06 June 2022 - NW1848

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

Whether, with reference to the replies to questions 1030 on 14 November 2019 and 497 on 2 March 2021, the City of Ekurhuleni met the deadline of October 2019 to have 40 buses operating; if not, what is the position in this regard; if so, what are the relevant details; (2) whether he will furnish Mr C H H Hunsinger with copies of the relevant correspondence of any caution issued by his department; if not, why not; if so, on what date; (3) whether there were any further requests for rollovers of unspent grant funding to his department; if not, what is the position in this regard; if so, what was/were the relevant amount(s); (4) what are the full and relevant details provided to his department of the amounts, sources of funding and reasons that short-term leases were entered into when records indicate long-term funding by various institutions; (5) (a) what is the total number of buses that have been bought, (b) how were the transactions funded and (c) how did the Vehicle Operating Company, a separate legal entity from the KTVR that was not yet constituted, secure financing in its name for the buses?

Reply:

1. A total of 40 buses were procured and were operating by October 2019. These took a year for these operations to be fully phased in due to the Covid-related drop in passenger demand.

These 40 buses are all currently being used to operate three (3) services between Thembisa hospital and Isando Industrial area, Bartlett Industrial area and OR Tambo International Airport.

2. The Department has held at least 3 Bilateral meetings per year on project progress with the City of Ekurhuleni. The need to complete unfinished work, ramp-up services and increase revenue has been continuously raised.

The City team has committed to do their best to implement changes. The Department has indicated it will continue to monitor progress.

3. The City of Ekurhuleni has not requested any rollover of unspent funds from the allocated budget in the current financial year.

4. The City indicates that all 40 buses have been procured. Initial leases were an interim measure to secure vehicles for services prior to the KTVR operating company being able to secure financing.

The Public Transport Network Grant (PTNG) covers the cost of vehicles as a capital subsidy. This subsidy is either paid to the operating company, if it secures financing; or as a direct purchase by the City.

5. a. 40 buses have been bought to date.

b. The Vehicle Operating Company (VOC) and KTVR are the same entity, KTVR (the VOC) obtained approval for bus funding through Bidvest Bank. The City used PTNG funds to enable KTVR to settle the loan. The Grant allows for a capital subsidy for bus purchase.

c. KTVR is the Vehicle Operating Company. There is no separate legal entity

06 June 2022 - NW1358

Profile picture: Matiase, Mr NS

Matiase, Mr NS to ask the Minister of Social Development

What impact has the COVID-19 virus had on the total number of persons who have been included in the social welfare programme since the outbreak of the specified virus?

Reply:

The COVID-19 pandemic that has spread rapidly and extensively around the world since March 2020, has had profound impact on the delivery of social development services to citizens especially community mobilisation, sustainable livelihoods, food security, registration and funding of non-profit organisations services. The unfolding crisis has affected these services and threatened people’s access to services and food. The country has witnessed not only a major disruption to food supply chains in the wake of lockdowns triggered by the global health crisis, but also a major global economic slowdown.

These crises have resulted in lower incomes and higher prices of food, putting food out of reach for many, and undermining the right to food and stalling efforts to meet Sustainable Development Goals. The Department (DSD) has been providing food and nutrition services to combat the growing challenge of malnutrition and hunger amongst poor and vulnerable communities therefore Covid-19 pandemic disrupted the provision of such very important commodity.

Prior to the outbreak of COVID-19 pandemic, the department developed a system of service delivery that empowered communities with economic empowerment projects, mobilisation and dialogue, food distribution and registration and funding of NPOs. South Africa has experienced an increase in the levels of food insecurity and vulnerability during this pandemic and the necessary lock-down to prevent the spread of the virus. Prior to lock-down the percentage of households with inadequate access to food was at 20.2% (3 347 342 people) in 2018. The lock-down exacerbated the magnitude of the need for food as more poor people living below the food poverty line found themselves with limited resources to sustain food supplies for their families.

The number of people accessing nutritious foods through DSD Food Programmes increased to 9 244 072 and 2 264 325 households, whilst the target set was 3 300 000 people and 1 million households. There was an increase in the number of persons accessing Psychosocial Support Services in 2020 as opposed to 2019. The increase can be attributed to the trauma resulted from the overall COVID-19 situation in the country.

The DSD through the Gender Based Violence Command Centre (GBV CC) mended by Social Workers dealt with all forms of trauma. There are number of reasons to the increase in the number of persons accessing psychosocial service via the GBV CC. For e.g. during the hard Lock down of March 2020, many people found themselves in confined spaces, with threatened job losses/security, this meant more people needed psychosocial support services. The Command Centre as a 24/7 telephonic service and was easily accessible under lockdown restrictions. Below table indicates over 50% increase on the comparison of number of persons who accessed the Centre for the period under review (2019 Vs 2020).

Table

Description automatically generated

  • Above indicates exponential increase of over 50%
  • The below is the reflection of number recorded cases that have since remained stable in 2021 as the situation of COVID-19/restrictions have been eased:

GBVCC Statistical Report

Date

Telephone call Receive

USSDs Received

SMS’s Received

Total

Jan - Dec

73 829

3484

2843

80156

Some of the impact of COVID 19 on shelters for victims of crime and violence are as follows:

  • Beneficiaries of services in social welfare facilities which amongst other include older were negatively impacted by restrictions imposed by the Disaster Regulations and Directions which did not allow any visitation to these facilities during COVID 19. The closure of community-based programmes also created a burden to families who were strained and were not prepared to care for their individual members during that period.
  • There was also a sudden increase in the number of persons who used the anti-substance abuse services. The following table illustrates number of persons reached through Anti-Substance Abuse programme during the 2020/21 and 2021/22 financial years:

Level of services

2020/21

2021/22

Prevention

217 9218

5 085 296

Treatment

32 575

44 332

Aftercare

7 557

10 032

Total

2 219 350

5 139 660

In general, the social welfare programme has been partially negatively impacted to render services as expected as the result of the outbreak. Some of the programmes that are customised to be delivered physically were compromised and delivered using the hybrid model and not all provinces and persons are having excess to the technological infrastructure.

The Department of Social Development (DSD) along with its agencies (South African Social Security Agency – SASSA and the National Development Agency - NDA) have initiated a Social Sector Research, Monitoring and Evaluation Technical Working Group for COVID-19 related projects. The studies which included three (3) rapid assessments were conducted to gather robust evidence on high priority strategies implemented in response to the COVID-19 pandemic. The table below summarises the findings of the three studies.

TITLE OF STUDY

KEY FINDINGS

1. Rapid Assessment on the Implementation and Utilisation of the Special R350 COVID-19 Grant

The findings indicates that:

a) Communication about access, application process and criteria as this was misunderstood by those in need and this area requires improvement.

b) The beneficiaries of the Special R350 COVID-19 grant are most likely in rural areas, less educated, less tech-savvy, and heavily reliant on word of mouth communication.

c) Reach was subsequently hindered as those that qualified did not have the means and/or knowledge of how to apply.

d) There is also a strong need to find ways to mitigate and bridge the digital divide in the administration of social security. This is supported by majority of the respondents (88%) who maintain that the grant to be accessed by all poor individuals that apply as there are many poor people in South Africa (as explained by 77% of respondents).

2. A rapid assessment of key monitoring indicators of measuring the impact of Covid-19 lockdown on child wellbeing in South Africa

a) General observations: The responsibility to care for children predominately rest on single parents. There are variations in family dynamics and support structure in different districts with possible implications for wholesome childcare and protection. This supposition is illustrated in various findings and should be considering in developing community specific interventions. Most households are headed by unemployed females who predominantly depend on child support grants. The high burden of childcare on single parents may be an impediment to pursue opportunities to improve their material circumstances and possibly break the circle of poverty and impoverishment.

b) Child Protection and Psychosocial Domains: A higher proportion of children feel unsafe even if they have never been hurt. This may be reflective of the internal and external environment they find themselves. Exposure to adult violence was high in most of the districts and children in most cases reported being hurt, highlighting child safety and protection issues. Sexual abuse rates are high and affects children of all ages, with risk increasing by age group. The long-term psychosocial health implication of this may require attention and the integrated school health programme can be leveraged.

c) Food Security and Anthropometric Findings: Rates of experience of hunger are concerning and vary considerably across districts. These variations are potentially due to prevailing socio-cultural, environmental, and economic dynamics. Anthropometric findings indicate that among vulnerable children targeted by this study, the prevalence of malnutrition is very high as reflected by the high proportions affected by stunting and underweight.

d) Education and Economic Wellbeing Domains: A concerning proportion of children of school going age are not attending school especially among the younger age groups. Special programmes to ensure greater school attendance are essential as a path to true self-reliance. High proportions of children reported having limited or no support with schoolwork and also many don’t have access to stationery. A portion of the household heads reported not being able to provide basic needs such as food, water, and clothing despite the grants. Higher proportions of children from households with other income sources access basic needs compared to those that are solely dependent on social grants. Families that reported being able to provide basic needs had higher proportions of children who attend school regularly and their daughters are less likely to miss school due to not having sanitary pads.

e) Health and HIV/AIDS Domains: There are varying levels of poor health among children across districts, with high rates of recent illness reported in the same districts that also had the lowest health seeking rates. Overall findings indicate high rates of recent illness reported among vulnerable children. Poor health seeking observed in some districts may indicate systemic challenges related to access to healthcare which require more investigation.

3. Synthesis evaluation of Social Development sector’s response to food relief mechanism during Covid-19

a) Relevance: The study found that the DSD food relief intervention was relevant for SA government needed to continually address the root causes of poverty, hunger and unemployment through policy initiatives and safety nets such as social grants to economically disempowered persons. There is a need for a systematic and consolidated approach to address the haphazard nature of government response to hunger and unemployment due to the lack of an integrated strategy to assist vulnerable people during crisis periods.

b) Cohesion: The relief effort was targeted at reaching the vulnerable families, experiencing severe food insecurity during the lockdown period and was designed to be a stopgap measure to allow time for the more systemic government grant solutions to come on stream, and the resumption of government feeding programmes at schools and DSD centres.

c) Effectiveness: The department was able to reach the most deserving vulnerable people through its partnership with SASSA. DSD and SASSA worked on a digital method for people to apply for grants as well as for the R350 Social Relief of Distress grant. This digital method applied to both smart and non-smart mobile phones to allow for others to apply on behalf of people who did not have a mobile phone or were not comfortable using one.

d) Efficiency: There was resource efficiency given that most of the Fund’s disbursement went directly to beneficiaries, with very limited funding covering intermediary distribution costs. On average, the distribution costs were 6% of the total disbursement, with remote areas incurring higher distribution charges.

e) Sustainability: Collaboration between the various levels of government and non-state actors in providing food relief response proved the potential of effective intergovernmental relations in responding to the needs of the poor. The use of hybrid food distribution (food parcels, cooked food and e-Voucher) model. The use of other stakeholders (multi-stakeholder approach to food distribution) will in future provide a working model for implementing food relief for future disasters. The disaster also assisted the capacity development of DSD internal systems for planning for disasters.

06 June 2022 - NW1796

Profile picture: van der Merwe, Ms LL

van der Merwe, Ms LL to ask the Minister of Social Development

(a) What (i) total amount did her department return unspent to the National Treasury at the end of the 2021-22 financial year and (ii) is the breakdown of the specified amount in terms of each of her department’s provincial departments and (b) how did the underspending affect the budgets available to her department’s welfare programmes in each province?

Reply:

a) Amounts unspent for the 2021/22 financial year

(i) National Department of Social Development.

The underspending relates to the social assistance grants (Old ages and Child Support Grants) for which less than expected beneficiaries have applied and being paid during the financial year.

The table below illustrates the preliminary underspending per programme:

Programme

Final

Approp

R’000

Prelim Exp Mar 2022

R’000

Prelim Deviation

R’000

Administration

474 797

472 269

2 528

Social Assistance

224 542 226

222 717 897

1 824 329

Social Security Policy and Admin

8 072 401

8 052 807

19 594

Welfare Services Policy Development and Implementation Support

1 516 316

1 505 208

11 108

Social Policy and Integrated Service Delivery

366 378

360 751

5 627

Grand Total

234 972 118

233 108 932

1 863 186

b) The above under-spending had no impact on Social Welfare Services, all organisations approved for funding were allocated funds accordingly

(ii) Provincial Departments of Social Development.

  • Eastern Cape

(a) See the link: https://pmg.org.za/files/1/Eastern_Cape.pdf

b) The impact of underspending on Social welfare Services affected the following:

  • Service Centres- the maximum number of beneficiaries were kept at 20 for all the centres.
  • Services to Persons with Disabilities- The funding for Sakhingomso in OR Tambo and CBR in Joe Gqabi will was not funded.
  • Social Relief of distress- less number of students will benefited from the uniform purchased from this funding.
  • Reduction of awareness programmes on prevention of GBV and Femicide (both physical and through media).
  • Reduced monitoring of services and programmes.
  • Reduced funding to NPOs affecting the number of caregivers and the increment in line with Ministerial Determination.
  • Reduced admin funds for funded posts in NPOs.
  • Reduced number of Everyday Heroes Ambassadors.
  • Funds for prevention programmes were affected in funded NPOs as only stipend will be afforded.
  • No expansion of services to underfunded or hot spot areas.
  • No funds for capacity building of caregivers
  • Free State

a) The Final adjusted budget for the 2021/22 financial year amounted to R1 533 739 000 of which R1 507 969 682.66 was spent. An unspent balance of R25 769 317.34 remained.

The under expenditure realised within the department was mostly due to the ECD Conditional Grant allocated within Programme 3. Remaining funds in respect of the maintenance portion as well as the ECD Stimulus Relief Fund were requested for rollover.

  • Gauteng

(a)

Gauteng Department of Social Development underspent the allocated budget for the 2021/22 financial year by R122,991 million.

The table below illustrates areas of underspending per standard item for the Gauteng Department of Social Development.

Economic classification

Final Approp

R’000

Expenditure

R’000

Variance

R’000

% Spent

Compensation of employees

2 050 901

2 028 216

22 685

99%

Goods and services

1 162 709

1 129 995

32 714

97%

Provincial and local governments

2 362

2 362

-

100%

Departmental agencies & accounts

1 969

1 969

-

100%

Non-profit institutions (npi)

2 783 547

2 717 156

66 391

98%

Households (hh)

13 311

13 311

-

100%

Buildings & other fix struct

94 281

93 080

1 201

99%

Machinery and equipment

38 836

38 836

-

100%

Payments for financial asset

641

641

-

100%

Grand total

6 148 557

6 025 566

122 991

98%

  • Compensation of Employee - 99%

Additional funds received in the 2021/22 adjustment budget period to appoint Social Workers on a four-month contract was not spent in full.

  • Goods and Services - 97%

The underspending in this category is mainly on dignity packs due to late finalisation of specifications. In addition, the allocation received for the maintenance of ECD centres was not spent in full as some of the facilities identified for renovation were found to be closed and no longer in operation.

  • Non-Profit -Institutions - 98%

The allocated budget for ECD Employment Stimulus Relief Fund was not spent in full due to rejections caused by unverified bank accounts, ECD Centres registered as Companies, Partnerships, and other forms of businesses other than Non-Profit Organisations.

  • Building & Other Fixed Structure - 99%

The infrastructure budget was underspent by 1% due to delays in completion of some projects.

The Gauteng Department of Social Department applied for the roll-over of unspent funds for ECD Employment Stimulus Relief Fund amounting to R 63,049. This amount will be used to fund commitments not paid by the 2021/22 financial year. The balance of R59,942 million not spent will be surrendered to the Provincial Revenue Funds after the audit process is finalised.

b) The welfare programme affected by the underspending is the delivery of dignity packs as the target for the 2021/22 financial year was not achieved by the end of the financial year.

-KwaZulu Natal

a) A total of R82, 255 million was unspent in the financial year 2022/2023 in respect of Early Child Development (ECD) grant.

(ii) An amount of R78,781 million is in respect of the Presidential Stimulus Package.

An amount of R1, 340 million is in respect of ECD subsidy expansion. The cause for not spending the funds is that the ECD centres who had been identified for funding were found to be non-functional. Other ECD centres were found to have previously mismanagement funds and as a result funding was stopped.

An amount of R2, 134 million is the balance of the rollover amount in respect of ECD maintenance funds that were repurposed for procurement of PPPE`s for unfunded ECDs

b) The equitable share allocation was overspent by R26 105 million.

  • Limpopo

a) The department surrendered R74,255,121 to National Treasury for 2021/22 financial year as detailed below:

cid:image002.png@01D86477.CE737AB0

-Mpumalanga

a) Unspent funds for the period ended 31 March 2022 amount to R53.068 million.

The underspending largely relates to conditional grant funding of Early Childhood Development (ECD) stimulus package which is attributed to payment rejections due to challenges of bank account of beneficiary ECD centres.

Application to request roll-over of unspent funds has been submitted to the Provincial Treasury to fund these commitments in 2022/23 financial year

(b) The under spending did not affect budget availability on any welfare programmes.

  • Northern Cape

(a)

  • Compensation – R 12,213 million

The saving in the compensation budget is due to vacant positions. The Department applied for a roll-over of R4,6 million for the appointment of Social Work leaners. Furthermore, the Department advertised vacant Social Workers and Community Development Workers positions in April 2022.

  • Goods and Services – R 8,978 million

The savings under goods and services was due to late implementation of some of the programmes due to Covid-19. As a result, the Department has accruals of R6,191 million. The Department will engage Provincial Treasury for possible roll-over to cover the accruals in the new financial year.

  • Transfers and Subsidies – R 12,765 million

The savings was primarily due to a decrease in the number of children at the children’s homes and reduction in the number of compliant ECDs.

  • Capital Expenditure – R R8,877 million

The Department applied for a roll-over of R6,9 million for the completion of infrastructure projects. Due to Covid-19, the delivery of computer equipment was delayed resulting in a saving.

  • Conditional Grant

ECD Administration allocation – R 1,414 million

The Department had a saving due to two vacant positions of a project manager and an administrative clerk.

  • Transfers and Subsidies – R 10 460

The saving is made up of the under-spending on the Presidential Stimulus package and ECD subsidies.

b) The above under-spending had no impact on Social Welfare Services, all organisations approved for funding were allocated funds accordingly.

-North West

(a)(i) The NW DSD returned R142,1 million

(ii) The breakdown is as follows

Programme

Budget

Expenditure at 31 March 2022

Available Budget

Administration

221 189 000

216 498 784

4 690 216

Social Welfare Services

563 466 000

540 037 020

23 428 980

Children and Families

541 538 000

464 876 952

76 661 049

Restorative Services

311 266 000

285 745 503

25 520 497

Development and Research

190 138 000

178 242 933

11 895 067

Grand Total

1 827 597 000

1 685 401 191

142 195 809

b) The underspending affected the programs negatively due to accruals relating to goods and services to be paid in the current financial year, over and above the budget reduction implemented during the 2021 MTEF period

  • Western Cape

a) The Western Cape DSD have spent R2,705 billion of the R2,726 billion adjusted budget that translates to 99.25% spent. This means an amount of R20.388 million was unspent.

The underspending relates to the following:

    • Procurement of specialized vehicles for the transport of children with intellectual disabilities (R6.290 million).

In terms of the procurement of the vehicles, the delivery of the vehicles did not take place by 31 March 2022. It is expected that the adapted vehicles will be delivered by GMT (Government Motor Transport) within the 2022/23 financial year.

    • Sanitary Dignity Project (R1.549 million).

The reason for the underspending in 2021/22 was due to the service provider informing the Department on 9th March 2022 that the delivery scheduled for March 2022 could not be completed due to the impact of load shedding and the non-availability of packaging. On 31 March 2022 the Department approved a 60-day extension ending 31st May 2022 for the delivery of the outstanding stock.

    • ECD National Conditional Grant and Partial Care (R10.306 million)

The department realised a saving of R10.306 million on the ECD CG. The reason for the unspent funds were that no new unregistered ECD centres applied for funding and thus no applications were received.

    • ECD Equitable Share (R2.243 million)

The department realised a saving on R2.243 million on the ECD Equitable Share. The reason for the unspent funds were due to fewer than anticipated unregistered ECD centres applied for funding and thus no applications were received.

06 June 2022 - NW1790

Profile picture: Powell, Ms EL

Powell, Ms EL to ask the Minister of Human Settlements

What total number of (a) Breaking New Ground houses, (b) Social Housing Opportunities, (c) Informal Settlement Upgrades, (d) Finance-Linked Individual Subsidy Programme opportunities and (e) title deeds did her department deliver in each province for the 2020-21 financial year?

Reply:

a) The total number of Breaking New Ground houses delivered in each province for the 2020-21 financial year.

Province

2020/21 FY

 

Houses delivered

Eastern Cape

5 427

Free State

1 890

Gauteng

9 495

KwaZulu-Natal

10 315

Limpopo

4 518

Mpumalanga

4 522

Northern Cape

221

North West

2 847

Western Cape

6 354

Total

45 589

b) The total number of Social Housing Opportunities delivered in each province for the 2020-21 financial year.

Community Residential Units (CRU’s)

Province

2020/21 FY

 

CRUs

Eastern Cape

0

Free State

602

Gauteng

0

KwaZulu-Natal

404

Limpopo

0

Mpumalanga

0

Northern Cape

0

North West

0

Western Cape

0

Total

1006

Social Housing Programme

Province

2020/21 FY

 

Social Housing units

Eastern Cape

385

Free State

0

Gauteng

1049

KwaZulu-Natal

0

Limpopo

164

Mpumalanga

0

Northern Cape

0

North West

0

Western Cape

258

Total

1856

c) The total number of Informal Settlement Upgrades delivered in each province for the 2020-21 financial year.

Province

2020/21 FY

 

Informal Settlements Upgrading Plans developed (constitute Phase 1)

Eastern Cape

42

Free State

19

Gauteng

46

KwaZulu-Natal

30

Limpopo

16

Mpumalanga

24

Northern Cape

74

North West

30

Western Cape

12

Total

293

d) The total number of Finance-Linked Individual Subsidy Programme (FLISP) opportunities delivered in each province for the 2020-21 financial year.

Province

2020/21 FY

 

FLISP

Eastern Cape

71

Free State

150

Gauteng

46

KwaZulu-Natal

313

Limpopo

32

Mpumalanga

39

Northern Cape

17

North West

131

Western Cape

1 176

Total

1 975

NHFC

1 186

Grand Total

3 161

e) The total number of title deeds delivered in each province for the 2020-21 financial year.

Province

2020/21 FY

 

Pre 1994

Post 1994

Current and New developments

Eastern Cape

234

658

-

Free State

51

2 911

1 171

Gauteng

32

2 303

1 178

KwaZulu-Natal

442

1 187

1 650

Limpopo

3

620

436

Mpumalanga

196

579

1 036

Northern Cape

178

253

12

North West

30

507

-

Western Cape

88

1 025

 

Total

1 254

10 043

5 483

06 June 2022 - NW1689

Profile picture: Madokwe, Ms P

Madokwe, Ms P to ask the Minister of Transport

Whether, considering the persistent rains in the Eastern Cape over the past three weeks which have resulted in a lot of damage to the roads, his department has made an assessment of affected villages; if not, why not; if so, what plans have been put in place to tar the roads in villages and eradicate gravel roads which get destroyed each time it rains?

Reply:

Yes, the Department has made assessment on the Provincial network. There are two processes currently underway and those are:

  • COGTA or National Disaster Management Centre processes – this is the normal process that gets undertaken when disasters occur. It requires declaration, gazette and verification of assessment; and the process normally takes longer than 6 months to be concluded.
  • National Department of Transport processes – Department is intervening in the Provinces that were recently affected by recent (April) disaster and Eastern Cape is one of those. There are series of meetings conducted in order to identify the exact intervention required. NDOT is considering reprioritising some of the Provincial Roads Maintenance Grant (PRMG) to disaster affected Provinces. NDOT processes are at advanced stages and ECDOT is finalising its implementation plan.

It must be mentioned that both processes will not result in roads being upgraded to surface standard but will restore condition to its original state.

06 June 2022 - NW1518

Profile picture: Sithole, Mr KP

Sithole, Mr KP to ask the Minister of Transport

Whether, given that the Passenger Rail Agency of South Africa (Prasa) is in a dire financial position, as it is not generating sufficient revenue to cover its operating costs as per his utterances during the virtual meeting of the Standing Committee on Public Accounts on 29 March 2022 and, following the recent conviction of a taxi driver for arson in Eerste River who stated that his motives were purely to generate more business for the taxi industry, his department has plans in place to tackle the issues of (a) Prasa operations and (b) the taxi industry, given that this is not an isolated incident and it has the potential to happen again; if not, why not, in each case; if so, what are the full, relevant details in each case?

Reply:

a) PRASA operations are receiving increased attention from the Department in a number of ways:

  1. In terms of the Shareholder Compact and Corporate Plan Prasa submits quarterly reports to the Department as a monitoring mechanism to track progress in key deliverables signed by the Minister and the Board of Control;
  2. Quarterly meetings are held to present progress reports to the Department of Transport;
  3. The Capital Project Steering Committee (CPSC) has been established and is convened quarterly to monitor progress in the implementation of CAPEX;

In addition to the above mechanisms the CPSC conducts oversight on the projects to verify information submitted.

b) PRASA has made strides in implementing the Integrated Security Plan launched by the Minister in October 2020. Security deployments have been made across identified hotspots.

Crimes and the type of crimes vary within PRASA. Constant intelligence and crime operations shows the different modus operandi within the different regions. When looking at the various crime data and information gathered, it shows how different regions will experience different types of crimes.

Intelligence driven projects, and criminal syndication penetration operations, have yielded great results. This would need to be intensified by strengthening PRASA joint operations with both the State security agency and SAPS crime intelligence.

06 June 2022 - NW1831

Profile picture: Motsepe, Ms CCS

Motsepe, Ms CCS to ask the Minister of Transport

What intervention measures have been put in place by his department to assist bus drivers, especially those driving buses belonging to a certain company (name furnished), who have not received any salary slips since 2019, are without leave days and have not received any increment?

Reply:

The company that is being alleged to be violating labour laws does not have a contract with government as it operates long distance or tourist services. However, the South African Road Passenger Bargaining Council (SARPBAC) is the enforcement agency for non-compliance with labour laws in the bus sector. Therefore, any non-compliance with basic conditions of employment and other labour practices by the operator should be reported at the agency. The Department of Employment and Labour may also be of assistance on this matter.

06 June 2022 - NW1617

Profile picture: Van Minnen, Ms BM

Van Minnen, Ms BM to ask the Minister of Transport

With reference to the briefing at the meeting of the Standing Committee on Public Accounts on 29 March 2022, wherein the committee was briefed on the sharp decline in income and the number of commuters making use of the railways, what (a) was the total number of commuters making use of the Passenger Rail Agency of South Africa (Prasa) network in the past five years and (b) was the income generated in the specified period versus the capital grants from the State used to support the operational costs of Prasa?

Reply:

(a)

Table 1: Passenger Volumes: 2017/18 – 2021/22

PERIOD

COMMUTER NUMBERS

2017/18

269,925,897

2018/19

208,888,587

2019/20

115,417,417

2020/21

8,147,180

2021/22

16,699,332

(b) Income Generated during the last 5 years as a % of Opex

Table 2: Income Generated versus Opex and Subsidy

Table 2 above proves the reply given earlier that the income generated through fare revenue during the last five years only covered a portion (or 10%) of operational costs. The rest has been covered through subsidy which indicates a heavy reliance on state support to operate commuter rail operations.

The major cause for this decline is the vandalism and theft of our Rolling Stock and Network Infrastructure impacting significantly on the optimal operations and in turn revenue collection. This was as a result of the lack of security to protect our infrastructure and network. The level 5 lockdown regulations imposed to mitigate the COVID-19 pandemic from 2020-2021 completely halted the operations, easing to levels 3 and 2 into 2021-2022 with limited operations also contributed to revenue loss.

06 June 2022 - NW1517

Profile picture: Sithole, Mr KP

Sithole, Mr KP to ask the Minister of Transport

Given that road infrastructure plays a critical role in the Republic’s economy and is the main mode of transport for goods, with the rail sector facing numerous challenges, and in light of the great amounts of money that small-scale farmers spend in attempting to fix the damaged roads themselves, which is surely unsustainable and may cripple them in the long run, what (a) plans does his department have in place to address the Republic’s ageing road infrastructure and (b) has been the (i) successes and (ii) challenges experienced in the implementation of the specified plans?

Reply:

a) It is true that the road infrastructure plays a critical role in the economy of our country and has to play a complimentary role with regards to its sister mode, the rail infrastructure. It is for this reason that while the department is putting policies for rail sector, the road sector is going ahead with its road infrastructure plan:

i) The road policy is being developed with four critical chapters, namely: Road Safety, Road Financing, Non-Motorised and road infrastructure delivery models. The consultation of this policy position is underway and would be concluded soon.

ii). The classification of roads in South Africa is underway and this in terms of the RISFSA guideline document and this classification will guide spheres of government on the responsibility as Road Authorities.

iii). The national roads are managed by SANRAL which is the road agency of the National Department of Transport whilst other categories of road are managed by provincial road department and municipalities.

Table one below explains road network and the responsible authority to manage it:

Authority

Paved

Gravel

Total

SANRAL

22,262

0

22,262

Provinces – 9

46,511

226,273

272,782

Metros – 8

51,682

14,461

66,143

Municipalities

37,680

219,223

256,903

Total

158,124

459,957

618,081

Unproclaimed (estimated)

 

131,919

131,919

Estimated total

158,124

591,876

750,000

 
  • Unproclaimed roads = Public roads not formally gazetted by any authority

iv) Provincial roads receive a grant called Provincial Roads Maintenance Grant (PRMG) from National Department of Transport (NDOT). The NDOT does oversight role on business plans submitted by provinces during the implementation stages of the grant.

This grant started during 2011/12 financial year and it is addressing the maintenance challenges the provinces face on their roads.

(b) (i)There has been huge successes with regard to road programs across the country:

-SANRAL: Road network is one of the best and it is ranked 18th in the world

-Provincial Roads are mostly having challenges due to the lack of critical technical skills at both Provincial and Municipal spheres of government. For this reason SANRAL is now assigned responsibilities to assist with technical skills for the construction and maintenance of provincial road in particular by entering into MOU/MOA, and also in skills transfer.

(ii) Challenges experienced:

  • There is a shortage of requisite technical skills particularly at Provincial and Municipal levels. They are unable to keep top engineers and relevant technical skills where the private sector pays more than the government.
  • The business forums disrupt projects demanding 30 percent without doing any work.
  • Another challenge is the level of funding in general, which is still lower than what is required and this is a general problem across all sectors.

As the economy improves, we believe government will be able to assist all sectors of our economy.

06 June 2022 - NW1758

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

(1) With reference to the reply to question 3520 of 23 November 2017, on what date did the (a) bus rapid transport kerbside and (b) trunk route become fully operational; (2) whether negotiations with taxi associations been completed; if not, (a) what are the obstacles preventing the finalisation of the negotiations and (b) on what basis is the special purpose vehicle KTVR for Katlehong, Tembisa, Vosloorus and Reiger Park operating and being funded by the City of Ekhuruleni if negotiations with the taxi industry have not been finalised; if so, what are the relevant details; (3) whether all the pedestrian bridges were (a) completed and (b) opened; if not, (i) why not and (ii) what are the revised completion date(s); if so, on what dates?

Reply:

1. (a) The Kerbside operations of the City of Ekurhuleni’s Bus Transport commenced in October 2017/18 with an introductory service with 8 buses operating between Thembisa and Isando Industrial area. In 2019/20 with the introduction of 10 additional buses (total of 18 buses) the system network was extended to OR Tambo International Airport. In 2021/22 additional 22 buses were introduced (total of 40 buses) the system was further extended to Bartlett Industrial area.

(b) The partial operations of the dedicated bus lanes commenced in 2019 when the system was extended to OR Tambo International Airport.

2. (a) Negotiations with the taxi industry for permanent compensation for Phase 1A have not been completed due to disunity within the taxi industry, and the City is actively assisting in resolving.

(b) KTVR is the current Special Purpose Vehicle (SPV) operating Harambee Bus service on behalf of the City and is solely funded for such operations. Finalisation of negotiations with the taxi industry shall result in the payment of permanent compensation.

3. (a) (b) Construction of the six pedestrian bridges along the dedicated bus lanes along Andrew Mapheto Drive and Zuurfontein Road were completed in 2019 and are currently open to the public.

06 June 2022 - NW1815

Profile picture: Nolutshungu, Ms N

Nolutshungu, Ms N to ask the Minister of Transport

What are the full details relating to the continued extension of the Public Utility Transport Corporation subsidised bus service by the Gauteng Department of Roads and Transport?

Reply:

The Department of Roads and Transport in Gauteng are the custodians of the subsidised contracts with the Public Utility Transport Company (PUTCO). There are 34 subsidised bus contracts in Gauteng and 7 of these belongs to PUTCO. However, all bus contracts in Gauteng have reached the end of their contract life, some as far back as 2003, but due to lack of sufficient funds these contracts have not been renewed but are being extended on a short-term basis. This is a problem that is not only confined to Gauteng but apply nationally. There are 108 subsidised bus contracts across all provinces and all have reached the end of their contract life and have also been extended on a short-term basis. The continued extension of subsidised bus contracts is simply to ensure that there is no total collapse of services in the country whilst government is in the process of resolving this matter. There are ongoing discussions between the Department and National Treasury exploring various options for implementing a sustainable public transport funding model which includes the development of a subsidy policy.

 

06 June 2022 - NW1816

Profile picture: Nolutshungu, Ms N

Nolutshungu, Ms N to ask the Minister of Transport

What has delayed the appointment of new boards for each specified entity given that the board terms for the (a) Cross Border Road Transport Agency, (b) Road Traffic Management Corporation and (c) Airports Company South Africa have expired?

Reply:

The following are the status of the appointment of Boards of the specified entities: -

a) The Cross Border Road Transport Agency (C-BRTA) has a constituted Board which was appointed with effect from 1st July 2021 and its term is ending on 30 June 2023.

b) The Board of the Road Traffic Management Corporation (RTMC) is appointed by the Shareholder Committee as contemplated by section 10 of the RTMC Act. The Shareholders Committee is a forum through which the national, provincial and local spheres of government co-operate with each other and with other persons or bodies concerned with road traffic matters. The Shareholder Committee consists of the Minister of Transport and every MEC of transport in the 9 provinces of South Africa. The Committee has initiated the process of appointment of the Board and this process will be finalised soon.

c) The term of the Board of the Airports Company of South Africa ended on 31 August 2021 and it has been extended until the process of appointment of a new board is completed. The process of appointment is at an advance stage and will be completed soon.

06 June 2022 - NW1817

Profile picture: Nolutshungu, Ms N

Nolutshungu, Ms N to ask the Minister of Transport

(1)(a) In which city is his department piloting the integrated ticketing system and (b) which modes of transport are involved in this pilot; (2) whether minibus taxis are included in the pilot; if not, why not; if so, how are they included in the process?

Reply:

1. a & b.

Rustenburg, Polokwane and Mangaung are the first three of the ten IPTN

cities that should implement the first integrated ticketing pilots in 2022. It will involve IPTN trunk and feeder buses and if applicable, contracted IPTN minibus services as well.

2. Santaco has been included in the rollout and are currently consulting on identifying their own pilot site utilising minibus taxis.

06 June 2022 - NW1592

Profile picture: Faber, Mr WF

Faber, Mr WF to ask the Minister of Social Development

Whether (a) her department and/or (b) entities reporting to her concluded any commercial contracts with (i) the government of the Russian Federation and/or (ii) any other entity based in the Russian Federation since 1 April 2017; if not, what is the position in this regard; if so, for each commercial contract, what are the (aa) relevant details, (bb) values, (cc) time frames, (dd) goods contracted and (ee) reasons why these goods could not be contracted in the Republic?

Reply:

DEPARTMENT OF SOCIAL DEVELOPMENT (DSD)

(a)(b) (i)(ii) (aa)(bb)(cc)(dd)(ee) Neither the Department nor its public entities have concluded any commercial contracts with the Government or any entity.

06 June 2022 - NW1812

Profile picture: Langa, Mr TM

Langa, Mr TM to ask the Minister of Transport

By what date will his department repair the stretch of road from Mpumalanga Airport to Nelspruit, which is full of potholes?

Reply:

The Road Construction and Maintenance Indaba held in February 2022 resolved to prioritise pothole fixing as one of the interventions to address the rapid deterioration of roads. The Mpumalanga Department of Public Works, Roads and Transport then commenced with pothole patching of the Nelspruit airport road between Plaston and the N4 Karino interchange.

The programme commenced on 18th April 2022 and has been completed on the 6th May 2022.

A small section remains where the pothole patching needs to be done after the underlying layers have been repaired and this should be completed before 31st May 2022.

As the Honourable member may be aware, pothole patching is a temporary intervention as the road has passed its design life and requires rehabilitation, which is not possible currently due to lack of funding.

06 June 2022 - NW1467

Profile picture: Masango, Ms B

Masango, Ms B to ask the Minister of Social Development

Whether the SA Social Security Agency (SASSA) is implementing any of the recommendations from the Workstreams and the Technical Committee for Payments of Social Grants and SASSA Governance reports; if not, (a) why not and (b) which recommendations have not been implemented; if so, which recommendations have been implemented?

Reply:

Yes.The recommendations made by the Technical Committee for Payments of Social Grants were mostly implemented, as most of them dealt with the transition of the payment services from Cash Payment Services (CPS) to the South African Post Office (SAPO) and the governance thereof.

The review of the SASSA implementation processes is in line with the amendments to the regulations. There are however, few governance and institutional reviews that are still work in progress. For example, the Department of Social Development has prepared a draft South African Social Security Agency Amendment Bill whilst the operationalisation of the Social Assistance Amendment Act No. 16 of 2020 and the amendment regulations thereof will be published shortly.

The recommendations by the Technical Committee can be summarised in 7 categories in the table below.

List of recommendations

a) Implemented

b) Not Implemented and why?

Ongoing

1. Documenting standard operating procedures: SASSA needs to document standard operating procedures of the new system as well as incorporate the biometric system. The SOPs must cover the entire cash transfer programme.

Yes:

   

2. Management and administration: A formal process of accountability and responsibility is required in which the system and institution operates. SASSA and SAPO need to collaborate to determine and implement a synchronised accountability system.

Yes:

There is a Service Level Agreement governing and delineating responsibilities in the contract between SASSA and SAPO.

   

3. Process redesign:

Identify multiple payment channels:

(a). Different methods of payment available to beneficiaries;

(b). The investment of SAPO and SASSA staff at the SAPO offices needs to be informed by the beneficiaries’ choice of accessing money.

Yes:

   

4. Management information system: Management and Information systems (MIS) are of crucial importance to ensure cash transfer programmes are effectively implemented.

Yes.

Payment files are generated by the system and verification of beneficiary status with Home Affairs is done monthly before payment is processed.

   

5. Grievance and redress: Implement a grievance system at the different SAPO station and ensure it corresponds to SASSA office grievance and redress.

Yes.

A system is in place whereby beneficiaries can lodge their complaints and grievances at the post office, Postbank and SASSA. Beneficiaries are able to lodge their complaints due to alleged payment fraud. These are investigated and refunded based on the merits of the fraud.

 

 

The refund of beneficiaries is still ongoing.

6. Monitoring and evaluation system: Robust monitoring and evaluation are crucial both for programme performance and political sustainability as well as to ensure quality control and assurance.

Yes:

The SASSA has a monitoring and evaluation system in place though the following structures:

  • SASSA/ SAPO Steering Committee
  • Joint Steering Committee at a ministerial level between Minister of the DSD and Minister of Communication and Digital Technologies
  • Joint EXCO DSD/(DCDT), SASSA & SAPO.
 

This process is ongoing, because the committees meet on a regular basis to monitor and evaluate progress.

7. Financial Inclusion: The current payment plan excludes financial integration for beneficiaries. Increasing financial access to the poor and allowing transfers into an account for beneficiaries enable households to save for future needs.

 

No:

This is due to the high number of deductions on the CPS card; unauthorised deductions such as: airtime, data, enticing people to take more than one funeral policy and loans.

Discussion were held with the oversight structures that the SAPO card will be restricted. Beneficiaries will only be allowed to have one funeral policy deducted and no other unauthorised deductions will be allowed on their SAPO card.

 

Workstreams: For SASSA to be able to effectively insource its core functions (grant administration and distribution) it had to undertake an extensive change programme spanning over 5 years with key functional components and sub-components that required:

  • new and up-skilled workforce,
  • improved business processes, and
  • technology investments.

Therefore, 11 programmes were developed by the workstreams to ensure that a careful and tightly integrated orchestration of activities can be set into motion to ensure that, in parallel to sourcing new payment service providers, that SASSA is able to undertake a number of change and readiness exercises.

It was recommended that in year one (1), a new service provider/s can commence with an on-schedule transfer of functions to SASSA in a phased “transition and integration” towards strategic insource completion.

Recommendations

Implemented

Not implemented

CPS phase-out – Build-Operate- Transfer (BOT) model has been recommended - transitioning strategic functions to SASSA in two phases, every two years in duration, thus resulting in a three-year contract with a two-year extension or ultimately a five year contract.

CPS is no longer rendering any contracted services for SASSA.

Inter-Governmental Partnership in place - SAPO/Postbank services comprising:

  • card issuance
  • over-the-counter payment
  • cash disbursement at pay points.

.

The Built-Operate-Transfer model (BOT) as part of the payment review process – the SASSA / SAPO agreement was based on BOT arrangement, but unfortunately due to other complications within SAPO and how some of their contracts with service providers were structured, it was not feasible for SASSA to continue on a BOT arrangement, Hence SASSA opted to go through a BPR process.

New payment infrastructure programme - strategic business processes are insourced and other payment functions co-sourced.

  • Core Banking and Payments
  • Electronic payment
  • Alternative pay points
 

As far as card issuance and payments are concerned – SASSA is currently engaging South African Reserve Bank (SARB) to establish possibilities for participation in the National Payment System (NPS) space as a non-bank organisation.

The engagements are at an early stage. In the same note, there is a project which is at a conceptual stage to look at implementation dynamics for a number of disbursement options in an effort to get the recommendation by the work-streams to life. The first report of this team was presented to SASSA EXCO in April 2022 and the team is currently packaging the terms of reference of the project, including finalisation of the appointment of team members.

 

SAPO/Postbank is responsible for - Card Body Production, Card Issuing, Account Issuing and transaction processing.

 
 

Insourced service: A cash send payment option has been introduced, although currently used only by COVID 19SRD R350 grant recipients.

 
 

Merchants network established and selected Retailers are now part of the Grant Payment eco-system. Various banks offer payments services including a wide range of ATMs.

 

Identity and Access management programme - integrated multi-factor authentication and access control capability.

  • User Biometric Access for internal staff

 

  • Biometric and Smart Card, as the central identity database and authorization for frontline staff project started in 2019. The project was stopped as a result of COVID-19. However, by the end of the 2020/2021 grants value chain officials have been registered and are making full use of the system.

Beneficiary Biometric project was halted due to disagreements with organised labour in 2019/2020 financial year. The issues of dispute have since been resolved.

For the 2022/23 financial year, the beneficiary biometrics project will be piloted in 4 local offices in line with the agreement with the organised labour.

Fraud, risk management and cyber assurance - ensure a more robust integrated risk management process to adequately address

  • Fraud & Risk Management System
  • Cyber Assurance & Risk Analytics Service
 

Introduction of Signature pads – this has not been done as yet but this is part of the SASSA Automation Strategy which goes beyond the Signature but focuses on their ICT and service offering to support business operations.

Web enabled platform - build a single web enabled platform to host all applications the user can access to process grants

  • Applications for deductions to manage Regulation 26 are internally performed.

The web enabled platform is being implemented. The Online Grants Application System is being rolled out and is stabilising.

Regulation 26A deduction has been insourced with the assistance of QLink.

 

Biometric enrolled programme - SASSA to biometrically enrol beneficiaries and recipients of grants.

  • High performance one-to-many matching server and integration to Home Affairs for identity verification.

SASSA has completed the rollout of Biometrics for Socpen Users access. A non-repudiation capability is built into the authentication process and this has significantly reduced user identity swaps and/or stealing to perform unauthorised access to the system or perform fraudulent transactions.

SASSA performs beneficiary validation and verification with Department of Home Affairs systematically before payment is run.

The one-to-many biometric server has not been implemented.

Integrated customer care and support - improve beneficiary experience through quality of service delivery

Electronic Queue Management system – Piloted in Benoni Office and work is in progress to roll-it out to an additional 18 offices during 2022/23 financial year.

 

Alternative pay points and Local Economic Development

  • Cashless environment where beneficiaries can utilize the SASSA payment card to purchase goods electronically.
 

SASSA to fast track some of the changes that were envisaged over time. These changes included automation of the application process; opening of multiple application channels, and introduction of an additional payment channel. SASSA is extending these lessons to cover the normal social grant process.

Date service integration

  • An integration layer must be built to support integration of data and the system between SASSA’s internal systems and external partners (government and non-governmental).

 

SASSA is able to conduct real-time personal information verification (ID numbers, name match etc.) of beneficiaries through the Department of Home Affairs.

Other departments and entities that SASSA has a system interface with and where such information is currently utilised for the COVID 19 SRD R350 grant applications with the intention of progressively introduced for main-stream grants applications process and these are:

  • SARS,
  • Department of Labour (UIF)
  • National Student Financial Aid Scheme
  • Correctional Services
  • PERSAL and PERSOL
  • Department of Public Service and Administration
  • Government Employees Pension Fund
  • Pensions database from National Treasury.
 

SASSA readiness change management office - Project Management framework developed to govern evolution of projects and programmes

  • Establish Programme and Project management office to support the change management

Projects management office has been established.

Change management – culture and ability audit conducted and the entity is currently implementing recommendations from the survey.

 

Supply Chain Management readiness

  • SASSA’s capacity and capability to manage external partners including merchants in the payment value chain
 

Only manual monitoring is conducted at merchants as part of the customer care programme.

06 June 2022 - NW1716

Profile picture: Marais, Ms P

Marais, Ms P to ask the Minister of Transport

(a) What total amount has his department spent to date on the Mangaung Bus Rapid Transport System, (b) what companies have been contracted by his department to develop the system and (c) by what date will the system be completed by his department?

Reply:

a) The Department has transferred R 2.025 billion from 2008 to 2022.

b) The Department of Transport has not contracted any companies for the Mangaung Metropolitan Municipality to develop its system. The Department’s role is to set standards, monitor and evaluate planning, implementation and management, and to report on progress with project implementation against funding. The Department transfers funds to the Municipality, and the Municipality will follow its Supply Chain Management t processes to procure services from companies to plan, develop and implement infrastructure and the subsequent public transport operations of the system.

c) Based on the Municipality’s Metro-wide IPTN plan, all the phases will be complete by 2034/35 financial year.

03 June 2022 - NW1963

Profile picture: George, Dr DT

George, Dr DT to ask the Minister of Finance

Whether the National Treasury has ever conducted an economic impact study to determine the impact of load-shedding on the economy since it began in 2008, as it has been shown to have a direct impact on economic growth,; if not, why not; if so, what are the relevant details?

Reply:

  • While the National Treasury has not specifically done a full cost analysis evaluating the impact that load shedding has had on GDP since 2008, various analyses have been undertaken over the past few years to assess the impact of the electricity constraint on economic activity.
  • To understand the impact of electricity shortages on factor productivity, investment and potential growth, the National Treasury uses analytical tools such as its macro-structural model (which is also used for the macroeconomic forecast) as well as a computable general equilibrium (CGE) model.
  • This macro-econometric analysis generally builds on detailed energy modelling conducted by institutions such as the CSIR and is always supplemented by secondary research, data from Eskom’s Medium-Term System Adequacy Outlook as well as consultations with key stakeholders in the energy sector.
  • Some of this analytical work has focused specifically on the economic impact of load shedding, which has been published in several editions of the Budget Review as macro-fiscal scenarios that inform the budgeting process. This includes:
      • The 2019 Budget Review quantified the impact of a decline in Eskom’s average energy availability factor to between 65 and 70 per cent for 18 months. As a consequence, GDP growth was anticipated to weaken to 0.2 per cent in 2019 relative to the baseline forecast of 1.5 per cent (which is equivalent to a loss in GDP of R40 billion in real terms).
      • The 2015 Budget Review estimated growth to decline by 1 per cent in 2015 should there continue to be a deterioration in electricity availability.
  • Beyond assessing the impact of load shedding on the economy, several studies on the evolution of electricity supply and economic growth have been conducted as part of the National Treasury’s Southern Africa - Towards Inclusive Economic Development (SA-TIED) programme. These studies are available on the SA-TIED website (https://sa-tied.wider.unu.edu/climate).
  • National Treasury takes into account the energy constraint when generating its macroeconomic forecasts, and frequently reviews its outlook for load shedding based on the most recent information at its disposal.

03 June 2022 - NW2031

Profile picture: Nolutshungu, Ms N

Nolutshungu, Ms N to ask the Minister of Employment and Labour

Whether he has developed a strategy to respond to the technological developments in the transport system such as e-hailing, to ensure that those working in the industry have their rights protected as workers; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

In dealing with the digital economy, the Honourable member will know that the President has established a commission. Amongst the others, the Commission is to assist the government in taking advantage of the opportunities presented by the digital economy. The work of the Commission will be tabled at NEDLAC for further discussion on how to come up with policies that will respond to the changes in the labour market.

Over and above this, NEDLAC social partners are hard at work in dealing with how to regulate the e-hailing industry. The first question that must be answered is whether uber workers are employees and if they are employees, what conditions of employment are suitable to their sector as way of introducing a sectoral determination.

Albeit the above, kindly note that the national minimum wage covers all workers, already uber drivers earn above the national minimum wage.

END

03 June 2022 - NW1788

Profile picture: Brink, Mr C

Brink, Mr C to ask the Minister of Finance

Whether the National Treasury has taken steps to place the names of companies implicated in the findings of the Judicial Commission of Inquiry into Allegations of State Capture, Corruption and Fraud in the Public Sector including Organs of State on the register of entities prohibited from doing business with the State; if not, why not; if so, what are the names of the companies?

Reply:

Kindly note that National Treasury Instruction Note 3 of 2021/2022 paragraph 6 states that, should an organ of state opt to restrict the contractor and or any other persons from obtaining a business with the public sector, the relevant institution must:

  • Inform the contractor or person(s) of the intention to impose a restriction, provide the reasons for such decision and the envisaged period of restriction.
  • Allow the contractor and or person (s) to provide reasons why the envisaged restriction should not be imposed.
  • Consider any reasons submitted by the contractor and or person in terms of two bullets;
  • Inform the National Treasury such imposition of the name of the restricted person(s), the reasons for restriction, the period of restriction and the date of commencement of restriction ( date, month and year).
  • National Treasury will then consider the submission by an Accounting Officer/Authority then list the affected contractor and or person (s) to provide reasons.

Summarily: Government institutions that utilized services of such a contractor and or person (s) must follow the National Treasury Instruction Note 3 of 2021/2022 paragraph 6 and finally send the submission to the National Treasury; without that submission National Treasury would not be able to finalize any restriction of suppliers.

03 June 2022 - NW1946

Profile picture: Weber, Ms AMM

Weber, Ms AMM to ask the Minister of Forestry, Fisheries and the Environment

With regard to Decision 14.69 of the Convention on International Trade in Endangered Species of Wild Fauna and Flora which requires that facilities restrict their populations to the extent that they only support the conservation of wild tigers, what (a) proof does her department requires from the facilities in order to establish their contribution to conservation, (b0 total number of the facilities have been audited in terms of the requirement and (c) were the results thereof?

Reply:

Attached find here: Reply

03 June 2022 - NW2131

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Employment and Labour

Since his appointment as Minister of Employment and Labour in 2019, (a) what total number of international trips has (i) he and (ii) the staff members employed in his office undertaken in an official capacity, (b) for what purpose was each trip and (c) what was the cost to the taxpayer regarding each specified trip?

Reply:

South Africa’s foreign policy promotes human rights and a broad developmental agenda both in the continent and the world. As the political head of the Department of Employment and Labour, the Minister leads the country’s domestic priorities in the global labour agenda (i.e. promoting rights at work, encouraging decent employment opportunities, enhancing social protection and strengthening dialogue) linking these to own priorities such as sustainable economic growth, employment, social justice and ultimately equality for all.

In line with the objectives set above and since his appointment in 2019, the Minister and support staff from his office have undertaken 7 international visit to the following destinations:

 

Botswana: ARLAC Ministerial meeting (February 2022);

Cost:

Accommodation& Flights: R 26890.26

Daily allowances: R6000

Brazil: Attending BRICS Ministerial meeting (September 2019);

Cost:

Accommodation & Flights: R 403923.79

Daily allowances: R6 633, 64

Cuba: Consolidation of Bilateral relations as per the signed MoU (November 2019);

Cost:

Accommodation & Flights: R 205651.86

Daily allowances: R14 759, 73

France: Attending the Global Deal Conference of which South Africa is a member (February 2020);

Cost:

Accommodation & Flights: R 277429.79

Daily allowances: R9694, 60

Geneva: Attending the International Labour Conference (June 2019) and Governing Body (November 2019)

Cost:

Accommodation & Flights: R 252779.79

Daily allowances: R 31000

Ivory Coast: ILO Africa Regional Meeting and part of Presidential visit and signed an MoU (December 2021)

Cost:

Accommodation & Flights: R 374608.85

Daily allowances: R10536,47

Ivory Coast: ILO Africa Regional Meeting (December 2019) and part of Presidential visit and signed and MoU.

Cost:

Accommodation & Flights: R 152105.79

Daily allowances: R10089, 73

03 June 2022 - NW1877

Profile picture: Cuthbert, Mr MJ

Cuthbert, Mr MJ to ask the Minister of Trade, Industry and Competition

Whether certain companies (names furnished) are utilised by the National Lotteries Commission (NLC) as and when the NLC needs its services; if not, what is the position in this regard; if so, (a) what are the relevant details of the services provided by the companies, (b) on what date did the companies and/or any of their affiliates start working for the NLC and (c) what total amount has been paid to the companies and/or any of their affiliates by the NLC to date? [

Reply:

I have been furnished with the attached reply to the question submitted, by Ms Thabang Mampane, Commissioner of the National Lotteries Commission.

 

-END-

03 June 2022 - NW1906

Profile picture: van der Merwe, Ms LL

van der Merwe, Ms LL to ask the Minister of Trade, Industry and Competition

(a) What total number of applications for funding were received by the National Lotteries Commission in each province in the (i) 2020-21 and (ii) 2021-22 financial years, (b) from which sectors were the funding applications and (c) what total number of applications from each sector received funding? [

Reply:

The Commissioner of the National Lotteries Commission (NLC), Ms Thabang Mampane has advised as follows:

(a)(i) and (ii) Provincial breakdown of the total number of applications received,:

Provinces

2020/21

2021/22

Gauteng

1 183

1 867

Mpumalanga

545

889

Limpopo

1 354

1 796

North West

324

421

Northern Cape

346

370

Eastern Cape

1 133

1 456

Free State

622

1 006

Western Cape

576

907

KwaZulu-Natal

1 376

2 270

Total

7 459

10 982

(b) Funding applications per legislated sector:

Sectors

2020/21

2021/22

Arts, Culture and National Heritage

2 129

2 797

Charities

3 061

4 880

Miscellaneous

203

154

Sports and Recreation

2 066

3 151

Total

7 459

10 982

(c) Total number of applications funded per sector:

Sectors

2020/21

2021/22

Arts, Culture and National Heritage

631

677

Charities

861

893

Miscellaneous Purpose

24

26

Sports and Recreation

1 121

1 698

Total

2 637

3 294

-END-

03 June 2022 - NW1998

Profile picture: Luthuli, Mr BN

Luthuli, Mr BN to ask the Minister of Forestry, Fisheries and the Environment

Whether, in light of the oiling up of plastic which ends up in landfills and oceans and adversely affects the environment, her department plays any role in assisting the informal sector, including but not limited to waste-reclaimers and waste-preneurs who are sad to contribute up to 70% of recycling in the Republic; if not, why not; if so, what are the relevant details?

Reply:

Attached find here: Reply

03 June 2022 - NW1875

Profile picture: Cuthbert, Mr MJ

Cuthbert, Mr MJ to ask the Minister of Trade, Industry and Competition

(1) (a) What (i) work have (aa) certain companies (names furnished) and (bb) any of their affiliates undertaken for the National Lotteries Commission (NLC), (ii) did this work entail and (iii) was the value of each tender, contract and/or once-off project awarded to each company and/or their affiliates and (b) in which financial year was the specified work done. (2) whether the companies and/or any of their affiliates are preferred service providers to the NLC and/or the National Lottery Distribution Trust Fund; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

I have been furnished with the attached reply to the question submitted, by Ms Thabang Mampane, Commissioner of the National Lotteries Commission.

-END-

03 June 2022 - NW2020

Profile picture: Mkhonto, Ms C N

Mkhonto, Ms C N to ask the Minister of Employment and Labour

(a) What are the reasons that it has taken so long to resolve the matter of the more than 395 workers of the Mbhaba Estate, who were unfairly dismissed by their employer in 2015 when they demanded wage increases, (b)(i) who is responsible for the specified case and (ii) why have the workers been left in limbo and (c) on what date will he release a report as promised to the workers by the President of the Republic, Mr M C Ramaphosa, in 2017?

Reply:

The CCMA has reviewed progress on the case file and reports as follows:

  1. FAWU obo Mahlalela & Others v Umbhaba Estates (Pty) Ltd initially relating to an Organizational Rights dispute under case MP6595-14 which, led to a strike following which employees were dismissed for misconduct.
  2. The dismissal dispute was referred to the CCMA under case number MP10027 – 15 for dismissal of employees for participating in a strike. The dismissal was not related to wages as per the EFF parliamentary question but emanates from the dispute about Organizational Rights.

Chronology of Events

  1. The matter commenced 03 September 2014 when FAWU referred an organizational rights dispute to CCMA against Umbhaba. The matter was conciliated on 23 September 2014.
  2. The matter remained unresolved and a certificate of non-resolution was issued.
  3. FAWU opted for a strike route.
  4. The strike was long and protracted,in between there was intimidation and later employer dismissed the employees.
  5. After the dismissal, the union referred an unfair dismissal dispute to CCMA under case MP10027-15 on 18 November 2015.
  6. On 03 December 2015, a jurisdictional challenge was lodged.
  7. On 30 June 2015, the Respondent forwarded a withdrawal notice of review under Labour Court case number JR640/2016.
  8. On 01 July 2016, the parties were directed to hold a pre-arbitration conference scheduled for 25 July 2016.
  9. On 03 July 2017, the Applicant attorney forwarded a notice of attorney of record withdrawal.
  10. On 04 October 2018, the Respondent attorney sought a postponement of the arbitration which was opposed by the Applicant.
  11. On 12 April 2019, the Respondent attorney forwarded a notice of attorney of record withdrawal.
  12. On 28 October 2019, the dispute was postponed without a date and the file closed on account of the intention of the Respondent to file a review application at the Labour Court.
  13. The CCMA received the review application on 18 November 2019.
  14. To date, the matter remains before the Labour Court.

03 June 2022 - NW1888

Profile picture: Mabika, Mr M

Mabika, Mr M to ask the Minister of Health

(1)What is the standard turnaround time for a patient to get assisted in a government hospital, with specific reference to the Manguzi Hospital (details furnished); (2) whether his department has a plan in place to improve the situation and assist patients in a more efficient way; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

According to the KwaZulu Natal Provinicial Department of Health, the response is as follows:

1. Please note that the waiting times on the table below is based on waiting time survey in 2021/2022 quarter four (04)

SERVICE POINT

AVERAGE ACTUAL TURN AROUND TIME (as per quarter 4 21/22)

Screening area

48 Minutes

OPD file registry

37 minutes

FACTORS CONTRIBUTING IN DELAYED WAITING TIME:-

  • Head count: Manguzi District hospital see +/-458 clients per day
  • Special clinic: mental health care user clinic and high risk clinic for maternity cases (every Wednesday), orthopaedic clinic, etc
  • Incomplete record management system (patient registration using identity document) and limited record storage room.
  • New normal (Covid-19 screening)
  • Fast-tracking all emergency cases
  • Border of Mozambique and Swaziland which increases influx of unplanned/ unreferred patients visits.

(2) The following table reflects the details in this regard.

Challenges

Plan to improve

Non referred cases

The hospital management has identified designated area to see non referred cases so as to reduce overcrowding in OPD which will also improve OPD waiting time.

Special clinics

Strengthening of booking system to clients referred from different clinics.

Limited record storage room

Extra record storage area in a form of a container – The procurement process is in the advertisement stage.

Incomplete record management system

- Continuously educating the community about new system (use of identity document for registration)

- noting unplanned/Unreferred visit of patients from Mozambique.

COVID -19 screening in waiting area

- Integration of services and educating community about the new normal.

- ensuring community compliance in covid-19 precautionary measures

Improved communication with the public

Strengthen education to the clients on existing national guidelines for complaints, compliments and suggestion procedure.

END.

03 June 2022 - NW1799

Profile picture: Ismail, Ms H

Ismail, Ms H to ask the Minister of Health

With reference to claims of medical negligence and/or injuries, what (a) total number of newborns have (i) died and/or (ii) been left physically and/or mentally disabled due to diagnostic errors, surgical errors or any other reasons in (aa) public and (bb) private facilities in each of the past three financial years and (b) are the full relevant details for each province?

Reply:

Honourable Member, this information can only be made available by sourcing it from all provinces, it is not readily available at the National Department of Health (NDOH). In this regard, the NDOH is busy soliciting this information from all the provinces of the country, to enable the Minister of Health to respond to the question.

The Minister will provide the full response to the question as soon as the information has been received from all the provinces.

END.

03 June 2022 - NW1908

Profile picture: Hlengwa, Ms MD

Hlengwa, Ms MD to ask the Minister of Health

Whether his department has any plans to permanently absorb all contracted COVID-19 workers, including but not limited to community service nurses; if not, why not; if so, what are the relevant details?

Reply:

Honourable Member, the National Department of Health is still consulting with all the provincial departments of Health to gather this information. The Minister will provide full details on this question as soon as the information has been received from all the provinces.

END.

03 June 2022 - NW2132

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Employment and Labour

What (a) are the reasons that the Government withdrew its nomination of Professor Mthunzi Mdwaba for the position of Director-General of the International Labour Organisation and (b) role did he play in this regard?

Reply:

The decision for the support and or withdrawal of the candidacy of Professor Mthunzi Mdwaba for the position of the International Labour Organisation Director-General was a Cabinet matter.

END

03 June 2022 - NW1810

Profile picture: Komane, Ms RN

Komane, Ms RN to ask the Minister of Finance

Whether, given that from a comparative perspective there seems to be a regression on the progress of programmes and projects since the 2022 Appropriations, the National Treasury has attempted to track any synergy between the appropriation of funds and performance; if not, why not; if so, what are the relevant details?

Reply:

The monitoring of performance by the National Treasury was conducted within the Framework for Strategic Plans and Annual Performance Plans. This framework was issued by the National Treasury in 2010 in order to guide institutions’ short and medium term planning. The Framework provided a standardised approach to strategic and annual performance planning; and promoted accountability for performance and service delivery, and alignment between the planning, budgeting and reporting processes.

To improve government-wide planning and to align planning with other government processes, the National Planning Commission (NPC) and the Department of Performance Monitoring and Evaluation (DPME) was established in 2009 in order to facilitate country-level long-term development planning through the NDP, outlines key policy trade-offs and sets out the sequence of decisions required to achieve the objectives, mobilise stakeholders and harness resources towards the implementation of the NDP, monitoring and evaluation for improved service delivery. In order to operationalize these functions, the planning and quarterly performance reporting function was transferred from National Treasury to the Department of Planning, Monitoring and Evaluation (DPME). DPME can report on progress against programmes and projects using the Electronic Quarterly Performance Reporting System. However, National Treasury is responsible for tracking expenditure /spending performance on appropriated funds. National Treasury has access to the Quarterly Performance Reporting data on a quarterly basis.

03 June 2022 - NW2133

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Employment and Labour

What amount in Rand has the Unemployment Insurance Fund (a) received in total, in terms of employer and/or employee contributions and (b) paid out in total, in terms of all benefits offered in each month from April 2020 until the end of April 2022?

Reply:

The table below shows comparison between the amounts collected as contributions versus benefit payments including COVID-19TERS and Workers Affected By Unrest (WABU) from 1 April 2020 to 30 April 2022. Collected contributions for the period in question were about R 42 614 054 783.39 and payments made amounted to R98 227 419 458.80. The payments made were augmented by UIF’s investment income.

MONTH AND YEAR

CONTRIBUTIONS COLLECTED

BENEFITS PAID OUT

April 2020

R 1 489 744 791.06

R 5 595 676 052.28

May 2020

R 1 375 298 505.07

R13 172 928 723.51

June 2020

R 1 335 564 830.96

R13 068 700 225.51

July 2020

R 1 496 909 778.13

R9 415 898 814.82

August 2020

R 1 585751 566.86

R5 667 762 970.91

September 2020

R 1 611 552 998.33

R7 908 312 370.75

October 2020

R 1 568 512 532.29

R5 980 930 862.56

November 2020

R 1 622 687 992.99

R4 456 953 942.35

December 2020

R 1 763 727 010.25

R3 927 167 367.31

January 2021

R 1 661 367 602.89

R2 899 403 916.45

February 2021

R 1 636 027 114.57

R2 310 584 770.16

March 2021

R 1 723 779 766.38

R404 273 999.73

April 2021

R 1 592 978 941.54

R2 323 066 342.86

May 2021

R 1 640 087 379.41

R2 514 408 103.46

June 2021

R 1 721 034 856.93

R2 355 909 336,52

July 2021

R 1 840 499 770.09

R1 983 650 328.24

August 2021

R 1 780 033 476.48

R2 153 009 834.92

September 2021

R 1 834 927 690.29

R1 744 262 146.86

October 2021

R 1 834 616 317.72

R1 872 803 420.63

November 2021

R 1 833 004 513.85

R2 061 444 524.61

December 2021

R 2 023 204 166.34

R1 040 830 165.00

January 2022

R 1 874 300 044.96

R1 387 392 619.75

February 2022

R 1 860 885 762.66

R1 348 257 031.23

March 2022

R 2 058 845 885.37

R1 179 149 173.01

April 2022

R 1 848 711 487.97

R1 454 642 416.20

Total

R 42 614 054 783.39

R98 227 419 458.80

03 June 2022 - NW1976

Profile picture: Bryant, Mr D W

Bryant, Mr D W to ask the Minister of Forestry, Fisheries and the Environment

(1) Whether, with reference to the concerns that have again been raised regarding the health and welfare of Charlie, the elephant at the Pretoria Zoo, with civil society offering to rewild the current living conditions for Charlie are of a suitable standard; if not, what is the position in this regard; if so, what are the relevant details; (2) Whether she will consider negotiating with the zoo and civil society to help rewild the elephant if not, why not; if so, what are the relevant details; (3) What total number of elephants are currently residing in zoos in the Republic

Reply:

Attached find here: Reply

03 June 2022 - NW1919

Profile picture: Groenewald, Mr IM

Groenewald, Mr IM to ask the Minister of Finance

(1)What total number of municipalities in each province, (a) in each of the past five financial years and (b) from 1 April 2022 to date could (i) not pay and/or (ii) only partly pay salaries for (aa) one month, (bb) two to six months, or parts thereof and (cc) more than six months; (2) whether he will make a statement on the matter?

Reply:

(1)(a)(b)(i)(ii)(aa)(bb)(cc) The attached annexure provides the detail of the number of municipalities over the past five years that did not pay or partially paid salaries per province per year. It further distinguishes which municipalities within the two categories did not pay for one month or two to six months or more than six months.

(2) No, the Minister will not make/issue a statement in this regard, the onus rests with the Municipal Council to ensure all financial obligations are honoured timeously. The design of the Local Government Fiscal System does not allow any Organ of State to “bail-out” a municipality should they find themselves in this position. This by implication means that a municipality is required by law to adopt a funded budget as per section 18 of the Municipal Finance Management Act, 2003 (ACT NO. 56 of 2003), MFMA. A funded budget will consist of any financial obligation due by the municipality which includes salary obligations.

03 June 2022 - NW1975

Profile picture: Bryant, Mr D W

Bryant, Mr D W to ask the Minister of Forestry, Fisheries and the Environment

(1) Whether, in view of the success of the seal rehabilitation programme in the Dassen area along the West Coast that has led to an increase in the seal population which appears to have impacted fish stocks in the area, while recent high numbers of deaths of seals in the area have been attributed to low fish stocks leaving fisherfolk worried that their livelihoods may be at risk, any recent studies have been carried out by her department on th growth in the seal population in this area and its potential impact on fish stocks; if not, why not; if so, what were the results; (2) what impact has she found does natural predation have on the seal population in the area; (3) what is the current estimated population of seals in the Dassen Island area?

Reply:

Attached find here: Reply

03 June 2022 - NW1977

Profile picture: Bryant, Mr D W

Bryant, Mr D W to ask the Minister of Forestry, Fisheries and the Environment

(1) Whether all the rhino horn stockpiles that are being kept at SA National Parks’ rhino stockpiles at a number of unidentified locations across the Republic have been profiled for DNA; if not, what percentage of the stockpiles have been (a) profiled and (b) entered into the Rhino DNA Index System database; if so, what are the relevant details; (2) whether any theft from the stockpiles have been reported in the past two years; if not, what is the position in this regard; if so, what are the relevant details?

Reply:

Attached find here: Reply

03 June 2022 - NW1856

Profile picture: Clarke, Ms M

Clarke, Ms M to ask the Minister of Health

(1)What is the expenditure on security for each hospital in each province; (2) whether all health care facilities and/or hospitals have cameras erected on their premises; if not, why not; if so, (2) whether the cameras are in working order; if not, for how long have the cameras been out of order?

Reply:

Honourable Member, this information can only be made available by sourcing it from all provinces, it is not readily available at the National Department of Health (NDOH). In this regard, the NDOH is busy soliciting this information from all the provinces of the country, to enable the Minister of Health to respond to the question.

The Minister will provide the full response to the question as soon as the information has been received from all the provinces.

END.

03 June 2022 - NW1858

Profile picture: Ismail, Ms H

Ismail, Ms H to ask the Minister of Health

(1)(a) What (i) number of positions are currently vacant at the Chris Hani Baragwanath Hospital and (ii) is the level of each vacant post and (b) by what date is it envisaged that each post will be filled; (2) what is the total number of community service (a) doctors, (b) nurses and (c) interns who are currently employed at the specified hospital; (3) whether the community service doctors, nurses and interns have been paid on time since their employment; if not, why not; if so, what are the relevant details; (4) what number of specialised (a) medical doctors and (b) nurses does the hospital currently have as compared to the amount of specialised health care professionals that the hospital needs to provide effective service delivery to its patients?

Reply:

According to the Gauteng Provincial Department of Health, the situation is as follows:

(1) (a) (i) 935 vacant posts as of 31 April 2022

(ii) Salary levels of the posts:

Management

 Number

 

Nursing

Number 

Level 12

4

 

Level 4

81

Level 13

1

 

Level 5

80

Level 14

2

 

Level 6

40

Admin

 

 

Level 7

82

Level 5

122

 

Level 9

103

Level 7

20

 

Level 10

17

Level 9

9

 

Level 12

1

Level 11

3

 

Medical

Number 

Allied

Number 

 

Level 11

39

Level 7

1

 

Level 12

82

Level 8

9

 

Support

Number 

Level 9

4

 

Level 2

177

Level 10

5

 

Level 3

34

Level 11

3

 

Level 4

9

Level 12

1

 

Level 5

20

Allied Support

Number  

 

Level 7

4

Level 4

4

 

 

 

Level 5

7

 

 

 

Level 6

3

   

 

Out of the 935 vacant posts, 302 are funded and are in the process of being filled

(2) (a) Doctors: 12

(b) Nurses: 40

(c) Medical Interns: 300

(3) The response is as follows:

  • All Community Doctors have been paid on time
  • 12 of the Medical interns were not paid on time as a result of late funding and creation of posts
  • 16 Nurses were timeously paid as the Hospital had enough posts to accommodate them. The other 24 Nurses’ posts were only created on the 2nd week of May 2022. The affected Nurses will be paid as soon as their transactions are processed on the Personnel and Salary (PERSAL) system.

(4) The response is as follows:

(a) Medical Specialist: 279

b) Professional Nurses: 474

The ideal staff compliment can only be determined once Provincial staffing norms are adopted and work studies completed.

END.

03 June 2022 - NW1911

Profile picture: Hlengwa, Ms MD

Hlengwa, Ms MD to ask the Minister of Health

Whether, when allocating graduate health professionals to perform their required community service internships, health professionals are provided with an allowance and/or stipend for relocation if they are placed outside of their ordinary residence; if not, why not; if so, (a) which sectors in the profession are eligible for allowance and/or stipend for relocation and (b) what is the total amount of the subsidy?

Reply:

Honourable Member, this information can only be made available by sourcing it from all provinces, it is not readily available at the National Department of Health (NDOH). In this regard, the NDOH is busy soliciting this information from all the provinces of the country, to enable the Minister of Health to respond to the question.

The Minister will provide the full response to the question as soon as the information has been received from all the provinces.

END.

03 June 2022 - NW1811

Profile picture: Komane, Ms RN

Komane, Ms RN to ask the Minister of Finance

Whether, given the current developments of lockdown in China and the supply chain disruptions caused by what is happening between Russia and Ukraine, the National Treasury will be required to revise its key assumptions and projections such as budget surplus by 2023; if not, what is the position in this regard; if so, what are the further, relevant details?

Reply:

The National Treasury is monitoring the impact of the global and domestic economic developments on the fiscal framework. This is part of the macro-fiscal planning process that takes place every quarter which involves updating the macroeconomic and revenue forecast. The impact of the Russia-Ukraine war will be included in the updated macroeconomic forecast and framework that will be published in the 2022 MTBPS.

03 June 2022 - NW1688

Profile picture: Madokwe, Ms P

Madokwe, Ms P to ask the Minister of Cooperative Governance and Traditional AffairsQUESTION

Following the recent findings by the Special Investigating Unit regarding a service provider (name furnished), that is accused of overcharging the Fetakgomo Tubatse Local Municipality when it was contracted to conduct a R326 million project to electrify 20 000 rural households in 2013, as well as other cases across the Republic, what (a) policies is her department, in collaboration with other departments, putting in place to ensure that municipalities and/or service providers do not waste money on tenders that do not result in effective service delivery, (b) plans have been developed to help municipalities build internal capacity to provide their own services and (c) steps have been taken by her department to recover the monies that the specified service provider had overcharged the specified municipality?

Reply:

The Honourable Member is requested to refer the question to the National Treasury as they are well positioned to provide response on the issues raised. A number of measures have been put in place by National Treasury aimed at enhancing the tender system to ensure there is value for money.

03 June 2022 - NW1809

Profile picture: Thembekwayo, Dr S

Thembekwayo, Dr S to ask the Minister of Health

Following the fatal shooting tragedy that claimed two lives inside the New Somerset Hospital, what is his contingency plan to address the issues of security in hospitals and clinics in the Republic to curb a recurrence of such incidents in the near future?

Reply:

According to the Western Cape Department of Health, the Department has taken a multi-pronged approach to prevent such incidents from occurring in the future. In line with the Departments security strategy, the department has commenced with the following:

  1. Liaised with Western Cape Department of Police Oversight and Community Safety for a standard operating procedure to guide hospital CEOs with oversight and management of armed South African Police Service (SAPS) officials who access health care facilities including armed SAPS officials who are guarding patients requiring inpatients care.
  2. Coordination by the Western Cape Department of Police Oversight and Community Safety for the implementation of a Provincial Memorandum of Agreement (MOA) between the SAPS Western Cape Provincial Commander and the MEC of Western Cape Health and Wellness. This MOA is to commit local resources for visibility and support of Health Facilities in the Province.
  3. The implementation of complementary security measures such as the implementation security technology to bolster the security officer deployment.
  4. A review of the current CCTV installations at health facilities and the procurement of CCTV systems on the approved tender since July 2021.

END.

03 June 2022 - NW1854

Profile picture: Clarke, Ms M

Clarke, Ms M to ask the Minister of Health

(1)What is the status of financial mismanagement within his department in terms of each province in the past three financial years; (2) (a) what is the total amount of funds that have been found to be mismanaged in respect of each province in the specified period and (b) what are details of (i) each supplier whose contracts were involved in each financial mismanagement case and (ii) the service that each supplier was contracted to provide in each case?

Reply:

Honourable Member, this information can only be made available by sourcing it from all provinces, it is not readily available at the National Department of Health (NDOH). In this regard, the NDOH is busy soliciting this information from all the provinces of the country, to enable the Minister of Health to respond to the question.

The Minister will provide the full response to the question as soon as the information has been received from all the provinces.

END.

03 June 2022 - NW1824

Profile picture: Tshwaku, Mr M

Tshwaku, Mr M to ask the Minister of Trade, Industry and Competition

In light of the fact that record companies take intellectual property rights away from the creator by means of deeds of assignment and the rights remain with the company 25 years after the creator is deceased, what measures have been put in place by his department to ensure that the copyright tribunal is accessible to poor and disadvantaged creators? [

Reply:

The Copyright Review Commission set up by the Department, considered the matter and its report recommended as follows:

“The Copyright Act must be amended to include a section modelled on that in the US Copyright Act providing for the reversion of assigned rights 25 years after the copyright came into existence. Such an amendment will go far to relieve the plight of composers whose works still earn large sums of money that are going to the assignees of the composers’ rights long after the assignees (or their predecessors) have recouped their initial investment and made substantial profits, in excess of those anticipated when the original assignment was taken”, page 102.

The Copyright Amendment Bill, 2017 and the Performers’ Protection Amendment Bill, 2016 Bills addresses the challenges of musicians in terms of the Copyright Review Commission report.

One of the amendments to the Copyright Act (Act No. 98 of 1978) is limiting the period of assignment to 25 years in order to aid musicians and creators to reclaim the rights to their copyright which was assigned to a producer or publisher, because they can exploit those works after 25 years when it reverts to the musician and creator.

One of the challenges musicians face is unfair contracts signed on a work that continues to make significant returns over time including after those assigned have recouped initial investment. In many cases, the musicians have signed the rights away in assignments and earn no royalties or income to those works and are locked in those contracts without economic benefits accruing to them. The Department advises that in a number of cases, musicians would have been paid a very small initial once off amount for their original work. This provision in section 22 of the Bill ensures that the musicians can have access to the copyright in musical or literary works after 25 years of such assignment.

The Copyright Tribunal under the Act has limited scope and jurisdiction. The scope of matters the Tribunal may hear has been extended to all Copyright matters in the Bill, therefore addressing issues of access. Regulations will further empower how the Tribunal will operate once the legislation has been finalised. The Department and the Companies and Intellectual Property Commission will embark on education and awareness programmes on the amendments to educate citizens on the changes.

On 16 June 2020, the President referred the Copyright Amendment Bill, 2017 and the Performers’ Protection Amendment Bill, 2016 back to the National Assembly to address constitutional issues. The remitted Bills are currently before the Portfolio Committee on Trade, Industry and Competition, and will be referred to the National Council of Provinces for consideration thereafter.

-END-

03 June 2022 - NW1859

Profile picture: Masango, Ms B

Masango, Ms B to ask the Minister of Health

What (a) total number of children have died due to (i) starvation and (ii) malnutrition in the past three years and (b) is the breakdown of the specified total number according to each province?

Reply:

Honourable Member is advised to refer to the response to Question 1770 she asked on 13 May 2022.

END.

03 June 2022 - NW1876

Profile picture: Cuthbert, Mr MJ

Cuthbert, Mr MJ to ask the Minister of Trade, Industry and Competition

(1)Whether certain companies (names furnished) and/or any of their affiliates are currently involved in any once-off IT-related tender and/or contract and/or any once-off IT-related projects for the National Lotteries Commission (NLC); if not, what is the position in this regard; if so, (a) what does each project involve, (b) on what date (i) did each project commence and (ii) is it envisaged to be completed and (c) what is the value of each project; (2) what is the nature of the online security and/or any other services that the companies and/or any of their affiliates are currently contracted to conduct for the NLC?

Reply:

The Commissioner of the National Lotteries Commission (NLC), Ms Thabang Mampane has advised as follows:

“(1)(a) )(b)(i), )(ii), (c) and (2)

Neo Solutions is not engaged in any ICT related tender or contract with the NLC neither is the NLC aware of any affiliate of Neo Solutions currently involved in any ICT related tender.

-END-

03 June 2022 - NW1857

Profile picture: Ismail, Ms H

Ismail, Ms H to ask the Minister of Health

(1)What (a) total number of teenage abortions and/or terminations of teenage pregnancy have been performed at each public healthcare facility in each province (i) in the (aa) 2019-20 and (bb) 2021-22 financial years and (ii) since 1 April 2022 and (b) is the breakdown in terms of age; (2) what number of the abortions were performed as a result of (a) sexual assault and/or rape and (b) any other specified reasons?

Reply:

Honourable Member, this information can only be made available by sourcing it from all provinces, it is not readily available at the National Department of Health (NDOH). In this regard, the NDOH is busy soliciting this information from all the provinces of the country, to enable the Minister of Health to respond to the question.

The Minister will provide the full response to the question as soon as the information has been received from all the provinces.

END.

03 June 2022 - NW2019

Profile picture: Mokgotho, Ms SM

Mokgotho, Ms SM to ask the Minister of Employment and Labour

What steps of intervention will be taken to ensure that workers at the (a) Vlakfontein mine and (b) Matutu mine in the Moses Kotane Local Municipality are registered for the Unemployment Insurance Fund?

Reply:

Thank Hon. Member by this question. The matter you have raised shall be attended to. Employer Audit Services under the Inspection and Enforcement Services in the North West Province will visit the two mines and ensure that all employees are registered for UIF and contributed for.

03 June 2022 - NW1855

Profile picture: Clarke, Ms M

Clarke, Ms M to ask the Minister of Health

With reference to health standards that must be at a minimum standard of 80%, what is the standard of health (a) in each province and (b) in each hospital in each province?

Reply:

Honourable Member, this information can only be made available by sourcing it from all provinces, it is not readily available at the National Department of Health (NDOH). In this regard, the NDOH is busy soliciting this information from all the provinces of the country, to enable the Minister of Health to respond to the question.

The Minister will provide the full response to the question as soon as the information has been received from all the provinces.

END.