Question NW650 to the Minister of Sport, Arts and Culture

Share this page:

19 March 2021 - NW650

Profile picture: Van Dyk, Ms V

Van Dyk, Ms V to ask the Minister of Sport, Arts and Culture

NATIONAL ASSEMBL1. (a). How long has the Bertram House been closed, (b) what are the reasons for the closure and (c) on what date will it reopen; 2. on what date will the marks on the Koopmans De Wet House indicating water leaks since October 2020 be attended to; 3. whether there has been proper inspection to see if there are indeed leaks; if not, why not; if so, (a) who conducted the inspection and (b) on what date? QUESTION NO. 650-2021 FOR WRITTEN REPLY INTERNAL QUESTION PAPER NO.06- 2021: Date of publication – 05 March 2021 “Mrs V van Dyk (DA): to ask the Minister of Sport, Arts and Culture” (a). How long has the Bertram House been closed, (b) what are the reasons for the closure and (c) on what date will it reopen; on what date will the marks on the Koopmans De Wet House indicating water leaks since October 2020 be attended to; whether there has been proper inspection to see if there are indeed leaks; if not, why not; if so, (a) who conducted the inspection and (b) on what date? NW768E REPLY: (1).(a). Iziko Bertram House (IBH) has been closed since August 2015. (b). The closure was as a result of a health and safety hazard, where part of a ceiling dislodged making it unsafe for the public and staff. (c). It is scheduled to reopen Iziko Bertram House in April 2021. (2). The marks on the wall is as a result of a roof leak. In terms of the DPWI Guidelines for Day to Day Maintenance paragraph 5.2; repair work to roofs and waterproofing must be attended to by the DPWI. The DPWI conducted inspections and scheduled a Contractor for week of 15 March 2021 to attend to the leak. (3)(a). An inspection was conducted by Architects with heritage expertise. (b). On 7 and 21 October 2020 the Iziko Security Health and Safety Officer conducted the inspection and the Architects conducted inspections on 12 and 13 November 2020.

Reply:

(1).(a). Iziko Bertram House (IBH) has been closed since August 2015.

(b). The closure was as a result of a health and safety hazard, where part of a ceiling dislodged making it unsafe for the public and staff.

(c). It is scheduled to reopen Iziko Bertram House in April 2021.

(2). The marks on the wall is as a result of a roof leak. In terms of the DPWI Guidelines for Day to Day Maintenance paragraph 5.2; repair work to roofs and waterproofing must be attended to by the DPWI. The DPWI conducted inspections and scheduled a Contractor for week of 15 March 2021 to attend to the leak.

(3)(a). An inspection was conducted by Architects with heritage expertise.

(b). On 7 and 21 October 2020 the Iziko Security Health and Safety Officer conducted the inspection and the Architects conducted inspections on 12 and 13 November 2020.

Source file