Questions and Replies

Filter by year

09 October 2017 - NW1987

Profile picture: Khawula, Ms MS

Khawula, Ms MS to ask the Minister of Water and Sanitation

How many litres of water are lost annually due to leaks in each province?

Reply:

Refer to the table below for the amount of litres of water lost annually in each province due to leaks:

Province

Volume of water lost (Mega Litres/Annum)

Volume of water lost (Litres/Annum)

Western Cape

64 788

64 788 000 000

Easter Cape

121 589

121 589 000 000

Northern Cape

34 534

34 534 000 000

Gauteng

295 187

295 187 000 000

Free State

76 793

76 793 000 000

KwaZulu Natal

238 614

238 614 000 000

Limpopo

124 013

124 013 000 000

Mpumalanga

93 239

93 239 000 000

North West

84 462

84 462 000 000

Total

1 133 219

1 133 219 000 000

---00O00---

09 October 2017 - NW2563

Profile picture: Kwankwa, Mr NL

Kwankwa, Mr NL to ask the President of the Republic

What steps did South Africa as Chair of the Southern African Development Community (SADC) Organ on Politics, Defence and Security Co-operation from 2016 until August 2017 take after President Kabila and the Electoral Commission announced that the elections will no longer be held in 2017 and that President Kabila will stand for re-election on an election date to be determined contrary to the December 2016 agreement signed by the government of the Democratic Republic of Congo (DRC) led by President Joseph Kabila, the opposition parties led by the Union for Democracy and Social Progress and civil society organisations aimed at averting a slide into anarchy and civil war in the DRC, which requires President Kabila, whose term of office expired in December 2016 to step down after the elections that must take place before the end of 2017 and (b) did the Government of South Africa take any steps to quell the violence that erupted in the DRC immediately after the violation of this agreement, in order to ensure peace and stability in the region?

Reply:

South Africa was not the Chair of the Southern African Development Community (SADC) Organ on Politics, Defence and Security Cooperation from 2016 to August 2017. 

It should be noted that SADC through the Organ on Politics, Defence and Security Cooperation remains seized with the political developments in the DRC. The Organ on Politics, Defence and Security Cooperation works on the basis of the Troika which at the time comprised of the Current Chair which was the United Republic of Tanzania, the Republic of Angola as Incoming-Chair and the Republic of Mozambique as Outgoing Chair.

Following the demonstrations led by the opposition parties in the DRC on 19 and 20 September 2016 which resulted in violence, deaths and destruction of property, the Chairperson of the Organ on Politics, Defence and Security Cooperation, H.E. Dr. John Pombe Joseph Magufuli, President of the Republic of the United Republic of Tanzania mandated the deployment of an Organ Troika Ministerial Assessment Mission to the DRC from 10 to 13 October 2016. The Assessment Mission was led by the Hon. Dr. Augustine P. Mahiga, Minister of Foreign Affairs and East African Cooperation of the United Republic of Tanzania as Chairperson, who was accompanied by Hon. Georges R. Chikoti, Minister of External Relations of the Republic of Angola and Deputy Chairperson and  Hon. Patricio Jose, Deputy Minister of National Defence of the Republic of Mozambique representing the Outgoing Chairperson  of the  Ministerial Committee of the Organ (MCO) on Politics, Defence and Security Cooperation.

The Organ Troika Assessment Mission made the following observations and conclusions:

  1. The political situation in the DRC remained volatile, thus necessitating the need for SADC to remain closely seized with the DRC situation and required deployment of  regular follow-up missions and continued expression of SADC support of the DRC;
  2. The Inclusive National Political Dialogue and the implementation of the outcomes thereof remains paramount in terms of garnering popular support to the electoral process, and the need to ensure the conduct of peaceful credible elections;
  3. The process of updating the voters’ register should be expedited and finalised within the time line to be agreed upon by the stakeholders;
  4. The regular deployment of follow-up SADC missions, including the SADC Electoral Advisory Council (SEAC), has been prioritised and will remain a priority in order to enhance the visibility of SADC’s continued involvement and to demonstrate  SADC’s support to the DRC peace, security and electoral processes;
  5. SADC to ensure that there is high level engagement with the Government of the DRC, especially within the current period up to December 2016, in order to encourage the Government and other stakeholders to refrain from resorting to violence, and instead continue to dialogue with opposition groups with a view to addressing the outstanding issues; and
  6. The International Community should be encouraged to support the DRC National Independent Electoral Commission (CENI) financially and materially in relation to the on-going voters’ registration process that will facilitate the conduct of combined presidential, parliamentary, and provincial elections, to be followed by local elections.

A Double Troika Summit of Heads of State and Government was also held in Lozitha, Kingdom of Swaziland on 17 March 2017 and noted that the political and security developments in the DRC and:

  1. commended the President of the DRC H.E. Joseph Kabila Kabange, the Government of the DRC, the National Episcopal Conference of Catholic Bishops for the DRC (CENCO), political parties and other stakeholders for the continued  efforts in addressing the political security challenges;
  2. noted and commended CENCO for the renewed meditation efforts, and urged the DRC stakeholders to finalise the Specific Arrangements for the Implementation of the 31st December 2016 Political Agreement, in particular the nomination of the Chairperson of the National Monitoring Committee, and encouraged the opposition to expeditiously submit the nominees for the position of the Prime Minister (now appointed);
  3. called upon the International Community to support the DRC in the electoral processes that are expected to facilitate peaceful and successful elections; and
  4. mandated the Organ Ministerial Troika to immediately conduct a follow-up mission to the DRC, on a date to be agreed upon in consultation with the Chairperson of the Organ and the Government of the DRC.

These efforts demonstrate that SADC remains committed in ensuring that the situation in the DRC is resolved in order for peace and security to prevail.  South Africa will play her role as SADC chairperson to ensure that the peace and stability goals of SADC in the region are achieved.

09 October 2017 - NW2674

Profile picture: Kwankwa, Mr NL

Kwankwa, Mr NL to ask the President of the Republic

(1)      Whether, in light of the decision of the African countries in 2012 to establish a Continental Free Trade Area (CFTA) by October 2017, which was reconfirmed in Addis Ababa in November 2016, in order to boost intra-Africa trade, the country has taken any steps to ensure that member countries in the Common Market for Eastern and Southern Africa receive the same revenue they derive from the current free trade agreement even after the new agreement has come into effect; if not, why not; if so, what are the relevant details; (2) what steps has the country taken to ensure (a) the finalisation of this process and (b) that, unlike most free trade agreements, the CFTA does not skew trade and development in favour of the more developed countries on the continent? NW2980E

Reply:

The negotiations towards establishing the Continental Free Trade Area (CFTA) are building on the trade liberalisation progress and achievements of the Regional Economic Communities such as our own, the Southern Africa Development Community, (SADC) and others.

The aim is to enhance intra-regional trade and ensure that African countries trade with each other on better terms than third countries. A free trade area implies granting parties thereto preferential access in terms of tariff duties, which has implications for revenue. Each negotiating party makes its own sovereign assessment about the benefits of entering into the CFTA negotiations and whether they potentially outweigh the negative considerations that arise. It is therefore not possible to predict with any degree of precision, how the CFTA will impact on the revenue base of the negotiating state parties. This will depend on the export profile of each negotiating state party to the CFTA.

The overriding imperative of the CFTA is to boost intra-Africa trade, promote market integration and industrialisation in Africa. A bigger market will improve the prospects of African countries to attract investment, promote the development of regional value-chains thus increase the potential of diversifying the economic base. We believe that this will contribute positively to economic growth and development in Africa. 

South Africa takes the CFTA negotiations very seriously, as the intervention has the potential to contribute positively to economic growth and development in Africa. Our commitment to the CFTA is evidenced by the fact that South Africa hosted the meeting of the AU Assembly of Heads of States that launched the CFTA negotiations. The CFTA is also one of the priorities of Agenda 2063 and the African Union Assembly of Heads of States receives regular feedback on progress. To demonstrate our commitment to the expeditious finalisation of the CFTA negotiations, South Africa recently hosted meetings of the CFTA technical working groups and the negotiating forum from 20 August to 2 September 2017, in Durban. Further, South Africa has made specific proposals, towards the conclusion of the CFTA negotiations.

In addition, the CFTA negotiations are receiving the highest political attention in South Africa, to provide the necessary guidance to speedily move towards the conclusion of the CFTA. South Africa is represented at all AU Trade Ministers meetings wherein the CFTA is discussed and direction given by AU Ministers of Trade to the negotiators. The International Trade and Economic Development Division of the dti advances and defends South Africa’s trade interests in the CFTA negotiations. The positions that South Africa advances in the CFTA negotiations are an outcome of consultations that take place in NEDLAC.

South Africa has advanced the development integration approach to the CFTA that combines market integration, industrial and infrastructure development. This approach ensures that Africa addresses the fundamental constraints to intra-Africa trade and Africa’s integration into the global economy, which include productive and supply-side constraints. This approach has been adopted by the Continent as a good basis to advance regional integration. This ensures that the benefits of the CFTA are broadened through the diversification of the export base and promoting inter-connectivity through infrastructure development.

Having said that, South Africa advances the retention of the policy space for development, particularly for Least Developed Countries. We defend the retention of policy space in any free trade agreement for the advancement of national development objectives such as industrialisation, access to affordable public health and the introduction of other development advancing measures in all free trade negotiations that we are party to, including the CFTA. South Africa supports free trade agreements that expressly recognise differentials in levels of development, and accordingly create differentiated obligations. South Africa is therefore committed to ensuring that the CFTA benefits all AU member states.

09 October 2017 - NW2592

Profile picture: Khawula, Ms MS

Khawula, Ms MS to ask the Minister of Water and Sanitation

When are the application dates (a) opening and (b) closing for the board positions of all entities and councils reporting to her?

Reply:

Refer to table below:

No.

Name of Entity

(a) Opening for the board positions

(b) Closing for board positions

1.

Amatola Water

The Board of Amatola Water was appointed in February 2016.

The term of office of the Board expires in 2020.

2.

Bloem Water

The Board of Bloem Water was appointed in April 2014.

The term of office of the Board expires in 2018.

3.

Lepelle Northern Water

The Board of Lepelle Northern Water was appointed in April 2016

The term of office of the Board expires in 2020.

4.

Magalies Water

The Board of Magalies Water was appointed in April 2014.

The term of office of the Board expires in 2018.

5.

Mhlathuze Water

The term of office of the Board was terminated in April 2017. The acting Chief Executive was appointed as the Accounting Authority in terms of Section 49(2) of the Public Finance Management Act, 1999 (Act No.1 of 1999) as amended.

The process for the appointment of a new Board has commenced.

6.

Overberg Water

The term of office of the Board was terminated in June 2017. The acting Chief Executive was appointed as the Accounting Authority in terms of Section 49(2) of the Public Finance Management Act, 1999 (Act No.1 of 1999) as amended.

Process for the appointment of a new Board has commenced.

7.

Rand Water

The Board was appointed in April 2014.

The term of office of the Board expires in 2018.

8.

Sedibeng Water

The Board was appointed in April 2017.

The term of office of the Board expires in 2021.

9.

Umgeni Water

The term of office of the Board was terminated in June 2017. The acting Chief Executive was appointed as the Accounting Authority in terms of Section 49(2) of the Public Finance Management Act, 1999 (Act No.1 of 1999) as amended.

The process for the appointment of a new Board has commenced.

10.

Trans-Caledon Tunnel Authority (TCTA)

The Board of the TCTA was appointed in December 2015.

The term of office of the Board expires in 2018.

11.

Water Research Commission (WRC)

The Board of the WRC was appointed in 2016.

The term of office of the Board expires in 2020

12.

Inkomati-Usuthu CMA

The Board of Inkomati-Usuthu CMA was appointed in 2014

The term of office of the Board expires in 2018

13.

Breede-Gouritz CMA

The Interim Board of Breede-Gouritz CMA was appointed in 2014

The term of office of the Board expires in 2018

---00O00---

09 October 2017 - NW2562

Profile picture: Kwankwa, Mr NL

Kwankwa, Mr NL to ask the President of the Republic

(1)      What is the position of the Government of South Africa with regard to the resolutions taken at the 28th African Union (AU) Summit held in January 2017 to (a) re-admit Morocco to the AU, although this was in violation of the Constitutive Act of the AU and (b) adopt the Kagame Report on AU Reform without it having been discussed by member states prior to the specified summit; (2) whether the Government supported the adoption of the Kagame Report; if not, why not; if so, what are the relevant details? NW2822E

Reply:

The Government of South Africa accepts the outcome of the Summit on the admission of Morocco to promote unity and coherence within the Continent. Member states expressed strong views that by virtue of acceding to the Constitutive Act, Morocco should abide by all provisions of the Act and immediately resolve its relations with the Western Sahara to ensure territorial integrity between the two nations. South Africa also supports the Summit’s decision that the African Union should prioritise the resolution of the impasse between the two countries to change the status quo, failing which the principles on which the African Union was constituted, as articulated in the Constitutive Act, would be undermined. We fully support the right of the people of Western Sahara to self-determination.

South Africa supports the adoption of the Kagame Report as its general thrust seeks to strengthen the African Union (AU) and improve its functioning and effectiveness.  South Africa will continue to safeguard the values of the AU Constitutive Act, and in this regard will continue to engage in AU discussions on the implementation of the report in a sustainable manner.

09 October 2017 - NW2161

Profile picture: Marais, Mr EJ

Marais, Mr EJ to ask the Minister of Public Enterprises

Given the qualified audit opinion of R 2996 million in irregular expenditure shown on page 22 of Eskom’s 2016/17 annual financial statements, (a) what is the itemised cost breakdown of this irregular expenditure with supplier names for each item, (b) how was the R2996 million expenditure processed without supporting documentation given that the systems do not allow it, (c) what disciplinary measures have been instituted against individuals implicated in this irregular expenditure and (d) what measures is Eskom implementing to prevent this from reoccurring? TO:Mogokare Richard Seleke DIRECTOR-GENERAL FROM :Justin De Allende RE:PARLIAMENTARY QUESTION NO 2161 DATE:4 August 2017 ================================================================ To provide the Minister with a response to Parliamentary Question Number 2161 COVER MEMO AND THE PACKAGING OF PQ BY: Department of Public Enterprises ………………………………. Acting Deputy Director-General Date: COMMENTS: ……………………………………….. ………………………………… Mogokare Richard Seleke Director-General Date: APPROVED/DECLINED/COMMENTS ………………………………………….. ………………………………………….. …………………………………………. DEPARTMENT: PUBLIC ENTERPRISES REPUBLIC OF SOUTH AFRICA NATIONAL ASSEMBLY QUESTION FOR WRITTEN REPLY QUESTION NO.:PQ 2161 DATE OF PUBLICATION: 4 August 2017 Mr E J Marais (DA) to ask the Minister of Public Enterprises: Given the qualified audit opinion of R 2996 million in irregular expenditure shown on page 22 of Eskom’s 2016/17 annual financial statements, (a) what is the itemised cost breakdown of this irregular expenditure with supplier names for each item, (b) how was the R2996 million expenditure processed without supporting documentation given that the systems do not allow it, (c) what disciplinary measures have been instituted against individuals implicated in this irregular expenditure and (d) what measures is Eskom implementing to prevent this from reoccurring?       REPLY: (a) Eskom has provided this detail in the Annual Financial Statements issued for the year ended 31 March 2017. Please refer to Note 52 on page 113. (b) Please refer to the attached note for details of the irregular expenditure. (c) A recovery plan has been developed, which includes instituting disciplinary measures and is in the process of execution. (d) Eskom has developed an improvement plan with the aim of addressing PFMA compliance. Please refer to Directors report on Page 13 to 14 of the Annual Financial Statements issued for the year ended 31 March 2017. Remarks: Reply: Approved / Not Approved Mr. Mogokare Richard SelekeMs. Lynne Brown, MP Director-General Minister of Public Enterprises Date:Date: Annexure to PQ 2162 (B) 52.Information required by the Public Finance Management Act Any losses due to criminal conduct or irregular or fruitless and wasteful expenditure that individually (or collectively where items are closely related) exceed R25 million must be reported in terms of the significance and materiality framework agreed with the shareholder. 52.1Irregular expenditure Group and company Note 2017 Rm 2016 Rm Balance at beginning of the year 348 418 Current year expenditure 4 043 106 Amounts condoned (1 084) (146) Amounts not recoverable (not condoned) (311) (30) Balance at end of the year 2 996 348 Age analysis 2 996 348 Current year 2 992 38 Prior years 4 310 Comprising – 310 B2B engineering tools expenditure incurred without PFMA approval(a) Balance at beginning of the year 310 310 Amounts not recoverable (not condoned) (310) – Purchase of land without investment committee approval(b) – – Balance at beginning of the year – 108 Amounts condoned – (108) Breach of PPPFA: monetary thresholds – incorrect tender process applied(c) 92 11 Balance at beginning of the year 11 – Current year expenditure 95 41 Amounts condoned (13) – Amounts not recoverable (not condoned) (1) (30) Breach of the NEMA(d) – 7 Balance at beginning of the year 7 – 7 – Current year expenditure – Amounts condoned (7) Use of labour broker – internal processes not followed(e) – 10 Balance at beginning of the year 10 – Current year expenditure – 10 Amounts condoned (10) – Professional services contract – internal processes not followed – – Current year expenditure – 36 Amounts condoned – (36) Tender processes not adhered to – commitments made before approval(f) 56 1 Balance at beginning of the year 1 – Current year expenditure 549 3 Amounts condoned (494) (2) Procurement of services – incorrect classification as an emergency(g) 8 4 Balance at beginning of the year 4 – 4 Current year expenditure 4 Quality management – tender process not followed and insufficient delegation of authority 1 560 – Current year expenditure(h) Breach of PPPFA – tax clearance certificates(i ) 987 – Current year expenditure 1 453 – Amounts condoned (466) – Non-compliance with CIDB regulations( j) 8 – Current year expenditure 97 – Amounts condoned (89) – Breach of PFMA – use of sole source 96 – – 5 Current year expenditure(k) Breach of PFMA – tender processes not adhered to Current year expenditure(l) 189 Various other instances – Balance at beginning of the year 5 – 5 – Current year expenditure – Amounts condoned (5) Irregular expenditure (continued) B2B engineering tools expenditure incurred without PFMA approval The matter regarding the expenditure incurred on the B2B Engineering Tools project of R310 million before PFMA approval was reported in 2015. The expenditure was subsequently derecognised by the board in accordance with the National Treasury Guideline issued on 19 April 2016. Purchase of land without investment committee approval The matter regarding the purchase of land without investment committee approval was reported in 2015. The irregular expenditure incurred has been condoned by the relevant authority and has therefore been removed from the register of irregular expenditure. Breach of PPPFA: monetary thresholds – incorrect tender process applied Irregular expenditure of R95 million was incurred in breach of the Preferential Procurement Policy Framework Act (PPPFA) as follows: the PPPFA requires that monetary thresholds to determine the appropriate point-scoring criteria applicable to specific transactions be considered inclusive of VAT. Eskom erroneously applied the thresholds exclusive of VAT. Certain procurement was therefore done using the incorrect point-scoring criteria and resulted in a breach of PPPFA. Irregular expenditure incurred on affected transactions amounted to R95 million (2016: R11 million) of which R13 million was condoned in 2017, including R11 million reported in 2016. An amount of R92 million was awaiting condonation at 31 March 2017. Eskom is ensuring that regular reviews are conducted and that buyers are made aware and retrained on the supply chain management procedure Eskom’s exemption from the PPPFA expired on 7 December 2012. Eskom paid R0.4 million (2016: R30 million) during the year on contracts that were entered into between 8 December 2012 and 31 March 2013 that were inconsistent with the requirements of the PPPFA. These contracts were not recalled or corrected at the time and Eskom continued to meet its obligations in terms of these contracts. All the affected transactions took place in the normal course of business and were subject to Eskom’s approved procurement policy in force at the time Breach of NEMA Eskom unlawfully commenced with construction activities for a 132 kV power line in the Eastern Cape Province along a route that was not authorised by the Department of Environmental Affairs (DEA). An amount of R7 million was incurred on the portion of the line constructed in contravention of the National Environmental Management Act (NEMA). Eskom rectified the breach and received the required authorisation from DEA on 2 September 2016. Eskom paid a penalty of R1 million imposed by DEA. Disciplinary action was concluded against three employees involved. Use of labour broker – internal processes not followed Eskom processes were not followed for the procurement of certain goods and services through a labour broker. The senior managers concerned were disciplined and the labour broker instructed to discontinue sundry payments. The expenditure was condoned and no further action is required. Tender processes not adhered to – commitments made before approval Irregular expenditure of R549 million comprising 245 incidents was incurred as a result of non-adherence to internal procurement processes and employees contravening the Eskom Delegation of Authority. Incidents totalling R56 million are awaiting condonation. Procurement of services – incorrect classification as an emergency Services procured to the value of R4 million (2016: R4 million) were incorrectly classified as an emergency in the procurement process. This matter will be submitted for condonation in 2018. Quality management – tender process not followed and insufficient delegation of authority Irregular expenditure estimated at R1 560 million was incurred because of the placement of contracts without proper delegation of authority or without following established processes during the 2008-2015 financial years. Multi-disciplinary investigations were conducted into indications of mismanagement and allegations of irregularities in the quality management department. Possible fruitless and wasteful expenditure of R886 million regarding this matter was reported in 2016. A further investigation was recently finalised by an independent external company with the following outcome: identification of irregular expenditure of R1 560 million because of the placement of contracts without proper delegation of authority or without following established processes during the 2008-2015 financial years with the bulk of the payments made on these contracts occurring in the 2013 and 2014 financial years estimated fruitless and wasteful expenditure of R510 million compared to the original estimate of R886 million reported in 2016. Refer to 52.2(a) losses due to criminal conduct of R2 million. Refer to 52.3(b) Actions taken to date include the following: two employees have been dismissed (one is a senior manager) a criminal case was opened with the South African Police Service to investigate possible fraudulent transactions civil action against Eskom by one of the main suppliers is being defended a fidelity claim has been lodged in terms of a commercial crime insurance policy with a cover limit of R3 billion for losses arising from fraudulent or dishonest acts committed by employees. This claim will be concluded once the legal matters have been finalised Further disciplinary, civil and/or criminal action as appropriate will be considered against other parties involved, including action to recover losses. The following contract management process improvements have been implemented: improvement in the monitoring of performance by the SHEQ panel service providers with regular inspections and enforcement of consequence management for poor or ineffective delivery effective segregation of duties reconciliation of task orders to scope, budget, timesheets, invoices and payments, with approval of timesheets by project managers on site limiting of long-term task orders and close monitoring of performance to ensure resources are not idle nor unproductive training of employees on effective electronic documentation management Breach of PPPFA – tax clearance certificates PPPFA regulations require that tenders may only be awarded to a person whose tax matters have been declared to be in order by SARS. SARS only issues such a confirmation to a person registered as a taxpayer. Three contracts with an award value of R340 million were reported as being under investigation in 2016. A further R126 million was incurred on these contracts during the year. They were confirmed as irregular in 2017 since no SARS declaration was found to be obtained at the time of award and were condoned during the year. There were 59 contracts that were similarly affected during 2017. Irregular expenditure of R987 million was incurred on these contracts during the year and is awaiting condonation. Non-compliance with CIDB regulations Construction Industry Development Board (CIDB) regulations specify the different levels of grading that contractors must have based on the value of the contracts to be awarded (not a requirement for World Bank-funded contracts). Expenditure of R89 million was identified and condoned during the year on two foreign contracts awarded in terms of World Bank funding where the grading level was not in line with CIDB regulations. A further R8 million was incurred on a contract for which tender invitations were not advertised on the CIDB website as per the CIDB Regulation 24. Breach of PFMA – use of sole source There were three incidents of irregular expenditure totalling R96 million where the use of sole sources could not be adequately justified. Breach of PFMA – tender processes not adhered to There were 11 incidents of irregular expenditure totalling R189 million where approved supply chain management processes were not adhered to. Irregular expenditure under investigation There are numerous additional instances of procurement that are subject to investigation, namely: tender processes not adhered to including breaches of delegation of authority incorrect PPPFA points thresholds applied non-compliance with CIDB regulations lack of supporting documentation including tax clearance certificates award made to a company on a sole source basis which might not comply with the criteria of sole source and contract amount determined on a contingency fee basis non-declaration of conflicts of interest by employees and tenderers giving rise to a risk of undue influence contract information not reflected correctly in the reporting system These matters are being investigated and will be disclosed in a subsequent period should they prove to be irregular. Relevant authority for condonations Condonations are currently approved by the relevant internal governance committee unless it is specifically required to be approved by National Treasury. Eskom is awaiting clarification from National Treasury on whether a relevant government department responsible for a particular piece of legislation must approve condonation of a breach relating to that legislation. Fruitless and wasteful expenditure Incidents of fruitless and wasteful expenditure above the materiality threshold There was one (2016: one) major incident of fruitless and wasteful expenditure incurred by the group during the year that exceeded the materiality threshold of R25 million. This matter is carried forward from 2016. Fruitless and wasteful expenditure incurred by the quality management department An investigation by an independent external party confirmed fruitless and wasteful expenditure estimated at R510 million compared to the original estimate of R886 million reported in the previous financial year. Refer to 52.1(h). Incidents of fruitless and wasteful expenditure below the materiality threshold Total fruitless and wasteful expenditure which individually or collectively (where items are closely related) were below the materiality threshold was R37 million (2016: R93 million) comprising 210 (2016: 655) incidents of which 10 incidents accounted for R22 million. Management continues to institute preventive and corrective measures, including disciplinary action, as considered appropriate. Fruitless and wasteful expenditure under investigation There are currently 84 incidents of alleged fruitless and wasteful expenditure under investigation, of which none is expected to exceed the materiality threshold of R25 million. The nature and extent of potential losses incurred cannot be reasonably ascertained at this stage. It is important to note that these are allegations and many of these occurrences may not qualify as fruitless and wasteful expenditure upon conclusion of the investigations. Criminal conduct Theft of conductors, cabling and related equipment Losses due to conductor theft, cabling and related equipment totalled R70 million (2016: R85 million), involving 5 734 incidents (2016: 5 161 incidents). Actions to combat these losses are managed by the Eskom Network Equipment Crime Committee in collaboration with other affected state-owned companies and the South African Police Services. The combined effort resulted in 235 (2016: 229) arrests and R5 million (2016: R5 million) worth of stolen material was recovered. Fraud Eskom concluded 15 (2016: 14) investigations into fraud during the reporting period involving R24 million (2016: R33 million), including a R2 million loss due to criminal conduct on the quality management matter. Refer to note 52.1(h). The existing internal control measures in the affected areas as well as similar areas have been reviewed and enhanced. Disciplinary, criminal as well as civil proceedings have been instituted against those involved. Non-technical revenue losses Non-technical losses are estimated at R1.3 billion (2016: R1.2 billion). These arise mainly from meter tampering and bypasses, illegal connections to the electricity network and illegal vending of electricity. Interventions to reduce non-technical energy losses: implementation of technologies in the form of smart/split meters with protective enclosures to prevent access to the meter disconnection of illegal connections, meter tampers and imposition of penalties (tamper fines) estimation and recovery of revenue for historic unaccounted energy where tampered metering installations are encountered revision of supply group codes on prepaid meters to prevent the use of illegal prepaid vouchers investigations and prosecution of criminals perpetrating electricity theft through the sale of illegal prepaid vouchers, illegal electrification and meter tampering services customer education, social mobilisation and partnership campaigns to drive behaviour change

Reply:

(a)

Eskom has provided this detail in the Annual Financial Statements issued for the year ended 31 March 2017. Please refer to Note 52 on page 113.

(b)

Please refer to the attached note for details of the irregular expenditure.

(c)

A recovery plan has been developed, which includes instituting disciplinary measures and is in the process of execution.

(d)

Eskom has developed an improvement plan with the aim of addressing PFMA compliance. Please refer to Directors report on Page 13 to 14 of the Annual Financial Statements issued for the year ended 31 March 2017.

Remarks: Reply: Approved / Not Approved

Mr. Mogokare Richard Seleke Ms. Lynne Brown, MP

Director-General Minister of Public Enterprises

Date: Date:

Annexure to PQ 2162 (B)

52. Information required by the Public Finance Management Act

Any losses due to criminal conduct or irregular or fruitless and wasteful expenditure that individually (or collectively where items are closely related) exceed R25 million must be reported in terms of the significance and materiality framework agreed with the shareholder.

52.1 Irregular expenditure

Group and company

Note

2017

Rm

2016

Rm

Balance at beginning of the year

348

418

Current year expenditure

4 043

106

Amounts condoned

(1 084)

(146)

Amounts not recoverable (not condoned)

(311)

(30)

Balance at end of the year

2 996

348

Age analysis

2 996

348

Current year

2 992

38

Prior years

4

310

Comprising

310

B2B engineering tools expenditure incurred without PFMA approval (a)

   

Balance at beginning of the year

310

310

Amounts not recoverable (not condoned)

(310)

Purchase of land without investment committee approval (b)

Balance at beginning of the year

108

Amounts condoned

(108)

Breach of PPPFA: monetary thresholds – incorrect tender process applied (c)

92

11

Balance at beginning of the year

11

Current year expenditure

95

41

Amounts condoned

(13)

Amounts not recoverable (not condoned)

(1)

(30)

Breach of the NEMA (d)

7

Balance at beginning of the year

7

– 7

Current year expenditure

 

Amounts condoned

(7)

 

Use of labour broker – internal processes not followed (e)

10

Balance at beginning of the year

10

Current year expenditure

10

Amounts condoned

(10)

Professional services contract – internal processes not followed

Current year expenditure

36

Amounts condoned

(36)

Tender processes not adhered to – commitments made before approval (f)

56

1

Balance at beginning of the year

1

Current year expenditure

549

3

Amounts condoned

(494)

(2)

Procurement of services – incorrect classification as an emergency (g)

8

4

Balance at beginning of the year

4

– 4

Current year expenditure

4

 

Quality management – tender process not followed and insufficient delegation of authority

1 560

Current year expenditure (h)

   

Breach of PPPFA – tax clearance certificates (i )

987

Current year expenditure

1 453

Amounts condoned

(466)

Non-compliance with CIDB regulations ( j)

8

Current year expenditure

97

Amounts condoned

(89)

Breach of PFMA – use of sole source

96

– 5

Current year expenditure (k)

   

Breach of PFMA – tender processes not adhered to

   

Current year expenditure (l)

189

 

Various other instances

 

Balance at beginning of the year

5

– 5

Current year expenditure

 

Amounts condoned

(5)

 

52.1 Irregular expenditure (continued)

a) B2B engineering tools expenditure incurred without PFMA approval

The matter regarding the expenditure incurred on the B2B Engineering Tools project of R310 million before PFMA approval was reported in 2015. The expenditure was subsequently derecognised by the board in accordance with the National Treasury Guideline issued on 19 April 2016.

b) Purchase of land without investment committee approval

The matter regarding the purchase of land without investment committee approval was reported in 2015. The irregular expenditure incurred has been condoned by the relevant authority and has therefore been removed from the register of irregular expenditure.

c) Breach of PPPFA: monetary thresholds – incorrect tender process applied

Irregular expenditure of R95 million was incurred in breach of the Preferential Procurement Policy Framework Act (PPPFA) as follows:

    • the PPPFA requires that monetary thresholds to determine the appropriate point-scoring criteria applicable to specific transactions be considered inclusive of VAT. Eskom erroneously applied the thresholds exclusive of VAT. Certain procurement was therefore done using the incorrect point-scoring criteria and resulted in a breach of PPPFA. Irregular expenditure incurred on affected transactions amounted to R95 million (2016: R11 million) of which R13 million was condoned in 2017, including R11 million reported in 2016. An amount of R92 million was awaiting condonation at 31 March 2017. Eskom is ensuring that regular reviews are conducted and that buyers are made aware and retrained on the supply chain management procedure
    • Eskom’s exemption from the PPPFA expired on 7 December 2012. Eskom paid R0.4 million (2016: R30 million) during the year on contracts that were entered into between 8 December 2012 and 31 March 2013 that were inconsistent with the requirements of the PPPFA. These contracts were not recalled or corrected at the time and Eskom continued to meet its obligations in terms of these contracts. All the affected transactions took place in the normal course of business and were subject to Eskom’s approved procurement policy in force at the time

d) Breach of NEMA

Eskom unlawfully commenced with construction activities for a 132 kV power line in the Eastern Cape Province along a route that was not authorised by the Department of Environmental Affairs (DEA). An amount of R7 million was incurred on the portion of the line constructed in contravention of the National Environmental Management Act (NEMA). Eskom rectified the breach and received the required authorisation from DEA on 2 September 2016. Eskom paid a penalty of R1 million imposed by DEA. Disciplinary action was concluded against three employees involved.

e) Use of labour broker – internal processes not followed

Eskom processes were not followed for the procurement of certain goods and services through a labour broker. The senior managers concerned were disciplined and the labour broker instructed to discontinue sundry payments. The expenditure was condoned and no further action is required.

f) Tender processes not adhered to – commitments made before approval

Irregular expenditure of R549 million comprising 245 incidents was incurred as a result of non-adherence to internal procurement processes and employees contravening the Eskom Delegation of Authority. Incidents totalling R56 million are awaiting condonation.

g) Procurement of services – incorrect classification as an emergency

Services procured to the value of R4 million (2016: R4 million) were incorrectly classified as an emergency in the procurement process. This matter will be submitted for condonation in 2018.

h) Quality management – tender process not followed and insufficient delegation of authority

Irregular expenditure estimated at R1 560 million was incurred because of the placement of contracts without proper delegation of authority or without following established processes during the 2008-2015 financial years.

Multi-disciplinary investigations were conducted into indications of mismanagement and allegations of irregularities in the quality management department. Possible fruitless and wasteful expenditure of R886 million regarding this matter was reported in 2016.

A further investigation was recently finalised by an independent external company with the following outcome:

    • identification of irregular expenditure of R1 560 million because of the placement of contracts without proper delegation of authority or without following established processes during the 2008-2015 financial years with the bulk of the payments made on these contracts occurring in the 2013 and 2014 financial years
    • estimated fruitless and wasteful expenditure of R510 million compared to the original estimate of R886 million reported in 2016. Refer to 52.2(a)
    • losses due to criminal conduct of R2 million. Refer to 52.3(b)

Actions taken to date include the following:

    • two employees have been dismissed (one is a senior manager)
    • a criminal case was opened with the South African Police Service to investigate possible fraudulent transactions
    • civil action against Eskom by one of the main suppliers is being defended
    • a fidelity claim has been lodged in terms of a commercial crime insurance policy with a cover limit of R3 billion for losses arising from fraudulent or dishonest acts committed by employees. This claim will be concluded once the legal matters have been finalised

Further disciplinary, civil and/or criminal action as appropriate will be considered against other parties involved, including action to recover losses.

The following contract management process improvements have been implemented:

    • improvement in the monitoring of performance by the SHEQ panel service providers with regular inspections and enforcement of consequence management for poor or ineffective delivery
    • effective segregation of duties
    • reconciliation of task orders to scope, budget, timesheets, invoices and payments, with approval of timesheets by project managers on site
    • limiting of long-term task orders and close monitoring of performance to ensure resources are not idle nor unproductive
    • training of employees on effective electronic documentation management

i) Breach of PPPFA – tax clearance certificates

PPPFA regulations require that tenders may only be awarded to a person whose tax matters have been declared to be in order by SARS. SARS only issues such a confirmation to a person registered as a taxpayer. Three contracts with an award value of R340 million were reported as being under investigation in 2016. A further R126 million was incurred on these contracts during the year. They were confirmed as irregular in 2017 since no SARS declaration was found to be obtained at the time of award and were condoned during the year. There were 59 contracts that were similarly affected during 2017. Irregular expenditure of R987 million was incurred on these contracts during the year and is awaiting condonation.

j) Non-compliance with CIDB regulations

Construction Industry Development Board (CIDB) regulations specify the different levels of grading that contractors must have based on the value of the contracts to be awarded (not a requirement for World Bank-funded contracts). Expenditure of R89 million was identified and condoned during the year on two foreign contracts awarded in terms of World Bank funding where the grading level was not in line with CIDB regulations. A further R8 million was incurred on a contract for which tender invitations were not advertised on the CIDB website as per the CIDB Regulation 24.

k) Breach of PFMA – use of sole source

There were three incidents of irregular expenditure totalling R96 million where the use of sole sources could not be adequately justified.

l) Breach of PFMA – tender processes not adhered to

There were 11 incidents of irregular expenditure totalling R189 million where approved supply chain management processes were not adhered to.

m) Irregular expenditure under investigation

There are numerous additional instances of procurement that are subject to investigation, namely:

    • tender processes not adhered to including breaches of delegation of authority
    • incorrect PPPFA points thresholds applied
    • non-compliance with CIDB regulations
    • lack of supporting documentation including tax clearance certificates
    • award made to a company on a sole source basis which might not comply with the criteria of sole source and contract amount determined on a contingency fee basis
    • non-declaration of conflicts of interest by employees and tenderers giving rise to a risk of undue influence
    • contract information not reflected correctly in the reporting system

These matters are being investigated and will be disclosed in a subsequent period should they prove to be irregular.

n) Relevant authority for condonations

Condonations are currently approved by the relevant internal governance committee unless it is specifically required to be approved by National Treasury. Eskom is awaiting clarification from National Treasury on whether a relevant government department responsible for a particular piece of legislation must approve condonation of a breach relating to that legislation.

 

52.2 Fruitless and wasteful expenditure

a) Incidents of fruitless and wasteful expenditure above the materiality threshold

There was one (2016: one) major incident of fruitless and wasteful expenditure incurred by the group during the year that exceeded the materiality threshold of R25 million. This matter is carried forward from 2016.

Fruitless and wasteful expenditure incurred by the quality management department

An investigation by an independent external party confirmed fruitless and wasteful expenditure estimated at R510 million compared to the original estimate of R886 million reported in the previous financial year. Refer to 52.1(h).

b) Incidents of fruitless and wasteful expenditure below the materiality threshold

Total fruitless and wasteful expenditure which individually or collectively (where items are closely related) were below the materiality threshold was R37 million (2016: R93 million) comprising 210 (2016: 655) incidents of which 10 incidents accounted for R22 million. Management continues to institute preventive and corrective measures, including disciplinary action, as considered appropriate.

c) Fruitless and wasteful expenditure under investigation

There are currently 84 incidents of alleged fruitless and wasteful expenditure under investigation, of which none is expected to exceed the materiality threshold of R25 million. The nature and extent of potential losses incurred cannot be reasonably ascertained at this stage. It is important to note that these are allegations and many of these occurrences may not qualify as fruitless and wasteful expenditure upon conclusion of the investigations.

 

52.3 Criminal conduct

a) Theft of conductors, cabling and related equipment

Losses due to conductor theft, cabling and related equipment totalled R70 million (2016: R85 million), involving 5 734 incidents (2016: 5 161 incidents). Actions to combat these losses are managed by the Eskom Network Equipment Crime Committee in collaboration with other affected state-owned companies and the South African Police Services. The combined effort resulted in 235 (2016: 229) arrests and R5 million (2016: R5 million) worth of stolen material was recovered.

b) Fraud

Eskom concluded 15 (2016: 14) investigations into fraud during the reporting period involving R24 million (2016: R33 million), including a R2 million loss due to criminal conduct on the quality management matter. Refer to note 52.1(h). The existing internal control measures in the affected areas as well as similar areas have been reviewed and enhanced. Disciplinary, criminal as well as civil proceedings have been instituted against those involved.

c) Non-technical revenue losses

Non-technical losses are estimated at R1.3 billion (2016: R1.2 billion). These arise mainly from meter tampering and bypasses, illegal connections to the electricity network and illegal vending of electricity.

Interventions to reduce non-technical energy losses:

    • implementation of technologies in the form of smart/split meters with protective enclosures to prevent access to the meter
    • disconnection of illegal connections, meter tampers and imposition of penalties (tamper fines)
    • estimation and recovery of revenue for historic unaccounted energy where tampered metering installations are encountered
    • revision of supply group codes on prepaid meters to prevent the use of illegal prepaid vouchers
    • investigations and prosecution of criminals perpetrating electricity theft through the sale of illegal prepaid vouchers, illegal electrification and meter tampering services
    • customer education, social mobilisation and partnership campaigns to drive behaviour change

06 October 2017 - NW2596

Profile picture: Mokoena, Mr L

Mokoena, Mr L to ask the Minister of Mineral Resources

When are the application dates (a) opening and (b) closing for the board positions of all entities and councils reporting to him?

Reply:

When are the application dates (a) opening and (b) closing for the board positions of all entities and councils reporting to him?

   

(a)

(b)

b)Entities

CGS

7 September 2016

21 September 2016

 

MINTEK

21 February 2016

06 March 2016

 

SDT

21 February 2016

06 March 2016

 

SADPMR

21 February 2016

06 March 2016

 

MHSC

9 September 2016

23 September 2016

Approved/Not Approved

Mr MJ Zwane, MP

Minister of Mineral Resources

Date Submitted:-……………/………………/2017

06 October 2017 - NW2368

Profile picture: Alberts, Mr ADW

Alberts, Mr ADW to ask the Minister of Home Affairs

(a) On which date permanent residence in the Republic was awarded to a certain person (name and details furnished), (b)(i) where and (ii) how the specified person would be able to obtain a permit and/or a copy of the permanent residence and (c)(i) on what date it will be available and (ii) which person needs to be contacted in order to collect the specified permit and/or copy from such person?

Reply:

(a) As the concerned person was born in Namibia before independence, he was a South African citizen and therefore has the rights to Permanent Residence from date of birth. In terms of SA law he can never lose his right to permanent residence.

(b)(i-ii) Should he wish to obtain a letter confirming the above, he is advised to apply for it at the local Home Affairs’ office.

(c)(i) Not applicable

(c)(ii) Not applicable

Remarks: Reply: Approved / Not Approved

Mkuseli Apleni Prof. Hlengiwe Mkhize, MP

Director-General Minister of Home Affairs

Date: Date:

06 October 2017 - NW2710

Profile picture: Breytenbach, Adv G

Breytenbach, Adv G to ask the Minister of Justice and Correctional Services

(a) What is the total number of official international trips that the National Director of Public Prosecutions, Mr Shaun Abrahams, undertook since 16 June 2015 and (b) what was the (i) destination, (ii) purpose, (iii) cost of flights, (iv) cost of accommodation, (v) name of each hotel where the specified person stayed and (vi) total of subsistence costs incurred in each case for (aa) the specified person and (bb) each accompanying person?

Reply:

a) The National Director of Public Prosecutions has informed me that he undertook 15 international trips since 16 June 2015.

b) The tables link below give details of the international trips undertaken by the NDPP and accompanying persons:

 

http://pmg-assets.s3-website-eu-west-1.amazonaws.com/RNW2710TABLE.pdf

06 October 2017 - NW2888

Profile picture: Gqada, Ms T

Gqada, Ms T to ask the Minister of Justice and Correctional Services

What is the detailed (a) breakdown of and (b) valuation for current and non-current assets and investments held by (i) his department and (ii) each entity reporting to him according to (aa) listed assets (aaa) directly held and (bbb) indirectly held and (bb) unlisted investments (aaa) directly held and (bbb) indirectly held by each of the entities, in each case breaking the current assets and investments down by 0-3 months, 3-6 months, 6-12 months and beyond 12 months?

Reply:

(a) & (b) (i) Department of Justice and Constitutional Development including National Prosecuting Authority

Breakdown

Valuation (R’000)

 

(aa) (R’000)

(aaa)

(R’000)

(bbb) (R’000)

(bb)

(R’000)

Current

855 883

 

Zero

855 883

Zero

Zero

Non-current

445 170

 

Zero

445 170

Zero

Zero

Investments:

    • 0-3 months
    • 3-6 months
    • 6-12months

Zero

 

Zero

Zero

Zero

Zero

Total

1 301 053

 

Zero

1 301 053

Zero

Zero

A. The President Fund

Breakdown

Valuation (R’000)

 

(aa) (R’000)

(aaa)

(R’000)

(bbb) (R’000)

(bb)

(R’000)

Current

57 551

 

Zero

57 551

Zero

Zero

Non-current

Zero

 

Zero

Zero

Zero

Zero

Investments:

    • 0-3 months
    • 3-6 months
    • 6-12months
    • Beyond 12months

476 197

523 224

350 151

57 678

 

Zero

Zero

476 197

523 224

350 151

57 678

476 197

523 224

350 151

57 678

Total

1 464 801

 

Zero

57 551

1 407 250

1 407 250

B. The Guardian Fund

Breakdown

Valuation (R’000)

 

(aa) (R’000)

(aaa)

(R’000)

(bbb) (R’000)

(bb) (R’000)

Current

894 430

 

Zero

894 430

Zero

Zero

Non-current

Zero

 

Zero

Zero

Zero

Zero

Investments:

    • 0-3 months
    • 3-6 months
    • 6-12months
    • Beyond 12 months

5 000 668

2 424 495

4 351 694

62 524

 

Zero

Zero

5 000 668

2 424 495

4 351 694

62 524

5 000 668

2 424 495

4 351 694

62 524

Total

12 733 811

 

Zero

894 430

11 839 381

11 839 381

C. The Third Party Fund

Breakdown

Valuation (R’000)

 

(aa) (R’000)

(aaa)

(R’000)

(bbb) (R’000)

(bb) (R’000)

Current

805 972

 

Zero

805 972

Zero

Zero

Non-current

Zero

 

Zero

Zero

Zero

Zero

Investments:

    • 0-3 months
    • 3-6 months
    • 6-12months

Zero

 

Zero

Zero

Zero

Zero

Total

805 972

 

Zero

805 972

Zero

Zero

(ii) The following entities have reported as follows:

A. Legal Aid South Africa:

(a) Breakdown of current, non-current assets and investments

(aa) and (bb) Legal Aid SA neither has listed assets nor unlisted investments

(aaa) Legal Aid SA directly holds the following assets:

 

Current assets

1.

Trade and other receivables

2.

Prepayments

3.

Deposits

4.

Inventories

5.

Cash and cash equivalents

 

Non-current assets

1.

Land

2.

Buildings

3.

Building improvements

4.

Computer equipment

5.

Furniture and equipment

6.

Fittings and fixtures

7.

Leasehold improvements

8.

Motor vehicles

9.

Finance leased assets

10.

Intangible assets

   
 

Investments held

1.

None held

(bbb) Legal Aid SA has no assets held indirectly.

 

(b) Valuation of current, non-current and investments held.

Legal Aid SA directly held the following assets as at 31 March 2017:

 

Current assets

Amount

1.

Trade and other receivables

 
 

0 – 3 months

R5 902 188

 

3 – 6 months

R54 667

 

6 – 12 months

R136 166

 

Beyond 12 months

R527 790

   

R6 620 810

2.

Prepayments

 
 

0 – 3 months

R1 244 889

 

3 – 6 months

R21 891 440

 

6 – 12 months

R495 094

 

Beyond 12 months

R936 897

   

R24 568 320

3.

Deposits

 
 

Beyond 12 months

R1 661 651

   

R1 661 651

4.

Cash and cash equivalents

 
 

0 – 3 months

R245 971 703

 

(cash set aside for creditors and provision for external legal practitioners who have been briefed.

R245 971 703

     

5.

Inventories

 
 

0 – 3 months

R1 664 789

   

R1 664 789

     
 

TOTAL

R280 487 273

 

Non-current assets

AMOUNT

1.

Land

R3 556 000

2.

Buildings

R24 143 169

3.

Building improvements

R8 955 909

4.

Computer equipment

R58 544 938

5.

Furniture and equipment

R4 381 060

6.

Fittings and fixtures

R439 675

7.

Leasehold improvements

R10 690 249

8.

Motor vehicles

58 929 637

9.

Finance leased assets

R1 099 255

10.

Intangible assets

R5 684 942

 

TOTAL

R176 424 834

 

Investments held

 

1.

None held

 

B. Special Investigating Unit: see table link below:

http://pmg-assets.s3-website-eu-west-1.amazonaws.com/Doc1RNW2888SIU_TABLE.pdf

06 October 2017 - NW2398

Profile picture: Kruger, Mr HC

Kruger, Mr HC to ask the Minister of Small Business Development

What is the status of the appointment of the Board of the National Small Business Advisory Council?”

Reply:

The National Small Business Advisory Body (The Council) is being established in terms of Section 2 of the National Small Business Amendment Act, 2003 (Act No. 26 of 2003) and the members of the Advisory Body are appointed by the Minister of Small Business Development in terms of Section 3(1) of the Act.

The Minister of Small Business Development invited nominations from the general public, small business organisations and interest groups in terms of Section 3(1) of the National Small Business Amendment Act to serve on the Advisory Body. From the nominations received, the Minister of Small Business Development is mandated to select amongst the list of nominees and appoint the members of the Small Business Advisory Body for a period of three years.

To date, the Panel approved by the Minister has finalised the process of shortlisting. All relevant documents and a shortlist of verified names by the DSBD Human Resource Directorate were submitted to the Minister for consideration of the appointment to the Council.

06 October 2017 - NW2890

Profile picture: Gqada, Ms T

Gqada, Ms T to ask the Minister of Mineral Resources

What is the detailed (a) breakdown of and (b) valuation for current and non-current assets and investments held by (i) his department and (ii) each entity reporting to him according to (aa) listed assets (aaa) directly held and (bbb) indirectly held and (bb) unlisted investments (aaa) directly held and (bbb) indirectly held by each of the entities, in each case breaking the current assets and investments down by 0-3 months, 3-6 months, 6-12 months and beyond 12 months?

Reply:

Assets held by the Department and each of the entities are disclosed on the Annual Financial Statements. Information required can therefore be obtained on the annual report tabled by the Department in September 2017 to Parliament. The annual report are the key reporting instruments for departments and its entities to report against the performance targets and budgets outlined in the strategic plans, read together with the ENE.

Approved/Not Approved

Mr MJ Zwane, MP

Minister of Mineral Resources

Date Submitted:-……………/………………/2017

06 October 2017 - NW2627

Profile picture: Figlan, Mr AM

Figlan, Mr AM to ask the Minister of Home Affairs

What are the relevant details of the measures that the Government will put in place to facilitate the African Union’s vision 2063 of establishing a continental passport for freedom of movement and trade in Africa in contrast to the more strict security measures restricting movement, as proposed by the Border Management Agency?NW2933

Reply:

The legal instruments relating to the implementation of the aspects of Vision 2063 relating to Free Movement are still being negotiated by the African Union Member States. Upon adoption by the African Union, the Member States will have to sign and, in accordance with their constitutional requirements, ratify and domesticate the legal instruments.


In the case of South Africa, if the legal instruments are ratified and domesticated, all relevant Departments and their entities or agencies will have to implement them as it would be the law in the Republic.

Remarks: Reply: Approved / Not Approved

Mkuseli Apleni Prof. Hlengiwe Mkhize, MP

Director-General Minister of Home Affairs

Date: Date:

06 October 2017 - NW2634

Profile picture: Kalyan, Ms SV

Kalyan, Ms SV to ask the Minister of Home Affairs

Whether an official from her department was present at the Waterkloof Airport to process the passports and travel documents of passengers embarking on the aircraft carrier Z-WPE (a) on its arrival on 16 August 2017 at 19:11 pm and (b) on its departure on 20 August 2017 at 01:19 am; if not, why not in each case; if so, (i) what is the (aa) full name and (bb) professional designation of the official concerned, (ii) what are the (aa) full names, (bb) passport number and (cc) nationality of every individual whose passport or travel documents were processed and (iv) when was the official notified that his presence at the airport is required?

Reply:

A. Whether an Official from department was present at Waterkloof Airport On its arrival on 16 August 2017 at 19:11 pm

Officials from the Department of Home Affairs were present during the embarking of the Aircraft carrier Z-WPE on its arrival

B. Whether an Official of the department was present during the departure of Z-WPE on 20 August 2017 at 01:19 am.

Officials from the Department of Home Affairs were also present during the departure of Z-WPE on 20 August 2017 at 01:19 am

(aa) Full name

Full names: David Dihele

Full names: Busi Nkambule

Full names: Molefe Machaba

(bb) Professional designation:

As per (aa) above, the professional designations are:

Professional Designation: Chief Immigration Officer

Professional Designation: Chief Immigration Officer

Professional Designation: Immigration Officer

(cc) The nationality of every individual whose passport or travel documents were processed

All individuals processed were Zimbabwean Nationals on arrival we processed 45+1=46 Pax and on departure it was 57+ 1 =58 Pax

(iv) When was the officials notified that his presence at the airport is required?

The Officials have been part of planning for the SADC Summit. The Office has been planning the summit from June.2017. There was a permanent deployment of immigration Officers for the duration of the summit from 11-22 August.2017.

 

Remarks: Reply: Approved / Not Approved

Mkuseli Apleni Prof. Hlengiwe Mkhize, MP

Director-General Minister of Home Affairs

Date: Date:

06 October 2017 - NW2865

Profile picture: Bucwa, Ms H

Bucwa, Ms H to ask the Minister of Higher Education and Training

(1)On what date will the investigation into the fraudulent obtaining of places in health sciences courses at various public universities be completed; (2) whether the findings of the specified investigation will be made public; if not, why not; if so, by what date?

Reply:

  1. The investigation is a two-pronged process, i.e. an institutional investigation and probe by law enforcement agencies. The internal process at the University of KwaZulu-Natal is expected to be completed by end of the year.
  2. The decision to make the internal investigation findings public rests with the Council of the university.

COMPILER/CONTACT PERSONS:

EXT:

DIRECTOR – GENERAL

STATUS:

DATE:

QUESTION 2865 APPROVED/NOT APPROVED/AMENDED

Dr BE NZIMANDE, MP

MINISTER OF HIGHER EDUCATION AND TRAINING

STATUS:

DATE:

06 October 2017 - NW2633

Profile picture: Kalyan, Ms SV

Kalyan, Ms SV to ask the Minister of Home Affairs

Was notice of an RSA05 clearance for the flight that (a) arrived at Waterkloof Air Force Base from Harare on or about 16 August 2017 and (b) departed from Waterkloof Air Force Base to Harare on or about 20 August 2017 received by her department; if so (a) who approved the clearance and (b) on what basis was the clearance done?

Reply:

The Department of Home Affairs is not responsible for the clearance of any flights.

Remarks: Reply: Approved / Not Approved

Mkuseli Apleni Prof. Hlengiwe Mkhize, MP

Director-General Minister of Home Affairs

Date: Date:

06 October 2017 - NW2505

Profile picture: Chance, Mr R

Chance, Mr R to ask the Minister of Small Business Development

Whether, with reference to her reply to question 1966 on 10 August 2017, her department has set targets for the country to achieve using the Global Entrepreneurship Monitor’s index known as the Total Early Stage Entrepreneurial Activity rate, which measures start-up activity in a country’s ecosystem; if not, (a) why not and (b) by when will targets be set; if so, what are the relevant details?

Reply:

No, the Department of Small Business Development (DSBD) has not set targets for the country to achieve a particular rate using the Global Entrepreneurship Monitor’s (GEMS) index known as the Total Entrepreneurial Activity rate, which measures start-up activity in a country’s entrepreneurship ecosystem.

a) The Global Entrepreneurship Monitor is not the only source of data which can be used to determine early stage entrepreneurial activity. The DSBD is therefore, not only limited to this source of data as a tool to measure nor determine the entrepreneurial activity rate. The DSBD will continue to consider other relevant research available to enhance its work.

b) The DSBD is in the process commissioning a “2016 Annual Review on the status of Small Business and Cooperatives in South Africa”. The findings from this research will determine a decision whether there is a need for target setting of early stage entrepreneurial activity.

06 October 2017 - NW2709

Profile picture: Breytenbach, Adv G

Breytenbach, Adv G to ask the Minister of Justice and Correctional Services

Whether the National Prosecuting Authority (NPA) is currently investigating a case of alleged fraud committed by seven individuals who were arrested in Heidelberg, Gauteng, for being in possession of SA Social Security Agency cards of private individuals who were receiving social grants; if not, why not; if so, (a) on what date was the case handed to the NPA by the SA Police Services and (b) what (i) is the current status of the investigation and (ii) steps have been taken to date with regard to the investigation; (2) whether the NPA launched any disciplinary action against a certain person (name and details furnished) for allegedly defeating the ends of justice after refusing to prosecute the case of alleged fraud; if not, why not; if so, what are the relevant details?

Reply:

1. The National Director of Public Prosecutions has informed me that the National Prosecuting Authority (NPA) is not investigating this matter. The power to investigate this case resorts with the South African Police Service (SAPS), who are investigating the matter.

The SAPS investigating docket was handed to the National Prosecuting Authority (NPA) on 3 May 2017 after which guidance was provided to the investigating officer on aspects relating to the investigation after which the docket was returned to the SAPS. The docket has not yet been resubmitted to the NPA as the investigation is yet to be concluded.

2. The SAPS approached the Senior Public Prosecutor with concerns regarding the manner in which the matter was dealt with. The Chief Prosecutor subsequently investigated the allegations and was satisfied that the prosecutors had provided the necessary guidance and had taken the appropriate steps in the circumstances of that matter. The Chief Prosecutor advised that no further steps were warranted.

06 October 2017 - NW2367

Profile picture: Alberts, Mr ADW

Alberts, Mr ADW to ask the Minister of Justice and Correctional Services

What number of cases has since 2010 between state law advisors as representatives of the State at all three levels of government and the public and contested as settlements agreed without the necessary mandate; (2) (a) what number of cases altogether has been settled in each (i) national and (ii) provincial department since 2010 and (b) what does the total for settlements amount to for each year from 1 January 2010 up to the latest specified date for which information is available?

Reply:

  1. I have been informed that there is only one (1) reported case since 2010 (For National and Provincial Departments).
  2. The Honourable Member should note that the Department of Justice and Constitutional Development has reported that: No data was collected during 2010/11 to 2014/15 financial years. The table below provides details of information captured from 2015/16 and 2016/17 financial years as well as the first quarter of the current (2017/18) financial year:

Verified data 2015/16 to 2016/17 for both National and Provincial Departments:

Year

No. of matters settled

Amount Claimed

Amount Awarded

2015/16

969

R1 330 597 548.02

R453 750 543.47

2016/17

787

R815 767 876.25

R347 354 310.86

Unverified data 2017/18 for both National and Provincial Departments:

Year

No. of matters settled

Amount Claimed

Amount Awarded

Quarter 1

275

R251 194 125

R112 552 023

06 October 2017 - NW2686

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Justice and Correctional Services

What is the reason provided by the Master of the High Court in Cape Town for refusing to grant the Ndabeni Land Claim Trust their Letter of Authority despite being instructed to do so by the court?

Reply:

I have been advised that the Master is not in a position to appoint Trustees, and the reasons for not issuing the letters of authority are as follows:

a) The judgment and order have been taken on appeal, hence the operation and execution of the latter have been suspended; and

b) The application by the Trustees Elect in terms of Section 18 (3) of the Superior Courts Act 10 of 2013, to allow the order to be operational and executable pending the outcome of the appeal, was dismissed by the Full Bench of the Western Cape High Court.

  

06 October 2017 - NW2711

Profile picture: Breytenbach, Adv G

Breytenbach, Adv G to ask the Minister of Justice and Correctional Services

What is the total cost incurred by (a) his department and (b) the National Prosecuting Authority for each official international trip undertaken by (i) the National Director of Public Prosecutions, Mr Shaun Abrahams and (ii) each person who accompanied him since 16 June 2015; (2) Whether a bodyguard accompanied the specified person on the international trips; if so, (a) for how many trips, (b) why and (c) what is the total cost incurred for the bodyguard to accompany the specified person in each case?

Reply:

1. (a) The table link below provides details of the total cost incurred by the Department of Justice and Constitutional Development, the amounts excludes information of the National Prosecuting Authority:

http://pmg-assets.s3-website-eu-west-1.amazonaws.com/RNW2711TABLE.pdf

(b) The information on the costs incurred by the National Prosecuting Authority for each official international trip undertaken by the National Director of Public Prosecutions and each person that accompanied him is attached at Annexure A.

2. Yes, the NDPP has informed me that he was accompanied by his bodyguard.

a) Three (3) trips.

b) Confidential information.

c) Please refer to Annexure A.

06 October 2017 - NW2731

Profile picture: Ross, Mr DC

Ross, Mr DC to ask the Minister of Finance

Whether a certain company (Jim Aviation SA) plays any role with regard to the contract concluded between SA Airways Technical and a certain company (Allen Aircraft Radio Corporation); if so, (a) what are the full details of the (i) role that the specified company is playing and (ii) value of its involvement in the specified contract and (b) who are the (i) directors and (ii) shareholders of the specified company?

Reply:

JM Aviation was, as at the time of the tender submission, and still is a BEE partner of AAR. SAA is not privy to the commercial agreement between AAR and JM Aviation and thus is not in a position to respond to the specifics around each party’s role with regard to the contract concluded between SAAT and AAR/JM Aviation. SAAT’s interactions in accordance with the contract are through a dedicated individual who is tasked with the client liaison and quarterly contract review.

a.(i) Not applicable.

a.(ii) Not applicable.

b.(i) Miss M.V. Sokhulu

       Miss I.N. Louw

       Mr V.A. Ndzeku

       Mr J. Aires

b.(ii) Miss M.V. Sokhulu: 35%

        Miss I.N. Louw: 30%

        Mr V.A. Ndzeku: 20%

        Mr J. Aires: 15%

06 October 2017 - NW2801

Profile picture: Mabika, Mr M

Mabika, Mr M to ask the Minister of Home Affairs

(1)Whether the Mbazwana Thusong Centre is officially authorised to close at 15H00 and send people away thereafter; if not, what is the position in this regard; if so; (2) whether she has found that there is staff shortage at the specified centre resulting in slow provision of services such as the collection of a document which takes the whole day?

Reply:

1. No, the office is not authorised to close at 15h00 as the Department’s offices official hours are 08h00 to 16h00 on weekdays. The Office Manager however, has discretion to decide on the queue cut off time depending on the number of clients on the day to be served. This depends on the number of clients already inside the office before closing time. This minimises the risk of clients refusing to leave the office at knock-off time and thus forcing the staff to perform unpaid overtime.

2. The office is short-staffed by one official currently and is operating with four officials. The standard norm for the staff compliment for a modernised office is a minimum of five officials. An additional post was approved for the office recently and the process of recruitment of the fifth official for the office has been completed and is awaiting approval of the appointment.

Remarks: Reply: Approved / Not Approved

Prof. Hlengiwe Mkhize, MP

Director-General Minister of Home Affairs

Date: Date:

06 October 2017 - NW2628

Profile picture: Masango, Ms B

Masango, Ms B to ask the Minister of Home Affairs

(1)By which date will her department’s newly built offices in Bronkhorstspruit in Gauteng, which were completed in May 2017, be opened; (2) whether employees stationed at her department’s Cullinan offices received any instructions to relocate to the newly built offices in Bronkhorstspruit; if not, what is the position in this regard; if so, (a) what is the status of the relocation and (b) how has the relocation affected service delivery by her department?

Reply:

(1) The new anticipated date for opening of the office in Bronkhorstspruit is 1 October 2017.

(2)(a) No. Consultation with staff took place during April 2017 upon which the affected staff were given a three (3) month period to prepare for the relocation. Not all officials at the Cullinan Local office - Medium will be affected by the move and this office will still be operating with a reduced number of staff to deal with applications of birth, marriage and death only. The Cullinan and Bronkhorspruit communities were also consulted on the intended opening of the new office in Bronkhorstspruit.

(2)(b) The relocation will not impact negatively as the Cullinan Local Office - Medium remains open and staff will be available to render service delivery, whilst the Bronkhorstspruit community will benefit with the opening of the new office.

Remarks: Reply: Approved / Not Approved

Mkuseli Apleni Prof. Hlengiwe Mkhize, MP

Director-General Minister of Home Affairs

Date: Date:

06 October 2017 - NW2812

Profile picture: Vos, Mr J

Vos, Mr J to ask the Minister of Home Affairs

(1)By what date will e-visas be implemented as a means to streamline tourist entry in the country; (2) (a) what are the names of the (i) countries and (ii) cities where Government has opened visa facilitation centres and (b) what are the (i) names of (aa) countries and (bb) cities where the Government plans to open visa facilitation centres in the future and (ii) timeframes in this regard?

Reply:

(1) By 30 March 2018 as a pilot phase.

(2)(a) Countries and Cities where Visa Facilitation Centers are opened as per the table below:

(i) Countries

(ii) Cities

1. India

Delhi/ Mumbai/ Kolkata/ Gurgaon/ Pune/ Ahmedabad/ Goa

2. Nigeria

Lagos/ Abuja/ Port Harcourt

3. China

Beijing/ Shanghai/ Chengdu/ Guangzhou/ Wuhan/ Xi’an/ Shenyang/ Hangzhou/ Jinan

4. Angola

Luanda

5. Democratic Republic of Congo

Kinshasa/ Lubumbashi

6. Kenya

Nairobi

7. Ghana

Accra

8. Uganda

Kampala

9. United Kingdom

London/ Edinburgh/ Manchester

10. Zimbabwe

Harare/ Bulawayo

11. Botswana

Gaborone

12. Iran

Tehran

13. United Arab Emirates

Dubai

14. Mongolia

Ulaanbaatar

15. Senegal

Dakar

16. Pakistan

Karachi/ Lahore/ Islamabad

17. Philippines

Manila

18. New Zealand

Wellington/ Auckland

(2)(b)(i) The information is as follows:

(aa) Countries

(bb) Cities

  1. Egypt

Cairo

(2)(b)(ii) January 2018

Remarks: Reply: Approved / Not Approved

Prof. Hlengiwe Mkhize, MP

Director-General Minister of Home Affairs

Date: Date:

06 October 2017 - NW2569

Profile picture: Mulaudzi, Adv TE

Mulaudzi, Adv TE to ask the Minister of Small Business Development

When are the application dates (a) opening and (b) closing for the board positions of all entities and councils reporting to her?”

Reply:

Small Enterprise Development Agency (SEDA) board positions

The Department issued call for nominations for members to serve on board of SEDA in the various print media from 31st July 2016 and the advert closed on 26 August 2016.

Small Enterprise Finance Agency (SEFA) board positions

Call for nominations for members to serve on board of SEFA was issued in various print media from 12th of July 2015 and the advert closed on 27 July 2015.

All board vacancies are filled, however a need for appointment of additional SEFA board members was recently identified. The Department of Small Business Development (DSBD) initiated the recruitment process of same in accordance with Cabinet approved Handbook for the appointment of persons to boards of state and state controlled institutions, section 31 (f) consulting with the parent department and (h) using departmental databases. The process is underway.

National Small Business Advisory Council

  a) The call for nominations was published on 23 August 2015.

   b) The closing date was 3 September 2015.

06 October 2017 - NW2675

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Justice and Correctional Services

(a) What processes and systems has his department put in place to ensure maximum public participation and commentary on the South African Law Reform Commission Report on Sexual Offences: Adult Prostitution, (b) what are the details of how public participation will take place and (c) what are the timelines for public participation and commentary on the report?

Reply:

(a) and (b) The Report on Adult Prostitution (Project 107) of the South African Law Reform Commission (the Report) was released into the public domain on 26 May 2017. The public and interested parties may consider and comment on the Report. The Department of Justice and Constitutional Development is embarking on the consultation process with internal governmental stakeholders on the legislative and non-legislative interventions due to the cross cutting impact of the recommendations. This internal process will consider the recommendations in a holistic and coordinated manner. A public participation process will be followed to facilitate debate and input from members of the public.

(c) The Department has indicated that this process of internal consultation will begin in October 2017. This process will be extensive as it must delve into all aspects of the implementation of the non-legislative recommendations. I will thereafter receive a report from the Department which will enable me to make a decision on the introduction of legislation.

06 October 2017 - NW2942

Profile picture: Macpherson, Mr DW

Macpherson, Mr DW to ask the Minister of Trade and Industry

Why did he not attend the opening of the first provincial One Stop Shop for InvestSA in Cape Town that was opened by the President of the Republic, Mr Jacob G Zuma?

Reply:

At the time, I was undergoing a medical procedure that disfigured my face. I was advised by my medical practioner to avoid high profile public events. The President agreed that, under the circumstances, the Ministry could be represented by the Deputy Minister.

06 October 2017 - NW2586

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Justice and Correctional Services

When are the application dates (a) opening and (b) closing for the board positions of all entities and councils reporting to him?

Reply:

In respect to the entities reporting to me, I have been informed as follows:

1. Legal Aid South Africa:

There are no application dates for members. The members of the Board are appointed by the Minister in terms of the Legal Aid South Africa Act, 2014 (Act No. 39 of 2014). The Board of Legal Aid South Africa is fully constituted. As a result, there are no Board vacancies currently.

2. Council for Debt Collectors:

There are no applications dates set for positions on the Council for Debt Collectors. In terms of the Debt Collectors Act, 1998 (Act No. 114 of 1998), 10 Council members are appointed by the Minister of Justice and Correctional Services, of which 7 members are appointed based on nominations received from the debt collection industry, law society of South Africa, Magistrates commission and an institution representing consumer interests. The Chairperson and 2 remaining members are appointed in the Ministers discretion.

In terms of section 3(4) of Act No. 114 of 1998, a member of the Council holds office for a term, not exceeding three years, determined by the Minister at the time of the member's appointment. The section also provides that a member may be reappointed at the expiration of his or her term of office.

3. South African Law Reform Commission:

Section 3 of the South African Law Reform Act, 1973 (Act No. 19 of 1973) provides for the appointment of the Commissioners by the President and does not require the prospective Commissioners to apply for these positions.

4. Special Investigating Unit

The Special Investigating Unit does not have a Board as it is a Schedule III Public entity, with the Accounting Authority fulfilling the role of the Board.

5. Rules Board for Courts of Law

There are no applications dates set for positions of the Rules Board as the Board is accountable to the Minister in terms of the Act. The Minister appoints when there is a vacancy and/or prior to the expiry of the terms of the Board.

06 October 2017 - NW2121

Profile picture: Lees, Mr RA

Lees, Mr RA to ask the Minister of Finance

What is the (a) full financial value of (i) funds and (ii) guarantees received by SA Airways (SAA) from (aa) the National Treasury and/or (bb) any other national department from 1 January 1997 to date, (b) detailed breakdown of these allocations to each department of SAA in each year, (c) motivation for providing the funds in each case and (d) detailed breakdown of the amounts of guarantees (i) requested and (ii) granted in each case?

Reply:

a(i): A summary of funds received and repaid is reflected in the table below, as per the records in the annual financial statements:

Financial Year

Funds Received or Paid

 

Initial capitalisation R3 137 million

2003/4

R6 089 million shareholder loan advanced

2004/5

R 4 000 million shareholder convertible loan

2005/6

R 1 600 million of shareholder convertible loan repaid (balance of R2 400 million remained)

2006/7

R 8 450 million of above loans was capitalised

2007/8

R1 564 million subordinated loan raised. Capitalised in 2009/10

2017/18

R2 208 million recapitalisation (30 June 2017)

a(ii): A summary of the Going Concern guarantees and utilisation towards loans or other purposes as is listed in the table below:

Guarantee Awarded

Amount

Utilisation

Balance

 

R’m

R’m

R’m

Subordinated Loan – Nedbank (Mar 2007)

1 300

1 300

Nil

Going Concern Guarantee (Sep 2009)

1 600

   

(Allocated to ATL, Sep ‘16)

 

541

 

Working Capital Utilisation (Dec ’14)

 

1 055

4

       

Going Concern Guarantee (Sep 2012)

5 006

   

Working Capital Utilisation (Jul ’14)

 

1 300

 

Working Capital Utilisation (Jul ’14)

 

1 500

 

Working Capital Utilisation (Dec ’14)

 

1 700

 

Working Capital Utilisation (Dec ’14)

 

295

211

       

Going Concern Guarantee (Dec 2014)

6 488

   

Working Capital Utilisation (Dec ’14)

 

450

 

Working Capital Utilisation (Apr ‘15)

 

1 500

 

Working Capital Utilisation (Jun ‘15)

 

1 500

 

Working Capital Utilisation (Jun’16) Bridge

 

1 000

2 038

       

Going Concern Guarantee (Sep 2016)

4 720

   

General Short Term Banking Facilities (Dec’16)

 

830

 

Working Capital Utilisation (Dec’16) Bridge

 

1 292

 

Working Capital Utilisation (Mar‘17) Bridge

 

757

 

LC and Guarantee Facilities (Mar’17)

 

522

 

ATL Credit Card Exposure (Apr’17)

 

768

 

Working Capital Utilisation (May‘17) Bridge

 

104

447

       

TOTAL

19 114

16 414

2 700

06 October 2017 - NW2578

Profile picture: Mkhaliphi, Ms HO

Mkhaliphi, Ms HO to ask the Minister of Home Affairs

When are the application dates (a) opening and (b) closing for the board positions of all entities and councils reporting to her?

Reply:

The entities responded as follows:

Electoral Commission

(a-b) The Electoral Commission does not have a Board. It has a Commission whose composition is described in section 6 of the Electoral Commission Act (51 of 1996). The Commission is not the equivalent of a Board.

Government Printing Works

(a-b) The Government Printing Works does not have a Board. GPW is currently a National Government component established as such in 2009 in accordance with section 7(5)(c) of the Public Service Act, 1994 (Proclamation No. 103 of 3 June 1994) (“Public Service Act”) and listed in Part A of Schedule 3 to that Act.

Remarks: Reply: Approved / Not Approved

Mkuseli Apleni Prof. Hlengiwe Mkhize, MP

Director-General Minister of Home Affairs

Date: Date:

06 October 2017 - NW2885

Profile picture: Figlan, Mr AM

Figlan, Mr AM to ask the Minister of Home Affairs

What is the detailed (a) breakdown of and (b) valuation for current and non-current assets and investments held by (i) her department and (ii) each entity reporting to her according to (aa) listed assets (aaa) directly held and (bbb) indirectly held and (bb) unlisted investments (aaa) directly held and (bbb) indirectly held by each of the entities, in each case breaking the current assets and investments down by 0-3 months, 3-6 months, 6-12 months and beyond 12 months?

Reply:

The Department and the entities responded as follows:

(i) Department of Home Affairs

(a-b) The breakdown and valuation of current and non-current assets held by Department of Home Affairs as at 31 March 2017 are as follows:

Asset type

0-3 months

3-6 months

6-12 months

Beyond 12 months (non- current assets)

Total

Staff debt

R1 616 079.85

R735 604.71

R242 576.06

R10 107 125.60

R12 701 386.22

Other debtors

R791 636.58

   

R330 558.59

R1 122 195.17

Recoverable expenditure (disallowance accounts)

R3 388 15.46

 

R2 781 994.10

R21 002 032.44

R24 122 842.00

Claims recoverable

R234 930.10

 

R173 7997 310

R843 334.20

R1 739 075 574.30

Total

R2 981 461.99

R735 604.71

R1 741 021 880.16

R32 283 050.83

R1 777 021 997.69

(bb) There are no investments held by Department of Home Affairs, listed or unlisted.

(ii) Government Printing Works

(a-b) The Government Printing Works (GPW) has an asset base of R3 228 752 000.57. A detailed breakdown and valuation of current and non-current assets is listed below:

Non-current assets:

Fixed assets

Net value

Land

R20 128 625.42

Buildings

R25 189 570.56

Lease Improvements

R80 503 178.75

Office furniture

R3 453 048.73

Computer equipment

R3 437 878.85

Machinery and equipment

R251 817318.80

Vehicles

R15.16

Computer software

R12 489 488.12

Asset in production

R455 345 950.10

Sub-total

R852 365 074.49

   

Intangible assets

 

Intangible software

R23 331 123.13

Total

R875 696 197.62

Current assets

Inventories*

R242 936 477.69

Trade and other receivables

R98 442 286.16

Cash and cash equivalents*

R2 011 677 039.10

Total

R2 353 055 802.95

*Inventories and cash and cash equivalents represent the balance as at 31 August 2017 and cannot be broken down by months.

The breakdown of trade and other receivables is as follows:

Period

Balance

0-3 months

R88 155 067.26

Greater than 3 months

R10,287,281.90

Total

R98 442 286.16

(bb) The GPW does not have any investments, both listed and unlisted.

(ii) Electoral Commission

(a-b) The breakdown and valuation of current and non-current assets of the Electoral Commission as at 31 March 2017 are as follows:

Current assets

Cash and cash equivalents

R14 078 042.00

Trade and other receivables from exchange transactions

R22 352 490.00

Inventories

R11 911 915.00

Total

R48 342 447.00

Non-current assets:

Property, plant and equipment

R197 705 422.00

Heritage assets

R1 663 664.00

Intangible assets

R94 809 947.00

Total

R294 179 033.00

(aa-bb) The breakdown period of current assets and investments is tabulated hereunder:

Current Assets

0 - 30 Months

3 - 6 Months

6 - 12 Months

Beyond 12 Months

Totals

Cash and Cash Equivalents

R14 078 042

-

-

-

R14 078 042

           

Trade and other receivables

R21 760 156

R8 874

R105 220

R478 240

R22 352 490

Accrued Interest

R36 682

-

-

-

R36 682

Cash collateral provided: property rentals

R12 634 488

-

-

-

R12 634 488

Prepayments

R7 984 858

-

-

-

R7 984 858

Sundry receivables

R1 104 128

R 8 874

R105 220

R478 240

R1 696 462

           

Inventories

R11 911 915

-

-

-

R11 911 915

           

Total Current Assets

R47 750 113

R8 874

R105 220

R478 240

R48 342 447

 

Remarks: Reply: Approved / Not Approved

J W Mckay Prof. Hlengiwe Mkhize, MP

Acting Director-General Minister of Home Affairs

Date: Date:

06 October 2017 - NW2726

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Environmental Affairs

Whether she (a) received, (b) considered, (c) approved and/or (d) rejected any (i) applications, (ii) requests and/or (iii) proposals to withdraw the national parks declaration of any portion(s) of the West Coast National Park; if so, what are the relevant details in each case?

Reply:

(a) No, I did not receive any (i) applications, (ii) requests and/or (iii) proposals to withdraw the national parks declaration of any portion(s) of the West Coast National Park.

(b) No, I did not consider any (i) applications, (ii) requests and/or (iii) proposals to withdraw the national parks declaration of any portion(s) of the West Coast National Park.

(c) No, I did not approve any (i) applications, (ii) requests and/or (iii) proposals to withdraw the national parks declaration of any portion(s) of the West Coast National Park.

(d) No, I did not reject any (i) applications, (ii) requests and/or (iii) proposals to withdraw the national parks declaration of any portion(s) of the West Coast National Park.

---ooOoo---

05 October 2017 - NW2261

Profile picture: Stubbe, Mr DJ

Stubbe, Mr DJ to ask the Minister of Basic Education

With reference to her reply to question 1851 on 6 July 2017 in which she stated that Information and Communication Technology (ICT) has been sourced in some provinces to provide for learners in braille, (a) what is the nature of the specified ICT and (b) which schools in each province have utilised the ICT?

Reply:

(a) A survey that was conducted in 2016 in all 22 schools for visual impairment in the country provided the following information with regard the provision of ICT sourced in some provinces to provide for learners who use Braille. According to the survey, the following ICT were sourced for schools in each province to expand access to the textbooks from the National Catalogue and reading texts in refreshable braille or audio format, or for production of braille at school-level:

  1. Braille embossers
  2. Graphic braille embossers;
  3. Refreshable braille readers;
  4. Classroom equipped with CCTV and magnification camera;
  5. Laptops;
  6. Cameras with keyboards;
  7. Tablets loaded with textbooks from the National Catalogue;
  8. Digital talking book readers

(b) The schools that have procured and utilised the ICT equipment in each Province are as follows:

Name of school

Province

Khanyisa

EC

Filadelfia

GP

Prinshof

GP

Sibonile

GP

Open Air

KZN

Bosele

LP

Letaba

LP

Rivoni

LP

Setotolwane

LP

Siloe

LP

Tshilidzini

LP

Silindokuhle

MP

Re- Tlameleng

NC

Christiana

NW

Athlone

WC

Pioneer School

WC

05 October 2017 - NW2788

Profile picture: Mashabela, Ms N

Mashabela, Ms N to ask the Minister of Basic Education

What number of schools in the country currently have asbestos roofs?

Reply:

NO

PROVINCES

NUMBER OF SCHOOLS ROOFED WITH ASBESTOS SHEETS

1

EASTERN CAPE

1 139

2

FREE STATE

5

3

GAUTENG

29

4

KWAZULU-NATAL

918

5

LIMPOPO

39

6

MPUMALANGA

0

7

NORTH WEST

10

8

NORTHERN CAPE

30

9

WESTERN CAPE

892

05 October 2017 - NW2794

Profile picture: Tlhaole, Mr L S

Tlhaole, Mr L S to ask the Minister of Basic Education

With reference to her reply to question 812 on 11 April 2017, (a) has her department received the necessary information from the Northern Cape Provincial Education Department and (b) what was the response of the specified department?

Reply:

The closure of schools in the Northern Cape’s John Taolo Gaetsewe (JTG) municipality during the 2013/14 financial year, was as a result of community protests for the construction of a tarred road, whereby children were barred from going to school and the school infrastructure was destroyed in the process.

The Northern Cape Provincial Education Department has since strengthened the community and stakeholder liaison structures by establishing the District Quality Learning and Teaching Campaign (QLTC) Structure, whose primary mandate is to focus on the following, amongst other things:

(a) inform citizens about the importance of education, their roles, responsibilities and obligations towards education;

(b) be the catalyst for positive change, quality improvement and transformation; and

(c) to provide a platform for communities and broader society to actively and constructively become involved in the improvement of teaching and learning.

Furthermore, the Province has appointed a dedicated official at a Provincial level to coordinate QLTC across all five (5) Districts in the province.

05 October 2017 - NW2096

Profile picture: Mashabela, Ms N

Mashabela, Ms N to ask the Minister of Basic Education

Whether (a) her department and/or (b) any entities reporting to her are funding, including by way of discretionary funding, any institution of research and development (i) domestically and/or (ii) internationally; if so, (aa)(aaa) what are the names of the specified institutions and (bbb) what are their functions, (bb) from what date has her department or any entity reporting to hier been funding them and (cc) what amount has her department contributed towards such funding?

Reply:

Department of Basic Education

(a)(i)(ii) The Department of Basic Education does not fund any Institution of Research and Development domestically or internationally.

(aa)(aaa) Not applicable

(bbb) Not applicable

(bb) Not applicable

(cc) Not applicable

South African Council for Educators

(b)(i)(ii) The South African Council for Educators does not fund any Institution of Research and Development domestically or internationally.

(aa)(aaa) Not applicable

(bbb) Not applicable

(bb) Not applicable

(cc) Not applicable

QUESTION NA 2096

UMALUSI

(b)(i)(ii) UMALUSI does not fund any Institution of Research and Development domestically or internationally.

(aa)(aaa) Not applicable

(bbb) Not applicable

(bb) Not applicable

(cc) Not applicable

05 October 2017 - NW2678

Profile picture: Mashabela, Ms N

Mashabela, Ms N to ask the Minister of Basic Education

What is the total number of learners who (a) registered for Grade 1, (b) completed Grade 9 and (c) completed Grade 12 in each province in the period 1 January 1996 up to 31 December 2016?

Reply:

(a),(b),(c)

The table link below shows the total number of Grade 1 learners registered between 1997 and 2005, the total number of learners in Grade 10 (completed Grade 9) in 2006-2014 and the total number of learners completed Grade 12 in 2008-2016, per province.

Based on the cohort of learners in Grade 1 in 1997, the table aligns the same cohort of learners in Grade 10, in 2006 and the same cohort of learners in Grade 12, in 2008.

Note:

  • What should not be done though, is to divide Grade 12 passes in one year (for instance 2016) by Grade 1 enrolments twelve years previously (for instance 2004) to obtain a statistic on survival to Grade 12. One key problem with this approach is that levels of repetition in Grade 1 are high, meaning one double counts learners in the denominator.
  • It must also be noted that a great number of learners also enrol in TVET colleges and that others attend AET classes after completing Grade 9 which forms part of the Higher Education and Training Sector.
  • With regard to (b), Repeaters in Grade 10 were included in the statistics of number of completed Grade 9 learners.
  • With regard to (c), the analysis includes only full-time Grade 12 passes in the public examination. Those figures exclude Grade 12 learners writing private examinations (in particular those of the Independent Examinations Board) and part-time learners in the public system who accumulate sufficient credits to obtain a Grade 12 pass.

 

Link: http://pmg-assets.s3-website-eu-west-1.amazonaws.com/RNW2678TABLE.pdf

Source: SNAP 1997 -2016

Note 1: ?? Indicate non submission of dataset

05 October 2017 - NW1604

Profile picture: Tlhaole, Mr L S

Tlhaole, Mr L S to ask the Minister of Defence and Military Veterans

(a) What percentage of military veterans, employed by her department, are former Umkhonto weSizwe veterans and (b) in what positions are the former Umkhonto weSizwe veterans employed?

Reply:

The Department currently employs 206 staff members excluding interns. Of the 206 employees, 76 are non-permanent employees (NPE). Therefore the Department has 130 permanent employees on its establishment.

Of the 130, there are 24 former MK members constituting 18% of the permanent employees. They hold the following positions:

  • 1 x Deputy Director General
  • 2 x Chief Directors
  • 4 x Directors
  • 13 x Deputy Directors
  • 4 x Assistant Directors

Of the 76 NPE’s, four (4) are from former MK members constituting 5% and they hold the following positions:

  • 1 x Acting Director General
  • 1 x Director
  • 1 x Deputy Director
  • 1 x Assistant Director

In total the Department has 28 employees from former MK constituting 14% of the entire Department workforce.

05 October 2017 - NW2662

Profile picture: Tarabella - Marchesi, Ms NI

Tarabella - Marchesi, Ms NI to ask the Minister of Basic Education

(a) What was the maintenance budget for each school in each school district in the 2016-17 financial year, (b) which schools underspent on their budget and (c)(i) by what amount did each specified school underspend and (ii) what was the reason for underspending in each case?

Reply:

(a),(b) & (c) (i) & (ii)

Maintenance funded from the Education Infrastructure Grant is not allocated per school but per project. As a result, it will not be possible to provide the budget and expenditure per school in each district in each province. However, the allocations for maintenance from the Norms and Standards for School Funding are allocated by the Provincial Education Departments. The honourable member is advised to request the information from the NCOP and/ or request provinces to provide the information as the function is a provincial competency.

05 October 2017 - NW2679

Profile picture: Mashabela, Ms N

Mashabela, Ms N to ask the Minister of Basic Education

(a) What is the total number of schools that have been built in each province since 1 January 2009 and (b) what number of schools are currently being built in each province?

Reply:

Prov

TOTAL NUMBER OF SCHOOLS COMPLETED (ASIDI AND PROVINCIAL)

 

2009/2010

2010/2011

2011/2012

2012/2013

2013/2014

2014/2015

2015/2016

2016/2017

Delivered in 2017/18 (1st Q)

ASIDI

Total School Delivered

Currently being built 2017/2018

EC

34

62

33

13

5

32

11

8

2

134

6

155

FS

13

4

0

2

3

5

3

3

0

12

45

10

GP

10

10

14

21

12

24

13

6

0

0

110

8

KZN

6

19

10

2

17

12

11

10

1

0

88

21

LP

34

4

14

7

7

13

17

3

0

3

102

9

MP

4

1

4

11

7

19

14

5

0

5

70

11

NC

1

2

2

4

3

0

4

3

0

1

20

7

NW

3

0

7

7

8

2

4

6

0

2

39

6

WC

6

9

19

5

4

14

23

19

2

22

123

6

TOTAL

111

111

103

72

66

121

100

63

5

179

931

233

05 October 2017 - NW2514

Profile picture: Bergman, Mr D

Bergman, Mr D to ask the Minister of Basic Education

(a) What number of staff members are employed in the vetting and verification unit at the SA Council of Educators (SACE) and (b) what steps is SACE taking to ensure that it has the requisite capacity for vetting and verifying the volume of applications that it receives for the listing in teachers’ roll?

Reply:

a) Eight (8) staff members have been allocated the vetting and verification responsibilities as part of the processing of registration of applications.

b) Currently the South African Council for Educators (SACE) is conducting visual verification at the office. However Council is working on a process of re-conceptualizing vetting and verification with an ultimate goal of streamlining the processes and establishing a formal institutional network that will play a more meaningful role in this area. The reconceptualisation process also includes the review of the registration criteria to include, fitness-to-practice as a new concept that will incoporate issues of vetting and verification within a broader context of professional registration. Council is persuing establishing institutional networks with e.g the South African Qualifications Authority; Department of Home Affairs and the Africa Forum of Teaching Regulatory Authorities (AFTRA) to enhance its registration process.

05 October 2017 - NW2511

Profile picture: America, Mr D

America, Mr D to ask the Minister of Basic Education

(1)With regard to each allegation of abuse of learners by school staff (details furnished), was the case reported to the (a) provincial education department, (b) SA Council of Educators (SACE) and/or (c) SA Police Service (SAPS); if not, in each case, why not; if so, what are the details of (i) all disciplinary action taken by each (aa) provincial education department and (bb) SACE against offending teachers, (ii) CAS numbers of the cases opened at SAPS and (iii) status of the SAPS investigations in each case and (iv) the outcomes of the specified disciplinary actions, (2) has psychological support been offered to the affected learners; if not, why not; if so, what are the relevant details?

Reply:

1. (a) In terms of section 3(1)(b) of the Employment of Educators Act, 76 of 1998, the Head of the Provincial Education Department is the employer of educators in the service of the Provincial Education Departments (PEDs) for all purposes of employment. For this reason, the Department of Basic Education (DBE) cannot intervene in the decisions of the PEDs regarding employer-employee relations matters because of the binding contract of employment between the two parties. It is therefore the responsibility of the employer to implement policies with regards to safety measures at schools. It is also the responsibility of the employer to enforce disciplinary code and procedures against their employees. The question therefore needs to be directed to the PED to establish the facts of these cases.

1. (b) SACE SUPPLEMENTARY RESPONSE

The following cases as per the attached list were reported to

Eastern Cape

1. EC 2 Qunu Junior Secondary School: the case was investigated on 11 October 2016 and no evidence of abuse of learners was found;

Free State

2. FS 1 Reatile Primary School: the case was investigated, disciplinary hearing was conducted, the educator was found guilty and given a sanction of a striking off, which was suspended for a period of 10 years and a fine of R10 000;

Gauteng

3. GP 2 Chief Albert Luthuli School - the matter was investigated. The parent of the learner did not co-operate with the investigation and removed the learner from the school;

4. GP 5 Teach to Pass College - The matter was investigated , a disciplinary hearing was finalised and the educator was found guilty, the report and sanction are to be tabled before the ethics committee in October 2017;

5. GP 6 Parktown Boys High School - The matter was brought to our attention. The school will be furnishing us with all the information at their disposal. The school is keeping us up to date with developments in the criminal case;

6. GP12 Krugersdorp High School- The matter was brought to our attention and was investigated. We await a report from the investigator and his findings;

Kwazulu Natal

7. KZN 6 Prince Tokoto High School- The matter was brought to our attention and was investigated. Charges have been brought against the educator. A disciplinary hearing had to be postponed as the educator has been admitted to hospital for depression. The hearing will proceed as soon as he has been discharged;

8. KZN 9 Ekucabangeni High School. The educator was investigated and he is currently still in prison and was denied bail. It is a bit difficult to conduct a disciplinary hearing at the moment;

9. KZN 11 George Campbell School of Technology.-The matter was investigated. A disciplinary hearing was conducted and the educator was found guilty and given a sanction of a striking off which was suspended for a period of 15 years and a fine of R25 000.00;

Limpopo

10. LP 1 Lemetja Secondary School- The matter was investigated, a disciplinary hearing conducted and the educator was found guilty and given a sanction of a striking off which was suspended for a period of 10 years and a fine of R10 000.00;

11. LP 3 Mphaphuli High School- The matter was brought to our attention. An investigation could not be conducted as the principal refuses to cooperate with the investigation or to speak to anyone. According to the principal, he has been instructed by the spokesperson for the Limpopo Education Department to not speak to anyone regarding the allegations. The circuit manager also refuses to cooperate and refers us to the District Manager. We are recommending to Council structures for charges to be preferred against the principal for refusal to cooperate;

Mpumalanga

12. MP2 Manyano Primary School-The matter was brought to our attention and investigated. A disciplinary hearing has commenced and is being finalised on 21 and 22 September 2017;

13. MP3 Mpakeni Primary School-The matter was brought to our attention and is being investigated;

14. MP 5 Lwaleng Primary school- The matter was brought to our attention and was investigated. There was no evidence found to substantiate the allegations. The parents and their lawyers are not cooperating with us despite our numerous requests for a meeting with them. The educator was also found not guilty by a court owing to lack of evidence;

Northern Cape

15. NC1 Laerskool Orange-Noord - The matter was brought to our attention and was investigated. A disciplinary hearing will take place on 16 and 17 November 2017;

North West

16. NW1 Poifo Primary School - The matter was brought to our attention and was investigated. A disciplinary hearing was finalised, the educator was found guilty and given a sanction of a striking off which was suspended for 10 years and a fine of R10 000.00

The rest of the reports not referred to herein did not come to our attention, we were unaware thereof and we will be following up on them in due course.

2. The question needs to be directed to the relevant employers, who are the Heads of Provincial Education Departments, for details and further responses.

05 October 2017 - NW2322

Profile picture: Tarabella - Marchesi, Ms NI

Tarabella - Marchesi, Ms NI to ask the Minister of Basic Education

(1)With reference to each province, (a) what is the deadline for schools to order textbooks from their provincial department and (b) what number of schools did not order textbooks by the deadline; (2) for each school that did not order textbooks, (a) what is the name of the school and (b) on what date was the catalogue for orders made available to the specified school; (3) what measures has each provincial department put in place to ensure that textbooks are ordered by schools that have not met the deadline?

Reply:

1. (a) In accordance with the National LTSM Sector Plan, textbooks orders have to be placed by 30 June of each year. Provinces and schools are expected to align the placement of orders to this date. The dates set by each Provincial Education Department (PED) is provided in the table below:

Province

Deadline to order textbooks

EC

30 September 2016.

FS

30 June 2017

GP

23 June 2017

KZN

15 May 2017.

23 June 2017 for Section 21 (1)(c) schools

LP

28 April 2017

MP

11 August 2017

NC

30 June 2107.

NW

22 June 2017

WC

19 June 2017

(b) All Section 20 schools and Section 21(1) (c) schools that opted for central procurement through their respective Provincial Education Departments

placed their orders by the deadlines as determined by their PEDs.

2. (a) (b) Please see list of schools for EC, LP and NW attached as Annexure A.

Province

Names of school that did not order by deadline

The date when catalogue was made available to schools

EC

The list of schools is attached see the link:

http://pmg-assets.s3-website-eu-west-1.amazonaws.com/RNW2322List_of_School-171005.pdf

End of June 2017

FS

All Section 20 schools ordered by the deadline

Section 21 schools order on their own.

GP

All 2196 schools in the province had not placed orders by 23 June 2017. There are no schools name provided.

Catalogues were distributed to all schools on 26 May 2017

KZN

A total of 48 schools are recorded as non-compliant for school-based procurement of textbooks. There are no names provided for the schools.

Catalogues were distributed to schools on 03 May 2017.

LP

The list of schools is attached see the link:

http://pmg-assets.s3-website-eu-west-1.amazonaws.com/RNW2322LP-_171005.pdf

The catalogue has been made available on the 14 August and the LDoE will place orders with publishers on 18 August.

MP

None

30 June 2017

NC

All schools ordered by the deadline

The catalogue for ordering was available from end of May 2017.

NW

The list of schools is attached see the link:

http://pmg-assets.s3-website-eu-west-1.amazonaws.com/RNW2322NW-171005.pdf

Catalogues made available from the 12th of June 2017.

WC

Deadline 29 May to 19 June 2017

Not provided

3. For Section 21 schools that did not opt for central procurement, the following measures have been put in place by provinces to ensure that textbooks are ordered by schools that have not met the deadline:

Province

Measures put in place

Eastern Cape

Co-ordinators were sensitised of the challenge of schools that did not order textbooks by the deadline and they were central in the re-direction of the surplus books to schools that did not place orders.

The warehouse also submitted a list of books available at the warehouse due to rejections/wrong orders, etc. and some of the schools that did not place orders benefitted from the rejections and wrong orders.

Schools that did not place orders have been directed to place orders with the 2018 orders.

Gauteng

All 200 schools without section 21.1c function have centrally procured textbooks and stationery for the 2018 academic year.

Of the total of 1864 Section 21.1c schools, 1323 have submitted proof of orders to Districts and a total of 541 schools are still outstanding.

The province receives weekly procurement reports from Districts for schools with section 21.1c function. As at Friday 11 August 2017. Districts continue to follow up with the 541 outstanding schools.

KwaZulu-Natal

The Department has issued an instruction that it would assume the responsibility of placing textbook orders on behalf of all schools which were found not to be complying with the procurement deadlines.

In these instances, Head-Office has written to District Directors to intervene and progress is updated on a weekly basis to ensure accountability for every school.

The District Offices are to solicit requisitions from the non-complying schools so that orders can be placed centrally on behalf of these schools.

Limpopo

The LDoE had several meetings with all stakeholders to ensure delivery deadlines for the 2018 academic year are met. Service Level Agreements have been signed with publishers/stationery

manufacturers and SAPO, the appointed delivery agent responsible for textbook distribution in the province.

The LTSM process for the 2018 academic year was communicated in circular S70. Districts have been instructed to do a verification exercise as some schools did not require additional top up textbooks.

Northern Cape

All schools placed orders. Schools are afforded an opportunity until mid-August 2017 to adjust/amend their orders through District Offices.

North West

All outstanding schools are being assisted

Mpumalanga

All schools submitted their orders therefore there was no need for further measures to be in place.

Western Cape

The Circuit Managers have the responsibility to monitor the 144 schools to ensure that textbooks are available to learners. The oversight responsibility resides with the District Directors and Chief Director: Districts.

The Department of Basic Education has obtained the above information as provided by provinces. The Honourable Member is advised to direct questions to provinces for further detail and outstanding information.

05 October 2017 - NW2599

Profile picture: Mashabela, Ms N

Mashabela, Ms N to ask the Minister of Basic Education

When are the application dates (a) opening and (b) closing for the board positions of all entities and councils reporting to her?

Reply:

SACE

The nominations for new Council members:

  1. Will start on 01 February 2021
  2. Close on the 31st May 2021

UMALUSI

Umalusi Council serves a four year term. The current term is from 8 June 2014 to 8 June 2018. The next term will be from 9 June 2018 to 30 June 2022.

Umalusi is working with the Department of Basic Education to:

  1. Advertise the soon-to-be vacant Council positions in October 2017.
  2. With the closing date in November 2017.

05 October 2017 - NW2774

Profile picture: Wilson, Ms ER

Wilson, Ms ER to ask the Minister of Basic Education

With reference to the undertaking by a certain person (name and details furnished) that the building of a school would commence in 2017 and be operational in 2019, (a) what monetary amount has been allocated to the building of the specified school, (b) on what date will (i) construction commence and (ii) the school be opened, (c) what will the capacity of the school be and (d) will it be a primary school or a high school?

Reply:

a)  A budget of R 69 364 000.00 has been allocated for the construction of New Birch Acres Primary School.

b) (i) It is anticipated that construction will commence on 24/10/2017.

(ii) Anticipated opening date for the completed school is 12/01/2019.

c) The capacity of the school is 1 200 leaners.

d) A Primary School.

05 October 2017 - NW2768

Profile picture: Waters, Mr M

Waters, Mr M to ask the Minister of Basic Education

(1)With regard to her reply to question 1571 on 25 September 2014, has the construction of the Esselen Park Primary School commenced; if not, (a) why not and (b) on what date will the construction commence; if so, what is the projected date of completion; (2) whether the commencement dates of construction as stipulated in the specified reply are being moved forward for (a) New Birch Acres Primary School and (b) Clayville Primary School; if so, (i) what are the new commencement dates in each case and (ii) by what dates are both schools expected to open?

Reply:

1. 

(a) No, construction has not commenced due to budgetary constraints.

(b) The current project status is at feasibility stage and the start date is estimated for 01 April 2020 and completion date is estimated for 20 April 2022.

2. 

(a) The estimated start date for the construction of New Birch Acres Primary is 24/10/2017 and the project is on target to commence on the said date.

(b) Construction for Clayville Primary School is estimated to start on 15/02/2020.

(i) Commencement date for New Birch Acres has not changed and for Clayville Primary School start date is 15/02/2020.

(ii) Opening dates cannot be confirmed at this stage; however, the completion dates are estimated for 31 June 2019 for New Birch Acres and 15 May2022 for Clayville Primary School.

Project name

Project Status

Date: Start

Date: Finish

New Birch Acres Primary School

Procurement

24/10/2017

31/06/2019

Clayville Primary School

Project Inception

15/02/2020

15/05/2022

Esselenpark Primary School

Feasibility

01/04/2020

20/05/2022

05 October 2017 - NW2858

Profile picture: Boshoff, Ms SH

Boshoff, Ms SH to ask the Minister of Basic Education

(1)With reference to the alleged sexual abuse of learners at Bothitong High School by their teachers, (a) what is the total number of victims in the cases that the provincial Department of Education is investigating, (b) on what date did the department become aware of the cases, (c) who reported the cases to the department and (d) what is her department doing to improve reporting mechanisms within provinces; (2) have the cases been reported to the SA Council of Educators; if so, on what date were they reported?

Reply:

  1. (a), (b) and (c)

In terms of Section 3(1)(b) of the Employment of Educators Act No 76 of 1998, the Head of the Provincial Department of Education is the Employer of teachers in schools. All disciplinary cases are therefore reported to the respective Employers, as the case may be and the Employer then proceeds with disciplinary actions against the alleged perpetrator. The above-mentioned case has not been reported to the Department of Basic Education (DBE) and we are therefore not able to give the details of the case. The question therefore needs to be directed to the relevant Employer, who is the Head of the Northern Cape Education Department, for details and response to these cases.

(d) The DBE is currently developing improved protocols that communicate in a user-friendly way the steps to be taken by a school community in cases of sexual abuse. Such improved protocols aim to spell out the responsibilities of any adult that becomes aware of any sexual abuse incident involving a child in terms of Section 54 of the Criminal Law (Sexual Offences and Related Matters) Amendment Act No 32 of 2007 in order to expedite charges against the offenders. Furthermore, the DBE has requested all Provincial Departments of Education (PEDs) to submit any reported cases involving a learner and teacher to the DBE on a monthly basis in order to maintain our own data base on case management in the PEDs on the conduct of educators. The data base will comprise cases such as application of corporal punishment, sexual assault and (any other) improper conduct of educators. In managing the data base, the DBE will analyse the reports from the PEDs on a monthly basis, managing the timeframes on dealing with such cases and making follow ups where there are unexplained delays.

The Department will furthermore engage with the SACE to improve their protocols regarding sexual offences with a view to expedite the process of de-registration and striking these teachers off the roll. The SACE will be requested to report on a monthly basis such cases reported to it regarding the conduct of educators and the decision taken on conclusion of the cases to enable the DBE to ensure that the PEDs implement the decisions of the SACE whereby teachers are struck off the roll.

Discussions are envisaged between the Department of Social Development, the SACE and the PEDs to discuss the reporting protocols. The Department of Social Development will be included because of the provision of Section 126 of the Children’s Act No 38 of 2005 which provides for the National Child Protection Register.

2. The DBE cannot confirm if the cases were reported to the SACE since, in terms of Section 26 of the SACE Act No 31 of 2000, the responsibility to do so lies with the PEDs. The question therefore needs to be directed to the relevant Employer for details and response.

04 October 2017 - NW2458

Profile picture: Ndlozi, Dr MQ

Ndlozi, Dr MQ to ask the Minister of State Security

How many current employees of (a) his department and (b) any entity reporting to him worked for the security branch or the Bureau of State Security prior to 1994?

Reply:

The State Security Agency does not profile their members, who are South Africans in their own right. The intergration of statutory and non-statutory members happened back in 1995 when the erstwhile National Intelligence Agency was created in terms of applicable legislation.

04 October 2017 - NW2141

Profile picture: Bara, Mr M R

Bara, Mr M R to ask the Minister of Higher Education and Training

With reference to his reply to question 2439 on 6 December 2016, for each institution awarded a grant by the Local Government Sector Education and Training Authority in the 2015-16 financial year, (a) what was the rand amount awarded to each institution, (b) what qualifications were awarded by each institution and (c) how many students were awarded each type of qualification at each institution?

Reply:

Institution

a) Amount Awarded

Northern Cape Rural TVET College

R 5 072 000.00

Africa Mayibuye Leadership (Pty) Ltd

R 52 150 000.00

African Century Investment

R 8 967 500.00

Alfred Nzo District Muncipality

R 1 751 000.00

Amahlathi Local Municipality

R 97 200.00

Amandla Obusha Developement Centre Cooperatives Ltd

R 900 000.00

Amathole Distric Municipality

R 2 295 000.00

Amavuso Project Primary Development Co-op

R 540 000 00

Artisan Development Academy

R 5 852 700.00

ATCOR

R 540 000.00

Beaufort West District Municipality

R 21 600.00

Bergrivier Local Municipality

R 90 000.00

Better Best Skills Development

R 2 322 500.00

Blouberg Local Municipality

R 3 820 000.00

Bryant Bell & Associates

R 540 000 00

Bushbuckridge Local Municipality

R 744 000.00

Camdeboo Local Municipality

R 250 000 00

Cape Agulhas Local Municipality

R 465 000 00

Cape Peninsula University of Technology

R 4 655 770.65

Cape Town Environmental Trust

R 432 000 00

Cape Winelands District Municipality

R 414 000 00

Central Karoo District Municipality

R 1 143 750 00

Central University of Technology

R 306 767.82

City of Cape Town Metropolitan Municipality

R 3 301 800.00

Coastal KZN TVET College

R 1 440 000.00

College of Cape Town

R 2 754.00

University of Pretoria

R 11 520 000.00

Council for Scientific and Industrial Research

R 5 700 000 .00

Creative Consulting

R 140 000.00

Dingaan Mogonwe Human Resource Dynamics

R 1 800 000.00

Donald Hanneman

R 500 000.00

Dr Pixley Ka Isaka Seme

R 880 000.00

Durban University of Technology

R 104 405.00

E-AET

R 100 320.00

Elective Training Institute Enterprise

R 900 000.00

Elsiemot and Associates

R 129 960.00

Emalahleni Local Municipality

R 384 000.00

Emfuleni Local Municipality

R 2 398 000.00

Empilweni Management Solutions

R 900 000.00

Ethekwini Metropolitan Municipality

R 4 060 000.00

ETS Emergency Training Solutions (Pty) Ltd

R 184 000.00

Fort Hare Trading Solutions

R 1 746 000.00

Free State Provincial Government: Office of the Premier

R 3 651 850.00

Friends for Life

R 250 000.00

Gateway City College

R 6 120 000.00

George Local Municipality

R 900 000.00

Goldfields TVET College

R 8 144.00

Hessequa Local Municipality

R 865 000.00

Ilembe District Municipality

R 194 814.53

Institute of Professional Studies and Service

R 540 000.00

Intsika Yethu Local Municipality

R 162 000.00

Joe Gqabi District Municipality

R 2 089 000.00

Josmap Training Institute

R 250 000.00

Kalideen Management Services

R 560 000.00

Kalwayi NPO

R 4 320 000.00

Kannaland Municipality

R 168 000.00

Kgolo Institute

R 36 000 000.00

Khosithi Training

R 2 520 000.00

Kouga Municipality

R 375 000.00

Langeberg Local Municipality

R 162 000.00

LEPS Training Provider

R 578 700.00

Lesedi Local Municipality

R 1 565 000.00

Life Long ABET Consulting

R 300 000.00

Lovedale Public TVET College

R 3 420 000.00

LP / Joe Gqabi

R 360 000.00

Mahube Training and Development

R 8 100 000.00

Makana Local Municipality

R 552 000.00

Mangosutho University of Technology

R 56 972.00

Maquassi Hills Local Municipality

R 850 000.00

Mass Computer Training and Printers

R 2 160 000.00

Matzikama Local Municipality

R 546 000.00

Mazasa Management Consulting cc

R 320 000.00

MBAT

R 828 000.00

Mbombela Local Municipality

R 1 425 000.00

Mhlontlo Local Municipality

R 360 000.00

Mkhondo Local Municipality

R 948 000.00

Mopani TVET College

R 1 036 800.00

Mossel Bay Local Municipality

R 97 200.00

Mthengenya & Associates (Pty) Ltd

R 965 000.00

Nala Local Municipality

R 540 000.00

National Council for Persons with Physical Disabilities of South Africa (NCPPDSA)

R 900 000.00

National Department of Public Works

R 11 500 000.00

National Economic Education Trust

R 540 000.00

Nelson Mandela Bay Municipality

R 7 724 439.14

Nelson Mandela University

R 2 695 000.00

Networx for Career Development

R 900 000.00

Nkomazi Local Municipality

R 5 560 000.00

Nkonkobe Economic Development Agency

R 1 800 000.00

Nnite Trading Enterprise

R 150 000.00

North West University

R 45 200.00

Northern Cape Rural TVET College

R 68 290 500.00

Ntsangala Business Enterprise (Pty) Ltd

R 230 000.00

Overberg District Municipality

R 45 000.00

Planact

R 138 000.00

PMA (Pty) Ltd

R 3 420 000.00

PMA Holding (Pty) Ltd

R 1 750 000 00

Polokwane Local Municipality

R 2 203 200.00

PTDEV Consulting

R 900 000.00

Qabuka-Vuka Development Trading

R 250 000 00

Re-Ethical Environmental Re-Engineering (KZN) (Pty) Ltd

R 1 980 000.00

Reflections Development Institute

R 10 800 000.00

Regent Business School

R 5 810 000.00

RPL Research Project

R 1 154 592.00

S and T School of Accounting Technicians

R 565 000.00

SAICE Professional Development and Projects

R 6 000 000.00

Sebata Municipal Solutions

R 540 000.00

Seed Entrepreneurship And Business Development

R 250 000.00

South African Council for the Project and Construction Management Professions

R 4 500 000.00

South African Geomatics Institute

R 4 500 000.00

South African Local Government Association

R 19 949 800.00

South African National Council on Alcohol and Drug Dependency

R 7 200 000.00

South African Planning Institute

R 1 800 000.00

South West Gauteng College

R 1 370 000.00

Swellendam Local Municipality

R 324 000.00

Theewaterskloof Municipality

R 55 800.00

Thembisile Hani Local Municipality

R 1 890 000.00

Thobologo Trading Enterprise

R 3 420 000.00

Tshwane University of Technology

R 203 805.74

uMgungundlovu District Municipality

R 6 300 000 00

uMgungundlovu TVET College

R 2 700 000.00

Umhlathuze Municipality

R 860 000 00

Umjindi Local Municipality

R 1 650 000.00

Umshwathi Local Municipality

R 1 430 000.00

University of Fort Hare

R 3 344 521.85

University of Johannesburg

R 7 169 109.00

University of KwaZulu-Natal

R 18 458 494.51

University of Limpopo

R 242 819.85

University of Pretoria

R 6 053 545.00

University of South Africa

R 1 708 275.00

University of Stellenbosch

R 1 161 059.00

University of the Witwatersrand

R 95 873 00

University of Venda

R 292 477 834.00

University of Western Cape

R 239 710.00

University of Witwatersrand

R 22 425 300.00

University of Zululand

R 4 156 375.00

Uthungulu District Municipality

R 101 500 000.00

Vaal University of Technology

R 96 850 000.00

Vezokuhle Youth Development

R 126 000 000.00

Westonaria Local Municipality

R 250 700 000.00

Witzenberg Local Municipality

R 32 400 000.00

Total

R 1 372 983 761.09

Institution

(b) Qualification Awarded

(c) No. of Students

Northern Cape Rural TVET College

AET

106

Africa Mayibuye Leadership (Pty) Ltd

AET

20

 

Traditional Leaders

75

African Century Investment

WIL

97

Alfred Nzo District Municipality

Ward Committee Skills

82

Amahlathi Local Municipality

Apprenticeship

195

Amandla Obusha Development Centre Cooperatives Ltd

Water and Wastewater Treatment Process Operations

9

Amathole District Municipality

Fire and Rescue

60

Amavuso Project Primary Development Co-op

Fire and Rescue

17

Artisan Development Academy

AET

65

ATCOR

Apprenticeship

4

Beaufort West District Municipality

Apprenticeship

36

Bergrivier Local Municipality

Apprenticeship

8

Better Best Skills Development

Apprenticeship

35

Blouberg Local Municipality

Apprenticeship

534

 

Fitting

6

Bryant Bell & Associates

Electrical

1

Bushbuckridge Local Municipality

Carpentry

3

Camdeboo Local Municipality

Bricklaying

2

Cape Agulhas Local Municipality

Welding

2

 

Local Government Accounting

2

Cape Peninsula University of Technology

Roadworks

21

Cape Town Environmental Trust

Road Construction

1

Cape Winelands District Municipality

Welder / Apprenticeship

5

Central Karoo District Municipality

Construction Roadwork

1

Central University of Technology

Construction Roadwork

2

City of Cape Town Metropolitan Municipality

Bursaries

53

 

Bursaries

1

Coastal KZN TVET College

Local Government Accounting

18

College of Cape Town

Bursaries

11

University of Pretoria

Bursaries

17

Council for Scientific and Industrial Research

AET

45

Creative Consulting

Bursaries

2

Dingaan Mogonwe Human Resource Dynamics

Bursaries

1

Donald Hanneman

Project Management

1

Dr Pixley Ka Isaka Seme Local Municipality

Conflict Management

5

 

Monitoring and Evaluation

148

Durban University of Technology

Local Government Councillor Practices

114

E-AET

IT Technology

6

Elective Training Institute Enterprise

Leadership Development

120

Elsiemot and Associates

Bursaries

113

Emalahleni Local Municipality

Bursaries

4

Emfuleni Local Municipality

Bursaries

43

Empilweni Management Solutions

Bursaries

4

Ethekwini Metropolitan Municipality

Bursaries

4

ETS Emergency Training Solutions (Pty) Ltd

Bursaries

18

Fort Hare Trading Solutions

Project Management

11

Gateway City College

Bursaries

126

George Local Municipality

Bursaries

51

Goldfields TVET College

Bursaries

4

Hessequa Local Municipality

Bursaries

139

Ilembe District Municipality

Bursaries

42

Institute of Professional Studies and Service

Bursaries

8

Intsika Yethu Local Municipality

Bursaries

2

Joe Gqabi District Municipality

NCV In Human Resources

314

Josmap Training Institute

N6 In Electrical

173

Kalideen Management Services

Diploma In Public Administration

113

Kalwayi NPO

National Certificate in Municipal Finance

13

Kannaland Municipality

Creative Consulting

22

Kgolo Institute

Research funding

22

Khosithi Training

Research funding

56

Kouga Municipality

Bursaries

6

Langeberg Local Municipality

Administration Management

13

LEPS Training Provider

Administration Management

20

Lesedi Local Municipality

Administration Management

8

Life Long ABET Consulting

Administration Management

43

Lovedale Public TVET College

Bursaries

42

LP / JoeGqabi

Bursaries

9

Mahube training and Development

N6 Electrical

59

Makana Local Municipality

Leadership Development

9

Mangosutho University of Technology

Environmental Practice

26

Maquassi Hills Local Municipality

Bursaries

71

Mass Computer Training and Printers

Bursaries

43

Matzikama Local Municipality

N6 Electrical Engineering

77

Mazasa Management Consulting cc

Plumbing

13

MBAT

Horticulture

3

Mbombela Local Municipality

Road Construction

17

Mhlontlo Local Municipality

Electrical

3

Mkhondo Local Municipality

Fire Fighter

37

Mopani TVET College

Waste Management

26

Mossel Bay Local Municipality

Plumbing

17

Mthengenya & Associates (Pty) Ltd

Bursaries

260

Nala Local Municipality

Environmental Practice

4

National Council for Persons with Physical Disabilities of South Africa

Bursaries

26

National Department of Public Works

Project Management

4

National Economic Education Trust

ICT

9

Nelson Mandela Bay Municipality

ICT

569

Nelson Mandela Metropolitan University

ICT

113

Networx for Career Development

ICT

13

Nkomazi Local Municipality

Middle Management Research

208

Nkonkobe Economic Development Agency

Education and Training Quality Assurance

27

Nnite Trading Enterprise

Education and Training Quality Assurance

865

North West University

Education and Training Quality Assurance

12

Northern Cape Rural TVET College

N6 Human Resources

105

Ntsangala Business Enterprise (Pty) Ltd

Generic Management and Risk

13

Overberg District Municipality

Generic Management and Risk

2

Planact

FET Learnership Development

13

PMA (Pty) Ltd

Project Administration

32

Polokwane Local Municipality

Water Reticulation

365

PTDEV Consulting

Construction Plant Operations

3

Qabuka-Vuka Development Trading

Construction Plant Operations

3

Re-Ethical Environmental Re-Engineering (KZN) (Pty) Ltd

Environmental Practice

13

 

Electrical

39

Reflections Development Institute

Environmental Practice

1

Regent Business School

Environmental Practice

181

RPL Research Project

N6 Corporate Services

3

S and T School of Accounting Technicians

Generic Management and Risk

10

SAICE Professional Development and Projects

Generic Management and Risk

14

Sebata Municipal Solutions

Environmental Management

12

Seed Entrepreneurship and Business Development

OEDTDP

12

South African Council for the Project and Construction Management Professions

Performance Management

16

South African Geometrics Institute

Municipal Finance Management

10

South African Local Government Association (SALGA)

Municipal Finance Management and Admin

141

South African National Council on Alcohol and Drug Dependency

Local Government Councillor Practices

15

South African Planning Institute (SAPI)

Local Government Councillor Practices

13

South west Gauteng College

Municipal Leadership

58

Thembisile Hani Local Municipality

Emergency Service Operations

60

Thobologo Trading Enterprise

Local Economic Developement

211

Tshwane University of Technology

Municipal Finance Management Learnership

28

uMgungundlovu District Municipality

Road Construction

189

uMgungundlovu TVET College

Electrical Engineering

900

Umhlathuze Municipality

Building & Civil Construction

47

Umjindi Local Municipality

Painter & Decorator

1023

Umshwathi Local Municipality

Road Construction

141

University of Fort Hare

Fire & Rescue

2489

University of Free State

ABET Practice

3232

University of Johannesburg

Local Government Councillors

350

University of KwaZulu-Natal

Water and Waste Water Process Control

499

University of Limpopo

Water and Waste Water Process Control

1130

University of Pretoria

N6 Electrical Engineering

193

University of South Africa

N6 Electrical Engineering

1 330

University of Stellenbosch

Municipal Finance Management Learnership

121

 

Public Finance Management Learnership

42

University of the Witwatersrand

Water and Wastewater Learnership

17

University of Venda

Plumbing

113

University of Western Cape

Microsoft Office

32

University of Witwatersrand

Road Construction

21

University of Zululand

Road Construction

37

Uthungulu District Municipality

Municipal Finance Management Learnership

47

Vaal University of Technology

Municipal Finance & Administration

3

Vezokuhle Youth Development

Environmental Practice

66

Westonaria Local Municipality

Supervision of Construction Processes

442

Witzenberg Local Municipality

Municipal Finance & Administration

1 558

TOTAL

21 260

COMPILER/CONTACT PERSONS:

EXT:

 

DIRECTOR – GENERAL

STATUS:

DATE:

QUESTION 2141 APPROVED/NOT APPROVED/AMENDED

Dr BE NZIMANDE, MP

MINISTER OF HIGHER EDUCATION AND TRAINING

STATUS:

DATE: