Questions and Replies
11 December 2017 - NW3929
Ketabahle, Ms V to ask the Minister of Health
Does each province have the necessary structured plan and budget to support the roll-out of the National Health Insurance scheme?
Reply:
The NHI Bill is still to go to Parliament and be passed into a law first before budget plans per province can be entertained.
END.
11 December 2017 - NW2163
Kopane, Ms SP to ask the Minister of Health
(a) How many public (i) hospitals and (ii) clinics do not have running water currently and (b) will he provide Ms S P Kopane with a list of the specified hospitals and clinics?
Reply:
(a) and (b) All our health facilities do have running water supply systems.
However, sometimes there may be some interruption due to drought, maintenance work on the system or shortage from the main source of supply, for example, a dried borehole or very low dam levels. It may also happen if there are local government problems in that municipality.
In such cases arrangements are made at facility level with the relevant municipality to cart water to such a facility until the problem is solved.
Jojo water tanks are also installed in many clinics and CHCs to harvest rain water and utilise in case of emergencies.
END.
11 December 2017 - NW3156
Filtane, Mr ML to ask the Minister of Health
(1)Whether, with regard to the insufficient provision of water at the Butterworth Hospital in the Eastern Cape, which resulted in ill people being released to go home and suffer or possibly die, he was informed of the pending water crisis; if not, why not; if so, what are the relevant details; (2) whether any measures were in place to avoid the above-mentioned consequence; if not, why not; if so, what are the relevant details?
Reply:
(1) Through the MEC for Health in the Eastern Cape, I was made aware of water challenges facing Butterworth area, thus affecting Butterworth Hospital.
Patients were transferred to other health facilities and no patients were sent home to die.
During the period in question, water carting happened in the hospital. As an additional measure, the Hospital reservoir is being expanded.
The drought situation has drastically improved with the good rains that we received. The Hospital is functioning normally.
(2) Yes, measures were put in place to avert the situation, such as the following:
(a) WATER CARTING
The Department is currently carting water from East London to Butterworth Hospital.
(b) BOREHOLE DRILLING
When the risk was identified by the Department in 2016, Geo-hydrological studies were commissioned by the Eastern Cape Department of Health which unfortunately indicated that there is no underground water in the Butterworth area, hence the Department resolved to initiate a project to construct an additional 800 Kilo Litre water reservoir. The project is currently in procurement. The reservoir will be sufficient to store water for 48 hours.
(c) SPECIAL ARRANGEMENTS WITH MNQUMA MUNICIPALITY
The Department made arrangements with Local Municipality to open water specifically to the Hospital reservoir on certain days of the week.
END.
11 December 2017 - NW1839
Carter, Ms D to ask the Minister of Health
With reference to the reports indicating (a) a catastrophic collapse of oncology services in the state hospital system in KwaZulu-Natal, (b) that there are currently no oncologists in the employ of the state in the Durban area to service the Addington and Albert Luthuli Hospitals and (c) that there are only two remaining oncologists in the employ of the state in Pietermaritzburg, servicing Grey’s Hospital, which amount to a human rights violation, what (i) are the root causes of this unacceptable situation, (ii) steps has the KwaZulu-Natal Department of Health taken to arrest and turn this situation around and (iii) actions and interventions does his department intend to take in this regard?
Reply:
(a) The breakdown of the linear accelerator at Addington Hospital resulted from lack of maintenance following a dispute between the suppliers and the KZN Department of Health. This has resulted in the province contracting a new service provider to maintain the equipment which from all accounts they failed to do. All oncologists that worked at Addington Hospitals were transferred to work in Inkosi Albert Luthuli Hospital. This also meant that all patients that required radiation in the eThekwini district were referred to Inkosi Albert Luthuli Hospital. It appears that the perceived additional workload at Inkosi Albert Luthuli Hospital contributed to the oncologists resigning.
(b) The Department is in the process of finalising a service level agreement with the supplier of the linear accelerator that requires significant repairs.
The KZN Department of Health has issued a tender to contract private oncologists to work in the public sector. This tender closes on 14 December 2017. In addition, the Department has recently requested the National Department of Health for assistance to recruit English speaking foreign oncologists who are eligible for registration with the Health Professions Council of South Africa.
(c) The National Department of Health has:
- Placed an order for a new linear accelerator to replace one of those in Addington Hospital; the service provider will also address infrastructure issues related to the bunker, including air-conditioning and leaks.
- Concluded a benchmarking exercise to assist the KZN Department of Health to evaluate the bids received against the tender referred to above.
- Commenced with a search for foreign qualified oncologists as a short term measure
- Developed a national plan for radiation oncology that was approved by the National Health Council on 7 December 2017 – given that the need to strengthen radiation oncology services throughout the country and in anticipation of increased need for these services over the next 5-10 years.
END.
11 December 2017 - NW3797
Hoosen, Mr MH to ask the Minister of Home Affairs
What is the current arrangement between (a) her department, (b) the National Treasury and (c) the Auditor-General in terms of resolving the (i) immigration control account and (ii) outstanding repatriation deposits?
Reply:
(a-c)(i-ii) Further to the promulgation of the Immigration Regulation during 2014, which changed the collection of repatriation deposits from travellers to RSA, the Department approached National Treasury requesting it to allow the Department to recognise all unclaimed repatriation deposits as revenue in its financial statements, to surrender all unclaimed repatriation deposits to the National Revenue Fund (NRF) and to close the Immigration Control Account.
In order to address the concerns raised by Auditor General in this regard, the Department issued a Government Gazette notifying all travellers that they will forfeit their repatriation deposits if not claimed by 31 March 2016. During the 2015/16 and 2016/17 financial years, the Department performed a reconciliation of the Immigration Control Account and paid over R441, 773 million to the NRF, R69 million to DIRCO and R8,5 million to qualifying travellers. This left the Immigration Control Account with a balance of R2,172 million as at 31 March 2017 – this amount constitutes refunds (un-cashed cheques) due to qualifying travellers.
Based on the above background that outlines the arrangement with National Treasury and the Auditor General, the Immigration Control Account is closed and all unclaimed repatriation deposits are forfeited and surrendered to the NRF.
11 December 2017 - NW3359
Lees, Mr RA to ask the Minister of Finance
(1)What are the details of all passengers who were prevented from boarding SA Airways (SAA) flights from Munich to Johannesburg on (a) 22 July, (b) 23 July and (c) 24 July 2017; (2) whether the specified passengers received any form of compensation for being prevented from boarding the specified flights; if not, why not; if so, what amount in compensation was awarded to each passenger; (3) whether all affected passengers received the compensation immediately in Munich; if not, what are the relevant details of the payment arrangements; (4) whether all affected passengers have received compensation; if not, (a) why have compensation payments not been made to all affected passengers, (b) by which date will payments be made and (c) how will payments be made?
Reply:
1. Refer Annexure A.
2. Yes. All passengers received EUR600 in form of vouchers as per EU regulations. In addition they were accommodated in hotels and provided with meal vouchers.
3. Yes. The vouchers were handed over to the passengers in Munich.
4. Yes. All affected passengers received compensations in the form of vouchers for EUR600.
11 December 2017 - NW2848
Mokgalapa, Mr S to ask the Mr S Mokgalapa (DA) to ask Minister of International Relations and Cooperation
1)Wether her Department has decided how it will facilitate prison exchange programmes; If not, why not; if so what are the relevant details (2)Wether she will make a statement on the details of the meeting held in Gaborone, Republic of Botswana, to discuss the specified programmes?
Reply:
(1)The mandate of concluding Prisoner Transfer Agreements is vested with the Department of Correctional Services.
(2)The Department is not aware of such a meeting. The question should be directed to the Department of Correctional Services.
UNQUOTE
11 December 2017 - NW2632
Kalyan, Ms SV to ask the Minister of International Relations and Cooperation
Was the flight that (a) arrived at Waterkloof Air Force Base from Harare on or about 16 August 2017 and (b) departed from Waterkloof Air Force Base to Harare on or about 20 August 2017 granted an RSA05 clearance; if so (c) who approved the clearance and (d) on what basis was the clearance done NATIONAL ASSEMBLY FOR WRITTEN REPLY QUESTION NO:2632 DATE OF QUESTION PAPER: 1 SEPTEMBER 2017 PUBLISHED IN INTERNAL QUESTION PAPER NO: 31 OF 2017 REPLY: Ms S V Kalyan (DA) asked the Minister of International Relations and Cooperation the following questions regarding the Zimbabwean aircraft that visited South Africa between 16 and 20 August 2017. Was the flight that (a) arrived at Waterkloof Air Force Base from Harare on or about 16 August 2017 and (b) departed from Waterkloof Air Force Base to Harare on or about 20 August 2017 granted an RSA05 clearance; if so (c) who approved the clearance and (d) on what basis was the clearance done? Yes Yes Department of Defence The aircraft was transporting a Head of State UNQUOTE
Reply:
- Yes
- Yes
- Department of Defence
- The aircraft was transporting a Head of State
UNQUOTE
11 December 2017 - NW3490
Carter, Ms D to ask the Minister of Health
Whether his department has considered using a device researched and manufactured by a certain company (name furnished) which detects biomarkers found in human tears (details furnished); if not, why not; if so, what are the relevant details?
Reply:
No. The Department of Health is dedicated to implementing the latest available technology to diagnose breast cancers. However the technology using human tears is still being researched and is not available for clinical use.
END.
11 December 2017 - NW2960
Robertson, Mr K to ask the Minister of Health
(1)What (a) total amount of budget was allocated for the construction of the Nhlazatshe 6 CHC community clinic in the Chief Albert Luthuli Local Municipality in Mpumalanga, (b) are the full details of how the project is being funded, (c) amount of the specified budget has been spent to date and (d) is the current status of the construction of the specified clinic; (2) (a) what are the (i) names and (ii) contact details of each contractor appointed to construct the specified clinic and (b) have all contractors been paid in full in accordance with the completed phases to date; (3) by what date will the (a) construction of the clinic be completed and (b) specified clinic be fully operational?
Reply:
(1) (a) R44 million.
(b) The project is funded from a special In-kind grant.
(c) Only fencing and consulting fees have been paid up to date, to the amount of R1,493,136.00.
(d) A contractor has been appointed and has already received a letter of award.
(2) (a) (i) and (ii) Names and details of contractors:
LDM Consulting (Pty) Ltd
21 West Riding Row, Sherwood, Durban, 4091
Tel: 031 207 1340
Fax: 031 209 9441
Email: [email protected];
Mpfumelelo Business Enterprise (Pty) Ltd; and
21 Norwin Street, White River, Mpumalanga, 1200
Tel: 013 751 3381
Fax: 013 751 2498
Email: [email protected]
Central Bridge Trading 109.
48 Bester Street, Nelspruit, 1200
Tel: 013 755 1133
Fax: 086 501 2531
Email: [email protected]
(b) Yes. Currently all payments have been made to the service provider and contractor. LDM Consulting (Pty) Ltd has been appointed for the total life cycle of the project, hence the contract has not been concluded with LDM. As the Project Manager/Principal Agent, LDM was appointed to manage the construction of the Clinic. Only the fencing contract was concluded and the main contract for the construction of the Clinic will commence in January 2018 after the builders' break.
(3) (a) and (b) The construction and commissioning will be concluded within 24 months from start to finish. Site hand-over to the contractor was done in November 2017. Construction will commence in January 2018. The construction period is 18 months plus an additional 6 months for the installation of Health Technology equipment and commissioning.
END.
11 December 2017 - NW3491
Carter, Ms D to ask the Minister of Health
With reference to his reply to question 158 on 13 March 2017 wherein he stated that the internship and Community Service Programme (ICSP) online application system was introduced in 2016 for placement of 2017 medical interns and community service candidates and that during the implementation of the ICSP programme various challenges were experienced with the key process activities and the use of ICSP online, what measures have been put in place to ensure smooth and fair placements of medical interns?
Reply:
In order to improve the efficiency and effectiveness of the ICSP online system the National Department developed ICSP Guidelines which are updated yearly in order to meet the demands of applicants. The Department also developed an Improvement Plan which is meant to address identified challenges experienced during the 2016/2017 period.
Both these documents are work-in-progress and are updated annually to ensure that the system is able to cope with emanating challenges.
The Department continuously engage with stakeholders to try and trouble-shoot envisaged challenges.
The Department has also established a helpdesk that operates for 8 hours from Monday to Friday to assist with responding to enquiries from applicants and directing them appropriately. Furthermore, the Department has an email ticket system that helps to track enquiries of applicants.
END.
11 December 2017 - NW3803
Maynier, Mr D to ask the Minister of Finance
(1)Whether the SA Revenue Service (SARS) ITA34 Notice of Assessment Income tax forms of certain persons (Mr AK Gupta and Mr RK Gupta),(a) has been released by the SARS as public information notwithstanding the provisions of section 69 (2)(d) of the Tax Administration Act, Act 28 of 2011; if so, what are the relevant details; if not; (2) Whether he has found that the Notice of the Income Tax Assessment Forms, ITA34, of the specific persons are authentic; if not, what is the position in this regard; if so, what are the relevant details in each case?
Reply:
1. The Tax Administration Act has specific secrecy requirements pertaining to the confidentiality of taxpayer information and as such SARS does not discuss or release information pertaining to the tax affairs of taxpayers unless specifically allowed for by the provisions of Chapter 6 of the Tax Administration Act. The provisions of 69(2) (d) of the Tax Administration Act speaks to allowing a senior SARS Official to disclose information which is public information. The ITA34’s of any taxpayer cannot be regarded as public information as set out in the Act.
2. Due to the provisions of Chapter 6 of the Tax Administration Act, and in specific the provisions of section 69 of that Act, SARS will not discuss the validity or not of the said documents.
11 December 2017 - NW2170
Dreyer, Ms AM to ask the Minister of Health
(a) Which public (i) hospitals and (ii) clinics (aa) have been damaged and (bb) had inadequate infrastructure in each of the past three financial years and (b) what are the details pertaining to this in each case?
Reply:
(a) Honourable Member, when you say public hospitals and clinics that have been damaged, what damage are you referring to? Do you mean a broken window, a burst water pipe, damage caused by earthquake? What actually do you mean? Please help me in order to be able to answer your question;
(b) Inadequate infrastructure is also relative and subjective term. May you please specify what you mean by inadequate infrastructure?
END.
11 December 2017 - NW3925
Thembekwayo, Dr S to ask the Minister of Health
In which sections of the National Health Insurance Project in Gauteng were some of the 160 interns employed who were transferred from the national Department of Health to the Gauteng Provincial Department of Health?
Reply:
May the Honourable Member please clarify which interns are being referred to. Are you referring to medical interns or any other graduate who was placed in the Department of Health for internship purposes? Please specify that so that I might be able to answer you. I am otherwise unable to relate to an issue of just 160 interns.
END.
11 December 2017 - NW2573
Mkhaliphi, Ms HO to ask the MINISTER OF INTERNATIONAL RELATIONS AND COOPERATION
When are the application dates? (a) Opening and (b) Closing for the board positions of all entities and councils reporting to her?
Reply:
(a) and (b) There are no application since the African Renaissance and International Cooperation Fund (ARF) does not have a board. However, in terms of the ARF Act 51 of 2000, Section 5. (1) it states that “the Minister must, in consultation with the Minister of Finance, establish an Advisory Committee consisting of the following members—
(a) the Director-General or the delegate of the Director-General;
(b) three officers of the Department appointed by the Minister; and
(c) two officers of the Department of Finance appointed by the Minister of Finance”.
UNQUOTE
11 December 2017 - NW3926
Thembekwayo, Dr S to ask the Minister of Health
Whether he informed the Member of the Executive Council responsible for health in Gauteng of his decision to transfer 160 employees from the payroll of the national Department of Health to that of the Gauteng provincial department in October 2016?
Reply:
I never took any decision to transfer 160 employees from the payroll of the National Department of Health to that of the Gauteng Department of Health.
END.
11 December 2017 - NW3745
Xalisa, Mr Z R to ask the Minister of Environmental Affairs
(1)Whether (a) her department and/or (b) entities reporting to her procured services from a certain company (name furnished); if so, (i) what services were procured in each case and (ii) what is the total amount that was paid to the specified company in each case; (2) whether the specified company provided services related to international travel to (a) her department and/or (b) entities reporting to her; if so, (i) what is the name of each person who travelled, (ii) what was the travel route and (iii) what is the total amount that was paid for each person?
Reply:
The services that my Department and its entities procure from any service provider, be it in the sphere of travel management and or accomodation, are services that are always awarded after a fair, equitable, transparent, competitive and cost-effective bid process in line with Section 38 (1) (a) (iii) of the Public Finance Management Act. Such procurement processes are administered by the Department’s Bid Evaluation Committee in terms of the same Act.
All procurement procedures and processes are audited annually and the information pertaining to the audit opinion on these matters is reflected in the relevant annual reports which are readily available as public documents.
--ooOoo---
08 December 2017 - NW3574
Lotriet, Prof A to ask the Minister of Human Settlements
(a) What is the total number of supplier invoices that currently remain unpaid by (i) her department and (ii) each entity reporting to her for more than (aa) 30 days, (bb) 60 days, (cc) 90 days and (dd) 120 days and (b) what is the total amount outstanding in each case?
Reply:
The information requested by the Honourable Member is provided in the table below:
(i) NATIONAL DEPARTMENT OF HUMAN SETTLEMENTS:
(aa) for more than 30 days |
(bb) for more than 60 days |
(cc) for more than 90 days |
(dd) for more than 120 days |
None |
None |
None |
None |
(ii) ENTITIES:
(aa) for more than 30 days |
(bb) for more than 60 days |
(cc) for more than 90 days |
(dd) for more than 120 days |
National Urban Reconstruction and Housing Agency |
|||
13 and total amount outstanding is R1,573,617.68 |
7 and total amount outstanding is R26,320.12 |
1 and total amount outstanding is R33,345.00 |
1 and total amount outstanding is R91.49 |
National Housing Finance Corporation |
|||
R316.92 |
None |
None |
None |
Social Housing Regulatory Authority |
|||
92 and total amount outstanding is R3 179 454.82 |
16 and total amount outstanding is R946 184.22 |
1 and total amount outstanding is R77 922.95 |
4 and total amount outstanding is R83 022.03 |
Housing Development Agency |
|||
2 and total amount outstanding is R15 104,00 |
6 and total amount outstanding is R1 411 171,00 |
5 and total amount outstanding is R164 227,00 |
12 and total amount outstanding is R6 681 692,00 |
Rural Housing Loan Fund |
|||
None |
None |
None |
None |
Community Schemes Ombud Service |
|||
1 and total amount outstanding is R961,879.90 |
None |
None |
2 and total amount outstanding is R261,800.00 |
Estate Agency Affairs Board |
|||
13 and total amount outstanding is R242 332,46 |
None |
1 and total amount outstanding is R11 475,00 |
None |
National Home Builders Registration Council |
|||
20 and total amount outstanding is R2 505 610,00 |
2 and the total amount outstanding is R64 370,00 |
1 and total amount outstanding is R29 135,00 |
None |
08 December 2017 - NW3162
Ketabahle, Ms V to ask the Minister of Telecommunications and Postal Services
What are the details including the ranks of service providers and /or contractors from which (a) his department and (b) the entities reporting to him procured services in the past five years 2. What (a) service was provided by each service provider and /or contactor and (b) amount was service provider and / or contractor paid 3. (a) how many of these service providers are black-owned entities, (b) what was each of the black-owned service providers awarded and; (c) how much was each black-owned service provider paid?
Reply:
I have been informed by the Department and entities as follows:
Department
The question is broad and not specific requiring detailed information over a long period of time. Various services procured by the Department range from small to big procurement of goods and services.
(1)(a) The Department of Telecommunications and Postal Services was established in May 2014. Since 2014 various services were rendered to the Department by various service providers. Therefore the answer to the question will only focus on the 2014/15, 2015/16 and 2016/17 financial years.
(2)(a) The list of service providers utilised during the abovementioned periods are too long to list.
(2)(b) The type of services that were rendered to the Department are as follows:-
Printing
Catering
Advertisements
Recruitment
Security Services
Cleaning Services
Pest Control
Hiring of a Mobile Theatre Stage
Hiring of Tents
Hiring of Furniture
Hiring of Public Address System
Hiring of Audio Visual Equipment
Hiring of Chemical Toilets
Repair and Service of Air Condition
Designing of Promotional Material
Design and Layout of Banners
Manufacturing and Installation of Blinds
Personnel Assessments
Data Capturing, Processing and Recovering
Branding and Marketing
Repair and Renovation of Building
Refuse Removal
Repair Access Control System
Competency Assessments
Furniture Removal
Transcription Services
Clothing with Logo Printing
Pluming Services
Electrician Services
Maintenance of Database
Burglar Proofing
Audit Services
Research
System Development Services
Legal Services
Advisory Consulting Services
Delivery of News Papers
Translators: Brailing Of Documents
Computer Support Services
Repair and Install CCTV System
Verification of Qualifications
Advisory Consulting Services
Video Recording
Repairing of Camera
Hiring Of Photographer
Website Development
Repair and Install Networks
Rendering of Health Care
Training
The total spent on services was R90 million for the period of 2014/15, 2015/16 and 2016/17 financial year.
YEAR |
TOTAL SPENT ON SMMEs and BEEs |
2016/17 |
9, million |
2015/16 |
6, million |
2014/15 |
14, million |
(b) Entities
1. – 3, I refer the member to the Annual Reports and the Financial Statements of the entities
Approved
Dr Siyabonga Cwele, MP
Minister of Telecommunications and Postal Services
Date:
08 December 2017 - NW3642
Thembekwayo, Dr S to ask the Minister of Health
What is the ratio of (a) nurse and (b) doctor to patient in respect of each (i) hospital and (ii) clinic in the country, based on population within the catchment area for each hospital and clinic?
Reply:
Ratios of health workers to patient was always calculated as nation per unit total population. This was deemed not useful by the World Health Organisation (WHO) because it does not talk about the spread of this Health workforce within a country.
The WHO then came with a mathematical formula called WISN (Work Indicator for Staffing Needs).
We are busy calculating these needs using this mathematical formula.
END.
08 December 2017 - NW3199
Thembekwayo, Dr S to ask the Minister of Health
Whether there is a plan in place for the Alfred Nzo Hospital in the Kopanong Local Municipality in the Xariep Region, Free State province, to provide (a) maternity services, (b) oncology services, (c) neurology services, (d) eye, ear and nose care, and (e) an intensive care unit?
Reply:
There is no Alfred Nzo Hospital in the mentioned municipality and districts.
END.
08 December 2017 - NW3736
Ketabahle, Ms V to ask the Minister of Telecommunications and Postal Services
1. Whether (a) his department and / or (b) entities reporting to him procured services from a certain company ( name furnished); if so, (i) what services were procured in each case and (ii) what is the total amount that was paid to the specified company in each case;
Reply:
I have been informed by the Department and Entities reporting to me as follows:
1 (a) Kindly note DTPS only existed May 2014. No services were procured from Travel with Flair by the Department of Telecommunications and Postal Services
- Not Applicable
- Not Applicable
1 (b) No services by entities of DTPS that had dealings with Travel with Flair (Pty) Ltd, except USAASA and Sentech have procured services from Travel with Flair.
- USAASA procured travel services.
- USAASA paid R29, 679.00 and USAF paid R17, 106.01.
2. (b)(i)(ii)(iii) USAASA procures services from the company for international travel and the details are as follows:
Who travelled | Date | Travel Route | Invoice Amount | Agency Fee |
P Radebe | 17 Oct 2015 | Sweden | R130 484.72 | R275.00 |
Z Nkosi | 17 Oct 2017 | Sweden | R117 954.72 | R275.00 |
SENTECH
(1)&(2) Sentech procured the following services from Travel with Flair:
Labels Sum of TWF Fee
2016 516 725
Accommodation (Acc) 234 124
Car Hire (Car) 91 522
Conference (Ccc) 31 074
Domestic Air Travel (Dom) 119 366
Insurance (Ins) 130
International Air Travel (Int) 7 985
Regional Air Tickets (Reg) 2 055
Transfers & Shuttles (Tra) 29 969
Trav Other (Sao) 280
Trav_ Accomod (Sac) 220
2017 484 090
Accommodation (Acc) 197 976
Bus & Rail Reservations (Bus) 110
Car Hire (Car) 74 501
Conference (Ccc) 58 428
Domestic Air Travel (Dom) 118 597
Insurance (Ins) 510
International Air Travel (Int) 6 215
Regional Air Tickets (Reg) 4 900
Tours (Tou) 110
Transfers & Shuttles (Tra) 22 113
Trav Other (Sao) 515
Trav_Conference (Sap) 115
2015 161 764
Accommodation (Acc) 51 790
Car Hire (Car) 22 930
Conference (Ccc) 29 207
Domestic Air Travel (Dom) 38 470
International Air Travel (Int) 4 840
Transfers & Shuttles (Tra) 14 412
Air (Ai1) 115
Grand Total 1 162 580
SENTECH
Approved/ not approved
Dr Siyabonga Cwele, MP
Minister of Telecommunications and Postal Services
Date:
08 December 2017 - NW2756
De Freitas, Mr MS to ask the Minister of Health
With regard to the upgrade of the South Rand Hospital in Johannesburg, Gauteng, what (a) resources has his department provided, (b) is the budget, (c) are the expenditure costs incurred, (d) additional human resources have been provided, (e) positions have been filled (f) posts remain vacant in each of the past three financial years?
Reply:
a) The NDOH has allocated Health Facility Revitalisation Grant funds for rehabilitation of Infrastructure, and for procurement of medical equipment,
b) R 3.7 million has been allocated to procure the medical equipment in 2017/18 financial year;
c) No expenditure has been incurred up to date;
d) The NDOH does not have statistics on additional human resources provided at South Rand Hospital and is awaiting information requested from the Gauteng Department of Health;
e) A total of 582 positions are filled at the South Rand Hospital;
f) A total of 70 positions remain vacant at the South Rand Hospital.
END.
08 December 2017 - NW3901
Kopane, Ms SP to ask the Minister of Health
(1)(a) What number of forensic science laboratories are currently (i) owned and/or (ii) administered by his department in each province and (b) where is each specified laboratory located; (2) (a) what number of forensic science laboratories does his department intend to set up in each province in the (i) 2017-18, (ii) 2018-19 and (iii) 2019-20 financial years and (b)(i) where will each laboratory be set up and (ii) what are the projected costs in each case?
Reply:
(1) (a) The Department of Health owns no forensic laboratories anywhere in South Africa;
(b) Not applicable;
(2) The Department of Health is not intending to set up any forensic science laboratory in the country, because they all fall under SAPS.
END.
08 December 2017 - NW3495
Mackenzie, Mr C to ask the Minister of Telecommunications and Postal Services
Whether the SA Post Office introduced a clearance fee for parcels and / or packages received from other countries; if so, what are the relevant (a) charges for each country and (b) details of the conditions attached to the collection and / or delivery of the parcels and / or packages?
Reply:
I have been informed by SAPO as follows:
The South African Post Office did not introduce a clearance fee for parcels and /or packages received from other countries. These handling fees were already applicable.
(a)(b) Not applicable to SAPO
Approved/ not approved
Dr Siyabonga Cwele, MP
Minister of Telecommunications and Postal Services
Date:
08 December 2017 - NW3571
Krumbock, Mr GR to ask the Minister of Health
(a) What is the total number of supplier invoices that currently remain unpaid by (i) his department and (ii) each entity reporting to him for more than (aa) 30 days, (bb) 60 days, (cc) 90 days and (dd) 120 days and (b) what is the total amount outstanding in each case?
Reply:
(a) (i) 5 invoices remain unpaid;
(aa) 3 invoices remain unpaid for more than 30 days;
(bb) No invoices remain unpaid between 60 to 90 days;
(cc) 2 invoices remain unpaid between 90 days to 120 days;
(dd) No invoices remain unpaid for more than 120 days;
(b) R183,789.38 for more than 30 days;
R27,619.46 between 90 days to 120 days;
(ii) The following table reflects the details with regards to the entities:
Total |
30 days |
60 days |
90 days |
120 days |
|
South African Medical Research Council (SAMRC) |
|||||
Total number of supplier invoices that currently remain unpaid |
99 |
95 |
4 |
0 |
0 |
Total amount outstanding in each case |
R37,255,155.10 |
R37,229,425.37 |
R25,729,73 |
0 |
0 |
Office of Health Standards Compliance (OHSC) |
|||||
Total number of supplier invoices that currently remain unpaid |
11 |
2 |
6 |
3 |
0 |
Total amount outstanding in each case |
R136,784.12 |
R124,613.01 |
R11,571.11 |
R600.00 |
0 |
Council for Medical Schemes (CMS) |
|||||
Total number of supplier invoices that currently remain unpaid |
12 |
11 |
1 |
0 |
0 |
Total amount outstanding in each case |
R473,307.18 |
R469,772.04 |
R3,535.14 |
0 |
0 |
National Health Laboratory Service (NHLS) |
|||||
Total number of supplier invoices that currently remain unpaid |
384 |
36 |
111 |
74 |
163 |
Total amount outstanding in each case |
R348,094,192.70 |
R6,017,985.01 |
R191,333,319.14 |
R93,676,507.35 |
R57,066,381.20 |
END.
08 December 2017 - NW3507
Robertson, Mr K to ask the Minister of Rural Development and Land Reform
(1)What number of employees of (i) his department, (ii) each provincial Department of Rural Development and Land Reform and (iii) each entity reporting to him are currently on suspension, (b) what are the reasons for the suspensions in each case, (c) what amount has been paid to each suspended employee for the period of suspension and (d) for what length of time has each specified employee been on suspension; (2) What number of employment contracts of employees of (a) his department, (b) each provincial Department of Rural Development and Land Reform and (c) each entity reporting to him were terminated due to them being found guilty of corruption since 1 April 2014? NW3934E
Reply:
1. (a) (i),(ii) National and Provincial Offices of Department of Rural Development and Land Reform : 12
(iii) Ingonyama Trust Board (ITB): 6
Land Claims Commission (LCC): 2
Deeds: 2
(b),(c),(d) Refer to the table below for details regarding the reasons, the amounts paid, and the length of time of suspension for the employees of the Department, provinces and entities reporting to the Minister of Rural Development and Land Reform. One employee at the ITB was employed on a fixed-term contract which expired before disciplinary action could be taken.
2. (a),(b) None.
(c) LCC: 1
Number |
Department, Province & Entity 1(i), (ii) &(iii) |
Reasons for the Suspension 1(b) |
Salaries paid to Suspended employees 1(c) |
Duration of Suspension 1(d) |
NATIONAL OFFICE |
||||
National Office |
Possible interference with the investigation and witnesses |
R581 315.06 |
5 Months |
|
National Office |
Possible interference with the investigation and witnesses |
R526 716.96 |
5 Months |
|
National Office |
Possible interference with the investigation and witnesses |
R568 925.78 |
4 Months |
|
National Office |
Possible interference with the investigation and witnesses |
R1 251 186.00 |
|
|
WESTERN CAPE |
||||
5. |
Western Cape |
Possible interference with the investigations and witnesses |
R165 250 |
2 Months |
EASTERN CAPE |
||||
6. |
Eastern Cape |
Possible interference with the investigations and witnesses |
R72 075.25 |
1 Month |
7. |
Eastern Cape |
Possible interference with the investigations and witnesses |
R68 926.50 |
1 Month |
8. |
Eastern Cape |
Possible interference with the investigations and witnesses |
R551 358.78 |
14 Months |
9. |
Eastern Cape |
Possible interference with the investigation and witnesses |
R846 217.61 |
13 Months |
10. |
Eastern Cape |
Possible interference with the investigation and witnesses |
R1 144 449.59 |
13 Months |
LIMPOPO |
||||
11. |
Limpopo |
Possible interference with the investigations and witnesses |
R17 271.00 |
2 Months |
12. |
Limpopo |
Possible interference with the investigations and witnesses |
R25 436.75 |
2 Months |
DEEDS PTA (GP) |
||||
13. |
Deeds |
Possible interference with the investigation and witnesses |
R415 791.28 |
4 Months |
14 |
Deeds |
Possible interference with the investigation and witnesses |
R303 355.32 |
4 Months |
RLCC(GP) |
||||
15. |
RLCC |
Possible interference with the investigation and witnesses |
R169 053.00 |
4 Months |
LCC(KZN) |
||||
16. |
Kwazulu Natal |
Possible interference with the investigations and witnesses |
R87 415.30 |
3 Months |
TABLE 2: INGONYAMA TRUST BOARD |
||||
17. |
KZN |
Pending disciplinary hearing relating to irregularities in discharge of duties |
R 493 920.06 |
14 Months |
18. |
KZN |
Pending disciplinary hearing relating to irregularities in discharge of duties |
R 724 984.75 |
14 Months |
19. |
KZN |
Pending disciplinary hearing relating to irregularities in discharge of duties |
R493 920.06 |
14 Months |
20. |
KZN |
Pending disciplinary hearing relating to irregularities in discharge of duties |
R274 489.11 |
14 Months |
21. |
KZN |
Pending disciplinary hearing relating to irregularities in discharge of duties |
R398 135.52 |
14 Months |
22. |
KZN |
Pending disciplinary hearing relating to irregularities in discharge of duties |
R398 135.52 |
14 Months |
08 December 2017 - NW2176
Esau, Mr S to ask the Minister of Health
(1)(a) How many (i) qualified oncologists are currently in practice in the country, (ii) are in the (aa) private and (bb) public sector in each province and (iii) are currently in training and (b) what is the guideline of the World Health Organisation pertaining to the number of oncologists; (2) does the country adhere to the specified guideline; if not, why not?
Reply:
(1) (a) (i) 155
(ii) (aa) 163
(bb) 72
(iii) 104
(b) Oncologists - There are no published WHO guidelines or other benchmarks specifically for oncologists.
(2) There are no WHO specified guidelines specifically for oncologists.
END.
08 December 2017 - NW3715
Malatsi, Mr MS to ask the Minister of Human Settlements
With reference to the contract awarded by the Estate Agency Affairs Board of South Africa to a certain company (name and details furnished) (a) what is the current (i) contract value and (ii) length of the contract, (b) when was the contract awarded and (c) when is the contract due to expire?
Reply:
(a)(i & ii) The Estate Agency Affairs Board (EAAB) confirmed that it did not directly award any contract to the company referred to by the Honourable Member. Instead, the EAAB has a support service level agreement and end user licence contract with a South African company which is an authorised reseller of the company in question.
(b) Falls away.
(c) Falls away.
08 December 2017 - NW3719
Mashabela, Ms N to ask the Minister of Health
What is the hospital bed to population ratio in (a) each province and (b) the eight biggest metropolitan municipalities?
Reply:
The following tables reflect the details in this regard
(a) Provinces
Organisation unit |
Total Inpatient beds |
Total population |
Population to Total Inpatient bed ratio |
Beds per 1000 population |
Eastern Cape |
13,176 |
7,139,336 |
542 |
1.8 |
Free State |
4,687 |
2,881,998 |
615 |
1.6 |
Gauteng |
18,103 |
13,773,639 |
761 |
1.3 |
KwaZulu-Natal |
21,609 |
11,229,961 |
520 |
1.9 |
Limpopo |
7,814 |
5,877,930 |
752 |
1.3 |
Mpumalanga |
4,586 |
4,388,269 |
957 |
1.0 |
Northern Cape |
1,646 |
1,200,703 |
729 |
1.4 |
North West |
4,343 |
3,847,629 |
886 |
1.1 |
Western Cape |
9,783 |
6,393,555 |
654 |
1.5 |
National |
85,747 |
56,733,020 |
662 |
1.5 |
(b) The eight biggest metropolitan municipalities
Organisation unit |
Total Inpatient beds |
Total population Midyear 2017 DHIS |
Population to Total Inpatient bed ratio |
Beds per 1000 population |
Buffalo City Metropolitan Municipality |
2090 |
864,130 |
413 |
2.4 |
Nelson Mandela Bay Municipality |
2233 |
1,279,035 |
573 |
1.7 |
Mangaung Metropolitan Municipality |
2388 |
801,716 |
336 |
3.0 |
City of Ekurhuleni Metropolitan Municipality |
3388 |
3,500,231 |
1033 |
1.0 |
City of Johannesburg Metropolitan Municipality |
5946 |
5,055,664 |
850 |
1.2 |
City of Tshwane Metropolitan Municipality |
5634 |
3,376,566 |
599 |
1.7 |
eThekwini metropolitan Municipality |
7450 |
3,715,328 |
499 |
2.0 |
City of Cape Town Metropolitan Municipality |
7103 |
4,070,914 |
573 |
1.7 |
END.
08 December 2017 - NW2174
Esau, Mr S to ask the Minister of Health
(1)(a) How many (i) qualified urologists are currently in practice in the country, (ii) are in the (aa) private and (bb) public sector in each province and (iii) are currently in training and (b) what is the guideline of the World Health Organisation pertaining to the number of urologists; (2) does the country adhere to the specified guideline; if not, why not?
Reply:
(1) (a) (i) 213
(ii) (aa) 248
(bb) 77
(iii) 83
(b) Urologists - there are no published WHO guidelines or other benchmarks specifically for oncologists.
(2) No. There are no WHO guidelines specifically for oncologists.
END.
08 December 2017 - NW3294
Groenewald, Dr PJ to ask the Minister of Health
(1)What number of the corpses in state mortuaries in each province and since the 2014-15 financial year were deaths resulting from (a) wounds caused by shootings, (b) knife wounds, (c) motor accidents, (d) motor-cycle accidents, (e) drownings, (f) fires, (g) pedestrians who were run over, (h) cyclists who were run down, (i) HIV, tuberculosis and other diseases and (j) ageing; (2) whether he will make a statement about the matter?
Reply:
The reply to questions (1) is summarized in Table 1 to 9 below:
TABLE 1: EASTERN CAPE |
|||
2014-15 |
2015-16 |
2016-17 |
|
(a) wounds caused by shootings |
1885 |
820 |
860 |
(b) knife wounds |
1885 |
1925 |
1971 |
(c) motor accidents |
1537 |
1799 |
1862 |
(d) motor-cycle accidents |
6 |
4 |
3 |
(e) drownings |
382 |
379 |
366 |
(f) fires |
393 |
376 |
481 |
(g) pedestrians who were run over |
163 |
221 |
145 |
(h) cyclists who were run down |
1 |
2 |
1 |
(i) HIV, tuberculosis and other diseases |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
(j) ageing |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* Forensic Pathology Services
TABLE 2: FREE STATE |
|||
2014-15** (2014) |
2015-16** (2015) |
2016-17** (2016) |
|
(a) wounds caused by shootings |
246 |
128 |
215 |
(b) knife wounds |
476 |
229 |
508 |
(c) motor accidents |
906 |
571 |
1025 |
(d) motor-cycle accidents |
32 |
10 |
8 |
(e) drownings |
154 |
64 |
112 |
(f) fires |
169 |
92 |
143 |
(g) pedestrians who were run over |
207 |
108 |
194 |
(h) cyclists who were run down |
Included in 1(d) above |
Included in 1(d) above |
Included in 1(d) above |
(i) HIV, tuberculosis and other diseases |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
(j) ageing |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* Forensic Pathology Services
** Data provided per calendar year
TABLE 3: GAUTENG |
|||
(a) 2014-15 |
(b) 2015-16 |
(c) 2016-17 |
|
(a) wounds caused by shootings |
1608 |
1854 |
2116 |
(b) knife wounds |
1257 |
1338 |
1438 |
(c) motor accidents |
1707 |
1981 |
1948 |
(d) motor-cycle accidents |
188 |
149 |
144 |
(e) drownings |
210 |
249 |
242 |
(f) fires |
715 |
702 |
746 |
(g) pedestrians who were run over |
1193 |
1314 |
1413 |
(h) cyclists who were run down |
Details not available |
Details not available |
Details not available |
(i) HIV, tuberculosis and other diseases |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
(j) ageing |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* Forensic Pathology Services
TABLE 4: KWA-ZULU NATAL |
|||
2014-15 |
2015-16 |
2016-17 |
|
(a) wounds caused by shootings |
1539 |
1735 |
1506 |
(b) knife wounds |
1534 |
1523 |
1217 |
(c) motor accidents*** |
2913 |
2967 |
2576 |
(d) motor-cycle accidents |
Details not available |
Details not available |
Details not available |
(e) drowning** |
1662 |
1788 |
1473 |
(f) fires |
610 |
642 |
491 |
(g) pedestrians who were run over |
Details not available |
Details not available |
Details not available |
(h) cyclists who were run down |
Details not available |
Details not available |
Details not available |
(i) HIV, tuberculosis and other diseases |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
(j) ageing |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* Forensic Pathology Services
** Reported as asphyxia deaths, including drowning, hanging etc.
*** Transportation accidents
TABLE 5: LIMPOPO |
|||
(a) 2014-15 |
(b) 2015-16 |
(c) 2016-17 |
|
(a) wounds caused by shootings |
221 |
261 |
245 |
(b) knife wounds |
277 |
289 |
291 |
(c) motor accidents |
1507 |
1757 |
1742 |
(d) motor-cycle accidents |
1 |
2 |
7 |
(e) drownings |
164 |
139 |
145 |
(f) fires |
150 |
147 |
155 |
(g) pedestrians who were run over |
Details not available |
Details not available |
Details not available |
(h) cyclists who were run down |
Details not available |
Details not available |
Details not available |
(i) HIV, tuberculosis and other diseases |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
(j) ageing |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* Forensic Pathology Services
TABLE 6: MPUMALANGA |
|||
(a) 2014-15 |
(b) 2015-16 |
(c) 2016-17 |
|
(a) wounds caused by shootings |
719 |
453 |
472 |
(b) knife wounds |
165 |
171 |
161 |
(c) motor accidents |
1150 |
1201 |
1200 |
(d) motor-cycle accidents |
107 |
29 |
21 |
(e) drownings |
148 |
144 |
132 |
(f) fires |
168 |
169 |
139 |
(g) pedestrians who were run over |
504 |
504 |
523 |
(h) cyclists who were run down |
18 |
8 |
12 |
(i) HIV, tuberculosis and other diseases |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
(j) ageing |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* Forensic Pathology Services
TABLE 7: NORTHERN CAPE |
|||
(a) 2014-15 |
(b) 2015-16 |
(c) 2016-17 |
|
(a) wounds caused by shootings |
21 |
23 |
24 |
(b) knife wounds |
294 |
300 |
255 |
(c) motor accidents |
333 |
321 |
297 |
(d) motor-cycle accidents |
6 |
5 |
4 |
(e) drownings |
95 |
98 |
108 |
(f) fires |
63 |
56 |
54 |
(g) pedestrians who were run over |
147 |
134 |
125 |
(h) cyclists who were run down |
3 |
9 |
3 |
(i) HIV, tuberculosis and other diseases |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
(j) ageing |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* Forensic Pathology Services
TABLE 8: NORTH WEST |
|||
(a) 2014-15 |
(b) 2015-16 |
(c) 2016-17 |
|
(a) wounds caused by shootings |
187 |
157 |
170 |
(b) knife wounds |
298 |
321 |
453 |
(c) motor accidents |
715 |
784 |
856 |
(d) motor-cycle accidents |
14 |
23 |
24 |
(e) drownings |
82 |
69 |
90 |
(f) fires |
134 |
122 |
146 |
(g) pedestrians who were run over |
217 |
181 |
289 |
(h) cyclists who were run down |
2 |
4 |
20 |
(i) HIV, tuberculosis and other diseases |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
(j) ageing |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* Forensic Pathology Services
TABLE 9: WESTERN CAPE |
|||
(a) 2014-15 |
(b) 2015-16 |
(c) 2016-17 |
|
(a) wounds caused by shootings |
1289 |
1323 |
1268 |
(b) knife wounds |
1429 |
1508 |
1649 |
(c) motor accidents |
579 |
701 |
627 |
(d) motor-cycle accidents |
56 |
49 |
55 |
(e) drownings |
180 |
202 |
197 |
(f) fires |
280 |
330 |
349 |
(g) pedestrians who were run over |
605 |
629 |
649 |
(h) cyclists who were run down |
27 |
26 |
30 |
(i) HIV, tuberculosis and other diseases |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
(j) ageing |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* FPS Mortuaries only handle unnatural deaths |
* Forensic Pathology Services
(2) No, there is no need to. There are many state institutions which release this data time and again, e.g quarterly police crime statistics, the Department of Transport, StatsSA and the South African Medical Research Council.
END.
08 December 2017 - NW3341
Thembekwayo, Dr S to ask the Minister of Health
What number of nurses were employed at Tshilidzini Hospital in (a) 1996, (b) 2000, (c) 2005 and (d) 2010?
Reply:
The following table reflects the details in this regard.
NUMBER OF NURSES EMPLOYED AT TSHILIDZINI HOSPITAL |
|||
1996 |
2000 |
2005 |
2010 |
Information unobtainable |
Information unobtainable |
509 |
568 |
END.
08 December 2017 - NW2175
Esau, Mr S to ask the Minister of Health
(1)(a) How many (i) qualified radiologists are currently in practice in the country, (ii) are in the (aa) private and (bb) public sector in each province and (iii) are currently in training and (b) what is the guideline of the World Health Organisation pertaining to the number of radiologists; (2) does the country adhere to the specified guideline; if not, why not?
Reply:
(1) (a) (i) 650
(ii) (aa) 335
(bb) 130
(iii) 253
(b) Radiologists - There are no published WHO guidelines or other benchmarks specifically for radiologists.
(2) There are no WHO guidelines for specifically for radiologists.
END.
07 December 2017 - NW3708
Mokgalapa, Mr S to ask the Minister of International Relations and Cooperation
Have the recommendations of the (a) Charles Nupen report and or (b) Cheadle and Thompson report been implemented; if so, provide details; if not, why not?
Reply:
The reply to the question is as follows:
Quote:
( a) The Charles Nupen report and recommendations were implemented with the involvement of stakeholders. The Departmental Task Team under the Deparmental Bargaining Chamber endorsed the implementation thereof.
(b) The Cheadle and Thompson report and recommendations were partly implemented, whereas some of the recommedations are in the process to be finalised by Management.
Unquote:
07 December 2017 - NW3983
Figg, Mr MJ to ask the Minister of Public Works
What are the full details of each of the two international trips undertaken by him recently in terms of (a) the countries visited, (b) who was included in the delegation, (c) the total cost of the trips and (d) the purpose of the trips?
Reply:
What are the full details of each of the two international trips undertaken by him recently in terms of:
(a) International trip one: details of the trip were replied to and submitted to Parliament as per PQ No. 2749. International trip two: official visit to Ethiopia.
(b) Mr Stanley Henderson, Deputy Director General: EPWP
Mr Ignatius Ariyo, Chief Director: EPWP Infrastructure Sector
Ms. Kgomotso Zantsi, Director: EPWP Evaluation and Research
Mr Percy Molefe, Chief Director: International Relations
Mr Thabo Mavimbela, Minister’s Private Assistant
Mr Neo Nage, Minister’s Protector
(c) Total costs of the trip in respect of Mr Henderson, Mr Ariyo and Ms Zantsi were fully paid by the International Labour Organisation (ILO). Total costs of the trip in respect of Minister Nhleko, Mr Molefe, Mr Mavimbela and Mr Nage amounted to R279 779
(d) Attending the 17th International Labour Organisation (ILO) Regional Seminar for Labour-based Practitioners held in Addis Ababa, Ethiopia on 13 – 17 November 2017 under the theme: “Delivering on the Sustainable Development Goals (SDGs): The Employment-Intensive Investment Approach”.
07 December 2017 - NW3914
De Freitas, Mr MS to ask the Minister of Transport
With reference to his reply to question 3550 on 10 November 2017, (a) on what date was the advertisement for the positions on the board placed, (b) what was the closing date for applications, (c) what is the current status of the selection process of a full-time board and (d) by which date will the full-time board be appointed?
Reply:
a) The positions were advertised on the 5 February 2017 and 11 June 2017.
b) The closing date was 20 February 2017 and 26 June 2017, respectively.
c) On 13 September 2017 Cabinet resolved that the Transport Ministers Cabinet Memorandum No. 20 of 2017 on the appointment of the members of the Board of Control of PRASA be withdrawn and further resolved that the Minister should consider the appointment of an Interim Board of the Passenger Rail Agency of South Africa (PRASA). The process of appointing the full-time board will be kick-started in the next financial year (2018/19).
d) In the 2018/19 financial year.
07 December 2017 - NW3815
De Freitas, Mr MS to ask the Minister of Transport
With regard to the increased vehicle licensing transaction fees, (a) how were these increases calculated, (b) what are the details (i) of parties who made submissions and (ii) of the content of the submissions received, (c) which stakeholders were consulted and (d) what public participation and/or public consultation processes were undertaken?
Reply:
(a) The increases of the transaction fees were based on the initial amount of R30 as determined by the Ministers of Transport and Finance, with the agreement that there will be an annual increase of R6.
(b) (i) In terms of the RTMC Act it is not required that the transaction fees be published for public comments, therefore the increase was not published for comments.
(ii) Not applicable, see (b)(i) above
(c) Not applicable, see (b)(i) above
(d) Not applicable, see (b)(i) above
07 December 2017 - NW3544
Figlan, Mr AM to ask the Minister of Transport
With regard to the issuing of tenders by his department and the entities reporting to him in the past three financial years, (a) which tenders were issued without following normal tender processes, (b) what were the reasons for the deviation in each case, (c) what was the monetary value of each tender, (d) how were the tenders issued and (e) who authorised the issuing of each tender?
Reply:
Department and entities (Refer to the Annexures) of Parliamentary Question 3544
- CBRT
- RAF
- RTIA
- RTMC
- SANRAL
- ACSA
- ATNS
- SACCA
- SAMSA
- PRSA
- RSR
- PRASA
PROJECT DESCRIPTION |
REASON FOR DEVIATION |
CONTRACT AMOUNT |
TYPE OF BID |
AUTHORISING AUTHORITY |
(a) |
(b) |
(c) |
(d) |
(e) |
Establishment of the Single Source Transport Economic Regulator through Developing Policy, Legislation and Implementation Plan |
During the Policy development, additional stakeholder engagement was required and work-shopping of various amendments |
1 500 240.00 |
Natural Continuation |
Accounting Officer |
Cooperative Model for Public Transport |
During the Project critical items that were not part of the TOR were identified as crucial to the success of the project, which amended the scope |
1 129 536.20 |
Natural Continuation |
Accounting Officer |
RE-APPOINTMENT: Review Road based subsidized transport service |
To complete the initial Project. Contract period lapsed before completion and as a result of unforeseen outside factors, at no additional cost |
691 347.30 |
Re-Appointment |
Accounting Officer |
RE-APPOINTMENT :Support to Regulating Committee on Fees and Charges by ACSA and ATNS - Cost Extension |
To complete the initial Project. Contract period lapsed before completion and as a result of unforeseen outside factors at, no additional cost |
402 101.00 |
Re-Appointment |
Accounting Officer |
RE-APPOINTMENT :Support to Regulating Committee on Fees and Charges by ACSA and ATNS - Cost Extension |
2nd re-appointment was to assist the Regulating Committee with an ongoing Court Case relating to the Fees |
916 106.00 |
Re-Appointment |
National Treasury |
Forensic Analysis of Putco Sandfontein Contract |
Urgent request to intervene as an emergency due to threats of violence. National Treasury notified during entire process |
2 259 266.08 |
Closed Bid |
Accounting Officer |
NATURAL CONTINUATION: Forensic Analysis of Putco Sandfontein Contract |
For the project to be completed successfully a census had to be conducted, which was not part of initial scope |
2 338 960.80 |
Natural Continuation |
Accounting Officer |
RE-APPOINTMENT: NATMAP 2050 Review and Update |
To complete the initial Project. Contract period lapsed before completion and as a result of unforeseen outside factors, at no additional cost |
680 000.00 |
Re-Appointment |
Accounting Officer |
CLOSED BID: Finalize the Draft White Paper on NCAP |
Open tender process was followed with no bids received that were responsive. Request to approach experts in the specific field on closed bid was approved for second attempt. Successful |
983 424.00 |
Closed Bid |
Accounting Officer |
Determining the criteria for certifying Auditors and training requirements. |
SAATCO is the sole provider of this service |
731 300.00 |
Single Source |
Bid Adjudication Committee |
EXPANSION: Review of the National Safety Regulator Act |
Additional Provincial Consultation and the development of a Money Bill had to be added to initial scope to finalise project successfully |
798 000.00 |
Expansion |
National Treasury |
Develop a National Railway Safety Strategy |
Open tender process was followed with no bids received that were responsive. Request to approach 5 experts in the specific field on closed bid was approved for second attempt. Successful |
2 730 120.00 |
Closed Bid |
Accounting Officer |
Develop a Salvage Strategy |
A quotation process was followed. No bids were received. Approval to restart as closed bid by approaching experts in the field, was approved. |
782 952.00 |
Closed Bid |
Accounting Officer |
Road Tariff determination framework |
A quotation process was followed. All qualifying bids received were over the threshold value of R500 000. Approval to restart as closed bid by approaching all 14 suppliers who attended the first briefing session, was approved. |
639 526.00 |
Closed Bid |
Accounting Officer |
PARTICIPATION: Participate in SANRAL tender for Media buying for 6 months |
Request to participate in SANRAL tender for only 6 months approved while DOT finalised own tender process |
N/A |
Participation |
Accounting Officer |
PARTICIPATION: Participate in SANRAL tender for Events Management and related Services for 6 months |
Request to participate in SANRAL tender for only 6 months approved while DOT finalised own tender process |
N/A |
Participation |
Accounting Officer |
Cross-Border Road Transport Agency
Cross-Border Road Transport Agency (C-BRTA) tenders issued in the past three financial years:
YEAR |
|
(b) Reasons for deviation |
( c) Monetary Value |
(d) How were the tenders issued |
(e) Who authorised the issuing of the tender |
2014/15 |
None |
N/A |
N/A |
N/A |
N/A |
2015/16 |
Appointment of a transactional advisor to provide transactional advisory services on the development New Permit System |
The initial cost estimation was below R500 000 and a Request for Proposal was issued to eight service providers. Only one bidder responded with three different options and the option that met the Agency’s specifications was above R500 000. |
R651 715.20 |
Tender was issued through a ‘Request for Proposals’ |
Chief Executive Officer |
2016/17 |
Appointment of a service provider to provide multi-functional printers on a rental basis for a period of twenty months |
The printers were originally procured through a normal tender process. This appointment was to continue using the current printers for an additional 20 months based on the following reasons:
|
R617 6516.00 |
Through continuation of the current service provider |
Chief Executive Officer |
Extension Office Accommodation lease of a period of 36 months |
The following are the reasons for deviations:
|
R25 241 519.16 |
Through continuation of the current service provider and after market research confirmed cost effectiveness |
National Treasury approved deviation as recommended by Procurement Committee of the Board. |
Road Accident Fund
(a) The Road Accident Fund (RAF), in the past three financial years issued the following tenders without following normal tender processes, |
(b) the reasons for the deviation in each case were, |
(c) the monetary value of each tender was, |
(d) the tenders were issued in the following manner, |
(e) the issuing of the tender was authorised by the, |
2014-2015 FY |
||||
storage facilities - M&T Development |
the service provider is the only available service provider that owns storage facilities within the proximity of not more than a one kilometer radius to the RAF head office |
R3,931,829.81 (fixed price) |
single source |
CEO |
Microsoft premier support services – Microsoft |
renewal of Microsoft premier support services |
R 632,240.00 (fixed price) |
sole source |
CEO |
HP data protector support- HP South Africa |
renewal of HP data protector support contract - original equipment manufacturer (OEM) |
R 781,514.88 (fixed price) |
single source |
CEO |
HP hardware maintenance - HP South Africa |
renewal of HP hardware maintenance contract - (OEM) |
R 9,889,578.24 (fixed price) |
single source |
CEO |
Lucidview maintenance and support - Lucidview Pty (Ltd) |
renewal of licensing, maintenance and support of Lucidview solution. - (OEM) |
R 1,973,588.52 (fixed price) |
single source |
CEO |
bulk media buying- Government Communications Information Systems (GCIS) |
as per the National Treasury Regulations |
R 117,617,400.00 (fixed price) |
National Treasury transversal contract |
Board |
Nashua SLA Gold Option - Nashua Communications |
support and maintenance of the Openscape Voice telephone system |
R 9,777,401.77 (fixed price) |
single source |
CEO |
employee wellbeing services – ICAS |
contract extension |
R 700 000.00 (fixed price) |
single source - extension |
CEO |
security services - Imvula Security |
variation- additional scope to add security |
original tender/contract value – R 4, 897, 865.07 value of the extension - R 236, 034.78 (extended for five months at R90, 052.82 per month) |
single source - extension |
CEO |
cleaning services Bontle ke Botho |
variation- extension of scope as an additional cleaner was added |
original tender/contract value - R 3, 800, 422.86 value of the extension - R 282 651.60 |
single source - variation extension of scope |
CEO |
auditing services - panel |
extension- while the tender process was underway to appoint a new panel |
expenditure as and when required subject to annual budgeted amount of R 3, 740, 983.73 |
single source - extension |
Board |
2015-2016 FY |
||||
SAP mobile platform and SAP data services - SAP South Africa |
supply of SAP mobile platform and SAP data services – (OEM) |
R 5,600,000.00 (fixed price) |
sole source |
CEO |
Telephony - Nashua Mobile |
service provider to provide Openscape Voice telephone system |
R 9,431,126.84 (fixed price) |
single source |
CEO |
new office space (Nelspruit) - FGK Capital |
acquiring of office space in Nelspruit due to limited building space available for lease, as per the RAF specifications |
R 2,600,000.00 (fixed price) |
single source |
CEO |
supply chain management turnaround strategy- Astute Advisory |
as per the National Treasury Regulations |
R 8,000,000.00 (fixed price) |
National Treasury transversal contract |
CEO |
Employee Awareness Programme (EAP) - Metropolitan Wellness |
as per the National Treasury Regulations |
R 1,166,666.67 (fixed price) |
National Treasury transversal contract |
CEO |
Pro-Active 24 hardware maintenance and support - HP South Africa |
renewal of the Pro-active 24 hardware maintenance and support contract- (OEM) |
R 9, 889, 578.24 (fixed price) |
single source |
CEO |
premier data protector - HP South Africa |
service provider to provide premier data support- (OEM) |
R 390, 757.44 (fixed price) |
single source |
CEO |
renewal of Lucidview licenses, maintenance and support – Lucidview Pty (Ltd) |
renewal of Lucidview licenses, maintenance and support- (OEM) |
R 1, 891, 508.52 (fixed price) |
single source |
CEO |
APN upgrade, Spend Manager Plus and Data Messenger- Vodacom |
contract scope extension |
R 21, 901, 888.08 (fixed price) |
single source |
Board |
supply chain management turnaround strategy - Astute Advisory |
variation - extension of the scope of work |
R 11 260. 000.00 (fixed price) |
single source - variation extension of scope |
Board |
Menlyn parking, increase of parking space - Interpark |
no alternative parking space could be sourced within the near vicinity |
R 4 524. 998.72 (fixed price) |
single source - variation extension of scope |
CEO |
banking services - Standard Bank |
banking services - extension while the tender process was underway |
transactional expenditure subject to annual budgeted amount of R 1,300,000.00 |
single source - extension |
Board |
security services - Venus Securities |
extension while the tender process was underway |
original tender/contract value - R 1, 130, 726.88 value of the extension - R254, 821.65 (extended for five months at R 50, 964.33 per month) |
single source - extension |
CEO |
security services - Fidelity Security |
extension while the tender process was underway |
original tender/contract value - R 3, 615, 743.98 value of the extension – R 162, 205.85 (extended for five months at R 32, 441.17 per month) |
single source - extension |
CEO |
security services - Securitas |
extension while the tender process was underway |
original tender/contract value - R 938, 448.00 value of the extension – R 153, 375.60 (extended for five months at R 30, 675.12 per month) |
single source - extension |
CEO |
2016-2017 FY |
||||
panel of recruitment agencies |
as per the National Treasury Regulation 16A.6.6 |
R 3,000,000.00 (fixed price) |
participation agreement (South African Civil Aviation Authority) |
CEO |
Road Traffic Infringement Agency
(a) The RTIA has not in the past three years issued any tender without following the normal tender processes.
(b) – N/A. See answer in (a) above.
(c) – N/A. See answer in (a) above.
(d) – N/A. See answer in (a) above.
(e) – N/A. See answer in (a) above.
Road Traffic Management Corporation
(a) The RTMC has not in the past three years issued any tender without following the normal tender processes.
(b) – N/A. See answer in (a) above.
(c) – N/A. See answer in (a) above.
(d) – N/A. See answer in (a) above.
(e) – N/A. See answer in (a) above.
South African National Roads Agency Limited
- (b) (c) (d) and (e) Please see attached
Airports Company of South Africa (ACSA)
Please see attached 2016 and 2017 annexures, and 2015 not yet completed.
Air Traffic and Navigation Services SOC Limited (ATNS)
- ATNS satisfy its requirements through competitive tender process unless there are justifiable reasons to the contrary. Below is a list of tender issued without following normal tender process.
a) Tender Description |
b) Reasons for Deviation |
c) Monetary Value |
d) method of tender |
e) Authorising Authority |
Componentization of assets, verification and barcoding |
Urgent audit request |
R 4,000,000 |
Closed Tender |
CEO |
South African Civil Aviation Authority (SACAA)
Seq |
Description |
Supplier |
|||
(a) |
Which tenders were issued without following normal tender processes |
Microsoft |
SAFRAM |
AFGEN (Pty) Ltd |
Avdex |
(b) |
What were the reasons for the deviation in each case |
Sole Supplier |
Sole Supplier |
Sole Supplier |
Sole Supplier |
(c) |
What was the monetary value of each tender |
R7, 461, 805.00 |
R5, 532, 258.00 |
R1, 276.80 |
R114, 000.00 |
(d) |
How were the tenders issued |
Negotiations with international supplier. |
Negotiations with international supplier. Annual Software technical Assistance for the Flight inspection equipment. |
Negotiations with International Supplier. PAPI light calibration Instrument. |
Aircraft Registry System – Contract extension for 12 months |
(e) |
Who authorised the issuing of each tender |
DCA, SACAA Board, and National Treasury |
DCA, SACAA Board, and National Treasury |
DCA, SACAA Board, and National Treasury |
DCA, SACAA Board, and National Treasury |
South African Maritime Safety Authority ( SAMSA)
BID DESCRIPTION |
REASONS FOR DEVIATION |
VALUE OF THE CONTRACT |
PROCESS FOLLOWED |
AUTHORISED BY |
Upgrade of Great Plains |
Adhering to National Treasury Circular No 10 of 2016/2017 not to engaged on long term contract agreement for ICT product, software and services. |
R 1 672 722.00 |
Current service requested to upgrade the financial system while waiting for National Treasury to finalize the tender process for an integrated financial system. |
ACEO |
VMWare Software |
Adhering to National Treasury Circular No 10 of 2016/2017 not to engaged on long term contract agreement for ICT product, software and services. |
R 2 259 238.85 |
A quotation process was followed. Quotes were sourced from VMWare local partners. Permission to deviate from the tender process was supported by National Treasury. |
Approval granted by National Treasury |
Design,implement and support the MPLS Infrastructure |
Contract over 15% National Treasury threshold |
R2 904 559.04 (vat excl) |
SAMSA requested contract extension from National Treasury for over 15% threshold. |
Approval granted by National Treasury |
Security Services |
Tender still pending evaluated and contract award |
R 801 436.00 |
Current supplier requested to extend the contract on a month to month |
Approved by SAMSA board |
Forensic Audit |
Closed Tender |
R 556 981.20 |
The company was appointed through the Company Secretary to ensure that staff members affected by the audit do not have influence on the awarding process. |
Approved by the ACEO |
Ports Regulator of South Africa
- The Ports Regulator has not issued any tenders in the past three financial years without following the normal tender processes.
- N/A
- N/A
- N/A
- N/A
Railway Safety Regular of South Africa (RSR)
2014/15 Financial Year
No |
Question a |
Question b |
Question c |
Question d |
Question e |
Supply information security solution and system |
Selected service provider- services of special nature |
R800 000.00 |
Deviation from a normal procurement process: The solution requested is only provided by only supplier in Southern Africa. The service provider was approached by the organization for the security solution based on the security breaches that had transpired in the year in question. |
Accounting Officer |
2015/16 Financial Year
No |
Question a |
Question b |
Question c |
Question d |
Question e |
Consultant to conduct a culture alignment intervention in the RSR |
Selected service provider- natural continuation |
R741 000.00 |
Deviation from a normal procurement process: The service provider initially conducted Culture Climate Survey on the employees of the Organization via normal procurement process, therefore this deviation was on the basis of natural continuation of the project. |
Accounting Officer |
|
Appointment of contractors to evaluate the condition of the current signalling and equipment installed on the Gauteng Region of PRASA |
Urgency- safety of Rail Passengers following the train collision due to faulty signals |
R742 539.80 |
Deviation from a normal procurement process: An independent signalling systems investigation in the Gauteng South region of Metrorail focusing on the safety, technical and operational readiness of the signalling installations employed in the Gauteng Region |
Accounting Officer |
|
Appointment of contractors to evaluate the condition of the current signalling and equipment installed on the Gauteng Region of PRASA |
Urgency- safety of Rail Passengers following the train collision due to faulty signals |
R536 800.00 |
Deviation from a normal procurement process: |
Accounting Officer |
|
An independent consultant to assess and investigate the suitability of the Afro 4000 Locomotives for use in South Africa |
Urgency- safety of Rail Passengers following procurement of oversized Train Locomotives by the operator |
R745 000.00 |
Deviation from a normal procurement process- Mechanical and Rolling Stock expertise was required urgently for the Afro 4000 to conduct an independent report. |
Accounting Officer |
2016/17 Financial Year
No |
Question a |
Question b |
Question c |
Question d |
Question e |
Service provider to provide strategic legal advice to the RSR on legal issues raised by operators which might have an impact on the organization |
Selected service provider- expertise and experience |
R2 000 000.00 |
Deviation from a normal procurement process: The organisation approached the service provider on the basis of similar work which had been conducted by them before and because of their Regulatory Framework expertise as well as in order not to compromise the organisation if and when other legal issues of the same nature occur from operators as they would have a view of the history. |
Accounting Officer |
Passenger Rail Agency of South Africa (PRASA)
- The tenders issued without following normal tender processes during the period 2014 – 2017 across the PRASA spectrum amount to 243. See attached Annexure A, Column “C”.
- The reasons for deviation for tenders issued during the period of 2014 – 2017, see attached Annexure B, Column “D”.
- The monetary value of tenders issued during the period of 2014 – 2017, see attached Annexure C, Column “E”.
- The method of how tenders were issued during the period of 2014 – 2017, see attached Annexure D, Column “F”.
- Tenders were authorized by officials with different levels of responsibilities. Refer to Annexure E, Column “G”.
07 December 2017 - NW3886
Hunsinger, Dr CH to ask the Minister of Transport
With reference to his reply to question 3560 on 10 November 2017, what was the total cost for the imbizos held for the Moloto Rail Development Corridor Project?
Reply:
Costs involved with regards to imbizos held for the Moloto Rail Development Corridor Project were as follow:
1 October 2013: Organised by Mpumalanga Department of Public Works, Roads and Transport as Provincial October Transport Month event. No cost known
13 July 2014: Funded by PRASA, as it was specifically for providing progress on the status of the Moloto Feasibility study to the Moloto Community, organised by the Department and PRASA. The cost of the event was R528,321.60 No cost known to the Department.
12 April 2015: This was RAF intiative, as part of their RAF on the Road. The Department used the imbizo to provide feedback to the community on progress for the Moloto Rail Corridor Project as part of the Imbizo Progress week. No cost known to the Department.
15 December 2015: The event was organized as part of the Imbizo Week Programeme with the focus on the upgrades of the Moloto Road, R573. The event was funded. No cost Known to the Department.
06 May 2016: The imbizo was a Presidential Siyahlola Monitoring Visit, and was organised and funded by Presidency. No cost known to the Department.
25 April 2016: The imbizo was a SANRAL initiative. No cost known to the Department.
05 June 2016: The imbizo was a Presidency intiative. No cost known to the Department
07 December 2017 - NW2847
Kalyan, Ms SV to ask the MINISTER OF INTERNATIONAL RELATIONS AND COOPERATION
(1) Is Dr Riek Machar being hosted as a guest of the State; if so, (a) for what period will the specified person be hosted as a guest of the State and (b) what are the conditions, if any, of his stay; (2) Is the specified person’s communication with any (a) of his former advisors and/or (b) leaders of other international bodies is being monitored; if not, what is the position in this regard; if so, what are the relevant details in each case; (3) whether the specified person is perceived as a threat to the national security of the specified person’s home country; if so, what are the relevant details? NW3154E
Reply:
1. Yes, Dr Riek Machar is hosted as a guest of the State.
a) At this stage the duration of Dr Riek Machar’s stay in South Africa is not known. Dr Machar came to South Africa on humanitarian grounds following consultations with the Government of the Republic of South Sudan and the Inter-Governmental Authority on Development (IGAD).
b) The conditions of Dr Machar’s stay in South Africa are that he may not engage in any activity that would contribute to the escalation of conflict in South Sudan.
2. Dr Machar’s communication is not monitored.
3. It has to be noted that there is conflict in South Sudan between government forces and the opposition armed rebel factions, including the armed rebel group led by Dr Machar. The African Union and the region through IGAD, are assisting the Republic of South Sudan to resolve the conflict.
UNQUOTE
06 December 2017 - NW3877
Mathys, Ms L to ask the Minister of Public Works
What is the (a) name, (b) location, (c) purpose, (d) time line, (e) contractor name and (f) contract value of each public works project currently underway?
Reply:
a) , (b), (c), (d), (e) and (f):
- The Department of Public Works has approximately 150 number of projects under PMTE Maintenance with a total value of R 5 534 797 456.00 and Professional Fees of R 918 983 587.20.
- The Department of Public Works has approximately 142 number of projects under PMTE Capital with a total value of R 6 058 441 006.42 and Professional Fees of R 1 178 422 286.42
- The Department of Public Works has approximately 55 number of projects under DPW Capital with a total value of R 14 145 734.36 and Professional fee of R 190 082 845.60.
DESCRIPTION |
NO OF PROJECTS |
TOTAL VALUE OF PROJECT |
PROFESSIONAL FEE |
PMTE Maintenance |
150 |
R 5 534 797 456.00 |
R 918 983 587.20 |
PMTE Capital |
142 |
R 6 058 441 006.42 |
R 1 178 422 286.42 |
DPW Capital |
55 |
R 14 145 734.36 |
R 190 082 845.60 |
- The location, purpose and details of the service providers are attached herewith (Annexure A)
1. PMTE CAPITAL - PROJECTS ON CONSTRUCTION PHASE
CLIENT DEPT |
PROVINCE |
TOWN |
COMPLEX |
DESCRIPTION |
WCS NO |
STATUS |
ANTICIPATED PRACTICAL COMPLETION |
CONTRACT PERIOD |
CONTRACTOR CASH FLOW AMOUNT |
CONSULTANT CASH FLOW AMOUNT |
CONTRACTOR'S NAME |
AGRICULTURE FORESTRY AND FISHERIES |
MPUMALANGA |
SKUKUZA |
VETERINARY COMPLEX |
DEPARTMENT OF AGRICULTURE FORESTRY AND FISHERIES: REFURBISHM ENT AND EXTENSIONS TO THE EXISTING VETERINARY OFFICE SKUKUZA |
052069 |
5B |
2017/05/30 |
12 |
4289223,09 |
1313683,00 |
MBANGA TRADING ENTERPRISE CC |
AGRICULTURE FORESTRY AND FISHERIES |
GAUTENG |
PRETORIA |
HARVEST HOUSE |
DEPARTMENT OF AGRICULTURE FORESTRY AND FISHERIES: HARVEST HO USE; HAMILTON STREET: PRETORIA: REVAMPING OF PARKING AREA |
052143 |
5B |
2017/11/13 |
12 |
2603307,42 |
748873,33 |
REABETSWE GROUP (PTY) LTD |
AGRICULTURE FORESTRY AND FISHERIES |
GAUTENG |
PRETORIA |
SEFALA BUILDING |
REPLACEMENT OF THE ROOF WATERPROOFING STRUCTURES |
052387 |
5B |
2017/08/17 |
8 |
3355085,73 |
928145,18 |
AQUAPROOF PROJECTS CC |
AGRICULTURE FORESTRY AND FISHERIES |
GAUTENG |
PRETORIA |
AGRICULTURAL : HEAD OFFICE |
MAIZE BOARD BUILDING: REPAIR AND MAINTENANCE PROGRAMME |
044038 |
5B |
2013/06/29 |
36 |
14508532,30 |
0,00 |
ABE PROJECTS AND MAINTENANCE CC |
ARTS AND CULTURE |
FREESTATE |
BLOEMFONTEIN |
WAR MUSEUM OF THE BOER REPUBLICS |
EXPANSION OF THE FIRE PROTECTION SYSTEM |
049503 |
5B |
2015/03/31 |
5 |
686621,51 |
113000,00 |
FIRETECH PROJECTS CAPE TOWN (PTY) LTD |
ARTS AND CULTURE |
WESTERN CAPE |
CAPE TOWN |
S A MUSEUM |
CONSTRUCTION OF STORAGE STRUCTURE IN COURTYARD |
042528 |
5B |
2017/11/16 |
24 |
235870000,00 |
38859479,41 |
SUPERWAY CONSTRUCTION (PTY) LTD |
ARTS AND CULTURE |
EASTERN CAPE |
HANKEY |
|
SARAH BARTMANN CENTRE OF REMEMBRANCE |
047427 |
5B |
2018/10/22 |
30 |
181235837,63 |
27300020,00 |
LUBBE CONSTRUCTION (PTY) LTD |
ARTS AND CULTURE |
GAUTENG |
PRETORIA |
NATIONAL LIBRARY OF SOUTH AFRICA |
HERITAGE - OLD BUILDING: REMEDIAL WORK |
047073 |
5B |
2017/03/29 |
21 |
96737951,83 |
18803091,75 |
LUBBE CONSTRUCTION (PTY) LTD |
ARTS AND CULTURE |
GAUTENG |
PRETORIA |
ARCHIVES BUILDING |
HERITAGE - UPGRADING OF FIRE PROTECTION SYSTEM AND REFURBISH MENT OF HVA C AND RELATED INSTALLATIONS |
048495 |
5B |
2018/03/29 |
18 |
200726227,17 |
22266685,75 |
FASTMOVE ELECTRICAL CC |
CORRECTIONAL SERVICES |
FREESTATE |
GOEDEMOED |
GOEDEMOED PRISON FARM |
THE UPGRADING OF THE WATER CHANNEL AND WATER LINE |
022417 |
5B |
2019/10/11 |
18 |
81211019,00 |
8000001,00 |
TOKOLOGO TECHNICAL ASSIGNMENTS |
CORRECTIONAL SERVICES |
FREESTATE |
VILJOENSDRIF |
PRISON |
GROENPUNT MEDIUM PRISON: UPGRADING OF THE EXISTING KITCHEN A ND CONVERSION FROM STEAM TO ELECTRICAL |
047869 |
5B |
2017/08/14 |
23 |
35578791,02 |
6930517,86 |
REFEMO MAINTENANCE SERVICES |
CORRECTIONAL SERVICES |
FREESTATE |
GROOTVLEI (FS) |
PRISON |
SEWAGE AND WATER INFRASTRUCTURE UPGRADE |
047923 |
5B |
2018/01/16 |
22 |
49552374,80 |
2932500,00 |
MLO INVESTMENTS & NEW BOSS CONSTRUCTION JOINT VENT |
CORRECTIONAL SERVICES |
FREESTATE |
KROONSTAD |
PRISON |
MEDIUM A, B AND COE: REPLACEMENT OF POTATOE PEELER, MEAT SAW , 3- PLATE STOVE, TILTING PAN, CONVETION OVEN AND 2 PHUTU POTS |
049701 |
5B |
2015/11/12 |
6 |
511669,62 |
0,00 |
TSOGA O BUNE BUILDING ENTERPRISE CC |
CORRECTIONAL SERVICES |
FREESTATE |
KROONSTAD |
PRISON |
IMPLEMENTATION OF EMERGENCY BACK-UP POWER SUPPLY AT KROONSTA D MEDIUM A, MEDIUM B, MEDIUM C & YOUTH CENTRE AND COLLEGE |
051574 |
5B |
2015/11/30 |
4 |
3476099,97 |
382700,00 |
BULA MAHLO TRADING AND PROJECT CC |
CORRECTIONAL SERVICES |
FREESTATE |
WEPENER |
PRISON |
INSTALLATION OF BACK UP POWER GENERATOR |
051586 |
5B |
2016/10/27 |
6 |
594717,48 |
147156,84 |
BNM CIVIL CONSTRUCTION |
CORRECTIONAL SERVICES |
WESTERN CAPE |
PAARL |
DRAKENSTEIN PRISON |
OUTSIDE KITCHEN: UPGRADE KITCHEN AND REFURBISH EQUIPMENT, IN CLUDING PAINTINGS & FLOORING |
048170 |
5B |
2017/12/09 |
8 |
1991312,44 |
381771,28 |
ILITHA PAINTERS AND DECORATORS CC |
CORRECTIONAL SERVICES |
WESTERN CAPE |
PAARL |
ALLANDALE PRISON |
BOUNDARY FENCE PROJECT |
053583 |
5B |
2017/06/15 |
12 |
7754965,42 |
468112,00 |
GORDIAN FENCE SA (PTY) LTD |
CORRECTIONAL SERVICES |
KWAZULU-NATAL |
ESTCOURT |
PRISON |
HERITAGE - REPLACEMENNT OF EXISTING CORRUGATED IRON BUILDING AND REBUILD WITH BRICK |
035878 |
5B |
2017/11/15 |
36 |
257665831,23 |
109967185,98 |
SANYATI CIVIL ENGINEERING AND CONSTRUCTION PTY LTD |
CORRECTIONAL SERVICES |
KWAZULU-NATAL |
DURBAN |
PRISON |
PAROLE BOARD FACILITIES: UPGRADING AND EXPANSION OF EXISTING AND PROVISION OF NEW STRUCTURES_(NEW) |
041690 |
5B |
2017/05/12 |
8 |
3376303,50 |
1242582,72 |
MASWIDI CONSTRUCTION CC |
CORRECTIONAL SERVICES |
KWAZULU-NATAL |
PIETERMARITZBURG |
NAPIERVILLE PRISON |
REPAIR AND MAINTENANCE OF INTEGRATED SECURITY SYSTEM |
044016 |
5B |
2019/02/21 |
36 |
119969533,73 |
0,00 |
JFE GROUP EMPOWERMENT (PTY) LTD |
CORRECTIONAL SERVICES |
KWAZULU-NATAL |
KOKSTAD |
PRISON |
KOKSTAD MEDIUM AND MAXIMUM CORRECTIONAL CENTRES: FOLLOW ON C ONTRACT: INTEGRATED SECURITY SYSTEM |
048437 |
5B |
2019/02/21 |
36 |
135359912,29 |
24600507,26 |
JFE GROUP EMPOWERMENT (PTY) LTD |
CORRECTIONAL SERVICES |
EASTERN CAPE |
UMZIMKULU |
PRISON |
SUPPLY AND INSTALLATION OF STANDBY GENERATOR AT MTUNZINI, GR EYTOWN, PORT SHEPSTONE, INGWAVUMA, UMZIMKHULU, MELMOTH, STAN GER AND WESTVILLE |
049632 |
5B |
2016/11/04 |
12 |
6509570,01 |
0,00 |
ERROL FORBAY ELECTRICAL CC |
CORRECTIONAL SERVICES |
KWAZULU-NATAL |
LADYSMITH (KZN) |
PRISON |
SUPPLY AND INSTALLATION OF STANDBY GENERATOR AT DUNDEE, VRYH EID, LADYSMITH, POMEROY, NEWCASTLE, UTRECHT AND KRANSKOP |
049824 |
5B |
2017/08/04 |
12 |
6239816,47 |
0,00 |
POLO ELECTRICAL CC |
CORRECTIONAL SERVICES |
GAUTENG |
JOHANNESBURG |
PRISON |
LEEUWKOP:PRISON:REPLACEMENT OF BOILERS AND MAINTENANCE OF BOILERS FOR THE PERIOD OF 24 MONTHS |
047918 |
5B |
2018/05/04 |
24 |
21796399,63 |
7381052,58 |
EXILITE 454 CC |
CORRECTIONAL SERVICES |
GAUTENG |
DEVON |
PRISON |
REPLACEMENT OF ALL SECURITY / PERIMETER LIGHTING AND PUMPS A T THE PUMP STATION |
048900 |
5B |
2017/03/20 |
4 |
2551500,06 |
756963,00 |
LETLAPA BORWA CIVIL |
CORRECTIONAL SERVICES |
NORTHERN CAPE |
KURUMAN |
PRISON |
REPLACEMENT OF FOUR IN ONE SLICER, KITCHEN FLOORING , FOOD P ROCESSOR AND MEAT SAW |
049653 |
5B |
2017/04/18 |
10 |
747394,20 |
0,00 |
NOMSA AND SHALILI CONSTRUCTION AND PROJECTS CC |
CORRECTIONAL SERVICES |
NORTHERN CAPE |
UPINGTON |
PRISON |
INSTALLATION OF BACK UP POWER GENERATOR AT UPINGTON PRISON |
051583 |
5B |
2016/12/13 |
5 |
1058698,62 |
105507,00 |
MAMELLO TRADING 876 CC T/A KH |
CORRECTIONAL SERVICES |
NORTHERN CAPE |
KIMBERLEY |
PRISON |
REPAIR AND MAINTENANCE PROJECT: FOLLOW ON CONTRACT FOR INTER GRATED SECURITY SYSTEM AT TSHWELOPELE (KIMBERLEY)CENTRE |
053008 |
5B |
2018/10/05 |
36 |
15562010,74 |
1099423,00 |
JFE GROUP EMPOWERMENT (PTY) LTD |
CORRECTIONAL SERVICES |
NORTH WEST |
MAHIKENG |
ROOIGROND PRISON |
FOLLOW ON CONTRACT FOR THE REPAIR AND MAINTENANCE OF BUILDINGS, CIVIL AND WET SERVICES, FENCING, MECHANICAL AND ELECTRICAL INSTALLATIONS. |
039783 |
5B |
2008/05/05 |
36 |
17114780,22 |
20012274,33 |
JST CONSTRUCTION CC |
CORRECTIONAL SERVICES |
NORTH WEST |
RUSTENBURG |
PRISON |
RUSTENBURG PRISON: REPAIR & RENOVATION AND UPGRADING OF BUIL DINGS, WET SERVICES AND CIVIL INFRASTRUCTURE. |
046456 |
5B |
2018/07/26 |
36 |
172060610,25 |
30816971,41 |
SHOMANG CONSTRUCTION CC |
CORRECTIONAL SERVICES |
NORTH WEST |
ROOIGROND |
PRISON FARM |
CONSTRUCTION OF A NEW SEPTIC TANK |
049499 |
5B |
2017/04/06 |
6 |
2479597,15 |
630675,37 |
VAJ CONSTRUCTION AND TRADING JV GLOWING SUNSET TRA |
CORRECTIONAL SERVICES |
NORTH WEST |
RUSTENBURG |
PRISON |
MEDIUM A: ELECTRICAL BUTCHER SCALE, POTATO PEELER X2 MINCE M ACHINE, BEND SAW |
050735 |
5B |
2017/04/29 |
8 |
1402034,66 |
650300,00 |
COMED SYSTEMS (PTY) LTD |
CORRECTIONAL SERVICES |
NORTH WEST |
LOSPERFONTEIN |
PRISON |
REPLACEMENT OF TWO BOILERS |
050738 |
5B |
2017/04/29 |
12 |
21936709,18 |
2735031,54 |
SEBUSHI SOMO CONSTRUCTION AND PROJECTS |
CORRECTIONAL SERVICES |
MPUMALANGA |
STANDERTON |
PRISON |
STANDERTON CORRECTIONAL CENTRE: ADAPTATION AND COMPLETE UPGRADING PHASE 2: WCS 044954 |
044954 |
5B |
2018/04/29 |
36 |
380092799,30 |
57535227,00 |
CLEAR CHOICE BUILDERS (PTY) LTD |
CORRECTIONAL SERVICES |
MPUMALANGA |
BARBERTON |
PRISON |
UPGRADING OF FIVE(05)CALORIFIERS |
052107 |
5B |
2016/02/14 |
5 |
2075405,31 |
383950,00 |
WOOLWICK INVESTMENTS (PTY) LTD |
CORRECTIONAL SERVICES |
LIMPOPO |
THOHOYANDOU |
PRISON |
DCS:THOHOYANDOU: MATATSHE PRISON: UPRADING OF WASTEWATER TRE ATMENT PLANT AND WATER PURIFICATION PLANT |
047870 |
5B |
2018/05/30 |
24 |
38688725,03 |
9935002,20 |
TAKE NOTE TRADING 73 |
CORRECTIONAL SERVICES |
LIMPOPO |
THOHOYANDOU |
PRISON |
REPLACEMENT OF BOILERS |
052535 |
5B |
2018/01/04 |
24 |
24310406,54 |
1986893,08 |
MAESELA BUILDING CONSTRUCTION |
CORRECTIONAL SERVICES |
EASTERN CAPE |
CRADOCK |
PRISON |
CONSTRUCTION OF NEW CLASSROOMS AT CRACOCK PRISON |
052041 |
5B |
2017/02/17 |
12 |
17796149,80 |
3717780,65 |
R O SWIKA PROJECTS CC |
CORRECTIONAL SERVICES |
GAUTENG |
PRETORIA |
PRISON |
PRETORIA MANAGEMENT AREA: UPGRADING OF EXISTING 'C' MAX FACILITY INTO A HIGH SECURITY DETENTION FACILITY |
046424 |
5B |
2018/07/18 |
15 |
323314121,00 |
56052989,14 |
RAUBEX JOINT VENTURE |
CORRECTIONAL SERVICES |
GAUTENG |
PRETORIA |
PRISON |
INSTALLATION OF A NEW STANDBY GENERATOR |
053863 |
5B |
2017/03/29 |
3 |
1272940,16 |
242000,00 |
DIESEL INNOVATIONS (PTY) LTD |
CORRECTIONAL SERVICES |
GAUTENG |
SANDTON |
LEEUWKOP PRISON FARM |
REMAINDER CONTRACT: REPAIR AND MAINTENANCE PROGRAMME |
038691 |
5B |
2018/05/05 |
9 |
20024862,93 |
3696013,00 |
MAGODA CIVILS(PTY)LTD |
CORRECTIONAL SERVICES |
LIMPOPO |
TZANEEN |
|
REPLACEMENT OF TEMPORARY PRISON WITH A FACILITY FOR 494 INMA TES INCLUDING SECURITY FENCE AND SPORTFIELD: ADDITIONAL ACCO MODATION REQUIREMENTS |
041821 |
5B |
2017/09/27 |
32 |
234004870,15 |
40836033,07 |
MUSAN TRADING ENTERPRISE CC |
DEFENCE |
WESTERN CAPE |
LANGEBAAN |
4 SPES FORCES REGIMENT |
SALAMANDER BOAT PARK: REPLACEMENT OF BREAKWATER |
052017 |
5B |
2017/05/25 |
7 |
26363919,37 |
1415500,00 |
GUERRINI MARINE CONSTRUCTION CC |
DEFENCE |
WESTERN CAPE |
SIMONSTOWN |
NAVAL BASE |
EAST YARD: UPGRADING OF WATER DISTRIBUTION SYSTEM |
053336 |
5B |
2017/04/29 |
18 |
43855986,36 |
1975976,00 |
EXEO KHOKELA CIVIL ENGINEERING CONSTRUCTION |
DEFENCE |
KWAZULU-NATAL |
DURBAN |
|
ASB: SECURITY INSTALLATION: QUARTERS: MAISONETTE'S ON BLUFF & ESSENHURST ESTATE: SECURITY GATES, BURGLAR PROOFING & LIGH TING |
046330 |
5B |
2012/07/02 |
4 |
2204999,20 |
0,00 |
OMYANGO INVESTMENTS CC |
DEFENCE |
KWAZULU-NATAL |
DURBAN |
|
SA NAVY: REFURBISHMENT OF MAIN KITCHEN |
052564 |
5B |
2017/05/31 |
12 |
37408769,89 |
32638509,38 |
DURBAN MAINTENANCE AND BUILDING (PTY) LTD |
DEFENCE |
GAUTENG |
JOHANNESBURG |
|
UPGRADING OF KITCHEN EQUIPMENT,,ASB |
053688 |
5B |
2017/03/31 |
6 |
2314936,36 |
300000,00 |
M Q M E BUSINESS ENTERPRISES CC |
DEFENCE |
NORTHERN CAPE |
KIMBERLEY |
MILITARY BASE |
DISKOBOLOS MILITARY SICK BAY: RESURFACING AND TARRING OF ACC ESS ROAD |
052546 |
5B |
2017/10/12 |
9 |
4183171,46 |
339977,43 |
SEGONYANA PROJECTS CC |
DEFENCE |
MPUMALANGA |
MIDDELBURG (MPU) |
4 S A I BATALION |
AREA MILITARY HEALTH UNIT: UPGRADING OF BUILDINGS AND CONSTR UCTION OF NEW SICK BAY FAILITY |
045457 |
5B |
2017/11/30 |
24 |
42858730,92 |
7036916,92 |
EXILITE 454 CC |
HOME AFFAIRS |
KWAZULU-NATAL |
HLUHLUWE |
HOME AFFAIRS |
CONSTRUCTION OF NEW OFFICE ACCOMMODATION |
050771 |
5B |
2017/06/09 |
12 |
36545115,67 |
7450000,00 |
MASBUILD CC |
HOME AFFAIRS |
NORTH WEST |
MMABATHO |
|
MMABATHO;VARIOUS FACILITIES: REPAIR AND UPGRADE TO ATAMELANG , MOLOPO AND MANKWE |
045668 |
5B |
2016/04/29 |
24 |
16866833,18 |
5448097,23 |
SOLIDAIRE CONSTRUCTION (PTY) LTD |
HOME AFFAIRS |
GAUTENG |
PRETORIA |
|
DEPT OF HOME AFFAIRS: MARABASTAD BUILDING: CONSTRUCTION OF W ALL AND ABLUTION BLOCK (TOILETS) |
047658 |
5B |
2014/12/08 |
6 |
8750000,00 |
3025677,81 |
LUCANGO BUSINESS AFFAIRS (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
FREESTATE |
WELKOM |
MAGISTRATE'S OFFICE |
MAGISTRATE'S OFFICE AND FAMILY ADVOCATE ADDITIONAL ACCOMMODA TION |
046406 |
5B |
2017/06/19 |
18 |
23302664,28 |
4314900,00 |
MADIGA PROJECTS AND SECURITY |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
FREESTATE |
ROUXVILLE |
MAGISTRATE'S OFFICE |
ADDITIONAL ACCOMMODATION |
047822 |
5B |
2017/10/20 |
13 |
8317898,30 |
2291230,68 |
RO SWIKA PROJECTS CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
FREESTATE |
BLOEMFONTEIN |
HIGH COURT |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES |
049689 |
5B |
2017/03/15 |
12 |
1323000,00 |
1328836,00 |
NARE TRADING 503 (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
WESTERN CAPE |
LADISMITH (WC) |
MAGISTRATE'S OFFICE |
ADDITIONAL ACCOMMODATION |
032271 |
5B |
2017/11/07 |
18 |
13084901,85 |
4339891,47 |
SIZISA UKHANYO TRADING 3 CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
WESTERN CAPE |
BEAUFORT WEST |
MAGISTRATE'S OFFICE |
CENTRAL AIR CONDITIONING: UPGRADE AND REPLACE REDUNDANT UNITS |
040220 |
5B |
2017/03/01 |
12 |
3460920,20 |
1305500,00 |
SLYAHLANGANA CONSTRUCTION (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
WESTERN CAPE |
CAPE TOWN |
MAGISTRATE'S OFFICE |
INSTALLATION OF AIR CONDITIONING AND UPGRADING OF BACK-UP GENERATOR |
046978 |
5B |
2015/02/11 |
12 |
17046930,21 |
4440400,00 |
SHATEL CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
WESTERN CAPE |
CAPE TOWN |
JUSTIA BUILDING |
REFURBISHMENT OF JUSTICIA BUILDING FOR FAMILY COURT |
047032 |
5B |
2017/04/02 |
24 |
111012532,40 |
20733100,00 |
EDEL CONSTRUCTION (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
WESTERN CAPE |
CAPE TOWN |
HIGH COURT |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES |
051605 |
5B |
2017/05/25 |
9 |
2302857,35 |
461220,75 |
AR PROJECTS AND DEVELOPMENTS (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
WESTERN CAPE |
ALBERTINIA |
MAGISTRATE'S OFFICE |
GROUP 1: ALBERTINIA; HEIDELBERG(WC); MOSSEL BAY: BUILDING OF FACILITIES FOR PEOPLE WITH DISABILITIES |
053916 |
5B |
2017/05/25 |
9 |
1926346,00 |
381139,24 |
VINO BUILDING CONSTRUCTIONS AND MULTI P |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
WESTERN CAPE |
LAINGSBURG |
MAGISTRATE'S OFFICE |
GROUP 2: LAINGSBURG; PRINCE ALBERT; MURRAYSBURG: BUILDING OF FACILITIES FOR PEOPLE WITH DISABILITIES |
053917 |
5B |
2017/03/09 |
8 |
804312,01 |
360100,00 |
AFRICAN ILANGA CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
WESTERN CAPE |
MOORREESBURG |
MAGISTRATE'S OFFICE |
GROUP 3: MOORREESBURG; TULBAGH; VAN RHYNSDORP: BUILDING OF FACILITIES FOR PEOPLE WITH DISABILITIES |
053918 |
5B |
2017/05/09 |
9 |
902073,34 |
316335,65 |
AFRICAN ILANGA CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
KWAZULU-NATAL |
UMBUMBULU |
MAGISTRATE'S OFFICE |
ADDITIONAL ACCOMMODATION AND ALTERATIONS |
034003 |
5B |
2017/10/31 |
18 |
40064000,00 |
11635920,01 |
TAURIS GARDEN TRADING 500CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
KWAZULU-NATAL |
IMPENDLE |
JUSTICE COMPLEX |
INSTALLATION OF PREPAID METERS |
036711 |
5B |
2017/04/25 |
3 |
53963,65 |
0,00 |
SIMPHIWE AMANDLA CONSTRUCTION PTY LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
KWAZULU-NATAL |
PORT SHEPSTONE |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF A NEW BUILDING |
045757 |
5B |
2017/02/22 |
24 |
323114263,53 |
56172453,89 |
BASIL READ (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
KWAZULU-NATAL |
DURBAN |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF ADDITIONAL ACCOMMODATION |
046386 |
5B |
2019/01/16 |
30 |
198282675,66 |
24950000,00 |
RAPID BUILDERS AND CONTRACTORS CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
KWAZULU-NATAL |
VULAMEHLO |
MAGISTRATE'S OFFICE |
REPAIRS AND RENOVATIONS TO OFFICE BUILDINGS |
051045 |
5B |
2018/05/11 |
24 |
21876478,55 |
3301472,04 |
GLOBACON (PTY) LTD T/A N E F |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
KWAZULU-NATAL |
CHARLESTOWN |
MAGISTRATE'S OFFICE |
UPGRADING OF ELECTRICITY SUPPLY AND INSTALLATION FO METER BOX |
053722 |
5B |
2016/11/18 |
6 |
406455,60 |
0,00 |
POWERCON ELECTRICAL CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
GAUTENG |
OBERHOLZER |
MAGISTRATE'S OFFICE |
SECURITY MEASURES UPGRADE INCLUDING MINOR NEW WORKS OF SEWERAGE PIPES. |
023106 |
5B |
2017/07/28 |
10 |
9384654,28 |
3108203,72 |
KING LAW'S ELECTRICAL CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
GAUTENG |
JOHANNESBURG |
HIGH COURT |
ADDITIONAL ACCOMMODATION: CONVERSION TO THE 7 AND 9 TO 12 FL OORS |
041546 |
5B |
2016/11/29 |
30 |
440493492,11 |
69685985,56 |
YIKUSASA BUILDING CONTRACTORS |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
GAUTENG |
VARIOUS CENTRES (GTJ) |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES:GROU P2:TEMBISA,MEADOWLANDS,KLIPTOWN |
054047 |
5B |
2016/08/15 |
6 |
1673395,62 |
472880,85 |
SMZEE PROPERTY DEVELOPMENT |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
GAUTENG |
VARIOUS CENTRES (GTJ) |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES:GROU P4:KRUGERSDORP,KHUTSONG |
054067 |
5B |
2016/08/15 |
6 |
1129135,80 |
385014,67 |
SMZEE PROPERTY DEVELOPMENT |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
NORTHERN CAPE |
FRASERBURG |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF ADDITIONAL ACCOMMODATION |
046253 |
5B |
2018/07/26 |
18 |
25509632,29 |
5810000,01 |
SHATSANE SYSTEMS SOLUTIONS PTY LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
NORTHERN CAPE |
KATHU |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES |
049619 |
5B |
2014/08/08 |
3 |
50791,55 |
225854,60 |
OLORATO CATERING AND PROJECTS CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
NORTHERN CAPE |
VARIOUS CENTES : NORTHERN CAPE |
MAGISTRATE'S OFFICE |
GROUP2:CONSTRUCTIONOF FACILITIES FOR PEOPLE WITH DISABILITIE S;HANNOVER,RICHMOND,DEAAR,NOUPOORT,PRIESKA,BRITSTOWN |
053909 |
5B |
2017/05/04 |
10 |
1276203,08 |
706000,00 |
ALF AND PHILL BUILDING CONSTRUCTION CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
NORTHERN CAPE |
VARIOUS CENTES : NORTHERN CAPE |
MAGISTRATE'S OFFICE |
GROUP3:CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITI ES:OLIFANTSHOEK,UPINGTON,GRIEKWASTAD |
053910 |
5B |
2016/11/25 |
10 |
3136140,00 |
810630,91 |
SELOANA CONTRACTORS (PTY)LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
NORTHERN CAPE |
VARIOUS CENTES : NORTHERN CAPE |
MAGISTRATE'S OFFICE |
GROUP4:CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILIT IES:KENHARDT,SPRINGBOK,PORT NOLLOTH |
053911 |
5B |
2018/05/18 |
10 |
1477587,57 |
1031286,46 |
BANZI TRADE 26 PTY LTD T/A BOKAMOSO BRICKS |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
NORTH WEST |
MAHIKENG |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES |
054054 |
5B |
2017/12/01 |
6 |
1116926,50 |
250000,00 |
SEOKE BUILDING CONSTRUCTION |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
MPUMALANGA |
EVANDER |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES |
049866 |
5B |
2017/02/16 |
6 |
1621970,91 |
538323,92 |
MABOSOLA CONSTRUCTION AND PROJECTS CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
MPUMALANGA |
BALFOUR (MPUMALANGA) |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES |
051615 |
5B |
2016/05/19 |
4 |
1288949,47 |
314500,00 |
SIBONGILE THEMBISILE FLORENCE TRADING CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
MPUMALANGA |
BETHAL |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES |
051616 |
5B |
2016/07/29 |
6 |
2100000,00 |
850000,00 |
SILIDI PROJECTS CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
MPUMALANGA |
VARIOUS CENTRES : MPUMALANGA |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES:GROU P1:ACORNHOEK,MHALA,WHITE RIVER,SABIE |
054021 |
5B |
2017/12/13 |
12 |
3112057,79 |
672381,00 |
TODAY'S DESTINY 47 JV SHWINGS |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
MPUMALANGA |
VARIOUS CENTRES : MPUMALANGA |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES:GROU P2:NSIKAZI,KANYAMAZANE,LYDENBURG |
054022 |
5B |
2017/03/13 |
9 |
2605852,00 |
924167,00 |
MOLANCO TRADING ENTERPRISE (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
MPUMALANGA |
VARIOUS CENTRES : MPUMALANGA |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES:GROU P3:MDUTYANA,MKOBOLA,KWAMMHLANGA |
054023 |
5B |
2017/03/27 |
9 |
1616068,50 |
650094,28 |
MUSAN TRADING ENTERPRISE CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
MPUMALANGA |
VARIOUS CENTRES : MPUMALANGA |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES:GROU P4:ERMELO,CAROLINA,BREYTEN |
054025 |
5B |
2017/03/13 |
9 |
1697215,80 |
525852,55 |
MOLANCO TRADING ENTERPRISE (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
MPUMALANGA |
VARIOUS CENTRES : MPUMALANGA |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES:GROU P5:BELFAST,SECUNDA,DAVEL |
054026 |
5B |
2017/04/12 |
9 |
1800000,00 |
1301483,50 |
MUSAN TRADING ENTERPRISE CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
MPUMALANGA |
VARIOUS CENTRES : MPUMALANGA |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF GACILITIES FOR PEOPLE WITH DISABILITIES:GROU P6:VOLKSRUST,PIET RETIEF,AMSTERDAM |
054027 |
5B |
2017/07/27 |
9 |
1888413,53 |
445937,00 |
SIYEPHI TRADING PROJECTS CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
EASTERN CAPE |
PORT ELIZABETH |
HIGH COURT |
ADDITIONAL ACCOMMODATION REPAIR AND RENOVATIONS |
045933 |
5B |
2017/09/29 |
24 |
129823286,63 |
17092730,00 |
ALFDAV CONSTRUCTION CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
EASTERN CAPE |
DIMBAZA |
PERIODICAL COURT |
CONSTRUCTION OF A NEW BUILDING |
046173 |
5B |
2018/01/10 |
24 |
89924943,24 |
16643229,07 |
TRANSTRUCT (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
EASTERN CAPE |
VARIOUS CENTRES (EC) |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES:GROU P1:ALEXANDRIA,PORT ALFRED |
053920 |
5B |
2017/04/12 |
8 |
785573,15 |
0,00 |
CELISCAN (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
EASTERN CAPE |
VARIOUS CENTRES (EC) |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PERSONS WITJH DISABILITIES:GR OUP2:CRADOCK,SOMERSET EAST |
053921 |
5B |
2016/06/14 |
6 |
1574928,24 |
0,00 |
S FOURIE |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
EASTERN CAPE |
VARIOUS CENTRES (EC) |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES:GROU P4:JOUBERTINA,KIRKWOOD,PORT ELIZABETH |
053923 |
5B |
2016/07/14 |
9 |
3744103,22 |
0,00 |
MSNH MAINTENANCE |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
EASTERN CAPE |
VARIOUS CENTRES (EC) |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF FACILITIES FOR PEOPLE WITH DISABILITIES:GROU P5:KEISKAMMAHOEK,PEDDIE,STUTTERHEIM |
053924 |
5B |
2016/11/09 |
27 |
1076119,10 |
0,00 |
TYS DEVELOPERS CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
GAUTENG |
PRETORIA |
PALACE OF JUSTICE |
HERITAGE - MODIFICATION, UPGRADING AND AUDIT OF SECURITY SYS TEMS IN HIGH COURT AND PALACE OF JUSTICE. |
042109 |
5B |
2016/06/02 |
18 |
25744559,66 |
7330998,76 |
GEORGE THOMAS T/A TRICOR SALES & SERVICE |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
GAUTENG |
MAMELODI |
MAGISTRATE'S OFFICE |
CONSTRUCTION OF A NEW BUILDING |
044028 |
5B |
2018/05/25 |
30 |
112147259,68 |
36023566,56 |
FIKILE CONSTRUCTION (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
GAUTENG |
PRETORIA |
MAGISTRATE'S OFFICE |
REFURBISHMENT OF ABLUTION FACILITY FOR PERSON WITH DISABILIT Y |
054388 |
5B |
2016/01/31 |
3 |
65221,80 |
0,00 |
L AND M TUMO TRADERS CONSTRUCTION AND PROJECTS |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
EASTERN CAPE |
BITYI |
PERIODICAL COURT |
CONSTRUCTION OF A NEW BUILDING |
044390 |
5B |
2018/01/10 |
20 |
62566269,50 |
10042756,76 |
DEWING CONSTRUCTION (PTY) LTD |
RURAL DEVELOPMENT AND LAND REFORM |
KWAZULU-NATAL |
LADYSMITH (KZN) |
|
NO 49 BEACON STREET: UPGRADING OF ACCOMMODATION |
052548 |
5B |
2016/08/22 |
6 |
6973536,00 |
0,00 |
KHONZI TRADING AND PROJECTS CC |
SA POLICE SERVICE |
FREESTATE |
GARIEP DAM |
POLICE STATION |
INSTALLATION OF GENERATOR SETS AT NO N DEVOLVED POLICE STATIONS |
054500 |
5B |
2017/03/14 |
6 |
1356408,08 |
79480,80 |
BNM CIVIL CONSTRUCTION CC |
SA POLICE SERVICE |
WESTERN CAPE |
CAPE TOWN |
STORES DEPOT |
EPPING STORES DEPOT: REPAIR ROOFS AND ASSOCIATED INFRASTRUCT URE |
044673 |
5B |
2017/04/12 |
18 |
95749155,11 |
9618300,00 |
GVK-SIYA ZAMA BUILDING CONTRACTORS (PTY) LTD |
SA POLICE SERVICE |
WESTERN CAPE |
FAURE |
SHOOTING RANGE |
SAPS COMLEX: UPGRADING OF CIVIL ENGINEER INFRASTRUCTURE |
048854 |
5B |
2017/04/19 |
8 |
16735332,12 |
3641015,00 |
UMZALI CIVILS PTY LTD |
SA POLICE SERVICE |
WESTERN CAPE |
CAPE TOWN |
POLICE STATION |
INSTALLATION OF GENERATOR SETS AT NON DEVOLVED FACILITIES IN THE WESTERN CAPE REGION |
053467 |
5B |
2018/09/13 |
30 |
11508990,65 |
1163800,00 |
LITE-LINE ELECTRICAL CC |
SA POLICE SERVICE |
KWAZULU-NATAL |
DONNYBROOK |
PROJECT VYFSTER |
REPAIR AND RENOVATION: CONSTRUCTION OF ADDITIONAL ACCOMMODAT ION. |
011014 |
5B |
2017/03/23 |
6 |
81583095,40 |
21848000,00 |
RAMBROS CONSTRUCTION CC |
SA POLICE SERVICE |
KWAZULU-NATAL |
MELMOTH |
PROJECT VYFSTER |
REPAIR AND RENOVATION: UPGRADING AND CONSTRUCTION OF ADD ACC |
013016 |
5B |
2017/07/11 |
30 |
93362031,57 |
16247324,70 |
PAN AFRICAN DEVELOPMENT (PTY) |
SA POLICE SERVICE |
KWAZULU-NATAL |
SAWOTI |
PROJECT VYFSTER |
COURT: LIVING QUARTERS: CELLS: NEWLY BUILD, REPAIR AND RENOV ATE AND CONVERSION OF FACILITIES. |
013020 |
5B |
2016/11/01 |
24 |
70503212,29 |
18378189,25 |
TOKOLOGO TECHNICAL ASSIGNMENTS |
SA POLICE SERVICE |
KWAZULU-NATAL |
COLENSO |
S A POLICE COMPLEX |
REPAIRS &RENOVATIONS TO STATION. UPGRADING OF EXISTING CELLS . DEMOLISH OLD STRUCTURES. CONSTRUCTION OF ADD ACC. |
035895 |
5B |
2017/06/30 |
24 |
67628628,52 |
10896688,89 |
SIYAXHASANA CONSTRUCTION CC |
SA POLICE SERVICE |
KWAZULU-NATAL |
DURBAN |
|
KZN: KWA-MASHU: REPAIR AND RENOVATIONS TO EXISTING POLICE ST ATION AND SINGLE QUARTERS |
041851 |
5B |
2016/06/24 |
36 |
82906835,92 |
29973706,61 |
RODPAUL CONSTRUCTION CC |
SA POLICE SERVICE |
KWAZULU-NATAL |
NTUZUMA |
POLICE STATION |
CONSTRUCTION OF CCTV CONTROL ROOM |
046725 |
5B |
2017/11/10 |
14 |
16838823,68 |
4355889,22 |
UMZINGWANE CONSTRUCTION AND PROJECTS |
SA POLICE SERVICE |
KWAZULU-NATAL |
DURBAN |
POLICE STATION |
INSTALLATION OF GENERATOR SET AT VARIOUS POLICE STATIONS |
053376 |
5B |
2019/07/13 |
36 |
18057083,34 |
0,00 |
POLO ELECTRICAL CC |
SA POLICE SERVICE |
EASTERN CAPE |
MALUTI |
MILITARY BASE |
INSTALLATION OF TEMPORARY WATER SUPPLY BACKUP SYSTEM |
054217 |
5B |
2016/09/06 |
3 |
423808,10 |
380004,00 |
VITSHA PM CONSULTANTS CC |
SA POLICE SERVICE |
NORTHERN CAPE |
KIMBERLEY |
POLICE STATION |
INSTALLATION OF GENERATOR SETS AT POLICE STATIONS : DOUGLAS, GRIEKWASTAD, HOPETOWN, JAN KEMPDORP, MODERIVIER, PAMPIERSTAD , WARRENTON AND KOOPMANSFONTEIN |
053831 |
5B |
2017/01/25 |
6 |
2478047,70 |
241895,28 |
ANIL M JESSA CC |
SA POLICE SERVICE |
NORTHERN CAPE |
DE AAR |
POLICE STATION |
INSTALLATION OF GENERATOR SETS AT COLESBURG, SUNRISE, PETRUS VILLE, NONZWAKAZI, VOSBURG AND CALVINIA |
053850 |
5B |
2016/03/02 |
6 |
2441939,85 |
217494,90 |
ANIL M JESSA CC |
SA POLICE SERVICE |
NORTH WEST |
ZEERUST |
POLICE STATION |
CONSTRUCTION OF ADDITIONAL ACCOMMODATION AND REPAIRS AND RENOVATIONS TO EXISTING FACILITIES |
043801 |
5B |
2017/11/02 |
30 |
80551731,70 |
13936667,60 |
K2017341003 (SOUTH AFRICA)(PTY) LTD |
SA POLICE SERVICE |
MPUMALANGA |
NELSPRUIT |
POLICE STATION |
INSTALLATION OF A GENERATOR SET AT VARIOUS POLICE STATIONS |
053490 |
5B |
2017/03/30 |
12 |
4386923,60 |
500000,00 |
MAMLI PROJECTS CC |
SA POLICE SERVICE |
LIMPOPO |
MANKWENG |
POLICE STATION |
PROJECTS_5 STAR, UPGRADE OF POLICE STATION AND CONSTRUCTION OF 8 ADDITIONAL OFFICES,CELLS AND LIVING QUARTERS |
014335 |
5B |
2017/03/28 |
24 |
60790429,07 |
7991779,71 |
MUMS BUSINESS ENTERPRISE CC |
SA POLICE SERVICE |
LIMPOPO |
VUWANI |
POLICE STATION |
PROJECT 5 STAR, UPGRADING OF POLICE STATION AND CONSTRUCTION OF ADDITIONAL OFFICES |
039789 |
5B |
2017/04/04 |
18 |
29090508,73 |
9020181,33 |
DWELLING INNOVATIONS CC |
SA POLICE SERVICE |
LIMPOPO |
DZANANI |
POLICE STATION |
UPGRADING OF POLICE STATION,REPAIR AND RENOVATION OF EXISTIN G OFFICE BLOCK & CONSTRUCTION OF ADDITIONAL ACCOMMODATION |
039804 |
5B |
2018/05/02 |
24 |
66140096,40 |
12168525,33 |
CHRYSELDA BUILDING CONSTRUCTION CC |
SA POLICE SERVICE |
LIMPOPO |
TOLWE |
S A POLICE QUARTERS |
CONSTRUCTION OF NEW CSC,MARRIED & SINGLE QUARTERS,CONVERSION OF EXISTING CELL BLOCK TO GENERAL STOREAND REPAIR AND RENOV ATION TO EXISTING BUILDINGS |
040352 |
5B |
2017/11/07 |
24 |
43885004,75 |
6710400,56 |
MORETENG INVESTMENTS (PTY) LTD |
SA POLICE SERVICE |
LIMPOPO |
HLOGOTLOU |
POLICE STATION |
REPAIR AND RENOVATION, UPGRADING, CONVERSION AND NEWLY BUILT FACILITIES |
042527 |
5B |
2017/03/20 |
30 |
71035179,69 |
12742196,00 |
ATILE INVESTMENT CC |
SA POLICE SERVICE |
EASTERN CAPE |
PORT ELIZABETH |
POLICE STATION |
COMPLETE UPGRADING OF THE SAPS COMPLEX INCLUDING PARKING |
027026 |
5B |
2017/06/22 |
24 |
58398723,04 |
11706835,57 |
TRANSTRUCT (PTY) LTD |
SA POLICE SERVICE |
EASTERN CAPE |
WHITTLESEA |
POLICE STATION |
CONSTRUCTION OF UNDERCOVER PARKING |
046836 |
5B |
2016/12/01 |
8 |
1301141,39 |
309700,00 |
NDZAMELA CONSTRUCTION |
SA POLICE SERVICE |
EASTERN CAPE |
GRAAFF-REINET |
POLICE COLLEGE |
ACADEMY: COMPLETE UPGRADING OF EXISTING BOUNDARY FENCE TO COMPLEX |
049997 |
5B |
2016/03/29 |
8 |
5917246,21 |
1320000,00 |
POENIE'S BUILDERS CC |
SA POLICE SERVICE |
EASTERN CAPE |
GONUBIE |
POLICE STATION |
SUPPLY, DELIVERY AND COMPLETE INSTALLATION OF GENERATOR SET |
050011 |
5B |
2017/01/03 |
6 |
665699,58 |
90000,00 |
RAM ELECTRICAL AND CIVIL CONTRACTORS (PTY) LTD |
SA POLICE SERVICE |
EASTERN CAPE |
PORT ELIZABETH |
POLICE STATION |
KWA ZAKHELE: COMPLETE CONSTRUCTION OF BOUNDARY FENCE |
050138 |
5B |
2016/10/10 |
8 |
4375764,03 |
603000,00 |
BLUE DISA TRADING 754 CC |
SA POLICE SERVICE |
EASTERN CAPE |
PORT ELIZABETH |
POLICE STATION |
SOUTHDENE GARAGE: COMPLETE CONSTRUCTION BOUNDARY WALL/ FENCE |
050144 |
5B |
2016/12/17 |
8 |
6950782,99 |
1470000,00 |
TWIZZA CIVLS AND BUILDING CC |
SA POLICE SERVICE |
EASTERN CAPE |
ADDO |
POLICE STATION |
ADDO ACADEMY: COMPLETE CONSTRUCTION OF BOUNDARY FENCE (8KM) |
050387 |
5B |
2017/05/18 |
9 |
6067463,24 |
1158500,00 |
RC ORBAN |
SA POLICE SERVICE |
EASTERN CAPE |
STEYTLERVILLE |
POLICE STATION |
ACQUISITION OF LAND: ERF 610: PROPOSED ADDITIONAL OFFICE ACC OMMODATION |
050487 |
5B |
2016/09/14 |
9 |
78935,00 |
0,00 |
DEPARTMENT OF JUSTICE (COURTS) |
SA POLICE SERVICE |
EASTERN CAPE |
WHITTLESEA |
POLICE STATION |
UPGRADE OF ELECTRICITY SUPPLY |
050715 |
5B |
2016/09/05 |
6 |
492898,28 |
235000,00 |
POENIE'S BUILDERS CC |
SA POLICE SERVICE |
GAUTENG |
PRETORIA |
|
BON ACCORD: NATIONAL INTERVENTION UNIT: LAVENDER RD |
030805 |
5B |
2015/01/16 |
24 |
127428694,98 |
34764001,01 |
MOKOENA-PHUMI CONSTRUCTION AND PROJECTS CC |
SA POLICE SERVICE |
GAUTENG |
MABOPANE |
POLICE STATION |
CONSTRUCTION OF POLICE STATION AND SINGLE QUARTERS |
033753 |
5B |
2017/05/10 |
24 |
31581451,41 |
5863142,85 |
ZIDLAPHI KGOMO AND ASSOCIATES CC |
SA POLICE SERVICE |
GAUTENG |
PRETORIA |
CENTRAL POLICE STATION AND SINGLE QUARTERS |
SEALING OF ROOF OF RESIDENTIAL BLOCK,REPLACEMENT OF DOWN PIP ES AND UPGRADING OF WET SERVICES |
039074 |
5B |
2016/06/14 |
9 |
16725780,70 |
7929042,86 |
SPLISH SPLASH CONSTRUCTION CC |
SA POLICE SERVICE |
GAUTENG |
PRETORIA |
DOG SCHOOL |
REPLACEMENT OF EXISTING SECURITY FENCE, UPGRADE OF THE FIRE BREAK ROAD AND PROVISION OF TWO ENTRANCE GATES |
050128 |
5B |
2016/01/03 |
18 |
29529302,11 |
5774563,80 |
ZIDLAPHI KGOMO AND ASSOCIATES CC |
SA POLICE SERVICE |
GAUTENG |
CENTURION |
POLICE STATION |
SAPS: ERASMIA: CONNECTION OF SERVICES TO ERVEN 656 & 657 |
050143 |
5B |
2016/12/09 |
6 |
17472393,17 |
5599284,29 |
ISIPHIWO TRADING CC |
SA POLICE SERVICE |
EASTERN CAPE |
UMTATA |
RADIO CONTROL CENTRE |
CENTRAL POLICE STATION: CONSTRUCITON OF 10111 RADIO CONTROL CENTRE |
045954 |
5B |
2014/12/15 |
20 |
51221273,41 |
14973253,97 |
KGAFELA CONSTRUCTION CC |
SA POLICE SERVICE |
EASTERN CAPE |
LUSIKISIKI |
|
CONSTRUCTION OF NEW POLICE STATION ON PORTION 1 OF ERF 49 |
040174 |
5B |
2016/12/12 |
18 |
64246718,15 |
17324540,40 |
BRIGHT HOMES CONSTRUCTION PTY LTD |
- DPW CAPITAL - PROJECTS ON CONSTRUCTION PHASE
CLIENT DEPT |
PROVINCE |
TYPE |
TOWN |
COMPLEX |
DESCRIPTION |
WCS NO |
STATUS |
ANTICIPATED PRACTICAL COMPLETION |
CONTRACT PERIOD |
CONTRACTOR CASH FLOW AMOUNT |
CONSULTANT CASH FLOW AMOUNT |
CONTRACTOR'S NAME |
PUBLIC WORKS |
EASTERN CAPE |
LAND PORTS OF ENTRY |
MONANTSA PASS |
|
MAINTENANCE AND REPAIRS OF BUILDINGS, CIVIL, MECHANICAL AND ELECTRICAL INFRASTRUCTURE AND INSTALLATIONS: 6 MONTHS INTERI M FACILITY MANAGEMENT/RAMP CONTRACT |
054784 |
5B |
2016/12/16 |
6 |
419465,13 |
0 |
LA NATURA (PTY) LTD |
PUBLIC WORKS |
WESTERN CAPE |
DEPARTMENTAL |
CAPE TOWN |
SERVICE PRODUCTS |
UPGRADING OF NDABENI AND EPPING SERVICE PRODUCTS |
046599 |
5B |
2017/08/14 |
21 |
46625354,54 |
5855249,28 |
PREMA RACITI CONSTRUCTION CC |
PUBLIC WORKS |
WESTERN CAPE |
DEPARTMENTAL |
CAPE TOWN |
RESEARCH STATION |
ANTARTICA ISLAND: SANAE IV: REFURBISHMENT OF THE EXISTING BA SE |
049596 |
5B |
2019/01/21 |
40 |
177782983,2 |
15912808,67 |
NOLITHA ELECTRICAL (PTY) LTD |
PUBLIC WORKS |
WESTERN CAPE |
ACCESSIBILITY |
KNYSNA |
PRISON |
INSTALLATION OF FACILITIES FOR PEOPLE WITH DISABILITIES |
048761 |
5B |
2017/05/26 |
3 |
487974,73 |
0 |
SOUTH WEST CONTRACTORS |
PUBLIC WORKS |
WESTERN CAPE |
ACCESSIBILITY |
WORCESTER |
POLICE STATION |
INSTALLATION OF FACILITIES FOR PEOPLE WITH DISBILITIES |
048770 |
5B |
2013/05/21 |
6 |
667339,47 |
0 |
MAJIET BUILDERS CC |
PUBLIC WORKS |
WESTERN CAPE |
ACCESSIBILITY |
BREDASDORP |
AIR FORCE BASE |
INSTALLATION OF FACILITIES FOR PEOPLE WITH DISABILITIES |
048771 |
5B |
2017/04/02 |
6 |
719358,1 |
0 |
SOUTH WEST CONTRACTORS |
PUBLIC WORKS |
WESTERN CAPE |
PRESTIGE |
CAPE TOWN |
PARLIAMENTARY VILLAGES |
UPGRADING OF ACCESS CONTROL AT THE THREE PARLIAMENTARY VILLA GES BY MEANS OF USING AN ELECTRONIC SOFTWARE. |
042638 |
5B |
2015/10/12 |
8 |
37452925,42 |
8398902,4 |
BAMBANA MANAGEMENT SERVICES (PTY) LTD |
PUBLIC WORKS |
WESTERN CAPE |
PRESTIGE |
CAPE TOWN |
PARLIAMENTARY COMPLEX |
SWANS GARAGE: REDESIGN TO OPTIMALLY UTILIZE SPACE |
053095 |
5B |
2017/03/29 |
12 |
13772105,89 |
729791,13 |
NOLITHA ELECTRICAL (PTY) LTD |
PUBLIC WORKS |
GAUTENG |
DEPARTMENTAL |
JOHANNESBURG |
SERVICE PRODUCTS |
DEPT OF LABOUR: UPGRADE OF INFRASTRUCTURE (ROADS,PAVEMENT,ST ORM WATER,DRAINAGE SYSTEM INCLUDING BUILDINGS) AT VILLAGE MA IN & SPRINGFILEDS |
046600 |
5B |
2017/07/27 |
24 |
48796091,89 |
6303751,11 |
LANCE MANAGEMENT SERVICES CC |
PUBLIC WORKS |
GAUTENG |
PRESTIGE |
PRETORIA |
RESIDENTIAL |
SECURITY MEASURES AT 321 RIGEL STREET, WATERKLOOF RIDGE |
048576 |
5B |
2015/12/03 |
12 |
3000000 |
3000000 |
COEGA DEVELOPMENT CORP (PTY) LTD |
PUBLIC WORKS |
EASTERN CAPE |
DEPARTMENTAL |
PORT ELIZABETH |
SERVICE PRODUCTS |
DEPT OF LABOUR:PORT ELIZABETH EMPLOYMENT FACTORY: COMPLETE R EPAIRS AND RENOVATIONS |
046603 |
5B |
2015/08/19 |
16 |
33067434,65 |
6707215 |
LAWRENCE AND VICTOR CC |
PUBLIC WORKS |
EASTERN CAPE |
DEPARTMENTAL |
PORT ELIZABETH |
EBEN DONGES BUILDING |
ALTERATIONS AND REFURBISHMENT INCLUDING AIR CONDITIONING AND MECHANICAL INSTALLATION |
049911 |
5B |
2018/03/22 |
8 |
84611785 |
8990662,63 |
NATHAN ALEC DATNOW T/A SHAWSHANK CONSTRUCTION |
PUBLIC WORKS |
GAUTENG |
ACCESSIBILITY |
CENTURION |
MILITARY BASE |
INSTALLATION OF FACILITIES FOR PEOPLE WITH DISABILITIES AT LYTTELTON DOD |
048739 |
5B |
2017/10/11 |
6 |
2888473,14 |
0 |
HILLPET GENERAL DEALER CC |
PUBLIC WORKS |
GAUTENG |
ACCESSIBILITY |
HAMMANSKRAAL |
|
DITHOLO MILITARY TRAINING COLLEGE:INSTALLATION OF FACILITIES FOR PEOPLE WITH DISABILITIES |
048763 |
5B |
2017/03/02 |
4 |
304881,6 |
0 |
PT LESHEGO TRADING AND PROJECTS(PTY)LTD |
PUBLIC WORKS |
GAUTENG |
PRESTIGE |
PRETORIA |
BRYNTIRION |
HERITAGE - CONSTRUCTION OF GATE 3 AND REFURBISHMENT OF EXIST ING GATE 4 |
044051 |
5B |
2017/06/29 |
18 |
19491791,97 |
7628106,3 |
EASY SECURITY AUTO GATES AND GUARDS CC |
PUBLIC WORKS |
GAUTENG |
PRESTIGE |
PRETORIA |
UNION BUILDINGS |
HERITAGE - JAKARANDA PROJECT |
048582 |
5B |
2015/11/30 |
12 |
30443000 |
0 |
COEGA DEVELOPMENT CORP (PTY) LTD |
PUBLIC WORKS |
GAUTENG |
PRESTIGE |
PRETORIA |
|
INSTALLATION OF SECURITY MEASURES AT 287 ALBERT STREET |
052426 |
5B |
2015/11/02 |
6 |
5577592,5 |
2600000 |
COEGA DEVELOPMENT CORP (PTY) LTD |
PUBLIC WORKS |
GAUTENG |
PRESTIGE |
PRETORIA |
|
INSTALLATION OF SECURITY MEASURES AT 238 INDUS STREET |
052427 |
5B |
2015/11/02 |
6 |
3113781,49 |
120999 |
COEGA DEVELOPMENT CORP (PTY) LTD |
PUBLIC WORKS |
GAUTENG |
DOLOMITE |
PRETORIA |
|
DRMS PHASE 4: EMERGENCY INVESTIGATIONS IN SUPPORT OF THE DOLOMITE RISK MANAGEMENT STRATEGY FOR THE NATIONAL DEPARTMENT OF PUBLIC WORKS |
049316 |
5B |
2016/02/27 |
36 |
13712670,12 |
0 |
KNIGHT PIESOLD (PTY) LTD |
PUBLIC WORKS |
GAUTENG |
INNER CITY REGENERATION |
PRETORIA |
|
SALVOKOP: BULK SERVICES FOR STATSSA |
052360 |
5B |
2015/10/26 |
7 |
54519595,19 |
13701351,24 |
STATS SA D AND C JV |
PUBLIC WORKS |
GAUTENG |
DEPARTMENTAL |
PRETORIA |
CIVITAS BUILDING |
REPLACEMENT OF LIFTS |
052129 |
5B |
2016/09/20 |
32 |
55323905,49 |
3000000 |
OTIS (PROPRIETARY) LTD |
PUBLIC WORKS |
GAUTENG |
DOLOMITE |
PRETORIA |
SWARTKOP AIR FORCE BASE |
UPGRADING OF WET SERVICES |
044991 |
5B |
2016/02/24 |
24 |
74238616,36 |
5130000 |
BOFEPI PROJECT MANAGEMENT CC |
PUBLIC WORKS |
GAUTENG |
DOLOMITE |
CENTURION |
POLICE COMPLEX |
WIERDA BRIDGE, ERASMIA, IRENE COMMAND AND HOME AFFAIRS: DOLO MITE RISK MANAGEMENT: UPGRADING OF CIVIL ENGINEERING SERVICE S |
045688 |
5B |
2017/11/07 |
10 |
9584996,86 |
1850000 |
MAAUASO PROJECT CC |
PUBLIC WORKS |
GAUTENG |
DOLOMITE |
PRETORIA |
|
DRMS: DOD & SAAF 68 AIR SCHOOL NORTH AND SOUTH: BULK WATER CONNECTION AND SECONDARY ENGINEERING SERVICES: REPLACEMENT AND UPGRADE |
047888 |
5B |
2017/11/08 |
26 |
87400160,45 |
8208000 |
SOUTH SOUND CIVILS/ EXEO KHOKELA CIVIL JOINT VENTURE |
PUBLIC WORKS |
LIMPOPO |
LAND PORTS OF ENTRY |
STOCKPOORT |
BORDER POST |
LAND PORTS OF ENTRY: GROBLERS BRIDGE AND STOCKPOORT: APPOINT MENT OF CONSULTANTS: MAINTENANCE AND SERVICING OF BUILDING, CIVIL MECHANICAL AND ELECTRICAL INFRASTRUCTURE AND INSTALLA |
052734 |
5B |
2019/06/21 |
36 |
39933817,76 |
1647900,78 |
CALEDON RIVER PROPERTIES CC |
PUBLIC WORKS |
NORTH WEST |
LAND PORTS OF ENTRY |
VARIOUS CENTRES: NORTH WEST |
BORDER POSTS |
BRAY, MAKGOBISTAD AND SWARTKOPFONTEIN: MAINTENANCE, SERVICIN G AND REPAIR OF BUILDINGS, CIVIL, MECHANICAL AND ELECTRICAL INFRASTRUCTURE AND INSTALLATIONS |
052982 |
5B |
2019/03/29 |
36 |
21651162,97 |
2465000 |
CALEDON RIVER PROPERTIES CC |
PUBLIC WORKS |
NORTH WEST |
LAND PORTS OF ENTRY |
VARIOUS CENTRES: NORTH WEST |
BORDER POSTS |
RAMATLABAMA, KOPFONTEIN AND DERDEPOORT: 36 MONTHS MAINTENANC E, SERVICING AND REPAIR OF BUILDINGS, CIVIL, MECHANICAL AND ELECTRICAL INFRASTRUCTURE AND INSTALLATIONS |
052983 |
5B |
2019/06/21 |
36 |
41434266,46 |
2020437,51 |
CALEDON RIVER PROPERTIES CC |
PUBLIC WORKS |
MPUMALANGA |
LAND PORTS OF ENTRY |
OSHOEK |
BORDER POST |
CONSTRUCTION/IMPLEMENTATION OF CRASH CUSHIONS/BARRIERS |
053327 |
5B |
2015/12/09 |
6 |
2789409,8 |
304699,2 |
SHAICON TENDERING SERVICES |
PUBLIC WORKS |
MPUMALANGA |
LAND PORTS OF ENTRY |
JEPPES REEF |
BORDER POSTS |
MAINTANANCE,SERVICING AND REPAIRS OF BUILDINGS,CIVIL MECHANICAL AND ELECTRICAL INFRASTRUCTURE AND INSTALLATIONS |
053366 |
5B |
2019/08/30 |
36 |
14220232,26 |
0 |
LA NATURA (PTY) LTD |
PUBLIC WORKS |
NORTHERN CAPE |
LAND PORTS OF ENTRY |
MCCARTHYSRUST |
BORDER POSTS |
BCOCC: MAINTANANCE AND SERVICING OF BUILDINGS, CIVIL, MECHANICAL AND ELECTRICAL INFRASTRUCTURE AND INSTALLATIONS |
053776 |
5B |
2019/06/13 |
36 |
31107662,5 |
2650000 |
RUWACON (PTY) LTD |
PUBLIC WORKS |
NORTHERN CAPE |
LAND PORTS OF ENTRY |
VIOOLSDRIFT |
BORDER POSTS |
MAINTENANCE AND SERVICING OF BUILDINGS, CIVIL, MECHANICAL AN D ELECTRICAL INFRASTRUCTURE AND INSTALLATIONS AT ALEXANDER B AY AND VIOOLSDRIFT |
053777 |
5B |
2019/06/13 |
36 |
47699963,52 |
2940000 |
RUWACON (PTY) LTD |
PUBLIC WORKS |
NORTHERN CAPE |
LAND PORTS OF ENTRY |
GEMSBOK |
BORDER POST |
MAINTENANCE AND SERVICING OF BUILDINGS, CIVIL, MECHANICAL AN D ELECTRICAL INFRASTRUCTURE AND INSTALLATIONS AT GEMSBOK, TW EE RIVIEREN AND RIETFONTEIN PORTS OF ENTRY |
053820 |
5B |
2019/06/14 |
36 |
25240177,65 |
2200000 |
RUWACON (PTY) LTD |
PUBLIC WORKS |
NORTHERN CAPE |
LAND PORTS OF ENTRY |
NAKOP |
BORDER POST |
MAINTENANCE AND SERVICING OF BUILDINGS, CIVIL, MECHANICAL AN D ELECTRICAL INFRASTRUCTURE AND INSTALLATIONS AT NAKOP AND ONSSEEPKANS PORTS OF ENTRY |
053821 |
5B |
2019/06/13 |
36 |
22192989,34 |
2100000 |
RUWACON (PTY) LTD |
PUBLIC WORKS |
EASTERN CAPE |
ACCESSIBILITY |
BARKLY EAST |
PRISON |
COMPLETION OF CONTRACT 1 |
048402 |
5B |
2017/08/07 |
3 |
772582,09 |
0 |
CONSA TRADING |
- PMTE MAINTENANCE - PROJECTS ON CONSTRUCTION PHASE
CLIENT DEPT |
PROVINCE |
TOWN |
COMPLEX |
DESCRIPTION |
WCS NO |
STATUS |
ANTICIPATED PRACTICAL COMPLETION |
CONTRACT PERIOD |
CONTRACTOR CASH FLOW AMOUNT |
CONSULTANT CASH FLOW AMOUNT |
CONTRACTOR'S NAME |
PUBLIC WORKS |
KWAZULU-NATAL |
ESHOWE |
OFFICE BLOCK |
HERITAGE - REHABILITATION OF SANDF: JOHN ROSS HIGHWAY |
046985 |
5B |
2017/07/04 |
24 |
51976303,72 |
14318436,58 |
TAURIS GARDEN TRADING 500CC |
PUBLIC WORKS |
KWAZULU-NATAL |
PIETERMARITZBURG |
WORKSHOPS |
REHABILITATION OF OLD DPW WORKSHOPS ON PRINCE EDWARD STREET |
050033 |
5B |
2019/06/01 |
30 |
247539864,2 |
45538151,41 |
EMB JOINT VENTURE |
PUBLIC WORKS |
GAUTENG |
BRAKPAN |
|
REHABILITATION OF OFFICES FOR ANY CLIENT DEPARTMENT (79 HIGH STREET) |
049345 |
5B |
2018/04/21 |
18 |
31412907,43 |
5811387,8 |
KWAGGA HOLDINGS (PTY)LTD |
PUBLIC WORKS |
NORTHERN CAPE |
KIMBERLEY |
|
REHABILITATION OF BUILDINGS FOR SAPS (ROODEPAN) |
049340 |
5B |
2018/02/27 |
12 |
5359602,27 |
1900000 |
MMANYANE CONSTRUCTION |
PUBLIC WORKS |
MPUMALANGA |
NELSPRUIT |
|
REHABILITATION OF OLD PRISON IN ERMELO,ERF NO.73IT |
050782 |
5B |
2017/12/28 |
18 |
26246002,61 |
6790852,38 |
MUSAN TRADING ENTERPRISE CC |
PUBLIC WORKS |
LIMPOPO |
TZANEEN |
LABOUR BUILDING |
HERITAGE - REHABILITATION OF EXISTING BUILDING FOR SAPS |
044323 |
5B |
2012/07/16 |
18 |
3447230,7 |
1299845,34 |
MEONDO JV QCOBS |
PUBLIC WORKS |
GAUTENG |
PRETORIA |
CENTRAL GOVERNMENT OFFICES |
HERITAGE - UPGRADING |
041384 |
5B |
2008/03/05 |
18 |
41384120,18 |
9158472,98 |
SIGHT LINES PIPE SURVEY SERVICES (PTY) LTD |
PUBLIC WORKS |
GAUTENG |
PRETORIA |
|
HERITAGE - 38 CHURCH SQUARE (OLD RESERVE BANK BUILDING): UPG RADING |
044271 |
5B |
2016/02/27 |
10 |
65000000 |
22252981,17 |
MORONGWA BUSINESS ENTERPRISE AND VICMOL CONSTRUCTION |
PUBLIC WORKS |
GAUTENG |
PRETORIA |
CENTRAL GOVERNMENT OFFICES |
INSTALLATION OF INTERIM SECURITY MANAGEMENT EQUIPMENT |
046538 |
5B |
2019/11/22 |
36 |
38032190,58 |
3691013,6 |
COOL BREEZE AIRCONDITIONING & REFRIGERATION CC |
PUBLIC WORKS |
GAUTENG |
PRETORIA |
MAGISTRATE'S OFFICE |
RESTORATION OF OLD MAGISTRATE COURT |
049065 |
5B |
2018/04/25 |
18 |
173163445,1 |
23667022,51 |
LUBBE CONSTRUCTION (PTY) LTD |
ARTS AND CULTURE |
WESTERN CAPE |
CAPE TOWN |
|
HERITAGE - ROBBEN ISLAND: INTERVENTION STRATEGY FOR A COMPRE HENSIVE FACILITIES MANAGEMENT CONTRACT |
054104 |
5B |
2019/04/13 |
48 |
112000000 |
0 |
COEGA DEVELOPMENT CORP (PTY) LTD |
CORRECTIONAL SERVICES |
FREESTATE |
VENTERSBURG |
PRISON |
REPAIR AND RENOVATIONS |
040824 |
5B |
2018/05/25 |
17 |
7000286,4 |
1172300 |
JUA DEVELOPERS CC |
CORRECTIONAL SERVICES |
WESTERN CAPE |
SWELLENDAM |
BUFFELSJACHTRIVER PRISON |
REPAIRS TO BUILDINGS, AND RELATED SERVICES |
040703 |
5B |
2014/01/17 |
24 |
24126852 |
4000704,68 |
SEBATA SEBATANA VISION BUILD |
CORRECTIONAL SERVICES |
WESTERN CAPE |
CALEDON |
PRISON |
REPAIR OF BUILDINGS AND RELATED SERVICES |
040706 |
5B |
2014/01/17 |
24 |
37768062,54 |
3391967,36 |
SEBATA SEBATANA VISION BUILD |
CORRECTIONAL SERVICES |
WESTERN CAPE |
PAARL |
DRAKENSTEIN PRISON |
REPAIR AND MAINTENANCE OF PRISON BUILDINGS AND RELATED SERVICES |
040714 |
5B |
2017/12/08 |
24 |
44828728,51 |
6083350 |
NOLITHA ELECTRICAL (PTY) LTD |
CORRECTIONAL SERVICES |
WESTERN CAPE |
PORTERVILLE |
VOORBERG PRISON |
REPAIR OF HOUSING ACCOMMODATION, BUILDINGS AND RELATED SERVICES |
040842 |
5B |
2014/02/21 |
24 |
19418527,65 |
3894700 |
SEBATA SEBATANA VISION BUILD |
CORRECTIONAL SERVICES |
WESTERN CAPE |
GOODWOOD |
PRISON |
:REPAIRS TO BUILDINGS AND WET SERVICES |
044464 |
5B |
2019/09/28 |
36 |
52431123,77 |
5414475,27 |
NOLITHA ELECTRICAL (PTY) LTD |
CORRECTIONAL SERVICES |
WESTERN CAPE |
CAPE TOWN |
PRISON |
VOORBERG, OBIQUA, DWARSRIVIER PRISONS:REPAIR, MAINTENANCE & OPERATION OF WATER & SEWERAGE WORKS |
050784 |
5B |
2018/07/13 |
24 |
32525866,68 |
2803529,6 |
ZANA MANZI SERVICES PTY LTD |
CORRECTIONAL SERVICES |
EASTERN CAPE |
UMZIMKULU |
PRISON |
REPAIRS AND RENOVATIONS FOR BUILDING RELATED SERVICES. |
040818 |
5B |
2017/03/12 |
24 |
10839301,79 |
4990394,37 |
SIFIKILE BUSINESS ENTERPRISE CC |
CORRECTIONAL SERVICES |
KWAZULU-NATAL |
GLENCOE |
HOUSES |
REPAIRS AND RENOVATIONS TO 48 HOUSES |
041219 |
5B |
2018/06/14 |
18 |
26502630 |
10005088,14 |
CRYSTAL LAGOON INVESTMENTS 44 CC |
CORRECTIONAL SERVICES |
KWAZULU-NATAL |
EMPANGENI |
PRISON |
REPAIR AND MAINTENANCE OF ELECTRICAL AND MECHANICAL INSTALLA TION |
044012 |
5B |
2012/02/25 |
36 |
65755285,4 |
9758027,59 |
AERO-DUCT MOYA CC |
CORRECTIONAL SERVICES |
KWAZULU-NATAL |
DURBAN |
PRISON |
WESTVILLE REPAIR AND MAINTENANCE FOR STEAM LINES, CALORIFIED BOILERS AND KITCHEN EQUIPMENT |
044257 |
5B |
2015/01/23 |
36 |
106097943,9 |
11700000 |
TOKOLOGO TECHNICAL ASSIGNMENTS |
CORRECTIONAL SERVICES |
KWAZULU-NATAL |
PIETERMARITZBURG |
PRISON |
PIETERMARITZBURG OLD AND NEW PRISON : MAINTENACE FOR BULK ELECTRICAL AND MECHANICAL INSTALLATIONS |
044487 |
5B |
2017/09/07 |
36 |
70634555,84 |
13542495,47 |
MISHOE TRADING AND PROJECTS (PTY) LTD |
CORRECTIONAL SERVICES |
GAUTENG |
BOKSBURG |
PRISON |
GROUP 4 PRISONS:REPAIR AND UPGRADE OF BUILDINGS AND RELATED SERVICES:CONTRACT 1(PRISON PRECINT) |
037448 |
5B |
2018/07/27 |
24 |
88723368,97 |
24370697,12 |
LETLAPA BORWA CIVIL |
CORRECTIONAL SERVICES |
GAUTENG |
DEVON |
PRISON |
DEVON PRISON: CONDITION BASED MAINTENANCE FOR WATER AND SEWE R PLANT |
050236 |
5B |
2018/03/06 |
10 |
6881729,7 |
1824244,97 |
NICKELODIA TRADING (PTY) LTD |
CORRECTIONAL SERVICES |
GAUTENG |
HEIDELBERG (GAUTENG) |
PRISON |
HEIDELBERG PRISON: REPAIR MAINTENANCE OF ELECTRICAL AND MECHANICAL INSTALLATIONS |
051550 |
5B |
2018/01/26 |
24 |
28378826,38 |
2847699,21 |
SEBUSHI SOMO CONSTRUCTION AND PROJECTS |
CORRECTIONAL SERVICES |
GAUTENG |
NIGEL |
PRISON |
NIGEL PRISON: REPAIR AND MAINTENANCE OF ELECTRICAL AND MECHA NICAL INSTALLATIONS FOR 24 MONTHS |
051555 |
5B |
2018/04/24 |
24 |
43768378,55 |
4787490 |
SEBUSHI SOMO CONSTRUCTION AND PROJECTS |
CORRECTIONAL SERVICES |
GAUTENG |
VEREENIGING |
PRISON |
VEREENIGING PRISON: REPAIR AND MAINTENANCE OF ELECTRICAL AND MECHANICAL INSTALLATIONS |
051558 |
5B |
2017/09/29 |
24 |
36235923,33 |
4914418,35 |
SEBUSHI SOMO CONSTRUCTION AND PROJECTS |
CORRECTIONAL SERVICES |
NORTH WEST |
MOGWASE |
PRISON |
REPAIR AND UPGRADING OF THE ENTIRE CENTRE |
037481 |
5B |
2019/04/24 |
36 |
130026531,1 |
33144817 |
SEBUSHI SOMO CHUENE MATLALA JV |
CORRECTIONAL SERVICES |
NORTH WEST |
ROOIGROND |
PRISON |
REPAIR, MAINTENANCE AND OPERATIONS OF WATER SEWERAGE |
045603 |
5B |
2018/05/10 |
24 |
38248128 |
5503651,67 |
EXILITE 454 CC |
CORRECTIONAL SERVICES |
EASTERN CAPE |
GRAAFF-REINET |
PRISON |
REPAIR AND RENOVATIONS OF BUILDINGS,RELATED SERVICES, ELECTR ICAL AND MECHANICAL INSTALLATIONS AND CIVIL INFRSTRUCTURE |
037464 |
5B |
2017/05/11 |
14 |
21808636 |
7310000 |
RUWACON (PTY) LTD |
CORRECTIONAL SERVICES |
EASTERN CAPE |
COFIMVABA |
PRISON |
COFIMVABA, NQAMAKWE,GOEDEMOED, WILLOWVALE PRISON:REPAIR MAINTENANCE AND OPERATIONS OF WATER AND SEWERAGE WORKS |
044114 |
5B |
2020/03/07 |
36 |
30627895,44 |
4341000 |
WATER SOLUTIONS SA HEAD OFFICE |
CORRECTIONAL SERVICES |
EASTERN CAPE |
BARKLY EAST |
PRISON |
REPAIR AND MAINTENANCE BUILDINGS, RELATED SERVICES, ELECTRICAL AND MECHANICAL INSTALLATIONS AND CIVIL INFRASTRUCTURE |
040693 |
5B |
2011/12/09 |
36 |
7186332,97 |
3134119,8 |
SOMANA CONSTRUCTION CC |
CORRECTIONAL SERVICES |
EASTERN CAPE |
MOUNT AYLIFF |
PRISON |
MOUNT AYLIFF PRISON: MAINTENANCE FOR BUILDINGS RELATED AND WET SERVICES, MECHANICAL, ELECTRICAL AND CIVIL INFRASTRUCTURE |
044483 |
5B |
2017/02/01 |
12 |
19357796,52 |
6939870,6 |
BITUPQUIP CONSTRUCTION CC |
CORRECTIONAL SERVICES |
EASTERN CAPE |
UMTATA |
PRISON |
REFURBISHMENT OF DOMESTIC WATER RETICULATION AND CIVIL INSTA LLATION |
050594 |
5B |
2018/06/07 |
15 |
58910461,15 |
6547329,11 |
SISONKE / LEBAKA JV |
DEFENCE |
FREESTATE |
BLOEMFONTEIN |
|
DE BRUG COMPLEX: REPAIRS AND MAINTENANCE OF SEWER SYSTEM |
047317 |
5B |
2018/05/27 |
12 |
7629595,37 |
800000,01 |
REDER CONSTRUCTION |
DEFENCE |
FREESTATE |
BLOEMFONTEIN |
|
BLOEMSPRUIT COMPLEX: REPAIRS AND RENOVATIONS OF SEWER SYSTEM |
047318 |
5B |
2018/06/25 |
23 |
22274635,92 |
3215443 |
BBT ELECTRICAL AND PLUMBING CONSTRUCTION AND MAINTENANCE |
DEFENCE |
FREESTATE |
BLOEMFONTEIN |
|
REPAIRS AND RENOVATION TO BUILDING 1,2,5, TO 8 AND 21 AT MPA TEMPE |
049859 |
5B |
2018/03/02 |
12 |
3507568,98 |
1161900 |
SOLOMON & SMITH PROPERTY DEVELOPERS AND BUILDERS |
DEFENCE |
FREESTATE |
BLOEMSPRUIT |
BLOEMSPRUIT AIR FORCE BASE |
REPAIR & RENOVATION TO BUILDINGS 70, 81, 82, 83, 95, 104, 105, 107 AND 318: GROUP 5 |
049921 |
5B |
2017/11/21 |
12 |
15858002,28 |
2684100 |
MBIKIZA GROUP OF COMPANIES (PTY) LTD |
DEFENCE |
WESTERN CAPE |
LANGEBAAN |
AIR FORCE BASE |
BUILDING 116: REPAIR OF LEAKING ARMOUR ROOF |
047471 |
5B |
2018/02/28 |
7 |
4350627,76 |
2737316 |
T.R. MECHANICALS 786 CC |
DEFENCE |
WESTERN CAPE |
CAPE TOWN |
WINGFIELD MILITARY BASE |
REPAIR AND MAINTENANCE OF BUILDINGS |
048960 |
5B |
2017/11/09 |
14 |
7194229,68 |
4007908 |
ILITHA PAINTERS AND DECORATORS CC |
DEFENCE |
WESTERN CAPE |
CAPE TOWN |
NAVAL BASE |
SIMONSTOWN NAVAL BASE: REPAIRS TO FMU BUILDING 1032 EAST YARD |
052086 |
5B |
2018/05/23 |
12 |
41383305,67 |
4180191,17 |
NOLITHA ELECTRICAL (PTY) LTD |
DEFENCE |
KWAZULU-NATAL |
DURBAN |
S A N D F COMPLEX |
SMITH STREET:REPAIRS AND RENOVATIONS INCLUDING ELECTRICAL AND FENCING |
028207 |
5B |
2018/01/25 |
13 |
18131499,28 |
6538095,18 |
SERENGETI INTERIORS CC |
DEFENCE |
GAUTENG |
JOHANNESBURG |
MILITARY BASE |
46 BRIGADE: REPAIR AND RENOVATIONS TO MILITARY BASE |
046946 |
5B |
2018/08/23 |
18 |
44714673,9 |
7650000 |
ZIDLAPHI KGOMO AND ASSOCIATES CC |
DEFENCE |
GAUTENG |
HEIDELBERG (GAUTENG) |
HOUSES |
REPAIR AND RENOVATIONS TO MILITARY HOUSE |
046952 |
5B |
2018/01/27 |
18 |
82283420,28 |
15222432,74 |
LETLAPA BORWA CIVIL |
DEFENCE |
GAUTENG |
ZUURBEKOM |
HOUSES |
REPAIR AND RENOVATION TO MILITARY HOUSE |
046954 |
5B |
2017/11/01 |
12 |
21866112,27 |
3624240,87 |
TCT CIVIL AND CONSTRUCTION CC |
DEFENCE |
GAUTENG |
JOHANNESBURG |
|
SA IRISH MILITARY BASE: REPAIRS AND RENOVATIONS TO ENTIRE MI LITARY BASES |
046956 |
5B |
2018/06/14 |
18 |
28550136,28 |
5955061 |
SHUMANIE PROPERTY MANAGEMENT SERVICES |
DEFENCE |
NORTHERN CAPE |
KIMBERLEY |
3 S A I BATALION |
REPAIRS AND RENOVATIONS TO THE MESS COMPLEX |
046877 |
5B |
2017/04/12 |
8 |
6821988,47 |
1740826,9 |
COURTESY CATERS MANAGEMENT CC |
DEFENCE |
NORTHERN CAPE |
DE AAR |
97 AMMUNITION DEPOT |
REPAIRS AND RENOVATION TO 184 AMMUNATION STORE DOORS |
049863 |
5B |
2018/09/13 |
18 |
2510526,5 |
950000 |
SELOANA CONTRACTORS (PTY)LTD |
DEFENCE |
NORTHERN CAPE |
JAN KEMPDORP |
93 AMMUNITION DEPOT |
REPAIR AND RENOVATION TO NON COMMISSIONED OFFICERS MESS |
049879 |
5B |
2018/07/27 |
12 |
13552936,45 |
1974366,24 |
MBIKIZA GROUP OF COMPANIES (PTY) LTD |
DEFENCE |
NORTHERN CAPE |
JAN KEMPDORP |
93 AMMUNITION DEPOT |
REPAIRS AND RENOVATIONS TO SINGLE QUARTERS, BUILDINGS 132, 1 33, 134 AND 138 |
049881 |
5B |
2017/08/31 |
12 |
9288950,55 |
1374580,01 |
DIMENGE S PROJECTS CC |
DEFENCE |
MPUMALANGA |
NELSPRUIT |
MILITARY BASE |
SANDRIVER: REPAIRS AND RENOVATION OF THE BASE |
050600 |
5B |
2018/07/01 |
24 |
15782234,87 |
4300000 |
MUSAN TRADING ENTERPRISE CC |
DEFENCE |
MPUMALANGA |
NELSPRUIT |
MILITARY BASE |
REPAIRS AND RENOVATION OF 55 GRANIET NELSPRUIT CLUB |
050601 |
5B |
2017/09/24 |
24 |
34104928,13 |
9781968 |
MUSAN TRADING ENTERPRISE |
DEFENCE |
EASTERN CAPE |
PORT ELIZABETH |
MILITARY BASE |
REPAIR AND RENOVATION OF THE HANGAR: AIRCRAFT HANGAR NO. 169 : 15 SQUADRON |
051677 |
5B |
2017/10/30 |
12 |
28522704,45 |
1813918,41 |
BLUE DISA TRADING 754 CC |
DEFENCE |
EASTERN CAPE |
UMTATA |
MILITARY BASE |
14 SAI: REFURBISHMENT OF INTERNAL WATER RETICULATION AND SEW ERAGE SYSTEM |
049605 |
5B |
2018/12/08 |
18 |
26991899,35 |
4000000,1 |
BLUE DISA TRADING 754 CC |
DPW - PRESTIGE |
WESTERN CAPE |
CAPE TOWN |
PARLIAMENTARY COMPLEX |
HERITAGE - REFURBISHMENT OF NCOP BUILDING, INCLUDING HVAC, ELECTRICAL AND ELECTRONIC INSTALLATIONS |
044232 |
5B |
2019/04/17 |
24 |
103200034,1 |
15605259,84 |
NOLITHA ELECTRICAL (PTY) LTD |
DPW - PRESTIGE |
WESTERN CAPE |
CAPE TOWN |
PARLIAMENTARY VILLAGES |
REFURBISHMENT OF RESIDENCES OF SESSIONAL OFFICIALS IN THE TH REE PARLIAMENTARY VILLAGES. |
045661 |
5B |
2018/07/30 |
36 |
140012045,5 |
34140890,51 |
VUSELA CONSTRUCTION (PTY)LTD |
DPW - PRESTIGE |
WESTERN CAPE |
CAPE TOWN |
PARLIAMENTARY COMPLEX |
CT: OFFICIAL OFFICE ACCOMMODATION: PROVIDE INTEGRATED FACILITIES MANAGEMENT SERVICES (FOR A 5 YEAR PERIOD) |
046547 |
5B |
2019/08/19 |
60 |
561021815,1 |
10912538,62 |
ARCUS FACILITIES MANAGEMENT (PTY) LTD |
DPW - PRESTIGE |
WESTERN CAPE |
CAPE TOWN |
PARLIAMENTARY VILLAGES |
CT: OFFICIAL RESIDENTIAL ACCOMMODATION: PROVIDE INTEGRATED FACILITIES MANAGEMENT SERVICES. (FOR A 5 YEAR PERIOD) |
046548 |
5B |
2019/08/19 |
60 |
541033745,5 |
21657079,87 |
BROLL PROPERTY GROUP (PTY) LTD - FACILITIES |
DPW - PRESTIGE |
WESTERN CAPE |
CAPE TOWN |
PARLIAMENTARY COMPLEX |
HERITAGE - TUYNHUYS: PROPOSED NEW FURNITURE AND ANCILLARY ST ORE, BUSINESS HUB, PARAPLEGIC PLATFORM STAIR LIFT AND SECURI TY INSTALLATIONS |
049416 |
5B |
2017/09/06 |
12 |
57971580,66 |
12631630 |
PREMA RACITI CONSTRUCTION CC |
DPW - PRESTIGE |
WESTERN CAPE |
CAPE TOWN |
PARLIAMENTARY COMPLEX |
HERITAGE - MARKS BUILDING: EXTERNAL RENOVATIONS TO THE BUILD ING |
050720 |
5B |
2018/07/05 |
18 |
40097200,45 |
6011978,05 |
PREMA RACITI CONSTRUCTION CC |
DPW - PRESTIGE |
WESTERN CAPE |
CAPE TOWN |
GROOTE SCHUUR ESTATE |
HERITAGE - BAIE DANKIE/WAG'N BIETJIE/RHEEZICHT: REPLACE EXISTING THATCH ROOF |
050768 |
5B |
2017/02/11 |
6 |
728368,8 |
0 |
ELIM ROOFTHATCHERS CC |
DPW - PRESTIGE |
GAUTENG |
PRETORIA |
|
HERITAGE - REFURBISHMENT OF HOUSE 23 |
044661 |
5B |
2007/12/14 |
6 |
351368 |
368822,81 |
DIRHAM CONSTRUCTION MANAGEMENT CC |
DPW - PRESTIGE |
GAUTENG |
PRETORIA |
|
HERITAGE - REFURBISHMENT OF HOUSE 15 |
044662 |
5B |
2007/12/14 |
6 |
228979 |
372879,02 |
DIRHAM CONSTRUCTION MANAGEMENT CC |
DPW - PRESTIGE |
GAUTENG |
PRETORIA |
|
INTERNAL & EXTERNAL MAINTENANCE OF HOUSE 205 ORION IN WATERK LOOF |
053320 |
5B |
2016/03/02 |
12 |
2941402,9 |
2941402,9 |
COEGA DEVELOPMENT CORP (PTY) LTD |
DPW - PRESTIGE |
GAUTENG |
PRETORIA |
|
HERITAGE - IMPLEMENTATION OF CRACKS REPAIR AND OF UNDERPIN- NING OF GOEDEHOOP HOUSE |
049724 |
5B |
2016/03/02 |
12 |
3000000 |
4854296,7 |
COEGA DEVELOPMENT CORP (PTY) LTD |
DPW - PRESTIGE |
GAUTENG |
PRETORIA |
|
REPAIRS AND RENOVATIONS AT 259 ACQUILA IN WATERKLOOF |
054032 |
5B |
2015/06/02 |
3 |
3843476,85 |
3843476,85 |
COEGA DEVELOPMENT CORP (PTY) LTD |
DPW - PRESTIGE |
GAUTENG |
PRETORIA |
|
REPAIRS AND RENOVATIONS AT 307 NICHOLSON IN WATERKLOOF |
054036 |
5B |
2015/12/02 |
9 |
2655407,51 |
2655407,51 |
COEGA DEVELOPMENT CORP (PTY) LTD |
ENVIRONMENTAL AFFAIRS |
WESTERN CAPE |
CAPE TOWN |
|
SALDANA BAY HARBOUR & PEPPER BAY AREA: STABILIZATION OF EROD ED EMBANKMENTS: REPAIR |
050712 |
5B |
2018/02/09 |
12 |
39986438,89 |
3200000 |
GUERRINI MARINE CONSTRUCTION CC |
ENVIRONMENTAL AFFAIRS |
WESTERN CAPE |
CAPE TOWN |
|
MARION ISLAND: MAINTENANCE TO THE RESEARCH BASE |
053795 |
5B |
2016/02/15 |
12 |
4746530,74 |
0 |
STARLIGHT WHOLESALE ELECTRICAL SUPPLIERS |
ENVIRONMENTAL AFFAIRS |
WESTERN CAPE |
CAPE TOWN |
|
ANTARTICA ISLAND: MAINTENANCE TO THE RESEARCH BASE: SANAE IV |
053796 |
5B |
2017/11/06 |
36 |
3691513,18 |
0 |
CCK BUILDING AND SCAFFOLDING HIRE |
ENVIRONMENTAL AFFAIRS |
WESTERN CAPE |
CAPE TOWN |
|
GOUGH ISLAND: MAINTENANCE TO THE RESEARCH BASE |
054041 |
5B |
2018/08/06 |
36 |
1853566,89 |
0 |
BLUE ICE REFRIGERATION CC |
GOVERNMENT PRINTING WORKS |
GAUTENG |
PRETORIA |
|
REPAIR OF LEAKING ROOF AND STRUCTURAL WORK FOR GOVERNMENT PRINTERS AS WELL AS HERITAGE |
048332 |
5B |
2017/10/04 |
12 |
47046045,9 |
15117858,06 |
BONO INFRASTRUCTURE FACILITIES AND PROJECT MANAGEMENT |
HOME AFFAIRS |
EASTERN CAPE |
UMTATA |
|
REPAIR & REFURBISH MECHANICAL, ELECTRICAL,BUILDING &CIVIL |
045609 |
5B |
2017/06/30 |
12 |
12465720,04 |
4490705,61 |
AZCON PROJECTS CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
FREESTATE |
TSEKI |
MAGISTRATE'S OFFICE |
REPAIR AND RENOVATIONS |
048335 |
5B |
2017/11/07 |
12 |
10603316,67 |
2578539,47 |
MADIGA PROJECTS AND SECURITY |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
FREESTATE |
BLOEMFONTEIN |
HIGH COURT |
REPAIR OF ROOF, CEILINGS AND FLOORS AS WELL AS PLASTERING OF WALLS AND PAINTING OF WALLS |
048352 |
5B |
2017/11/02 |
18 |
19443945,97 |
4474719,86 |
VARYMIX NINETEEN (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
FREESTATE |
BOTHAVILLE |
MAGISTRATE'S OFFICE |
REPAIR AND RENOVATIONS OF BOTHAVILLE MAGISTRATE OFFICE |
048364 |
5B |
2017/05/22 |
8 |
3598691,69 |
921576,52 |
MBIKIZA GROUP OF COMPANIES (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
FREESTATE |
DEWETSDORP |
MAGISTRATE'S OFFICE |
REPAIR AND RENOVATIONS OF MAGISTRATE COURT |
048367 |
5B |
2017/09/20 |
13 |
4433808,21 |
1547042 |
PHUTHALUSHAKA CIVIL PROJECTS CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
FREESTATE |
FRANKFORT(FREE STATE) |
MAGISTRATE'S OFFICE |
REPAIR AND RENOVATIONS OF MAGISTRATE OFFICE |
048368 |
5B |
2018/06/04 |
12 |
3554444,82 |
775000 |
DJ AND SS CLEANING SERVICES CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
FREESTATE |
SPRINGFONTEIN |
MAGISTRATE'S OFFICE |
REPAIR AND RENOVATIONS OF MAGISTRATE OFFICE |
048371 |
5B |
2017/11/06 |
11 |
2321990,78 |
803147,84 |
LEBURU FETSI CONSTRUCTION |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
FREESTATE |
HEILBRON |
|
HEILBRON MAGISTRATE OFFICE, CONDITION BASED MAINTENANCE |
050800 |
5B |
2018/06/11 |
18 |
20860791,01 |
3845497,25 |
WHITE LEOPARD TRADING CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
WESTERN CAPE |
CAPE TOWN |
MAGISTRATE'S OFFICE |
REPAIRS AND RENOVATIONS |
048538 |
5B |
2018/01/11 |
24 |
76855357,88 |
9520900 |
NOLITHA ELECTRICAL (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
WESTERN CAPE |
PAARL |
REGIONAL COURT |
HERITAGE- RESTORATION |
049038 |
5B |
2017/04/12 |
12 |
18510546,19 |
4237800 |
ABDA BUILDING AND INTERIOR PROJECTS CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
KWAZULU-NATAL |
UMLAZI |
COMPLEX |
HERITAGE - REPAIRS AND RENOVATIONS TO OFFICE BUILDING |
040855 |
5B |
2019/06/21 |
32 |
88425000 |
19877000 |
AFRISCAN CONSTRUCTION (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
KWAZULU-NATAL |
HLABISA |
MAGISTRATE'S OFFICE |
VARIOUS BUILDING REPAIRS |
048453 |
5B |
2017/10/31 |
8 |
1416037,59 |
789071,77 |
MABHULANE CONSTRUCTION |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
MPUMALANGA |
MIDDELBURG (MPU) |
MAGISTRATE'S OFFICE |
REPAIR AND RENOVATIONS: ROOF LEAKS; CRACKED WALLS; WINDOW PANES; ETC. |
036169 |
5B |
2017/04/06 |
18 |
27730856,91 |
13200000 |
ASATICO CIVIL AND CONSTR P/L |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
MPUMALANGA |
WITBANK |
MAGISTRATE'S OFFICE |
REPAIR AND RENOVATIONS OF BUILDING |
048621 |
5B |
2017/12/13 |
12 |
8219565,59 |
3361180,21 |
LA NATURA (PTY) LTD |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
LIMPOPO |
MANKWENG |
MAGISTRATE'S OFFICE |
REPAIR AND RENOVATIONS |
048596 |
5B |
2017/01/04 |
9 |
10919238,28 |
2187117,58 |
NKOLELE PROJECTS CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
LIMPOPO |
NAMAKGALE |
MAGISTRATE'S OFFICE |
REPAIR AND RENOVATIONS TO BUILDING |
048603 |
5B |
2017/02/08 |
8 |
7679850,82 |
1911437,14 |
NKOLELE PROJECTS CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
LIMPOPO |
LULEKANI |
MAGISTRATE'S OFFICE |
REPAIR AND RENOVATIONS |
048604 |
5B |
2017/11/20 |
12 |
19936796,35 |
7420393,38 |
SEGABOKENG BUILDING CONSTRUCTION CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
LIMPOPO |
HLANGANANI (NP) |
MAGISTRATE'S OFFICE |
REPAIR AND RENOVATIONS OF BUILDING |
048605 |
5B |
2017/03/24 |
12 |
13921885,98 |
3764862,89 |
BITUPQUIP CONSTRUCTION CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
EASTERN CAPE |
QUEENSTOWN |
MAGISTRATE'S OFFICE |
QUEENSTOWN MAGISTRATE COURT - CONDITION BASED MAINTENANCE |
050840 |
5B |
2017/12/14 |
18 |
31345834 |
8518662 |
NATHAN ALEC DATNOW T/A SHAWSHANK CONSTRUCTION |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
EASTERN CAPE |
DORDRECHT |
MAGISTRATE'S OFFICE |
CONDITION BASED MAINTAINANCE |
046756 |
5B |
2017/11/06 |
14 |
9256645,61 |
4605274,02 |
T.P.CONSTRUCTION CC |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
EASTERN CAPE |
MOUNT FRERE |
MAGISTRATE'S OFFICE |
CONDITION BASED MAINTAINANCE |
046766 |
5B |
2018/10/11 |
13 |
20900460,5 |
8452279,91 |
TP CONSTRUCTION JV MC BAVU CONSTRUCTION |
JUSTICE AND CONSTITUTIONAL DEVELOPMENT |
EASTERN CAPE |
TABANKULU |
MAGISTRATE'S OFFICE |
CONDITION BASED MAINTENANCE |
046769 |
5B |
2019/01/18 |
18 |
24670081,72 |
4977500 |
SIVIWE JAYIYA CONSTRUCTION CC |
PUBLIC WORKS |
FREESTATE |
VARIOUS CENTRES (FS) |
|
REPAIRS AND RENOVATIONS TO LIFT INSTALLATIONS IN VARIOUS GOVERNMENT BUILDINGS |
051540 |
5B |
2018/10/23 |
56 |
22887527,27 |
2881975,79 |
SIGMA LIFTS AND ESCALATORS (PTY) LTD |
PUBLIC WORKS |
WESTERN CAPE |
CAPE TOWN |
|
CONTRACT A, MODERNIZATION, REPAIRS AND MAINTENANC E OF LIFTS IN THE WESTERN CAPE |
052134 |
5B |
2018/01/28 |
24 |
64117755,64 |
1899612 |
OTIS (PROPRIETARY) LTD |
PUBLIC WORKS |
WESTERN CAPE |
CAPE TOWN |
|
CONTRACT B, MODERNIZATION, REPAIRS AND MAINTENANC E OF LIFTS IN THE WESTERN CAPE |
052156 |
5B |
2017/11/19 |
24 |
65896378,25 |
2269652 |
SCHINDLER LIFTS (SA) (PTY) LTD |
PUBLIC WORKS |
WESTERN CAPE |
CAPE TOWN |
|
SERVICE CONTRACTS FOR MEDIUM VOLTAGE(11 000 VOLT)SUBSTATION AND RETICULATION SYSTEM TO VARIOUS GOVERNMENT OWMNED COMPLEX ES |
052348 |
5B |
2019/07/26 |
36 |
21296897,58 |
0 |
ABRIE ERASMUS ELEKTRIES BK |
PUBLIC WORKS |
NORTHERN CAPE |
KIMBERLEY |
|
ADDITIONS TO THE AIRCONDITIONIONG SYSTEM IN THE NEW PUBLIC O OFFICE UTILISED BY DEPARTMENT OF JUSTICE |
050838 |
5B |
2016/01/15 |
12 |
18194236,83 |
3274962,48 |
MAGIC LABOUR HIRE & SECURITY SERVICES CC |
PUBLIC WORKS |
NORTHERN CAPE |
KIMBERLEY |
|
REPAIR AND MAINTENANCE FOR VARIOUS LIFTS IN THE NORTHERN CAP E REGION |
053772 |
5B |
2020/09/13 |
36 |
21861193,9 |
4229426,68 |
SIGMA LIFTS AND ESCALATORS (PTY) LTD |
PUBLIC WORKS |
NORTHERN CAPE |
KIMBERLEY |
MAGISTRATE'S OFFICE |
KIMBERLEY NEW PUBLIC OFFICES BUILDING: REPAIRS TO ROOF AND WALLS CAUSED BY WATER PENETRATION |
054347 |
5B |
2018/03/07 |
6 |
822034,5 |
280821,9 |
SELOANA CONTRACTORS (PTY)LTD |
PUBLIC WORKS |
EASTERN CAPE |
PORT ELIZABETH |
|
REPLACEMENT OF FENCE AT HUMEWOOD MILITARY BASE |
048686 |
5B |
2018/02/02 |
9 |
8766083,94 |
1200000 |
CRYSTAL SPARKLE TRADING 98 CC |
PUBLIC WORKS |
GAUTENG |
PRETORIA |
SAMS COLLEGE |
EMERGENCY WORK - REPAIR/REPLACE LEAKING PIPES, TILES, TOILET S AND SHOWERS IN BLOCKS G, H, I, J & K |
046021 |
5B |
2008/04/15 |
1 |
3600000 |
0 |
SAKYA'S BUILDING CONSTRUCTION CC |
PUBLIC WORKS |
GAUTENG |
PRETORIA |
OFFICE BLOCK |
PTA-VARIOUS GOVT BUILDINGS:FOLLOW ON CONTRACT WCS 046918 FOR THE REPAIRS AND MAINTENANCE OF THE LIFTS |
051920 |
5B |
2018/03/06 |
36 |
21483889,65 |
2925586,56 |
KONE ELEVATORS SOUTH AFRICA (PTY) LTD |
PUBLIC WORKS |
GAUTENG |
PRETORIA |
|
FOLLOW ON CONTRACT WCS 046919 ON REPAIR AND MAINTENANCE OF L IFTS FOR THE VARIOUS GOVERNMENT BUILDINGS IN PRETORIA |
052574 |
5B |
2018/02/26 |
36 |
34063599,91 |
3610740,69 |
NGAATENDWE TRADING CC |
SA POLICE SERVICE |
FREESTATE |
HERTZOGVILLE |
POLICE STATION AND HOUSING UNITS |
HERTZOGVILLE POLICE STATION: REPAIR AND MAINTENANCE TO ELECT RICAL,CIVIL,STRUCTURAL AND MECHANICAL ELEMEMNTS TO THE STATI ON AND HOUSES |
051847 |
5B |
2018/06/22 |
12 |
9675399,49 |
2714260 |
ESOERENS CIVIL CONTRACTORS (PTY) LTD |
SA POLICE SERVICE |
FREESTATE |
SENEKAL |
POLICE STATION |
SENEKAL POLICE STATION: REPAIR AND MAINTENANCE TO ELECTRICAL CIVIL, MECHANICAL AND STRUCTURAL ELEMENTS TO THE STATION |
051850 |
5B |
2018/03/02 |
9 |
3249735,53 |
587000,01 |
ESOERENS CIVIL CONTRACTORS (PTY) LTD |
SA POLICE SERVICE |
FREESTATE |
WANDA |
POLICE STATION AND HOUSING UNITS |
WANDA POLICE STATION: REPAIR AND MAINTENANCE TO ELECTRICAL, CIVIL,MECHANICAL AND STRUCTURAL ELEMENTS TO THE STATION AND HOUSES |
051855 |
5B |
2017/05/30 |
12 |
9296037,01 |
1750565,77 |
VINO BUILDING CONSTRUCTIONS AND MULTI P |
SA POLICE SERVICE |
FREESTATE |
VREDE |
POLICE STATION AND HOUSING UNITS |
CONDITION BASED MAINTENANCE ON STRUCTURAL, ELECTRICAL AND CI VIL ELEMENTS OUSES |
051856 |
5B |
2016/08/12 |
18 |
13339817,05 |
3451486,86 |
CENTRAL BRIDGE TRADING 389 CC |
SA POLICE SERVICE |
WESTERN CAPE |
OUDTSHOORN |
GARAGE |
REPAIRS AND RENOVATIONS INCLUDING, ELECTRICAL INSTALLATIONS, WATER SUPPLY, SEWERAGE SERVICES AND STRUCTURAL WORKS |
050477 |
5B |
2018/03/19 |
18 |
57375113,13 |
7383932,58 |
REDER CONSTRUCTION |
SA POLICE SERVICE |
KWAZULU-NATAL |
JOZINI |
S A POLICE QUARTERS |
COMPLETE REPAIRS AND RENOVATION TO 6HOUSES AND 24 MARRIED QU ARTERS |
035854 |
5B |
2015/09/10 |
21 |
23783788,24 |
9850000 |
SETHEO INVESTMENTS PTY LTD |
SA POLICE SERVICE |
KWAZULU-NATAL |
KWAMSANE |
POLICE STATION |
KWAMSANE: COMPLETE R&R TO STATION COMPLEX AS WELL LIVING QUA RTERS. |
046041 |
5B |
2016/03/21 |
14 |
14875048,73 |
6478799,02 |
EMCAKWINI CONSTRUCTION AND FENCING CC |
SA POLICE SERVICE |
KWAZULU-NATAL |
NONGOMA |
|
REPAIRS AND RENOVATIONS TO NONGOMA ROYAL PROTECTION UNIT BUI LDING |
050159 |
5B |
2018/04/19 |
24 |
12214485,82 |
5300000 |
LAKHIMU INVESTMENTS CC |
SA POLICE SERVICE |
KWAZULU-NATAL |
LADYSMITH (KZN) |
|
REPAIRS AND RENOVATION TO LADYSMITH POLICE STATION COMPLEX |
050160 |
5B |
2018/01/11 |
24 |
69578664 |
24346550 |
SIYAXHASANA CONSTRUCTION CC |
SA POLICE SERVICE |
GAUTENG |
KEMPTON PARK |
POLICE STATION |
17 MONUMENT RD: REPAIR AND RENOVATION OF ALL BUILDINGS: INCL UDING THE PROVISION OF ALTERNATIVE ACCOMMODATION FOR THE DUR ATION OF THE PROJECT |
033313 |
5B |
2017/08/23 |
15 |
30258249,2 |
5586357,44 |
SHUMANIE PROPERTY MANAGEMENT SERVICES |
SA POLICE SERVICE |
GAUTENG |
VANDERBIJLPARK |
POLICE STATION |
BARRAGE & VANDERBIJLPARK POLICE STATIONS: REFURBISHMENT OF CORRIDORS, INSTALLATION OF DISABILITIES TOILETS & REPAIRS OF BUILDING(MECHANICAL & ELECTRICAL) |
046651 |
5B |
2017/11/10 |
12 |
35605733,05 |
5337132,44 |
KWAGGA HOLDINGS (PTY)LTD |
SA POLICE SERVICE |
GAUTENG |
JOHANNESBURG |
MARRIED QUARTERS |
REPAIR AND RENOVATIONS OF OFFICIAL QUARTERS INCLUDING FINDIN G ALTERNATIVE ACCOMMODATION |
046652 |
5B |
2018/02/02 |
24 |
72006562,6 |
14871401,51 |
YIKUSASA BUILDING CONTRACTORS |
SA POLICE SERVICE |
GAUTENG |
SOWETO |
|
REPAIRS AND MAINTENANCE OF DIEPKLOOF CRIME COMBATING UNIT BU ILDINGS |
050179 |
5B |
2018/09/28 |
18 |
29364678,5 |
5428661,24 |
H B C CONSTRUCTION PTY LTD |
SA POLICE SERVICE |
GAUTENG |
ALEXANDRA |
SINGLE QUARTERS |
REPAIRS AND MAINTENANCE |
050188 |
5B |
2018/08/27 |
25 |
67379915,54 |
12347582,72 |
LETLAPA BORWA CIVIL |
SA POLICE SERVICE |
NORTHERN CAPE |
LOUISVALE |
S A POLICE COMPLEX |
REPAIR OF DOG UNIT AND MARRIED QUARTERS |
046890 |
5B |
2017/09/09 |
12 |
8037726,06 |
1711345,82 |
MBIKIZA GROUP OF COMPANIES (PTY) LTD |
SA POLICE SERVICE |
NORTHERN CAPE |
COLESBERG |
POLICE STATION AND QUARTERS |
REPAIR OF STATION AND MARRIED QUARTERS (8A-, 8B- AND 8C STOC KENSTROOM PLEIN, DWELLING 8630H AND 8631E) |
046895 |
5B |
2017/08/14 |
18 |
6738285,38 |
2013220 |
DAVID DIVA JV PILONITE |
SA POLICE SERVICE |
NORTHERN CAPE |
COLESBERG |
MARRIED QUARTERS |
REPAIR OF MARRIED QUARTERS AT 1 AND 3 BAINS ROAD, 1,3,5,7 AN D 9 LELIE STREET, 5 EARL HAIG STREET, 3 GOUSBLOM STREET, 8 A ND 9 TOERENBERG STREET AND 7 DE JAGER STREET |
046896 |
5B |
2017/10/20 |
12 |
7939570,47 |
1590000 |
MF ADAMS |
SA POLICE SERVICE |
NORTHERN CAPE |
KIMBERLEY |
OFFICE BLOCK |
REPAIR OF GLADSTONE BUILDING OFFICES |
046897 |
5B |
2016/12/05 |
18 |
7412266,35 |
1346699,73 |
VINO BUILDING CONSTRUCTIONS AND MULTI P |
SA POLICE SERVICE |
NORTHERN CAPE |
HONDEKLIP BAY |
POLICE STATION, SINGLE QUARTERS AND DWELLING |
REPAIR OF STATION, MARRIED QUARTERS AND BACHELOR FLAT |
046898 |
5B |
2016/10/13 |
15 |
8437252,16 |
3762000 |
DAWID OOR BOUKONTRAKTEURS |
SA POLICE SERVICE |
NORTHERN CAPE |
NOENIEPUT |
POLICE STATION AND QUARTERS |
REPAIR OF STATION AND MARRIED QUARTERS |
046903 |
5B |
2016/07/15 |
12 |
7625371,95 |
2650000 |
DAWID OOR BOUKONTRAKTEURS |
SA POLICE SERVICE |
NORTHERN CAPE |
KENHARDT |
|
REPAIRS AND MAINTENANCE OF THREE HOUSES NO 1393,1386 AND 140 0 |
050163 |
5B |
2017/12/15 |
12 |
3002958,19 |
612871,96 |
P AND E ARTISANS BK |
SA POLICE SERVICE |
NORTHERN CAPE |
BARKLY WEST |
DETECTIVE BRANCH |
HERITAGE - REPAIRS AND MAINTENANCE OF THE SAPSBUILDING |
050164 |
5B |
2017/10/12 |
12 |
6647674,38 |
1198761,6 |
BITUPQUIP CONSTRUCTION CC |
SA POLICE SERVICE |
NORTHERN CAPE |
KIMBERLEY |
POLICE STATION |
KIMBERLEY: REPAIR AND MAINTENANCE OF LCRC IN DE AAR, UPINGTO N, KURUMAN |
051826 |
5B |
2018/07/24 |
24 |
4097051,54 |
1243968,85 |
MISHOE TRADING AND PROJECTS (PTY) LTD |
SA POLICE SERVICE |
NORTHERN CAPE |
DOUGLAS |
POLICE STATION |
REPAIRS AND MAINTENANCE TO ELECTRICAL, CIVIL AND STRUCTURAL ELEMENTS OF STATION AND OFFICIAL QUARTERS |
051904 |
5B |
2017/11/20 |
12 |
12881478,68 |
1470000 |
MF ADAMS |
SA POLICE SERVICE |
NORTH WEST |
SANNIESHOF |
POLICE STATION |
CONDITION BASED MAINTENANCE ON STRUCTURAL, ELECTRICAL AND CI VIL ELEMENTS |
051872 |
5B |
2018/08/03 |
16 |
6429031,88 |
0 |
TECH-COM SOLUTIONS CC |
SA POLICE SERVICE |
NORTH WEST |
GANYESA |
POLICE STATION |
GANYESA:REPAIR AND MAINTANANCE OF CIVIL, ELECTRICAL, AND STRUCTURAL ELEMENTS TO STATION, FACILITIES FOR THE DISABLED AND FOUR HOUSES |
051875 |
5B |
2017/11/15 |
12 |
8088788,3 |
2277823,59 |
GMD PROJECTS CC T/A GDM SERVICE |
SA POLICE SERVICE |
NORTH WEST |
BIESIESVLEI |
POLICE STATION |
CONDITION BASED MAINTENANCE ON STRUCTURAL, ELECTRICAL AND CIVIL ELEMENTS AND FACILITIES FOR THE DISABLED |
051894 |
5B |
2019/01/14 |
18 |
5992153,44 |
0 |
BOTHO SOCIETE |
SA POLICE SERVICE |
MPUMALANGA |
KABOKWENI |
POLICE STATION |
REPAIR AND RENOVATIONS OF POLICE STATION AND ALL OFFICIAL QU ARTERS. |
038133 |
5B |
2017/11/06 |
18 |
13900014,04 |
5998249,86 |
ENZAR TRADING 23 CC |
SA POLICE SERVICE |
MPUMALANGA |
STANDERTON |
POLICE STATION |
STANDERTON P STATION REPAIRS AND MAINTENANCE OF STATION AND OFFICIAL QUARTES ELECTRICAL,CIVIL,STRUCTURAL ELEMENTS |
051786 |
5B |
2018/08/16 |
24 |
28872578,33 |
6000000 |
BITUPQUIP CONSTRUCTION CC |
SA POLICE SERVICE |
MPUMALANGA |
KWAMHLANGA |
POLICE STATION |
MPUMALANGA: REPAIR AND MAINTENANCE OF LCRC IN KWA-MHLANGA, S ECUNDA, NELSPRUIT & ULUKWATINI |
051821 |
5B |
2018/08/31 |
24 |
9700574,91 |
4671970,42 |
BUREWA TRADING 84 CC |
SA POLICE SERVICE |
LIMPOPO |
SIBASA |
|
REPAIRS AND RENOVATION TO SIBASA CLUSTER COMMANDER'S OFFICE: SOUTH AFRICAN POLICE SERVICES |
050207 |
5B |
2017/12/06 |
18 |
20383796,47 |
3600000 |
DITLOU SUPPLIERS AND SERVICES CC 2006/0 |
SA POLICE SERVICE |
LIMPOPO |
THOHOYANDOU |
POLICE STATION |
THOHOYANDOU POLICE STATION: REPAIRS & MAINTENANCE OF CIVIL, ELECTRICAL, MECHANICAL & STRUCTURAL ELEMENTS OF THE STATION |
051773 |
5B |
2018/02/13 |
12 |
14306305,18 |
2490000 |
KGALEMO CONSTRUCTION CC |
SA POLICE SERVICE |
EASTERN CAPE |
GRAAFF-REINET |
|
REPAIRS AND MAINTENANCE OF LEAKING ROOF IN THE OFFICIAL QUAT ERS AND DRAINAGE SYSTEM FOR GRAAF REINET POLICE COLLEGE |
050218 |
5B |
2018/05/29 |
12 |
123888022,6 |
19956000 |
SUPERWAY CONSTRUCTION (PTY) LTD |
SA POLICE SERVICE |
GAUTENG |
PRETORIA |
HEAD QUARTERS |
INTERIM FACILITIES MANAGEMENT CONTRACT FOR TELKOM TOWERS COM PLEX (SAPS NHQ) |
054635 |
5B |
2016/12/31 |
12 |
20803381,12 |
0 |
BIDVEST FACILITIES MANAGEMENT (PTY) LTD |
SA POLICE SERVICE |
EASTERN CAPE |
NQAMAKWE |
POLICE STATION |
STATION,CELLS,DETECTIVE OFFICE,HOUSES AND COMPLETE REPAIRS |
021158 |
5B |
2013/05/15 |
18 |
16234267,07 |
18653487,32 |
SOMANA CONSTRUCTION CC |
SA POLICE SERVICE |
EASTERN CAPE |
LUSIKISIKI |
POLICE COMPLEX |
COMPLETE REPAIRS INCL ELECT REPAIRS AND NEW ESKOM POWER |
025459 |
5B |
2009/03/01 |
18 |
12940906,91 |
4628987,05 |
DEMO CONSTRUCTION (PTY) LTD |
SA POLICE SERVICE |
EASTERN CAPE |
MT FLETCHER |
POLICE STATION |
COMPLETE REPAIRS AND RENOVATIONS |
025500 |
5B |
2015/05/08 |
15 |
14354759,28 |
6043556,99 |
INTELLEC CONSTRUCTION__CC |
SA POLICE SERVICE |
EASTERN CAPE |
COFIMVABA |
POLICE COMPLEX |
REPAIRS AND RENOVATIONS OF THE ENTIRE COMPLEX INCLUDING ELEC RICAL AND CIVIL WORKS |
046703 |
5B |
2016/12/24 |
11 |
6564501,57 |
2930627,23 |
MABONVINI TRADING ENTERPRISE CC |
SA POLICE SERVICE |
EASTERN CAPE |
UMTATA |
POLICE COMPLEX |
REPAIRS AND RENOVATION OF POLICE CAMP INCLUDING ELECTRICAL A ND CIVIL WORKS |
046705 |
5B |
2013/03/02 |
24 |
105090881,8 |
26999450,02 |
MABONVINI TRADING ENTERPRISE CC |
SA POLICE SERVICE |
EASTERN CAPE |
MOUNT AYLIFF |
POLICE STATION |
REPAIRS AND RENOVATION OF POLICE STATION INCLUDING ELECTRICA L AND CIVIL WORKS |
046711 |
5B |
2018/01/31 |
18 |
36482749,28 |
8446368,91 |
CONDOR CONSTRUCTION (PTY) LTD |
SA POLICE SERVICE |
EASTERN CAPE |
ELLIOT |
POLICE STATION |
ELLIOT POLICE STATION REPAIRS AND MAINTENCE OF ELECTRICAL,ST RUCTURAL AND CIVIL ELEMENTS OF STATION AND OFFICIAL QUARTERS |
051745 |
5B |
2019/01/17 |
18 |
16452332,9 |
3640000,02 |
FEZ BUILDING CONSTRUCTION CC |
PUBLIC WORKS |
WESTERN CAPE |
CAPE TOWN |
|
WATER TREATMENT |
053096 |
5B |
2018/08/30 |
36 |
1028798,47 |
0 |
TREATCO WATER CC |
06 December 2017 - NW3863
Alberts, Mr ADW to ask the Minister of Basic Education
(1)Whether the proposed amending Bill on schools aims to eradicate apartheid practices and the said amendment process is the beginning of the elimination of outdated education; if so, which apartheid practices will be dealt with and eradicated by the specified amending Bill according to her finding; (2) whether public comments regarding the amending Bill will be taken into account and the amending Bill will therefore be adjusted in the light of such public participation; if not, what is the position in this regard; if so, what are the relevant details; (3) what are the relevant details of any further process that is envisaged to eradicate any outdated education?
Reply:
1. It is not clear what apartheid practices the honourable member is referring to. As long ago as in 1996, when the South African Schools Act (SASA) was first promulgated, the preamble made it clear that SASA was being enacted –
because the achievement of democracy in South Africa had consigned to history the past system of education which had been based on racial inequality and segregation; and
because South Africa required a new national system for schools which would redress past injustices in educational provision, provide an education of progressively high quality for all learners …, advance the democratic transformation of society, [and] combat racism and sexism and all other forms of unfair discrimination and intolerance, … .
Be that as it may, let me quote from the Memorandum on the Objects of the Bill: "The Bill proposes to amend the South African Schools Act, 1996 (Act No. 84 of 1996), and the Employment of Educators Act, 1998 (Act No. 76 of 1998) (the SASA and the EEA, respectively), so as to align them with developments in the education landscape and to ensure that systems of learning and excellence in education are put in place in a manner which respects, protects, promotes and fulfils the right to basic education enshrined in section 29(1) of the Constitution of the Republic of South Africa, 1996."
"The Bill also seeks to amend the SASA and the EEA so as to make certain technical and substantive adjustments, to clarify certain existing provisions and to insert certain provisions to cover matters which are not provided for in the existing legislation."
2. Yes, all the comments submitted by organisations, members of the public and education stakeholders in general will be considered, and those that have merit will be incorporated into the Bill.
It is worth noting that more than 5 000 emailed comments and reactions were received in response to the call for comments, together with 36 faxes, two thick couriered bundles of documents, and one thick hand-delivered bundle of documents. A document containing 98 635 names, most with short comments added, was also received.
3. The Department of Basic Education is committed to reviewing its legislation, policies and guidelines as often as is necessary to ensure that they remain relevant and that they keep abreast of developments in education practice, technology and other relevant fields.
06 December 2017 - NW2987
Lees, Mr RA to ask the Minister of Finance
(1)Have any members of the (a) SA Airways (SAA) (i) board of directors and/or (ii) management and/or (b) National Treasury engaged in any correspondence with any persons associated with the Public Investment Corporation and/or the Government Employees’ Pension Fund on matters relating to SAA during the six months ending on 30 September 2017; if so, what are the details of each piece of correspondence in terms of the (aa) dates of each piece of correspondence, (bb) names of the persons (aaa) sending, (bbb) receiving and (ccc) copied into the correspondence and (cc) purpose and contents of each piece of correspondence; (2) whether he will furnish Mr R A Lees with copies of each piece of correspondence; if not, why not; if so, by what date?
Reply:
1. Yes, members of the SA Airways (SAA) board and management did engage in correspondence with the Public Investment Corporation (PIC) during the six months ending 30 September 2017. The first correspondence between SAA and PIC was on 7 March 2017 where SAA requested a meeting with representatives of PIC Management. Thereafter, various correspondence were sent between SAA and PIC management dealing, inter alia, with the signing of non-disclosure agreements between SAA and PIC for the PIC to access information during the due diligence process. During the due diligence process there were also correspondence on matters such as risk management, financial management, environmental, social and governance matters (ESG matters), etc, between SAA and the respective PIC teams.
2. In line with its standard practices and procedures, the PIC and SAA entered into a non-disclosure agreement and therefore copies of the correspondence between SAA and PIC, cannot be made available.
06 December 2017 - NW3763
Mashabela, Ms N to ask the Minister of Basic Education
(1)Whether (a) her department and/or (b) entities reporting to her procured services from a certain company (name furnished): if so (i) what services were procured in each case and (ii) what is the total amount that was paid to the specified company in each case: (2) Whether the specified company provided services related to international travel to (a) her department and/or (b) entities reporting to her; if so (i) what is the name of each person who travelled, (ii) what was the travel route and (iii) what is the total amount that was paid for each person
Reply:
1. (a) Yes
(a)(i)Services were procured through Travel with Flair (TWF) for events management as and when required by the Department.
(a)(ii)R64 421 866.21 was paid for sub service providers for all the events of the Department from 1 April 2017 to date. Only the 12.5% of the above amount was paid to TWF as management fee. The remainder of the fees were for the subservice providers.
(b) No
(b)(i) None
(b)(ii) Not applicable
2. (a) No
(a)(i) Not applicable
(a)(ii) Not applicable
(a)(iii) Not applicable
(b) No
(b)(i) Not applicable
(b)(ii) Not applicable
(b)(iii) Not applicable
06 December 2017 - NW3851
Tarabella - Marchesi, Ms NI to ask the Minister of Basic Education
Are officials of the provincial departments of education who fail to report instances of (a) sexual abuse and/or (b) physical abuse to the SA Council for Educators (i) disciplined or (ii) prosecuted for failing to do so?
Reply:
(a)(b)(i) & (ii) The Provincial Education Departments are obliged to report instances of sexual abuse and/or physical abuse to the South African Council for Educators. In terms of section 26 of the South African Council for Educators Act, 31 of 2000, the employer of an educator is obliged to provide SACE with records of disciplinary proceedings of each case against an educator where the sanction imposed was dismissal. This means that the employer must report the case after the finalisation of the disciplinary proceedings. Failing to report to SACE may lead to disciplinary action against the relevant officials.
06 December 2017 - NW3848
Boshoff, Ms SH to ask the Minister of Basic Education
Whether, with reference to her reply to question 2512 on 11 September 2017 she received the requested information?
Reply:
The Department of Basic Education has requested the information from the Provincial Education Departments. The response will be updated as soon as information is received from the respective Provincial Education Departments.
06 December 2017 - NW3837
Esau, Mr S to ask the Minister of Defence and Military Veterans
With regard to the 1908 military veterans or parents of dependents who received training and skills development in the 2016-17 financial year, what (a) is the military formation that each was part of, (b) are the details of the training and skills development, (c) are the details of each service provider who provided training, (d) are the details of the venues, including (i) town, (ii) province and (iii) number of military veterans in each venue, (e) is the total cost incurred for the training provided and (f) are the reasons that none of the military veterans were placed in a job?
Reply:
(a) When accessing the skills development benefit, previous formation or grouping is not part of the prerequisite. The department (skills development doesn’t request applicant to provide information in that format, therefore such information is not available.)
(b) What are details of the training and skills development?
Response
The training requested by military veterans and their dependents varies from Agriculture, driving school, security, computer literacy, plumbing, welding etc. attached hereto is the list of military veterans and their dependents training provided.
(c) Details of each service provider who provided training.
Response
List of service providers.
There are over 40 training provider reflected on the attached list.
(d) details of (i) town, (ii) province and (iii) number of military veterans in each venue,
Response
The methodology of implementing training and skills development is of the reactionary basis. The applicant identifies his/her area of needs / training and the institution / service provider for that particular training and thereafter submit a request to the department. It is for that reason that the department has limited information on the service provider, their facilities, town etc.
(e) The total cost incurred for the training provided.
Response
The total expenditure for 2016-17 on training and skills development is attached.
06 December 2017 - NW3850
Tarabella - Marchesi, Ms NI to ask the Minister of Basic Education
Are principals who fail to report instances of (a) sexual abuse and/or (b) physical abuse to the relevant provincial department of education (i) disciplined or (ii) prosecuted for failing to do so?
Reply:
In terms of the law, principals who fail to report instances of (a) sexual abuse and/or (b) physical abuse to the relevant Provincial Department of Education (i) must be disciplined or (ii) prosecuted for failing to do so. Employers are expected to discipline such principals since they are entrusted with the duty of care towards children. If the case was reported to the South African Police Services (SAPS) and it was established during the investigation that the principal was aware of the allegations before it could be reported, then the principal will be charged with a criminal offence. Section 54 of the Criminal Law (Sexual Offences and Related Matters) Amendment Act 32 of 2007 and section 110 of the Children’s Act, 38 of 2005, put an obligation on any person who has knowledge of any commission of child abuse (sexual and/or physical abuse) to report such abuse to the police official and/or social worker. It is therefore in terms of the above-mentioned legislation the responsibility of the person who has first-hand information of the alleged offence to report the OR Tambo airportoffence to SAPS.
06 December 2017 - NW3910
Figg, Mr MJ to ask the Dr M J Figg (DA) asked the Minister of Public Works
With reference to his department’s mandate as custodian of the country’s immovable assets, what are the details of the condition of state-owned buildings?
Reply:
DPW conducted physical verification and condition assessment on the entire portfolio of immovable assets consisting of Ninety Three Thousand Nine Hundred and Forty Four (93,944) buildings and improvements as per Section 13(d) of Government Immovable Asset Management Act (GIAMA). The Immovable Asset Register includes buildings and improvements which have been assessed as follows: