QUESTION NO. 1401 INTERNAL QUESTION PAPER NO 24DATE OF PUBLICATION: 22 August 2008
Mr I F Julies (DA) to ask the Minister of Environmental Affairs and Tourism:
Whether, with reference to his replies on 15 March 2008 to questions (a) 542, (b) 543, (c) 544 and (d) 549, he can now provide the relevant details requested therein; if not, why not; if so, when?
NW2111E
MR I F JULIES (DA) SECRETARY TO PARLIAMENTHANSARD
PAPERS OFFICE
PRESS1401. THE MINISTER OF ENVIRONMENTAL AFFAIRS AND TOURISM ANSWERS:
The full report compiled by Price Waterhouse Cooper has been provided to Mr GR Morgan of the Democratic Alliance which addresses all the questions referred to.
QUESTION NO 1402
DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: 22 AUGUST 2008
(INTERNAL QUESTION PAPER NO 24)
Mr M Waters (DA) to ask the Minister of Water Affairs and Forestry:
(1) Whether the Swartspruit in the Kempton Park area has been tested for pollution; if not, (a) why not and (b) when will it be done; if so, (i) when was the last test conducted and (ii) what were the findings;
(2) Whether any action has been taken against (a) the local authority and (b) local businesses for polluting the Swartspruit; if not, why not; if so, what action? NW2116E
REPLY:
(1) Yes. There is a monitoring programme in place for the Swartspruit / Rietvlei River. One monitoring point is located upstream of the Hartebeesfontein sewage works along the Bapsfontein road while the second point is situated downstream of the works along the Witkoppies dirt road.(i) The monitoring programme was implemented in the late 1980's and the latest set of samples was taken on 19 August 2008.
(ii) The results of the latest samples are still pending. The samples are analyzed by an accredited laboratory for physical, chemical and microbiological constituents. The water quality of the Swartspruit (like streams in other urban areas) shows an increasing trend in sewage related pollutants (Total Suspended Solids, Total Dissolved Solids, Nitrates, Sulphates, E Coli and Faecal Coliforms). The main source of the pollutants is sewage spills in the Swartspruit catchment. The Hartebeesfontein sewage works is performing well and does not contribute to the problem.
(2) Yes. (a) A compliance notice was sent to the Ekurhuleni Metropolitan Municipality to rectify a malfunctioning sewage pump station in Pomona (Kempton Park).
(b)The Department engages with the municipalities, including Ekurhuleni, through the Hennops River Forum to identify the sources of pollution and requests them to respond as quickly as possible to deal with the sources of pollution, especially sewer spillages. A river clean up project has also been initiated on the Kaalspruit (a tributary of the Hennops) by the Department together with a Task Team from the Hennops River Forum to identify other causes of pollution, to clean up the river and to initiate further programmes to deal with pollution problems.
QUESTION: NO 1404
(Internal Question Paper No – 2008)
1404. Mr M Waters (DA) to ask the Minister of Sport and Recreation:
(1) Whether playground equipment are locally manufactured; if not, what is the
position in this regard; if so,
(2) whether surfacing safety guidelines or standards of the South African Bureau of Standards apply to such equipment; if not, what is the position in this regard; if so, (a) what are they and (b) how are they enforced;
(3) whether South Africa has contravened the United Nations Convention on the
Rights of the Child regarding safe playgrounds; if so, when will this be rectified;
(4) whether safe playgrounds are one element that would assist South Africa in
meeting the content of this convention; if not, why not; if so, what are the
relevant details?
NW2118E
REPLY:
1. Yes. Most of the equipment is manufactured locally. In exceptional cases some specialized equipment that does not exist in the country would be imported.
2. Yes. Surfacing and equipment is done in accordance with the South African National Standards (SANS) regulations, formerly SABS.
a) The regulations are:
SANS 400 National Building Regulations
SANS 142 Electrical Wiring
SANS 241 Regulation for Water Supply
SANS 763 Hot dip galvanizing after fabrication
(b) They are enforced through site inspections. SRSA has established a Technical Support Sub-unit which amongst other things will carry out technical assessment of sport and recreation facilities.
3. No. South Africa has not contravened the United Nations Convention on the Rights of the Child as contained in Article 31 of the 1989 Convention. There are however financial constraints which limits the efforts to ensure that suitable amenities are provided in the disadvantaged areas.
4. Yes. Safe playgrounds would assist South Africa in meeting the content of the UN Convention on the Rights of the Child. Sport and Recreation South Africa has as an effort to ensure equitable provision of amenities of an acceptable standard developed the Norms and Standards for Sport and Recreation Infrastructure.
QUESTION NUMBER: 1406
DATE PUBLICATION: 01 AUGUST 2008
DATE REPLY SUBMITTED: 28 AUGUST 2008
MS PATRICIA DE LILLE (ID) TO ASK THE MINISTER IN THE PRESIDENCY:
(1) (a) What is the total sum paid by the state in legal fees and costs to date on behalf of the former Deputy President, Mr Jabob Zuma and (b) What further sums is it anticipated the State will pay in this regard;
(2) Whether Mr Jacob Zuma's legal team made any requests for payment above the anticipated amount; if so, how much?
N2145E
REPLY:
Question 1
An amount of R9, 676, 176.21 has to date been paid in respect of legal costs in the corruption charges against the former Deputy President.
Question 2
It is difficult to estimate the costs that the state will pay in view of the fact that the trial has not yet started and the anticipated application by Mr Zuma to stay the proceedings. It is difficult to determine the duration of the trial considering the postponements and other interlocutory proceedings which might arise.
The fee may also be influenced by the size of the legal team representing him in court.
Question 3
Since the matter was struck off the roll in September 2007, no further request for payment for the Zuma legal team has been made over and above the figure mentioned in Question 1 above.
QUESTION NO: 1409
MR I E JENNER (ID) TO ASK THE MINISTER OF CORRECTIONAL SERVICES
(1) How many prisoners (a) has the Mthatha Medium Prison been built for and (b) were being held in this prison as at 1 July 2008;
(2) what (a) ablution facilities (i) exist and (ii) have been available for the prisoners and (b) number of mattresses, blankets and/or sleeping facilities have been made available for these prisoners? NW2148E
REPLY
(1)(a) and (b) Certified information is unfortunately only available up to 30 June 2008. On this date, Mthatha Medium Correctional Centre had accommodation capacity for 580 inmates whilst 1 161 Awaiting Trial Detainees and 831 Sentenced Offenders (total of 1 992) were incarcerated.
(2)(a)(i) and (ii) Two showers, two toilets and two washing basins are provided for in each communal cell, whilst one toilet and one washing basin are provided for in each single cell.
(2)(b) Each offender is issued with one mattress, four blankets, two sheets and one pillow.
Question 1411
Mr L W Greyling (ID) to ask the Minister of Trade and Industry:
(1) Whether a private shipping company will be formed with state backing to cover the shipping routes between Brazil, South Africa and India; if not, what is the position in this regard; if so, when will the tender be issued for such a shipping company;
(2) Whether the Government has signed a memorandum of understanding with India in this regard; if not, what is the position in this regard; if so, what are the relevant details;
(3) Whether the Government is in negotiations with any South African companies concerning the setting up of such a shipping company; if not, what is the position in this regard; if so, what are the relevant details?NW2150E
Response:
While the dti participates in the India-Brazil-South Africa initiative, as part of the government's overall engagement with these strategic partners, the specific area of marine transport and shipping is the responsibility of the Department of Transport.
QUESTION 1413
WRITTEN REPLY
DATE OF PUBLICATION: FRIDAY, 23 AUGUST 2008
INTERNAL QUESTION PAPER NO.: 24-2008
MR L W GREYLING (ID) TO ASK THE MINISTER OF DEFENCE
Whether the SA Navy has trained crew to man the three new submarines in the fleet; if not, (a) what are the extent of shortages, (b) in what areas of the operation of submarines and (c) what steps are being taken to reverse the shortages?
-------ooo0ooo------- NW2152E
REPLY
(a) & (b) The SA Navy did train sufficient submariners for all three submarines. However, it has lost numerous qualified submariners
(c) The SA Navy therefore now has sufficient crew to man the two submarines that are currently operational. The third submarine is undergoing a maintenance cycle and as such does not require an entire crew.
The SA Navy has gone on record a number of times to indicate that there is a shortage of technical personnel in the Navy. Due to the technical nature of the submarines, the crew is predominantly technically trained, which means that there is currently a shortage of submarine qualified personnel.
The SA Navy is in the process of implementing a strategy aimed at retaining the scarce skills of submariners and is actively targeting the submariners in the Navy in order to ensure that their services are retained.
QUESTION NUMBER 1414
DATE OF PUBLICATION: 22 AUGUST 2008
MR M H Hoosen (ID) to ask the Minister of Finance:
(1) What is the point of dispute between the parties involved in the Financial Services Charter process talks that were halted;
(2) whether he has found justifiable reasons for the delay; if so, what are the relevant details;
(3) whether he is considering any action to resume and complete the talks; if not, why not; if so, what are the relevant details? NW2153E
REPLY:
(1) The point of dispute between the parties involved in the Financial Sector Charter (FSC) process is around the extent of alignment between the FSC and the Codes of Good Practice (the Codes), issued by the Minister of Trade and Industry in terms of the Broad-Based Black Economic Empowerment Act, 2003 (B-BEEE Act). The FSC preceded the generic Codes as they took effect on 1 January 2004, whilst the Codes were gazetted on the 9 February 2007.
The Codes require that sector-specific charters like the FSC have to be gazetted as a sector code in terms of section 9 of the B-BBEE Act, in order for such sector codes to apply instead of the generic Codes. The dispute arosed when the FSC Council applied for a sector 9 gazetting notice, as the Labour and Community representatives objected to such gazetting for public comments as they first wanted a change to the black direct ownership targets to increase from 10% to 15%.
Both the FSC and the Codes set a minimum target of black ownership at 25%, but the FSC stipulates that 10% of this 25% target "must be satisfied by way of direct ownership by black people", and that a maximum of 15% of the 25% target may be satisfied by way of indirect ownership by black people. This target was to make it easier for black people to secure a significant ownership share in financial institutions, without exposing them to the risk of liability for funding.
(2) It should be noted that unlike the Codes, the FSC has "access" and "empowerment financing" targets that have direct positive impact on the economic growth, poverty alleviation and financial inclusion. Our position as government has always been that transformation and empowerment must be embraced, but not at the cost of threatening the financial stability of the country. It is our view that such transformation must be broad-based and sustainable. For this reason, Government does not support the approach taken by Labour and Community constituencies.
The approach taken by the Labour and Community constituencies increases the risk of instability in the banking and financial sector at a time when international banks are going through great financial stress, and also undermines the access targets of the FSC in favour of narrow based ownership targets. Their approach has surprised government, as it came as a sudden switch in policy priorities. This after they (together with government) fought strongly for tough access targets during the process of establishing the FSC. Indeed, such was the enthusiasm for the access targets, that Dr. Blade Nzimande (who represents the community) in a written submission to a Parliamentary hearing dated May 2005:
"Arising from this perspective, the SACP is of the view that changing the racial and gender composition of agents in ownership or leadership positions in capitalist enterprises operating in the formal sector of the economy, although an important and valid objective in its own right, must be subordinated to, and located within a broader programme to transform our existing dualistic socio-economic reality in ways that benefit working people and the poor".
This initial approach recognised that banks and other financial institutions are regulated institutions, and that any significant ownership share has to be approved by the relevant regulator. This is because, unlike non-financial institutions, a financial institution that experiences capital or liquidity problems is exposed to a run on that institution – for this reason, international rules like Basel II and local legislation like the Banks Act require shareholders holding more than 15% of shares to inject readily available (and not leveraged) cash into that financial institution. We see such capital and liquidity injections with the many US and other international banks that have run into trouble in the last year, as a result of sub-prime and related problems. For this reason, government cannot agree to any proposal on changing the ownership target to 15% as this significantly increases the risk to the financial sector.
Government is also committed to protect the integrity of the FSC by not changing targets or rules mid-stream, and therefore affect (many current BEE deals retrospectively. In any case, all FSC targets would be reviewed in 2010 in terms of the Charter. It is important that potential and foreign investors have confidence that Government sticks to its words, and does not continually change the rules unless there are really good economic reasons for doing so.
(3) Yes, I continue to engage with all stakeholders in the FSC Council as it is important for all the stakeholders to seek and find common ground on transformation and to make sure that the important and unique aspects of the FSC around access are not lost. The FSC has been hailed as an unprecedented success and a unique charter internationally. If the generic Codes were to .replace the FSC, then its current access and empowerment financing (which currently total 40%) targets would be significantly reduced to a maximum of 5% as required by the socio-economic development/residual target of the Codes. These access targets are far too important to give up, and I will continue to engage with Labour and Community to come to an agreement with all other stakeholders and preserve the FSC.
For the information of the House, I should add that since the impasse in October 2007, I have convened at least five meetings with the principals of the labour and community constituencies. More recently, I invited the principals of all the constituencies to meet with the Minister of Trade and Industry and myself on 18 August 2008, with the aim of re-igniting the same kind of commitment and spirit that saw the formation and launching of the FSC. Though labour and community constituencies did not attend, all the other stakeholders present in the meeting emphasised the importance of saving and preserving the gains of the FSC, and the need to find a solution urgently.
Since the 18 August meeting, the Minister of Trade and Industry has published a press statement dated 31 August 2008 indicating his intention to gazette the FSC as a draft Sector Code. Such a gazette will require public comment within 60 days. It is my hope that we, the principals of the FSC Council, will resolve the problem within this time and ensure that the FSC eventually takes effect as a Sector Code.
QUESTION 1416
Dr R Rabinowitz (IFP) to ask the Minister for Public Enterprises:
(1) Whether the government will continue to subsidise the SA Airways (SAA) with taxpayers money in view of its losses suffered (details furnished); if not, why not; if so,
(2) whether he has any plans in place to (a) reduce the burden on the taxpayers of subsidising the SA Airways and (b) improve competitiveness in the airline industry; if not, why not; if so, what are the relevant details? NW2156E
REPLY:
(1) Government is not subsidising SAA but like any other shareholder is funding the restructuring costs. SAA is in the process of implementing a challenging restructuring exercise which began in 2007. SAA has achieved a operating profit of R 123 million at the end of 2007/08 excluding restructuring costs. Government has provided R 653 million (excluding VAT) to fund the restructuring exercise. Furthermore, in 2007/08 Government provided SAA with guarantees amounting to R 1 560 million for the grounding of the B 747-400 aircraft. The guarantees were used to raise fund in the market at commercial interest rates.
(2)(a-b)The restructuring plan has improved the sustainability and competitiveness of SAA by reducing the ongoing cost base by approximately R1,1 billion per annum. Revenue has also improved over this period, thus improving the overall sustainability of the airline. The airline has still some way to go before it can boast of success in its restructuring programme, however the signs are encouraging. The high oil prices and depressed global economic environment are challenging for all carriers including SAA and makes this an important ongoing imperative.
Question 1417
Dr P J Rabie (DA) to ask the Minister of Trade and Industry:
Whether his department has been requested to extend the deadline for gazetting the Financial Sector Charter; if so, what are the relevant details?NW2157E
Response:
The Codes of Good Practice for B-BBEE were gazetted on the 9thFebruary 2007, with a Transitional period of 12 months granted to the entire market. In response to requests the transitional period was extended for a further six months. The extension was deemed to have been sufficient to enable the alignment of charters to the codes. Therefore the transitional period lapsed on 1 September 2008. By 31 August 2008, the department had received at least 7 industry sector charter applications for gazetting under section 9 of the B-BEE Act, being the following: Financial Sector Charter (FSC), Construction Charter, Property, Forestry, Marketing and Advertising Charter, Transport and ICT.
Charters that have applied for gazetting before the end of the Transitional Period ending 31 August 2008 will be processed accordingly and afforded a 60-day public commentary process as per section 9 of the B-BBEE Act coupled with a 30 day technical analysis process. Thereafter the Charters will be gazetted as sector codes. All other sectors of the economy will be governed by the Codes.
Question 1418
Dr P J Rabie (DA) to ask the Minister of Trade and Industry:
Whether his department is considering changing the current vehicle incentive schemes which rewards exports with the import-duty rebates in the new motor industry development programme to be announced shortly; if so, what are the relevant details? NW2158E
Response:
To ensure consistency with government's international obligations, the new vehicle incentive scheme will shift from export incentives and reward value addition and volume production. The details on the new scheme were communicated to stakeholders on 4 September 2008.
Question 1420
Mr L B Labuschagne (DA) to ask the Minister of Trade and Industry:
Whether any member of a distribution agency appointed in terms of the Lotteries Act, Act 57 of 1997, benefited from any distributions made by such agency in the past; if so, (a) to what extent and (b) what steps are being taken to ensure that no member of such an agency is a beneficiary of any funds distributed?NW2160E
Response:
A member of a distribution agency did benefit from distributions made.
a. The benefit was through a share of the R3million Management Fee.
b. the dti is developing guidelines to prevent such an occurrence in the future QUESTION NO: 1421PUBLISHED IN INTERNAL QUESTION PAPER NO 24 of 22 AUGUST 2008
Mr LB LABUSCHAGNE (DA) to ask the Minister of Foreign Affairs:
(1) How many Heads of Mission have been recalled before the expiry of their contract terms (a) in 2006, (b) in 2007 and (c) during the period 01 January 2008 up to the latest specified date for which information is available?
REPLY:
(1) (a) One (1) Head of Mission was recalled in 2006
(b) One (1) Head of Mission was recalled in 2007
(c) One (1) Head of Mission recalled during the period 01 January 2008 to date
QUESTION NO.: 1422 DATE OF PUBLICATION: 22 AUGUST 2008Mr L B Labuschagne (DA) to ask the Minister for Justice and Constitutional Development:
(1) How many court orderlies are employed at the Hatfield Community Court in Pretoria;
(2) whether there is a sufficient number of court orderlies at the said court; if not, why not; if so, what are the relevant details?
NW2162E
REPLY
(1) There are six court orderlies employed at the Hatfield Community Court.
(2) I have been informed that there are sufficient court orderlies employed at the Hatfield Community Court.
QUESTION 1423
DATE OF PUBLICATION OF INTERNAL QUESTION PAPER: 22/08/ 2008
(INTERNAL QUESTION PAPER 24-2008)
Mr GG Boinamo (DA) to ask the Minister of Education:
(1) Whether her department commenced with implementing the policy to offer indigenous languages in all the schools; if not, what is the position in this regard; if so, (a) when and (b) in which grades;
(2) Whether her department has taken into account the difficulty of introducing indigenous languages to older learners; if not why not; if so, what steps has her department taken to deal with these difficulties? NW2163E
REPLY:
(1) Everyone has the right to be taught in the official language of their choice at a public educational institution "where this is reasonably practicable". The Language in Education Policy (1997) specifies that it is "reasonably practicable" to teach in a preferred language if there are at least 40 primary or 35 secondary learners in a particular grade who request it at a particular school. Parents who believe this right is not being promoted and fulfilled should approach, in the first instance, the school governing body, which sets a school's language policy. If they do not feel sufficiently accommodated, parents should then contact the relevant local education authority.
Schools offer the 11 official and 14 other languages as subjects at three different levels: home language, first additional language and second additional language. With the agreement of the provincial department of education, schools determine what languages should be offered at what level, based on demand from parents. Again, parents must ensure that their preferences are made known to the school through the governing body. I encourage all schools to offer at least one African language as part of their curriculum. In fact, most schools in South Africa offer an African language as a subject in both the GET and FET phases, but it is not as yet a compulsory requirement.
(2) Yes. Learners cannot begin a new language as a subject in the FET phase (post Grade 9). Learners must have taken a language in the GET phase in order to offer that language for matric. It should also be noted that in order to be offered as a subject, any language must comply with all the requirements set out in national policy regarding the outcomes and literature requirements. Any language must be determined as policy before a school may offer it for certification purposes.
QUESTION 1424
DATE OF PUBLICATION OF INTERNAL QUESTION PAPER: 22/08/ 2008
(INTERNAL QUESTION PAPER 24-2008)
Mr GG Boinamo (DA) to ask the Minister of Education:
(1) Whether by spending more funds to expand the Further Education and Training (FET) colleges, her department intends replacing matric with FET qualifications, if not, what is the position in this regard; if so, what are the relevant details;
(2) What steps her department has taken to ensure that schools continue to aim for high matric pass rates?
NW2164E
REPLY:
(1) No, the NC (V) qualification for colleges will not replace the matric qualification. Young people have a choice of two qualifications in the FET learning pathway. Both college and matric qualifications serve important but different purposes. The matric qualification will continue to provide a general education for students wishing to pursue an academic career. The NC (V) qualification provides an opportunity for young people to begin their education and training in a given vocational specialization as early as possible. It also allows those with general academic qualifications, such as the matric, to access the vocational specializations should they choose to do so.
The NC (V) qualifications require that students:
The increased expenditure in colleges is motivated by two essential factors. The first is the historical under-funding of FET colleges, which dates back to the former Technical Colleges era. The second is the need to reposition these colleges to respond appropriately to the new and emerging skills demands in the labour market. The responsibility to provide simulated learning environments, for example, is a considerable cost driver in this sector.
(2) The Department of Education has developed a plan to support schools and the Grade 12 learners who will be writing the National Senior Certificate examination in November 2008. As part of this process, the Department introduced a variety of interventions to support the readiness of schools for these examinations. The interventions included the following:
- Subject adviser and teacher training
- The development of Learning Programme Guidelines, which provide guidelines on teaching each subject in Grades 10, 11 and 12. These include 40 week programmes to provide guidance on coverage, pace and sequence for delivering the curriculum
- Subject Assessment Guidelines which indicate the types and nature of the assessment tasks to be developed
- The development of catalogues of approved textbooks for grades 10, 11 and 12
- The provision of textbooks to grade 10, 11 and 12 learners
- The development of examination exemplars for Grades 10, 11 and 12 by the Department's examination panel
- The publication and distribution of examination exemplars in Study Mate and Studie Pel, in each of 33 weeks from March to October 2008
- The development and distribution of a book of Exemplar Maths and Maths Literacy Papers for grades 10, 11 and 12 funded by Old Mutual
- Saturday classes
- Winter schools
- The National Strategy for Learner Attainment which provides specific support for schools that achieved under 60% pass rate in the Senior Certificate.
These interventions are intended to support schools achieve good pass rates in the National Senior Certificate examinations.
QUESTION 1425
DATE OF PUBLICATION OF INTERNAL QUESTION PAPER: 22/08/ 2008
(INTERNAL QUESTION 22-2008)
Mr GG Boinamo (DA) to ask the Minister of Education:
(1) Whether her department has taken any steps to prevent learners from falling pregnant; if not, why not; if so, what steps;
(2) Whether these numbers have decreased since the introduction of these steps; if not, what is the position in this regard; if so, what are relevant details?
NW2165E
ANSWER:
(1) Government recognizes that schoolgirl pregnancy is a social issue that causes anxiety for learners, teachers and schools. The Measures for the Prevention and Management of Learner Pregnancy, which the Department published in 2007 and distributed to all schools, provides guidelines for dealing with schoolgirl pregnancies. These guidelines focus on prevention, emphasizing the importance of sex education, HIV/Aids education and peer education among pupils, but also offer practical steps to take when schoolgirls become pregnant. The guidelines aim to educate and assist learners to understand and exercise their rights and responsibilities in relation to pregnancy. In support of the guidelines, the Department is developing materials to assist teachers in dealing with the complexities of schoolgirl pregnancy at school. The Department will publish the first edition of a series of support materials in late September 2008. The guidelines complement preventative programmes emphasizing abstinence amongst school-going youth, such as the Life Orientation curriculum, HIV and AIDS peer education programmes, the Girls' Education Movement clubs, and human rights and values education programmes of the Department focusing on responsibilities and positive lifestyle choices.
(2) It is too early to measure the impact of the guidelines on the reduction of learner pregnancy at school. However, the Department is investigating the current data and research available on teenage and schoolgirl pregnancy. The results of this research will be available in early 2009.
QUESTION NO 1426
DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: 22 AUGUST 2008
(INTERNAL QUESTION PAPER NO 24/2008)
Date reply submitted: 21 October 2008
Ms D Kohler-Barnard ask the Minister of Safety and Security:
(1) (a) What is the status of investigations into certain cases (details furnished), (b) what are the details of any arrests made, (c) what are the reasons for any case being closed, (d) what are the court hearing dates regarding each case and (e) what are the further relevant details in each case;
(2) whether any formal complaint of police complicity and/or lack of action against a certain local criminal syndicate (name furnished) have been made by any member of the public in the Venterstad or Oviston area against the SA Police Service; if so, what are the relevant details?
NW2169E
REPLY:
(1)(a - e) Venterstad CAS 69/02/2008
Housebreaking and Theft: Bowling club - stolen property valued at R50,00.
No suspect and no arrest. Personnel of the Local Criminal Record Centre (LCRC) visited the scene of crime and to date no links could be made with suspects.
Case closed as undetected. No information is available for the case to be opened.
Venterstad CAS 09/01/2006
Housebreaking and Theft: Residence - laptop - valued at R11 000,00. Laptop was recovered and as a result of information, one (1) arrest was made. The case was heard in court and the accused was found Not Guilty and Discharged. The accused is one of the members of the so-called "the family".
Court case number: 01/2006.
Venterstad CAS 02/08/2007 must read Venterstad CAS 01/08/2007
Housebreaking and Theft: Residence - stolen property valued at R250,00.
No suspect and no arrest. Personnel of the LCRC visited the scene of crime and to date no links were made with any suspects.
Case closed: File (fingerprints available) and to be brought forward in 2009/08. No information is available for the case to be opened.
Multiple cases under the name of RB Napier for July 2008.
No, cases reported in this period by the above complainant.
Venterstad CAS 15/07/2006
Housebreaking and Theft: Residence - stolen property valued at R300,00.
No suspect and no arrest. Personnel of the LCRC visited the scene of crime and to date, no links could be made with suspects.
Case closed as Undetected (fingerprints are available). No information is available for the case to be opened.
Venterstad CAS 25/10/2006 must read Venterstad CAS 28/10/2006
Housebreaking and Theft: Residence - stolen property valued at R30,00.
No suspect and no arrest. Personnel of the LCRC visited the scene of crime and no fingerprints were found at the scene.
Case closed: Undetected. No information is available for the case to be opened.
(2) No.
QUESTION NO 1427
DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: 22 AUGUST 2008
(INTERNAL QUESTION PAPER NO 24/2008)
Date reply submitted: 21 October 2008
Ms D Kohler-Barnard ask the Minister of Safety and Security:
With reference to his replies to Question 44 on 29 May 2008 and Question 924 on 13 August 2008, how many of these members who appeared before the court (a) were found (i) guilty and (ii) not guilty and (b) had their charges withdrawn in (i) murder, (ii) rape, (iii) corruption and (iv) armed robbery?
NW2170E
REPLY:
(1) Criminal outcomes of criminal cases during the period 2006-01-31 to 2008-01-31 are as follows:
(a) (i) Number of members found guilty : 108
(ii) Number of members found not guilty : 60
(b) Number of charges withdrawn in:
(i) Murder : 8
(ii) Rape : 23
(iii) Corruption : 37
(iv) Armed Robbery : 13
QUESTION: NO 1428
(Internal Question Paper No – 2008)
1428. Mr T D Lee (DA) to ask the Minister of Sport and Recreation:
(1) (a) What are the reasons for setting up the Ikhaya Centre at the 2008 Olympics
in Beijing, (b) on whose authority was the decision to set up the centre approved,
(c) how much was (i) budgeted for, (ii) allocated to and (iii) actually spent on the
centre and (d) what is the total cost for (i) accommodation, (ii) hiring offices and
(iii) staff remunerations regarding the expo;
(2) whether his department had any cheaper alternative venue to host the event; if
so, (a) why was such a venue not chosen, (b) on what date was this centre
planned to be (i) opened and (ii) closed and (c) on what date was this centre
actually (i) opened and (ii) closed;
(3) (a) what were the reasons for the centre to open late and close earlier than
originally planned and (b) who was responsible for the failure of the centre to
open and operate as planned;
(4) whether any action has been taken against the officials responsible for the
failure; if not, why not; if so, what action?
NW2171E
REPLY:
(1) (a) Reasons for setting up the Ekhaya Centre at the 2008 Olympics in Beijing were: To promote the country's image and to counteract 'Afro-pessimism' by showcasing progress of South Africa's preparations towards hosting the 2010 FIFA World Cup. This would also showcase the country's ability to host major events. The centre was also seen as an opportunity to promote tourism and sport tourism in particular. It was also intended to provide South Africans, Team SA, and the sponsors of Team SA, a home away from home. Ekhaya was also one of the projects that were used to celebrate the 10 year anniversary of diplomatic relations between South Africa and the People's Republic of China during 2008.
(b) The decision to set up the centre was approved by: the Minister after a decision by the IRPS Cluster
(c) Amount (i) budgeted: R17, 891, 340
(ii) Amount allocated: R 11,000,000 (2007/08) R6,000,000 (2008/09)
(iii) Actual amount spent: R16, 591, 796
and
(d) The total cost for (i) accommodation: R5, 965, 008
(ii) hiring offices: = R5, 967,774
and
(iii) staff remunerations regarding the expo: R107, 500.00;
(2) whether there was any cheaper alternative venue to host the event: No. SRSA sourced the assistance of the South African Embassy in Beijing that indicated that suitable venues have been taken up by countries that offered to settle the full costs in advance.
If so, (a) why was such a venue not chosen, N/A
(b) on what date was this centre planned to be (i) opened: 5 August 2008
and (ii) expected closing date: 12 September 2008.
and (c) Date on which the centre was actually (i) opened: 6 August 2008
and (ii) closed; 25 August 2008.
(3) (a) what were the reasons for the centre to open late and close earlier than
originally planned:
- Intensive security arrangements linked to President George Bush's stay at the hotel hosting Ekhaya: the security arrangements were such that it was difficult for non guests and people who were not IOC (International Olympic Committee) accredited to get easy access to the hotel. As Ekhaya events targeted even people who were not part of the two aforementioned groups, it became difficult to go on with planned operations.
- Exhibition material: the material that was shipped to Beijing was held by customs in China. The Embassy could not release the material earlier as most of it was addressed to SRSA officials that were part of the Ekhaya Team.
- The centre was closed earlier than anticipated on the instruction from the Ministry.
(b) who was responsible for the failure of the centre to open and operate as planned; Although we acknowledge that the centre experienced operational challenges in the beginning, thus preventing it from fully achieving as planned, it cannot be judged to have been a failure. The Department is awaiting reports about the centre, from all stakeholders.
(4) whether any action has been taken against the officials responsible for the
failure; if not, why not; if so, what action? Flowing from the response in 3b above, no action has been taken against any official.
QUESTION: NO 1429
(Internal Question Paper No 24 - 2008)
1429 Mr T D Lee (DA) to ask the Minister of Sport and Recreation:
What are the reasons for his department spending more on the expo at the 2008, Olympic Games and on the SA Sports Confederation and Olympic Committee (SASCOC); than on Team SA's preparations for the Olympics?
NW2172E
REPLY:
It is incorrect to imply that the Department spent more funds on the expo (Ekhaya) than on team preparation. During the 2007/2008 financial year alone the Department spent R21 354 569.95 on preparation of the team.
This amount was split as follows: R9 100 000.00 was allocated to SASCOC; of which R6 100 000.00 was utilized for Operation Excellence and R3 000 000.00 for the 2007 All Africa Games which in itself is a preparatory event for the Olympic Games.
The amount of R12 254 569.95 was paid to the High Performance Centre, at the University of Pretoria as they won the tender for the preparation of athletes through the National Academy Programme.
The table below shows the breakdown per federation of the funds spent on the National Academy Programme at the High Performance Center from 2005 to 2008. The total spent for the period referred to above is R25 270 306.29 excluding funds allocated to SASCOC (Olympic sports in italics).
FEDERATION | 2005/2006 | 2006/2007 | 2007/2008 | TOTAL 2005-2008 |
ARCHERY | 345,000.00 | 25,919.70 | 12,181.62 | 383,101.32 |
ATHLETICS | 219,000.00 | 1,916,238.85 | 2,932,757.45 | 5,067,996.30 |
BADMINTON | 111,000.00 | 275,073.83 | 390,330.05 | 776,403.88 |
BASKETBALL | 218,000.00 | 165,630.96 | 383,630.96 | |
BOWLS | 118,000.00 | 118,000.00 | ||
BOXING | 333,000.00 | 339,160.19 | 523,779.34 | 1,195,939.53 |
CANOEING | 107,000.00 | 635,159.96 | 631,268.87 | 1,373,428.83 |
CYCLING | 283,000.00 | 283,000.00 | ||
EQUESTRIAN | 119,871.47 | 119,871.47 | ||
FENCING | 44,665.85 | 44,665.85 | ||
GYMNASTICS | 276,000.00 | 94,062.64 | 316,479.41 | 686,542.05 |
HOCKEY | 288,000.00 | 559,967.29 | 1,392,446.41 | 2,240,413.70 |
JUDO | 83,000.00 | 81,586.57 | 178,810.07 | 343,396.64 |
PENTATHLON | 75,000.00 | 44,343.52 | 98,105.17 | 217,448.69 |
ROWING | 382,000.00 | 1,120,914.29 | 1,574,138.62 | 3,077,052.91 |
SAILING | 132,510.33 | 88,788.00 | 221,298.33 | |
SOFTBALL | 68,000.00 | 88,436.15 | 156,436.15 | |
SWIMMING | 461,000.00 | 1,076,732.04 | 1,620,907.73 | 3,158,639.77 |
SHOOTING | 103,000.00 | 103,000.00 | ||
SQUASH | 23,000.00 | 23,000.00 | ||
TAEKWONDO | 179,000.00 | 214,003.82 | 529,860.11 | 922,863.93 |
TENNIS | 67,648.00 | 59,192.00 | 126,840.00 |
TRIATHLON | 84,000.00 | 83,552.29 | 68,432.29 | 235,984.58 |
TABLE TENNIS | 137,000.00 | 521,222.69 | 659,023.77 | 1,317,246.46 |
VOLLEYBALL | 476,000.00 | 1,063,037.26 | 757,319.57 | 2,296,356.83 |
WRESTLING | 67,000.00 | 112,236.11 | 29,596.00 | 208,832.11 |
WEIGHTLIFTING | 50,736.00 | 138,180.00 | 188,916.00 | |
TOTAL | 4,436,000.00 | 8,579,736.34 | 12,254,569.95 | 25,270,306.29 |
QUESTION: NO 1430
(Internal Question Paper No 24 - 2008)
1430. Mr T D Lee (DA) to ask the Minister of Sport and Recreation:
What is the breakdown of the amount of money allocated to the SA Sports Confederation and Olympic Committee (SASCOC) for Team SA's preparation for the 2008 Olympics with regard to each sporting code in which athletes qualified?
NW2173E
REPLY:
An amount of R6,1m was allocated to SASCOC for the 2007/2008 financial year for Operation Excellence (athlete stipends). This amount was broken down as follows per federation:
OLYMPIC CODES | AMOUNTS |
Athletics | 400,000.00 |
Badminton | 110,013.20 |
Basketball | 64,000.00 |
Boxing | 40,000.00 |
Canoeing | 196,000.00 |
Rowing | 195,000.00 |
Shooting | 50,013.20 |
Swimming | 497,500.00 |
Gymnastics | 30,013.20 |
Hockey | 796,000.00 |
Sailing | 105,000.00 |
Table Tennis | 60,000.00 |
Tennis | 195,500.00 |
Triathlon | 20,000.00 |
Volleyball | 82,000.00 |
Weightlifting | 40,000.00 |
Wrestling | 16,000.00 |
TOTAL | 2,897,039.60 |
PARALYMPIC CODES | AMOUNTS |
Athletics | 425,000.00 |
Basketball | 384,000.00 |
Cycling | 143,651.23 |
Equestrian | 115,827.41 |
Football | 138,080.90 |
Swimming | 211,142.43 |
Table Tennis | 156,839.57 |
Tennis | 4,180.00 |
Powerlifting | 76,598.48 |
Wheelchair Rugby | 31,629.17 |
Deaflympics | 55,957.78 |
Athletes Support - Paralympics | 1,989,861.16 |
TOTAL | 3,732,768.13 |
GRAND TOTAL | 6,629,807.73 |
Question 1431
Mrs J A Semple (DA) to ask the Minister of Trade and Industry:
(1) Whether the National Lotteries Board (NLB) have conditionally allocated any amounts to the (a) Novalis Ubuntu Institute, (b) Thohoyandou Victim Empowerment Programme and/or (c) Teddy Bear Clinic; if so, with regard to each institution, (i) what amounts were conditionally awarded and (ii) when was each notified;
(2) Whether, with regard to each of these institutions, the amount conditionally approved was fully paid; if not, (a) what amount was not paid and (b) what conditions did the institution fail to comply with; if so, (i) what amount was paid and (ii) when;
(3) (a) how was the decision of the NLB communicated to each institution and (b) on what date in each case? NW2174E
Response:
(1) a. The National Lotteries Board (NLB) has not allocated any conditional amount to the Novalis Ubuntu Institute.
b. The National Lotteries Board (NLB) has not allocated any conditional amount to the Thohoyandou Victim Empowerment Programme.
c. A conditional amount was allocated to the Teddy Bear Clinic.
i. An amount of R2 million was conditionally awarded.
ii. The amount was allocated in January 2007.
(2) a. The amount of R2 million was not paid to the Teddy Bear Clinic.
b. he organisation was requested and failed to submit signed Articles of Association and a detailed Income and Expenditure Statement for their 2004 Financial Statements
(3) A letter was faxed to the Teddy Bear Clinic on 27 March 2007 informing the organisation to submit the outstanding information by 30 April 2007. The organisation did not submit the information by the deadline and the conditional approval was subsequently withdrawn.
QUESTION NO.: 1432 DATE OF PUBLICATION: 22 AUGUST 2008Ms M Smuts (DA) to ask the Minister for Justice and Constitutional Development:
Whether her department has considered introducing legislation compelling the permanent disabling of stolen cellphones in order to discourage cellphone theft and the trade in illegal cellphones; if not, why not; if so, what are the relevant details?
NW2175E
REPLY
Extensive research relating to the prevention of theft of cellular phones and the blacklisting of such phones has been conducted. Cognizance has been taken of international trends, measures and practices in this regard. Possible interventions have been discussed with a number of role players and the matter is presently under consideration by my Department.
Furthermore, the blacklisting of lost, stolen or destroyed cellular phones is currently being dealt with in accordance with an agreement concluded between the mobile cellular telecommunication service providers and the South African Police Services. This position is in line with the international trend in that the blacklisting of stolen cellular phones is not legislated for, but left to the cellular industry to address. Since the blacklisting of stolen cellular phones, although an important step to combat cellular phone theft, is only the first step in the process, other measures are necessary to deal with the matter. These measures require legislative intervention, hence the further investigation.
QUESTION NO. 1433
(Internal Question Paper No 24 – 2008)
Mr M M Swathe (DA) to ask the Minister for Provincial and Local Government:
With regard to each municipality, (a) what was the (i) total number of staff, (ii) total number of days taken for (aa) sick leave and (bb) annual leave and (iii) rate of absenteeism, (b) (i) what total amount was spent on consultants and (ii) what was the (aa) nature of the work done by the consultants, (bb) duration of their contracts or work done and (cc) hourly rates charged by these consultants during the 2007-08 financial year and (c) what total amount was spent by each of these municipalities on (i) parties and (ii) any other social events in each of the past three financial years up to and including 15 August 2008?
ANSWER
This question requires that information covering all the two hundred and eighty-three municipalities, be made available. The information sought also covers a wide range of issues.
The National Assembly Guide to Procedure, 2004 provides that members of the National Assembly "may not raise questions which would require an impractically extensive answer". This question falls within this category. Consequently, it is not possible to respond to the question.
QUESTION NO: 1434
DATE OF PUBLICATION: 22 August 2008
QUESTION PAPER NO: 24
DATE OF REPLY:
Ms M Smuts (DA) to ask the Minister of Communications:
Whether, with reference to her reply to Question 1197 on 6 August 2008, what the position of the meeting has been on the subject of challenges to the of the SA Broadcasting Corporation (SABC) board by Cosatu and others; if not, why not; if so, what are the relevant details?
NW2177E
The meeting did not take any position as the matter was never formally raised by any of the parties present but had been widely reported on by the media.
QUESTION NO: 1435
DATE OF PUBLICATION: 22 August 2008
QUESTION PAPER NO: 24
DATE OF REPLY: 27 August 2008
Ms Smuts (DA) asked the Minister of Communications
With reference to her reply to Question 649 on 5 June 2008, (a) what were the details of the misconduct of which Mr Motsoeneng was found guilty, (b) what was the basis of his appeal and (c) on what grounds or arguments did the appeal succeed? NW2178E
REPLY
I am advised by the SABC that:
a) It would not be desirable to divulge details of the charge sheet beyond what has been given in the reply of the 5th June in the interest of human dignity and there is a lawsuit in respect of this issue.
b) and c) As indicated in the reply of 5 June 2008, the appeal was conducted by the Group Chief Executive Officer in his capacity at the Accounting Officer. Advocate Dali Mpofu, has since been on suspension since May 2008. He is the only one who can respond to this question effectively.
QUESTION NO. 1436
(Internal Question Paper No 24 - 2008)
Mr M M Swathe (DA) to ask the Minister for Provincial and Local Government
What is the breakdown of the (a) actual number of engineer posts and (b) the number of these posts that are vacant in each municipality as at 1 August 2008?
ANSWER
The Honourable Member will note that information has been obtained from Northern Cape and Western Cape provinces. The outstanding information from Eastern Cape, Gauteng, Free State, Kwa Zulu Natal, Limpopo, Mpumalanga, and North West province will be made available to the Honourable Member as soon as it has been received.
See the tables here: http://www.pmg.org.za/docs/2008/questions/Q1436tables.pdf
QUESTION NO 1438
DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: 22 AUGUST 2008
(INTERNAL QUESTION PAPER NO 24)
Mr E W Trent (DA) to ask the Minister of Water Affairs and Forestry:
(1) Whether any investigations or feasibility studies have been or will be conducted into the construction of a dam across the Umzimvubu River; if not, why not; if so, what are the relevant details;
(2) Whether any companies or interested parties have made unsolicited bids to participate in the proposed development; if so, (a) what are the names of the companies or interested parties and (b) what are the further relevant details? NW2181E
---00O00---
REPLY:
(1) The DWAF is not investigating any specific dam for any specific purpose on the Umzimvubu River. Such a study will only be done on the request of ASGISA Eastern Cape (Pty) Ltd, which has been specially created to lead the development of the Umzimvubu River catchment, as well as areas lying in the geographical region generally referred to as the Umzimvubu Development Zone. In anticipation of the water-related developments of the region, and in line with the Eastern Cape Provincial Growth and Development programme, Department of Water Affairs and Forestry has been doing some foundation work which will be used to compile a database to aid the formulation of specific studies requested by ASGISA Eastern Cape (Pty) Ltd. The work that has already been done is at a low level of investigation, but could be used to identify possible irrigation opportunities, pumped-storage hydro-electric schemes, forestry opportunities and rainwater harvesting for household security. Databases on hydrology, climate, soil types, suitable crops and other developmental inputs are also being compiled in anticipation of the needs of the area. None of these possible schemes involve any sizeable dam on the Umzimvubu River or its tributaries. The Department of Water Affairs and Forestry still awaits direction regarding development proposals from ASGISA Eastern Cape (Pty) Ltd before doing a detailed study on any specific dam.
(2) No companies have made any such unsolicited bids.
QUESTION 1439
Mr E W Trent (DA) to ask the Minister of Public Enterprises:
Whether any negotiations are taking place between Transnet or any of its subsidiaries regarding the transfer of assets of the Apple Express to the Eastern Cape Provincial Department of Roads and Transport or any other entity; if so, what are the relevant details regarding these assets? NW2182E
REPLY:
Transnet Freight Rail is not in any negotiations with the Eastern Cape Provincial Department of Roads and Transport ("ECDORT") to transfer any assets from the Apple Express to the ECDORT.
QUESTION NO. 1442 INTERNAL QUESTION PAPER NO 24 of 2008DATE OF PUBLICATION: 22 August 2008
Mr G R Morgan (DA) to ask the Minister of Environmental Affairs and Tourism:
What was the actual number of species hunted according to the Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES) permit system in each province in 2007?
NW2185E
MR G R MORGAN (DA) SECRETARY TO PARLIAMENTHANSARD
PAPERS OFFICE
PRESS1442. THE MINISTER OF ENVIRONMENTAL AFFAIRS AND TOURISM ANSWERS:
The table indicates the actual number of animals listed in the Appendices of the Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES) hunted by foreign clients in each province in 2007. Data for the Eastern Cape (EC) was not available at time of compilation.
Common Name | Scientific Name | NC | WC | FS | LP | GP | MP | KZN | EC | NW | Total per species |
Aardwolf | Proteles cristatus | 4 | 4 | ||||||||
Baboon | Papio hamadryas | 12 | 1 | 15 | 88 | 3 | 12 | 8 | 69 | ||
Barbary Sheep | Ammotragus lervia | 26 | 26 | ||||||||
Bontebok | Damaliscus dorcas dorcas | 59 | 5 | 17 | 81 | ||||||
Caracal | Felis caracal | 33 | 40 | 14 | 2 | 2 | 4 | 5 | 100 | ||
Civet | Civettictis civetta | 2 | 19 | 21 | |||||||
Crocodile | Crocodylis niloticus | 3 | 5 | 1 | 34 | 43 | |||||
Elephant | Loxodonta Africana | 12 | 6 | 4 | 5 | 27 | |||||
Hippo | Hippopotamus amphibius | 8 | 26 | 3 | 19 | 56 | |||||
Lechwe | Kobus leche | 60 | 64 | 16 | 23 | 163 | |||||
Leopard | Panthera pardus | 10 | 4 | 1 | 5 | 20 | |||||
Lion | Panthera leo | 52 | 9 | 2 | 2 | 637 | 702 | ||||
Mongoose Yellow | Cynictis penicillata | 15 | 15 | ||||||||
Common Name | Scientific Name | NC | WC | FS | LP | GP | MP | KZN | EC | NW | Total per species |
Monkey Vervet | Chlorocebus aethiops | 308 | 1 | 3 | 43 | 5 | 10 | 370 | |||
Oryx Arabian | Oryx leucoryx | 2 | 2 | ||||||||
Oryx Scimitar Horned | Oryx dammah | 17 | 6 | 23 | |||||||
Rhino Black | Diceros bicornis | 1 | 1 | ||||||||
Rhino White | Ceratotherium simum | 12 | 18 | 25 | 4 | 19 | 78 | 156 | |||
Serval | Leptailurus serval | 1 | 16 | 17 | |||||||
Sitatunga | Tragelaphus spekei | 2 | 22 | 24 | |||||||
Tsessebe | Damaliscus lunatus | 11 | 7 | 2 | 5 | 1 | 26 | ||||
Wild cat African | Felis lybica | 7 | 13 | 18 | 38 | ||||||
Zebra Hartmann | Equus zebra hartmannae | 25 | 11 | 7 | 43 | ||||||
Total animals hunted | 2140 |
DATE OF PUBLICATION: 22 August 2008
Mr G R Morgan (DA) to ask the Minister of Environmental Affairs and Tourism:
(1) Whether, with reference to his reply to Questions 1787 on 3 December 2007, the Minister for Agriculture has been consulted on the draft Alien and Invasive Species Regulations; if not, why not; if so, what are the relevant details;
(2) whether there will be any change in provisions for the management of Rainbow Trout in the final regulations; if not, why not; if so, when will these regulations be finalised?
NW2186E
MR G R MORGAN (DA) SECRETARY TO PARLIAMENTHANSARD
PAPERS OFFICE
PRESS1443. THE MINISTER OF ENVIRONMENTAL AFFAIRS AND TOURISM ANSWERS:
(1) Yes, the Department of Agriculture (DoA) was consulted on the development of the draft regulations. An official from the Department of Agriculture participated in and gave a presentation at the Minister's roundtable which took place on 12 March 2007. DoA also participated in the stakeholder workshop held on 2 April 2008.
(2) The department is finalizing the regulations and is considering all the submissions and comments made by the public on Trout. The department is anticipating finalizing the regulations by March 2009.
QUESTION NO.: 1444
Mr A C Steyn (DA) is to ask the Minister of Housing as follows:
(1) (a) What was the total cost to the State of consultants used by her
department in the (i) 2005-06; (ii) 2006-07 and (iii) 2007-08 financial years, (b) what are the names of the consultants used, (c) for what purpose were they used and (d) what was the reason for preferring to use consultants instead of hiring persons with the necessary skills?
(2) Whether any former employees of her department have been employed as consultants in the abovementioned financial years; if so (a) why and (b) why did each person leave her department?
Reply:
(1)(a)(i) The total cost to the State of consultants used by the department in the 2005-06 financial years amounted to R 16 597 564.46;
(ii) The total cost to the State of consultants used by the department in the 2006-07 financial years amounted to R21 495 726-96; and
(iii) The total cost to the State of consultants used by the department in the 2007-08 financial year amounted to R 29 464 653-47.
(b)(i) Consultants appointed in 2005-06:
Name of Consultant | Purpose of appointment |
CSIR - Boutek | Conduct feasibility study into the development of a mechanism to support alternative technologies and indigenous knowledge systems in rural context. |
Shikanda Event Management cc | To organize a National Housing research seminar for the Department of Housing. |
Strategic Alter Management | Development of a detailed policy and implementation guidelines for housing assistances to Households affected by death of Guardians / Parents and the protection of Assets Financed by HSS . |
V3 Consulting Engineers | Assist with the determining the capacity requirements for the National department of Housing as well as the Provincial Housing Departments. |
Nkonki Incorporated | Development of a detailed policy and implementation manual on variation of subsidy amount to cater for extraordinary development. Conditions and the special housing requirements of categories beneficiaries. |
Manto Management (Pty) Ltd | Validation of the housing waiting lists in the country, their development processes and the consolidation thereof. |
KPMG Service | Development of a comprehensive monitoring evaluation and impact assessment system for the National Department of Housing. |
Africon Engineering International | Development of a comprehensive monitoring evaluation and impact assessment system for the National Department of Housing. |
Procurement Dynamics (Pty) Ltd | Investigation of the impact of client payment processes on small/ micro and medium contractors. |
Nkonki Incorporated | Finalizing of registration process towards achieving a National Housing demand database in the Western Cape, City of Cape Town. |
Consultants appointed in 2006/07:
Name of Consultant | Purpose of appointment |
EDTECH Consulting | To Conduct Housing Consumer Education Train the Trainer as part of the Housing Consumer Education {HOE} – Rollout to Provinces and Municipalities. |
T.L. Consulting | To Manage the implementation of the housing Consumer Education Programme. |
Nomkhitha Gys ans & Associates Development Consultants | For finalizing the registration / confirmation process towards achieving a national housing demand database in the Western cape City of Cape Town. |
Kago Local Government Consulting | Conduct Train-the-Trainer on Sanitation, Health and Hygiene Programme: |
Richard Tomlinson | For converting the National Housing Code into new policy and implementation guidelines for sustainable housing development. |
Khuthulani Cleaning Services | Rendering of cleaning services for one year. |
Bergstan SA | Conduct a study into the State of Social Economic, Ethnic, Citizenry and Racial Integration in residential areas. |
Focused Approach Management Urban Dynamics Gauteng Inc. | Appointment of a service provider: task directive for the first phase of a back office delivery turn around plan for the National Department of Housing. |
Consultants appointed in 2007/08:
Name of Consultant | Purpose of appointment |
Bergstan SA | To undertake a study into the State of Social Economic, Ethnic, Citizenry and Racial Integration in Resettlement Areas. |
Tiso Coaching Services | To workshop Councilors in terms of the Home Loan and Mortgage Disclosure Act 2000 (Act No. 63 of 2000) |
Development Works | Development of the Rollout Strategy for Housing Chapters of Integrated Development Plans |
Oryx Media Products | Develop and implement a Communication Strategy to influence and raise awareness in the NS Gateway Project |
Graham Paddock and Associates | Assist with the completion of the remaining work on Sectional Titles Management Bills and Community Schemes Ombud Service Bills. |
Ashira Consulting | Do an investigation of insurance cover for subsidy house |
Kayamandi Informatics (Pty) Ltd | To mediate between communities in conflict over housing development in Ekhuphumeleni in Phillipi in the Western Cape Province |
Centre for Conflict Resolution | Conduct training on Housing Consumer Education and Housing Policy and Legislation for the N2 Gateway Project |
T L Consulting | Undertake a benchmarking initiative on corporate policies of public agencies and develop a full suite of corporate policies for the Housing Development Agency Ltd in preparation for its eventual establishment and operation |
I Selepe Consulting | Perform DOH Risk Management Services |
Ernst & Young | Do an evaluation of the reporting on the advance tranch payments made to municipalities to implement approved projects linked to subsidies |
Hlaniki Investment Holding and Wits Business School | Conduct training for elected Councilors |
Dynamics Maserumule Incorporated | Assist with legal advisory services |
Urban Dynamics | Appointment of a service provider: task directive for the first phase of a back office delivery turn around plan for the National Department of Housing. |
(c) See above.
(d) The appointment of consultants was necessitated by the specialised nature of the specific assignments. These assignments required special expertise for a defined period. Such projects furthermore did not warrant the appointment of persons on a permanent basis on the structure of the Department as it would not have been cost effective.
2. No former employees of the department were employed as consultants during the financial years: 2005/ 06; 2006/07 and 2007/08.
QUESTION NO 1445
DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: 22 AUGUST 2008
(INTERNAL QUESTION PAPER NO 24/2008)
Date reply submitted: 27 October 2008
Ms D Kohler‑Barnard ask the Minister of Safety and Security:
(1) (a) What was the total cost to the State of consultants used by his department in the (i) 2005‑06, (ii) 2006‑07 and (iii) 2007‑08 financial years, (b) what are the names of the consultants used; (c) for what purpose were they used and (d) what was the reason for preferring to use consultants instead of hiring persons with the necessary skills;
(2) whether any former employees of his department have been employed as consultants in the abovementioned financial years; if so, (a) why and (b) why did each such person leave her department?
NW2189E
REPLY:
(1)(a)(i ‑ iii) The total cost within the expenditure category: Consultants, Contractors and special services, was R 130,908 million for the 2005/2006 financial year, R 227,488 million for the 2006/2007 financial year and R 222,445 million for the 2007/2008 financial year.
(1)(b) A name list cannot be provided at this stage as it will require some programming to extract the information.
(1)(c)‑(d) To provide a perspective on the extent and significance relative to the context of the question, it is deemed appropriate to provide the following information:
• A new Standard Chart of Accounts (SCOA) synchronised with a new Economic Reporting Format was introduced with effect from the 2004/2005 financial year. The SCOA contains the classification of items according to classification standards. The SCOA, therefore, comprises the coding of items used for classification, recording and reporting within the accounting system. Different classification regimes were harmonised in the chart. The chart caters for data dissemination as determined by the National Treasury.
• The design principles of the new reporting tables inter alia allow for the grouping of transactions based on their nature. One such grouping of items included in the Annual Report (page 145 of the 2005/2006 financial year and page 156 of the 2006/2007 financial year. The Annual Report for the 2007/2008 financial year is still to be tabled in Parliament) is Goods and Services, of which "Consultants, contractors and special services" is a sub‑classification.
• The full complement of this sub‑category and accompanying description can be indicated as follows :
‑ Goods and Services
‑ Consultants, contractors and special services (2005/2006: R 130,908 million / 2006/2007: R 227,488 million / 2007/2008: R 222,445 million)
Consulting services refer to specialist services and skills provided that are required for the achievement of a specific objective, with the aim of providing expert and professional advice on a time and material basis. It is unnecessary to maintain these skills in‑house, since they are required on a once‑off or temporary basis. Therefore, a consultant is a professional person appointed by the department to provide technical and specialist advice or to assist with the design and implementation of projects/programmes. The legal status of this person can be an individual, a partnership or a corporation. The fact that a consultant is defined as a professional person implies that the consultant is professionally qualified. The provision of advice or service is in line with a contractual arrangement (usually commissioned on a project basis). Remuneration is usually based on an hourly fee or a fixed fee for a product/deliverable.
Contractors, on the other hand, are required to provide services that are of a current and non‑specialised nature, that are not core business of the department. It is normally not cost‑effective to maintain these skills within the department, e.g. cleaning services.
‑ The major sub‑categories as utilized by the SAPS, are the following:
• Accountants and auditors (2005/2006: R 13,395 million / 2006/2007: R 15,321 million / 2007/2008: R 13,921 million)
A distinction should be made between fees paid for the audit and fees paid for other services. Audits of departments are performed by the Auditor‑General or by a firm of auditors on behalf of the Auditor‑General. That firm may not render other services to the department, unless prior approval of the Auditor‑General has been obtained. Accordingly, any fees paid to firms that also act as auditors, but not to the department, would be included under the heading of consultants and advisory services, in particular where, for example, the internal services have been outsourced. (Example: Internal Audit firm appointed)
• Financial, advisory and management consultants (2005/2006: R 82 thousand / 2006/2007: R 1,933 million / 2007/2008: R 5,264 million)
Management consulting services/advisory services are those professional services provided to management by a management consulting services practitioner and which typically involves some combination of the following activities in relation to the functions of management:
(1) Identifying and investigating problems and opportunities concerned with policy, organisation, procedures and methods
(2) Providing advice and recommending appropriate actions or programmes
(3) Helping to implement actions or programmes
(4) Monitoring the results of actions or programmes that have been implemented. (Example: Facilitation of workshop)
• Engineering: Mechanical (2005/2006: R 3,811 million / 2006/2007: R 25,129 million / 2007/2008: R 2,021 million)
Costs incurred for services rendered by persons with skills to develop/build/reconstruct highly specialised mechanical equipment. These professionals must be registered at an appropriate recognised institution in order to work/operate in their specific specialised fields. (Example: Mechanics at local workshops)
• Health: Private medical services (2005/2006: R 2,828 million / 2006/2007: R 1,489 million / 2007/2008: R 1,655 million)
Costs incurred in providing medical care by consultants/other service providers responsible for the general well‑being of the bodies and minds of SAPS employees.(Example: Nurses at Police Colleges)
• Personnel and labour (2005/2006: R 84,556 million / 2006/2007: R 72,350 million / 2007/2008: R 55,334 million)
Costs incurred for services rendered by persons with skills in training/assisting personnel in addressing specific needs and problems in the workplace and improving general happiness, efficiency and productivity. This includes psychological services, skills development workshops, etc. (Example: Cleaning services / day labourers, special escorts and matrons)
• Investigation of crime (2005/2006: R 25,010 million / 2006/2007: R 33,934 million / 2007/2008: R 32,754 million)
This category still requires acknowledgement by the National Treasury in the new reporting structure, i.e separate classification owing to the nature of transactions involved. (Example: Police actions)
• Reservists (2005/2006: No expenditure incurred / 2006/2007: R 66,906 million / 2007/2008: R 84,408 million)
Costs incurred for services rendered by reservists.
• In terms of Public Service Regulation J.3, Part III: Planning, Work Organisation and Reporting of Chapter 1 of the Public Service Regulations, 2001, a consultant means "a natural or juristic person or a partnership who or which provides, in terms of a specific contract on an ad hoc basis, any of the following professional services to a Department against remuneration received from any source:
(a) The rendering of expert advice;
(b) The drafting of proposals for the execution of specific tasks; and
(c) The execution of specific tasks that are of a technical or intellectual nature, but excludes an employee of a Department".
• Further, a consultant ‑
• is not regarded as a Public Service employee in terms of the criteria set out in the Labour Laws;
• does not include any person appointed on a fixed term contract against an approved post;
• is an independent contractor working as a consultant, or
• is an independent labour broker providing consultants to Departments.
• The above include items for the 2005/2006, 2006/2007 and 2007/2008 financial years such as:
‑ Mechanical services
‑ Cleaning services
‑ Internal Audit
‑ Day labourers, special escorts and matrons, etc.
• In absence of a universally accepted definition regarding consultants per sé, and if the afore‑mentioned is taken as demarcation, the viewpoint is held that the Department for Safety and Security has none or at least very few consultants.
(2) Yes
(2)(a) The primary objective towards the appointment of one former employee as a consultant during the 2007/2008 financial year was to optimize the structuring and organization of the department, to strengthen the capacity to combat organized crime as well as to improve the effectiveness of policing and crime combating at local level.
(2)(b) The services of the employee was terminated as a result of early retirement.
QUESTION NO. 1446 INTERNAL QUESTION PAPER NO 24 of 2008DATE OF PUBLICATION: 22 August 2008
Mr I F Julies (DA) to ask the Minister of Environmental Affairs and Tourism:
(1) (a) What was the total cost to the State of consultants used by his department in the (i) 2005-06, (ii) 2006-07 and (iii) 2007-08 financial years, (b) what are the names of the consultants used; (c) for what purpose were they used and (d) what was the reason for preferring to use consultants instead of hiring persons with the necessary skills;
(2) whether any former employees of his department have been employed as consultants in the above-mentioned financial years; if so, (a) why and (b) why did each such person leave her department?
NW2190E
MR I F JULIES (DA) SECRETARY TO PARLIAMENTHANSARD
PAPERS OFFICE
PRESS1446. THE MINISTER OF ENVIRONMENTAL AFFAIRS AND TOURISM ANSWERS:
(1) (a) As reported in the Audited Annual Financial Statements, as part of the Annual Report of the department, the total cost to the State of consultants used by the department in the (i) 2005-6 was R20 million and (ii) 2006-07 was R87 million and (iii) 2007-08 was R33 million.
(b) and (c) Tabulated below is a reflection of the consultants appointed and the services rendered:
FINANCIAL YEAR 2005-2006Tender Number | Company name | Services rendered |
1.1 E970 | CSIR | Draft the National Cleaner production strategy and action plan. |
1.2 E998 | Phakisa Communications | The outsourcing of the Department production and marketing of Bojanala. |
E1001 | E-Centric Link | To set up a call center |
E1006 | Palmer Development Group | To assist in developing a national compliance monitoring system and implementation plan. |
E1010 | University of Pretoria / Traffic | The developing and implementation of bridging training for environmental management inspectors. |
E1012 | Airshed Planning Professional | APPA registration certificate review report |
E1015 | CSIR | The drafting, editing and final review of one integrated Environmental Management (IEM) guidelines series document. |
E1016 | PTERSA | To Develop a national ODS phase out plan. |
E1023 | Siyafika Recruitment Advertisements | The outsourcing of the publication recruitment advertising in the media. |
E1026 | Yaroma | Study and review the state of transformation in the Tourism Industry. |
Tender Number | Company Name | Services rendered |
E1037 | 1.3 Magida Human Capital Corporation | To guide the Tourism BEE Charter council and the Department in the finalization of an organization development plan for the Council. |
E1032 | 1.4 Greenline consortium | To establish a National Park on the Wild Coast |
E1035 | 1.5 Katiba PMC. | The outsourcing and development of Departmental monitoring and evaluation system for DEAT Period 2 years. |
E1038 | Fair Trade in tourism | 1.6 The development of verification systems, procedures, standards, capacity & reporting mechanisms for verification within the Tourism sector on behalf of the Tourism BEE Charter Council. |
E1039 | 1.7 Performance Enhancement and Rewards (Pty) Ltd | The development of a recognition rewards and awards system to incentives all stakeholders in the Tourism sector |
E1040 | Hubyeni Consulting (Pty) Ltd | The independent analysis of enterprise development mechanisms of incorporation for entities within the Tourism industry |
1.8 E1041 | Hubyeni Consulting (Pty) Ltd | 1.9 The establishment of three database to support implementation of the Tourism BEE charter |
E1042 | 1.10 Environmental Resources Management | The outsourcing of a mid-term evaluation of the social responsibility program of DEAT for a period of 22 months |
E1045 | Price Waterhouse Coopers and Sizwe Ntsaluba (partnership) | The outsourcing of an internal audit function for a period of three years |
E1046 | 1.11 IT Aware | For skills audit exercise for DEAT. 2 years |
E1048 | Lereko Energy | 1.12 The Greenhouse gas information management project |
E1049 | 1.13 Malebo Manyeleti Consulting | Spend analysis for both internal and external on specialized goods and services by DEAT for past 3 years and the impact on BEE |
E1050 | 1.14 Grant Thornton, Percy Mkosi Prodigy Business service | To analyse funding and advisory options for Tourism enterprises in the Public & Private Sector |
E1056 | Mogale Solutions Providers | 1.15 To develop and implement change management strategy for open plan office design. |
1.16 E1057 | 15 Service providers forming a panel: 1.17 Performance Enhancement Rewards, People Support Services, Tiso Coaching Services, Ndawo Consulting, Connemara, People Capacity Builders, Leadership Action and Alignment, Mindset Consultant, Resolve Encounter Consultancy, Noyanas Management Consultancy, Centre For Concious Leadership, Tinunu Trading CC, USB Executive and Change Partners. | 1.18 The outsourcing of an executive coaching programme. |
E1059 | 1.19 Gondwana Environmental Solutions (Pty) Ltd | 1.20 To develop the Vaal Triangle Air shed air quality management plan as contemplated in section 18 of Air Quality Act 3 of 2004 |
E1060 | Palmer Development Group | For the assessment of the status of waste services at local government |
E1063 | 1.21 Cheadle Thompson & Haysom Inc. Attorneys | To develop guidelines for drafting legally robust and monitoring authorizations issued in the EQP Branch. |
E1064 | 1.22 Nantsho Holdings (PTY) Ltd | To evaluate the implementation and effectiveness of plastics Bags |
E1065 | Resolve Group (Pty) Ltd | To conduct culture audit and culture development |
E1066 | Argus Gibbs for FS 1.23 Nimham Shand for EC | Outsourcing the review of Environmental impact assessment applications submitted in terms of section 22 of the environment conservation Act, Act no 73 of 1939 for the Dept. Of Economics Affairs, Environment & Tourism, Eastern Cape and development of Tourism, Environmental & Economics Affairs, Free State 6 months |
E1067 | Felehetsa Environmental | For outsourcing and the development Management framework for the SEDIBENG district municipality for 6 months |
E1069 | 1.24 Zanokuhle and Wessa Joint Venture | The implementation of the Environmental Education Training and Development Practice leader ship |
E1070 | Lefatshe Technologies (PTY) Ltd | 1.25 To develop and implement ICT policies, standards and procedures for the effective use of the Departmental ICT resources |
E1071 | 1.26 Cullwin Consulting CC | The outsourcing of the development of five sector guideline documents relating to the implementation of the new environmental impact assessment regulations promulgated in terms of the environmental management Act 1998. |
E1072 | Zanokuhle Environmental Services | The outsourcing AQA implementation: Air Quality management planning as contemplated in section 15-17 of the National Air Quality Act 39 of 2004 |
E1073 | 1.27 SRK Consulting | The outsourcing of the development of the Environmental management framework for the Eastern Cape Department of Economics Affairs, Environment and Tourism |
E1074 | The EviroXcellence Services | Outsourcing the review of environmental impact assessment application submitted in terms of section 22 of environment conservation Act, Act no. 73 of 1989 for the Department of Agriculture, conservation and Environment North West for 6 months |
E1075 | 1.28 Sivest SA (PTY) Ltd | 1.29 Outsourcing the review of environmental impact assessment applications submitted in terms of section 22 of environment conservations Act. Act no 73 of 1989 for the Department of Agriculture and Environmental Affairs (DEAT) Kwazulu-Natal province 6 months |
E1076 | BKS (Pty ) Ltd | 1.30 The establishment of an inventory and assessment of infrastructure and capacity for the development of National Implementation Plans (NIPS) of Strickholm Convention on Persistent Organic Pollutants 1.31 (POPS) in SA. |
E1077 | Arcus Gibb 1.32 | The outsourcing of the review of Environmental Impact Assessment applications submitted in terms of Section22 of the Environment Conservation At, Act no 73 of 1989 for the Department of Environmental Affairs Development Planning, Western Cape |
E1078 | Strategic Environmental Focus 1.33 Kwezi V3 Engineers | Outsourcing the review of Environmental Impact Assessment applications in terms of section 22 of Environment Conservation Act. Act no 73 of 1989 for the Department of Agriculture and Land Administration |
E1080 | Savannah Environmental 1.34 Bohlweki Environmental | Outsourcing the review of Environmental Impact Assessment on terms of section 22 in the Environment Conservation Act, Act no 73 of 1989 for the Northern Cape Department of Tourism Environment and Conservation Northern Cape |
E1081 | CSIR-Natural Resource & Environment | Outsourcing of the Environmental Management Framework for DIHLABENG municipality FREE STATE |
1.35 E1082 | Strategic Environmental Focus | 1.36 To support the Mpumalanga Department of Agriculture and Land Administration (MDALA) Deat and Emekhazeni Local Municipality (RLM) with development of the EMF for ELM. |
E1025 | 1.37 Madyatshamile Holdings | Public survey on perception regarding government on environmental and tourism issues |
E1083 | 1.38 Strategic Environmental Focus | Outsourcing the development of the Environmental Management Framework for MADIBENG local Municipality in the North West Province |
E1084 | Environomics Environmental Consultants | Outsourcing the development of the Environmental Management Framework for SUYANDA |
E1094 | 1.39 Regenesys Management (Pty) Ltd. | Outsourcing of the capacity audit and needs analysis in relation to the implementation of the Environmental Impact Assessment regulation by the EIA Administrator. |
E1095 | 1.40 Kwezi V3 Engineers | To support the Department of Environmental Affairs and Tourism (DEAT) to address the current waste disposal site permitting backlog |
1.41 E1099 | SRK Consulting S.A. ( Pty ) | Appointment of a suitable independent service provider/s that can support DEAT, KwaZulu Natal Department of Agriculture and Environmental Affairs (DAEA) and Msunduzi Municipality with the development of Environmental Management Framework (EMF) for the Msunduzi Municipality |
E1101 | 1.42 Environmental Science Assosiates | Appointment of a suitable consultant who have expertise and in-depth understanding of high temperature thermal technologies to assist DEAT with the review of eleven EIA applications associated with the use of Hazardous waste as a replacement fuel in cement kilns, the development of a policy statement on the treatment/ destruction of Hazardous waste in high temperature thermal technologies and a policy on the use of alternative fuels in cement kilns. |
E1103 | Gondwana Environmental Solutions ( Pty ) Ltd | The development of the South African Air Quality information system (SAAQIS) – Phase One. |
E1092 | 1.43 Airshed Planning Professionals (Pty) Ltd. | To support DEAT in developing the publication of listed activities and related minimum emission standards as contemplated in section 2 of the National Environmental Management: Air Quality Act (Act no 39 of 2004) |
E1091 | University of Kwa-Zulu Natal and CSIR | To support DEAT in developing the National Framework as contemplated in section 7 of the National Environmental Management Act 39 of 2004 |
FINANCIAL YEAR 2007 – 2008
Tender Number | Company Name | Services rendered |
E1048 | 1.44 Energy Research Centre University of Cape Town | Appointment of a service provider for the Green House Gas Information Management Project. |
E1099 | 1.45 SRK Consulting | To support DEAT, KwaZulu-Natal Department of Agriculture and Environmental Affairs (DAEA) and Msunduzi Municipality with the development of Environmental Management Framework (EMF) for the Msunduzi Municipality. |
E1100 | 1.46 M13 Consortium (3P Design) | Appointment of a Transaction Advisor Services for the procurement of suitable office accommodation for (DEAT new building) and related services through the Public Private Partnership (PPP) option. |
E1101 | 1.47 Environmental Science Association | Appointment of a suitable consultants who have experience in EIA reviews and an in-depth understanding of high temperature thermal technologies to assist DEAT with the review of 11 EIA applications associated with the use of hazardous waste as a replacement fuel in cement kilns, the development of a policy statement on the treatment/destruction of hazardous waste in high temperature thermal technologies and a policy on the use of alternative fuels in cement kilns. Through this EIA review and policy development process EIA review guideline for the destruction/treatment of waste through temperature thermal technologies is to be developed which will assist provinces in the future. |
E1095 | 1.48 Kwezi V3 Engineers | To support DEAT to address the current waste disposal site permitting backlog. |
E1103 | 1.49 Gondwana Environmental Solutions | Appointment of a service provider for the development of the South African Air Quality Information System (SAAQIS) – Phase 1. |
E1105 | 1.50 SI Analytics (Pty) Ltd | Appointment of a service provider/s to support DEAT with the implementation of a project that will install 5 Air Quality Monitoring stations in the 2nd priority area to be declared by the Minister. |
E1106 | 1.51 University of Pretoria | For the developing of course material and support DEAT with the training of Environmental Impact Assessment administrators on the new Environmental Impact regulations 2006 promulgated in terms of the National Environmental Management Act, No 108 of 1998 as amended. |
E1107 | 1.52 3P Consulting (Pty) Ltd | Appointment of a specialist consultancy services to assist the Regulating Committee for Metrological Services in verifying the SAWA aviation proposal and the basis thereof before new tariffs are approved and promulgated. |
E1116 | 1.53 University of Cape Town (Environmental Evaluation Unit) | To conduct a research project on the effective sustainable livelihood options for fishers in the three Coastal communities including appropriate recommendations. |
E1111 | 1.54 Cullwin Consulting t/a Enact International and SAHA | 1.55 Appointment of a suitable independent service provider for outsourcing the costing of the implementation of the National Biodiversity Framework (NBF). |
E1106 | 1.56 University of Pretoria | 1.57 Appointment of a service provider for outsourcing of the new review of effectiveness and efficiency of the Environmental Impact Assessment system in SA and the formulation of an Environmental Impact Management Strategy Action Plan. |
(d) To render a Specialized Service which could not be done in-house. Tasks were not of a permanent nature.
(2) Yes.
(a) Technical and Strategic Skills.
(b) Resigned.
QUESTION 1447
DATE OF PUBLICATION OF INTERNAL QUESTION PAPER: 22/08/2008(INTERNAL QUESTION PAPER 24-2008)
1447 Mrs D van deer Walt (DA) to ask the Minister of Education:
(1) (a) What was the total cost to the state of consultants used by her department in the (i) 2005-06, (ii) 2006-07, (iii) 2007-08 financial years; (b) what are the names of the consultants used; (c) for what purpose were they used; (d) what was the reason for preferring to use consultants instead of hiring persons with the necessary skills?
(2) Whether any former employees of her department have been employed as consultants in the above-mentioned financial years; if so, why; why did each such person leave her department?
NW2191E
REPLY:
(1) (a)
Table 1: Total costs of consultant contracts
2005/06 | 2006/07 | 2007/08 |
R 72,883,130.00 | R 5,736,558.02 | R 7,960,135.85 |
Note: These totals reflect the ceiling amounts of contracts at date of appointment. Each contract allows for a specific timeframe for the completion of the task and payments to the service providers, which could be interim payments based on the progress, or only paid in total after the completion of the task. The NEIMS contract with Deloitte Consulting largely accounts for the high expenditure in 2005/6.
1. (b and c)
Table 2: Consultants and projects
Names | Purpose used for |
(b) | (c) |
2005-06 | |
Deloitte Consulting | Assisted with the creation of a National Education Infrastructure Management Survey and Database. |
Sizanang Centre | Produced the "Education Financial Tool", and assisted in the utilization of the Tool in the production of medium and long term expenditure plans. |
Link Community Development | Assisted with the development of School Financial Guidelines. |
Paul Musker & Associates | Reviewed national, regional and international literature and analysed information on incentives for teachers in primary schools, as well as the development of a comprehensive report. |
2006-07 | |
Namela Projects | Conducted a transport study that would inform DoE's undertaking of education dynamics in relation to accessibility of schools. |
Dishumelani Business Enterprises | Assisted with Whole School Development Intervention. |
Khulisa Management | Conducted an EMIS sample survey. |
M Power Learning & Development | Assisted with the pilot project to train Master Teachers in Grade 10-12 Mathematics and Physical Science. |
Centre for Research in Politics of Language, University of Pretoria | Conducted research on the implications of translating Senior Certificate question papers into all the official African languages. |
O.M.A. | Assisted with internal auditing activities. |
Bosele Management Consulting (BMC) | Assisted with the "Women in and into Management" project. |
Leonie Tiearney | Assisted with tracking the performance of cohorts on first time entries in tertiary institutions. |
Ahmed Essop | Assisted in finalizing performance indicators for the National Plan on Higher Education. |
Bridging Executive Development | Assisted with Organizational Development. |
Unleash Potential Unlimited | Assisted with the monitoring and evaluation of the Innovative Management Project. |
Prof Brahm Fleisch | Assisted with the analyses of Provincial Education Strategic Plans. |
Regenesys Manager | Assisted with the compilation of a National Report on Education Management, Governance and Development. |
Prof Brahm Fleisch | Assisted with the analysis of annual performance plans. |
Class Act Educational Services | Refined the IQMS based on 6 provinces and 3 schools per province. |
HSRC | Classified towns and determined distances between schools and towns. |
Wits Education Policy Unit | Assisted with the "Home Education Project". |
2007-08 | |
IC Blue Consulting | Assisting with the re-development of the DoE's website. |
Singizi Consulting | Revise existing National Human Resource Development (NHRD) Strategy 2001, into a second version. |
Khulisa Management Services | Evaluate, review and refine Whole School Evaluation (WSE) instruments, developing a framework for aligning information from the criteria descriptions, ratings, interview schedules and questionnaire pilot, and report on these instruments. |
Pauline Malhaela & Associates | Delivery of Advanced Certificate in Education: School Leadership Field Test. |
Mind Pool | Assist DoE in the development of an Integrated Quality Management System (IQMS) – Audio visual training at schools. |
OMA Chartered Accountants | Assisted with internal audit activities. |
SAB&T | Administrative management of the mass literary campaign of the DoE – Kha Ri Gude |
(d) The reason for preferring to use consultants instead of hiring persons with the necessary skills is that the professional expertise of consultants is required for specific projects for a short duration of time. Once the project is finalised, their services are no longer required. The process of creating posts, advertising, short listing, interviewing and appointing candidates for a short contract period is subsequently avoided. Furthermore, few candidates are prepared to accept short-term contract appointments.
(2) Three former employees of the Department have been contracted as consultants or are employed by consulting companies appointed by the DoE, in the following financial years:
2005-06 - Ms Helen Perry (Sizanang Centre)
2006-07 - Mr Ahmed Essop
2007-08 - Mr Bobby Soobrayan (Singizi Consulting)
After leaving the DoE, they became employees of the respective companies that were awarded the bids in the three cases. They left the DoE on their own accord either by resigning or by departmental transfer and promotion as in the case of Mr Soobrayan. He thereafter left the public service.
QUESTION NO 1448
DATE REPLY SUBMITTED: MONDAY, 08 SEPTEMBER 2008
DATE OF PUBLICATION IN INTERNAL QUESTION PAPER: FRIDAY, 22 AUGUST 2008 (INTERNAL QUESTION PAPER NO 24 – 2008)
Mr S B Farrow (DA) asked the Minister of Transport:
(1) (a) What was the total cost to the State of consultants used by his department in the (i) 2005-06, (ii) 2006-07 and (iii) 2007-08 financial years, (b) what are the names of the consultants used; (c) for what purpose were they used and (d) what was the reason for preferring to use consultants instead of hiring persons with the necessary skills;
(2) whether any former employees of his department have been employed as consultants in the abovementioned financial years; if so, (a) why and (b) why did each such person leave her department?
NW2192E
REPLY:
1.58
The Minister of Transport:
(1) (a) The total cost to the State of consultants used by the Department of Transport in the (i) 2005-06 financial year was R196,119,308, (ii) in the 2006-07 financial year it was R304,387,157 and (iii) in the 2007-08 financial year it was R 317,346,426.
(1) (b) The names of the consultants used and (c) the purpose for which they were used are listed in the table below:-
(b) | (c) | 2005-06 | 2006-07 | 2007-08 | TOTAL |
NAME OF CONSULTANT | PURPOSE FOR WHICH THE CONSULTANTS WERE USED | AMOUNT | AMOUNT | AMOUNT | |
3M SOUTH AFRICA (PTY) LTD | Marking of taxis | 196,513 | 196,513 | ||
A ROUX | Expert group on the restructuring of the Road Accident Fund (RAF) | 136,825 | 136,825 | ||
ACHER AVIATION PTY LTD | Search and rescue services | 28,861 | 28,861 | ||
AFRICAN RAMBLE | Search and rescue services | 25,080 | 25,080 | ||
AFRICON ENGINEERING INTERNATIONAL | Research on discussion paper for Transport Summit and review of Aviation Policy | 236,406 | 1,267,557 | 1,503,963 | |
National Transport Master Plan | 4,721,487 | 4,721,487 | |||
Project management for Public Transport Infrastructure and Systems Grant | 52,979 | 52,979 | |||
Technical assistance for 2010 FIFA World Cup | 72,660 | 72,660 | |||
AFROMATION TRADING | Business Plan for brokering services in the OR Tambo District Municipality | 122,500 | 87,000 | 209,500 | |
AGANANG CONSULTING ENGINEERS CC | Development of Cross-Border Transport Survey on RSA/Lesotho route for the Department of Transport(DoT) | 98,547 | 394,188 | 492,735 | |
AIRPORTS COMPANY SOUTH AFRICA LIMITED (ACSA) | Payment of secondment fee to the Airports Company South Africa Limited (ACSA): Mr T Teegler, World Cup 2010 Aviation Sub-sector Task Team Coordinator | 60,154 | 60,154 | ||
ALTA SWANEPOEL & ASSOCIATES CC | Legal technical & secretariat services for the TCSP | 98,771 | 98,771 | ||
Legal assistance – Road Traffic Management Corporation (RTMC) | 499,535 | 499,535 | |||
A-M CONSULTING ENGINEERS | Project management for Public Transport Infrastructure and Systems Grant | 1,935,440 | 1,935,440 | ||
Technical assistance for 2010 FIFA World Cup | 4,188,511 | 4,188,511 | |||
AMATHOLE DISTRICT MUNICIPALITY | Pilot project for Public Transport Interchange Management | 510,000 | 510,000 | ||
ARCUS GIBB PTY LTD | Project management for Public Transport Infrastructure and Systems Grant | 453,226 | 453,226 | ||
Coding system for taxi operations | 250,127 | 250,127 | |||
Technical assistance for 2010 FIFA World Cup | 150,959 | 150,959 | |||
ARIVIA.KOM (PTY) LTD | IT maintenance and support services for Cape Town office | 1,037,748 | 1,037,748 | ||
Maintenance and support on full maintenance for high-end users, procurement of helpdesk system silences, maintenance and support once off payment to clear the backlog repairs and enhancement. | 689,442 | 689,442 | |||
ARUP SA PTY LTD | Report on Road-based Public Transport | 98,600 | 98,600 | ||
Taxi recapitalisation consultancy services | 207,211 | 207,211 | |||
ATALALA CONSULTING | Development of Policy Framework on Animal Drawn Transportation | 18,000 | 18,000 | ||
Drafting Non-Motorised Transport Policy | 7,200 | 7,200 | |||
AXIO CONSULTING | 2010 World Cup support | 976,226 | 976,226 | ||
Technical assistance for 2010 FIFA World Cup | 861,604 | 861,604 | |||
Develop operational planning guidelines and an initial Transport operational plan for the 2010 FIFA World Cup | 3,242,212 | 3,242,212 | |||
AXIOS-TMT CONSORTIUM | Develop freight databank | 2,141,646 | 2,141,646 | ||
BEOSUMBAR & ASSOCIATES | Technical assistance for 2010 FIFA World Cup | 56,124 | 56,124 | ||
BLACK EARTH CONSULTING | Knowledge Management Strategy, assessment and marketing tools | 185,820 | 185,820 | ||
BONISIWE MARKETING | Rebranding of the DoT and IC manual | 82,764 | 82,764 | ||
BOWMAN GILFILLAN INC CC | Drafting of regulations for the Ports Regulator of South Africa | 306,266 | 20,000 | 326,266 | |
BRIESCH COMPLIANCE (PTY) LTD | Develop maritime security transport legislation and regulations | 154,137 | 154,137 | ||
BUREAU FOR ECONOMIC RESEARCH | Conduct Macro-economic Impact Analysis of an increase in fuel price to finance expenditure on transport infrastructure and transport services | 28,500 | 28,500 | ||
BUSINESS ENTERPRISES | Appointment of committee of experts in the field of economy-wide impact analysis | 8,075 | 61,794 | 69,869 | |
C J VENTER | Set Unit Standards for Transport Planning Qualifications | 13,200 | 22,000 | 35,200 | |
CEREBRAL CONSULTING | Project Management for Public Transport Infrastructure and Systems Grant | 49,887 | 49,887 | ||
CHRISTOPHER JOHN ESTATE AGENCY | Assessment of the SALU building | 250,000 | 250,000 | ||
CIBER INFORMATION INTERNATIONAL | Project management for Public Transport Infrastructure and Systems Grant | 45,600 | 45,600 | ||
CILS | Investigation into allegations of misconduct | 130,720 | 130,720 | ||
CITY OF TSHWANE | Park and Ride: October Transport Month | 44,600 | 44,600 | ||
COMWEZI SECURITY SERVICES | Security services | 2,280 | 2,280 | ||
CORPORATION FOR ECONOMIC RESEARCH | An investigation for transport infrastructure in South Africa | 189,923 | 189,923 | ||
COSTANZA M | Departmental structure for World Cup Co-ordination | 32,930 | 32,930 | ||
CREATIVE HEALTH RISK MANAGEMENT | Restructuring of the Road Accident Fund (RAF) | 125,905 | 125,905 | ||
CSIR | Develop a Strategic Framework for Travel Demand Management Implementation | 596,277 | 3,626,357 | 4,222,634 | |
Development of a National Strategy for Overload in South Africa | 96,198 | 96,198 | |||
CSIR TRANSPORTEK | Development of standard weighing procedures to be followed by traffic officers at all weighbridges for weighing and screening of heavy vehicles | 165,158 | 165,158 | ||
DATACENTRIX | Installation of Storage Area Network Solution | 184,340 | 184,340 | ||
Installation of Web Server FCA Drive | 1,581 | 1,581 | |||
DELOITTE AND TOUCHE | Transaction advisor for fleet management services, competency assessment, internal control and tax consultants | 5,558,351 | 3,226,978 | 8,785,329 | |
DELOITTE CONSULTING | Taxation consulting services | 27,739 | 27,739 | ||
DEPARTMENT OF DEFENCE | Search and rescue services | 131,700 | 131,700 | ||
DEPARTMENT OF PUBLIC WORKS, ROADS AND TRANSPORT | Conversion of permits to operating licenses and registration | 872,691 | 872,691 | ||
DEPARTMENT OF TRANSPORT (GAUTENG) | Conversion of permits to operating licenses and registration | 3,000,000 | 3,000,000 | ||
DEPARTMENT OF TRANSPORT (KZN) | Conversion of permits to operating licenses and registration | 1,496,245 | 1,496,245 | ||
DEPARTMENT OF TRANSPORT, ROADS & COMMUNICATION | Conversion of permits to operating licenses and registration | 3,670,000 | 3,670,000 | ||
DEVELOPMENT BANK OF SOUTHERN AFRICA | Revision of the Road Infrastructure Strategic Framework for South Africa | 22,344 | 22,344 | ||
DL VAN ONSELEN | Consulting on the Taxi Recapitalisation | 109,417 | 183,492 | 292,909 | |
Implementation and roll out of Taxi Recapitalisation Project office. | 395,306 | 395,306 | |||
DOWN SOUTH CREATIONS AND PRODUCTIONS | Events management during the IMO Secretary-General's visit - writing and formulation of report. | 1,284,458 | 306,303 | 1,590,761 | |
DR JHO PRETORIUS | Group of experts for restructuring of Road Accident Funds to be established by the DoT | 41,340 | 41,340 | ||
EASTERN CAPE PROVINCE | Conversion of permits to operating licenses and registration | 2,000,000 | 2,000,000 | ||
ECON MANAGEMENT SERVICES | Assessment of selected Integrated Transport Plans and Provincial Land Transport Frameworks | 410,400 | 410,400 | ||
EKTA CONSULTING | Advisor for the transfer of the Civil Aviation security functions | 97,970 | 97,970 | ||
EKUGCINENI CONSULTING AND DEVE | To support the DoT in the development of a draft Transport Environmental and Health Charter | 750,000 | 750,000 | ||
ELGIN AIR | Search and rescue services | 3,990 | 3,990 | ||
ENS FORENSICS | Forensic investigation | 58,294 | 58,294 | ||
EOH KPMG CONSULTING | Manage the restructuring of the RAF | 367,914 | 367,914 | ||
EUROP ASSISTANCE | Employee Health and Assistance Programme | 110,013 | 110,013 | ||
FASTFUNCTION | Professional conference organiser for Non-motorised Transport and Alternative Intermediate Motorised Means of Transport Conference and Exhibition at Gallagher Estate | 961,439 | 961,439 | ||
FINELINE DESIGNS INTERNATIONAL | Headhunting of senior staff | 80,940 | 80,940 | ||
FISHER ASSOCIATES | Engineering for the NaTIS and credit card format driving license contract | 90,960 | 90,960 | ||
FROST & SULLIVAN INTERNATIONAL | Conduct study of the interventions to reduce freight and passenger transport cost | 495,027 | 495,027 | ||
FULLOUTFUT 1366CC | Employee Health and Assistance Programme | 28,728 | 28,728 | ||
GAUGE ARCHITECTURE CC | Restructuring of the RAF | 103,421 | 103,421 | ||
GAUTENG TAXI COUNCIL | Payment for the Park and Ride during the October 2006 Transport Month | 620,000 | 620,000 | ||
GIJIMA AST HOLDINGS PTY LTD | Consolidation of the South African Rail Commuter Corporation Limited (SARCC) and Metrorail and the implementation of an Information Management System | 301,135 | 374,033 | 675,168 | |
GIMS MIDRAND | On-site consulting and support in GIS room for launch of freight databank | 17,100 | 17,100 | ||
GOBA (PTY) LTD | Develop taxi facility design guidelines and standards for the Taxi Recapitalisation Project | 43,125 | 97,185 | 140,310 | |
GOMBA SOLUTIONS | Professional consultancy services to the DoT for the compilation and publication of the South African Maritime Year Book and organising of the Maritime Awards Ceremony | 1,230,970 | 1,230,970 | ||
GOVERNMENT COMMUNICATIONS (GCIS) | October Transport Month/Arrive Alive | 195,847 | 195,847 | ||
GROOVE CONSULTANTS | October Transport Month/Arrive Alive | 35,223,092 | 35,223,092 | ||
HUMAN SCIENCES RESEARCH COUNCIL | Woman and Gender Audit | 128,592 | 128,592 | ||
ICASEMP AND ENLIANCEMENT SERVICES | Employee Health and Assistance Programme | 171,416 | 202,565 | 59,626 | 433,607 |
INDYEBO CONSULTING (PTY) LTD | Risk Management services | 179,573 | 179,573 | ||
INTEGRATED WELLNESS SOLUTION | Activity sessions and health risk screening for Wellness Day | 63,327 | 63,327 | ||
Employee Health and Assistance Programme | 10,032 | 10,032 | |||
ITP CONSORTIUM | Road Traffic Offence System | 937,574 | 937,574 | ||
J M PROFESSIONAL SERVICES CC | Empowerment model for taxi industry | 259,385 | 259,385 | ||
Development of a funding strategy for the taxi industry | 133,447 | 133,447 | |||
Development of an Integrated Taxi Operations Strategy and Plan | 733,922 | 733,922 | |||
JEFF & ASSOCIATES FINANCIAL CONSULTANTS | Edit of Information Technology Policy | 20,520 | 20,520 | ||
KAISER INTERNATIONAL | Development of the National Airport Development Plan | 3,220,125 | 3,220,125 | ||
KARABO CONSULTING (PTY) LTD | Professional consulting services for NLTTA capacity building | 607,410 | 607,410 | ||
Development of the National Intersphere Strategic Implementation Framework | 562,632 | 562,632 | |||
KHUTHELE PROJECTS | Technical assistance for the OR Tambo International Airport integration process | 767,324 | 767,324 | ||
Advisory services on the design and implementation of the Rail Economic Regulator | 884,791 | 884,791 | |||
KPMG CHARTERED ACCOUNTANTS | Advisors of the Regulating Committee for economic regulation of ACSA and the Air Traffic and Navigation Services Company Limited (ATNS) | 687,085 | 687,085 | ||
Establishment of a State Owned Entity to Accommodate Autopax | 1,407,900 | 1,407,900 | |||
Evaluation of ACSA and ATNS financial statements | 285,000 | 285,000 | |||
Forensic investigation | 203,437 | 203,437 | |||
Socio-economic impact of the 2010 World Cup | 627,046 | 627,046 | |||
KPMG SERVICES (PTY) LTD | Conducted high-level risk assessment | 228,800 | 150,366 | 379,166 | |
Advisors to the Regulating Committee for the issuing of the permissions of levy charges to ACSA, and conduct a forensic audit | 1,787,843 | 3,808,077 | 5,595,920 | ||
KREDITINFORM PTY LTD | Check credit status of suppliers | 186,390 | 186,390 | ||
KWEZI V3 CONSULTING ENGINEERS | Project management for Public Transport Infrastructure and Systems Grant | 49,736 | 49,736 | ||
Technical assistance for 2010 FIFA World Cup | 110,523 | 110,523 | |||
LEFATSHE T/A LEFATSHE/ODIRILE | Development and piloting of a monitoring framework in the freight transport sector | 5,179,590 | 5,179,590 | ||
LESIBA MUDAU TRANSPORT CONSULTANTS | Development on Integrated Taxi Plan in relation to the Public Transport Strategy | 22,000 | 22,000 | ||
LESIBA MUDAU TRANSPORT CONSULT | Development of an Integrated Taxi Plan | 27,500 | 27,500 | ||
LIMPOPO PROVINCIAL GOVERNMENT | Conversion of permits to operating licenses and registration | 2,405,974 | 2,097,178 | 4,503,152 | |
M R MOLETSANE | Investigations | 34,350 | 30,000 | 64,350 | |
MADLANDUNA CORPORATION | Technical assistance for 2010 FIFA World Cup | 66,134 | 66,134 | ||
MAGNA FS BUSINESS AND SYSTEM DEVELOPMENT | NaTIS maintenance | 10,987,618 | 4,065,572 | 15,053,190 | |
MANDATUM | Parliamentary passage of the National Land Transport Transitional Amendment Bill by addressing and responding to provincial negotiated mandates and written submissions | 275,829 | 275,829 | ||
Assist with the amending of the Legal Succession Act | 18,926 | 18,926 | |||
Assist with the final National Land Transport Act and its Regulations. | 776,150 | 776,150 | |||
Drafting of the Land Transport Act and Regulations | 54,884 | 54,884 | |||
Drafting of the National Land Transport Strategy Document | 271,245 | 271,245 | |||
MAPUTO CORRIDOR | Funding for implementation of an institutional framework for Mpumalanga Corridor Forum | 1,931,330 | 1,931,330 | ||
MARKDATA (PTY) LTD | Compilation of annual transport statistics | 34,257 | 34,257 | ||
MAYIKANA CONSULTING | Appointment of facilitator for the RAF mass meeting in Cape Town, Durban and Pretoria | 28,506 | 28,506 | ||
MPUMALANGA PROVINCE | Conversion of permits to operating licenses and registration | 2,430,500 | 2,430,500 | 4,861,000 | |
MR. LLOYD WRIGHT (VIVA) | Bus Rapid Transport development/technical assistance. | 196,902 | 196,902 | ||
NAFRATITI PRODUCTIONS | Property evaluation of SALU Building | 261,000 | 261,000 | ||
NAMELA PROJECTS | Provide services on Integrated Rural Mobility and Access Project in Secunda | 459,631 | 1,318,304 | 1,777,935 | |
Development of a National Scholar Transport Policy | 285,057 | 285,057 | |||
NATIONAL INTELLIGENCE AGENCY | Security services | 48,346 | 48,346 | ||
NEO SOLUTIONS PTY LTD | Transaction advisors to complete the review of the provision of official vehicles for political office bearers | 98,248 | 98,248 | ||
NOSANDA MANAGEMENT SOLUTIONS | Develop of a Anti-Train Surfing Policy | 178,538 | 178,538 | ||
O R TAMBO DISTRICT MUNICIPALITY | Integrated Transport Plan | 354,200 | 354,200 | ||
ODIRILE IT HOLDINGS | Development and piloting of a monitoring framework in the freight transport sector | 96,000 | 96,000 | ||
ORATILWE CONSULTANT SERVICES | Women's Day | 81,664 | 81,664 | ||
P.C. VAN RYNEVELD | Scoping Phase in Integrated Networks for Public Transport | 96,672 | 96,672 | ||
PAKISA COMMUNICATIONS (PTY) LTD | To develop an Integrated Marketing Communications Brief | 1,114,920 | 1,114,920 | ||
PENDULUM CONSULTING | Technical assistance for 2010 FIFA World Cup | 30,945 | 30,945 | ||
PHT PRINTING SERVICES | Recording of proceedings of International and Air Licensing Council meetings | 58,400 | 58,400 | ||
PHUNGO IT SOLUTIONS | Upgrading of IT Server | 235,227 | 235,227 | ||
PINNACLE MICRO | NaTIS support | 53,301 | 53,301 | ||
PITSENG RESOURCES | Development of a Freight Logistics Plan for Durban | 3,892,641 | 973,160 | 4,865,801 | |
Facilitator for Transport Logistics Strategic Workshop | 87,781 | 87,781 | |||
POSITIVE TALK SERVICES | Motivational speaker - HIV & AIDS | 11,400 | 11,400 | ||
PREDICATE LOGISTICS (PTY) LTD | Administration of supplier database | 177,500 | 327,425 | 224,880 | 729,805 |
PRIMEDIA BROADCASTING (PTY)LTD | 702 Walk the Talk Registration | 75,862 | 75,862 | ||
PROCON FISHER | Maintenance of the NaTIS System | 5,954,855 | 45,066 | 5,999,921 | |
PROF C GREEF | Profit group for the restructuring of the Road Accident Fund | 293,588 | 293,588 | ||
PROTEA SECURITY SERVICES | Security services | 1,094,126 | 1,094,126 | ||
Q TIQUE 27 | Graphic designer used at Sun City for the AU Conference | 10,200 | 10,200 | ||
QUANTEC RESEARCH (PTY) LTD | Input /output for desegregation of the transport sector modal analysis | 91,200 | 34,200 | 125,400 | |
RAMATHE FIVAZ FORENSIC & INVESTIGATION SERVICES | Forensic investigation | 145,423 | 177,230 | 51,973 | 374,626 |
RAWS CONSULTING ENGINEERS | Consulting Engineers for the Integrated Rural Mobility Access Project | 84,189 | 84,189 | ||
RB BEHRENS | Set Unit Standards for Transport Planning Qualifications | 13,200 | 22,000 | 35,200 | |
REGIONAL MARITIME PROJECTS CC | Review and development of Maritime Policy | 1,466,910 | 372,790 | 180,000 | 2,019,700 |
ROAD TRAFFIC MANAGEMENT CORPORATION | Coordination of road traffic law enforcement during the High Occupancy Vehicle Lane project in October Transport Month | 55,719 | 55,719 | ||
S C KRYGSMAN | Assessment of tender questions | 1,600 | 1,600 | ||
SA MARITIME SAFETY AUTHORITY | Rigging an emergency towing of the "Vinar" | 480,848 | 480,848 | ||
SABC GROUP SERVICES MARKETING | Signing of Memorandum of Agreement between the DoT and South African Bureau of Standards to manage the development of concepts for the non-motorized designs | 2,986,747 | 1,631,994 | 4,618,741 | |
SAFE DRIVE HOLDINGS | Disability study | 39,786 | 39,786 | ||
SALT AND PEPPER MARKETING | Creation of a presentation of the DoT's Strategic Plan | 5,741 | 5,741 | ||
SEKTOR CONSULTING ENGINEERS | Study into design and construction of non-motorized transport infrastructure | 2,186,976 | 3,681,564 | 5,868,540 | |
SHARPLINE | Marking of taxis | 1,762,537 | 1,762,537 | ||
SILVER CREST 21 (PTY) LTD | Taxi Scrapping Agency | 91,581,818 | 91,581,818 | ||
SIMBA CIVIL & STRUCTURAL ENGINEERS | Technical assistance for 2010 FIFA World Cup | 294,432 | 294,432 | ||
SITA PTY LTD | Mapping a server for the DoT | 139,674 | 139,674 | ||
Procurement and implementation of EMS for DoT | 180,428 | 180,428 | |||
System analysis for implementation of GIS | 515,248 | 515,248 | |||
Geographic information system and mapping service for the DoT - renewal of Novell license | 605,832 | 1,604,235 | 2,210,067 | ||
SITHOLE HUMAN CAPITAL | To conduct a departmental skills audit for the DoT | 348,840 | 348,840 | ||
SMIT MARINE SOUTH AFRICA | Oil Pollution Prevention contract | 43,191,101 | 50,277,072 | 42,874,282 | 136,342,455 |
SOGA STREET INVESTMENTS CC | Corporate finance advisor in the pricing of 10% share option ADR is entitled to exercise | 75,000 | 75,000 | ||
SOMA INITIATIVE | Professional services by medical doctor on Incapacity Leave cases | 34,908 | 34,908 | ||
SONNENBERG HOFFMANN GALOMBIK | To advise on the exercise of the 10% share option by ADR in ACSA | 32,497 | 32,497 | ||
SOUTH AFRICAN POLICE SERVICE | Security services | 396,774 | 396,774 | ||
SPECIAL INVESTIGATING UNIT | Investigations into driver and vehicle license fraud | 21,837,491 | 21,837,491 | ||
STARLITE AVIATION (PTY) LTD | Search and rescue services | 9,120 | 9,120 | ||
STEWART SCOTT INTERNATIONAL | Determination of action agenda for the development of transport infrastructure in support of the SA regional integration | 391,216 | 391,216 | ||
SUDEO INTERNATIONAL BUSINESS CC | Strategic project management: Taxi Recapitalisation scrapping administration & Scrapping Agency | 1,021,342 | 1,021,342 | ||
TASIMA PTY LTD | Migration to the new eNaTIS System and NaTIS maintenance | 62,792,630 | 51,988,465 | 52,732,999 | 167,514,094 |
TAXI SCRAPPING ADMINSTRATOR | Taxi scrapping administration fees | 22,492,494 | 56,760,588 | 79,253,082 | |
TECHSO (PTY) LTD | Electronic fare collection and information systems and related standards | 497,280 | 299,803 | 797,083 | |
TELKOM SA LTD | Telkom data line for the NaTIS System and watch keeping services contract | 25,572,562 | 22,775,866 | 26,393,390 | 74,741,818 |
THE JUNCTION | National Household Travel Survey - Technical Report | 142,500 | 142,500 | ||
THE SPECIAL INVESTIGATING UNIT | Investigations into Driver's License and Vehicle License Testing Centers | 16,800,000 | 772,800 | 17,572,800 | |
THE ZINTO MARKETING GROUP | Charter for Road Safety Roadshow | 37,620 | 37,620 | ||
THOMAS INTERNATIONAL MANAGEMENT | Personnel Profile Analysis | 472,788 | 472,788 | ||
THUTHUKANI INFORMATION TECHNOLOGY | E-mail security and control system | 174,306 | 174,306 | ||
TMT PROJECTS (PTY) LTD | Develop freight databanks | 590,372 | 2,602,230 | 685,382 | 3,877,984 |
TOKISO DISPUTE SETLEMENT | Labour expert to assist with Heads of Agreements issues and assist with dispute settlements | 70,711 | 80,722 | 151,433 | |
TRANSPAY | Technical assistance for Taxi Recapitalisation Programme | 674,878 | 644,387 | 693,502 | 2,012,767 |
TRANSPORT & ECONOMIC SUPPORT | Appointment of expert to supervise and monitor bus operators in terms of route compliance, schedule compliance, customer/passenger satisfaction survey | 27,246 | 27,246 | ||
Public Transport Strategy for bus mode | 97,727 | 97,727 | |||
TRC AFRICA (PTY) LTD | Management of the National Household Travel Survey | 254,978 | 1,194,102 | 1,449,080 | |
TSELA-TSHWEU BUSINESS CONCEPT | Project management for Public Transport Infrastructure and Systems Grant | 10,000 | 10,000 | ||
TSHAWE INFRASTRUCTURE TECHNOLOGIES | Project management for Public Transport Infrastructure and Systems Grant | 455,684 | 455,684 | ||
Technical assistance for 2010 FIFA World Cup | 1,447,728 | 1,447,728 | |||
TSHEPEGA ENGINEERING | Infrastructure planning: road and rail | 749,231 | 749,231 | ||
TSHOLETSO PROJECTS | Technical assistance for 2010 FIFA World Cup | 1,622,969 | 1,622,969 | ||
TULLEKEN & ASSOCIATES | Professional editing of Lekgotla Report | 4,800 | 4,800 | ||
UNIVERSITY OF STELLENBOSCH | Information products and reference material for research | 47,880 | 47,880 | ||
UPINGTON MICROLIGHT CENTRE | Search and rescue services | 3,500 | 3,500 | ||
UTHO CAPITAL (PTY) LTD | Advisory services on capital restructuring of ACSA | 2,502,517 | 1,373,917 | 3,876,434 | |
VELA VKE CONSULTING ENGINEERS | Assessment of municipal road network for the DoT | 473,000 | 473,000 | ||
Technical assistance for 2010 FIFA World Cup | 55,347 | 55,347 | |||
WHITE & CASE | International lawyers for the Taxi Recapitalisation | 10,103 | 10,103 | ||
WISDOM KEYS GROUP (PTY) LTD | Communication and marketing of the Taxi Recapitalisation Programme | 22,536,238 | 22,536,238 | ||
WITS COMMERCIAL ENTERPRISE | Information management and strategy | 471,517 | 471,517 | ||
National Transport Master Plan | 666,385 | 666,385 | |||
WM VAN ZYL | Request for opinion on claw-back: ACSA | 10,000 | 10,000 | ||
WORKFORCE IT SOLUTIONS (PTY) LTD | Consultancy services to augment the in-house skills for business analysis and server /network strategy design | 521,804 | 224,403 | 746,207 | |
XINJOVO CONSULTING | Land transport promotion services | 345,659 | 345,659 | ||
TOTALS | 196,119,308 | 304,387,157 | 317,346,426 | 817,852,891 |
(1) (d) The reasons for preferring to use consultants instead of hiring persons with the necessary skills, are because varied and specialised skills are required, which are not required on a full time basis, and also because certain services are outsourced to specialist organisations.
(2) A company, Briesch Compliance, belonging to two former employees, a husband and wife team, who specialises in maritime legislation, was contracted as a consultant in 2007-08.
(a) The company was contracted on the invitation of quotations to develop maritime security transport legislation and regulations.
(b) The former employees left the Department to join the South African Maritime Safety Authority (SAMSA) when SAMSA was established in April 1998.
1449. Ms A M Dreyer (DA) to ask the Minister of Labour:
(1) (a) What was the total cost to the State of consultants used by his department in the (i) 2005-06, (ii) 2006-07 and (iii) 2007-08 financial years, (b) what are the names of the consultants used; (c) for what purpose were they used and (d) what was the reason for preferring to use consultants instead of hiring persons with the necessary skills;
(2) whether any former employees of his department have been employed as consultants in the abovementioned financial years; if so, (a) why and (b) why did each such person leave her department? NW2193E
THE MINISTER OF LABOUR REPLIED:
2005/2006 Financial Year
Project Title | Cost used in Rand (1)(a)(i) | Names of the consultants used (1)(b) | For what purpose were they used? (1)( c) | Reasons for preferring to use consultants instead of hiring person with the necessary skills. (1)(d) | Whether any former employees of his department have been employed as consultants. (2) |
Synthesis paper on firms' performance, training and Skills Development – resulting from Ekurhuleni Survey | R60,000.00 | Human Sciences Research Council (HSRC) and University of Cape Town (UCT) | To inform the Director General of the Research Agenda (2002-2004) prepared by the Research, Policy and Planning directorate in the Labour Market Policy programme. | Consultants have been identified as the suitable supplier, since they are in a possession of the data required for the survey, and they had a detailed background for a study of this magnitude. They are the only research organization that owns a database with such information and thus, there are no competitors. | None |
Evaluation of Sector Skills Plans 2005 | R367,500.00 | All SETAs | The sector skills ' forum has been established to address issues relevant to the sector skills planning. | The use of consultants to assist in the preparation of the publication that is necessitated by the lack of capacity within the Department, particularly to deal with some of the specialist tasks required in the preparation of the publication and the short-time frame involved. | None |
Project Title | Cost used in Rand (1)(a)(i) | Names of the consultants used (1)(b) | For what purpose were they used? (1)( c) | Reasons for preferring to use consultants instead of hiring person with the necessary skills. (1)(d) | Whether any former employees of his department have been employed as consultants. (2) |
Development of a framework , assessment tool and system for Director General reviews\substantive compliance inspections in terms of the Employment Equity Act of 1998 | R2,408,250.00 | Resolve Training Works | Section 43 of the Employment Equity Act provides the Director General with powers to review employers to determine compliance. | Consultants were engaged to develop a system to support the Department to conduct Director General Reviews on employment equity. The Department has implemented the system and employer reviews are currently in progress. | None |
Capturing Employment Equity Reports | R535,828.00 | Barnton Consulting | Section 21 of the Employment Equity Act requires designated employers to submit prescribed forms EEA2 and EEA4 (EE reports) to the Department. The service provider was used to capture employment equity reports prior to the enhancements to the Employment Equity (EE) System in 2005 that enabled the internal capturing of reports. | Prior to the October 2005 reporting deadline, the EE System was unable to be used internally for the capturing of reports as it did not provide for this functionality. The data could only be imported into the system after being captured by an external service provider. | None |
Investigation into minimum wages and conditions of employment in the hospitality sector | R1,062,685.00 | Human Sciences Research Council | To develop a status report on the hospitality sector as well as provide recommendations on policy with respect to developing a sectoral determination for the sector. | No Research Capacity in this area within the Department | None |
Total cost used in Rand (1)(a)(i) | R4,434,263.00 |
2006/2007 Financial Year
Project Title | Cost used in Rand (1)(a)(ii) | Names of the consultants used (1)(b) | For what purpose were they used? (1)( c) | Reasons for preferring to use consultants instead of hiring person with the necessary skills. (1)(d) | Former employees of his department have been employed as consultants. (2) |
Facilitation and submission of revised financial reporting requirements of Department's public entities | R346 000 | Kelaiah Jether (Pty) Ltd | Financial analysis and consolidation of fiscal information of 30 public entities for oversight purposes, in advancing and expanding on the scrutiny of financial management. | Present Salary packages offered by the State do not compete with such high level and scarce skills. | None |
Appointment of a service provider for the drafting of a training manual and training ESDS staff in the newly defined employment service | R480 000 | Barongwa Development Holding | To draft a training manual for new employment services | The skill to provide training and to draft a training manual was not available within the Department. | None |
To implement the Department's Research programme for 2006-2007 | R8 000 000 | Human Sciences Research Council (HSRC) | To perform Labour Market Research. | Inadequate Research Capacity within the Department | None |
Compiling of annual financial statements (Sheltered Employment Factories) | R205 000 | PriceWaterHouse Coopers | To compile the annual financial statements | Skill was not available within the Department | None |
Forensic investigation to address concerns raised by the Office of the Auditor General | R139 000 | KPMG | To perform a forensic audit | The skill to do a forensic investigation was not available within the Department. | None |
Total cost used in Rand (1)(a)(i) | R9 170 000 |
2007/2008 Financial Year
Project Title | Cost used in Rand (1)(a)(iii) | Names of the consultants used (1)(b) | For what purpose were they used? (1)( c) | Reasons for preferring to use consultants instead of hiring person with the necessary skills. (1)(d) | Former employees of his department have been employed as consultants. (2) |
Asset Management & Support Services | R5,788,000.00 | AMANZI | To perform asset verifications and asset location verifications | Due to the fact that the Asset Management Unit had not been established and there were capacity constraints in the Department. | None |
KPMG-Incorporation of Public Private Partnership (PPP) into the Financial Statements | R74,883.00 | KPMG | To provide assistance in disclosing PPP in the Department's financial statements. | This is a highly specialized area that the Department does not have skills for. | None |
Conducting of Phase II Investigation into irregularities at the Compensation Fund | R1,075,020.00 | Rain Risk Management Services | Investigation regarding irregularities at the Compensation Fund | Skill was not available within the Department | None |
Consultants to assist Salaries section in clearing of suspense accounts | R228,732.00 | Kwinana and Associates (Gauteng) Incorporated | To assist the Department to clear suspense accounts. | Due to capacity constraints and the consultants cost effectiveness. | None |
Organizational Climate Survey for Department of Labour | R896,396.00 | Sefikile Consulting CC | To conduct an organizational climate survey for the Department. | To ensure objectivity due to the sensitivity of the exercise and thus obtain buy-in from staff and management and to also ensure that the Department build capacity internally so as to avoid depending on consultants in future | None |
Research, Monitoring & Evaluation (RME) Agenda | R12,000,000.00 | Human Science Research Council (HSRC) | To perform Labour Market Research. | Inadequate Research Capacity within the Department | None |
International Review of the Labour Market | R290,195.00 | Guy Standing | To perform an International review of SA Labour Market Policies. | No relevant Research Capacity within the Department | None |
Welfare Research | R279,585.00 | African response | To develop a status report on the welfare sector in order to determine the feasibility of developing a sectoral determination for the sector as well as to provide recommendations on policy in this regard. | No relevant Research Capacity within the Department | None |
Labour Market Review | R28,000.00 | South African Migration Project | To perform labour market research. | Inadequate Research Capacity within the Department | None |
Unskilled Labour | R29,000.00 | Mr. Don Moody | To develop a status report on the unskilled labour sector in order to determine the focus areas for further research, the basis of coverage current in the sector and identify critical areas that needed special protection since the cancellation of a number of old Wage determinations. | Inadequate Research Capacity within the Department | None |
Business Case for the National Skills Fund | R497,838.50 | Global Business Solutions / Halcyon Financial Services Consortium | To compile a business case for the National Skills Fund | With the view of NSF becoming listed as a public entity expertise were required to formulate a business case which unfortunately could not necessarily be advisable that internal resource be used besides having the time to deliver. | None |
Total cost value in Rand (1)(a)(i) | R21 063 189.50 |