Questions and Replies
08 April 2024 - NW807
Smalle, Mr JF to ask the Minister of Water and Sanitation
(1)With reference to the bilateral agreement signed between the government of Zimbabwe and the Republic to transfer treated water from Beitbridge Water Treatment Works in the Republic of Zimbabwe to the Musina Local Municipality, what (a) will be the cost for a cubic metre of water and (b) are the relevant details of the guarantees provided by the Government; (2) (a) who will be responsible for the construction of the water pipeline, -(b) what is the total cost of the specified construction and (c) by what date will the water be delivered and used by the specified local municipality (3) whether the bulk of the water will be channelled to the Musina-Makhado Special Economic Zone; if not, what is the position in this regard; if so, what are the relevant details?
Reply:
1. The price paid for water shall be computed through a pricing model to be determined and agreed to by both parties. The are no guarantees provided by the Government except for the provisions in the agreement. A supplementary agreement will be entered into between the Parties implementing agents.
2. The Development Bank of South Africa will be responsible for the implementation of the agreement and the estimated cost of the water transfer scheme at R2 billion. This cost will be refined at feasibility phase. The water is anticipated to be delivered by December 2026.
3. The water transfer scheme will supply 15m3/per day. Treated Water from Beitbridge Water Treatment Works in Zimbabwe to Musina Town to augment water supply in Musina to contribute to future economic activity. Musina-Makhado Special Economic Zone is a user within the Musina Local Municipality and will supplied from own ground water sources and from Musina water supply.
---00O00---
08 April 2024 - NW648
Groenewald, Mr IM to ask the Minister of Water and Sanitation
(1)Which municipalities (a) submitted their Water Services Development Plans (WSDPs) annually for the past five years, (b) did so over the full period, (c) submitted incomplete plans for any specified year(s) and (d) failed to submit any WSDPs in any year; (2) whether he will make a statement on the matter?
Reply:
1. The Department of Water and Sanitation (DWS) has provided guidelines, support and developed the administrative tool, Water Services Development Plans (WSDP) online system, to ensure that all the Water Services Authorities (WSA) comply with this requirement. The WSAs are being capacitated/trained annually on the utilisation of this online tool. The WSDP online system is being used by the WSA to populate their WSDP data and the Department monitors the submission and the completeness of the information.
(a) The Water Services Authorities who submitted WSDPs are indicated in the table below.
Province |
Number of WSAs submitted Water Services Development Plans (WSDP) |
Names of WSAs submitted Water Services Development Plans (WSDP) |
The WSDP with council resolution Approved (Yes/ No) year |
Free State |
5 |
Mafube Local Municipality |
No |
Maluti-A-Phofung Local Municipality |
No |
||
Mantsopa Local Municipality |
No |
||
Metsimaholo Local Municipality |
No |
||
Setsoto Local Municipality |
No |
||
Limpopo |
2 |
Bela-Bela Local Municipality |
No |
Mopani District Municipality |
No |
||
Gauteng |
2 |
City of Johannesburg |
No |
Merafong City Local Municipality |
No |
||
Eastern Cape |
1 |
Nelson Mandela Bay Metropolitan Municipality |
No |
Mpumalanga |
1 |
Thembisile Hani Local Municipality |
Yes (2021/2022) |
Northern Cape |
12 |
!Kheis Local Municipality |
No |
Dikgatlong Local Municipality |
No |
||
Emthanjeni Local Municipality |
No |
||
Gamagara Local Municipality |
No |
||
Karoo Hoogland Local Municipality |
No |
||
Khai-Ma Local Municipality |
No |
||
Kgatelople Local Municipality |
Yes 2022/23 |
||
Magareng Local Municipality |
No |
||
Hantam Local Municiplaity |
Yes 2022/23 |
||
Siyathemba Local Municipality |
No |
||
Sol Plaatje Local Municipality |
No |
||
Thembelihle Local Municipality |
No |
||
Northwest |
2 |
City of Matlosana Local Municipality |
Yes (2022) |
Rustenburg Local Municipality |
No |
||
KZN |
7 |
City of uMhlathuze Municipality |
No |
eThekwini Metropolitan |
No |
||
Harry Gwala District Municipality |
Yes (2022/23) |
||
iLembe District Municipality |
No |
||
King Cetshwayo District Municipality |
No |
||
uMkhanyakude District Municipality |
No |
||
uThukela District Municipality |
No |
||
Western Cape |
14 |
Bitou Local Municipality |
No |
Breede Valley Local Municipality |
No |
||
Drakenstein Local Municipality |
No |
||
George Local Municipality |
No |
||
Kannaland Local Municipality |
No |
||
Langeberg Local Municipality |
No |
||
Matzikama Local Municipality |
No |
||
Oudtshoorn Local Municipality |
No |
||
Overstrand Local Municipality |
No |
||
Prince Albert Local Municipality |
No |
||
Saldanha Bay Local Municipality |
No |
||
Stellenbosch Local Municipality |
No |
||
Theewaterskloof Local Municipality |
No |
||
Witzenberg Local Municipality |
No |
(b) WSDP must be developed for a five-cycle period and reviewed annually, therefore all the municipalities listed in Table 1 above comply.
(c) Municipalities who submitted incomplete plans for 2022/2023 and 2023/2024 financial years are :
Province |
Number of WSAs submitted incomplete Water Services Development Plans (WSDP) |
Names of WSAs submitted incomplete Water Services Development Plans (WSDP) |
Free State |
5 |
Letsemeng Local Municipality |
Metsimaholo Local Municipality |
||
Masilonyana Local Municipality |
||
Metsimaholo Local Municipality |
||
Ngwathe Local Municipality |
||
Northern Cape |
14 |
Dawid Kruiper Local Municipality |
Gamagara Local Municipality |
||
Ga-Segonyana Local Municipality |
||
Joe Morolong Local Municipality |
||
Kai! Garib Local Municipality |
||
Kamiesberg Local Municipality |
||
Kareeberg Local Municipality |
||
Kgatelopele Local Municipality |
||
Nama Khoi Local Municipality |
||
Phokwane Local Municipality |
||
Renosterberg Local Municipality |
||
Siyancuma Local Municipality |
||
Ubuntu Local Municipality |
||
Umsobomvu Local Municipality |
||
Limpopo |
3 |
Capricorn District Municipality |
Polokwane Local Municipality |
||
Vhembe District Municipality |
||
Eastern Cape |
1 |
Amathole District Municipality |
KZN |
2 |
eThekwini Metropolitan |
Newcastle Local Municipality |
||
Western Cape |
2 |
Cape Agulhas Local Municipality |
Kannaland Local Municipality |
(d) Municipalities who failed to submit any WSDPs are indicated in the table below:
Province |
Number of WSAs fail to submit any Water Services Development Plans (WSDP) in any year |
Names of WSAs fail to submit any Water Services Development Plans (WSDP) in any year |
Free State |
10 |
Dihlabeng Local Municipality |
Kopanong Local Municipality |
||
Mangaung Metropolitan |
||
Matjhabeng Local Municipality |
||
Moqhaka Local Municipality |
||
Nala Local Municipality |
||
Nketoana Local Municipality |
||
Phumelela Local Municipality |
||
Tokologo Local Municipality |
||
Tswelopele Local Municipality |
||
Gauteng |
7 |
City of Tshwane Metropolitan Municipality |
Ekurhuleni Metropolitan Municipality |
||
Emfuleni Local Municipality |
||
Lesedi Local Municipality |
||
Midvaal Local Municipality |
||
Mogale City Local Municipality |
||
Rand West City Local Municipality |
||
Limpopo |
5 |
Lephalale Local Municipality |
Modimolle-Mokgopong Local Municipality |
||
Mogalakwena Local Municipality |
||
Sekhukhune District Municipality |
||
Thabazimbi Local Municipality |
||
Eastern Cape |
12 |
Alfred Nzo District Municipality |
Amathole District Municipality |
||
Blue Crane Route Local Municipality |
||
Buffalo City Metropolitan Municipality |
||
Chris Hani District Municipality |
||
Dr Beyers Naudé Local Municipality |
||
Joe Gqabi District Municipality |
||
Kouga Local Municipality |
||
Koukamma Local Municipality |
||
Makana Local Municipality |
||
Ndlambe Local Municipality |
||
OR Tambo District Municipality |
||
Sundays River Valley |
||
Mpumalanga |
16 |
Bushbuckridge Local Municipality |
Chief Albert Luthuli Local Municipality |
||
City of Mbombela Local Municipality |
||
Dipaleseng Local Municipality |
||
Dr JS Moroka Local Municipality |
||
Dr Pixley Ka Isaka Seme Local Municipality |
||
Emakhazeni Local Municipality |
||
Emalahleni Local Municipality |
||
Govan Mbeki Local Municipality |
||
Lekwa Local Municipality |
||
Mkhondo Local Municipality |
||
Msukaligwa Local Municipality |
||
Nkomazi Local Municipality |
||
Steve Tshwete Local Municipality |
||
Thaba Chweu Local Municipality |
||
Victor Khanye Local Municipality |
||
North West |
8 |
Dr Ruth Segomotsi Mompati District Municipality |
JB Marks Local Municipality |
||
Kgetlengrivier Local Municipality |
||
Madibeng Local Municipality |
||
Maquassi Hills Local Municipality |
||
Moretele Local Municipality |
||
Moses Kotane Local Municipality |
||
Ngaka Modiri Molema District Municipality |
||
Northen Cape |
4 |
!Kheis Local Municipality |
Dikgatlong Local Municipality |
||
Richtersveld Local Municipality |
||
Tsantsabane Local Municipality |
||
Western Cape |
10 |
Beaufort West Local Municipality |
Bergrivier Local Municipality |
||
Cederberg Local Municipality |
||
City of Cape Town Metropolitan Municipality |
||
Hessequa Local Municipality |
||
Knysna Local Municipality |
||
Laingsburg Local Municipality |
||
Mossel Bay Local Municipality |
||
Swartland Local Municipality |
||
Swellendam Local Municipality |
The Minister will not make a statement on this matter as this is a legal requirement that WSA must comply with. The Department will strengthen its regulation to ensure compliance. This is also a main requirement for consideration of funding for water services projects such as Regional Bulk Infrastructure Grant project approval.
---00O00---
08 April 2024 - NW695
Terblanche, Mr OS to ask the Minister of Police
What is the average response time, expressed in minutes, that in minute, that it takes the SA Police Service (SAPS) first responder members to respond to call emanating from (a) 10111 call centres and (b) SAPS dispatch centres in each province?
Reply:
Find here: Reply
08 April 2024 - NW667
Komane, Ms RN to ask the Minister of Police
In light of the increase reports of children being kidnapped on their way to and from various schools, by what date will he establish a division that specialises and only work with gender-based violence and crimes related to children to address the challenges?
Reply:
Find here: Reply
08 April 2024 - NW628
Lorimer, Mr JR to ask the Minister of Mineral Resources and Energy
Whether his department has put any plans in place to extend the testing of fuel at more service stations to monitor and/or check whether the fuel is adulterated; if not, why not; if so, what are the relevant details?
Reply:
1. Diesel adulteration is not only a challenge in South Africa but globally. It is increasing as unscrupulous businesspeople seek to benefit from the tax differential between paraffin and diesel.
2. Yes, the Department of Mineral Resources and Energy (“the DMRE”) intends to extend testing of fuel at more service stations to establish full extent and challenges confronting the sector on fuel quality. The foregoing extension to cover more service stations will be done through a greater focus on diesel samples compare to other fuels.
3. DMRE plans to continue conducting random and scheduled fuel quality monitoring inspections in the Republic of South Africa’s nine provinces, targeting high risk areas. The foregoing will be carried out through collaboration/ partnerships with Government entities sharing same mandate to enforce fuel quality compliance. The Department is increasing its collaboration with the South African Revenue Services and is exploring cooperation with the National Consumer Commission to further punish offenders and protect consumers.
08 April 2024 - NW488
Thembekwayo, Dr S to ask the Minister of Basic Education
Whether her department has taken any urgent steps of intervention at Noordgesig Secondary School in Soweto, which is currently using a rotational school learning system, after 13 asbestos structures were shut down in October 2023 for health and safety reasons?
Reply:
(1) (2) (a) The question falls under the Executive Authority of the Member of the Executive Council (MEC) for Gauteng Province. The Member is kindly requested to refer the question to the MEC for Education for Gauteng Province as per section 92(3)(b) of the Constitution and Rule 134 (5)(b) of the NA rules.
08 April 2024 - NW495
Mathulelwa, Ms B to ask the Minister of Police
Whether he has been informed that on 20 February 2024 members of the National Intervention Unit broke into the home of a family in Malangeni at Umzinto in the Ugu District Municipality, KwaZulu-Natal, and possession of the belongings of the family and did not had them over to the local police station; if not, what is the position in this regard; if so, (a) what are the reasons that the belongings of family were taken, (b) where are the specified belongings currently store and (c) who accounts for the specified belongings?
Reply:
Find here: Reply
08 April 2024 - NW629
Mileham, Mr K to ask the Minister of Mineral Resources and Energy
What are the relevant details of the process that was followed to appoint Mr Xolile Sizani as the permanent Chief Executive Officer of PetroSA?
Reply:
- The position of PetroSA CEO was advertised on the CEF SOC website as well as the websites of its subsidiaries in April 2023 and the closing date for applications was 31st May 2023.
- A total of 49 applications were received, 3 of which were received after the closing date and 2 duplicate applications.
- Six (6) candidates who met the minimum job requirements and qualifications were shortlisted.
- The 6 shortlisted candidates were interviewed on 24 July 2023 by an Interview Panel comprised of CEF Group Board Chairperson and the chairpersons of CEF Board Committees.
- The following 3 candidates were recommended to Cabinet for appointment in the order of the scores achieved:
- Mr. S Poya.
- Mr. X Sizani.
- Ms. S Ncemane.
- The 3 candidates went subjected to employment verifications which included criminal, qualifications, credit, citizenship and previous employment checks.
- Cabinet further insisted on candidate number 1 being subjected to State Security Clearance and the results came out negative.
- With candidate number 1 having obtained a negative security clearance outcome, Cabinet endorsed the appointment of candidate number 2, Mr X Sizani
08 April 2024 - NW230
Gericke, Mr V to ask the Minister of Police
In light of the gross concern by the public regarding the proliferation of private neighbourhood watch bodies that masquerade as farm- and neighbourhood watch and/or community policing forums who often abuse power to do access control in public areas through harassment of ordinary citizens and violating their rights, how does his department intend to stop the private companies from exercising the functions of the SA Police Service?
Reply:
Find here: Reply
08 April 2024 - NW845
Whitfield, Mr AG to ask the Minister of Police
(1) With reference to the alleged police negligence and misconduct recently reported to have occurred in and around Kat-Kop in the Eastern Cape, what are the reasons that the SA Police Service (SAPS) members at the Mount Fletcher Police Station (a) failed to respond to the report of a rape for a period of two days, (b) requested that the local community in Kat-Kop detain the alleged perpetrator for a period of two days, (c) failed to take a statement from the victim upon their eventual response and (d) failed to arrest the alleged perpetrator; (2) whether consequence management steps have been taken against each of the SAPS members responsible for the alleged failures and/or misconduct; if not, why not; if so, what are the relevant details; (3) whether any support services have been offered to the victim; if not, why not; if so, what are the relevant details; (4) whether the alleged perpetrator has been arrested and charged; if not, why not; if so, what are the relevant details; (5) what is the current situation regarding (a) members of the local community and (b) the victim's son, who were reportedly arrested by the SAPS members?
Reply:
Find reply here
08 April 2024 - NW692
Smalle, Mr JF to ask the Minister of Water and Sanitation
(1)What total number of (a) investigations and (b) consequence management actions has his department taken against each specified (i) local municipality, (ii) district municipality and (iii) water authority for the alleged breaches of legislation to address the pollution of water resources (aa) in the past three financial years and (bb) since 1 April 2023; (2) what (a) water resource has been severely impacted and (b) is the current status for each water resource?
Reply:
1 (a) The Department of Water and Sanitation (DWS) has conducted inquiries into reported instances of non-compliance within municipalities. The table below provides a summary of the number of investigations conducted over three years and from 1 April 2023 to date.
2020/2021 |
2021/2022 |
2022/2023 |
2023/2024 |
284 |
338 |
385 |
425 |
(b) The Department, upon detecting non-compliances during investigations, has issued 136 Notices of intention to issue Directives, mandating corrective actions to address identified contraventions. These Notices were issued to allow the municipalities the opportunity to provide representations in accordance with the requirements of the Promotion of Administrative Justice Act (PAJA). Some Municipalities have responded to the issued Notices by submitting representations. These submissions were subsequently assessed by the Department. Some remedial action plans submitted were accepted in some cases, while others were declined due to inadequacy.
The DWS took further enforcement measures by issuing 51 Directives, compelling the municipalities to undertake corrective actions to protect water resources. Multiple follow-up inspections were conducted to monitor compliance with the issued Directives. Regrettably, several Municipalities continued in non-compliance, prompting the Department to initiate criminal actions.
As a result, 19 criminal cases were opened with the South African Police Services against Municipalities that failed to comply with the Directives, amongst other charges.
2. The table attached hereto as Annexure A provides details on cases investigated and finalized by the DWS and subsequent enforcement measures undertaken to rectify the contraventions committed by the municipalities.
- The table also illustrates the status of water resources per water management area using the following classifications:
- Low risk indicates oligotrophic conditions, characterized by low nutrient levels and limited productivity in terms of aquatic animal and plant life.
- Medium risk signifies mesotrophic conditions, with moderate nutrient levels, relatively productive aquatic ecosystems, and emerging indications of water quality issues.
- High risk denotes eutrophic conditions, characterized by high nutrient levels, high productivity of aquatic animal and plant life, and escalating signs of water quality problems.
---00O00---
Annexure A: Rectification measures and status of water resources |
||||||||
ECMS No |
Responsible Office (Assignment Level) |
1(b)(iii)Transgressor/Case Title |
1(b)(i)(ii) Local Government and District Municipality |
1(b) Actions taken by the Department |
2(a) Water Management Area/ Rivers |
2 (b) Status of Water Management Area |
||
NWA Notice Issue |
NWA Directive Issue |
Case Registered at SAPS |
||||||
31309 |
Breede/Gouritz CMA |
Knysna Knysna Municipality Main Sewer Line, Knysna Local Municipality, Erf 3503 (Rem), Knysna: Breede/Gouritz |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Breede/Gouritz |
Based on data extracted from NIWIS dashboards in 2023, out of a total of 117 sampling stations, water quality assessments reveal that 87% exhibit low risk (Oligotrophic), comprising 102 stations, while 13% pose a medium risk (Mesotrophic), representing 15 stations. No stations indicate high-risk (Eutrophic) |
31306 |
Breede/Gouritz CMA |
Albertinia Watewater Treatment Works, Hessequa Local Municipality, Erf RE/2, Riversdale: Breede/Gouritz |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Breede/Gouritz |
Based on data extracted from NIWIS dashboards in 2023, out of a total of 117 sampling stations, water quality assessments reveal that 87% exhibit low risk (Oligotrophic), comprising 102 stations, while 13% pose a medium risk (Mesotrophic), representing 15 stations. No stations indicate high-risk (Eutrophic) |
31173 |
Breede/Gouritz CMA |
Witsand Wastewater Treatment Works, Hessequa Local Municipality, Port Beaufort 484/65, Swellendam , Hessequa Local Municipality, Port Beaufort 484/65, Swellendam : Breede/Gouritz |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Breede/Gouritz |
Based on data extracted from NIWIS dashboards in 2023, out of a total of 117 sampling stations, water quality assessments reveal that 87% exhibit low risk (Oligotrophic), comprising 102 stations, while 13% pose a medium risk (Mesotrophic), representing 15 stations. No stations indicate high-risk (Eutrophic) |
31011 |
Breede/Gouritz CMA |
Discharge on substandard effluent into Huis River by Zoar WWTW , Kannaland Local Municipality, Zoar RE/78: Breede/Gouritz |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
Criminal Case Opened |
Huis River |
Based on data extracted from NIWIS dashboards in 2023, out of a total of 117 sampling stations, water quality assessments reveal that 87% exhibit low risk (Oligotrophic), comprising 102 stations, while 13% pose a medium risk (Mesotrophic), representing 15 stations. No stations indicate high-risk (Eutrophic) |
30986 |
Breede/Gouritz CMA |
Illegal dumping at near Theewaterskloof Dam causing pollution , Theewaterskloof, Theewaterskloof Municipality: Breede/Gouritz |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Breede/Gouritz |
Based on data extracted from NIWIS dashboards in 2023, out of a total of 117 sampling stations, water quality assessments reveal that 87% exhibit low risk (Oligotrophic), comprising 102 stations, while 13% pose a medium risk (Mesotrophic), representing 15 stations. No stations indicate high-risk (Eutrophic) |
30456 |
Breede/Gouritz CMA |
Remaining Extent of Farm 381, Rawsonville, Wim Du Toit, Remaining Extent of Farm 381 Rawsonville, Wim Du Toit, Remaining Extent of Farm 381 Rawsonville: Breede/Gouritz |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Breede/Gouritz |
Based on data extracted from NIWIS dashboards in 2023, out of a total of 117 sampling stations, water quality assessments reveal that 87% exhibit low risk (Oligotrophic), comprising 102 stations, while 13% pose a medium risk (Mesotrophic), representing 15 stations. No stations indicate high-risk (Eutrophic) |
30385 |
Breede/Gouritz CMA |
Portion 17 of Farm Klip Heuwel 410, Mr. Thinus Kershoff, Amandel Plaas: Breede/Gouritz |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Breede/Gouritz |
Based on data extracted from NIWIS dashboards in 2023, out of a total of 117 sampling stations, water quality assessments reveal that 87% exhibit low risk (Oligotrophic), comprising 102 stations, while 13% pose a medium risk (Mesotrophic), representing 15 stations. No stations indicate high-risk (Eutrophic) |
30383 |
Breede/Gouritz CMA |
De Doorns Wastewater Treatment Works (WWTW), Breede Valley Municipality, Erf Number: RE/799: Breede/Gouritz |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Breede/Gouritz |
Based on data extracted from NIWIS dashboards in 2023, out of a total of 117 sampling stations, water quality assessments reveal that 87% exhibit low risk (Oligotrophic), comprising 102 stations, while 13% pose a medium risk (Mesotrophic), representing 15 stations. No stations indicate high risk (Eutrophic) |
30382 |
Breede/Gouritz CMA |
Villiersdorp Wastewater Treatment Works (WWTW), Thweewaterskloof Municipality, Portion 7 of the farm Radyn No. 24: Breede/Gouritz |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Breede/Gouritz |
Based on data extracted from NIWIS dashboards in 2023, out of a total of 117 sampling stations, water quality assessments reveal that 87% exhibit low risk (Oligotrophic), comprising 102 stations, while 13% pose a medium risk (Mesotrophic), representing 15 stations. No stations indicate high risk (Eutrophic) |
30381 |
Breede/Gouritz CMA |
Robertson Wastewater Treatment Works, Langeberg Municipality, ERF Number: RE/2: Breede/Gouritz |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Breede/Gouritz |
Based on data extracted from NIWIS dashboards in 2023, out of a total of 117 sampling stations, water quality assessments reveal that 87% exhibit low risk (Oligotrophic), comprising 102 stations, while 13% pose a medium risk (Mesotrophic), representing 15 stations. No stations indicate high risk (Eutrophic) |
31113 |
Eastern Cape Regional Office |
Rietbron WWTW, Dr Beyers Naude Local Municipality , Rietbron: Mzimvubu/Tsitsikamma |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Mzimvubu/Tsitsikamma |
Based on data extracted from NIWIS dashboards in 2023 from 167 sampling stations, 93% show low risk (Oligotrophic, 155 stations), 4% medium risk (Mesotrophic, 6 stations), and 4% high risk (Eutrophic, 6 stations). |
31070 |
Eastern Cape Regional Office |
Cookhouse WWTW, Blue Crane Route Local Municipality , Great Fish River (Somerset East): Mzimvubu/Tsitsikamma |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Great Fish River |
Based on data extracted from NIWIS dashboards in 2023 from 167 sampling stations, 93% show low risk (Oligotrophic, 155 stations), 4% medium risk (Mesotrophic, 6 stations), and 4% high risk (Eutrophic, 6 stations). |
30607 |
Eastern Cape Regional Office |
Glen Grey Hospital WWTW, Department of Health , Lady Frere: Mzimvubu/Tsitsikamma |
Government [National/Prov] |
NWA Notice Issued |
None |
None |
Mzimvubu/Tsitsikamma |
Based on data extracted from NIWIS dashboards in 2023 from 167 sampling stations, 93% show low risk (Oligotrophic, 155 stations), 4% medium risk (Mesotrophic, 6 stations), and 4% high risk (Eutrophic, 6 stations). |
29164 |
Eastern Cape Regional Office |
Tsolo, Eskom CNS, Eskom, Tsolo, Eskom CNS: Mzimvubu/Tsitsikamma |
Government [National/Prov] |
NWA Notice Issued |
None |
None |
Mzimvubu/Tsitsikamma |
Based on data extracted from NIWIS dashboards in 2023 from 167 sampling stations, 93% show low risk (Oligotrophic, 155 stations), 4% medium risk (Mesotrophic, 6 stations), and 4% high risk (Eutrophic, 6 stations). |
24781 |
Eastern Cape Regional Office |
Addo WWTW and pump station, Sunday's River Local Municipality , Addo : Mzimvubu/Tsitsikamma |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Mzimvubu/Tsitsikamma |
Based on data extracted from NIWIS dashboards in 2023 from 167 sampling stations, 93% show low risk (Oligotrophic, 155 stations), 4% medium risk (Mesotrophic, 6 stations), and 4% high risk (Eutrophic, 6 stations). |
24742 |
Eastern Cape Regional Office |
Keiskammahoek Pump station, Amathole District Municipality, Keiskammahoek Pump station: Mzimvubu/Tsitsikamma |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Mzimvubu/Tsitsikamma |
Based on data extracted from NIWIS dashboards in 2023 from 167 sampling stations, 93% show low risk (Oligotrophic, 155 stations), 4% medium risk (Mesotrophic, 6 stations), and 4% high risk (Eutrophic, 6 stations). |
24699 |
Eastern Cape Regional Office |
Hankey Waste Water Treatment Works, Kouga Local Municipality , Jeffery's Bay: Mzimvubu/Tsitsikamma |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Mzimvubu/Tsitsikamma |
Based on data extracted from NIWIS dashboards in 2023 from 167 sampling stations, 93% show low risk (Oligotrophic, 155 stations), 4% medium risk (Mesotrophic, 6 stations), and 4% high risk (Eutrophic, 6 stations). |
31178 |
Free State Regional Office |
Sewage spillages in Matlakeng near Zastron (CAS 53/082023 , Mohokare Local Municipality, Township of Matlakeng near Zastron: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
Criminal Case Opened |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
31099 |
Free State Regional Office |
Mashaeng Wastewater Treatment Works, Dihlabeng Local Municipality, Remainder of Groenfontein 881: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30946 |
Free State Regional Office |
Caledonspoort WWTW, Department of Public Works and Infrastructure, Caledonspoort: Orange |
Government [National/Prov] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30945 |
Free State Regional Office |
Dordrecht WWTW, Chris Hani District Municipality , Dordrecht: Orange |
Government [National/Prov] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30944 |
Free State Regional Office |
Koppies WWTW, Ngwathe Local Municipality , Koppies: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
30943 |
Free State Regional Office |
Thabong WWTW, Matjhabeng Local Municipality, Free State, Matjhabeng Local Municipality, Free State: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30942 |
Free State Regional Office |
Van Stadensrus WWTW, Mangaung Metropolitan Municipality , Mangaung: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30941 |
Free State Regional Office |
BFN-Bloemdustria WWTW, Mangaung Metropolitan Municipality, BFN-Bloemdustria: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30939 |
Free State Regional Office |
BFN - Northern Works (WWTW), Mangaung Local Municipality , Mangaung : Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30938 |
Free State Regional Office |
Oppermansgronde WWTW, Letsemeng Local Municipality: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30931 |
Free State Regional Office |
Fauresmith WWTW, Kopanong Local Municipality, Fauresmith: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30418 |
Gauteng Regional Office |
KLIP RIVER POLLUTION, City of Johannesburg Metropolitan Municipality, Klip River: Vaal |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Klip River |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
30416 |
Gauteng Regional Office |
Maluti-A-Phofung Loca Municipality-Phuthaditjhaba, , : Vaal |
Local Government [WSA/WSP] |
None |
None |
Criminal Case Opened |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
30364 |
Gauteng Regional Office |
Sky City, Cosmpolitan, E RESIDENTIAL TOWNSHIP ON PORTION 2, 31, 32, 33, 56, 57 & 58 OF THE FARM RIETSPRUIT 152 I.R waterval: Vaal |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
30293 |
Gauteng Regional Office |
Goudkoppies WWTW, City of Johannesburg Metropolitan, Goudkoppies WWTW: Vaal |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
30289 |
Gauteng Regional Office |
grootvlei WWTW, Dipaleseng Local Municipality, Dipaleseng Local Municipality Grootvlei WWTW: Vaal |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
29263 |
Gauteng Regional Office |
Pollution of Kliprivier at R59 bridge Eikenhof (White Foam), Unknown , Zwartkop JES 143 IR: Vaal |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
29103 |
Gauteng Regional Office |
Dipaleseng Local municipality, Nthorwane/Greylingstad WWTW, Dipaleseng Local Municipality, Dipaleseng Local Municipality Nthorwane/Greylingstad WWTW: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24974 |
Gauteng Regional Office |
Tshiame WWTWs, Maluti-A-Phofong, Tshiame WWTWs: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
Criminal Case Opened |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24897 |
Gauteng Regional Office |
Rothdene Pumpstation, Midvaal Local Municipality , Rothdene Pumpstation: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24801 |
Gauteng Regional Office |
Kestell WWTW under Maluti-a-Phofung Local Municipality, Maluti-a-Phofung Local Municipality , kestell WWTW: Vaal |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
Criminal Case Opened |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24765 |
Gauteng Regional Office |
Manhole Overflowing into A Wetland area near Johnny Mokoena Drive Balfour, Dipaleseng Local Municipality, Suikerbosrand Catchment: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24764 |
Gauteng Regional Office |
Deneysville No 1778, Metsimaholo Local Municipality, Deneyville No 1778 (Sewage Leakage into Vaal Dam): Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24739 |
Gauteng Regional Office |
Metsimaholo Local Municipality (Oranjeville Manhole overflowing into Vaal Dam), Metsimaholo Local Municipality, Unknown: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24738 |
Gauteng Regional Office |
Harrismith Wastewater Treatment Works, Maluti-A-Phofung Local Municipality, Unknown: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
Criminal Case Opened |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24438 |
Gauteng Regional Office |
Perdekop Wastewater Treatment Works, Pixley Ka Seme Local Municipality, Unknown: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24417 |
Gauteng Regional Office |
Kleinfontein Channel, Ekurhuleni Metropolitan Local Municipality, Unknown: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24415 |
Gauteng Regional Office |
Dihlabeng Local Municipality (Sewage into the Pretoriuskloof), Dihlabeng Local Municipality, Unknown: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24408 |
Gauteng Regional Office |
Erwat Dekema Water Care Works (Wastewater Treatment Plant), Erwat - Ekurhuleni, Erwat Dekema WCW: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24389 |
Gauteng Regional Office |
Cornelia Wastewater Treatment Works, Mafube Local Municipality, Cornelia Wastewater Treatment Works: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
Criminal Case Opened |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24092 |
Gauteng Regional Office |
Morgezon Wastewater Treatment works, Lekwa Municipality, Morgezon Wastewater Treatment Works Portion 32 of 466 Morgezon : Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
31571 |
Inkomati/Usuthu CMA |
Mkhondo Local Municipality-Amsterdam-Emvelo Section, Mr. M.J Mkhonza, Amsterdam, Emvelo: Inkomati_Usuthu |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Inkomati_Usuthu |
Based on data extracted from NIWIS dashboards in 2023 from 1342 sampling stations, 90% show low risk (Oligotrophic, 1207 stations), 9% medium risk (Mesotrophic, 127 stations), and 1% high risk (Eutrophic, 8 stations). |
31314 |
Inkomati/Usuthu CMA |
Sewage overflow from a manhole opposite railway line bridge, Mkhondo Local Municipality, Ethandukukhanya, Piet Retief: Inkomati_Usuthu |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Inkomati_Usuthu |
Based on data extracted from NIWIS dashboards in 2023 from 1342 sampling stations, 90% show low risk (Oligotrophic, 1207 stations), 9% medium risk (Mesotrophic, 127 stations), and 1% high risk (Eutrophic, 8 stations). |
31311 |
Inkomati/Usuthu CMA |
Sewage overflow from a manhole opposite railway line bridge, Mkhondo Local Municipality, Ethandukukhanya, Piet Retief: Inkomati_Usuthu |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
Criminal Case Opened |
Inkomati_Usuthu |
Based on data extracted from NIWIS dashboards in 2023 from 1342 sampling stations, 90% show low risk (Oligotrophic, 1207 stations), 9% medium risk (Mesotrophic, 127 stations), and 1% high risk (Eutrophic, 8 stations). |
30557 |
KwaZulu-Natal Regional Office |
Mtunzini Waste Water Treatment Works, King Cetshwayo District Municipalty, Umllazi River: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Umllazi River |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28064 |
KwaZulu-Natal Regional Office |
Esikhawini Waste Water Treatment Works , uMhlathuze Local Municipality , Esikhaweni: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Pongola/Mtamvuna |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28063 |
KwaZulu-Natal Regional Office |
Ubombo Wastewater Treatment Works, Umkhanyakude District Municipality , Ubombo: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Pongola/Mtamvuna |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28060 |
KwaZulu-Natal Regional Office |
Hluhluwe Wastewater Treatment Works (Manhole Overflow), uMkhanyakude District Municipality, .: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Pongola/Mtamvuna |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28059 |
KwaZulu-Natal Regional Office |
Mtunzini Waste Water Treatment Works, King Cetshwayo District Municipalty, Umllazi River: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Umllazi River |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28058 |
KwaZulu-Natal Regional Office |
Eshowe Ocean View Waste Water Treatment Works, uMhlathuze Local Municipality, King Cetshwayo DM: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Pongola/Mtamvuna |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28056 |
KwaZulu-Natal Regional Office |
Dumisani Makhanya Village Sewer Overflow, uMhlathuze Local Municipality , Mkhumbane River: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Mkhumbane River |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28055 |
KwaZulu-Natal Regional Office |
Felixton Village Final Effluent Dam & Pump Station, uMhlathuze Local Municipality, uMhlathuze River: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Pongola |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28054 |
KwaZulu-Natal Regional Office |
Felixton Village Waste Transfer Station, uMhlathuze Local Municipality, uMhlathuze River: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
uMhlathuze River |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28053 |
KwaZulu-Natal Regional Office |
121 Battalion Wastewater Treatment Works, Department of Public Works , Umkhanyakude DM: Pongola/Mtamvuna |
Government [National/Prov] |
NWA Notice Issued |
None |
None |
Pongola/Mtamvuna |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28052 |
KwaZulu-Natal Regional Office |
St Francis Waste Water Treatment Works, Zululand District Municipality, Ulundi: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Pongola/Mtamvuna |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28050 |
KwaZulu-Natal Regional Office |
Mtunzini Prison Waste Water Treatment Works, King Cetshwayo District Municipalty, .: Pongola/Mtamvuna |
Government [National/Prov] |
NWA Notice Issued |
None |
None |
Pongola/Mtamvuna |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28049 |
KwaZulu-Natal Regional Office |
Manhole overflow Ntukwini River Ulundi WWTW, Ulundi LM Zululand DM, Ulundi: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Ntukwini River |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28048 |
KwaZulu-Natal Regional Office |
King Dinuzulu Wastewater Treatment Works , King Cetshwayo District Municipality, Richards Bay: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Pongola/Mtamvuna |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
28047 |
KwaZulu-Natal Regional Office |
Vulindlela Waste Water Treatment Works, uMhlathuze Local Municipality, Richards Bay: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Pongola/Mtamvuna |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
15927 |
KwaZulu-Natal Regional Office |
Nseleni Waste Water Treatment Works, uMhlathuze Local Municipality, Nseleni: Pongola/Mtamvuna |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Pongola/Mtamvuna |
Based on data extracted from NIWIS dashboards in 2023 from 179 sampling stations, 94% show low risk (Oligotrophic, 169 stations), 6% medium risk (Mesotrophic, 10 stations), and 0% high risk (Eutrophic, 0 stations). |
30823 |
Limpopo Regional Office |
Thohoyandou P West manhole, Vhembe district Municipality, 665 Mphephu Drive: Limpopo |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
30816 |
Limpopo Regional Office |
Witpoort Oxidation Ponds , Lephalale Local Municipality, Witpoort: Limpopo |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
30575 |
Limpopo Regional Office |
Mogalakwena Wastewater Management Facilities , Mogalakwena Local Municipality, Mokopane town and Mahwelereng location: Limpopo |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
Criminal Case Opened |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
30360 |
Limpopo Regional Office |
Sewage flowing from 8 Spekboom Street in Lephalale, Lephalale Local Municipality , Onverwacht 503 LQ: Limpopo |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
30355 |
Limpopo Regional Office |
Ledibeng Eco Estate Manhole, Ledibeng eco estate, Ledibeng Eco Estate: Limpopo |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
30352 |
Limpopo Regional Office |
Campbell package plant, Vhembe district Municipality, Campbell Township: Limpopo |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
29208 |
Limpopo Regional Office |
Thohoyandou WWTW, Vhembe District Municipality, All Pump Stations: Limpopo |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
29119 |
Limpopo Regional Office |
Nancefield WWTW, Vhembe District Municipality, Nancefield WWTW: Limpopo |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
24921 |
Limpopo Regional Office |
Biaba ponds Nzhelele, Vhembe Municipality, Biaba ponds Nzhelele: Limpopo |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
24391 |
Limpopo Regional Office |
Parliamentary Village (Sewage Spillage), Polokwane Municipality, Divine Estate in Bendor Ext. 82, Polokwane: Limpopo |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
24387 |
Limpopo Regional Office |
Seshego dam, DWS NWRI, Seshego dam: Limpopo |
Government [National/Prov] |
NWA Notice Issued |
None |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
31383 |
Mpumalanga Regional Office |
Airforce Military Base – Sewage Manhole and Pipeline Construction, Mopani District Municipality, Hoedspruit: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
31355 |
Mpumalanga Regional Office |
Magatle Village , Department of Public Works and Infrastructure , Zebediela: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
31179 |
Mpumalanga Regional Office |
Mopani District Municipality Raptors View Wildlife Estate Pump station, Mopani District Municipality, To be confirmed: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
31016 |
Mpumalanga Regional Office |
Govan Mbeki Local Municipality - Leslie, Leandra, Govan Mbeki Local Municipality, TRichardt: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
30844 |
Mpumalanga Regional Office |
Lebowakgomo Wastewater Treatment Works , Capricorn District Municipality, Capricorn District Municipality: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
30838 |
Mpumalanga Regional Office |
Tecroveer (Pty) (Ltd), Tabile Mapekula, Klipspruit Wastewater treatment plant: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
30696 |
Mpumalanga Regional Office |
Emalahleni Local Municipality_Siyabonga Sewer Pump Station, Mr Selate Matlejwana, Emalahleni Local Municipality: Olifants |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
30695 |
Mpumalanga Regional Office |
Emalahleni Local Municipality_Klarinet Pump Station, Mr Selate Matlejwana, Emalahleni Local Municipality: Olifants |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
30686 |
Mpumalanga Regional Office |
Klipspruit WWTW, Emalahleni Local Municipality, Bulpan : Olifants |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
30558 |
Mpumalanga Regional Office |
Sewage overflow at Cnr. Dirk Winterbach &, Marone Street, Fetakgomo Tubatse Municipality, Burgersfort: Olifants |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
Criminal Case Opened |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
30500 |
Mpumalanga Regional Office |
Sewage overflow near Pine Ridge new RDP houses, Emalahleni Local Municipality , Leeuwpoort 283 JS: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
30449 |
Mpumalanga Regional Office |
Emalahleni Local Municipality, The Municipal Manager: Mr H.S. Mayisela, Klarinet sewer pump station, emalahleni Local Municipality: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
30353 |
Mpumalanga Regional Office |
Namakgale 464 Shakes Street, Mopani District Municipality, Nmakgale 464 Shakes Street: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
30329 |
Mpumalanga Regional Office |
Molengroff Pump Station, Mopani District Municipality, Unknown: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
30324 |
Mpumalanga Regional Office |
Flag Boshielo WTW, Ephraim Mogale Local Municipality, Sekhukhune District Municipality, Ephraim Mogale Local Municipality, Sekhukhune District Municip, Ephraim Mogale Local Municipality, Sekhukhune District Municipality: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
30301 |
Mpumalanga Regional Office |
Dullstroom WWTWS, Emakhazeni Local Municipality, Unknown: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
29227 |
Mpumalanga Regional Office |
Siyanqoba RDP Housing Settlement, Emalahleni Local Municipality, Leeuwpoort,: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
29226 |
Mpumalanga Regional Office |
Siyabuswa Wastewater Treatment Works, Dr JS Moroka Local Municipality, Siyabuswa Wastewater Treatment Works: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
Criminal Case Opened |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
29225 |
Mpumalanga Regional Office |
Bronkhorspruit Sewer Pipeline next to Godrich Flour Mill, City of Tshwane Metropolitan Municipality, Bronkhorspruit Pipeline Next to Godriich Four Mill: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
29217 |
Mpumalanga Regional Office |
Blinkpan Sewer Pump Station, Steve Tshwete Local Municipality, Blinkpan Sewer Pump Station: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
29211 |
Mpumalanga Regional Office |
Kiewiet Street, Komati, Steve Tshwete Local Municipality, Steve Tshwete Local Municipality, Komati: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
29187 |
Mpumalanga Regional Office |
Steelpoort Wastewater Treatment Works, Greater Tubatse/Fetakgomo Local Municipality, Steelpoort : Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
Criminal Case Opened |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
29179 |
Mpumalanga Regional Office |
Pine Ridge pump station, Emalahleni Local Municipality, Unknown: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
Criminal Case Opened |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
29173 |
Mpumalanga Regional Office |
Steve Tshwete Local Municipality, Steve Tshwete Local Municipality, : Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
28027 |
Mpumalanga Regional Office |
sekhukhune sewer network, Sekhukhune DM, oosthuisen vervoer: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
25004 |
Mpumalanga Regional Office |
Siyathuthuka Sewer Pump Station, Emakhazeni Local Municipality, Siyathuthuka Sewer Pump Station: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
25003 |
Mpumalanga Regional Office |
Cypress Sewer Pump Station (Sewage overflow), Emalahleni LM, Tambotie Street Kriel WWTW: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24964 |
Mpumalanga Regional Office |
1425 Fo-Kuang Street Erasmus (Sewage Spillage), City of Tshwane Metropolitan Municipality, Bronkhorstpruit: Olifants |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24943 |
Mpumalanga Regional Office |
77 Walter Sisulu Street (Manhole overflow), Steve Tshwete Local Municipality, Middleburg: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24874 |
Mpumalanga Regional Office |
MOTETEMA WWTW, Elias Motsoaledi Local Municipality, MOTETEMA WWTW: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
Criminal Case Opened |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24873 |
Mpumalanga Regional Office |
GROBLERSDAL WWTW, Elias Motsoaledi Local Municipality, GROBLERSDAL WWTW: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
Criminal Case Opened |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24872 |
Mpumalanga Regional Office |
MARBLEHALL WWTW, Ephraim Mogale Local Municipality, MARBLEHALL WWTW: Olifants |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
Criminal Case Opened |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24851 |
Mpumalanga Regional Office |
Emakhazeni Local Municipality Belfast Pump Station, Emakhazeni Local Municipality, Belfast Wastewater Treatment Works: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
Criminal Case Opened |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24847 |
Mpumalanga Regional Office |
Emakhazeni Local Municipality 34 Rotterdam street, Municipal Manager, Unknown: Inkomati_Usuthu |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Inkomati_Usuthu |
Based on data extracted from NIWIS dashboards in 2023 from 1342 sampling stations, 90% show low risk (Oligotrophic, 1207 stations), 9% medium risk (Mesotrophic, 127 stations), and 1% high risk (Eutrophic, 8 stations). |
24811 |
Mpumalanga Regional Office |
Moganyaka Waste Water Treatment Works, Ephraim Mogale Local Municipality, Moganyaka waste water treatment works: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
Criminal Case Opened |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24713 |
Mpumalanga Regional Office |
Willian Pump Station, Emalahleni LM, Emalahleni LM: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24712 |
Mpumalanga Regional Office |
Vilakazi Pump Station, Emalahleni LM, Emalahleni LM: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24711 |
Mpumalanga Regional Office |
SPCA Pump Station, Emalahleni LM, Emalahleni LM: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24710 |
Mpumalanga Regional Office |
Rietstream Pump Station, Emalahleni LM, Emalahleni LM: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24709 |
Mpumalanga Regional Office |
Phola Pump Station, Emalahleni LM, Emalahleni LM: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24708 |
Mpumalanga Regional Office |
Kriel -Ganala Waste Water Treatment Works, Emalahleni Municipality, Ganala Kriel WWTW: Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
24702 |
Mpumalanga Regional Office |
Emalahleni Local Municipality-Thubelihle Waste treatment Works, Emalahleni Local municipality, : Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
Criminal Case Opened |
Olifants |
Based on data extracted from NIWIS dashboards in 2023 from 914 sampling stations, 73% show low risk (Oligotrophic, 665 stations), 21% medium risk (Mesotrophic, 193 stations), and 6% high risk (Eutrophic, 56 stations). |
31390 |
North West Regional Office |
Construction of Mayibuye Primary School on a wetland, Gauteng Department of Education, Erf 2326 Commercia Extension 34 Township Tembisa: Limpopo |
Government [National/Prov] |
NWA Notice Issued |
None |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
31368 |
North West Regional Office |
Sewage from Soshanguve WWTW , City of Tshwane Metropolitan Municipality , Ditsong Tswaiing Meteoric Crater: Limpopo |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
31336 |
North West Regional Office |
Sewage flowing into Elands River, City of Tshwane Metropolitan Municipality, Leeuwfontein, Cullinan : Limpopo |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Elands River |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
31251 |
North West Regional Office |
klein jukskei River within RE/135/MAROELADAL 193IQ downstream of Kya Sand Estate , City of Johannesburg, RIVERBEND AH- FARM MAROELADAL 193 IQ/ RE/135: Limpopo |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
31232 |
North West Regional Office |
Mahole overflow Tanglewood Estate Beverley, Johannesburg Water City of Johannesburg , Sewage into Jukskei River : Limpopo |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Jukskei River |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
31184 |
North West Regional Office |
Continuous raw sewage flowing into the Klein Jukskei River within the Sharonlea, City of Johannesburg Metropolitan Municipality , Pampoenspruit in Randpark Ridge: Limpopo |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Klein Juskei River |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
31105 |
North West Regional Office |
Fish Kill at Setumo Dam near Mahikeng , Ngaka Modiri Molema District Municipality, Molopo River: Vaal |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Molopo River |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
30800 |
North West Regional Office |
Swartdam Wastewater Treatment Works , Moretele Local Municipality, Farm Haakdoornfontein 55JR/3: Limpopo |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
30732 |
North West Regional Office |
Thaba Tshwane Voortrekkerhoogte,, Department of Defence Force , Pretoria town and townlands 351JR: Limpopo |
Government [National/Prov] |
NWA Notice Issued |
None |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
30478 |
North West Regional Office |
Zinniaville Estate (service delivery, water supply and sewage leak complaints), Rustenburg Local Municipality, Zinneaville Estate in Rustenburg : Limpopo |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
29221 |
North West Regional Office |
Oil Stench around Lindo Park, Kiner Park and Koedespoort, City of Tshwane Metropolitan Municipality, Derdepoort 327 JR: Limpopo |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
24906 |
North West Regional Office |
Zeekoegat Wastewater Treatment Works, City of Tshwane Metropolitan Municipality , Portion 142 Zeekoegat 296 JR: Limpopo |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
24830 |
North West Regional Office |
Afsaal/ Refentse Township in hartbeespoort, Madibeng Local Municipality, Afsaal/ Refentse Township in Hartebeespoort: Limpopo |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Limpopo |
Based on data extracted from NIWIS dashboards in 2023 from 1615 sampling stations, 54% show low risk (Oligotrophic, 868 stations), 20% medium risk (Mesotrophic, 324 stations), and 26% high risk (Eutrophic, 423 stations). |
31234 |
Northern Cape Regional Office |
Sol Plaatjie Sewer Infrastructure on 28 Central Road, Sol Plaatjie Local Municipality, Beaconsfield: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
30771 |
Northern Cape Regional Office |
Vredesvallei Wastewater Treatment Works , Kai !Garib Local Municipality, Riemvasmak: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30552 |
Northern Cape Regional Office |
Noupoort WWTW, Umsobomvu Local Municipality, Unknown: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30550 |
Northern Cape Regional Office |
Loeriesfontein Wastewate Treatment Works, Hantam Local Municipality , Loeriesfontein Farm : Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30548 |
Northern Cape Regional Office |
Calvinia Wastewater Treatement Works, Hantam Local Municipality , Calvinia Farm : Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30494 |
Northern Cape Regional Office |
Victoria West Oxidation Ponds, Ubuntu Local Municipality, Ubuntu LM: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
30486 |
Northern Cape Regional Office |
Hertzogville Oxidation Ponds, Tokologo Local Municipality, Hertzogville Oxidation Ponds: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30454 |
Northern Cape Regional Office |
Norvalspont Wastewater treatment plant., Umsobomvu Local Municipality, Dapperfontein, Farm number 79, Portion 53 : Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30452 |
Northern Cape Regional Office |
De Aar Water Treatment Works, Emthanjeni Local Municipality , Farm Paarde Valley : Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30398 |
Northern Cape Regional Office |
Carolusberg Wastewater Treatment Works, Nama-Khoi Local Municipality , Farm Carolusberg: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30397 |
Northern Cape Regional Office |
Springbok WWTW, Nama-Khoi Local Municipality , Farm Springbok: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30396 |
Northern Cape Regional Office |
Port Nolloth WWTW, Richtersveld Local Municipality, Farm Port Nollorth: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30395 |
Northern Cape Regional Office |
Concordia WWTW, Nama-Khoi Local Municipality , Farm Concordia: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
30342 |
Northern Cape Regional Office |
Ga Segonyana LM - Kuruman sewage overflows , Ga Segonyana Local Municipality, Kuruman town: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
29171 |
Northern Cape Regional Office |
Sol Plaatje LM Overflowing Manhole on 72 Study Street in Kimberley , Sol Plaatje Local Municipality , Fabricia: Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
29166 |
Northern Cape Regional Office |
Carnarvon WWTW, Kareeberg Municipality, Carnarvon 353: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
29135 |
Northern Cape Regional Office |
Williston WWTW, Karoo Hoogland LM, Williston Farm: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
29118 |
Northern Cape Regional Office |
Disposing of raw sewerage into the stormwater drainage at Corner Hoop Street and Kort Street, , Emthanjeni Local Municipality, De Aar: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
29114 |
Northern Cape Regional Office |
Sutherland WWTW, Karoo Hoogland Local Municipality , Farm Sutherland: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
29113 |
Northern Cape Regional Office |
Fraserburg WWTW, Karoo Hoogland Local Municipality , Farm Fraserburg: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
29086 |
Northern Cape Regional Office |
Bergsig WWTW, Nama Khoi , Bergsig: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
29076 |
Northern Cape Regional Office |
Karkams Wastewater Treatment Works, Department of Public Works and Education , Karkams: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
24946 |
Northern Cape Regional Office |
Hopetown WWTW, Thembelihle Local Municipality, Remainder of Portion 1, Hopetown: Orange |
Local Government [WSA/WSP] |
None |
NWA Directive Issued |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
24410 |
Northern Cape Regional Office |
Van Zylsrus Oxidation ponds, Mr. T. Gopetse, : Vaal |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Vaal |
Based on data extracted from NIWIS dashboards in 2023 from 799 sampling stations, 59% show low risk (Oligotrophic, 469 stations), 20% medium risk (Mesotrophic, 161 stations), and 21% high risk (Eutrophic, 169 stations). |
24394 |
Northern Cape Regional Office |
koingaas WWTW, Kamiesberg Local Municipality , Koingaas WWTW: Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
NWA Directive Issued |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
24393 |
Northern Cape Regional Office |
Kenhaddt, Kai!Garib Municipality , Kenhardt, Lennerstville : Orange |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Orange |
Based on data extracted from NIWIS dashboards in 2023 from 259 sampling stations, 68% show low risk (Oligotrophic, 177 stations), 22% medium risk (Mesotrophic, 58 stations), and 9% high risk (Eutrophic, 24 stations). |
31403 |
Western Cape Regional Office |
Stellenbosch waste water treatment works, Stellenbosch Municipality, Stellenbosch wwtw: Berg/Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Berg/Olifants |
Based on data extracted from NIWIS dashboards in 2023, out of 403 sampling stations, water quality assessments reveal that 88% exhibit low risk (Oligotrophic), comprising 353 stations, while 10% pose a medium risk (Mesotrophic), representing 42 stations. Additionally, 8 stations indicate high risk (Eutrophic), totaling 2%. |
30780 |
Western Cape Regional Office |
Clanwilliam wwtw, Cederberg Municipality, Clanwilliam wwtw: Berg/Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Berg/Olifants |
Based on data extracted from NIWIS dashboards in 2023, out of 403 sampling stations, water quality assessments reveal that 88% exhibit low risk (Oligotrophic), comprising 353 stations, while 10% pose a medium risk (Mesotrophic), representing 42 stations. Additionally, 8 stations indicate high risk (Eutrophic), totaling 2%. |
30749 |
Western Cape Regional Office |
Malfunctioning Pump Station , George Municipality , Eden Pump Station: Breede/Gouritz |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Breede/Gouritz |
Based on data extracted from NIWIS dashboards in 2023, out of a total of 117 sampling stations, water quality assessments reveal that 87% exhibit low risk (Oligotrophic), comprising 102 stations, while 13% pose a medium risk (Mesotrophic), representing 15 stations. No stations indicate high risk (Eutrophic) |
29180 |
Western Cape Regional Office |
Laingvile WWTW (Sewage Overflow), Saldanha Bay LM, St Helena Bay: Berg/Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Berg/Olifants |
Based on data extracted from NIWIS dashboards in 2023, out of 403 sampling stations, water quality assessments reveal that 88% exhibit low risk (Oligotrophic), comprising 353 stations, while 10% pose a medium risk (Mesotrophic), representing 42 stations. Additionally, 8 stations indicate high risk (Eutrophic), totaling 2%. |
24163 |
Western Cape Regional Office |
Pniel & Wemmershoek WWTW, Stellenbosch Local Municipality, Dwarsriver : Berg/Olifants |
Local Government [WSA/WSP] |
NWA Notice Issued |
None |
None |
Dwarsriver |
Based on data extracted from NIWIS dashboards in 2023, out of 403 sampling stations, water quality assessments reveal that 88% exhibit low risk (Oligotrophic), comprising 353 stations, while 10% pose a medium risk (Mesotrophic), representing 42 stations. Additionally, 8 stations indicate high risk (Eutrophic), totaling 2%. |
08 April 2024 - NW255
Loate, Mr T to ask the Minister of Police
What quantity of state property and assets were recovered by the SA Police Service, since 27 February 2018 when he became the Minister of Police, from criminal syndicates and their leaders who have been causing enormous harm to the economy through impacting state-owned enterprises such as Transnet, Telkom and Eskom?
Reply:
Find here: Reply
08 April 2024 - NW396
Matuba, Ms M M to ask the Minister of Water and Sanitation
In light of his department implementing massive water and sanitation infrastructure projects and noting that some of these projects have experienced poor performance and workmanship by appointed service providers, what consequence management actions has his department enforced to (a) ensure timeous completion of the projects and (b) address poor performance of appointed service providers?
Reply:
a) To ensure timeous completion of projects, the Department of Water and Sanitation entered into Memoranda of Understanding and contracts with Implementing Agents with clear project plans and timelines. These contracts are monitored monthly with a specific focus on timelines in line with the agreed upon project plans.
b) The contracts are clear in terms of roles and responsibilities between the parties. If the contractor fails to perform as per the requirements of the General Conditions of Contract for Construction Works (GCC) clause 9.2.1.3.4 which requires the employer to give 14 days’ written notice to the contract, will be used. If non-performance persists, the contract will then be terminated as per the prescripts of GCC. The Department ensures that Implementing Agents appoint contractors as guided by the Construction Industry Development Board Act 38 of 2000. Contractors who do not deliver as per agreed timelines and outputs are terminated.
---00O00---
08 April 2024 - NW793
Weber, Ms AMM to ask the Minister of Water and Sanitation
(1)(a) On what date was the Beethoven process plant, ref number 12/9/11/L230710104834/6/N, in the Steve Tshwete Local Municipality sold, (b) to whom was the process plant sold to and (c) on what date did the wash plants change ownership, including (i) all licenses, (ii) the Environmental Impact Assessment and (iii) water usage licenses (2) whether the new owners of this plant has taken responsibility in cleaning the spillage of the wash plant into the environment; if not, why not; if so, what are the relevant details?
Reply:
1. (a-c) The Department of Water and Sanitation (DWS) is not aware of the date of sale of the Beethoven Process Plant, whom it was sold to or when the plant changed ownership.
2. The owners of the wash plant have taken responsibility for the spillage and have conducted clean-up operations and submitted a detailed action plan and rehabilitation plan. This was in response to the Notice previously issued by the DWS. A follow up inspection conducted on 14 March 2024 indicated that Beethoven Organics has failed to fully implement the actions on the action plan that was submitted and there were further unlawful water use activities taking place. The Department is in a process of issuing a Directive to compel the company to discontinue unlawful water uses.
---00O00---
08 April 2024 - NW755
Komane, Ms RN to ask the Minister of Water and Sanitation
What urgent measures of intervention has he taken to ensure that there is adequate water provision for all communities, especially the rural communities?
Reply:
The Minister is actively intervening in poorly performing municipalities and action plans have been agreed upon to address water supply shortages and other challenges in struggling municipalities. Interventions are intended to improve the capacity of Water Service Authorities to operate, maintain and manage assets for existing infrastructure include:
- A number of bulk water resource projects aimed at ensuring water security are being implemented by the DWS throughout the country. These include regional, inter-basin and transboundary transfer schemes/ systems entailing large dams, canals, pump stations, tunnels and pipelines.
- Financial support to municipalities by the DWS in terms of the grant framework in terms of which 44 billion is budgeted for over the MTEF. Implementation of grant funded projects will improve the reliability of water supply and sanitation services to all households in South Africa through the development of municipal water and sanitation infrastructure to address backlogs. This also includes refurbishment of existing infrastructure that is no longer functioning optimally.
- The DWS has implemented a country wide programme to ensure effective integrated planning together with Municipalities through the development of Five-Year Water and Sanitation Reliability plans that will also ensure funding stream interaction during the implementation programme.
- The Department is also in the process of developing Provincial Bulk Master Plans that will identify Water Resource shortages in critical areas and the development of pipeline of projects to ensure the availability of resources to all affected areas.
- To ensure the sustainability of water services sector, the Department is introducing a number of water reforms including:
-
- Introduction of Operating License for Water Service Provider (WSP). The Department will specify minimum competency and minimum performance levels for WSP linked to gazetted norms and standards for water and sanitation services (including full financial transparency and reporting). Municipalities must fulfil licence conditions if it provides the service itself or must contract with a licensed WSP that also meets the requirements.
-
- Strengthening the enforcement by amending Section 63 of Water Services Act to enable enforcement through directives. Currently sections 62 and 63 of the Water Services Act enable the Department to intervene in municipalities where monitoring of municipal water and sanitation services by DWS indicates failure to adhere to national norms and standards, subject to section 139 of the Constitution. The amendments will, as the last resort, enable the Minister to enforce the separation of water services function from the municipal administration where there is persistent failure to meet license conditions, and require the municipality (as Water Services Authority) to contract with a licensed WSP.
- Lastly, the department has established the Water Partnerships Office (WPO) at the Development Bank of South Africa to assist municipalities to contract for public private partnerships (PPPs) and to contract with independent water producers (IWPs). The WPO has developed five standardized national programmes for private sector participation in municipal water and sanitation services, to make it easier, quicker, and cheaper for municipalities to enter into partnerships, without having to ‘reinvent the wheel’ for each partnership.
---00O00---
08 April 2024 - NW806
Smalle, Mr JF to ask the Minister of Water and Sanitation
(1)In light of the bilateral agreement between the government of Zimbabwe and the Republic to transfer treated water from Beitbridge Water Treatment Works in the Republic of Zimbabwe to the Musina Local Municipality, on what date did Musina Local Municipality become a water authority; (2) whether there is money that is due to the Vhembe District Municipality since it will supply water to the Musina Local Municipality while the construction work of the project is underway; if not, what is the position in this regard; if so, what is the total amount?
Reply:
1. The Musina Local Municipality is not a Water Services Authority. The Vhembe District Municipality is a Water Services Authority and Water Services Provider in that area.
2. The implementing agent will arrange financing, procurement for implementation, and manage construction of the project. The project is earmarked to supply 15 million m3/a (41 Ml/d) of treated water to the Musina area. Engagements with potential water off-takers (Mines, Musina Makhado Special Economic Zone, Musina Local Municipality) have commenced to finalise the funding model. Vhembe District Municipality would need to collect revenue from the users once the project is completed. The total amount will be established once tariffs have been finalised.
---00O00---
08 April 2024 - NW647
Groenewald, Mr IM to ask the Minister of Water and Sanitation
(1)(a) Which municipalities failed to comply with the directives issued by him based on the Blue Drop and Green Drop audits done by his department and (b) what steps were taken by his department against the specified municipalities and the responsible municipal officials; (2) whether he will make a statement on the matter?
Reply:
1. The details provided below refer to actions taken on the results of the 2022 full Green Drop audit and the 2023 full Blue Drop audit. Regulatory action is not taken based on the Progress Assessment reports. It is important to note that both the Water Services Act and the National Water Act are used to address non-compliance of the Green Drop report as it impacts on the water resource. Non-compliance identified in the Blue Drop can only be addressed using the Water Services Act and it does not currently make provision for administrative directives. This gap is being addressed through the Water Services Amendment Bill.
For the Blue Drop audit outcomes, the process includes issuing non-compliance letters to Water Services Authorities (WSA) that have critical systems, setting out the findings and requiring the WSA to develop and submit a corrective action plan. Where the WSA fails to do so, the department will follow up. Once a plan is received it is reviewed to assess whether it addresses the findings, and the department proceeds to monitor compliance.
In the case of the Green Drop, the process includes issuing non-compliance letters to WSAs that have critical systems, setting out the findings. The WSAs are required to develop and submit corrective action plans. Where a WSA fails to do so a notice of intention to issue a directive will be issued and again should the WSA fail to comply, a directive is issued by the DWS. Once a plan is received it is reviewed to assess whether it addresses the findings, and the department monitors compliance.
a) The Blue Drop report released on 5 December 2023 identified 277 critical water supply systems belonging to 61 WSAs. Non-compliance letters were issued with a due date of corrective action plans set for 28 February 2024. Table 1 below indicates the status of submission of corrective action plans.
Table 1: Submission of Blue Drop Corrective Action Plans for critical drinking water supply systems
Province |
Number of WSAs with critical Systems |
Number of WSAs that have provided action plans |
Eastern Cape |
5 |
5 |
Free State |
10 |
6 |
KwaZulu Natal |
4 |
3 |
Mpumalanga |
8 |
8 |
Limpopo |
6 |
1 |
North-West |
7 |
4 |
Northern Cape |
22 |
4 |
Western Cape |
4 |
2 |
The WSAs in the Eastern Cape and Mpumalanga provinces have all submitted as required. There are 33 WSAs plans outstanding from the various provinces and the DWS is still following up on these.
Plans that have been received are currently being evaluated and follow ups made with the WSAs that have yet to submit. The Department will continue to monitor implementation of the action plans. Continued failure to submit will result in the laying of criminal charges.
b) The Green Drop report released in 2022 identified 344 critical wastewater systems belonging to 90 WSAs. Following the release of this report, the Department issued non-compliance notices to these 90 municipalities, requesting the municipalities to submit corrective action plans to address the shortcomings identified in the Green Drop report. The Department received corrective action plans from municipalities for 168 of the 334 wastewater systems (i.e. a 50% response rate) by March 2023. There were 43 municipalities that requested support from the Department to develop corrective action plans. The DWS is providing assistance to these municipalities to improve wastewater management. The DWS has issued directives to municipalities that did not submit corrective action plans compelling them to submit such plans in terms of the National Water Act. Criminal charges had been laid against some of the municipalities which have not submitted corrective action plans. Please see Annexure A for details and actions taken by the Department against non-compliant municipalities.
The Department has issued a total of 122 Notices of Intention to Issue Directives against Municipalities that demonstrated substandard performance in the Green Drop Report. These Notices were issued to allow the Municipalities the opportunity to provide representations in accordance with the requirements of the Promotion of Administrative Justice Act (PAJA). Certain Municipalities have replied to the Notices issued, and by submitting representations and these submissions were subsequently assessed, the Department accepted remedial action plans where these were appropriate. However, in other instances, the DWS rejected the representations due to their unsatisfactory nature. Subsequent follow-up inspections were carried out to ascertain compliance with the Notices requirements and it was found that some municipalities failed to comply with the instructions outlined in the Notices.
In response, the DWS took further enforcement measures by issuing 77 Directives, compelling the Municipalities to undertake corrective actions to protect water resources. Multiple follow-up inspections were conducted to monitor compliance with the issued Directives. Regrettably, several municipalities have failed to comply, prompting the Department to initiate criminal actions.
As a result, 49 criminal cases were opened with the South African Police Services against municipalities that failed to comply with the Directives, among other charges. Three case dockets have been finalized and referred to the National Prosecution Authority (NPA) for consideration of prosecution. Fines were imposed by the courts on the 3 Municipalities found guilty of contravening the provisions of the National Water Act (36 of 1998) amongst other legislations and Plea Sentencing Agreements were entered into with the Municipalities.
Additionally, the Department pursued Civil Action against non-compliant Municipalities, resulting in the issuance of 3 Court Orders mandating remedial actions to protect water resources.
2. There have been numerous media statements issued by the Ministry in this regard, including when the results were released on the outcomes of the Blue and No Drop Reports and Green Drop Progress Assessment Report released in December 2023, and since the Water Services Authority Summit in January 2024.
---00O00---
ANNEXURE A
Further enforcement action for failure to address Green Drop findings after issuance of non-compliance letters.
Province |
Name of Municipality |
Name of WWTWs |
Action Taken* |
Eastern Cape
|
OR Tambo DM |
Lady Frere |
National Water Act Notice and Directive Issued |
Tsolo |
National Water Act Notice and Directive Issued |
||
Loerie |
National Water Act Notice and Directive Issued |
||
Blue Crane LM |
Cookhouse |
NWA Notice Issued |
|
Somerset East |
NWA Notice Issued |
||
Jansenville |
National Water Act Notice and Directive Issued |
||
Willowmore |
NWA Notice Issued |
||
Rietbron |
NWA Notice Issued |
||
Addo |
National Water Act Notice and Directive Issued |
||
Free State |
Letsemeng LM |
Koffiefontein |
National Water Act Notice and Directive Issued, Criminal Case Opened |
Oppermansgronde |
National Water Act Notice and Directive Issued |
||
Tswelopele LM |
Hoopstad |
NWA Notice Issued |
|
Nketoana LM |
Lindley-Ntha |
National Water Act Notice and Directive Issued, Criminal Case Opened |
|
Mangaung LM |
Northern Works |
NWA Notice Issued |
|
Bloemindustria |
NWA Notice Issued |
||
Soutpan |
NWA Notice Issued |
||
Dewetsdorp |
National Water Act Notice and Directive Issued |
||
Van Stadensrus |
NWA Notice Issued |
||
Wepener |
NWA Notice Issued |
||
Ladybrand |
National Water Act Notice and Directive Issued |
||
Gariep Dam |
National Water Act Notice and Directive Issued |
||
Hennenman |
National Water Act Notice and Directive Issued |
||
Mmamahabane |
NWA Notice Issued |
||
Odendaalsrus |
NWA Notice Issued |
||
Phomolong |
National Water Act Notice and Directive Issued |
||
Thabong |
NWA Notice Issued |
||
Ventersburg |
NWA Notice Issued |
||
Witpan |
National Water Act Notice and Directive Issued |
||
Zastron |
National Water Act Notice and Directive Issued, Criminal Case Opened |
||
Setsoto LM |
Ficksburg |
National Water Act Notice and Directive Issued |
|
Clocolan |
National Water Act Notice and Directive Issued |
||
Kestell |
National Water Act Notice and Directive Issued, Criminal Case Opened |
||
Phuthaditjhaba |
National Water Act Notice and Directive Issued, Criminal Case Opened |
||
Tshiame |
National Water Act Notice and Directive Issued, Criminal Case Opened |
||
Wilge/Harrismith |
National Water Act Notice and Directive Issued, Criminal Case Opened |
||
Masilonyana LM |
Brandfort |
National Water Act Notice and Directive Issued, Criminal Case Opened |
|
Theunissen-Masilo |
National Water Act Notice and Directive Issued |
||
Winburg |
NWA Notice Issued, |
||
Oranjeville |
NWA Notice Issued, |
||
Moqhaka LM |
Kroonstad |
National Water Act Notice and Directive Issued |
|
Steynsrus |
National Water Act Notice and Directive Issued |
||
Viljoenskroon |
National Water Act Notice and Directive Issued, Criminal Case Opened |
||
Ngwathe LM |
Parys |
National Water Act Notice and Directive Issued, Criminal Case Opened |
|
Koppies |
NWA Notice Issued |
||
Heilbron |
NWA Notice Issued |
||
Nala LM |
Bothaville |
National Water Act Notice and Directive Issued, Criminal Case Opened |
|
Wesselsbron |
National Water Act Notice and Directive Issued |
||
Monyakeng |
National Water Act Notice and Directive Issued |
||
Mafube LM |
Namahadi |
National Water Act Notice and Directive Issued, Criminal Case Opened |
|
Villiers/Qalabotjha |
NWA Notice Issued, NWA Directive Issued, Criminal Case Opened |
||
Frankfort |
National Water Act Notice and Directive Issued, |
||
Tweeling |
National Water Act Notice and Directive Issued, Criminal Case Opened |
||
Cornelia |
National Water Act Notice and Directive Issued, Criminal Case Opened |
||
Gauteng |
Lesedi LM |
Devon |
National Water Act Notice and Directive Issued, |
City of Tshwane |
Klipgat |
National Water Act Notice and Directive Issued, Criminal Case Opened |
|
Rand West LM |
Randfontein |
National Water Act Notice and Directive Issued, Criminal Case Opened, Case Referred to NPA, Plea Sentencing Agreement |
|
Merafong LM |
Khutsong |
National Water Act Notice and Directive Issued, Criminal Case Opened |
|
Kokosi-Fochville |
National Water Act Notice and Directive Issued, Criminal Case Opened |
||
Wedela |
National Water Act Notice and Directive Issued, Criminal Case Opened |
||
Welverdiend |
National Water Act Notice and Directive Issued, Criminal Case Opened |
||
KwaZulu Natal |
uMkhanyakude DM |
St Lucia |
NWA Notice Issued |
Hluhluwe |
NWA Notice Issued |
||
Ingwavuma-Mosvold |
NWA Notice Issued |
||
Mtubatuba |
NWA Notice Issued |
||
Hlabisa Hospital |
NWA Notice Issued |
||
Limpopo |
Capricorn DM |
Senwabarwana |
NWA Notice Issued |
Mogwadi |
NWA Notice Issued |
||
Modimolle-Mookgopong LM |
Vaalwater-Mabatlane |
NWA Notice Issued |
|
Mookgophong Naboomspruit |
National Water Act Notice and Directive Issued, Criminal Case Opened, Court Interdict |
||
Greater Sekhukhune DM |
Dennilton |
National Water Act Notice and Directive Issued, Criminal Case Opened |
|
Motetema |
National Water Act Notice and Directive Issued, Criminal Case Opened |
||
Phokwane |
NWA Notice and Directive Issued |
||
Nebo |
NWA Notice Issued |
||
Tubatse |
NWA Notice and Directive Issued, Criminal Case Opened |
||
Mopani DM |
Giyani |
NWA Notice and Directive Issued, Criminal Case Opened |
|
Phalaborwa |
NWA Notice Issued, |
||
Namakgale |
NWA Notice and Directive Issued, Criminal Case Opened |
||
Lephalale LM |
Witpoort |
NWA Notice and Directive Issued |
|
Zongesien |
NWA Notice and Directive Issued |
||
Polokwane LM |
Seshego |
NWA Notice and Directive Issued |
|
Mankweng |
NWA Notice and Directive Issued |
||
Mogalakwena LM |
Mokopane Old&New |
NWA Notice and Directive Issued, Criminal Case Opened |
|
Rebone |
NWA Notice and Directive Issued, Criminal Case Opened |
||
Louis Trichardt-Makhado |
NWA Notice and Directive Issued |
||
Biaba-Dzanani Ponds (Makhado) |
NWA Notice and Directive Issued |
||
Hlanganani Ponds |
NWA Notice Issued |
||
Vleifontein Ponds |
NWA Notice and Directive Issued |
||
Malamulele |
NWA Notice and Directive Issued, Criminal Case Opened |
||
Mhinga |
NWA Notice and Directive Issued |
||
Thabazimbi LM |
Thabazimbi |
NWA Notice and Directive Issued, Criminal Case Opened |
|
Mpumalanga |
Emalahleni LM |
Thubelihle |
NWA Notice and Directive Issued, Criminal Case Opened |
Pixley ka Seme LM |
Amersfoort |
NWA Notice and Directive Issued |
|
Perdekop |
NWA Notice Issued |
||
Lekwa LM |
Standerton |
NWA Notice and Directive Issued, Criminal Case Opened, Plea Sentencing Agreement, Court Interdict. |
|
Msukaligwa LM |
Breyton Ponds |
NWA Notice and Directive Issued, |
|
Ermelo New |
NWA Notice and Directive Issued, Criminal Case Opened, Case Referred to NPA. |
||
Thaba Chweu LM |
Lydenburg |
NWA Notice and Directive Issued, Criminal Case Opened, Case Referred to NPA, Plea Sentencing Agreement. |
|
Coromandel |
NWA Notice and Directive Issued |
||
Greylingstad |
NWA Notice Issued |
||
Grootvlei Mine |
NWA Notice and Directive Issued |
||
North-West |
Madibeng LM |
Mothotlung |
NWA Notice and Directive Issued |
Dr Ruth Mompati DM |
Vryburg |
NWA Notice and Directive Issued, Court Interdict |
|
Maganeng/Pudimoe |
NWA Notice Issued |
||
Mazista |
NWA Notice and Directive Issued |
||
Moretele LM |
Swartdam |
NWA Notice Issued |
|
Ngaka Modiri Molema DM |
Coligny |
NWA Notice and Directive Issued |
|
Northern Cape |
Nama Khoi LM |
Carolusberg |
NWA Notice Issued |
Concordia |
NWA Notice and Directive Issued, Criminal Case Opened |
||
Springbok |
NWA Notice and Directive Issued, Criminal Case Opened |
||
Victoria West |
NWA Notice Issued |
||
Nababeep |
NWA Notice and Directive Issued Criminal Case Opened |
||
Onseepkans Trench |
NWA Notice and Directive Issued Criminal Case Opened |
||
Pofadder |
NWA Notice and Directive Issued Criminal Case Opened |
||
Norvalspont |
NWA Notice Issued |
||
Pella |
NWA Notice and Directive Issued Criminal Case Opened |
||
Noupoort |
NWA Notice Issued |
||
Bergsig |
NWA Notice and Directive Issued Criminal Case Opened |
||
Kenhardt |
NWA Notice Issued |
||
Colesburg |
NWA Notice and Directive Issued, Criminal Case Opened |
||
Okiep |
NWA Notice and Directive Issued, Criminal Case Opened |
||
Komaggas |
NWA Notice and Directive Issued, Criminal Case Opened |
||
!Kai !Garib LM |
Vredesvallei |
NWA Notice Issued |
|
Emthanjeni LM |
De Aar |
NWA Notice and Directive Issued |
|
Hanover |
NWA Notice and Directive Issued, Criminal Case Opened |
||
Karoo Hoogland LM |
Fraserburg |
NWA Notice Issued |
|
Sutherland |
NWA Notice Issued |
||
Williston |
NWA Notice Issued |
||
Ga-Segonyana LM |
Kuruman |
NWA Notice and Directive Issued |
|
Richtersveld LM |
Port Nolloth |
NWA Notice Issued |
|
Vanderkloof |
NWA Notice and Directive Issued, |
||
Magareng LM |
Jan Kempdorp |
NWA Notice and Directive Issued, Criminal Case Opened |
|
Phokwane LM |
Hartswater |
NWA Notice and Directive Issued, Criminal Case Opened |
|
Western Cape |
Langeberg LM |
Robertson |
NWA Notice Issued |
Zoar |
NWA Notice and Directive Issued, Criminal Case Opened |
*Where only a notice was issued there was representation received in which case there was no need for a directive. Similarly, once a directive is issued and there is compliance with the instructions, the department will monitor progress. If none it will proceed to open a criminal case and conduct investigations to obtain evidence to substation the charges.
08 April 2024 - NW375
Mohlala, Ms MR to ask the Minister of Water and Sanitation
What are the full, relevant details of the steps of intervention taken by his department to (a) aggressively tackle the systemic failures in water and sanitation services and (b)(i) ensure radical transformation and (ii) develop efficient and financially viable water provision institutions?
Reply:
a) The Blue, Green and No Drop reports that Department of Water and Sanitation (DWS) issued in December 2023, indicated that municipal water and waste water services have generally declined sharply over the last ten years, in terms of indicators such as the quality of water provided, the quality of effluent from waste water treatment works, and the levels of physical water losses and non-revenue water. The reports also identified the key causes of this decline, including:
- Weak billing and revenue collection,
- Insufficient prioritization of budgets for maintenance by municipal councils,
- Insufficient employment of staff with the required qualifications
This decline in the delivery of municipal water services has taken place despite very high levels of support from the national government to municipalities, including more than R60 billion per annum in grants for water and sanitation infrastructure and for free basic water for the indigent, as well as substantial technical, financial and other capacity building support. This indicates that financial support is necessary but not sufficient to turn around the decline, and structural reform of the municipal water services function is also required.
b) Despite the widespread challenges in the local government, the solution is not for the national government to take over municipal water functions. Reforms are required to ensure that municipal water services become professionally run and financially sustainable. This will require strengthened legislative and regulatory measures, such as those that DWS has proposed in the draft Water Services Amendment Bill, which introduces a requirement for municipal Water Services Providers to have an operating license, with the aim of ensuring minimum levels of capability.
---00O00---
08 April 2024 - NW827
Mkhonto, Ms C N to ask the Minister of Human Settlements
In light of the torrential rains and floods that affected the province of KwaZulu-Natal in 2021, (a) how many households (i) were affected, (b) needed urgent attention, (ii) have since been rebuilt by her department and (b) how many of the affected houses are owned by indigent individuals in the district of uThukela?
Reply:
a) (i) According to the report from the KwaZulu-Natal Provincial Department of Human Settlements (KZN-DHS), there were no torrential rains and floods in KwaZulu-Natal in 2021.
b) Not applicable
(ii)Not applicable
c) Not applicable
08 April 2024 - NW844
Whitfield, Mr AG to ask the Minister of Police
With reference to the special remission programme and the release of 15 000 inmates, (a) what total number of the released inmates had DNA samples taken from them prior to their release, (b) of those DNA samples taken, how many were added to the national database and (c) what total number of the specified inmates DNA samples have matched DNA samples of subsequent crimes since their release, whether arrested or not?
Reply:
Find reply here
08 April 2024 - NW746
Montwedi, Mr Mk to ask the Minister of Human Settlements
Whether there are still projects of Reconstruction and Development Programme houses that remain unfinished to date; if not, what is the position in this regard; if so, what (a) are the reasons behind the delays, (b)(i) time frames have been put in place to complete the specified projects and (ii) total amount required for the completion and (c) are the relevant details regarding the stages of completion?
Reply:
The Department of Human Settlements still has a number of incomplete/blocked projects in relation to the BNG houses that were formerly known as the RDPs. These incomplete projects spread across all nine provinces. However, there has been a significant improvement in unblocking these projects.
(a)(i)
Provinces have cited a number of contributory factors to the delays in completing the blocked projects that they are expected to finalise. Some of the reasons mentioned by provinces are as follows:
- Lack of bulk infrastructure in most of the areas where blocked projects are located.
- Difficult terrains leading to double handling fees on the contractor’s side.
- The structural assessments conducted by NHBRC on incomplete projects takes too long in some instances.
- Scattered nature of projects and etc
Considering that these projects have been left incomplete for too long, they are usually exposed harsh weather conditions for years on the ground and provinces are expected to conduct structural tests before the reconstruction of the incomplete units. The structural assessment is the prerequisite which will determine the structural integrity for each structure on the ground. This will assist in determining the cost of the projects particularly where there are existing structures.
(b)(i)
During my visit to Free State Province in 2021, I discovered a number of incomplete/blocked that were not being prioritised for completion. As the responsible Minister of the portfolio, I issued a directive to all provinces to complete the unfinished/blocked projects within a period of three years starting from financial year 2022/23, 2023/24 and 2024/25.
(b)(ii)
There is no dedicated funding that is allocated to provinces to complete the blocked projects. These projects are funded through their allocations on Human Settlements Development Grant (HSDG) and they are at different milestones.
Considering that NHBRC is still conducting structural assessments in other areas, it will not be possible to provide an exact amount required to complete these projects as the expected expenditure is informed by the final structural assessment reports.
(c)
During 2022, as a sector we were able to identify three thousand four hundred and forty-five (3445) and to date, provinces have since completed three thousand one hundred and fifty (3150) projects.
08 April 2024 - NW525
Mkhwebane, Adv B to ask the Minister of Police
(1) Whether a certain person (name furnished) called the National Commissioner of the SA Police Service (SAPS), Lt Gen Fannie Masemola, to inform him of the danger that the sources are in after the leaking of information regarding their identities; if not, what is the position in this regard; if so, what are the relevant details; (2) whether the National Police Commissioner knows the content of the information that a certain person (name furnished) wanted to give to him; if not, what are the reasons that he did not make any arrangements with a certain SAPS officer (name and details furnished) to obtain the information from the specified person; if so, what are the relevant details?
Reply:
Find here: Reply
08 April 2024 - NW819
Tito, Ms LF to ask the Minister of Basic Education
What (a) is the total number of high schools that offer the learner’s licence course and (b) are the time frames that have been put in place by her department for other schools in each province in each case?
Reply:
The Department of Basic Education(DBE) signed a collaborative Implementation Protocol with the Road Traffic Management Corporation (RTMC) on Learner Road Safety. Included in the programme is the roll-out of the Learner Driver Development Programme. The main focus of this protocol has been on the scholar patrol programme. The Learner Driver Development Programme in which the DBE plays a supporting role has not officially started.
08 April 2024 - NW295
Nodada, Mr BB to ask the Minister of Basic Education
(1) What is the current formula used by her department to determine post provisioning; (2) whether all the provinces follow the same formula; if not, why not; if so, what are the relevant details; (3) what is the current vacancy rate in each province for each (a) grade and (b) subject?
Reply:
(1) The allocation of educator posts to schools is regulated through the post provisioning norms. The main purpose of the norms is to ensure equity and redress in the distribution of available posts across provinces, taking into account, among other factors such as the number of learners; curriculum composition; size of the school; language medium; ideal maximum class size and the poverty level. The norms in the post provisioning norms are transferred into a post distribution model, which is then used to distribute posts in an equitable manner across all schools. The model applies an elaborate system of formulas which take into account all factors in the post provision norms. The copy of the post provisioning norms is attached for reference.
(2) All provinces follow the same formula which is nationally regulated through the post provisioning norms.
(3) (a) (b) The Department does not, as part of its regular monitoring, collect vacancy information to the level of detail requested . The Honourable Member is, kindly, requested to direct this specific question to the Provincial Education Departments.
08 April 2024 - NW384
Montwedi, Mr Mk to ask the Minister of Police
In light of his commitment to construct a new police station in Taung in the North West and to also open two satellite police stations in Magogong and Molelema, how far is the construction process, what (a) specific time frames have been put in place for the projects and (b) is the projected total cost of (i) constructing new police station in Taung and (ii) opening the two specified satellite police stations?
Reply:
Find here: Reply
08 April 2024 - NW794
Weber, Ms AMM to ask the Minister of Water and Sanitation
(1)Whether, considering that the Republic is a water scarce country while there are already two operational washing plants called Beethoven in the Steve Tshwete Local Municipality area within a radius of 3 km of each other (details furnished), his department has given a water usage license for the new Hillside wash plant in the Steve Tshwete Local Municipality in Mpumalanga; if not, what is the position in this regard; if so, which catchment dams and/or storm water trenches will be used to collect the 14 million litres of water per day to run this specific wash plant; (2) how it is possible that the Hillside wash plant has been built and/or are operational without the correct water use license; (3) whether his department issued a water usage license to the Hillside wash plant to use the natural fresh water of the Spookspruit allowing the excess water being dumped into the Spookspruit; if not, what is the position in this regard; if so, what are the relevant details?
Reply:
1. The Department of Water and Sanitation (DWS) issued a Water Use Licence for the wash plant (attached hereto). The water which will be used to operate the wash plant is obtained from a borehole.
2. Hillside was issued with a water use licence which expired, and the company subsequently applied for a new water licence which has been granted.
3. The water use licence issued by DWS is for the use of water from a borehole and not for surface water from the Spookspruit.
---00O00---
05 April 2024 - NW605
Ngcobo, Mr S to ask the Minister of Public Enterprises
With reference to his reply to question 91 on 28 February 2023, what are the details of the (a) make, (b) model, (c) year of manufacture, (d) date of purchase and (e) purchase price paid for each vehicle purchased by his department for (i) him and (ii) the Deputy Minister since 8 May 2019?
Reply:
(i) Table below display the vehicle information for Minister Pravin Gordhan
(a) Make |
(b) Model |
(c) Year of Manufacture |
(d) Purchase date |
(e) Purchase price |
Audi |
A6 2.0 TDI S Tronic Audi A6 |
2018 |
2021/03/19 |
R783 909.98 |
(ii) Minister Pravin Gordhan has been the only Minister since 1 June 2019.
(iii) Table below display the vehicle information for Deputy Minister Obed Bapela. He was appointed on 6 March 2023.
(a) Make |
(b) Model |
(c) Year of Manufacture |
(d) Purchase date |
(e) Purchase price |
Audi |
A6 2.0 TDI S Tronic Audi A6 |
2018 |
2021/03/19 |
R783 909.98 |
(iv) Deputy Minister Phumulo Masualle had been the Deputy Minister since 01 June 2019 up to the appointment of Deputy Minister Obed Bapela.
(a) Make |
(b) Model |
(c) Year of Manufacture |
(d) Purchase date |
(e) Purchase Price |
Audi |
A6 2.0 TDI S Tronic Audi A6 |
2018 |
2021/03/19 |
R783 909.98 |
However, in Cape Town, the Minister and Deputy Minister still use vehicles purchased by the department in 2016.
Remarks: Reply: Approved / Not Approved
Jacky Molisane P J Gordhan, MP
Acting Director-General Minister of Public Enterprises
Date: Date:
05 April 2024 - NW455
Bergman, Mr D to ask the Minister of Justice and Correctional Services
(1) What (a) is the name of the National Prosecuting Authority prosecutor who was given a National Lottery Commission dossier in 2020 containing details of four grants that were given to questionable nonprofit organisations, (b) total number of the four cases did the prosecutor decide to prosecute and (c) were the outcomes of the prosecutions. (2) whether there was a decision not to prosecute; if not, what is the position in this regard; if so, what are the relevant detailed reasons (a) for which such a decision was made, (b) that there has been no outcome of the prosecution and (c) for such a delay?
Reply:
I have received the following response from the National Prosecuting Authority:
1 (a) It is confirmed that experienced prosecutors are assigned to manage all cases emanating from the National Lottery Commission. As a matter of policy, the NPA does not divulge the name of prosecutors assigned to cases, particularly during the investigation stage.
(b) There are 11 NLC - SIU referrals that are being dealt with by the prosecutors. All 11 matters are still under investigation and the prosecution team is awaiting the DPCI to finalise outstanding investigations e.g. forensic report and further statements to be obtained. Some matters, not from the 11 referred to above were closed due to duplication and merged to existing ones. Other matters were closed due to lack of sufficient evidence. It is not clear which four matters the question relates to. Perhaps if the names of the Non-Profit Organisation (NPO) and/or the name of an individual linked to an NPO was provided would we be in a position to properly respond to the question.
(c) No prosecutions have been instituted at present, please see response in (b) above.
2. There is no final decision taken on the 11 matters referred to above and the reason for the delay is the finalisation of outstanding investigations. Processes are underway by the DPCI to appoint forensic auditors to compile flow of funds analysis and forensic reports in respect of certain investigations.
05 April 2024 - NW711
Faber, Mr WF to ask the Minister of International Relations and Cooperation
Whether she will furnish Mr W F Faber with a (a) list and (b) full description of all events planned by her department to take place before 29 May 2024 in celebration of the 30 years of democracy in the Republic, including the (i) projected total cost or expenditure of each event and (ii) breakdown thereof in terms of expenditure for (aa) catering, (bb) entertainment, (cc) venue hire, (dd) transport and (ee) accommodation; if not, why not; if so, what are the relevant details?
Reply:
The Department of International Relations and Cooperation is planning no events before 29 May 2024 in celebration of democracy.
05 April 2024 - NW633
Graham, Ms SJ to ask the Minister in The Presidency for Electricity
(1) With reference to the construction of a temporary chimney at the Kusile Power Station to bypass the desulpherisation process to bring Units 1 and 3 back online, by what date is it envisaged that construction on the new wet flue gas desulpherisation plant at the specified power plant will commence; (2) Whether the design flaws that led to the buildup of slurry that caused the collapse of the plant have been rectified yet; if not, by what date is it envisaged that the design flaws will be rectified; if so, what are the relevant details?
Reply:
1) There is no new flue gas desulphurisation plant being constructed, but the temporary stacks were constructed to allow continued operation of Units 1, 2 and 3 while the repairs on the existing permanent stacks are being conducted. The work has commenced, and the targeted completion date is 31 December 2024. The exemption granted by the DFFE is up to 31 March 2025.
(2) Eskom has entered into a long-term contract with the FGD plant's Original Equipment Manufacturer for operation and maintenance, including technical support.
05 April 2024 - NW584
Engelbrecht, Mr J to ask the Minister of Justice and Correctional Services
(1) What (a) is the total number of chickens that died before being sent to the abattoir during the week of 26 February 2024 to 1 March 2024 at the animal production farm of the Drankenstein Correctional Facility, (b) are the detailed reasons leading to the death of the chickens and (c) is the (i) total number of people currently employed in the abattoirs and (ii) breakdown of the number of persons who have the knowledge and experience with meat inspection; (2) whether his department procured the services of a private company to do meat inspections; if not, why not; if so, (a) what total amount did it cost his department and (b) on what date did his department procure the services; (3) what does it cost to feed a chicken from day-old to slaughter at the animal production farm of the Drankenstein Correctional Facility?
Reply:
(1)(a) According to the service level standards, chickens may be slaughtered from forty-two (42) days of which none of the chickens that died during the mentioned period had reached 42 days. It should be noted however that a total of five thousand seven hundred and sixty nine (5769) chickens twenty-eights (28) days old, died during the week of 26 February 2024 to 1 March 2024 at the animal production farm of the Drankenstein Correctional Centre, the breakdown is as follows:
- 26 February 2024 – twelve (12)
- 27 February 2024 – twelve (12)
- 28 February 2024 – Twenty-one (21)
- 29 February 2024 – Five thousand seven hundred and one (5701)
- 01 March 2024 – Twenty-three (23)
(1)(b) The mortalities of 26-28 February 2024 are within the acceptable norm of broiler projects. The mortalities of 29 February 2024 were due to extremely hot weather which was reported to be forty-three (43) degrees in Paarl. The situation was aggravated by an unplanned water down which affected the broiler houses’ cooling system due to maintenance by a service provider for a period of approximately five (05) hours. It is important to mention that the service provider was appointed by Department of Public Works and Infrastructure.
(1)(c)(i) A total of seven (07) officials are currently employed in the abattoirs.
(1)(c)(ii) A total four (04) officials with Poultry Meat examination accreditation are currently working at the abattoir.
(2) Yes, the department procured the services of a private company to do meat inspections.
(2)(a) The Independent Meat Inspector 12 Month Contract is at a cost of R600 000 and the meat examiner month to month contract is at a cost of R45 000 per month.
(2)(b) The contract for the Meat inspector started on 01 July 2024 and will end on 30 June 2024. The meat examiner services have been provided on a month to month basis starting September 2023.
(3) Average cost to feed a chicken from day-old to slaughter is R35.93 per chicken.
It should be noted that the Department of Correctional Services implements policies in line with the Agriculture Service Level Standards, which are informed by industry norms and standards, Bio-security plan and Meat Safety Act, which is applicable to all abattoirs.
END
05 April 2024 - NW632
Graham, Ms SJ to ask the Minister in The Presidency for Electricity
(1) Whether, with reference to the statement issued by Eskom on 2 March 2024, where it was confirmed that the Generation Operational Recovery Plan had been successful in arresting the decline of the energy availability factor (EAF), he has found that the utility is on track to achieve an EAF of (a) 65% from the current EAF by 31 March 2024 and (b) 70% by March 2025; if not, in each case, why not; if so, what are the details of how the respective EAFs will be achieved in each case?
Reply:
(a) The improvement of the EAF and unplanned outages results from the concerted efforts focusing on priority power stations (Kusile, Kendal, Majuba, Matla, Tutuka and Duvha), where each power station has its detailed recovery plan. A total of 3 510MW was recovered by January 2024 through these interventions.
The highest level of planned maintenance was performed between December 2023 and January 2024, reaching an average of 18% of the generation capacity. The downside of increased maintenance was a negative impact on EAF. However, the deliberate spike in planned maintenance aims to improve the reliability of the generation fleet, deliver long-term benefits, and ensure the security of the energy supply.
Although heightened maintenance negatively impacted the Energy Availability Factor (EAF), it remains a necessary trade-off, as the deliberate spike in planned maintenance is intended to improve the generation fleet's reliability to deliver long-term benefits and ensure the security of the energy supply is restored. Not only has the plan started to yield desirable results as far as EAF is concerned, but the Unplanned Capacity Loss Factor (unplanned outages) has also taken a positive turn from 34% of the generation capacity in January 2023 to 30% in January 2024
The gradual improvement brought about by the Generation Operational Recovery Plan has starting to be visible as far as the frequency and intensity of loadshedding in the past five and half months, September 2023 to mid-February 2024
Based on linear modelling undertaken by the Ministry, had Planned Maintenance been reduced by 25-50% from September 2023 to February 2024, Load shedding could have been wholly averted for this period, and consequently, a much improved EAF performance could have been reported; edging annualised EAF performance closer to the planned 65% target to March 2023.However, this would have left the system vulnerable and weaker going into winter 2024.
The notion that Eskom’ is experiencing a further decline in performance is not supported by the factual position, as reported. It is also important to emphasise that the setback of implementing Stage 6 from 09 February 2024 midnight until 11 February 2024 midday was an outlier due to the multiple generation units being taken offline.While EAF has not tracked in line with the planned performance, the declining trend, which has been ongoing for the past six years, has been arrested.
The reduction in the intensity and frequency of loadshedding and the positive EAF trajectory is evident indicators of improvements in the generation fleet's performance. The focus remains on sustaining this trajectory.
(b) The increase in planned maintenance (September 2023 – February 2024) has created buffers in the available capacity going into winter 2024. From the end of March 2024, we will begin reducing planned maintenance from the high of 8000 MW (January 2024) to 5000 MW in April 2024 and to around 4000 MW in May 2024. Effectively, this will account for 4000 MW available to the system during the winter 2024 peak season.
In addition, Medupi Unit 4 (800 MW) will return to service in August 2024, followed by Koeberg Unit 2 (980 MW) in September. Further, Kusile Unit 6 (800 MW) will be synchronised to the grid in December 2024, adding up to 2,300 MW of additional capacity during the year.
These will similarly improve EAF performance (year on year). Coupled with the expected improved performance (or reduced failure rate) due to the aggressive maintenance programme, all indications are that we are on track to achieve the planned target for March 2025.
05 April 2024 - NW456
Bergman, Mr D to ask the Minister of Justice and Correctional Services
(1) What is the (a) total number of prosecutors from the National Prosecuting Authority who work on the cases of the National Lottery Commission (NLC) and (b) time period that the same prosecutors have been allocated to the NLC cases. (2) what (a) total number of cases (i) have been handed to each prosecutor, (ii) has each prosecutor decided to prosecute and (iii) that have been prosecuted have been finalised with an outcome and (b) were the outcomes in each case?
Reply:
I have received the following response from the National Prosecuting Authority:
1. (a) Initially one prosecutor was allocated the matters. An additional prosecutor was subsequently tasked to assist, as the workload increased. Prosecutorial resources are reviewed regularly to manage the increasing workload.
(b) The cases involving the NLC were assigned to the initial prosecutor in the latter part of 2020.
2. (a)There are a total of 11 NLC cases that were received from the SIU, one of which is an enquiry.
(i) The two prosecutors assigned to attend to these matters are handling them with a holistic approach and regard it as one big project. The 11 matters are therefore jointly allocated to the two prosecutors.
(ii) The SIU referrals to the NPA do not constitute a fully investigated criminal case that would enable the prosecution to immediately decide on a matter and make an informed decision. Such matters have been referred to the DPCI, who is mandated to conduct the necessary outstanding investigations that have been identified by the prosecution. All 11 matters are still under investigation and the prosecution team is awaiting the DPCI to finalise the investigations that would include forensic reports and further statements to be obtained. Only then will the NPA be able to make an informed decision whether or not to institute a prosecution.
(iii) No prosecutions have been instituted at present, please see the response in 2(a)(ii) above. This also applies to question 2(b).
05 April 2024 - NW741
Sithole, Mr KP to ask the Minister of Tourism
Considering the importance of business and medical tourism, what plans does her department have in place to enhance infrastructure and services catering for these segments of the market, thus ensuring the Republic remains competitive as a destination for various purposes?
Reply:
I have been informed by the Department that the approach to Medical Tourism is that practitioners who want to participate in this niche are free to do so. However, government does not actively promote or market South Africa as a destination for this purpose. This is based on the levels of potential risks of litigation associated with the field.
As far as the infrastructure for medical tourism concerned, that is the responsibility of the practitioners in the sector.
I have, further, been informed by South African Tourism (SA Tourism) that the medical sector is a key priority for the South Africa National Convention Bureau (SANCB) to bid for international and regional conferences. The SANCB works closely with associations, federations and societies in the Medical sector to bid for international and regional meetings to be hosted in South Africa.
The role of the South Africa National Convention Bureau (SANCB) is to create demand for international and regional conferences to be hosted in South Africa and to bid to host these conferences in South Africa. SANCB works with the private sector, like convention centres, to bid for these conferences.
In terms of infrastructure for business tourism purposes some of the community-based projects that the department is involved with, and where feasible has an element of business tourism infrastructure in the form of event and/or conference venues.
05 April 2024 - NW660
Mhlongo, Ms N to ask the Minister in The Presidency for Electricity
(How is Eskom collaborating with stakeholders, like municipalities and industry partners, to enhance grid infrastructure such as transmission and distribution to promote energy security?
Reply:
Transmission is collaborating with industry stakeholders through the Department of Trade Industry & Competition (DTIC) and the Industrial Development Corporation (IDC). We have been meeting with the DTIC and industry since 2022, specifically to evaluate industrial capacity, identify opportunities and support the growth of industrial capacity. One such identified opportunity is steel fabrication, where Eskom is working with the IDC to capacitate five new factories. Another one is construction contractors, where Eskom is undertaking an incubation programme with five companies and intends to assist in further capacitation. A memorandum of agreement (MoA) is presently being finalised and will be signed between Eskom and the IDC.
Eskom Distribution is working with municipalities and industry partners as follows:
1. Direct stakeholder engagements: Eskom is engaging with various stakeholders on new products, for example, we had community engagements in two provinces discussing the load-limiting programme. We are also engaging other provinces on the use of smart meters for load reduction, to ensure energy security with lower levels of loadshedding by voluntarily switching off loads in a systematic way.
2. Industry collaborations: Eskom is involved in the deployment of microgrids through the appointment of contractors to engineer, construct and hand over to Eskom. A total of 33 have been done to date, and more are on the way. These come with battery energy storage systems.
Eskom is also engaging various industry associations to discuss issues of interest and plans that are of mutual benefit, to take the industry forward.
3. Localization: transformer, line equipment, and construction companies - we are developing a Technically Evaluated and Accepted Products (TEAP) list. This shortens the time to tender and select companies that provide services. Localization creates employment and new players and sustains the local steel industry. The TEAP list is a living document that is updated as and when new suppliers enter the market. Products in the list meet the Eskom standards.
4. Training courses: Eskom Distribution offers training courses to engineers, even external to Eskom when requested to do so.
05 April 2024 - NW703
Bond, Mr M to ask the Minister of Defence and Military Veterans
Whether she will furnish Mr M S Bond with a (a) list and (b) full description of all events planned by her department to take place before 29 May 2024 in celebration of the 30 years of democracy in the Republic, including the (i) projected total cost or expenditure of each event and (ii) breakdown thereof in terms of expenditure for (aa) catering, (bb) entertainment, (cc) venue hire, (dd) transport and (ee) accommodation; if not, why not; if so, what are the relevant details?
Reply:
Find reply here
05 April 2024 - NW225
Nqola, Mr X to ask the Minister of Justice and Correctional Services
(1) What progress has been made in turning around and addressing the challenges at the offices of the Master of the High Court to date; (2) what is the progress regarding the piloting of the online registration system?
Reply:
On 24 November 2024, the Master of the High Court committed to implementing immediate/short-term interventions as part of the Master’s turn-around strategy. The progress and the implementation thereof is reported as follows:
a) Intervention 1: The roll-out of the Deceased Estates Online system nationally by January 2024.
b) This intervention is assisting the Masters in addressing challenges of long queues, long turn-around times in issuing appointment letters and it enables practitioners as well as members of the public to lodge deceased estates online and to book appointments online to visit the Masters’ offices at a date and time of their choosing. Masters and ICT have successfully completed the roll-out of the system on 14 December 2023 in all Masters’ offices as well as service points. As at 21 February 2024, 2926 applications were lodged on the online system. The 2926 applications are explained in detail as follows:
CASE STATUS |
NUMBER OF CASES |
Total number of Applications |
2926 |
Incomplete (awaiting client/attorney finalisation and submission) |
217 |
Awaiting DHA validations (failed DHA validations) |
1 |
Rework Requested (awaiting client/attorney corrections) |
429 |
Screen Application and awaiting Masters’ approval |
408 |
Will lodgement (awaiting original will lodgement at Masters) |
39 |
Cases Registered (completed and letters issued) |
1832 |
c) Intervention 2: Increased visibility and education on the Deceased Estates online functionalities and other Masters’ services – The Department has developed and published training videos on the Masters’ portal, YouTube and on the DOJ & CD Facebook platform on 29 January 2024. The videos can be accessed by practitioners and members of the public to assist them in lodging deceased estates applications, booking appointments online and tracking the status of their applications.
d) Intervention 3: Increased engagements with the legal fraternity and provision of training on online platforms as requested by the Law Society of South Africa - On 23 January 2024, a training webinar was hosted by the Office of the Chief Master to train stakeholders practising in deceased estates on the use of the new online system, provide them with further updates on future developments and to give them a platform to raise any issues they may have with the Masters’ services. The initial intention was to engage only legal practitioners however, members of FISA, BASA, CIBA and SAICA participated in the webinar. 2308 legal practitioners, fiduciary professionals and accountants were trained in the webinar.
(2) what is the progress regarding the piloting of the online registration system?
The target on the Masters’ APP 2023/2024 was to roll-out the deceased estates online registration system in three (3) Masters’ offices by 31 March 2024 however, it is with delight that we can report that this system has been implemented in all 16 Masters’ offices on 14 December 2023. The expedited implementation was in a bid to improve service delivery as well as access to the Masters’ services and alleviate the challenges experienced by clients having to physically visit the offices. All clients across the country can now report deceased estates in the comfort of their homes. The Masters have seen a marked reduction in queues. Further, clients who are not tech savvy or who do not have access to technology have been assisted to lodge estates online by the Masters with the use of staff-assisted and self-service kiosks.
05 April 2024 - NW731
Matumba, Mr A to ask the Minister of Tourism
Whether the Government has any plans to refurbish the Mphephu Resort to revive the tourism economy of the Vhembe Region in Limpopo; if not, why not; if so, what are the relevant details?
Reply:
I have been informed that the Department of Tourism does not have Mphephu Resort as one of its projects. The resort belongs to the Limpopo Provincial Department of Economic Development, Environment and Tourism.
The Honourable member, may direct the enquiry to the Provincial authorities in this regard.
05 April 2024 - NW301
Graham, Ms SJ to ask the Minister in The Presidency for Electricity
(1) With reference to his reply to question 4181 on 4 January 2024 regarding the emergency generators received from the Republic of China, what (a) was the value of the exemption of taxes and fees for material imports, (b) was the cost of the domestic (i) transportation and (ii) delivery and (c) which service providers were used for domestic transportation; (2) What (a) is the full breakdown of the cost to government for the facilitation of Chinese technical service personnel and (b) were the costs of the (i) overdue storage and (ii) truck and container detention fees as a result of the delays in the Republic
Reply:
1.(a) The donation from the People’s Republic of China to the Republic of South Africa was done in terms of a technical assistance agreement. The value R1 393 602 was charged as part of Eskom’s deferred group tax and this will be claimed back from SARS in due course.
(b)(i)(ii)(iii)-(c) The transportation of the emergency equipment was undertaken by Eskom, consequently, the Ministry did not appoint a service provider for the transportation and delivery of the emergency equipment, as a result no costs accrued.
2. (a) The South African Government did not incur any costs regarding the facilitation of the Chinese technical personnel
(b)(i)-(ii) The South African Government did not incur any costs regarding overdue storage, truck and container detention fees.
05 April 2024 - NW659
Mhlongo, Ms N to ask the Minister in The Presidency for Electricity
What are the relevant details of the infrastructure investments being prioritised by Eskom to strengthen the resilience and reliability of the national electricity grid, particularly in response to climate change and extreme weather events?
Reply:
Transmission projects have been identified and are funded up to FY26 through the government debt relief package. These projects are for integrating renewable energy in line with determinations issued according to S34 of the Electricity Regulations Act (ERA). The priority programme consists of 47 projects that will deliver 37GW of grid connection capability. A total of 12 of these projects are at the procurement stage, in preparation to start construction.
In line with the grid code, transmission infrastructure is planned and constructed with redundancy, often called “N-1”. The grid is therefore largely redundant to ensure resiliency.
Transmission has also increased its budgets significantly for the replacement of assets at the end of life. This will address aged assets as observed by the VGBE consultants in their recent report. Transmission however plans to carry out performance using world best practices, again as observed in the report by VGBE consultants. We also conduct asset condition assessments that can inform us in advance of assets at risk of failure
To respond to failures that may still occur even after all this due care, we keep strategic and critical spares. Transmission continues to conduct research in areas that will improve grid resilience, such as new physical and cyber security standards and alternative materials.
05 April 2024 - NW637
Manyi, Mr M to ask the Minister in The Presidency for Electricity
(a) What are the full details of the causes of the recent high frequency of load shedding, despite efforts towards integrating renewable energy sources into Eskom’s grid and (b) how does he explain the persistent challenges facing Eskom in maintaining stable electricity supply, despite his numerous visits to Eskom plants and initiatives to address the issues?
Reply:
(a)It is incorrect to suggest there has been a recent “high frequency of load shedding”. It is important to note that Stage 6, which occurred from 09 February 2024 midnight until 11 February 2024 midday, was an outlier due to the multiple generation units being taken offline.The gradual improvement brought about by the Generation Operational Recovery Plan has started to be visible as far as the frequency and intensity of loadshedding in the past five and half months, September 2023 to mid-February 2024
A comparison of loadshedding between December 2022 and February 2023 (from 1 December 2022 to 16 February 2023) and in the same period (1 December 2023 to 16 February 2024) indicates that loadshedding hours were reduced from 1 801.25 to 1 217.98, which is about 600 hours less.
It is important to note that renewable energy does not, and will not address, baseload requirements due to its intermittent nature, which depends on sunshine and wind speed. Whilst we continue to ensure ease of path for the development of our renewable basket, including battery storage capacity, we are fast-tracking efforts to ensure, in the short to medium term, work is initiated to convert the current (diesel) peaking plants to gas-to-energy facilities capable of operating as baseload stations.
(b) The improvement of the EAF and unplanned outages results from the concerted efforts focusing on priority power stations (Kusile, Kendal, Majuba, Matla, Tutuka and Duvha), where each power station has its detailed recovery plan. A total of 3 510MW was recovered by January 2024 through these interventions.
The highest level of planned maintenance was performed between December 2023 and January 2024, reaching an average of 18% of the generation capacity. The downside of increased maintenance was a negative impact on EAF. However, the deliberate spike in planned maintenance aims to improve the reliability of the generation fleet, deliver long-term benefits, and ensure the security of the energy supply.
Although heightened maintenance negatively impacted the Energy Availability Factor (EAF), it remains a necessary trade-off, as the deliberate spike in planned maintenance is intended to improve the generation fleet's reliability to deliver long-term benefits and ensure the security of the energy supply is restored. Not only has the plan started to yield desirable results as far as EAF is concerned, but the Unplanned Capacity Loss Factor (unplanned outages) has also taken a positive turn from 34% of the generation capacity in January 2023 to 30% in January 2024
The gradual improvement brought about by the Generation Operational Recovery Plan has starting to be visible as far as the frequency and intensity of loadshedding in the past five and half months, September 2023 to mid-February 2024
Based on linear modelling undertaken by the Ministry, had Planned Maintenance been reduced by 25-50% from September 2023 to February 2024, Load shedding could have been wholly averted for this period, and consequently, a much improved EAF performance could have been reported; edging annualised EAF performance closer to the planned 65% target to March 2023.However, this would have left the system vulnerable and weaker going into winter 2024.
The notion that Eskom’ is experiencing a further decline in performance is not supported by the factual position, as reported. It is also important to emphasise that the setback of implementing Stage 6 from 09 February 2024 midnight until 11 February 2024 midday was an outlier due to the multiple generation units being taken offline.While EAF has not tracked in line with the planned performance, the declining trend, which has been ongoing for the past six years, has been arrested.
The reduction in the intensity and frequency of loadshedding and the positive EAF trajectory is evident indicators of improvements in the generation fleet's performance. The focus remains on sustaining this trajectory.
05 April 2024 - NW625
Groenewald, Dr PJ to ask the Minister of Defence and Military Veterans
(1)Whether the official residence of the Chief of the SA National Defence Force in Waterkloof on the corner of Edward Street and Rose Street is currently occupied; if not, (a) why not and (b) from what date has the residence been unoccupied; (2) What is the total monthly expenditure regarding the (a) municipal fees and (b) guarding of the residence?
05 April 2024 - NW738
Ismail, Ms H to ask the Minister of Tourism
What total amount did her department spend on the commission of the (a) SNG Grant Thornton and (b) TFS Africa forensic investigations?
Reply:
a) I have been informed by the Department that the Department spent R 778 789.86 for the SNG Grant Thornton investigation, and
b) R 232 921.00 for the TFS Africa investigation.
05 April 2024 - NW719
Khakhau, Ms KL to ask the Minister in The Presidency for Electricity
Whether he will furnish Ms K L Khakhau with a (a) list and (b) full description of all events planned by his Office to take place before 29 May 2024 in celebration of the 30 years of democracy in the Republic, including the (i) projected total cost or expenditure of each event and (ii) breakdown thereof in terms of expenditure for (aa) catering, (bb) entertainment, (cc) venue hire, (dd) transport and (ee) accommodation; if not, why not; if so, what are the relevant details?
Reply:
- – (b) (i) (ii) (aa) (bb) (cc) (dd) & (ee) The Ministry has not be initiated specific events of its own, but will, however participate in the planned programmes by the Presidency and other government departments.
05 April 2024 - NW248
Horn, Mr W to ask the Minister of Justice and Correctional Services
What (a) progress has been made with the implementation of the Master’s Turnaround Strategy since its adoption in 2023 and (b) are the relevant details of the backlog faced by the Master’s Offices as at 31 December 2023?
Reply:
On 24 November 2024, the Master of the High Court committed to implementing immediate/short-term interventions as part of the Master’s turn-around strategy. The progress and the implementation thereof is reported as follows:
a) Intervention 1: The roll-out of the Deceased Estates Online system nationally by January 2024.
This intervention is assisting the Masters in addressing challenges of long queues, long turn-around times in issuing appointment letters and it enables practitioners as well as members of the public to lodge deceased estates online and to book appointments online to visit the Masters’ offices at a date and time of their choosing. Masters and ICT have successfully completed the roll-out of the system on 14 December 2023 in all Masters’ offices as well as service points. As at 21 February 2024, 2926 applications were lodged on the online system. The 2926 applications are explained in detail as follows:
CASE STATUS |
NUMBER OF CASES |
Total number of Applications |
2926 |
Incomplete (awaiting client/attorney finalisation and submission) |
217 |
Awaiting DHA validations (failed DHA validations) |
1 |
Rework Requested (awaiting client/attorney corrections) |
429 |
Screen Application and awaiting Masters’ approval |
408 |
Will lodgement (awaiting original will lodgement at Masters) |
39 |
Cases Registered (completed and letters issued) |
1832 |
b) Intervention 2: Increased visibility and education on the Deceased Estates online functionalities and other Masters’ services – The Department has developed and published training videos on the Masters’ portal, YouTube and on the DOJ & CD Facebook platform on 29 January 2024. The videos can be accessed by practitioners and members of the public to assist them in lodging deceased estates applications, booking appointments online and tracking the status of their applications.
c) Intervention 3: Increased engagements with the legal fraternity and provision of training of online platforms as requested by the Law Society of South Africa - On 23 January 2024, a training webinar was hosted by Office of the Chief Master to train stakeholders practising in deceased estates on the use of the new online system, provide them with further updates on future developments and to give them a platform to raise any issues they may have with the Masters’ services. The initial intention was to engage only legal practitioners however, members of FISA, BASA, CIBA and SAICA participated in the webinar. 2308 legal practitioners, fiduciary professionals and accountants were trained in the webinar.
a) What are the relevant details of the backlog faced by the Master’s Offices as at 31 December 2023?
The backlog in the Masters office consists of backlog in Guardian’s funds applications, Trust matters and the issuing of appointments in deceased estate matters. As at 31 December 2023, the backlog was 13851 matters; 935 (6.75%) of backlog matters have been cleared and offices are working on clearing the rest of the backlog. The Masters are still plagued by several challenges including but not limited to, systems downtime, load shedding and a high vacancy rate in the midst of costs containment measures, thus finding themselves juggling between reaching increased APP targets, assisting clients as well as dealing with the omnipresent and inevitable increasing backlog.
04 April 2024 - NW740
Gondwe, Dr M to ask the Minister of Public Enterprises
(a) What are the relevant details of the steps his department will take to ensure the full implementation of the recommendations of the VGBE Consortium report that was commissioned by the National Treasury, which constitutes an independent assessment of the operational situation at Eskom’s fleet of coal-fired power stations and (b) by what date is it envisaged that the recommendations will be fully implemented?
Reply:
According to the information received from Eskom:
(a)
The report covers an assessment period from March to May 2023, coinciding with the inception of the Generation Operational Recovery Plan approved by the Eskom Board. During this time, significant developments occurred, including the appointment of Bheki Nxumalo as the Generation Group Executive in mid-April 2023. The Generation Operational Recovery Plan addressed various operational observations at power stations. These initiatives focus on improving people, plant, and process performance. Regular progress updates, which also cover progress feedback on these aspects, are shared with the public every two weeks by the Minister of Electricity (MoE) and Eskom executives during media briefings to give updates on the implementation of the country’s Energy Action Plan (EAP).
Over the nine months since the report’s assessment period, positive results included fixing design-related issues at Medupi and Kusile Power Stations, which have been addressed through modifications. This has improved maintenance and operations, and significantly improved plant availability. This is evident in the much-improved performance at Medupi, which remains among Eskom’s most reliable power stations following the modifications.
Furthermore, as of January 2024, a total of 3 510MW was recovered through concerted efforts focusing on priority power stations. Each power station has its detailed recovery plan, and these are centrally monitored to ensure successful implementation of the actions. Tracking of VGBe recommendations, alongside recommendations of other similar reports, will be done via the Eskom Board and NECOM processes.
(b)
The new Group Chief Executive, Mr. Dan Marokane is assessing the Generation Operation Recovery Plan, which has been instrumental in addressing the issues contained in the VGBe report. This is with the view of accelerating its execution and ensuring that issues in the VGBe report that have not been already addressed are prioritised.
The cooperation of the private sector in the National Energy Crisis Committee has also assisted Eskom to improve operations and training of operators.
The Department and National Treasury are monitoring implementation of the recommendations of VGB.
04 April 2024 - NW737
Essack, Mr F to ask the Minister of Public Enterprises
What are the full details of the Government’s plan with regard to the operation of the SA Airways in the short- to medium term, following the termination of the Takatso deal?
Reply:
- Following the termination of the strategic equity partner transaction, SAA’s plans are being enhanced to continue operating the airline
son a sustainable basis. - In the short term the airline will require strengthening the SAA Board and Management as well as raising funds for acquiring aircraft to expand the network. In the medium to long term, it will require developing a long-term strategy. The Board will present the strategy to Minister for consideration. Among the measures being taken/putting in place post the termination of the SEP transaction are the following:
- Strengthening the board,
- Strengthening the management with aviation specialists,
- Consolidating the strategic, operational and corporate plans with the support of aviation experts,
- Entering into longer term leases for aircrafts,
- Exploring alternative options for financing the expansion of SAA services,
3. We are past the “interim” phase of SAA’s recovery. It is important to hand over to the 7th Administration, a firmly consolidated and efficient SAA.
04 April 2024 - NW728
Magaxa, Mr K to ask the Minister of Public Enterprises
(1) Whether he has found that it will be appropriate to conclude the SA Airways (SAA) and Mango business rescue processes before the start of the 7th administration; if not, why not; if so, what are the relevant details: (2) what progress has been made by Global Aviation and Syranix in terms of selling their stake in Takatso Consortium to satisfy the conditional regulatory requirement of the Competition Commission for finalising the sale of the SAA?
Reply:
- The SAA business rescue process concluded on April 30, 2021, subsequent to the filing of the Notice of substantial implementation of the Business Rescue Plan by SAA Business Rescue Practitioners. Meanwhile, the business rescue process for Mango is ongoing and being managed by the Mango Business Rescue Practitioners. Its finalization hinges upon the substantial implementation of the Business Rescue Plan and the filing of the Notice of substantial implementation with the CIPC by the Business Rescue Practitioner. We are awaiting further legal advice on how we conclude the Mango matter.
- The divestiture process involving Takatso Aviation (Pty) Ltd's minority shareholders was overseen by Takatso itself, rather than the Department of Public Enterprises. However, following the recent termination of the SEP transaction by the Parties, there is no longer a requirement to fulfil this condition.
04 April 2024 - NW699
Alexander, Ms W to ask the Minister of Agriculture, Land Reform and Rural Development
Whether she will furnish Mrs W R Alexander with a (a) list and (b) full description of all events planned by her department to take place before 29 May 2024 in celebration of the 30 years of democracy in the Republic, including the (i) projected total cost or expenditure of each event and (ii) breakdown thereof in terms of expenditure for (aa) catering, (bb) entertainment, (cc) venue hire, (dd) transport and (ee) accommodation; if not, why not; if so, what are the relevant details?
Reply:
(a), (b) No.
(i), (ii), (iii),(aa),(bb),(cc),(dd),(ee) Falls away.
The Department of Agriculture, Land Reform and Rural Development is not aware of any events planned to celebrate 30years of democracy before the 29th of May 2024.
04 April 2024 - NW715
Ngcobo, Mr S to ask the Minister of Public Enterprises
Whether he will furnish Mr S Ngcobo with a (a) list and (b) full description of all events planned by his department to take place before 29 May 2024 in celebration of the 30 years of democracy in the Republic, including the (i) projected total cost or expenditure of each event and (ii) breakdown thereof in terms of expenditure for (aa) catering, (bb) entertainment, (cc) venue hire, (dd) transport and (ee) accommodation; if not, why not; if so, what are the relevant details?
Reply:
There are no events that are planned to take place in celebration of 30 Years of Democracy by the Department of Public Enterprises. Therefore, no budget was set aside for catering, entertainment, venue hire, transport, accommodation in celebration of such important milestone in the history of South Africans.