Questions and Replies

Filter by year

15 December 2017 - NW2786

Profile picture: Matsepe, Mr CD

Matsepe, Mr CD to ask the Minister of Cooperative Governance and Traditional Affairs

With regard to the closing of the bridges in (a) Central Avenue, (b) Van Riebeeck Avenue, (c) 4th Avenue and (d) 1st Avenue in Edenvale in the Ekurhuleni Metropolitan Municipality, (i) what assessment of the structural damage to each specified bridge has been completed, (ii) what were the findings of each assessment, (iii) what will the cost be to rehabilitate each bridge and (iv) by what date (aa) does the Ekurhuleni Metropolitan Municipality intend to start repairing each bridge and (bb) will each bridge be re-opened?

Reply:

The response from Ekhurhuleni Metropolitan Municipality is narrated underneath:

The Municipality appointed consultants to investigate the bridges. They had submitted the report to the Municipality. The answers are based on the report and Municipal comments.

(a) Central Avenue

The bridge was not closed. Visual inspections by the relevant department of the municipality indicated that it appeared to be stable enough to allow traffic through it. This was confirmed by the appointed Consultants.

(b) Van Riebeeck Avenue

The bridge was not closed. Visual inspections by the relevant department of the municipality indicated that it appeared to be stable enough to allow traffic through it. This was confirmed by the appointed Consultants.

(c) 4th Avenue

The bridge was not closed. Visual inspections by the relevant department of the municipality indicated that it appeared to be stable enough to allow traffic through it. This was confirmed by the appointed Consultants.

(d) 1st Avenue in Edenvale

This was the only bridge that was closed as the visual inspection indicated damage to the deck overlay. It is a small bridge constructed with culverts, which is the reason for closing the bridge until it could be certified as stable/ safe by specialist consultant. However, the bridge was opened for traffic after getting certification from the consultant.

(i) The appointed consultant assessed the stability and safety of the mentioned bridges for any movement/ displacement that could have taken place. They checked the stability of the abutments, floor slabs, approach roads and discharge/ downstream apron slabs. They also checked the extent of the erosion of the embankments and any movement/ damage to the decks/ overlays.

(ii) The consultant’s finding confirmed that all the bridges were structurally stable. They recommended that the upstream and downstream embankments require extensive rehabilitation due to the erosion and/ or flood damage to the areas around the wing walls.

(iii) The estimated costs for the remedial measure or to rehabilitate the bridges are as bellow:

(a) Central Avenue bridge: R 63 000 000.00 (it may vary depending on which design option is acceptable to the Consultants and Department of Water and Sanitation)

(b) Van Riebeeck Avenue bridge : R 300 000.00

(c)4th Avenue bridge/canal: R 5 600 000.00

(d) 1st Avenue bridge: R 800 000.00

(iv) The process has already been started. In order to execute the remedial measures designed by Specialist Consultants, approval from GDARD and Department of Water and Sanitation is required. These approvals and authorization requests have been submitted and approval is awaited.

(aa) Yes it does. The process has already been started. The municipality is awaiting the approvals and authorization of the design requests have been submitted and approval is awaited form GDARD and Department of Water and Sanitation.

(bb) All the bridges have been declared stable and have been open for traffic for quite some time now.

15 December 2017 - NW3898

Profile picture: Vos, Mr J

Vos, Mr J to ask the Minister of Tourism

Since her appointment as Minister of Tourism on 31 March 2017, (a) what number of overseas trips has she taken, (b) what are the details of the programme of each visit and (c) what was the cost of each overseas trip?

Reply:

a) What number of overseas trips has she taken.

Trip to :

b) What are the details of the programme of each visit.

c) What was the cost of each overseas trip for the Minister.

Madrid, Spain

(9 – 15 May 2017)

  • 105TH UNWTO Executive Council Meeting

Total: R105 694,80

Chicago and Miami, USA

(10-16 July 2017)

  • Rainbow PUSH Coalition and Citizenship Education Fund 46th Annual International Convention Program and SAT Meetings, Chicago
  • SAT Trade Engagement, Miami

Total: R250 488,78

Kigali, Rwanda and Lilongwe, Malawi

(27 August – 1 September 2017)

  • 41st Annual World Tourism Conference, Kigali
  • Takulandirani Malawi International Tourism Expo and Signing of Memorandum of Understanding, Lilongwe

Total: R59 649,29

Chengdu, China and Beijing and Tokyo, Japan

(10-24 September 2017)

  • CAF, UNWTO Executive Council Meeting and UNWTO General Assembly, Chengdu
  • Tourism Expo (Ministerial Roundtable) and SAT Trade Engagements, Beijing and Tokoyo

Total: R106 780,29

New York and Las Vegas, USA

(8-14 October 2017)

  • SAT Engagements, New York
  • IMEX America, Las Vegas

Total: R271 471,29

London, UK

(4-8 November 2017)

  • World Travel Market, London

Total: R81 481,29

Gaborone, Botswana (15-17 November 2017)

  • Binational Commission Meeting (BNC)

Total: R6 645,29

15 December 2017 - NW3993

Profile picture: Boshoff, Ms SH

Boshoff, Ms SH to ask the Minister of Basic Education

Whether (a) her department and/or (b) any of the provincial basic education departments provide free sanitary pads to female learners; if not, why not; if so, (i) what number of schools have received the free sanitary pads and (ii) what are the relevant details in each case?

Reply:

a) The Department of Basic Education (DBE) does not have resources in the voted funds to provide sanitary towels to female learners.

b) Provinces such as Limpopo, Mpumalanga, Free State and KwaZulu-Natal have implemented local initiatives to provide sanitary towels to female learners.

(i) (ii)The project is a provincial initiative that is led and funded by each of the provinces. The school lists and relevant details remain in the custody of the said Provincial Education Departments (PEDs) and the question may be referred to the said PEDs.

 

15 December 2017 - NW359

Profile picture: Topham , Mr B

Topham , Mr B to ask the Minister of Human Settlements

What is the (a) make, (b) model, (c) price and (d) date on which each vehicle was purchased for use by (i) her and (ii) her deputy (aa) in the (aaa) 2014-15 and (bbb) 2015-16 financial years and (bb) since 1 April 2016?

Reply:

(i) & (ii) The information requested by the Honourable Member is available in the Department’s Annual Report.

 

15 December 2017 - NW3965

Profile picture: Krumbock, Mr GR

Krumbock, Mr GR to ask the Minister of Cooperative Governance and Traditional Affairs

(1)In light of the cost containment measures contained in the National Treasury’s Municipal Finance Management Act Circular 82 dated 30 March 2016, on what statutory grounds did the uMngeni Local Municipality in KwaZulu-Natal rely when it spent an estimated R350 000 at a 4-star beachfront hotel in Durban from 23 to 26 April 2017 for a service delivery workshop; (2) (a) why was it necessary for the specified workshop to be hosted at the specified hotel, when a local venue was allegedly available at a cost of R45 000 and (b) has he found that the conducting of workshops outside of municipal facilities due to less distractions and better levels of concentration improve the outcomes of the workshops hosted by municipalities; (3) whether he intends to take any steps against the specified municipality for hosting the workshop at the hotel; if not, why not; if so, what are the relevant details?

Reply:

The information requested by the Honourable Member is not readily available in the Department. The Department has however, engaged the Provincial Departments responsible for Local Government to request the relevant information from municipality. The information will be submitted to the Honourable Member as soon as it is received.

15 December 2017 - NW3979

Profile picture: Tarabella - Marchesi, Ms NI

Tarabella - Marchesi, Ms NI to ask the Minister of Basic Education

With regard to her reply to question 3270 on 9 November 2017, have any of the 184 Accelerated School Infrastructure Delivery Initiative schools not yet received their building maintenance certificate; if so, (a) which schools have not received a certificate and (b) what are the reasons for the delay?

Reply:

Once schools are fit for purpose, a practical completion certificate is awarded. Upon final completion, the asset is handed over to the relevant Provincial Department who then makes sure that there is a maintenance budget and maintenance plan for the school. All 184 schools have been issued with their practical completion certificates.

15 December 2017 - NW3967

Profile picture: Krumbock, Mr GR

Krumbock, Mr GR to ask the Minister of Tourism

(a) What number of buildings and other structures have been built as part of the Royal Khalanga Lodge project in Limpopo, (b) what is the total square meters, including upper floors, of each building and structure and (c) have the specified buildings and structures been registered with the National Home Builders Registration Council?

Reply:

a) What number of buildings and other structures have been built as part of the Royal Khalanga Lodge project in Limpopo

b) what is the total square meters, including upper floors, of each building and structure

c) have the specified buildings and structures been registered with the National Home Builders Registration Council

Entrance gate & guard house

33m²

The National Home Builders Registration Council (NHBRC) is an agency of the Department of Human Settlements which is responsible for the protection of housing consumers and to regulate the home building industry. Registration with the NHBRC is mainly intended for residential buildings as areas designated as business, industrial or otherwise are excluded from the NHBRC. The Khalanga Project was therefore not registered with the NHRBC as the buildings did not fall within the requirements for registration.

Chalets - standard type (x10)

320m²

 

Chalets - luxury type (x4)

490m²

 

Chalet - Presidential suite

50m²

 

4 Chalets ( 4 rooms each)

324m²

 

Hall -1000 seater

1123m²

 

Hall toilets

75m²

 

Toilet block - pool

44m²

 

Breakaway rooms (x2 buildings)

160m²

 

Entertainment area

107m²

 

Laundry

66 m²

 

Steel palisade fence (1.8m) high

2500m

 

Swimming Pools (4x3m2)

7m/3 and 6/4 (280 m²)

 

Deck

75m² with approximately 20m long staircase

 

Carports

13/36-468 m²

 

Retaining wall

2450 m²

 

Paving in the hall

3285 m²

 

Paving – access road

10131 m²

 

Bulk services

Electrical supply

455m

 

Sewer reticulation

631m

 

Water reticulation including 6x 6000l tanks

631m

 

15 December 2017 - NW3980

Profile picture: Tarabella - Marchesi, Ms NI

Tarabella - Marchesi, Ms NI to ask the Minister of Basic Education

With regard to her department’s presentation to the Portfolio Committee on Basic Education on 7 November 2017, has the Free State government spent 91,57% of their budget in only two financial quarters; if so, how will school transport in the remaining two financial quarters be funded?

Reply:

The Free State Government has spent 91.57% of their Learner Transport Budget in the first two financial quarters. Information received from the Free State Department of Police, Roads and Transport indicate that the Executive Committee of the Free State Government has earmarked Learner Transport to receive provincially earmarked funds. The funds will be made available during the budget adjustments and services will proceed without interruptions. An additional R10m was already made available on the adjustments budget and the Department is busy assessing internal funds for reprioritisation.

15 December 2017 - NW3208

Profile picture: Madisha, Mr WM

Madisha, Mr WM to ask the Minister of Cooperative Governance and Traditional Affairs

Whether, with reference to the Moerane Commission of Inquiry regarding the political killings in KwaZulu-Natal, he will launch an investigation into the alleged corruption in the awarding of tenders presented as evidence by a certain official (name and details furnished) within the Harry Gwala District Municipality and surrounding local municipalities; if not, why not?

Reply:

The information requested by the Honourable Member is not readily available in the Department. The Department has however, engaged the Provincial Departments responsible for Local Government to request the relevant information from municipality. The information will be submitted to the Honourable Member as soon as it is received.

15 December 2017 - NW2346

Profile picture: Mileham, Mr K

Mileham, Mr K to ask the Minister of Cooperative Governance and Traditional Affairs

(1)With reference to his reply to question 1588 on 21 July 2017, (a) what is the case number under which the matter, relating to the specified trip, appears on the court role and (b) on what grounds does the sub judice rule, as defined by the Supreme Court of Appeal on 18 May 2007 in the Midi Television case (details furnished), prevent him from answering the specified question as part of his constitutional obligation to account to Parliament in line with section 92 of the Constitution of the Republic of South Africa, 1996; (2) whether, in light of his constitutional obligation to account to Parliament and the specified judgment, he will reconsider his response to question 1588 on 21 July 2017; if not, on what grounds; if so, what are the comprehensive details?

Reply:

1. The law enforcement agencies in particular the Hawks are investigating the so called Gupta leaked emails, this has been widely reported, Minister will not be commenting on any matter arising or related to the alleged Gupta leaked emails in order not to interfere with the due processes of the law.

2. The Minister is required by law to respect due process of the law which inter alia include investigations by law enforcement agencies and therefore I will not interfere with such investigation by making comments.

15 December 2017 - NW3210

Profile picture: Madisha, Mr WM

Madisha, Mr WM to ask the Minister of Cooperative Governance and Traditional Affairs

In light of the alleged corruption involving officials of a certain political party (name and details furnished), (a) what are the circumstances, systems and processes that are applied by the Msunduzi Local Municipality in identifying candidates for one-year meter-reading contracts, (b) on what legislative provisions did the specified municipality rely when it applied the systems and processes and (c) of those contractors that are awarded the meter-reading contracts, how many of them are functionaries of the specified political party?

Reply:

The information requested by the Honourable Member is not readily available in the Department. The Department has however, engaged the Provincial Departments responsible for Local Government to request the relevant information from municipality. The information will be submitted to the Honourable Member as soon as it is received.

15 December 2017 - NW3165

Profile picture: Mokause, Ms MO

Mokause, Ms MO to ask the Minister of Human Settlements

(1)What are the details including the ranks of service providers and/or contractors from which (a) her department and (b) the entities reporting to her procured services in the past five years; (2) what (a) service was provided by each service provider and/or contractor and (b) amount was each service provider and/or contractor paid; (3) (a) how many of these service providers are black-owned entities, (b) what contract was each of the black-owned service providers awarded and (c) how much was each black-owned service provider paid?

Reply:

Honourable Member, in accordance with the established practise applicable to parliamentary questions contained in the document titled, “Guide to Parliamentary Questions in the National Assembly”, I will not be able to provide names of the service providers as requested. The document referred to prohibits Members of Parliament, including the Executive, from divulging names of persons, bodies when asking or responding to parliamentary questions. It specifically states the following:

Questions are to be framed as concisely as possible. All unnecessary adjectives, references and quotations are omitted. Names of persons, bodies and, for example, newspapers are only used in questions if the facts surrounding the case have been proven. As the mere mention of such names could be construed as publicity for or against them, it should be clear that this practice is highly undesirable. If a question will be unintelligible without mentioning such names, the Departments concerned are notified of the name (-s) and this phrase is used: ".......a certain person (name furnished)”

In addition, to spend time sourcing information for the past five financial years will take time and it would not be prudent to spend resources on a project such as this one. The Honourable Member is, however, encouraged to provide me with specific areas of concern that she might have in respect of any service provider used by my Department and the entities reporting to me.

 

15 December 2017 - NW2776

Profile picture: Wilson, Ms ER

Wilson, Ms ER to ask the Minister of Cooperative Governance and Traditional Affairs

With regard to the flooding in Edenvale in November 2016, on which date did the (a) Mayor, (b) Member of the Executive Council for Safety and (c) Chairperson of the Portfolio Committee on Safety visit Edenvale to assess the damage for themselves?

Reply:

The Ekurhuleni Metropolitan municipality through the Gauteng Provincial Department of Cooperative Governance and Traditional Affairs provided the information:

The Emergency Management Services Department can confirm that the Executive Mayor, Member of Mayoral Committee (MMC) Community Safety, other political office bearers and the Gauteng Premier did visit the areas that were affected by floods in the City of Ekurhuleni. However, the department cannot confirm whether the Executive Mayor and other political office bearers specifically visited Edenvale. The Office of the Executive Mayor and / or Member of Mayoral Committee (MMC) Community Safety or the Chairperson of the Community Safety Portfolio is well placed to respond to the specific visit to Edenvale from Honourable E R Wilson from Democratic Alliance.

15 December 2017 - NW3999

Profile picture: Figlan, Mr AM

Figlan, Mr AM to ask the Minister of Cooperative Governance and Traditional Affairs

Is the Local Labour Forum in the Modimolle - Mookgophong Local Municipality in Limpopo currently functional; if not, why not; if so, what are the relevant details? Who is currently part of the Local Labour Forum? (3) (a) when last did the Local Labour Forum meet and (b) what was discussed?

Reply:

According to the information received from Limpopo Provincial Department of Cooperative Governance, Human Settlement and Traditional Affairs:

1. Yes, the Local Labour Forum in the Modimolle - Mookgophong Local Municipality in Limpopo is currently functional.

2. Three Councillors, Trade unions (IMATU and SAMWU), Management (Municipal Manager, Manager: Corporate Services, Manager: Technical Services, Manager: Social Services, Area Manager: Vaalwater and Mookgophong: Legal, Human Resources and Labour Relations Officer.

3. (a) 16 October 2017 (postponed on 27 October 2017, 1 November 2017 and 28 November 2017.

(b) (i) New Limpopo Collective Agreement;

     (ii) Essential Service Agreement;

     (iii) Protective clothing;

     (iv) One job one salary;

     (v) Paid leave; and

     (vi) Progress report of job evaluation and placement.

 

15 December 2017 - NW3960

Profile picture: Davis, Mr GR

Davis, Mr GR to ask the Mr G R Davis (DA) to as the Minister of Energy

Whether he met with a delegation from the Russian Federation on or around Monday,16 October 2017;if not, what is the position in this regard; if so,(a) with whom did he meet,(b) where did the meeting take place,(c)what was discussed and (d) what was the outcome of the meeting?

Reply:

No

15 December 2017 - NW2714

Profile picture: Mileham, Mr K

Mileham, Mr K to ask the Minister of Cooperative Governance and Traditional Affairs

(1)Whether any municipalities which have made payment agreements with Eskom to address outstanding debt have defaulted on those agreements in each of the past three financial years; if so, (a) which municipalities defaulted and (b) what actions have been taken to assist these municipalities to meet their financial obligations in each case; (2) whether any of the specified municipalities are at risk of having their electricity supply cut off by Eskom; if so, what are the relevant details in each case?

Reply:

(1)

Yes, there are municipalities which have made payment agreements (PA’s) with Eskom and have defaulted on those agreements in each of the past three financial years.

(1)(a)

Annexure A presents the municipalities which have made payment agreements with Eskom and have defaulted on those agreements at some point within each of the past three financial years.

(1)(b)

Eskom together with the intervention of national and provincial (Treasury and Co-operative Governance and Traditional Affairs) have engaged municipalities in order to agree on realistic payment plans.

(2)

Yes, from the specified municipalities in Table 1 above there are municipalities at risk of having their electricity supply cut off by Eskom. Planned interruptions dates for municipalities at risk of having their electricity supply cut off by Eskom are presented in Table 1 below.

Table 1:

Province

Municipality

Planned Interruption Date

Free State

Nketoana

Mantsopa

Tokologo

Masilonyana

Nala

Dihlabeng

Moqhaka

27-Sep-17

27-Sep-17

27-Sep-17

27-Sep-17

27-Sep-17

27-Sep-17

27-Sep-17

Limpopo

Thabazimbi

21-Sep-17

Northern Cape

Siyancuma

Renosterberg

Thembelihle1

Tsantsabane

18-Sep-17

18-Sep-17

18-Sep-17

18-Sep-17

Although Thembelihle municipality electricity supply will be interrupted, the municipality does not have a payment arrangement with Eskom.

Annexure A:

Province

2015_2016 Financial Year Municipal Payment arrangement list

 

Valid PA's in 2015/16 Fin Year

Municipality

Honouring PA’s in 2015/16 Fin Year

Number of municipalities who did not honour their agreements

Eastern Cape

5

1. Maletswai (Now Walter Sisulu)

2. Nkonkobe (Now Raymond Mhlaba)

3. Nxuba (Now Raymond Mhlaba)

4. Makana

5. Gariep Municipality (Now Walter Sisulu)

0

5

Free State

8

1.  Dihlabeng

2.  Masilonyana

3. Mantsopa

4. Matjabeng

5. Nketoana

6. Maluti A Phofung

7. Metsimaholo Munic

8. Nala Local Munic

1

7

Gauteng

3

1.  Midvaal

2.  Randfontein

3. Westonaria

3

0

KZN

2

1. Abaqulusi

2. Ulundi

1

1

Limpopo

2

  1. Thabazimbi Munic
  1. Mookgophong

0

2

Province

2015_2016 Financial Year Municipal Payment arrangement list

 

Valid PA's in 2015/16 Fin Year

Municipality

Honouring PA’s in 2015/16 Fin Year

Number of municipalities who did not honour their agreements

Mpumalanga

10

1. Emalahleni

2. Msukaligwa

3.  Govan Mbeki

4.  Lekwa

5.  Emakhazeni

6. Mkhondo

7. Nkomazi

8. Thaba Chweu

9. Chief Albert Luthuli

10. Umjindi

1

9

North West

9

1. Ditsobotla

2. Kgetlengrivier

3. Lekwa-Teemane

4. Mamusa

5. Matlosana

6. Naledi

7. Tswaing

8. Maquassi Hills

9. Madibeng

2

7

Northern Cape

11

1. Kamiesberg

2. Khara Hais

3. Khai - Ma

4.  Nama Khoi

5.  Renosterberg

6.  Tsantsabane

7.  Magareng

8. Siyathemba

9. Siyancuma

10. Dikgatlong

11. Ubuntu

3

8

Western Cape

3

1. Oudtshoorn

2. Kannaland

3. Cederberg

2

1

Province

2016_2017 Financial Year Municipal Payment arrangement list

 

Valid PA's in 2016/17 Fin Year

Municipality

Honouring PA’s in 2016/17 Fin Year

Number of municipalities who did not honour their agreements

Eastern Cape

4

1. Dr Beyers Naude (Former Ikwezi)

2. Makana

3. Raymond Mhlaba

4. Walter Sisulu (former Gariep and Maletswai)

1

3

Free State

8

1. Dihlabeng

2. Masilonyana

3. Mantsopa

4. Moqhaka

5. Nala

6. Nketoana

7. Phumelela

8. Tokologo

2

6

Gauteng

7

1. Midvaal

2. Randfontein

3. Lesedi

4. Mogale City

5. Emfuleni

6. Merafong

7. Westonaria

7

0

KZN

4

1. Mpofana

2. eDumbe

3. Ulundi

4. Abaqulusi

3

1

Limpopo

5

1. Musina

2.  Bela-Bela

3. Modimolle

4. Mookgophong

5. Thabazimbi

0

5

Mpumalanga

11

1.    Emalahleni

2.    Msukaligwa

3.    Thaba Chweu

4.    Govan Mbeki

5.    Lekwa

6.    Emakhazeni

7.    Mkhondo

8.    Albert Lithuli

9. Dipalaseng

10. Victor Khanye

11. City of Mbombela

1

10

North West

9

1. Ditsobotla

2. Kgetlengrivier

3. Lekwa-Teemane

4. Mamusa

5. Matlosana

6. Naledi

7. Ramotshere

8. Tswaing

9. Ventersdorp

4

5

Northern Cape

18

1.   Kai Garib (Keimoes)

2.  Kai Garib (Kenhardt)

3.  Kai Garib (Kakamas)

4.    Kamiesberg

5.    Khai - Ma

6.    Nama Khoi

7.    Kgatelopele

8.    Renosterberg

9.  Tsantsabane

10. Magareng

11. Ga-Segonyana

12. Phokwane/Hartswater

13. Emthanjeni

14. Gamagara

15. Siyathemba

16. Siyancuma

17. Dikgatlong

18. Ubuntu

2

16

Western Cape

2

1. Oudtshoorn

2. Kannaland

1

1

Province

2017_2018 Financial Year Municipal Payment arrangement list

 

Valid PA's in 2017/18 Fin Year

Municipality

Honouring PA’s in 2017/18 Fin Year

Number of municipalities who did not honour their agreements

Eastern Cape

5

1. Dr Beyers Naude (Former Ikwezi)

2. KSD

3. Makana

4. Raymond Mhlaba

5. Walter Sisulu (former Gariep and Maletswai)

1

4

Free State

8

1. Dihlabeng

2. Masilonyana

3. Mantsopa

4. Moqhaka

5. Nala

6. Nketoana

7. Phumelela

8.. Tokologo

1

7

Gauteng

4

1. Emfuleni

2. Merafong

3. Mogale City

4. Randfontein

0

4

KZN

6

1. eDumbe

2. Mpofana

3. Newcastle

4. Phongolo

5. Ulundi

6. Zululand

4

2

Limpopo

4

1. Modimolle

2.. Mookgophong

3. Musina

4. Thabazimbi

0

4

Mpumalanga

10

1. Albert Lithuli

2. Dipaleseng

3. Emakhazeni

4. Emalahleni

5. Govan Mbeki

6. Lekwa

7. Mkhondo

8. Msukaligwa

9. Thaba Chweu

10. Victor Khanye

0

10

North West

9

1. Ditsobotla

2. Kgetlengrivier

3. Lekwa-Teemane

4. Mamusa

5. Matlosana

6. Naledi

7. Ramotshere

8. Tswaing

9. Ventersdorp

2

7

Northern Cape

14

1. Dikgatlong

2. Emthanjeni

3. Gamagara

4. Ga-Segonyana

5. Kai Garib

6. Kgatelopele

7. Magareng

8. Nama Khoi

9. Phokwane/Hartswater

10. Renosterberg

11. Siyancuma

12. Siyathemba

13. Tsantsabane

14. Ubuntu

4

10

Western Cape

2

1. Oudtshoorn

2. Kannaland

1

1

15 December 2017 - NW3961

Profile picture: Davis, Mr GR

Davis, Mr GR to ask the Minister of Energy

Whether he accompanied the President of the Republic, Mr Jacob G Zuma, to meet the President of the Russian Federation, Mr Vladimir Putin, in August 2014 in Novo-Ogariovo; if so, (a) was nuclear energy discussed at the meeting and (b) was the meeting related to the intergovernmental agreement with Russia that was signed a month later?

Reply:

a) Yes, I accompanied H.E President Jacob Zuma on a working visit to the Russian Federation.

b) No

15 December 2017 - NW3513

Profile picture: Gqada, Ms T

Gqada, Ms T to ask the Minister of Energy

On what basis is his department disputing the Auditor-General’s qualified findings against his department’s 2016-17 financial statements and (b) what (i) are the details of the areas of concern identified by the Auditor-General that need to be addressed, (ii) steps will his department take to address the areas of concern and (iii) what mechanisms will be instituted to avoid the concerns being identified again in the 2017-18 financial statements?

Reply:

a) At the conclusion of the Audit there was a dispute between the Department and the Auditor- General on the amount of irregular expenditure. The Minister of Energy has since met with the Auditor-General and the matter in dispute has been resolved.

b) (i) The area of concern that had been identified by the Auditor- General was understatement of irregular expenditure.

(ii) Steps to be taken to address the areas of concern include strengthening of internal controls.

(iii) As indicated in (ii) above mechanisms will be instituted to avoid the concerns identified again in 2017/18 financial statements as part of the remedial action plan. The Minister and the audit committee will oversee the administration on quarterly basis.

15 December 2017 - NW3982

Profile picture: Ollis, Mr IM

Ollis, Mr IM to ask the Minister of Basic Education

(a) What is the current backlog for schools requiring (i) sanitation, (ii) electricity, (iii) water and (iv) replacement due to inappropriate materials and (b) of these, what number of schools will be provided with this infrastructure in the (i) 2017-18, (ii) 2018-19 and (iii) 2019-20 financial years?

Reply:

The Question has been referred to all the Provincial Education Departments and the response will be provided as soon as it is received.

15 December 2017 - NW3728

Profile picture: Carter, Ms D

Carter, Ms D to ask the President of the Republic

Whether the Minister of State Security, Mr Bongani Bongo, had security clearance when he was appointed as Minister; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

I am always guided by the Constitution of the Republic of South Africa, 1996, when I appoint Ministers. Section 91 of the Constitution provides the prescripts by which I abide when appointing the members of Cabinet. 

15 December 2017 - NW2490

Profile picture: Robertson, Mr K

Robertson, Mr K to ask the Minister of Cooperative Governance and Traditional Affairs

(1) (a) What amount of funding was budgeted for the maintenance and repair of (i) roads and (ii) stormwater infrastructure in each ward of Carolina in the Albert Luthuli Local Municipality in Mpumalanga in each of the past five municipal financial years and (b) what amount of the specified funding was spent on the maintenance and repair of (i) roads and (ii) stormwater infrastructure in each specified municipal financial year;

Reply:

The following response was provided by the Chief Albert Luthuli Local Municipality:

(1) (a) (i)(ii)

The municipality budgets for the maintenance and repair of (i) roads and (ii) storm-water infrastructure covering all wards. It doesn’t budget ward-wise.

The municipality budgeted a total amount of R 9 000,00 thousand for the past five years from 2012-2013 to 2016-2017. The year-wise budget amounts are detailed below in thousand Rand:

Roads and storm-water maintenance budget for 2012-2017 period

2012/13

(000 )

2013/14

(000 )

2014/15

(000 )

2015/16 (000 )

2016/17

(000 )

TOTAL

(000 )

1 100,00

2 400,00

1 900,00

1 400,00

2 200,00

9 000,00

(1) (b)(i)(ii)

According to the municipality, it spent a total amount of R 2 500,00 thousand for the past five years from 2012-2013 to 2016-2017. The year-wise expenditure amounts are detailed below in thousand Rand:

Expenditure for roads and storm-water during 2012-2017 period

2012/13

(000 )

2013/14

(000 )

2014/15

(000 )

2015/16 (000 )

2016/17

(000 )

TOTAL

(000 )

450,00

600,00

550,00

600,00

300,00

2 500,00

(2) According to the municipality, it allocated a total budget of R 1 800,00 thousand for the 2017-2018 financial year for maintenance and repair of roads and storm-water.

15 December 2017 - NW3981

Profile picture: Tarabella - Marchesi, Ms NI

Tarabella - Marchesi, Ms NI to ask the Minister of Basic Education

With regard to her department’s presentation to the Portfolio Committee on Basic Education on 7 November 2017, why are the school transport incidents (details furnished) not included in the provincial totals for (a) KwaZulu-Natal and (b) the Eastern Cape?

Reply:

The information on the incidents mentioned has been requested from the Eastern Cape and the KwaZulu-Natal Departments of Education and will be provided as soon as it is received.

15 December 2017 - NW3692

Profile picture: Boshoff, Ms SH

Boshoff, Ms SH to ask the Minister of Basic Education

With reference to her reply to question 2503 on 19 September 2017, what are the details of cases in which the physical abuse of learners is not considered a criminal offence?

Reply:

It is acknowledged that under common law physical abuse is classified as a criminal offence. This means that the listing of an educator’s name on the Register depends on the gravity of the sanction imposed against the educator for an offence he/she committed against a child. If an educator has physically abused a child, which abuse resulted in the child receiving medical attention/treatment, such an educator will be charged with a criminal offence by the South African Police and if found guilty by the court of law and convicted, then that person’s name will automatically be listed in the Register. In that case, the employer cannot overrule the decision of the court of law and therefore will also find the educator guilty of the alleged offence and dismissal is the only sanction for such an offence. In that case where an educator was found guilty of physical abuse against a child and dismissed, such educator’s name submitted by the employer to the Department of Social Development for listing on the National Child Protection Register.

However, in a case where an educator was found guilty of physical abuse by the employer or SACE during the disciplinary hearing, and the sanction imposed was not dismissal, (depending on the severity of the abuse) that person’s name is not listed in the Register. E.g. in a case where an educator used an open hand on the child’s back leaving the child with no finger marks or any mark related to the abuse, the educator may be given a final written warning as a sanction.

15 December 2017 - NW3211

Profile picture: Carter, Ms D

Carter, Ms D to ask the Minister of Cooperative Governance and Traditional Affairs

(1)Whether, in light of the submission by a certain person (name and details furnished) at the Moerane Commission of Inquiry that a multi-million rand tender to guard the Umgeni offices in Umzimkhulu was awarded to a security company in 2011 without following proper procedures (details furnished), he has found that the specified tender was awarded unlawfully; if not, what is the position in this regard; if so what are the relevant details; (2) (a) was the specified company registered with the Security Industry Regulatory Authority and (b) what are the details of the circumstances that resulted in the monetary value of the tender being inflated?

Reply:

The information requested by the Honourable Member is not readily available in the Department. The Department has however, engaged the Provincial Departments responsible for Local Government to request the relevant information from municipality. The information will be submitted to the Honourable Member as soon as it is received.

15 December 2017 - NW3747

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Energy

(1)Whether (a) his department and/or (b) entities reporting to him procured services from a certain company (name furnished); if so, (i) what services were procured in each case and (ii) what is the total amount that was paid to the specified company in each case; (2) whether the specified company provided services related to international travel to (a) his department and/or (b) entities reporting to him; if so, (i) what is the name of each person who travelled, (ii) what was the travel route and (iii) what is the total amount that was paid for each person?

Reply:

1. (a) No procurement and/or services were made to Travel with Flair (Pty) Ltd by the Department of Energy

(i) Not applicable

(ii) No payments were made to Travel with Flair (Pty) Ltd.

(b) (i) Other than the National Nuclear Regulator none of the other entities reporting to the Minister of Energy have procured any services from Travel With Flair

(ii) R 2, 027, 867.96

2. (a) Travel with Flair (Pty) Ltd did not provide international travel for the Department of Energy.

(i) Not applicable

(ii) Not applicable

(iii) Not applicable

(b) (i) The revelation of such information would allow others to develop a profile of the operations of the National Nuclear Regulator which could impact on both safety and security.

15 December 2017 - NW3031

Profile picture: Madisha, Mr WM

Madisha, Mr WM to ask the Minister of Energy

(a) What is delaying the finalisation and release of the report into the sale of 10.3 million barrels of the country’s strategic oil reserves by the Central Energy Fund and (b) when is it anticipated that the report will be published?

Reply:

a) A legal firm had been appointed to conduct investigations. The investigations took longer than expected. The report presented had gaps due to the method used by the investigators. The Minister directed that the report must be able to meet the principles of natural justice i.e. Ald. at partem. The financial aspect conducted by KPMG had to be subjected to a reliance audit and this further caused more delays.

b) When the Minister was supposed to receive final report the service provider on the legal part declared a conflict of interest. The Minister has instructed CEF and SFF to expedite the investigations without further delays.

15 December 2017 - NW3529

Profile picture: Bara, Mr M R

Bara, Mr M R to ask the Minister of Cooperative Governance and Traditional Affairs

What number of persons worked in the office of the (a) Mayor, (b) Speaker, (c) Chief Whip, (d) each Mayoral Committee Member and (f) each chairperson of a committee at the Ekurhuleni Metropolitan Council, on (i) 1 August 2016 and (ii) 1 August 2017?

Reply:

The information requested by the Honourable Member is not readily available in the Department. The Department has however, engaged the Provincial Departments responsible for Local Government to request the relevant information from municipality. The information will be submitted to the Honourable Member as soon as it is received.

15 December 2017 - NW1122

Profile picture: Cassim, Mr Y

Cassim, Mr Y to ask the Minister of Basic Education

Whether, with reference to her reply to question 212 on 6 March 2017, the requested information has been received from the Council for Quality Assurance in General and Further Education and Training (Umalusi); if not, (a) why not and (b) by what date is the information expected; if so, by what date will she communicate it?

Reply:

Information on the question is the information included in the USB flash drive that was submitted to the Portfolio Committee on 17 February 2017 and to the questions office.

15 December 2017 - NW4024

Profile picture: Stubbe, Mr DJ

Stubbe, Mr DJ to ask the Minister of Energy

(1)(a) What was the purpose of the R2,1 million that was paid as a once-off gratuity to the former Minister of Energy shown on page 182 of the 2017 adjusted estimates of national expenditure of Vote No 26: Energy, (b) why was it paid and (c) What are the details of the gratuity; (2) (a) Why is there a shift of R17 million on the same page from the National Solar Water Heater Project to personnel remuneration, travel, gratuity, events and relocation costs, (b) what are the implications of this shift in funds for the project and (c) what are the current targets and achievements for this project for the current year?

Reply:

1. (a) The purpose of the R2.1 million is a once off gratuity paid in accordance with Proclamation by the President of the Republic of South Africa No. 50, 2008. It is in line with paragraph 3.3 once off gratuity for Members of Executive or Deputy Ministers who have served more than 5 years and whose term of office has ended.

(b) The former Minister had served more than 5 years and her term of office had ended from 31st March 2017.

(c) The details of the gratuity are as follows:

i) 4 months pensionable salary for every 5 years term amounting to R 1,847,408.96

ii) Pro-rata part of the 5 year period (last term) 1 May 2014 – 31 March 2017 amounting to R 269,413.81

(2) (a) There was a shift of R17 million from the National Solar Water Heater Project to personnel remuneration, travel, gratuity, events and relocation costs because of the savings under SWHP that could be utilised to defray excess expenditure in those items. The shift was done in line with Section 43(1) of the Public Finance Management Act, Act 1 of 1999.

(2) (b) The shift of R17 million has had a minimal impact on the project. The budget was largely allocated for installation of solar water heaters for the financial year 2017/18 which had not commenced by end of September 2017, as the department is currently busy with compliance requirements of governance. For the remaining months of the current financial year the achievable number of installations will not be impacted upon by the shift of funds.

(2) (c) The current targets for this project for the current year, is to increase the number of procured baseline systems in line with the budget allocation and train youth on the installation of solar water heaters at targeted municipalities. In terms of the achievement, the Department increased the number of procured baseline systems from 42 196 in 2016/17 to 87 206 in 2017/18.

15 December 2017 - NW3739

Profile picture: Mokause, Ms MO

Mokause, Ms MO to ask the Minister of Human Settlements

(1)Whether (a) her department and/or (b) entities reporting to her procured services from a certain company (name furnished); if so, (i) what services were procured in each case and (ii) what is the total amount that was paid to the specified company in each case; (2) whether the specified company provided services related to international travel to (a) her department and/or (b) entities reporting to her; if so, (i) what is the name of each person who travelled, (ii) what was the travel route and (iii) what is the total amount that was paid for each person?

Reply:

(1) (a) & (b) Yes

The Honourable Member did not specify the period for which the information is required.

(2) Furthermore, in accordance with the established practise applicable to parliamentary questions contained in the document titled, “Guide to Parliamentary Questions in the National Assembly”, I will not be able to provide names of persons as requested in the question. The document referred to prohibits Members of Parliament, including the Executive, from divulging names of persons, bodies when asking or responding to parliamentary questions. It specifically states the following:

Questions are to be framed as concisely as possible. All unnecessary adjectives, references and quotations are omitted. Names of persons, bodies and, for example, newspapers are only used in questions if the facts surrounding the case have been proven. As the mere mention of such names could be construed as publicity for or against them, it should be clear that this practice is highly undesirable. If a question will be unintelligible without mentioning such names, the Departments concerned are notified of the name (-s) and this phrase is used: ".......a certain person (name furnished)”

15 December 2017 - NW3873

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Energy

Whether (a) his department and/or (b) any entity reporting to him had any contract with a certain company (name furnished); if so, in each case, (i) what services did the specified company provide, (ii) what was the duration of the contract, (iii) what amount did the department or entity pay the specified company for the contract and (iv) who approved the (aa) contract and (bb) payment?

Reply:

a) Yes, the Department had a contract with Mahlako-A-Phahla Investment.

(i) Services rendered were for transactional advisory to review the state of readiness for the Nuclear New Build Programme.

(ii) The initial contract was for three (3) months, i.e. 27 May to 26 August 2016 with further extension of four (4) months starting from 1 September to December 2016.

(iii) The department paid R20 174 423.82 for the initial contract and a further R67, 745, 337.77 for the extension of the contract.

(iv) (aa) The contract was approved by the Accounting Officer of the Department of Energy

(bb) Payment was approved by the responsible Programme Manager for Nuclear Energy.

Entity

(b)

(i) What services did the specified company provide

(ii) What was the duration of the contract,

(iii) What amount did the entity pay the specified company for the contract

(iv) Who approved the (aa) contract

(iv) Who approved (bb) payment?

NERSA

No

N/A

N/A

N/A

N/A

N/A

SANEDI

No

N/A

N/A

N/A

N/A

N/A

NRWDI

No

N/A

N/A

N/A

N/A

N/A

NNR

No

N/A

N/A

N/A

N/A

N/A

NECSA

Yes

Feasibility Study

27 May 2017 -30 March 2018

3,554,442.86

Senior Executive Manager: Pelindaba Enterprises

Senior Executive Manager: Pelindaba Enterprises

   

Uxc Reports

27 May 2017 -30 March 2018

327,750.00

   
   

Management Fees

27 May 2017 -30 March 2018

None

   
   

Nuclear Fuel Feasibility Study

27 May 2017 -30 March 2018

12,398,629.74

   
   

Project Management

27 May 2017 -30 March 2018

None

   
   

Nuclear Fuel Feasibility Study

27 May 2017 -30 March 2018

387,366.41

   

CEF

Yes

To develop an acquisition strategy for renewable energy projects

2 months

None

The contract has not yet been signed but the procurement manager has issued a letter of intent

No payment has been done yet as the service provider has not started working

15 December 2017 - NW3431

Profile picture: Hill-Lewis, Mr GG

Hill-Lewis, Mr GG to ask the President of the Republic

Whether he facilitated the introduction of any member of a certain family (name furnished) to (a) the Zambian President, Mr Edgar Lungu and/or (b) any Zambian (i) cabinet members, (ii) service chiefs and/or (iii) diplomats during his official state visit to the Republic of Zambia from 12 to 13 October 2017; if so, what are the relevant details in each case?

Reply:

There was no member of the specified family that was part of the official delegation that accompanied the President to the State Visit to Zambia.

15 December 2017 - NW2614

Profile picture: Carter, Ms D

Carter, Ms D to ask the Minister of Cooperative Governance and Traditional Affairs

(1)With reference to reports that for the 10th consecutive year the Ethekwini Metropolitan Municipality has rolled over a R50 million-a-month security tender citing situations of emergency as the reason for deviating from proper procurement processes, (a) what were the situations of emergency that were proffered for the deviations over the past 10 years, (b) what are the names of companies that have benefitted from these deviations and (c) who are the owners/shareholders of the companies in question; (2) will his department undertake an investigation into this matter; if not why not, if so, what are the relevant details?

Reply:

The matter raised by the Honourable Member can best be responded to by the National Treasury, as the competent authority.

15 December 2017 - NW3646

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Energy

Whether his department has engaged in any formal or informal discussions with energy companies in the past year; if so, (a) what are the names of the energy companies, (b) on what dates did the discussions take place, (c) who represented his department and (d) where did the discussions take place?

Reply:

In carrying out its mandate, the Department develops legislation, undertakes programs and projects, and in that process interacts with a plethora of stakeholders and industry players of varying nature. This for example may take a form of bilateral meetings, visits, conferences, etc. and therefore it is practically impossible to mention with specific engagements that the department, often represented by different officials at different levels, has undertaken.

15 December 2017 - NW2577

Profile picture: Xalisa, Mr Z R

Xalisa, Mr Z R to ask the Minister of Cooperative Governance and Traditional Affairs

When are the application dates (a) opening and (b) closing for the board positions of all entities and councils reporting to him?

Reply:

SOUTH AFRICAN LOCAL GOVERNMENT ASSOCIATION (SALGA) AND SOUTH AFRICAN CITIES NETWORK (SACN)

a) Not applicable. In respect of Salga, positions are filled through elective conference linked to the Local Government Elections while the board members of the SACN are mandated by their respective municipalities to form part of the board based on municipal council resolutions of each municipality.

b) Not applicable. Positions are filled through elective conference linked to the Local Government Elections.

MUNICIPAL DEMARCATION BOARD

(a) (b) The applications for persons to be appointed as a member board are advertised in accordance with Section 8(1)(a) of the Municipal Demarcation Act, Act 27 of 1998.

COMMISSION FOR THE PROMOTION AND PROTECTION OF THE RIGHTS OF CULTURAL, RELIGIOUS AND LINGUISTIC COMMUNITIES (CLR COMMISSION)

(a) (b) The current Commissioners were appointed in March 2014 for a five-year period, expiring in March 2019.

15 December 2017 - NW3852

Profile picture: Gqada, Ms T

Gqada, Ms T to ask the Minister of Energy

(a) What was the total cost of the involvement of the SA Nuclear Energy Corporation’s mobile hot cell in the removal of high activity sealed radioactive sources from 87 teletherapy units in the Federative Republic of Brazil and (b) what amount has been budgeted for the mobile hot cell’s operation?

Reply:

a) The total cost of the involvement of the SA Nuclear Energy Corporation ‘s mobile hot cell in the removal of high activity sealed radioactive sources from 87 teletherapy units in the Federative Republic of Brazil was R 35 663 397.17.

b) No funds were budgeted by NECSA for the Mobile Hot Cell operation as the operation was in Brazil and funded by the United States Department of Energy and the Government of Brazil.

15 December 2017 - NW2875

Profile picture: Brauteseth, Mr TJ

Brauteseth, Mr TJ to ask the Minister of Basic Education

What is the detailed (a) breakdown of and (b) valuation for current and non-current assets and investments held by (i) her department and (ii) each entity reporting to her according to (aa) listed assets (aaa) directly held and (bbb) indirectly held and (bb) unlisted investments (aaa) directly held and (bbb) indirectly held by each of the entities, in each case breaking the current assets and investments down by 0-3 months, 3-6 months, 6-12 months and beyond 12 months?

Reply:

(a)

 

Value

(aa)

Listed assets

(bb)

Unlisted Investment

   

(aaa)

Directly held

(bbb)

Indirectly held

(aaa)

Directly held

(bbb)

Indirectly held

 

R’000

R’000

R’000

R’000

R’000

a) Current assets

 

N/A

N/A

N/A

N/A

Unauthorised expenditure

6 488

N/A

N/A

N/A

N/A

Cash and cash equivalents

863 651

N/A

N/A

N/A

N/A

Other Financial Assets

-

N/A

N/A

N/A

N/A

Prepayment and advances

497 761

N/A

N/A

N/A

N/A

Receivables

 

61 867

N/A

N/A

N/A

N/A

Loans

-

N/A

N/A

N/A

N/A

Aid Assistance prepayments

-

N/A

N/A

N/A

N/A

Aid assistance receivables

-

N/A

N/A

N/A

N/A

(b) Non-Current assets

 

N/A

N/A

N/A

N/A

Investments

-

N/A

N/A

N/A

N/A

Receivables

96 632

N/A

N/A

N/A

N/A

Loans

-

N/A

N/A

N/A

N/A

Other Financial Assets

-

N/A

N/A

N/A

N/A

(b) Public Entities detailed breakdown of and valuation for current and non-current assets and investments:

SACE

Assets: Less than months <

(aa)

Listed assets

(bb)

Unlisted Investment

 

(aaa)

Directly held

(bbb)

Indirectly held

(aaa)

Directly held

(bbb)

Indirectly held

Assets/Investment

R’000

R’000

R’000

R’000

Buildings

0.00

N/A

N/A

N/A

Motor vehicles

0.00

N/A

N/A

N/A

Office equipment

84 602.99

N/A

N/A

N/A

IT equipment

72 870.90

N/A

N/A

N/A

Leasehold improvements

0.00

N/A

N/A

N/A

Intangible assets

20 736.23

N/A

N/A

N/A

Current assets

47 208 088

N/A

N/A

N/A

Assets: 3-6 months

       

Buildings

0.00

N/A

N/A

N/A

Motor vehicles

0.00

N/A

N/A

N/A

Office equipment

276 926.90

N/A

N/A

N/A

IT equipment

51 688.33

N/A

N/A

N/A

Leasehold improvements

0.00

N/A

N/A

N/A

Intangible assets

39 465.59

N/A

N/A

N/A

Current assets

24 210 996

N/A

N/A

N/A

Assets: 6-12 months

       

Buildings

61 110 936.74

N/A

N/A

N/A

Motor vehicles

0.00

N/A

N/A

N/A

Office equipment

851 192.17

N/A

N/A

N/A

IT equipment

76 444.51

N/A

N/A

N/A

Leasehold improvements

N/A

N/A

N/A

N/A

Intangible assets

270 527.15

N/A

N/A

N/A

Current assets

25 095 798

N/A

N/A

N/A

Assets: 1 year and older

       

Buildings

0.00

N/A

N/A

N/A

Motor vehicles

138 000

N/A

N/A

N/A

Office equipment

3 078 392

N/A

N/A

N/A

IT equipment

3 857 437

N/A

N/A

N/A

Leasehold improvements

1 409 972

N/A

N/A

N/A

Intangible assets

5 524 281

N/A

N/A

N/A

Current assets

98 072 547

N/A

N/A

N/A

UMALUSI

 

Value

(aa)

Listed assets

(bb)

Unlisted Investment

   

(aaa)

Directly held

(bbb)

Indirectly held

(aaa)

Directly held

(bbb)

Indirectly held

 

R’000

R’000

R’000

R’000

R’000

b) Current assets

 

N/A

N/A

N/A

N/A

Cash and cash equivalents

1 504

N/A

N/A

N/A

N/A

Short-term deposit

70 835

N/A

N/A

70 835

 

Receivables from exchange transactions

 

4 379

N/A

N/A

N/A

N/A

(b) Non-Current assets

 

N/A

N/A

N/A

N/A

Property, plant and equipment

43 344

N/A

N/A

N/A

N/A

Operating lease assets

17

N/A

N/A

N/A

N/A

Comment

  • The short term investment is available cash invested with the Corporation for Public Deposits (CPD). The CPD is governed by the Corporation for Public Deposits Act 46 of 1984. The CPD accepts all deposits from the public sector and invests the funds in short-term money-market instruments and special Treasury bills. All funds invested with the CPD, and the interest earned on these funds, are payable on demand.

15 December 2017 - NW3945

Profile picture: Van Der Walt, Ms D

Van Der Walt, Ms D to ask the Minister of Cooperative Governance and Traditional Affairs

With reference to the advertising contracts at Bela-Bela Local Municipality in Limpopo (a) what is the name of (i) the current company and (ii) the previous company awarded the contract and (b) in each case (i) what are the contract duration dates, (ii)(aa) on what date and (bb) where was the contract advertised, (iii) what are all the relevant details of the process followed to award the specified contract, (iv) what is the total amount of the contract, (v) what amount has been paid to the company to date and (vi) who signed the contract on behalf of the municipality?

Reply:

The information requested by the Honourable Member is not readily available in the Department. The Department has however, engaged the Provincial Department responsible for Local Government to request the relevant information from municipality. The information will be submitted to the Honourable Member as soon as it is received.

15 December 2017 - NW3968

Profile picture: Vos, Mr J

Vos, Mr J to ask the Minister of Tourism

What (a) are the details of the marketing initiatives undertaken in 2017 to promote the Royal Khalanga Accommodation Lodge in Limpopo, (b) is the total cost of the specified marketing initiatives and (c) amounts have been budgeted to promote the lodge in (i) 2018 and (ii) 2019?

Reply:

The Department is not responsible for the operation of a project post-handover and therefore is not involved in the marketing initiatives post-handover. This question will need to be referred to the Project Owning Entity who is the Valoyi Traditional Authority Trust.

 

15 December 2017 - NW3992

Profile picture: Boshoff, Ms SH

Boshoff, Ms SH to ask the Minister of Basic Education

(1)Whether, with reference to her reply to question 2511 on 5 October 2017, a report has been received from the investigator regarding the Krugersdorp High School; if not, by what date is it expected; if so, what are the relevant details; (2) whether the educator from the Prince Tokoto High School has been discharged from hospital; if not, what is the prognosis; if so, have the investigations commenced; (3) what charges have been preferred against the principal of the Mphaphuli High School; (4) what was the outcome of the hearings which were held on 21 and 22 September relating to the Manyano Primary School; (5) what is the nature of the developments in the criminal case against the alleged educator of the Parktown Boys High School?

Reply:

(1) The complaint was investigated by the South African Council of Educators (SACE) on 7 September 2017. The investigator, after conclusion of the case, recommended that no charges be levelled against the accused educator and furnished his reasons for the findings (Case 135/2017-GP).

(2) The educator in question was charged by SACE with 53 counts of applying corporal punishment on the learner. She has been placed on medication by her doctor, Dr Lugongolo for 6 months with effect from 08 August. This means that she may be fit for work in February 2018 and all that is known is that she has a mental condition. We tried contacting the school to ascertain her status, but the only number available keeps ringing unanswered and the landline number is no longer in service according to Telkom. The school is Prince Dokodoko High School (Case 119/2016-KZN).

(3) Without having to repeat the full reading of the charges, the Principal of Mphaphuli Secondary School was charged with three (3) charges:

  • The first one was for refusing to cooperate with a SACE investigator;
  • The second one was for refusing to grant the investigator access to the educators in the school; and
  • The third one was for refusing to grant the investigator access to the learners or complainants in the school.

The hearing was scheduled to take place on 10 November 2017, but was postponed as his representative was engaged in arbitration on the day in question. The hearing will proceed in February 2018 (Case 133/2017-LP).

(4) The disciplinary hearing was finalised on 20 November 2017 and the presiding officer promised to furnish his report by 09 December 2017 (Case number 476/2016-MP).

(5) We have been informed by the school that the matter was postponed in court until January 2018. The accused will appear again in 2018.

15 December 2017 - NW3615

Profile picture: Xalisa, Mr Z R

Xalisa, Mr Z R to ask the Minister of Cooperative Governance and Traditional Affairs

Whether (a) his department and/or (b) any entity reporting to him own land; if so, in each case, (i) where is each plot of land located, (ii) what is the size of each specified plot and (iii) what is each plot currently being used for?

Reply:

a) (i)(ii)(iii)

The Department of Cooperative Governance and Traditional Affairs does not own any land

b) (i)(ii)(iii)

The Department is still awaiting a response from entities reporting to me.

15 December 2017 - NW3487

Profile picture: Madisha, Mr WM

Madisha, Mr WM to ask the Minister of Cooperative Governance and Traditional Affairs

What steps has his department taken or intends to take with regard to serious allegations of sexual impropriety, grooming and abuse directed against a certain person (name and details furnished)?

Reply:

The information requested by the Honourable Member is not readily available in the Department. The Department has however, engaged the Provincial Departments responsible for Local Government to request the relevant information from municipality. The information will be submitted to the Honourable Member as soon as it is received.

15 December 2017 - NW3380

Profile picture: Mackay, Mr G

Mackay, Mr G to ask the Minister of Energy

Given that the National Energy Regulator of SA (NERSA) originally instructed Eskom to reveal its coal contracts and costs in its latest tariff application for 19.9%, (a) why did NERSA reverse this decision and allow Eskom to blackout the coal contracts and costs and (b) who instructed NERSA to reverse its decisions; 2) Whether (a) the Minister and/or (b) his department instructed and/or his department instructed and/or caused by any other means NERSA to reverse its decision?

Reply:

1. a) NERSA did not reverse any decision related to Eskom‘s coal contracts and costs. The decision taken by NERSA was that Eskom‘s information relating to coal contracts and cost not be published as it contained commercially sensitive information. Eskom has submitted all requested information to NERSA.

b) NERSA did not reverse any decision. (Limiting information only to the personnel of the Regulator is standard practice with all commercially sensitive information).

2. a) No decision was reversed by NERSA.

b) No decision was reversed by NERSA

15 December 2017 - NW3164

Profile picture: Mkhaliphi, Ms HO

Mkhaliphi, Ms HO to ask the Minister of International Relations and Cooperation

(1) What are the details including the ranks of service providers and/or contractors from which (a) her department and (b) the entities reporting to her procured services in the past five years; (2) what (a) service was provided by each service provider and/or contractor and (b) amount was each service provider and/or contractor paid; (3) (a) how many of these service providers are black-owned entities, (b) what contract was each of the black-owned service providers awarded and (c) how much was each black-owned service provider paid? NW3488E

Reply:

The Department utilises many service providers over the a wide range of service areas. The number of service providers utilised by the Department over the past five years is average. In accordance with the kind of services the Department renders.

UNQUOTE.

15 December 2017 - NW3962

Profile picture: Davis, Mr GR

Davis, Mr GR to ask the Minister of Energy

Whether he accompanied certain persons (name furnished) on a trip to the Russian Federation in or around August 2017;if so, did (a) a meeting take place with representatives of a certain company (name furnished) and (b) officials of the Central Energy Fund form part of the delegation?

Reply:

a) The matter was asked during the meeting of the Portfolio committee on Energy on the 22 November 2017.

b) The Minister reaffirms the same answer provided to the committee.

15 December 2017 - NW3107

Profile picture: Mileham, Mr K

Mileham, Mr K to ask the Minister of Cooperative Governance and Traditional Affairs

(1)Whether any municipalities have been late in paying (a) councillor salaries and/or (b) municipal staff salaries from 1 October 2016 to date; if not, what is the position in this regard; if so, in each case, (i) which municipality and (ii) what was the reason for the late payment; (2) whether all outstanding amounts have now been paid; if not, what measures has each respective municipality put in place to ensure that the situation does not re-occur?

Reply:

The information requested by the Honourable Member is not readily available in the Department. The Department has however, engaged the Provincial Departments responsible for Local Government to request the relevant information from municipality. The information will be submitted to the Honourable Member as soon as it is received.

14 December 2017 - NW2953

Profile picture: Vos, Mr J

Vos, Mr J to ask the Minister of Police

(1)How many (a) kilometres of security border fences and (b) static observation posts at border crossings were (i) erected and/or (ii) repaired in terms of the National Rural Safety Strategy (aa) in each of the past five financial years and (bb) since 1 April 2017 in each province; (2) what is the total number of SA Police Service members who are currently stationed at each static border crossing observation post?

Reply:

(1)(a)(b)(i)(ii)(aa)(bb) The South African Police Service (SAPS), does not erect or repair security border fences or static observation posts. This is the responsibility of the South African National Defence Force (SANDF).

2. Border crossing observation posts are monitored and manned by members of the SANDF.

14 December 2017 - NW3163

Profile picture: Ndlozi, Dr MQ

Ndlozi, Dr MQ to ask the Minister of State Security

1. What are the details including the ranks of service providers and/or contractors from which (a) his department and (b) the entities reporting to him procured services in the past five years; 2. What (a) service was provided by each service provider and/or contractor and (b) amount was each service provider and/or contractor paid; 3.(a) how many of these service providers are black-owned entities, (b) what contract was each of the black-owned service providers awarded and (c) how much was each black-owned service provider paid?

Reply:

Such information relating to service providers and/or contractors of the State Security Agency (SSA) forms part of the broader operational framework of the SSA and therefore remains classified and privileged. Information about service providers and/or contractors is a matter that falls in the ambit of national security and therefore excluded from public disclosure. It should however be observed that the SSA is held accountable on such matters by the Joint Standing Committee on Intelligence (JSCI).

14 December 2017 - NW3954

Profile picture: Bergman, Mr D

Bergman, Mr D to ask the Minister of Police

What (a) are the full details of crimes that were linked to the firearms handed in during the period of the two previous firearm amnesties and (b) number of firearms were handed in each province during each of the amnesties?

Reply:

This question requires consultation with various role players, including all station commanders. It is, therefore, requested that extension is granted to reply to this question. An extension period of five working days is requested, to gather and consolidate the correct information.

 

 

14 December 2017 - NW3951

Profile picture: America, Mr D

America, Mr D to ask the Minister of Police

(1)Does the SA Police Service (SAPS) currently employ a certain person (name and details furnished); if not, on what date did the specified person resign; if so, (a) in what (i) division and (ii) rank and (b) what is his current job description; (2) with reference to the internal disciplinary report on the actions of a certain person (name furnished) in crime intelligence, what is the total number of relatives of the specified person who are still working in (a) crime intelligence or in (b) any division of the SAPS and (c) what is the (i) rank and (ii) position of each person?

Reply:

1. The alleged employment of the relatives of Lieutenant General Richard Mdluli, in the South African Police Service (SAPS), is the subject of both criminal and internal disciplinary proceedings and as such, the matter is sub judice.

2. The alleged employment of the relatives of Lieutenant General Richard Mdluli, in the SAPS, is the subject of both criminal and internal disciplinary proceedings and as such, the matter is sub judice.