Question NW986 to the Minister of Transport

Share this page:

25 April 2016 - NW986

Profile picture: Hunsinger, Mr CH

Hunsinger, Mr CH to ask the Minister of Transport

(a) How much of the Moloto road corridor has been transferred to the SA National Roads Agency in kilometres, (b) which sections have been transferred, (c) when was the transfer made and (d) what is the (i) total length and (ii) locality of the Moloto road corridor?

Reply:

(a) Approximately 92.4 kilometres has been transferred to SANRAL

(b) Section 2 in Mpumalanga Province (54.9 km) and Section 3 in Limpopo Province (37.5 km)

(c) Section 2 and 3 was transferred on 29th July 2015.

(d) (i) Total Length = 139.1 km

(ii) The R573 starts at Sefako Makgatho Drive (Pretoria North) and proceeds in north easterly direction through Gauteng Province, then passing through Moloto, Kwamhlanga, Tweefontein, Kwaggafontein in Mpumalanga Province and continuing up to Marble Hall in Limpopo Province.

Source file