Question NW1858 to the Minister of Transport

Share this page:

27 June 2017 - NW1858

Profile picture: Waters, Mr M

Waters, Mr M to ask the Minister of Transport

With reference to the recent fatal train collision at Elandsfontein, (a) when last were the signal points (i) inspected and/or (ii) maintained and (b) how often are signal points supposed to be maintained?

Reply:

a) (i) New points machines were installed in March 2017 and commissioned in May 2017.

    (ii) The point maintenance were replaced in March 2017 in a form of a new installation of signal machines as commissioned in May 2017.

b) Inspion of signal points is done every six months by Engineering Technicians and every twelve months by a Senior Engineering Technician. In between the fore mentioned inspections, there are ad hoc signal train inspections by Branch Managers.

Source file