Questions & Replies: Question & Replies No. 2101 to 2125

Share this page:
2009-11-26

Search this file by selecting Ctrl + F on your keyboard

[PMG note: Replies are inserted as soon as they are provided by the Minister]

QUESTION NO 2187

(Internal Question Paper No 27 - 2009)

The Leader of the Opposition (DA) to ask the Minister for Cooperative Governance and Traditional Affairs:

Whether, with reference to his statement of a single election (details furnished), national, provincial and local elections will be merged so that all three elections occur on one day; if not, what is the position in this regard; if so, (a) why and (b) what are the relevant processes and timeframes with regard to this plan? NW2895E

Answer

The idea for a single election across all spheres of government remains a proposal still under exploration and engagement will be held at appropriate time after the 2011 local government election. A single election for national, provincial and local government is envisaged to provide a single manifesto, one financial year, integrated public service, common five year medium term planning, aligned human resource and budgeting frameworks across all spheres of government.

QUESTION NO 2148

(Internal Question Paper No 29 - 2009)

Mr S J Masango (DA) to ask the Minister for Cooperative Governance and Traditional Affairs:

(1) Whether the re-calling of councillors of Lekwa Municipality will improve service delivery in that area; if not, what is the position in this regard; if so, what is the effective resignation date for each councillor;

(2) whether there are (a) pending and (b) intended disciplinary actions against any of these councillors; if not, what is the position in this regard; if so, (i) what will happen to these disciplinary actions and (ii) what are the further relevant details;

(3) whether the funds missing from the council will be recovered; if not, why not; if so, what are the relevant details? NW2836E

Answer

(1) The re-calling of councilors is not a Departmental matter but a party matter.

(2) The Administrator is investigating allegations of fraud and corruption with regard to the missing funds depending on the outcome of the investigation. The Administrator will make recommendations and due process of the law will be applied, even if it means perpetrators should go to jail.

(3) Upon completion of investigation by the Administrator, Council could institute recovery claims should anyone be found responsible for the missing funds.


QUESTION NO 2129

DATE REPLY SUBMITTED: MONDAY, 7 DECEMBER 2009

DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: FRIDAY, 6 NOVEMBER 2009 (INTERNAL QUESTION PAPER: NO 27 – 2009)

Mr S B Farrow (DA) asked the Minister of Transport:

Whether the Ports Regulator has submitted a strategic plan to his department; if not, why not; if so, what are the relevant details?

NW2804E

REPLY:

The Minister of Transport:

Yes, the Ports Regulator of South Africa has submitted the Regulator's 2009/10 Strategic Plan and the Performance Agreement to the Department of Transport (DoT) on 04 August 2009.

This document is available on the Port Regulator's website (www.portsregulator.org) or from its office on the 11th Floor, The Marine, Gardiner Street, Durban.

NATIONAL ASSEMBLY

(For written reply)

QUESTION NO. 2126

INTERNAL QUESTION PAPER NO. 27 of 2009

DATE OF PUBLICATION: 06 November 2009

Mr M J Ellis (DA) to ask the Minister of Water and Environmental Affairs:

Why did the Marine and Coastal Management determine the recreational scuba diving permit prices on a 50% willingness to pay basis, (b) what effect does this permit price have on the socio-economic situation of communities and businesses (i) directly and (ii) indirectly by the imposition of a Marine Protected Area where recreational scuba diving permits are required and (c) how does this permit price achieve the objective of promoting eco-tourism activities?

2126. THE MINISTER OF WATER AND ENVIRONMENTAL AFFAIRS ANSWERS:

The independent study undertaken regarding scuba fees used this established methodology. Its recommendations were considered when the Minister of Finance approved the level of fees for individual scuba divers in 4 Marine Protected Areas (MPAs) in 2006. In addition, when the scuba fees were published for comment regarding the Stilbaai, St Lucia and Maputaland MPAs, and the proposed Border MPA, only one comment and one query relating to the fees was received. This comment suggested that the permit fees should be zero instead of R75 annually or R45 monthly.

(b)(i) In relation to the cost of scuba diving the direct cost of an annual permit at R75 (current cost) is approximately 20-30% of the cost of a single dive with an operator; i.e. very low. The monthly fee of R45 for tourists and other ad hoc divers is even lower.

(b)(ii) The "imposition" of an MPA is of great value to scuba divers, rather than being an imposition to them. For example, the Crown Area of the Aliwal Shoal MPA and the Castle Rock Restricted Zone in the Table Mountain National Park Marine Protected Area, where fishing is prohibited, are very popular dive areas. These sites and others allow divers to enjoy a much-enhanced experience (as would be the case in a terrestrial Protected Area where fees are routinely imposed for entrance into and use of facilities in such areas).

(c) The management of 20 marine protected areas costs the Marine Living Resources Fund and the Department over R20 million annually in direct costs. The cost is partially recovered from the main user groups, one of which is eco-tourism operators and eco-tourists, including scuba divers. The value of tourism in MPAs in relation to the eco-tourism opportunities (quite apart from their benefit to biodiversity and fisheries) is much greater than the annual management cost.

NATIONAL ASSEMBLY

(For written reply)

QUESTION NO. 2125

INTERNAL QUESTION PAPER NO. 27 of 2009

DATE OF PUBLICATION: 06 November 2009

Mr. M J Ellis (DA) to ask the Minister of Water and
Environmental Affairs:

(1) (a) What were the obligations for fishers who received interim relief permits in the 2008-09 financial year to report on catches, (b) what was the (i) total number of interim relief permits that were granted to fishers in the abovementioned period and (ii) number of fishers who reported on their catches, (c) how many fishers with the interim relief permits for the abovementioned period exceeded their allowable catches, (d) by how much did they exceed the catch in each case and (e) what action was taken against these fishers;

(2) whether any measures are in place to allow such fishers to easily record their catches; if not, why not; if so, what measures? NW2797E

2125. THE MINISTER OF WATER AND ENVIRONMENTAL AFFAIRS ANSWERS:

(1)(a) It was expected of Interim Relief Permit Holders to complete catch data forms for every day they engaged in harvesting and provide the forms to the Catch Data Monitors or the local Fishery Control Officers, as per Permit Conditions.

(1)(b)(i) 952.

(1)(b)(ii) 890.

(1)(c) 240.

(1)(d) See attachment. Click here

(1)(e) The Department's Section 28 committee will make a decision on the appropriate action.

(2) Yes. The Department has appointed Catch Data Monitors to assist Interim Relief Permit Holders with recording their catches each time they land their catches.


NATIONAL COUNCIL OF PROVINCES

WRITTEN REPLY

QUESTION NO 2123

(Internal Question Paper No 29 - 2009)

Mr W P Doman (DA) to ask the Minister for Cooperative Governance and Traditional Affairs:

(1) Whether it is the policy of his department that local iabour forums be established for every local municipality; if not, for which geographical or functional area; if so, what are the relevant details;

(2) (a) who should be part of a local labour forum and (b) what is the main purpose of a local labour forum? NW2794E

Answer

1. Local Labour Forums (LLFs) are a product of negotiation between Trade Unions recognized in Local Government and the Employer as represented by SALGA.

The said negotiations resulted in a collective agreement between parties in the bargaining council that Local Labour Forum be established in municipalities i.e. the South African Local Government Bargaining Council (SALGBC).

2. (a) Section 2.8.1 of the Constitution SALGBC Part C; Procedural Matters clearly states that -

  • "A Loeal Labour Forum shall be established for every employer /municipality a with equal representation from the trade unions and the employer",
  • The trade unions' representation shall be divided in proportion to their membership in that employer
  • "Employer representatives shall consist of Councillors and of Management (as set out in clause 2.4.2.1 of the Main Collective Agreement) provided that Councilors make up no less than one third of the delegation".
  • "Up to 2 (two) trade union officials or office bearers may attend such meetings with prior notice to the employer and up to 2 (two) SALGA representatives may attend with prior notice to the trade unions";
  • "In metropolitan areas the metropolitan division of the Council shall not serve as the Local Labour Forum and shall establish Local Labour Forums at a departmental or other suitable level as may be decided by that division of the Council"
  • ''The representatives on each side in each employer shall be constituted locally on the following basis by combining the membership of the trade unions";
  • 2(b) Section 2.8.2 of the SALGBC Main Collective Agreement Part C assigns the following powers and functions to the LLF:

    "The Local Labour Forum shall have the powers and functions of negotiating and! or consulting:

    • On matters of mutual concern pertaining to the employer and which do not form the subject matter of negotiations at the Council or its Divisions;
    • On such matters as may from time to time be referred to such forum by the Councilor its Divisions;
    • Provided that it may not negotiate on any matter which has been reserved for exclusive bargaining in the Council or the Divisions;
    • Concluding of Minimum Service agreements.

    NATIONAL ASSEMBLY

    ORAL REPLY

    QUESTION NO. 2122

    QUESTION

    Dr LL Bosman (DA), to ask the Minister of Human Settlements:

    (1) Whether his department has a record of the (a) number and (b) details of the beneficiaries that have benefited from the Farm Worker and Occupier Housing Assistance programme; if not, why not; if so, what are the relevant details? NW2790E

    REPLY:

    1 (a) Yes, 1 119 beneficiaries have benefited from Farm Worker related housing assistance.

    (b) The details of the beneficiaries are available and can be obtained from Mr. Johan Minnie on the telephone number 012 421 1778 within our Department.



    NATIONAL ASSEMBLY

    FOR WRITTEN REPLY

    QUESTION NO 2121

    DATE REPLY SUBMITTED: MONDAY, 7 DECEMBER 2009

    DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: FRIDAY, 6 NOVEMBER 2009 (INTERNAL QUESTION PAPER: NO 27 – 2009)

    Mr D M Gumede (ANC) MP asked the Minister of Transport:

    What progress has been made with regard to the provision of infrastructure, particularly roads and public transport, around the 2010 Fifa World Cup Soccer tournament host cities?

    NW2788E


    REPLY:

    The Minister of Transport:

    The progress, provided per host city, is as follows:-

    BOMBELA MUNICIPALITY

    Mataffin Stadium Precinct

    The construction of the Mataffin Precinct Road Access System and the Mataffin Public Transport Rank and Stadium Precinct Boulevard.

  • The progress on the project is 60% complete.
  • The construction started on 01 August 2008 and the expected completion date is 15 March 2010.
  • R40 Lanes

    The construction of HOV lanes in each direction on the R40 between Sarel Cilliers Road and the P166 link via Lydenburg Road, with associated improvements to intersections, and related signage.

    • The progress on the project is 23 % complete.
    • The expected completion date is 23 March 2010.

    KMIA Access and Public Transport Facilities

    Construction of a traffic circle at the intersection, with the provincial main road to improve safety and access and temporary public transport facilities at the terminal building for operations during the 2010 Soccer World Cup events.

    • Still waiting for the procurement processes to be finalised.
    • The project was planned to start on 31 October 2009 and to be completed on 31 March 2010.

    Fan Park and Satellite Parking

    Planning, design and implementation of infrastructure required to support public transport at the Fan Park and remote satellite public parking area.

    • The project will start on 01 December 2009 and be completed on 31 March 2010.

    POLOKWANE

    Completed Projects

  • Upgrading of facilies at the Bus Terminus
  • Taxi Holding Area - Phase 1, 2 and 3
  • Marshall Street Widening - Phase 1 and 2
  • Webster Street Widening - Phase 1 and 2
  • Suid Street Widening - Compensatie to Webster
  • Dorp/Landros Mare Intersection Upgrade
  • Magasyn Street Extension
  • Dorp/Landros Mare Intersection upgrade
  • Nelson Mandela - N1 traffic circle
  • Westenburg/Rissik/Nelson Mandela Intersection
  • Suid Street Extension - Kerk to Marshall
  • Landross Mare/Biccard Street Link
  • Nelson Mandela Drive - Seshego Circle - New Era
  • Houtbosdorp Road Upgrading - R71 To Mankweng Stadium
  • Nelson Mandela Link - Marshall to Kerk
  • Church Street Extension
  • Biccard Street Widening - Jorrisen to Hospital
  • Biccard Street Widening - Hospital to Landros Mare (N1)
  • Public Transport Facilities Architecture Theme
  • Intelligent Transport Systems - Initial Studies
  • Current Projects

    Taxi holding area (Phase 4)

    Upgrading of Taxi Holding Area adjacent to the completed Phase 1, 2 and 3. The areas are linked by a culvert that is constructed as part of Phase 4.

    • Construction started on 09 March 2009.
    • The progress is now 85 % complete.

    CCTV Network

    Implementing of a CCTV Network in the CBD.

    • The project started on 30 March 2009 and is expected to be completed on 20 April 2010.

    Control room upgrade

    • The starting date was 02 September 2009 and planned end date 30 April 2010.

    Upgrading of Traffic Signal Hardware

    • The project started on 17 February 2009.
    • The progress is now at 5%.

    Traffic Signals

    • The actual starting date was 16 February 2009.
    • The progress to date is 70%.

    Transport Hub

    Creation of a transport hub.

    • The project started on 01 April 2009.
    • The planned end date is 31December 2009.

    Temporary signage

    Design of temporary signage for 2010.

    • Work started on 01 July 2009 and the planned end date is 31 December 2009.
    • No progress percentage has been provided.

    Existing Signage

    Improve existing signage in Polokwane.

    • The project started on 01 June 2009.
    • The planned end date is 31 December 2009.

    Seshego Park and Ride

    • The project started on 01 April 2009 and the expected completion date is 31 December 2009.

    Fan Park

    • The planned end date is 31 December 2009.

    Bus Deport

    • The planned end date is 31 December 2009.

    Non-motorised Transport Project

    • Due to the re-allocation of the Fan Park, a new plan is to be developed to accommodate the current allocation (next to the stadium).

    NELSON MANDELA BAY

    Completed Projects

  • Seyisi Street
  • Diaz Road
  • Pearl Road
  • Matomela Street
  • Avenue A
  • Forrest Hill Airport Access
  • Projects under construction

    Road works

    New Bolt Street from Stanford to Commercial Road

  • The project commenced on 01 October 2008.
  • The planned completion date is 30 November 2009.
  • Allister Miller

    • The project commenced on 01 December 2008.
    • The progress on the project is now 75% complete.

    Bus Rapid Transit Lane

    Govan Mbeki

    Construction of Bus Rapid Transit lanes along the Govan Mbeki Avenue. Rehabilitation of base course and kerbing.

    • Construction started on 01 October 2008 and the planned end date is 31 January 2010.
    • The progress on the project is now at 70%.

    Kempston Road (Haupt to Diaz)

    • Construction started on 01 January 2009.
    • The planned end date is 30 May 2010.

    Fettes and Theale

    Construction of BRT lanes along Fettes and Theale (base course layer).

    • Construction started on 01 August 2008 and the planned end date is 30 February 2010.
    • The progress on the project is now at 55%.

    Harrower Road

    • Construction started in August 2009.

    Kempston Road (Haupt to N2)

    • The project is 85% complete.

    Modal Interchange (CBD)

    • Construction commenced on 30 September 2009 and the planned end date is 30 April 2010.
    • Project progress is at 10%.

    Minor works

    • Minor construction projects around the stadium are ongoing.

    MANGAUNG

    Completed Projects

  • Elizabeth Street Pedestrianisation was completed in August 2007.
  • Pedestrianisation of Selbourne Avenue was completed in September 2008.
  • Mangaung Activity Corridor extension, Dr Belcher Road and Chief Moroka Crescent, were completed in August 2008 and August 2009,respectively.
  • Current Projects

    Widening and Improvement of Parfitt Avenue and Nelson Mandela Intersection

    Construction is still in progress and the Contractor surfaced the other sections, but is still busy with massive earthworks on the eastern side. The contractor has indicated that he has requested an extension of time of about eight weeks. The extension of time has not yet been officially granted. This project has started in March 2009 and is expected to be finished by no later than April 2010. The project is 35% complete.

    Widening of Nelson Mandela Avenue (Phase 1)

    Construction is still well underway and other sections of the road are now complete and open for public use. The Contractor has also indicated that they are ahead of the schedule. The contract is moving smoothly and will be completed on time if everything remains the same. This project has started in February 2009 and is expected to be completed at the end of March 2010. The project is 58% complete.

    Bloemfontein Inter-Modal Facility

    Construction is in progress and 80% of pilling has been completed. Most of the concrete columns have been constructed. Relocation of sewer pipes is now completed. The contractor reported a delay of approximately 48 working days caused by the underground services that were not expected and are on the line of construction and the concrete rubble that is buried under the taxi rank. The contractor furthermore indicated that they are now working extra hours to try to make up for lost time. The project started in May 2009 and is expected to be completed after the 2010 FIFA Soccer World Cup event in August 2010. The percentage completed is 4%.

    ITS (Feasibility Study)

    This is an ongoing project and is conducted in collaboration with the Transport Operational Plan. It is expected to be completed in July 2010. The project is 19% complete.

    Hoffman Square (pedestrianisation of streets around Hoffman Square)

    The project has been on hold for some time due to the unofficial scope of work and also the disagreements between the parties involved. It was agreed that the project would kick-start very soon and the Council was given until September 2009 to have a contractor on site.

    Bloemspruit Pedestrian Route: Markgraaff Pedestrian Bridge

    Construction is still on course. The contractor has started with the bridge walls and is progressing well. The anticipated completion date is 02 January 2010 and the project is 23% complete.

    Airport Link Feasibility Study

    A detailed design of the interchange has been completed. The project has been delayed due to the withdrawal of the Airports Company South Africa Limited (ACSA) on its financial contribution. The construction has since started as planned on 15 June 2009 and is progressing well. The South African National Roads Agency Limited (SANRAL) is funding the construction of the interchange. This project is about 19% complete and is expected to be finished in July 2010.

    ETHEKWINI

    Completed Projects

  • The Warwick Junction upgrade planning was completed at the end of July 2007.
  • Integration planning for the inner-city was completed at the end of July 2007.
  • The Western Freeway Rehabilitation project was completed and is fully operational.
  • Reunion Station and Pedestrian.
  • Current Projects

    Public Transport Call Centre

    This project consists of two phases. Phase 1 includes investigating the specification of the system and environment, and producing a requirement specification document which will be used as the blue print for the development of the software and environment in Phase 2. The design and specification for this project is complete.

    Phase 2 covers three areas of focus, i.e. enquiries, complaints and infrastructure and touch screens and kiosks. It is to be completed in November 2009. The project is 95% complete. The only challenge, given the current Durban transport issues, will be the exact date to go live on the project.

    City Bowl District (CBD) Public Transport Distribution System

    This ICDS is an essential element of the public transport system providing access to the stadium precinct and the fan fest. The project has started in October 2008 and is expected for completion at the end of December 2009. The project is 38% complete.

    Ethekwini Transport Services IRPTN

    • Phase 1 - Development of prioritisation treatments for Public Transport, along trunk sections of corridors in restructured PT system.
    • Phase 2 - Restructuring of current Public Transport services into feeder and trunk services, in a network of Public Transport corridors across the eThekwini Municipal area.
    • Phase 3 - Detailed planning and design of the first phase corridors, including infrastructure and service contracts, as well as the operating entities. The end date will only be known once the Phase 3 contract has been awarded. Phase 3, which would include the planning of IRPTN and Public Transport operations plans, is due to go on tender soon.

    Intelligent Transport System - Phase 1 and 2

    • Phase 1: Provides full incident detection and monitoring (CCTV) facilities along the M4 from Umhlanga to the airport, as well as strategically placed Variable Message Signs (VMS) to advise motorists. Phase 1 is 98% complete and should have been fully completed by the end of October 2009.
    • Phase 2: To complete coverage of all freeways and arterials (Masabalala Yengwa Avenue (NRM), with its access to Kings Park), as well as an incident detection and communication desk at the Traffic Control Centre. Phase 2 is 30% complete and should be fully completed by the end of June 2010.

    Kings Park Precinct:

    Project A: Realigned Walter Gilbert

    • Realigned Walter Gilbert – The stadium access route is expected to be completed by the end of November 2009 and is currently 68% complete.

    Project B: Pedestrian Routes, Bus Rotunda, Parking and Stadium Entrance

    • The project has started in March 2009 and is due for completion in November 2009. The project is 68% complete.

    Project C: Pedestrianisation/Peoples Park

    • The project has started in May 2009 and is due for completion at the end March 2010. The project is 38% complete.

    Project D: Intersection Upgrade and Footpaths

    • The project has started in April 2009 and is due for completion at the end March 2010. The project is 68% complete.

    Project E: Pedestrian Linkages (stadium to Beach)

    • The project has started in April 2009 and is due for completion at the end of March 2010. The project is 60% complete.

    M4 (Nkosi Albert Luthuli) Public Transport Lane Implementation

    • The project entails the construction of the additional lane, for the exclusive use by public transport, on the M4 southern freeway. The project is progressing well and completion is expected in May 2010. The project is 55% complete.

    Warwick Junction:

    Warwick Junction Implementation Phase 1 - Inbound Overpass

    • This project is 68% complete and is due for completion on 23 November 2009.

    Warwick Junction Implementation Phase 1 - Modal Interchange

    • Relocation negotiations with traders are delaying site occupation. The estimated site occupation was end of August but the issues are still not resolved.

    Warwick Junction Implementation Phase 2 - Project A: Outbound Overpass

    • This project is 45% complete and is due for completion on 28 May 2010.

    Warwick Junction Implementation Phase 2 - Project B: Northern Interchange for Northern Public Transport

    • This includes the Northern Interchange for Northern Public Transport integrated with pedestrian circulation systems. This project is planned for completion on 28 February 2010.

    RUSTENBURG

    2010 Infrastructure Projects

    Completed Projects

  • The Phokeng Link Road was completed in April 2009.
  • Ring Road in Phokeng Stadium Precinct was completed in May 2009.
  • Construction of P16/2: Road and Interchange (Provincial Road) was completed in July 2009.
  • Current Projects

    Park and Ride Facilities

    • The project entails providing park and ride facilities for the World Cup 2010 spectators. The upgrading of temporary park and ride facilities that were used during the Confederations Cup should start without further delays so that they are ready in time for the 2010 World Cup. The planned end date for this is in November 2009 and the project is about 50% completed.

    Construction of R565, Phokeng to CBD (Western Bypass: Provincial Road)

    • The project entails the implementation of a new alignment from N4 outside Rustenburg CBD to Road R565 bypassing the western side of Phokeng. Storm water structures are ongoing and the project is due for completion by 20 January 2010. It is three months behind schedule due to the challenge in gaining access to portions of the site beyond 6km and delays in obtaining other critical information. The project is at 53% complete.

    Construction of D108, Eastern Bypass

    • The preliminary design report has been completed. The process of tendering for construction will follow soon. The project is due for completion in 2011.

    TSHWANE

    CBD and Surroundings - Feasibility Study (Inner City and surroundings)

  • The project entails the feasibility study for the Inner City public transport distribution systems as well as HOV Lanes and corridors to the North and Hatfield. The project was allocated an amount of R7,100,000.00 and was planned for completion by 01 November 2008. The project is therefore 100% complete.
  • CBD Surroundings - Public Transport Assessment

    • Public Transport Assessments were allocated an amount of R328,471.00, with a completion date of 17 January 2006. This project was completed on time.

    Training Venues - Upgrading of Buitekant Street in the vicinity of Giant Stadium

    • The project entails the upgrading of the intersection as well as widening the road to provide more public transport movements. It was expected to be completed on 30 May 2010 and an amount of R15,000,000.00 was allocated for it. The project was, however, completed before the planned date.

    Waterkloof Air Force Base Access Road

    • The project entails the rehabilitation of the Waterkloof access road, which forms the main access to the airport. An amount of R19,000,000.00 was allocated for this project with a planned completion date of 30 May 2010. The project is however 100% complete.

    Wonderboom Airport Access Road

    • The project entails the rehabilitation of the Lindveldt access road, which forms the main access to the Wonderboom Airport. It was planned to be completed by 30 May 2010 with an allocated budget of R16,000,000.00. The project was, however, completed before the planned date.

    Bus Rapid Transit Implementation

    • The project entails the construction of Bus Rapid Transit Lanes in and around the City of Tshwane CBD and the linking of townships. The project has been divided into two sections (i.e. Line 1 and Line 2). A budget of R4,260,460,000.00 has been allocated and it is planned to be completed by 01 April 2012. The project is 11% complete.

    Loftus and Hatfield - Hatfield One Way

    • The project entails the rehabilitation of some streets in Hatfield and converting them to one way streets to accommodate the increase in traffic volumes. An amount of R15, 000,000.00 was allocated for this project, with a completion date of 30 August 2009. The project is presently 85% complete.

    Loftus and Hatfield - Pretorius Street Upgrading

    • This entails the upgrading of Pretorius Street to create easy access to Loftus Stadium. An allocation of R22,000,000.00 was made available for this project with a planned completion date of 30 August2009. The project is presently 71% complete.

    Loftus and Hatfield - Upgrading Of Duncan Street

    • This entails the rehabilitation and widening of Duncan Street to accommodate easy access to Loftus Stadium. This project was allocated an amount of R20,000,000.00 with a planned completion date of 30 August 2009. It is presently at 98% in terms of completion.

    Loftus and Hatfield - Upgrading Of Schoeman Street

    • This entails the upgrading of Schoeman Street to accommodate HOV lanes. The amount allocated for this project is R20,000,000.00 and the planned completion date was 30 August 2009. The project is 55% complete.

    Loftus and Hatfield - Widening Of Charles Street

    • The project entails the rehabilitation and widening of Charles Street to accommodate high occupancy vehicles (HOV). A budget of R87,000,000.00 was allocated for this project with a planned completion date of 30 May 2010. The project is progressing well with 70% completed.

    Public Transport North - Pretoria North Modal Interchange

    • The project entails the installation of Public Transport Facilities. An amount of R7, 400,000.00 was allocated towards this project. It is progressing well with a planned completion date of 01 August 2010. The percentage completed is 76%.

    Public Transport Support - Call Centre (Information and Control Centre)

    • This entails the implementation of a public transport call centre to accommodate the Gauteng Province. This project has not yet started, but has a planned completion date of 01 June 2011 and an allocation amount of R15,000,000.00

    Public Transport Support - Integrated Electronic Ticketing System

    • This entails the implementation of the public transport electronic ticketing system for the BRT. It is planned to be completed on 01 June 2011 with an allocation of R10, 000,000.00. No work has started on this project.

    Public Transport Support – ITS

    • This entails the implementation of public transport electronic signage as well as the operational room. This project was allocated an amount of R25,000,000.00 and is planned to be finished on 01 June 2011. It is currently at 19%.

    Rissik Station Pedestrian Bridge

    • The project entails the upgrade of Rissik Station. It was allocated an amount of R10, 000,000.00, but has not yet started.

    Training Venues - Private and Public Parking at Atteridgeville Stadium

    • The project entails the provision of parking for public and private (VIP) transport at the Atteridgeville Stadium. It is planned to be completed on 30 April 2010. Not much work has started in this area with only 2% completed work. The project was allocated an amount of R10,000,000.00.

    Training Venues - Private and Public Parking at H M Pitje Stadium

    • The project entails the provision of parking for public and private (VIP) transport around the H M Pitje Stadium. It is planned to be completed on 30 April 2010 with a budget of R10,000,000.00. About 10% of the work relating to this project has been done.

    JOHANNESBURG

    Bezuidenhout Park

  • This project entails the construction of additional parking in and around the park. It was planned to be completed on 21 October 2008, but was completed before this date. An amount of R1,263,977.00 was spent towards this project.
  • BRT Section 2: Modderspruit Culvert to Main Reef Road

    • This entails preliminary and detailed design as well as the implementation of the Rea Vaya (BRT) on Section 2 (Modderspruit Culvert to Main Reef Road). The project was planned for completion on 31 May 2010 and was allocated R2,722,154.69. It is, however, 100% complete.

    BRT Section 4: Empire/Jan Smuts to Empire/Victoria in Parktown

    • This entails the BRT implementation on the section of the road along Empire Road, between Jan Smuts Avenue and Victoria Road. The section is 0.94 kilometre in length and forms part of Phase 1b. It was planned to be completed on 31 May 2010, but is now 100% complete. An amount of R4,191,000.00 was allocated for this project.

    BRT Section 13: Ellis Park to Bruma

    • The section is approximately 5.2 kilometre in length and stretches from Bezuidenhout, Kitchner from Ellis Park towards Bruma Lake/Eastgate. It was planned for completion on 31 May 2010 and was allocated R350,000.00. The project is, however, 100% complete.

    BRT Section 14: Baralink to Soweto Highway

    • The section extends from Baralink to Soweto Highway. It was allocated an amount of R649,040.00 and was planned for completion on 31 May 2010, but is now 100% complete.

    Park and Ride Upgrade

    • This project, which involves the upgrade of Park and Ride facilities, was planned for completion on 21 October 2008, with an allocated budget of R1,263,977.00. It was completed on time.

    Training Venues - Pedestrian Facilities

    • This project entails the construction of pedestrian walkways at three 2010 World Cup Training Venues (Orlando, Rand and Dobsonville Stadia) as well as the upgrade of the Bezuidenhout Valley Park and Ride Facility. An amount of R10,094,365.00 was allocated and it is now 100% complete.

    BRT Depots

    • The project entails the design and construction of depot facilities required for the BRT. Completion for this project is planned for 12 November 2010 and R20,000,000.00 was allocated towards it. It is currently 21% complete.

    BRT ITS - Rea Vaya (Bus Rapid Transit)

    • This includes the detailed design and implementation of the Rea Vaya (Bus Rapid Transit - BRT) ITS Project. There is also the construction of the BRT ITS Backup Control Room. It is planned to be completed on 01 June 2010 with an allocated budget of R332,000,000.00. The project is 18% complete.

    BRT Section 01: Regina Mundi to Modderspruit Culvert

    • This includes the detailed design and implementation of the Rea Vaya (Bus Rapid Transit) on section 1A and C. The project was planned to be completed on 04 June 2009, but is now 99% completed. An amount of R166,578,089.00 was allocated to this project.

    BRT Section 03: Main Reef Road Commando to Portland Perth

    • The section is approximately 3.9 kilometre in length and extends from the intersection of Main Reef Road to the intersection of Portland Road/Perth Road. The section will generally consist of one BRT lane and one mixed traffic lane in both directions. The project is planned for completion on 31 May 2010. An allocation amount of R17,578,733.00 was made towards this project, which is now 35% completed.

    BRT Section 05: Portlands/Perth to Empire/Jan Smuts

    • The section is approximately 5.2 kilometre in length and extends from Portlands Road/Perth Road to Empire/Jan Smuts Intersection. The section will generally consists of a BRT lane and two mixed traffic lanes in both directions, except between Mentone Road and Anet Road, where there will only be one mixed traffic lane northbound and two mixed traffic lanes southbound. It is also planned for completion on 31 October 2010 and was allocated an amount of R63,612,490.00. It is now 40% complete.

    BRT Section 06: Empire/Victoria to West Street, Sandton

    • Implementation of the section along Oxford/Rivonia Road from Victoria Avenue in Parktown to West Street in Sandton falls under Phase 1B of the BRT. It is planned to be completed on 30 April 2010. An amount of R7,239,000.00 was allocated towards this project, which is now 18% completed.

    BRT Section 07: Sandton to Sunninghill

    • Implementation on the section of the road along Rivonia Road from West Street in Sandton to Suninghill forms part of the Phase 1C of the BRT for completion in April 2010. An amount of R6,858,000.00 was allocated for this project.

    BRT Section 08: Alexandra to Sandton

    • The section is approximately 16.3 kilometre in length and extends from the intersection of Goba and Uhuru. It is planned to be completed on 31 May 2010 and was allocated R762,000.00. The project has not yet started.

    BRT Section 09: Randburg to Sandton

    • This entails the implementation of the BRT section from Randburg to form part of Phase 1C of the BRT for completion on 31 May 2011. An amount of R500,000.00 was allocated for this project, which has not yet started.

    BRT Section 11: Jabulani to Orlando

    • This section is on Phase 1C and commences from the intersection of Klipspruit Valley and Khumalo Road through the Jabulani Mall. It is planned to be completed on 31 May 2011 and has an allocation of R741,216.86. The project has not yet started.

    BRT Section 12: Koma Road to Lenasia

    • This section is on Phase 1C and is approximately 25.4 kilometre in length. It commences at the intersection of Koma Road and Old Potchefstroom Road and ends at the Lenasia Taxi Facility. It is planned for completion on 31 December 2012 and was allocated an amount of R2,500,000.00. It is presently 45% complete.

    Dobsonville and Orlando Stadia Lighting Contract

    • This project entails the construction of lighting facilities in and around the Dobsonville and Orlando Stadia. It was planned for completion on 24 November 2008 and was completed on time. A budget of R6,285,250.00 was allocated for this project.

    Ellis Park Precinct

    • The scope includes for road widening to accommodate an additional two dedicated lanes for BRT on Saratoga and Betrams and the construction of BRT layer works and asphalt overlay on the existing lanes for each of the sections. The planned completion date was 31 May 2009, but only 98% has been completed. An amount of R115, 089,715.00 was allocated for this project.

    Inner City Distribution Systems - ICDS BRT

    • The objective of the project is to improve accessibility and connectivity in the inner City. This will create a combination of BRT and Inner City totaling 16 kilometre. The planned completion date is 30 May 2010 and the allocated budget is R240,035,572.00. The project is now 94% complete.

    International Transit and Shopping Centre (ITSC) (BRT Link)

    • This entails the establishment of a BRT link between Harrison and Simonds Streets. R6, 000,000.00 has been allocated towards this project, which is planned to be completed by 30 November 2010. The project is presently 28% complete.

    Nasrec BRT Link Phase 1

    • This section of the Pat Mbatha Motorway is approximately 4.7 kilometre, extending from the N1 highway bridge to the west of the M1 western by-pass highway bridge. The main scope of work has been completed with the road formally opened on 16 May 2008, except for the road widening to accommodate Nasrec and Booysens Reserve BRT Station - currently 27% completed.

    Orlando Stadium

    • This section of road stretches from the Southgate railway station from the Inner City to the Ophir Booysens Road area, approximately 500 metre over the M1 Highway on the Pat Mbatha motorway (approximately 3.3 kilometre long), ultimately linking up with the east end of Phase 1. The project was completed on time and was allocated a budget of R3,165,610.00

    Park and Ride Pedestrian Facilities

    • This is the section from the Mooki/Main Streets Intersection in Soweto, extending eastwards into the CBD. It links up with Phase 1 at the N1 western by-pass bridge and is 4.0 kilometre long. It was planned for completion on 23 January 2009 with an allocated budget of R24,674,207.00. It is now 99% complete.

    Signage

    • This project entails the design of road signage. An amount of R587,815.00 was allocated for this project, which is now 95% completed.

    CAPE TOWN

    MTI Call Centre

  • The call centre is 100% completed and had a completion date of 15 December 2008. The project was allocated R6,500,000.00.
  • Bus Based Park and Ride Facilities

    • The facilities will enhance rail based transport for domestic and local tourists. The project had a planned completion date of 30 October 2009 and was allocated an amount of R11,000,000.00. It is now 43% completed.

    Bus Shuttle Embayments

    • These embayments will include, inter alia, bus and taxi turn around, road signs and markings, paving of pedestrian areas, landscaping and lighting. It is planned for completion on 16 December 2009 and was allocated an amount of R21,400,000.00. The project is currently 83% complete.

    Cape Town Bus Fleet

    • The project involves acquisition of special buses for use during the Soccer World in 2010. The buses will remain as part of the legacy projects for the City. Of Cape Town. This project has a planned implementation date of 14 December 2009 and was allocated R180,00,000.00. It is currently 60% complete.

    City Centre Pedestrian Improvements

    • The project involves improvement of pedestrian crossings at Cape Town Station across Adderley Street, where access to and from the station is poor. An allocation of R29, 800,000.00 was made towards this project, which is planned for completion on 28 April 2010. The project is 35% complete.

    City-Wide NMT Plan

    • The project entails a number of upgrades to the pedestrian and bicycle network in the CBD and the Somerset Road areas for the Soccer World Cup in 2010. These upgrades will enhance the pedestrian links between the CBD, De Waterkant, the V&A Waterfront and the training venues. The planned completion date was 30 August 2009 and an amount of R40,000,000.00 was allocated towards it. The project is currently 28% completed.

    Grade Separated Crossing of Western Boulevard

    • This entails the provision of a safe pedestrian crossing over the Boulevard that separates pedestrians from the vehicles. This project had a planned completion date of 10 October 2009 and was allocated an amount of R68,100,000.00. It is currently 71% completed.

    Grade Separated Pedestrian Facilities

    • This project entails the upgrading of Somolo transfer taxi tank, Lesedi taxi rank and Malula taxi rank. It is planned for completion on 12 February 2010. An amount of R35, 000,000.00 was allocated for this project, which iscurrently 53% completed.

    Green Point Stadium - Informal Parking

    • The parking is required in 2010 for the management of FIFA/media/emergency vehicles adjacent to the FIFA Hospitality Arena, and for the public on the western side of the precinct. The planned completion date is 16 December 2009 and a budget of R3, 900,000.00 was allocated. The project is currently 35% complete.

    Green Point Stadium - Pedestrian Improvements

    • This entails the provision of better pedestrian facilities around the stadium. The project currently stands at 59% and is planned to be completed on 30 November 2009. An amount of R55,000,000.00 was allocated for this project.

    Hospital Bend

    • This project entails the upgrading of the Hospital Bend (N2), which includes the extension of the third westbound public transport lane along the N2/Settlers Way route into the eastern access from the M3 via the N2 into the City by means of a PR-selection lane. It is planned for completion on 31 March 2010 and was allocated an amount of R380,400,000.00. The project stands at 84%.

    Inner City Transport System

    • The Inner City includes the CBD and offshore, the Port and V&A Waterfront and all the suburbs of the City Bowl. It also extends eastwards to include Green Point, Sea Point and Camps Bay and then eastwards to include the Culemborg area, Woodstock, Salt River, Observatory and Mowbray. The project is currently 85% complete and is planned to be fully completed on 30 April 2010. An amount of R500,000.00 was allocated for this project.

    Integrated Fare Management System

    • The project entails the setting up of an inter-operable, integrated fare management system as one of the key components of the public transport improvement programme for the Province. It is currently standing at 15% completeness with a planned completion date of 30 October 2009. R50, 000,000.00 was allocated for this project.

    ITS / Travel Demand Management

    • Provision of ITS and CCV facilities. The project currently stands at 98% and was planned to be completed on 30 August 2009. R6,000,000.00 was allocated for this project.

    ITS N2 Klipfontein Corridor

    • The City has embarked on intelligent Transport Management System (ITS) to bring about improvement in network operations on a City-wide basis. The planned completion date was 31 January 2009, but the project is currently 32% completed. It was allocated an amount of R78,000,000.00.

    Klipfontein Corridor – BRT

    • The envisaged project will offer alternative routes to the predominant mobility routes. The project is planned for completion on 02 February 2010 and was allocated an amount of R116,000,000.00. It is currently standing at 13%.

    Klipfontein Corridor – NMT

    • These include bus shelters, embayments, signage (branding) and road markings. The planned date for completion is on 24 December 2009 with an allocation of R154, 354,000.00. The project is presently 78% completed.

    Koeberg BRT Corridor

    • The project involves the planning, designing, construction and management of a Rapid Bus Transit System, plus cycle lanes on the R27 and Koeberg route to link Table View with the CBD. It is planned to be completed on 30 April 2010 and was allocated R836, 000,000.00. It is currently 39% complete.

    Long Distance Coach Terminals

    • The provision of long distance coach terminals is planned to be completed on 16 December 2009 and was allocated an amount of R85,000,000.00. The project is currently standing at 11%.

    N2 Airport City Link

    • The project entails the upgrading and extension of Provincial Trunk Road 2, section 1 (National Route N2), between Vanguard Drive and the R300 as well as the upgrade of the Airport Approach Road interchange on the N2. The project currently stands at 90% complete with a planned completion date of 31 March 2010. A budget of R100, 000,000.00 was allocated towards this project.

    NMT Bridge: Bhunga Avenue

    • The project involves the design and construction of an NMT bridge over Bhunga Avenue over the N2, as well as NMT links between Langa and the Klipfontein Corridor/Athlone Stadium. It is planned for completion on 15 October 2009 with a total allocation of R28, 000,000.00. The project is 74% complete.

    Public Transport Infrastructure Upgrade on Public Transport Corridors

    • The project is one of a number of Public Transport infrastructure priority projects identified in the draft Public Transport Plan. It is planned for completion on 31 March 2010 and was allocated an amount of R45,000,000.00. The project currently stands at 25% completion.

    Rail Based Park and Ride

    • This entails the upgrade of rail based facilities and was allocated an amount of R51, 200,000.00. It is planned for completion on 16 December 2009. The project currently stands at 27%.

    Road Signage Upgrade

    • This entails the provision of signage and a navigational system planned for completion on 28 May 2010 and was allocated a budget of R28, 000,000.00. The project is now 72% complete.

    Stadium Precinct Local Access Roads

    • This involves the upgrading of Fritz Sonnenberg Street from the Granger Bay Boulevard to access the stadium. This project is planned for completion on 15 December 2009 and was allocated and amount of R17,500,000.00. It is currently 62% complete.

    Stadium Precinct Pedestrian and Cycle Facilities

    • This entails the provision of pedestrian and cycle facilities as well as adequate lighting. The planned completion date for this project is 16 December 2009, but is currently 45% complete. A budget of R7,800,000.00 was allocated for this project.

    Symphony Way

    • The project involves upgrading of the existing road network around the Symphony area. The planned completion date was 20 November 2009, with an allocation of R30, 000,000.00. It is currently 47% complete.

    Transport Management Centre

    • This centre was planned for completion on 30 October 2009 and was allocated an amount of R223,376,000.00. It is 79% complete.

    QUESTION 2120

    FOR WRITTEN REPLY

    Date of publication on internal question paper: 6 November 2009

    Internal question paper no:

    Dr S M Pillay (ANC) to ask the Minister of Social Development:

    Whether she has been informed of the computer network failing repeatedly in Uitenhage's SA Social Security Agency (Sassa) offices; if not, what is the position in this regard; if so, why is this office using the 3G cards whereas the State has access to State Information Technology Agency, Sentech and Telkom which are more reliable and secure? NW2785E

    REPLY:

    Yes, I have been informed of the challenges faced by the South African Social Security Agency ("Agency") regarding service delivery in general, which also embrace ICT challenges not only in the Uitenhage office, but throughout the entire Agency.

    SASSA is exploring and where possible partnering with other organs of state utilizing their network. In provinces where offices are being shared with the Department of Social Development, the agreement is that SASSA would utilize their network and carry expenditure in that regard. We are also capitalizing on space in Thusong Centres and connect to SASSA via the GCCN line that already exist in these Centres. The challenge is where SASSA has independent offices, acquired its own building, and no partnership can be explored as in the case of the Uitenhage office.

    Unfortunately, the service delivery challenges faced by the South African Social Security Agency are mainly due to budgetary constraints. This is a general challenge for Government as a whole which emanates from the current economic recession that has affected the World at large.

    The SASSA office in Uitenhage, is amongst offices that have been identified to be in need of ICT infrastructure upgrading and was included in the Agency's ICT Infrastructure Development Plans. This includes cabling and installation of network services, both the Local Area Network and the Wide Area Network. However, as indicated above the lack of financial resources has been a constraint in effectively implementing these plans.

    The Agency hopes to access funding as part of its 2010-2012/13 MTEF Budget Cycle in order to address this matter.

    As an interim measure, the Agency issued 3G cards, ensuring service delivery continuity and the execution of its mandate.

    UESTION NO: 2118

    DATE SUBMITTED:

    MR L RAMATLAKANE (COPE) TO ASK THE MINISTER OF CORRECTIONAL SERVICES:

    (1) Whether she has reviewed her department's performance with regard to the Public Service Commission report on the non compliance with the Public Service regulation that compels Senior Management Service (SMS) to declare all interests yearly; if not, why not; if so, (a) how many did not declare their interest and (b) what are the (i) names and (ii) ranks of the noncompliant members of the SMS;

    (2) whether senior managers who failed to declare have been charged with misconduct; if not, why not; if so, what are the relevant details;

    (3) whether she has found that where senior managers failed to declare their interests it was as a result of hiding any conflicting business interest with any department; if so, what are the relevant details;

    (4) whether any investigation will be undertaken in order to root out corruption in her department ; if not, why not' if so, what are the relevant details? NW2777E

    REPLY

    (1)(a) 22 SMS officials did not declare certain entities registered in their names.

    (b) They are:

    Name (i)

    Ranks (ii)

    Mqobi T

    Chief Deputy Commissioner

    Jolingana NJ

    Chief Deputy Commissioner

    Nhlapo VH

    Deputy Commissioner

    Fosi TA

    Director

    Jobodwana MD

    Director

    Makgaila MA

    Director

    Makhuza TD

    Director

    Manzini BS

    Director

    Masha SB

    Director

    Mashabela MP

    Director

    Mkhwanazi MD

    Director

    Mocheko MF

    Director

    Mokadi ML

    Director

    Monacks CPB

    Director

    Monyobo SO

    Director

    Mphela RE

    Director

    Mzanywa ST

    Director

    Nkhabu MJ

    Director

    Prozesky HJJ

    Director

    Sello MP

    Director

    Thokolo TA

    Director

    Ximiya AP

    Director

    (2) The Senior Managers who failed to declare were given warning letters and no formal charges of misconduct were laid against any of them. They indicated in their responses that the said entities were either not actively involved in business or that they were redundant.

    (3) No conflict of interest was established as most of the entities were found to be either redundant or not engaged in active business.

    (4) The DCS has a structure in place to investigate fraud and corruption and also conducts disciplinary hearings as provided for in Section 95 of the Correctional Services Act. The Directorate Departmental Investigation Unit conducts the said investigations and the Code Enforcement Unit handles disciplinary processes on cases of fraud, corruption and serious maladministration. Investigations for the period 01 April 2009 to 30 September 2009:

    151 cases reported. 161 cases were carried over from previous FYs. 80 cases closed due to lack of evidence. 18 cases referred to Code Enforcement. 214 cases are still under investigation. Information on Lesedi database and diary of the case dockets are updated daily.

    Disciplinary steps instituted:

    45 officials were charged. 44 found guilty, 1 withdrawn, success rate of 97.77%



    QUESTION NO. 2116

    DATE PUBLISHED: 06 November 2009

    DATE SUBMITTED: 24 November 2009

    2116. Ms A Mda (Cope) to ask the President of the Republic:

    (1) Whether he will instruct the Minister of Correctional Services to investigate the recent developments of a certain person (name furnished) on having been seen shopping and playing golf while on medical parole; if not, why not; if so, when;

    (2) What (a) steps will he take to fulfill his commitment of rooting out corruption and (b) have been the successes in resolving problems encountered by the public in respect of the various departments since the launch of the presidential hotline on 14 September 2009? NW2775E

    REPLY:

    (1) As the Honourable Member should be aware the Correctional Services Act (Act No 111 of 1998) sets out the procedures to be followed where there are allegations of non compliance by a parolee with his or her parole conditions. In terms of the Act the National Commissioner of Correctional Services must investigate any non compliance and based on the seriousness of the non compliance a parolee may be reprimanded or instructed to appear before the Parole Board to have their parole conditions altered.

    I am informed that the Department of Correctional Services has not received any formal complaint alleging non compliance by the person referred to.

    The Minister of Correctional Services has requested the National Council for Correctional Services (chaired by Judge Siraj Desai) to review the legislative provisions of medical parole. This request has been made because a number of problems exist with regard to the implementation of the current medical parole system. The National Council is expected to submit their report to the Minister by the end of November 2009.

    (2) (a) The government will continue to strengthen the strategies that are in place to fight corruption.

    At its meeting of 18 November 2009, Cabinet decided to set up an Anti-Corruption Inter-Ministerial Committee to effectively deal with all incidence of corruption in the public service.

    This Inter-Ministerial Committee will study the report and recommendations on corruption issued by the Public Service Commission and other reports.

    The Inter-Ministerial Committee will ensure that action is taken against all persons who are involved in corrupt practices involving public finances.

    The Anti-Corruption Inter-Ministerial Committee, which will be chaired by Minister in the Presidency, Mr Collins Chabane, will present its report and action plan at the Cabinet Lekgotla in January 2010.

    Other steps that have been taken include the establishment of a new National Treasury unit to monitor and investigate corruption in public procurement processes.

    As I have said before, we will not tolerate or condone the misuse of public resources by any public official. Where transgressions are found to have been committed, the required remedial action will be taken, including instituting legal proceedings against the officials concerned.

    (b) Since the Presidential Hotline was established, there have been numerous successes in resolving problems encountered by the public. A report on the Hotline will be tabled in Parliament in due course.

    QUESTION NO 2115

    Mrs H N Ndude (Cope) to ask the Minister of Trade and Industry:

    Whether his department will lead the role in government to ensure that South African Battery manufacturers or importers who are seeking to meet the anticipated demand for battery packs with the advent of electrical cars like the Joule will adopt a common standard to boost the production volumes and help to bring down prices; if not, why not; if so, what steps will he take to compel compliance in this matter before it becomes too chaotic to regulate?NW2774E

    REPLY:

    A private company: Optimal Energy is the manufacturer of the Joule. The battery pack, currently used in proto-types of the Joule, was configured and built by Joule themselves. They imported the individual cells (lithium-ion) from Korea. The configuration depends on the type of vehicle - and in this case it is custom made. These types of batteries are not currently available commercially for sale in South Africa, given the prototype stage of the Joule.

    The dti together with other entities such as Department of Science and Technology (DST) and the Industrial Development Corporation (IDC) are working actively to try and attract investment in battery production for the Joule to South Africa. As part of supporting and ensuring successful commercialisation of the Joule and promoting local manufacturing, the dti together with DST, IDC and Optimal Energy is exploring ways and means of localising the production of the electric vehicle battery in South Africa.

    The South African Bureau of Standards (SABS) has this far adopted two standards for electric vehicles and there are a few more that the International Standards Organisation (ISO) has published recently that the SABS is looking at adopting as South African National Standards.

    The dti and the South African Bureau of Standards (SABS) currently investigating the expansion of the SABS battery testing facility in order for it to meet the increase in testing demand for different types of batteries including batteries for electric motor vehicles. The SABS will also re-establish the technical committee responsible for the development of South African National Standards for batteries.

    The National Regulator for Compulsory Specifications (NRCS) is aware of the focus on electric cars and the standards that is currently under development by the International Standards Organisation (ISO) and the SABS. The NRCS will regulate these vehicles. The process would be to amend one or more of the current Compulsory Specifications to accommodate these standards. This compulsory specifications addresses all aspects relating to safety in passenger vehicles by referencing relevant standards. This will also be the case for batteries.

    The dti will work actively with SABS and NRCS to develop appropriate standards for the Joule battery.

    QUESTION NO. 2114

    DATE PUBLISHED: 06 November 2009

    DATE SUBMITTED: 24 November 2009

    2114. Mr L S Ngonyama (Cope) to ask the President of the Republic:

    (1) Whether the Government has been informed that the crisis in Zimbabwe is worsening; if so, what are the relevant details;

    (2) Whether he or the Government has played any role recently in trying to preserve the functioning of the unity government in Zimbabwe; if not, why not; if so, what role;

    (3) Whether he will make a statement on the matter? NW2773E

    REPLY:

    (1) South Africa participated in the Summit of the Troika of the SADC Organ on Politics, Defence and Security, which met in Mozambique on 5 November 2009. Among the principal issues on the agenda was the situation in Zimbabwe, and specifically the outstanding issues with respect to the full implementation of the Global Political Agreement (GPA).


    The Summit, which was also attended by the three signatory parties to the GPA, received an extensive briefing on the situation in Zimbabwe.

    (2) The Honourable Member is referred to the answer and responses to follow-up questions to Oral Question no 11 given in the National Assembly on 12 November 2009.

    (3) We will not make any statement on the matter at this time. As the facilitator, the South African government is required to evaluate progress and report back to the Chairperson of the Organ on Politics, Defence and Security Cooperation.

    NATIONAL ASSEMBLY

    FOR WRITTEN REPLY

    QUESTION NO 2112

    DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: 6 NOVEMBER 2009

    (INTERNAL QUESTION PAPER NO 27- 2009)

    Date reply submitted : 15 December 2009

    Mr L B Gaehler (UDM) to ask the Minister of Police:

    (1) (a) What is the monthly rental of the Savoy Hotel building on the corner of Stanford Terrace Street and Sutherland Street, Mthatha and (b) what has been the total expenditure for renting this building as at the latest specified date for which information is available;

    (2) (a) why is this building being used instead of state-owned property and (b) how much longer does the police plan to use this building?

    NW2769E

    REPLY:

    (1)(a) The monthly rental of the Savoy Hotel is R129, 820.70

    (1)(b) The Department of Public Works is the custodian of the South African Police Service=s fixed assets therefore it is suggested that this question be redirected to the Department of Public Works.

    (2)(a) State owned buildings are a scarcity in this area and alternatives such as lease holds need to be used to provide office accommodation.

    (2)(b) The accommodation will be utilized for as long as required. Mthatha does not appear on the Capital Works Priority List for the Eastern Cape for the construction of additional offices at the Mthatha Central Police Station and no capital funding is currently available for the construction of a suitable state owned building.

    NATIONAL ASSEMBLY

    WRITTEN REPLY

    QUESTION 2111

    INTERNAL QUESTION PAPER [No 27-2009]

    DATE OF PUBLICATION: 6 November 2009

    2111. Mr L B Gaehler (UDM) to ask the Minister of Rural Development and Land Reform:

    (1) What is the (a) status of the (i) Lindile and (ii) Highbury community land claims in Mthatha and (b) reason for the delay in settling the claims;

    (2) whether he has been informed of the deteriorating state of the structures on the property; if so, what are the relevant details;

    (3) what is the status of the Paynes farm/Zimbane land claim in Mthatha?

    THE MINISTER OF RURAL DEVELOPMENT AND LAND REFORM:

    (1)(a)(i) The Kwa Lindile community land claim has been investigated and was found to be compliant with section 2 of the Restitution of Land Rights Act, 1994 (Act No 22 of 1994) ("the Restitution Act"). Claimant verification has been concluded and the Office of the Regional Land Claims Commissioner: Eastern Cape (RLCC:EC) is in the process of establishing legal entities to which the land will be transferred.

    (ii) The Highbury community land claim was similarly found to be legally compliant and has undergone the research and verification processes. The RLCC:EC is currently negotiating with all relevant stakeholders including government parastatals, and the occupiers of the claimed land.

    (b) In respect of the Kwa Lindile community land claim, the matter was in the process of being referred to court in terms of section 14(1) of the Restitution Act, on request by the community due to a dispute between the King Sabata Dalindyebo (KSD) Municipality and the community on the issue of the validity of the claim. While the RLCC:EC was in the process of filing the referral, an application was lodged in terms of section 34 of the Restitution Act by the KSD Municipality for an order that the claimed land should not be restored to the community. The section 34 application was set down for hearing from 24 to 30 August 2009. Judgment has not yet been delivered.

    With regard to the Highbury community land claim, delays in settling the land claim have resulted from illegal occupants on some portions of the land under claim as well as claimant disputes and internal conflict within the community. The internal conflict has resulted in the need for further work to be conducted in the area thus making it extremely difficult for the RLCC:EC to finalise the matter.

    (2) Yes. Negotiations are currently underway with government parastatals to find ways of making use of the existing structures for the benefit of the claimant community. The Provincial Rural Development and Land Reform Office in Mthatha (Eastern Cape) is also assisting in resolving the matter.

    (3) The Zimbane community claim is being investigated and processed jointly with the Kwa Lindile community claim. This claim is also before the Land Claims Court as a result of a section 34 application brought by the Municipality and was heard during the week of 24 to 30 August 2009. Judgment has not yet been delivered.

    NATIONAL COUNCIL OF PROVINCES

    WRITTEN REPLY

    QUESTION NO 2110

    (Internal Question Paper No 29 - 2009)

    Mr L B Gaehler (UDM) to ask the Minister for Cooperative Governance and Traditional Affair
    s:

    1. Why were the 26 houses located in Mthatha (i) transferred to a defunct entity (name furnished) and (ii) later sold at an auction in 2008 by the MEC for local government in the Eastern Cape, (b)(i) where and (ii) when was the auction advertised, (c) how many interested parties attended the auction, (d) what criteria influenced the auction to enable a single person to buy all the houses and (e) what was the selling price per house;

    2 Whether the occupants of the affected houses were given preference to buy the property; if not, why not; if so, what are the relevant details? NW2767E

    Answer

    The details to this question can only be provided by the MEC of Local Government in the Eastern Cape. The recommendation is that the question be redirected to the Eastern Cape Province to reply.

    NATIONAL ASSEMBLY FOR WRITTEN REPLY

    QUESTION NO 2108

    DATE REPLY SUBMITTED: TUESDAY, 15 DECEMBER 2009

    DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: FRIDAY, 6 NOVEMBER 2009 (INTERNAL QUESTION PAPER: NATIONAL ASSEMBLY, NO 27 – 2009)

    Mr P F Smith (IFP) asked the Minister of Transport:

    (1) Whether municipalities focus on speed transgressions whilst minimising other traffic violations; if not, what is the position in this regard; if so,

    (2) whether the reason for this has to do with the income stream to municipalities and corresponding incentives to traffic officers; if not, what is the position in this regard; if so, what are the relevant details;

    (3) what is the breakdown of the revenue earned by every municipality through speed fines relative to other traffic violations?

    REPLY:

    The Minister of Transport:

    (1) High speed remains one of the major contributory factors to the high accident rate in the country. The Road Traffic Management Corporation (RTMC), through the Law Enforcement Technical Committee (LETCOM), provides guidelines in respect of speed law enforcement to ensure that these operations are conducted at hazardous locations (HAZLOCS), with a view to reducing high speeds at such locations.

    The identification of hazardous locations is done scientifically through the gathering of relevant crash data over various periods along particular stretches of roads. After careful analysis are made on the causes of accidents, various interventions, that could include engineering, education and enforcement, are proposed to make the biggest impact in reducing offences and subsequently crashes and casualties.

    With the latest technology available, speed timing operations are a quick, inexpensive and effective method of making a high impact on compliance. This is, however, not at the expense of the other offences. According to the National Rolling Enforcement Plan, which we admit has not cascaded to all Municipal Traffic Departments, emphasis is placed on vehicle and driver fitness and other moving offences as well.

    (2) The purpose of road traffic enforcement is to promote compliance with the road traffic rules and regulations. It is not for income generation or incentives for traffic officers. By penalising errant road users, there can be greater awareness of compliance, thereby reducing offences, crashes and casualties.

    (3) There are more than two hundred Municipal Traffic Departments in the country and the RTMC does not have access to information in respect of the revenue earned by each municipality through speed fines and other traffic violations.

    ____________________________________________________________________

    FOR WRITTEN REPLY

    QUESTION 2107

    DATE OF PUBLICATION OF INTERNAL QUESTION PAPER: 06/11/09

    (INTERNAL QUESTION PAPER 27-2009)

    Mr PF Smith (IFP) to ask the Minister of Basic Education:

    1. What her department (a) has done, (b) is doing and (c) will be doing to improve South Africa's ranking in the forseeable future with reference to the World Economic Forum's Global Information Technology Report of 2008-2009, ranking South Africa at 110 AND 132 respectively for the quality of its education system, mathematics and science education compared to Tunisia's ranking of 17 and 7 in global terms? NW2757E

    REPLY:

    1. The Department of Basic Education is committed to ensuring quality education for all children in schools. The National Curriculum Statement implemented in Grade R – 12 which has been internationally benchmarked to ensure that it is responsive and provides learners with the 21st century skills. With effect from 2010 the Department of Basic Education will strengthen the implementation of the NCS in schools by alleviating the administration burden on teachers and providing sufficient time on teaching and learning. In particular, the Department will continue to strengthen the support for the teaching of Literacy and Numeracy in the early Grades in schools through the expansion of the Foundations for Learning in all schools up to Grade 6. There will be an annual national assessment conducted for learners in Grades 1-6 and 9 in all schools to assess progress in numeracy and literacy which are foundational skills for learning. The Department will further consolidate the Dinaledi Schools Project to ensure that the teaching of and performance in mathematics and science are improved. The performance of the Dinaledi schools in 2008 NSC examinations has demonstrated the value of dedicated teacher training in subject contact knowledge, and the availability of textbooks and other LTSM in the promotion of mathematics and science. The Department will sustain this support in schools.


    NATIONAL ASSEMBLY

    WRITTEN REPLY

    QUESTION NO: 2104

    DATE OF PUBLICATION: 6 November 2009

    QUESTION PAPER NO: 27

    DATE OF REPLY: 19 November 2009


    Mrs J D Kilian (Cope) to ask the Minister of Communications:

    (1) Whether thousands of schools have no form of ICT services or infrastructure or internet connectivity; if so, what are the (a) short-; (b) medium- and (c) long –term strategies to remedy the situation.

    (2) what measures will be taken to factor in and overcome the impact of unpredictable migration patterns on the implementation of such strategies?

    NW2542E

    REPLY:

    (1) (a), (b) and (c):

    While some schools have access to basic communication services, e.g e-mail, telephone, etc, the majority do not have internet connectivity. In response to this challenge, the Department of Basic Education and other relevant ministries have developed a national connectivity plan for schools to in the long-term provide a national standard for connectivity to all public schools and to ensure a structured and co-ordinated national programme. This plan will ensure the provision of cost-effective, secure and efficient connectivity to public schools. This national connectivity plan is an additional intervention for the provision of connectivity to public schools, other interventions have occurred at provincial levels. In the short-term the Department of Communications is working closely with the Department of Communications is working closely with the Department of Basic Education and ICASA in respect of fast-tracking pressing legislative interventions.

    (2) The Connectivity plan for public schools seeks to provide connectivity to all public

    schools on an equal basis, regardless of their geographic location and their affordability status. Due to the high number of public schools and their diverse circumstances, the plan is based on various categories of public schools such a primary and secondary as well as factors such as the number of learners. As this plan focuses on a national programme the various categories should take care of unpredictable factors.

    DEPARTMENT: JUSTICE AND CONSTITUTIONAL DEVELOPMENT

    REPUBLIC OF SOUTH AFRICA

    NATIONAL ASSEMBLY

    PARLIAMENTARY QUESTION FOR WRITTEN REPLY

    QUESTION NO: 2103 DATE OF PUBLICATION: 6 NOVEMBER 2009

    Mr L Ramatlakane (Cope) to ask the Minister of Justice and Constitutional Development:

    Whether his department has implemented the Cabinet's recommendations regarding the case backlog that was identified within the criminal justice cluster; if not, why not; if so, (a) what are the hours of (i) improvement on hearing cases and (ii) magistrate daily hearing cases, (b) how did an improvement of hearing cases increase in the (i) 2007-08 and (ii) 2008-09 financial years and (c) what (i) are the hearing incremental plans for the next three years, (ii) are the backlog figures and (iii) is the increase thereof?

    NW2346E

    REPLY:

    Yes, the Backlog Reduction Project was instituted to provide additional capacity to the courts where there are serious backlogs. The focus has thus far been on all the high priority Regional Courts where the backlog numbers are serious enough to warrant intervention. Backlogs in the Regional Courts are viewed as all the cases on the outstanding Regional Court roll for longer than 9 months. The intervention in terms of backlogs reduction entails the appointment, additionally to the current establishment, of an experienced prosecutor on contract where possible, a retired magistrate, additional interpreter, clerk and an administrative clerk to operate the Digital Recording System and e-scheduler. Since the inception of the backlog reduction intervention, very good progress has been made at the various Regional Court hotspots, which has also lead to a decrease in general in the outstanding and backlog case rolls of the Regional Courts. Notwithstanding this, the total outstanding Regional Court roll country-wide, as at the end of September 2009, was 50 510 cases and the backlogs on that outstanding roll, 15 763 cases (indicating a 31.2% backlog percentage). This indicates that we still require a backlog intervention to assist these courts.

    As the success of this project depends also to a large extent on eliminating any delays caused by issues related to the accused's right to legal representation, Legal Aid SA continues to strive to ensure that legal representation is immediately available to anyone who appears in the case backlog courts. Additional legal aid practitioners have thus been made available in this regard to all the regional court backlog sites. A further additional practitioner was also allocated to each of these courts to ensure that the court continues to function while one practitioner is busy with consultations and the other with preparations for the cases. This ensures a smooth flow of cases which results in the maximum possible utilization of the available court time.

    Furthermore, all the various role players are participating in the activities of the national case backlog task team, provincial case flow management fora as well as local case review committees to ensure that the productivity of these backlog courts is continuously monitored and evaluated.

    The District Court backlogs will be dealt with in the next phase which is now being considered and which will still commence this financial year.

    The High Court backlog is relatively low, but where there are specific needs suitable interventions will be considered in conjunction with the respective Judges President.

    (a)(i) The average regional court hours country-wide from April 2007 to March 2008 were 03:23. The average court hours from April 2008 to March 2009 were 03:40. (The average court hours used for the dealing with the court cases therefore improved significantly from 03:23 to 03:40).

    (ii) The average court hours from April 2009 to September 2009 were 03:42 (2366 cases finalised). (The average hours therefore again increased – though for this period only slightly, namely from 03:40 to 03:42).

    In general it can be noted that regarding the specific backlog reduction project, the current 39 case reduction backlog courts have sat on average 3:36 minutes per day at those backlog sites, since 1 November 2006 until the end of September 2009. In the current financial year (since 1 April 2009 until the end of September 2009), these courts have sat at those backlog sites, on average 3:43 minutes per day. (Some backlog courts have averaged more than 4 hours)

    (b)(i) Approximately 388 532 cases were finalised during 2007-2008.

    (ii) Approximately 431 640 cases were finalised during 2008-2009.

    The improvement in hearing cases thus led to more cases being finalised (and in a shorter time) and it also led to a general reduction in case backlogs. The backlog courts finalise on average 10.8 cases per month, which is substantially more than the normal regional courts (which averages about 6 per month). The increased capacity at the regional backlog court centres, as was indicated above, has been instrumental in improving the hearing of cases. The fact that backlog courts operate as far as possible on a continuous roll and only deal with trial ready cases (and not new matters) has also improved case flow management in those courts.

    (c)(i) Because of the fact that there is still a significant number of outstanding and backlog cases in the District Courts, Regional Courts and High Courts, many of which have been outstanding for long periods of time, the project is being extended to new Regional Court sites. Requests for 9 additional Regional backlog Courts were received and are being assessed for establishment during the 2009-2010 financial year. In addition, 27 high priority sites have already been identified for District backlog interventions and it is envisaged that at least 9 of these sites will be assisted with District backlog Courts during the 2009-2010 financial year, with additions from April 2010. The High Courts will also be receiving attention from April 2010.

    (ii)

    Backlog and Outstanding Cases: 30 March 2007

    Outstanding Cases

    Backlog Cases

    % Backlog Cases

    District Courts

    158 951

    16 480

    10.4%

    Regional Courts

    46 418

    19 481

    42.0%

    High Courts

    1139

    169

    14.8%

    Backlog and Outstanding Cases: 30 March 2008

    Outstanding Cases

    Backlog Cases

    % Backlog Cases

    District Courts

    180 720

    22 186

    12.3%

    Regional Courts

    50 483

    17 333

    34.3%

    High Courts

    1325

    217

    16.4%

    Backlog and Outstanding Cases: 30 March 2009

    Outstanding Cases

    Backlog Cases

    % Backlog Cases

    District Courts

    181 138

    26 505

    14.6%

    Regional Courts

    51 802

    15 767

    30.4%

    High Courts

    1192

    223

    18.7%

    Backlog and Outstanding Cases: 30 September 2009

    Outstanding Cases

    Backlog Cases

    % Backlog Cases

    District Courts

    159 535

    21 434

    13.4%

    Regional Courts

    50 510

    15 763

    31.2%

    High Courts

    1217

    262

    21.5%

    (iii) Regional court backlog figures have in general decreased, with the country-wide number of Regional Court backlog cases having being reduced substantially from the inception of the project from 20 452 backlog cases (43%) (on an outstanding roll of 47 343) in 2006, to 15 763 backlog cases (31.2%) (on an outstanding roll of 50 510) at the end of September 2009, notwithstanding the fact that the outstanding roll increased with 6.6% from 47 343 to 50 510.

    For the current financial year, the country-wide number of Regional Court backlog cases was reduced with 2.45% from April 2009 until 30 September 2009 and in addition the outstanding roll was reduced with 3.03% for the same period. The number of Regional Court backlog cases at the specific 39 current regional backlog court sites have been reduced substantially with 11.1 % (from 7 159 to 6 363 cases) and the outstanding roll with 12.6% (from 20 018 to 17 502 cases) at those centres from April 2009 until 30 September 2009.

    These backlog courts have received 16 328 cases in total and finalised hereof 11 220 (68.7%) cases as follows:

    • Guilty: 8 285 (73.8 %) (of which 401 were as a result of plea bargains)

    • Not guilty: 2 731

    • Diversions: 110

    • Admission of Guilt: 94

    This brings the total number of cases removed from the Regional Court rolls as a result of the backlog courts from inception of the project, in November 2006, until the end of September 2009, to 16 705 (comprising the 11 220 cases finalised + 4 786 cases withdrawn through re-screening of cases on the roll + 699 cases transferred to higher courts) .

    If the baseline figures (November 2006) are used, the backlogs have been reduced by 22.9% from 20 452 in November 2006 (which is the date used as the baseline date to monitor performance of the backlog courts) to 15 763 at the end of September 2009.

    In the current financial year, the backlogs have been reduced by 2.4% from 16 159 in April 2009 to 15 763 at the end of September 2009.

    National Assembly

    Question 2102

    2102. Ms S P Lebenya-Ntanzi (IFP) to ask the Deputy President:

    (1) Whether, in light of his reply to Question 80 for oral reply on 15 September 2009 and the recently-reported loss of 267 000 jobs (details furnished), the Government will increase its target of creating 500 000 new jobs by the end of 2009 to a target of 767 000 new jobs by the end of 2009; if so, what plans are in place to create these new jobs; if not;

    (2) whether this will be considered a failure to deliver on the promise made; if not, what is the position in this regard; if so, what are the relevant details? NW1300E

    REPLY

    In his State of the Nation Address in June this year, President Jacob Zuma said that government planned to create about 500,000 work opportunities this year as part of the second phase of the Expanded Public Works Programme (EPWP).

    This is part of government's goal of creating about 4 million such opportunities by the end of its five-year term.

    Speaking in the debate on the State of the Nation Address, President Zuma said: "Let me emphasise that these measures are not a substitute for the permanent jobs that must be created and sustained in the economy."

    As the President made clear from the outset, the 500 000 work opportunities refer specifically to the opportunities that the EPWP aims to create. It does not refer to the net number of people employed in the country.

    Therefore, the issue of 767 000 jobs does not arise in this context.

    We are working hard to ensure that the second phase of the Expanded Public Works Programme does indeed deliver 500 000 job opportunities within its first year. The programme is being implemented on a large scale, and we are confident that we can achieve this target.

    NATIONAL ASSEMBLY

    QUESTION FOR WRITTEN REPLY

    QUESTION NUMBER: 2101

    DATE FOR PUBLICATION: 2 NOVEMBER 2009

    DATE REPLY SUBMITTED: 1 DECEMBER 2009

    MR JJ Mc GLUWA (ID) TO ASK THE MINISTER IN THE PRESIDENCY: PERFORMANCE MONITORING AND EVALUATION AND ADMINISTRATION

    (1) How many cases have been registered to the presidential hotline, (b) how many of these cases have been resolved, (c) what is the breakdown of cases in each province and (d) what are the top three issues that are raised in complaints;

    (2) Whether the presidential hotline is able to handle the call load; if not, why not, if so, what are the relevant details;

    (3) Whether the presidential hotline will be expanded in terms of resources; if not, why not; if so, what are the relevant details;

    (4) When is it expected that cellular phones will be able to call the presidential hotline?

    NW2765E

    REPLY:

    1. a) Total calls up to 27.11.09: 30650

    b) Resolved cases: 9190

    c) Breakdown of cases in each province: Complaints

    Enquiry

    Suggestions

    Compliments

    d) Top 3 complaints: 1) Employment/World of work

    2) Housing

    3) Legal

    2. No, the Presidential Hotline is not able to handle the call load at this stage. Even if we were to scale up the number of call agents, we can only do so up to a certain limit – given that resources are limited. Together with DPSA, SITA and GCIS, are working at integrating existing government call centres to reduce the load on the Presidential Hotline.

    3. Before we can allocate more resources to the Presidential Hotline, we would like to first explore if we are achieving efficiencies across all government hotlines. That is investigation is currently underway.

    4. Cellular phones are able to call the Presidential Hotline. In fact, approximately 95% of all calls we receive are from mobile lines.

    QUESTION NO 2130

    DATE REPLY SUBMITTED: MONDAY, 7 DECEMBER 2009

    DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: FRIDAY, 6 NOVEMBER 2009 (INTERNAL QUESTION PAPER: NO 27 – 2009)

    Mr S B Farrow (DA) MP asked the Minister of Transport:

    What progress has been made with the investigations into the alleged fraudulent (a) payments made out of a certain Passenger Rail Agency of South Africa (Prasa) bank accounts amounting to R5,7 million as reported by the Auditor-General in the annual report and (b) banking transactions made out of abovementioned agencies' bank accounts amounting to R8,1 million processed in the Metrorail Durban and Tshwane regions in 2008?

    NW2805E

    REPLY:

    The Minister of Transport:

    (a) and (b)

    According to the Passenger Rail Agency of South Africa (PRASA), the fraudulent transactions were reported to both the concerned bank and the South African Police Service. PRASA also enlisted the services of Deloitte Forensics for an investigation and they recently submitted a draft of the investigation report. It is being studied by PRASA and further steps will be spelt out in due course.