Questions and Replies

Filter by year

20 October 2015 - NW3558

Profile picture: Mackay, Mr G

Mackay, Mr G to ask the Minister of Energy

(1)With reference to the Regulations regarding the Mandatory Blending of Biofuels with Petrol and Diesel, 2012, which will come into operation on 1 October 2015, as published in the Government Gazette, No 36890 on 30 September 2013, (a) did the specified regulations become effective on 30 September 2013 in accordance with Regulation 6 of the promulgated Mandatory Blending Regulations; if not, why not; if so, what are the relevant details; (2) (a) will the specified regulations still come into operation on 1 October 2015, (b) were intensive public hearings held on the specified regulations and (c) what will be the impact of the specified regulations on the energy industry?

Reply:

The Regulations seek to ensure a captured market for locally manufactured biofuels and will therefore assist in promoting the blending of biofuels with mineral fuels in the country, thereby supporting the achievement of the objectives of the Biofuels Industrial Strategy of 2007.

20 October 2015 - NW3316

Profile picture: Carter, Ms D

Carter, Ms D to ask the Minister of Energy

(1)Whether the Government has made continuous assessments of all the wind and solar farms already established in the country to determine (a) economic viability, (b) annual electricity generation, (c) carbon emission reduction, (d) job creation and (e) time frames by which 50% of the country’s electricity will be derived from wind and sun; if not, why not, in each case; if so, what are the relevant details in each case; (2) whether she will make a statement on (a) wind and solar energy generation in the country and (b) the extent to which the specified farms were either meeting or failing to meet the electricity generation capacity expected from these sources; (3) whether she has found that the cost of generating such electricity is comparable to conventional methods employed in the country?

Reply:

Yes. The relevant information is published in The Report on Renewable Energy in South Africa.

20 October 2015 - NW3423

Profile picture: Mackay, Mr G

Mackay, Mr G to ask the Minister of Energy

Whether any consulting company conducted any work for her department (a) in the (i) 2013-14 and (ii) 2014-15 financial years and (b) during the period 1 April 2015 up to the latest specified date for which information is available; if not, in each case, why not; if so, in respect of each specified project, (aa) what was the nature of the project, (bb) on what date did the project (aaa) begin and (bbb) end and (cc) what was the (aaa) title of any report(s) produced as a result of the project and (bbb) total expenditure?

Reply:

The information is in the Annual Report of the Department.

20 October 2015 - NW3426

Profile picture: Mackay, Mr G

Mackay, Mr G to ask the Minister of Energy

With reference to the agreement signed on 18 July 2013 between the Republic of South Africa and the European Atomic Energy Community for Cooperation in the Peaceful Uses of Nuclear Energy, (a) what are the reasons for the delay in the ratification process by her department, (b) why was the specified agreement not included in her department’s intergovernmental agreements tabled in Parliament on 11 June 2015 and (c) when will the specified agreement be tabled in Parliament?

Reply:

The specified EU agreement will be tabled in Parliament as time permits.

22 September 2015 - NW3298

Profile picture: Dlamini, Mr MM

Dlamini, Mr MM to ask the Minister of Energy

(1) (a)(i) What total amount did her department spend on her travel costs between Gauteng and Cape Town in the 2014-15 financial year and (ii) how many trips did she undertake between Gauteng and Cape Town in the specified financial year and (b) what total amount did her department spend on (i) hotel and (ii) residential or other accommodation for her in (aa) Cape Town and (bb) Pretoria in the 2014-15 financial year; (2) (a)(i) what total amount did her department spend on the Deputy Minister’s travel costs between Gauteng and Cape Town in the 2014-15 financial year and (ii) how many trips did the Deputy Minister undertake between Gauteng and Cape Town in the specified financial year and (b) what total amount did her department spend on (i) hotel and (ii) residential or other accommodation for the Deputy Minister in (aa) Cape Town and (bb) Pretoria in the 2014-15 financial year?

Reply:

The Minister of Energy and the Deputy Minister travel to Gauteng and Cape Town as per official government responsibilities.



END

22 September 2015 - NW3079

Profile picture: Van Dalen, Mr P

Van Dalen, Mr P to ask the Minister of Energy

(a) How does (i) her department and (ii) entities reporting to her define red tape and (b) what (i) specific interventions and/or (ii) systems have been implemented to (aa) identify and (bb) reduce red tape in (aaa) her department and (bbb) the entities reporting to her?

Reply:

The Department of Energy’s processes are subject to due diligence that is informed by the Public Financial Management Act of 2000, The Treasury Regulations and the National Treasury instruction notes. These are to ensure transparency, accountability and compliance and cannot be regarded as bureaucratic processes.


END

07 September 2015 - NW2942

Profile picture: Van Dalen, Mr P

Van Dalen, Mr P to ask the Minister of Energy

Will her department release an updated version of the Integrated Resource Plan; if not, why not;if so, when?

Reply:

Yes, as soon as the policy adjustment process is completed and Cabinet approval is obtained.

07 September 2015 - NW2569

Profile picture: Mackay, Mr G

Mackay, Mr G to ask the Minister of Energy

Whether, with reference to her reply to question 654 on 17 March 2015, the technical task team responsible for the investigation of allegations of irregularities at the SA Nuclear Energy Corporation has concluded its investigation; if not, why not; if so, what are the relevant details of the investigation?

Reply:

The matter is being dealt with.

07 September 2015 - NW2671

Profile picture: Mackay, Mr G

Mackay, Mr G to ask the Minister of Energy

Will she provide a detailed report containing all the information provided by the Central Energy Fund to the National Prosecuting Authority to assist in the prosecution against Lesedi Biogas (Pty) Ltd; if not, why not; if so, when?

Reply:

The matter has been reported to the NPA under Case Number 65/3/2012.  The matter is under investigation. CEF is not in the position to avail and/or request the content of the docket, such request should be directed to the NPA accordingly and a determination by the NPA in terms of their rules shall be made as to whether or not to avail such information on pending matters.

07 September 2015 - NW2801

Profile picture: van der Merwe, Ms LL

van der Merwe, Ms LL to ask the Minister of Energy

Whether her department meets the Government’s 2% employment equity target for the employment of persons with disabilities that was set in 2005; if not, why not; if so, what are the relevant details?

Reply:

Yes, the Department of Energy fully complies with the set employment target. 2.48% was reached as at 31 July 2015.

07 September 2015 - NW2720

Profile picture: Van Dalen, Mr P

Van Dalen, Mr P to ask the Minister of Energy

(a) What are the relevant reasons for suddenly and completely aborting the Mmamabula Power Purchase Agreement (PPA) entered into between Eskom and a certain independent power producer (name furnished), which allowed for a potential electricity supply of 4 800 MW and the proposed Mmamabula Energy project as her department was responsible for procurement and (b) who were the key decision-makers responsible for aborting this project?

Reply:

The question was responded to as Parliamentary question number 2454.The resolution of these outstanding matters coincided with the need to resolve Eskom’s funding model.

.

07 September 2015 - NW2933

Profile picture: Van Dalen, Mr P

Van Dalen, Mr P to ask the Minister of Energy

With reference to the solar water heating contracting model mentioned in her department’s Annual Performance Plan for the first quarter of 2015-16 financial year, (a) did Cabinet approve the specified model and (b) what are the exact details of the specified model?

Reply:

(a) Yes.

(b) Cabinet approved the new model for Solar Water Heaters on 24 June 2015. An Inter-Ministerial Committee on Energy will finalise the model.

11 August 2015 - NW2576

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Energy

(1)Has PetroSA been in discussions with the company James Street Capital Partners; if so, what were the nature of these discussions; (2) were any agreements signed between the two companies; if so, what are the relevant details of each of these agreements; (3) are there still any ongoing discussions taking place between PetroSA and the specified company; if so, what are the relevant details of these discussions; (4) did the specified company withdraw a business proposal to solve one of the business problems within PetroSA; if not, what is the status of this business proposal by the specified company; if so, (a) what are the relevant details of this proposal and (b) why was the business proposal withdrawn? NW2951E

Reply:

  1. During the first half of 2015, PetroSA representatives had exploratory discussions with James Street Capital Partners (JSCP). In these exploratory discussions JSCP expressed an interest in partnering with PetroSA in the trading function of the business. In the three meetings held with JSCP representatives, PetroSA outlined the workings of its procurement policy and procedures, and the requirement to always adhere to these. The discussions with JSCP never materialised into any agreements.
  2. No agreements were concluded with JSCP.
  3. There are no ongoing discussions with JSCP.
  4. PetroSA policies require the National Oil Company to perform a due-diligence probe on the company that is presenting a proposal. The policies also stipulate that such potential partners need to sign a Non-Disclosure Agreement. In the case of JSCP, their proposal could not be progressed as the process of verification was never finalised.

11 August 2015 - NW2604

Profile picture: Van Dalen, Mr P

Van Dalen, Mr P to ask the Minister of Energy

(1)(a) What are the names of each of the proposed sites where the new nuclear power plants will be built and (b) where are each of these sites located; (2) whether any environmental impact assessments have been done at each of these sites; if not, why not; if so, (a) when and (b) what were the detailed findings of these assessments; (3) in respect of each of the proposed sites, are there currently transmission lines in place to connect the power generated from the nuclear power station to the national power grid? NW2979E

Reply:

  1. (a) and (b) Thyspunt in the Eastern Cape

Dunefontein in the Western Cape

Bantamsklip in the Western Cape

Brazil in Northern Cape

Schulpfontein in the Western Cape

KwaZulu-Natal the names of sites and locations yet to be identified investigated in detail

2. (a) The Environmental Impact Assessment has been done for Thyspunt, Dunefontein and Batamsklip

(b) The detailed findings of the assessments of these sites are public available on Eskom Nuclear's 1 EIA website.

The Brazil and Schulpfontein sites were scoped out during scoping phase

The EIA has not started in potential sites in KwaZulu-Natal as these still have to be confirmed

3. The transmission to the grid is contained in the EIA report.

 

11 August 2015 - NW2677

Profile picture: Van Dalen, Mr P

Van Dalen, Mr P to ask the Minister of Energy

With reference to the (a) Petroleum Oil and Gas Corporation of SA (PetroSA), (b) Petroleum Agency South Africa (PASA), (c) Strategic Fuel Fund Association (SSF) and (d) African Exploration Mining and Finance Corporation (AEMFC), (i) what are the (aa) names, (bb) qualifications and (cc) salaries of each of the board members at each of these entities and (ii) how long has each of the board members been on the board of each of the entities?

Reply:

 

(a) Petroleum Oil and Gas Corporation of South Africa SOC Ltd (PetroSA)

Board Status

Director

Appointment Date

Term Ends

Qualifications and Experience

Remunerated. Yes/No

Fee per meeting

Mr O Tobias

14/11/2014

13/11/2017

BA LLB

PMD

Yes. Earnings reflected in Audited Annual Financial Statements.

R22 136.12

Ms J May-Ntwane

14/11/2014

13/11/2017

BA

Cert In Public Relations

Dip Human Resource Management

BA Hons (Anthropology)

Yes. Earnings reflected in Audited Annual Financial Statements.

R22 136.12

Mr W Steenkamp

14/11/2014

13/11/2017

Cert. Management

MBA (Still Studying)

Yes. Earnings reflected in Audited Annual Financial Statements.

R22 136.12

Mr W Ngubane

14/11/2014

13/11/2017

B Compt

Dip Acc

CA (SA)

Yes. Earnings reflected in Audited Annual Financial Statements.

R22 136.12

Mr M Mkhize

(DOE)

01/02/2015

31/01/2018

BSc (Chem Eng)

B Com

MBL

Cert. Legislative Drafting

No

 

Mr S Mokuena

1/1/2013

31/12/2015

BSc Electrical Engineering.

MBA

GCC Mines and Works

Yes. Earnings reflected in Audited Annual Financial Statements.

R22 136.12

Mr. S Mthethwa (CEF Chief Executive Officer)

01/01/2015

TFN

B Com. (Acc)

B Compt. (Hons)

H Dip in Acc

CA (SA)

No

 

Ms N Nokwe (Chie Executive Officer)

01/03/2012

Linked to her term of Office

BSc

MSc Petrochemical Engineering

Certificate in Int Mgmt.

No

 

Ms L Bakoro

(Chief Financial Officer)

01/03/2014

Linked to term of Office as CFO

B Com,

Post Graduate Diploma in Accounting,

Post Graduate Diploma in Tax Law. M Com,

CA (SA)

No

 

(b) Petroleum Agency (PASA)

Board Status

Director

Appointment Date

Term Ends

Qualifications and Experience

Remunerated. Yes/No

Fee per Meeting

Mr P Fusi (Chair)

01/07/2015. Second term

30/06/2018

BSc Chemical Engineering,

MBA

Not remunerated in his personal capacity

 

Ms T Ramuedzisi (DOE)

01/07/2009

Until Further Notice

BSc Computer Science and Mathematics,

BSc (Hons) Computer Science,

MDP

MBA

No

 

Ms R Nkambule (DMR)

01/07/2009

Until Further Notice

Information not received.

No

 

Ms J Luthuli

01/03/2015. Second Term

28/02/2018

BCom

B Compt (Hons)

CA (SA)

Yes. Earnings reflected in Audited Annual Financial Statements.

R14 757.22

Mr Nengovhela

17/12/2014. First term

16/12/2017

B Admin. Post grad Diploma-Labour Relations. B Com (Honours). Management Advanced Program. LLM Labour Law. Int. Executive Development Program.

Yes. Earnings reflected in Audited Annual Financial Statements.

R14 757.22

(c) SFF

Current Board Status

Director

Appointment Date

Term Ends

Qualifications and Experience

Remunerated. Yes/No

Fee per Meeting

Dr S Mthembi-Mahanyele (Chairperson)

1/2/2012

Until Further Notice

Senior Teachers Diploma,

BA – Ed,

Honorary Doctorate (PhD) (Honorius Causa)

Post Grad Dip in Economic Principles,

Post Grad Dip in Financial Economics.

MSc Public Policy and Management

Yes. Earnings reflected in Audited Annual Financial Statements.

R22 136.12

Mr. E Cloete

(DOE representative)

21/8/2013 First Term

21/8/2016

BSC.

H Dip Education

Cert Economics and Public Finance

No

 

Mr. L Mulaudzi

(DOE representative)

1/9/2012. First Term

1/9/2015

N Dip. Public Management and Administration,

Executive National Security Program,

Programme in Housing Policy Development

No

 

Ms R. Van Wyk

1/12/2012 (Appointed to BARC 01/03/2011. Appointed Interim BARC Chair 01/08/2011. Reappointed BARC Chair 01/03/2012. Appointed Director 01/12/2012)

1/12/2015

CA(SA),

MBA,

Dip. Advanced Banking

Yes. Earnings reflected in Audited Annual Financial Statements.

R14 757.22

Amb. B. Gila (Chief Executive Officer)

1/01/2013

Until Further Notice (linked to term of office)

Advocate of the High Court

Former Ambassador to Venezuela.

No

 

Mr K Vilakazi

17/12/2014

16/12/2017

BCom,

B Compt (Hons) / CTA

CA (SA)

MBL

Yes. Earnings reflected in Audited Annual Financial Statements.

R14 757.22

Mr S Gounden

17/12/2014

16/12/2017

Post Graduate Diploma in Accounting - Auditing, Financial Accounting, Management Accounting & Taxation,

CA (SA)

Yes. Earnings reflected in Audited Annual Financial Statements.

R14 757.22

(d) African Exploration Mining and Finance Corporation (AEMFC)

Current Board Status

Director

Appointment Date

Term Ends

Qualifications and Experience

Remunerated. Yes/No Subcommittee

Fee per meeting

Mr A Mngomezulu

07/12/2011 (Appointed as Director 12/07/2007. Reappointed in 2010 for one year. Appointed Interim Chair 22/09/2011. Reappointed 07/12/2011)

Until Further Notice

BSc Honours Geology.

Grad Dip Engineering,

Mining Economics

No

 

Mr S Madondo

(Chief Executive)

01/04/2007

(linked to his term of office as CEO)

BSc Applied Maths,

BSc. (Hons) Mathematical Statistics, MBA

No

 

Dr. Z Rustomjee

01/12/2012 (Appointed 12/07/2007. Reappointed 30/03/2010. Reappointed 12/07/2011. Term ended 12/07/2012)

30/11/2015

Pr.Eng,

PhD Economics,

MPhil Development Economics,

MSc. Industrial Engineering,

BSc.(Hons)Chemical Engineering,

MIChem.E,

MSAIChe.

Yes. Earnings reflected in Audited Annual Financial Statements.

R14 757.22

Ms B Mdyesha (Executive)

01/12/2012

(linked to term of office as CFO)

BSc Statistics

Post Grad Diploma in Accounting

B Com. (Hons)

CA (SA)

No

 

Mr. S Mthethwa

(CEF Chief Executive Officer)

01/01/2015

TFN

B Com. (Acc)

B Compt. (Hons)

H Dip in Acc

CA (SA)

No

 

Mr J Lekgetha

17/12/2014

16/12/2017

B Com. (Acc)

CFA (SA)

H Dip in Tax Law

Yes. Earnings reflected in Audited Annual Financial Statements.

R14 757.22

Ms P Rammutla

17/12/2014

16/12/2017

B Com (Acc)

B Com (Hons)

CA (SA)

Yes. Earnings reflected in Audited Annual Financial Statements.

R14 757.22

11 August 2015 - NW2672

Profile picture: Mackay, Mr G

Mackay, Mr G to ask the Minister of Energy

(1)With reference to the audit report completed for and on behalf of the Central Energy Fund (CEF) by Ms. Joubert, the chief auditor for CEF, relating to the Lesedi Biogas Project, has the specified report been made available to the Auditor-General; (2) (a) who was the accounting officer instructed by the CEF to ensure that the Lesedi Biogas matter was reported to the appropriate bodies, (b) what documents were sent to the (i) Auditor-General, (ii) Department of Public Service and Administration and (iii) Public Service Commission; (3) why has the CEF failed to take the necessary steps in terms of section 86 of the Public Finance Management Act, Act 1 of 1999; (4) with reference to the two executives implicated in the Lesedi Biogas matter who are leaving the CEF, were post termination hearings held as stated in the Labour Relations Act, Act 66 of 1995; if not, why not? NW3103E

Reply:

  1. Yes.
  2. The CEF Management reported the matter to the National Prosecuting Authority, case number: CAS 65/3/2012. CEF made several follow-ups and the NPA assured CEF that the matter was under investigation and had also been referred to the Specialised Commercial Crime Unit. All the necessary project documents were made available to the (i) AG for the full audit. No documents were sent to (ii) DPSA and the (iii) Public Service Commission as the staff members implicated for possible wrong-doing had left the employ of CEF.
  3. This has been done. The CEF Management reported the matter to the National Prosecuting Authority, case number: CAS 65/3/2012. CEF made several follow-ups and the NPA assured CEF that the matter was under investigation and had also been referred to the Specialised Commercial Crime Unit.
  4. No. The implicated executive had resigned from their employment with CEF. This was a voluntary resignation and was not related to this matter. At the time when the matter was investigated by our Auditors, the implicated employees had already resigned. As indicated above, charges were laid, the matter was referred to the Special Crimes Unit/ National Prosecuting Authority.

11 August 2015 - NW2670

Profile picture: Mackay, Mr G

Mackay, Mr G to ask the Minister of Energy

(1)With reference to her reply to question 1821 on 9 June 2015, what (a) were the relevant details of the undertaking between the Central Energy Fund (CEF) and Lesedi Biogas and (b) amount of funding was given to Lesedi Biogas; (2) was the funding to the Lesedi Biogas project stopped due to actual or suspected fraud; if so, (a) when did the CEF become aware of the suspected or actual fraud and (b) when did the funding to this project cease; (3) what (a) steps did the CEF take to recover the funds given to Lesedi Biogas and (b) amount was (i) recovered and (ii) lost; (4) why was the Lesedi Biogas matter only reported to the National Prosecuting Authority in March 2012? NW3101E

Reply:

  1. (a) the undertaking was to further development the project,

(b) the amount spent was R2.2million.

2. (a) No, funding was stopped because the project did not achieve certain required conditions.

(b) funding ceased during May 2009.

3. The matter was reported to the Commercial Crimes Unit for Investigation.

4. The CEF internal investigation commenced towards end of 2010 and was finalized in 2011. The matter was immediately reported to the National Prosecuting Authority after being considered internally.

11 August 2015 - NW2711

Profile picture: America, Mr D

America, Mr D to ask the Minister of Energy

Whether (a) she, (b) her Deputy Minister and (c) any officials in her department travelled to China in the 2014-15 financial year; if so, what was the (i) purpose of each specified visit and (ii)(aa) total cost and (bb) breakdown of such costs of each specified visit?

Reply:

The Minister, Deputy Minister and officials have travelled to China. The details will be specified as soon as the information is available.

11 August 2015 - NW2436

Profile picture: Van Dalen, Mr P

Van Dalen, Mr P to ask the Minister of Energy

What amount did (a) her department and (b) each entity reporting to her spend on advertising in (i) Sowetan and (ii) Daily Sun in the (aa) 2012-13, (bb) 2013-14 and (cc) 2014-15 financial years?

Reply:

The Department spent the following on (i) Sowetan (aa) 2012 – 2013 R43 299.77

(bb) 2013 - 2014 R433 319.35 (cc) 2014 – 2015 R145 230.82. The Department spent the following on (ii) Daily Sun in (aa) 2012 – 2013 R61 221. 42, bb) 2013 - 2014 No advert made, (cc) 2014 – 2015 R163 257.12)

11 August 2015 - NW2454

Profile picture: Mackay, Mr G

Mackay, Mr G to ask the Minister of Energy

(1)With reference to the Mmamabula Power Purchase Agreement drafted between Eskom and the independent power producer (IPP), CIC Energy, that allowed for a potential electricity supply of 4 800MW and the proposed Mmamabula Energy Project emanating from the specified agreement; (a) what were the detailed reasons for aborting this project so suddenly and completely and (b) was her department involved in the decision making process responsible for aborting this project; if not, why not; if so, to what extent;

Reply:

  1. Eskom did not have the financial capacity to conclude the transaction and hence the project negotiations were aborted. However, the IPP office has revived the project.
  2. Yes, IPP’s play an important role, side by side with Eskom, in bringing more MW into the grid. The current RSA IPP programme has been acknowledged as one of the best IPP programmes globally.

11 August 2015 - NW2535

Profile picture: Lekota, Mr M

Lekota, Mr M to ask the Minister of Energy

Whether her department, in pursuing a nuclear energy build programme, had (a) carefully factored in the Government’s policy position as captured in the Integrated Resource Plan and the National Development Plan (NDP), particularly the caution of the NDP for Government to evaluate the potentially prohibitive capital costs of nuclear energy as this required a level of investment unprecedented in the country, (b) worked out plans A, B and C to comfortably meet cost overruns of 50%, 75% and 100% in an increasingly costlier capital market following a possible down grading by rating agencies and (c) requested the Portfolio Committee on Energy to conduct public hearings with a view to reporting to Parliament the inputs received from experts and the public and the recommendations that the Portfolio Committee on Energy was therefore making to Parliament; if not, why not in each case; if so, what are the relevant details in each case?

Reply:

(a)  The Department of Energy has carefully factored in the relevant government policies in preparation for rollout of the nuclear new build including the requirements of the National Development Plan(NDP) and Integrated Resource Plan 2010-2030 (IRP 2010-2030).

(b) The IRP2010-2030 provides a schedule to start commission the nuclear power plants from 2023 to 2030. The Department of Energy has identified a government State Owned Entity as an Implementing Agent for the nuclear new build programme. The Implementing Agent will work out specific detailed implementation plans to rollout the programme.

(c) South Africa has signed the Intergovernmental Agreements (IGAs) with Nuclear Vendor countries (USA, South Korea, China, France and Russia). The Department of Energy has tabled these IGAs to Parliament for deliberations and ratification. The Department awaits feedback from the Portfolio Energy Committee on this matter.

11 August 2015 - NW2564

Profile picture: Majola, Mr TR

Majola, Mr TR to ask the Minister of Energy

Whether, with reference to her reply to oral question 146 on 10 June 2015, she will make available all the studies referred to in her reply; if not, why not; if so, when?

Reply:

The studies will be used to inform government’s decision process for procurement of the Nuclear New Build Programme.

11 August 2015 - NW2566

Profile picture: America, Mr D

America, Mr D to ask the Minister of Energy

With reference to her reply to question 1612 on 26 May 2015, what were the reasons for not referring the draft Integrated Resource Plan 2013 to Cabinet?

Reply:

The policy adjustment process is not yet completed.

11 August 2015 - NW2567

Profile picture: America, Mr D

America, Mr D to ask the Minister of Energy

Whether, with reference to her reply to question 1968 on 19 June 2015, the Independent Power Producer Office is accountable to her department; if so, when will she answer question 1968 as originally submitted?

Reply:

The IPP Office is funded by fees collected from prospective bidders.

11 August 2015 - NW2568

Profile picture: Mackay, Mr G

Mackay, Mr G to ask the Minister of Energy

With reference to her reply to question 2074 on 9 June 2015, what are the relevant details of the proper financial provisions made with reference to the nuclear build programme?

Reply:

The Nuclear New Build Programme Funding requirement is being discussed within National Treasury.

11 August 2015 - NW2570

Profile picture: Mackay, Mr G

Mackay, Mr G to ask the Minister of Energy

Whether, with reference to her reply to question 635 on 13 March 2015, her department has decided on the number of (a) high and (b) low pressure solar water heaters to be installed in the 2015-16 financial year; if so, what is the total number of each type of solar water heater to be installed?

Reply:

No.

11 August 2015 - NW2573

Profile picture: Marais, Mr EJ

Marais, Mr EJ to ask the Minister of Energy

Is her department considering to source electricity from energy ships and power barges run by the company Karpower; if not, why not; if so, when can the citizens expect to have these ships producing electricity on our shores?

Reply:

Yes, we have issued a Request for Information in relation to any initiative to relieve the grid constraints, including through power barges. The Request for Information results have been collated and the procurement process will follow within the next 2 months.

11 August 2015 - NW2575

Profile picture: Cardo, Dr MJ

Cardo, Dr MJ to ask the Minister of Energy

(1)With reference to the three executives (Nosiviwe Nokwe-Macamo, Lindiwe Mthimunye-Bakoro and Andrew Diepenaar) at PetroSA who were recently placed on forced leave pending an investigation into their performance, what are the detailed reasons for suspending each of the three executives; (2) Has the investigation into the specified three executives been concluded; if not, why not; if so, what are the detailed results of the investigations? NW2950E

Reply:

  1. PetroSA will declare a substantial loss of approximately R15 billion for the financial year ending 31 March 2015.

In discharging its fiduciary duty, the Board of Directors of PetroSA resolved to conduct an investigation into the causes of the substantial loss and PetroSA's poor performance as well as the role played by PetroSA's executive team including the Group Chief Executive Officer (GCEO), the Group Chief Financial Officer (GCFO) and the Vice President – Upstream in relation thereto. The Board of Directors formed the prima facie view that PetroSA's poor financial performance was, at least in part, attributable to the three executives given their role, duties and responsibilities as employees of PetroSA.

2. The investigation is currently still in progress. It was envisaged that the investigation would be completed within a period of approximately two months. At this stage, it is anticipated that the investigation will be completed towards the end of August. In light of the fact that the investigation is still underway, no results are available.

28 November 2014 - NW1926

Profile picture: Greyling, Mr LW

Greyling, Mr LW to ask the Minister of Energy

(1) With reference to the reply to question 3125 on 11 December 2013 in respect of the (a) 2011-12, (b) 2012-13 and (c) 2013-14 financial years, (i) when has (aa) she and (bb) the former Minister of Energy visited the Russian Federation and (ii) in respect of each visit, which (aa) persons, (bb) businesses and/or (cc) organisations accompanied them, (iii) what meetings were held during these visits and (iv) what was discussed during each of these meetings; (2) (a) what was the total cost of each visit, (b) what is the detailed breakdown of the costs involved and (c) who paid for each item respectively?