Questions and Replies

Filter by year

05 June 2017 - NW1195

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Communications

(1)Whether the Films and Publication Board (FPB) is currently conducting any internal disciplinary processes and/or investigations; if so, (a) what are the (i) names and (ii) professional designations of each person being investigated, (b) for what reason in each case, (c) what is the current status of each investigation and (d) what disciplinary action is being considered in each case; (2) whether any of the specified persons have been placed on suspension pending the outcome of the disciplinary investigations; if not, why not; if so, (a) what are the names of the persons who were placed on suspension and (b) are they receiving full salaries; (3) whether the (a) Chief Executive Officer and (b) Chief Operating Officer of the FPB are being investigated on disciplinary charges; if not, in each case, why not; if so, what are the relevant details in each case; (4) what are the details of all disciplinary steps that were taken against any person whose processes have been concluded to date?

Reply:

(1) Yes

The issues of internal disciplinary processes and/or investigations is sub judice, therefore the FPB is not in a better position to release details in relation to (a)(b) at this stage.

(c) The investigations are at an advance stage

(d) The employee has consented to pre-dismissal arbitration and application has been lodged with the CCMA.

(2) Yes, with effect from 17 March 2017 pending the outcome of the disciplinary process.

(a) The details of the employee in relation to suspension cannot be disclosed as the matter is sub judice.

(b) Yes, they were receiving salaries.

(3) (a) Yes

(b) No, as the imployee has since resigned from the FPB following an agreement of mutual separation.

(4) The FPB has reached a mutual separation agreement.

05 June 2017 - NW1026

Profile picture: Ross, Mr DC

Ross, Mr DC to ask the Minister of Communications

(1)What was the total amount that was spent on international travel by the (a) chief executive officer (b) chief executive officer and (c) chief financial officer of each entity reporting to her in the past two financial years; (2) What is the breakdown of each trip undertaken in terms of (a) the date on which the trip took place, (b) the total number of persons who were part of the delegation, (c) the costs of flights, (d) the costs of accommodation, including which hotels were used, (e) the total subsistence and travel allowance approved for each member of each delegation on each trip and (f) the cost of special vehicles and/or chauffeur driven transport

Reply:

Auditing process in relation to the total amount spent, amongst others, refer to in this parliamentary question is still under away, once the auditing process and all other process has been completed, the amount spent, will be submitted to Parliament as part of the Annual Reports, which will be tabled in Parliament.

05 June 2017 - NW1289

Profile picture: Vos, Mr J

Vos, Mr J to ask the Minister of Transport

(a) What is the total number of examiners of vehicles in the Northern Cape who have been convicted of issuing fraudulent certificates of road worthiness and continue to practice as examiners, (b) why have the specified examiners not been charged and arrested and (c) by what date will they be arrested and charged?

Reply:

It is difficult to report on the statistics relating to convictions of examiners due to the prolonged period it takes to finalise a case; and due to the fact that once a case has been opened with the South African Police Service (SAPS), they must conduct investigations and ultimately prepare the docket for the Department of Justice to prosecute. Therefore a case may take much longer than expected to be finalised. This involves arms of government other than the Department of Transport.

a) It was reported to the Department that no examiners of vehicles in the Northern Cape have been convicted of issuing fraudulent certificates of road worthiness during the 2016 / 17 financial year.

b) See above (a)

c) See above (b)

05 June 2017 - NW1196

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Communications

(1)Whether the Chief Operating Officer of the Films and Publication Board (FPB) is currently on suspension; if so, since what date; (2) whether any steps were taken by the FPB against the specified person for allegedly plagiarising parts of the FPB’s draft policy directly from an Australian publication entitled Guiding Principles for Reform; if not, why not; if so, what (a) are the full details and (b) were the outcomes of the steps taken?

Reply:

(1) Yes, since from 17 March 2017.

(2) (a)(b) the FPB conducts benchmarking studies in different jurisdictions and the work on the Online Regulation Policy was a culmination of such studies.

05 June 2017 - NW1292

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Transport

(a) What is the total number of examiners of vehicles in the Eastern Cape who have been convicted of issuing fraudulent certificates of road worthiness and continue to practice as examiners, (b) why have the specified examiners not been charged and arrested and (c) by what date will they be arrested and charged?

Reply:

It is difficult to report on the statistics relating to convictions of examiners due to the prolonged period it takes to finalise a case; and due to the fact that once a case has been opened with the South African Police Service (SAPS), they must conduct investigations and ultimately prepare the docket for the Department of Justice to prosecute. Therefore a case may take much longer than expected to be finalised. This involves arms of government other than the Department of Transport.

(a) The Eastern Cape Province reported that one examiner was convicted and is still practicing (Case no 217/ 1 /2016 Cradock Magistrate Court). The reason for continuation is that the Department is waiting for the response of the accused. A suspension letter was issued to him and signed by him on 08 May 2017. He was given 21 days to respond and this will end on the 02 June 2017.

(b) See above (a)

(c) See above (b)

05 June 2017 - NW1284

Profile picture: Walters, Mr TC

Walters, Mr TC to ask the Minister of Transport

(a) What is the total number of examiners of vehicles in Limpopo who have been convicted of issuing fraudulent certificates of road worthiness and continue to practice as examiners, (b) why have the specified examiners not been charged and arrested and (c) by what date will they be arrested and charged?

Reply:

It is difficult to report on the statistics relating to convictions of examiners due to the prolonged period it takes to finalise a case; and due to the fact that once a case has been opened with the South African Police Service (SAPS), they must conduct investigations and ultimately prepare the docket for the Department of Justice to prosecute. Therefore a case may take much longer than expected to be finalised. This involves arms of government other than the Department of Transport.

a) The Limpopo province reported that there were no examiners convicted of issuing fraudulent certificates of road worthiness in the 2016 / 17 financial year.

b) See above (a)

c) See above (b)

05 June 2017 - NW1430

Profile picture: Figlan, Mr AM

Figlan, Mr AM to ask the Minister of Transport

With regard to the investigation commissioned by the Board of the Passenger Rail Agency of South Africa under the chairmanship of a certain person (name furnished), (i) who will lead the investigation (ii) what are the terms of reference (iii) what is the total amount budgeted (iv) what are the timeframes, timelines and milestones of the investigation going forward and (v) how will the findings and evidence from the specified investigation be incorporated into the current investigation?

Reply:

(i) There are three ongoing investigations at PRASA.

  1. The investigations into the irregular and fruitless and wasteful expenditure found by the Auditor-General in the 2014/2015 annual financial statements. This was commissioned by the Board of PRASA in terms of its fiduciary duties flowing from the Public Finance Management Act and led by Werksmans Attorneys.
  2. The investigations into contracts of more than R10 million concluded between 2012 and 2015 as per the remedial steps recommended by the Public Protector’s Report in August 2015 that are associated with the entities and transactions that were under investigation in (1) above. These investigations were, by agreement between PRASA, the Office of the Chief Procurement Officer of the National Treasury and the Department of Transport, led by Werksmans Attorneys.
  3. The investigations into contracts of more than R10 million concluded between 2012 and 2015 as per the remedial steps recommended by the Public Protector in August 2015. These relate to entities and transactions that were not viewed as related to the entities and transaction under investigation in (1) above. These investigations are led by National Treasury and National Treasury has appointed about 20 entities with forensic investigation capacity to conduct the investigation of these transactions and entities.

(ii) There is no new investigation commissioned by the Board of PRASA.

(iii) For the Financial Years 15/16 and 16/17, R148 million was paid for the investigations, and for the 17/18 Financial Year R14 million has been budgeted.

(iv) The timeframes for the conclusion of the investigations is end of July. The Milestones are that reports are submitted to the Board as they are completed. To date the Board has instituted seven court actions and has also forwarded 41 reports to the Directorate of Priority crimes investigations for further criminal investigations and 4 internal disciplinary actions have been instituted against affected employees.

(v) Please see response under (ii).

05 June 2017 - NW1065

Profile picture: Krumbock, Mr GR

Krumbock, Mr GR to ask the Minister of Health

Whether the West End Psychiatric Hospital in the Northern Cape has been (a) refurbished and (b) equipped for patients?

Reply:

The Department has refurbished and equipped the West End Psychiatric Hospital state patients unit in the 2016/17 financial year.

(a) A vacated 36 bed ward at West End Hospital has been completely upgraded to make it suitable for involuntary male health patients. The male involuntary patients were transferred from the secure ward adjacent to the existing State Patient Ward. This vacated ward is also suitable for State Patients which allowed rapid transfer in early May of 21 State Patients from Kimberley Correctional Services.

(b) The ward is fully and appropriately equipped for State Patients.

END.

05 June 2017 - NW1180

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Communications

What amount has (a) her department and (b) each of the entities reporting to her spend on promotional events organised by a certain newspaper (name furnished) since 1 May 2014?

Reply:

a) The Department of Communications (DoC) spent R958 689.84 on a business briefing held on 26 May 2016 which was organised by the newspaper in question.

b) The entities in the DoC portfolio did not spend on promotional events organised by the newspaper in question since 1 May 2014.

05 June 2017 - NW1220

Profile picture: Macpherson, Mr DW

Macpherson, Mr DW to ask the Minister of Health

Whether (a) his department and (b) each entity reporting to him has (i) procured any services from and/or (ii) made any payments to the Decolonisation Foundation; if not, in each case, what is the position in this regard; if so, what (aa) services were procured, (bb) were the total costs, (cc) is the detailed breakdown of the costs, (dd) was the total amount paid, (ee) was the purpose of the payments and (ff) is the detailed breakdown of the payments in each case?

Reply:

No, neither the National Department of Health nor any of the public entities reporting to the Ministry of Health procured any services from the Decolonisation Foundation.

END.

05 June 2017 - NW1416

Profile picture: Dreyer, Ms AM

Dreyer, Ms AM to ask the Minister of Transport

What amount has his department spent on (a) travel, (b) accommodation and (c) subsistence costs for (i) him, (ii) his deputy minister and (iii) the respective spokespersons and media liaison officer(s) in the (aa) 2014-15, (bb) 2015-16 and (cc) 2016-17 financial years?

Reply:

(aa) 2014-15

ITEM

NAME

DESIGNATION

AIR

CAR HIRE

(a) TRAVEL

(b) ACCOMMODATION

(i)

MS E PETERS

MINISTER

R1 298 747.00

R 667 166.38

R1 965 913.38

R181 172.70

(ii)

MS L CHIKUNGA

DEPUTY MINISTER

No information available

R392 782.61

R392 782.61

R21 345.00

(iii)

MR I MNISI

MEDIA LIAISON OFFICER - MINISTRY

R8 706.17

R17 527.30

R26 233.47

R69 754.38

(iii)

MS N MAPHANGA

PARLIAMENTARY AND MEDIA LIAISON OFFICER - DEPUTY MINISTER

R0.00

R142 222.72

R142 222.72

NO INFO

No information – no record, company insolvent

(bb) 2015-16

ITEM

NAME

DESIGNATION

AIR

CAR HIRE

(a) TRAVEL

(b) ACCOMMODATION

(i)

MS E PETERS

MINISTER

R1 401 868.22

R883 813.53

R 2 285 681.75

R50 760.73

(ii)

MS L CHIKUNGA

DEPUTY MINISTER

R1 008 247.22

R863 496.51

R1 871 743.73

R109 187.69

(iii)

MR I MNISI

MEDIA LIAISON OFFICER - MINISTRY

R104 071.11

R30 607.13

R134 678.24

R52 744.00

(iii)

MS N MAPHANGA

PARLIAMENTARY AND MEDIA LIAISON OFFICER - DEPUTY MINISTER

R219 534.16

R154 047.35

R373 581.51

R124 636.87

(cc) 2016-17

ITEM

NAME

DESIGNATION

AIR

CAR HIRE

(a) TRAVEL

(b) ACCOMMODATION

(i)

MS E PETERS

MINISTER

R750 529.60

R1 047 281.14

R1 797 810.74

R85 616.07

(ii)

MS L CHIKUNGA

DEPUTY MINISTER

R862 245.83

R539 112.08

R1 401 357.91

R152 472.49

(iii)

MR I MNISI

MEDIA LIAISON OFFICER - MINISTRY

R93 865.84

R47 183.02

R141 048.86

R49 622.53

(iii)

MS N MAPHANGA

PARLIAMENTARY AND MEDIA LIAISON OFFICER - DEPUTY MINISTER

R195 974.90

R282 622.46

R478 597.36

R191 802.97

05 June 2017 - NW1049

Profile picture: Steyn, Ms A

Steyn, Ms A to ask the Minister of Rural Development and Land Reform

With reference to his reply to question 604 on the 24 April 2017, (a) what was the cost of each borehole (i) drilled per meter, (ii) refurbished and (iii) equipped, (b) what type of (i) pump and (ii) equipment was installed and in each case and (c)(i) who was responsible for the maintenance and (ii) at what cost?

Reply:

(a) (i) Please refer to Annexure A.

(ii) Only 1 (one) borehole was refurbished at a cost of R 58 129.98. All other boreholes were drilled and equipped, as per annexure A.

(iii) Please refer to Annexure A.

(b) (i),(ii) Please refer to the Annexure A.

(c) (i) There were no service providers appointed for maintenance of boreholes. Boreholes were on completion handed over to the farmers (beneficiaries or communities).

(ii) No maintenance costs were incurred by the Department.

ANNEXURE A OF NA QUES 1049 OF 2017

No

Province

Local Municipality

Name

  1. Total Cost per borehole

(a)(i) Drilling cost per metre

(a)(iii) Equipping cost per metre

(b)(i) Type of pump

(b)(ii) Type of equipment installed

1

Free State

Dihlabeng/Maluti a phofung

Bethlehem Camp 1

R 475 218.35

R 320.00

R 3 052.00

Mono

1x5000lt tank on 350mm thick concrete base & 4 drinking troughs and 1 windmill

2

Free State

Dihlabeng/Maluti a phofung

Bethlehem Camp 2

R 475 218.35

R 320.00

R 3 052.00

Mono

1x5000lt tank on 350mm thick concrete base & 4 drinking troughs and 1 windmill

3

Free State

Dihlabeng/Maluti a phofung

Gedachtenis

R 475 218.35

R 320.00

R 3 052.00

Mono

1x5000lt tank on 350mm thick concrete base & 2 drinking troughs and 1 windmill

4

Free State

Dihlabeng/Maluti a phofung

Mahlake 305

R 475 218.35

R 320.00

R 3 052.00

Mono

1x5000lt tank on 350mm thick concrete base & 4 drinking troughs and 1 windmill

5

Free State

Dihlabeng/Maluti a phofung

Mahlake 310

R 475 218.35

R 320.00

R 3 052.00

Mono

1x5000lt tank on 350mm thick concrete base & 4 drinking troughs and 1 windmill

6

KZN

Umkhanyakude

Mcakwini 1

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

7

KZN

Umkhanyakude

Ndombeni

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

8

KZN

Umkhanyakude

Bethangwe

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

9

KZN

Umkhanyakude

Mansiya

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

10

KZN

Umkhanyakude

Manaba

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

11

KZN

Umkhanyakude

Imanzibomvu (Mbazwana)

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

12

KZN

Umkhanyakude

Kwageorge dip

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

13

KZN

Umkhanyakude

Mabandleni dip

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

14

KZN

Umkhanyakude

Mkhumbikazane

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

15

KZN

Umkhanyakude

Thengane dip

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

16

KZN

Umkhanyakude

Bomvini Dip

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

17

KZN

Umkhanyakude

Genuka dip

R 265 354.15

R 3 960.51

No information provided

No information provided

No information provided

18

KZN

Umkhanyakude

Mfanela

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

19

KZN

Umkhanyakude

Mthaleni

R 265 354.15

R 3 960.51

No information provided

No information provided

No information provided

20

KZN

Umkhanyakude

Mthaleni 2

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

21

KZN

Umkhanyakude

Masakeni

R 265 354.15

R 3 960.51

No information provided

No information provided

No information provided

22

KZN

Umkhanyakude

Masakeni 2 (Giba)

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

23

KZN

Umkhanyakude

Nqutshini

R 265 354.15

R 3 960.51

No information provided

No information provided

No information provided

24

KZN

Umkhanyakude

Nqutshini 2 (Esimphondweni)

R 526 184.52

R 3 960.51

R 3 892.99

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

25

KZN

Zululand

Ntweni

R 420 891.75

R 736.60

R 2 816.89

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

26

KZN

Zululand

Nkweme

R 420 891.75

R 736.60

R 2 816.89

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

27

KZN

Zululand

Ndololwane

R 420 891.75

R 736.60

R 2 816.89

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

28

KZN

Zululand

Emfemfeni

R 420 891.75

R 736.60

R 2 816.89

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

29

KZN

Zululand

Dabhazi

R 87 246.73

R 736.60

No information provided

No information provided

No information provided

30

KZN

Zululand

Dabhazi

R 87 246.73

R 736.60

No information provided

No information provided

No information provided

31

KZN

Zululand

Dabhazi

R 420 891.75

R 736.60

R 2 816.89

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

32

KZN

Zululand

KwaMphothi

R 420 891.75

R 736.60

R 2 816.89

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

33

KZN

Zululand

Qanqathu Trust

R 420 891.75

R 736.60

R 2 816.89

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

34

KZN

Uthungulu

Thelumoyaphansi

R 483 218.87

R 1 214.29

R 2 826.97

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

35

KZN

Uthungulu

Matina

R 145 193.84

R 1 214.29

No information provided

No information provided

No information provided

36

KZN

Uthungulu

Matina

R 145 193.84

R 1 214.29

No information provided

No information provided

No information provided

37

KZN

Uthungulu

Siyangokuya

R 145 193.84

R 1 214.29

No information provided

No information provided

No information provided

38

KZN

Uthungulu

Mpongose

R 483 218.87

R 1 214.29

R 2 826.97

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

39

KZN

Uthungulu

Dubeni Dip tank

R 483 218.87

R 1 214.29

R 2 826.97

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

40

KZN

Uthungulu

Ntshiweni Dip Tank

R 145 193.84

R 1 214.29

No information provided

No information provided

No information provided

41

KZN

Uthungulu

Patane (Gcobashe)

R 483 218.87

R 1 214.29

R 2 826.97

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

42

KZN

Uthungulu

Mfanisa

R 483 218.87

R 1 214.29

R 2 826.97

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

43

KZN

Uthungulu

Ntuthunga

R 145 193.84

R 1 214.29

No information provided

No information provided

No information provided

44

KZN

Uthungulu

eDayini

R 483 218.87

R 1 214.29

R 2 826.97

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

45

KZN

Uthungulu

Sabhuza

R 145 193.84

R 1 214.29

No information provided

No information provided

No information provided

46

KZN

Uthungulu

Sabhuza

R 145 193.84

R 1 214.29

No information provided

No information provided

No information provided

47

KZN

Uthungulu

Gegethe

R 483 218.87

R 1 214.29

R 2 826.97

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

48

KZN

Amajuba

Inkululeko Yomphakathi

R 407 185.65

R 716.48

R 3 210.10

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

49

KZN

Amajuba

Ndwakazane

R 292 295.64

R 716.48

No information provided

No information provided

No information provided

50

KZN

Amajuba

Vaalbank-Esidakeni

R 292 295.64

R 716.48

No information provided

No information provided

No information provided

51

KZN

Amajuba

Vaalbank-Esidakeni

R 292 295.64

R 716.48

R 3 210.10

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

52

KZN

Amajuba

Slagveld

R 292 295.64

R 716.48

No information provided

No information provided

No information provided

53

KZN

Amajuba

AMAJUBA - OSIZWENI

R 292 295.64

R 716.48

R 3 210.10

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

54

KZN

Amajuba

Jiyane

R 292 295.64

R 716.48

R 3 210.10

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

55

KZN

Amajuba

Waaihoek

R 292 295.64

R 716.48

R 3 210.10

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

56

KZN

Amajuba

Esikhaleni

R 292 295.64

R 716.48

No information provided

No information provided

No information provided

57

KZN

Amajuba

Reserve Farm

R 292 295.64

R 716.48

R 3 210.10

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

58

KZN

Amajuba

Bloodriver -Nzimane

R 292 295.64

R 716.48

No information provided

No information provided

No information provided

59

KZN

Amajuba

Bloodriver -Nzimane

R 292 295.64

R 716.48

No information provided

No information provided

No information provided

60

KZN

Amajuba

AMAJUBA BUFFALO RIVER

R 292 295.64

R 716.48

R 3 210.10

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

61

KZN

Amajuba

Steeling

R 292 295.64

R 716.48

No information provided

No information provided

No information provided

62

KZN

Amajuba

Malonjane

R 292 295.64

R 716.48

No information provided

No information provided

No information provided

63

KZN

Amajuba

GROOTHOEK

R 292 295.64

R 716.48

R 3 210.10

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

64

KZN

Amajuba

MANCAMANE

R 292 295.64

R 716.48

R 3 210.10

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

65

KZN

Amajuba

WAAIHOEK FARM 2 TRUST

R 292 295.64

R 716.48

No information provided

No information provided

No information provided

66

KZN

Amajuba

GROOTVLEI

R 292 295.64

R 716.48

R 3 210.10

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

67

KZN

Amajuba

BEROUW

R 292 295.64

R 716.48

R 3 210.10

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

68

KZN

Umzinyathi

Ward 9

R 322 772.55

R 657.26

R 3 199.74

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

69

KZN

Umzinyathi

Ward 7

R 322 772.55

R 657.26

No information provided

No information provided

No information provided

70

KZN

Umzinyathi

Ward 7 Replacement

R 322 772.55

R 657.26

R 3 199.74

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

71

KZN

Umzinyathi

Nquthu Ward 12 Jabuvu

R 322 772.55

R 657.26

No information provided

No information provided

No information provided

72

KZN

Umzinyathi

Jabavu - alternate

R 322 772.55

R 657.26

R 3 199.74

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

73

KZN

Umzinyathi

Nquthu Ward 13 Hluleni

R 322 772.55

R 657.26

R 3 199.74

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

74

KZN

Umzinyathi

HLAZAKAZI

R 322 772.55

R 657.26

R 3 199.74

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

75

KZN

Uthukela

Emnambithi piggery

R 322 772.55

R 657.26

No information provided

No information provided

No information provided

76

KZN

Uthukela

Mdlatswele -Cornfields

R 322 772.55

R 657.26

R 3 199.74

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

77

KZN

Uthukela

Mkholombe -Weenen

R 322 772.55

R 657.26

No information provided

No information provided

No information provided

78

KZN

Uthukela

Khanjana (Nhlambamsoka)

R 322 772.55

R 657.26

No information provided

No information provided

No information provided

79

KZN

Uthukela

Rosboom ( Goodhope)

R 322 772.55

R 657.26

R 3 199.74

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

80

KZN

Uthukela

RIETKUIL FARM

R 322 772.55

R 657.26

R 3 199.74

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

81

KZN

Uthukela

KLIP PORT FARM

R 322 772.55

R 657.26

R 3 199.74

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

82

KZN

Uthukela

MANGQATENI

R 322 772.55

R 657.26

R 3 199.74

Mono

3x5000lt tanks on 3m stands & 2 troughs on slab

83

Limpopo

Greater Giyani

Thomo

R 346 225.00

R 657.26

No information provided

No information provided

No information provided

84

Limpopo

Thulamela

Tshifudi

R 415 663.38

R 657.26

No information provided

No information provided

No information provided

85

Limpopo

Lephalale

Kgobagodimo

R 482 582.50

R 657.26

No information provided

No information provided

No information provided

86

Mpumalanga

Thembisile Hani

Gemsbokfontein

R 150 000.00

R 657.26

R 3 200.00

Mono

1x10 000lt tanks on 3m stands & 1 troughs on slab

87

Mpumalanga

Bushbuckridge

Welverdiend A

R 315 680.00

R 657.26

R 3 200.00

Mono

1x10 000lt tanks on 3m stands & 2 troughs on slab

88

Mpumalanga

Chief Albert Luthuli

Lekkerloop (section 2)

R 58 129.98

R 657.26

R 3 200.00

Mono

4x10 000lt tanks on 3m stands & 8 troughs on slab

89

Mpumalanga

Thaba Cheu

Pilgrimrest

R 160 000.00

R 657.26

R 3 200.00

Mono

4 x10 000lt tanks on 3m stands & 16 troughs on slab

90

Mpumalanga

Nkomazi

Strydomblok/Dludluma

R 202 000.00

R 657.26

R 3 200.00

Mono

1x10 000lt tanks on 3m stands & 2 troughs on slab

91

Mpumalanga

Nkomazi

Goba

R 189 720.00

R 657.26

R 3 200.00

Mono

1x10 000lt tanks on 3m stands & 2 troughs on slab

92

North West

Moses Kotane

DRIEFONTEIN FARM-MMEKWA

R 190 000.00

R 657.26

R 300.00

windmill

water tank, elevated stand & windmill

93

North West

Moses Kotane

DRIEFONTEIN FARM-MONAGENG

R 190 000.00

R 657.26

R 300.00

windmill

water tank, elevated stand & windmill

94

North West

Mahikeng

FARM LUCYDALE-STONE

R 190 000.00

R 657.26

R 300.00

windmill

water tank, elevated stand & windmill

95

North West

Mahikeng

FARM LUCYDALE-MATSHEKA

R 190 000.00

R 657.26

R 300.00

windmill

water tank, elevated stand & windmill

96

North West

Mahikeng

SUNNYSIDE-MOJIWA

R 220 000.00

R 657.26

R 300.00

windmill

water tank, elevated stand & windmill

97

North West

Moses Kotane

VLAKFONTEIN FARM

R 220 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

98

North West

Moses Kotane

Driefontein farm-Mabiletsa

R 220 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

99

North West

Moses Kotane

Driefontein farm- ntshabele PJ

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

100

North West

Moses Kotane

driefontein farm -Monageng

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

101

North West

Moses Kotane

Donkerhoek farm-Ramokgadi

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

102

North West

Moses Kotane

Driefontein farm-Pitse

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

103

North West

Moses Kotane

Driefontein farm-Lekgotla PN

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

104

North West

Moses Kotane

Donkerhoek farm- Maragel BJ

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

105

North West

Moses Kotane

Donkerhoek farm - Matlapeng

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

106

North West

Moses Kotane

Donkerhoek farm Moraka

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

107

North West

Moses Kotane

Donkerhoek farm- Maragele TM

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

108

North West

Moses Kotane

Driefontein farm-Molefe ES

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

109

North West

Moses Kotane

Driefontein farm-Ntshabele NS

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

110

North West

Rustenburg

Palmietfontein -Mokgatle

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

111

North West

Rustenburg

Potgieters fontein-Motlhabane

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

112

North West

Rustenburg

Palmietfontein -Rammutla

R 190 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

113

North West

Mahikeng

Lucydale farm

R 220 000.00

R 0.00

R 300.00

windmill

water tank, elevated stand & windmill

05 June 2017 - NW1288

Profile picture: Vos, Mr J

Vos, Mr J to ask the Minister of Transport

(a) What is the total number of examiners of vehicles in the Free State who have been convicted of issuing fraudulent certificates of road worthiness and continue to practice as examiners, (b) why have the specified examiners not been charged and arrested and (c) by what date will they be arrested and charged?

Reply:

It is difficult to report on the statistics relating to convictions of examiners due to the prolonged period it takes to finalise a case; and due to the fact that once a case has been opened with the South African Police Service (SAPS), they must conduct investigations and ultimately prepare the docket for the Department of Justice to prosecute. Therefore a case may take much longer than expected to be finalised. This involves arms of government other than the Department of Transport.

a) According to information provided by the Free State province, no examiners were arrested or convicted in the 2016 / 17 financial year for fraudulent certification of roadworthiness.

b) See above (a)

c) See above (b)

05 June 2017 - NW1286

Profile picture: Walters, Mr TC

Walters, Mr TC to ask the Minister of Transport

(a) What is the total number of examiners of vehicles in North West who have been convicted of issuing fraudulent certificates of road worthiness and continue to practice as examiners, (b) why have the specified examiners not been charged and arrested and (c) by what date will they be arrested and charged?

Reply:

It is difficult to report on the statistics relating to convictions of examiners due to the prolonged period it takes to finalise a case; and due to the fact that once a case has been opened with the South African Police Service (SAPS), they must conduct investigations and ultimately prepare the docket for the Department of Justice to prosecute. Therefore a case may take much longer than expected to be finalised. This involves arms of government other than the Department of Transport.

a) The North West Department of Transport reported on the following:

Four (4) Examiners had been arrested and charged.

Of the four (4), one (1) examiner resigned during the process,

One (1) examiner was found guilty by the Wolmaranstad Magistrate Court and sentence will be passed on the 9th June 2017.

Two (2) Examiners' case ongoing at the Tlhabane Magistrate Court, but are currently on bail and the hearing postponed to the 8th June 2017 - Case No. 336/02/2017

One (1) Runner and a Clerk arrested with the Examiner above, case also ongoing - Case No. 336/02/2017

The examiner who was found guilty is not currently working as an examiner.

b) See above (a)

c) See above (b)

 

05 June 2017 - NW1287

Profile picture: Vos, Mr J

Vos, Mr J to ask the Minister of Transport

(a) What is the total number of examiners of vehicles in Gauteng who have been convicted of issuing fraudulent certificates of road worthiness and continue to practice as examiners, (b) why have the specified examiners not been charged and arrested and (c) by what date will they be arrested and charged?

Reply:

It is difficult to report on the statistics relating to convictions of examiners due to the prolonged period it takes to finalise a case; and due to the fact that once a case has been opened with the South African Police Service (SAPS), they must conduct investigations and ultimately prepare the docket for the Department of Justice to prosecute. Therefore a case may take much longer than expected to be finalised. This involves arms of government other than the Department of Transport.

a) Gauteng Province responded by noting that that five (5) Examiners of vehicles have been de-registered as Authorized Officers for Fraud during the 2016/2017 financial year and are no longer practicing as Examiners of Vehicles in the Gauteng Province due to their registration being cancelled.

b) See above (a)

c) See above (b)

05 June 2017 - NW1293

Profile picture: Topham , Mr B

Topham , Mr B to ask the Minister of Transport

(a) Why are the provisions of SA National Standards 10216 not being applied equally with regard to the vehicle testing stations in each of the provinces, (b) why have the recommendations by the SA Bureau of Standards Inspectorate of vehicle testing stations been ignored to date, (c) what is his department doing to ensure that these recommendations are complied with, (d) what are the (i) timelines, (ii) milestones and (iii) deadlines in each province, (e) what is being done to ensure that these dates are complied with and (f) who is responsible to ensure that these dates are met?

Reply:

(a) In terms of section 40 of the National Road Traffic act, 1996 (Act No. 93 of 1996) read with regulation 136 of the National Road traffic Regulations, 2000 it is the competency of the respective MEC’s responsible for transport to either suspend or cancel the registration of a testing station, if a testing station no longer complies with the requirements for registration. In terms of Regulation 137E the Inspectorate of Testing Stations shall evaluate and inspect as prescribed and make recommendations to the MEC in terms of the compliance or non-compliance of vehicle testing stations in the province. This includes but is not limited to the compliance to SANS 10216. It remains the prerogative of the respective MECs to implement the recommendations of the SABS and the reason for different applications of the recommendations is due to the fact that each MEC may choose to implement according to his or her discretion.

(b) The function of the Inspectorate of Testing Stations is currently performed by the South African Bureau of Standards (SABS). The Inspectorate can only make recommendations to the respective MEC and have no powers to enforce such recommendations. It remains the prerogative of the respective MECs to implement the recommendations of the SABS and the reason for different applications of the recommendations or not implementing at all is due to the fact that each MEC may choose to implement according to his or her discretion. All provinces have replied that the recommendations were adhered to.

(c) The Department is communicating concerns regarding noncompliance at the national forums and via provincial information sessions. This happens on a continuous basis. The Department has further included the development of the Anti-Fraud and Corruption Strategy in its Strategic Plan and Annual Performance Plan. The Department is further striving towards publishing the Minimum Requirements for Service Delivery Standard. Both these initiatives strive to address non-compliance at not only testing stations but also Driving Licence Testing Centres and Registering Authorities. All of the mentioned initiatives involves publication in the Gazette and impact studies. The replies to (d), (e) and (f) are dependent on the relevant MECs of each province and are depicted under the applicable provincial heading below.

Eastern Cape:

(d) (i) Upon recommendations by the SABS, Eastern Cape issues a TS4 notice to the contravening vehicle test station in terms of Regulation 136 (1) and (2) NRTA, Act 93 of 1996, and the Promotion of Administrative Justice Act 3 of 2000, requiring the said VTS to report to the MEC in writing within 14 days from the date of the notification, the reason for such failure to comply and details of the measures taken to rectify and prevent such failure. Standards are applied to in terms of the National Road Traffic Act 93/1996

(ii) (iii) The Province follows up with the VTS after the 14 days, and with the SABS to determine if the recommendations have been implemented and findings cleared. If the findings are not cleared, and of a nature that warrants suspension or cancellation, Eastern Cape then issues a TS5 notice to the contravening VTS notifying of the suspension or cancellation of the registration of such VTS, in terms of Regulation 136 NRTA, Act 93 of 1996, and the Promotion of Administrative Justice Act 3 of 2000.

No SABS findings were ignored. All recommendations by the Vehicle Testing Centre were rectified and sent back to SABS.

EC Inspectorate Section is doing a follow up to those recommendations by SABS and most were rectified.

The contravening VTS then has the right to appeal to the Minister of Transport within 21 days of receipt of the notice as per Section 51A NRTA, Act 93 of 1996. If an appeal is lodged with the Minister of Transport within the 21 days, and the Province is notified of such, then the Province waits for the decision of the Minister before implementing the suspension or cancellation.

(e) Inspectorate after the visit SABS should immediately forward copy or Email to the Provincial Inspectorate

(f) Eastern Cape Vehicle Fitness Section

Free State:

(d)The Province has started during the 2014-2015 Financial Year to upgrade and calibrate all the vehicle testing equipment at vehicle testing stations in the province.

(i) (ii)The Province reported that 17 stations were upgraded (i.e. Bloemfontein, Trompsburg, Bethlehem, Harrismith, Parys, Heilbron, Sasolburg, Kroonstad, Welkom, Virginia, Wesselsbron, Marquard, Ladybrand, Ficksburg, Odendaalrus, Thaba-Nchu, and Windburg Testing Stations) by the end of the 2016/17 financial year.

(iii) The province endeavors to continue upgrades in the 2017/18 financial year and will further calibrate the equipment of five more stations i.e. Botshabelo, Phuthaditjhaba, Bultfontein, Viljoenskroon and Petrusburg.

(e) The Inspectorate for Vehicle Testing Stations will follow up on the progress reported by the province.

(f) Provincial Monitoring Unit

Gauteng Province:

(d) (i) Upon recommendations by the SABS, Gauteng issues a TS4 notice to the contravening vehicle test station in terms of Regulation 136 (1) and (2) NRTA, Act 93 of 1996, and the Promotion of Administrative Justice Act 3 of 2000, requiring the said VTS to report to the MEC in writing within 14 days from the date of the notification, the reason for such failure to comply and details of the measures taken to rectify and prevent such failure.

(ii) The Province follows up with the VTS after the 14 days, and with the SABS to determine if the recommendations have been implemented and findings cleared. If the findings are not cleared, and of a nature that warrants suspension or cancellation, Gauteng then issues a TS5 notice to the contravening VTS notifying of the suspension or cancellation of the registration of such VTS, in terms of Regulation 136 NRTA, Act 93 of 1996, and the Promotion of Administrative Justice Act 3 of 2000. The contravening VTS then has the right to appeal to the Minister of Transport within 21 days of receipt of the notice as per Section 51A NRTA, Act 93 of 1996. If an appeal is lodged with the Minister of Transport within the 21 days, and the Province is notified of such, then the Province implements the decision to suspend or cancel the VTS in question on approval by the Minister

(iii) Addressed in (ii) above

(e)Addressed in (d) above

(f) Gauteng: Vehicle Fitness Section

KwaZulu-Natal:

The KwaZulu-Natal Province abides by the prescripts of SANS 10216. The Inspectorate of testing stations, SABS conducts yearly inspections at KwaZulu-Natal Vehicle Testing Stations and provides recommendations in respect of the findings in terms of SANS codes 10216 and deviations are addressed accordingly.

KZN does adhere to the recommendations made by the SABS. Upon receipt of TS4, TS5 recommendations from SABS, notices of intention to cancel or suspend or suspension/cancellation notices, signed by the HOD, are forwarded to the vehicle testing stations. Responses are followed up.

(c) Notices are sent to the vehicle testing stations, responses are dealt with, and SABS is consulted with regarding the responses.

(d) What are the:

(i) The recommendation is received from SABS. The notice is prepared for the HOD’s signature. On receipt of the signed notice, the notice is hand delivered and from the date of delivery, the testing station is given 14 days to respond.

(ii) The KwaZulu-Natal Department of Transport issued twelve (12) TS4 notices on recommendation from SABS, and 1 TS5 notice is in the process of being served. The representations in respect of the TS4 notices are in the process of being reviewed by SABS/Administration, and

(iii) The proprietor is given 14 days to respond.

(e) Monitor and pend for response, follow up on responses.

(f) The KwaZulu-Natal Department of Transport

Limpopo:

(d) The province is having number of compliance inspections conducted as one of the indicators in the Annual Performance Plan.

(i) Each and every institution is monitored every six months.

(ii) Compliance reports are received from National Inspectorate, follow-ups are made on implementation of the recommendations.

(iii) Monthly reports are received from the Departmental Inspectors and reports are being made to the respective institutions.

(e)(f) The National Inspectorate of Vehicle Testing Stations makes regular follow ups to ensure that these dates are met.

Mpumalanga:

(d) (i) (ii) (iii) Once the testing station report has been received, TS4 is issued to the affected testing station and a response is expected within 14 days. The testing station is given 30 days to put corrective measures.

(e) A follow up inspection is conducted to confirm the corrective measures.

(f) The Senior Manager responsible for Transport Administration and Licensing in the province.

North West:

d) The Provincial monitoring unit conducts follow up inspections to ensure the implementation and monitoring of the recommendations as communicated with the stations.

(i) Stations are given 30 days to respond to the recommendations made by the SA Bureau of Standards.

(ii) Non-compliant stations at the time of the inspection, have implemented all recommendations and now operating effectively. Furthermore, the Provincial Inspectorate conducts unannounced inspections to independently confirm that short comings are addressed accordingly.

(iii.) The provincial deadline for the implementation of the recommendations are linked to the SA Bureau of Standards Inspectorate deadline of 30 days.

e) Provincial monitoring unit conducts regular announced and unannounced visits to the Vehicle Testing Stations to ensure strict adherence to the deadlines, and where slow implementation is experienced, immediate intervention is sought with relevant authorities.

f) The Provincial monitoring unit is mandated with the responsibility of ensuring that all recommendations and deadlines thereto are strictly adhered to by relevant stations.

Northern Cape:

(d) Follow up letters are submitted to the respective Testing Stations in line with the findings and recommendations of the South African Bureau of Standards where TS4/ TS5 notices were issued.

Follow up visits are conducted to determine whether corrective interventions were taken or not. In the case where no corrective actions are taken the Testing Stations are suspended from operation i.e., De Aar, Victoria West, Kathu, Prieska etc.

Regular follow up visits and hosting of information sessions to ensure a common understanding in respect of the interpretation and application of relevant policies governing the Vehicle Testing Station environment.

(i) Quarterly

(ii) Follow up visits are done on Quarterly basis to ensure implementation plans are adhere to.

(iii) Testing Stations are given 14 (fourteen) days to comply in terms of Regulation 136 of the National Road Traffic Act, (Act. 93 of 1996).

(e) Regular follow ups in writing, telephonically and meetings with Municipal Managers/ Testing Station Proprietors.

(f) The Provincial Monitoring Unit.

Western Cape:

(d) Findings raised in reports that are provided to the Department are formally brought to the attention of the VTSs and followed up until rectified:

(i) as soon as the report is received with feedback due to the Department within 21 days (ii) milestones and corrected finding

(iii) reported immediately for a response within 21 days,

(e) The Section Vehicle Regulation and Standards Unit and the Compliance Monitoring Unit do follow up inspections.

(f) The Section Vehicle Regulation and Standards Unit and the Compliance Monitoring Unit

05 June 2017 - NW1427

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

(1)When was a certain person (name furnished) appointed onto the Road Traffic Infringement Agency Board; (2) whether the appointment was gazetted; if not, (a) why not and (b) what are the implications of not having the appointment gazetted; if so, what are the relevant details?

Reply:

(1) Adv Bilikwana is not appointed to the Board of the Road Traffic Infringement Agency;

(2) There was no appointment made and thus no need for his name to be gazetted;

(a) there was no gazetting because he is not a member of the board. His official employment duties are that of a Company Secretary. In the RTIA’s correspondence therefore, his name is listed along with that of board members, expressly indicating that he is the Company/Board Secretary, in line with best practise

05 June 2017 - NW1290

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Transport

(a) What is the total number of examiners of vehicles in the Western Cape who have been convicted of issuing fraudulent certificates of road worthiness and continue to practice as examiners, (b) why have the specified examiners not been charged and arrested and (c) by what date will they be arrested and charged?

Reply:

It is difficult to report on the statistics relating to convictions of examiners due to the prolonged period it takes to finalise a case; and due to the fact that once a case has been opened with the South African Police Service (SAPS), they must conduct investigations and ultimately prepare the docket for the Department of Justice to prosecute. Therefore a case may take much longer than expected to be finalised. This involves arms of government other than the Department of Transport.

a) It was reported to the Department that no examiners of vehicles in the Western Cape were convicted of issuing fraudulent certificates of road worthiness in the 2016 / 17 financial year.

b) See above (a)

c) See above (b)

05 June 2017 - NW1333

Profile picture: Mhlongo, Mr TW

Mhlongo, Mr TW to ask the Minister of Sport and Recreation

(1) (a) What are the details of the shortage of sporting facilities in each province, (b) what is the total number of sporting facilities that are available in each province and (c)of the specified facilities, how many are accessible to differently-abled persons; (2) (a) which provinces have been earmarked by his department for upgrading of sporting facilities and (b) what are the time frames for each province?

Reply:

(1) (a) In the current financial year the Department of Sport and Recreation SA (SRSA) will conduct a facility audit intended not only to quantify number of facilities available, their type and level of service they offer, but also to assess needs and shortfalls using various methods including municipal IDPs and the SRSA Facility Classification Framework, which provides guidelines in terms of type and category of facility, level of service it must offer and minimum distance/radius for accessibility. This, in line with the department’s annual performance plan, will ensure the prioritisation of building and maintenance of facilities in order to contribute to the objectives of National Sport and Recreation Plan and the National Development Plan.

(b) The Department has conducted and concluded a facility count and verification process in 2016. The process included count of all facilities irrespective of their ownership and this was done through our facility count project team in all nine (9) provinces in collaboration with municipalities. The national total sum of facilities as counted is 5022, and provincial breakdown is as follows:

 

PROVINCE

FACILITIES

Eastern Cape

214

Free State

259

Gauteng

989

KwaZulu-Natal

1341

Limpopo

947

Mpumalanga

791

Northern Cape

102

North West

134

Western Cape

245

NATIONAL

5022

(c) Our 2016 facility count took this matter into consideration and make a shocking revelation that of all facilities counted, irrespective of their conditions, only 20% are accessible to people with disabilities, and this is another matter that justifies a need to strengthen the role of SRSA in planning and monitoring implementation of sports and recreation infrastructure projects in order to enforce Norms and Standards, and Sports and Recreation Amendment Act both of which emphasize a need to ensure that sports facilities are user friendly to people with disability.

(2) (a) Since 2016/17 the department has been involved with identification of sports infrastructure projects in all provinces in order to guide allocation of the R300 million for MIG. The NDP dictates that all settlement in the country must have access to sport and recreation facilities, and it is in that spirit that while resources are limited and prioritisation is inevitable, allocations will be made in all provinces.

(b) Since sports infrastructure projects are implement in a context of MIG, therefore, with exception of multi-year projects, completion dates of projects will coincide with the end municipal financial year, and this effectively informs time frames.

**************************************

05 June 2017 - NW1374

Profile picture: Horn, Mr W

Horn, Mr W to ask the Minister of Justice and Correctional Services

(a) What is the total number of applications for cellphone data in terms of section 19 of the Regulation of Interception of Communications and Provision of Communication-Related Information Act, Act 70 of 2002, that were submitted in the period 1 January 2014 to 31 March 2017 and (b) of the specified applications, what is the total number that was (i) granted and (ii) declined in each case?

Reply:

a) I have been informed that the total number of applications for cellphone data in terms of Section 19 of the Regulation of Interception of Communications and Provision of Communication-Related Information Act, Act 70 of 2002 that were submitted in the period 1 January 2014 to 31 March 2017 is 866.

b) (i) Granted: 866

(ii) Declined: 0

05 June 2017 - NW1201

Profile picture: King, Ms C

King, Ms C to ask the Minister of Communications

(1)Whether the Chairperson of the Board of the Media Development and Diversity Agency (MDDA) has acted (a) on behalf of the Chief Executive Officer (CEO) of the MDDA and/or (b) as the CEO of the MDDA in each of the past five financial years; if not, what is the position in this regard; if so, (i) why in each case and (ii) on which statutory grounds was each such instance based; (2) for how long has the CEO position of the MDDA been vacant; (3) whether the specified person is compensated for the roles of (a) Chairperson of the MDDA Board and (b) CEO; if not, what is the position in this regard; if so, (i) on what statutory grounds, (ii) what are the terms and (iii) how much in each case; (4) whether, with reference to the reply to question 435 on 30 March 2017, she has found that the position of CEO of the MDDA will be filled by the end of the first quarter of the 2017-18 financial year as anticipated; if not, what is the position in this regard; if so, what progress has been made in this regard?

Reply:

1. (a) and (b) The Chairperson of the Board of the Media Development and Development Agency (MDDA) has neither (a) acted on behalf of the CEO; nor (b) acted as the CEO of the MDDA in each of the past five financial years.

In the absence of the CEO between 1 March 2017 and 9 May 2017, the Board took a resolution, in the Board meeting of 01 March 2017, that the Chairperson of the Board is to assume the caretaker role over the existing management structure.

After the resignation of the CEO on the 28 February 2017, the Board requested the Minister of Communications via letter dated 2 March 2017 and at the bi-lateral meeting on 5 March 2017 for a secondment from the Department of Communications for an Acting CEO. After a further request to the newly appointed Minister of Communications, Mr Donald Liphoko was seconded to the MDDA as Acting CEO effective from 8 May 2017.

2. The position of CEO has been vacant since 28 February 2017.

3. (a) and (b) This is not applicable as, as stated above, the Chairperson of the Board was not acting as CEO of the MDDA. She therefore has only received compensation as Chairperson and not as CEO.

4. No, the position of the CEO will not be filled by end of Q1 of 2017/2018 as the MDDA currently does not have a quorating Board. The recruitment process has commenced which will be approved by a quorating Board.

05 June 2017 - NW1411

Profile picture: Brauteseth, Mr TJ

Brauteseth, Mr TJ to ask the Minister of Transport

What (a) total amount has been spent by his department on legal fees (i) in the (aa) 2014-15, (bb) 2015-16 and (cc) 2016-17 financial years and (ii) since 1 April 2017 and (b) are the (i) details, (ii) outcomes and (iii) costs of each case?

Reply:

(a) Total amount spent on legal fees

(i)

(aa) 2014-2015 (R8,983.177.00)

(bb) 2015-2016 (R9,383.623.00)

(cc) 2016-2017 (R19,911,320.00)

(ii) Since 1 April 2017 (928,574.00)

(b)

(i) details

2014 2015

Tasima

City of Cape Town / Minister of Transport and SANRAL

DOT / Thwala

Prodiba

2015-2016

Tasima

Prodiba

Marine enquiry Kingfisher

City of Cape Town / Minister of Transport and SANRAL

DOT / Vilana

DOT / Thwala

MEC For Transport KZN / Transport Appeal Tribunal

JV Ndorum (Mthatha Airport)

2016-2017

Tasima

Prodiba

Marine enquiry Kingfisher

Marine enquiry Witbank

MEC for Transport KZN / Transport Appeal Tribunal

City of Cape Town / Minister of Transport and SANRAL

DOT / Thwala

DOT/ Vilana

JV Ndorum (Mthatha Airport)

African Harvest / Minister of Transport and ACSA

1 April 2017

Tasima

JV Ndorum ( Mthatha Airport)

(ii) outcomes

Tasima - success

Prodiba – success

Marine enquiry kingfisher – completed

Marine enquiry Witbank – completed

DOT / Vilana - settled)

DOT / Thwala – success

MEC for Transport KZN / Transport Appeal Tribunal - success

City of Cape Town – not succesful

JV Ndorum (Mthatha Airport) – not finalized

African Harvest (not finalized)

(ii) costs of each case

Tasima (R13, 322, 170. 54)

Prodiba (R1, 792, 495.19)

Marine enquiry Kingfisher (R2, 582, 935.33)

Marine enquiry Witbank (R1, 722, 232.54)

DOT / Vilana (R1, 552, 420.00)

DOT / Thwala (R2, 550, 370.93)

MEC for Transport KZN / Transport Appeal Tribunal (R1, 306, 460.93)

City of Cape Town / Minister of Transport and SANRAL (R1, 087, 503.00)

JV Ndorum (Mthatha Airport) (R247, 095.00)

African Harvest (R809 172.00)

05 June 2017 - NW1291

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Transport

(a) What is the total number of examiners of vehicles in KwaZulu-Natal who have been convicted of issuing fraudulent certificates of road worthiness and continue to practice as examiners, (b) why have the specified examiners not been charged and arrested and (c) by what date will they be arrested and charged?

Reply:

It is difficult to report on the statistics relating to convictions of examiners due to the prolonged period it takes to finalise a case; and due to the fact that once a case has been opened with the South African Police Service (SAPS), they must conduct investigations and ultimately prepare the docket for the Department of Justice to prosecute. Therefore a case may take much longer than expected to be finalised. This involves arms of government other than the Department of Transport.

  1. It was reported to the Department that no examiners of vehicles in KwaZulu-Natal who have been convicted of issuing fraudulent certificates of road worthiness during the 2016 / 17 financial year are still practicing.
  1. See above (a)
  1. See above (b)

05 June 2017 - NW1232

Profile picture: Redelinghuys, Mr MH

Redelinghuys, Mr MH to ask the Minister of Rural Development and Land Reform

Whether (a) his department and (b) each entity reporting to him has (i) procured any services from and/or (ii) made any payments to the Decolonisation Foundation; if not, in each case, what is the position in this regard; if so, what (aa) services were procured, (bb) were the total costs, (cc) is the detailed breakdown of the costs, (dd) was the total amount paid, (ee) was the purpose of the payments and (ff) is the detailed breakdown of the payments in each case?

Reply:

(a),(b)(i),(ii) No.

(aa),(bb),(cc),(dd),(ee),(ff) Falls away.

05 June 2017 - NW1393

Profile picture: Maynier, Mr D

Maynier, Mr D to ask the Minister of Finance

What is the (a) total amount spent by Government and (b) the detailed breakdown of such expenditure, in respect of (i) Standard and Poor’s, (ii) Moody’s, (iii) Fitch and (iv) any other ratings agency from 1 April 2008 to date?

Reply:

(a)  Total amount spent by Government on rating agencies fees

South Africa has solicited the credit rating services of Moody’s Investors Services (Moody’s), S&P Global Ratings (S&P), Fitch Ratings (Fitch) and the Japanese’ Ratings and Investment Information, Inc. (R&I). In terms of the contractual agreements, the government has to pay fees to the rating agencies for the services rendered.

Since April 2008 to May 2017, a total amount of R 81 451 873.00 has been paid to the rating agencies. The table link below illustrates the total spent in rands made to all the four solicited credit rating agencies. S&P is the highest paid rating agency followed by Moody’s.

http://pmg-assets.s3-website-eu-west-1.amazonaws.com/RNW1393Table-170605.pdf

(b) The detailed breakdown of such expenditure per rating agency:

(i) S&P:

S&P’s annual rating fees are based on:

  • Annual surveillance;
  • Rating of long term debt issuances;
  • Ratings of short term debt issuances; and
  • Ratings of the Commercial Paper and Medium Term Notes.

(ii) Moody’s:

Moody’s annual and quarterly rating fees are based on:

  • Annual and quarterly credit surveillance;
  • Ratings of all Non-US Medium Term Notes Programs;
  • Ratings of all US Medium Term Notes;
  • Ratings of all Global Medium Term Notes Programs;
  • Ratings of all Commercial Paper/Short Term; and
  • Ratings of all long term debt issuances and Medium Term Notes sales in all markets including local currency debt issuances.

(iii) Fitch

Fitch’s annual rating fees are based on:

  • Annual surveillance;
  • Ratings of debt issuance; and
  • Expense reimbursement for reasonable travel and lodging expense incurred during the annual rating mission to the Republic of South Africa.

(iv) R&I

R&I’s annual rating fee is based on:

  • On-going surveillance of the credit rating
  • Foreign currency issuer rating;
  • Domestic currency issuer rating; and
  • Foreign currency short term rating.

05 June 2017 - NW1048

Profile picture: James, Dr WG

James, Dr WG to ask the Minister of Health

What progress has been made in the evaluation of the capacity of the South African health security under the Global Health Security Agenda, using the Joint External Evaluation tool?

Reply:

South Africa is implementing the International Health Regulations (2005) [IHR 2005] since its enactment on 15 June 2007. In February 2017, the National Department of Health completed a self IHR assessment using the Joint External Evaluation tool, with the participation of all relevant Government departments and key stakeholders. The National Department of Health officials assessed all the action packages, namely: prevention, detection, response, and IHR-related hazards as well as Points of Entry. The Department of Health is using the findings to develop an action plan aimed at further strengthening of South Africa's IHR capacity.

END.

05 June 2017 - NW1285

Profile picture: Walters, Mr TC

Walters, Mr TC to ask the Minister of Transport

(a) What the total number of examiners of vehicles in Mpumalanga who have been convicted of issuing fraudulent certificates of road worthiness and continue to practice as examiners, (b) why have the specified examiners not been charged and arrested and (c) by what date will they be arrested and charged?

Reply:

It is difficult to report on the statistics relating to convictions of examiners due to the prolonged period it takes to finalise a case; and due to the fact that once a case has been opened with the South African Police Service (SAPS), they must conduct investigations and ultimately prepare the docket for the Department of Justice to prosecute. Therefore a case may take much longer than expected to be finalised. This involves arms of government other than the Department of Transport.

a) The province of Mpumalanga has reported that there were no examiners that were convicted of issuing fraudulent certificates of road worthiness in the 2016 / 17 financial year.

b) See above (a)

c) See above (b)

05 June 2017 - NW1266

Profile picture: Steyn, Ms A

Steyn, Ms A to ask the Minister of Rural Development and Land Reform

Whether the Office of the Valuer-General was involved in any of the transactions involving the (a) acquisition and (b) transfer of land undertaken by his department since the Valuer-General’s appointment; if not, why not; if so, (i) what are the relevant details of the transactions and (ii) in each case, (aa) what were the values of the transactions and (bb) to what extent were these values (aaa) less or (bbb) more than the estimated market value of the property?

Reply:

Response:

a) Yes

b) Yes

Response to (i), (ii), (aa), (aaa) (bbb) on table below.

PROGRAMME

ESTIMATED MARKET VALUE

OVG DETERMINED VALUE

DIFFERNCE

LAND REDISTRIBUTION AND DEVELOPMENT

R 116,866,011.00

R 98,264,000.00

R 18,602,011.00

STRENGTHENING OF RELATIVE RIGHTS

R 218,457,051.64

R 176,651,900.00

R 41,805,151.64

RESTITUTION

R 250,376,449.00

R 226,205,265.96

R 24,171,183.04

 Total

R 585,699,511.64

R 501,121,165.96

R 84,578,345.68

05 June 2017 - NW1433

Profile picture: Gqada, Ms T

Gqada, Ms T to ask the Minister of Transport

What (a) total amount in legal fees and (b) other costs did (i) his department and/or (ii) any of the entities reporting to him have to pay with regard to the High Court case number 17748/17 of 10 April 2017?

Reply:

(a) The Department has not as yet received the legal fees from its legal team.

(b) Not applicable

(i) The Department has not yet received any taxed costs from the Applicants.

(ii) PRASA did not join legal proceedings, thus there were no legal fees to be paid

05 June 2017 - NW1073

Profile picture: Mokgalapa, Mr S

Mokgalapa, Mr S to ask the Minister of Health

With reference to his reply to question 406 on 27 March 2017, are there any patients being accommodated in correctional services facilities due to inadequate mental health facilities in any other province; if so, (a) what is the total number of patients who are currently being accommodated, (b) in which prisons and (c) for how long?

Reply:

Yes.

Detailed answers to questions (a), (b) and (c) are as follows:

Province

(a) Number of patients accommodated

(b) Prison facilities

(c) For how long

Eastern Cape

14

St. Albans

8-22 months

 

14

Grahamstown

6-19 months

 

43

East London

1-22 months

 

1

Wellington

1month

 

13

King Williams Town

1-11 months

 

11

Fort Beaufort

10-18 months

 

3

Cradock

14-21 months

Sub-total

99

Mpumalanga

2

Witbank

84 months

 

6

Nelspruit

12-36 months

 

1

Middelburg

12 months

 

6

Ermelo

1-48 months

Sub-total

15

Total

114

The waiting list of patients in prison facilities in Mpumalanga province is due to the lack of a specialised psychiatric hospital to render this service. Plans are underway to build a hospital, and currently patients are referred to Weskoppies Hospital in Gauteng Province, when a bed becomes available.

END.

05 June 2017 - NW1063

Profile picture: Jooste, Ms K

Jooste, Ms K to ask the Minister of Health

With reference to her reply to question 406 on 27 March 2017, for how long has each of the 26 patients been accommodated in correctional services facilities due to inadequate mental health facilities in the Northern Cape?

Reply:

With regard to my reply to Question 406 on 27 March 2017, I wish to inform Honourable Member that since the beginning of May 2017, the 21 of the 26 patients mentioned in March have been moved to West End Psychiatric Hospital after completion of refurbishment of facilities there.

When they were still in correctional service facilities, on a waiting basis, they used to wait for an average of 4 years.

END.

05 June 2017 - NW1226

Profile picture: Motau, Mr SC

Motau, Mr SC to ask the Minister of Labour

Whether (a) her department and (b) each entity reporting to her has (i) procured any services from and/or (ii) made any payments to the Decolonisation Foundation; if not, in each case, what is the position in this regard; if so, what (aa) services were procured, (bb) were the total costs, (cc) is the detailed breakdown of the costs, (dd) was the total amount paid, (ee) was the purpose of the payments and (ff) is the detailed breakdown of the payments in each case?

Reply:

1. (a) (i) No.

(a) (ii) No.

(aa) Not Applicable

(bb) Not Applicable

(cc) Not Applicable

(dd) Not Applicable

(ee) Not Applicable

(ff) Not Applicable

05 June 2017 - NW1197

Profile picture: Kalyan, Ms SV

Kalyan, Ms SV to ask the Minister of Communications

(1)Whether any person may serve on the board of more than one of the entities that report to her simultaneously; if so, (a) on what statutory grounds and (b) what are the (i) names, (ii) names of boards, (iii) terms served on each board and (iv) salaries of each specified person; (2) whether each of the specified persons declared serving in positions on each of the specified boards; if not, in each case, why not; if so, what are the relevant details in each case?

Reply:

(1) Yes

(a) The law does not prohibit any person from serving on more than one Board of the entities reporting to the Minister of Communications.

(b) (i) Ms Khanyisile Kweyama

    (ii) Brand South Africa Board and the interim SABC Board.

    (iii) Serving a three-year term at Brand South Africa and six months at the SABC interim Board.      

    (iv) payment for services rendered were in line with the required prescript

(2) Yes.

05 June 2017 - NW1432

Profile picture: Figlan, Mr AM

Figlan, Mr AM to ask the Minister of Transport

(a) Why has the Metrorail Chatsworth and Durban service been suspended, (b) how are passengers being accommodated whilst the service is suspended, (c) what is being done to reinstate the service and (d) by what date will the service be reinstated?

Reply:

a) The Metrorail commuter service between Crossmoor (Chatsworth) and Durban was suspended from 22 February 2017 due to the general shortage of serviceable rolling stock experienced by the PRASA KZN Region. As at February 2017, only 32 train sets out of the required 57 train sets were in-service, due to major overhaul/upgrade and maintenance program requirements of the ageing fleet. PRASA was also losing 5 coaches on average per month due to vandalism. As a consequence the in-service fleet is under pressure and run more kilometres than usual, with less time to effect day to day maintenance, having an adverse effect on the performance of the fleet. The over extension and poor performance of the available fleet create serious risks in terms of commuter dissatisfaction and overcrowding.

In balancing the available in-service fleet with overall demand across the KZN region, the Chatsworth and Bluff services were suspended in order to make rolling stock available on higher demand corridors in areas where alternative bus services are not viable due to objections from the taxi industry.

b) A replacement bus service was provided by PRASA between Crossmoor and Merebank, making it possible for commuters to connect with trains travelling to and from the South Coast and Umlazi.

c) Although a partial recovery of the KZN Metrorail fleet availability towards the end of March allowed the train service between Durban and Crossmoor to be reinstated, limited spare trains sets still affects service capacity and performance, resulting in frequent cancellations. Buses are arranged on an ad-hoc basis to augment the train service as far as possible.

d) The train service between Durban and Crossmoor was officially reinstated on 30 March 2017. The train service between Durban/Umlazi and Wests (Bluff) remains suspended due to the ongoing shortage of rolling stock. PRASA is in a process of accelerating the return of additional rolling stock (train sets) to improve the fleet availability across all services in the KZN region.

02 June 2017 - NW785

Profile picture: Kalyan, Ms SV

Kalyan, Ms SV to ask the Minister of International Relations and Cooperation

(a) What are the full details of the (i) grievances and (ii) disciplinary cases that (aa) her department and (bb) each foreign mission of South Africa dealt with in the 2015–16 financial year, (b) how many were concluded, (c) what is the nature of sanctions that were meted out in each case, (d) how many are still pending and (e) what are the reasons?

Reply:

(a) (i) Total number of grievances handled during the period 01 April 2015 to 31 March 2016 is thirty two (32), and all thirty two (32) were concluded.

 

Nature of grievance

Number

Status

Unfair PMDS process

2 (two)

Finalised

Unfair recruitment and selection process

3 (three)

Finalised

Verbal abuse and intimidation

2 (two)

Finalised

Failure by the department to assist officials serving abroad with medical aids

1 (one)

Finalised

Disapproval of resignation

1 (one)

Finalised

Unilateral decision by the CFO to discontinue education allowance

6 (six)

Finalised

Failure by the department to upgrade the officials’ qualifications from FAA to MAC

4 (four)

Finalised

Harrasment and victimization

1 (one)

Finalised

Disapproval to undergo surgery abroad

1 (one)

Finalised

Exclusion from management meetings

1 (one)

Finalised

Disapproval of an application to attend MAC bridging course

1 (one)

Finalised

Disapproval of transfer back to South Africa

1 (one)

Finalised

Failure to upgrade post to high level

4 (four)

Finalised

Disapproval to attend a course

1 (one)

Finalised

False accusations

2 (two)

Finalised

Non payment of COLA

1 (one)

Finalised

     

(ii) Twelve (12) misconduct cases were handled and finalised during the period 01 April 2015 to 31 March 2016. See the table in paragraph (C)

(b) Twelve (12) grievances were from officials stationed abroad while twenty (20) were from officials at DIRCO Head Office

(bb) One (1) misconduct case was for the official stationed abroad and the remaining eleven (11) were for officials at DIRCO Head Office

(c) The nature of sanctions that were meted out in each misconduct case are as follows:

Nature of Misconduct

Sanction

Plagiarism

Not Guilty

Fraud

Dismissal

Insubordination

Not Guilty

Breach of Security

Final Written Warning plus recovery of COLA Allowance

Failure to disclose conflict of interest

One month Suspension without pay plus final written warning

Direlection of duty

Written Warning

Contravention of the procurement policy

Written warning

Gross negligence and dishonesty

Final written warning

Fraud

Final written warning plus one month suspension without pay

Misrepresentation and fraud

Dismissal

Irregular processes of the DBAC

Final written warning plus counselling

Absenteeism

Written warning

(d) All the cases have been finalised

(e) See the answer in (d)

Unquote.

02 June 2017 - NW1084

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Energy

How were all the public submissions for the Integrated Resource Plan (IRP) and Integrated Energy Plan (IEP) processes made available to the public before the closing date of 31 March 2017, b) i) what is the next step and timeframes in the development of final IRP and IEP and (ii) will the public be involved in the processes, c) when will the revised assumptions and base case be made available to the public, d) will she table a proposed IRP policy before Parliament; and e) (i) what document will record how public comments were used to guide improvements on the draft plans and (ii) by what date will the specified document be made available to the public? NW1221E

Reply:

a) The Department is in the process of analysing the comments received from the public, once done the Department will also consult sister departments for comments and submit to Cabinet for processing. The updated Integrated Resource Plan (IRP) and the Integrated Energy Plan (IEP) will then be submitted to Parliament for processing.

b) i) The next step is to analyse the public inputs, make adjustment to assumptions used where necessary, rerun the base case, run scenarios and come up with a balanced scenario (draft IRP) before policy adjustment. We anticipate having the plans to Cabinet by the fourth quarter of 2017/18 financial year.

c) Once Cabinet has processed the updated IRP &IEP,..

d) i) Once Cabinet approves the IRP it will be submitted to Parliament for processing

    ii) See response to question (c)

(e) (i) See response to question (a)

    (ii) See response to question (c)

 

02 June 2017 - NW132

Profile picture: Mokgalapa, Mr S

Mokgalapa, Mr S to ask the Minister of International Relations and Cooperation

(1)What are the details of her department’s policy concerning the employment of foreign nationals in South Africa’s foreign missions; (2) (a) how many foreign nationals are currently employed by each foreign mission and (b) in each case, (i) in which position are each of these foreign nationals employed and (ii) what (aa) qualifications and (bb) special skills does each person possess; (3) did the mission conduct (a) background checks and (b) security clearance procedures on each specified foreign national; if not, why not; if so, what are the relevant details?

Reply:

(1) The South African Government, through the Department of International Relations and Cooperation (DIRCO), employs country nationals, third country nationals and/or South African nationals at the various Diplomatic and Consular Missions abroad, as support staff to the South African diplomats stationed in these missions abroad. Such employees are referred to as Locally Recruited Personnel (LRP).

(2) (a) 2049 LRP

(b)(i) The LRP are employed in the following positions:

  • Cleaner
  • Domestic Worker
  • Gardener
  • Watchman/Security
  • Chauffeur
  • Messager/Driver
  • Receptionist
  • Registry Clerk
  • Accountant/Assistant Accounts Clerk
  • Consular Clerk
  • Maintenance Officer
  • Secretary
  • Administrative Clerk/Officer
  • Information Clerk
  • Translator
  • Trade and Information Assistant
  • Marketing Officer

(ii) (aa) Each post has minimum requirements in terms of qualifications.

(bb) Post requirements and skills are determined by the level of the post

(3) (a) Yes

(b) As part of recruitment and selection, all applicants are required to submit a police clearance certificate from the local authorities of the host country.

02 June 2017 - NW307

Profile picture: Mokgalapa, Mr S

Mokgalapa, Mr S to ask the MINISTER OF INTERNATIONAL RELATIONS AND COOPERATION

(1) With reference to the statement of the President of the Republic, Mr Jacob G Zuma, made during the State of the Nation Address on 9 February 2017, that South Africa will continue mediation efforts, peacekeeping operations and peace-making initiatives in the Democratic Republic of Congo, what is the current status of South Africa’s formal involvement in the specified country?

Reply:

  1. South Africa continues to support MONUSCO (United Nations Organization Stabilization Mission in the Democratic Republic of the Congo) through a deployment of uniformed and other personnel in a multi-dimensional peacekeeping which involves the military, police and the civilian components. MONUSCO’s strategic priorities are to protect civilians, stemming out of violence against women and children perpetuated by armed groups. The current mandate of MONUSCO will expire on 31 March 2017. The UN will provide guidance in terms of the extension of the mandate based on a situational analysis on the ground, particularly in the Eastern DRC and the political developments as the country prepares for the elections by end of 2017.

 

UNQUOTE

02 June 2017 - NW1230

Profile picture: Redelinghuys, Mr MH

Redelinghuys, Mr MH to ask the MINISTER OF PUBLIC SERVICE AND ADMINISTRATION

Whether (a) her department and (b) each entity reporting to her has (i) procured any services from and/or (ii) made any payments to the Decolonisation Foundation; if not, in each case, what is the position in this regard; if so, what (aa) services were procured, (bb) were the total costs, (cc) is the detailed breakdown of the costs, (dd) was the total amount paid, (ee) was the purpose of the payments and (ff) is the detailed breakdown of the payments in each case?

Reply:

The Department of Public Service and Administration (DPSA) did not procure any services from and/or made any payments to the Decolonisation Foundation.

The National School of Government (NSG) has neither procured any services nor made any payments to the Decolonisation Foundation.

(b) (i) No – The Centre for Public Service Innovation (CPSI) has not procured nor had any need to procure any services from the Decolonisation Foundation.

(ii) No – The CPSI has not made any payments nor had any need to make payments to the Decolonisation Foundation.

(aa) Not applicable

(bb) Not applicable

(cc) Not applicable

(dd) Not applicable

(ff) Not applicable

End

02 June 2017 - NW1074

Profile picture: Van Der Walt, Ms D

Van Der Walt, Ms D to ask the MINISTER OF PUBLIC SERVICE AND ADMINISTRATION

Whether he intends to amend provisions of paragraph 1.2.4 of the Ministerial Handbook; if not, what is the position in this regard; if so, (a) by what date and (b) what will the amendments entail?

Reply:

Paragraph 1.2.4 of Chapter 5 of the Ministerial Handbook relates to the purchase of motor vehicles for Members. There are proposals to amend this provision as part of the review of the Ministerial Handbook.

(a) It is expected that the review of the Ministerial Handbook will be completed once the Joint Cabinet Committee has considered the content and approved a revised Ministerial Handbook.

(b)The details of the revised Ministerial Handbook will be made available as soon as it is approved by the Cabinet.

End

02 June 2017 - NW172

Profile picture: Lees, Mr RA

Lees, Mr RA to ask the Minister of International Relations and Cooperation

a) Whether, with reference to her reply to question 318 on 31 March 2016, the Government has taken any further action to secure the release of Mr Stephen McGowan; if not, why not; if so, (a) what are the relevant details of the further action the Government took in order to secure his release since her reply and (b) what are the relevant details of the action that the Government intends to take in order to secure his release; b) Whether she has any knowledge of (a) where the specified person has been held and (b) by whom; if not, in each case, why not; if so, what are the relevant details in each case; c)Whether the Government is working with and/or assisting any non-governmental organisations to secure the release of the specified person ; if not, why not; if so, what are the relevant details of the (a)non-governmental organisation and (b)assistance being provided to the specified organisations?

Reply:

(a) Yes -Government is involved in a continuum of actions securing the release of Mr Stephen McGowan, involving support from any of the Government Departments when needed. Actions were taken since March 2016, including, but not limited to, considering every viable option to ensure his release. Government continued to liaise with other Governments and agencies who may contribute to effect the release of Mr McGowan. Disclosing any details of actions taken at this stage will not serve a proper purpose but the House should know that Government did not leave any stone unturned to secure the release of Mr McGowan and will continue to assign resources and sincere efforts to ensure his return to South Africa..

(b)The exact location of Mr Stephen McGowan is not known, because it is a known trend of the captors to move their captives with regular intervals, ensuring their safety and security. Different groups are publicly known to capture tourists in Mali and, although more information about the group may be sourced, providing more information on the group is not in the interest of the matter being dealt with.

(c)Government is working with many other Governments and agencies in an effort to effect the release of Mr Stephen McGowan. Providing details on each of these organisations at this stage may compromise his safety.

UNQUOTE

02 June 2017 - NW786

Profile picture: Kalyan, Ms SV

Kalyan, Ms SV to ask the Minister of International Relations and Cooperation

Whether the locally recruited personnel charter of her department has been implemented yet; if not, (a) why not and (b) by what date will it be implemented; if so, what are the relevant details in this regard?

Reply:

An LRP Charter does not apply to our regulatory context , since all LRP administrative matters are regulated through domestic legislation applicable to the respective countries of accreditation. Therefore, DIRCO does not have such a charter.

a) Not applicable

b) Not applicable

01 June 2017 - NW1046

Profile picture: Matsepe, Mr CD

Matsepe, Mr CD to ask the Minister of State Security

Whether his department has employed a certain person (name furnished) in any capacity; if so, (a) what is the specified person’s (i) employment start date and (ii) job description and (b) what are the relevant details of the payments the person received since the employment start date, including (i) salary, (ii) benefits, (iii) bonuses and (iv) any other payments?

Reply:

1.The person referred to, is said by the member that he is a suspended person from Crime Intelligence.

2. Crime Intelligence does not have its mandate on the Minister of State Security.

3. Labour Relations Act and Basic Conditions Employment Act defines every Employment Relations of everyone in the Employment of the State.

01 June 2017 - NW1237

Profile picture: Robinson, Ms D

Robinson, Ms D to ask the Minister of State Security

Whether (a) his department and (b) each entity reporting to him has (i) procured any services from and/or (ii) made any payments to the Decolonisation Foundation; if not, in each case, what is the position in this regard; if so, what (aa) services were procured, (bb) were the total costs, (cc) is the detailed breakdown of the costs, (dd) was the total amount paid, (ee) was the purpose of the payments and (ff) is the detailed breakdown of the payments in each case?

Reply:

The State Security Agency (SSA) has no company called Decolonisation Foundation in its data base.

01 June 2017 - NW1506

Profile picture: Mokgalapa, Mr S

Mokgalapa, Mr S to ask the Minister of State Security

Whether (a) his department and (b) each entity reporting to him procured any services from and/or made any payments to (i) a certain company (name furnished) or (ii) any other public relations firms; if not, in each case, what (aa) services were procured, (bb) was the total cost, (cc) is the detailed breakdown of such costs, (dd) was the total amount paid, (ee) was the purpose of the payments and (ff) is the detailed breakdown of such payments?

Reply:

The State Security Agency (SSA) has no Bell Pottinger in its data base of companies.

01 June 2017 - NW1217

Profile picture: Lotriet, Prof  A

Lotriet, Prof A to ask the Minister of Energy

Whether (a) her department and (b) each entity reporting to her has (i) procured any services from and/or (ii) made any payments to the Decolonisation Foundation; if not, in each case, what is the position in this regard; if so, what (aa) services were procured, (bb) were the total costs, (cc) is the detailed breakdown of the costs, (dd) was the total amount paid, (ee) was the purpose of the payments and (ff) is the detailed breakdown of the payments in each case?

Reply:

(a) The Department of Energy and (b) its entities reporting to it has never; (i) procured; (ii) nor made any payments to the Decolonisation foundation.

(bb) Not applicable

(cc) Not applicable

(dd) Not applicable

(ee) Not applicable

(ff) Not applicable

01 June 2017 - NW1136

Profile picture: Ollis, Mr IM

Ollis, Mr IM to ask the Minister of Labour

(1)(a) What was the total expenditure of Supported Employment Enterprises in the 2016-2017 financial year, (b) what is the total staff compliment of Supported Employment Enterprises and (c) what was the total spend on marketing, advertising, and sales incentives by Supported Employment Enterprises; (2) What is the total (a) budget of Supported Employment Enterprises and (b) marketing-advertising budgets for the Supported Employment Enterprises in the 2017-18 financial year?

Reply:

1. (a) The information that the Honourable Member is seeking is currently going through an audit process in order to ensure its accuracy. However, we will gladly provide such information in the 2016/17 Annual report which will be tabled in Parliament in August 2017 as prescribed in the PFMA.

(2) (a) The total budget for Supported Enterprises is R141 million and

(b) Marketing-advertising budgets is R4.4 million

01 June 2017 - NW1514

THE NATIONAL ASSEMBLY QUESTION FOR WRITTEN REPLY Question 1514 Mrs E N Ntlangwini to ask the Minister of Trade and Industry

What number of (a) companies have divested from the country since 2012 in respect of all their industries and (b) jobs were lost when the specified companies divested from the country?

Reply:

the dti has facilitated numerous investments since 2012 and we are not aware of any of these companies divesting since then.

The General Motors decision is due to a commercial decision by its Head-Quarters in terms of its future global operations. Such divestment may also based on restructuring of the companies, mergers & acquisitions and general restrictive global market conditions.

Invest SA, offers as part of its services investor facilitation and aftercare and we are paying particular attention on the retention and maintenance of investment in the country. We have engaged with the steel sector, companies such as AMSA, Highveld, SC Smelters and well as companies in the renewables sector.

01 June 2017 - NW1137

Profile picture: Ollis, Mr IM

Ollis, Mr IM to ask the Minister of Labour

(1)What was the (a) total expenditure and (b) detailed breakdown of the expenditure of Productivity SA in the (i) 2014-15, (ii) 2015-16 and (iii) 2016-17 financial years; (2) what is the projected budget for Productivity SA for the 2017-18 financial year; (3) what was the staff complement of Productivity SA for the 2016-17 financial year

Reply:

(1) (a) The detailed breakdown of the 2014/15 and 2015/16 information can be gleaned in the Productivity South Africa’s Audited Financial statements and/or the Annual Reports that were tabled in Parliament in the periods in question.

(b) (i), (ii) & (iii) Detailed breakdown for 2016/17 is currently being audited and as such it will be premature and improper to provide such information at this stage. However the information will be provided in the Productivity South Africa/s Audited Financial Statements and/or in the 2016/17 Annual Report as prescribed.

(2) The projected budget for Productivity SA for 2017/18 Financial Year is in the region of R177 million.

(3) The staff complement of Productivity South Africa for the 2016/17 financial year is currently being audited and as such it will be premature to provide such information at this stage. However, the detailed information in this regard will be tabled in Parliament in August 2017 as prescribed.

01 June 2017 - NW1512

Profile picture: Rabotapi, Mr MW

Rabotapi, Mr MW to ask the Minister of Women in the Presidency

Whether (a) her Office and (b) each entity reporting to her procured any services from and/or made any payments to (i) a certain company (name furnished) or (ii) any other public relations firms; if not, in each case, why not; if so, in each case, what (aa) services were procured, (bb) was the total cost, (cc) is the detailed breakdown of such costs, (dd) was the total amount paid, (ee) was the purpose of the payments and (ff) is the detailed breakdown of such payments?

Reply:

(a)(b) Not applicable.

________________________

Approved by the Minister on

Date………………………..