Questions and Replies

Filter by year

02 August 2018 - NW955

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Public Enterprises

What was the process by which Mervyn Carstens was selected to take up the Alexkor Pooling and Sharing Joint Venture CEO position, specify (a) when the post was advertised, (b) who were the other candidates who applied, (c) who were the other candidates shortlisted or interviewed, (d) who was on the selection panel, and (e) what relevant qualifications Mr Carstens possesses?

Reply:

The response is based on information received from Alexkor SOC Limited.

According to Alexkor, Mr Carstens was appointed by the Board of Alexkor/PSJV following a recruitment process for the position in question. The process was as per the PSJV recruitment and selection process.

(a)

The position was advertised in the Sunday Times on Sunday, 27 May 2012.

(b)

The names of the candidates whom applied for this position have been disclosed to the Department. However, due to the confidential nature of this information, no further details will be disclosed.

(c)

The names of the candidates shortlisted or interviewed have been disclosed to the Department. However, due to the confidential nature of this information, no further details will be disclosed.

(d)

(i)

Mr Reginald Muzariri

Chairperson (at the time)

 

(ii)

Dr Roger Paul

Member of the Board (at the time)

 

(iii)

Prof Viola Makin

Member of the Board (at the time)

 

(iv)

Mr Craig Matthews

Representing the RMC

 

(v)

Mr Willem Diergaardt

Representing the RMC

 

(vi)

Mr Melvin Duckitt

HR Manager (at the time)

   

(e)

According to Alexkor, Mr Carstens’ qualifications:

 

(i)

National Diploma : Human Resources (Vaal University of Technology)

 

(ii)

Industrial Relations Development Programme (University of Stellenbosch).

 

(iii)

The Member is reminded that the decision to appoint would jointly have been taken between Alexkor and the Richtersveld Mining Company (RMC) representatives on the Alexkor PSJV Board.

The Board members who appointed Mr Carstens no longer serves on the Alexkor PSJV Board. The names for the selection panel are detailed in (d)(i) to (vi) above.

Therefore, the current Alexkor PSJV Board is limited in terms of its understanding of the process that led to the appointment of Mr Carstens, which at face value seems to be a deviation from the qualification requirements of the position as advertised. However, the current Alexkor PSJV Board can confirm that Mr Carstens has acquitted himself in line with their expectations in running the PSJV operations. The 30 years’ experience that Mr Carstens has garnered in the industry seems to have stood him well.

Minister: The Department is currently reviewing both the governance and operating model of Alexkor.

 

02 August 2018 - NW2144

Profile picture: Mkhaliphi, Ms HO

Mkhaliphi, Ms HO to ask the Minister of Public Enterprises

(a) What are the details of his plan to deal with the problems regarding the coal independent power producers (IPPs) for Eskom, in particular the fact that Eskom (i) will have to close certain of its own coal plants early to meet the offtake requirements of the coal IPPs, and even earlier in a low greenhouse gas emission scenario and (ii) will be faced with having to sell electricity at very high prices in circumstances where more and more electricity consumers are defecting from the grid and (b) what steps does he intend to take to mitigate the impact on Eskom?

Reply:

According to the information received from Eskom

BACKGROUND

Eskom has not approved the signing of the coal independent power producers (IPPs) agreements. No approval nor instruction has been given by the Department of Public Enterprises to Eskom to sign such agreements.

Eskom understands that all future IPP programmes are on hold until such time as the Integrate Resource Plan (IRP) has been concluded. Eskom provided these IPPs with budget quotations for connection to the grid as is required by the Eskom transmission license, but has made no other allowances for these IPPs in the Eskom production plans and price applications.

(a)(i)(ii)

The impact of new capacity as well as the low greenhouse gas emissions scenario on the electricity system and the Eskom generators must be considered in the development of the IRP. The IRP also considers price impacts.

Eskom will provide comments on the IRP when it is given the opportunity to do so, and any impact on Eskom’s generators, costs and prices to consumers will be addressed in these comments.

(b)

Government together with Eskom and other key stakeholders are in the process of evaluating the socio-economic costs of decommissioning of mines that have reached their end of life. A transitional plan will be developed that will support the integrated Resources Plan (IRP).

02 August 2018 - NW1044

Profile picture: van Wyk, Ms A

van Wyk, Ms A to ask the Minister of Public Enterprises

With reference to the annual reports of Alexkor which indicate that the specified company incurred expenditure amounting to R225 406 938.00 in the 2012-2017 financial years, what value has the company gained by this expenditure?

Reply:

 

The response is based on information received from Alexkor SOC Limited.

The breakdown of the expenditure incurred for Alexkor’s Corporate Head Office amounting to R225 406 938.00 during the period 01 April 2012 to 31 March 2017 is detailed in the table below:

 

SPEND CATEGORY:

AMOUNT

 

1. Bursaries

R    1 687 360

The amounts include Corporate Social Responsibility initiatives as well as bursaries awarded to learners in the field of mining, geology and environmental management

2. Corporate Costs

R   47 442 391

Salaries of employees and head office operational costs

3. Mining Operations

R   14 846 968

Alexkor SOC Limited was mining in Alexander Bay prior to the PSJV being established, in terms of the Deed of Settlement. Hence the mining operations cost of R14.8m. Related revenue against the Mining operating cost was R27.4m

4. Town Maintenance

R   85 988 049

The DoS directed that once the township had been established, the municipal engineering services are to be upgraded and Alexkor is to hand over the municipal services to the Alexander Bay Municipality; however, that has not yet occurred. Alexkor has assumed the responsibilities to maintain the Township of Alexander Bay as if they are a municipality.

5. Discontinued Operations and Other

R     9 735 795

The discontinued operating cost of R9.7 million relates to the cost of transferring the farming operations to  the community.

6. Environmental Management

R   41 343 822

Implementation of Phase 1  of rehabilitation of historically disturbed areas

 

7. Directors Remuneration

R   24 362 554

Fees paid to directors serving on both Alexkor and Alexkor RMC PSJV boards

TOTAL: 

R 225 406 938

 

 

02 August 2018 - NW1204

Profile picture: Kalyan, Ms SV

Kalyan, Ms SV to ask the Minister of Public Enterprises

Whether complaints about certain persons namely Mr Bagus and Ms Kellerman, and also about the appointment of a certain company namely Scarlet Sky Investments were lodged with the Public Protector by a certain person namely Mr Duncan Korabie, and later withdrawn; if so, (2) whether one of the specified persons namely Ms Kellerman was thereafter appointed to do an internal investigation into the affairs of Alexkor; if not, what is the position in this regard; if so, what was the outcome? NW1298E

Reply:

REPONSE BASED ON INFORMATION RECEIVED FROM ALEXKOR SOC LIMITED:

(1)

Alexkor were informed by Mr Korabie about the complaint he lodged to the Office of the Public Protector during 2015.

The complaint was withdrawn by Mr Korabie subsequent to a meeting between DPE and the Alexkor-CPA during November 2015, to allow the Department to investigate the matter internally. The investigation was done by the ARC Committee of the PSJV and the outcomes have been communicated with the Department.

 

(2)

Alexkor is not aware that Ms Kellerman was appointed to investigate the internal matters of Alexkor SOC. However, Ms Kellerman, as Chief Legal Officer at the time was instructed by the then Board of Directors to institute the forensic investigation into allegations made against the then CEO, Mr Percy Khoza. SizweNtsalubaGobodo (SNG) was appointed as an independent entity to conduct the said forensic investigation.

The technical nature of the irregularities were such that it was not obvious to the current Board whether it was appropriate, or not, to initiate any disciplinary action against the CEO. The Board subsequently commissioned Mkhabele Huntley Adekeye Inc. (MHA) to evaluate the SNG report in terms of the possible disciplinary actions available to Alexkor.

The finding of Mkhabele Huntley Adekeye Inc was that the CEO took “a cavalier approach to financial management of the entity, which exposes the entity to risk”. The report continues that: “based on the evidence before us, we are of the view that the Accounting Authority has reasonable prospects of securing a dismissal at arbitration”. The Board considered the Mkhabele Huntley Adekeye Inc reports and decided that a “reasonable” prospect of a successful dismissal was insufficient to warrant further action. Furthermore, the Company had embarked on a restructuring process during which the CEO put himself forward for voluntary retrenchment, which offer the Board accepted, as a simpler and more cost-effective option to disciplinary action.

02 August 2018 - NW1202

Profile picture: Kalyan, Ms SV

Kalyan, Ms SV to ask the Minister of Public Enterprises

Who nominated (a) (i) Mrs H B Matseke, (ii) Mr T Haasbroek, (iii) Ms McMaster and (iv) Mr T Matona for their positions as board members of the Alexkor SOC Ltd. Board and (b) Mr V Bansi for Acting Chief Executive Officer of Alexkor? NW 1296E

Reply:

(a) (i), (ii), and (iv) In terms of the Board appointment process, names of potential candidates for the database may be submitted through various means, including:

  1. Submission by the individual of his or her Curriculum Vitae;
  2. Nomination by another person; or
  3. Application or nomination to the annual advertisement to update the database.

From the records it would appear that there are no specific nominations by another person of Mrs Matseke (Chairperson) and Messrs Haasbroek, Matona and Bansi, respectively. These names came through the Ministry during the Board review process. They were appointed as Non-executive Directors (NEDs) of the Board of Alexkor by former Minister of Public Enterprises, Ms Lynne Brown, at a Special General Meeting held on 14 August 2015. The appointments (with the exception of Ms McMaster who was never appointed as a Director to the Alexkor Board), were done in accordance with clause 13.2 of the Alexkor Memorandum of Incorporation (MOI) which provides that the Shareholder (the Minister of Public Enterprises) shall appoint the Directors of the Company, as well as in accordance with terms 13.11 of the Alexkor MOI which provides for the rotation of Directors and the filling of vacancies on the Alexkor Board.

Ms Matseke was appointed as Chairperson and NED of the Board, while Messrs Haasbroek, Matona and Bansi, respectively were appointed as NEDs at the SGM with effect from 14 August 2015, for a period of three years, subject to annual review by the Minister.

(iii) Ms McMaster was not appointed as a Director to the Alexkor Board.

(b) Following the resignation of former Chief Executive Officer (CEO), Mr Percival (Percy) Khoza, during the Company’s restructuring process in February 2016, Mr Bansi was recommended by the Board and supported by the then Minister to Act as CEO and ex-officio Director of the Board of Alexkor on 1 March 2016, until such time that a permanent CEO was appointed by the Company. Mr Bansi subsequently submitted his resignation as Acting CEO, ex officio, to the Board effective 6 November 2017, before the new CEO took up office. At the time, Mr Bansi had indicated that he is not available for re-election as NED of the Board going forward.

02 August 2018 - NW1043

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Public Enterprises

Who appointed (a) Mrs Matseke, (b) Mr Trevern Haasbroek, (c) Ms McMaster, (d) Mr Tshediso Matona and (e) Mr Bansi for their positions on the Alexkor Board?

Reply:

(a), (b), (d) and (e) Mrs Matseke, together with Messrs Haasbroek, Matona and Bansi were four of six new Non-Executive Directors (NEDs) appointed to the Board of Alexkor at a Special General Meeting (SGM) held on 14 August 2015, by former Minister of Public Enterprises, Ms Lynne Brown. The appointments were done in accordance with clause 13.2 of the Alexkor Memorandum of Incorporation (MOI) which provides that the Shareholder (the Minister of Public Enterprises) shall appoint the Directors of the Company from time to time and in so doing shall endeavour to ensure that the Board shall be appropriately balanced in terms of executive and non-executive Directors, with the majority being non-executive, and shall be representative of gender and race demographics, on the grounds of their collective knowledge, experience and appropriate skills.

Furthermore, the appointments were made in terms of clause 13.11 of the Alexkor MOI which provides for the rotation of Directors and the filling of vacancies on the Alexkor Board. The former Alexkor Board was rotated at the Annual General Meeting held on 14 August 2015, with the exception of Ms Z Ntlangula and Dr R Paul who were re-appointed to the Board at the SGM of 14 August 2015.

Ms Matseke was appointed as Chairperson and NED of the Board, while Messrs Haasbroek, Matona and Bansi were appointed as NEDs with effect from 14 August 2015, for a period of three years, subject to annual review by the Minister of Public Enterprises.

(c) Ms McMaster was not appointed as a Director to the Alexkor Board.

02 August 2018 - NW1221

Profile picture: Alberts, Mr ADW

Alberts, Mr ADW to ask the Minister of Public Enterprises

(1)      With reference to the appointment of Regiments Capital as investment advisor to the Transnet Second Defined Benefit Fund (TSDBF), (a)(i) for what reason(s) did the specified company make payments to Trillion Capital Partners, (ii) what services were rendered in this regard and (iii) what total amount was paid and (b) why did the TSDBF’s Board of Trustees give a blank mandate to Regiments Capital as investment advisor to make investments according to its best judgement on behalf of the TSDBF without consulting the board of trustees; (2) Whether the trustees were authorised to take the specific decision to give such mandate to the company; if not, (3) Whether he has found that their decision was ultra vires; if so, on what legal grounds did they rely in order to take this decision; (4) (a) what are the names of the trustees who (i) voted in favour of the appointment of the company as investment advisor and (ii)(aa) are currently and/or (bb) were previously directors on the Transnet Board and (b) what role did the Transnet Board play in appointing Regiments Capital as the investment advisor of the TSDBF; (5) Whether he will make a statement on this matter? NW1317E

Reply:

This response is according to information received from the SOC:

(1)(a)(i) As per invoices received "Transaction Fees".

(1)(a)(ii) According to Regiments these payments were made for services rendered during the structuring of the transaction. It was found by

the TSDBF that no such fees were payable separately from the fee and cost structure agreed in the original investment management

mandate agreement and as such not allowed.

(1)(a)(iii) R 228millon.

(1)(b) The TSDBF Board of Trustees appointed Regiments Capital in terms of a detailed duly legal and approved investment agreement.

No blank mandate was given (supporting documents attached).

(2) The decision of the Trustees was in terms of the authority vested in terms of the Rules of the TSDBF.

(3) The decision of the Board of Trustees was not ultra vires but in terms of the authority vested in The Rules of the Fund.

(4)(a)(i) H Gazendam, Y Forbes, E Tshabalala,R Louw, V Naidoo,

C Fichardt, J Benwell, M Myburgh, J Grobler.

(4)(ii)(aa) No current directors of Transnet.

(4)(bb) H Gazendam,Y Forbes, E Tshabalala

(4)(b) The Transnet Board did not play any role in appointing Regiments

Capital as the investment advisor of the TSDBF.

(5) N/A

Minister: the dubious and problematic role of Regiments, Trillion and other entities in the state capture process will be investigated further by the respective SOC Boards – and presumably by the Zondo Commission.

01 August 2018 - NW1752

Profile picture: Breytenbach, Adv G

Breytenbach, Adv G to ask the Minister of Justice and Correctional Services

What number of (a) parole applications for inmates serving (i) life sentences and (ii) other sentences became due for consideration in each year since 1 January 2004, (b) the specified applications for parole that became due were considered by parole boards in each case in each specified year, (c) the specified parole applications considered by the parole boards were sent to the Minister of Justice in each specified year and (d) the specified parole applications sent to the Minister of Justice were granted in each year?

Reply:

(a)(i): The statistics of 01 January 2004 are not readily available because there was no system in place to record information. Manual count will have to take place and this will take time. For the purpose of this question (a)(i) our statistics will commence from 2011. A hand system was implemented to manage the offenders sentenced to Life imprisonment as the Admission and Release System (A&R System) of the Department was not configured to provide necessary information to manage caseloads.

Offenders sentenced to life imprisonment due for consideration:

Qualifying Year

Total expected

2006

93

2007

108

2008

82

2009

78

2010

115

2011

617

2012

661

2013

856

2014

932

2015

930

2016

566

Total

5038

 

(a)(ii): The Admission and Release System (A&R System) of the Department was not configured to provide information on determinate sentences however, the Department of Correctional Services is developing and piloting an Integrated Inmate Management System (IIMS) that will replace the A & R System. This will, among others, enable the DCS to manage the admission and release of offenders in an integrated manner.

(b): The following statistics of offenders sentenced to life imprisonment were manually kept by the Department.

Applications considered by Parole Boards

2011

420

2012

104

2013

172

2014

285

2015

252

2016

419

2017

1391

2018

915

Total

3958

(c): Offenders sentenced to life imprisonment considered by the Parole Boards and forwarded for Minister’s attention:

Applications considered by Parole Board and forwarded to Minister:

 

2011

397

2012

68

2013

164

2014

243

2015

202

2016

162

2017

1336

2018

817

Total

3389

(d): The below statistics indicate that since this Administration came into office there has been a sharp increase in both the number of profiles considered and the number of inmates released on parole. We attribute this success to various interventions that we put in place to ensure that as many as possible offenders who qualify to be considered are indeed considered.

Parole granted by Minister to offenders sentenced to life imprisonment:

2011

130

2012

35

2013

43

2014

81

2015

157

2016

99

2017

256

2018

120

Total

921

01 August 2018 - NW2074

Profile picture: Horn, Mr W

Horn, Mr W to ask the Minister of Justice and Correctional Services

What number of court applications or actions have been instituted against his department concerning (a) victim-offender dialogues and (b) the parole system in each of the past six years?

Reply:

a) The following are details of court applications instituted against the department concerning victim offender dialogues for the past six calendar years:

Period

Total applications

January-December 2012

0

January-December 2013

0

January-December 2014

1

January-December 2015

0

January-December 2016

1

January-December 2017

1

National Total

3

b) The following are details of court applications instituted against the department concerning parole systems for the past six calendar years:

Period

Total applications

January-December 2012

8

January-December 2013

3

January-December 2014

10

January-December 2015

24

January-December 2016

88

January-December 2017

78

National Total

211

01 August 2018 - NW2072

Profile picture: Breytenbach, Adv G

Breytenbach, Adv G to ask the Minister of Justice and Correctional Services

(1)What number of offenders are currently imprisoned by his department in each management area; (2) what number of (a) psychologists, (b) social workers and (c) criminologists are currently employed and/or used by his department in each management area; (3) what are the details of the current backlog in respect of reports awaited from (a) psychologists, (b) social workers, (c) criminologists and (d) victim-offender dialogues regarding persons serving (i) life sentences and (ii) other sentences?

Reply:

1. As on 15 June 2018:

NUMBER OF SENTENCED OFFENDERS PER MANAGEMENT AREA: 15 JUNE 2018

Region

Management Area

Number of Sentenced Offenders

Eastern Cape

Amathole

1763

 

East London

3318

 

Kirkwood

1466

 

Mthatha

2646

 

Sada

2095

 

St Albans

4354

 

Total

15642

Free State/
Northern Cape

Colesberg

682

 

Goedemoed

1835

 

Groenpunt

3752

 

Grootvlei

4163

 

Kimberly

3219

 

Bizza Makhate

3069

 

Upington

925

 

Total

17645

Region

Management Area

Number of Sentenced Offenders

Gauteng

Baviaanspoort

2023

 

Boksburg

2279

 

Johannesburg

4150

 

Krugersdorp

1643

 

Leeuwkop

4013

 

Modderbee

4022

 

Kgoši Mampuru II

5399

 

Zonderwater

2557

 

Total

26086

KwaZulu/Natal

Durban

6026

 

Empangeni

3398

 

Glencoe

889

 

Kokstad

1804

 

Ncome

2126

 

Pietermaritzburg

4853

 

Waterval

2485

 

Total

21581

Limpopo/
Mpumalanga/
North West

Barberton

3124

 

Bethal

2020

 

Belfast

1559

 

Polokwane

1456

 

Thohoyandou

4838

 

Klerksdorp

1873

 

Rooigrond

1699

 

Rustenburg

1888

 

Total

18457

Western Cape

Allandale

1283

 

Brandvlei

1641

 

Drakenstein

1991

 

Southern Cape

1938

 

Goodwood

730

 

Overberg

2145

 

West Coast

1605

 

Pollsmoor

2886

 

Voorberg

2531

 

Breede River

1622

 

Total

18372

(2)(a), (b) and (c)

OCCUPATION

REGION

MANAGEMENT AREA

NATURE OF APPOINTMENT

     

CONTRACT

PERMANENT

TOTAL

a) Psychologists

Eastern Cape

East London

 

2

2

   

Kirkwood

 

1

1

   

Middledrift

1

1

2

   

Sada

 

1

1

   

ST Albans

2

4

6

 

Free State and Northern Cape

Goedemoed

 

1

1

   

Groenpunt

 

1

1

   

Grootvlei

 

2

2

   

Kimberly

 

1

1

   

Kroonstad

 

1

1

   

Upington

 

1

1

 

Gauteng

Baviaanspoort

1

2

3

   

Boksburg

 

4

4

   

Johannesburg

 

5

5

   

Kgosi Mampuru II

1

8

9

   

Krugersdorp

2

2

4

   

Leeuwkop

3

5

8

   

Modderbee

 

2

2

   

Zonderwater

 

2

2

 

Head Office

CDC Incarcerations & Corrections

 

1

1

 

Kwazulu-Natal

Durban

 

3

3

   

Empangeni

 

1

1

   

Kokstad

 

1

1

   

Ncome

 

1

1

   

Pietermaritzburg

1

3

4

 

Limpopo, Mpumalanga and North West

Barberton

 

2

2

   

Klerksdorp

 

1

1

   

Rooigrond

 

1

1

   

Rustenburg

 

1

1

   

Thohoyandou

 

2

2

   

Witbank

1

1

2

 

Western Cape

Allandale

2

1

3

   

Brandvlei

 

2

2

   

Breede Rivier

1

2

3

   

Drakenstein

1

2

3

   

George

1

2

3

   

Goodwood

 

2

2

   

Helderstroom

1

1

2

   

Malmesbury

1

2

3

   

Pollsmoor

1

4

5

   

Voorberg

2

1

3

b) Social Workers

Eastern Cape

East London

2

15

17

   

Kirkwood

1

7

8

   

Middledrift

1

11

12

   

Sada

1

19

20

   

ST Albans

1

21

22

   

Umtata

1

17

18

 

Free State and Northern Cape

Colesberg

1

5

6

   

Goedemoed

1

5

6

   

Groenpunt

1

16

17

   

Grootvlei

 

10

10

   

Kimberly

1

17

18

   

Kroonstad

3

14

17

   

Upington

2

7

9

 

Gauteng

Baviaanspoort

 

9

9

   

Boksburg

2

16

18

   

Johannesburg

2

20

22

   

Kgosi Mampuru II

1

21

22

   

Krugersdorp

1

8

9

   

Leeuwkop

 

14

14

   

Modderbee

 

14

14

   

Zonderwater

1

14

15

 

Head Office

CDC: Incarcerations & Corrections

 

7

7

 

Kwazulu-Natal

RC KZN

 

1

1

   

Durban

1

30

31

   

Empangeni

1

12

13

   

Glencoe

1

5

6

   

Kokstad

1

13

14

   

Ncome

 

9

9

   

Pietermaritzburg

 

19

19

   

Waterval

1

16

17

 

Limpopo, Mpumalanga and North West

Barberton

1

9

10

   

Bethal

1

12

13

   

Klerksdorp

1

10

11

   

Polokwane

3

8

11

   

Rooigrond

1

12

13

   

Rustenburg

1

12

13

   

Thohoyandou

2

11

13

   

Witbank

1

11

12

 

Western Cape

Allandale

1

10

11

   

Brandvlei

 

13

13

   

Breede Rivier

 

12

12

   

Drakenstein

 

13

13

   

George

2

16

18

   

Goodwood

1

5

6

   

Helderstroom

1

10

11

   

Malmesbury

1

11

12

   

Pollsmoor

2

18

20

   

Voorberg

1

14

15

(c)

 

n/a

   

0

GRAND TOTAL

   

70

682

752

(3)(a), (b), (c) and (d) (i) and (ii)

The Admission and Release System was not configured to reflect the requested information. The information is therefore unfortunately not readily available.

01 August 2018 - NW2071

Profile picture: Breytenbach, Adv G

Breytenbach, Adv G to ask the Minister of Justice and Correctional Services

(1)What number of times did the parole boards of each management area meet (a) in each of the past six calendar years and (b) since 1 January 2018; (2) what number of parole applications of persons serving (a) life sentences and (b) other sentences were denied in each management area in each specified calendar year due to (i) files that were not properly compiled by the relevant Case Management Committee, (ii) programmes required by the Correctional Supervision Plan that were not completed in time and/or (iii) reports that expired before the parole boards could consider them; (3) what number of (a) cases were instituted against his department in each management area for delays in the processing of parole applications in each specified calendar year and (b) prisoners were represented in each case? NW2225E

Reply:

(1) Parole Boards have been appointed on a permanent basis at all management areas and schedule sitting continuously in order to deal with cases received from Case Management Committees. Currently there are 52 Parole Boards in the country and each Parole Board determines the frequency and number of sittings according to their operational requirements. Unfortunately, the detail as requested is not centrally available.

(2) (a)(b) (i) and (ii)(iii)

The Admission and Release System (A&R System) was not configured to provide the requested information and it is therefore unfortunately not readily available. However, the Department of Correctional Services is developing and piloting an Integrated Inmate Management System (IIMS) that will replace the A&R System. This will, among others, enable the DCS to manage the admission and release of offenders in an integrated manner.

It is important to note that a quality control mechanism has been implemented by Heads of Centres to ensure that profile reports submitted to Parole Boards comply with the required standards and that files which do not comply are corrected before reaching the Parole Boards. This includes a progress report on the Correctional

Sentence Plan as well as ensuring that reports from professionals are not older than 2 years.

(3)(a)(b) See Annexure 1.

01 August 2018 - NW2073

Profile picture: Breytenbach, Adv G

Breytenbach, Adv G to ask the Minister of Justice and Correctional Services

(1)Whether his department’s victim-offender dialogue programme is a prerequisite for parole applications to be considered; if not, what is the position in this regard; if so, how much weight is given to the victim-offender dialogues when parole applications are considered; (2) what number of (a) further profile dates decisions did he take recommending that a victim-offender dialogue be completed (i) in each of the past six calendar years and (ii) since 1 January 2018, (b) parole applications for persons serving (i) life sentences and (ii) other sentences were granted without a victim-offender dialogue in each year and (c)(i) his department’s officials and (ii) other organisation were available in each management area in each of the specified years to facilitate victim-offender dialogues?

Reply:

1.Victim-offender-dialogue programme is not a prerequisite for consideration of offenders on parole. However it is a crucial element in the rehabilitation process to ensure effective social reintegration with more involvement by victims, families and communities.

(2) (a)(i)(ii) (b)(i)(ii)

The current Admission and Release System (A&R) is outdated and the Department of Correctional Services is developing and piloting an Integrated Inmate Management System (IIMS) that will replace the A & R System. This will, amongst others, enable the DCS to manage the admission and release of offenders in an integrated manner. The A & R System was not configured to reflect the requested information and it is therefore unfortunately not readily available.

(2) (c)(i)(ii)

The department has always used its professionals Social Workers, Psychologist Chaplains and even the external partners to facilitate the Victim-Offender Dialogue (VOD) anytime it is required. VOD forums have been established in management areas to facilitate these VODs. Lastly Social Auxiliary Workers have been contracted from 2015 to assist in the implementation of Restorative Justice (VOM/VOD).

31 July 2018 - NW1665

Profile picture: Majola, Mr TR

Majola, Mr TR to ask the Minister of Small Business Development

What number of cases relating to the Prevention and Combating of Corrupt Activities Act, Act 12 of 2004, as amended, have been referred to the (i) SA Police Service (SAPS) and (ii) Directorate for Priority Crime Investigation (DPCI) by (aa) her department and (bb) each entity reporting to her for further investigation since the Act was assented to and (b) what number of the specified cases have (i) been investigated by SAPS and DPCI, (ii) been followed up by the respective accounting officers and (iii) resulted in a conviction in each specified financial year since 2004?”

Reply:

The Department of Small Business and Development Business Development (DSBD)

(i)(aa) None. The investigations did not conclude recommendations for criminal prosecution.

(ii)(aa) None.

(b)(i) Not applicable.

(b)(ii) Not applicable.

(b)(iii) Not applicable.

The Small Enterprise Development Agency (SEDA)

(i)(bb) Two (2) cases were reported to the South African Police Service (SAPS). There are additional two (2) cases that management still needs to implement the recommendations and open criminal cases with the SAPS.

(ii)(bb) None.

(b)(i) With regard to the two (2) cases reported to the SAPS, internal investigations concluded and recommendations have been given to management for implementation and improvement of the control environment. Further investigations are continuing with the SAPS.

(b)(ii) Refer to (b)(i).

(b)(iii) Refer to (b)(i).

The Small Enterprise Finance Agency (SEFA)

(i)(bb) Eight (8) Criminal cases of fraud have been opened by SEFA since its establishment in April 2012. These have been opened with the SAPS and investigated by the Commercial Crimes Unit.

(ii)(bb) None.

(b)(i) Eight (8) Criminal cases of fraud have been opened by SEFA.

(b)(ii) On-going follow-up is done with the Commercial Crimes Unit through SEFA’s Internal Audit Department.

(b)(iii) To date, there have been no convictions in relation to the cases opened.

30 July 2018 - NW2176

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

Whether his department is building any new (a) clinics and/or (b) hospitals; if so, (i) where will each clinic and/or hospital be built, (ii) by what date will each be completed and (iii) what will be the budget allocation for each planned clinic and/or hospital?

Reply:

Please refer to the attached Annexure 1 for the response to the question.

END.

30 July 2018 - NW2177

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

Whether his department is planning to build any new (a) clinics and/or (b) hospitals; if not, why not; if so, (i) where will each clinic and/or hospital be built, (ii) by what date will each be completed and (iii) what is the budget to be allocation for each clinic and/or hospital that will be constructed?

Reply:

Please refer to the attached Annexure 1 for details in this regard.

END.

30 July 2018 - NW1620

Profile picture: Kopane, Ms SP

Kopane, Ms SP to ask the Minister of Health

What (a) is the name of each (i) clinic, (ii) hospital and (iii) community health centre in each province that is earmarked for refurbishment and/or revitalisation in the 2018-21 Medium-Term Expenditure Framework, (b) are the details of any new medical equipment that will be procured and (c) are the relevant details of the upgrades in each case?

Reply:

The attached Annexure 1 reflects the details in this regard.

END.

30 July 2018 - NW993

Profile picture: Mazzone, Ms NW

Mazzone, Ms NW to ask the Minister of Public Works

How much land does (a) his department and (b) the entities reporting to him (i) own, (ii) have exclusive rights to and/or (iii) lease from the State to (aa) use and/or (bb) occupy?

Reply:

(a) (i) and (ii)

The National Department of Public Works (NDPW) has got 29 322 land parcels in its custodianship as at 31 March 2017 (as per the number of immovable assets disclosed for the 2016/17 financial year, in terms of the State Land Disposal Act, 1961 (Act No. 48 of 1961) and the Government Immovable Asset Management Act of, 2007 (Act No. 19 of 2007)).This implies that NDPW has exclusive rights over these land parcels.

(iii) (aa) and (bb)

In terms of the protocol applied by the NDPW, all property that is not owned by the Department is occupied by virtue of a lease agreement with a third party that owns the property. In this regard, the NDPW leases a total of 215 properties from other State organs in the various spheres of Government, as listed below:

  1. Government departments (both national and provincial): 18
  2. District and Local Municipalities: 159
  3. Metropolitan Municipalities: 38

All the properties are occupied and used by various client departments of the NDPW.

(b)

IN RESPECT OF THE ENTITIES REPORTING TO THE MINISTER OF PUBLIC WORKS:

Entity Name

Own

(ii)

have exclusive rights to

(iii)

lease from the State

(aa)

(iii)(bb)

Agrément South Africa (ASA)

None

Lease agreement with the Council for Scientific and Industrial Research (CSIR), lease the whole second floor of Building 17B, CSIR Campus, two offices on the ground floor of Building 17B, CSIR Campus, and the test site.

Lease agreement with the CSIR, to lease the whole second floor of Building 17B, CSIR Campus, including two offices on the ground floor of Building 17B, CSIR Campus, and the test site.

Agrément South Africa as per the signed lease agreement on 21 February 2018, with the CSIR, lease the whole second floor of Building 17B, CSIR Campus, two offices on the ground floor of Building 17B, CSIR Campus, and the test site. Plans and lease agreements are available on request.

Council for the Built Environment (CBE)

None

None

None

None

Construction Industry Development Board (CIDB)

None

None

Lease their Head Office and Gauteng Provincial Office from the South African Bureau of Standards, an entity of the Department of Trade and Industry.

Occupy premises provided by the Provincial Department Public Works in each province (Mpumalanga/ Nelspruit, Limpopo/ Polokwane, North West/ Mahikeng, Free State/ Bloemfontein, KwaZulu-Natal/ Durban, Eastern Cape/ Bhisho, Western Cape/ Cape Town and Northern Cape/ Kimberley).

Independent Development Trust (IDT)

Head office Pretoria

6000 sqm Building

None

None

None

 

30 July 2018 - NW1545

Profile picture: Mbhele, Mr ZN

Mbhele, Mr ZN to ask the Minister of Police

What is the total number of firearms that (a) are currently registered in the Central Firearm Register (CFR) and (b) were registered on the CFR as at (i) 31 December 1994, (ii) 31 December 1996, (iii) 31 December 1998, (iv) 31 December 2000, (v) 31 December 2002, (vi) 31 December 2004 and (vii) 31 December 2006?

Reply:

(a) The total number of firearms that are currently registered in the Central Firearm Register (CFR), is 5 567 706.

(b)(i) to (v) The requested data is not available for the period, 1994 to 2002. Prior to 1994, South Africa was divided into different states, namely South Africa, Transkei, Bophuthatswana, Venda and Ciskei. All these territories had their own separate firearm registration systems. In South Africa, the firearm licencing process was the responsibility of the Department of Home Affairs (DHA), up until 1994.

After the assumption of the firearm licencing process, by the South African Police Service (SAPS), in 1994, a new system called the Firearm Register System, was introduced. However, information received from the DHA was in a form of a spreadsheet, called a "data dump" and there was no application linked to a specific firearm. Therefore, the current Enhanced Firearm Register System (EFRS), does not contain records for the period, 1994 to 2002.

(b)(vi) The total number of firearms that were registered in the CFR, as at 31 December 2004, was 3 237 987.

(b)(vii) The total number of firearms that were registered in the CFR, as at 31 December 2006, was 3 352 728.

Reply to question 1545 recommended

GENERAL NATIONAL COMMISSIONER: SOUTH AFRICAN POLICE SERVICE
KJ SITOLE (SOEG)
Date:

Reply to question 1545 approved

MINISTER OF POLICE
BH CELE, MP
Date: 27/07/2018

30 July 2018 - NW1819

Profile picture: Cassim, Mr Y

Cassim, Mr Y to ask the Minister of Health

(1)Whether (a) his spouse and/or (b) an adult family member accompanied him on any official international trip (i) in each of the past five financial years and (ii) since 1 April 2018; if not, what is the position in this regard; if so, what (aa) is the name of the person(s), (bb) was the (aaa) purpose and (bbb) destination of the trip and (cc) was the (aaa) total cost and (bbb) detailed breakdown of the costs of the accompanying person(s) to his department; (2) whether each of the specified trips were approved by the President in terms of the provisions of Section 1, Annexure A of the Ministerial Handbook; if not, why not; if so, what are the relevant details?

Reply:

(1) I took a total of 49 international trips in the past five financial years.

a) I travelled with my spouse, Mrs TD Motsoaledi on four of the 49 trips mentioned above. One of these four trips was a fully sponsored trip by the host.

b) None

The table below presents a summary of the trips on which I was accompanied by my spouse.

Purpose of trip

Destination

Total Cost to Dept

Breakdown of cost

     

Air ticket

Daily allowance

2013 International Symposium for Design and Health

Doha, State of Qatar

None, the trip was fully paid for by the hosts who invited me to to attend the Symposium

R63 381-00

R6 352-00

Celebration of Diplomatic relations between China and SA

World Economic Forum Annual meeting of the New Champions 2014

Tiajin, People's Republic of China

R57 340-47

R51 496-00

R5 844-47

4th meeting of the BRICS Health Ministers

Brasilia, Brazil

R74 038-20

R69 537-39

R4 500-81

Stop TB Partnership Board retreat, meeting and other activities

Paris, France

R71 758-58

R64 996-72

R6 761-86

TOTAL

 

R203,137.25

   

(2) Yes, each of the specified trips were approved by the President in terms of the provisions of Section1, Annexure A of the Ministerial Handbook.

END.

30 July 2018 - NW1224

Profile picture: Groenewald, Dr PJ

Groenewald, Dr PJ to ask the Minister of Cooperative Governance and Traditional Affairs

(1)With reference to the reply to question 2435 on 13 November 2017, whether his department has received the information; if not, (a) why not and (b) by what date will the information actually be available; if so, what number of tribal chiefs is currently recognised by the Government as traditional leaders; (2) what amount has each specified tribal chief received in remuneration in each year since 1 January 2012; (3) (a) what (i) movable and (ii) immovable benefits did each specified tribal chief reveived in each specified year and (b) what did the costs amount to in each case; (4) whether he will make a statement on the matter?

Reply:

The Honourable Member is requested to note that the Department has not received the said information from provinces. However, a reminder to submit the outstanding information on movable and immovable benefits with the associated costs that each senior traditional leader and king received was forwarded to the Kwa-Zulu Natal, Limpopo and Mpumalanga Provinces. The information will be provided to the Honourable Member as soon as it becomes available.

30 July 2018 - NW1313

Profile picture: Groenewald, Dr PJ

Groenewald, Dr PJ to ask the Minister of Cooperative Governance and Traditional Affairs

(1) Whether, with reference to the reply to question 3725 on 15 December 2017, his department has received the information; if not, (a) why not and (b) on what date the information will be available; if so, (2) what number of dwellings in the Lehurutshe area in North West currently (a) have running water, (b) have flush toilets and (c) still have pit toilets; (3) what steps does his department take in order to improve the conditions of residents in the specified area; (4) Whether he will make a statement on the matter?

Reply:

The information requested by the Honourable Member is not readily available in the Department. However, the Department has engaged the Municipality to obtain the relevant information. The information will be submitted to the Honourable Member as soon as it is available.

30 July 2018 - NW1920

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

(1)What (a) is the total number of incidents of sexual harassment that were reported to the human resources offices of entities reporting to him in (i) 2016 and (ii) 2017 and (b) are the details of each incident that took place; (2) was each incident investigated; if not, why not in each case; if so, what were the outcomes of the investigation in each case?

Reply:

Entity

(1)(a)

(b)

(2)

National Health Laboratory Service

(i) 2016

1

The case involves a male supervisor who gave a lift to one of the junior female staff members after they had completed their shift. The supervisor was alleged to have made inappropriate comments to the lady colleague and also wanted to touch her inappropriately. The matter was reported and the supervisor was subsequently charged and dismissed. He then referred his matter to the CCMA for adjudication. The CCMA ruled in his favour and the NHLS applied to the Labour Court to have the matter reviewed and set aside.

After the matter was reported there was an investigation conducted which led to the conclusion that there was a case to be answered hence the supervisor was charged and dismissed from the NHLS.

 

(ii) 2017

1

The case involves a senior manager who is alleged to have shown two junior staff members an inappropriate explicit picture of a pornographic nature. The manager concerned was charged and subjected to a disciplinary enquiry and the matter is still ongoing.

The Matter was investigated and also referred to a disciplinary enquiry as a result of the recommendation from the investigation. This was after prima facie evidence was unearthed.

Council Medical Schemes

(i) 2016

None

None

None

 

(ii) 2017

None

None

None

Office of Health Standards Compliance

(i) 2016

None

None

None

 

(ii) 2017

None

None

None

South African Medical Research Council

(i) 2016

None

None

None

 

(ii) 2017

None

None

None

END.

30 July 2018 - NW1225

Profile picture: Groenewald, Dr PJ

Groenewald, Dr PJ to ask the Minister of Cooperative Governance and Traditional Affairs

(1)With reference to the reply to question 2434 on 13 November 2017, whether his department has received the information; if not, (a) why not and (b) by what date will the information be available; if so, (i) what number of kings is currently recognised by the Government as traditional leaders, what is the name of (i) each king and (iii) over which tribe does each specified senior traditional leader rules; (2) what amount has each specified tribal chief received in remuneration in each year since 1 January 2012; (3) (a) what (i) movable and (ii) immovable benefits each specified senior traditional leader received in each specified year and (b) what was the costs amount to in each case; (4) whether he will make a statement on the matter?

Reply:

The Honourable Member is requested to note that the Department has not received the said information from provinces. However, a reminder to submit the outstanding information on movable and immovable benefits with the associated costs that each senior traditional leader and king received was forwarded to the Kwa-Zulu Natal, Limpopo and Mpumalanga Provinces. The information will be provided to the Honourable Member as soon as it becomes available.

30 July 2018 - NW2178

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

What is the total number of babies that were born at each (a) clinic and/or (b) hospital in the country in 2017?

Reply:

a) The total number of babies born in clinics during 2017 were 34,992;

b) The total number of babies born in hospitals during 2017 were 778,720.

END.

30 July 2018 - NW2019

Profile picture: Mhlongo, Mr TW

Mhlongo, Mr TW to ask the Minister of Health

(1)What are the details of the (a) number of accidents that vehicles owned by his department were involved (i) in each of the past three financial years and (ii) since 1 April 2018, (b) cost for repairs in each case and (c)(i) number of and (ii) reasons for vehicles being written off in each case; (2) whether all vehicles owned by his department have tracking devices installed?

Reply:

1. (a) (i) Please note that the following details pertain to fleet vehicles rented by the Department, i.e they are not wholly owned by the Department. The Department only pays for excess fee in the event of accidents and damages.

  • One hundred and ten (110) accident damages occurred involving departmental rented vehicles for the financial year 2015/16;
  • Eighty-nine (89) accident damages occurred involving departmental rented vehicles for the financial year 2016/17;
  • One hundred and thirty (130) accident damages occurred involving departmental rented vehicles for the financial year 2018/18.

(ii) No accidents occurred involving departmental rented vehicles since 1 April 2018.

(b) - Insurance excess fee for the financial year 2015/16: R147,518.35

- Insurance excess fee for the financial year 2016/17: R139,897.96

- Insurance excess fee for the financial year 2017/18: R217,455.25

- Insurance excess fee for the period since 1 April 2018: R36,346.96

(c) (i) The details are as follows:

  • One (1) accident occurred involving rented departmental vehicle for the financial year 2015/16;
  • Two (2) accidents occurred involving rented departmental vehicle for the financial year 2016/17;
  • One (1) accident occurred involving rented departmental vehicle for the financial year 2017/18;
  • Twenty-four (24) accidents occurred involving rented departmental vehicle since 1 April 2018.

(ii) Supposedly beyond economical repair for the financial years: 2015/16; 2016/17 and 2017/18. No vehicles were written-off since 1 April 2018.

2. Yes, all rented departmental vehicles are fitted with tracking devices.

END.

30 July 2018 - NW2061

Profile picture: Groenewald, Dr PJ

Groenewald, Dr PJ to ask the Minister of Police

(1) What number of applications for the renewal of firearm licences has been received (a) in the (i) 2015, (ii) 2016 and (iii) 2017 calendar years and (b) since 1 January 2018; (2) what number of firearm licences have currently expired for which no renewal applications for licences have been received; (3) what number of applications for the renewal of firearm licences were submitted after the three months before the due date in each abovementioned year; (4) what number of applications for the renewal of such licences longer than three months after its expiry date were (a) approved and (b) rejected; (5) whether he will make a statement on the matter? NW2215E

Reply:

(1)(a)(i)(ii)(iii) and (b) The total number of applications received, for the renewal of firearm licenses, per financial year, is as follows:


Renewals (individuals and institutions)
 

(a)(i)

(a)(ii)

(a)(iii)

(b)

2014/2015

2015/2016

2016/2017

2017/2018

April to May 2018

48 724

128 419

124 807

76 995

13 338

 

 

(2) A total of 377 027 firearm licences have currently expired, for which no renewal applications for licences have been received.

(3) No applications for the renewal of firearm licences were submitted, after the three months before the due date, in each of the above-mentioned years.

(4)(a)(b) None.

(5) The Minister will determine, whether to make a statement or not:


Original signed MAJOR GENERAL

ACTING DIVISIONAL COMMISSIONER: VISIBLE POLICING

MJ MAMOTHETI

Date: 4 July 2018

Reply to question 2061 recommended

 

Original signed LIEUTENANT GENERAL

DEPUTY NATIONAL COMMISSIONER: POLICING

SFMASEMOLA

Date: 16 July 2018

 

Reply to question 2061 recommended/


GENERAL NATIONAL COMMISSIONER: SOUTH AFRICAN POLICE SERVICE
KJ SITOLE (SOEG)
Date
: 23/07/2018

Reply to question 2061 approved


MINISTER OF POLICE
BH CELE, MP
Date
: 27/07/2018
 

30 July 2018 - NW1474

Profile picture: Schmidt, Adv H

Schmidt, Adv H to ask the Minister of Labour

(1) Whether , with reference to the reply of the President, Mr CM Ramaphosa ,to the debate on the State of the Nation Address on the 22 February 2018 to implement lifestyle audits, (a) she, (b) senior management service members in her department and /or (c) any of the heads of entities reporting to her have undergone a lifestyle audit in the past three financial years; if not , have any plans been put in place to perform such audits; if so, in each case, what are the details of the (i) of the lifestyle audit, (ii) name of the person undergoing the audit, (iii) auditing firm conducting the audit and (iv) outcome of the audit ; (2) (whether she will furnish Adv. HC Schmidt with copies of the lifestyle audit reports?

Reply:

Government Policy prohibits Government Officials from doing business with the Government.

The Public Service Commission is responsible to investigate whether that is happening. Therefore the Honourable Member should refer the matter accordingly.

30 July 2018 - NW1223

Profile picture: Groenewald, Dr PJ

Groenewald, Dr PJ to ask the Minister of Cooperative Governance and Traditional Affairs

(1)With reference to the reply to question 2436 on 13 November 2017, whether his department has received the information; if not, (a) why not and (b) by what date will the information be available; if so, what number of senior traditional leaders is currently recognised by Government as senior traditional leaders; (2) what amount has each senior traditional leader received in remuneration in each year since 1 January 2012; (3) (a) what (i) movable and (ii) immovable benefits did each senior traditional leader receive in each specified year and (b) what did the costs amount to in each case; (4) whether he will make a statement on the matter?

Reply:

The Honourable Member is requested to note that the Department has not received the said information from provinces. However, a reminder to submit the outstanding information on movable and immovable benefits with the associated costs that each senior traditional leader and king received was forwarded to the Kwa-Zulu Natal, Limpopo and Mpumalanga Provinces. The information will be provided to the Honourable Member as soon as it becomes available.

30 July 2018 - NW1949

Profile picture: Khawula, Ms MS

Khawula, Ms MS to ask the Minister of Health

What number of paramedics employed by his department are stationed in each district municipality in the North West?

Reply:

The following table reflects the details in this regard, according to the North West Provincial Department of Health

       

Filled Post – Paramedics (April 2018)

 

BASIC LIFE UPPORT

INTERMEDIATE LIFE SUPPORT

EMERGENCY CARE TECHNICIAN

PARAMEDICS

Grand Total

North West

360

105

97

1

563

Dr. Kenneth Kaunda

77

26

27

0

130

Ngaka Modiri Molema

88

20

38

0

146

Dr. Ruth Segomotsi Mompati

88

18

14

1

121

Bojanala

107

41

18

0

166

Grand Total

360

105

97

1

563

END.

30 July 2018 - NW2049

Profile picture: Moteka, Mr PG

Moteka, Mr PG to ask the Minister of Health

What number of paramedics employed by his department are stationed in each district municipality in Mpumalanga?

Reply:

The table below is the list of operational Emergency Care personnel that are employed in the Health Districts of Mpumalanga Province. The number of Paramedics per district is highlighted in bold.

MPUMALANGA

BASIC AMBULANCE ASSISTANT

AMBULANCE EMERGENCY ASSISTANT

PARAMEDIC

EMERGENCY CARE TECHNICIAN

EMERGENCY CARE PRACTITIONER

TOTAL

Nkangala

208

58

9

7

0

282

Ehlanzeni

240

44

2

4

2

292

Gert Sibande

240

63

3

5

0

311

TOTAL

688

165

14

16

2

885

END.

30 July 2018 - NW1546

Profile picture: Mbhele, Mr ZN

Mbhele, Mr ZN to ask the Minister of Police

What is the total number of private firearm owners that were registered in the Central Firearm Register in each specified year (details furnished)?

Reply:

The requested data is not available, for the period 1994 to 2002.

Prior to 1994, South Africa was divided into different states, namely South Africa, Transkei, Bophuthatswana, Venda and Ciskei. All these territories had their own separate firearm registration systems. In South Africa, the firearm licencing process was the responsibility of the Department of Home Affairs (DHA), up until 1994.

After the assumption of the firearm licencing process, by the South African Police Service (SAPS), in 1994, a new system called the Firearm Register System was introduced. However, the information received from the DHA, was in a form of a spreadsheet, called a "data dump" and there was no application linked to a specific firearm. Therefore, the current Enhanced Firearm Register System (EFRS), does not contain records for the period, 1994 to 2002.

The number of private firearm owners, registered in the Central Firearm Register CFR), in the specified years, is as follows:

Specified period

Number of private firearm owners

31 December 2004

903 481

31 December 2006

925 285

31 December 2008

969 560

31 December 2010

1 069 077

31 December 2012

1 337 280

31 December 2014

1 425 822

31 December 2016

1 586 279

 


Reply to question 1546 recommended

GENERAL NATIONAL COMMISSIONER: SOUTH AFRICAN POLICE SERVICE
KJ SITOLE (SOEG)
Date:23-07-2018

Reply to question 1546 approved


MINISTER OF POLICE
BH CELE, MP
Date: 27/07/2018

30 July 2018 - NW1790

Profile picture: Kopane, Ms SP

Kopane, Ms SP to ask the Minister of Health

Whether the Free State department of health has embarked on a tender process to outsource ambulance services to private ambulance service providers; if so, (a)(i) why has the provincial department done so and (ii) has he found that the tender is not in contravention of national policy and (b) what are the further relevant details in this regard?

Reply:

The Free State Department of Health embarked on a tender process to procure services for Inter Facility ambulance services in order to augment the current Provincial EMS inter facility services within the Province.

The Province took the decision because of shortage of Intermediate and Advance life support staff within the Province that could be deployed on obstetric and critical ambulance inter-facility services.

Since the whole private ambulance matter in the Free State and North West is under investigation by National Treasury, we will have to wait for the findings of the investigation, to arrive at a well informed conclusion.

END.

30 July 2018 - NW1789

Profile picture: Kopane, Ms SP

Kopane, Ms SP to ask the Minister of Health

(1)Whether the North West department of health has ever spent any Comprehensive HIV and AIDS Conditional Grant funds on the procurement of ambulance services; if not, what is the position in this regard; if so, (a) why, (b) in which financial year(s) was the conditional grant used to procure ambulance services, (c) which ambulance services were procured, (d) at what costs to the provincial department and (e) what are the terms of the contract in each case; (2) whether the provincial department paid the invoices of Buthelezi Emergency Medical Services in full even though it has been found that the service has been overcharging and that the invoices were not in line with the provisions of the Public Finance Management Act, Act 1 of 1999; if so, what are the relevant details in each case?

Reply:

(1) (a) Money was spent from the Conditional Grant for the Inter Facility Transfer of patients in the province.

(b) In the 2016/17 and the 2017/18 financial years.

(c) The service procured was for inter facility transfers, that is the moving of patients between health facilities.

(d) The ambulance services procured were for inter-facility transfer of patient and for the financial years mentioned above the costs were as 2016/17 - R45,188,078 and 2017/18 - R207,531,593-50 by March 2018 with other invoices submitted by the service provider for payment amounting to R174,064,224-21, however subject to verification. The contract was for the movement of patient from one health facility to the next so that the patient could get a better level of care. This is for the movement of Priority One, two and three patients.

(e) It is an order based contract.

(2) Some of the invoices were paid in full. When invoices were verified it was noted that some were overcharged. An investigation is underway to try to recover the costs.

END.

30 July 2018 - NW1460

Profile picture: Wilson, Ms ER

Wilson, Ms ER to ask the Minister of Basic Education

(1)Whether, with reference to the reply of the President, Mr C M Ramaphosa, to the debate on the State of the Nation Address on 22 February 2018 to implement lifestyle audits, (a) she, (b) senior management service members in her department and/or (c) any of the heads of entities reporting to her have undergone a lifestyle audit in the past three financial years; if not, have any plans been put in place to perform such audits; if so, in each case, what are the details of the (i) date of the lifestyle audit, (ii) name of the person undergoing the audit, (iii) name of the auditing firm conducting the audit and (iv) outcome of the audit; (2) whether she will furnish Ms E R Wilson with copies of the lifestyle audit reports?

Reply:

1. (a) (b) (i) (ii) (ii) and (iv) The Department has taken note following the State of the Nation Address to conduct an audit or implement lifestyle audit starting at Minister and Senior Management level. The Department will engage and work with the law enforcement agency to assist in the lifestyle audit as the Department alone will not have access to review personal information of officials like bank accounts. The fraud risk assessment will be utilised to identify other areas of potential fraud and corruption for the entire Department.

(c) (i) (ii) (ii) and (iv)

SACE RESPONSE:

1.C. No – For the past three financial years, the Council did not conduct lifestyle Audits for its Head or Chief Executive Officer.

  1. N/A
  2. N/A
  3. N/A
  4. N/A

2. The Council will adhere to the directives and guidance of the Accounting authority in this regard.

UMALUSI RESPONSE:

1. (c) The Chief Executive officer of Umalusi has not undergone a lifestyle audit in the past three financial years. Currently there is no plan in place to perform such an audit in the current financial year.

2. Once the lifestyle audit is conducted and finalised the Minister will determine its circulation.

30 July 2018 - NW1931

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Finance

(1)What (a) is the total number of incidents of sexual harassment that were reported to the human resources offices of (i) the National Treasury and (ii) entities reporting to him in (aa) 2016 and (bb) 2017 and (b) are the details of each incident that took place; (2) was each incident investigated; if not, why not in each case; if so, what were the outcomes of the investigation in each case?

Reply:


NATIONAL TREASURY

1. (a) (i) (aa) (bb) Nil

(b) Not applicable

(2) Not applicable.

ASB

No incidents of sexual harassment were reported to the human resources officer in the Accounting Standards Board during 2016 or 2017.

CBDA

CBDA did not have any incidents of sexual harassment reported to the human resources offices.

DBSA

(1) (a) (b) None

(2) N/A

FIC

(1)(a)(ii)(aa)(bb)(b) The Financial Intelligence Centre confirms that there were no reports of

sexual harassment made to its Human Resources business unit.

(2) Not applicable.

FSCA

(1) 1 case.

(2) There was one case of sexual harassment reported during the month of October / November in 2017. An independent Chairperson was appointed to adjudicate the case. It was found that the employee made unsubstantiated allegations against the accused. She referred the matter to the CCMA but subsequently withdrew the case.

GEPF

There has been no incidents of sexual harassment reported.

 

GPAA

Question 1 : In 2016/2017, The following incidents were reported;

1. A female employee at level 6 lodged a grievance against a team leader at level 8.

2. Incident reported on 2/10/2017, where a junior employee at level 6 lodged a grievance against a senior employee acting at level 14.

3. A female employee at level 6 lodged a grievance against a fellow employee at level 5.

Reply to Question 2;

2.1 With regards the first incident, an investigation was conducted, the complainant subsequently withdrew her complain

2.2 Regarding the second incident, an investigation was conducted, the allegations were ruled to be unfounded.

2.3 An investigation was lodged and is still ongoing.

SUMMARY:

  • The total number of reported cases is 3 (Three);
  • All three reported cases were investigated.
  • One (1) case withdrawn by the employee;
  • One (1) case ruled allegations as unfounded;
  • One (1) case, investigation is ongoing.

IRBA

The IRBA hereby declares that no incidents of secual harassment were reported to the human resources office in (aa) 2016 and (bb) 2017.

LAND BANK

There were no incidents of sexual harassment that was reported to the human resources office in 2016 and 2017 at the Land Bank.

FAIS OMBUD

  1. Zero (0)
  2. Not applicable

PFA

No incident of sexual harassment was reported to the human resources office of the OPFA.

PIC

  1. No incedents of sexual harassment were reported at the PIC for 2016 and 2017.
  2. Falls away.

SAA

  1. & (2)

Total number of sexual harassment incidents report to HR in:

2016 = 1

2017 = 4

Details are as follows:

Year

Personnel Area

Matter was investigated

Status

2016

 In-Flight Services

Offender was found guilty of sexual harassment

Offender was dismissed following a disciplinary hearing

2017

Airport Operations

Offender was found guilty of sexual harassment

Offender was dismissed following a disciplinary hearing

2017

Cargo

Alleged offender found not guilty due to inconclusive evidence

Matter closed

2017

In-Flight Services

Offender was found guilty of sexual harassment

Offender was dismissed following a disciplinary hearing

2017

Legal

Alleged offender found not guilty due to inconclusive evidence

Matter closed

SARS

Over the period 2015 to 2017 there have been 3 Sexual Harassment cases reported to the Employer under the auspices of a Grievance process and 6 cases that resulted in a formal disciplinary process.

The tables below contain the list of these cases which includes the details as well as if the matter was investigated and the outcome of these formal cases.

Year

Type

Nature of Case

Details of Incident

Investigated Y/N

Outcome

2016

Grievance

Sexual harassment

1. Defamation of character

2. Emotional abuse

3. Sexual harassment/abuse

Yes

Through the grievance process, the aggrieved employee and the accused managed to resolve the matter on amicable terms.

2016

Grievance

Sexual harassment

Employee alleges that the Executive made advances of a sexual nature towards the aggrieved.

No

The complainant resigned and then lodged a Grievance during her notice period in which the alleged sexual harassment. After serving her notice period she referred the matter to the CCMA as Constructive Dismissal based on Sexual Harassment and Unfair Discrimination. The Award was not in favour of the Complainant.

2016

Grievance

Sexual harassment

Inappropriate comments

Yes

A Grievance Hearing held and the complainant accepted an apology. They agreed to have a respectful working relationship going forward.

Year

Type

Nature of Case

Details of Incident

Investigated Y/N

Outcome / Sanction

2015

Formal Disciplinary Hearing

Sexual harassment

A complainant, being a non-SARS employee, alleged that the SARS employee sexually assaulted the complainant.

Yes

The Presiding Officer found the employee “Not Guilty”

2015

Formal Disciplinary Hearing

Sexual harassment

It was alleged that the employee behaved in an inappropriate sexual manner towards a colleague.

Yes

Dismissal

2015

Formal Disciplinary Hearing

Sexual harassment

It was alleged that the employee behaved and made inappropriate and unwelcomed comments to a subordinate.

Yes

Final Written Warning plus

Suspension Without Pay: 10 Days as an alternative to dismissal

2017

Formal Disciplinary Hearing

Sexual harassment

Employee allegedly committed Sexual Harassment

Yes

The suspension was uplifted and the employee was not charged as the investigation failed to substantiate the allegation of sexual harassment and the credibility of the complainant.

2017

Formal Disciplinary Hearing

Sexual harassment

Making inappropriate sexual comments towards 3 colleagues

Yes

The main complainant requested that SARS resort to the informal disciplinary process as a means of resolving her complaint and that she was not comfortable to give evidence in a disciplinary hearing. Due consideration was given regarding the weight of the totality of the evidence of the main complainant and her colleagues; there were slim possibilities of a guilty finding against the employee. An informal process is currently underway.

2017

Informal Disciplinary Hearing

Sexual harassment

Inappropriate Behavior - Sexual Harassment

Yes

Final Written Warning and a formal referral to Wellness.

SASRIA

Sasria has not had incidents of sexual harassment reported to Human Resources (Human Capital), for the financial years of 2016 and 2017 respectively.

TAX OMBUD

1. (a) Only one incident was reported to the human resources office

(aa) there were no incidents reported in 2016

(bb) Only one incident was reported to the human resources office in 2017

(b) Allegations of sexual harassment were made by a female employee against her male manager. The complaint related to comments allegedly made by the manager to the complainant.

2. The allegations were investigated and a decision was taken to charge the manager. Disciplinary proceedings are in progress.

30 July 2018 - NW1452

Profile picture: Bara, Mr M R

Bara, Mr M R to ask the Minister of Labour

With reference to her reply to question 2167 on 31 October 2016, (a) what was the outcome of the inspection at the Edleen Primary School in Kempton Park, Gauteng, that was scheduled to take place on 30 November 2016 and (b) what defects had been

Reply:

a) Leaking roof, which was subsequently repaired.

 

30 July 2018 - NW1622

Profile picture: Kopane, Ms SP

Kopane, Ms SP to ask the Minister of Health

(1)What (a)(i) are the details of the methodology used by his department to assess the 3 400 public healthcare facilities to determine their functionality, (ii) is the total number of assessors who were involved, (b) criteria were used to identify each facility and (c) are the details of the outcome of the assessment; (2) whether any consultants were used to conduct the assessment; if not, why not; if so, what are the relevant details?

Reply:

1. (a) (i) The functionality of the 3480 public health facilities are assessed using the Ideal Clinic Realisation and Maintenance Tool developed by the department of health as part of the Operation Phakisa Ideal Clinic Laboratory. In preparation for the introduction of National Health Insurance (NHI), the Ideal Clinic programme is setting in place a systematic approach to transform all PHC facilities to meet national standards when inspected by the Office of Health Standards Compliance (OHSC). The National Health Amendment Act (12 of 2013) mandates the OHSC to protect and promote the health and safety of health service users through monitoring and enforcing compliance with prescribed norms and standards[1]. The Ideal Clinic programme is the NDoH’s internal mechanism for ensuring PHC facilities’ compliance with these norms and standards in order to satisfy the needs of South African communities.

A dashboard, using the standard traffic-light colours, was developed. The figure below depicts the arrangement of 32 sub-components under 10 components. The 32 sub-components are further subdivided into 206 elements. The number of elements change on an annual basis as the national team receive feedback from clinical staff and managers on clinic and district level about how to improve the framework. Elements are assigned a green colour when they are fully functional, an orange colour if they are partially functional and corrective actions are under way, and a red colour if the element is absent or non-functional.

 

The elements are assigned a vital, essential or important weight in line with the definitions below.

The table below indicates the scores required per element weight.

Weights

Silver

Gold

Platinum

Vital

(10 elements)

90%

100%

100%

Essential

(86 elements)

70%

80%

90%

Important

(110 elements)

68%

78%

89%

AVERAGE

70%-79%

80%-89%

90%-100%

The Ideal Clinic Realisation and Maintenance (ICRM) Programme follows the PLAN, DO STUDY, Act (PDSA) cycle. The first large scale planning took place in October and November 2014. This in-depth planning in a laboratory setting called “Operation Phakisa Ideal Clinic Lab” resulted in a comprehensive implementation plan. The cycle starts with status determinations by PHC facility managers(April to June) and a re-planning session in May. This is followed by the correction of weaknesses (turning red and orange elements green during July to October). In November district peer reviews are done.

Peer review results are immediately captured on the web based ICRM monitoring software tool for the purpose of result analyses (Study). District scale-up teams then assist clinic managers and staff to turn the remaining orange and red elements to green (December to February). In March peer review updates are done to determine achievement for the financial year. The NDoH receives continuous feedback from managers and staff at provincial, district and facility level about changes required to guidelines, standard operating procedures and systems processes that currently cause bottlenecks. The results are used to plan the implementation for the next year. Planning for the following year includes amendments to the framework resulting in a subsequent version.

(ii) Professionals who do the status determinations through peer reviews are from South Africa's 52 health districts. Every year, since the implementation of the programme, 196 professionals are orientated to do the peer reviews.

(b) In the beginning of each financial year since 2015/2016 to date all fixed primary health care facilities in the country are subjected to status determination (assessment) exercise;

(c) The details of the outcome of the assessment from 2015/2016 to 2017/2018 is as follows

District/ Metro

Total Facilities

2015/16 Ideal Clinics

2016/17 Ideal Clinics

No clinics from 2015 to 2017 that remained Ideal in 2017/18

2017/18 Ideal Clinics

Total Ideal Clinics

% Ideal Clinics

Eastern Cape

771

14

128

93

64

157

20.4

Free State

221

22

49

75

39

114

51.6

Gauteng

367

89

133

200

91

291

79.3

KwaZulu-Natal

600

141

204

303

80

383

63.8

Limpopo

477

27

42

49

72

121

25.4

Mpumalanga

288

19

46

46

41

87

30.2

North West

314

7

86

75

46

121

38.5

Northern Cape

164

3

62

58

31

89

54.3

Western Cape

275

 

36

34

110

144

52.4

South Africa

3,477

322

786

933

574

1507

43.3

(2) The department does not use consultants for this task. District quality assurance and supervisory staff are formed into a team to do peer reviews.

END.

Republic of South Africa.National Health Amendment Act (12 of 2013). Cape Town: Government Gazette No. 367, 24 July 2013.

30 July 2018 - NW1748

Profile picture: Steyn, Ms A

Steyn, Ms A to ask the Minister of Health

(1)In the aftermath of his department’s response to the listeriosis outbreak, (a) what kind of regulatory measures is his department considering in order to ensure food health and safety, (b) what sort of consultations has his department had with the various industries in relation to the listeriosis outbreak and (c)(i) who was consulted and (ii) what information was obtained during these consultations; (2) (a) when will proposed guidelines on levels of Listeria monocytogenes be published to serve as minimum standard for the industry and (b) will the standards apply only to the meat processing industry or will they be applicable across all food categories and their related value chains; (3) whether any interim guidelines or an interim protocol for the food sector on Listeria levels will be published so that industry is clear on what basis they can operate; if not, will the industry continue to operate on 100 cfus per gram in a 25 g sample, as is currently the practice; (4) what are the acceptable levels of Listeria monocytogenes that he has considered; (5) (a) what is his policy position on the establishment of an independent food health and safety agency to align all areas of food handling and manufacturing regulation and (b) what action will he take to support the existence of such an agency?

Reply:

1. (a) The confirmed source of the Listeriosis outbreak, immediately triggered Regulation 4(b) in the Hazard Analysis and Critical Control Point System (HACC) Regulations (R908 of 2003) which requires the mandatory application of the Hazard analysis and Critical Control Point system, audited by the South African National Accreditation System (SANAS) accredited certifying bodies.

The review of the National Health Act, 2003 as well as the Foodstuffs, Cosmetics and Disinfectants Act, 1972 is underway to allow for the incorporation of reporting requirements for food testing.

(b) The South African Meat Processors Association (SAMPA) was consulted through official correspondence as well as a formal meeting.

(c) (i) SAMPA;

(ii) The industry association indicated that as they represent more than 60% of the Ready To Eat (RTE) processing industry, they have no objection that the sector be required to implement the mandatory Hazard Analysis and Critical Control Point system. Levels for Listeria Monocytogenes for the products that they manufactured were clarified in relation to the levels adopted by teh Codex Alimentaius, the joint World Health Organisation and Food and Agricultural Organisation, food standards setting body for protecting consumers and facilitating trade.

2. (a) The guideline levels will be published following extensive consultation with the industry as well as other important stakeholders such as academics, epidemiologists and consumers.

(b) The regulated levels will cover all food categories that are considered as ready to eat.

3. Owing to the risk that these ready to eat meat products pose, a zero tolerance is observed until the outbreak has been contained.

According to the internationally accepted Codex Alimentarius, the current industry practice of 10 cfm/gram in a 25g sample is only applicable for foodstuffs that do not promote the growth of Listeria monocytogenes. Ready to eat processed products implicated in the outbreak promote the growth of Listeria monocytogenes and the internationally agreed level is absent when tested according to the sampling plan.

4. The international guidance has been considered. Consultation referred to in (2)(a) above will need to explore whether a zero tolerance needs to be considered owing to the new scientific research regarding the emerging nature and virulence of Listeria monocytogenes and the current health status of the South African population.

5. (a) The relevant authorities (Department of Health; Department of Agriculture, Forestry and Fisheries; Department of Trade and Industry with its two entities (National Consumer Commission and National Regulator for Compulsory Specifications) have been tasked to review the existing food control system, including legislation and recommend the best way to regulate food safety in the country.

(b) Once the review has been finalised by all parties involved, it will then be taken to the relevant stakeholders for the requisite consultation and comment.

END.

27 July 2018 - NW1793

Profile picture: Malatsi, Mr MS

Malatsi, Mr MS to ask the Minister of Human Settlements

(1) (a) What was the total number of hostels in (i) the country and (ii} each province in each year since 1 January 1994; (2) Whether she will provide a list to Mr M Malatsi of all the hostels in each province owned or managed by the (a)(i} provincial government and (ii) municipality and (b) any other entity; (3} (a} which hostels have had ownership and management changed between the provincial government, municipalities and other entities after the 1994 elections, (b) on what date(s} did the change of ownership/management of the specified hostels take place and (d} what number of the specified hostels were demolished/converted?

Reply:

(1) (a} (i) The total number of hostels in the country is 166 excluding hostels in Limpopo. (Information from Limpopo is outstanding and will be submitted at a later stage)

(ii) The total number of hostels in each province since 1 January 1994 is as follows:
 

PROVINCE

NUMBER OF HOSTELS

Northern Cape

1

Eastern Cape

0

Mpumalanga

20

Gauteng

68

Kwa Zulu Natal

23

Free State

5

Western Cape

42

North West

7

Limpopo

(Information not available)

   
   


Find here: 2(a)(i)(ii) & (b) A list of all the hostels in each province owned or managed by the (a)(i) provincial government and (ii) municipality and (b) any other entity

27 July 2018 - NW1822

Profile picture: Esau, Mr S

Esau, Mr S to ask the Minister of Human Settlements

(1) Whether (a) her spouse and I or (b) an adult family member accompanied her on any official international trip (i) in each of the past five financial years and (ii) since 1 April 2018; if not, what is the position in this regard; if so, what (aa) is the name of the person(s), (bb) was the (aaa) purpose and (bbb) destination of the trip and (cc) was the (aaa) total cost and (bbb) detailed breakdown of the costs of the accompanying person( s) to her department; (2) whether each of the specified trips were approved by the President in terms of the provisions of Section 1, Annexure A of the Ministerial Handbook; if not, why not; if so, what are the relevant details?

Reply:

(1) (a) The spouse and I or (b) an adult family member of the Minister of Human Settlements did not accompany Minister Sisulu or Minister Mfeketo on any official international trip in each of the past five financial years to date. (i) N/A, (ii) (aa) and (bb) N/A, (ii) (aaa) and (bbb) N/A, (ii) (cc) (aaa) and (bbb) N/A.

(2) N/A

27 July 2018 - NW1967

Profile picture: Ryder, Mr D

Ryder, Mr D to ask the Minister of Human Settlements

(a) What is the average time for construction, from foundation to key handover, of a government-subsidised house through a project led by the Government, (b) what has been the average time for construction, from foundation to key handover, of a government-subsidised house in the Savanna City housing project and (c) of the planned 18 000 houses in the Savanna City housing project, what is the total number that has been completed to date? NW2126E

Reply:

(a) The average time for construction of a government-subsidised house is 35 days.

The breakdown is as follows:

• Preparation of foundation and casting: 7 days

• Brick work: 3 days

• Roofing: 2 days

• Plumbing: 4 days

• Plastering: 3 days

• Painting: 1 day

• Glazing: 1 day

• Turnaround time for inspection by the Engineer; the Provincial Department of Human Settlements and the Municipality: 7 days

• Preparation and key handover: 7 days

(b) The average time for construction of a government-subsidised house in Savanna City has been 35 days.

(c) The total number of houses completed to date is 2 434 which comprises of 1 492 subsidised houses, 90 Financed Linked Individual Subsidy Programme (FLISP) houses and 352 bonded houses.

27 July 2018 - NW1921

Profile picture: Hlonyana, Ms NKF

Hlonyana, Ms NKF to ask the Minister for Human Settlements

1. What (a) is the total number incidents of sexual harassment that were reported to the human resources offices of (i) her department and (ii) entities reporting to her in (aa) 2016 and (bb) 2017 and (b) are the details of each incident that took place; 2. Was each incident investigated; if not, why not in each case; if so, what were the outcomes of the investigation in each case?

Reply:


3.1 What (a) is the total number incidents of sexual harassment that were reported to the human resources offices of (i) her department and (ii) entities reporting to her in (aa) 2016 and (bb) 2017

3.1.1 Two incidents of sexual harassment were reported in the Department in the period under question.

3.2 and (b) are the details of each incident that took place.

3.2.1 In the 1st incident, the complainant brought an informal complaint to the department's Employee Health and Wellness unit. The complainant reported on comments with sexual overtones received from the respondent/perpetrator that resulted in the complainant being uncomfortable. Thus this incident involved sexual harassment of a verbal nature.

3.3.2 In the 2nd incident, the complainant brought an informal complaint to the Department's Employee Health and Wellness unit. The complainant reported an incident whereby the respondent/perpetrator inappropriately physically pressed against the complainant, when the two of them were in an elevator. The complainant was upset by this incident. This incident involved sexual harassment of a physical contact nature.

3.3 Was each incident investigated; if no, why not in each case; if so, what were the outcomes of the investigation in each case?

3.3.1 Yes, the incidents were investigated.

3.3.2 The 1st incident was resolved with the perpetrator being reprimanded by his supervisor and apologizing to the complainant.

3.3.3 The 2nd incident was resolved with the perpetrator issued a warning by the relevant supervisor; an apology by the perpetrator to the complainant; and the complainant transferred to another unit, as requested.

• Sexual harassment cases are dealt with in accordance with the provisions of the departmental Management of The Sexual Harassment policy.

• The Policy was developed in order to facilitate, expedite, offer guidance and complement all other Labour relations prescripts that are meant to resolve matters related to sexual Harassment in the department.

• In addition to this, there are various interventions that the department apply for instance, awareness sessions that are frequently held in order to educate and make employees aware of lawful and prohibited behaviours at the work place especially sexual harassment.

• In essence, the department takes every opportunity and utilizes every available platform to provide information and education. For example, quarterly Human Resources Outreach Sessions; Staff meetings as well as Women Month and 16 Days of Activism Against Women and Children Abuse, are used to ensure that sexual harassment matters are given sufficient attention by all.

27 July 2018 - NW1471

Profile picture: Stubbe, Mr DJ

Stubbe, Mr DJ to ask the Minister of Human Settlements

1. Whether, with reference to the reply of the President, Mr C M Ramaposa, to the debate on the State of the Nation Address on 22 February 2018 to implement lifestyle audits, (a) she, (b) senior management service members in her department and/or (c) any of the heads of entities reporting to her have undergone a lifestyle audit in the past three financial year; if not, have any plans been put in place to perform such audits; if so, in each case, what are the details of the (i) date of the lifestyle audit, (ii) name of the person undergoing the audit, (iii) name of the auditing firm conducting the audit and (iv) outcome of the audit; 2. Whether she will furnish Mr D J Stubbe with copies of the lifestyle audit reports?

Reply:

Entities

1. Rural Housing Loan Fund

(1)(c) The Rural Housing Loan Fund (RHLF) has not undertaken a process of lifestyle audits for Members of the Board or Senior Management. There is no plan in place to perform lifestyle audits.

(1 )(c)(i) N/A

(1)(c)(ii) N/A

(1 )(c)(iii) N/A

(1 )(c)(iv) N/A

(2) There are no reports available for submission and it should be noted that the disclosure of such reports will be done within the provisions of relevant prescripts governing such disclosure.

2. Social Housing Regulatory Authority

(1 )(c) The Social Housing Regulatory Authority (SHRA) has not undertaken a process of lifestyle audits for Members of the Board or Senior Management. The SHRA has no plan put in place to perform lifestyle audits.

(1 )(c)(i) N/A

(1 )(c)(ii) N/A

( 1 )( c )(iii) N/A

(1 )(c)(iv) N/A

(2) There are no reports available for submission and it should be noted that the disclosure of such reports will be done within the provisions of relevant prescripts governing such disclosure.

3. National Urban Reconstruction and Housing Agency

(1 )(c) The National Urban Reconstruction and Housing Agency (NURCHA) have not undertaken lifestyle audits for Members of the Board or Senior Management. The NURCHA has no plan put in place to perform lifestyle audits.

(1 )(c)(i) N/A

(1 )(c)(ii) N/A

(1 )(c)(iii) N/A

(1 )(c)(iv) N/A

(2) There are no reports available for submission and it should be noted that the disclosure of such reports will be done within the provisions of relevant prescripts governing such disclosure.

4. Housing Development Agency

(1 )(c) The Housing Development Agency (HOA) has not undertaken lifestyle for Members of the Board or Senior Management. The HOA has no plan put in place to perform lifestyle audits.

4

(1 )(c)(i) N/A

(1 )(c)(ii) N/A

(1 )(c)(iii) N/A

(1 )(c)(iv) N/A

(2) There are no reports available for submission and it should be noted that the disclosure of such reports will have to be done within the provisions of relevant prescripts governing such disclosure.

National Home Builders Registration Council

(1 )(c) The National Housing Builders Registration Council (NHBRC) has not undertaken any lifestyle audits for managers in the past three financial years. NHBRC Management intends making a recommending to the Audit and Risk Management Committee to execute lifestyle audits as a matter of urgency. A tender process will be initiated to request bids and appoint a firm to undertake the audits and the National Department of Human Settlements will be kept abreast on the process and outcomes.

(1 )(c)(i) N/A

(1 )(c)(ii) N/A

(1 )(c)(iii) N/A

(1 )(c)(iv) N/A

(2) Once the lifestyle audit of senior management is completed, the management will provide the results to the Audit and Risk Management Committee (ARMCO) and thereafter through the Council then to the Department if so required.

5. National Housing Finance Corporation

1)(c) The National Housing Finance Corporation (NHFC) does not conduct lifestyle audits. The Human Resource Policies provide guidelines on Business Conduct and matters related to conflict of interest. As a rule employees are not allowed to do business with the entity and its clients.

Where policy is breached the Disciplinary Code of the organisation is invoked.

(1 )(c)(i) N/A

(1 )(c)(ii) N/A

(1 )(c)(iii) N/A

(1 )(c)(iv) N/A

(2) Not available for reason stated in (1 )( c) above.


6. Estate Agency Affairs Board

(1 )(c) The Estate Agency Affairs Board (EAAB) has not undertaken lifestyle audits for Members of the Board or Senior Management. The EAAB has no plan put in place to perform lifestyle audits.

(1 )(c)(i) N/A

(1 )(c)(ii) N/A

( 1 )( c )(iii) N/A

(1 )(c)(iv) N/A

(2) There are no reports available for submission and it should be noted that the disclosure of such reports will done within the provisions of relevant prescripts governing such disclosure.

7. Community Schemes Om bud Service

(1 )(c) The Community Schemes Ombud Service (CSOS) has not undertaken lifestyle audits for Members of the Board Members or Senior Management. There is no plan put in place to perform lifestyle audits.

(1 )(c)(i) N/A

(1 )(c)(ii) N/A

(1 )(c)(iii) N/A

(1 )(c)(iv) N/A

(2) There are no reports available for submission and it is to be noted that the disclosure of such reports will have to be done consistent with the provisions of relevant prescripts governing such disclosure.

27 July 2018 - NW1429

Profile picture: Van Der Walt, Ms D

Van Der Walt, Ms D to ask the Minister of Human Settlements

1) With regard to land and housing projects undertaken in Bela-Bela, Limpopo, (a) what projects were undertaken as a result of collaboration between the Housing Development Agency and the Bela-Bela Municipality for the periods (i) 2006-2011, (ii) 2011-2016 (iii) 2016-2018 and (b) what was the amount of each agreement that was signed; 2) whether all the projects were completed; if not, (a) what are the reasons for not completing the projects and (b) what actions taken against those causing the failure to complete the specified housing projects; if so, (i) what are the full relevant details? (NW1531 E)

Reply:

(1) Land housing projects undertaken in Bela-Bela, Limpopo a) There is no collaboration agreement that was signed between the Housing Development Agency and Bela-Bela Municipality. However, as a result of relevant agreements between the Department of CoGHST A in Limpopo and HDA, the following were activities undertaken by the HOA in Bela-Bela Municipality:

(i) Period 2006 - 2011

The HDA assisted the Department in the acquisition of land (Erf. 1491 Warmbaths Ext.25). The price of the land that was paid by CoGHSTA to the land owner is R 65.4m.


(ii) Period 2011 - 2016

The HDA completed township establishment on Erf. 1491 Warmbaths Ext.25 in 2012/2013 financial year. The amount for rezoning and subdivision was R420 664. The project was completed. During 2015/16 financial year, the HDA completed installation of interim basic services on Erf.1491 Warmbaths Ext.25. This involved the following:


(a) Sewer:

• Supply and installation of 587m of Sewer pipeline, which involved construction of 9 manholes and connection to existing sewer line.

• Supply and connection of fittings to ablution facilities


(b) Water:
• Supply and installation of 50mm HDP water supply pipeline.

• Design, supply and installation of steel vertical tanks

• Supply and installation of water tanks

• Additional works, supply and installation of water taps cages

(c) Electrical:
• Supply and installation of lighting

• Supply and installation of a highlight mast.

• Additional work, supply and installation of radiant lighting at ablution facilities

(iii) No projects were undertaken during the 2016 - 2018 period.

b) The cost of the project for the period 2006 - 2011 was R2 104 822.92.

The cost of the project for the 2011 - 2016 period was R6 018 000.00. It was for the engineering designs for bulk and internal engineering services to supply Erf.1491 Warmbaths Ext.25 which was completed during the 2015/16 financial year. The project was completed.

(2) The projects were completed

a) N/A

b) N/A

(i) N/A

27 July 2018 - NW2051

Profile picture: Malatsi, Mr MS

Malatsi, Mr MS to ask the Minister of Human Settlements

What was the total amount spent by the Estate Agency Affairs Board for each year between 1 January 2014 and 31 December 2017 on (a) vehicle hire, (b) hotel stays, (c) conference venue hire, (d) catering, (e) furniture hire, (I) stationary, (g) I-shirts, (h) gift bags and (i) leasing of offices?

Reply:

The following is provided based on information provided by the Estate Agency Affairs Board

Cost Description

Jan 2014 – Dec14

Jan 2015 – Dec 15

Jan 2016 – Dec 16

Jan 2017 – Dec 1

Total Spent

a) Vehicle Hire

R 662,311.89 

R 1,056,831.54 

R 1,113,745.41

R 502,615.94 

 R 3,335,504.78

b) Hotel Stays

R 1,396,339.14 

R 2,559,017.68 

R 3,914,341.11 

R 1,353,506.45

R 9,223,204.38

c) Conference Venue Hire (including CPD)

R 316,996.70 

R 6,256,851.36

 R 4,064,592.10 

R 2,989,646.93

 R 13,628,087.09

d) Catering

R 408,007.70

 R 465,371.06

 R 429,801.39

R 566,204.88

  R 1,869,385.03

e) Furniture Hire

R 17,028.40

R 27,570.00

R 31,050.00

R 37,500.00

R 54,528.40

f) Stationery & Printing

R 1,175,435.08 

R 1,355,302.41

R 1,301,325.21

 R 2,353,454.68

 R 6,185,517.38

g) T-Shirts

n/a

n/a

R 32,943.28

R 37,400.00

R 37,400.00

h) Gift bags

n/a

R 35,451.00

R 52,750.00

n/a

R 88,201.00

i) Leasing of offices

n/a

n/a

R 74,660.88 

R 384,426.79 

R 459,087.67

 

R 3,976,118.91 

R 11,728,825.05

R 10,951,216.10

R 8,224,755.67 

R 34,880,015.73

 

26 July 2018 - NW2117

Profile picture: Boshoff, Ms SH

Boshoff, Ms SH to ask the Minister of Social Development

What (a) number of early childhood development centres are currently registered in each province, (b) is the location of each centre, (c) number of children attend each centre, (d) number of qualified practitioners are employed at each centre and (e) number of the centres are funded by the Government?

Reply:

Province

(a) No. of ECD

(b) Location

(c) No. of Children

(d) No. of practitioners

(e)Funded

Eastern Cape

200

Alfred Nzo

6964

245

200

 

184

BCM

6442

238

184

 

314

Chris Hani

9333

365

314

 

318

O R Tambo

8196

323

318

 

121

Sarah Baartman

4140

158

121

 

113

Joe Gqabi

3467

137

113

 

366

Amathole

10947

418

366

 

99

NMM

4254

149

99

Province

(a) No. of ECD

(b) Location

(c) No. Children

(d) No. of practitioners

(e)Funded

Free State

673

Mangaung

14800

741

1018

 

52

Xhariep

3240

122

 
 

126

Fezile Dabi

9020

419

 
 

319

Thabo Mofutsanyane

118160

883

 
 

154

Lejweleputswa

11630

543

 

Province

(a) No. of ECD

(b) Location

(c) No. Children

(d) No. of practitioners

(e)Funded

Gauteng

2225

Ekurhuleni

15573

1797

1426

   

JHB Metro

32133

   
   

Sedibeng

14839

   
   

West Rand

91948

   
   

Tshwane

19700

   

Province

(a) No. of ECD

(b) Location

(c) No. Children

(d) No. of practitioners

(e)Funded

KZN

556

King Cetywayo

6910

258

278

 

648

Zululand

14599

340

336

 

736

Umkhanyakude

18407

478

367

 

369

uThukela

6370

250

170

 

389

uMzinyathi

10112

162

197

 

280

Amajuba

9740

337

146

 

210

Ilembe

4707

236

111

 

247

eThekwini South

6910

320

135

 

394

eThekwini North

13984

644

204

 

576

uMgungundlovu

11463

391

283

 

376

Harry Gwala

3985

125

209

 

641

uGu

15850

459

341

Province

(a) No. of ECD

(b) Location

(c) No. Children

(d) No. of practitioners

(e)Funded

Limpopo

3490

Capricorn

43381

1234

490

   

Mopani

47162

1951

504

   

Sekhukhune

32469

1106

479

   

Vhembe

45655

1467

423

   

Waterberg

24799

652

284

Province

(a) No. of ECD

(b) Location

(c) No. Children

(d) No. of practitioners

(e)Funded

Mpumalanga

665

Ehlanzeni

41219

1956

420

 

342

Gert Sibande

23194

989

281

 

377

Nkangala

21918

1268

326

Province

(a) No. of ECD

(b) Location

(c) No. Children

(d) No. of practitioners

(e)Funded

North West

331

Bojanala

21914

74

110

 

121

Dr Kenneth Kaunda

10424

99

59

 

293

Dr Ruth Mompati

17243

119

157

 

410

Ngaka Modiri

21115

166

135

Province

(a) No. of ECD

(b) Location

(c) No. Children

(d) No. of practitioners

(e)Funded

Northern Cape

58

ZF Mgcawu

3284

85

2346

 

110

JT Galeshewe

6555

178

4971

 

42

Pixley ka Seme

3699

65

2994

 

40

Namakwa

1864

46

1600

 

100

Frances Baard

7662

280

5660

Province

(a) No. of ECD

(b) Location

(c) No. Children

(d) No. of practitioners

(e)Funded

Western Cape

616

Cape Wine Lands

34657

Database still being compiled

15313

 

265

Eden Karoo

22024

 

10097

 

299

Metro East

19801

 

9636

 

351

Metro North

24485

 

3763

 

399

Metro South

27289

 

10645

 

155

West Coast

9730

 

3871

           

________________________

Approved by the Minister on

Date……………………….

26 July 2018 - NW1739

Profile picture: Esterhuizen, Mr JA

Esterhuizen, Mr JA to ask the Minister of Mineral Resources

In light of the fact that mining is an industry with long-time horizons that require mining companies to project decades ahead when making adjustments (details furnished), what is the reason for the continued delay in the promulgation of key minerals legislation?

Reply:

The key reason for delay of the finalisation of Mining Charter, 2018 was to allow the mining industry stakeholders to reengage in an inclusive and meaningful discussion on issues of divergence to find a lasting solution. As a result, the Department of Mineral Resources has engaged extensively and meaningfully with all mining industry’s stakeholders, which was followed by community consultations led by Minister of Mineral Resources across all nine (9) provinces. The department has gazetted draft Mining Charter, 2018 on Friday, 15th June 2018 for public comments.

The Mineral and Petroleum Development Amendment Bill is currently going through the parliamentary process, and it is therefore out of the department’s influence. However, it is noteworthy to indicate that the National Council of Provinces has accepted the draft Bill and Provincial Legislatures are expected to provide their final mandates.

26 July 2018 - NW438

Profile picture: Hugo, Mr RT

Hugo, Mr RT to ask the Minister of Mineral Resources

What (a) amount in funding did his department contribute towards equipping two groundwater boreholes which were handed over to the Beaufort West Local Municipality in the Western Cape by the Council for Geoscience on 13 February 2018, (b) amount did his department spend on the handing-over ceremony and (c) are the details of the procedures followed to select the service providers for the handing-over ceremony?

Reply:

a) The groundwater was discovered by the Council for Geoscience (CGS) during the execution of the Karoo Deep Drilling baseline and geo-environmental study for the purposes of possible shale gas exploration. Two high-yielding boreholes were donated (at no cost to the municipality) to the Beaufort West Municipality who incurred the cost of the pumping infrastructure for one of the borehole. Although the CGS spent just over R495 000 to drill the two boreholes, the value of the water provided to the water-scarce municipality (to assist just over 44 000 people) is in the order of R1 million per month and could easily reach about R13 million a month based on level 6 water restriction rates for the Western Cape Province.

b) The CGS spent about R423 000 towards the handover ceremony. Flight and accommodation of CGS personnel have not been included in these calculations.

c) The CGS selected the service providers through the Beaufort West Municipality supplier chain department. The procedures were followed accordingly.

26 July 2018 - NW1591

Profile picture: Jooste, Ms K

Jooste, Ms K to ask the Minister of Social Development

(a) What are the relevant details regarding shortages of vehicles for conducting home visits by social workers in each province and (b) in each case, (i) at which offices are the shortages experienced and (ii) what are the details of the backlog in home visits at each specified office?

Reply:

Province

(a) Vehicle Shortages

(b)(i) Offices with Shortages

(b)(ii) Backlog to visits

Eastern Cape

16

Alfred Nzo

8909

 

21

BCM

616

 

35

Chris Hani

570

 

30

O R Tambo

1500

 

23

Sarah Baartman

971

 

6

Joe Gqabi

3827

 

20

Amathole

150

 

24

NMM

490

Province

(a) Vehicle Shortages

(b)(i) Offices with Shortages

(b)(ii) Backlog to visits

Free State

25

Thabo Mofutsanyane

1980

 

13

Xhariep

1358

 

14

Fezile Dabi

1313

 

10

Mangaung Metro

8909

 

15

Lejweleputswa

1568

Province

(a) Vehicle Shortages

(b)(i) Offices with Shortages

(b)(ii) Backlog to visits

Gauteng

492

Ekurhuleni

N/A

 

603

JHB Metro

N/A

 

234

Sedibeng

N/A

 

190

West Rand

N/A

 

413

Tshwane

N/A

 

1932

   

Province

(a) Vehicle Shortages

(b)(i) Offices with Shortages

(b)(ii) Backlog to visits

KZN

 

King Cetywayo

2525

   

Zululand

1075

   

Umkhanyakude

651

   

uThukela

0

   

uMzinyathi

2397

   

Amajuba

900

   

Ilembe

1366

   

eThekwini South

2434

   

eThekwini North

570

   

uMgungundlovu

619

   

Harry Gwala

209

   

uGu

4358

Province

(a) Vehicle Shortages

(b)(i) Offices with Shortages

(b)(ii) Backlog to visits

Limpopo

302

Capricorn

7300

 

116

Vhembe

1384

 

47

Waterberg

3771

 

90

Mompani

4906

 

107

Sekhukhune

2058

Province

(a) Vehicle Shortages

(b)(i) Offices with Shortages

(b)(ii) Backlog to visits

Mpumalanga

122

Ehlanzeni

1114

 

91

Gert Sibande

437

 

89

Nkangala

848

Province

(a) Vehicle Shortages

(b)(i) Offices with Shortages

(b)(ii) Backlog to visits

North West

82

Bojanala District

284

 

92

Dr Kenneth Kaunda District

118

 

139

Dr Ruth Mompati

14

 

89

Ngaka Modiri Molema

574

Province

(a) Vehicle Shortages

(b)(i) Offices with Shortages

(b)(ii) Backlog to visits

Northern Cape

0

ZF Mgcawu

96

 

0

JT Galeshewe

10

 

0

Pixley ka Seme

67

 

0

Namakwa

56

 

0

Frances Baard

114

 

The backlog in the Province is not due to a shortage of vehicles but related to supervision and management issues

Province

(a) Vehicle Shortages

(b)(i) Offices with Shortages

(b)(ii) Backlog to visits

Western Cape

1

George

NA

 

1

Knysna

NA

 

1

Mosselbay

NA

 

2

Drakenstein

47

 

1

Stellenbosch

98

 

3

Breede Valley

562

       

________________________

Approved by the Minister on

Date……………………….

26 July 2018 - NW1695

Profile picture: Mhlongo, Mr P

Mhlongo, Mr P to ask the Minister of Defence and Military Veterans

(1)Have any of the properties and/or assets of the Department of Military Veterans been repossessed in 2018; if not, what is the position in this regard; if so; (2) are the affected employees able to perform their duties at any of the departments properties; if not, are employees being paid while they are unable to perform their duties; if so, where are the employees located to enable them to perform their duties?

Reply:

Question 1

A number of (movable) assets/furniture of the DMV were attached and removed in terms of a Court Order in the Z. Matunjwa matter. DMV approached Court in this regard and the property was returned within 5 days as per the order of the Court.

Question 2

The DMV (immovable) property was never repossessed. Employees continued to render a service even when the movable property was removed. They were paid as they continued to work even with fewer equipment/furniture. If an employee is not able to perform due to any repossession or attachment/removal of property, which is not his/her fault, then his/her salary may not be stopped as that person cannot be held responsible for such an event outside his/her control.