26 April 2018 - NW485

Profile picture: Lees, Mr RA

Lees, Mr RA to ask the Minister of Rural Development and Land Reform

What are the details of the (a) number of livestock that the Zamokuhle Community Property Association (CPA) in northern KwaZulu-Natal had on hand at the end of every six-month period since its establishment, (b) carrying capacity of the land transferred to the CPA, (c) description of all livestock purchases and (d) current number of livestock on hand; (2) (a) what are the full details of all (i) improvements made and/or (ii) farming equipment and other movable assets purchased by the CPA since its establishment and (b) what amount did each improvement and/or purchase cost; (3) Whether the CPA disposed of any assets since its establishment; if so, (a) what are the details of the assets in each case, (b) who authorised each transaction and (c) what amount was received by the CPA in each case?

Reply:

1. (a) The CPA has no livestock; 12 cattle that were purchased for them died during the drought but individual households have a combined total of 100 heads of livestock.

(b) 2 hectares per large stock unit (LSU)

(c) None by the CPA.

(d) None by the CPA.

2. (a) (i) None.

(ii) None.

(b) Falls away.

3. (a) No.

(b),(c),(d) Falls away.

26 April 2018 - NW1000

Profile picture: Vos, Mr J

Vos, Mr J to ask the Minister of Tourism

How much land does (a) his department and (b) the entities reporting to him (i) own, (ii) have exclusive rights to and/or (iii) lease from the State to (aa) use and/or (bb) occupy?

Reply:

a) Department

(i) How much land does the department own?

None

(ii) How much land does the department have exclusive rights to?

Not applicable

(iii) How much land does the department lease from the state?

(aa) to use: None

(bb) occupy: None

b) SA Tourism

(i) How much land does South Africa Tourism own?

5345 sq. meters

(ii) How much land does South Africa Tourism have exclusive rights to:

South African Tourism owns the South African business premises used for marketing operations in line with the Tourism Act no 3, 2014.

(ii) How much land does South Africa Tourism lease from the state?

(aa) to use: South African Tourism does not lease land from the state.

(bb) occupy: South African Tourism does not lease land from the state.

26 April 2018 - NW582

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Rural Development and Land Reform

What (a) progress has the Government made in developing legislation for 50/50 ownership of farms between farmers and farmworkers and (b) impact does or could this have on evictions from farms?

Reply:

a) A policy implemntation framework has been developed by the Department and the Land is 100% owned by the state.

b) None, the impact assessment study has not been done since the programme was still in a pilot stage.

26 April 2018 - NW332

Profile picture: Figlan, Mr AM

Figlan, Mr AM to ask the Minister of Rural Development and Land Reform

What amount did (a) his department and (b) each entity reporting to him spend on the promotion or celebration of the Year of O R Tambo on the (i) Africa News Network 7 channel, (ii) SA Broadcasting Corporation (aa) television channels and (bb) radio stations, (iii) national commercial radio stations and (iv) community (aa) television and (bb) radio stations since 1 January 2017?

Reply:

(a),(b)(i),(ii),(aa),(bb),(iii),(iv),(aa),(bb) Please refer to the table below

(a) Department

(b) Entities

(i) (ii) (aa) (bb) None

(i) (ii) (aa) (bb) None

(iii) (iv) (aa) (bb) None

(iii) (iv) (aa) (bb) None

26 April 2018 - NW669

Profile picture: Wilson, Ms ER

Wilson, Ms ER to ask the Minister of Rural Development and Land Reform

(a) Why does her department’s outstanding account with the Ba-Phalaborwa Local Municipality amounting to R21,9 million remain unpaid, (b) what is the reason for the arrears, (c) by what date will this account be settled in full and (d) what is the (i) amount owed by her department to each municipality in Limpopo and (ii) total amount of days in arrears of each amount owed?

Reply:

a) According to the Department’s records, an amount of R18 798 186.11 for the period 2008/2009 until 2014/2015 has been paid to the Ba-Phalaborwa Local Municipality. However, invoices to the value of R27 116 178.36 are being disputed based on incorrect billing/invoicing by the municipality for the periods 2015/2016: R8 743 089.18; 2016/2017: R8 743 089.18 and 2017/2018: R9 630 000.00. The Department has since been engaging officials from Ba-Phalaborwa Local Municipality in an attempt to correct the invoices, but with no success to date. The engagements with the municipality on the outstanding invoices date back to middle December 2017 and early March 2018.

b) There is a dispute regarding incorrect billing/invoicing by the municipality for the period 2015/16 to 2017/18.

c) The account will be settled within thirty days of receipt of the correct invoices.

d) (i) Invoices to the value of R46 119 588.59 are still outstanding. The breakdown is as follows: R37 130 096.90 are disputed invoices which have been sent back to municipalities for corrections and re-submission, including the Ba- Phalaborwa one. Invoices to the value of R8 989 491.69 are en route for approval for payment to be effected in the 2017-2018 financial year.

(ii) The arrears periods varies depending on the response of municipalities to the Department’s request for correction and resubmission of invoices e.g. Ba-Phalaborwa case. On average the period in arears for the R8 989 491.69 is 44 days. The Department is committed to finalising these payments before the end of the current financial year, with the cooperation of the relevant municipalities.

25 April 2018 - NW1137

Profile picture: Macpherson, Mr DW

Macpherson, Mr DW to ask the Minister of Trade and Industry

(a) Why are there instances of different identity numbers registered for one person on the website of the Companies and Intellectual Property Commission (CIPC)? (b) How many other instances of different identity numbers were found on the CIPC’s website against the name of one person; and (c) By what date will the CIPC’s database be cleaned up?

Reply:

a)  The CIPC system authenticates individuals against valid Identity Number supplied from the Home Affairs database. This is done either through electronic or biometric validation against the Home Affairs (DHA) database. The DHA is the owner of all Identity Number database.

b) The CIPC is only aware of 2 instances of different Identity Numbers for a single individual.

c) The CIPC does not have the right to record or amend any particulars in the Population Register. The status awarded to the CIPC by the Director-General of the Department of Home Affairs in terms of section 6 of the Identification Act No. 68 of 1997 is that of right to access to authenticate individuals exclusively against their Identity Number and any associated bio-metrics.

   
   

25 April 2018 - NW1138

Profile picture: Macpherson, Mr DW

Macpherson, Mr DW to ask the Minister of Trade and Industry

(a) Why has the National Lotteries Commission (NLC) failed to allocate funding towards animal welfare groups, specifically the Society for the Prevention of Cruelty to Animals, for the past two financial years, (b) What are the detailed reasons and rationale behind this decision and (c) What plans does his department have in place to assist animal welfare organisations, as these groups rely solely on funding from the NLC and the public in order to provide free services and assistance in poor communities?

Reply:

a)  The National Lotteries Commission annually publishes priority areas to ensure more focused funding and maximum impact of the funds allocated. Priority areas are published yearly and available on the NLC’s website. There is continuous work done to ensure that beneficiaries are aware of priority areas and the NLC holds regular Indabas and Post Indaba Stakeholder Engagements with its beneficiaries to ensure that they are aware and actually contribute to the decisions of this nature.

b) Due to the limitation of funds and the increasing demand for assistance by non-profit originations, the NLC’s funding is aligned to the published priority areas to ensure more focused funding and maximum impact on funding allocated. The result is therefore that some funding areas get affected by this categorization.

c) The NLC held a meeting with NSPCA and fully explained the position relating to priority areas. A budget has been ring-fenced from the miscellaneous category of funding for the national body to apply on behalf of its branches.

25 April 2018 - NW1146

Profile picture: Kruger, Mr HC

Kruger, Mr HC to ask the Minister of Trade and Industry

(a) What number of industrial parks and/or incubators have been established in (i) Dr J S Moroka Local Municipality and (ii) Thembisile Hani Local Municipality and (b) in each case, (i) where it is located (ii) what is the description of the facility, (iii) on what date was it established, (iv) what amount did it cost to build, (v) what amount did it cost to run the facility in the past three financial years, (vi) what services and support are provided, (vii) what total number of beneficiaries and/or businesses are reached and (viii) what total number of jobs were created?

Reply:

a) i) the dti is not establishing new industrial parks, however it is revitalising the old state owned industrials parks in the former homeland states. The Siyabuswa Industrial Estate under Mpumalanga Economic Growth Agency (MEGA) in Dr J S Moroka Local Municipality is not yet on the dti list for revitalisation, and there is no dti supported incubator in this Local Municipality.

ii) the dti does not have an industrial park or an incubator at Thembisile Hani Local Municipality, however there was an invitation by the Municipality to do the Incubator Support Programme (ISP) presentation. The presentation was done on the 13th March 2014 but nothing materialised thereafter, the municipality never applied for any support.

b) N/A

25 April 2018 - NW1068

Profile picture: Ntlangwini, Ms EN

Ntlangwini, Ms EN to ask the Minister of Trade and Industry

(1)(a) On what basis was G4S given black economic empowerment (BEE) and broad based black economic empowerment (BBBEE) status and (b) what are the details which qualify G4S for BEE and BBBEE status, (2) whether his department has done an investigation into G4S’s BEE and BBBEE credentials; if not, why not; if so, what are the findings of the investigation?NW1158E

Reply:

1. In accordance with the provisions of Statement 005 of the B-BBEE Codes of Good Practice, issued in terms of Section 9(1) of the B-BBEE Act, the B-BBEE Status level of Measured Entities are determined by Accredited Rating Agencies, through the issuing of Verification Certificates. Said Verification Certificates are valid for 12-months from date of issue, based on verified information requested by and supplied to the Accredited Rating Agency by the Measured Entity.

B-BBEE Status is determined through evaluation against the B-BBEE Scorecard contained in the Codes of Good Practice, measuring the participation in and recognition of black people in Ownership, Management Control, Skills Development, Enterprise and Supplier Development and Socio Economic Development.

2. The question on G4S BBBEE credentials was brought to the attention of the dti before the establishment of the Office of the BEE Commission. Following the establishment of this Office, all BBBEE potential fronting cases were handed over for further investigation. Therefore, further investigation into the G4S BBBEE credentials is being conducted by the office of the BEE Commissioner.

25 April 2018 - NW1121

Profile picture: America, Mr D

America, Mr D to ask the Minister of Trade and Industry

Whether his department provided any form of assistance to co-operatives in each of the past five financial years; if not, what is the position in this regard; if so, in each case, what is the (a) name of the co-operative, (b) total number of members of the co-operative, (c) type of co-operative, (d) service that the co-operative delivers, (e) physical address of the co-operative, (f) type of assistance provided to the co-operative and (g) current status of the co-operative; (2) whether any of the specified co-operatives will require additional assistance from his department in future; if so, what are the relevant details?

Reply:

Two Co-Operatives were approved for the Agro-Processing Support Scheme (APSS), as follows:

Vuma Rural Development Primary Co-operative Limited

a) Khora Africa Projects Co-operative Limited

a) 7 members

b) Primary Co-Operative

c) Growing vegetables, processing & packaging of vegetables

d) D465 Road, Ward 8, Vuma Location. Eshowe

e) Cost sharing investment grant in buildings, machinery & equipment and commercial vehicles.

f) There is no disbursement yet to the cooperative

b) 5 members

c) Primary Co-Operative

d) Manufacturing of fruit juices, jam, dried fruit, chutney

e) 36009 Lehong Street, Mamelodi East, Pretoria

f) Cost sharing investment grant in buildings, machinery & equipment and commercial vehicles.

g) There is no disbursement yet to the cooperative

Should any of the co-operative require additional funds, it may apply for a relevant incentive programmme.

 

25 April 2018 - NW948

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Transport

With reference to his reply to question 455 on 13 March 2018, (a) why was information prior to the 2017 calendar year on planned maintenance not recorded, (b) what is being done to reduce the number of breakdowns and (c) what alternative technology to copper cables are being considered?

Reply:

a) Following an investigation into the reason for the absence of records for planned maintenance prior to 2017, it was discovered that these reports are in fact available in the Infrastructure Maintenance System. Attached, please find the requested reports.

b) As part of PRASA’s Modernisation Programme, PRASA is in the process of replacing the old signalling system through a national re-signalling programme. However, the impact of this programme has been hampered by the high levels of vandalism and cable theft in specific areas.

c) The current re-signalling program aims to minimize the use of copper cables in the rail network and optic fibre is preferred where ever possible e.g. communication between relay rooms (Main to Sub relay rooms). Unfortunately, power cables remain copper from the relay rooms to the signal apparatuses itself. These copper cables are concealed with a double layer of concrete to protect the cable from pilferage. Alternative technologies are vigorously pursued and innovations/developments in this area are closely monitored.

25 April 2018 - NW355

Profile picture: Kalyan, Ms SV

Kalyan, Ms SV to ask the Minister of Higher Education and Training

(a) What is the total amount that was (i) budgeted for and (ii) spent on her private office (aa) in each of the past three financial years and (bb) since 1 April 2017 and (b) what was the (i) remuneration, (ii) salary level, (iii) job title, (iv) qualification and (v) job description of each employee appointed in her private office in each of the specified periods?

Reply:

a) (aa) (i) Total amount budgeted:

2014/15: R19.576 million

2015/16: R24.732 million

2016/17: R25.930 million

(ii) Total amount spent:

2014/15: R19.575 million

2015/16: R24.688 million

2016/17: R25.840 million

(bb) (i) Amount allocated since 1 April 2017: R22.647 million.

b) The tables below show the remuneration, salary level, job title and qualifications for the period 2014/15.

Job Title

Salary Level

Remuneration

Qualifications

Chief of Staff

13

R1 042 500

National Senior Certificate

Media Liaison Officer

13

R819 126

National Diploma in Public Management

Personal Assistant to Minister

5

R132 399

Bachelor of Technology in Management

Parliamentary Liaison Officer

13

R819 126

National Diploma in Human Resource Management

Bachelor of Technology: Human Resource Management

Administrative Secretary

13

R819 126

Bachelor of Arts in Sociology

Appointment Secretary

7

R211 194

Honours in Social Sciences

Masters in Social Science

Chief Registry Clerk

7

R188 985

National Diploma: in Human Resource Management

Secretary

5

R132 399

National Diploma in Sports Management

Secretary

5

R132 399

BA Honours in Public Management

Driver/Messenger

5

R131 328

Grade 11

Special Advisor

15

R1 353 732

Bachelor of Arts in Accounting

Special Advisor

15

R1 267 806

National Certificate

Customer Services Certificate

Secretary to Special Advisors

8

R243 747

National Diploma in Office Management

Receptionist

5

R158 985

National Senior Certificate

Stakeholder and Public Relations Management

12

R695 379

Bachelor of Technology in Business Administration

Assistant Director: Administration

9

R361 659

Diploma in Management

Special Projects

13

R843 888

Bachelor of Education

Secretary

5

R132 399

National Diploma in Administration Management

Secretary to Chief of Staff

5

R142 461

National Diploma in Public Relations

Special Projects in the Ministry

13

R864 177

Doctor of Philosophy - Labour Studies

Researcher and Speech Writer

13

R864 177

National Senior Certificate

Bachelor of Arts Degree in Communication

Project Coordinator

12

R674 979

Bachelor of Social Sciences

The tables below show the remuneration, salary level, job title and qualifications for the period 2015/16.

Job Title

Salary Level

Remuneration

Qualifications

Chief of Staff

13

R1 144 251

National Senior Certificate

Media Liaison Officer

13

R898 743

National Diploma in Public management

Personal Assistant to Minister

6

R183 558

Bachelor of Technology in Management

Parliamentary Liaison Officer

13

R864 177

National Diploma in Human Resource Management

Bachelor of Technology: Human Resource Management

Administrative Secretary

13

R864 171

Bachelor of Art in Sociology

Chief Registry Clerk

7

R243 747

National Diploma in Human Resource Management

Assistant Appointment and Administrative Secretary

5

R158 985

Bachelor of Technology in Sports Management

Bachelor of Arts in Human Resource Management

Registry Clerk

5

R158 985

Bachelor of Art in Public Management

Honours in Public Management

Driver/Messenger

5

R140 520

Grade 11

Special Advisor

N/A. 50% of Wits salary

R530 676

for six months

PhD in Education

Special Advis0r

14

R1 267 806

National Diploma

Secretary to Special Advisors

8

R266 214

National Diploma in Office Management

Receptionist

5

R158 985

National Senior Certificate

Stakeholder and Public Relations Management

12

R759 444

Bachelor of Business Administration

Assistant Director

10

R361 659

National Diploma in Management

Special Projects

13

R939 810

Bachelor of Education

Secretary

6

R171 069

National Diploma in Administration Management

Secretary

6

R171 069

National Diploma in Public Relations

Special Projects in the Ministry

13

R864 177

National Diploma In Public Relations

Researcher and Speech Writer

13

R864 177

Bachelor of Arts and Communication

Project Coordinator

12

R674 978

Bachelor of Social Sciences

The tables below show the remuneration, salary level, job title and qualifications for the period 2016/17.

Job Title

Salary Level

Remuneration

Qualifications

Chief of Staff

13

R1 144 251

National Senior Certificate

Media Liaison Officer

13

R898 743

National Diploma in Public Management

Personal Assistant to Minister

6

R183 558

Bachelor of Technology in Management

Parliamentary Liaison Officer

Vacant

-

-

Administrative Secretary

13

R962 409

Bachelor of Arts in Sociology

Chief Registry Clerk

7

R266 214

National Diploma in Human Resource Management

Assistant Appointment and Administrative Secretary

6

R183 558

Bachelor of Technology in Sports Management

Bachelor of Arts in Human Resource Management

Registry Clerk

6

R183 558

Bachelor of Arts

Honours of Public Management

Driver/Messenger

6

R155 775

Grade 11

Special Advisor

14

R1 358 868

National Diploma in Electrical Engineering

Masters in Business Administration

Special Advisor

14

R1 358 868

National Diploma

Secretary to Special Advisor

8

R289 929

National Diploma: Office Management

Receptionist

6

R173 640

National Senior Certificate

Stakeholder and Public Relations Management

12

R814 884

Bachelor of Technology in Business Administration

Assistant Director

10

R423 807

National Diploma: Management

Secretary

6

R183 558

National Diploma in Administration Management

Secretary to Chief of Staff

6

R183 558

National Diploma in Public Relations

The tables below show the remuneration, salary level, job title and qualifications for the period from 1 April 2017 to 31 October 2017.

Job Title

Salary Level

Remuneration

Qualifications

Chief of Staff

13

R1 144 251

National Senior Certificate

Media Liaison Officer

Vacant

-

-

Personal Assistant to Chief of Staff

6

R183 558

Bachelor of Technology Management

Parliamentary Liaison Officer

Vacant

-

-

Administrative Secretary

13

R962 409

Bachelor of Arts in Sociology

Chief Registry Clerk

7

R266 214

National Diploma: Human Resource Management

Assistant Appointment and Administrative Secretary

6

R183 558

Bachelor of Technology in Sports Management

Bachelor of Arts in Human Resource Management

Registry Clerk

6

R183 558

Bachelor of Arts

Honours in Public Management

Driver/Messenger

6

R155 775

Grade 11

Special Advisor

14

R1 358 868

National Diploma in Electrical Engineering

Master of Business Administration

Special Advisor

14

R1 358 868

National Diploma

Secretary to Special Advisors

8

R289 929

National Diploma in Office Management

Receptionist

6

R173 640

National Senior Certificate

Stakeholder and Public Relations Management

12

R814 884

National Senior Certificate

Assistant Director

10

R423 807

National Diploma in Management

Secretary

6

R183 558

National Diploma

Secretary to Chief of Staff

6

R183 558

National Diploma: Public Relations

Special Advisor

14

R1 267 806

National Certificate Customer Services

The tables below show the remuneration, salary level, job title and qualifications for the period from 1 November 2017 to 27 February 2018.

Job Title

Salary Level

Remuneration

Qualifications

Chief of Staff

14

R1 196 526

National Diploma in Journalism

Researcher/Speech Writer

13

R 962 409

Bachelor of Commerce

Personal Assistant to Minister

12

R779 295

National Diploma Accounting

Administrative Support and Public Relations

12

R779 295

Bachelor of Arts in Psychology

Parliamentary Officer

12

R779 295

Diploma in Journalism

Assistant Appointment and Administrative Secretary

9

R334 545

Bachelor of Arts

Assistant Appointment and Administrative Secretary

9

R334 545

Bachelor of Arts in Administration

Stakeholder Management

9

R334 545

Governance Leadership NQF Level 5

Secretary

6

R183 558

Senior Certificate

Messenger/Driver

5

R152 862

Senior Certificate

Messenger/Driver

5

R152 862

National N4 Certificate

Intern

1

R60 000

Bachelor of Artisan Administration

Special Advisor

16

R1 782 687 (50%)

Master of Arts in Law

Special Advisor

16

R1 782 687 (50%)

Bachelor of Arts

PHD in Public Affairs

The tables below show the remuneration, salary level, job title and qualifications for the period from 27 February 2018 to date.

Job Title

Salary Level

Remuneration

Qualifications

Chief of Staff

14

R1 214 475

Bachelor of Arts

Researcher and Strategy

13

R1 036 788

Bachelor of Arts

Bachelor of Arts Honours

Media Liaison Officer

13

R1 068 132

National Diploma

Administrative Secretary

13

R1 100 418

Bachelor of Science

Parliamentary Officer

13

R991 500

Bachelor of Arts

Assistant Appointment Secretary

10

R447 417

Bachelor of Arts

Assistant Director: Administration

9

R339 552

Bachelor of Arts

Senior Administration Officer

8

R298 695

National Diploma

Personal Assistant to Special Advisors

7

R226 611

National Senior Certificate

Messenger/Driver

5

R162 337

National Senior Certificate

Senior Administration Clerk

5

R152 862

National Senior Certificate

Special Advisor

16

R2 008 200

Bachelor of Commerce

Special Advisor

15

R1 370 973

Bachelor of Arts and BA Honours

(v) Annexures A1 to A10.

24 April 2018 - NW568

Profile picture: Mokoena, Mr L

Mokoena, Mr L to ask the Minister of Health

(a) What is the (i) name, (ii) location and (iii) patient capacity of each clinic that does not have information management support and (b) what is the reason for this in each case?

Reply:

There is no clinic in South Africa that does not have information management support.

END.

24 April 2018 - NW548

Profile picture: Hlonyana, Ms NKF

Hlonyana, Ms NKF to ask the Minister of Health

(a) What is the (i) name, (ii) location and (iii) patient capacity of each hospital that does not have a high-care unit and (b) what is the reason for this in each case?

Reply:

In terms of Government Gazette No R185 issued in 2012 (attached) and the national norms and standards all regional, tertiary and central hospitals have high care units. District hospitals are not expected to have high care units 

24 April 2018 - NW552

Profile picture: Sonti, Ms NP

Sonti, Ms NP to ask the Minister of Health

(a) What is the (i) name, (ii) location and (iii) patient capacity of each hospital that does not offer cardiology services and (b) what is the reason for this in each case

Reply:

(a)-(b). In terms of Government Gazette No R 185 issued in 2012 and the national norms and standards cardiology services are provided at tertiary and central hospitals. This include referral of patients needing specialist care.

24 April 2018 - NW549

Profile picture: Hlonyana, Ms NKF

Hlonyana, Ms NKF to ask the Minister of Health

a) What is the (i) name, (ii) location and (iii) patient capacity of each hospital that does not offer neonatal ICU services and (b) what is the reason for this in each case

Reply:

In terms of government Gazette No R 185 issued in 2012 (attached) and the national norms and standards regional , tertiary and central hospitals provide neonatal ICU services.

END

Parliamentary Question 549 of 2018

24 April 2018 - NW556

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Health

(a) What is the (i) name, (ii) location and (iii) patient capacity of each hospital that does not offer oncology services and (b) what is the reason for this in each case?

Reply:

In terms of Government Gazette No R 185 issued in 2012 and the national norms and standards regional, tertiary and central hospitals provide oncology services. this includes referral of patient needing specialist care.

24 April 2018 - NW322

Profile picture: Brauteseth, Mr TJ

Brauteseth, Mr TJ to ask the Minister of Human Settlements

What amount did (a) her department and (b) each entity reporting to her spend on the promotion or celebration of the Year of OR Tambo on the (i) Africa News Network 7 channel, (ii) SA Broadcasting Corporation (aa) television channels and (bb) radio stations, (iii) national commercial radio stations and (iv) community (aa) television and (bb) radio stations since 1 January 2017?

Reply:

(a)& (b)The Department of Human Settlements and its entities reporting to the Minister of Human Settlements did not spend money on the promotion or celebration of the Year of O.R. Tambo on any television channels and radio station since 1 January 2017.

24 April 2018 - NW555

Profile picture: Mkhaliphi, Ms HO

Mkhaliphi, Ms HO to ask the Minister of Health:

What is the (i) name, (ii) location and (iii) patient capacity of each hospital that does not offer mental health services and (b) what is the reason for this in each case?

Reply:

Section 3(a)(iii) of the Mental Health Care Act of 2002 (Act No. 17 of 2002) provides that mental health services must be integrated in the general health services environment, which is clinics and hospitals. In compliance with this provision all hospitals provide mental health services that have been determined for each hospital level.

24 April 2018 - NW708

Profile picture: Vos, Mr J

Vos, Mr J to ask the Minister of Defence and Military Veterans

(1)Whether her department has a sexual harassment and assault policy in place; if not, (a) why not and (b) by what date will her department have such a policy in place; if so, (i) how are reports investigated and (ii) what are the details of the consequence management and sanctions stipulated by the policy; (2) (a) what is the total number of incidents of sexual harassment and assault that have been reported in her department (i) in each of the past three financial years and (ii) since 1 April 2017, (b) what number of cases were (i) opened and concluded, (ii) withdrawn and (iii) remain open based on the incidents and (c) what sanctions were issued for each person who was found to have been guilty?

Reply:

DEPARTMENT OF DEFENCE

In terms of section 5 of the Sexual Offence Act, Act 32 of 2007 all acts associated with sexual assaults are classified as criminal offences and should therefore be criminally prosecuted and penalised. The DoD also follows the same approach in dealing with all sexual assault cases whereby offenders are criminally charged, prosecuted and penalised.

6.1.2. Yes, Sexual Harassment is included in the under-mentioned departmental policies and instructions.

a. DODI/PERS/00038/2006

b. DOD/PERS/0008/2006

c. Joint Defence Publication /PERS/00026/2006 (Edition 1)

The DOD is currently in the process of developing a stand alone policy on Sexual Harassment.

POLICING PERSPECTIVE

(1) “Sexual Harassment” and “Sexual Assault’’ – 1 January 2015 to 1 April 2017: 25 Cases reported = Sexual Harassment (8) + Sexual Assault (17)

(i) 01 April 2015 – 31 March 2016 =07

  1. Sexual Harassment (05)
  2. Sexual Assault (02)

(ii) 01 April 2016 – 31 March 2017 =13

  1. Sexual Harassment (01)
  2. Sexual Assault (12)

(iii) 01 April 2017 – 13 March 2018 =05

  1. Sexual Harassment (04)
  2. Sexual Assault (01)

(2) what number of cases were (i) opened and concluded, (ii) withdrawn and (iii) remain open based on the incidents and (c) what sanctions were issued for each person who was found to have been guilty?

(b) “Sexual Harassment” and “Sexual Assault’’ – 1 January 2015 to 13 March 2018

(i) 25 Cases Opened and Concluded: Sexual Harassment (8) and Sexual Assault (17),

01 April 2015 – 31 March 2016 = 08

  1. Sexual Harassment = 05
  2. Sexual Assault = 03

01 April 2016 – 31 March 2017 = 13

  1. Sexual Harassment = 10
  2. Sexual Assault = 3

01 April 2017 – 13 March 2018 = 04

  1. Sexual Harassment = 02
  2. Sexual Assault = 02
  3. Withdrawn: 04 cases,

01 April 2017 – 13 March 2018 = 04

  1. Sexual Harassment = 00
  2. Sexual Assault = 04
  3. Remain open: 19 still under investigation,

01 April 2015 – 31 March 2016 = 09

  1. Sexual Harassment = 05
  2. Sexual Assault = 04

01 April 2016 – 31 March 2017 = 09

  1. Sexual Harassment = 01
  2. Sexual Assault = 08

01 April 2017 – 13 March 2018 = 01

  1. Sexual Harassment = 00
  2. Sexual Assault = 01

PROSECUTION PERSPECTIVE

1. Financial Year (F/Y) 2014/15:

a. Total number of cases reported = 15.

b. Total number of cases finalised= 6.

c. Total number of cases outstanding=9.

d. Total no of cases withdrawn=1

2. Financial Year (F/Y) 2015/16:

a. Total number of cases carried over from F/Y 14/15 =9.

b. Total number of cases reported =4.

c. Total number of cases finalised=1.

d. Total number of outstanding cases=13

e. Total no of cases withdrawn=0

3. Financial Year (F/Y) 2016/17

a. Total number of cases carried over from F/Y 15/16 =13.

b. Total number of cases reported =2.

c. Total number of cases finalised=1.

d. Total number of outstanding cases=15

e. Total no of cases withdrawn= 0

4. Financial Year (F/Y) 2017/18:

a. Total number of cases carried over from F/Y 16/17 = 15.

b. Total number of cases reported =5.

c. Total number of cases finalised=3.

d. Total number of outstanding cases=17.

e. Total no of cases withdrawn= 0

The current (F/Y 2017/18) number of sexual assaults cases outstanding (remain open) is =17.

1. The following table depicts the total number of accused found guilty of sexual assault and sentences thereof (sanctions):

Serial No.

Force No and Name

Description of Offence

Sentence/Sanction

F/Y

01

94683679PE MWO Indurith

Accused touched the private parts of the complainant

Fine of R6000 and suspended sentence of 6 months imprisonment and discharge from the SANDF, both sentences of 6 months imprisonment and discharge suspended for a period of 3 years

2014/15

02

9802261PE Sgt Monageng

Accused made sexual advances to a lady Capt

Fine of R1000

2014/15

03

94822285PE S/sgt Mfene

Accused touched breast and vagina of the complainant

Fine of R4000 and 180 days detention and reduction to the ranks wholly suspended for a period of 3 years

2014/15

04

04048856ME Rfn Ramuhashi

Touched the complainant’s nipples

Fine of R6000 and 365 days detention

2017/18

DEPARTMENT OF MILITARY VETERANS

REPLY

(1) (a) and

(b)The Department of Military Veterans has a draft policy on Sexual Harassment which is aligned to the DPSA. The draft policy is pending the necessary consultation processes which are envisaged to be finalised during the 2018/19 financial year.

With respect to questions (i) the sexual harassment policy is confined to acts of misconduct arising from work[place violations of sexual nature or sexual violence, acts of misconduct in government departments are generally dealt with in terms of the Disciplinary Code and Procedures for the Public Service contained in Resolution 1 of 2003 of the PSCBC (for employees within the salary levels 1 to 12 categories) and the Disciplinary Code and Procedures for members of the Senior Management Service contained in chapter 7 of the SMS handbook (for employees within the salary levels 13 to 16 categories). Therefore acts of sexual harassment and assault are addressed through the relevant disciplinary code and procedures making reference to the relevant policy. (ii) The sanctions are determined following a process of disciplinary enquiry/hearing which may assume an informal or formal setting. According to the two codes a list of possible sanctions will include corrective counselling, verbal warnings, written warnings, final written warnings, suspension without pay, demotion or a combination of these sanctions and dismissal.

(2) (i) for the past financial years i.e. 2015/16, 2016/17 and 2017/18, two cases of sexual harassment and one case of assault were reported. (b) The one assault case was finalised on 19 October 2015 and the one sexual harassment case was finalised on 28 January 2017. The other sexual harassment case was reported on 9 March 2018 and is under investigation. (ii) No cases were withdrawn and (iii) one case is pending because it was recently reported (c) in terms of the two cases the employees were found guilty, a sanction of dismissal was implemented as an appropriate sanction recommended by the chairperson of the disciplinary hearing.

24 April 2018 - NW550

Profile picture: Mulaudzi, Adv TE

Mulaudzi, Adv TE to ask the Minister of Health

(a) What is the (i) name, (ii) location and (iii) patient capacity of each hospital that does not have an intensive care unit and (b) what is the reason for this in each ca see?

Reply:

In terms of Government Gazette No R 185 issued in 2012 and the national norms and standards regional, tertiary and central - hospitals have intensive care units.

23 April 2018 - NW741

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

What is the (a) race, (b) age and (c) last residential address of all persons who died from listeriosis?

Reply:

(a) The racial distribution of deceased patients is known only for those patients for whom a case investigation form was submitted to the NICD. The racial breakdown is shown in Table 1.

Table 1. Race distribution where available of persons with lab-confirmed listeriosis, who were reported to have died (1 Jan 2017-20 March 2018)

Race

Died

% of deaths

Total cases recorded

BLACK

62

34

261

COLOURED

8

4

21

UNKNOWN

109

59

675

WHITE

6

3

26

ASIAN

0

0

0

Total

185

100

983

(b) The age distribution of deceased patients is shown in Table 2.

Table 2. Age (where reported) of all laboratory-confirmed listeriosis cases who have been reported dead at the end of hospitalisation "1 January 2017 - 20 March 2018".

Outcome

Died

%

≤28 days

78

42.2

1 months - 14 years

7

4.0

15 - 49 years

47

25.4

50 - 64 years

24

13.0

≥65 years

26

14.1

Unknown

3*

1.1

Total

185

100

*3 patients with lab-confirmed listeria had no age reported on lab investigation form, and a case investigation form was not completed.

(c) I am not able to release residential addresses of people who died in our hospitals from any cause, through a parliamentary question. This needs a legal process.

END.

23 April 2018 - NW403

Profile picture: Nolutshungu, Ms N

Nolutshungu, Ms N to ask the Minister of Health

(a) What number of doctors are currently suspended in (i) total and (ii) each province and (b) in each case, what is the (i) doctor’s place of employment, (ii) reason for the suspension and (iii) timeline of the suspension?

Reply:

(a) (i) Seven (7) doctors are suspended, as per table below.

PROVINCE

NUMBER

Eastern Cape

1

Free State

0

Gauteng

2

KwaZulu Natal

3

Limpopo

0

Mpumalanga

1

North West

0

Northern Cape

0

Western Cape

0

(b) The table below reflects the details in this regard

PROVINCE

(i) Place of Employment

(ii) Reason for suspension

(iii) Timelines

Eastern Cape

Livingstone Hospital

Sexual harassment

10/01/2018

Free State

N/A

N/A

N/A

Gauteng

Weskopies Mental Hospital

Sexual harassment

09/02/2018

 

Yusuf Dadoo

Sexual harassment

21/02/2018

KwaZulu Natal

Ngwelesana Hospital

Endangering life of patient and poor administration

12/10/2017

 

Prince Mshiyeni Hospital

Insubordination

12/02/2018

 

Prince Mshiyeni Hospital

Insubordination

12/02/2018

Limpopo

N/A

N/A

N/A

Mpumalanga

Witbank Hospital

Sexual harassment

15/01/2018

North West

N/A

N/A

N/A

Northern Cape

N/A

N/A

N/A

Western Cape

N/A

N/A

N/A

TOTAL

7

   

END.

23 April 2018 - NW262

Profile picture: Paulsen, Mr N M

Paulsen, Mr N M to ask the Minister of Agriculture, Forestry and FisheriesQUESTION

Number of farms is a certain company (name furnished) leasing in villages in and around Keiskammahoek, particularly in Lower and Upper Zingcuka, Lenye, Zanyokhwe and Mkhubiso; (2) Is the nature of support that they are receiving from his department and (c) are the reasons for supporting the specified company at the expense of broad-based agricultural production in Keiskammahoek?

Reply:

1. Rance Timber is not leasing land from communities or state land.

2. Neither the Department of Agriculture, Forestry and Fisheries nor the Eastern Cape Department of Rural Development and Agrarian Reform is supporting the said companies of Rance Timber. The only support that was given was in 2013 to producers and they were supported with production inputs.

23 April 2018 - NW673

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Transport

What are the (a) plans, (b) time frames, (c) deadlines, (d) milestones in each province and (e) monitoring mechanisms with regard to the new rail infrastructure and its integration onto the existing rail infrastructure and network?

Reply:

Key programmes on the rail infrastructure network is reflected in the table below. All of these projects are multi-year projects and dates indicated on current projects are as per contracts.

Plans/Programme

Region

d)

Key Milestones

b &c)

Projected Completion Date

e)

Monitoring Mechanism

Re-Signalling Programme

KwaZulu/Natal (KZN)

 

25 Jun 2021

Project Progress meetings;

Monthly report;

APP;

Quarterly Report DOT

   

Phase 1: Pinetown line

20 Jul 2018

 
   

Phase 2: New Rossborough Centralised Traffic Control Centre (CTC)

16 May 2019

 
   

Phase 3A: Kwa Mashu to Temple

30 Nov 2018

 
   

Phase 3B: Avoca to Springfield

27 May 2020

 
   

Phase 4: Umlazi to Umbogintwini

23 Sep 2019

 
   

Phase 5: Clairwood to Crossmoor

05 Jun 2020

 
   

Phase 6: Berea to Congella

15 Oct 2020

 
   

Phase 7: Durban station

11 May 2021

 
 

Western Cape (WC)

 

30 Jun 2020

Project Progress Meeting ; Monthly report;

APP

Quarterly report to DOT

   

Regional Monitoring and Train Control Centre (RM&TCC)

30 June 2018

 
   

Phase 1.2: Wynberg – Simonstown, Crawford – Diep River

30 Apr 2018

 
   

Phase 1.4: Koeberg – Maitland - Hazendal

31 May 2018

 
   

Phase 1.3: Salt River - Kenilworth

31 Jul 2018

 
   

Phase 3.1: Cape Town - Woodstock (South)

30 Sep 2018

 
   

Phase 3.2: Cape Town - Woodstock (North)

31 Oct 2018

 
   

Phase 2.3: Esplanade - Ysterplaat

31 Jan 2019

 
   

Phase 1.1: Philippi - Kaptiensklip, Chris Hani

28 Feb 2020

 
   

Phase 2.2: Woltemade – Parow

31 Mar 2020

 
   

Phase 2.1: Langa - Nyanga, Bontheuwel – Sarepta

30 Apr 2020

 
   

Phase 4.1: Tygerberg – Bellville

31 May 2020

 
   

Phase 4.2: Kuils River - Strand, Eerste River - Muldersvlei

30 Jun 2020

 
 

Gauteng

 

28 Feb 2021

Project Progress meetings;

Monthly report;

APP;

Quarterly Report DOT

   

Gauteng Nerve Centre (GNC)

Apr 2016 - Completed

 
   

Phase 1: Midway – Residentia

31 Mar 2016 – Completed

 
   

Phase 2: Kaalfontein – Leralla, Olifantsfontein – Irene

28 Nov 2016 – Completed

 
   

Phase 3: Randfontein – Roodepoort

15 May 2017 – Completed

 
   

Phase 4: Boksburg East – Springs, Daveyton – Alliance

15 Dec 2017 – Completed

 
   

Phase 5: George Goch – Geldenhuys, Benrose – Kaserne West, Booysens – Crown

03 Apr 2018

 
   

Phase 6: Rissik – Koedoespoort – Eerste Fabrieke

15 Dec 2019

 
   

Phase 7: Jeppe – Johannesburg – Braamfontein

25 Sep 2018

 
   

Phase 8: Centurion – Pretoria, Mitchell Street – Saulsville

07 Jan 2019

 
   

Phase 9: Kempton Park – Knights

11 Mar 2019

 
   

Phase 10: Langlaagte – Florida, Croesus

20 May 2019

 
   

Phase 11: New Canada – Naledi, Orlando – Kliptown

14 Oct 2019

 
   

Phase 12: Hercules – Belle Ombre, Capital Park East and West, Pretoria North – Mabopane, Rosslyn

23 Jun 2020

 
   

Phase 13: De Wildt

06 Jul 2020

 
   

Phase 14: Driehoek – Germiston, Angelo – Oosrand, Kutalo – Elsburg – Kwesine, India

01 Feb 2021

 

Blue Downs Rail Extension

Western Cape: Cape Town

Preliminary Design and EIA

Detail Design

Construction

Operations

Aim to commence Preliminary Design in 2018/19, thereafter timeframes can be confirmed with greater accuracy.

Allow for 4-6 month procurement process for phases leading up to Operations

12 – 15 months

6 months

  1. – 30 months

Programme Management office

Cape Town Intermodal Planning Committee

Depot Modernisation

Wolmerton

Gauteng North

Phase 1 complete

Phase 2 in testing & commissioning scheduled for completion by end March 2018

Phase 3 Consultants appointed

Designs complete

Contractor appointed

All construction complete

February 2019

February 2020

November 2021

March 2026

 

Depot Modernisation

Braamfontein

Gauteng South

Will be done in phases

Phase 1 awaiting appointment of contractor by PRASA Board. 12 month design and construction period envisaged

Phase 2

Consultants appointed

Designs complete

Contractor appointed

All construction complete

June 2019

March 2020

December 2021

June 2024

Project Progress meetings;

PRASA Tech Management Committee;

Monthly report;

APP;

Quarterly Report DOT

Depot Modernisation

Salt River

Western Cape

Will be done in Phases

Phase 1 will be advertised by June 2018 and construction will be complete by June 2021

Phase 2

Consultants appointed

Designs complete

Contractor appointed

All construction complete

December 2019

December 2020

December 2021

June 2025

PRASA Tech Management Committee;

Monthly Report;

APP

Quarterly Report DOT

Depot Modernisation

Durban Yard and Springfield

KZN

Consultants appointed

Designs complete

Contractor appointed

All construction complete

January 2019

January 2020

November 2021

March 2026

PRASA Tech Management Committee;

Monthly Report;

APP

Quarterly Report DOT

 

23 April 2018 - NW346

Profile picture: Van Der Walt, Ms D

Van Der Walt, Ms D to ask the Minister of Basic Education

(a) What is the total amount that was (i) budgeted for and (ii) spent on her private office (aa) in each of the past three financial years and (bb) since 1 April 2017 and (b) what was the (i) remuneration, (ii) salary level, (iii) job title, (iv) qualification and (v) job description of each employee appointed in her private office in each of the specified periods?

Reply:

(a)

(aa) Financial year

(a)(ii) Budget

(a)(ii) Expenditure

2014/15

R 16 032 000

R 15 928 000

2015/16

R 15 214 000

R 15 203 000

2016/17

R 19 030 000

R 18 120 000

(bb) since 1 April 2017

R 14 068 000

R 14 247 000

     

2014/15

SURNAME

INITIALS

(b)(i)

(b)(ii)

(b)(iii)

(b)(iv)

(b)(v)

   

REMUNERATION

SALARY

LEVEL

JOB TITLE

QUALIFICATION

JOB

Motshekga

AM

R 2 211 937.00

16

Minister

Master’s Degree in Education

Minister

Sehlabelo

SP

R 988 152.00

14

Chief Director

Bachelor of Education Degree

Chief Of Staff of the Ministry

Khala

R

R 856 554.00

13

Director: Office Of The Minister

Bachelor of Arts Degree

Administrative Secretary

Mncube

W

R 819 126.00

13

Director: Office Of The Minister

B-Tech: Journalism

Media Liaison Officer

Mabua

RS

R 669 534.00

12

Deputy Director: Office Of The Minister

Senior Certificate

Private Secretary/Appointments Secretary

Van den Heefer

RPZ

R 856 554.00

13

Director: Office Of The Minister

BA Honours Degree

Parliamentary Officer

Skwatsha

JN

R 203 589.00

7

Principal Ministerial Typist

Senior Certificate

Secretary Receptionist

Mphigalale

P

R 157 701.00

6

Senior Secretary Grade III

Senior Certificate

Secretary Receptionist

Masote

O

R 123 738.00

5

Senior Messenger

National Diploma: Information Technology

Aid or Driver/Messenger

2015/16

SURNAME

INITIALS

(b)(i)

(b)(ii)

(b)(iii)

(b)(iv)

(b)(v)

   

REMUNERATION

SALARY

LEVEL

JOB TITLE

QUALIFICATION

JOB

Motshekga

AM

R 2 309 262.00

16

Minister

Master’s Degree in Education

Minister

Sehlabelo

SP

R 1 042 500.00

14

Chief Director

Bachelor of Education Degree

Chief Of Staff of the Ministry

Khala

R

R 903 663.00

13

Director: Office Of The Minister

Bachelor of Arts Degree

Administrative Secretary

Mncube

W

R 864 177.00

13

Director: Office Of The Minister

B-Tech: Journalism

Media Liaison Officer

Mabua

RS

R 727 149.00

12

Deputy Director: Office Of The Minister

Senior Certificate

Private Secretary/Appointments Secretary

Van den Heefer

RPZ

R 917 220.00

13

Director: Office Of The Minister

BA Honours Degree

Parliamentary Officer

Skwatsha

JN

R 221 106.00

7

Principal Ministerial Typist

Senior Certificate

Secretary Receptionist

Mphigalale

P

R 171 273.00

6

Senior Secretary Grade III

Senior Certificate

Secretary Receptionist

Masote

O

R 132 399.00

5

Senior Messenger

National Diploma: Information Technology

Aid or Driver/Messenger

2016/17

SURNAME

INITIALS

(b)(i)

(b)(ii)

(b)(iii)

(b)(iv)

(b)(v)

   

REMUNERATION

SALARY

LEVEL

JOB TITLE

QUALIFICATION

JOB

Motshekga

AM

R 2 309 262.00

16

Minister

Master’s Degree in Education

Minister

Sehlabelo

SP

R 1 084 599.00

14

Chief Director

Bachelor Of Education

Chief Of Staff of the Ministry

Khala

R

R 855 516.00

12

Deputy Director: Office Of The Minister

Bachelor of Arts Degree

Administrative Secretary

Mncube

W

R 898 743.00

13

Director: Office Of The Minister

B-Tech: Journalism

Media Liaison Officer

Mabua

RS

R 794 145.00

12

Deputy Director: Office Of The Minister

Senior Certificate

Private Secretary/Appointments Secretary

Van den Heefer

RPZ

R 855 516.00

12

Deputy Director: Office Of The Minister

BA Honours Degree

Parliamentary Officer

Skwatsha

JN

R 241 476.00

7

Principal Ministerial Typist

Senior Certificate

Secretary Receptionist

Mphigalale

P

R 187 059.00

6

Senior Secretary Grade III

Senior Certificate

Secretary Receptionist

Masote

O

R 144 591.00

5

Senior Messenger

National Diploma: Information Technology

Aid or Driver/Messenger

2017/18

SURNAME

INITIALS

(b)(i)

(b)(ii)

(b)(iii)

(b)(iv)

(b)(v)

   

REMUNERATION

SALARY

LEVEL

JOB TITLE

QUALIFICATION

JOB

Motshekga

AM

R 2 401 633.00

16

Minister

Master’s Degree in Education

Minister

Sehlabelo

SP

R 1 161 423.00

14

Chief Director

Bachelor Of Education

Chief Of Staff of the Ministry

Khala

R

R 917 970.00

12

Deputy Director: Office Of The Minister

Bachelor of Arts Degree

Administrative Secretary

Mncube

W

R 962 409.00

13

Director: Office Of The Minister

B-Tech: Journalism

Media Liaison Officer

Mabua

RS

R 864 903.00

12

Deputy Director: Office Of The Minister

Senior Certificate

Private Secretary/Appointments Secretary

Nkonyeni

NP

R 1 116 918.00

13

Director: Office Of The Minister

Post Graduate Diploma in Management

Parliamentary Officer

Skwatsha

JN

R 262 992.00

7

Principal Ministerial Typist

Senior Certificate

Secretary Receptionist

Mphigalale

P

R 203 721.00

6

Senior Secretary Grade III

Senior Certificate

Secretary Receptionist

Masote

O

R 157 491.00

5

Senior Messenger

National Diploma: Information Technology

Aid or Driver/Messenger

23 April 2018 - NW347

Profile picture: James, Ms LV

James, Ms LV to ask the Minister of Communications

(a) What is the total amount that was (i) budgeted for and (ii) spent on her private office (aa) in each of the past three financial years and (bb) since 1 April 2017 and (b) what was the (i) remuneration, (ii) salary level, (iii) job title, (iv) qualification and (v) job description of each employee appointed in her private office in each of the specified periods?

Reply:

a) (i) The private office does not have a separate budget from that of the Ministry.

(ii)The budget and the expenditure of the private office is included in the budget of the Ministry which is reflected in the Annual Reports of the 2014/15, 2015/16 and the 2016/17 financial years.

b) The remuneration of employees in the private office is included in the compensation of all employees in the department as reflected in the relevant annual reports.

The salary levels and job descriptions are in line with the guidelines provided by the Handbook for Members of the Executive as well as the Public Service Regulations.

23 April 2018 - NW210

Profile picture: Lees, Mr RA

Lees, Mr RA to ask the Minister of Health

(1)With reference to his reply to question 1263 on 13 December 2017, has the overpayment of R 1 181 977,52 been recovered; if not, why not; if so, what are the details of (a) the repayment and (b) interest charged and paid to date; (2) whether any disciplinary action has been taken and/or criminal charges laid against any persons found to have been involved in the specified overpayment; if not, why was no disciplinary action taken and/or criminal charges laid; if so, what are the details of any disciplinary action taken and/or criminal charges laid against those responsible for the overpayment?

Reply:

(1) (a) The correct overpayment as per response 1263 of December 2017 is R1,196,482.92, not the R1,181,977.52 as stated above. Of the R1,196,482.82, an amount of R826,116.60 was for Commuted Overtime, which the previous response clarified that this was properly authorised and there is no overpayment.

The balance of R370,373.22 was for rural allowance which the official had continued earning even though he had moved to another institution. This is the amount that the employee raised as a grievance through his union that his transfer between the two institutions, included that the new salary package was to compensate the previous rural allowance. This matter as been followed up and no evidence of the agreement has been found. The employee was sent written communication to acknowledge the debt and to respond with a payment plan.

(b) As there had been a grievance that had to be attended, no interest has been charged, as the employee also needs to acknowledge the debt. Only when the debt is captured on BAS, the system will then calculate interest, and only if the debt type is interest bearing

(2) There has been no disciplinary action taken as the grievance needed to be attended to first.

The matter is now being followed up on why the rural allowance was not stopped by HR officials when the transfer was done, and then disciplinary action will be considered against HR officials on not stopping the rural allowance.

END.

23 April 2018 - NW101

Profile picture: Chetty, Mr M

Chetty, Mr M to ask the Minister of Human Settlements

How many title deeds were handed over to housing beneficiaries in each municipality in the Free State (a) in the 2016/17 financial year and (b) from 1 April 2017 up to the latest specified date for which information is available?

Reply:

(a)  + (b) The question has been referred to the Free State Province for a detailed reply. As soon as it is available, the Honourable Member will be provided with the reply.

23 April 2018 - NW406

Profile picture: Mente-Nkuna, Ms NV

Mente-Nkuna, Ms NV to ask the Minister of Health

(a)What (i) is the total number of hospitals in the country that offer maternity services and (ii)is the name of each hospital and (b) of those hospitals, how many have fully functional maternity services?

Reply:

(a) (i) The total number of hospitals that offer maternity services is 309.

(ii) See Annexure A for the names of the hospitals.

(b) The 309 of the hospitals have fully functional maternity services.

END.

23 April 2018 - NW238

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

What are the relevant details of the (a) name, (b) patient capacity and (c) location of each (i) hospital, (ii) clinic and (iii) other healthcare facility at (aa) national, (bb) provincial and (cc) municipal level?

Reply:

Attached is the schedule providing the details as requested.

END.

23 April 2018 - NW752

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

What are the ten leading causesfor admission to a healthcare facility in the Buffalo City Metropolitan Municipality in the Eastern Cape in the 2016-17 financial year?

Reply:

Attached is the latest detailed Burden of Disease profile for Buffalo City Metropolitan Municipality for the period 2010 to 2015 by age and gender.

END.

23 April 2018 - NW753

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

What are the ten leading causes for admission to a healthcare facility in the SarahBaartman District Municipality in the Eastern Cape in the 2016-17 financial year?

Reply:

Attached is the latest detailed Burden of Disease profile for Sarah Baartman District Municipality for the period 2010 to 2015 by age and gender.

END.

23 April 2018 - NW755

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Health

What are the ten leading causes for admission to a healthcare facility in the Chris Hani District Municipality in the Eastern Cape in the 2016-17 financial year?

Reply:

Attached is the latest detailed Burden of Disease profile for Chris Hani District Municipality for the period 2016/17 by age and gender.

END.

23 April 2018 - NW758

Profile picture: Ntlangwini, Ms EN

Ntlangwini, Ms EN to ask the Minister of Health

What are the ten leading causes for admission to a healthcare facility in the Nelson Mandela Bay Metropolitan Municipality in the Eastern Cape in the 2016-17 financial year?

Reply:

Attached is the latest detailed Burden of Disease profile for Nelson Mandela Bay Metropolitan Municipality for the period 2010 to 2015 by age and gender.

END.

23 April 2018 - NW760

Profile picture: Tshwaku, Mr M

Tshwaku, Mr M to ask the Minister of Health

What are the ten leading causes for admission to a healthcare facility in the Lejweleputswa District Municipality in the Free State in the 2016-17 financial year?

Reply:

Attached is the latest detailed Burden of Disease profile for Lejweleputswa District Municipality in the financial year 2016/17 by age and gender.

END.

23 April 2018 - NW769

Profile picture: Tshwaku, Mr M

Tshwaku, Mr M to ask the Minister of Health

What are the ten leading causes for admission to a healthcare facility in the Ugu District Municipality in KwaZulu-Natal in the 2016-17 financial year?

Reply:

Attached is the latest detailed Burden of Disease profile for Ugu District Municipality for the period 2010 to 2015 by age and gender.

END.

23 April 2018 - NW771

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Health

What are the ten leading causes for admission to a healthcare facility in the uThukela District Municipality in KwaZulu-Natal in the 2016-17 financial year?

Reply:

Attached is the latest detailed Burden of Disease profile for uThukela District Municipality for the period 2010 to 2015 by age and gender.

END.

23 April 2018 - NW773

Profile picture: Khawula, Ms MS

Khawula, Ms MS to ask the Minister of Health

What are the ten leading causes for admission to a healthcare facility in the Zululand District Municipality in KwaZulu-Natal in the 2016-17 financial year?

Reply:

Attached is the latest detailed Burden of Disease profile for Zululand District Municipality for the period 2010 to 2015 by age and gender.

END.

23 April 2018 - NW775

Profile picture: Mathys, Ms L

Mathys, Ms L to ask the Minister of Health

What are the ten leading causes for admission to a healthcare facility in the King Cetshwayo District Municipality in KwaZulu-Natal in the 2016-17 financial year?

Reply:

Attached is the latest detailed Burden of Disease profile for Cetshwayo District Municipality for the period 2010 to 2015 by age and gender.

END.

23 April 2018 - NW787

Profile picture: Ntlangwini, Ms EN

Ntlangwini, Ms EN to ask the Minister of Health

What are the ten leading causes for admission to a healthcare facility in the Frances Baard District Municipality in the Northern Cape in the 2016-17 financial year?

Reply:

Attached is the latest detailed Burden of Disease profile for Frances Baard District Municipality for the period 2010 to 2015 by age and gender.

END.

23 April 2018 - NW1002

Profile picture: Vos, Mr J

Vos, Mr J to ask the Minister of Water and Sanitation

How much land does (a) his department and (b) the entities reporting to him (i) own, (ii) have exclusive rights to and/or (iii) lease from the State to (aa) use and/or (bb) occupy?

Reply:

a) (i) In terms of Section 1(1)(x) of the National Water Act, 1998 (Act no. 36 of 1998) (NWA) the Minister owns the land on which a Government Waterwork is situated. The Minister owns, manages and controls 322 dams (Government Waterworks) country wide. The extent of the land is determined scientifically up to the dam boundary line of each dam which includes the full supply level, the 1:100 year flood line and a buffer line. All excess land must in terms of Government Immovable Asset Management Act (GIAMA) and the disposal policies of the Department of Water and Sanitation (DWS) and the National Department of Public Works (NDPW) fall back to the NDPW.

(ii) In terms of ownership the Minister has exclusive rights on the land mentioned as above. No other Custodian Departments have any right over the mentioned land because Government Waterworks are National Assets and the water source must be protected in terms of the NWA.

(iii) None, due to the fact that the Minister acquires the minimum land needed for a Government Waterwork.

(aa) Refer to (a)(1)

(bb) Refer to (a)(1)

b) Refer to Annexure A for information regarding entities reporting to the Department.

ANNEXURE A

(b) How much land does the entities reporting to him

(i) own

(ii) have exclusive rights to and/or

(iii) lease from the State to

(aa) use and/or

(bb) occupy

Amatola Water

6 Lancaster Road Vincent East London-

R2 372 250.00

3 Lancaster Road Vincent East London-

R1 332 220.17

Albany Coast-

R1 705 213.00

Nahoon WTW (and related land and dwellings on site)

Laing WTW (and related land and dwellings on site)

Craighead Pumping Station (and related land and dwellings on site)

Glenmore WTW (and related land and dwellings on site)

Peddie Regional WTW (and related land and dwellings on site)

Gubu Dam (and related land and dwellings on site)

Wriggleswade Dam  (and related land and dwellings on site)

Rooikrantz WTW (and related land and dwellings on site)

Binfield WTW (and related land and dwellings on site)

Debe Nek WTW (and related land and dwellings on site)

Masincedane WTW (and related land and dwellings on site)

Upper Mnyameni WTW (and related land and dwellings on site)

Sandile WTW (and related land and dwellings on site

None

Public Works Port Elizabeth workshop – Harrower Road

Public Works Port Elizabeth workshop – Harrower Road

Bloem Water

44509.1479 Hectare

75338.89 hectare

There are no properties leased from the state

None

None

Lepelle Northern Water

2 hectares valued at R6.4 million situated in Polokwane area

2 hectares valued at R6.4 million situated in Polokwane area

There are no properties leased from the state

None

None

Magalies Water

24 properties, of which covers the area of 169 hectares, 15 of the properties own by Magalies Water are still registered with Department Public Works, and Magalies Water is in the process of transferring ownership.

Magalies Water has 226 servitudes endorsement in different properties, of which it covers 54 163M2 and 105 servitudes not registered, which covers the area of 307 hectares

There are no properties leased from the state

None

None

Mhlathuze Water

Portion 6 ERF 6724 Richards Bay Registration Division GU in the Richards Bay Transitional Local Council area, Province of KwaZulu-Natal on sub-divisional diagram S.G no. 2118/1997 in extent 2 5012 hectares;

Sub 4 of Lot 8723 Richards Bay (Extension No. 28) situated in the Richards Bay Transitional Local Council Area, Administrative District of Natal, Province of KwaZulu-Natal, in extent Three comma Three Five Nought One ( 3, 3501) hectares;

Portion 41 of Reserve 6 No.15 825 Registration Division GU Province of KwaZulu-Natal in extent 44,4332 ( Forty Four , Four Three Three Two) hectares;

ERF 960 Eshowe ( Extension Number 9 Registration Division GU Province of KwaZulu-Natal in extent 1534( One Thousand Three Hundred and Thirty Four) square metres;

Portion of ERF 1413 Eshowe Registration Division GU Province of KwaZulu-Natal in extent 1441( One Thousand Four Hundred and Forty One) square metres; and

Portion 1 of the farm Richards Bay No. 16990 GU situated in the Township of Richards Bay, Administrative District of KwaZulu- Natal in the extent 3 542(Three Thousand Five and Forty Two) square metres as indicated on SG Diagram 2009/1999.

Mhlathuze Water does not have land that it has exclusive right to use.

Mhlathuze Water does has have land that it is leasing from the State:

None

None

Overberg Water

No land is owned except the wastewater treatment works in three schemes and houses.

Servitude to access infrastructure in someone property such as the adjacent farm.

None

None

None

Rand Water

7778.798ha land owned

4072.006ha Servitudes

None

None

None

Sedibeng Water

R142,440,370.95 (Both Land and Buildings for Office and Plant Operations: Total value of all regions combined as at 31 March 2018. Land used for Offices, Purification Plants and Pump station area is 144.9H but government owned).

R1,088,122.85 (Servitudes where the pipeline is laid. Right to use the land-Estimated area is 5.17657 km²).

None

Refer to response in (b) (i) & (ii) above

Refer to response in (b) (i) & (ii) above

Umgeni Water

Properties own by Umgeni Water are 451

Umgeni Water has exclusive right over 473 properties

Umgeni Water is leasing no land from the State

None

None

Trans Caledon Tunnel Authority (TCTA)

Total freehold land owned: 1318.35 hectares

Land with exclusive rights: 675.39 hectares;

State Land: 1115.63 hectares

None

State Land: 1115.63 hectares

Water Research Commission (WRC)

Through its subsidiary ERF 706 Pty (Ltd) WRC is currently the registered owner of a property with a building situated in Gezina, Pretoria. This property together with the building was sold during the 2017/18 financial year and the transfer of ownership in the Deeds office is underway.

Yes, the WRC own the building and the land and at this stage has exclusive right of use until the transfer to the new owners occur and this should happen soon

The WRC does not lease land from the state

The WRC is currently leasing and using office space in 4 Daventry Street, Lynnwood Bridge, Pretoria as it has sold the property ERF706 in Gezina.

See response (aa) above

23 April 2018 - NW777

Profile picture: Nolutshungu, Ms N

Nolutshungu, Ms N to ask the Minister of Health

What are the ten leading causes for admission to a healthcare facility in the Harry Gwala District Municipality in KwaZulu-Natal in the 2016-17 financial year?

Reply:

Attached is the latest detailed Burden of Disease profile for Harry Gwala District Municipality for the period 2010 to 2015 by age and gender.

END.

23 April 2018 - NW532

Profile picture: De Freitas, Mr MS

De Freitas, Mr MS to ask the Minister of Transport

(1)With reference to the construction of the N1 bypass through extension 4 Nancefield outside Musina to Beitbridge, what (a) is the (i) budget and (ii) timeframe of the contract and (b) are the names of the contractors; (2) (a) what is the total number of households that are affected, (b) where are the affected households being relocated to and (c) what other compensation was offered to the affected households?

Reply:

(1) (a) (i) Construction contract award value is R487 279 565,59 excluding CPA and VAT.

(ii) The 30 month construction contract commenced on 16 March 2016 and was scheduled to be completed by 15 September 2018. The contractor is however currently behind schedule and now only forecasts to complete in November 2019, with associated applicable contractual penalties to be applied by SANRAL.

(b) The contractor is Basil Read Limited

(2) (a) A total of 30 households in Musina Nancefield Ext 4 are affected due to their houses been within the new road reserve.

(b) The affected households are provided with new houses in Musina Nancefield Ext 10.

(c) Ownership of the affected stands vests with Musina local municipality. SANRAL compensated the municipality for the affected stands as well as for the new stands identified by the municipality. SANRAL is in the process of constructing new houses to all applicable national standards on the new stands at SANRAL’s cost. Compensation values per affected property have been determined by independent Professional Valuers appointed by SANRAL through negotiations with households and the municipality. The affected households also agreed to R3000 per household compensation for relocation costs to be paid by SANRAL.

23 April 2018 - NW122

Profile picture: King, Ms C

King, Ms C to ask the Minister of Health

Whether, with reference to the research conducted by the University of Cape Town’s molecular endrinologist which found that the contraceptive Depro Provera increases the risk of HIV, his department has conducted its own study to find out whether the synthetic hormone could affect the body’s immune system and increase the risk of contracting HIV; if not, why not; if so, what were the findings?

Reply:

The National Department of Health is aware of the study that was published in January 2018 which were based on animal studies. The possibility of DMPA being associated with HIV acquisition has been discussed by the World Health Organisation since 2012. South African experts have been part of these discussions. The studies presented at meetings of the World Health Organisation were not based on randomised clinical trials but on observational studies. In order to get conclusive evidence that DMPA definitely facilitates HIV acquisition, a number of donors, with the support of the National Department of Health commissioned the ‘Evidence for Contraceptive Options and HIV Outcomes’ Study (ECHO) in 2016 with results expected in 2019.

As well, in April 2017, the Department convened a group of experts in contraception to review the data on DMPA and HIV acquisition. These experts recommended the following: (a) that women must be provided with the full range of contraceptives and they must be counselled on the advantages and disadvantages of each to enable them to make the best possible decision; and that (b) regardless of which contraceptive method women chose, they must be informed about the importance of dual protection – this means consistent use of male or female condoms together with a contraceptive of their choice. This reinforced the policy decision taken earlier and included in the National Contraception and Fertility Planning Policy and Service Delivery Guidelines which the Department has been implementing since 2014.

The Department is committed to continue to monitor the research as well as World Health Organisation guidance on the use of DMPA and take appropriate decisions based on evidence.

END.

23 April 2018 - NW97

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Communications

With reference to the reply to question 1958 on 16 October 2017, (a) which trade exchanges are currently in dispute, (b) what amounts are associated with each trade exchange and (c) which trade exchanges are currently before the courts?

Reply:

a) Currently there are no trade exchanges before the courts, but there exists a dispute which is not before the courts yet.

The background briefly:

The South African Broadcasting Corporation SOC Limited (“SABC”) through Metro FM concluded a Trade Exchange Agreement (“Agreement”) with RBA Developments JHB (Proprietary) Limited (“RBA”) for the exchange of value added services set out in Annexure “A” and Schedules II, III and IV of the Agreement. The salient terms of the Agreement are as follows:

  • The Agreement commenced on 08 August 2016;
  • The Agreement will terminate on 08 October 2016;
  • The parties to the Agreement are the SABC and RBA;
  • In terms of the Agreement the parties would perform the obligations set out in Annexure “A” including the deliverables set out in the trade exchange items schedule. A copy of the Agreement is attached herewith and marked as “Annexure A”.

b) The trade exchange value is R3 450 749.68 including VAT.

In terms of the Agreement, the parties agreed to jointly work together in delivering a fully furnished house as a prize giveaway pursuant to a competition to be run by Metro FM for its listeners. To this end each of the parties undertook to perform certain obligations to ensure the successful implementation of the competition and delivery of the house to the competition winner. The dispute is therefore that RBA was liquidated and MSP, which took over and agreed to step in and assist in completing the house and handing it over to the completion winner is now reneging on its initial undertaking.  This has resulted in the house not having been handed over to the competition winner despite that the house was long completed.

Metro FM has received a demand from Legal Wise representing the competition winner claiming a handover of the house to the winner.

c) Save for the demand from Legal wise, no court pleadings have been served on the SABC yet. We are still in the process of engaging with MSP to try and resolve the matter amicably by handing over the house to the competition winner.

23 April 2018 - NW1010

Profile picture: Nolutshungu, Ms N

Nolutshungu, Ms N to ask the Minister of Basic Education

What amount in funding is required (a) to train teachers to fill existing vacancies and (b) for future needs of new schools to be built?

Reply:

a) Budgeting for provisioning of educators is done in terms of the normal government budgeting processes. On an annual basis, each Member of the Executive Council (MEC) for Education declares a basket of posts his/her respective Provincial Education Department, based on the available budget. Such posts are then distributed to schools using the post provisioning model. Therefore, vacancies that exist at any point are part of the declared post establishment and are funded and there is no additional amount of funding required to fill existing vacancies.

b) Requirements for funding for infrastructure is based on the Regulations Relating to Minimum Norms and Standards for Public School Infrastructure. As at the publication of the Norms and Standards, a shortfall of R 182 billion was estimated to address new schools and new spaces to be provided to bring all schools to optimum functionality. This includes provision of new education and curricular spaces, education support areas as well as administrative spaces. The sector is planning to conduct a condition assessment of all schools to determine the current backlog and calculate the resultant funding required.

 

QUESTION: NA 1010- I

COMPILER:

MS S GEYER (3740)

CD/TE

DATE:

MR ER MAFOKO

EXT: X 4317

DATE:

DR G WHITTLE

A/DDG: SECTOR INFRASTRUCTURE MANAGEMENT

DATE:

MS P TYOBEKA

ACTING DIRECTOR–GENERAL

DATE:

QUESTION NA 1010- I APPROVED/ NOT APPROVED/ AMENDED

MR ME SURTY, MP

DEPUTY MINISTER

DATE:

QUESTION: NA 1010- I APPROVED/ NOT APPROVED/ AMENDED

MRS AM MOTSHEKGA, MP

MINISTER

DATE:

23 April 2018 - NW98

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Communications

(1) With reference to the reply to question 1181 on 16 October 2017 and the annual report of the SA Broadcasting Corporation (SABC) which does not provide a detailed breakdown of the information requested, (a) which (i) officials from her department and (ii) officials and Board members from (aa) the SABC and (bb) each entity reporting to her were in Cape Town for the duration of the inquiry of the Ad Hoc Committee on SABC, (b) on which dates was each individual in Cape Town, (c) what was the cost for each specified individual to be in Cape Town, (d) what class of travel did each specified individual use to attend the SABC inquiry, (e) what accommodation costs were incurred and (f) in which hotel(s) did the specified individuals stay; (2) whether any costs will be recovered from those individuals who were in Cape Town for the duration of the SABC inquiry, but did not attend its meetings?

Reply:

DEPARTMENT OF COMMUNICATIONS (DOC)

1. 

a) (i) Mr Tshegofatso Kgarabjang.

a) 6-9 December 2016; 12-15 December 2016; and 19 January 2017.

b) The total cost incurred in attending the SABC inquiry is R27 907.10.

c) Ecomony class flight was utilised.

e) The cost incurred for accommodation is R1320 for one night on 19 January 2017.

f) Protea hotel in Seapoint.

2. Mr Kgarabjang attended all the sessions of the SABC inquiry when he was in Cape Town and as such no cost was recovered from him.

BRAND SOUTH AFRICA (BSA)

1. Not Applicable

a).Not Applicable

i) Not Applicable

ii) Not Applicable

aa) Not Applicable

bb) Not Applicable

b) Not Applicable

c) Not Applicable

d) Not Applicable

e) Not Applicable

f) Not Applicable

2. Not Applicable

FILMS AND PUBLICATIONS BOARD (FPB)

1. Not Applicable

a). Not Applicable

i) Not Applicable

ii) Not Applicable

aa) Not Applicable

bb) Not Applicable

b) Not Applicable

c) Not Applicable

d) Not Applicable

e) Not Applicable

f) Not Applicable

2. Not Applicable

MEDIA AND DIVERSITY DEVELOPMENT AGENCY (MDDA)

1. Not Applicable

a). Not Applicable

i) Not Applicable

ii) Not Applicable

aa) Not Applicable

bb) Not Applicable

b) Not Applicable

c) Not Applicable

d) Not Applicable

e) Not Applicable

f) Not Applicable

2. Not Applicable

INDEPENDENT COMMUNICATIONS AUTHORITY OF SOUTH AFRICA (ICASA)

(1) (a) (i) to (1) (a) (ii) Not applicable for ICASA

(aa) Not applicable for ICASA

(bb) ICASA was requested to present to the Ad-Hoc Committee on SABC. Councillor Batyi and Mr. Willington Ngwepe (COO) represented ICASA.

(b) 7 December 2016

(c) Total amount incurred was R15, 228 for flights only.

(d) Economy Class.

(e) No accommodation costs were incurred.

(f) No accommodation costs were incurred.

(2) Not applicable, both officials attended the Meeting.

SOUTH AFRICAN BROADCASTING CORPORATION (SABC)

1. (ii) Refer to the attached table below.

2. No, as all employees listed below travelled on official SABC business, namely the Adhoc Inquiry held to establish the fitness of the SABC Board to hold office.

____________________

Mr Thabiso Thiti

Acting Director-General

Date:

Approved/ Not approved

_______________________________

Ms Nomvula Mokonyane

Minister

Date:

Name

Departure date

Return Date

Duration

Flight Name'

Amount

Hotel

Amount

Car rental

Amount

Total

George Hlaudi Motsoeneng

2016-12-06

2016-12-09

3

SAA/BA

9 322,07

Hilton Hotel

10 706,14

 

-

20 028,21

James Rogers Aguma

2016-12-06

2016-12-09

3

SAA/BA

9 322,07

Hilton Hotel

4 276,32

Avis Car Rental

2 588,50

16 186,89

James Rogers Aguma

2016-12-14

2016-12-15

1

SAA/BA

6 394,67

African Pride Crystal Towers

7 785,72

Avis Car Rental

1 062,88

15 243,27

Audrey Maleshane Raphela

2016-12-12

2016-12-14

2

Kulula Airways

5 692,74

African Pride Crystal Towers

4 275,79

 

-

9 968,53

Bessie Lillian Tugwana

2016-12-01

2016-12-03

2

British Airways

7 543,97

African Pride 15 on Orange

3 989,64

Avis Car Rental

1 943,97

13 477,58

Bessie Lillian Tugwana

2016-12-12

2016-12-14

2

British Airways

7 503,62

African Pride Crystal Towers

2 858,85

Europ car Rental

4 034,93

14 397,40

Ayanda Mkhize

2016-12-12

2016-12-15

3

South African Airways

4 005,72

African Pride Crystal Towers

3 740,79

Avis Car Rental

2 201,51

9 948,02

Jacob Johannes Potgieter

2016-12-07

2016-12-09

2

South African Airways

4 005,72

 

-

 

-

4 005,72

Jacob Johannes Potgieter

2016-12-13

2016-12-15

2

British Airways

4 963,62

African Pride Crystal Towers

1 246,93

Avis Car Rental

3 266,85

9 477,40

Mohlolo Lephaka

2016-12-05

2016-12-09

4

British Airways

7 543,97

African Pride Crystal Towers/Premier Hotel

12 862,28

Avis Car Rental

3 893,49

24 299,74

Nomsa Penlope Mhlanga

2016-12-06

2016-12-09

 

South African Airways

5 302,04

African Pride Crystal Towers

3 842,10

   

9 144,14

Nomsa Penlope Mhlanga

2016-12-12

2016-12-15

 

South African Airways

5 285,72

African Pride Crystal Towers

3 740,79

   

9 026,51

Keobokile Edwin Mosweu

2016-12-06

2016-12-07

1

South African Airways

5 285,72

Hilton Hotel

3 684,21

Avis Car Rental

897,66

9 867,59

Keobokile Edwin Mosweu

2016-12-13

2016-12-15

2

SAA/BA

6 233,62

African Pride Crystal Towers

2 493,86

 

-

8 727,48

Alwyn Burger Kloppers

2016-12-12

2016-12-14

2

South African Airways

4 515,72

African Pride Crystal Towers

2 493,86

Avis Car Rental

818,00

7 827,58

Zakir Allie Rawoot

2016-12-06

2016-12-09

3

SAA/BA

6 428,00

African Pride Crystal Towers

14 194,75

Avis Car Rental

4 270,99

24 893,74

Zakir Allie Rawoot

2016-12-11

2016-12-15

4

SAA/BA

9 047,53

African Pride Crystal Towers

4 987,72

Avis Car Rental

2 159,89

16 195,14

Theresa Geldenhuys

2016-11-27

2016-12-02

 

British Airways

7 563,26

African Pride 15 on Orange

15 144,78

Avis Car Rental

5 227,67

27 935,71

Theresa Geldenhuys

2016-12-01

2016-12-12

 

British Airways

7 543,96

African Pride Crystal Towers/15 on Orange

53 334,76

Avis Car Rental

14 774,28

75 653,00

David Sizwe Vilakazi

2016-11-27

2016-12-02

6

British Airways

7 543,96

African Pride 15 on Orange

9 404,61

Avis Car Rental

3 546,18

20 494,75

David Sizwe Vilakazi

2016-12-12

2016-12-15

3

South African Airways

5 285,72

African Pride Crystal Towers

3 740,79

Europ car Rental

3 252,17

12 278,68

David Sizwe Vilakazi

2016-12-06

2016-12-09

3

South African Airways

9 053,85

African Pride Crystal Towers

3 740,79

Avis Car Rental

2 617,27

15 411,91

David Sizwe Vilakazi

2017-02-16

2017-02-16

0

South African Airways

6 350,81

 

-

Avis Car Rental

1 042,51

7 393,32

Sello Emanuel Xama

2016-12-06

2016-12-08

2

South African Airways

4 332,04

African Pride Crystal Towers

3 712,20

   

8 044,24

Lindiwe Vuyelwa Bayi

2016-11-27

2016-12-02

5

British Airways

7 563,26

African Pride 15 on Orange

9 649,15

   

17 212,41

Lindiwe Vuyelwa Bayi

2016-12-05

2016-12-09

4

British Airways

10 199,98

African Pride Crystal Towers

4 125,79

BROAD HORIZON TOURS & TRANSPORT

1 200,00

15 525,77

Lindiwe Vuyelwa Bayi

2016-12-12

2016-12-15

3

British Airways

7 503,62

African Pride Crystal Towers

11 227,79

 

-

18 731,41

Mbulaheni Obert Maguvhe

2016-12-04

2016-12-09

5

British Airways

5 758,88

African Pride Crystal Towers

10 500,48

 

-

16 259,36

Mbulaheni Obert Maguvhe

2016-12-11

2016-12-14

3

South African Airways

5 275,72

African Pride 15 on Orange

6 600,00

 

-

11 875,72

Andre Webber

2016-12-06

2016-12-09

3

South African Airways

5 302,04

The residence Imvusa Park

6 578,95

 

-

11 880,99

Andre Webber

2016-12-13

2016-12-15

2

British Airways

4 963,62

African Pride Crystal Towers

1 246,93

 

-

6 210,55

Mosimanegape Daniel Mongale

2016-12-11

2016-12-15

2

South African Airways

4 515,72

African Pride Crystal Towers

4 321,28

 

-

8 837,00

Florence Nomathemba Buhlalu

2016-12-04

2016-12-09

5

South African Airways

5 758,88

African Pride Crystal Towers

9 378,74

Avis Car Rental

5 043,00

20 180,62

Florence Nomathemba Buhlalu

2016-12-11

2016-12-15

4

South African Airways

5 275,72

African Pride 15 on Orange

5 989,49

First Car Rental

2 202,97

13 468,18

Mbulaheni Obert Maguvhe - Lucky Thekiso

2016-12-11

2016-12-15

4

British Airways

7 503,62

African Pride Crystal Towers

6 564,03

First Car Rental

1 381,31

15 448,96

Mbulaheni Obert Maguvhe - Lucky Thekiso

2016-12-05

2016-12-09

4

British Airways

7 543,97

African Pride Crystal Towers - reflected on Theresa Geldenhuys

Avis Car Rental

3 344,29

10 888,26

Mbulaheni Obert Maguvhe - Lucky Thekiso

2016-11-27

2016-12-03

6

South African Airways

6 447,30

African Pride 15 on Orange

19 386,00

Avis Car Rental

2 249,53

28 082,83

Mbulaheni Obert Maguvhe - Sikhumbuzo Nhantsi

2016-12-05

2016-12-09

4

British Airways

7 543,97

African Pride Crystal Towers - reflected on Theresa Geldenhuys

-

7 543,97

Mbulaheni Obert Maguvhe - Sikhumbuzo Nhantsi

2016-12-11

2016-12-15

4

SAA/BA

6 394,67

African Pride Crystal Towers

5 307,89

 

-

11 702,56

Mbulaheni Obert Maguvhe - Kgomotso Mathipa

2016-12-05

2016-12-09

4

SAA/BA

6 428,00

African Pride Crystal Towers - reflected on Theresa Geldenhuys

-

6 428,00

Mbulaheni Obert Maguvhe - Kgomotso Mathipa

2016-12-12

2016-12-15

3

SAA/BA

7 396,25

African Pride Crystal Towers

4 689,04

 

-

12 085,29

Mbulaheni Obert Maguvhe - Jimmy Hlongwane

2016-11-27

2016-12-03

6

British Airways

10 238,58

African Pride 15 on Orange

19 513,00

 

-

29 751,58

Mbulaheni Obert Maguvhe - Jimmy Hlongwane

2016-12-05

2016-12-09

5

British Airways

7 543,97

African Pride Crystal Towers - reflected on Theresa Geldenhuys

-

7 543,97

Mbulaheni Obert Maguvhe - Matthwes Mathipa

2016-11-27

2016-12-02

5

British Airways

10 219,28

African Pride 15 on Orange

15 659,00

 

-

25 878,28

Totals

       

295 447,17

 

316 995,24

 

73 019,85

685 462,26

                     

23 April 2018 - NW703

Profile picture: Stander, Ms T

Stander, Ms T to ask the Minister of Agriculture, Forestry and FisheriesQUESTION

(1)  Whether his department has a sexual harassment and assault policy in place; if not, (a) why not and (b) by what date will his department have such a policy in place; if so, (i) how are reports investigated and (ii) what are the details of the consequence management and sanctions stipulated by the policy; (2) (a) what is the total number of incidents of sexual harassment and assault that have been reported in his department (i) in each of the past three financial years and (ii) since 1 April 2017, (b) what number of cases were (i) opened and concluded, (ii) withdrawn and (iii) remain open based on the incidents and (c) what sanctions were issued for each person who was found to have been guilty?

Reply:

(1)The Department does not have an approved sexual harassment and assault policy in place.

(a) A draft policy has been developed and submitted to the Departmental Bargaining Chamber (DBC) for consultation.

b) It is anticipated that the sexual harassment and assault policy will be approved in the 2018/19 financial year.

(i) Incidents of sexual harassment are reported through the normal grievance procedure.

(ii).The draft policy does not stipulate consequence management and sanctions. However, consequence and sanctions will be determined by the outcome of each case.

(2)

(a) (i) There were no cases of sexual harassment and assault reported in the past three years

(ii) There were no cases of sexual harassment and assault opened since 2017

(b) (i) N/A

(ii) N/A

(iii) N/A

(c) N/A

23 April 2018 - NW694

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Communications

(1) (a) What portion of Brand SA’s budget for the 2017-18 financial year was used for offices abroad and (b) what was the cost of running offices in each country (i) in each of the past three financial years and (ii) since 1 April 2017; (2) whether Brand SA will increase its budget for the 2018-19 financial year; if not, what is the position in this regard; if so, what are the relevant details; (3) what are the details of the top 10 countries targeted by Brand SA?

Reply:

1. (a) R21,375,360 14% of R154,910,000

(b) (i) China

2014/2015 = R2,761808

2015/2016 = R5,281,620

2016/2017 = R2, 846, 987

United States

2014/2015 = R2, 933,350

2015/2016 = R4, 072,220

2016/2017 = R4, 561,451

United Kingdom

2014/2015 = R5, 991,782

2015/2016 = R5, 365,610

2016/2017 = R2, 843,252

(ii) China (since 1 April 2017) = R3, 112,108

United States (since 1 April 2017) = R6, 892,777

United Kingdom (since 1 April 2017) = R5, 493,852

2. Yes, by 6%.

3. Not Applicable