FINANCE SELECT COMMITTEE & SPORT AND RECREATION
PORTFOLIO COMMITTEE
23 May 2007
4th QUARTER 2006/7 CONDITIONAL GRANT EXPENDITURE: EDUCATION, &
SPORT & RECREATION PROVINCIAL DEPARTMENT BRIEFINGS
Chairperson: Mr T Ralane (ANC, Free State)
Documents handed out:
Free State
Department of Sports, Arts and Culture presentation
North West Department of Sport, Arts and Culture presentation: Part1 and Part2
Free State
Department of Public Works 4th quarter 2006/ 07 infrastructure review
Gauteng Department of Education presentation: Part1 and Part2
Limpopo Province
Mass Participation grant presentation
Gauteng Department of Public Transport, Roads and Works presentation: Part1 and Part2
Mpumalanga
Department of Public Works presentation
Northern Cape
Department of Education presentation
Gauteng Department
of Sport, Arts, Culture & Recreation presentation
Northern Cape
Department of Sport, Arts and Culture presentation to select committee on
finance
Western Cape
Provincial Government: presentation to select committee on finance
Eastern Cape: Conditional Grant mass participation fourth quarter report
06/07: Part1 & Part2
KZN Department of Sport and Recreation Public Hearings on conditional grants
fourth quarter 2006/7 report [please email [email protected]]
North West Department of education: 4th
quarter provincial expenditure report for 2006/7
Western Cape Education
Department: Report to the select committee on finance
Eastern Cape Department of Education: public hearings on conditional grants: Part1 and Part2
North West Public Works:
Presentation to the NCOP select committee on finance
National
Treasury: Preliminary outcome of conditional grants & capital expenditure
as at 31 March 2007
Department
of Sport, Recreation, Arts and Culture (Easterne Cape): 2006/7 Infrastructure
Expenditure Report
Department of
Education presentation on Conditional Grants
SUMMARY
The Committee was briefed by the provincial departments of Sport and
Recreation and Education regarding their 4th quarter expenditure of
conditional grants. The Public Works provincial departments submitted
documentation and participated in questions.
The provincial Sport and Recreation departments presented their expenditure on
the Siyadlala and School Sport Mass Participation Programmes. There had
generally been fair spending on these and most departments commented that a
number of people had participated and several more had been trained. Lack of staff and lack of monitoring presented challenges.
Questions asked by Members related to the existence of business plans,
development of sport at schools, whether the provincial departments had the
capacity to deal with increased allocations, and the contribution of the local
soccer leagues to refurbishment of stadiums. The Chairperson indicated that
Municipal Infrastructure Grants should be accessed and taken into account in
the reports. The Chairperson requested lists of clubs developed in line with
the mass participation programmes as some of the provincial departments were
said to be performing inadequately.
Moreover, the provincial Education departments presented their expenditure on
school feeding programmes, HIV/ Aids and FET recapitalisation. Most reported
under spending, often in very significant percentages, which were variously
attributed to delays in supply, infrastructure backlogs, personnel and funding
shortages and suspension of the school feeding schemes. Only the Northern Cape
had extended the school feeding programmes to high schools, and the Committee
Members expressed concern on this, and on the under spending. Further concerns
were raised in regard to the transfer of programmes from North West to Northern
Cape without transfer of the budgetary allocations, which resulted in
difficulties in implementing health, education and social services programmes.
It was decided that a joint discussion on these issues must be arranged between
the relevant departments and National and Provincial Treasuries. IT was further
decided that answers to some of the more general questions posed to all
departments may be submitted in writing, as many of the presenters were new in
their positions.
MINUTES
Fourth quarter conditional grant expenditure briefings by Provincial
Departments
Free State Department of Sports Arts and Culture briefing
The Head of Department, Free State Department of Sports, Arts and
Culture, informed the Committee that he would present on the conditional grants
for the Siyadlala Mass Participation Programme (MPP) and the school sport MPP.
The budget for the Siyadlala MPP was R6.5 million and 99% of it was spent. The
School Sport MPP had a budget of R3.4 million, with under spending of 3%. The
under spending was attributed to improper and late submission of documents
required for payment. A corrective measure put in for this financial year was
the budget Control Register.
Siyadlala MPP was a success as over 280 000 people participated. Moreover, many
people were trained, including 25 in events management and another 25 in first
aid, and over 169 clubs were established. School MPP had identified 50 schools
for the programme and 13 200 students took part. There was training for
educators and volunteers for coaching athletics, volleyball and cricket. A
further 55 educators were trained in sport administration and events
management.
Reporting on capital expenditure (capex), the HOD stated that R180 000 out of a
Budget of R138 892 000 was unspent. Transfers were made according to a pre-
approved cash flow plan and the Department had managed to comply with this cash
flow plan to a great extent. The monitoring capacity for capex was ensured by
monthly meetings, attended by the HOD and other senior managers, to monitor
expenditure trends, reports produced during the year, and the Free State
Legislature’s Portfolio Committee on Finance.
Kwazulu Natal Department of Sport and Recreation Briefing
Ms Sumaya Khan, HOD, KZN Department of Sport and Recreation, informed the
Committee that her Department had spent its entire conditional grant budget of
R21 300 000. She elaborated that a greater part had been spent in the 2nd
half of the year owing to delays in tendering which also led to delays in
payments for equipment. She stated that the MPP was managed through the
Recreation Director’s Office and that its success was being hampered by a lack
of staff both regionally and at head office, which led to ineffective marketing
and a lack of continuous monitoring of the programme.
The programme objectives of the school sport MPP were highlighted as
facilitating participation in sport and recreation within disadvantaged
schools, with a focus on high crime areas, farm and rural areas and government
priority nodes. A total of 162 schools in 9 clusters had been identified for
the school sport MPP. 173 contract employees had been appointed, and the dates
for the cluster festivals were indicated.
Ms Khan said that there was ongoing recruitment and training for the Siyadlala
MPP, with the budget for training being R2 050 000 while the number of hubs in
KZN had increased to 650. A new marketing strategy was being prepared to create
greater awareness of MPP in the community.
Northern Cape Department of Sport Arts and Culture Briefing
The representative from the Northern Cape Department of Sport, Arts and Culture
reported that the departmental budget for conditional grants in 2006/ 07
amounted to R6.2 million and that the entire budget had been spent. R5 million
had been allocated to the Siyadlala MPP and R1,2
million to the school MPP.
The Siyadlala MPP had been extended to all 27 municipalities and over 30 jobs
had been created by this programme. The school sport MPP had been implemented
in 38 schools and 35 school sport MPP coordinators had been employed on an
annual contract. The monitoring and management of the MPP was done by 7
district coordinators and through the MMIS (Management Monitoring Information
System). It had been hindered by staff shortage and limited support from
municipalities.
The Malibu Multi- purpose sport and cultural centre had been constructed at a
cost of R40 million. The Department was to take occupation of the building in
June 2007. Reasons for the under spending on the centre were alluded to,
including unexpected geological problems and delays in awarding construction
tenders.
Western Cape Department of Cultural Affairs and Sport
Mr Mxolisi Lindie, HOD, Western Cape Department of Cultural Affairs and Sport,
informed the Committee that their budget for 2006/ 07 was R12,1
million. R7,25 million had been allocated to Siyadlala
MPP with R4,85 million allocated to the School Sport MPP. There had been 97, 4%
spending. The HOD informed the Committee that expenditure trends in the
Siyadlala MPP in the first two quarters were extremely slow owing to the
renewal of contracts. New hubs had been created in both the Siyadlala and
school sport MPPs with a total of 117 schools involved. The monitoring of the
Siyadlala MPP was done by two support staff managers and an operational
manager. There were quarterly meetings and the submission of monthly reports.
In school sport MPP there were two support staff, a training and recruitment
team had been established, and monthly reports were submitted by cluster
coordinators.
Mr Lindie informed the Committee of the many employment opportunities created
and the positive impact the MPP had on communities. The challenges included
chronic staff shortages.
Limpopo Department of Sport Arts and Culture
Ms Joyce Mashamba (MEC, Limpopo Department of Sports, Arts and Culture)
informed the Committee that the Siyadlala MPP was aimed at reducing poverty
through job creation, promoting participation in recreational activities in
disadvantaged communities and addressing issues of national importance such as
crime and HIV/ AIDS. The total number of hubs had increased to 25, with 175
coordinators. 368 coaches and referees had been trained, 168 people had been
trained in administration and events management, and more than 37 000 people
participated in the programme. She indicated that monthly reports were received
from coordinators. The budget for the Siyadlala MPP was R8.3 million, of which
86,4% was spent.
The School sport MPP now involved 84 schools with 85 coordinators. Activities
included athletics, soccer, netball, volleyball, rugby and cricket. Of the R6.5
million budget, R1.8 million remained unspent. The
reasons for under spending were the late approval of the school sport MPP,
protracted procurement processes and the late appointment of coordinators.
Other challenges presented were frequent resignations by coordinators from the
MPP, the Department’s inability to fill posts as speedily as they would like, delays in the procurement process and lack of
facilities in schools. Corrective measures to be put in place were the
recruitment of new coordinators in 2008, additional manpower in the supply
chain directorate and the employment of 3 MPP deputy managers.
Discussion
Mr D Botha (ANC, Limpopo) asked the provincial departments if business plans
were in place for the new financial year. He also enquired if capacity had been
increased where it was found to be lacking, and whether the provinces were
involved in sport development at schools.
The Chairperson stated that in terms of the Division of Revenue Act there would
be additional funding for club development and school sport development. He
asked whether the provincial departments had the capacity to deal with the new
monies being availed to them, in view of their record of under spending in the
past.
The HOD from the Free State Department of Sports, Arts and Culture informed the
Committee that his Department had business plans in place and had increased its
capacity. With regard to mass participation programme: a memorandum of
understanding (MOU) with the Free State Department of Education had been
signed. He further indicated that 203 educators and volunteers had been trained
and that 169 clubs had been established.
The Chairperson enquired how 169 clubs could have been developed owing to the
fact that money had only recently been allocated to club development.
The HOD indicated that the Free State Department had used unspent monies from
other projects to develop clubs. Additionally, she stated that a further
allocation came from the National Department of Sport and Recreation.
Ms Khan indicated that the KZN Department in KZN also had business plans in
place. Furthermore, to increase the Department’s capacity, additional
administrative staff had been employed, there was close collaboration with the
Departments of Education and Sport and Recreation. Club development had
commenced in the previous financial year and had been funded by monies from the
National Department of Sport (SRSA)
The Chairperson asked how much money had been spent on club development and
sought a categorical breakdown of amounts spent on each sporting code.
Ms Khan stated that R1 million had been allocated by SRSA to her Department for
goods and services. It had been spent on football and netball, development of
30 clubs and on human resources and administrative staff. She indicated that
unfortunately she could not give a further breakdown of costs at this stage.
Northern Cape Department of Sport, Arts and Culture stated that its business
plans had been submitted. An MOU regarding School Sport MPP had recently been
signed with the provincial Department of Education. Moreover, a quarterly
municipal forum had been established to increase capacity. The Mayibuye Centre
would be operational in June, but the Department required R1,2
million to finalise the centre. This department had focused its club
development on the two districts of Pixley Ka Seme and Namaqua. An agreement
with the South African Football Association (SAFA) had been concluded and would
aid football development.
Limpopo MEC Ms Mashamba indicated that business plans and plans to increase
capacity at the Department in Limpopo were in place. An MOU was soon to be
signed with the Limpopo Education Department. A number of coaches and referees
had been trained, with 168 more being trained in events management. She
informed the Committee of her Department’s inability to fill vacancies as
quickly as they wished.
Eastern Cape Department of Sport, Recreation, Arts and Culture
Mr B Mfenyana, HOD, Eastern Cape Department of Sport, Recreation, Arts and
Culture, stated that the MPP was his Department’s flagship for the
resuscitation of sport in the province. He stated that all local municipalities
would have a hub and that further targets were set out in the Department’s
business plan. The Siyadlala MPP was being implemented in 43 local
municipalities, while school sport MPP covered 120 schools in 7 district
municipalities. 357 new jobs had been created owing to the MPP and the total
number of participants in both MPPs amounted to 200 676.
Mr Mfenyana noted that the budget amounted to R 17.06 million, which was spent
in its entirety. There had been low expenditure in the first quarter owing to
recruitment delays and an increase in spending in the 4th quarter
due to journal entries showing wrong payment of stipends. He indicated that a
manager for MPP and 2 provincial coordinators, as well as support staff, had
been appointed and a further 7 district coordinators had been employed.
North West Department of Sports, Arts and Culture
Ms Irene Mpolweni, HOD, North West Department of Sports, Arts and Culture,
indicated that business plans were in place and that a MOU would soon be signed
with the provincial Department of Education. The total grant received for the
Siyadlala MPP amounted to R 7 million of which R6.1 million (87%) had been
spent as at 31 March 2007. The Department would approach the provincial
Treasury for a roll- over of funds and if approved equipment would be purchased
with this money.
24 clubs had been developed with 187 114 people participating in the MPP. The
monitoring of the MPP was achieved through the submission of weekly plans from
the hub coordinators, monthly hub visits by provincial coordinators to confirm
the smooth running of activities and a monthly submission to the provincial
coordinator by the departmental coordinators.
The School Sport MPP received a total grant of R4.1 million of which 83% was
spent. The Provincial Treasury was to be approached for a rollover of the
funds.
Challenges highlighted for the conditional grants were the rapid resignation of
contract workers and the long procedures of recruitment of contract workers.
The capital projects for 2007 were also presented.
Discussion
The Chairperson stated that the Committee would require the locations of the
clubs created and developed, as the Committee would be doing constituency work
and may want to visit these clubs to verify their existence.
Mr Lindie attested to the fact that Western Cape department had a business plan
in place and that it intended to increase its capacity. A MOU had been signed
with the provincial Education Department and the Western Cape MPP was now
increasingly geared to rural areas. He indicated that the targeted areas for
club development were soccer, netball and rugby.
The Chairperson stated that provincial departments were entitled to a certain
percentage of the Municipal Infrastructure Grant (MIG) and that as they engaged
with municipalities they must inform them of the percentage allocation to sport
and stop pleading poverty when presenting to the Committee.
Gauteng Department of Sport Arts Culture and Recreation
Ms Dawn Robertson, HOD, Gauteng Department of Sport, Arts, Culture and
Recreation, indicated that her department’s conditional grant budget amounted
to R16.8 million of which 78% was spent in the 2006/07 financial year. The
Capital Expenditure (CAPEX) budget amounted to R53.4 million and funding was
made available to municipalities for the implementation of infrastructure
projects. She indicated it would be used to upgrade four named stadiums to be
used as training grounds for 2010 in Gauteng. After refurbishment, these would
be leased to Premier Soccer League (PSL) soccer teams for upkeep.
The MPP was the flagship of the department, and would eventually include 40
hubs in the various municipalities. A total of 121 schools had been identified
for the school sport MPP and the six codes to be played were football, netball,
cricket, rugby, volleyball and athletics.
A deputy director and project manager had been appointed for monitoring and
monthly reports were received. Moreover, to increase capacity, staff had been
transferred to hubs, and trainees and volunteers had also been used. Club
development was still in its infancy as baseline studies were still being
conducted. The MPP had created jobs, but there was a high staff turnover owing
to these people being poached.
Discussion
Mr B Tolo (ANC, Mpumalanga) asked what contributions professional soccer clubs
were making to the refurbishment of stadiums
Mr M Goieiman (ANC, Northern Cape) enquired about the contractual relationship
between provinces and stadiums and who had the final say in such stadiums. He
noted that government was refurbishing Ellis Park Stadium, although it was in
fact private property.
Ms Robertson stated that Gauteng Department was looking at implementing long
term leases with PSL clubs at the stadiums being refurbished. These clubs would
have the responsibility to maintain the stadiums. Both Ellis Park and Loftus
stadiums were the responsibilities of the respective metros.
Mr E Sogoni (ANC, Gauteng) feared that the long term leases would decrease
public access to public property. He asked about club development in Gauteng.
Mr Tolo noted that Gauteng constantly under spent on Capex and that there were
no facilities for school sport in township schools.
Mr Goeieman (ANC, Northern Cape) stated that between the North West and
Northern Cape there were assets owned by the Department of Public Works that
had not yet been registered. He indicated that some had been put on auction and
that this may be a good revenue base for municipalities. He asked how
departments were dealing with asset registration.
Mr Howard Yawa, MEC for Public Works, North West, stated that he thought that
the Northern Cape had received an asset register from the North West regarding
areas that had fallen into the Northern Cape after demarcation. He would verify
that this had been done.
The Chairperson requested a list of areas of overspending as the Committee may
want to visit these projects. Moreover he stated that the Public Works
department in Gauteng seemed to be charging departments exorbitant rent.
Mr Seiso Mohai, MEC for Public Works, Free State, indicated that his department
had overspent owing to floods that had occurred in the Free State, and yet had
not been declared a disaster area.
Northern Cape Department of Education Briefing
Mr E Williams, HOD, Northern Cape Department of Education, indicated that R
72,4 million had been allocated to his department and that 95,7% had been
spent. He indicated that R27 812 000 had been spent on infrastructure, R29 284
000 on food nutrition, R2 279 000 on life skills and HIV/ AIDS and finally R10
million on further education centres (FET). He stated that a total of 60
classrooms, 2 new laboratories, 7 ablution blocks and 3 administration blocks
had been built. There had also been an upgrade to water borne sanitation in
eleven schools and eight schools had minor rehabilitation work done.
Reasons for the under expenditure were elucidated. There had been delays in
supply and the Department only paid on delivery of equipment. The major
challenges presented were infrastructure backlogs in the Kgalagadi District
which hindered the implementation of school feeding, non-functional Health
Advisory Committees, and contractors experiencing difficulties in completing
projects timeously owing to a lack of capacity.
The Department had met the overall goals outlined in their business plan on the
four conditional grants, notwithstanding the many challenges, and looked
forward to increased management and implementation in the 2007/ 08 financial
year.
Western Cape Department of Education
The representative from the Western Cape Education Department indicated that it
had had a budget of R126 829 000 of which R123 286 000 (97, 2%) had been spent.
The rate of expenditure was good since sites for most of the school building
projects were handed over timeously to the contractors.
Owing to the increased migration into the Cape metro and to seaside towns the
Education Department requested an increased PIG (Provincial Infrastructure
Grant).
Of the R48 313 000 received for the national school nutrition programme, the
Department had spent R48 178 000 (99, 72%). The Department possessed the
capacity to monitor expenditure. 203 535 learners were fed at 991 targeted
schools, 219 school gardens had been established at schools and 95 structures
were provided at schools to serve as food preparation areas.
In regard to FET recapitalisation, the Department stated that the entire R70
million budget had been spent. It was further added
that 403 educators were capacitated to deliver 11 NCV programmes, that there
was constant staff training and that equipment and learning and teaching
materials had been procured and were in use.
The entire HIV/ AIDS budget of R11 870 000 had been spent. Challenges
were still faced in both personnel and funding.
Eastern Cape Department of Education
Ms N Mahanjama, Superintendent General: Eastern Cape Education Department, outlined the types of conditional grants for
200/07 as HIV/ AIDS, school nutrition programme and FET recapitalisation. Her
Department had received a total allocation of R355.1 million, of which R248 789
000 had been spent.
The key objectives of the HIV/ AIDS programme included the integration of HIV/
AIDS across learning areas, training and development, promotion of peer
education and research, monitoring and evaluation. The entire R25.8 million
budget allocated had been spent, with over expenditure of R174 000.
Of the R267 219 000 school nutrition budget, only 63, 6% was spent. The under
spending was explained by the suspension of all activities of the programme
after the forensic audit in December 2006. There was also poor supplier
performance and a lack of capacity within district offices. In order to address
these issues, electronic financial management of tender contracts and payments
was to be implemented, and establishment of new communication networks and the
placement of unemployed graduates would bolster district monitoring capacity.
FET recapitalisation had a budget of R61 million budget
but 85% was spent, owing to slow tender processes, slow submission of invoices
and a lack of qualified staff.
Discussion
Mr Goeieman stated that there were 14 villages recently transferred to the
Northern Cape from the North West that still had their budget allocations in
the North West. He added that in the Kgalagadi district the transport services
that were to take children to school could not cater for all children owing to
the increased numbers resulting from reallocation of cross boundary
municipalities. There had been no transfer of budgetary allocations from the
North West to the Northern Cape. This also affected health services, social
services and education. He requested a comment on this matter from the National
Treasury.
The Chairperson suggested convening an indaba with the Departments of Health,
Education, Social Services, Provincial Treasuries and National Treasury to
resolve this pertinent matter.
Mr Z Kolweni (ANC, North West) commended the Northern Cape for having increased
school nutrition to include high schools.
The Chairperson stated that all departments must be mindful of the Bill of
Rights as they carried out their duties and added that learners must not be
prejudiced. He added that the core business of provincial education departments
was to teach.
The meeting was adjourned.
Audio
No related
Documents
No related documents
Present
- We don't have attendance info for this committee meeting
Download as PDF
You can download this page as a PDF using your browser's print functionality. Click on the "Print" button below and select the "PDF" option under destinations/printers.
See detailed instructions for your browser here.