Question NW736 to the Minister of Transport

Share this page:

09 June 2020 - NW736

Profile picture: Waters, Mr M

Waters, Mr M to ask the Minister of Transport

(1) What (a) number of train stations have been vandalised in Gauteng over the past three financial years, including signal equipment, substations, cables and any other operational equipment and (b) does he envisage will the total cost be to replace all the vandalised equipment; (2) (a) which train lines have been impacted, (b) what (i) was the optimal train service and (ii) is the current train service, (c) what number of commuters make use of each affected train line daily, (d) how were commuters informed of the reduction in train services and (e) what alternative transport arrangements has his department made for commuters; (3) what is the estimated daily loss in revenue for the Passenger Rail Agency of South Africa?

Reply:

1. (a) The number of train stations that have been vandalised over the past three financial years, including signal equipment, substations, cables and any other operational equipment is:

Incidents (vandalised)

2018

2019

2020

TOTAL

Stations

37

42

94

173

Signal equipment

298

469

221

988

Substations

7

15

20

42

Cables

760

585

488

1833

(b) Theft and vandalism has been increasing over the years and the cost to restore the vandalized equipment is in excess of R2bn. This cost covers the following:

  • Both Conventional and Modern Signalling System
  • Signals and Train Detection Cables including Battery Banks at Signalling Equipment Rooms
  • Multiple spans of Contact and Catenary wire Overhead Track Equipment (OHTE)
  • Transformers, Rectifiers and various components at substations

2. (a) Train lines which have been impacted are:

Gauteng West

Gauteng East

Gauteng North

Vereeniging via Midway

Daveyton – Dunswart both lines 24

Mabopane – Pretoria

Westgate

Springs – Germiston all lines 24

De Wildt – Pretoria

Faraday

Germiston – Katlehong via India & Germiston East 34

Saulsville – Pretoria

Naledi to New Canada

Germiston – Knights – Elandsfontein 12

Pretoria – Pienaarspoort

Randfontein line

Germiston – Johannesburg all lines 12

Pretoria – Johannesburg

Midway – Oberholzer

   

New Canada – George Goch

   

(b) (i) Optimal train service was:

Gauteng West

Gauteng East

Gauteng North

Vereeniging via Midway

66 trips weekday

Daveyton – Dunswart both lines

24 trips per weekday

Mabopane – Pretoria

103 trips per weekday

Westgate

16 trips weekday

Springs – Germiston all lines

24 trips per weekday

De Wildt – Pretoria

42 trips per weekday

Faraday

20 trips weekday

Germiston – Johannesburg all lines

12 trips per weekday

Saulsville – Pretoria

48 trips per weekday

Naledi to New Canada

144 trips weekday

Germiston - Kwesine

Pretoria – Pienaarspoort

127 trips per weekday

Randfontein line

46 trips weekday

 

Pretoria – Johannesburg

68 trips per weekday

Midway – Oberholzer

14 trips weekday

   

New Canada – George Goch

Included in Vereenigin & Naledi trips

   

(ii) Current Service – pre lockdown train trips and during lockdown no services are running

Gauteng West

Gauteng East

Gauteng North

Vereeniging via Midway

0 trips per day

Daveyton – Dunswart

No train service due to all lines not available

Mabopane – Pretoria

0 trips per day

Westgate

0 trips per day

Springs – Dunswart

Single line working up and down

24 trips per weekday

De Wildt – Pretoria

0 trips per day

Faraday

0 trips per day

Germiston – Johannesburg

Shuttle hauled by diesel locomotive

Saulsville – Pretoria

0 trips per day

Naledi to New Canada

74 trips per day

(before lockdown vandalism)

Elandsfontein – Germiston – Johannesburg

Shuttle hauled by diesel locomotive to connect with the Pretoria train service at Elandsfontein

Pretoria – Pienaarspoort

69 trips per weekday

Randfontein line

26 trips per day

Germiston – Kwesine

A service between Elsburg – Kwesine was implemented. Commuters connected trains to Germiston with the Meyerton – Vereeniging service at Elsburg

Pretoria – Johannesburg

10 trips per day

Midway – Oberholzer

0 trips per day

6 shuttle (express) trips between Randfontein and Oberholzer per day

   

New Canada – George Goch

0 trips per day

All trains are travelling via Langlaagte

   

c) Based on the 2018 census, the number of commuters making use of each affected train line daily, are:

Gauteng West

Gauteng East

Gauteng North

Vereeniging via Midway

95 686

Olifantsfontein – Elandsfontein

95 921

Mabopane – Pretoria

154 512

Westgate

2 508

Daveyton – Germiston

108 543

De Wildt – Pretoria

1 679

Faraday

194

Germiston – Johannesburg

37 711

Saulsville – Pretoria

38 162

Naledi to New Canada

78,277

Germiston – Kwesine

43 200

Pretoria – Pienaarspoort

147 800

Randfontein line

46 260

 

Pretoria – Johannesburg

21 388

Midway – Oberholzer

2 620

   

New Canada – George Goch

5 109

   

d) For every incident where trains were reduced, Metrorail Marketing and Communications Department notified employees, commuters and the public at large via media. Please note that the information below is based on a single incident. This is then replicated in other areas when the train service in that area/corridor is also reduced.

When the train service is reduced, Metrorail employs the following platforms to notify affected commuters and the public at large:

  • E-mail
  • Media statement / alert
  • Metrorail Gauteng Facebook page
  • Twitter - @metrorailgp
  • Go Metro (no longer operational since November 2019, but was used before when it was active)
  • Face-to-face meetings with Commuter Forums
  • Information Offices at stations
  • Radio train traffic updates (free slots)
  • In-house produced posters
  • Commuter WhatsApp groups
  • Commuters can also call stations and Information Centers
  • Train service information updates also posted at some stations

e) Per region in Gauteng the following alternative transport arrangements were made for commuters:

Gauteng West:

Buses are used as alternative transport, but the service could not be sustained due to operational constraints and budget challenges at Autopax. Between Randfontein and Oberholzer a shuttle is running.

Gauteng East:

Alternative transport could not be provided due to budget being depleted to acquire buses from Autopax and the magnitude of the corridors to be provided for was really high in terms of demand and availability.

Gauteng North:

Diesel locomotive shuttle services were introduced but could not be sustained and could not cover all the corridors due to insufficient numbers of diesel locomotives available as well as continuous theft that resulted in hanging wires all over on different places on different days.

3. The estimated daily loss in revenue, based on the 2019/2020 Revenue Budget (excluding Covid-19 Lockdown), for the Passenger Rail Agency of South Africa is:

Gauteng West

Amount

Gauteng East

Amount

Gauteng North

Amount

Vereeniging via Midway

R77,429

Olifantsfontein – Elandsfontein

R65,607

Mabopane – Pretoria *

R95,125

West Gate

R1,425

Daveyton - Germiston

R53,856

De Wildt – Pretoria *

R15,223

Faraday

R465

Germiston – Johannesburg

R10,178

Saulsville – Pretoria **

R35,212

Naledi to New Canada

R70,290

Germiston – Kwesine

R36,684

Pretoria – Pienaarspoort

R85,255

Randfontein line

R25,766

   

Pretoria – Johannesburg

R14,556

Midway to Oberholzer

R6,476

       

New Canada to George Goch

R870

       

Johannesburg

R61,593

       

Total

R244,314

Total

R166,325

Total

R245,371

Total estimated daily loss in revenue is R656,010

* Mabopane and De Wildt Corridors were suspended in December 2019

** Saulsville corridor was suspended in March 2020 before the Covid-19 Lockdown was implemented

Source file