (a) What is the mandate of the implementing agency for the digital implementation plan, (b) how is the appointment process being conducted, (c) who are the stakeholders being consulted, (d) when will the appointment be made and (e) what is the cost of the specified agency over the Medium Term Expenditure Framework.

Reply:

I have been advised by the Department as follows:-

(1) (a) The implementing agency will lead and coordinate State-Owned Companies in the rollout of broadband infrastructure in the identified areas to facilitate government connectivity.

(b) The Department is following the relevant treasury regulation and supply chain management processes.

(c) Cabinet; the Economic Sectors, Employment and Infrastructure Development (ESEID) Cluster; and State Information Technology Agency (SITA) will be consulted.

(d) The appointment will be made once due process has been followed and Cabinet, National Treasury and the Auditor General have been informed.

(e) The agency will not incur any cost for the Department. The operational expenditure of the agency over the MTEF will not be attributed to the Department.

08 September 2015 - NW2948

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Environmental Affairs

(1)What is her department’s position on ISO 17025 accreditation for air quality seeing that it is the internationally recognised tool for quality assured measurements; (2) what is her department currently doing to obtain the specified accreditation; (3) when can the specified accreditation be achieved; (4) is the specified tool being used at a municipal level; if not, why not; if so, what are the relevant details?

Reply:

(1) The South African National Accreditation System (SANAS) is a tool to support quality assurance of ambient monitoring stations in South Africa. The department has signed a Memorandum of Understanding with SANAS with the view to ensuring that emission monitoring measurements from all point sources and all ambient monitoring stations in the country are accredited in terms of ISO 17025.

The accreditation process entails the development of accreditation procedures such as guidelines, assessment protocols, as well as the capability of technical staff responsible for running the monitoring stations and associated equipment. The department’s officials are members of the Ambient and Emissions Monitoring SANAS Technical Committee (STC), a body that provides technical advice to the SANAS Chief Executive Officer on various matters regarding ambient and emission monitoring accreditation.

(2) The department has submitted an application to SANAS for ISO 17025 accreditation for its three Air Quality Monitoring Stations located in the Waterberg-Bojanala Priority Area and is currently awaiting the completion of the assessment of these stations by SANAS.

In the meantime, the South African Weather Service (SAWS) is in the processes of applying for SANAS accreditation for the monitoring stations in other Priority Areas (Vaal Triangle and Highveld) which it (SAWS) is managing on behalf of the department.

(3) It is envisaged that accreditation will be granted for all the stations in Waterberg, Highveld and Vaal Triangle networks by the end of 2015/16 financial year.

(4) With respect to other ambient monitoring networks nationwide, the department is providing technical support towards improved station and data management to all government-owned networks with the view to getting these networks to ultimately achieve SANAS accreditation into the future. To this end the department is working on the development of quality assurance (QA) systems to assist these government networks. These QA systems will form part of the Norms and Standards for Ambient Air Quality Monitoring and the standards are under development in the department.

Currently the City of Cape Town is ISO 17025 accredited for Sulphur Dioxide (SO2). There is a lack of expertise and resources at municipal level; hence the management of these stations is always outsourced to service providers. Furthermore, there are only few municipalities managing their stations in-house. The department is currently conducting a comprehensive Ambient Air Quality Monitoring course across all provinces (currently five provinces have been trained and those are; the Gauteng Province; the KwaZulu-Natal Province; the Northwest Province; the Northern Cape Province and the Free State Province).

---ooOoo---

08 September 2015 - NW3135

Profile picture: Whitfield, Mr AG

Whitfield, Mr AG to ask the Minister of Environmental Affairs

With reference to the Algoa Bay Aquaculture Development Zone (ABADZ), (a) has his department (i) conducted a cost-benefit analysis regarding the potential impact on tourism and (ii) identified other suitable locations for the ABADZ given the numerous concerns and objections lodged and (b) when will his department make the decision on the site for the ABADZ?

Reply:

(a) & (b) The question should be routed to the Department of Agriculture, Forestry and Fisheries (DAFF) for a response.

--ooOoo--

08 September 2015 - NW3017

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Environmental Affairs

(1)With regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and in view of the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 (details furnished), what is (a) meant by significant fish and wildlife habitat and (b) the anticipated negative impact on the specified habitats, in each case; and (2) what steps will her department take to ensure that mitigation measures are included in the plan?

Reply:

(1) and (2) The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the MEC is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

---ooOoo---

08 September 2015 - NW2966

Profile picture: Matsepe, Mr CD

Matsepe, Mr CD to ask the Minister of Telecommunications and Postal Services

(1)      Has his department had any interactions with the information and communication technology companies about employee retrenchments; if not, does he intend to initiate any interactions; if so, 2) (a) what was the purpose of the specified interactions, (b)with whom were the specified interactions held, (c) what was the (i) format and (ii) objective of the specified interactions, (d) what (i) agreements or (ii) understandings were reached and (e) what are the further relevant details of the specified (i) agreements or (ii) understandings of the specified interactions?

Reply:

 

  1. The Department has not as yet specifically interacted with the ICT Companies about employee retrenchments. The Department intends to hold consultations during the 3rd and 4th quarters to address the issues affecting employment in the sector.
  2. The Department will communicate the format and objectives of the interactions once held. Outcomes will also be communicated.

08 September 2015 - NW3016

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Environmental Affairs

Whether, with regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and in view of the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 (details furnished), all graves and/or grave yards on the specified property that are over 60 years old will be declared as a heritage site; if not, why not; (2) whether she (a) has found that all the graves older than 60 years have been identified and (b) will ensure that no graves will be damaged or destroyed during the construction phase?

Reply:

 

(1) and (2) The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the MEC is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

---ooOoo---

08 September 2015 - NW2312

Profile picture: Mackenzie, Mr C

Mackenzie, Mr C to ask the Minister of Telecommunications and Postal Services

Have tenders been called by Sentech for the R185 million equipment upgrade; if so, in each case, (a) what were the relevant details of the tender and (b) on what (i) date and (ii) under which Government Gazette number were the tender proposals published?

Reply:

I have been advised by Sentech as follows:-

No, Sentech has not called tenders for equipment upgrade to the value of R185 million.

(a) Not applicable

(b) Not Applicable

(c) Not Applicable

08 September 2015 - NW3150

Profile picture: Tarabella - Marchesi, Ms NI

Tarabella - Marchesi, Ms NI to ask the Minister in the Presidency: Presidency

Is her department, in co-operation with the Minister of Police, working on (a) policy documents and/or (b) strategic plans to address the issues of (i) domestic violence, (ii) gender-based violence, (iii) crimes against members of the National Intervention Strategy for Lesbian, Gay, Bisexual, Transgender and Intersex community, particularly women living in urban informal settlements and (iv) femicide; if not, why not; if so, what are the relevant details of the specified policy documents and/or strategic plans?

Reply:

Government has adopted a multi-sectoral approach to addressing Gender based violence which includes the department as well as the Justice Crime Prevention and Security cluster departments under the leadership of the Department of Social Development. This multi-sectoral approach takes into account existing policies, strategic plans, relevant legislation and is focused on implementation of the Integrated Program of Action on Violence Against Women.

The government has also established an Inter-Ministerial Committee on Gender Based Violence which takes into account violence against all women and children regardless of their sexual orientation and geographic location. The government Programme of Action on Violence against women and children requires that communities are engaged which would be in urban, peri-urban as well as rural area.

 

________________________

Approved by the Minister on

Date………………………..

08 September 2015 - NW3129

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Telecommunications and Postal Services

(a) Who heads his department’s South Africa Connect project office, (b) how many full-time staff members work in the specified office, (c) what are their roles, (d) what is the budgeted cost of the specified office over the Medium-Term Expenditure Framework period and (e) what (i) is the mandate and (ii) are the (aa) deliverable targets and (bb) deadlines?

Reply:

I have been advised the Department as follows:-

(a)(i) Mr. Kefilwe Madingoane heads the Department’s South Africa Connect project office

(b) The project office comprises of eighteen (18) full time departmental staff members.

(c) Their roles include:

• Broadband infrastructure gap analysis using Geographic Information Systems (GIS) tools

• High-level broadband technical planning to determine appropriate technology options and to develop the technical specification

• Stakeholder engagement at a National Government level to ensure coordination of the rollout plan with the requirements of the line Departments

• Stakeholder engagement at Provincial and Local Government level to ensure that there is coordination between the rollout programme and the readiness of the targeted facilities. Also to assist Provincial Governments with setting up appropriate provincial broadband steering committees to drive the rollout programme at the provincial and local government level.

• Development of relevant business cases to secure funding for the rollout of broadband initiatives.

• Coordination with stakeholders such as State-Owned Companies and the private sector to ensure alignment with public and private sector initiatives.

(d) The budgeted cost for the office over the Medium Term Expenditure Framework is as shown below. The budget includes broadband rollout, remuneration, goods and service and professional services.

Financial Year (over MTEF)

Budget:R’000

2015/16

R 227,150

2016/17

R 380,181

2017/18

R 390,361

(e)(i)(ii)(iii) The mandate is to execute on the four (4) strategies of the SA Connect Policy. The deliverable target is to achieve 100% broadband penetration by 2020 as per Outcome 6 of Medium Term Strategic Framework.

 

08 September 2015 - NW3140

Profile picture: Mackenzie, Mr C

Mackenzie, Mr C to ask the Minister of Telecommunications and Postal Services

Did the State Information and Technology Agency play any role in the broadband projects planned and implemented by (a) the City of Johannesburg, (b) the City of Tshwane, (c) the City of Pietermaritzburg, and (d) the City of Cape Town; if so, in what form did this take place?

Reply:

I have been advised by SITA as follows:-

(a-d) No, SITA did not play a role in planning or implementation of the City of Johannesburg, City of Tshwane, City of Pietermaritzburg and the City of Cape Town broadband projects.

08 September 2015 - NW3136

Profile picture: Bozzoli, Prof B

Bozzoli, Prof B to ask the Minister of Transport

(1)(a) How many inspections has the Civil Aviation Authority (CAA) conducted at the SA Flying Training Academy in (i) 2010, (ii) 2011, (iii) 2012, (iv) 2013 and (v) 2014, (b) what were the findings of those inspections and (c) who signed off on those findings; (2) in cases where problems were identified by the CAA, (a) what recommendations were made to remedy the problems, (b) what records are there that the problems were indeed remedied, (c) who signed off on the reports of the problems and (d) what remedial action was taken?

Reply:

South African Civil Aviation Authority (SACAA)

  1. (a)The South African Civil Aviation Authority conducted inspections at the SA Flying Training Academy in terms of two Air Operating Certificates (AOC) namely the Flight Operations Part 141 (Aviation Training Organisation) as well as the Aviation Maintenance Organisation (AMO) that maintains the fleet of the Part 141 Operations. The audits were conducted in (i) 2010 (ii) 2011 (iii) 2012 (iv) 2013 and (v) 2014. (b) listed below are a summary of the findings per year. (c) All Audit findings are signed off by an Airworthiness Review panel prior to any approval being granted.  

   (i) In 2010 the following audits were carried out:

  In the Flight Operations Part 141 unit - one (1) audit was conducted with no findings.

In the Airworthiness General Aircraft (AMO) unit - a total of six (6) audits were conducted which included a Surveillance audit; Amendment audit and Renewal audits, (b) a total of 27 findings were identified which comprised a lack of documentation, shortage of personnel and tools. Two (2) follow up inspections were called for by the Review board.

(ii) In 2011 the following audits were carried out:

In the Flight Operations Part 141 unit – one audit was conducted with no findings.

In the Airworthiness General Aircraft (AMO) unit - a total of 17 audits and inspections were conducted including Surveillance audits; Amendment audits, Renewal audits and Aircraft Inspections, (b) a total of 34 findings were identified. The type of findings included lack of documentation, shortage of personnel and tools as well as not closing previous audit findings. On Aircraft inspections it was found that defects were not being logged or repaired.

(iii) In 2012 the following audits were carried out:

In the Flight Operations Part 141 unit – two (2) audits were conducted and two (2) findings relating to lack of management and quality control.

In the Airworthiness General Aircraft unit - a total of seven (7) audits were conducted including Surveillance audits; Amendment audits, Renewal audits and Aircraft Inspections, (b) a total of 15 findings were identified. The type of findings identified included a lack of documentation and publications, shortage of personnel and tools as well as not closing previous audit findings. On Aircraft inspections it was found that defects were not being logged or repaired. Maintenance was not recorded correctly.

(iv)  In 2013 the following audits were carried out:

In the Flight Operations Part 141 unit - a total of 2 audits were conducted and seven (7) findings were identified including lack of management, documentation, publication and quality control.

In the Airworthiness General Aircraft unit – a total of six (6) audits including Surveillance audits, Amendment audits, Renewal audits and Aircraft Inspections, (b) a total of 21 findings were identified including lack of documentation, shortage of personnel and tools as well as not closing previous audit findings. On Aircraft inspections it was found that defects were not being logged or repaired. Maintenance was not recorded correctly.

(v) In 2014 The following audits were carried out:

In the Flight Operations Part 141 unit - a total of 1 audit was and 0 findings were recorded.

In the Airworthiness General Aircraft unit – a total of five (5) audits were conducted including Surveillance audits; Amendment audits, Renewal audits and Aircraft Inspections audits, (b) a total of 22 findings were identified including a lack of documentation and publications, shortage of personnel and tools as well as not closing previous audit findings. On Aircraft inspections it was found that defects were not being logged or repaired. Maintenance was not recorded correctly and a serious finding of an incorrect engine fitted to an aircraft. These can also be linked to Quality and Management control.

in cases where problems were identified by the CAA, (a) what recommendations were made to remedy the problems, (b) what records are there that the problems were indeed remedied, (c) who signed off on the reports of the problems and (d) what remedial action was taken?

(2) In cases where problems were identified by the SACAA, (a) the SACAA does not make recommendations but the following process ensues after an audit where findings are identified: the Civil Aviation Regulations requires that the operator submits a Corrective Action Plan (CAP) that outlines how and when the operator will close the identified findings. Should the SACAA be satisfied that the CAP addresses all deficiencies, they allow the operator to continue with closing the findings. If the findings are major the SACAA will schedule an ad hoc inspection to verify if the findings are closed however if the findings are regarded as minor then the SACAA will verify if they were addressed in their following annual audit. In the case of the Flight Operations Part 141 operations SAFTA didn’t present with any major findings and therefore no further action was taken. In 2010 when the AMO started up the lack of personnel was identified and follow up audits were conducted to ensure that the maintenance could be conducted on the SAFTA fleet. Throughout its existence, the same personnel shortage was noted and after each of these remedial plans were put into place to employ or contract more personnel. These contracts unfortunately didn’t last very long and the AMO suffered from a high staff turnover. In one particular case the QA manager was replaced three times in a period of 6 months. Currently they have only one certifying engineer left. In January 2015 a combined Flight Operations and Airworthiness in-depth surveillance was conducted at the facility. Seven (7) major findings and nine (9) findings were identified, which include process control and maintenance records, management responsibility and quality control, publications and documentation availability and utilisation, lack of defect rectification on aircraft. As with every audit a corrective action plan was submitted by the client to the SACAA. This action plan was found to be satisfactory in addressing identified findings.

In July 2015 surveillance was conducted on SAFTA following numerous Mandatory Occurrence Reports (MOR). During this surveillance 11 major findings and 2 findings were identified in the AMO of the SAFTA operations. These findings were similar in nature to those of the January audit but it was clear that the situation had deteriorated. As a remedial action a recommendation has been made to the enforcement department of the SACAA to suspend the operations of the AMO.

SAFTA’s Part 141 (Flight School) operations attracted 5 minor findings that will be addressed by the Instructors at the school. For the continued operations of the school, SAFTA will have to use an alternative and accredited AMO as there is no compelling evidence to close down the school.

(b) Records relating to these inspections are kept at the SACAA records management department.

(c) The reports are signed off firstly by the inspectors conducting the inspection or audit and thereafter the decision is verified by a Review Board or panel.

(d) In general the findings were similar in nature from all the inspections conducted, as required by the Promotion of Justice Act (Act 3 of 2000); approval holder was granted an opportunity to remedy the non-compliances discovered during our inspections. And this was indeed the case, however we have taken cognisance that the situation is deteriorating and we have now embarked on a much more comprehensive enforcement action against the AMO since our last inspection.

07 September 2015 - NW3049

Profile picture: Kohler-Barnard, Ms D

Kohler-Barnard, Ms D to ask the Minister of Police

Whether (a) a certain person (details furnished) retains the rank of Lieutenant General, (b) what is the current salary level of the specified person, (c) from which legislation and/or regulation is the specified rank derived and (d) which other persons hold the same rank?

Reply:

(a) Yes.

(b)  The current salary level of the specified person is: SMS Grade C (salary level 15).

(c) The rank is derived from the prescripts contained in Regulation 8 of the South African Police Service Act (Act No 68 of 1995), as promulgated in Government Gazette Notice No 9252, dated 1 April 2010.

(d) A total number of 23 other Lieutenant Generals (Deputy National Commissioners/Provincial Commissioners and Divisional Commissioners) are on the establishment of the South African Police Service.

 

07 September 2015 - NW3139

Profile picture: Cassim, Mr Y

Cassim, Mr Y to ask the Minister of Higher Education and Training

(a) How many students over how many years have graduated from the recently de-accredited social work degree at the University of South Africa, (b) have the employers of the specified students been informed that their employees are in possession of a degree which has now been deemed inadequate by the Council for Higher Education, (c) how will the inadequacies in their training be remedied, (d) how many other social work degrees were assessed by the specified council, (e) what were the specific outcomes of each assessment and (f) what remedies were proposed in each case where inadequacies were found?

Reply:

(a) Students who graduated from the University of South Africa (UNISA) with a Bachelor of Social Work (BSW) before the programme’s accreditation status was changed to ‘not accredited’ by the Council on Higher Education (CHE) in June 2015, are not affected by the change. Therefore, only graduates in 2015 are affected but will be allowed to register with the South African Council on Social Service Practitioners. Students who are currently enrolled in the programme will be transferred to the new programme once accredited. The University has already commenced with the recurriculation of the programme and will submit the programme to CHE for accreditation before the end of 2015. No new enrolments in the BSW will be allowed at UNISA for 2016. Once new enrolments are allowed in 2017, current students will be transferred to the new accredited programme.

(b) The primary employer of BSW graduates is the Department of Social Development (DSD). The Department, DSD and UNISA met to discuss the implications of the de-accreditation. The primary employer is therefore aware of the processes going forward, with regard to the development and offering of a new accredited BSW at UNISA.

(c) Inadequacies are remedied through recurriculation. A communication and teach-out plan for current BSW students has been developed by UNISA. Transferring current students to other programmes, until the new BSW is accredited, is considered as an option. More resources will be allocated to the Department of Social Work at the University and additional staff will be headhunted.

(d) Sixteen BSW programmes were reviewed.

(e) Seven received full accreditation, five received accreditation with conditions, one with a notice of withdrawal, whilst three were de-accredited, including UNISA’s programme.

(f) The four primary concerns were about staff competencies, the theoretical underpinning and content of the programme, programme design, and the nature and extent of practical sessions in the programme.

 

 

Compiler/Contact persons:

Ext:

DIRECTOR – GENERAL

STATUS:

DATE:

REPLY TO QUESTION 3139 APPROVED/NOT APPROVED/AMENDED

Dr BE NZIMANDE, MP

MINISTER OF HIGHER EDUCATION AND TRAINING

STATUS:

DATE:

07 September 2015 - NW3160

Profile picture: Figlan, Mr AM

Figlan, Mr AM to ask the Minister of Home Affairs

With regard to his department’s modernisation road map which indicates that the processes of the registration of marriages, issuing of death certificates and application for citizenship will be automated by mid-2015, what measures has his department put in place in respect of (a) infrastructure and (b) policies to meet this target?

Reply:

(a-b) According to the Departmental Strategic Plan 2015–2020 the department has targeted to automate the registration of marriages, divorces, deaths and citizenship business processes by the end of the 2017/2018 financial year. Currently it has only committed to continue with automation of the ID smart card and passport system through live capture in the 2015/2016 financial year. At an appropriate time the department will make further announcement on the modernisation project.

07 September 2015 - NW3148

Profile picture: Robinson, Ms D

Robinson, Ms D to ask the Minister of Justice and Correctional Services

(a) How many cases of human trafficking did his department prosecute in the (i) 2010-11, (ii) 2011-12, (iii) 2012-13, (iv) 2013-14 and (v) 2014-15 financial years, (b) how many of the specified cases resulted in successful convictions and (c) (i) how many of the specified cases involved female victims and (ii) what was the nationality of the victims identified in each case?

Reply:

(a) The National Prosecuting Authority has reported the following numbers of prosecutions for human trafficking during the financial years requested:

  1. 2010/11: 1;
  2. 2011/12: 1;
  3. 2012/13: 3;
  4. 2013/14: 1; and
  5. 2014/15: 19.

The NPA has added that several cases are currently under investigation and in order not to jeopardise these cases that are sub judice, the NPA is unable to provide any information regarding the said matters.

(b) How many of the specified cases were convictions?

  1. 2010/11: 1;
  2. 2011/12: 1;
  3. 2012/13: 3;
  4. 2013/14: 1; and
  5. 2014/2015: 7 convictions.

Based on the information available at the time of this response, the NPA is only aware of two additional prosecutions on trafficking which resulted in an acquittal (both in the Western Cape. In the one matter the accused was convicted on minor charges and in the other case, the complainant refused to testify.

Progress in other matters: In eight (8) matters, the cases are partly-heard; in one case, the trial is to commence in October 2015; in one case, the trial date was set on 25 August 2015; and in two cases, bail applications will still be heard.

(c) (i) How many of the specified cases involved female victims?

Statistics regarding the gender of the victim was not captured and are therefore unavailable. However, based on experience, the NPA’s cases involve predominantly female victims.

(ii) What was the nationality of the victims identified in each case?

Statistics regarding the nationality of the victim was not captured and are therefore unavailable.

BACKGROUND INFORMATION AS RECEIVED FROM THE NATIONAL PROSECUTION AUTHORITY:

(a) How many cases of human trafficking was prosecuted in the financial years as indicated:

(i) 2010 – 2011

NAME

PROVINCE / DIVISION

DATE

STATUS

S v Eloff & Another

Free State

2009

CONVICTION – Trafficking in persons for sexual purposes, section 71 of Act 32/2007. Sentenced to 8 years imprisonment suspended for 5 years on conditions.

(ii) 2011 – 2012

NAME

PROVINCE / DIVISION

DATE

STATUS

S v Dos Santos

North Gauteng

2011

CONVICTION - Trafficking in persons for sexual purposes, section 71 of Act 32/2007 (4 charges). Sentenced to life imprisonment.

(iii) 2012 – 2013

NAME

PROVINCE / DIVISION

DATE

STATUS

S v Shembe

Western Cape

2012

CONVICTION - Trafficking in persons for sexual purposes, section 71 of Act 32/2007. Sentenced to 23 years imprisonment.

S v Ntonga & Bell

Eastern Cape

2013

CONVICTION - Trafficking in persons for sexual purposes, section 71 of Act 32/2007. Sentenced to 10 years imprisonment.

S v Gwambe

Mpumalanga

2013

CONVICTION - Trafficking in persons for sexual purposes, section 71 of Act 32/2007. Sentenced to 15 years imprisonment.

(iv) 2013 – 2014

NAME

PROVINCE / DIVISION

DATE

STATUS

S v Jezile

Western Cape

2014

CONVICTION - Trafficking in persons for sexual purposes, section 71 of Act 32/2007 and Rape section 3 of Act 32 / 2007. Sentenced to 22 years imprisonment (conviction and sentence confirmed on appeal).

  1. 2014 – 2015

NAME

PROVINCE / DIVISION

DATE

STATUS

S v Allima

KZN

2014

CONVICTION - Trafficking in persons for sexual purposes, section 71 of Act 32/2007. Sentenced to life imprisonment.

S v Simelane

North Gauteng

2014

CONVICTION - Trafficking in persons for sexual purposes, section 71 of Act 32/2007 and Rape section 3 of Act 32/2007. Sentenced to 30 years imprisonment.

S v Mabuza

Mpumalanga

2014

CONVICTION - Trafficking in persons for sexual purposes, section 71 of Act 32/2007 (8 charges). Sentenced to life imprisonment on all 8 charges.

S v Wang

Western Cape

2014

CONVICTION - Trafficking in persons for sexual purposes, section 71 of Act 32/2007. Postponed for sentence.

S v Knoetze

Eastern Cape

2014

CONVICTION – Trafficking in persons for sexual purposes, section 71 of Act 32/2007. Sentenced to 15 years imprisonment.

S v Uche & Others

KZN

2015

CONVICTION - Trafficking in persons for sexual purposes, section 71 of Act 32/2007. Postponed for sentence.

S v Palan & Another

KZN

2015

CONVICTION - Trafficking in persons for sexual purposes, section 71 of Act 32/2007. Sentenced to 10 years imprisonment.

S v Rugnath

KZN

2014

Partly heard

S v Mansaur

KZN

2014

Partly heard

S v Matini & Another

Eastern Cape

2014

Partly heard

S v Gudwana

Western Cape

2014

Partly heard

S v Tiki & Others

Western Cape

2014

Partly heard

S v Wellem & Others

Western Cape

2014

Partly heard

S v Agasi & Others

Western Cape

2014

Partly heard

S v Jooste

Western Cape

2014

Trial to commence in October 2015

S v Zweni

KZN

2015

Partly heard

S v Chijoko & Another

WC

2015

Trial date to be set on 25/08/2015

S v Mbene & Another

WC

2015

For bail application on 27/8/2015

S v Okoye & Others

WC

2015

For bail application on 28/9/2015

Several cases are currently under investigation, in order not to jeopardise these cases that are sub judice, we are unable to provide any information regarding the said matters.

(b) How many of the specified cases were convictions?

See schedule as per paragraph (a) supra. Based on the information available at the time of this response, the NPA is only aware of two additional prosecutions on trafficking which resulted in an acquittal (both in the Western Cape. In the one matter the accused was convicted on minor charges and in the other case, the complainant refused to testify.

(c) (i) How many of the specified cases involved female victims?

Statistics regarding the gender of the victim was not captured and are therefore unavailable. However, based on experience, the NPA’s cases involve predominantly female victims.

(ii) What was the nationality of the victims identified in each case?

Statistics regarding the nationality of the victim was not captured and are therefore unavailable.

07 September 2015 - NW2908

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Public Works:

In light of the fact that the Government continues to spend billions of rands through leases and rentals to accommodate government departments and agencies, and considering that in 2013 a total of 930 000 transactions worth more than R90 billion were scrutinised and many of which were found to be not in line with the Public Finance Management Act, Act 1 of 1999, (a) what is the total number of fraud cases related to leases and rentals which included officials from government departments who were investigated by either his department or the SA Police Service between 2012 and 2015 and (b) how many of the specified cases found wrongdoing on the part of departmental officials? MINISTRY PUBLIC WORKS REPUBLIC OF SOUTH AFRICA Department of Public Works l Central Government Offices l 256 Madiba Street l Pretoria l Contact: +27 (0)12 406 2034 l +27 (0)12 406 1224 Private Bag X9155 l CAPE TOWN, 8001 l RSA 4th Floor Parliament Building l 120 Plain Street l CAPE TOWN l Tel: +27 21 468 6900 Fax: +27 21 462 4592 www.publicworks.gov.za NATIONAL ASSEMBLY WRITTEN REPLY QUESTION NUMBER: 2908 [NW3404E] INTERNAL QUESTION PAPER: No. 30 of 2015 DATE OF PUBLICATION: 14 AUGUST 2015 DATE OF REPLY: 07 SEPTEMBER 2015 Mr M M Dlamini (EFF) asked the Minister of Public Works: In light of the fact that the Government continues to spend billions of rands through leases and rentals to accommodate government departments and agencies, and considering that in 2013 a total of 930 000 transactions worth more than R90 billion were scrutinised and many of which were found to be not in line with the Public Finance Management Act, Act 1 of 1999, (a) what is the total number of fraud cases related to leases and rentals which included officials from government departments who were investigated by either his department or the SA Police Service between 2012 and 2015 and (b) how many of the specified cases found wrongdoing on the part of departmental officials? NW3404E ________________________________________________________________________ REPLY: The Minister of Public Works (a) There are six fraud cases have been concluded relating to leases / rentals, where officials have been implicated, during the period in question. (b)In five of the cases wrongdoing was found on the part of Departmental officials.

Reply:

 

(a) There are six fraud cases have been concluded relating to leases / rentals, where officials have been implicated, during the period in question.

(b) In five of the cases wrongdoing was found on the part of Departmental officials.

07 September 2015 - NW1532

Profile picture: Balindlela, Ms ZB

Balindlela, Ms ZB to ask the Minister of Water and Sanitation

(1)With reference to her replies to question 89 and question 619 on 23 March 2015 and 24 March 2015, respectively, how does she reconcile the calculated average cost of R96 491.00 for a toilet in the Eastern Cape and the cost of R9 500.00 for installing a ventilated improved toilet in the Eastern Cape; (2) (a) what is the name of the contractor who built the 57 toilets in the Eastern Cape, (b) when (i) were the toilets completed and (ii) was payment made to the contractor, (c) for the construction of how many toilets did the contract go out on tender and (d) in which municipalities were the 57 toilets built; (3)(a) what is the name of the contractor who built the 530 toilets in the Northern Cape,(b) when (i) were the toilets completed and (ii) was payment made to the contractor, (c) for the construction of how many toilets did the contract go out on tender, (d) in which municipalities were the 530 toilets built and (e) why was the calculated average cost of building a toilet R40 943.00?

Reply:

(1) With reference to question 89 of 10 March 2015 the response was adequately provided and was addressing the average cost of installing a Ventilated Improved Pit (VIP) latrine at the cost of R9 500.00 (Nine thousand five hundred) that includes the top and underground structure, health and hygiene education, project management cost and construction costs, whereas the response to question 619 of 6 March 2015 was with regard to the Bucket Eradication Programme.

(2) The name of the contractors who built the 57 toilets in Makana Local Municipality: Eastern Cape is Tyolumnqa Civils and Andile Plant Hire. Construction was completed between November 2013 and March 2014 and payment was made to the contractor. The contract went out on tender for the construction of 737 toilets.

(3) The names of the contractors who built the 363 toilets in Sol Plaatjie Municipality: Northern Cape are Reyoko Construction and Designs and LFP Trading. Construction was completed in July 2014 and payment was made to the contractor. The contract went out on tender for the construction of 954 toilets.

The Rural Household Infrastructure Grant (RHIG) provides dry, on-site sanitation at an average cost of between R9 500 (Single pit toilet) and R11 500 (Double pit toilet) however, variations may occur from province to province and may marginally increase the cost due to location of the project and the availability of materials which at times will be imported or transported from other provinces, if adequate stock is not available from local suppliers.

With regard to Water Borne Sanitation, the cost of providing a new toilet structure in urban and peri-urban areas is between R12 000 to R15 000. This does not include the water and sewer reticulation network and other direct or indirect cost associated with the project. This programme does not provide sanitation in rural areas.

Requesting the Honorable Member to clarify on the referred calculated average cost of building a toilet at the cost of R96 491.00 and R40 943.00.

---00O00---

07 September 2015 - NW2801

Profile picture: van der Merwe, Ms LL

van der Merwe, Ms LL to ask the Minister of Energy

Whether her department meets the Government’s 2% employment equity target for the employment of persons with disabilities that was set in 2005; if not, why not; if so, what are the relevant details?

Reply:

Yes, the Department of Energy fully complies with the set employment target. 2.48% was reached as at 31 July 2015.

07 September 2015 - NW3126

Profile picture: Davis, Mr GR

Davis, Mr GR to ask the Minister of Justice and Correctional Services

(1) Whether a certain person (name furnished) was found guilty and convicted of driving under the influence of alcohol in 1994 and was also found guilty and convicted of culpable homicide in 1998; if so, (a) what are the specific details of the offences that the specified person was convicted of, (b) which courts handed down such conviction and (c) what sentences were handed down; (2) Was the specified person incarcerated as a result of each specified conviction; if so, for how long in each specified case; and (3) Have any of the specified convictions been expunged by his department; if so, (a) on what date were they expunged, (b) under whose authority were they expunged, (c) in terms of what legislation were they expunged and (d) what reasons were considered when the convictions of crimes were expunged?

Reply:

(1) The Departments of Justice and Constitutional Development and of Correctional Services, are not responsible for the keeping of criminal records of previous convictions. This is a function of the South African Police Service (SAPS), in particular the Criminal Record Center of the SAPS (CRC). This question should therefore be referred to the Ministry of Police for an answer or input in this regard.

(2) The Department of Justice and Constitutional Development does not have specific information in this regard.

(3) No. (a) to (d) therefore fall away.

 
 
 
 
 
 

Please also find attached a copy of the Parliamentary Question answer No 2615 of the 7th August 2015, where-in the Honourable Member is informed that no pardon has been granted by the President to the person in question, because additional information is still being awaited.

Pardons are submitted for consideration by the President, when the person concerned, does not qualify to have his conviction expunged in terms of the Criminal Procedure Act, 1977. Applications for expungement are submitted to the Director-General of the Department of Justice and Constitutional Development, where a convicted person has been convicted of an offence for which he/ she did not serve a term of direct imprisonment; the conviction happened more than 10 years ago; and he or she has not been found guilty of a sexual offence against a child or a mentally disabled person, which would then mean that such person’s details will be added to the National Register of Sexual Offenders in terms of Chapter 6 of the Criminal Law Amendment (Sexual Offences and Related Matters) Act, 2007 (Act No 32 of 2007).

It is the responsibility of the person applying for a pardon and/or an expungement, to obtain a SAPS Clearance Certificate from the Criminal Record Centre him- or herself, to submit to the Department of Justice and Constitutional Development, for consideration of the expungement, if there was no direct term of imprisonment imposed, after 10 years have passed and the person has not been convicted of a sexual offence against a child or a mentally disabled person. In the latter case, an expungement will not be granted and the only option for removal of a person’s criminal conviction/s, is to apply for a Presidential pardon.

 

07 September 2015 - NW2671

Profile picture: Mackay, Mr G

Mackay, Mr G to ask the Minister of Energy

Will she provide a detailed report containing all the information provided by the Central Energy Fund to the National Prosecuting Authority to assist in the prosecution against Lesedi Biogas (Pty) Ltd; if not, why not; if so, when?

Reply:

The matter has been reported to the NPA under Case Number 65/3/2012.  The matter is under investigation. CEF is not in the position to avail and/or request the content of the docket, such request should be directed to the NPA accordingly and a determination by the NPA in terms of their rules shall be made as to whether or not to avail such information on pending matters.