Question NW242 to the Minister of Trade and Industry

Share this page:

05 August 2019 - NW242

Profile picture: Lotriet, Prof  A

Lotriet, Prof A to ask the Minister of Trade and Industry

(1)(a) Whether, with regard to the testing of electrical equipment by the SA Bureau of Standards (SABS), the high voltage laboratory is functional, (b) what number of tests on individual electoral equipment has SABS conducted over the past seven years, (c) what income has been generated from the tests, (d) what number of persons work on the electoral equipment testing facility and (e) what is the annual cost of running the unit; (2) whether any equipment in the unit needs to be (a) repaired and/or (b) replaced; if not, what is the position in this regard; if so, (i) which equipment in each case and (ii) what is the estimated cost in each case?

Reply:

I am advised by the SABS as follows:

The high voltage laboratory is currently functional, though with capabilities principally in alternating current testing.

The number of test reports conducted by the facility for the past seven years is provided in the following table:

Financial year

Number of reports

2012/13

149

2013/14

108

2014/15

110

2015/16

80

2016/17

76

2017/18

47

2018/19

50

The income generated from the tests is provided in the following table:

Financial Year

Revenue

2012/13

R8 893 421

2013/14

R9 467 604

2014/15

R13 070 036

2015/16

R10 456 255

2016/17

R10 023 898

2017/18

R6 739 603

2018/19

R6 433 130

Between 4 and 7 employees have worked at the facility at any time. The annual running cost of the laboratory is provided in the table below:

Financial Year

Annual running costs (expenditure)

2012/13

R7 019 826

2013/14

R7 650 153

2014/15

R9 776 543

2015/16

R7 730 499

2016/17

R6 244 888

2017/18

R4 369 121

2018/19

R5 352 030

A number of equipment items need to be repaired, at an estimated cost of R23 million, while equipment items that need to be replaced have an estimated cost of R32.2 million, both sums inclusive of equipment and the linked engineering, project management and operational alignment services.

-END-