Question NW2614 to the Minister of Transport
25 September 2018 - NW2614
De Freitas, Mr MS to ask the Minister of Transport
With reference to his reply to question 457 on 8 March 2018, what (a) summary reports can be supplied by each province and (b) are the details of each report?
Reply:
a) Summary reports for each region indicating the number of maintenance events per region per sub-area of the asset for electrical, Perway (track) and Signal infrastructure.
b) Detail of the report: (planned = preventative maintenance jobs scheduled)
Perway / Track:
Electrical:
SIGNALS:
In Gauteng addressing faults occurring in the signal system has priority over planned maintenance.