Questions and Replies

Filter by year

26 August 2015 - NW2855

Profile picture: Davis, Mr GR

Davis, Mr GR to ask the Minister of Communications

What was the purpose of her attendance at the annual Lifestyle Show Hub in Atlanta, Georgia, USA on 8 July 2015, (b) who attended the event with her and (c) what amount was spent by her department on (i) flights and (ii) accommodation for (aa) her and (bb) those who attended the show with her?

Reply:

(a)The Deputy Minister of Small Business Development has extended an invitation to Minister Muthambi F to attend both the Atlanta Lifestyle Hub Show and the Santa FE Folk Art Market events with other role-players to represent the country in these important gatherings.

(b)South African delegation:

1. The Minister

2. Chief of Staff

3. Protector

4. Assistant Director in the office of the DG

(C)FINANCIAL IMPLICATIONS FOR SUPPORT STAFF

Item

People

Exchange rate

Days

Cost

Accommodation:

Atlanta

Santa FE

3

$275

$ 289

9

R10 226.46

R10 747.08

Ground Transport

Atlanta

Santa FE

3

$85

$100

9

R 6 321.78

R 9 916.56

Ticket, service fees and insurance

3

 

9

R349 823.16

Travel and Subsistence Daily Allowance

3

$106.40

9

R30 226.59

Total

     

R417 261.63

FINANCIAL IMPLICATIONS FOR MINISTER

Item

People

Exchange rate

Days

Cost

Accommodation:

Atlanta

Santa FE

1

$515

$580

9

R6 383.79

R7 183.30

Ground Transport

Atlanta

Santa FE

1

$170

$195

9

R12 643.62

R19 337.28

VIP Services at airport

1

$100

9

R 2 479.14

Ticket, service fees and insurance

1

   

R116 607.72

Travel and Subsistence Daily Allowance

1

106.40

9

R11 619.70

Total

     

R176 254.55

 

 

MR NN MUNZHELELE

DIRECTOR GENERAL ACTING

DEPARTMENT OF COMMUNICATIONS

DATE:

MS AF MUTHAMBI (MP)

MINISTER OF COMMUNICATIONS

DATE

26 August 2015 - NW2714

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Communications

Whether (a) she, (b) her Deputy Minister and (c) any officials in her department travelled to China in the 2014-15 financial year; if so, what was the (i) purpose of each specified visit and (ii)(aa) total cost and (bb) breakdown of such costs of each specified visit?

Reply:

The Embassy of the People’s Republic of China has extended an invitation to Minister Muthambi F to attend the Ministerial Workshop on Development and Management of Radio and TV Media for Developing Countries trip will take place on 20 – 31 July 2015.

The South African delegation was represented by:

1. Chief of Staff.

2. Outcome facilitator.

3. Assistant director in the office of the DG.

4. DTT project Head.

5. Chief Director Broadcasting Policy.

FINANCIAL IMPLICATIONS FOR SUPPORT STAFF

Item

People

Exchange rate

Days

Cost

Accommodation:

Changsha, China

3

 

11

R46 200.00

Ground Transport

3

 

11

R 11 000.00

Ticket, service fees and insurance(To and From and internal Flights)

5

   

R130 710.00

Daily Allowance

5 (note)

 

11

R63 864.80

Total

     

R 251 774.80

Note

The accommodation and ground transport in respect of the Head of the DTT Project and the CD: Broadcasting Policy were sponsored by the Government of China. The DoC was only responsible for paying the daily allowance for the period.

There are no financial implications for the Minister due to the fact that the above expenses were catered by the Ministry of Commerce of the People’s Republic of China as the sponsor.

FINANCIAL IMPLICATIONS FOR MINISTER

Item

People

Exchange rate

Days

Cost

Accommodation:

1

 

11

R0.00

Ground Transport

1

 

11

R0.00

VIP Services at airport

1

 

11

R0.00

Ticket, service fees and insurance

1

   

R0.00

Ticket, service fees and insurance

1

   

R12 807.44

Total

     

R12 807.44

 

 

MR NN MUNZHELELE

DIRECTOR GENERAL ACTING

DEPARTMENT OF COMMUNICATIONS

DATE:

MS AF MUTHAMBI (MP)

MINISTER OF COMMUNICATIONS

DATE

26 August 2015 - NW2886

Profile picture: Mbatha, Mr MS

Mbatha, Mr MS to ask the Minister of Higher Education and Training

With reference to his reply to question 42 on 27 February 2015 wherein he stated that the total expenditure on the Vukani Aviation cadet pilot programme is R68 million as at February 2015, what were the agreed programme performance targets for the specified signed contracts in (a) 2012-13, (b) 2013-14 and (c) 2014-15 financial years; (2) what were (a) the reported achievements of the specified programme and (b) the reasons for non-performance on the specified financial years; (3) (a) how many cadets were actively participating in the commercial pilot license training and (b) what was the amount of the specified contracts as at 12 February 2015; (4) when is the specified programme expected to be completed?

Reply:

  1. The Department concluded one contract with Vukani Aviation, which commenced on 8 January 2013 covering a period of 36 months and includes the information on the requested financial years.

The Vukani Aviation Cadet Pilot Scheme Programme has the following targeted outcomes:

Programme

Target

Aviation Awareness: Recruitment and Selection

500

Psychometrics Test

500

Simulation

100

Life Skills Programmes

60

Commercial Pilot License

60

It should be noted that the cadets were split into 3 groups of 20, to allow for reasonable instruction time.

(2) (a) A summary of achievements since the inception of the programme are as follows:

  • Training

Training Programmes

Learners who completed the Commercial Pilot License and Advanced Pilot Training

4

Learners currently undergoing Commercial Pilot License Training

19

Learners who have obtained their Commercial Pilot License and currently undergoing Advanced Pilot Training

15

Cadets who have found employment after completing the Commercial Pilot License and Advanced Pilot Training

5

Total students who dropped out / dismissed / absconded

17

Total

60

  • Aviation Awareness: Recruitment and Selection - The aviation awareness portion of the project started on 16 February 2013 targeting 500 learners. Vukani Aviation visited rural and township based schools in five provinces, as well as utilizing radio stations and local newspapers to ensure greater awareness and project reach. According to the data provide to us, over 10 000 students were reached through this awareness campaign.
  • Psychometric Test: 189 Psychometric tests were done.
  • Simulation: 100 Learners were shortlisted and went through the simulation process.

Life Skills Programmes: The planned target for the Life Skills Programme was 60 learners, with 50 learners benefitting whilst 10 learners left the programme before completing all the required activities.

(b) The intention was that all 60 cadets would complete all the required tasks and flight hours in a period of 18 months, which proved to be difficult due to the following reasons:

  • According to Vukani Aviation, the Private Pilot License Ground School component took longer than anticipated, as the cadets struggled with mastering the required content and some were given more than the required attempts to accomplish certain tasks.
  • During the period leading up to the funeral of the late President Nelson Mandela, flight schools around Gauteng lost almost a month of flying time due to restrictions placed on the Gauteng airspace.

(3) (a) 9 Cadets have completed the Commercial Pilot License and Advanced Pilot Training with 5 cadets already having found employment, 19 learners are currently undergoing Commercial Pilot License Training and 15 learners are currently undergoing Advanced Pilot Training.

(b) The total budgeted programme cost is R77 070 921.00.

(4)  The entire programme, as per the contract with Vukani Aviation, is expected to be completed by 31 December 2015.

 

 

 

Compiler/Contact persons:

Contact number:

DIRECTOR – GENERAL

STATUS:

DATE:

REPLY TO QUESTION 2886 APPROVED/NOT APPROVED/AMENDED

Dr BE NZIMANDE, MP

MINISTER OF HIGHER EDUCATION AND TRAINING

STATUS:

DATE:

26 August 2015 - NW2989

Profile picture: Lorimer, Mr JR

Lorimer, Mr JR to ask the Minister of Mineral Resources

(1) Does his department conduct lifestyle audits of its employees; if not, why not; if so, when was the last lifestyle audit conducted; (2) is there any monitoring of employee expenditure patterns; if not, why not; if so, what are the relevant details; (3) has any employee ever been found guilty to have accepted money for (a) issuing a license or (b) not issuing a stoppage order, if so, what are the relevant details of each specified case?

Reply:

  1. No, the department does not conduct lifestyle audits of its employees.
  2. No, there is no monitoring of employee expenditure patterns because there has never been any reason to do so;
  3. (a) (b) Yes, the matter was referred to relevant law enforcement agency.

Approved/not approved

 

 

Adv N Ramatlhodi

Minister of Mineral Resources

Date Submitted:-……………/………………/ 2015

26 August 2015 - NW3006

Profile picture: Madisha, Mr WM

Madisha, Mr WM to ask the Minister of Agriculture, Forestry and Fisheries

Whether he has taken any action to assist small-scale farmers at Grabouw, Western Cape, in particular, and other farmers in a similar predicament in general, who have no land for their cattle to graze on, resulting in their cattle straying where they are impounded and/or roaming near major national roads where they are knocked down by motorists causing farmers serious loss and seriously endangering the lives of motorists; if not, why not; if so, what are the relevant details? WRITTEN REPLY QUESTION 3006 / NW3545E MINISTER OF AGRICULTURE, FORESTRY AND FISHERIES: Honourable W. M. Madisha to ask the Minister of Agriculture, Forestry and Fisheries: QUESTION Whether he has taken any action to assist small-scale farmers at Grabouw, Western Cape, in particular, and other farmers in a similar predicament in general, who have no land for their cattle to graze on, resulting in their cattle straying where they are impounded and/or roaming near major national roads where they are knocked down by motorists causing farmers serious loss and seriously endangering the lives of motorists; if not, why not; if so, what are the relevant details?    REPLY The Theewaterskloof Local Municipality (THWK LM), the Department of Rural Development and Land Reform (DRDLR) from the Office of the Honourable Deputy Minister Skwatsha, the Office of the Premier of the Western Cape, the Western Cape Department of Agriculture (WCDOA), and other role players held a meeting on the 27th July 2015 particularly to discuss the problem of the cattle (120 cows) crossing the roads, especially crossing on the National Road (N2) which has put motorists and other people’s lives at risk. There is an urgent need for land that will be used to graze the cattle. The requirement for land has been communicated with the DRDLR office. The THWK LM reported that there are 2 farms available in the area, but these could not be committed as available/secure for use by the cattle. This will be looked into as a short term solution whilst following the DRDLR processes to acquire land. There is a 17 hectare piece of land available as part of the ARC land, though this is equally not available for use by the producers immediately as it is meant to support the ARC’s research interventions. The WCDOA advised the producers to reduce the number of cattle in order to contain the cows in a better condition, in terms of supervision and easy handling, including the provision of feed on a continuous basis. The reduction in cattle numbers was proposed by the WCDOA as a short term solution whilst the THWK LM resolves the availability of the two farms for immediate use. The cattle producers did not agree to this and refused to negotiate any further. The land acquisition matter is being discussed as a matter of urgency to address the challenge of the cattle crossing the N2.

Reply:

The Theewaterskloof Local Municipality (THWK LM), the Department of Rural Development and Land Reform (DRDLR) from the Office of the Honourable Deputy Minister Skwatsha, the Office of the Premier of the Western Cape, the Western Cape Department of Agriculture (WCDOA), and other role players held a meeting on the 27th July 2015 particularly to discuss the problem of the cattle (120 cows) crossing the roads, especially crossing on the National Road (N2) which has put motorists and other people’s lives at risk. There is an urgent need for land that will be used to graze the cattle. The requirement for land has been communicated with the DRDLR office. The THWK LM reported that there are 2 farms available in the area, but these could not be committed as available/secure for use by the cattle. This will be looked into as a short term solution whilst following the DRDLR processes to acquire land.

There is a 17 hectare piece of land available as part of the ARC land, though this is equally not available for use by the producers immediately as it is meant to support the ARC’s research interventions. The WCDOA advised the producers to reduce the number of cattle in order to contain the cows in a better condition, in terms of supervision and easy handling, including the provision of feed on a continuous basis. The reduction in cattle numbers was proposed by the WCDOA as a short term solution whilst the THWK LM resolves the availability of the two farms for immediate use. The cattle producers did not agree to this and refused to negotiate any further.

The land acquisition matter is being discussed as a matter of urgency to address the challenge of the cattle crossing the N2.

25 August 2015 - NW2884

Profile picture: Maimane, Mr MA

Maimane, Mr MA to ask the Minister of Economic Development

Has his department commissioned any (a) research or (b) academic studies into the link between the three aspects of internet access, job creation and economic development; if not, why not; if so, what were the findings of the specified research or studies?

Reply:

Research studies undertaken in other economies and the experience of a number of countries have established strong and positive relationships between internet access, job creation and economic development.

The benefit of internet access is clear for individuals and enterprises.

For individuals, the internet provides access to a vast array of information through which citizens and workers can become more productive and effective at their workplaces. Businesses are often dependent on the opportunities that can be accessed through the internet inter alia to access information or market, buy or sell their products (e-commerce) and through improving business processes that enhances productivity. The benefits are not confined to large enterprises: many small companies are able to cut costs and improve their product offerings through access to the internet.

A study by the International Telecommunications Union (ITU) of the impact of broadband on the economy noted the following

"The economic impact of broadband manifests itself through four types of effects.

The first effect results from the construction of broadband networks. In a way similar to any infrastructure project, the deployment of broadband networks creates jobs and acts over the economy by means of multipliers. The second effect results from the “spill-over” externalities, which impact both enterprises and consumers. The adoption of broadband within firms leads to a multifactor productivity gain, which in turn contributes to growth of GDP. On the other hand, residential adoption drives an increase in household real income as a function of a multiplier. Beyond these direct benefits, which contribute to GDP growth, residential users receive a benefit in terms of consumer surplus, defined as the difference between what they would be willing to pay for broadband service and its price. This last parameter, while not being captured in the GDP statistics, can be significant, insofar that it represents benefits in terms of enhanced access to information, entertainment and public services."

UNCTAD publishes annual reviews of the information economy that set international benchmarks and challenges.

Because the positive link between internet access and economic performance is so well-established. EDD has focused on advocacy of, and supporting measures to, enable more South Africans to have access to quality, affordable internet access, instead of conducting more research to simply confirm that positive relationship.

Access to the internet is a function of the backbone infrastructure laid by the public and private sectors, as well as the 'last-mile' connectivity that brings internet access to users and support for ICT-intensive industries.

There has been a significant increase in access to the internet in both urban and rural areas, through the availability of increased broadband facilities that has led greater broadband penetration (through lower prices and better quality of access) and improvement in smart-phone technologies that enables handset access to the internet.

Since 2009, 41 a significant of cable have been laid and maintained principally by Telkom, Eskom Transmission, Dark Fibre Africa, Broadband Infraco, FibreCo and the NLD Consortium. Broadband rollout is now monitored and supported through the work of the Presidential Infrastructure Coordinating Commission. The CSIR has been appointed to coordinate the work of Strategic Integrated Project 15 on Information and Communication Technologies

According to the 2014 General Household Survey, 37% of South African households have access to mobile broadband, and 11% have fixed broadband. But the figures vary substantially by area. While 43% of people in the urban areas have access to mobile broadband and 15% to fixed, in the rural areas the figures are just 3% mobile and 25% fixed.

Many South Africans access the internet from their phones, personal computers (using home telephone or data lines) and portable devices such as laptops (using 3G and 4G cards). Though prices fell, cost is still a constraint for a considerable number of potential users.

In order to avoid the development of a digital divide where access is only available to those who can access private facilities, government has partnered to provide greater levels of public access to broadband. Though such initiatives are still fairly new, they have provided access points at schools, universities and some public transport and government facilities. We provide a few examples below.

A partnership between the Department of Telecommunications and Postal Services (DTPS),Telkom and the Department of Basic Education has resulted in 1650Dinalediand District schools connected (as at December 2014) at a cost of R375 million. By March 2015, 1148 of the targeted schools (70% of the total) are using the connection points.

USAASA is charged with extending broadband coverage and installs connection points to clinics, TVET colleges and libraries in rural areas with limited internet and television access. In the past two financial years, four rural municipalities with 493lic access to broadband. Though such iMorolong (Northern Cape); Ratlou (North West); Msinga (KwaZulu Natal) and Emalahleni (Eastern Cape). USAASA provided a subsidy of R46,7million. In 2015/16, a further two municipalities - Mutale in Limpopo and Albert Luthuli in Mpumalanga - will be connected, at a cost of R23 million, to provide coverage to 277 000 people.

A number of municipalities are extending broadband to their citizens. For instance, Tshwane has 673 live sites in schools, clinics and other public buildings, with 72023 million, to 493lic access to broadband. Though shrough smartphones.

A further priority is to ensure that broadband supports higher education and knowledge management. For this reason, government has prioritised improving ICT for universities.

Almost a million students at South African public universities have access to the Internet, either through their own computers or through the computer labs at the universities.

The current South African National Research Network (SANReN) backbone consists of a 10Gbps ring between Tshwane, Johannesburg, Mangaung, Cape Town, Port Elizabeth, East London and eThekwini, extensions to more remote towns with university campuses, and several metropolitan rings.

All 26 public universities are connected to the internet.

During the 2014/2015 financial year the CSIR was tasked by the Department of Science and Technology (DST) to expand the SANReN (South African Research Network) reach by 25 new connections and upgrade the networketworkchnology (DST) to expand the sburg, Mangaung, the computer labs aGbps) per connected site. Construction and commissioning work on 29 new broadband connections are also currently in various stages of completion.

The activation and backhauling of two 10Gbps channels of the recently procured West African Cable System (WACS) capacity right-of-use was completed in August 2014. This effectively doubled the available capacity for all South African universities and science organisations connected to the SANReN to transfer data between South Africa and the rest of the world.

In order to achieve more of the digital dividend for the economy, the National Infrastructure Plan provides for an increase in the rollout of broadband through additional fibre-optic networks.

-END-

25 August 2015 - NW2590

Profile picture: Waters, Mr M

Waters, Mr M to ask the Minister of Social Development

Whether, with reference to her reply to question 1650 on 9 June 2015, the SA Social Security Agency will transfer any money to her department for the payment of military veterans; if so, what (a) amount is to be transferred, (b) are the reasons for the transfer and (c) process is to be used in order to recruit the military veterans?

Reply:

The Honourable Member must refer to question 300 on 28 April 2015 and question 1650 on 09 June 2015 in which I replied to these questions in details.

 

25 August 2015 - NW2849

Profile picture: Mackenzie, Mr C

Mackenzie, Mr C to ask the Minister of Telecommunications and Postal Services

With reference to his reply to question 2042 on 24 June 2015, (a) what are the dates of the presentations to the information and communications technology industry on SA Connect, (b) where were the specified meetings held and (c) which industry players attended the specified meetings; (2) When can the work plan, based on the National Broadband Advisory Council, be submitted to his department; (3) Will the specified work plan be published; if so, (a) when and (b) how will it be published?

Reply:

(1) (a) Presentations were held on the 21 August 2014 and 27 November

2014.

(b) Presentation were held at the DTPS offices

(c) For the meeting of the 21 August 2014, six members of the NBAC Working Group, four members from the department and a representative from Government Technical Advisory Centre (GTAC) were in attendance. For the meeting of the 27 November 2014, five members of the NBAC Working Group were in attendance as well as six members of the department. Viasat and the Gauteng Broadband Network (GBN) were invited to deliver presentations at the meeting of 27th November 2014 but only Viasat managed to deliver the presentation on the day.

(2) The Minister will meet the Chairperson of the NBAC to map a way forward with regards to the continuing role of the NBAC as well as the work plan that will guide the NBAC going forward.

(3) Since the work plan is expected to be a dynamic document, it will not be gazetted to allow for flexible adaptation of the document to the rapidly changing ICT environment and to ensure that the work of the NBAC remains relevant.

25 August 2015 - NW2669

Profile picture: Stubbe, Mr DJ

Stubbe, Mr DJ to ask the Minister of Police

Whether, with reference to the appointment of the Secretary of the Civilian Secretariat, the post has been permanently filled; if not, (a) why not and (b) on which specific dates was the post first advertised; if so, (i) was the post ever re-advertised and (ii) on which specific dates was the post re-advertisement?

Reply:

a) Since the post was vacant following the termination of service of the former Secretary of Police at the end of August 2014, the post was advertised in line with Section 11 (2) of the Public Service Act which requires that there should be transparent competition between applicants for the post.

b) The post was advertised on the 20th October 2014 with a closing date of 31 October 2014.

(i)  No

(ii) Not applicable

25 August 2015 - NW2713

Profile picture: Bhanga, Mr BM

Bhanga, Mr BM to ask the Minister of Cooperative Governance and Traditional Affairs

Whether (a) he, (b) his Deputy Ministers and (c) any officials in his department travelled to China in the 2014-15 financial year; if so, what was the (i) purpose of each specified visit and (ii)(aa) total cost and (bb) breakdown of such costs of each specified visit?

Reply:

(1) No.

25 August 2015 - NW2914

Profile picture: Madisha, Mr WM

Madisha, Mr WM to ask the Minister of Transport

Whether she had instituted an investigation (a)(i) to what extent and (ii) at what cost the modernisation of stations, particularly in KwaZulu-Natal, had been effected and (b) when the special train will start to provide full service between Pietermaritzburg and Durban to ease congestions on the road; if not, why not, in each case; if so, what are the relevant details in each case?

Reply:

(a) The modernization of stations in the country is occurring according to the programme of implementation.

   (i) Of the total of 135 stations identified for modernization, 25 are located in KZN

   (ii) Duffs Road station is the only station in KZN in the current financial year undergoing modernization at a cost of R143 095 385, with expenditure to date being R82 114 808.

(b) The expected date of service of the KZN Business Express between Pietermaritzburg and Durban in early November 2015.

25 August 2015 - NW2964

Profile picture: Mackenzie, Mr C

Mackenzie, Mr C to ask the Minister of Telecommunications and Postal Services

(1) (a) What is the status of the draft policy on data pricing and (b) who drafted the specified policy; (2) Whether the specified draft policy will be published for public comment; if not, why not; if so, when?

Reply:

  1. (a) The draft policy direction has already been prepared and consultation with the Independent Communications Authority of South Africa commenced.

(b) The draft policy direction was drafted by the Department.

(2) After finalising consultation with ICASA, public consultation will commence in accordance with section 3(5) of the Electronic Communications Act, 2005 that requires that the text of a policy direction must be published in the Gazette for 30 days to obtain the views of interested persons.

25 August 2015 - NW2822

Profile picture: Matsepe, Mr CD

Matsepe, Mr CD to ask the Minister of Cooperative Governance and Traditional Affairs

(1)Whether any chief financial officers (CFO) in local, metropolitan, district municipalities or any other municipal entities do not meet the qualifications criteria for employment in such a position; if so, (a) what is the (i) name, (ii) qualifications and (iii) entity or municipality at which the specified person is employed and (b) what action has been taken in this regard; (2) (a) how many vacancies exist at CFO level in local, metropolitan, district municipalities or any other municipal entities and (b) what is the average duration that the positions have been vacant?

Reply:

The information requested by the Honourable Member is not readily available within the Department. We have, however, requested all the Provinces, to provide the information.

The Honourable Member will be provided with the requested information as soon as it is submitted to us.

25 August 2015 - NW2818

Profile picture: Mileham, Mr K

Mileham, Mr K to ask the Minister of Cooperative Governance and Traditional Affairs

Whether any income and expenditure reports for the Mantsopa Local Municipality in the Free State have been tabled before the Municipal Council in the past 12 months; if not, why not; if so, (a) when was each report tabled, (b) what was the total operational income and expenditure reported in each case and (c) how much was owed to creditors in each aging category in each report?

Reply:

The information requested by the Honourable Member is not readily available within the Department. We have, however, requested the Province and Mantsopa Local Municipality, to provide the information.

The Honourable Member will be provided with the requested information as soon as it is submitted to us.

25 August 2015 - NW2867

Profile picture: Steenkamp, Ms J

Steenkamp, Ms J to ask the Minister of Environmental Affairs

Whether, with regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153, where it is stated on page 65 that the area where the Trachyandra erythrorrhiza species was found is not a typical habitat for the species and therefore not regarded as crucial that the specific habitat be protected by the specified buffer (details furnished), she has found that it was not crucial to protect the specified habitat; if not, what action does she intend taking in this regard; if so, what is the basis of her finding?

Reply:

The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the Member of Executive Council is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

--ooOoo--

25 August 2015 - NW2702

Profile picture: Lorimer, Mr JR

Lorimer, Mr JR to ask the Minister of Transport

Whether (a) she, (b) her Deputy Minister and (c) any officials in her department travelled to China in the 2014-15 financial year; if so, what was the (i) purpose of each specified visit and (ii)(a) total cost and (ii)(b) breakdown of such costs of each specified visit?

Reply:

(a) Yes, from 29 November - 06 December 2014

(b) No

(c) Yes

(i) State Visit to the People’s Republic of China

(ii) (a) R163 199.30

(ii) (b) Airfare: R149 459.00

S&T Advance: R 13 740.30

DIRCO has not submitted the invoices for Accommodation, Translators and Ground transport.

(c) (i) see table below

(ii) (a) R582 771.48

(b) See table below

Passenger

Purpose of visit (c) (i)

Travel Date

Breakdown of Costs (c) (ii) (b)

Mr Mkhacani Godfrey Maluleke

Integrated Border Management Agency During September and October 2015 (BMA)

18-27 October 2014

Airfares: R 71 764.00

Daily Allowance: R 8 683.65

Accommodation: Waiting for invoices from DIRCO

Ground transport: Waiting for invoices from DIRCO

Total Amount: R80 447.65

Ms Keitumetse Mathibe

State Visit to the People’s Republic of China

29 November - 06 December 2014

Airfares: R149 459

Daily Allowance: R 12 491.20

Accommodation: Waiting for invoices from DIRCO

Total: R161 950.20

Ms Lesego Ntsieni

State Visit to the People’s Republic of China

29 November - 06 December 2014

Airfares: R149 459

Daily Allowance: R 12 491.20

Accommodation: Waiting for invoices from DIRCO

Total: R161 950.20

Mr Mawethu Vilana

State Visit to the People’s Republic of China

29 November 2014

 

Airfare: R62 446

Advance: R 12 575.32

Accommodation: Waiting for invoices from DIRCO

Total: R75 021.32

Mr P Mohan

Cross Border Road Transport study Tour to China

7-13 March 2015

Airfares: R 72 332.14
Accommodation: R 15 670.00
Daily Allowance: R 15 400.00

Total Amount:

R 103 402.14

TOTAL COST

   

R582 771.48

25 August 2015 - NW2866

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Environmental Affairs

Whether, with regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality, and the stipulation on page 63 of the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153, wherein it is stated that a vulnerable plant species name Trachyandra erythrorrhiza has been identified on the proposed development area, she has found that there must be a 200m buffer area around the species; if not, (a) on what grounds can the buffer area be reduced and (b) which entity can approve the reduction of the buffer zone; (2) has there been such an application to reduce the buffer zone; if so, what was the outcome of the application?

Reply:

1. The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the Member of Executive Council is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

(a) and (b) Not applicable.

2. Not applicable.

--ooOoo--

25 August 2015 - NW2762

Profile picture: Mackenzie, Mr C

Mackenzie, Mr C to ask the Minister of Telecommunications and Postal Services

(a) What is the (i) mandate and (ii) budget of the Cyber Security Hub for the (aa) 2015-16 financial year and (bb) Medium-Term Expenditure Framework and (iii) programme of action of the hub for the specified financial year, (b) how many persons does it employ, (c) what skills set do they hold, (d) who is in charge of the Cyber Security Hub, (e) what is their job title and (f) to whom do they report?

Reply:

(a)(i) The mandate of the Cybersecurity Hub is to be the central point of collaboration for Cybersecurity incidents;

(ii)(aa)The budget for 2015-16 Financial Year is R11 755 000.00

(bb)The Medium-Term Expenditure Framework is as follows:

Financial Year (FY) 2016-17 (R11 847 000.00)

FY 2017-18 (R11 939 000.00)

FY 2018-19 (R12 536 000.00)

(iii) The money will be spent on operations of the Cybersecurity Hub as per the Cybersecurity Hub Road Map.

(b) The operations of the Cybersecurity Hub is currently outsourced.

(c) Most of the staff members from the Service Provider hold Masters Degrees.

(d) As outlined in the National Cybersecurity Policy Framework, the Department of Telecommunications and Postal Services is in charge of the Cybersecurity Hub and the Cybersecurity Hub is headed by Mr Jabu Radebe.

(e) He is a Chief Director: ICT Security

(f) The Cybersecurity Hub reports to the Ministry of Telecommunications and Postal Services, the Director-General of the Department, Deputy Director-General: ICT Infrastructure Support and the Cybersecurity Response Committee (CRC).

25 August 2015 - NW2963

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Telecommunications and Postal Services

Will the draft regulations on the Rapid Deployment Policy be published for public comment; if not, (a) why not and (b) why has a public participation process not been followed; if so, (i) when and (ii) where will the draft regulations be published?

Reply:

The Independent Communications Authority of South Africa (ICASA) is the body responsible for issuing electronic communications regulations in South Africa. ICASA will be in a position to issue the Rapid Deployment Regulations in accordance with the procedure prescribed in the Electronic Communications Act No 36 of 2005 after the Cabinet has approved the Rapid Deployment Policy.

25 August 2015 - NW2736

Profile picture: Macpherson, Mr DW

Macpherson, Mr DW to ask the Minister of Cooperative Governance and Traditional Affairs

In relation to the Manase Report into corruption and maladministration in the Ethekwini Municipality, how many officials have been dismissed as a result of internal disciplinary action stemming from the report; (2) What criminal charges have been brought against (a) current or (b) former officials stemming from the report; (3) What cost recovery proceedings have been initiated against (a) current of (b) former officials stemming from the report; (4) What action has been taken against politicians implicated in the report?

Reply:

The response below was provided by the eThekwini Metropolitan Municipality:

  1. Two (2) officials were charged with misconduct following the recommendations of the Manase report were dismissed.
  2. In line the resolution of Council, the City Manager referred all the matters that required investigation by the police to the Anti-corruption Task Team for consideration of possible criminal action. The report from the ACTT is still outstanding.
  3. The Manase report recommended recovery from a number of officials involved in irregular expenditure. (a) The current criminal investigation will assist to determine which amounts were proceeds of crime, which would enable recovery. (b) One million rand was recovered from the two dismissed officials, dismissed for fraud. This amount was taken from their pension.
  4. Council referred the matters relating to Councillors to the Ethics Committee. Disciplinary action was taken against the ten (10) Councillors who were implicated. One Councillor is no longer a Councillor and two are deceased. The other Councillors were fined according to the quantum of transgression. The fines ranged from R8248,19 to R19500,22. Arrangements were made by the Councillors to pay the fines.

25 August 2015 - NW2819

Profile picture: Mileham, Mr K

Mileham, Mr K to ask the Minister of Cooperative Governance and Traditional Affairs

(1)Whether the whereabouts and status of the mayoral chain of each metropolitan municipality are known; if so, (a)(i) where and (ii) how is each specified mayoral chain secured and (b) what is the current value of each specified mayoral chain; (2) is each specified mayoral chain insured for full replacement value; if not, (a)(i) when and (ii) under what circumstances did the mayoral chain or elements thereof go missing and (b) was any claim instituted against the municipal insurance for the loss of the mayoral chain or elements thereof; (3) in cases where the whereabouts of the mayoral chain is not known, has any criminal case been opened relating to the loss of the mayoral chain or elements thereof; if not, why not; if so, what is the current status of the case?

Reply:

The information requested by the Honourable Member is not readily available within the Department. We have, however, requested all the Metropolitan Municipalities, to provide the information.

The Honourable Member will be provided with the requested information as soon as it is submitted to us.

25 August 2015 - NW2865

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Environmental Affairs

Whether, with regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 which states on page 65 that Dr Johan van der Waals concluded various soil surveys and applied the Department of Water and Sanitation (DWS) 2005 guidelines for the classification of a wetland, and his findings was that the area in which the Trachyandra erythrorrhiza species was found cannot be classified as a wetland because it did not contain all the required characteristics of a wetland, (a) she is in agreement with this finding and (b) there are more recent DWS guidelines for the classification of a wetland; if so, (i) why are the 2005 guidelines being used, (ii) what are the differences between the two sets of guidelines and (iii) is the developer compelled to use the latest set of guidelines?

Reply:

The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the above-mentioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the Member of Executive Council is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

(a) and (b)(i), (ii) and (iii) Not applicable

--ooOoo--

25 August 2015 - NW2988

Profile picture: Lorimer, Mr JR

Lorimer, Mr JR to ask the Minister of Public Enterprises

(1) Where does the Hendrina Power Station source its coal from since the withdrawal of Optimum Colliery’s mining licence; (2) does the specified power station source its coal from a stockpile; if so, (a) how long will the stockpile last, (b) how is the coal transported, (c) at what price is the coal delivered and (d) how does the specified price compare to the Optimum Colliery contract price; (3) will the closure of the colliery affect the power output of the specified power

Reply:

(1) The suspension of the mining license at Optimum Colliery’s commenced on Monday 3 August 2015 and was lifted on Friday 7 August 2015. As part of the normal contingency plans at all coal fired Power Stations, supply is supplemented from other sources. The specific details of supplemental suppliers are confidential.

(2) Yes.

(a) There is over 30 coal stock days at Hendrina Power Station (levels vary daily).

(b) Coal is transported by conveyor belt from Optimum Colliery and is trucked in from the supplementary sources.

(c) This information is commercially sensitive and it is subject to standard confidentiality clauses in Eskom’s agreements with suppliers. Therefore it cannot be disclosed.

(d) This information is commercially sensitive and it is subject to standard confidentiality clauses in Eskom’s agreements with suppliers. Therefore it cannot be disclosed.

(3) If the supply of coal is maintained through other sources then the generating capacity will stay the same.

25 August 2015 - NW2873

Profile picture: Kohler-Barnard, Ms D

Kohler-Barnard, Ms D to ask the Minister of Police

(1)How many SA Police Service (SAPS) officers in each province were charged with aiding an escapee (a) in the 2014-15 financial year and (b) from 1 April 2015 up to the latest specified date for which information is available; (2) how many such cases against the specified SAPS officers have been (a) withdrawn and/or (b) are pending; (3) how (a) many escapees did a SAPS officers assist in escaping and (b) did they assist the escapee in each specified case?

Reply:

Due to the nature of information that is required . A request is hereby made for an extension in order for us to provide quality and correct information as soon as it is received.

25 August 2015 - NW2863

Profile picture: Waters, Mr M

Waters, Mr M to ask the Minister of Environmental Affairs

With regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and the Final Environmental Impact Assessment Report Gaut: 002/13- 14/E0153 which states on page 66 that the fauna and flora specialist also found some medicinal plants on the study area and it will be recommended that the medicinal plants also be relocated, which medicinal plants (a) were found and (b) are on the vulnerable list; (2) can the specified plants be relocated; if not, why not; if so, what are the relevant details?

Reply:

1.  The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the Member of Executive Council is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

(a) and (b) Not applicable

2.  Not applicable

--ooOoo--

25 August 2015 - NW2661

Profile picture: Horn, Mr W

Horn, Mr W to ask the Minister of Cooperative Governance and Traditional Affairs

(1)With respect to the report by the Auditor-General that 233 contractual awards to councillors, employees of councils and close family members of councillors to a value of R165 million were made by the local government in the Free State in the 2013-14 financial year, (a) how many contracts of this nature were made in each municipality and (b) what was the value of each specified contract made in respect of each of the municipalities in the Free State during the specified period; (2) (a) what are the names of the councillors that received rewards of this nature, (b) which municipalities are they from and (c) what amount did they receive due to each specified contract during the specified period; (3) what are the names of the (a) family members, (b) councillors that they are related to and (c) municipality that they belong to?NW3092E

Reply:

I do not have the information regarding sub-questions (1), (2) and (3).

The MEC responsible for Local Government in Free State, is being requested to commission an investigation into the matter.

25 August 2015 - NW2697

Profile picture: Volmink, Mr HC

Volmink, Mr HC to ask the Minister of Health

Whether (a) he, (b) his Deputy Minister and (c) any officials in his department travelled to China in the 2014-15 financial year; if so, what was the (i) purpose of each specified visit and (ii)(aa) total cost and (bb) breakdown of such costs of each specified visit?

Reply:

The Minister visited China to attend the World Economic Forum’s Annual Meeting of New Champions 2014, in Tianjin, People’s Republic of China from 10 to 12 September 2014. Minister used this opportunity to honour a long standing invitation to pay an official visit to China from Minister Li Bin, the Minister of Health and Family Planning of the People’s Republic of China. This official visit took place on the 9th of September 2014.

He was accompanied by Dr Anban Pillay: Deputy Director General: Health Regulation and Compliance Management and PA, Ms M Sethosa.

Return Air Tickets: R 316 576.00

Accommodation: R 78 000.00

Daily allowances: R 35 249.34

Vehicles: R 75 000.00

VIP Lounges: R 20 000.00

The total cost for the visit was R 524 825.34.

 

Another delegation of Senior Officials visited China from 18 to 22 August 2014 to attend the Global Health Diplomacy Executive Training Course in Beijing, China. The delegation consisted of Deputy Director-General: International Health Development and Support, Ms MK Matsau, Mr M Modisenyane, Director: Africa Relations and the Deputy-Director: South-South Relations, Ms T Khosa.

Return Air Tickets: R 135 108.00

Accommodation: R 24 717.00

Daily allowances: R 16 756.20

The total cost for the visit was R 176 581.20

Please note that the trip was sponsored, tickets, accommodation and local transport were paid for by the National Health and Family Planning Commission (NHFPC) of the People’s Republic of China.

END.

25 August 2015 - NW2864

Profile picture: Hadebe, Mr TZ

Hadebe, Mr TZ to ask the Minister of Environmental Affairs

Whether, with regard to the awarding of the tender for the development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR, City of Johannesburg Metropolitan Municipality and the Final Environmental Impact Assessment Report Gaut: 002/13-14/E0153 which states on page 65 that the relocation of the species Trachyandra erythrorrhiza can be treated as a pilot project in order to determine whether the plant can be successfully transplanted, she is in agreement for a pilot project to continue; if so, (a) what will the impact be on the area if the transplanting does not succeed and (b) on what evidence did her Department rely when determining that the species could possibly be transplanted?

Reply:

The National Department of Environmental Affairs (DEA) has no record of an application for environmental authorisation for the abovementioned project. The application was lodged with the provincial department of environmental affairs, the Gauteng Department of Rural Development (GDARD), for which the Member of Executive Council is the competent authority in terms of S24C of NEMA. Please contact the GDARD for a response.

(a) and (b) Not applicable

--ooOoo--

25 August 2015 - NW2817

Profile picture: Boshoff, Ms SH

Boshoff, Ms SH to ask the Minister of Basic Education

( 1) How many (a) blind and deaf learners are enrolled in the Kha Ri Gude programme in each (i) province and (ii) district and (b) qualified (i) braille and (ii) SASL educators or volunteers are registered to teach these learners; (2) How many officials at (a) district and (b) circuit level are qualified to assist these educators or volunteers in presenting the classes; (3) What was the drop-out rate of the specified learners in each {a) province and (b) district in the 2012, 2013, 2014 calendar years? NW3290E

Reply:

(1) (a)(i)
In 2014. the Kha Ri Gude Mass Literacy Campaign enrolled 2 048 Blind learners that were taught how to read and vvTite using Braille. In addition, 1 084 deaf learners were taught to communicate using the South African Sign Language (SASL).

There is a challenge with regard to finding qualified unemployed educators to teach Braille and SASL. Therefore the campaign did not recruit learners in the Northern Cape. Unfortunately, the programme was unable to recruit blind and deaf learners in the Northern Cape and blind learners in the Western Cape.

The Campaign has implemented plans to recruit a suitable volunteer in both these provinces for the 2015 Campaign to ensure that these learners are included in the campaign.

Attached find here: Provinces

25 August 2015 - NW2690

Profile picture: America, Mr D

America, Mr D to ask the Minister of Telecommunications and Postal Services

Whether (a) he, (b) his Deputy Minister and (c) any officials in his department travelled to China in the 2014-15 financial year; if so, what was the (i) purpose of each specified visit and (ii)(aa) total cost and (bb) breakdown of such costs of each specified visit?

Reply:

(a) No, and the rest of the questions fall off.

25 August 2015 - NW2598

Profile picture: Boshoff, Ms SH

Boshoff, Ms SH to ask the Minister of Basic Education

With regard to development of Portions 87, 148, 149 and the remainder of Portion 1 of the farm Rietfontein 61 IR in the City of Johannesburg Metropolitan Municipality, (a) how many (i) primary and (ii) high schools are to be built on the specified property, (b) how many learners will each school accommodate, (c) when will each school be completed and (d) what is the projected total cost of building each specified school?

Reply:

(a); (i), (ii), (b), (c), (d). According to information received from Gauteng Department of Education, no educational sites have been provided during the town planning of the area mentioned. Rietfontein falls within the border of the City of Johannesburg and Ekurhuleni Metropolitan Municipalities and is surrounded by areas such as Greenstone, Linksfield, Modderfontein and Edenvale. At this point there are no sites earmarked for public schooling within the area and no schools are presently planned to be built on the specified sites.

25 August 2015 - NW2724

Profile picture: Mileham, Mr K

Mileham, Mr K to ask the Minister of Cooperative Governance and Traditional Affairs

(1)Whether the appointment of the municipal manager of Lekwa-Teemane Local Municipality in the North West complied with relevant legislation and regulations; if not, (a) why not and (b) what action will he take in this regard; if so, what (i) are the qualifications of the specified municipal manager and (ii) process was followed in the municipal manager’s appointment; (2) What is the gross annual remuneration, total cost to company, of the municipal manager of Lekwa-Teemane Local Municipality; (3) Whether such remuneration is within the Upper Limits for the Total Remuneration of Municipal Manager as promulgated in the Government Gazette; if not, why not; if so, what are the relevant details; (4) Whether the contract of the municipal manager was approved by the municipal council of Lekwa-Teemane Local Municipality prior to the signing thereof; if not, (a) why not and (b) what action will he take in this regard; if so, (i) when was it tabled before council for consideration, (ii) what was the resolution of the council in this regard, (iii) when was the contract signed and (iv) by whom?

Reply:

  1. (a) The Local Government: Regulations on Appointment and Conditions of Employment of Senior Managers, which came into effect on 17 January 2014, requires that a person appointed as the municipal manager of a municipality must have a Bachelor degree in Public Administration/ Social Sciences/ Law, or equivalent. According to information at the disposal of the Department, the municipal manager of Lekwa Teemane Local Municipality holds a National Diploma in Town and Regional Planning, Certificate in Local Government Finance Management and a short course certificate in Public Management and Governance. As it stands, the Minister is not able to make a conclusive decision whether the qualifications of the municipal manager comply with the prescribed requirements due to lack of evidence or proof that his qualifications were subjected to an evaluation by the South African Qualifications Authority (SAQA) to determine if his qualifications are equivalent to a Bachelor’s degree.

   (b)  The MEC for local government in the North-West Province has been requested to investigate this matter, which will include an evaluation of the municipal manager’s qualifications by SAQA. Upon conclusion of the investigation, the MEC will submit a formal report to the Minister in terms of section 54A(7)(b) of the Municipal Systems Act, whereafter the Minister will determine the course of action, if any.

  (i)   National Diploma in Town and Regional Planning, Certificate in Local Government Finance Management and a short course certificate in Public Management and Governance.

(ii) The process followed in the municipal manager’s appointment will be determined once a full report on the appointment of the municipal manager has been received from the MEC.

2.  The total annual remuneration package of the Municipal Manager of Lekwa Teemane is R970 920-00.

3.   Yes, the total remuneration of the Municipal Manager is within the upper limits for the total remuneration payable to municipal managers, inclusive of the 20% market premium allowance as provided for in clause 10(4) of the Notice on upper limits of the total remuneration packages payable to senior managers under Government Notice No. 225 as published in Government Notice No. 37500 of 29 March 2014.

4.   Section 57 of the Municipal Systems Act requires that a person may be appointed as a municipal manager of a municipality only in terms of a written employment contract with the municipality complying with the provisions of this section and that the employment contract be entered into with the municipality represented by the mayor or executive mayor. On 3 March 2015, the Lekwa Teemane municipal council resolved to appoint a successful candidate and further directed that the employment contract be entered into between the successful candidate and the municipality represented by the mayor.

 (a)  There is no legal requirement for the employment contract to be tabled before council prior to the signing thereof.

 (b) (i) and (ii) Not applicable.

      (iii) The employment contract was signed on 16 April 2015.

     (iv) The contract was entered into between the municipal manager and municipality represented by the mayor.

25 August 2015 - NW2874

Profile picture: Kohler-Barnard, Ms D

Kohler-Barnard, Ms D to ask the Minister of Police

(a) What is the total amount of narcotics seized by the SA Police Service (i) in the 2014-15 financial year and (ii) from 1 April 2015 up to the latest specified date for which information is available, (b) what amount of the seized narcotics subsequently went missing and (c) how many SAPS members faced disciplinary action as a result of the missing narcotics in each case?

Reply:

Due to the nature of information required. A request is hereby made for an extension in order for us to provide quality and correct information as soon as it is received.

25 August 2015 - NW2821

Profile picture: Matsepe, Mr CD

Matsepe, Mr CD to ask the Minister of Cooperative Governance and Traditional Affairs

(1) Whether any municipal managers are remunerated in excess of the Upper Limit of Total Remuneration Package Payable to Municipal Managers and Managers Directly Accountable to Municipal Managers; if so, what is the (a) name, (b) qualification(s) and (c) municipality of the relevant municipal manager in each case; (2) Whether a waiver was (a) requested and (b) granted by him in each case; (3) What is the (a) remuneration amount and (b) amount in excess of the upper limit in each case; and (4) Whether any action has been taken to address the amounts paid to municipal managers remunerated in excess of the Upper Limit of Total Remuneration Package Payable to Municipal Managers and Managers Directly Accountable to Municipal Managers; if not, why not; if so, what steps have been taken in this regard? NW3294E

Reply:

  1. The first Notice on the total remuneration packages payable to municipal managers was issued on 29 March 2014, with the express provision that it becomes applicable from 1 July 2014. According to transitional measures contained in Item 11 of the Notice, the Notice does not apply to serving municipal managers whose contracts were concluded before the commencement of the Notice (i.e. 1 July 2014); meaning that such senior manager remuneration will continue to be governed in terms of their employment contracts until the contracts have lapsed or terminated.
  2. (a) A total of twenty (20) applications to waive the provisions of the Notice were received by the Minister.

(b) No application of waiver was granted by the Minister.

3.  No waiver was granted.

4.  Please refer to the response on (3) above.

25 August 2015 - NW2707

Profile picture: Ollis, Mr IM

Ollis, Mr IM to ask the Minister of Labour

Whether (a) she, (b) her Deputy(b)and (c) any officials in her department travel to China in the 2014-15 financial year; if so, what was the (i) purpose of each specified visit and (ii) (aa) total cost and (bb) breakdown of such costs of each specified visit?

Reply:

The Deputy Minister of Labour, Honourable SP Holomisa led a delegation consisting of eight (8) senior officials of the Department of Labour to China, once during 2014-15 financial year.

The visit to China was to finalise focal areas of cooperation in terms of the signed Memorandum Of Understanding with China.

25 August 2015 - NW2650

Profile picture: Nkomo, Ms SJ

Nkomo, Ms SJ to ask the Minister of Health

(1)Whether his department has commissioned any studies on the safety of genetically modified organisms (GMOs) currently present in the majority of maize crops in the country; (2) whether foodstuffs that contain GMOs are safe to eat; if so, what are the full relevant details?

Reply:

  1. The Department of Health has not commissioned any studies on the safety of genetically modified organisms (GMOs). However, the Department participates in the regulatory systems of GMOs.

The safety of Genetically Modified Organisms is regulated in terms of the Genetically Modified Organisms Act, 1997 (Act No. 15 of 1997), (GMO Act), which is administered by the Department of Agriculture, Forestry and Fisheries (DAFF). The GMO Act provides for safety of human and animal health, as well as the environment. There are specific regulatory systems which have been set up for the rigorous evaluation of GMOs and Genetically Modified foodstuffs, so as to ensure access to sufficient, safe and nutritious food. These regulatory systems evaluate both human health and the impact that these organisms may have. The regulatory system consists of scientists, including food safety experts, who conduct food safety assessments before the GMO crops are approved for human consumption. The Department of Health participates in this regulatory system which also focuses on risk assessments of GMOs.

2. All GMO foodstuffs approved by government are safe to eat.

All foodstuffs from GMOs are thoroughly assessed during the developmental phase to ensure that they are safe for animal and human consumption. This is done before they are made available to the public. The safety assessments of Genetically Modified foodstuffs are based on guidelines and principles developed by Codex Alimentarius Commission (Codex), an international body involved in food safety, under the World Health Organization (WHO) and Food and Agriculture Organisation (FAO) of the United Nations. The Codex guidelines and principles include the need for a case-by-case safety assessment, i.e., the use of scientific risk-based assessment methods that would take into consideration the newly introduced genetic material in crops, including new proteins and other characteristics of the Genetically Modified foodstuffs. This is also done in comparison with conventionally produced foods. All the Genetically Modified foodstuffs that are on the market have been approved by government and are considered as safe as their conventional counterparts.

The details of all the GMOs approved in South Africa are as a result of the safety assessment by scientists who are experts in fields related to GMOs as appointed by the Minister for Agriculture, Forestry and Fisheries, in terms of the GMO Act and evaluate risk assessments (scientific data relating to food, feed and environmental impact). The decisions for approval are by the Executive Council, which consists of officials from six government departments responsible for matters relating to Agriculture, Health, the Environment, Labour, Trade and Industry and Science and Technology, as well as the chairperson of the Advisory Committee.

END.

25 August 2015 - NW2972

Profile picture: Esau, Mr S

Esau, Mr S to ask the Minister of Defence and Military Veterans

What critical opportunities has her department (a) identified and (b) negotiated on behalf of military veterans in the 2015-16 financial year?

Reply:

(i) Registration of Co-operatives

The Department of Military Veterans has been tasked with ensuring that the registration of effective co-operatives continues to be deliverable for the Department in the 2015/16 financial year. In this regard, the Department has set a target for the establishment of at least 40 new co-operatives by the end of the financial year. The task involves the conducting of workshops to advise military veterans on the requirements for establishment of co-operatives. Thereafter, those interested are provided with a training workshop after which they are provided with the requisite documentation to allow for them to independently call their proposed co-operatives members together, complete the Constitution and applications forms and then to submit all the required documents to the DMV for registration of the co-operatives. In the interim, the DMV is engaging in discussion with various stakeholders for potential opportunities for economic participation and job opportunities for military veterans. All workshops and training of Co-operatives is done in conjunction with the Department of Small Business Development’s Small Enterprise Development Agency. A further critical opportunity identified is for the funding of small and medium enterprises and co-operatives of military veterans through the Small Enterprise Financing Agency, with whom the DMV has a signed MOU.

(ii) Alienation of Disposable Products from the Department of Defence

The Minister has identified a critical opportunity for Military Veterans to take part in the process for the disposal of old and non-usable stock from the Department of Defence. Through this opportunity, it is envisaged that many work opportunities and possibility for economic participation can be identified for military veterans. The DMV has been tasked with developing an entity to house the programme so that it is carefully managed to derive maximum benefit to all military veterans, SANMVA shall play a role as a stakeholder to this entity. At present, in planning towards achieving on this goal, the DMV has identified at least 31 military veterans to be trained as auctioneers, in conjunction with the Department of Defence, so that military veterans would have a clear knowledge of the different steps in the alienation of disposable materials from the Department of Defence. The training of the auctioneers is expected to commence before the end of August 2015. It is envisaged that a large proportion of the co-operatives currently listed on the business development and support register would be able to derive benefit from the Department of Defence Programme.

(iii) Training through MERSETA and SASSETA

(b) The Critical Opportunities Identified

(i) Department of Defence alienation of obsolete materials

The Department of Defence programme on the alienation of obsolete is a key initiative being negotiated by the Minister on behalf of Military Veterans as indicated above.

25 August 2015 - NW2761

Profile picture: Mackenzie, Mr C

Mackenzie, Mr C to ask the Minister of Telecommunications and Postal Services

(a) How many employees have resigned from Broadband Infraco in the period 30 September 2014 to 30 June 2015 and (b) in each case, (i) at what positions were they employed, (ii) what skills set did they hold and (iii) at what salary level were they employed?

Reply:

I have been advised by Broadband Infraco as follows:

(a) Six (6) employees have resigned from Broadband Infraco in the period from 30 September 2014 to 30 June 2015.

(b) The table below referred to questions (b)(i)-(iii)

Termination from September 2014 to June 2015

Number of resignations

Termination date

Termination Service

Positions

Skills

Job Grade

Annual TCTC

1

2014/09/12

Resignation

Technician

Infrastructure maintenance

Peterson C2 Lower

R354 660

2.

2015/01/31

Resignation

Manager for performance Information Monitoring

Business Performance Monitoring and Reporting

Peterson D3 Lower

R504 534

3.

2014/02/01

Resignation

Manager Legal

Commercial Law

Peterson D3 Lower

R800 000

4.

2015/05/31

Resignation

Snr Engineer Transmission

Network Design

Peterson D3 Lower

R711 207

5.

2015/06/12

Resignation

Payroll Account

Payroll reconciliation and payment

Peterson D1 Lower

R355 200

6.

2015/06/30

Resignation

Specialist Maintenance

Infrastructure Maintenance

Peterson D1 Lower

R759 384

25 August 2015 - NW2971

Profile picture: Esau, Mr S

Esau, Mr S to ask the Minister of Defence and Military Veterans

(1)Why has her department failed to establish a health and wellness centre, as per its 2014 Annual Performance Plan; (2) What options were under consideration with reference to her department’s briefing to Parliament that her department was on the verge of procuring a centre; (3) What are the current associated costs for the specified centre; (4) (a) how many centres does her department plan to establish and (b) where will the specified centres be established, including the roll-out plan by the end of the 2015-16 financial year; (5) What is the sustainability plan for the specified centres in the long term?

Reply:

1) Acquisition of Infrastructure is done through the Department of Public Works (DPW) and the Department of Military Veterans does not have control over the process hence failure to acquire health and wellness centre as planned.

(2) The Department has made the financial provision for the establishment of the Health and Wellness Centre and had identified several sites in Gauteng which were submitted to the Department of Public Works, together with the specifications of the envisioned centre to fast track the procurement process as advised by DPW. Furthermore the Department is also considering the possibility of renting the Health and Wellness Sites and out-source the related services based on the specifications developed for the centre.

(3) Currently the Department has not incurred any costs but has reserved R19 million based on projections of the procurement and the management of the facility.

(4) (a) The ultimate plan for the Department is to establish one Health and Wellness Centre in each Province.

(b) The location of the Health and Wellness Centre will be based on the suitability of the sites, however for the 2015/16 period the Department plans to establish one centre in Gauteng.

(5) The department has developed a business plan which will inform the annual budget to ensure the sustainability of the program.

NW3475E

25 August 2015 - NW2846

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Telecommunications and Postal Services

(a) Which (i) national departments, (ii) provincial governments and (iii) local governments are financing their inclusion in the rural broadband project announced in the State of the Nation Address on 12 February 2015 and (b) in each case, (i) what amount have they committed or budgeted for this project and (ii) which elements of the project are they financing (aa) in the current financial year and (bb) for the Medium-Term Expenditure Budget?

Reply:

(a)(i) National Department of Health (NDOH) has rolled out connectivity in 34 of the 50 targeted for the NHI Pilot. The solution will dovetail and align with SA Connect once the service rollout commences following the appointment of a service provider.

(ii) At provincial level, only the Gauteng provincial government and the Western Cape provincial government have financed broadband plans

(iii) At local government level, there are various initiatives by Government and the private sector to provide Wi-Fi hotspot infrastructure and access to the public. Initiative from Tshwane and Lusikisiki are good examples were WiFi infrastructure was financed. The rollout in Tshwane cost in the order of R77, 000 per Wi-Fi site.

(b) The rollout programme of the DTPS will focus on broadband infrastructure and services for government facilities. The DTPS will aggregate government demand to ensure that there is a compelling business case for infrastructure to be extended to the rural areas. The national, provincial and local government departments will then compliment the efforts of the DTPS by focusing on the provisioning of end-user devises and equipment, applications, relevant content and the training of users of the technology. The DTPS has worked with provincial departments to establish provincial broadband steering committees that are used to ensure alignment of the DTPS programme and provincial plans.

25 August 2015 - NW2653

Profile picture: Singh, Mr N

Singh, Mr N to ask the Minister of Environmental Affairs

What informed the process of stakeholder selection to discuss issues around lion breeding and hunting at the stakeholder engagement held on 17 July 2015; (2) whether all interested parties were invited to the specified meeting; if so, what are the names of the parties that were invited and attended the specified meeting; (3) when will the outcomes from this stakeholder engagement be brought before Parliament for the members’ consideration and input?

Reply:

1. The Minister requested a meeting with organisations which are involved in lion hunting in South Africa in response to mounting public concern around captive breeding of lion and, in particular, to address claims of allegedly widespread so-called canned hunting of lion in South Africa. This meeting was then convened on 14 July 2015.

The Department identified organisations in attendance through the National Wildlife Forum, which is a forum established by the Minister in 2005 to address policy, permitting and legislation issues that affect the wildlife sector.

2. No, The Minister still intends to invite civil society, non-governmental organisations and other interested members of the public to discuss the allegedly widespread so-called canned hunting of lion in South Africa.

The following organisations which were directly affected were invited:

  • Professional Hunters Association of South Africa
  • South African Predators Association
  • Wildlife Ranching South Africa
  • National Shooting Association
  • Wildlife Translocation Association
  • The National Confederation of Hunters Associations of South Africa
  • South African Hunters and Game Conservation Association
  • Department of Agriculture, Forestry and Fisheries

 

The following organisations attended the meeting:

  • Professional Hunters Association of South Africa
  • South African Predators Association
  • The National Confederation of Hunters Associations of South Africa
  • South African Hunters and Game Conservation Association
  • Provincial Conservation Authorities
  • Department of Agriculture, Forestry and Fisheries

3. The Minister of Environmental Affairs from time to time receives requests to meet. And she also requests meetings with various stakeholders on a range of issues within the Department’s mandate; ranging from biodiversity and conservation, air quality, climate change, to general matters around environmental protection. All such meetings and their respective agendas are diarised.

The meeting with stakeholders in the hunting industry forms part of regular interaction between the Minister and industry. The Department’s Chief Directorate: Communications regularly releases statements on such meetings, which may be found on the Department’s website.

--ooOoo--

25 August 2015 - NW2848

Profile picture: Mackenzie, Mr C

Mackenzie, Mr C to ask the Minister of Telecommunications and Postal Services

With reference to his reply to question 2047 on 24 June 2015, what exact items will the R739 000 000 be spent on?

Reply:

The monies will be used to provide broadband connectivity services to the targeted government sites in the Phase 1 districts.

25 August 2015 - NW2764

Profile picture: Mubu, Mr KS

Mubu, Mr KS to ask the Minister of Telecommunications and Postal Services

(1)   Has South Africa ratified the Southern African Development Community (SADC) Model Law on Computer Crime and Cyber Crime; if not, why not; if so, on what date was it ratified; (2) Whether any provisions of the specified policy are included in any legislation (a) under review or (b) being developed in collaboration with entities in the security cluster; if so, what (i) laws and (ii) regulations will be amended and developed?

Reply:

  1. South Africa has not ratified the Southern African Development Community Model Law on Electronic -Transactions and Electronic-Commerce Model Law; Data Protection Model Law; and Cybercrime Model Law.

These SADC Model Laws were developed under the Harmonization of ICT Policies in the Sub-Sahara Africa (HIPSSA) project to assist and to build a comprehensive regional framework for the development of the information society and the knowledge economy in SADC; and to guide the SADC Member States to draft or update their corresponding national legislations.

The SADC Model Laws were adopted as framework, not as binding agreement. Ratification is not applicable.

2. The SADC Model Laws are included in the following:

   (a) None.

   (b) The National ICT Policy.

(i) To be determined on finalization of the National ICT Policy White Paper.

(ii) To be determined by the National ICT Policy White Paper.

25 August 2015 - NW2759

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Telecommunications and Postal Services

(a)How many meetings have been held by each of the four chambers reporting to the National ICT Forum, (b) when was each of these meetings held, (c) did each specified meeting quorate and (d) what decisions were made at each of these meetings?

Reply:

(a)  Only one meeting was held by the Governance and Security Chamber. The Social Chamber meeting is scheduled to take place on 21 August 2015, the Economic Chamber for 26 August 2015 and the ICTs and Disability Chamber in the first week of September 2015.

(b)  Governance and Security Chamber meeting was held on 17 August 2015.

(c)  Yes, the meeting did quorate.

(d) The following decisions were made by the meeting:

  • The terms of reference of the Chamber were developed and adopted.
  • A clear Scope of Work was developed and adopted.
  • Working Groups were established in three areas, namely, cybersecurity, internet governance and e-commerce.
  • Convenors of the Working Groups were nominated and confirmed.
  • Each Working Group will develop a specific action plan to be implemented by the Chamber.

25 August 2015 - NW2765

Profile picture: Mubu, Mr KS

Mubu, Mr KS to ask the Minister of Telecommunications and Postal Services

What is the status of the revision of the Electronic Communications and Transactions Act, Act 25 of 2002?

Reply:

The amendment of the ECT Act was taking place in parallel to the ICT Policy review process. It was decided to halt the amendments of the ECT Act pending the finalisation of the review. This was to ensure alignment and coherence with the outcomes of the policy review.

25 August 2015 - NW2961

Profile picture: Shinn, Ms MR

Shinn, Ms MR to ask the Minister of Telecommunications and Postal Services

Has the draft of the Rapid Deployment Policy been completed and handed to his department by the contractors; if not, (a) when is the specified policy due to be handed over and (b) what process will follow; if so, when?

Reply:

The draft Rapid Deployment Policy is scheduled to be processed by the Department at the end of September 2015. The draft Policy will then be gazetted for public comment in accordance with the procedure prescribed in the Electronic Communications Act No. 36 of 2005. The final Rapid Deployment Policy will then be developed taking into account the submissions made on the draft Policy. The final Rapid Deployment Policy will then be submitted to the Cabinet for approval.

25 August 2015 - NW2594

Profile picture: Wilson, Ms ER

Wilson, Ms ER to ask the Minister of Social Development

(1)With regard to her reply to question 1960 on 23 June 2015, can she provide copies of the specified reports; (2) what process was used by the SA Social Security Agency’s (SASSA’s) senior management to interrogate these reports, as well as reports by the Council for Scientific and Industrial Research, to determine which payment model is appropriate for SASSA; (3) whether any additional international trips are planned; if so, what are the relevant details? NW2969E

Reply:

  1. Yes
  2. These reports on the payment model are being discussed at SASSA executive management level.
  3. Currently there are no planned international trips but this does not preclude the Agency or the Department to do so when the need arises.

25 August 2015 - NW2763

Profile picture: Mackenzie, Mr C

Mackenzie, Mr C to ask the Minister of Telecommunications and Postal Services

1) Has South Africa ratified the African Union Convention on Cyber Security and Personal Data Protection; if not, why not; if so, when was the convention signed; 2) Whether any provisions of the specified convention are included in any legislation that is (a) under review or (b) being developed in collaboration with entities in the security cluster; if so, what (i) laws and (ii) regulations will be amended and developed?

Reply:

  1. The African Union Convention on Cyberspace Security and Protection of Personal Data was adopted by the 23rd Ordinary Session of the Assembly of the African Union which was held in Malabo, Equatorial Guinea, on 26 and 27 June 2014.

South Africa has not ratified the African Union Convention on Cyberspace Security and Protection of Personal Data because South Africa has not yet signed as she is awaiting the official document from the African Union Commission to be dispatched through diplomatic channels.

The Convention has not yet been signed.

2.  The provisions of the AU Convention on Cyber Security and Personal Data Protection

(a)  Will have to be studied by the relevant department and authorities, as part of the process of ratification to ensure that it is consistent with our domestic law and not in conflict with any of South Africa’s international law obligations and that procedurally South Africa is in a position to ratify the Amendment. This will be done by the Office of the Chief State Law Adviser of the Department of Justice and Constitutional Development, and Office of the Chief State Law Adviser - International Law of the Department of International Relations and Cooperation.

(b)  No information is available, awaiting the study and legal opinion.

(i) Not applicable

(ii) Not applicable

25 August 2015 - NW2926

Profile picture: Groenewald, Mr HB

Groenewald, Mr HB to ask the Minister of Public Enterprises

How many train accidents (a) occurred in ((i) 2010, (ii) 2011, (iii) 2012, (iv) 2013, and (v) 2014 and (b) have occurred since 1 January 2015; (2) (a) how many persons in each of the specified accidents in each specified year were (i) injured and (ii) killed, (b) where did the specified accidents take place and (c) what was the cause of each specified accident in each case; (3) Whether she will make a statement on the matter? NW3429E

Reply:

(1) (a) (i) 2010 = 3 train accidents

(ii) 2011 = 2 train accidents

(iii) 2012 = 3 train accidents

(iv) 2013 = 11 train accidents

(v) 2014 = 6 train accidents

(b) 7 train accidents.

(2 ) (a) (i) * 2010 = 3 employee injuries

* 2011 = no injuries

* 2012 = no injuries

* 2013 = 7 employee injuries

* 2014 = no injuries

since 1 January 2015 = 58 injuries (3 employee injuries and 55 3rd party injuries)

(ii) * 2010 = 6 employee fatalities

* 2011 = 2 employee fatalities

* 2012 = no fatalities

* 2013 = 3 employee fatalities

* 2014 = no fatalities

since 1 January 2015 = two 3rd party fatalities

(b) See annexure A

(c) See annexure A

(3) No, the Minister will not make a statement on the matter.

 

25 August 2015 - NW2651

Profile picture: Nkomo, Ms SJ

Nkomo, Ms SJ to ask the Minister of Health

Whether his department has any programmes in place to improve education about multidrug-resistant tuberculosis, with particular reference to the importance of testing; if not, why not; if so, what are the relevant details?

Reply:

Honourable Member, the same question was asked by Honourable LV James of the DA (see Annexure A - Question 2059 asked on 29 May 2015).

END.

ANNEXURE A

NATIONAL ASSEMBLY

FOR WRITTEN REPLY

QUESTION NO. 2059

DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: 29 MAY 2015

(INTERNAL QUESTION PAPER NO. 17)

Ms L V James (DA) to ask the Minister of Health:

Whether his department has any programmes to improve education about multidrug-resistant tuberculosis, specifically about the importance of testing; if not, why not; if so, what are the relevant details?

NW2322E

REPLY:

The National Department of Health has several programmes and platforms that are being used to inform, educate and raise awareness about TB, including MDR-TB at community level.

(a) The national and provincial TB programmes have Advocacy, Communication and Social Mobilisation units with focal persons whose role is to, on a regular basis, disseminate information to members of the community on the importance of being screened, tested and treated for TB, including MDR-TB. Each of these units have focal persons who, sometimes with support from partner organisations, use various platforms including the media (radio, television, and print) to educate communities about TB. The units also disseminate information through posters, fliers and billboards and sometimes conduct door-to-door campaigns to engage household members on TB.

(b) In 2010, during the advert of the FIFA World Cup hosted in South Africa, the Department and Stellenbosch University conceptualised and implemented a communications platform called “Kick TB and HIV”, which uses community activations (campaign style) to educate members of the community on TB. Over the past year, 266 activations were conducted, and 467 817 people were reached.

(c)  The Deputy President launched, on 24 March 2015, a massive TB campaign that aims to mobilise millions of South Africans to be screened, tested and treated for TB, including MDR-TB.

(d) An integrated mass media communication and education campaign that will focus on HIV/AIDS, TB (including MRD-TB), maternal and child health, non-communicable diseases, violence and injuries, has been developed and a tender is currently being evaluated to appoint a service provider to manage the campaign over the next 3 years.

END.